COST FILE
SUNRIDGE PROJECT -
ENVIRONMENTAL IMPACT REPORT
PROPOSAL # CD-25-26-27
SUBMITTED TO
CITY OF SANTA CLARITA
COMMUNITY DEVELOPMENT
DEPARTMENT, PLANNING DIVISION
23920 Valencia Boulevard
Santa Clarita, CA 91355-2196
SUBMITTED BY
MICHAEL BAKER INTERNATIONAL
3760 Kilroy Airport Way • Suite 270
Long Beach, CA 90806
APRIL 9, 2026
renymepepenetetE
—
y.-2 .
SUNRIDGE
“sier*Darhay ETEAPUTA. „ I
aes‘ms,
ch
32*
1he OAsE % —
i
E.SE
?. 1 1,
LOCALFOOD
HIKING
SURFING
■
a TPAIT h
Y
t’s - a
a y
il V wC
SANTA
‘ “N
_ jol ■ t
s-
TaCh
I MORE TIME
(RESHA/R _ N *
A
• 11
oo
-1. Mrutene as .
IEJWAAJPWE
hisee ‘ iniae wEnWM"W.
$*Tw?
"J
$7
“s
* aAS
MD e| ’__ %
1. I
INTERNATIONAL
Michael Baker
J
r JLSS.
f ®2 a
I
to
riFs 20Y‘4/
!NS
J 1
■
AMEI
III
■ t
i
1 -
■ - 4
3 0 7
1 ‘aen
9 1---V——
P
SB
(
V
■!
■
i
■ |
■I
Ie”
„. ■
l
L‘ i! ■
...
7 j
i
18 -
-
102.
I
CITY OF SANTA CLARITA ▬ SUNRIDGE PROJECT - ENVIRONMENTAL IMPACT REPORT ▬ PROPOSAL # CD-25-26-27
1.2.1 BASE BID SCOPE OF WORK
Page | 1
11..22..11.. BBaassee BBiidd SSccooppee ooff WWoorrkk As required in the City’s RFP, this section includes the costs for all tasks and subtasks described in Section
1.1.3, Plan of Study/Scope of Work, of the Response File. Table 1 below provides this proposal’s total costs, and Table 2 provides the billing rates for proposed staff from Years 2026 through 2028. The proposed base bid cost for our scope of work is $875,102.05. A detailed breakdown of costs by task and individual is provided on the attached spreadsheet; however, we understand that costs will be dependent upon the specific services performed under this scope of work. Relative to the cost estimate, it is realized that the proposed costs are in fact an approximation of the labor and reimbursable costs by task. Actual costs per task within the framework of the not-to-exceed task amount will be billed to the City on a time and materials basis. Michael Baker requests flexibility to increase or decrease the level of effort between tasks and among staff within the total not-to- exceed limit of the overall budget.
For budgeting purposes, our scope of work assumes the following, consistent with the deliverables identified in the RFP, except where noted:
• An electronic copy (Word and pdf format) of a working draft version of the Administrative Draft EIR for City staff review.
• Five hard copies and one electronic copy (Word and pdf format) of the preliminary (screencheck) Draft EIR for City staff review.
• Five hard copies and one electronic copy (pdf format) of the Appendices for the preliminary Draft EIR for City staff review; for printing budget purposes, Michael Baker assumes that the Appendices will total no more than 1,000 pages.
• Ten hard copies and one reproducible master of the Draft EIR for public review and an electronic copy (Word and pdf format) of the Draft EIR.
• Ten hard copies of the appendices for the Draft EIR for public review and an electronic copy (pdf format) of the appendices for the Draft EIR; for printing budget purposes, Michael Baker assumes that the Appendices will total no more than 1,000 pages.
• An electronic copy (Word and pdf format) of a working draft version of the Administrative Final EIR for City staff review.
• An electronic copy (Word and pdf format) of the preliminary (screencheck) Final EIR for City staff review.
• Fifteen copies and one reproducible master of the Final EIR for public review and an electronic copy (Word and pdf format) the Final EIR.
In addition, a new California law requires CEQA documents submitted to the State Clearinghouse (SCH), as a state agency, be compliant with the requirements of the Web Content Accessibility Guidelines (WCAG). Because creating WCAG-compliant documents is a very time-intensive exercise, our cost only includes staff time to produce WCAG-compliant Draft and Final EIRs but not the EIR Appendices. Due to the unknown length of these appendices at this time, our proposed cost does not include producing WCAG-compliant EIR Appendices as the cost will vary based on length and complexity of the documents. Michael Baker will provide the City within an estimate for these costs once the number of appendices has been determined.
Our proposed scope of services provided in Section 1.1.3, Plan of Study/Scope of Work, of the Response File, also includes a kickoff meeting, a scoping meeting, and a community meeting during the 45-day review of the Draft EIR, and regular staff meetings throughout the CEQA process. Furthermore, the cost identified in the table below includes time for the Michael Baker project management team to assist with the preparation of presentations and attendance at one Planning Commission hearing and one City Council hearing.
INTERNATIONAL
Michael Baker
CITY OF SANTA CLARITA ▬ SUNRIDGE PROJECT - ENVIRONMENTAL IMPACT REPORT ▬ PROPOSAL # CD-25-26-27
1.2.2 ADDITIONAL ANALYSIS PRICING
Page | 2
11..22..22.. AADDDDIITTIIOONNAALL AANNAALLYYSSIISS PPRRIICCIINNGG Consistent with requirements Sections 1.2.2.1 through 1.2.2.5 of the RFP, Table 1 also presents our estimated cost for work that may be required due to changes in the project description and associated environmental analyses. Separate optional costs associated with recirculation of the Draft EIR (Section 1.2.2.4) or preparation of a Supplemental EIR or Revised EIR (Section 1.2.2.5) are shown at the bottom of the table. These optional costs are our best estimation at this point. However, accurate costs for recirculation of the Draft EIR or a Supplemental/Revised EIR cannot be provided until the nature and extent of the Project changes are identified.
In addition, the estimated cost of attendance at additional public meeting or hearings or extended coordination with reviewing agencies (Section 1.2.2.6) will vary and depend on which members of the Project team the City requests to participate; the cost per public meeting or hearing may range from $2,300 (attendance by our Principal-in-Charge, Project Manager, and Deputy Project Manager) to $5,000 (additional staff attendance, such as our senior biologists, transportation engineers, and/or technical specialists), and virtual one-hour coordination meetings with reviewing agencies may start at $800 per meeting.
Regarding responses to unusually high volumes of public or agency comments (Section 1.2.2.7), we estimate that, on average, responding to an individual comment in a comment letter will typically require 1 to 2 hours of staff time; however, responding to certain individual comments may take up to 5 to 6 hours of staff time, depending on the complexity of the comment, whether subject matter experts are needed to weigh in on the comment, and whether the comment is attorney-written. Therefore, we would assume that addressing 100 additional comments may require between $10,000 to $50,000 more, with the assumption that a number of these comments are similar in nature to ones already addressed during the initial batch of responses to comments. Hourly billing rates by staff are presented in Table 2.
As required in the City’s RFP, this proposal is a firm offer for a 120-day period, and work will be performed at the “not-to-exceed” price shown in Table 1.
This cost proposal is signed by Fareeha Kibriya, who is the authorized representative to make legally binding commitments for Michael Baker.
Fareeha Kibriya Date
Vice President/Office Executive
April 9, 2026
INTERNATIONAL
Michael Baker
CITY OF SANTA CLARITA ▬ SUNRIDGE PROJECT - ENVIRONMENTAL IMPACT REPORT ▬ PROPOSAL # CD-25-26-27 Bellas, John Marcelo, Madonna Tong, Frankie Chou, Pei-Ming Rosen, Vicky Schleck, Brent Lowery, Cristina Trevizo, Cristina Popp, Arthur Winkleman, Ryan Whitney, Travis Beck, Richard Ming, Trina Millar, Danielle Shivaiah, Darshan Beherec, Marc Goodrich, Andrew Kloess, Peter Gray, Jordan Swim, Jacob Cappiello, Jeanette Cotham, Ana Johnson, Amanda Torrez, Virginia Principal-in-
Charge/Project
Director
Department
Manager/PM
Sr. Env. Planner/
Deputy PM
Principal Env.
Planner
Sr. Env. Planner Sr. Env. Planner Sr. Env. Planner Associate Env.
Planner
Principal Biologist Sr. Biologist Principal Reg.
Specialist
Tech. Director/
Project Advisor
Associate Reg.
Specialist/ Arborist
Principal Tech. Spec.
-- AQ/GHG/Noise
Associate Tech.
Spec.
Principal
Archaeologist
Sr. Architectural
Historian
Paleontogist Principal
Transportation
Planner
Sr. Transportation
Planner
Graphic Artist Tech. Editor Assistant Technical
Specialist/WCAG
Project Controls
1 Project Management and Team Coordination
Meetings 30 1 40 8 000000000800000000000 1 0 2 68 7 0,750.70$ 0.00 0.00 70,750.70
1.1 Project Management 10 100 40 10 160 41,869.50$ 0.00 0.00 41,869.50
1.2 Team Coordination Meetings 20 40 40 8 108 28,881.20$ 0.00 0.00 28,881.20 2 Project Kickoff and Project Description 20 4 4 4 4000000000000000008400 1 20 2 8,824.00$ 0.00 0.00 28,824.00
2.1 Kickoff Meeting 4 4 4 12 3,104.00$ 0.00 0.00 3,104.00
2.2 Project Description 16 40 40 8 4 108 25,720.00$ 0.00 0.00 25,720.00 3 Notice of Preparation (NOP) and Scoping Meeting 8 3 2 5 6000000000000000000000 9 6 2 2,528.00$ 1,265.00 1,100.00 24,893.00
3.1 Preparation, Distribution, and Filing of the NOP 16 40 56 12,488.00$ 880.00 1,100.00 14,468.00
3.2 Preparation for and Attendance at the Scoping Meeting 8 16 16 40 10,040.00$ 385.00 0.00 10,425.00 4 Peer Review of Applicant-Provided Technical Studies 20 82 96 0 40 0 32 0 4 40 20 0 20 48 56 36 16 16 8 40 0 0 0 0 574 125,108.00$ 0.00 32,890.00 157,998.00
4.1 Air Quality/HRA/GHG 8 8 32 40 88 18,432.00$ 0.00 0.00 18,432.00
4.2 Biological Resources 8 8 4 40 20 20 100 21,900.00$ 0.00 0.00 21,900.00
4.3 Cultural Resources 8 4 36 16 64 13,548.00$ 0.00 0.00 13,548.00
4.4 Geology and Soils 4 4 16 24 5,532.00$ 0.00 0.00 5,532.00
4.5 Hazardous Materials Reports 8 4 12 3,028.00$ 0.00 32,890.00 35,918.00
4.6 Hydrology and Water Quality 8 4 24 36 8,452.00$ 0.00 0.00 8,452.00
4.7 Noise 4 4 16 16 40 8,540.00$ 0.00 0.00 8,540.00
4.8 Paleontological Resources 2 2 16 20 2,974.00$ 0.00 0.00 2,974.00
4.9 Sewer Study 4 2 16 22 5,290.00$ 0.00 0.00 5,290.00
4.10 Traffic (VMT/LOS) and Fire Evacuation 4 8 4 8 40 64 12,872.00$ 0.00 0.00 12,872.00
4.11 Utility/Infrastructure Report 4 24 28 5,936.00$ 0.00 0.00 5,936.00
4.12 View Simulations 4 4 16 24 5,692.00$ 0.00 0.00 5,692.00
4.13 Water Supply Assessment 4 16 20 4,328.00$ 0.00 0.00 4,328.00
4.14 Wildfire Plan 16 8 8 32 8,584.00$ 0.00 0.00 8,584.00 5 Draft Environmental Impact Report 114 348 312 176 130 60 90 304 0 0 0 0 0 0 0 0 0 0 0 0 54 92 0 0 1,680 370,014.75$ 0.00 0.00 370,014.75
5.1 Preparation of Adminstrative Draft EIR #1 90 268 212 176 130 60 90 204 0 0 0 0 0 0 0 0 0 0 0 0 54 92 0 0 1,376 305,062.55$ 0.00 0.00 305,062.55
5.2 Preparation of Administrative Draft EIR #2 16 60 80 80 236 49,847.80$ 0.00 0.00 49,847.80
5.3 Screencheck Draft EIR 8 20 20 20 68 15,104.40$ 0.00 0.00 15,104.40 6 Draft Environmental Impact Report Circulation 8 5 6 7 00 1 600 3 200000000000000 6 00 2 42 5 0,334.90$ 12,265.00 0.00 62,599.90
6.1 Finalization, Production, and Distribution 16 24 12 52 11,487.00$ 11,000.00 0.00 22,487.00
6.2 Completion, Distribution, and Filing of Notices (Notice of Completion and Notice of Availability) 20 20 20 60 12,978.00$ 880.00 0.00 13,858.00
6.3 Preparation for and Attendance at the Public Meeting 8 16 10 34 9,275.70$ 385.00 0.00 9,660.70
6.4 OCR and WCAG-Compliant Version of the Draft EIR 4 16 16 60 96 16,594.20 0.00 0.00 16,594.20 7 Final Environmental Impact Report 20 104 136 60 20 0 0 56 0 10 0 0 0 10 0 0 0 0 10 10 0 8 80 0 524 114,464.70$ 6,600.00 0.00 121,064.70
7.1 Preparation of Responses to Comments 20 60 60 60 10 10 10 10 8 248 61,658.10$ 0.00 0.00 61,658.10
7.2 Preparation of Revisions to the Draft EIR and MMRP 24 24 24 72 15,573.60$ 0.00 0.00 15,573.60
7.3 Compilation of the Final EIR 8 16 16 40 8,047.20$ 0.00 0.00 8,047.20
7.4 Production and Distribution of the Final EIR 8 16 16 40 8,047.20$ 6,600.00 0.00 14,647.20
7.4a OCR and WCAG-Compliant Version of the Final EIR 4 20 20 80 124 21,138.60$ 0.00 0.00 21,138.60 8 Certification Process 24 3 7 6 00000400000000000000 1 00 1 35 3 2,907.00$ 6,050.00 0.00 38,957.00
8.1 Preparation of the Findings of Fact and Statement of Overriding Considerations 8 16 40 64 15,607.20$ 0.00 0.00 15,607.20
8.2 Preparation for and Attendance at the Public Hearings 16 16 16 48 13,036.80$ 1,100.00 0.00 14,136.80
8.3 Preparation and Filing of the Notice of Determination 4 4 8 1,751.40$ 4,950.00 0.00 6,701.40
8.4 OCR and WCAG-Compliant Version of the FoF and SOC 1 4 10 15 2,511.60$ 0.00 0.00 2,511.60 244 843 854 236 206 60 122 396 4 50 20 8 20 58 56 36 16 16 18 50 62 104 150 10 3,639 814,932.05$ 26,180.00 33,990.00 875,102.05 Tasks Roux Total Fee Estimate
Total Hours/Budget
ODCTotal Hours Labor Fee
9.1 Project Description Variability and
Contingent Environmental Analysis (RDEIR) 64 220 224 40 48 16 40 136 2 16 10 0 8 20 20 4 0 0 4 24 24 20 60 4 1,004 236,225.43$ 9,515.00 0.00 245,740.43
9.1a Project Management and Team Coordination Meetings 8 32 24 4 68 18,558.96$ 0.00 0.00 18,558.96
9.1b Project Description 8 20 12 40 11,409.70$ 0.00 0.00 11,409.70
9.1c Peer Review of Applicant-Provided Technical Studies 8 20 16 16 16 2 16 10 8 20 20 4 4 24 184 44,677.35$ 0.00 0.00 44,677.35
9.1d Preparation of Administrative Recirculated Draft EIR #1 16 60 60 40 32 16 24 60 24 20 352 81,610.04$ 0.00 0.00 81,610.04
9.1e Preparation of Administrative Recirculated Draft EIR #2 4 16 16 16 52 12,212.40$ 0.00 0.00 12,212.40
9.1f Screencheck Recirculated Draft EIR 4 16 16 36 9,760.22$ 0.00 0.00 9,760.22
9.1g Recirculated Draft EIR Production and Distribution 20 40 40 60 160 29,792.25$ 8,250.00 0.00 38,042.25
9.1h Completion, Distribution, and Filing of Notices 20 20 20 60 13,628.14$ 880.00 0.00 14,508.14
9.1i Public Meeting 16 16 20 52 14,576.37$ 385.00 0.00 14,961.37
9.2 Project Description Variability and
Contingent Environmental Analysis (SEIR or Revised
EIR)
114 372 390 60 48 16 40 140 2 20 10 0 8 24 20 4 0 0 8 28 24 28 82 8 1,446 350,778.96$ 19,992.50 0.00 370,771.46
9.2a Project Management and Team Coordination Meetings 20 60 24 8 112 31,882.78$ 0.00 0.00 31,882.78
9.2b Project Description 8 20 12 40 11,409.70$ 0.00 0.00 11,409.70
9.2c NOP and Scoping Meeting 8 32 50 90 23,509.64$ 0.00 0.00 23,509.64
9.2d Peer Review of Applicant-Provided Technical Studies 8 20 16 16 16 2 16 10 8 20 20 4 4 24 184 44,677.35$ 0.00 0.00 44,677.35
9.2e
Preparation of Administrative Draft SEIR or Revised EIR #1 16 60 60 40 32 16 24 60 24 20 352 81,610.04$ 0.00 0.00 81,610.04
9.2f
Preparation of Administrative Draft SEIR or Revised EIR #2 4 16 16 16 52 12,212.40$ 0.00 0.00 12,212.40
9.2g Screencheck Draft SEIR or Revised EIR 4 16 16 36 9,760.22$ 0.00 0.00 9,760.22
9.2h Draft SEIR or Revised EIR Production and Distribution 20 40 40 60 160 29,792.25$ 8,250.00 0.00 38,042.25
9.2i Completion, Distribution, and Filing of Notices 20 20 20 60 13,628.14$ 935.00 0.00 14,563.14
9.2j Public Meeting 16 16 20 52 14,576.37$ 357.50 0.00 14,933.87
9.2k Preparation of Responses to Comments 8 20 20 20 4 4 4 4 8 92 23,379.53$ 0.00 0.00 23,379.53
9.2l
Preparation of Revisions to the Draft SEIR or Revised
EIR and MMRP 24 24 48 12,675.49$ 0.00 0.00 12,675.49
9.2m Compilation of the Final SEIR or Revised EIR 8 16 10 34 7,442.55$ 0.00 0.00 7,442.55
9.2n Production and Distribution of the Final EIR 8 16 10 34 7,442.55$ 5,500.00 0.00 12,942.55
9.2o
Preparation of Findings of Fact and Statement of
Overriding Considerations 6 12 24 42 10,962.05$ 0.00 0.00 10,962.05
9.2p Public Hearings 16 16 16 48 13,689.88$ 0.00 0.00 13,689.88
9.2q Preparation and Filing of the Notice of Determination 4 4 2 10 2,128.02$ 4,950.00 0.00 7,078.02 Base Bid Scope of Work Cost
Project Description Variability and Contingent Environmental Analysis Scope of Work for a Recirculated Draft EIR Project Description Variability and Contingent Environmental Analysis Scope of Work for a Supplemental EIR or Revised EIR (Base Bid + Task 9.1)
(Base Bid + Task 9.2)
Table 2 Sunridge Project Environmental Impact Report Hourly Rate Sheet for Years 2026 through 2028