RECOMMENDED ACTION
City Council:
1. Approve Final Tract Map for Tract No. 83605.
2. Accept the following on behalf of the public the offer of dedication and grant of: (1) the easements for public use and road purposes; (2) the easements for sanitary sewer and sanitary sewer ingress and egress purposes; (3) all sanitary sewers and appurtenant structures; (4) the easements for covered storm drain appurtenant structures and ingress and egress purposes; (5) the easement for flood control purposes; (6) the easement for public use and sidewalk purposes; (7) the easement for sight distance purposes; and (8) the right to restrict or prohibit the erection or construction of any buildings or structures within the restricted use areas.
3. Make findings as follows: This project is consistent with the provisions of Sections 66474 and 66474.1 of the Subdivision Map Act and should be approved.
4. Instruct the Director of Administrative Services to endorse the Special Assessment Statement on the face of Tract Map for Final Tract No. 83605, which indicates all special assessments levied by the City of Santa Clarita are paid.
5. Instruct the City Clerk to endorse the City Clerk’s Statement on the face of Final Tract Map for Tract No. 83605, which embodies the approval of said map.
6. Instruct the City Surveyor to endorse the City Surveyor’s Statement on the face of Final Tract Map for Tract No. 83605, which provides for verification that the map is technically correct.
7. Instruct the City Engineer to endorse the City Engineer’s Statement on the face of Final Tract Map for Tract No. 83605, which provides for verification of substantial conformance with the Tentative Parcel Map and all provisions of local ordinances and state laws applicable at the time of approval.
BACKGROUND
The Final Tract Map for Tract No. 83605, a Location Map of which is attached, has been reviewed by City of Santa Clarita (City) staff and found to be in substantial conformance with the principles and standards required by the Unified Development Code and State Subdivision Map Act. Tentative Tract Map 83605 was approved by the City Council on November 12, 2024, under Resolution No. 24-71 for Master Case MC21-205, to allow for the subdivision of one existing lot into five lots located at the former Saugus Speedway site.
Lots 1 through 4 provide for a total of 318 residential units, and lot 5 designated for a light manufacturing building. Lot 5 is currently undergoing the development review process to allow for a proposed residential use under separate discretionary application. The proposed Final Tract Map is approximately 35.44 acres.
The Final Tract Map for Tract No. 83605 was reviewed to the satisfaction of the City Engineer and found to be in substantial conformance with the previously approved tentative tract map. The conditions of approval adopted by the City have been met and fees have been and/or will be paid as indicated on the attached Fact Sheet. Therefore, the Tract Map for Tract No. 83605 is ready for City Council approval.
Pursuant to CEQA Guideline 15162(a) no subsequent CEQA review is required for the actions requested by this agenda item, because there are no substantial changes to the project or the circumstances under which the project is being undertaken, and no new information of substantial importance regarding the project has come to light triggering the need for subsequent review. A separate application, for changes to Lot 5, is under review and will be addressed by the City Council at a future meeting.
Pursuant to Section 66474.1 of the Subdivision Map Act, a legislative body shall not deny approval of a final or parcel map if it was previously approved as a tentative map for the proposed subdivision and if it finds the final or parcel map is in substantial compliance with the previously approved tentative map.
ALTERNATIVE ACTION
Staff has not identified alternative actions that would conform to requirements set forth in the Subdivision Map Act.
FISCAL IMPACT
The resources required to implement the recommended action are contained within the City's adopted Fiscal Year 2026-27 budget.