agenda-report PURCHASE OF POOL PUMPS, MOTORS, AND MANWAY COVERS FOR THE SANTA CLARITA AQUATICS CENTER POOL PUMP REPLACEMENT, PROJECT M3046

Santa Clarita City Council
September 22, 2026

Document
agenda-report PURCHASE OF POOL PUMPS, MOTORS, AND MANWAY COVERS FOR THE SANTA CLARITA AQUATICS CENTER POOL PUMP REPLACEMENT, PROJECT M3046
Meeting
September 22, 2026
Body
Santa Clarita City Council
Pages
3
Original file
91 KB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.
Page 1 ends

Agenda Item: 7

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: September 22, 2026
SUBJECT: PURCHASE OF POOL PUMPS, MOTORS, AND MANWAY COVERS

FOR THE SANTA CLARITA AQUATICS CENTER POOL PUMP
REPLACEMENT, PROJECT M3046
DEPARTMENT: Public Works
PRESENTER: Carla Callahan

RECOMMENDED ACTION

City Council:

1. Approve the purchase of seven pool pumps and motors and 12 manway covers from Estate Design and Construction for a total contract amount not to exceed $158,700.

2. Find the Santa Clarita Aquatics Center Pool Pump Replacement project exempt from review under the California Environmental Quality Act (CEQA) pursuant to Title 14 of the California Code of Regulations Article 19, Section 15301.

3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney review.

BACKGROUND

This project involves the replacement of the existing pool circulation pumps, motors, and manway covers at the Santa Clarita Aquatics Center, as shown on the attached Location Map.

The pumps and motors circulate water throughout the 25-meter, 50-meter, and activity pools, while the manway covers provide access for manual servicing of the pool water filters. The existing equipment is more than 22 years old and has reached the end of its useful service life.

The project will replace the existing equipment with new high-efficiency circulation pumps and premium-efficiency motors to improve performance. The construction bids for equipment installation will be solicited separately and the construction contract will be presented to the City Council for consideration at a later date as required. This project supports the Sustainable Public Infrastructure theme of the City of Santa Clarita’s (City) strategic plan, Santa Clarita Pathway

Page 2 ends

Forward.

The Santa Clarita Aquatics Center Pool Pump Replacement project is not subject to the California Environmental Quality Act (CEQA) review pursuant to Title 14 of the California Code of Regulations, Article 19, Section 15301, which exempts from CEQA review, projects that consists of the operation, repair, maintenance, or minor alteration of existing public or private facilities or mechanical equipment, involving negligible or no expansion of existing or former use. Examples include but are not limited to, interior or exterior alterations involving such things as plumbing, and electrical conveyances. This project meets the criteria for this exemption because the Santa Clarita Aquatics Center Pool Pump Replacement project will be performing repairs and maintenance to existing mechanical and electrical systems located in the same facilities and performing at the same capacity.

An invitation to bid was published and circulated via the City’s e-procurement system, BidNet, on August 14, 2026. The City transmitted the solicitation to 216 vendors on BidNet, of which 34 vendors downloaded materials. A total of six bids were submitted and opened on September 1, 2026. The results of the bids are shown below.

Company Location Bid Amount
Estate Design and Construction Culver City, CA $ 158,700 National Boiler Supply Gulf Breeze, FL $ 178,120
Knorr Systems, Inc. Santa Ana, CA $ 197,719
WMS Aquatics Ellensburg, WA $ 202,871
Kijero, LLC Morgan Hill, CA $ 304,228
Levon Construction Group Anaheim, CA $ 312,000

Staff recommends awarding the purchase to Estate Design and Construction, the lowest responsive and responsible bidder. The vendor’s bid was reviewed for accuracy and conformance to the contract documents and was found to be complete. The bid proposal is available in the City Clerk’s Reading File.

The City Council appropriated $424,000 for this project upon adoption of the Fiscal Year 2026- 27 budget. The project budget is $424,000, representing $158,700 for equipment and $265,300 for construction and project administration costs. Project administrative costs include staff time, project management, inspection, permits, and labor compliance monitoring.

ALTERNATIVE ACTION

Other action as determined by the City Council.
x

FISCAL IMPACT

The amount of $424,000 is available in project expenditure account M3046601-516101 (General Fund - Capital) to support the recommended action and associated project costs.

Page 3 ends

ATTACHMENTS
Location Map
Proposal for Estate Design and Construction (available in the City Clerk's Reading File)