CITY OF SANTA CRUZ
809 Center Street
Santa Cruz, California 95060
CITY COUNCIL AGENDA
Regular Meeting – October 25, 2022
11:30 A.M. CLOSED SESSION, ZOOM/COURTYARD CONFERENCE ROOM 1:00 P.M. CONSENT, CONSENT PUBLIC HEARINGS, AND GENERAL BUSINESS,
ZOOM/COUNCIL CHAMBERS
4:30 P.M. ORAL COMMUNICATIONS, ZOOM/COUNCIL CHAMBERS
6:00 P.M. GENERAL BUSINESS, ZOOM/ COUNCIL CHAMBERS
IMPORTANT NOTICE:
Pursuant to California Government Code 54953(e)(1)(A) and (C), and the City of Santa Cruz’s resolution authorizing continued virtual participation in public meetings given the COVID-19 pandemic, meetings of the Santa Cruz City Council are being conducted with a hybrid format, providing both in-person and virtual participation in order to promote social distancing and protect the health and safety of attendees, staff, and Councilmembers.
In order to minimize exposure to COVID-19, the meeting may be viewed remotely, using any of the following sources:
Click on Zoom link (no time delay): https://zoom.us/j/94684401344 Online at http://www.cityofsantacruz.com/government/city-council/council-meetings Online at Watch – Community Television of Santa Cruz County Comcast Channel 25
Or: Call any of the numbers below. If one is busy, try the next one. 1-833-548-0276 (Toll Free)
1-833-548-0282 (Toll Free)
1-877-853-5247 (Toll Free)
1-669-900-9128
Enter the meeting ID number: 946 8440 1344
When prompted for a Participant ID, press #.
Press *9 on your phone to “raise your hand” when the Mayor calls for public comment. It will be your turn to speak when the Mayor calls on you. Press *6 to unmute yourself. The timer will then be set.
Correspondence to be included in the agenda packet must be received by 5:00 pm on Monday, October 24th.
October 25, 2022 City Council 2
PLEASE NOTE:
Requests for extra speaking time on items other than Oral Communications must be made by 5:00 p.m. on Sunday, October 23rd by emailing the Mayor and the City Clerk.
Approval will be confirmed via email.
[email protected] [email protected]
The City of Santa Cruz does not discriminate against persons with disabilities. Out of consideration for people with chemical sensitivities we ask that you attend fragrance free. Upon request, the agenda can be provided in a format to accommodate special needs. Additionally, if you wish to attend this public meeting and will require assistance such as an interpreter for American Sign Language, Spanish, or other special equipment, please call the City Clerk’s Department at 420-5030 at least five days in advance so that we can arrange for such special assistance, or email [email protected]. The CalRelay system number: 1-800-735-2922.
Si desea asistir a esta reunión pública y necesita ayuda - como un intérprete de lenguaje de señas americano, español u otro equipo especial - favor de llamar al Departamento de la Secretaría de la Ciudad al 420-5030 al menos cinco días antes para que podamos coordinar dicha asistencia especial o envié un correo electrónico a [email protected]. El número del sistema Cal-Relay es: 1-800-735-2922.
Closed Session
11:30 AM
Closed Session
1. Conference with Labor Negotiators (Government Code §54957.6) SEIU Temporary Employees
SEIU Service Employees
Supervisors, OE3
City Negotiator - Lisa Murphy
2. Conference with Legal Counsel - Existing Litigation (Government Code §54956.9(d)(1))
City of Santa Cruz v. Regents of the University of California, et al. (Santa Cruz County Superior Court Case No. 22CV00373)
October 25, 2022 City Council 3
City Council
1:00 PM
Call to Order
Roll Call
Presentation
3. Annual Climate Adaptation Plan Progress Update
Presiding Officer's Announcements
Statements of Disqualification
Additions and Deletions
City Attorney Report on Closed Session
Council Meeting Calendar
4. The City Council will review the meeting calendar attached to the agenda and revise it as necessary.
Council Memberships in City Groups and Outside Agencies
5. The Presiding Officer will provide Councilmembers with the opportunity to update Council on any external committee meetings that occurred since the last Council meeting.
October 25, 2022 City Council 4
Consent Agenda
6. Resolution Authorizing the City to Continue Teleconferenced Public Meetings Pursuant to Assembly Bill 361 (CA)
Resolution authorizing legislative bodies of the City of Santa Cruz to continue the use of teleconferenced meetings pursuant to Assembly Bill 361.
7. Minutes of the October 11, 2022 City Council Meeting (CC) Motion to approve as submitted.
8. Coastal Conservancy Vegetation Management/Equipment Purchase - Grant Acceptance, Authorization and Appropriation (FD)
Motion to:
1) Adopt a resolution authorizing the City Manager to apply for, accept, and appropriate funds from the Coastal Conservancy Vegetation Management/Equipment Purchase Grant to conduct vegetation management activities in the Pogonip/Arana Gulch open spaces; and 2) Adopt a resolution amending the FY 2023 Fire Department budget to appropriate $219,499 to hire a contractor to perform vegetation management activities in the Pogonip/Arana Gulch open spaces and purchase a chipper and masticator blade attachment.
9. Greenwaste, Wood Waste, and Construction and Demolition Material Grinding Service – Change Order (PW)
Motion to approve a change order with Vision Recycling (Fremont, CA), for providing greenwaste, wood waste, and construction and demolition grinding services at the Resource Recovery Facility. The City Manager is hereby authorized and directed to execute the change order in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved budget.
October 25, 2022 City Council 5
Consent Agenda (continued)
10. 3 Water Cogeneration Cooling Line Replacement (c401407) – Notice of Completion (PW)
Motion to accept the work of ACCO Engineered Systems, Inc. (Pasadena, CA) and authorize the filing of the Notice of Completion for 3 Water Cogeneration Cooling Line Replacement (c401407).
11. Operation and Maintenance Agreement with the Soquel Creek Water District for the Operation and Maintenance of the Pure Water Soquel Project Facilities located at the City of Santa Cruz Regional Wastewater Treatment Facility (PW)
Motion authorizing the City Manager to execute an Operation and Maintenance Agreement between the City of Santa Cruz and Soquel Creek Water District (Soquel, CA) for the Operation and Maintenance of the Pure Water Soquel Project Facilities located at the Santa Cruz Regional Wastewater Treatment Facility, in a form acceptable to the City Attorney.
12. Approval of Plans and Specifications for the Rodriguez Street Water Main Relocation Project and Ratify Construction Contract with Anderson Pacific Engineering – Budget Adjustment (WT)
Motion to:
1) Approve the plans and specifications for the Rodriguez Street Water Main Relocation Project (c700003); and
2) Ratify the Construction Contract for the Rodriguez Street Water Main Relocation Project with Anderson Pacific Engineering Construction, Inc. (Santa Clara, CA) in the amount of $224,026 and authorize the Water Director to execute change orders within the approved project budget; and
3) Adopt a resolution amending the FY 2023 budget to transfer $225,000 within the Water Department's Capital Investment Program (CIP) from project c701507, Main Replacements - Distribution Section, to project c700003, Main Replacements - Outside Agency.
October 25, 2022 City Council 6
Consent Agenda (continued)
13. Dudek Master Service Agreement for California Environmental Quality Act Compliance and Environmental Permitting: First Amendment (WT) Motion authorizing the City Manager to execute with Dudek (Santa Cruz, CA) the Master Service Agreement, in a form to be approved by the City Attorney, for California Environmental Quality Act Compliance and Environmental Permitting: First Amendment, authorizing a revised fee schedule and extending the term of the contract, and to authorize the Water Director to execute future Master Service Agreement renewals and amendments per the agreement.
End Consent Agenda
Consent Public Hearings
14. Tri-Annual, 2022 Building Standards Code Adoption, Consistent with the State Building Standards Commission and the International Code Council Tri-Chapter Uniform Code Committee Amendments through Introduction of an Ordinance Amending Building Regulations Contained in Title 18 of the Santa Cruz Municipal Code and Adopting the California Code of Regulations Title 24, 2022 Building Standards Code to Establish Minimum Requirements to Safeguard Public Health, Life, Safety and General Welfare (PL)
Introduce for publication an ordinance amending Title 18 of the Municipal Code and adopting the 2022 editions of the California Building Standards Code, California Code of Regulations Title 24, Parts 1, 2, 2.5, 3, 4, 5, 6, 8, 10, 11, and 12, including referenced appendices, amendments, and modifications.
15. Adoption of the 2022 Edition of the California Fire Code and Fire Code Standards, Including Annual Supplements and State Amendments and Errata (FD)
Introduce for publication an ordinance to (1) amend Santa Cruz Municipal Code Chapter 19.05 to adopt and incorporate by reference the 2022 edition of the California Fire Code and make other amendments; and (2) amend Santa Cruz Municipal Code Chapter 19.10.
October 25, 2022 City Council 7
General Business
16. Youth Well-being Snapshot – Status Update (PR)
Accept report on the Status of the Youth Well-being Program Snapshot. 4:30 PM
Oral Communications Announcement – Community members may address the Council for two minutes or less about any matter not on the agenda. 30 minutes is allocated for Oral Communications. No extra time for groups will be granted.
Oral Communications
Recess - The City Council will recess to the 6:00 p.m. session.
October 25, 2022 City Council 8
City Council
6:00 PM
Call to Order
Roll Call
General Business
17. Permanent Outdoor Dining Program Update: First Reading of Parklet Ordinance for Public On-Street Parking Spaces (ED)
Motion to:
1) Introduce for publication an ordinance establishing a permanent parklet program citywide; and
2) Direct staff to bring the Parklet Guidelines and Parklet Fee Schedule for adoption at the November 15, 2022 City Council meeting; and 3) Direct staff to coordinate with the Coastal Commission and process a Coastal Permit to authorize the implementation of the Parklet Ordinance for the construction, use, or operation of parklets within the coastal zone under Chapter 5.83 of the Santa Cruz Municipal Code (SCMC); and
4) Direct staff to initiate the process of repealing SCMC Section
24.10.2341 "Outdoor Curb Extension Area" pursuant to SCMC Chapter
24.06. 18. Permanent Outdoor Dining Program Update: Private Property Permitting (ED)
Direct staff to make the necessary revisions to the municipal code for future Council consideration in early 2023 to develop a streamlined permit for private property outdoor dining, and direct staff to continue to work with Coastal Commission staff to allow for the construction, use, or operation of permanent outdoor dining on private property within the coastal zone.
October 25, 2022 City Council 9
General Business (continued)
19. Permanent Outdoor Dining Program Update: First Reading of an Ordinance Amending Uncodified Ordinance 2020-27 Extending Temporary Use of Certain Adjacent Public Street and Outdoor Areas for Eligible Businesses (ED)
Introduce for publication an ordinance amending uncodified Ordinance No. 2020-27 extending temporary use of certain adjacent public street and outdoor areas for eligible businesses that:
a) Extends the temporary period for commercial use in the public right-of-way, currently set to expire the end of this December through March 31, 2023; and
b) Extends the temporary period for commercial use on private property from the end of this December through October 31, 2023; and
c) Maintains the expiration date of December 31, 2022 for the partial closure of Cathcart Street.
Adjournment
October 25, 2022 City Council 10
INFORMATION ITEMS PREVIOUSLY DISTRIBUTED TO CITY COUNCILMEMBERS ADDENDUM TO CITY COUNCIL AGENDA – OCTOBER 25, 2022
20. City Manager: Quarterly Grant Report – Fiscal year 2022 as of June 30, 2022 - 10/17/22 (CMFYI 262)
21. Finance Department: Portfolio Management Report – Unpooled Cash and Investments as of June 30, 2022 - 9/28/22 (FNFYI 359)
MAYOR'S PROCLAMATIONS
ADDENDUM TO CITY COUNCIL AGENDA – OCTOBER 25, 2022
22. Proclaiming Monday, October 11, 2022 as “Raley’s Food For Families Day” and encouraging all citizens to join in congratulating it for being named the Food Donor of the Year for Santa Cruz County by Second Harvest Food Bank Santa Cruz County and expressing heartfelt appreciation for its efforts that benefit the Second Harvest Food Bank Santa Cruz County and its network of member agencies.
23. Proclaiming October 20, 2022 as “Research Center for the Americas Day.”
24. Proclaiming October 21, 2022 as “Catherine Segurson Day” and encouraging all citizens to join in expressing heartfelt appreciation for her years of service and numerous contributions to artistic nourishment and creative cross-pollination for all those in the wider Santa Cruz area and points beyond.
25. Proclaiming the month of October 2022 as “Domestic Violence Awareness Month” and encouraging members of our community to participate in activities during the month of October to raise awareness and work together to prevent violence in our world.
October 25, 2022 City Council 11
MAYOR'S PROCLAMATIONS (continued)
26. Proclaiming Monday, November 14, 2022 as “Suzanne Healy Day” and encouraging all citizens to join in acknowledging her two-plus decades of dedicated service; expressing gratitude for her multiple contributions to our safety, environmental protection, and quality of life; and wishing her well in her retirement.
Advisory Body Appointments
The following positions are vacant. Council will make the appointments at a future meeting.
Commission for the Prevention of Violence
Against Women
One opening
Public Hearing
If, in the future, you wish to challenge in court any of the matters on this agenda for which a public hearing is to be conducted, you may be limited to raising only those issues which you (or someone else) raised orally at the public hearing or in written correspondence received by the City at or before the hearing.
Any person seeking to challenge a City Council decision made as a result of a proceeding in which, by law, a hearing is required to be given, evidence is required to be taken, and the discretion in the determination of facts is vested in the City Council, shall be required to commence that action either 60 days or 90 days following the date on which the decision becomes final as provided in Code of Civil Procedure Section 1094.6 Please refer to code of Civil Procedure 1094.6 to determine how to calculate when a decision becomes “final.” The 60-day rule applies to all public hearings conducted pursuant to the City’s Zoning Ordinance, Title 24, Santa Cruz Municipal Code. The 90-day rule applies to all other public hearings.
October 25, 2022 City Council 12
City Council Agenda Legislative History Addendum
No information was submitted.
City staff is responsible for providing the City Clerk with such documentation and information for the Legislative History Addendum. The information will be on file in the City Clerk’s Department.
The Addendum is a listing of information specific to City Council business, but which does not appear on a Council meeting agenda. Such entities would include, but not be limited to: Court decisions, Coastal Commission Appeals of City Council actions, Closed Session Agreements/Settlements, which are public record, Association of Monterey Bay Area Governments, Local Agency Formation Commission.
CLIMATE ADAPTATION PLAN
PROGRESS REPORT OCTOBER 25, 2022
SANTA CRUZ CITY COUNCIL
3.1 3.2
2018 PLAN
44 STRATEGIES:
25 VERY HIGH PRIORITY STRATEGIES
9 HIGH PRIORITY STRATEGIES
10 IMPORTANT STRATEGIES
3.3 Top Very Important Strategies:
Increasing Public Awareness
Evaluating all Decisions through a Climate
Lens
3.4 CHANGING TEMPERATURES
4o to 7o
Source: Climate Change and Health Profile
Report: Santa Cruz County (2017)
…Coastal areas should expect one more heat wave
per year by 2050 and 4-8 more per year by 2100
3.5 CHANGING TEMPERATURES
4o to 7o
Source: Climate Change and Health Profile
Report: Santa Cruz County (2017)
…Coastal areas should expect one more heat wave
per year by 2050 and 4-8 more per year by 2100
Street Tree Master Plan Complete in 2021
Urban Tree Master Plan in FY23-24
Planting 3,000 trees by 2030
High heat study as part of
Adaptation Plan UPdate
3.6 INCREASE IN EXTREME STORMS + FLOODING (RIVER)
3.7 INCREASE IN EXTREME STORMS + FLOODING (RIVER)
Participation in Community Rating System +
National Flood Insurance Program
Flood Protection + Climate Change Study
Upgrade of Pump Station No. 1
Rivermouth Culvert Project
Branciforte Fish Passage + Sediment Removal
3.8 🡪🡪 $137M exposed
🡪🡪 $148M exposed
🡪🡪 $615M-$1B exposed
🡪🡪 >$1B in exposed assets
INCREASE IN EXTREME STORMS + FLOODING (COASTAL)
3.9 INCREASED EROSION + LANDSLIDES (COASTAL)
3.10 SEA LEVEL RISE (RISING TIDE)
West Cliff Drive Adaptation
and Management Plan
Development of LCP Sea Level
Rise Strategies & Policies to
Support Beach and Public
Access Protection
3.11 2022-2023: SOCIAL TRIGGERS
DEVELOPMENT
FUTURE: ECOLOGICAL TRIGGERS
Possible
CoastSnap
Location
3.12 INCREASED WILDFIRE THREAT
…in SC projected to
increase between
the historical time
period (1961 – 1990)
from 78 acres to 87.2
to 91.2 acres in the
projected time
horizon (2070 to
2099), depending on
the emissions
scenario
Source: Cal-Adapt
3.13 INCREASED WILDFIRE THREAT
…in SC projected to
increase between
the historical time
period (1961 – 1990)
from 78 acres to 87.2
to 91.2 acres in the
projected time
horizon (2070 to
2099), depending on
the emissions
scenario
Source: Cal-Adapt
8 grants for Vegetation Mgmt since
2018
WUI Ordinance in 2019
Cooperative Agreement with UCSC
2 FireWise Groups meeting regularly
Next in FY23:
5 Year Vegetation Managemetn Plan
Forest Mgmt / Fire Resiliency Plan
276 Fires in
wildland open
space areas
since 2018
3.14 INCREASED EROSION + LANDSLIDES (INLAND)
wildland fires impact
watersheds and increase the
risk of landslides or mudslides
and sediment in run-off that
reduce water quality
3.15 INCREASED EROSION + LANDSLIDES (INLAND)
wildland fires impact
watersheds and increase the
risk of landslides or mudslides
and sediment in run-off that
reduce water quality
Realigning critical raw water pipelines
out of landslide hazard zone
Upgrades to Graham Hill WTP
SLR Nutrient + Sediment Management
Newell Creek Dam Inlet/Outlet
Replacement
3.16 LONGER DROUGHTS + MORE INTENSE STORMS
Water Supply Reliability Studies
Water Supply Augmentation
Strategy
Development of Securing our
Water Future Policy
3.17 SOCIAL VULNERABILITY TO CLIMATE CHANGE
Medium-High Social
Vulnerability to Coastal Climate
Hazards primarily driven by
incidence of elderly folks
High Social Vulnerability to Coastal
Climate Hazards driven by
incidence of non-English speakers &
low incomes
Social Vulnerability Score includes
• Poverty
• Age > 65 years old
• Crime incidence
• English not spoken well or at all
• Disabled
3.18 3.19
WHAT’S NEXT?
CLIMATE ADAPTATION PLAN UPDATE + LOCAL HAZARD MITIGATION PLAN UPDATES (2024-2029)
GRANTS PLAN FOR HIGH PRIORITY STRATEGY IMPLEMENTATION
Address combinations of hazards
Develop Ecologically oriented strategies
Tie to HIAP community well being outcome indicator metrics Address Public Health, High Heat
Living Shorelines + Nature Based Solutions Feasibility Study
3.20 THANK YOU +
QUESTIONS?
Dr. Tiffany Wise-West,
Sustainability & Climate Action Manager
[email protected]
831.420.5433
3.21 Meeting Type
Holiday
Jewish Holiday
Regular Meeting
Special Meeting
Study Session (will be added as scheduled)
Budget Hearing
DATE Location Meeting Type
November 11
Council Chambers/Zoom Closed Session ‐ Closed to the Public Council Chambers/Zoom Council Regular Meeting ‐ Open to the Public November 24
November 25
November 29 Council Chambers/Zoom Special Meeting ‐ Open to the Public December 6 Special Closed Session ‐ Closed to the Public December 18/19
Council Chambers/Zoom Closed Session ‐ Closed to the Public Council Chambers/Zoom Council Regular Meeting ‐ Open to the Public December 25
City Council Meeting Calendar for 2022
Please note: Meeting times are not final and are likely to change December 13
City Hall Closure ‐ Veteran's Day (observed)
City Hall Closure ‐ Thanksgiving Day
City Hall Closure ‐ Day After Thanksgiving Day
December 27 Meeting Cancelled ‐ CITY COUNCIL DARK
City Hall Closure ‐ Christmas Day
Hanukkah (City observed ‐ sundown to sundown)
November 15
4.1 Council Membership in City Groups and Outside Agencies (2022) Councilmembers may provide direction, request additional information or that a topic raised be agendized for future Council action. The Presiding Officer may request oral updates from Council Ad Hoc Committees.
City Council Standing Committees Councilmember Assigned Staff Community Programs Watkins, Brown, Kalantari-Johnson Tiffany Wise-West Public Safety Watkins, Golder, Cummings Emeline Nguyen
City Council Ad Hoc Committees Councilmember Assigned Staff Council Ad Hoc Budget and Revenue Committee Brown, Watkins, Brunner Laura Schmidt Oversized Vehicles Ordinance Ad Hoc Committee Golder, Kalantari-Johnson, Brunner Brian Borguno Charter Amendment Committee Meyers, Golder, Watkins
Beach Flats Parking Subcommittee Cummings, Brown, Brunner Brian Borguno Health in All Policies Committee Brunner, Kalantari-Johnson, Watkins Tiffany Wise-West External Governmental Agencies/ Intergovernmental
Coordinating Committees Councilmember Assigned Staff
Association of Monterey Bay Area Governments
(AMBAG)
Cummings, Brown (alternate) Lee Butler
City–Santa Cruz City Schools Committee Watkins, Golder, Kalantari-Johnson Tony Elliot City Select Committee Brunner Matt Huffaker
Library Financing Authority Brunner, Watkins (alternate) Matt Huffaker Homelessness 2x2 Committee Watkins, Brunner Lee Butler
Monterey Bay Air Resources District (City Nominee) Brown Tiffany Wise-West Central Coast Community Energy Policy Board
Central Coast Community Energy Operations Board
Meyers, Brunner (alternate)
Mark Dettle, Tiffany Wise-West (alternate)
Mark Dettle
Santa Cruz County Integrated Waste Management Local
Task Force
Golder, Cummings (alternate)
Bob Nelson, Leslie
O’Malley (staff
alternate)
Santa Cruz County Consolidated Redevelopment
Successor Agency Oversight Board
Meyers Bonnie Lipscomb
Santa Cruz Metropolitan Transit District Board (METRO) Meyers, Kalantari-Johnson Claire Gallogly Santa Cruz County Regional Transportation
Commission (RTC)
Brown, Golder (alternate) Nathan Nguyen
Claire Gallogly
(alternate)
Santa Cruz Mid-County Groundwater Agency Councilmember Meyers, Water Commissioner David Baskin, Water Commissioner Doug Engfer (alternate)
Rosemary Menard
5.1 External Governmental Agencies/ Intergovernmental
Coordinating Committees Councilmember Assigned Staff
Santa Margarita Groundwater Agency Water Commissioner Doug Engfer, Former Water Commissioner David Baskin (citizen alternate)
Rosemary Menard
Joint Powers Authorities/City Groups Staff Appointments Agency Contact Information Santa Cruz County Animal Services
Authority
Laura Schmidt, Bernie Escalante Santa Cruz County Animal Services Authority 2200 7th Avenue
Santa Cruz, CA 95062
https://www.scanimalshelter.org/
Santa Cruz Public Libraries Matt Huffaker Santa Cruz Public Libraries 117 Union Street
Santa Cruz, CA 95060
https://www.santacruzpl.org/
Santa Cruz Regional 9-1-1 Laura Schmidt Santa Cruz Regional 9-1-1 495 Upper Park Rd.
Santa Cruz, CA 95065
(831) 471-1000
External Community Organizations Councilmember/Staff Agency Contact Information Area Agency on Aging (AAA) Advisory
Council
Brown, Brunner (Council alternate), Rita
Hester (citizen alternate)
Seniors Council, Clay Kempf
234 Santa Cruz Ave.
Aptos, CA 95003
Phone: (831) 688-0400
Climate Action Task Force Cummings, Dr. Tiffany Wise-West (staff) Dr. Tiffany Wise-West [email protected]
Cowell Working Group Meyers, Tony Elliot (staff) CWG Facilitated by Save the Waves Criminal Justice Council Cummings, Kalantari-Johnson (alternate), Bernie Escalante
Criminal Justice Council of Santa Cruz County
[email protected]
Downtown Management Corporation Meyers, Cummings, Bonnie Lipscomb (staff) Downtown Management Corporation [email protected]
337 Locust Street,
Santa Cruz, CA 95060
Santa Cruz County Youth Action Network
Kalantari-Johnson
[email protected]
United Way of Santa Cruz County
4450 Capitola Rd, Ste 106
Capitola, CA 95010
Santa Cruz Community Farmers’ Market Watkins, Brunner (alternate) Bonnie Lipscomb (staff)
Mr. Nesh Dillon Executive Director SCCFM
P.O. Box 8189
Santa Cruz, CA 95061
Visit Santa Cruz County Watkins, Brunner, Bonnie Lipscomb (staff) Visit Santa Cruz County 303 Water Street, Suite 100
Santa Cruz, CA 95060
800-833-3494 or 831-425-1234
Community Action Board (CAB) Kalantari-Johnson, Eve Bertram, UCSC Professor (alternate)
Community Action Board of Santa Cruz
County, Inc.
406 Main St. STE 207
Watsonville, CA 95076
831-763-2147
5.2 City Council
AGENDA REPORT
DATE: 10/13/2022
AGENDA OF: 10/25/2022
DEPARTMENT: City Attorney
SUBJECT: Resolution Authorizing the City to Continue Teleconferenced Public Meetings Pursuant to Assembly Bill 361 (CA)
RECOMMENDATION: Resolution authorizing legislative bodies of the City of Santa Cruz to continue the use of teleconferenced meetings pursuant to Assembly Bill 361.
BACKGROUND: On March 4, 2020, Governor Newsom issued a proclamation of State of Emergency in response to the developing COVID-19 pandemic. Due to the continued spread of the virus, the Governor issued Executive Order N-29-20 on March 17, 2020, which included a provision authorizing suspensions to the Ralph M. Brown Act’s (“Brown Act”) teleconferencing rules in order to facilitate virtual meetings while public health orders were in place.
On June 11, 2021, the Governor issued Executive Order N-08-21, which provided that the Brown Act teleconferencing suspensions would expire after September 30, 2021. On September 16, 2021, the Governor signed Assembly Bill 361 (“AB 361”), an urgency measure taking effect immediately, which amended the Brown Act to allow local legislative bodies to continue using teleconferencing and virtual meeting technology provided certain conditions are met.
DISCUSSION: AB 361 allows for teleconferenced meetings during a declared State of Emergency, as defined under the California Emergency Services Act, if one of the following circumstances apply: (1) State or local officials have imposed or recommended measures to promote social distancing; (2) The legislative body is meeting to determine whether, as a result of the emergency, meeting in person would present imminent risks to the health or safety of attendees; or (3) The legislative body has determined that, as a result of the emergency, meeting in person presents imminent risks to the health or safety of attendees.1 The Governor’s March 4, 2020 proclamation of State of Emergency is still in effect. Measures continue to exist that impose and recommend measures to promote social distancing. The California Department of Public Health (“CDPH”) requires that all individuals wear masks indoors in specific, high-risk settings.2 Further, the CDPH and the Santa Cruz County Health 1 Cal. Gov’t Code § 54953(e)(1)(A)-(C)
2 See CDPH, Guidance for the Use of Face Coverings (Updated September 20, 2022), https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/COVID-19/guidance-for-face-coverings.aspx.
6.1 Officer strongly recommend that all individuals continue to wear masks in indoor public settings.3
The highly transmissible omicron variant continues to contribute to positive cases and hospitalizations locally and throughout the State. Additionally, other variants of COVID-19 exist, and it is unknown at this time whether other variants may result in a new surge in COVID19 cases. As such, holding meetings in person would present imminent risks to the health or safety of attendees due to the continued spread of COVID-19.
To continue teleconferenced meetings under AB 361, the City Council will need to declare every thirty (30) days that it has reconsidered the circumstances of the State of Emergency and either (1) the State of Emergency continues to directly impact the ability of the members to meet safely in person; or (2) State or local health officials continue to impose or recommend measures to promote social distancing.4
This declaration is needed for any use of teleconferenced meetings pursuant to AB 361, including for two City meeting models: (1) A City Council hybrid model that uses the City Council Chambers as an in person venue along with teleconference attendance; and (2) Continued use of teleconferencing for City Council and Brown Act City boards, commissions and committees.
At its regular meeting of October 12, 2021, the City Council adopted Resolution No. NS-29,877, authorizing legislative bodies of the City of Santa Cruz to continue using teleconferenced meetings pursuant to AB 361. At its regular meetings of November 9, 2021, November 23, December 14, 2021, January 11, 2022, February 8, 2022, March 8, 2022, March 22, 2022, April 12, 2022, May 10, 2022, May 24, 2022, June 14, 2022, June 28, 2022, August 9, 2022, August 23, 2022, September 13, 2022, and October 11, 2022, the City Council adopted Resolution Nos.
NS-29,886, NS-29,894, NS-29,900, NS-29,915, NS-29,923, NS-29,933, NS-29,942, NS-29,954, NS-29,975, NS-29,987, NS 29,994, NS-30,005, NS-30,017, NS-30,028, NS-30,035, and NS30,049, further authorizing legislative bodies of the City of Santa Cruz to continue using teleconferenced meetings pursuant to AB 361.
This Resolution would re-authorize the legislative bodies of the City of Santa Cruz to continue to use teleconferenced meetings for an additional thirty (30) from the date of its adoption.
FISCAL IMPACT: None.
Prepared By:
Stephanie Duck
Deputy City Attorney
Submitted By:
Tony Condotti
City Attorney
Approved By:
Matt Huffaker
City Manager
ATTACHMENTS:
1. RESOLUTION.DOCX
3 See Press Release, Twelve Bay Area Health Officers to Life Most Indoor Mask Mandates on February 16 (Feb. 9, 2022), https://www.santacruzhealth.org/Portals/7/pdfs/Coronavirus/02.09.22%20ABAHO%20Masking_FINAL.pdf.
See also, BAY AREA HEALTH OFFICERS URGE PUBLIC TO TAKE PRECAUTIONS AS COVID LEVELS RISE (May 13, 2022),
https://www.santacruzhealth.org/Portals/7/pdfs/Coronavirus/ABAHOMaskRecommendationENG.05132022.pdf. 4 Cal. Gov’t Code § 54953(e)(3).
6.2 RESOLUTION NO. NS-XX,XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ
AUTHORIZING THE CONTINUED USE OF TELECONFERENCED MEETINGS PURSUANT TO ASSEMBLY BILL 361
WHEREAS, on March 4, 2020, Governor Newsom declared a State of Emergency, as defined under the California Emergency Services Act, due to the COVID-19 pandemic; and WHEREAS, on March 17, 2020, due to the threat of COVID-19, Governor Newsom issued Executive Order N-29-20, which suspended certain requirements of Government Code section 54950 et seq., the Ralph M. Brown Act (“Brown Act”), in order to allow local legislative bodies to conduct meetings telephonically or electronically without a physical meeting place; and WHEREAS, on June 11, 2021, Governor Newsom issued Executive Order N-08-21, which stated that the provision suspending requirements of the Brown Act in Executive Order N-29-20 would remain in effect through September 30, 2021, at which point the suspensions would expire; and
WHEREAS, on September 16, 2021, Governor Newsom signed Assembly Bill 361 into law, an urgency measure effective upon adoption, amending the Brown Act to allow legislative bodies to continue to meet remotely during a proclaimed State of Emergency, and either state or local officials have imposed or recommended measures to promote social distancing, or the legislative body determines that meeting in person would present imminent risks to the health or safety of attendees;
WHEREAS, on October 12, 2021, the City Council adopted Resolution No. NS-29, 877, making its initial finding that the requisite conditions exist for the legislative bodies of the City of Santa Cruz to conduct remote teleconference meetings; and WHEREAS, on November 9, 2021, November 23, 2021, December 14, 2021, January 11, 2022, February 8, 2022, March 8, 2022, March 22, 2022, April 12, 2022, May 10, 2022, May 24, 2022, June 14, 2022, June 28, 2022, August 9, 2022, August 23, 2022, September 13, 2022, and October 11, 2022, the City Council adopted Resolution Nos. NS-29,886, NS-29,894, NS-29,900, NS-29,915, NS-29,923, NS-29,933, NS-29,942, NS-29,954, NS-29,975, NS-29,987, NS-29,994, NS-30,005, NS-30,017, NS-30,035, and NS-30,049,each making a subsequent finding that the requisite conditions exist for the legislative bodies of the City of Santa Cruz to conduct remote teleconference meetings; and
WHEREAS, as a condition of authorizing the continued use of teleconferenced meetings, the City Council must, every 30 days, reconsider the circumstances of the State of Emergency that exists in the City and the City Council has done so; and WHEREAS, the State of Emergency proclaimed by the Governor on March 4, 2020, remains in effect; and
6.3 RESOLUTION NO. NS-XX,XXX
2 WHEREAS, the California Department of Public Health and the Santa Cruz County Health Officer require that all individuals wear face coverings indoors in specified high-risk settings, and continue to strongly recommend that all individuals wear face coverings in indoor public settings; and
WHEREAS, the highly contagious omicron variant continues contribute to the increase in positive cases and hospitalizations locally and throughout the State of California, demonstrating the unpredictable nature of the pandemic, and that transmission rates have the potential to rise quickly; and
WHEREAS, other variants of COVID-19 exist, including an Omicron subvariant, BA.5, and it is unknown at this time whether this or other variants may result in a new surge in COVID-19 cases; and
WHEREAS, due to the continued impact of COVID-19, the City continues to be concerned about the health and safety of attendees at public meetings should they be held in person and in a shared indoor public meeting space, as such, the City Council desires to take the actions necessary to comply with AB 361 and to continue to hold its meetings in a hybrid format, providing both inperson and virtual participation; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz (City Council) as follows:
A. The City Council hereby acknowledges that the Governor’s State of Emergency proclamation issued on March 4, 2020 remains in effect; and B. The City Council finds that due to the emergence of the omicron variant and the continued threat of COVID-19, holding in person meetings for the City Council, City Commissions, and City Committees continues to present imminent risks to the health or safety of attendees.
C. The legislative bodies of the City of Santa Cruz are hereby authorized and directed to take all actions necessary to carry out the intent and purpose of this Resolution, including continuing to conduct open and public meetings in accordance with Government Code section 54953(e) and other applicable provisions of the Brown Act.
D. This Resolution shall take effect immediately upon its adoption and shall be effective until the earlier of (i) thirty days from the adoption of this Resolution, or (ii) such time the City Council adopts a subsequent resolution in accordance with Government Code section 54953(e)(3) to extend the time during which the legislative bodies of the City of Santa Cruz may continue teleconferencing without compliance with the Brown Act’s prior rules regarding teleconferencing.
6.4 RESOLUTION NO. NS-XX,XXX
3 PASSED AND ADOPTED this 25th day of October, 2022 by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
APPROVED: ______________________________
Sonja Brunner, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
6.5 MINUTES ARE UNOFFICIAL UNTIL APPROVED BY COUNCIL
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060
MINUTES OF A CITY COUNCIL MEETING
October 11, 2022
1:30 PM
Mayor Brunner opened the City Council Closed Session at 1:32 p.m. in a public meeting in Council Chambers, for the purpose of announcing the agenda, and receiving public testimony.
Roll Call
Present: Councilmembers Kalantari-Johnson, Golder, Cummings, Brown, Meyers (via Zoom); Vice Mayor Watkins; Mayor Brunner.
Absent: None.
Staff: Assistant City Manager L. Schmidt, City Attorney T. Condotti, Finance Director E. Cabell, Director of Information Technology K. Morgan, Deputy City Clerk Administrator J. Wood, City Clerk Administrator B.
Bush.
Public Comment
Mayor Brunner opened the public comment period at 1:33 p.m. There were no speakers. Mayor Brunner closed the public comment period at 1:34 p.m., at which time the meeting was closed to the public and Council adjourned to the Courtyard Conference Room.
Closed Session
1. Conference With Legal Counsel – Liability Claims (Government Code §54956.95) 1) Claimant: Zoran Cica
2) Claimant: Santa Cruz Elks Lodge #824
Claims against the City of Santa Cruz
Council received a status report, took up under agenda item 20, and no reportable action was taken.
7.1 October 11, 2022 CITY COUNCIL MINUTES 6242
Closed Session (continued)
2. Conference with Legal Counsel - Existing Litigation (Government Code §54956.9(d)(1))
Lopez, Alicia v. Mary McCoy, City of Santa Cruz
Santa Cruz Superior Court Case No. 18CV03301
By unanimous vote, Council authorized the City Attorney’s Office to file a writ of appeal in the 6th Appellate District, challenging the Superior Court’s recent decision denying a motion for summary judgment that the City Attorney’s Office filed.
3. Conference with Labor Negotiators (Government Code §54957.6) SEIU Temporary Employees
SEIU Service Employees
Supervisors, OE3
City Negotiator - Lisa Murphy
Council deferred discussion of this item to resume after the Council meeting adjourns.
7.2 October 11, 2022 CITY COUNCIL MINUTES 6243
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060
MINUTES OF THE ANNUAL MEETING OF THE
BOARD OF DIRECTORS OF THE INDUSTRIAL DEVELOPMENT AUTHORITY October 11, 2022
3:30 PM
Call to Order – at 3:30 p.m.
Roll Call
Present: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers (via Zoom); Vice Chair Watkins; Chair Brunner.
Absent: None.
General Business
4. Election of Officers
MOTION: Director Golder moved, seconded by Director Brown, to elect new officers as set forth in Section 3.02 of the Industrial Development Authority bylaws as follows:
Executive Director: City Manager M. Huffaker
Chief Financial Officer: Director of Finance E. Cabell
Chair: Mayor Brunner
Vice Chair: Vice Mayor Watkins
Secretary/Treasurer: City Clerk Administrator B. Bush
ACTION: The motion carried unanimously with the following vote.
AYES: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice Chair Watkins; Chair Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
7.3 October 11, 2022 CITY COUNCIL MINUTES 6244
General Business (continued)
5. Minutes of the October 12, 2021 Industrial Development Authority (IDA) Chair Brunner opened the public comment period. There were no speakers.
Chair Brunner closed the public comment period.
MOTION: Director Brown moved, seconded by Director Golder, to approve as submitted.
ACTION: The motion carried unanimously with the following vote.
AYES: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice Chair Watkins; Chair Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
Adjournment - The Industrial Development Authority adjourned at 3:35 p.m.
7.4 October 11, 2022 CITY COUNCIL MINUTES 6245
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060
MINUTES OF THE ANNUAL MEETING OF THE BOARD OF DIRECTORS OF
THE SANTA CRUZ PUBLIC IMPROVEMENT FINANCING CORPORATION October 11, 2022
At or around 3:35 PM
Call to Order – at 3:35 p.m.
Roll Call
Present: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers (via Zoom); Vice President Watkins; President Brunner.
Absent: None.
General Business
6. Election of Officers
MOTION: Director Watkins moved, seconded by Director Cummings, to elect new officers as set forth in Section 3.02 of the Santa Cruz Public Improvement Financing Corporation bylaws as follows:
Executive Director: City Manager M. Huffaker
Chief Financial Officer: Director of Finance E. Cabell
President: Mayor Brunner
Vice President: Vice Mayor Watkins
Secretary/Treasurer: City Clerk Administrator B. Bush
ACTION: The motion carried unanimously with the following vote.
AYES: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice President Watkins; President Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
7.5 October 11, 2022 CITY COUNCIL MINUTES 6246
General Business (continued)
7. Minutes of the October 12, 2021 Santa Cruz Public Improvement Finance Corporation (SCPIFC)
President Brunner opened the public comment period. There were no speakers. President Brunner closed the public comment period.
MOTION: Director Meyers moved, seconded by Director Cummings, to approve as submitted.
ACTION: The motion carried unanimously with the following vote.
AYES: Directors Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice President Watkins; President Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
Adjournment - The Santa Cruz Public Improvement Financing Corporation adjourned at 3:39 p.m.
7.6 October 11, 2022 CITY COUNCIL MINUTES 6247
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060
MINUTES OF A CITY COUNCIL MEETING
October 11, 2022
At or around 3:40 PM
Call to Order – Mayor Brunner called the meeting to order at 3:39 p.m. in Council Chambers.
Roll Call
Present: Councilmembers Kalantari-Johnson, Golder, Cummings, Brown, Meyers (via Zoom); Vice Mayor Watkins; Mayor Brunner.
Absent: None.
Staff: City Manager M. Huffaker, Assistant City Manager L. Schmidt, City Attorney T. Condotti, Water Director R. Menard, Director of Public Works M. Dettle (via Zoom), Chief of Police B. Escalante (via Zoom), Director of Planning and Community Development L. Butler (via Zoom), Director of Information Technology K. Morgan (via Zoom), Fire Chief R.
Oatey (via Zoom), Director of Parks and Recreation T. Elliot (via Zoom), Deputy City Manager/Human Resources Director L. Murphy (via Zoom), Assistant Director of Public Works/City Engineer N. Nguyen (via Zoom), Deputy City Clerk Administrator J. Wood, City Clerk Administrator B.
Bush.
Presentations
8. Santa Cruz Mountains Trail Stewardship (SCMTS) Summer Youth Trail Crew Accomplishments
Emma Ussat, Trails Program Manager of Santa Cruz Mountains Trail Stewardship, gave a presentation highlighting the accomplishments of the Summer Youth Trail Crew.
9. Pure Water Soquel Project Update - Soquel Creek Water District Melanie Mow Schumacher with the Soquel Creek Water District gave a presentation providing an update of the Pure Water Soquel Project.
7.7 October 11, 2022 CITY COUNCIL MINUTES 6248
Presiding Officer's Announcements
Statements of Disqualification – None.
Additions and Deletions – City Clerk Administrator B. Bush reminded Council that item 21 was removed from the agenda and would not be discussed. There were no other additions or deletions.
City Attorney Report on Closed Session – See pages 6241—6242 for the report.
City Manager Report
10. The Assistant City Manager provided a report and updates on the City's business and events of interest.
Assistant City Manager L. Schmidt gave a presentation providing an update on the San Lorenzo Park restoration and Benchlands encampment closures, Water Street Bridge remembrance, the Fire Department’s Wildfire Resiliency Outreach and Education, the Santa Cruz Downtown Farmer’s Market, and upcoming affordable housing projects. Deputy City Manager/Human Resources Director L. Murphy responded to Councilmember questions.
Council Meeting Calendar
11. The City Council reviewed and did not revise the meeting calendar attached to the agenda.
Consent Agenda
Councilmember Brown pulled item 15 for further discussion.
Vice Mayor Watkins and Councilmembers Cummings and Kalantari-Johnson made comments on item 18.
Assistant Director of Public Works/City Engineer N. Nguyen responded to Councilmember Brown’s questions on item 23.
Mayor Brunner opened the public comment period. The following people spoke:
Unidentified person spoke regarding item 12.
Unidentified person spoke regarding item 12.
Unidentified person spoke regarding item 19.
Mayor Brunner closed the public comment period.
7.8 October 11, 2022 CITY COUNCIL MINUTES 6249
Consent Agenda (continued)
MOTION: Vice Mayor Watkins moved, seconded by Councilmember Cummings, to approve the remaining Consent Agenda.
ACTION: The motion carried unanimously with the following vote.
AYES: Councilmembers Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice Mayor Watkins; Mayor Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
12. Resolution Extending the Emergency Declaration in Connection with the COVID19 Pandemic by Sixty (60) Days (CA) Resolution No. NS-30,047 was adopted extending by sixty days the Declaration of Emergency in connection with the COVID-19 pandemic.
13. Resolution Extending the Emergency Declaration in Connection with the CZU August Lightning Complex Fire by Sixty (60) Days (CA)
Resolution No. NS-30,048 was adopted extending by sixty days the Local Emergency Declaration in connection with the CZU August Lightning Complex Fire.
14. Resolution Authorizing the City to Continue Teleconferenced Public Meetings Pursuant to Assembly Bill 361 (CA)
Resolution No. NS-30,049 was adopted authorizing legislative bodies of the City of Santa Cruz to continue the use of teleconferenced meetings pursuant to Assembly Bill 361.
7.9 October 11, 2022 CITY COUNCIL MINUTES 6250
At this time Mayor Brunner heard Oral Communications.
Consent Agenda (continued)
15. Resolution Rescinding all but the Uncontested Portions of the Santa Cruz Wharf Master Plan and Environmental Impact Report (CA)
City Attorney T. Condotti responded to Councilmember questions.
Mayor Brunner opened the public comment period. The following people spoke.
Gillian Greensite
John Aird
Mayor Brunner closed the public comment period.
MOTION: Vice Mayor Watkins moved, seconded by Councilmember Golder, to adopt Resolution No. NS-30,050 rescinding the Santa Cruz Wharf Master Plan and Environmental Impact Report in Resolution Nos. NS-29,747 and NS-29,748 with the following amendments:
From:
WHEREAS, the court has ordered that the City to rescind its approval of Resolution No. NS-29,747 and Resolution No. NS-29,748 as it pertains to all but the uncontested components memorialized in the Peremptory Writ of Mandamus.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz, that Resolution Nos. NS-29,747 and NS-29,748 are hereby rescinded, but for the uncontested components memorialized in the Peremptory Writ of Mandamus which shall remain in full force and effect.
To:
WHEREAS, the court has ordered that the City rescind its approval of Resolution No. NS-29,747 and Resolution No. NS-29,748.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz, that Resolution Nos. NS-29,747 and NS-29,748 are hereby rescinded.
7.10 October 11, 2022 CITY COUNCIL MINUTES 6251
Consent Agenda (continued)
15. Resolution Rescinding all but the Uncontested Portions of the Santa Cruz Wharf Master Plan and Environmental Impact Report (CA) (continued) SUBSTITUTE MOTION: Councilmember Brown moved, seconded by Councilmember Cummings, to:
Adopt Resolution No. NS-30,050 rescinding the Santa Cruz Wharf Master Plan and Environmental Impact Report in Resolution Nos. NS-29,747 and NS29,748 with the amendments stated in the original motion; and Direct staff to issue a Notice of Preparation (NOP) and hold a scoping meeting as part of the circulation of the new Environmental Impact Report.
Director of Economic Development B. Lipscomb responded to Councilmember questions.
ACTION: The substitute motion was not accepted with the following vote.
AYES: Councilmembers Cummings, Brown.
NOES: Councilmembers Kalantari-Johnson, Golder, Meyers; Vice Mayor Watkins; Mayor Brunner.
ABSENT: None.
DISQUALIFIED: None.
FRIENDLY AMENDMENT: Councilmember Golder requested to include one or more community outreach meetings to receive additional public input on the Wharf Master Plan within the 45-day comment period while the Environmental Impact Report is being recirculated. Vice Mayor Watkins accepted.
MOTION TO AMEND: Councilmember Cummings moved, seconded by Councilmember Brown, to agendize a discussion about the elements of the Wharf Master Plan for a future meeting for community discussion prior to the 45-day notice of release of the draft Environmental Impact Report.
ACTION: The motion to amend was not accepted with the following vote.
AYES: Councilmembers Cummings, Brown; Mayor Brunner.
NOES: Councilmembers Kalantari-Johnson, Golder, Meyers; Vice Mayor Watkins.
ABSENT: None.
DISQUALIFIED: None.
7.11 October 11, 2022 CITY COUNCIL MINUTES 6252
Consent Agenda (continued)
15. Resolution Rescinding all but the Uncontested Portions of the Santa Cruz Wharf Master Plan and Environmental Impact Report (CA) (continued) ACTION: The original motion, as amended, carried unanimously with the following vote.
AYES: Councilmembers Kalantari-Johnson, Golder, Cummings, Brown, Meyers; Vice Mayor Watkins; Mayor Brunner.
NOES: None.
ABSENT: None.
DISQUALIFIED: None.
Councilmember Cummings stated for the record that he tried to provide as much opportunity for community engagement and his hope is that people will have the opportunity to weigh-in during this 45-day period before the notice of release of the draft EIR.
Staff Direction:
Councilmember Brown requested the City Attorney provide a report of the cost to the City to absorb the two-year delay and for the legal support to defend the lawsuit.
16. Minutes of the September 22, 2022 City Council Special Meeting (CC) Motion carried to approve as submitted.
17. Minutes of the September 27, 2022 City Council Meeting (CC) Motion carried to approve as submitted.
18. Resolution Supporting the Rights of the People of Iran to Free Expression and Standing in Solidarity with the Women and People of Iran (CN) Resolution No. NS-30,051 was adopted supporting the women and people of Iran and their rights to free expression.
7.12 October 11, 2022 CITY COUNCIL MINUTES 6253
Consent Agenda (continued)
19. State Permanent Local Housing Allocation (PLHA) Commitment (ED) Resolution No. NS-30,052 was adopted to commit funding from the California State Department of Housing and Community Development (“HCD”) Permanent Local Housing Allocation (PLHA) Program funds in the amount of $676,239 for land acquisition for the Pacific Station South affordable housing project, authorize Economic Development to submit the request for funds (RFF), and authorize the City Manager or Economic Development Director to execute related PLHA documents.
20. Liability Claims Filed Against the City of Santa Cruz (FN) Motion carried to reject the liability claim of a) Zoran Cica; and to return as late the claim of b) Santa Cruz Elks Lodge #824, based on staff recommendation.
21. SEIU Local 521 Tentative Agreement for a Successor Memorandum of Understanding (HR)
This item was removed from the agenda prior to the meeting and was not discussed.
22. Resource Recovery Facility Household Hazardous Waste Collection Facility Upgrade (c402202) – Notice of Completion (PW)
Motion carried to accept the work of Atlantis Paving and Grading (Scotts Valley, CA) as completed per the plans and specifications and authorize the filing of the Notice of Completion for the Resource Recovery Facility Household Hazardous Waste Collection Facility Upgrade (c402202).
7.13 October 11, 2022 CITY COUNCIL MINUTES 6254
Consent Agenda (continued)
23. HSIP10: Unsignalized Crossing Improvement Project (c402215) – Advertise for Bids and Award Contract (PW)
Motion carried to approve the plans and specifications for the HSIP10:
Unsignalized Crossing Improvement Project (c402215) and authorize staff to advertise for bids and award the contract. The City Manager is hereby authorized and directed to execute the contract in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved budget.
End Consent Agenda
Oral Communications Announcement - The Mayor provided a brief announcement about Oral Communications.
Oral Communications
At 5:16 p.m. Mayor Brunner opened Oral Communications for members of the public who wished to speak regarding items not listed on the City Council agenda.
Unidentified person spoke regarding the upcoming election and ballot measures.
Becky Steinbruner spoke regarding water being transported over the San Lorenzo River, and the upcoming project at 908 Ocean Street.
Unidentified person spoke regarding the Benchlands Encampment.
Unidentified person spoke regarding the “Occupy” movement and homelessness.
At 5:28 p.m. Mayor Brunner closed Oral Communications.
At this time, Mayor Brunner returned to hear item 15.
Adjournment - The City Council adjourned at 6:49 p.m. to Closed Session.
7.14 October 11, 2022 CITY COUNCIL MINUTES 6255
Respectfully Submitted:
Julia Wood, Deputy City Clerk Administrator
Attest:
Bonnie Bush, City Clerk Administrator
Approved:
Sonja Brunner, Mayor
7.15 City Council
AGENDA REPORT
DATE: 10/13/2022
AGENDA OF: 10/25/2022
DEPARTMENT: Fire
SUBJECT: Coastal Conservancy Vegetation Management/Equipment Purchase - Grant Acceptance, Authorization and Appropriation (FD)
RECOMMENDATION: Motion to:
1) Adopt a resolution authorizing the City Manager to apply for, accept, and appropriate funds from the Coastal Conservancy Vegetation Management/Equipment Purchase Grant to conduct vegetation management activities in the Pogonip/Arana Gulch open spaces; and 2) Adopt a resolution amending the FY 2023 Fire Department budget to appropriate $219,499 to hire a contractor to perform vegetation management activities in the Pogonip/Arana Gulch open spaces and purchase a chipper and masticator blade attachment.
BACKGROUND: Nearly every year, California experiences major wildfires that can be devastating to the environment and communities throughout the state. These fires frequently and tragically displace California locals from their homes due to property destruction, poor air quality, extreme heat, and other consequences. Santa Cruz County has seen 7-major wildland fires over the last 15 years. The most recent was the 2020 CZU August Lightening Complex Fire that burned over 911 homes and displaced thousands of residents. The purpose of this project is to conduct vegetation management activities to reduce fire risk and increase fire department access to the Pogonip/Arana Gulch open spaces, both designated as Wildland Urban Interface (WUI). Both areas are in the moderate to high severity rankings per the State Fire Marshal Fire Hazard Severity Zone. This project will improve safety to first responders and homeowners living in the WUI by slowing the spread of the fire, which allows for safer direct attack, increased time for evacuations and less severe fire behavior. These areas are directly adjacent to and/or would directly affect State responsibility Areas.
DISCUSSION: Coastal Conservancy’s Wildfire Resilience Grants Program provides funding for fire prevention projects and activities in and near fire threatened communities that focus on increasing the protection of people, structures, and communities.
Project Types and Activities – Qualifying projects and activities include those related to hazardous fuels reduction, wildfire prevention planning, and wildfire prevention education with an emphasis on improving public health and safety while reducing greenhouse gas emissions.
8.1 Within the grant performance period of November 1, 2022 and October 31, 2023, when awarded funds, the City of Santa Cruz will hire a contractor to:
• Remove overgrown, combustible vegetation from the Pogonip/Arana Gulch open spaces, which are both in close proximity to neighborhoods, schools, healthcare facilities and places of worship.
• Create defensible space by way of a shaded fuel break between these open spaces and the surrounding community.
• Remove dead or hazardous trees consistent with the City Arborist dead tree removal planning efforts.
• Improve emergency access to these critical areas. These heavily used public open spaces feature very steep terrain and heavily wooded areas, and are home to many different plant and animal species.
• Purchase a chipper and masticator blade attachments.
FISCAL IMPACT: Approval of this recommendation will result in an immediate fiscal impact to the General Fund in the amount of $219,499. Funds will be used to execute the work identified in the grant application to perform vegetation management activities in the wildland urban interface areas of the Pogonip/Arana Gulch open spaces, and to purchase chipper and masticator blade attachments.
Prepared By:
Paul Horvat
Emergency Services
Manager/PMA
Submitted By:
Robert Oatey
Fire Chief
Approved By:
Matt Huffaker
City Manager
ATTACHMENTS:
1. RESOLUTION.DOCX
2. BUDGET ADJUSTMENT.PDF
8.2 RESOLUTION NO. NSRESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ AUTHORIZING
THE CITY MANAGER TO APPLY FOR, ACCEPT AND APPROPRIATE COASTAL
CONSERVANCY GRANT FUNDS TO HIRE A CONTRACTOR TO PERFORM
VEGETATION MANAGEMENT ACTIVITIES IN THE POGONIP/ARANA GULCH OPEN
SPACES AND PURCHASE A CHIPPER AND MASTICATOR BLADE ATTACHMENTS TO
DECREASE FIRE RISK IN THE WILDLAND URBAN INTERFACE AREAS OF THE CITY
OF SANTA CRUZ
WHEREAS, The purpose of this project is vegetation management to reduce fire risk and increase fire department access to the Pogonip and Arana Gulch open spaces, both designated as Wildland Urban Interface (WUI); and
WHEREAS, The City of Santa Cruz will purchase a chipper and masticator blade attachments to conduct ongoing maintenance in the WUI after initial vegetation management work has been completed; and
WHEREAS, Both vegetation management areas are in the moderate to high severity rankings per the State Fire Marshal Fire Hazard Severity Zones; and WHEREAS, This project will improve safety to first responders and homeowners living in the WUI by slowing the spread of the fire, which allows for safer direct attack, increased time for evacuations and less severe fire behavior.
.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Santa Cruz hereby:
1. Directs City of Santa Cruz staff to submit the grant proposal package to Coastal Conservancy for the project described more particularly in the accompanying agenda report in the amount of $219,499; and
2. Authorizes the City Manager of the City of Santa Cruz to apply for, accept, and execute in the name of the City of Santa Cruz, all necessary applications, contracts and agreements and amendments thereto and appropriate funds from Coastal Conservancy to procure a contractor to execute the vegetation management work identified in the Pogonip/Arana Gulch open spaces wildland urban interface and vegetation management equipment purchase grant application.
8.3 PASSED AND ADOPTED this 25th day of October 2022, by the following vote:
AYES:
NOES:
ABSENT:
DISQUALIFIED:
APPROVED: __________________________
Sonja Brunner, Mayor
ATTEST: __________________________
Bonnie Bush, City Clerk Administrator
8.4 City of Santa Cruz
BUDGET ADJUSTMENT REQUEST
$GPLQLVWUDWLYH$SSURYDO
)LVFDO<HDU
ACCOUNT 352-(&71$0( REVENUE EDEN ACCOUNT TITLE
ACCOUNT 352-(&71$0( EXPENDITURE EDENACCOUNT TITLE
NET: $
REQUESTED BY DEPARTMENT HEAD
APPROVAL
BUDGET/ACCOUNTING
5(9,(:('
FINANCE DIRECTOR
APPROVAL
CITYMANAGER
APPROVAL
5HVR
352-(&7
352-(&7
$02817
$02817
&RXQFLO$SSURYDO
TOTAL EXPENDITURE
TOTALREVENUE
'DWH
1VSQPTF
3FWJTFE0DUPCFS Clear Form
2023
10/19/2022
Grant awarded by the Coastal Conservancy relating to Vegetation Management and Equipment purchase for related activities in Pogonip/Arana Gulch Open Spaces to improve fire road access and reduce vegetation in the wildland urban interface. Project is to be completed by November 1, 2023.
101-21-32-2203-43257 g212303-216-1051-0 CC grant-Pogonip/Arana Gulch State Capital Grant-Coastal Conserv. 219,499.00 219,499.00
101-21-32-2203-57490 g212303-100-2020-651 CC grant-Pogonip/Arana G. Other Capital Outlay 119,499.00 101-21-32-2203-52199 g212303-100-2020-249 CC grant-Pogonip/Arana G. Other Professional and technical svcs 100,000.00 219,499.00
0.00 Paul
Horvat
Digitally signed by Paul Horvat
DN: cn=Paul Horvat, o=City of
Santa Cruz, ou=Fire Department,
[email protected]
om, c=US
Date: 2022.10.17 13:05:10 -07'00'
Robert
Oatey
Digitally signed
by Robert Oatey
Date: 2022.10.17
13:46:34 -07'00'
Nicholas
Gong
Digitally signed by Nicholas Gong
DN: cn=Nicholas Gong, o=City of
Santa Cruz, ou=Finance,
[email protected],
c=US
Date: 2022.10.18 09:09:53 -07'00'
Elizabet
h Cabell
Digitally signed by Elizabeth Cabell
DN: cn=Elizabeth Cabell, o=City of Santa Cruz,
ou=Finance Department,
[email protected], c=US
Date: 2022.10.19 12:40:55 -07'00'
8.5 City Council
AGENDA REPORT
DATE: 10/12/2022
AGENDA OF: 10/25/2022
DEPARTMENT: Public Works
SUBJECT: Greenwaste, Wood Waste, and Construction and Demolition Material Grinding Service – Change Order (PW)
RECOMMENDATION: Motion to approve a change order with Vision Recycling (Fremont, CA), for providing greenwaste, wood waste, and construction and demolition grinding services at the Resource Recovery Facility. The City Manager is hereby authorized and directed to execute the change order in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved budget.
BACKGROUND: The City receives approximately 1,000 tons per month of greenwaste and wood waste through the curbside program, drop-off at the Resource Recovery Facility (RRF), and recovery of wood from construction and demolition (C&D) loads at the landfill. Staff attempts to divert these materials to their highest beneficial reuse. Clean (unpainted and untreated) wood and stumps are ground up and hauled off for composting by a local farmer.
Ground wood and greenwaste are also sometimes used at the RRF for erosion control purposes.
Materials such as painted wood, plywood, and roofing shingles, which would otherwise have to be buried in the landfill, can be ground and used as alternative daily cover for the landfill, reducing space that soil cover would use up.
The City of Santa Cruz is required to meet the waste diversion goals set by the State’s Waste Board (CalRecycle). This ground up material make a significant contribution to our current overall landfill diversion rate, which is approximately 56% in 2021.
The RRF uses a contractor to process wood, greenwaste and C&D materials with portable grinding equipment. Depending on the volume, the contractor processes material every 6-8 weeks to meet state regulatory requirements, avoid fires, and ensure that the materials meets the specifications of the end users.
DISCUSSION: In FY 2023, staff budgeted $95,000 to grind this material, however, the price to grind the material has jumped from $14/ton to $19/ton in the last 18 months due to high inflation and surge in fuel prices. This pushed the original purchase order (PO) with Vision Recycling over the $100,000 threshold.
To streamline this in the future, staff plans to bid for a 3-year contract from contractors in the coming months to grind and screen these materials on site. The bid to contract process is
9.1 expected to take 3-4 months. In the meantime, the grinding operation will need to continue so the RRF can stay in compliance.
Staff is recommending a PO change order with Vision Recycling to continue providing the grinding services to allow staff the time to formally solicit bids for this service.
FISCAL IMPACT: Staff estimates the cost of continuing greenwaste, wood waste, and C&D grinding services until a contract is in place will be $83,000, bringing the PO total amount to $178,940. Funds are available in the FY 2023 Refuse Fund budget. There is no impact to the General Fund.
Prepared By:
Hoi Yu
Associate Professional
Engineer
Submitted By:
Mark R. Dettle
Director of Public Works
Approved By:
Matt Huffaker
City Manager
ATTACHMENTS:
None.
9.2 City Council
AGENDA REPORT
DATE: 10/12/2022
AGENDA OF: 10/25/2022
DEPARTMENT: Public Works
SUBJECT: 3 Water Cogeneration Cooling Line Replacement (c401407) – Notice of Completion (PW)
RECOMMENDATION: Motion to accept the work of ACCO Engineered Systems, Inc. (Pasadena, CA) and authorize the filing of the Notice of Completion for 3 Water Cogeneration Cooling Line Replacement (c401407).
BACKGROUND: At its April 12, 2022 meeting, City Council approved the authorization to advertise this project and authorized the City Manager to execute the contract for the 3 Water Cogeneration Cooling Line Replacement project. On May 17, 2022, the project was awarded to the lowest responsive and responsible bidder ACCO Engineered Systems, Inc. (Pasadena, CA) in the amount of $471,200.89. Construction began on August 17, 2022 at the Santa Cruz Wastewater Treatment Facility (WWTF). The project replaced approximately 367 linear feet of ductile iron piping with HDPE piping to supply pressurized secondary effluent water (3 Water) to the Cogeneration Building generators, along with valves and cleanouts to allow for efficient maintenance moving forward.
DISCUSSION: The work for this project is now complete. The project utilized HDPE piping in place of C900 piping due to supply shortages. The project has been inspected by Public Works staff and found to be completed in accordance with the plans and specifications FISCAL IMPACT: The total project cost was $446,173.15. This project was fully funded in the Capital Investment Program (CIP) project (c401407 - WWTF-Water Piping Rehabilitation).
There is no impact to the General Fund.
Prepared By:
Tim Wong
Assistant Engineer I
Submitted By:
Mark R. Dettle
Director of Public Works
Approved By:
Matt Huffaker
City Manager
ATTACHMENTS:
1. NOTICE OF COMPETION.DOCX
10.1 Notice of Completion (Revised Oct 2021)
(Space above for Recorder’s use only)
This instrument is being recorded for the benefit of the City of Santa Cruz.
No recording fee is required pursuant to Government Code § 27383.
NOTICE OF COMPLETION
(CA Civil Code Sections 8102 and 9204)
NOTICE IS HEREBY GIVEN THAT:
The undersigned is an authorized representative of the owner of the interest or estate stated below.
1. The Owner’s Name and Address. The Project owner is the City of Santa Cruz, a municipal corporation (the “City”). The City’s mailing address is 809 Center Street, Santa Cruz, California 95060. The City of Santa Cruz has the following interest in the subject Property described below: City Property
2. Project Title and Number. The full name of the work of improvement/public works project (the “Project”) which is the subject of this Notice of Completion is: 3 Water Cogeneration Cooling Line Replacement (c401407)
3. Nature of Work Performed on the Property or Materials Furnished for the City. The Project consisted of work described as: Installed new pressurized water piping at the wastewater treatment facility.
4. The general site location description or address (the “Property”) of the public improvement is located at: 110 California St, Santa Cruz, CA 95060
5. Name and Address of Contractor. The Contractor on the Project is: ACCO Engineered Systems, Inc. 888 East Walnut Street, Pasadena, CA 91101
6. Date of Completion. The Project on the Property was completed on: September 27, 2022
7. The filing of this Notice of Completion was authorized by the Santa Cruz City Council Minute Order on Tuesday, October 25, 2022
DATE: ___________________
Mark Dettle
Director of Public Works, City of Santa Cruz
RECORDED AT THE REQUEST OF:
City of Santa Cruz, Public Works
Attn: Tim Wong
WHEN RECORDED MAIL TO:
City Clerk’s Department
809 Center Street, Room 9
Santa Cruz, CA 95060
10.2 City Council
AGENDA REPORT
DATE: 10/12/2022
AGENDA OF: 10/25/2022
DEPARTMENT: Public Works
SUBJECT: Operation and Maintenance Agreement with the Soquel Creek Water District for the Operation and Maintenance of the Pure Water Soquel Project Facilities located at the City of Santa Cruz Regional Wastewater Treatment Facility (PW)
RECOMMENDATION: Motion authorizing the City Manager to execute an Operation and Maintenance Agreement between the City of Santa Cruz and Soquel Creek Water District (Soquel, CA) for the Operation and Maintenance of the Pure Water Soquel Project Facilities located at the Santa Cruz Regional Wastewater Treatment Facility, in a form acceptable to the City Attorney.
BACKGROUND: The City of Santa Cruz (City) and Soquel Creek Water District are member agencies of the Santa Cruz Mid-County Groundwater Agency (MGA), which is responsible for implementing the mandates set forth in the 2014 Sustainable Groundwater Management Act (SGMA) in the Santa Cruz Mid-County Basin (Basin). Under SGMA, the Basin is identified as one of 21 basins in California that are critically overdrafted and the MGA is required to bring the Basin into sustainability by 2040. The MGA adopted a Groundwater Sustainability Plan (GSP) on November 21, 2019 and submitted it to the State in January 2020. The GSP includes projects and management actions that are being implemented to restore protective water levels and prevent further seawater intrusion from moving further inland and contaminating the groundwater basin. The Pure Water Soquel (PWS) Project is included in the GSP as a project to implement for the basin to reach sustainability.
Since 2016, the City has formally and informally communicated to the District its willingness to work with the District to explore opportunities for utilizing a portion of the secondary treated effluent produced by the City’s Regional Wastewater Treatment Facility (WWTF) for a Groundwater Replenishment Project (GRP).
In July 2017, the District and City entered into a memorandum of understanding (MOU) to memorialize preliminary terms between the parties related to PWS and provide a general framework for good faith negotiations.
The District evaluated several alternative designs for the PWS project, including various locations for pipelines and treatment facilities. PWS Facilities located at the WWTF include a Secondary Effluent Source Water Pump Station, pipeline facilities for Reverse Osmosis Concentrate blend to discharge through the City Regional Ocean Outfall and a Title 22 recycled
11.1 water system. The placement of the Title 22 tertiary treatment facility (TTF) at the WWTF is based, in part, on the fact that the existing TTF is at the end of its useful life. The existing TTF produces 50 million gallons of recycled water a year (approximately 0.14 million gallons a day) for in-plant uses and cannot produce Title 22 tertiary treated water for unrestricted use in applications such as irrigation or bulk water for construction type uses. Absent the opportunity to replace this facility as an element of the PWS project, the City’s existing TTF would require major rehabilitation with an estimated cost of $3.5 million. Thus, siting the TTF component of the PWS project at the WWTF is mutually beneficial to the parties and will provide Title 22 recycled water for City use.
At its June 25, 2019 meeting, the City Council unanimously approved a Project Agreement formalizing collaboration between the City and the District for the District’s PWS Project. The PWS project will recycle a portion of treated secondary effluent water from the WWTF and use advanced water purification methods to further purify it for replenishing the groundwater basin to increase protective water levels and prevent seawater intrusion from moving further inland and saving District’s sole source of water supply.
The agreement also included additional benefits such as recycled water for the City’s use at the WWTF and future uses such as a recycled water fill-station and irrigation water for La Barranca park as well as the overall reduction of the City’s discharge of treated wastewater to the Monterey Bay National Marine Sanctuary.
Furthermore, the PWS project is supported through an encroachment permit granted by the City’s Public Works Department to the District and at its September 22, 2020 meeting, City Council unanimously approved the installation and maintenance of PWS conveyance pipelines in various streets within the City’s right-of-way.
At its November 24, 2020 meeting, the City Council unanimously approved a Land Lease setting forth terms and conditions for the location of project equipment at the WWTF, which is in the Project Agreement attachment.
Once constructed, the City’s WWTF staff will operate and maintain PWS Facilities located at the WWTF. As Construction is underway at the WWTF, the City and District staff have developed and are bringing forward for Council action an agreement for Operations and Maintenance (O&M) for the PWS Facilities located at the City Regional WWTF which will be owned by the District and operated by the City.
DISCUSSION: This O&M Agreement, as identified in the Project Agreement for Source Water and Design, Construction and Startup of the PWS Project, is the next step in the project development process as the project moves toward the completion of the construction phase and begins operation of the Source Water Pump Station, ROC Discharge Facilities and the Title 22 TTF located at the City’s WWTF.
The agreement begins with a comprehensive set of recitals and definitions that provide an overview of the purpose of the O&M agreement, parties involved and definition of terms to be included in the agreement.
Key components of this O&M Agreement address: Ownership of Facilities, Provisions of Source Water including Quantity and Quality, Operation and Maintenance of the PWS Facilities,
11.2 Compensation for City Operations and Maintenance of the PWS Facilities, Capital Improvement Plan and Budget and Expansion of City or District Programs, Discharge of the RO Concentrate and Insurance, Indemnification and Term.
As planned, the O&M Agreement was developed prior to start-up and commissioning of PWS.
Sections 6 of the approved Project Agreement and Section 7 of the Land Lease agreement outlined the topics that are covered in this O&M agreement.
During the last several months, staff from the City Public Works and Water Departments, City Attorney, and District staff, and the District’s attorney have worked in an iterative process to develop an O&M Agreement that meets the needs of both the City and the District.
FISCAL IMPACT: Fiscal impacts related to the PWS project are laid out in the Interagency and Project Agreement and associated staff report. Overall, the District will cover capital and other costs, including design, construction and commissioning of the PWS Project Facilities.
Once the facilities are constructed and in operation, the City will operate and maintain the Project Facilities under the governing principle of cost neutrality to ensure that the City’s actual costs are fully compensated by the District. Consistent with cost neutrality, the District shall pay the City its actual costs as to the facilities benefiting the District. For the Facilities of joint benefit, the District shall pay the City the percentage of costs based on the district percentage of benefit from the Facility. The City costs for the Facilities that benefit the City will be borne by the City’s Wastewater and Water enterprise funds. There is no impact to the City’s General Fund.
Prepared By:
Anne Hogan
Wastewater Systems Manager
Submitted By:
Mark R. Dettle
Director of Public Works
Approved By:
Matt Huffaker
City Manager
ATTACHMENTS:
1. ORIGINAL MOU.PDF
2. PROJECT AGREEMENT.PDF
3. LAND LEASE AND ASSOCIATED EXHIBITS.PDF
4. PROPOSED OPERATION AND MAINTENANCE AGREEMENT.PDF
11.3 11.4
11.5 11.6
11.7 11.8
11.9 11.10
11.11 11.12
11.13 11.14
11.15 11.16
11.17 11.18
11.19 11.20
11.21 11.22
11.23 11.24
Soquel Creek Water District – City of Santa Cruz
Pure Water Soquel Program – Tertiary Treatment Facility Agreement
ARTICLE 14: WAIVER
The waiver or failure to declare a breach in this AGREEMENT as a result of violation of any term or provision set forth in this AGREEMENT shall not constitute a waiver of that term or condition and shall not provide the basis for a claim of estoppel.
ARTICLE 15: DISPUTE RESOLUTION, MEDIATION, AND ARBITRATION
15.1 INFORMAL DISPUTE RESOLUTION
Representatives of CITY and DISTRICT with day‐to‐day involvement in the administration and performance of this AGREEMENT, shall initially and promptly enter into negotiations to attempt to address and resolve any disputes that may arise concerning this AGREEMENT. In connection with such negotiations, the PARTY asserting the dispute shall provide the other with a written description of the nature of the dispute, along with reasonable supporting documentation. Upon the expenditure of reasonable efforts towards resolution of a dispute through such informal negotiations without reaching agreement, a PARTY may seek mediation in accordance with this Article.
15.2 MEDIATION
15.2.1 Participation in Mediation. Following the completion of the informal negotiations as set forth in Section 15.1, if any dispute relating to this remains between the PARTIES (a "Mediation Dispute") and a PARTY requests mediation, the PARTIES shall attempt in good faith to settle and resolve the Mediation Dispute through mediation in accordance with the procedures specified in this Section 15.2. Each PARTY's good faith participation in mediation shall constitute a condition precedent to the right of the PARTY to pursue any other remedy available to the PARTY under this AGREEMENT or as a matter of law.
15.2.2 Procedures. Upon completion of the informal negotiations as set forth in Section 15.1, the PARTY seeking mediation shall provide notice of the commencement of mediation to the other PARTY within one‐hundred eighty (180) days following actual notice of the facts giving rise to the dispute. The PARTIES to the dispute shall jointly select a single neutral mediator to conduct the mediation. In the event that the PARTIES are unable to select a single mediator, then each PARTY to the dispute shall select one (1) mediator, and the selected mediators shall select one additional mediator to serve on the mediation panel.
15.2.3 Costs. The PARTIES to the Mediation Dispute shall share equally the mediation fees and expenses. Each PARTY shall bear its own attorney and consultant fees and other costs incurred in connection with the mediation.
11.25 11.26
11.27 11.28
30814.00101\33446309.7
15958040.6
TERTIARY TREATMENT FACILITY LAND LEASE
BY AND BETWEEN
CITY OF SANTA CRUZ,
A CALIFORNIA MUNICIPAL CORPORATION
(“Landlord”)
AND
SOQUEL CREEK WATER DISTRICT,
A CALIFORNIA COUNTY WATER DISTRICT
(“Tenant”)
_______________, 2020
11.29 TABLE OF CONTENTS
Page
-i1. DEFINITIONS................................................................................................................ 1
2. DEMISE ........................................................................................................................ 3
3. TERM............................................................................................................................ 3
4. POSSESSORY INTEREST TAX AND RENT ................................................................ 3
5. UTILITIES AND ACCESS RIGHTS. .............................................................................. 4
6. DESIGN AND CONSTRUCTION OF TERTIARY TREATMENT.................................... 4
7. USE AND OPERATION OF THE PROJECT. ................................................................ 5
8. INSURANCE ................................................................................................................. 7
9. INDEMNIFICATION......................................................................................................12
10. AMERICANS WITH DISABILITIES ACT.......................................................................13
11. ALTERATIONS, ADDITIONS AND IMPROVEMENTS .................................................13
12. DESTRUCTION AND RESTORATION.........................................................................14
13. LIENS...........................................................................................................................14
14. SURRENDER OF THE PROJECT. ..............................................................................14
15. DEFAULT.....................................................................................................................14
16. MISCELLANEOUS.......................................................................................................15
11.30 TABLE OF CONTENTS
Page
ii
EXHIBIT A INTERAGENCY AND PROJECT AGREEMENT
EXHIBIT B LEGAL DESCRIPTION
EXHIBIT C MAP OF LEASED LAND AND LICENSES
EXHIBIT D TEMPORARY CONSTRUCTION EASEMENT
EXHIBIT E FORM OF MEMORANDUM OF LEASE
11.31 30814.00101\33446309.7
1 15958040.6
LAND LEASE
THIS LAND LEASE (“Lease”) is made and entered into as of , 2020 (“Effective Date”), by and between CITY OF SANTA CRUZ, a California municipal corporation (“Landlord”), and SOQUEL CREEK WATER DISTRICT, a county water district organized pursuant to California Water Code Section 30000, et seq., or its assignee (“Tenant”).
RECITALS
A. Landlord and Tenant previously executed that certain Agreement By and Between Soquel Creek Water District and the City of Santa Cruz Regarding Source Water, Design, Construction, Start-Up and Ownership of the Tertiary Facility Component of the Pure Water Soquel Program dated July 19, 2019 as amended by subsequent letter agreements (collectively, the “Interagency and Project Agreement”), attached as Exhibit A. Section 7.2 of the Interagency and Project Agreement requires the parties to execute a land lease for the siting of the Tertiary Treatment Facility (as defined below).
B. Landlord is the owner of that certain real property commonly referred to as the Santa Cruz Wastewater Treatment Facility (defined as the “WWTF” in the Interagency and Project Agreement), which is located in the City of Santa Cruz, in the County of Santa Cruz, State of California, as more particularly described in Exhibit B (the “Land”).
C. Tenant has requested that Landlord lease a portion of the Land to Tenant on the terms and conditions contained herein in furtherance of the PWS (as defined below) and as set forth in Section 7.2 of the Interagency and Project Agreement (the “Premises”) as more particularly described in Exhibit C.
D. Landlord is willing to lease the Premises to Tenant on the terms and conditions contained herein for the construction and operation of the Tertiary Treatment Facility, as detailed on the Site Plan attached to this Lease as Exhibit D.
E. Tenant has determined, based on its review of the certified Pure Water Soquel (“PWS“) Environmental Impact Report (“EIR”), and California Environmental Quality Act (“CEQA”) addendum adopted under Public Resources Code section 21166, and CEQA Guidelines section 15162, that the PWS EIR and addendum considered and analyzed the actions authorized by the Lease, and that any relevant mitigation measures concerning those actions authorized by the Lease are addressed in the Mitigation Monitoring and Reporting Program adopted by Tenant. As such, Tenant has determined that no additional environmental review under CEQA is required for approval of the Lease.
NOW, THEREFORE, in consideration of the covenants herein contained, Landlord and Tenant hereby agree as follows:
1. DEFINITIONS
For purposes of this Lease, the following defined terms will have the meanings given them in this Section.
1.1 Business Day. Means any day other than Saturdays, Sundays and days on which Tenant is closed for business.
11.32 30814.00101\33446309.7
2 15958040.6
1.2 Claims. Means any and all liabilities, obligations, losses, damages, fines, penalties, forfeitures, claims, demands, suits, actions, causes of action, charges, judgments, costs (including, without limitation, attorneys’ and expert witness fees and costs of litigation and all appeals) and expenses of any nature whatsoever which may be imposed upon, incurred or paid by, or asserted against a party, the Tertiary Treatment Facility, the Land, the Premises or any interest therein.
1.3 Hazardous Materials. Means any chemical substances, pollutants, contaminants, materials, industrial solid wastes or other wastes, or combinations thereof, whether solid, liquid or gaseous in nature which poses or may pose a hazard to the health or safety of persons or the environment or the presence of which may require investigation or remediation under any applicable Environmental Laws, including, without limitation, material which is or becomes defined as a “hazardous waste” or “hazardous substance” under the Comprehensive Environmental Response Compensation and Liability Act (42 U.S.C. § 9601, et seq.) and/or the Resource Conservation and Recovery Act (42 U.S.C. § 6901, et seq.), Federal Water Pollution Control Act (33 U.S.C. § 1317), California Health and Safety Code, Division 20, mold and fungi, and/or which contains gasoline, diesel fuel or other petroleum hydrocarbons, polychlorinated biphenyls (PCBs), asbestos, urea formaldehyde foam insulation, or radon gas.
1.4 Interagency and Project Agreement. Has the meaning described in Recital A.
1.5 Land. Has the meaning described in Recital B.
1.6 Landlord. Means the City of Santa Cruz, a California municipal corporation.
1.7 Lease. Has the meaning described in the Preamble.
1.8 Legal Requirements. Means all statutes, codes, laws, ordinances, orders, judgments, decrees, injunctions, rules, regulations, permits, licenses, authorizations, directions and requirements of all federal, state, county, municipal and other governments, departments, commissions, boards, courts, authorities, officials and officers, foreseen or unforeseen, ordinary or extraordinary, which now or at any time hereafter are applicable to and enforceable against the Land, the Premises, the Tertiary Treatment Facility, or any part thereof, or any construction, use, manner of use or condition of the Land, Premises, or Tertiary Treatment Facility, or any part thereof.
1.9 O & M Plan. Means that certain Operations and Maintenance Plan and Agreement to be negotiated and executed by Landlord and Tenant regarding the operation and maintenance of the Tertiary Treatment Facility as set forth in Section 7.1 and as referred to in Article 6 of the Interagency and Project Agreement.
1.10 Premises. Has the meaning described in Recital C.
1.11 PWS. Has the meaning set forth in Section 1 of the Interagency and Project Agreement.
1.12 Tenant. Means the Soquel Creek Water District, a county water district organized pursuant to California Water Code Section 30000, et seq.
1.13 Term. Means the initial term and any extension of this Lease as provided in Section 3.
11.33 30814.00101\33446309.7
3 15958040.6
1.14 Tertiary Treatment Facility. Has the meaning set forth in Section 1 of the Interagency and Project Agreement, and its design, construction, operation, repair, and/or maintenance is also referred herein as “Project”.
1.15 WWTF. Has the meaning in Recital B and Section 1 of Interagency and Project Agreement.
2. DEMISE
2.1 Creation of Lease. For and in consideration of the rents and covenants herein specified to be paid and performed by Tenant, Landlord hereby demises and leases to Tenant, and Tenant hereby hires and leases from Landlord, the Premises, for the Term and upon and subject to the terms and conditions and for the purposes herein set forth.
2.2 Covenant of Title and Quiet Enjoyment. That Landlord is well seized of and has good title to the Premises and all improvements located on it on the date of this Lease, free and clear of all liens, encumbrances, easements, tenancies and restrictions other than those currently on record as of the Effective Date. Landlord warrants and will defend the title, and will indemnify Tenant against any damage and expense which Tenant may suffer by reason of any claim against title or defect in the title or description of the Premises.
3. TERM
3.1 Initial Term. This Lease will be effective as of the Effective Date and if not sooner terminated as provided in this Lease, will expire at 11:59 pm on [September 1, 2059].
3.2 Extensions. This Lease shall be extended for subsequent five (5) year terms unless either party provides written notice to the other party at least twenty-four (24) months prior to the expiration of the then existing term of its intent to terminate the Lease.
4. POSSESSORY INTEREST TAX AND RENT
4.1 Payment of Taxes. The parties hereby recognize and understand that this Lease may create a possessory interest subject to property taxation, and that Landlord may be subject to the payment of property taxes levied on such interest. Any such imposition of a possessory interest tax shall be a tax liability of Tenant. Tenant shall pay any personal property taxes that may become due for equipment, fixtures, inventory, or other personal property installed, maintained, or present in the Premises.
4.2 Payment of Possessory Interest Tax. Landlord shall promptly notify Tenant of any possessory interest tax imposed against Landlord’s or Tenant’s interest in the Premises, and shall provide Tenant with a copy of any bill or assessment imposing the possessory interest tax.
Tenant shall remit to the taxing agency the amount of the possessory interest tax imposed against Landlord or Tenant and shall promptly notify Landlord in writing of the payment. In addition and without limiting Landlord’s rights under this Lease, if Tenant fails to timely pay such possessory interest tax, Landlord may do so and Tenant shall promptly reimburse Landlord.
4.3 Rent. Pursuant to Section 7.2.1 of the Interagency and Project Agreement, Landlord shall lease the Premises without monetary rent ($0) as a partial recognition of the value that PWS provides to the Landlord and greater community.
11.34 30814.00101\33446309.7
4 15958040.6
5. UTILITIES AND ACCESS RIGHTS.
5.1 Other Utilities. During the Term, Tenant will pay, or cause to be paid, all charges which are incurred by Tenant or which are asserted to be a charge or lien against the Tertiary Treatment Facility for electricity or any other third party provided utility service used, rendered or supplied upon or in connection with the Tertiary Treatment Facility, in accordance with the terms and conditions of the O & M Plan.
5.2 Access Rights. Landlord agrees to sign such documents or easements as may reasonably be required by utility companies to provide such service to the Premises, including the grant to Tenant or to the servicing utility company at no cost to Tenant of an easement in, over, across, under, above and/or through the Land to the Premises as required at such locations acceptable to Landlord, Tenant, and the servicing utility company.
6. DESIGN AND CONSTRUCTION OF TERTIARY TREATMENT FACILITY.
6.1 Design. The Tenant shall design the Tertiary Treatment Facility to meet those technical requirements set forth in Exhibit D. Landlord and Tenant shall coordinate design as set forth in Section 5.1 of the Interagency and Project Agreement.
6.2 Construction.
6.2.1 General. Tenant shall construct the Tertiary Treatment Facility as set forth in the Interagency and Project Agreement and in substantial compliance with applicable Legal Requirements. Tenant shall complete construction within the time periods required by applicable funding agencies for the Tertiary Treatment Facility.
6.2.2 Demolition of Existing Improvements. Prior to or concurrently with the construction of the Tertiary Treatment Facility, Tenant shall be responsible for demolishing any existing portions of the WWTF within the Premises. Tenant and Landlord shall coordinate any operational impacts to the WWTF occasioned by such work, and Landlord shall review and approve a demolition plan outlining such work prior to its commencement provided, however, that such approval shall not be unreasonably withheld. Tenant shall endeavor to provide Landlord with two months’ notice prior to demolition, and Tenant shall provide Landlord with at least two week’s written notice prior to demolition. By at least four weeks prior to the commencement of demolition activities in this Section, Landlord may remove and relocate any equipment and materials within the Premises that it intends to retain. If Landlord fails to timely do so, Tenant may demolish such equipment and materials at its sole cost and expense, provided, however, that at Landlord’s request, Tenant shall use its best efforts to remove and relocate any salvageable fixtures or equipment that can only be reasonably be removed during the demolition process.
6.2.3 Staging Areas. Pursuant to Section 7.2.2 of the Interagency and Project Agreement, Tenant’s staging areas for construction of the Tertiary Treatment Facility and related site improvements shall be situated within the Land, to be delineated in a separate Temporary Construction Easement in the form attached as Exhibit E to this Lease. Exhibit E contains an anticipated area for the Temporary Construction Easement. Landlord shall provide an executed Temporary Construction Easement for such area upon Tenant’s completion of the design for the Tertiary Treatment Facility and within ten (10) Business Days of receipt of a final legal description from Tenant.
11.35 30814.00101\33446309.7
5 15958040.6
6.2.4 As Builts. Landlord and Tenant understand and agree that the final location of the Premises may differ from that depicted in Exhibit C depending on changes to the Tertiary Treatment Facility during design and construction. If necessary, and upon the reasonable approval of the alternative location by the parties through the design and construction process, the Tenant shall prepare an updated Exhibit C, including legal descriptions, after construction to reflect the actual location of the Tertiary Treatment Facility and Premises. In such event, the updated Exhibit C shall supersede and replace the current Exhibit C and constitute an amendment to this Lease without the need for further documentation.
6.3 Cost of Construction. Construction costs shall be allocated between the parties as set forth in the Interagency and Project Agreement.
6.4 Title to Improvements. Title to the Tertiary Treatment Facility shall be held as set forth in Section 7.1 of the Interagency and Project Agreement.
6.5 Landlord Expansion. As set forth in Section 7.1.4 of the Interagency and Project Agreement, the Premises contains adequate space for the expansion of the Tertiary Treatment Facility or a similar facility for the production of additional recycled water sufficient for the Landlord’s use. If Landlord elects to pursue such a project, Landlord and Tenant shall negotiate in good faith regarding necessary amendments to the Lease and O & M Plan to allow Landlord to operate a recycled water facility on the Premises jointly with Tenant or by itself without any major disruptions to the Tertiary Treatment Facility and associated downstream processes of the PWS.
Such amendments shall ensure that Tenant retains the ability to operate the Tertiary Treatment Facility without additional cost unless compensated by Landlord.
7. USE AND OPERATION OF THE PROJECT.
7.1 Purposes. The Premises will be used for the construction, operation, maintenance, and repair of the Tertiary Treatment Facility.
7.2 O & M Plan. Landlord and Tenant shall negotiate the O & M Plan in good faith and subject to the requirements of the Interagency and Project Agreement and this Lease.
Landlord and Tenant understand that Tenant will contract with Landlord to provide operational services to Tenant for the Tertiary Treatment Facility in the O & M Plan. The O & M Plan shall permit Landlord to recover its legal, fair marginal costs attributable to the operation of the Tertiary Treatment Facility to ensure that operations are cost neutral to other WWTF operations.
7.3 Additional Access, Pipeline, and Use Rights.
7.3.1 During the Term, Landlord grants a non-exclusive license to Tenant over, under and through the Land as reasonably necessary for Tenant, its contractors, consultants, and agents to access the Land and Premises and supervise the operation the Tertiary Treatment Facility. Tenant shall comply with reasonable notice and security procedures requested by Landlord when doing so. If requested by Landlord, the location of any Tenant’s licenses granted under this Section shall be further defined in a specific legal description. If prepared, such legal description shall be included in Exhibit C to this Lease and become a part of this Lease without further action by Landlord and Tenant
7.3.2 Moreover, Landlord grants a non-exclusive license to Tenant to allow Tenant, its contractors, consultants, and agents over, under and through the Land for the construction, maintenance, and repair of such pipelines necessary to operate the Tertiary
11.36 30814.00101\33446309.7
6 15958040.6
Treatment Facility. Lastly, Landlord grants a non-exclusive license to Tenant over, under and through the Land for the non-exclusive use by Tenant, its contractors, consultants, and agents of portions of the Land for storage of chemicals, equipment and facilities necessary to operate the Tertiary Treatment Facility. The initial location of such licenses may be depicted in Exhibit C. If necessary, and upon the approval of the alternative location by the Director of Public Works during the design and construction process, the Tenant shall prepare an updated Exhibit C after construction to reflect the actual location of such licenses. Tenant may further prepare legal descriptions of the location of any licenses which shall become part of Exhibit C. In all such events, the updated Exhibit C shall supersede and replace the current Exhibit C and constitute an amendment to this Lease without the need for further documentation.
7.3.3 If required by Landlord during the term of this Lease for the purpose of locating or relocating City facilities, the pipelines and any licenses referenced in Section 7.3.2 shall be relocated by Tenant at Tenant’s expense.
7.3.4 All licenses referenced in this Section 7.3 shall be irrevocable during the term of this Lease and shall automatically expire upon the expiration or termination of this Lease.
7.4 Hazardous Materials.
7.4.1 Use. Tenant hereby agrees that Tenant and Tenant’s officers, directors, members, employees, representatives, agents, contractors, subcontractors, lessees, sublessees, concessionaires, invitees and any other users or occupants of the Premises or the Tertiary Treatment Facility (referred to collectively herein as “Tenant’s Representatives”) shall not use, create, generate, manufacture, refine, produce, process, store or dispose of Hazardous Materials, in, at, on, under or about the Land, Premises, and the Tertiary Treatment Facility or transport to or from the Land, Premises and/or Tertiary Treatment Facility at any time for the purpose of generating, manufacturing, refining, producing, processing, storing, disposing of or transporting Hazardous Materials, except in compliance with all applicable Environmental Laws. “Environmental Laws” shall mean the Clean Water Act (33 U.S.C. §1251, et seq.); the Clean Air Act (42 U.S.C. §7401, et seq.); the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (42 U.S.C. §9601, et seq.); the Resource Conservation and Recovery Act (42 U.S.C. §6901, et seq.); and the Toxic Substances Control Act (15 U.S.C. §2601, et seq.), each as may be amended or renumbered from time to time, and their respective state and local counterparts and all regulations promulgated pursuant to any of the foregoing. Landlord shall not constitute a Tenant’s Representative for purposes of this Section 7.4.
7.4.2 Tenant Remediation. If, at any time during the Term or during the pendency of Tenant’s construction of the Tertiary Treatment Facility, any contamination of the Land, the Premises, or the Tertiary Treatment Facility by Hazardous Materials is directly caused by the acts or omissions of Tenant or Tenant’s authorized contractors or others acting on Tenant’s behalf or under Tenant’s authority or control (“Tenant Contamination”), then Tenant, at its sole cost and expense, if and to the extent actually required by applicable Environmental Laws, shall promptly and diligently remove such Hazardous Materials from the Land, the Tertiary Treatment Facility, or the Premises in accordance with the requirements of all applicable Environmental Laws and industry standards then prevailing in the Hazardous Materials management and remediation industry. Tenant shall promptly take all actions at its sole cost and expense as are necessary to return the Land, Premises, or the Tertiary Treatment Facility (and the improvements located or to be located thereon) to the condition existing prior to the introduction of any such Hazardous Materials; provided that Landlord’s approval of such action(s) shall first be obtained, which approval shall not be unreasonably withheld so long as such action(s) would not potentially
11.37 30814.00101\33446309.7
7 15958040.6
have any material adverse long-term or short-term effect on the Land, Premises or the Tertiary Treatment Facility (or the improvements located or to be located thereon). Tenant Contamination shall not include any contamination caused by the Landlord or its officials, employees or contractors operating pursuant to the O&M Plan.
7.4.3 Landlord Remediation. Except as set forth in Section 7.4.5, if at any time during the Term, any contamination of the Land, the Premises, or the Tertiary Treatment Facility by Hazardous Materials is directly caused by the acts or omissions of Landlord or Landlord’s authorized contractors or others acting on Landlord’s behalf or under Landlord’s authority or control (“Landlord Contamination”), then Landlord, at its sole cost and expense, if and to the extent actually required by applicable Environmental Laws, shall promptly and diligently remove such Hazardous Materials from the Land, the Tertiary Treatment Facility, or the Premises to the extent reasonably possible in accordance with the requirements of all applicable Environmental Laws and industry standards then prevailing in the Hazardous Materials management and remediation industry.
7.4.4 Indemnification. Except as otherwise provided in the O&M Plan, each party (“Indemnitor”) will indemnify, defend and hold harmless the other party from all claims resulting from the death of or injury to any person or damage to any property whatsoever, but only in proportion to and to the extent such claims arise from or are caused in whole or in part, directly or indirectly, by: (i) Indemnitor (either Tenant for Tenant Contamination or Landlord for Landlord Contamination); (ii) Indemnitor’s failure to comply with any Environmental Laws; (iii) Indemnitor’s breach of any covenant, warranty or representation under this Section 7.4; and (iv) Indemnitor’s negligent or intentional acts or omissions in any way relating to this Lease. The mutual indemnification obligations under this Section 7.4 are subject to the principles of comparative negligence, and each party shall bear the proportionate cost of any loss, damage, expense or liability attributable to that party’s negligence. Notwithstanding the above, no party shall be indemnified hereunder for any loss, liability, damage or expense resulting from its sole negligence or willful misconduct.
7.4.5 Pre-Existing Conditions. Landlord represents to Tenant that as of the Effective Date, to the actual knowledge of Landlord, the Land is free of Hazardous Materials in violation of Environmental Laws. In the event Tenant discovers during construction of the Tertiary Treatment Facility any existing Hazardous Materials on or about the Premises (“Existing Contamination”) that require remediation under any applicable law, Tenant shall promptly notify Landlord. The parties shall meet and confer regarding the appropriate course of action but Tenant shall either (1) be responsible for the cost of such remediation unless otherwise agreed to by the parties or (2) be entitled to terminate the Lease and consider alternative facility locations or operations for PWS. In such event, Landlord and Tenant shall negotiate such amendments to the Interagency and Project Agreement and O & M Plan as necessary to reflect such alternative PWS configuration provided, however, that any alternative configuration that includes other portions of the Land shall be subject to Landlord’s approval in its reasonable discretion.
8. INSURANCE. The insurance obligations of the Tenant and its Contractors/ subcontractors are separate, independent obligations under this Lease.
8.1 Tenant’s Policies of Insurance. From and after the Effective Date, based on the activities being undertaken at the Tertiary Treatment Facility on the Premises, Tenant will carry and maintain throughout the Term, at its sole cost and expense, the types of insurance in the amounts and forms hereinafter specified.
11.38 30814.00101\33446309.7
8 15958040.6
8.1.1 Commercial General Liability. Tenant will obtain and maintain commercial general liability insurance with coverage limits of not less than Two Million Dollars ($2,000,000.00) for each occurrence and Two Million Dollars ($2,000,000.00) in the aggregate insuring against any liability of the insured including products and completed operations, property damage, bodily injury and personal & advertising injury with respect to the Tertiary Treatment Facility or arising out of the maintenance, use or occupancy thereof and of the Premises.
All such insurance will specifically insure performance by Tenant of the indemnity agreements set forth herein. Such policy will name Landlord, its officials, officers, and employees as additional insureds. Tenant’s liability insurance policy will provide that the insurance company has the duty to defend all insureds under the policy; provide that defense costs are paid in addition to and do not deplete any of the policy limits; contain a cross-liability endorsement or separate of insureds clause; provide that it is primary to and non-contributing with any policy of insurance carried by Landlord covering the same loss; and provide that any failure to comply with any reporting provisions will not affect the coverage provided to Landlord, its directors, members, officers, employees, property managers and mortgagee. All endorsements affecting such additional insured status will be acceptable to Landlord.
8.1.2 Property Insurance. Tenant will obtain and maintain an “all risk” property insurance covering the Tertiary Treatment Facility during the Term, including all improvements, alterations, additions installed on or in the Tertiary Treatment Facility, trade fixtures, and business personal property of Tenant within the Tertiary Treatment Facility, in an amount not less than the full replacement cost providing protection against any peril included within the classification “Special Form” coverage.
8.1.3 Automobile Liability Insurance. Tenant will obtain and maintain automobile liability insurance, including the ownership, maintenance and operation of any automobile, owned, hired or non-owned, in a combined single limit of One Million Dollars ($1,000,000.00) for each accident for bodily injury and property damage.
8.1.4 Workers’ Compensation Insurance and Employer’s Liability Insurance.
Worker’s Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease.
8.1.5 Broader Coverage. The limits of insurance described herein are not intended as a limitation of liability under this Lease. Tenant may obtain higher limits in its discretion. If the Tenant maintains broader coverage and/or higher insurance policy limits than the minimums shown above, the Landlord requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Tenant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Landlord.
8.1.6 Primary Coverage. For any claims related to the Lease, the Premises and/or the improvements located thereon (including, but not limited to, any Tenant Improvements), Tenant’s insurance coverage shall be primary insurance as respects the Landlord, its officers, officials, and employees. Any insurance or self-insurance maintained by the Landlord shall be excess of Tenant’s insurance and shall not contribute with it.
8.1.7 Additional Insured. The Landlord (the City of Santa Cruz), its officers, officials, and employees are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of work or operations performed by or on behalf
11.39 30814.00101\33446309.7
9 15958040.6
of Tenant including, but not limited to, materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of Tenant. General liability coverage can be provided in the form of an endorsement to Tenant’s insurance (at least as broad as ISO Form CG 20 10).
8.1.8 Acceptable Insurers. All policies of insurance required to be maintained by Tenant herein will be issued by insurance companies qualified to do business in the State and reasonably acceptable to Landlord. Each such insurance company will have an A.M. Best rating of at least A-VII
8.1.9 Waiver of Subrogation. Landlord and Tenant hereby waive any rights each may have against the other in connection with any of the damage occasioned to Landlord or Tenant, as the case may be, their respective property, the Land and the Tertiary Treatment Facility or its contents, arising from any risk generally covered by the required insurance coverage hereunder; the parties each, on behalf of their respective insurance companies insuring the property of either Landlord or Tenant against any such loss, waive any right of subrogation that it may have against Landlord or Tenant, as the case may be. The foregoing waivers of subrogation will be operative only as long as available in the State and provided they do not invalidate any such policy.
8.1.10 Evidence Required. Upon commencement of the Term and thereafter upon reasonable request by Landlord from time to time, Tenant will provide Landlord with a copy of the certificate of insurance for each policy and endorsements required to be furnished pursuant to this Section.
8.1.11 Deductibles and Retentions. Tenant will be responsible for payment of any deductible or retention on Tenant’s policies without right of contribution from the Landlord.
8.1.12 Earthquake Insurance. Tenant is not required presently to maintain earthquake insurance during the term of this Lease.
8.1.13 Self-insurance. Upon evidence of financial capacity satisfactory to Landlord, Tenant’s obligation hereunder may be satisfied in whole or in part by adequately funded self-insurance.
8.1.14 Notice of Cancellation. Each insurance policy required by this Paragraph shall provide that coverage shall not be canceled, except with written notice to the Landlord.
8.1.15 Modifications. Landlord reserves the right to modify these requirements at any time, including reasonable increases in limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances with prior notice to Tenant.
8.2 Contractor Insurance. For any construction, Tenant shall require and verify that all contractors and subcontractors maintain insurance meeting all the requirements stated herein, and Tenant shall ensure that the Landlord, its officers, officials, employees, and agents are additional insureds on insurance required from contractors and subcontractors. Insurance requirements for contractors and subcontractors may be modified with written agreement from the City of Santa Cruz, depending on the scope of work.
Tenant shall include provisions in all construction or design-build agreements for construction of the Project requiring contractors and subcontractors to procure and maintain the following
11.40 30814.00101\33446309.7
10 15958040.6
minimum insurance to fully protect Landlord(and in any event throughout the course of construction and for five (5) years after completion of the work):
8.2.1 Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence and $10,000,000 in the aggregate; $5,000,000 personal injury liability, $10,000,000 aggregate for products-completed operations for Tenant’s general contractor.
For subcontractors, minimum limits of no less than $2,000,000 per occurrence/$2,000,000 aggregate are required. If a general aggregate limit applies, the general aggregate limit shall apply separately to this project/location and the general aggregate limit shall be twice the required occurrence limit. However, if contractors or subcontractors maintain higher limits, Landlord requires and shall be entitled to coverage for the higher limits maintained
8.2.2 Automobile Liability. Proof of coverage for $1,000,000 provided on ISO Form Number CA 00 01 covering any auto (Code 1), or if Contractor has no owned autos, hired, (Code 8) and non-owned autos (Code 9), per accident for bodily injury and property damage.
8.2.3 Workers’ Compensation Insurance and Employer’s Liability Insurance.
Worker’s Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease. The Workers Compensation policy shall be endorsed with a waiver of subrogation in favor of Landlord.
8.2.4 Builder’s Risk (Course of Construction) Insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the Project and no coinsurance penalty provisions. Tenant may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage.
8.2.5 Professional Liability Insurance (APPLICABLE TO ALL CONTRACTORS
AND SUBCONTRACTORS OF ANY TIER PERFORMING ANY PROFESSIONAL SERVICES INCLUDING ENGINEERS, SURVEYORS, OR CONSULTANTS) with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate. Claims Made polices shall include a five-year extended reporting period beyond completion of the work.
8.2.6 Contractors Pollution Liability (CPL) (APPLICABLE TO ALL
CONTRACTORS AND SUBCONTRACTORS OF ANY TIER PERFORMING ANY REMOVAL,
REMEDIATION, ABATEMENT, TRANSPORTATION OR DISPOSAL OF ANY HAZARDOUS MATERIALS AND/OR PROJECTS INVOLVING ENVIRONMENTAL HAZARDS) with limits no less than $2,000,000 per occurrence or claim, and $4,000,000 policy aggregate. Claims Made polices shall include a five-year extended reporting period beyond completion of the work. (a) If the services involve lead-based paint or asbestos identification / remediation, the Pollution Liability shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification / remediation, the Pollution Liability shall not contain a mold exclusion and the definition of “Pollution” shall include microbial matter including mold. (b) The Automobile Liability policy shall be endorsed to include Transportation Pollution Liability insurance, covering hazardous materials to be transported by Contractor
11.41 30814.00101\33446309.7
11 15958040.6
pursuant to the Agreement. This coverage may also be provided on the Contractors Pollution Liability policy.
8.2.7 Broader Coverage. The limits of insurance described herein are not intended as a limitation of liability under this Lease. Tenant may require higher insurance limits or Contractor may obtain higher limits in its discretion. If the Contractor maintains broader coverage and/or higher insurance policy limits than the minimums shown above, the Landlord requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Landlord.
8.2.8 Additional Insured. Landlord (City of Santa Cruz), its officers, employees, and agents (collectively the “Additional Insured”) to be named as additional insureds on the Commercial General Liability and the Automobile Liability policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. Additional Insured coverage shall be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as Insurance Services Office Form CG 20 10 11 85). A copy of the endorsement evidencing that the Additional Insured have been added as an additional insured on the policy, must be attached to the certificate of insurance.
8.2.9 Subcontractors. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that the Landlord is an additional insured on insurance required from subcontractors. For Commercial General Liability coverage subcontractors shall provide coverage with a format at least as broad as Insurance Services Office form CG 20 38 04 13.
8.2.10 Notice of Cancellation. A provision that coverage will not be cancelled or subject to reduction without written notice given to the Landlord.
8.2.11 Primary Coverage. For any claims related to this contract, the Contractor’s insurance coverage shall be primary insurance as respects the Additional Insured. Any insurance or self-insurance maintained by the Additional Insured shall be excess of the Contractor’s insurance and shall not contribute with it.
8.2.12 Waiver of Subrogation. Contractor shall agree to waive rights of subrogation on the CGL policy which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor shall agree to obtain any endorsement that may be necessary to affect this waiver of subrogation. Contractor shall to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision shall apply regardless of whether or not Landlord has received a waiver of subrogation endorsement from the insurer.
8.2.13 Excess Liability/Umbrella Insurance Policies. The excess/liability policies will provide similar coverage as the primary CGL policy with no new exclusions - Excess liability insurance must follow form the terms, conditions, definitions, and exclusions of the underlying CGL insurance. The excess/umbrella policy must also be written on a primary and noncontributory basis for an additional insured, and that it will apply before any other insurance that is available to such additional insured which covers that person or organization as a named insured, and we will not share with that other insurance.
11.42 30814.00101\33446309.7
12 15958040.6
8.2.14 Claims Made Policies. If any of the required policies provide coverage on a claims-made basis:
(a) The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
(b) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. (c) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Contractor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
8.2.15 Self-insurance. Upon evidence of financial capacity satisfactory to Landlord and Tenant, Contractor’s obligation hereunder may be satisfied in whole or in part by adequately funded self-insurance.
8.2.16 Deductibles and Retentions. Contractor will be responsible for payment of any deductible or retention on Contractor’s policies without right of contribution from the City.
8.2.17 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A: VII, unless otherwise acceptable to the Landlord or Tenant.
8.2.18 Verification of Coverage. Tenant shall provide Landlord with a copy of the Contractor’s/subcontractor’s certificate of insurance for each policy and endorsements required to be furnished pursuant to this Section. Policy endorsements are to be approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning will not waive the Contractor’s or Tenant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
8.2.19 Modifications. Landlord reserves the right to modify these requirements applicable to Contractor at any time, including reasonable increases in limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances with prior notice to Tenant.
9. INDEMNIFICATION.
9.1 Except as otherwise provided in the Interagency and Project Agreement and the O&M Plan, each party (“Indemnitor”) agrees to indemnify, defend, and hold harmless at its own expense, the other party, its directors, agents, officers, employees, and representatives (“Indemnified Parties”) from and with respect to any claims, actions, causes of action, demands, suits, orders, judgments, liabilities, payments, losses, damages, and costs and expenses (including reasonable attorneys’, consultants’ and experts’ fees and costs) (collectively, “Losses”) but only in proportion to and to the extent such Losses are caused by or arise out of or relate to any negligent act, error or omission, or willful misconduct of the Indemnitor, its directors, agents, officers, employees, and representatives acting under this Lease.
11.43 30814.00101\33446309.7
13 15958040.6
The mutual indemnification obligations under this Lease are subject to the principles of comparative negligence, and each party shall bear the proportionate cost of any loss, damage, expense or liability attributable to that party’s negligence. Notwithstanding the above, no party shall be indemnified hereunder for any loss, liability, damage or expense resulting from its sole negligence or willful misconduct.
9.2 Contractors. To the extent permitted by applicable law, Tenant shall require that its contractors and subcontractors constructing, repairing, maintaining or operating the Tertiary Treatment Facility or performing other work on the Premises to indemnify, defend and hold harmless the City, its officials, officers, employees, agents, and volunteers for their negligent acts or omissions or willful misconduct.
10. AMERICANS WITH DISABILITIES ACT.
10.1 Pursuant to California Civil Code section 1938:
“A Certified Access Specialist (CASp) can inspect the subject premises and determine whether the subject premises comply with all of the applicable construction-related accessibility standards under state law. Although state law does not require a CASp inspection of the subject premises, the commercial property owner or lessor may not prohibit the lessee or tenant from obtaining a CASp inspection of the subject premises for the occupancy or potential occupancy of the lessee or tenant, if requested by the lessee or tenant. The parties shall mutually agree on the arrangements for the time and manner of the CASp inspection, the payment of the fee for the CASp inspection, and the cost of making any repairs necessary to correct violations of construction-related accessibility standards within the premises.”
10.2 Tenant acknowledges and expressly accepts full responsibility (with the exception of the parking lot area, for which Landlord retains responsibility) and shall incur all costs and expenses for compliance with the requirements of the Americans with Disabilities Act (ADA) and any other local, state or federal law or regulation regarding the accessibility of the Premises and of the Tertiary Treatment Facility by disabled individuals. Tenant agrees to release, indemnify, defend and hold harmless Landlord (and its officials, officers, employees, and agents, successors and assigns) from and against any claim, loss, expense or liability arising from Tenant's failure to fully comply with all such laws or regulations.
11. ALTERATIONS, ADDITIONS AND IMPROVEMENTS.
11.1 Design. The Parties shall work cooperatively with regard to the design, construction, operation, maintenance, and repair of the Tertiary Treatment Facility as set forth in the MOU, Project Agreement, and in accordance with an O&M Plan to be developed and mutually agreed upon by the Parties.
11.2 Construction. All construction, addition, improvement, and/or alteration on, at or about the Premises, which has been approved by the Landlord, shall be accomplished expeditiously, diligently, and with due care. Tenant shall take all reasonably necessary measures to minimize any damage, disruption or inconvenience caused by such work and make adequate provision for the safety and convenience of all persons affected thereby. The Tertiary Treatment Facility shall be constructed and maintained in a good and workmanlike manner and in compliance with all applicable local, state and federal laws, regulations, and permits.
11.44 30814.00101\33446309.7
14 15958040.6
12. DESTRUCTION AND RESTORATION.
If at any time during the term of this Lease the Tertiary Treatment Facility is destroyed in whole or in part by fire, theft, the elements, or any other cause not the fault of Landlord, this Lease shall continue in full force and effect and Tenant, at Tenant's own cost and expense, shall repair and restore the Tertiary Treatment Facility, provided that Tenant actually receives insurance proceeds covering the estimated cost of such repair and restoration. Any restoration by Tenant shall comply with original plans for the Tertiary Treatment Facility, except as may be otherwise modified by Tenant and approved in writing by Landlord. Notwithstanding the foregoing, Tenant shall have the right to terminate this Lease if, during the last ten years of the Lease's term, the Tertiary Treatment Facility is damaged or destroyed by a casualty. In such event, if requested by Landlord, Tenant shall demolish and remove all damaged facilities and equipment and restore the Premises and Land to its original condition, excepting normal wear and tear.
13. LIENS.
13.1 Discharge of Liens. During the Term of this Lease, Tenant will not permit to remain, and will promptly discharge, at its cost and expense, all liens (other than liens created by Landlord) upon the Tertiary Treatment Facility; provided, however, that the existence of any mechanics liens or rights thereto will not constitute a violation of this Section if payment is not yet due under the contract which is the foundation of such liens or rights thereto. Tenant shall pay, when due, all claims for labor and materials furnished to or for Tenant for use in improving the Premises. If any such liens, stop notices, or similar proceedings are filed or commenced, Tenant shall, within thirty (30) days after notice of the filing, cause the same to be discharged of record by payment, deposit, order of court or by bonding. Tenant hereby indemnifies and holds Landlord harmless against loss, damage, attorneys' fees and all other expenses on account of claims of lien of laborers or materialmen or others for work performed or materials or supplies furnished to Tenant or persons claiming under it.
13.2 Notice of Non-responsibility. Landlord will have the right at all times to post and keep posted on the Tertiary Treatment Facility any notices permitted or required by law.
14. SURRENDER OF THE PROJECT.
On the last day of the Term or upon any earlier termination of this Lease pursuant to the provisions of this Lease and the Interagency and Project Agreement, the parties shall proportionally bear the costs of (i) the removal and relocation of the Tertiary Treatment Facility to a location designated by Tenant, (ii) related demolition work on the Premises and Land, and (iii) such work reasonably required to return the Premises to the condition existing as of the Effective Date excepting wear and tear and any demolition work on the Premises undertaken by Tenant as part of the initial construction of the Tertiary Treatment Facility. The allocation of these costs shall be determined by reviewing the actual proportional use of the tertiary treated water produced by the Tertiary Treatment Facility by each party. Such cost allocation shall be the same as set forth in Article 8 of the Interagency and Project Agreement, and the parties shall retain records of such historic use during the Term of this Lease as more particularly set forth in the O & M Plan.
15. DEFAULT.
15.1 Dispute Resolution. Disputes under this Lease shall be subject to the dispute resolution procedures set forth in Section 15 of the Interagency and Project Agreement.
11.45 30814.00101\33446309.7
15 15958040.6
15.2 Default During Construction.
Without limiting Landlord’s other rights and remedies in the event of default Tenant’s default during the construction of the Tertiary Treatment Facility, Landlord may enter onto the Premises and undertake such work necessary to ensure the continued operation of the WWTF.
Prior to exercising its rights under this section and in addition to the informal mediation process under Section 15.1, Landlord shall provide Tenant with fourteen (14) days prior written notice of its intent to exercise its rights under this Section.
16. MISCELLANEOUS.
16.1 Partial Invalidity. If any term or provision of this Lease is determined to be invalid or unenforceable, the remainder of this Lease will not be affected thereby, and each term and provision of this Lease will be valid and be enforced to the fullest extent permitted by law.
16.2 Notices. Any notice, request, consent, demand or other communication permitted or required to be given under this Lease will be deemed given (a) on the date of delivery (if delivered by messenger or other form of hand-delivery), (b) on the date of transmission (if delivered and confirmed by email, provided a copy of such email is sent by certified mail), (c) three (3) Business Days following mailing by an internationally recognized overnight carrier, or (d) ten (10) Business Days after deposit in the mail by certified mail, return receipt requested, with postage prepaid and duly addressed to the party to be notified, as follows:
If to Landlord: City of Santa Cruz
809 Center Street, Room 10
Santa Cruz, CA 95060
Attention: City Manager
Email:
with a copy to: City of Santa Cruz
809 Center Street, Room 10
Santa Cruz, CA 95060
Attention: City Attorney
Email:
with a copy to: City of Santa Cruz
809 Center Street, Room 201
Santa Cruz, CA 95060
Attention: Public Works Director
Email:
If to Tenant: Soquel Creek Water District
5180 Soquel Drive
Soquel, CA 95073
Attention: General Manager
Email: [email protected]
11.46 30814.00101\33446309.7
16 15958040.6
with a copy to: Soquel Creek Water District
5180 Soquel Drive
Soquel, CA 95073
Attention: District Counsel
Email: [email protected]
Or to such other address or addresses as Landlord or Tenant or a Leasehold Mortgagee may from time to time designate by written notice given by registered mail. All notices will be effective upon receipt or upon an attempted delivery if receipt of such notice has been refused by the party to whom such notice is directed.
16.3 Tenant Representations.
16.3.1 All requisite action has been taken by Tenant in connection with entering into this Lease. This Lease has been duly executed and delivered by Tenant and constitutes the legally valid and binding obligation of Tenant, enforceable against Tenant in accordance with its terms, except as the same may be affected by bankruptcy, insolvency, moratorium or similar laws or by legal or equitable principles relating to or limiting the rights of contracting parties generally.
16.3.2 The execution of this Lease and the acceptance of the obligations set forth in this Lease do not violate any order or ruling of any court binding on Tenant or any provision of any indenture, agreement or other instrument to which Tenant is a party or may be bound. Neither the entry into nor the performance of this Lease has resulted or will result in the violation, or conflict with, or invalidate, cancel or make inoperative, or constitute a default under any charter, bylaw, partnership agreement, trust agreement, mortgage, deed of trust, indenture, contract, credit agreement, franchise, permit, judgment, decree, order, easement, restriction or other charge, right or interest applicable to Tenant.
16.4 Landlord Representations.
16.4.1 All requisite action has been taken by Landlord in connection with entering into this Lease. This Lease has been duly executed and delivered by Landlord and constitutes the legally valid and binding obligation of Landlord, enforceable against Landlord in accordance with its terms, except as the same may be affected by bankruptcy, insolvency, moratorium or similar laws or by legal or equitable principles relating to or limiting the rights of contracting parties generally.
16.4.2 The execution of this Lease and the acceptance of the obligations set forth in this Lease do not violate any order or ruling of any court binding on Landlord or any provision of any indenture, agreement or other instrument to which Landlord is a party or may be bound.
Neither the entry into nor the performance of this Lease has resulted or will result in the violation, or conflict with, or invalidate, cancel or make inoperative, or constitute a default under any charter, bylaw, partnership agreement, trust agreement, mortgage, deed of trust, indenture, contract, credit agreement, franchise, permit, judgment, decree, order, easement, restriction or other charge, right or interest applicable to Landlord.
16.5 Force Majeure. Any prevention, delay or stoppage due to strikes, lockouts, labor disputes, acts of God, inability to obtain labor or materials or reasonable substitutes therefore, governmental restrictions, regulations or controls, enemy or hostile government action, civil commotion, fire or other casualty, and other causes beyond the reasonable control of the party
11.47 30814.00101\33446309.7
17 15958040.6
obligated to perform, shall excuse the performance by such party for a period equal to that resulting from such prevention, delay or stoppage.
16.6 Prevailing Wage. The construction of the Tertiary Treatment Plant and any other Tenant improvements may be considered a public works project, subject to labor compliance monitoring and enforcement by the Department of Industrial Relations. In performing any Tenant improvements, Tenant (and its contractor(s) and subcontractor(s) performing the work) shall conform to any and all prevailing wage requirements applicable to the work on the Premises under this Agreement, if any. Tenant (and its contractors and subcontractors) shall adhere to the prevailing wage determinations made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, applicable to the Tenant Improvements and associated work, if any. All workers employed in the execution of a public works contract (as such term is defined California Labor Code Section 1720 et seq. and Section 1782(d)(1)) must be paid not less than the specified prevailing wage rates for the type of work performed. Reference: California Labor Code Sections 1720, 1774 and 1782. Tenant shall ensure that contractors and subcontractors adhere to this prevailing wage provision. Tenant shall be responsible for any failure of Tenant’s contractors and/or subcontractors to comply with applicable prevailing wage and public works laws. If the Tenant is unsure whether a Tenant Improvement is a “public work” as defined in the California Labor Code, it may wish to seek a timely determination from the DIR or an appropriate court.
If any Tenant improvements are considered public works under the California Labor Code (see California Labor Code Sections 1720 et seq. and Title 8, California Code of Regulations, Chapter 8, Subchapter 3, commencing with Section 16000), Tenant, as the awarding agency, is required to include in its bid invitations and public works contracts, notice of the following: (1) the public works contractor registration requirement as specified in Labor Code section 1771.1(a), and (2) that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. DIR recommends including the text of Labor Code sections 1725.5 (contractor registration requirements and criteria), 1771.1 (requirement to register as a condition to bid or work on public works), and 1771.4 (project compliance monitoring) in contract documents.
Tenant agrees to indemnify, defend, and hold harmless the City and its officials, officers, employees, and agents, and each of them, from and against any and all claims, liabilities, losses, costs, expenses, attorney’s fees, damages, expenses, fines, interest, and penalties, of any kind or nature, arising from or relating to any failure (or alleged failure) of the Tenant (and/or any of its contractors and/or subcontractors) to comply with the applicable prevailing wage laws. If the City (or its officers, employees, agents or representatives) are named as a party in any dispute arising from the failure (or alleged failure) of Tenant (or its contractors and/or subcontractors) to pay prevailing wages, the Tenant agrees that the City (and other indemnified parties) may appoint their own independent counsel, and the Tenant agrees to pay all attorney’s fees and defense costs of the City (and the other indemnified parties) as billed, in addition to all other damages, fines, penalties and losses incurred by the City and the other indemnified parties as a result of the action.
16.7 Headings. The titles and headings underlying the Section and section designations contained herein are inserted solely for convenience and under no circumstances are they or any of them to be treated or construed as any part of this instrument.
16.8 Successors and Assigns. This Lease may not be assigned without the written consent of the other party which may be withheld in such party’s sole and complete discretion.
11.48 30814.00101\33446309.7
18 15958040.6
This Lease will be binding upon and will inure to the benefit of the parties hereto and their respective successors and assigns. Wherever a reference in this Lease is made to either of the parties hereto, such reference will be deemed to include, wherever applicable, also a reference to the successors and assigns of such party, as if in every case so expressed.
16.9 Memorandum of Lease. Concurrently with the execution of this Lease, Landlord and Tenant shall execute and acknowledge a memorandum of this Lease in the form attached hereto as Exhibit E and promptly thereafter shall cause the memorandum to be recorded against the Premises at Tenant’s cost in the official records of the County of Santa Cruz, State of California.
16.10 Choice of Laws; Forum. This Lease will be construed and enforced in accordance with the laws of the State of California. Any and all actions brought under this Lease will be brought solely and exclusively in the courts of Santa Cruz County or the United States District Court for the Northern District of California.
16.11 Counterparts. This instrument may be executed in two or more counterparts, each of which will be deemed an original but all of which together will constitute one and the same instrument. Electronic and scanned pdf signatures shall be accepted as originals, except for documents which may be recorded.
16.12 Entire Agreement; Amendment. Except as noted in this Section, this Lease constitutes the entire agreement of Landlord and Tenant with respect to the subject matter of this Lease and supersedes all prior agreements of the parties. Neither this Lease nor any provision hereof may be changed, waived, discharged or terminated orally, but only by an instrument in writing signed by the party against whom enforcement of the change, waiver, discharge or termination is sought. This Lease may be amended only by a writing signed by Landlord and Tenant. All Exhibits attached to this Lease are hereby incorporated by reference and made a part of this Lease. Notwithstanding the foregoing, the Landlord and Tenant acknowledge and agree that the development and operation of the Tertiary Treatment Facility remains subject to the applicable provisions of the Interagency and Project Agreement and O & M Plan. Any breach of the Interagency and Project Agreement or O & M Plan shall be a breach of this Lease. These agreements shall be interpreted together and to avoid conflicts to the extent possible. However, in the event of any inconsistency, the agreements shall be interpreted in the following order of precedence: (i) the O & M Plan, (ii) this Lease, and then (iii) the Interagency and Project Agreement. The parties understand and agree neither party is in breach of the Interagency and Project Agreement as of the Effective Date, the Interagency and Project Agreement remains in full force and effect, and Section 18 of the Interagency and Project Agreement is hereby amended so that the term of the Interagency and Project Agreement shall be the same as the term of the Lease as set forth in Section 3.
16.13 Commissions. Landlord and Tenant have dealt with each other directly in connection with this transaction and no real estate broker, salesperson or finder has the right to claim a real estate brokerage, salesperson’s commission or finder’s fee by reason of contact between the parties brought about by such broker, salesperson or finder. Each party will hold and save the other harmless of and from any and all loss, cost, damage, injury or expense arising out of or in any way related to Claims for real estate broker’s or salesperson’s commissions or fees based upon allegations made by the claimant that it is entitled to such a fee from the indemnified party arising out of contact with the indemnifying party or alleged introductions of the indemnifying party to the indemnified party or the Land.
11.49 30814.00101\33446309.7
19 15958040.6
16.14 Attorneys’ Fees. In the event any action is brought by Landlord or Tenant against the other to enforce the Lease obligations thereunder or any indemnity rights herein contained, or to seek a clarification of the terms herein contained, or for the breach of any of the terms, covenants or conditions contained in this Lease, the prevailing party will be entitled to recover reasonable attorneys’ fees to be fixed by the court (or arbitrator, if applicable), together with the costs of suit therein incurred.
16.15 Time is of the Essence. Time is of the essence of this Lease, and of each provision of this Lease.
16.16 Interpretation. This Lease has been negotiated by the parties and both parties have fully participated in its drafting. The language in all parts of this Lease will be construed simply, according to its fair meaning and not strictly for or against Landlord or Tenant.
16.17 Rights and Obligations upon Termination. Upon termination of this Lease, all rights and obligations of the Landlord and Tenant accruing or arising prior to termination will survive and remain in full force and effect, including without limitation, indemnity obligations for matters accruing or occurring prior to termination.
[SIGNATURE PAGE FOLLOWS]
11.50 30814.00101\33446309.7
Signature Page
15958040.6
IN WITNESS WHEREOF, Landlord and Tenant have executed this Lease as of the date first above written.
LANDLORD:
CITY OF SANTA CRUZ,
a California municipal corporation
By:
Name: Martin Bernal
Title: City Manager
APPROVED AS TO FORM:
By:
Name: Anthony P. Condotti
Title: City Attorney
TENANT:
SOQUEL CREEK WATER DISTRICT,
a county water district organized pursuant to California Water Code Section 30000, et seq.
By:
Name: Bruce Daniels
Title: President
APPROVED AS TO FORM:
By:
Name: Joshua Nelson
Title: District Counsel
11.51 30814.00101\33446309.7
A-1
15958040.6
EXHIBIT A
INTERAGENCY PROJECT AGREEMENT
11.52 30814.00101\33446309.7
B-1
15958040.6
EXHIBIT B
LEGAL DESCRIPTION
(TO BE INCLUDED UPON COMPLETION OF CONSTRUCTION)
11.53 30814.00101\33446309.7
C-1
15958040.6
EXHIBIT C
MAP OF LEASED LAND AND LICENSES
11.54 30814.00101\33446309.7
D-1
15958040.6
EXHIBIT D
TEMPORARY CONSTRUCTION EASEMENT
FOR A VALUABLE CONSIDERATION, the receipt of which is hereby acknowledged, Owner:
CITY OF SANTA CRUZ, a California municipal corporation (“Grantor”), hereby grants to the SOQUEL CREEK WATER DISTRICT, a county water district organized pursuant to California Water Code Section 30000, et seq. (“Grantee”), a temporary construction easement for the construction of the Tertiary Treatment Facility as defined and described in the Land Lease executed by Grantor and Grantee. The purpose of said temporary construction easement is to allow Grantee and its’ agents to construct the Tertiary Treatment Facility (“Project”).
The temporary construction easement shall be located over and upon and through those portion of the parcel of real property owned by Grantor located in the City of Santa Cruz, State of California, which is more particularly described in Exhibit A hereto, and shown on Exhibit B hereto (“Temporary Easement Area”). This easement agreement is referred to as the Easement Agreement.
Terms
1. Grant and Use of Temporary Construction Easement. Grantor hereby grants to Grantee and its contractors, consultants, subcontractors, subconsultants, materialmen, suppliers, workers, successors, and assigns, a non-exclusive temporary construction easement and right-of-way for construction, installation and access purposes in connection with the Project, but not by way of limitation, the right to ingress and egress, to place equipment and materials, and otherwise use the Easement Area, to perform the Project work. Access to and upon the Easement Area shall be done in such a manner as to allow the Grantor continued reasonable rights of ingress and egress during such construction period. Grantee’s access and use of the Easement Area shall be limited solely to the activities necessary to complete the Project and shall not involve any permanent changes to the condition of the Property, including the Easement Area, unless the Grantor provides prior written approval. The Project shall be constructed in compliance with the terms of the Land Lease.
2. Notice. Grantee shall provide Grantor at least twenty-one (21) days prior written notice of the commencement of Grantee’s use of the Easement Area. The Parties shall coordinate efforts and cooperate with each other to ensure that the Parties have adequate safety measures in place to protect the persons using the Property during construction of the Project and Grantee’s use of the Easement Area.
3. Non-Exclusivity of Easement. Grantor reserves all rights attendant to its ownership of the Easement Area, including but not limited to, the use and enjoyment of the Easement Area for all purposes not inconsistent with the terms and conditions of this Easement Agreement.
4. Property Damage. Grantee shall be responsible for any damage to the Property resulting from any exercise of the rights herein granted, including, but not limited to, property damage.
5. Liens. Grantee shall not cause liens of any kind to be placed against the Easement Area or Property.
6. Term. The term of the Easement shall begin upon commencement of construction of the Project. The Easement shall terminate upon the completion of the Project as certified by Grantee
11.55 30814.00101\33446309.7
D-2
15958040.6
and restoration of the Easement Agreement (“Easement Term”). Upon termination of this Easement Agreement, all covenants in this instrument are released and the Easement Area shall be considered free and clear of any restriction or any right or privilege attaching to the grant of the easement set forth in this Easement Agreement. Upon request by Grantor, Grantee shall execute any documents reasonably requested by Grantor to confirm the termination of the easement.
7. Restoration of Easement Area. Prior to termination of this Easement Agreement, Grantee shall promptly remove all equipment, materials and personal property from the Easement Area and restore the Easement Area to the state it was prior to any rights conferred to Grantee herein, except normal wear and tear.
8. Agreement Nonassignable. This Easement Agreement shall not be assigned. Any purported assignment of this agreement or of any interest in this Easement Agreement shall be void and of no effect.
9. Time of Essence. Time is of the essence in this Easement Agreement.
10. Insurance. Grantee shall maintain all insurance required under the Land Lease during the Easement Term.
11. Indemnification. Grantee shall indemnify, defend and hold harmless Grantor, its officials, officers, agents and employees against any and all liability, claims, actions, causes of action of demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, arising out of, connected with, or caused by Grantee, Grantee’s employees, agents, independent contractors and subcontractors, the provisions of this agreement, the construction of the Project, or the use of this temporary easement, excepting any claims arising out of the Grantor’s willful misconduct or sole or active negligence. Grantee shall include provisions in construction agreements for the Project requiring the contractor indemnify the Grantor, its officials, officers, agents and employees for any damage to the Property caused by the negligence or willful misconduct of the contractor, its employees, agents or others under contractor’s control or authority. Such indemnification requirements may be limited as required by law.
12. Entire Agreement. Except for applicable portions of the Land Lease, this Easement Agreement constitutes the entire agreement between Grantor and Grantee relating to the above easement. Any prior agreements, promises, negotiations, or representations not expressly set forth in this Easement Agreement are of no force and effect. Any amendment to this Easement Agreement shall be of no force and effect unless it is in writing and signed by Grantor and Grantee.
13. Binding Effect. This Easement Agreement shall be binding on and shall inure to the benefit of the heirs, executors, administrators, successors, and assigns of Grantor and Grantee, except as otherwise provided in this Easement Agreement.
[signature page follows]
11.56 30814.00101\33446309.7
D-3
15958040.6
IN WITNESS WHEREOF, the parties have executed this instrument as of this _____day of __________________, 2020.
GRANTOR:
CITY OF SANTA CRUZ,
By:
Name:
Its:
GRANTEE:
SOQUEL CREEK WATER DISTRICT,
By:
Name:
Its:
11.57 30814.00101\33446309.7
E-1
15958040.6
EXHIBIT E
MEMORANDUM OF LEASE
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
Space above this line for Recorder’s use.
MEMORANDUM OF LEASE
This Memorandum of Lease and Purchase Option (this “Memorandum”), dated for reference purposes as of _______________, 20___ (“Effective Date”), is made by and between CITY OF SANTA CRUZ, a California municipal corporation (“Landlord”), and SOQUEL CREEK WATER DISTRICT, a county water district organized pursuant to California Water Code Section 30000, et seq. (“Tenant”), who agree as follows:
1. Landlord leased to Tenant and Tenant leased from Landlord those certain premises as more particularly described in Exhibit A attached hereto and incorporated herein (the “Premises”), on the terms of that certain Ground Lease (“Lease”) between Landlord and Tenant dated as of (the “Effective Date”) for an initial term expiring on February 28, 2059, subject to extension by the parties. The terms and provisions of the Lease, as the same may be amended, are incorporated into this Memorandum by this reference.
2. This Memorandum is prepared for the purpose of recordation and to reflect the abovedescribed covenants, and it in no way modifies the provisions of the Lease. In the event any conflict or inconsistency between the terms and provisions of the Lease and this Memorandum, the terms and provisions of the Lease shall control.
3. This Memorandum may be executed in one (1) or more counterparts with the same effect as if the parties executing several counterparts had executed one (1) document and all such executed counterparts shall together constitute one (1) and the same instrument.
11.58 30814.00101\33446309.7
E-2
15958040.6
IN WITNESS WHEREOF, the parties have executed this Memorandum as of the Effective Date.
LANDLORD:
CITY OF SANTA CRUZ,
a California municipal corporation
By:
Name: Martin Bernal
Title: City Manager
APPROVED AS TO FORM:
By:
Name: Anthony P. Condotti
Title: City Attorney
TENANT:
SOQUEL CREEK WATER DISTRICT,
a county water district organized pursuant to California Water Code Section 30000, et seq.
By:
Name: Bruce Daniels
Title: President
APPROVED AS TO FORM:
By:
Name: Joshua Nelson
Title: District Counsel
11.59 30814.00405\40709364.2
OPERATIONS AND MAINTENANCE AGREEMENT
(COVERING THE PURE WATER SOQUEL PROJECT FACILITIES LOCATED AT THE SANTA
CRUZ WASTEWATER TREATMENT FACILITY)
This Operations and Maintenance Agreement (“O&M Agreement”) is entered into and made effective this ____ day of October, 2022 (“Effective Date”), by and between the Soquel Creek Water District (“District”), a county water district organized and operating under the California County Water District Law (Cal. Water Code § 33000, et seq.), and the City of Santa Cruz (“City”), a charter law city organized and existing under Article XI, Section 5 of the California Constitution and the City Charter. The District and the City are sometimes referred to individually in this O&M Agreement as a “Party” and collectively as the “Parties”. The Parties enter into this O&M Agreement in light of the following recited facts (each a “Recital”):
RECITALS
A. The City owns and operates a regional wastewater treatment facility (“WWTF”) that provides both wastewater treatment and disposal services to the City of Santa Cruz, the Santa Cruz County Sanitation District (including the areas of Live Oak, Soquel, Capitola and Aptos) and wastewater disposal services to the City of Scotts Valley.
B. The District is constructing the Pure Water Soquel Groundwater Replenishment and Seawater Intrusion Prevention Project (“PWS Project”), which will supplement the natural recharge of the Santa Cruz Mid-County Groundwater Basin with purified water that is produced using a portion of the secondary treated effluent from the WWTF.
C. As part of the PWS Project, the District is constructing certain new facilities at the WWTF. Among other things, these facilities will: (1) allow portions of the treated effluent from the WWTF to be conveyed offsite to the District’s Advanced Water Purification Facility for purification and subsequent use for groundwater recharge; (2) allow the District to convey back to the WWTF the concentrate from the reverse osmosis treatment process, as well as the strainer and membrane filtration backwash, (collectively “RO Concentrate Blend”), at the Advanced Water Purification Facility for discharge through the WWTF’s ocean outfall; and (3) include a Title 22 Facility that will provide recycled water for the City’s use at the La Barranca Park and at its Recycled Water Station.
D. On July 19, 2019, the District and the City entered into that certain agreement titled “Agreement By and Between Soquel Creek Water District And the City of Santa Cruz Regarding Source Water, Design, Construction, Start-Up and Ownership Of The Tertiary Facility Component Of The Pure Water Soquel Program” (the “2019 Agreement”). The 2019 Agreement sets forth the initial terms under which the City would provide source water for the PWS Project, permit the District to use the WWTF ocean outfall to discharge the RO Concentrate Blend and permit the District to construct facilities to support the PWS Project at the WWTF.
E. The 2019 Agreement provides in Article 6 that the City and the District would subsequently negotiate an operations and maintenance agreement, and specifies certain terms to be addressed in that document.
F. On March 22, 2021, the District and the City entered into that certain lease titled “Tertiary Treatment Facility Land Lease” (“2021 Lease”). Through the 2021 Lease, the
11.60 30814.00405\40709364.2
District leased a portion of the WWTF from the City for the construction and operations of the portions of the PWS Project facilities to be located at the WWTF.
G. The 2021 Lease in Section 7.2 provides that the City and the District shall negotiate an operations and maintenance agreement regarding the facilities to be constructed at the WWTF in accordance with the 2021 Lease.
H. On October 5, 2021, the District approved a construction contract for the construction of the treatment facilities for the PWS Project, including the construction of the facilities to be located at the WWTF. Construction in accordance with this construction contract commenced on or about December 10, 2021.
I. In accordance with the 2019 Agreement and the 2021 Lease, the District and the City have negotiated the terms under which the facilities constructed as part of the PWS Project and located at the WWTF will be operated and maintained by the City, and how the District will compensate the City for operations and maintenance of these facilities.
J. The Parties now therefore desire to enter into this O&M Agreement, consistent with the 2019 Agreement and the 2021 Lease, in order to set forth the terms and conditions under which the facilities constructed as part of the PWS Project and located at the WWTF will be operated and maintained by the City, and how the District will compensate the City for this operation and maintenance.
NOW, THEREFORE, in consideration of the covenants contained in this O&M Agreement, and for good and valuable consideration, the receipt and sufficiency of which is acknowledged, the Parties enter into this O&M Agreement.
O&M AGREEMENT
1. RECITALS
The Parties agree that the Recitals are true and correct and incorporate them into this O&M Agreement.
2. DEFINITIONS
As used in this O&M Agreement, the following defined terms shall have the meaning ascribed to them below:
2.1 Actual Costs. The full costs to the City to provide the Operations and Maintenance required by this O&M Agreement for the Facilities Benefiting the District and for the District’s Percentage of Benefit for the Facilities of Joint Benefit. Actual Costs include, but are not limited to, the City’s direct and indirect labor costs, equipment, material and supply costs, utility costs, monitoring and testing costs, permitting and enforcement costs, costs of third-party vendors or consultants, plus Administrative Overhead.
2.2 Administrative Overhead. For purposes of calculating Actual Costs, Administrative Overhead initially means _ten percent (10%) of the direct costs to the City to provide the Operations and Maintenance required by this O&M Agreement for the Facilities Benefiting the District and for the District’s Percentage of Benefit for the Facilities of Joint Benefit. Administrative Overhead shall be adjusted by the Parties through the O&M budget process in this O&M Agreement.
The Parties anticipate that the percentage used to calculate Administrative
11.61 30814.00405\40709364.2
Overhead will be reduced once initial Operations and Maintenance work by the City stabilizes, consistent with Cost Neutrality.
2.3 Advanced Water Purification Facility. The District’s water purification facility located at the southwest corner of the intersection of Soquel Avenue and Chanticleer Avenue, including, but not limited to, a reverse osmosis (RO) system and other components that will produce RO Concentrate Blend.
2.4 2019 Agreement. That certain Agreement entered into between the City and the City on July 19, 2019, setting forth the initial agreements of the Parties regarding the design and construction of the PWS Facilities at the WWTF, the provision of source water, the start-up and operations process and the discharge of RO Concentrate Blend.
2.5 Applicable Law. All statutes, codes, laws, ordinances, orders, judgments, decrees, injunctions, regulations, permits, licenses, authorizations, directions and requirements of all federal, state, county, municipal and other governments, departments, commissions, boards, courts, authorities, officials and officers, foreseen or unforeseen, ordinary or extraordinary, which now or at any time hereafter are applicable to this O&M Agreement.
2.6 Business Day. Any day other than Saturdays, Sundays and official City holidays on which City offices are closed.
2.7 Capital Improvements. Any repair, replacement or improvement to the PWS Facilities at the WWTF that is capital in nature and does not fall within the definition of the terms Maintenance or Operations.
2.8 Capital Improvements Budget. The long-term budget to be prepared by the Parties to plan for and provide funding for Capital Improvements to the PWS Project Facilities at the WWTF, as more fully described in paragraph 7.1 of this O&M Agreement.
2.9 Capital Improvement Fund. The funds or other financial mechanisms, including annual capital budgets, that the District and the City use to satisfy their respective obligations to ensure that sufficient funds are available when needed to pay for the Capital Improvements contemplated by the Capital Improvements Budget as described in paragraph 7.2 of this O&M Agreement.
2.10 City. The City of Santa Cruz.
2.11 Cost Neutrality. The governing principle for compensation of the City by the District under this O&M Agreement. Cost Neutrality requires that the District compensate the City for its incremental Actual Costs for the Operations and
11.62 30814.00405\40709364.2
Maintenance activities associated with the Facilities of District Benefit and for the District’s Percentage of Benefit for the Facilities of Joint Benefit.
2.12 Day. Any one calendar day of the year.
2.13 District. The Soquel Creek Water District.
2.14 Emergency Maintenance. Unscheduled repairs or replacements of portions of the PWS Project Facilities at the WWTF that have become inoperable and which do not constitute Capital Improvements or Routine Maintenance.
2.15 Facilities Benefiting the City. Those parts of the PWS Project Facilities at the WWTF that provide primary benefit to the City, such as the Title 22 Facility and related equipment, and for which the District shall not be obligated to reimburse the City for Actual Costs of operations and maintenance. The Facilities Benefiting the City are depicted in Exhibit A and itemized in Exhibit B to this O&M Agreement and incorporated herein by this reference. The Parties will verify, update and may replace these Exhibits with more accurate versions based on asbuilt conditions.
2.16 Facilities Benefiting the District. Those parts of the PWS Project Facilities at the WWTF that provide primary benefit to the District and/or the PWS Project and, for which the District shall be obligated to compensate the City for the Actual Costs of operations and maintenance. The Facilities Benefiting the District are depicted in Exhibit A and itemized in Exhibit B to this O&M Agreement and incorporated herein by this reference. The Parties will verify, update and may replace these Exhibits with more accurate versions based on as-built conditions.
2.17 Facilities of Joint Benefit. Those parts of the PWS Project Facilities at the WWTF that provide shared benefit to both the City and the District and/or the PWS Project, and for which the District shall be obligated to compensate the City for the portion of the Actual Costs of operations and maintenance that is equal to the District’s Percentage of Benefit. The Facilities of Joint Benefit are depicted in Exhibit A and itemized in Exhibit B to this O&M Agreement. The Parties will verify, update and may replace these Exhibits with more accurate versions based on as-built conditions.
2.18 Fiscal Year. The year commencing July 1 and ending June 30.
2.19 Force Majeure Event. Any occurrence of any of the following events, provided such event was not caused by or substantially contributed to by an act, error, or omission of a Party, which materially and adversely changes the tasks to be performed by a Party to this O&M Agreement, and the effects of which could not have been prevented or avoided by due diligence if reasonable efforts had been expended by a Party: strikes, lockouts, labor disputes, acts of God, inability to obtain labor or materials or reasonable substitutes therefor, governmental restrictions, regulations or control, enemy or hostile government action, civil commotion, fire or other casualty, pandemic or epidemic.
2.20 Initial O&M Budget. The budget to be mutually developed and approved by the Parties to estimate the City’s costs for Operations and Maintenance of the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefits for the period commencing when the City assumes responsibility
11.63 30814.00405\40709364.2
under this O&M Agreement until the commencement of the Two Year O&M Budget, as described in more detail in paragraph 6.3 of this O&M Agreement.
2.21 Maintenance. Those routine or emergency activities as defined in the O&M Plan that are necessary to achieve the useful life, maintain the integrity and ensure the continued operations of the PWS Project Facilities at the WWTF, including, but not limited to, Routine Maintenance and Emergency Maintenance but not including Capital Improvements.
2.22 NPDES Permit. The permit issued to the City under the National Pollutant Discharge Elimination System which allows the City to discharge from the Ocean Outfall.
2.23 Ocean Outfall. The pipe through which the City discharges treated water (disinfected secondary effluent) into the Pacific Ocean at the Monterey Bay National Marine Sanctuary.
2.24 Operations. Regular activities necessary to cause the PWS Facilities at the WWTF to perform as designed.
2.25 O&M Plan. The plan to be mutually developed and approved by the Parties to specify the Operations and Maintenance activities that the City shall perform on the PWS Facilities at the WWTF, as described in more detail in paragraph 5.1 of this O&M Agreement.
2.26 Percentage of Benefit. The portion of benefit from the Facilities of Joint Benefit that is separately attributable to the District and the City. The City’s Percentage of Benefit is the measured portion of the Source Water delivered to the Title 22 Facility and the District’s Percentage of Benefit is the measured portion of the Source Water delivered to the Advanced Water Purification Facility, as measured at the WWTF.
2.27 Prudent Industry Practices. Those methods, techniques, standards and practices which, at the time they are employed and in light of the circumstances known or reasonably believed to exist, are generally recognized and accepted as prudent operations, maintenance, repair and replacement and monitoring practices in the municipal wastewater and recycled water industries in the State of California.
2.28 PWS Project. The construction and operation of facilities to take existing secondary effluent from the WWTF, purify that water at the Advanced Water Purification Facility, discharge the resulting RO Concentrate Blend through the Ocean Outfall, and use the purified water to supplement natural recharge of the Santa Cruz Mid-County Groundwater Basin, as more fully described in the environmental documents certified by the District and in all the approvals of the PWS Project.
2.29 PWS Project Facilities at the WWTF. Those facilities constructed by the District as part of the PWS Project at the WWTF, including the source water pumps, the Title 22 Facility, the bioassay panel and sampling equipment, storage tanks, communication facilities, power lines and service equipment and conveyance infrastructure within the WWTF. The PWS Project Facilities at the WWTF consist of the Facilities Benefiting the District, the Facilities Benefiting the City and the Facilities of Joint Benefit. The PWS Project Facilities at the WWTF are depicted
11.64 30814.00405\40709364.2
in the diagram attached to this O&M Agreement as Exhibit A and itemized in Exhibit B and incorporated herein.
2.30 RO Concentrate Blend. The three combined waste residual streams that are byproducts of the Advanced Water Purification Facility process and which will be conveyed by the District to the City for discharge through the Ocean Outfall. These three waste streams include reverse osmosis concentrate, strainer backwash from the pre-membrane filtration strainer and membrane filtration backwash.
2.31 Routine Maintenance. Industry standard or manufacturers’ recommended activities such as testing, flushing, calibrating, exercising of valves, repairs and scheduled replacement of parts or other preventative actions as specified in the O&M Plan and that do not constitute Capital Improvements.
2.32 Source Water. The secondary treated wastewater provided by the City from the WWTF to the District for use as part of the PWS Project.
2.33 2021 Lease. That certain Tertiary Treatment Facility Land Lease entered into between the City and the District on March 22, 2021, as it currently exists or as it may be subsequently amended, through which the City leases to District land at the WWTF for the construction and operation of the PWS Project Facilities at the WWTF.
2.34 Title 22 Facility. The portion of the PWS Facilities at the WWTF that will treat a portion of the Source Water to Title 22 standards and provide that water for the City’s use.
2.35 Two Year O&M Budget. The budget to be mutually developed and approved by the Parties to estimate the City’s costs for Operations and Maintenance of the Facilities Benefiting the District and the District’s Percentage of Benefit from the Facilities of Joint Benefits for the first two full fiscal years of Operations and Maintenance, as more fully provided in paragraph 6.6 of this O&M Agreement.
2.36 WWTF. The Santa Cruz Regional Wastewater Treatment Facility owned and operated by the City and located in the City of Santa Cruz, County of Santa Cruz, State of California, with a street address of 110 California Street, Santa Cruz, California 95060.
3. OWNERSHIP OF FACILITIES
3.1 Ownership of Existing Facilities at the WWTF
The City owns and shall retain ownership of all of the preexisting facilities located at the WWTF. Nothing in this O&M Agreement alters or shall be interpreted to alter the City’s rights, title and ownership of such preexisting facilities.
3.2 Ownership of PWS Facilities at the WWTF
The District owns and shall retain ownership of all of the PWS Facilities at the WWTF, subject only to the terms of the 2021 Lease and except as the Parties may otherwise subsequently provide in writing.
11.65 30814.00405\40709364.2
3.3 Title 22 Facility
The Title 22 Facility is a Facility Benefiting the City. Subject to any restrictions and required approvals related to the grants or other financing provisions for the PWS Project, and based on subsequent negotiations of terms and conditions for such a transfer, the District and the City will consider the eventual transfer of ownership of the Title 22 Facility from the District to the City.
4. PROVISION OF SOURCE WATER
4.1 Minimum Quantity of Source Water
4.1.1 Minimum Quantity
Subject to the terms of this O&M Agreement, the City shall provide the District with Source Water in an amount equal to twenty-six percent (26%) of the total available secondary treated effluent produced at the WWTF (an amount that is currently estimated to be 2.32 Million Gallons per Day (MGD) or 2,600 Acre Feet Per Year (AFY)) for use in the PWS Project, based on a seven-day average.
Nothing in this O&M Agreement shall be construed as requiring the City to supply more than twenty-six percent of the total available secondary treated effluent produced at the WWTF for use in the PWS Project.
4.1.2 Notice and Response to Temporary Deviations from Minimum Quantity
If the District determines that the City is not providing the minimum quantity of Source Water required by this O&M Agreement, the District shall provide the City with written notice of the deficiency, and the parties shall meet and confer within fourteen (14) business days of the date of the District’s written notice in an effort to return deliveries to the minimum quantity. If the parties are unable to resolve the issue through the meet and confer process, the parties shall seek to resolve the issue through the dispute resolution process set forth in this O&M Agreement.
If the City becomes aware of planned or unplanned events that may result in deviations from the delivery of the minimum quantity of Source Water, but not complete cessation of the delivery of Source Water, the City shall provide the District with written notice of the event so that the District may adjust operations of the PWS Project as appropriate. For planned events, the City shall provide the District with written notice as early as possible and not less than thirty (30) business days in advance. For unplanned events, the City shall provide the District with written notice as soon as feasible and not later than three (3) business days after becoming aware of the unplanned event.
4.1.3 Significant Reductions in the Volume of Water to be Treated at WWTF
If the available volume of secondary treated wastewater available to the City falls twenty percent (20%) below the 2011-2018 average annual amount of 7.72 MGD (i.e., below 6.18 MGD), the Parties shall, within thirty (30) business days of becoming aware of such a significant reduction, meet and confer and shall
11.66 30814.00405\40709364.2
commit to working together as needed to address any City and District issues with availability of secondary treated effluent as a source of supply needed to address City and District water supply, water quality and groundwater sustainability issues and work together to ensure that critical needs, such as preventing seawater intrusion, are adequately and appropriately addressed.
4.1.4 Planned or Unplanned WWTF Shutdowns and Notice to District The Parties acknowledge that, from time to time, the City will need to shut down all or portions of WWTF, such that no Source Water may be delivered to the District. These shutdowns might result from planned maintenance or improvement activities or from emergency events. For planned WWTF shutdowns, the City will endeavor to schedule those activities in coordination with the District’s operations of the PWS Project so as to minimize the impact on PWS Project operations. For planned maintenance or improvement activities, the City shall provide the District with early notice of such events, in no case less than one hundred twenty (120) days written notice. For unplanned events that require WWTF shutdowns, the City will provide the District with written notice of the event as soon as feasible and not later than one (1) business day after the event that required the WWTF shutdown.
4.1.5 Planned or Unplanned Advanced Water Purification Facility Shutdowns and Notice to City
The Parties acknowledge that, from time to time, the District will need to shut down all or portions of the Advanced Water Purification Facility, such that the District may only accept some or no Source Water. These shutdowns might result from planned maintenance or improvement activities or from emergency events. For planned Advanced Water Purification Facility shutdowns, the District will endeavor to schedule those activities in coordination with the City’s operations of the WWTF and the Title 22 Facility so as to minimize impacts. For planned maintenance or improvement activities, the District shall provide the City with early notice of such events, in no case less than one hundred twenty (120) days written notice. For unplanned events that require Advanced Water Purification Facility shutdowns, the District will provide the District with written notice of the event as soon as feasible and not later than one (1) business day after the event that required the shutdown.
4.2 Minimum Quality of Source Water
4.2.1 Compliance with NPDES Permit Standards
The Source Water delivered by the City to the District under this O&M Agreement shall comply with all requirements of the City’s NPDES Permit or other regulatory requirements for the WWTF. The City shall, at its sole cost, make any changes to its treatment processes required to maintain compliance with secondary treatment regulations.
4.2.2 City’s Industrial Pretreatment and Source Water Control Program The City shall continue to operate its comprehensive industrial wastewater pretreatment and pollutant source control program for controlling the discharge of wastes from point sources in accordance with regulatory requirements for industrial wastewater pretreatment and pollution source control for secondary
11.67 30814.00405\40709364.2
treated wastewater. Costs of implementation of additional industrial wastewater pretreatment and pollutant source control program elements required for the Title 22 Facility and the PWS Project shall be shared by the Parties based on the Percentage of Benefit. Capital costs, if any, required for any additional industrial wastewater pretreatment and pollution source control methods required for the PWS Project shall be borne by the District.
4.2.3 Notice and Response to Deviations from Minimum Quality Standards
In the event the City becomes aware of any deviations in the Source Water from NPDES Permit requirements, the City shall provide written notice to the District as soon as feasible and not later than three (3) business days of becoming aware of the deviation. In the event of a deviation, the Parties shall, within fourteen (14) business days of the City’s notice, meet and confer to develop a response, as appropriate, to the deviation. If the Parties are unable to address the deviation through the meet and confer process, the Parties shall seek to resolve the issue through the dispute resolution process of this O&M Agreement.
To help address and plan for possible fluctuations in Source Water quality, the Parties shall hold regular technical meetings, anticipated to be on a weekly basis, to discuss current WWTF operations, water quality issues and related topics. At a minimum, these technical meetings shall occur monthly.
5. OPERATIONS AND MAINTENANCE OF THE PWS PROJECT FACILITIES AT
THE WWTF
5.1 O&M Plan for the PWS Project Facilities at the WWTF.
Before the City assumes responsibility for Operations and Maintenance of the PWS Project Facilities at the WWTF, the City and the District shall develop and approve in writing a mutually acceptable O&M Plan for the PWS Project Facilities at the WWTF. The O&M Plan will describe the specifications for Operations and the frequency and requirements for Maintenance. The O&M Plan must be consistent with Prudent Industry Practices and shall conform with all Applicable Law.
5.2 City Operations of the PWS Project Facilities at the WWTF.
Subject to and conditioned on the District’s compensating the City as provided in this O&M Agreement, the City shall perform all required Operations of the PWS Project Facilities at the WWTF in accordance with the specifications of the O&M Plan. The District shall provide the City with written notice of the commencement date for Operations of the PWS Project Facilities at the WWTF.
5.3 City Maintenance of the PWS Project Facilities at the WWTF.
Subject to and conditioned on the District’s compensating the City as provided in this O&M Agreement, the City shall perform all required Maintenance of the PWS Project Facilities at the WWTF in accordance with the specifications of the O&M Plan. The District shall provide the City with written notice of the commencement date for Maintenance of the PWS Project Facilities at the WWTF.
11.68 30814.00405\40709364.2
6. COMPENSATION TO CITY FOR OPERATIONS AND MAINTENANCE OF THE
PWS PROJECT FACILITIES AT THE WWTF
6.1 Cost Neutrality as Governing Principle for Compensation to the City.
Cost Neutrality shall be the governing principle by which the District compensates the City for the Actual Costs of Operations and Maintenance of the PWS Project Facilities at the WWTF. In the event of any ambiguity, the provisions of this O&M Agreement shall be interpreted to ensure that the City’s Actual Costs are fully compensated.
6.2 City’s Costs During Commissioning of the PWS Project Facilities at the WWTF.
The Parties anticipate that there will be a period of time when the PWS Project Facilities at the WWTF are being commissioned by the District’s contractor prior to the City’s assumption of Operations and Maintenance responsibilities in accordance with the O&M Agreement. The Parties agree, consistent with the 2019 Agreement, that the City should participate in this commissioning process. Consistent with Cost Neutrality, the District shall pay the City its Actual Costs on a time and materials basis for the City’s participation in the commissioning process as to the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit. At the end of the commissioning process and upon the City’s assumption of Operation and Maintenance responsibilities, the City shall send the District a written invoice for the City’s Actual Costs of participating in the commissioning process as to the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit, and the District shall pay the invoice within sixty (60) days.
6.3 Initial O&M Budget.
Prior to the City’s commencement of Operations and Maintenance pursuant to this O&M Agreement, the City and the District shall mutually prepare and approve an initial O&M Budget for the remaining portion of the Fiscal Year in which City Operations and Maintenance commences. The initial O&M Budget shall estimate on a monthly basis the City’s anticipated Actual Costs to perform its Operations and Maintenance obligations under this O&M Agreement for the remainder of the Fiscal Year for the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit. The initial O&M Budget shall include, without limitation, the City’s estimated Actual Costs, including direct and indirect labor costs, equipment, materials and supply costs, utility costs, testing and monitoring costs, and repair and replacement costs, and costs of third-party vendors performing Operations and Maintenance functions for the City in accordance with this O&M Agreement and Administrative Overhead.
6.4 Monthly Payments to the City Based on Initial O&M Budget The District shall make monthly payments to the City in accordance with the Initial O&M Budget. The District shall make payment to the City on the first day of each month, commencing with the first day of the first full month, as reflected in the Initial O&M Budget.
6.5 Initial True Up Payment or Credit
Within sixty (60) days of the completion of the Fiscal Year covered by the Initial O&M Budget, the City and the District shall meet to true up the City’s Actual Costs for the Operations and Maintenance obligations under this O&M Agreement for the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit. If the City’s Actual Costs exceed the Initial O&M Budget, the District shall pay the City the difference within sixty (60) days. If the City’s Actual Costs were less than the Initial O&M Budget, the District
11.69 30814.00405\40709364.2
shall receive a credit for that amount, to be credited against the District’s next payment obligation to the City.
6.6 Two Year O&M Budget
Prior to the first full Fiscal Year in which the City shall be responsible for Operations and Maintenance under this O&M Agreement, the City and the District shall mutually prepare and approve a Two Year O&M Budget. The Two Year O&M Budget shall estimate on a monthly basis the City’s anticipated Actual Costs to perform its Operations and Maintenance obligations under this O&M Agreement for the first two years of Operations and Maintenance for the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit. The Two Year O&M Budget shall include, but shall not be limited to, the City’s estimated Actual Costs for direct and indirect labor costs, equipment, materials and supply costs, utility costs, testing and monitoring costs, and repair and replacement costs, and estimated costs of third-party vendors performing Operations and Maintenance functions for the City in accordance with this O&M Agreement.
6.7 Quarterly Payments Based on Two Year O&M Budget.
The District shall make quarterly payments to the City representing one-eighth (1/8th) of the total Two Year O&M Budget. The District shall make each quarterly payment to the City no later than the first day of each quarter of the year (i.e., July 1, October 1, January 1, and April 1).
6.8 True Up Payment or Credit.
Within sixty (60) days of the completion of each Fiscal Year covered by the Two Year O&M Budget, the City and the District shall meet to true up the City’s Actual Costs for the Operations and Maintenance obligations under this O&M Agreement for the Facilities Benefiting the District and the District’s Percentage of Benefit for the Facilities of Joint Benefit.
If the City’s Actual Costs exceed the Two Year O&M Budget, the District shall pay the City the difference within sixty (60) days. If the City’s Actual Costs were less than the Two Year O&M Budget, the District shall receive a credit for that amount, to be credited against the District’s next payment obligation to the City.
6.9 City Record Keeping of Actual Costs.
The City shall reasonably maintain records of its Actual Costs of providing the Operations and Maintenance services required by this O&M Agreement. Records shall include, without limitation, receipts for equipment and material, invoices for third-party vendor services, and records of employee costs. The City shall seek to use its computerized maintenance management system (“CMMS”) as feasible to track Actual Costs. The Parties recognize, however, that the CMMS will not capture all of the City’s Actual Costs, and that certain activities, will not be susceptible to documentation. The Parties acknowledge that the City’s obligations are to maintain reasonable records of its Actual Costs that can be readily tracked and recorded. As part of the annual true up process, and upon reasonable request, the City shall make these records available to the District for review.
6.10 Interest for Late Payments.
Amounts due to the City that are not paid when due shall bear interest at the rate of two percent (2%) per month until paid.
11.70 30814.00405\40709364.2
6.11 Conversion to Fixed Costs for O&M.
After the completion of the Two Year O&M Budget, or earlier if mutually agreed to by the Parties in writing, the City and the District shall meet and confer to discuss whether there is sufficient consistency in the City’s Actual Costs for Operations and Maintenance under this O&M Agreement to convert the compensation obligations of the District into a fixed or flat cost.
If the Parties agree that such an approach is desirable, the Parties shall consider amending this O&M Agreement to convert the compensation process from a budget-based process to a fixed annual cost-based approach. If the Parties cannot agree to a fixed annual cost-based approach, the Parties shall develop and agree upon a new Two Year O&M Budget, and use that new Two Year O&M Budget to compensate the City as provided in paragraph 6.6 above.
7. Capital Improvement Plan and Budget and Expansion of City or District Programs
7.1 Capital Improvement Plan and Budget.
Not later than the date on which the Parties approve the Two Year O&M Budget, the City and the District shall mutually prepare and approve a Capital Improvement Plan and Budget for the PWS Facilities at the WWTF. The Capital Improvement Budget shall set forth a schedule and plan for significant replacement, significant repairs or improvements that constitute Capital Improvements to the PWS Facilities at the WWTF based on Prudent Industry Standards.
7.2 Funding for Capital Improvements Based on Capital Improvement Budget.
Based on the Capital Improvement Plan and Budget, the City and the District shall establish and maintain a Capital Improvement Fund to fund the planned costs for Capital Improvements in accordance with the Capital Improvement Budget. The District shall be responsible for establishing and maintaining a Capital Improvement Fund to fund the costs for Capital Improvements to the Facilities Benefiting the District, the City shall be responsible for establishing and maintaining a Capital Improvement Fund to fund the costs Capital Improvements to the Facilities Benefiting the City, and the Parties shall establish and maintain a Capital Improvement Fund to proportionally fund the costs of Capital Improvements to the Facilities of Joint Benefit based on the Percentage of Benefit.
7.3 Expansion of City or District Programs
The Parties contemplate and seek hereby to provide flexibility within this O&M Agreement for future expansions of either the City’s or the District’s recycled water programs.
No decision regarding possible expansions has been made by either Party, but it is possible that the City, the District, other entity, or a combination thereof, will desire such expansions in the future. At this time, the Parties agree that this O&M Agreement will continue, as adjusted below, to address Operations and Maintenance in the event of future expansions.
7.3.1 Capital Costs for Expansion by City
In the event the City decides to expand or build new facilities at the WWTF to expand its recycled water program, the City shall be solely responsible for the costs of such expanded or new facility.
7.3.2 Capital Costs for Expansion by District
In the event the District decides, with concurrence from the City as necessary, to expand or build new facilities at the WWTF to expand its recycled water program,
11.71 30814.00405\40709364.2
the District shall be solely responsible for the costs of such expanded or new facility.
7.3.3 Capital Costs for Expansion of Facilities of Joint Benefit In the event the City and the District agree to expand or build a new Facility of Joint Benefit, the capital costs for such expanded or new facility shall be allocated based on the Percentage of Benefit, subject to adjustment as provided below.
7.3.4 Reset of Percentage of Benefit, O&M Budget or Flat Fees Upon Expansion
In the event of an expansion by the City, by the District or a joint expansion, the Parties will meet and confer and recalculate the Percentage of Benefit. In addition, the Parties will jointly prepare and implement a new Two Year Budget, or other similar process, to reset the compensation calculation, in order to take into account the new or expanded facilities. The basic compensation structure and allocation of responsibilities in this O&M Agreement shall remain the same, but the Parties will use the new Two Year O&M Budget, or other similar process, to adjust and recalculate compensation and any flat fees consistent with the governing concept of Cost Neutrality and the 2019 Agreement.
8. DISCHARGE OF RO CONCENTRATE BLEND FROM OCEAN OUTFALL
8.1 Maximum Quantity of RO Concentrate Blend
The District shall have the right to deliver to the City, and the City shall accept from the District for discharge through the Ocean Outfall, RO Concentrate Blend up to the average amount of 0.7 MGD.
8.2 Minimum Quality of RO Concentrate Blend
The District shall cause the RO Concentrate Blend to be of sufficient quality so as not to cause a violation of an effluent limitation, prohibition or receiving water limitation of the City’s NPDES Permit. The District shall monitor the quality of the RO Concentrate Blend prior to its comingling with other flows into the Ocean Outfall so that the Parties can assess the quality of the RO Concentrate Blend.
8.3 Process to Respond to NPDES Discharge Violations
The Parties acknowledge that upon the commencement of PWS Project operations, the City’s discharge from its Ocean Outfall shall consist of a commingled discharge of treated effluent from the WWTF, treated effluent from the City of Scott’s Valley’s treatment plant and RO Concentrate Blend. Based on current monitoring and modeling, it is anticipated that this commingled discharge will meet or exceed the minimum requirements of the NPDES Permit.
However, in the event of a possible permit violation, the City will perform an analysis of the monitoring data and other information associated with the possible non-compliance. If the information indicates that the non-compliance is the result of the City’s effluent, the City shall be responsible for the costs of correcting the non-compliance. If the information indicates that the non-compliance is the result of the effluent from the City of Scott’s Valley, the City will address that non-compliance through its separate agreement with the City of Scott’s Valley. If the information indicates that the non-compliance is the result of the RO Concentrate Blend, the City
11.72 30814.00405\40709364.2
shall meet and confer with the District and provide the District with the information supporting this conclusion. The District will have fourteen (14) business days to respond to the information.
If the District agrees with the City’s conclusion, the District shall be responsible for the costs of addressing the non-compliance. If the District disagrees with the City’s conclusion, the District shall provide the City with a written explanation of the District’s position with the fourteen (14) day response period. The Parties shall thereafter meet and confer to resolve the matter. If the Parties cannot resolve the matter, the Parties will pursue resolution through the dispute resolution process. In any event, if there is a final determination that the RO Concentrate Blend was the cause of the non-compliance, the District shall be responsible for the costs of addressing the noncompliance.
9. INSURANCE
9.1 District Insurance
The District shall obtain and maintain the types and amounts of insurance coverage required by Section 8 of the 2021 Lease. The City acknowledges that the District has provided all required proofs of such insurance and accepts those proofs of insurance as satisfaction of the District’s obligation under this paragraph.
9.2 City Insurance
The City shall obtain and maintain during the term of this Agreement insurance coverage that is at least as broad and in the amounts specified in this paragraph and shall submit certificates of insurance for review and approval by the District. Acceptance of the certificates by the District does not relieve the City of any of the insurance requirements, nor decrease the liability of the City, if any, under this O&M Agreement. For each policy of insurance, the City shall include the following coverages or endorsements in the policies: “The Soquel Creek Water District, its Board Members, Officers and Employees are Additional Insureds in the policy(ies) as to obligations of the City under the Operations and Maintenance Agreement between the City and the District.”
9.2.1 Workers’ Compensation and Employers’ Liability Insurance The City shall obtain and maintain in full force and effect workers’ compensation insurance as required by the State of California with statutory limits and employers’ liability insurance (for all employees engaged in providing services under this O&M Agreement) with limits of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.
9.2.2 Automobile Liability Insurance
The City shall obtain and maintain in full force and effect automobile insurance in a combined single limit of One Million Dollars ($1,000,000) for each accident for bodily injury and property damage.
9.2.3 Commercial General Liability Insurance
The City shall obtain and maintain in full force and effect commercial general liability insurance of One Million Dollars ($1,000,000) for each accident for bodily injury and property damage.
11.73 30814.00405\40709364.2
9.2.4 Property Insurance on WWTF
The City shall maintain current levels of property insurance on the property it owns at the WWTF.
10. INDEMNITY
10.1 Mutual Indemnification
To the extent permitted by law, each of the Parties shall each indemnify and hold the other, its officers, agents and employees harmless from any and all losses, damages, liability on the account of personal injury, death, or property damages, or claim for personal injury, death or property damage of any nature whatsoever and by whomsoever made, arising out of the activities of the indemnifying Party, its employees, subcontractor, or agents under this O&M Agreement.
10.2 Challenges to the O&M Agreement
The District agrees to indemnify, release and hold harmless the City, its agents, officers, attorneys, employees, contractors, boards and commissions related to any claim, action or proceeding to attack, set aside, void or annul this O&M Agreement.
11. DISPUTE RESOLUTION
11.1 Informal Dispute Resolution
Representatives of the City and the District with day-to-day involvement in the administration and performance of this O&M Agreement shall initially and promptly enter into negotiations to attempt to address and resolve any disputes that may arise concerning this O&M Agreement. In connection with such negotiations, the Party asserting the dispute shall provide the other with a written description of the nature of the dispute, along with reasonable supporting documentation. If, after reasonable efforts toward resolution of a dispute through such informal negotiations have been made without reaching agreement, a Party may seek mediation in accordance with paragraph 11.2 below.
11.2 Mediation
11.2.1 Participation in Mediation
Following the completion of the informal negotiations process set forth above, if any dispute relating to this O&M Agreement remains between the Parties (a “Mediation Dispute”) and a Party requests mediation in writing, the Parties shall engage in a good faith attempt to settle and resolve the Mediation Dispute through mediation. A Party’s good faith participation in mediation shall constitute a condition precedent to the right of the Party to pursue any other remedy available to the Party under this O&M Agreement as a matter of law.
11.2.2 Procedures for Mediation
The Party seeking mediation shall provide notice of the commencement of mediation to the other Party within one-hundred eighty (180) days following actual notice of the facts giving rise to the Mediation Dispute. The Parties shall thereafter jointly select a single neutral mediator to conduct the mediation. In the
11.74 30814.00405\40709364.2
event that the Parties are unable to select a single mediator, then each Party shall select one (1) mediator, and the selected mediators shall select one additional mediator to serve on the mediation panel.
11.2.3 Costs for the Mediation
The Parties shall share equally the mediation fees and expenses. Each Party shall bear its own attorney and consultant fees and other costs incurred in connection with the mediation.
11.3 Litigation
The Parties agree that should the Mediation Dispute not be resolve through the mediation process, any Party may seek relief in the Superior Court for the State of California in and for the County of Santa Cruz. The Parties hereby waive the right to trial by jury in any such legal action.
12. TERM
12.1 Initial Term
The initial term of this O&M Agreement shall run from the Effective Date and shall expire at 11:59 on September 1, 2059.
12.2 Extensions of Initial Term
This O&M Agreement shall be extended for subsequent five (5) year terms unless either Party provides written notice to the other Party at least twenty-four (24) months prior to the expiration of the then existing terms of its intent to terminate the O&M Agreement.
13. FORCE MAJEURE EVENT
If a Force Majeure Event prevents a Party from performing an obligation under this O&M Agreement, performance of the obligation shall be excused for the period the delay resulting from the Force Majeure Event. If any Party is prevented from performance by a Force Majeure Event, that Party shall provide the other Party with written notice of the Force Majeure Event within seven (7) business days of the event. The Parties shall meet and confer regarding the Force Majeure Event and shall seek to return to performance of obligations under the O&M Agreement as quickly as is feasible under the circumstances.
14. GENERAL PROVISIONS
14.1 Severability
If any term, provision, covenant or condition of this O&M Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remainder of the provisions shall remain in full force and effect, to the extent permitted by law and consistent with the purpose of the O&M Agreement.
14.2 Notices
Any notice, request, consent, demand or communication permitted or required to be given under this O&M Agreement shall be deemed given (a) on the date of delivery (if delivered
11.75 30814.00405\40709364.2
by messenger or other form of hand-delivery), (b) on the date of transmission (if delivered and confirmed by email), (c) three (3) business days following the mailing by an internationally recognized overnight mail carrier, or (d) ten (10) business days after deposit in the mail, with postage prepaid and duly address to the Party to be notified as follows:
If to City:
City of Santa Cruz
Attn: City Manager
809 Center Street, Room 10
Santa Cruz, CA 95060
With a Copy To:
City of Santa Cruz
Attn: City Attorney
333 Church Street
Santa Cruz, CA 95060
If to District:
Soquel Creek Water District
Attn: General Manager
5180 Soquel Drive
Soquel, CA 95073
With a Copy to:
Best, Best & Krieger LLP
Attn: Josh Nelson, District Counsel
500 Capital Mall
Sacramento, CA 95814
14.3 Prevailing Wages
To the extent required by law, all work under this O&M Agreement shall be performed consistent with prevailing wage requirements.
14.4 Headings
The titles and headings of the paragraphs in this O&M Agreement are inserted for convenience and are not intended to modify the plain language of this O&M Agreement.
14.5 Successors and Assigns
A Party to this O&M Agreement shall not assign, sell, or otherwise transfer its interest under this O&M Agreement, without first receiving the prior written consent of the other Party.
Subject to this requirement, the O&M Agreement shall be binding upon and will inure to the benefit of the Parties and their respective successors and assigns.
11.76 30814.00405\40709364.2
14.6 Counterparts
This O&M Agreement may be executed in two or more counterparts, each of which will be deemed an original but all of which together will constitute one and the same instrument.
Electronic or scanned pdf signatures shall be accepted as originals.
14.7 Entire Agreement; Amendment
14.7.1 Entire Agreement and Exhibits
Except as provided below, this O&M Agreement constitutes the entire agreement between the City and the District regarding the Operations and Maintenance of the PWS Facilities at the WWTF, and supersedes all prior agreement of the Parties related to the subject matter covered in the O&M Agreement. All Exhibits to this O&M Agreement are hereby incorporated by reference and made a part of this O&M Agreement as if fully set forth herein.
14.7.2 Relationship to 2019 Agreement and 2021 Lease
The Parties agree and acknowledge that the operations of the PWS Facilities at the WWTF remain subject to the applicable provisions of the 2019 Agreement and the 2021 Lease. The Parties intend that the provisions of this O&M Agreement, the 2019 Agreement and the 2021 Lease be interpreted together and to avoid conflicts to the extent feasible. However, in the event of conflict, the more specific terms of this O&M Agreement shall govern.
14.7.3 No Amendment Except in Writing
This O&M Agreement may only be amended by a written instrument signed by the duly authorized representatives of the Parties.
14.8 No Third-Party Beneficiaries
This O&M Agreement does not create, and shall not be construed to create, any rights enforceable by any person, partnership, corporation, joint venture, limited liability company or other form of organization or association of any kind that is not a Party to this O&M Agreement.
14.9 Waiver
The waiver or failure to declare a breach of this O&M Agreement as a result of a violation of any term or provision set forth in this O&M Agreement shall not constitute a waiver of that term or condition and shall not provide the basis for a claim of estoppel.
14.10 Attorneys’ Fees
In the event any action is brought by a Party against the other Party to enforce the terms of this O&M Agreement or any indemnity rights herein contained, the prevailing party will be entitled to recover reasonable attorneys’ fees to be fixed by the court, together with the costs of suite therein incurred.
11.77 30814.00405\40709364.2
14.11 Interpretation
This O&M Agreement has been negotiated by the Parties and both Parties have fully participated in its drafting. The language in all parts of this O&M Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.
IN WITNESS HEREOF, the Parties, by their duly authorized agents, have executed this O&M Agreement as of the Effective Date.
Dated: _____________________, 2022 SOQUEL CREEK WATER DISTRICT By:
Dated: _____________________, 2022 APPROVED AS TO FORM:
By:___________________________________
Counsel for Soquel Creek Water District
Dated: _____________________, 2022 CITY OF SANTA CRUZ
By:
Dated: _____________________, 2022 APPROVED AS TO FORM:
By:___________________________________
City Attorney
11.78 30814.00405\40709364.2
EXHIBIT A
11.79
11.80 CL-PLC101001
CL-PLC101001
SCADA HMISCADA HMI
TSH
005
B 115-X-7001
TO AUTOMATIC
STRAINERS
SPEED
INDCTN
SI
005
SPEED
INDCTN
SI
005
RUN
CMD
UCR
005
RUN
CMD
UCR
005
SW-VFD101005
(EL-MCC101001)
HMS
005
RST
HS
005B
SS
SIC
005
RUNNING
YIR
005
RUNNING
YIR
005
COMMON
FAIL
UA
005
COMMON
FAIL
UA
005
YLR
005
UA
005
FAIL
IN
REMOTE
YI
005
IN
REMOTE
YI
005
TSH
004
TSH
003
PI
005
SPEED
INDCTN
SI
004
SPEED
INDCTN
SI
004
RUN
CMD
UCR
004
RUN
CMD
UCR
004
SW-VFD101004
(EL-MCC101001)
HMS
004
RST
HS
004B
SS
SIC
004
RUNNING
YIR
004
RUNNING
YIR
004
COMMON
FAIL
UA
004
COMMON
FAIL
UA
004
YLR
004
UA
004
FAIL
IN
REMOTE
YI
004
IN
REMOTE
YI
004
SPEED
INDCTN
SI
003
SPEED
INDCTN
SI
003
RUN
CMD
UCR
003
RUN
CMD
UCR
003
SW-VFD101003
(EL-MCC101001)
HMS
003
RST
HS
003B
SS
SIC
003
RUNNING
YIR
003
RUNNING
YIR
003
COMMON
FAIL
UA
003
COMMON
FAIL
UA
003
YLR
003
UA
003
FAIL
IN
REMOTE
YI
003
IN
REMOTE
YI
003
HS
005A
LOR
HI
MOTOR
TEMP
TAH
005
HI
MOTOR
TEMP
TAH
005
SPEED
CNTRL
SC
005
SPEED
CNTRL
SC
005
HS
004A
LOR
HI
MOTOR
TEMP
TAH
004
HI
MOTOR
TEMP
TAH
004
SPEED
CNTRL
SC
004
SPEED
CNTRL
SC
004
HS
003A
LOR
HI
MOTOR
TEMP
TAH
003
HI
MOTOR
TEMP
TAH
003
SPEED
CNTRL
SC
003
SPEED
CNTRL
SC
003
PI
004
PI
003
SPEED
INDCTN
SI
002
SPEED
INDCTN
SI
002
RUN
CMD
UCR
002
RUN
CMD
UCR
002
SW-VFD101002
(EL-MCC101001)
HMS
002
RST
HS
002B
SS
SIC
002
RUNNING
YIR
002
RUNNING
YIR
002
COMMON
FAIL
UA
002
COMMON
FAIL
UA
002
YLR
002
UA
002
FAIL
IN
REMOTE
YI
002
IN
REMOTE
YI
002
HS
002A
LOR
HI
MOTOR
TEMP
TAH
002
HI
MOTOR
TEMP
TAH
002
SPEED
CNTRL
SC
002
SPEED
CNTRL
SC
002
I I I
I
120V LIT
001
LEVEL
LI
001
LEVEL
LI
001
HS
004D
SS
HS
003D
SS
PSH
005
PSH
004
PSH
003
US
LE
001
HI DISCH
PRESS
PAH
002
HI DISCH
PRESS
PAH
002
HI DISCH
PRESS
PAH
003
HI DISCH
PRESS
PAH
003
HI DISCH
PRESS
PAH
004
HI DISCH
PRESS
PAH
004
E-STOP
HS
005C
E-STOP
HS
004C
E-STOP
HS
003C
HS
005D
SS
PI
002
PSH
002
PI
001
PSH
001
HS
002D
SS
E-STOP
HS
002C
HS
001D
SS
E-STOP
HS
001C
TSH
002
TSH
001
ESTOP
PRESSED
YA
005
ESTOP
PRESSED
YA
005
ESTOP
PRESSED
YA
004
ESTOP
PRESSED
YA
004
B/GA/G
HI DISCH
PRESS
PAH
005
HI DISCH
PRESS
PAH
005
I I
ESTOP
PRESSED
YA
003
ESTOP
PRESSED
YA
003
ESTOP
PRESSED
YA
002
ESTOP
PRESSED
YA
002
I I
PIT
008
PRESS
PI
008
PRESS
PI
008
SC3
TAH
005
TAH
004
TAH
003
TAH
002
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS SW AND AREA CODE IS 110 UNLESS OTHERWISE NOTED.
4. SEE INSTRUMENT INSTALLATION DETAIL DRAWING FOR INSTALLATION DETAILS AND ACCESSORIES.
5. FUTURE I/O'S FOR FUTURE EQUIPMENT ARE LOCATED IN THE FUTURE RIO PANELS.
FUTURE PWS SOURCE
WATER PUMP NO.5
SW-P110005
FUTURE PWS SOURCE
WATER PUMP NO.4
SW-P110004
PWS SOURCE WATER
PUMP NO.3
SW-P110003
PWS SOURCE WATER
PUMP NO.2
SW-P110002
16"-SW-DIP-0001
SW-HV110009
SW-CKV110005
SW-HV110010
SW-HV110007
SW-CKV110004
SW-HV110008
SW-HV110005
SW-CKV110003
SW-HV110006
SW-HV110003
20"-SW-HDPE-0001
SW-ARV110005
SW-ARV110004
SW-ARV110003
10"-SW-DIP-000210"-SW-DIP-000310"-SW-DIP-0004
CONCRETE CHANNEL
FEED FROM OUTLET
OF EXISTING
SANTA CRUZ
WWTF UV SYSTEM
PWS SOURCE WATER
PUMP NO.1
SW-P110001
SW-HV110001
20"-SW-HDPE-0002
SW-HV110004 10"-SW-DIP-0201
SW-CKV110002 SW-CKV1100001
SW-HV1100002 10"-SW-DIP-0202
NOTE 5
SW-ARV110002SW-ARV110001
EXISTING
PLANT PLC
TYPICAL I/O'S AND CONTROLS
ETHERNET/IP
14"-SW-HDPE-0003
14"-SW-HDPE-0004 14"-SW-HDPE-0005
16"-SW-PVCPP-0008
14"-SW-HDPE-0006 14"-SW-HDPE-0007
TYPICAL FOR PUMP P110001 AND PSH-001
SW-PSV110001
SAMPLE
TAP
SW-ARV110006
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 8:57:04 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
PVR, AD
KAB, BLB
BLB
311 370
110-X-7001
INSTRUMENTATION
TTF PWS SOURCE
WATER PUMP STATION
P&ID
BDS
404790-110-SEC_EFF_PS.rvt
0 08/26 ISSUED FOR CONSTRUCTION
1 2/22/22 RFI 29 18"-SW-HDPE-0008 SW-VGL110011
11.81 FG
006
PDAH
001
PDSH
001
HS LOR
001A
HS RST
001B
RUNNING
FORWARD
YIR
001
RUNNING
FORWARD
YIR
001
IN
REMOTE
YI
001
IN
REMOTE
YI
001
B 110-X-7001
FROM SOURCE WATER
PUMP STATION
PDSH
002
HS FWD
001D
YL
001B
FAULT
M
D
M
YL
001A
ON
HS LOR
002A
HS RST
002B
HS FWD
002D
YL
002B
FAULT
YL
002A
ON
RUNNING
FORWARD
YIR
002
RUNNING
FORWARD
YIR
002
IN
REMOTE
YI
002
IN
REMOTE
YI
002
A 130-X-7002
TO SURGE TANK
PIT
009
FWD
CMD
UCR
001
FWD
CMD
UCR
001
RUNNING
REVERSE
YIR
001
RUNNING
REVERSE
YIR
001A
PRESS
PI
009
PRESS
PI
009
HS REV
001C
HS REV
002C
PDAH
002
DIFF
PRESSURE
HI
PDAH
001
DIFF
PRESSURE
HI
PDAH
001
FWD
CMD
UCR
002
FWD
CMD
UCR
002
REV
CMD
UCR
002
REV
CMD
UCR
002A
RUNNING
REVERSE
YIR
002
RUNNING
REVERSE
YIR
002A
DIFF
PRESSURE
HI
PDAH
002
DIFF
PRESSURE
HI
PDAH
002
CL-PLC101001CL-PLC101001
SCADA HMISCADA HMI
D
PDI
001
PDI
002
PDSH
003
M
D
PDI
003
HS
LOR
003A
HS
RST
003B
HS
FWD
003D
YL
003A
FAULT
YL
003B
ON
HS
REV
003C
PDAH
003
RUNNING
FORWARD
YIR
003
RUNNING
FORWARD
YIR
003
IN
REMOTE
YI
003
IN
REMOTE
YI
003
FWD
CMD
UCR
003
FWD
CMD
UCR
003
REV
CMD
UCR
003
REV
CMD
UCR
003A
RUNNING
REVERSE
YIR
003
RUNNING
REVERSE
YIR
003A
DIFF
PRESSURE
HI
PDAH
003
DIFF
PRESSURE
HI
PDAH
003
A 181-X-7002
FROM SODIUM
HYPOCHLORITE FEED
PUMPS
B/G A/G
B/GA/GB/GA/G
REV
CMD
UCR
001
REV
CMD
UCR
001A
PLANT
PIPING
YARD
PIPING
D D D
A 140-X-7001
TO TITLE 22 FILTER
AE
003
TURB
AIT
003
AE
004
pH/COND
AIT
004
AE
005
pH
AI
005
pH
AI
005
COND
AI
004
COND
AI
004
TURB
AI
003
TURB
AI
003
D
INFLUENT SAMPLE PANEL FG002
FG
003
TOTAL
CL2
AI
002
TOTAL
CL2
AI
002
AE
002
TOTAL CL2
AIT
002
FG
001
ORP
AI
001
ORP
AI
001
AE
001
ORP
AIT
001
FG
004
AE
006
TURB
120V
AIT
006
TURB
AI
006
TURB
AI
006
120V
FIT
001
M
FE
001
FLOW
FI
001
FLOW
FI
001
CL-PLC101002CL-PLC101002
SCADA HMISCADA HMI
CL-PLC101001CL-PLC101001
SCADA HMISCADA HMI
FG
005
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS SW AND AREA CODE IS 115 UNLESS OTHERWISE NOTED.
4. PROVIDED BY AUTO STRAINER SUPPLIER.
5. FUTURE I/O'S FOR FUTURE EQUIPMENT ARE LOCATED IN THE FUTURE RIO.
6. NOT USED.
7. SEE INSTRUMENT INSTALLATION DETAIL DRAWING FOR INSTALLATION DETAILS AND ACCESSORIES. 16"-SW-PVCPP-0008
SAMPLE TAP
SW-LCP115001 SW-LCP115002
SW-HV115002 SW-HV115001
SW-CV115041
SW-HV115003
SW-CV115042
SW-HV115004
14"-SW-DIP-0010
14"-SW-DIP-0012
14"-SW-DIP-0202
SW-LCP115003
SW-HV115012 SW-HV115013
SW-CV115043
STATIC MIXER
SW-MXS115001
NOCL-HV115035
NOCL-CKV115005
NOTE 5
SW-HV115051 SW-HV115052 SW-HV115053
SW-VGL115054
480V 480V 480V
3/4"-NOCL-HST1-0016
14"-SW-DIP-001514"-SW-DIP-0014
AUTO STRAINER NO. 1 AUTO STRAINER NO. 2 AUTO STRAINER NO. 3 14"-SW-DIP-0015
2"-NOCL-PVC1-0014
1/2"-NOCL-TEFL1-0012
SW-SEP115001 SW-SEP115002 SW-SEP115003
GRAB
SAMPLE
SW-HV115011
SW-SPL115001 (NOTE 7)
120V
SW-HV115012
SW-PCV115002
1"-SW-PVC2-0002
SW-PCV115003
SAMPLE TAP
SW-VGL115055
16"-SW-DIP-0017
12"-SW-DIP-0018
4"-SW-DIP-0020
14"-SW-DIP-001114"-SW-DIP-000914"-SW-DIP-0021
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 11:41:01 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
PVR, AD
KAB, BLB
BLB
312 370
115-X-7001
INSTRUMENTATION
TTF AUTOMATIC
STRAINERS
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
3/4''-NOCL-CPVC1-0016 1 09/27 ADDENDUM 1B 18"-SW-HDPE-0008 14"-SW-HDPE 14"-SW-HDPE 14"-SW-HDPE 2 2/22/22 RFI 29 6"-SW-DIP-0020 3 01/17 DCN 5 x CAT 6
11.82 CL-RIO101001
CL-RIO101001
SCADA HMISCADA HMI
A 210-X-7003
FROM ROC WETWELL
M
B/G A/G
PI
013
A/GB/G
120V FIT
013
M
FE
013
FLOW
FI
013
FLOW
FI
013
B/GA/G A/GB/G
PIT
010
PRESS
PI
010
PRESS
PI
010
IN
REMOTE
YI
025
IN
REMOTE
YI
025
FULLY
CLOSED
ZIC
025
FULLY
CLOSED
ZIC
025
VALVE ACTUATOR
HS
025A
LOR
HS
025B
OSC
ZT
025
ZSC
025
ZSO
025
POSI
INDCTN
ZI
025
POSI
INDCTN
ZI
025
POSI
CNTRL
ZC
025
POSI
CNTRL
ZC
025
FULLY
OPEN
ZIO
025
FULLY
OPEN
ZIO
025
TOTAL CL2
AE
005
TOTAL
CL2
AI
005
TOTAL
CL2
AI
005
D
TOTAL CL2
120V AIT
005
SC2
FG
005
pH
AE
006
pH
120V
AIT
006
pH
AI
006
pH
AI
006
B/G PIPE GALLERY PIPE GALLERY B/G
D
A/GB/G B/GA/G
HS
001
OOR
YLR
001
SC
001
IAH
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
IN
REMOTE
YI
001
IN
REMOTE
YI
001
RUN
CMD
UCR
001
RUN
CMD
UCR
001
SPEED
CNTRL
SC
001
SPEED
CNTRL
SC
001
I
SPEED
INDCTN
SI
001
SPEED
INDCTN
SI
001
RUNNING
YIR
001
RUNNING
YIR
001
COMMON
FAIL
UA
002
COMMON
FAIL
UA
002
IN
REMOTE
YI
002
IN
REMOTE
YI
002
RUN
CMD
UCR
002
RUN
CMD
UCR
002
SPEED
CNTRL
SC
002
SPEED
CNTRL
SC
002
SPEED
INDCTN
SI
002
SPEED
INDCTN
SI
002
RUNNING
YIR
002
RUNNING
YIR
002
HS
002
OOR
YLR
002
SC
002
IAH
002
I
120V FIT
M
FE
FLOW
FI
014
FLOW
FI
014
FG
006
D
A/G B/G
SC1
SC18
SC19
FLOW
SP
FC
001
FLOW
SP
FC
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001A
FLOW
SP
FC
002
FLOW
SP
FC
002
CL-RIO101002CL-RIO101002
SCADA HMISCADA HMI
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS ROC AND AREA CODE IS 120 UNLESS OTHERWISE NOTED.
4. FURNISH BIOASSAY LAB EQUIPMENT.
5. TERMINATION POINT LOCATION APPROX 3' INTO OCEAN OUTFALL PIPE.
6. ENDS OF RECYCLED WATER PIPE TO BE CAPPED.
7. SYSTEM INTEGRATOR TO PROVIDE AN ANALOG OUTPUT SIGNAL ISOLATOR FOR THE ANALOG OUTPUT - CCLEAN PUMP FLOW IN THE PLC.
ROC-CV120025
TO OCEAN
EXISTING TUNNEL PORTAL BOX
FROM SCOTT'S
VALLEY
FROM SC WWTF
ROC-AVRV120001 ROC-AVRV120002
16"-ROC-DIP-0002
ROC-HV120011
ROC-HV120010
PIG RECEIVING STATION
16"-ROC-PVCPP-0001
16"-ROC-DIP-0060
ROC-HV120001
16"-ROC-PVCPP-0061
16"-ROC-DIP-0062
COMPOSITE
SAMPLER
ROC-SMP120001
120V
ROC-HV120003
14"-ROC-DIP-0059
480V
1"-ROC-PVC2-0063
ROC-ARV120003
SAMPLE
TAP
16"-ROC-PVCPP-0064 16"-ROC-DIP-0065
ROC-HV120026
NOTE 5
TO DRAIN
TO BIOASSAY LAB
ROC-AVRV120004
NOTE 6
PIPE
GALLERY 6"-RW-PVCPP-0063 6"-RW-DIP-0064 6"-RW-PVCPP-0065 NOTE 6
ROC-LCP120001
120V
ROC-LCP120002
120V
72"-SE-DIP
PUMP NO. 1
ROC-P120001
PUMP NO. 2
ROC-P120002
BIOASSAY SAMPLE BLEND PANEL
12"-ROC-DIP-0066
1/2"-ROC-HDPE-0068
EXISTING OUTFALL EFFLUENT FLOWMETER
EXISTING
PLC
1/4"-ROC-PE4-0072
1/4"-ROC-PE4-0070 1/4"-ROC-PE4-0071
1/4"-ROC-PE4-0069
1/4"-ROC-PE4-0073
FROM CITY EFFLUENT
SAMPLE FEED IN
BIOASSAY LAB
TUNNEL PORTAL BOX
SAMPLE PANEL
ROC-SPL120001
8"-ROC-DIP-0075
20"-ROC-DIP-0001
4"-ROC-DIP-0067
COMPOSITE
SAMPLER
RESERVOIR
1/4"-ROC-PE4-0080 1"-ROC-PVC-0081
1"-ROC-PVC-0082
ROC-AVRV120003
JB
SEE NOTE 7
ROC-ARV120004
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 11:50:31 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
PVR, AD
KAB, BLB
BLB
313 370
120-X-7013
INSTRUMENTATION
SC WWTF TUNNEL
PORTAL BOX
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.83 CL-PLC101001
CL-PLC101001
SCADA HMISCADA HMI
A/G B/G
A 210-X-7001
TO CONVEYANCE PIPE
TO CHANTICLEER
PI
006
PI
007
A 115-X-7001
FROM TTF AUTOMATIC
STRAINERS
PI
008
A/GB/G
SC7
B/G PIPE GALLERY
B/G A/G
PIPE GALLERY B/G
SW-AVRV130006
16"-SW-PVCPP-0007
PWS SOURCE WATER
SURGE TANK
SW-T130002
SW-HV130006
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS SW AND AREA CODE IS 130 UNLESS OTHERWISE NOTED.
4. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
SW-AVRV130008
16"-SW-DIP-0017
PIG LAUNCH
SW-ARV130007
20"-SW-DIP-0018
SW-HV130007
SW-HV130023
SW-HV130030
16"-SW-DIP-0005
4"-SW-DIP-0008
16"-SW-DIP-0007
FUTURE PWS SOURCE
WATER SURGE TANK
SW-T130003
16"-SW-PVCPP-0001
16"-SW-DIP-0019
SW-CKV130006
16"-SW-PVCPP-0001
SW-ARV130010
16"-SW-DIP-0006
SW-CKV130007
SW-ARV130011
SW-HV130031
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:06:32 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
314 370
130-X-7002
INSTRUMENTATION
TTF PWS SOURCE
WATER SURGE TANK
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.84 CL-PLC101002
CL-PLC101002
SCADA HMISCADA HMI
A 115-X-7001
FROM AUTOMATIC
STRAINERS
A 140-X-7002
TO TITLE 22 FILTER
BREAK TANK
US
LE
001
120V
LIT
001
YLR
001
RUN
TAH
001
HMS
RST
001
HS
SS
001B
SIC
001A
YLR
001
UA
001
FAIL
HS
LOR
001A
HMS
RST
002
HS
SS
002B
SIC
002
YLR
002
UA
002
FAIL
HS
LOR
002A
IN
REMOTE
YI
001
IN
REMOTE
YI
001
RUNNING
YIR
001
RUNNING
YIR
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
LEVEL
LI
001
LEVEL
LI
001
M
RW-LCP140001
HS SS
001A
HMS
RST
001
HS
LOR
001B
SIC
001
SIK
001
LI
001
PI
003
MMM
PIT
003
PIT
002
RUN
CMD
UCR
001
RUN
CMD
UCR
001
PI
002
PRESS
PI
003
PRESS
PI
003
PRESS
PI
002
PRESS
PI
002
BACKWASH
PERMISS
YA
001
BACKWASH
PERMISS
YA
001
IN
REMOTE
YI
001
IN
REMOTE
YI
001A
RUNNING
YIR
001
RUNNING
YIR
001A
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001A
IN
REMOTE
YI
002
IN
REMOTE
YI
002
RUNNING
YIR
002
RUNNING
YIR
002
COMMON
FAIL
UA
002
COMMON
FAIL
UA
002
120V FIT
001
FLOW
FI
001
FLOW
FI
001
M
FE
001
M
IN
REMOTE
YI
001
IN
REMOTE
YI
001
FULLY
CLOSED
ZIC
001
FULLY
CLOSED
ZIC
001
VALVE ACTUATOR
HS
001A
LOR
HS
001B
OSC
ZT
001
ZSC
001
ZSO
001
POSI
INDCTN
ZI
001
POSI
INDCTN
ZI
001
POSI
CNTRL
ZC
001
POSI
CNTRL
ZC
001
FULLY
OPEN
ZIO
001
FULLY
OPEN
ZIO
001
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS RW AND AREA CODE IS 140 UNLESS OTHERWISE NOTED.
4. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
5. ALL ITEMS MARKED BY AN ' ' ARE TO BE PROVIDED BY CLOTH FILTER SUPPLIER.
6. CONNECTION FOR FUTURE COAGULANT ADDITION, IF REQUIRED. 3"-FBW-PVC2-0002
RW-FLT140001
480V
CLOTH FILTER
BACKWASH / WASTE
PUMP NO. 1
RW-P140001
CLOTH FILTER
BACKWASH / WASTE
PUMP NO. 2
RW-P140002
SOLIDS
VALVE (TYP)
SW-HV140004
FILTER UNIT BACKWASH / WASTE PUMP 1 BACKWASH / WASTE PUMP 2 FILTER UNIT BACKWASH / WASTE PUMP 1 BACKWASH / WASTE PUMP 2 TITLE 22 FILTER SKID
6"-FE-PVC2-0003
NOTE 5
RW-CV140011
RW-CV140012
RW-CV140013
RW-CV140014
INFLUENT
WEIR
LCP (WITH LOCAL STARTERS)
EFFLUENT
WEIR
SAMPLE
TAP
SAMPLE
TAP
SW-PCV140001
SEE NOTE 6
3"-SW-DIP-0021 6"-SW-DIP-0022
120V
SW-CV140001
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:07:19 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
315 370
140-X-7001
INSTRUMENTATION
TTF TITLE 22 FILTERS
AND UV
SHEET 1 OF 2
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
OVERFLOW
WEIR
TO CATCH
BASIN #8
11.85 CL-PLC101002
CL-PLC101002
SCADA HMISCADA HMI
120V
FIT
002
M
FLOW
FI
002
FLOW
FI
002
UV MASTER CONTROL PANEL
UV-PLC140001
PIT
001
A 140-X-7001
FROM TITLE 22 FILTER
EFFLUENT WEIR
M
D
A 181-X-7001
FROM SODIUM
HYPOCHLORITE FEED
PUMPS
120V
AIT
003
UVT
AE
003
UVT
FG
003
UVT
AI
003
UVT
AI
003
DATA
WORD
AI
002
DATA
WORD
AI
002A
D
120V
AIT
004
TOTAL CL2
TOTAL CL2
AE
004
TOTAL
CL2
AI
004
TOTAL
CL2
AI
004
PRESS
PI
001
PRESS
PI
001
SPEED
INDCTN
SI
001
SPEED
INDCTN
SI
001
RUN
CMD
UCR
001
RUN
CMD
UCR
001
RW-VFD101001
HMS
001
RST
HS
001B
SS
SIC
001
RUNNING
YIR
001
RUNNING
YIR
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
YLR
001
UA
001
FAIL
IN
REMOTE
YI
001
IN
REMOTE
YI
001
HS
001A
LOR
SPEED
CNTRL
SC
001
SPEED
CNTRL
SC
001
YARD PIPING PLANT PIPING
HS
003A
LOR
HS
003B
OSC
ZLC
003
ZLO
003
ZSC
003
ZSO
003
VALVE ACTUATOR
E-STOP
HS
003C
SS
HS
003D
LEVEL
LI
003
LEVEL
LI
003
LEVEL
LI
001
LEVEL
LI
001
LIT
001
OPENED
ZIO
003
OPENED
ZIO
003
CLOSED
ZIC
003
CLOSED
ZIC
003
IN
REMOTE
YI
003
IN
REMOTE
YI
003
OPEN
CMD
ZCO
003
OPEN
CMD
ZCO
003
CLOSE
CMD
ZCC
003
CLOSE
CMD
ZCC
003
I
LIT
AE
002
TURB
AI
002
TURB
AI
002FG002
120V
AIT
002
TURB
D
D
B/GA/G A/GB/G
D
SC4
FG
004
D
A 140-X-7003
TO BACK UP T22
STORAGE TANK
M
FE
002
D
HS
002A
LOR
HS
002B
OSC
ZLC
002
ZLO
002
ZSC
002
ZSO
002
VALVE ACTUATOR
OPENED
ZIO
002
OPENED
ZIO
002
CLOSED
ZIC
002
CLOSED
ZIC
002
IN
REMOTE
YI
002
IN
REMOTE
YI
002
OPEN
CMD
ZCO
002
OPEN
CMD
ZCO
002
CLOSE
CMD
ZCC
002
CLOSE
CMD
ZCC
002
FLOW
SP
FC
002
FLOW
SP
FC
002
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001A
6"-UVE-PVC2-0006
UV DISINFECTION UNIT NO.1
RW-UVL140001
RW-CV140002
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS RW AND AREA CODE IS 140 UNLESS OTHERWISE NOTED.
4. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
5. ALL ITEMS MARKED BY AN ' ' ARE TO BE PROVIDED BY UV SYSTEM SUPPLIER. 6"-DRN-PVC2-0007
RW-CV140003
RW-CKV140002
1/2"-NOCL-TEFL1-0008
RW-HV140010
RW-HV140011
TITLE 22 FILTER BREAK TANK
RW-T140001 TITLE 22 UV FEED PUMP
RW-P140003
2"-NOCL-PVC1-0009
6"-FE-PVC2-0004
6"-FE-PVC2-0005
6"-FE-PVC2-0003
NOTE 4
RW-HV140006
RW-CKV140007 RW-HV140008
480V
4"-UVE-PVC2-0006
4"
EXISTING 2W
TANK
RW-HV140025
6"-UVE-PVC2-0006
EXISTING
PLC
1"-NOCL-CPVC1-0012
RW-AVRV140002
SAMPLE
TAP
SAMPLE
TAP
RW-AVRV140003
COMPOSITE
SAMPLER
RW-SMP140001
120V
480V
UV DISINFECTION
UNIT NO.1 INLET
SAMPLE PANEL
UV-SPL140001
120V
TO STORM DRAIN
CATCH BASIN
6"-UVE-PVC2-0008
1/2"-UVE-PVC2-0019
UV DISINFECTION
UNIT NO.1 OUTLET
SAMPLE PANEL
UV-SPL140002
480V
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:07:45 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
316 370
140-X-7002
INSTRUMENTATION
TTF TITLE 22 FILTERS
AND UV
SHEET 2 OF 2
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
6"-UVE-PVCPP
6"-UVE-PVC2
1 1 12/10/21 RFI #013
6"-UVE-PVC2
6"-UVE-HDPE
2 2/22/22 RFI #029
2 CL-PLC101002CL-PLC101002
SCADA HMISCADA HMI
120V FIT
002
M
FLOW
FI
003
FLOW
FI
003
UV MASTER CONTROL PANEL
UV-PLC140001
PIT
001
A 140-X-7001
FROM TITLE 22 FILTER
EFFLUENT WEIR
M
A 181-X-7001
FROM SODIUM
HYPOCHLORITE FEED
PUMPS 120V
AIT
003
UVT
AE
003
UVT
FG
003
UVT
AI
003
UVT
AI
003
DATA
WORD
AI
002
DATA
WORD
AI
002A
D
120V
AIT
004
TOTAL CL2
TOTAL CL2
AE
004
TOTAL
CL2
AI
004
TOTAL
CL2
AI
004
PRESS
PI
001
PRESS
PI
001
SPEED
INDCTN
SI
001
SPEED
INDCTN
SI
001
RUN
CMD
UCR
001
RUN
CMD
UCR
001
RW-VFD101001
HMS
001
RST
HS
001B
SS
SIC
001
RUNNING
YIR
001
RUNNING
YIR
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
YLR
001
UA
001
FAIL
IN
REMOTE
YI
001
IN
REMOTE
YI
001
HS
001A
LOR
SPEED
CNTRL
SC
001
SPEED
CNTRL
SC
001
YARD PIPING PLANT PIPING
HS
003A
LOR
HS
003B
OSC
ZLC
003
ZLO
003
ZSC
003
ZSO
003
VALVE ACTUATOR
E-STOP
HS
003C
SS
HS
003D
LEVEL
LI
003
LEVEL
LI
003
LEVEL
LI
001
LEVEL
LI
001
LIT
001
OPENED
ZIO
003
OPENED
ZIO
003
CLOSED
ZIC
003
CLOSED
ZIC
003
IN
REMOTE
YI
003
IN
REMOTE
YI
003
OPEN
CMD
ZCO
003
OPEN
CMD
ZCO
003
CLOSE
CMD
ZCC
003
CLOSE
CMD
ZCC
003
I
LIT
AE
002
TURB
AI
002
TURB
AI
002FG002
120V
AIT
002
TURB
D
D
A/G B/G
B/G A/G
D
SC4
FG
004
D
A 140-X-7003
TO BACK UP T22
STORAGE TANK
M
FE
002
D
HS
002A
LOR
HS
002B
OSC
ZLC
002
ZLO
002
ZSC
002
ZSO
002
VALVE ACTUATOR
OPENED
ZIO
002
OPENED
ZIO
002
CLOSED
ZIC
002
CLOSED
ZIC
002
IN
REMOTE
YI
002
IN
REMOTE
YI
002
OPEN
CMD
ZCO
002
OPEN
CMD
ZCO
002
CLOSE
CMD
ZCC
002
CLOSE
CMD
ZCC
002
FLOW
SP
FC
002
FLOW
SP
FC
002
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001A
M
FLOW
FI
002
FLOW
FI
002
M
A/G B/G
B/G A/G
120V FIT
003
M
FE
003
M M
UV DISINFECTION UNIT NO.1
RW-UVL140001
RW-CV140002
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS RW AND AREA CODE IS 140 UNLESS OTHERWISE NOTED.
4. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
5. ALL ITEMS MARKED BY AN ' ' ARE TO BE PROVIDED BY UV SYSTEM SUPPLIER. 6"-DRN-PVC2-0007
RW-CV140003
RW-CKV140002
1/2"-NOCL-TEFL1-0008
RW-HV140011
TITLE 22 FILTER BREAK TANK
RW-T140001
TITLE 22 UV FEED PUMP
RW-P140003
2"-NOCL-PVC1-0009
6"-FE-PVC2-0004
6"-FE-PVC2-0005
6"-FE-PVC2-0003
NOTE 4
RW-HV140006
RW-CKV140007 RW-HV140008
480V
4"-FE-PVC2-0002
4"
EXISTING 2W
TANK
6"-UVE-PVC2-0006
EXISTING
PLC
1"-NOCL-CPVC1-0012
RW-AVRV140002
SAMPLE
TAP
SAMPLE
TAP
RW-AVRV140003
COMPOSITE
SAMPLER
RW-SMP140001
120V
480V
UV DISINFECTION
SAMPLE PANEL
UV-SPL140001
120V
TO STORM DRAIN
CATCH BASIN
6"-UVE-PVC2-0008
UVT PANEL
UV-SPL140002
480V
CCP-140001
RW-CV140005
6"-UVE-PVC2-0010
6"-UVE-PVCPP-0001
6"-UVE-PVC2-0009
6"-UVE-HDPE-0002
RW-HV140011
UV DISINFECTION UNIT NO.2
RW-UVL140002
CCP-140002
RW-CV140007
208V
208V
RW-CV140004
RW-CV140006
10"-FE-PVC2-0001
10"-FE-SS-0001
10"-FE-SS-0002
4"-FE-PVC2-0001
1 1
4"-FE-PVC2-0010
120V
1/2"-UVE-PVC2-0019
120V
6"-FE-PVC2-0009
480V
480V
480V
RW-AVRV140004
RFI #013, 029
O/C
O/C
MOD
MOD
480V
10"-FE-PVC2-0002
10"-FE-SS-0003
10"-FE-SS-0004
4"
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
4/14/2022 10:06:24 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
316 370
140-X-7002
INSTRUMENTATION
TTF TITLE 22 FILTERS
AND UV
SHEET 2 OF 2
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
1 04/14 GENERAL REVISION
6"-RW-PVC2
(UV-SSC140001)
TO CATCH
BASIN #8
11.86 CL-PLC101002
CL-PLC101002
SCADA HMISCADA HMI
LIT
002
A 140-X-7002
LSLL
002
LEVEL
LI
002
LEVEL
LI
002
LO-LO
LEVEL
LALL
002
LO-LO
LEVEL
LALL
002
I
PIT
004
B/GA/G
PRESS
PI
004
PRESS
PI
004
HMS
004
RST
HS
004B
SS
SIC
004
YLR
004
UA
004
FAIL
HS
004A
LOR
IN
REMOTE
YI
004
IN
REMOTE
YI
004
RUNNING
YIR
004
RUNNING
YIR
004
COMMON
FAIL
UA
004
COMMON
FAIL
UA
004
RUN
CMD
UCR
004
RUN
CMD
UCR
004
SPEED
CNTRL
SC
004
SPEED
CNTRL
SC
004
SPEED
INDCTN
SI
004
SPEED
INDCTN
SI
004
ESTOP
PRESSED
YA
004
ESTOP
PRESSED
YA
004A
I
UVE-VFD140004
HMS
005
RST
HS
005B
SS
SIC
005
YLR
005
UA
005
FAIL
HS
005A
LOR
I
UVE-VFD140005
IN
REMOTE
YI
005
IN
REMOTE
YI
005
RUNNING
YIR
005
RUNNING
YIR
005
COMMON
FAIL
UA
005
COMMON
FAIL
UA
005
RUN
CMD
UCR
005
RUN
CMD
UCR
005
SPEED
CNTRL
SC
005
SPEED
CNTRL
SC
005
SPEED
INDCTN
SI
005
SPEED
INDCTN
SI
005
ESTOP
PRESSED
YA
005
ESTOP
PRESSED
YA
005A
PI
002
HS
005D
SS
HS
005C
E-STOP
HS
004D
SS
HS
004C
E-STOP
PI
001
SC9
UVE-LCP140002
D
4"-UVE-PVC2-0008
UVE-HV140019
UVE-HV140020
MANWAY
T22 BACK-UP
PUMP NO. 1
UVE-P140004
BLADDER
TANK
TITLE 22 BACK-UP
PUMP STATION
6"-UVE-PVC2-0018
T22 BACK-UP
PUMP NO. 2
UVE-P140005
UVE-HV140013
UVE-HV140014
UVE-CKV140003 UVE-HV140016
UVE-CKV140004 UVE-HV140017
UVE-T140003
6"-UVE-PVC2-0017
4"-UVE-PVC2-0011
4"-UVE-PVC2-0012
4"-UVE-PVC2-0014
4"-UVE-PVC2-0015
EXISTING 2W
NETWORK
UVE-HV140012
6"-UVE-PVC2-0009
UVE-HV140021
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS UVE AND AREA CODE IS 140 UNLESS OTHERWISE NOTED.
4. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
5. ALL ITEMS MARKED BY AN ' ' ARE TO BE PROVIDED BY EQUIPMENT VENDOR. 3"-UVE-PVC2-0010
6"-UVE-HDPE-0001
480V
T22 BACK-UP STORAGE TANK
UVE-T140002
UVE-HV140022
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 3:26:59 PM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
PVR
KAB, BLB
BLB
317 370
140-X-7003
INSTRUMENTATION
TTF TITLE 22 BACK-UP
STORAGE TANK AND
PUMPS
P&ID
BDS
404790-101-NBAF_BUILDING.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.87 CL-PLC101002
CL-PLC101002
SCADA HMISCADA HMI
HS
001
OOR
YLR
001
SC
001
IAH
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
IN
REMOTE
YI
001
IN
REMOTE
YI
001
RUN
CMD
UCR
001
RUN
CMD
UCR
001
SPEED
CNTRL
SC
001
SPEED
CNTRL
SC
001
I
PI
001
PSH
001
HI DISCH
PRESS
PAH
001
HI DISCH
PRESS
PAH
001
A 140-X-7002
TO TITLE 22 UV EFFLUENT
PI
002
PSH
002
SPEED
INDCTN
SI
001
SPEED
INDCTN
SI
001
HS
002
OOR
YLR
002
SC
002
IAH
002
COMMON
FAIL
UA
002
COMMON
FAIL
UA
002
IN
REMOTE
YI
002
IN
REMOTE
YI
002
RUN
CMD
UCR
002
RUN
CMD
UCR
002
SPEED
CNTRL
SC
002
SPEED
CNTRL
SC
002
HI DISCH
PRESS
PAH
002
HI DISCH
PRESS
PAH
002
SPEED
INDCTN
SI
002
SPEED
INDCTN
SI
002
RUNNING
YIR
001
RUNNING
YIR
001
RUNNING
YIR
002
RUNNING
YIR
002
AUTO /
MANUAL
HC
001
AUTO /
MANUAL
HC
002
YARD
PIPING
PLANT
PIPING
I I
I
SC12
SC13
A 181-X-7002
SC16
181-X-7002 B
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS NOCL AND AREA CODE IS 181 UNLESS OTHERWISE NOTED.
4. LOCAL CONTROL DEVICES, SUCH AS LIGHTS AND SWITCHES LOCATED ON MCCS OR AT DRIVEN EQUIPMENT, MAY NOT BE SHOWN ON THIS P&ID.
5. NOT ALL FUNCTIONS ARE SHOWN AT THE SCADA HMI LEVEL. REFER TO CONTROL BLOCK LOOP NUMBER PARAGRAPHS IN SECTION 40 68 83 FOR FURTHER DETAIL ON PLC, SCADA CONTROL AND MONITORING.
6. A 6 INCH LENGTH OF CLEAR PVC SHALL BE SUPPLIED AND SOLVENT WELDED IN PLACE AS SHOWN IN THE DRIP LEG.
7. TOP OF ANTI-SIPHON LOOP SHALL BE 2 FEET HIGHER THAN EXISTING STORAGE TANK OVERFLOW CONNECTION.
8. CONTROL PANEL IS INTEGRAL TO THE PUMP.
9. ROUTE VENT HEADERS 12 INCHES ABOVE EXISTING STORAGE TANK OVERFLOW ELEVATION.
10. LOCATE TEE FOR VENT AS CLOSE AS POSSIBLE TO PUMP SUCTION CONNECTION. THE VENT PIPING SHLL BE CONNECTED TO THE RUN OF THE TEE IN THE VERTICAL POSITION. VENT PIPING SHALL NOT BE CONNECTED TO THE BRANCH OF THE TEE.
11. PUMP SUCTION PIPING IS TO SLOPE DOWNWORD FROM THE EXISTING STORAGE TANK TO METERING PUMP WITHOUT HIGH POINTS OR LOW POINTS.
12. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
13. VALVE TO BE OPEN EXCEPT WHEN STORAGE TANK LEVEL IS BELOW PUMP CENTERLINE. 1"-NOCL-CPVC1-0006
NOTE 9 (TYP) 1"-NOCL-CPVC1-0007
1"-NOCL-CPVC1-0001
1" SODIUM HYPOCHLORITE
METERING PUMP NO.1
NOCL-P181001
1"-NOCL-CPVC1-0001
1"-NOCL-CPVC1-0003
1"-NOCL-CPVC1-0005
1"-NOCL-CPVC1-0005
VACUUM BREAKER (TYP)
ANTI-SIPHON
LOOP
EL. NOTE 7
1"-NOCL-CPVC1-0002
1"-NOCL-CPVC1-0004
DRAIN / FLUSH VALVE (TYP)
NOTE 6 (TYP)
6" (TYP)
PUMP BASE
NOTE 11
FROM TANK
PUMP SUCTION DETAIL
MINIMIZE THIS DISTANCE
MAXIMIZE THIS DISTANCE
NOTE 10
TO STORAGE
TANK VENT
METERING PUMP
DISCHARGE METERING
PUMP
NOCL-HV181002
NOCL-HV181004
NOCL-HV181005
NOCL-HV181006
NOCL-HV181007
NOCL-HV181008
NOCL-HV181011
NOCL-HV181012
NOCL-HV181010
NOCL-HV181009
NOCL-CKV181001
NOCL-HV181016 NOCL-HV181017
NOCL-CKV181002
SODIUM HYPOCHLORITE
METERING PUMP NO.2
NOCL-P181002
1"
NOCL-HV181014
NOCL-HV181013
THREADED CAP (TYP)
2"-NOCL-PVC1-0010
1/2"-NOCL-TEFL1-0008
NOTE 12
NOTE 13
NOCL-HV181001
NOCL-PSV181002
NOCL-PSV181003
NOTE 8 (TYP)
120V
NOCL-LCP181001
120V
NOCL-LCP181002
TO EXISTING
STORAGE TANK
VENT
FROM
EXISTING
STORAGE
TANK
NOCL-PSV181001
NOCL-PSV181004
NOCL-HV181003
NOCL-HV181015
1"-NOCL-CPVC1-0002
FROM EXISTING
STORAGE TANK
VENT
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:18:21 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
318 370
181-X-7001
INSTRUMENTATION
TTF SODIUM
HYPOCHLORITE FEED
SYSTEM
SHEET 1 OF 2
P&ID
BDS
404790-180-CHEMICAL_STORAGE.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.88 CL-RIO101001
CL-RIO101001
SCADA HMISCADA HMI
HS
003
OOR
YLR
003
SC
003
IAH
003
COMMON
FAIL
UA
003
COMMON
FAIL
UA
003
IN
REMOTE
YI
003
IN
REMOTE
YI
003
RUN
CMD
UCR
003
RUN
CMD
UCR
003
STROKE
CMD
NC
003
STROKE
CMD
NC
003
I
PSH
003
HI DISCH
PRESS
PAH
003
HI DISCH
PRESS
PAH
003
A 115-X-7001
SW TO AWPF
PSH
004
SPEED
INDCTN
SI
003
SPEED
INDCTN
SI
003
HS
004
OOR
YLR
004
SC
004
IAH
004
COMMON
FAIL
UA
004
COMMON
FAIL
UA
004
IN
REMOTE
YI
004
IN
REMOTE
YI
004
RUN
CMD
UCR
004
RUN
CMD
UCR
004
SPEED
CNTRL
SC
004
SPEED
CNTRL
SC
004
I
HI DISCH
PRESS
PAH
004
HI DISCH
PRESS
PAH
004
SPEED
INDCTN
SI
004
SPEED
INDCTN
SI
004
RUNNING
YIR
003
RUNNING
YIR
003
RUNNING
YIR
004
RUNNING
YIR
004
AUTO /
MANUAL
HC
003
AUTO /
MANUAL
HC
004
YARD
PIPING
PLANT
PIPING
I I
PI
003
PI
004
SC15
SPEED
CNTRL
SC
003
SPEED
CNTRL
SC
003
STROKE
LENGTH
NI
003
STROKE
LENGTH
NI
003
NC
003
NC
004
STROKE
LENGTH
NI
004
STROKE
LENGTH
NI
004
STROKE
CMD
NC
004
STROKE
CMD
NC
004
PI
005
D
PI
006
D
PI
008
D
PI
007
D
A 181-X-7001
181-X-7001 B
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'T-'.
3. PROCESS CODE IS NOCL AND AREA CODE IS 181 UNLESS OTHERWISE NOTED.
4. LOCAL CONTROL DEVICES, SUCH AS LIGHTS AND SWITCHES LOCATED ON MCCS OR AT DRIVEN EQUIPMENT, MAY NOT BE SHOWN ON THIS P&ID.
5. NOT ALL FUNCTIONS ARE SHOWN AT THE SCADA HMI LEVEL. REFER TO CONTROL BLOCK LOOP NUMBER PARAGRAPHS IN SECTION 40 68 83 FOR FURTHER DETAIL ON PLC, SCADA CONTROL AND MONITORING.
6. A 6 INCH LENGTH OF CLEAR PVC SHALL BE SUPPLIED AND SOLVENT WELDED IN PLACE AS SHOWN IN THE DRIP LEG.
7. TOP OF ANTI-SIPHON LOOP SHALL BE 2 FEET HIGHER THAN EXISTING STORAGE TANK OVERFLOW CONNECTION.
8. NOT USED.
9. ROUTE VENT HEADERS 12 INCHES ABOVE EXISTING STORAGE TANK OVERFLOW ELEVATION.
10. LOCATE TEE FOR VENT AS CLOSE AS POSSIBLE TO PUMP SUCTION CONNECTION. THE VENT PIPING SHLL BE CONNECTED TO THE RUN OF THE TEE IN THE VERTICAL POSITION. VENT PIPING SHALL NOT BE CONNECTED TO THE BRANCH OF THE TEE.
11. PUMP SUCTION PIPING IS TO SLOPE DOWNWORD FROM THE EXISTING STORAGE TANK TO METERING PUMP WITHOUT HIGH POINTS OR LOW POINTS.
12. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
13. VALVE TO BE OPEN EXCEPT WHEN STORAGE TANK LEVEL IS BELOW PUMP CENTERLINE. 1"-NOCL-CPVC1-0006
NOTE 9 (TYP) 1"-NOCL-CPVC1-0007
1"-NOCL-CPVC1-0011
1"
1"-NOCL-CPVC1-0011
3/4"-NOCL-HST1-0013
3/4"-NOCL-HST1-00153/4"-NOCL-HST1-0015
VACUUM BREAKER (TYP)
ANTI-SIPHON
LOOP
EL. NOTE 7
1"-NOCL-CPVC1-0012
3/4"-NOCL-HST1-0014
DRAIN / FLUSH VALVE (TYP)
NOTE 6 (TYP)
6" (TYP)
PUMP BASE
NOTE 11
FROM TANK
PUMP SUCTION DETAIL
MINIMIZE THIS DISTANCE
NOTE 10
TO STORAGE
TANK VENT
NOCL-HV181019
NOCL-HV181021
NOCL-HV181022
NOCL-HV181023
NOCL-HV181024
NOCL-HV181025
NOCL-HV181028
NOCL-HV181029
NOCL-HV181027
NOCL-HV181026
NOCL-CKV181003
NOCL-HV181033
NOCL-CKV181004
1"
NOCL-HV181030
NOCL-HV181031
THREADED CAP (TYP)
2"-NOCL-PVC1-0014
1/2"-NOCL-TEFL1-0012
NOTE 12
NOTE 13
NOCL-HV181018
NOCL-PSV181006
NOCL-PSV181007
120V
NOCL-LCP181003
120V
NOCL-LCP181004
FROM
EXISTING
STORAGE
TANK
NOCL-PSV181005
NOCL-PSV181008
NOCL-HV181020
NOCL-HV181032
METERING PUMP
DISCHARGE
METERING
PUMP
SODIUM
HYPOCHLORITE
METERING PUMP NO. 3
NOCL-P181003
SODIUM
HYPOCHLORITE
METERING PUMP NO. 4
NOCL-P181004
NOCL-PCV181001
NOCL-HV181035
NOCL-PCV181002
NOCL-HV181036
1"-NOCL-CPVC1-0012
NOCL-HV181034
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:18:03 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
BNG, AD
KAB, BLB
BLB
319 370
181-X-7002
INSTRUMENTATION
TTF SODIUM
HYPOCHLORITE FEED
SYSTEM
SHEET 2 OF 2
P&ID
BDS
404790-180-CHEMICAL_STORAGE.rvt
0 08/26 ISSUED FOR CONSTRUCTION
1 09/27 ADDENDUM 1B 3/4''-NOCL-CPVC1-0015 3/4''-NOCL-CPVC1-0015 3/4''-NOCL-CPVC1-0013 3/4''-NOCL-CPVC1-0014
TO BE UPDATED ONCE CONSTRUCTION IS COMPLETED
11.89 B/G A/G
CL-RIO201003CL-RIO201003
SCADA HMISCADA HMI
FLOW
FI
002
FLOW
FI
002
IN
REMOTE
YI
001
IN
REMOTE
YI
001
RUNNING
YIR
001
RUNNING
YIR
001
COMMON
FAIL
UA
001
COMMON
FAIL
UA
001
RUN
CMD
UCR
001
RUN
CMD
UCR
001
SPEED
CNTRL
SC
001
SPEED
CNTRL
SC
001
SPEED
INDCTN
SI
001
SPEED
INDCTN
SI
001
PRESS
PI
001
PRESS
PI
001
A 281-X-7002
FROM SODIUM
HYPOCHLORITE
A 130-X-7002
FROM SANTA CRUZ TTF
PI
001
PIT
001
M
FE
002
120V
FIT
002
P
P
A 210-X-7002
TO STRAINERS
B 210-X-7003
TO ROC WETWELL
MFF-VFD203001
HMS RST
001
HS
LOR
001A
YLR
001
HS
SS
001B
SIC
001
UA
001
FAIL
VFD
FAULT
YA
001
VFD
FAULT
YA
001
PI
002
PI
003
PI
004
PI
005
TURB
AE
001
TURB
AIT
001
TOTAL
AE CL2
002
TOTAL
AIT CL2
002
D D
TOTAL
CL2
AI
002
TOTAL
CL2
AI
002
A 240-X-7001
FROM UV / AOP
OPENED
ZIO
004
OPENED
ZIO
004
CLOSED
ZIC
004
CLOSED
ZIC
004
IN
REMOTE
YI
004
IN
REMOTE
YI
004
OPEN
CMD
ZCO
004
OPEN
CMD
ZCO
004
CLOSE
CMD
ZCC
004
CLOSE
CMD
ZCC
004
D 210-X-7003
MF FEED TANK
OVERFLOW TO ROC
WETWELL
LEVEL
LI
001
LEVEL
LI
001
LIT
001
HS LOR
004A
HS OSC
004B
ZLC
004
ZSC
004
ZLO
004
ZSO
004 VALVE ACTUATOR
PSH
001
PSH
002
PSH
003
PSH
004
PSH
005
LSLL
001
LSHH
001
HI-HI
LEVEL
LAHH
001
HI-HI
LEVEL
LAHH
001
LO-LO
LEVEL
LALL
001
LO-LO
LEVEL
LALL
001
M
FE
003
120V FIT
003
FLOW
FI
003
FLOW
FI
003
B/G
A/G
PI
013
YARD PIPING PLANT PIPING
I
HS
001D
SS
HS
001C
E-STOP
HS
002D
SS
HS
002C
E-STOP
HS
003D
SS
HS
003C
E-STOP
HS
004D
SS
HS
004C
E-STOP
HS
005D
SS
HS
005C
E-STOP
C 210-X-7003
TO PIG LAUNCHING
STATION
CL-PLC201001CL-PLC201001
SCADA HMISCADA HMI
CL-RIO201003CL-RIO201003
SCADA HMISCADA HMI
HI DISCH
PRESS
PAH
001
HI DISCH
PRESS
PAH
001
I I
TURB
AI
001
TURB
AI
001
SAMPLE PANEL
C1
FG
001
FG
002
LIT
002
LEVEL
LI
002
LEVEL
LI
002
ORP
AI
003
ORP
AI
003
AE
003
ORP
AIT
003
D
FG
003
pH
AI
004
pH
AI
004B
pH/TEMP
AE
004
pH/TEMP
AIT
004
D
FG
004
J 210-X-7003
TO PIG LAUNCH STATION
TEMP
AI
004
TEMP
AI
004A
H
TO OSS OZONE
DESTRUCT P&ID
I
TO OSS OZONE
CONTRACTOR P&ID
F
TO VENDOR OZONE
INJECTION P&ID
G
TO VENDOR OZONE
INJECTION P&ID
A
TO OSS TOC AND
NITRITE ANALYZER
PANEL
A
TO OSS ORP ANALYZER
A
TO OSS DISSOLVED
OZONE ANALYZER
A
FROM VENDOR OZONE
INJECTION P&ID
A
FROM OSS DISSOLVED
OZONE ANALYZER
RETURN
A
FROM OSS ORP
ANALYZER
MF FEED PUMP 1
MFF-P210001
MF FEED PUMP 2
MFF-P210002
MF FEED PUMP 3
MFF-P210003
FUTURE
MF FEED PUMP 4
MFF-P210004
FUTURE
MF FEED PUMP 5
MFF-P210005
SAMPLE
STATIC MIXER
SW-MXS210001
NOCL-CKV210001
NOCL-HV210017
SW-CV210005
SW-CV210004
MFF-HV210006
MFF-HV210008
MFF-HV210010
MFF-CKV210004
MFF-CKV210005
MFF-CKV210006
MFF-HV210011
MFF-HV210009
MFF-HV210007
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'A-'.
3. CHEMICAL DUCT BANK TO CONSIST OF CARRIER PIPE WITH TUBING PULLED THROUGH.
4. PROCESS CODE IS MFF AND AREA CODE IS 210 UNLESS OTHERWISE NOTED.
5. OSS- OZONE SYSTEM SUPPLIER.
6. SEE INSTRUMENT INSTALLATION DETAIL DRAWING FOR INSTALLATION DETAILS AND ACCESSORIES.
7. THE LEVEL INSTRUMENTS SHALL BE MOUNTED 6' OFF THE GROUND. 16"-SW-PVCPP-0007
14"-SW-DIP-0002
SW-ARV210001
18"-MFF-DIP-0003
SEE TYPICAL I/Os
AND CONTROL
8"-MFF-DIP-0004
8"-MFF-DIP-0006
8"-MFF-DIP-0008
8"-MFF-DIP-0201
8"-MFF-DIP-0203
8"-MFF-DIP-0005
8"-MFF-DIP-0007
8"-MFF-DIP-0009
8"-MFF-DIP-0202
8"-MFF-DIP-0204
MFF-ARV210004
14"-MFF-DIP-0010
12"-MFF-DIP-0012
2"-NOCL-PVC1-0013
NOTE 3
NOTE 3
NOTE 3
SW-AVRV210001
SW-ARV210002
20"-SW-DIP-0001
PIG RECEIVING
STATION
1/2"-NOCL-TEFL1-0008
1"-NOCL-CPVC1-0009
12"-UVE-DIP-0006
14"-SW-DIP-0004
14"-MFF-DIP-0011
14"-MFF-DIP-0013
SW-HV210025
SW-HV210026
12"-MFF-DIP-0014
1"
MFF-HV210029
MFF-HV210030
MFF-HV210026
MFF-HV210028
MFF-CKV210008
MFF-CKV210007
SW-SPL210001
NOTE 6
120V
TYPICAL I/O'S
AND CONTROLS
TYPICAL I/O'S
AND CONTROLS
(EL-MCC201001)
12"-SW-DIP-0001
SAMPLE
TAP
OZONE CONTACT TANK
OZ-T210001
14"-OSW-SS8-0001
4"-OZD-SS7-0001
4"-DRN-DIP-0001
14"-SW-DIP-0002
14"-SW-DIP-0005
MF FEED TANK
MFF-T210001
10"-SW-DIP-0020
4"-OZ-SS7-0002
SW-HV210030
12"-SW-DIP-0002
14"-SW-DIP-0005
NOTE 7
NOTE 7
MFF-HV210035
TYPICAL I/O FOR FOR OPEN / CLOSE VALVE TYPICAL I/O FOR PUMP MFF-P210002 AND MFF-P210003
TYPICAL I/O'S
AND CONTROLS
TYPICAL I/O'S
AND CONTROLS
TYPICAL I/O FOR PUMP PSH-002 AND PSH-003
16"-SW-DIP-0001
6" PRESS / VAC
(FUTURE)
2" SAMPLE PORT
SW-HV210031
3/4"-OSW-SS7-0002
3/4"-OSW-SS7-0004
3/4"-OSW-SS7-0003
3/4"-OSW-SS7-0005
3" SAMPLE
PORT
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:34:01 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
VSD, AD
KAB, BLB
BLB
ISSUED FOR CONSTRUCTION
320 370
210-X-7001
INSTRUMENTATION
AWPF MF FEED TANK
AND PUMP STATION
P&ID
BDS
404790-210-Intake PS.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.90 CL-RIO201003
CL-RIO201003
SCADA HMISCADA HMI
M
FE
001
120V
FIT
001
B 220-X-7005
FROM FUTURE MF UNIT 5
BACKWASH
LSHH
002
PIT
003
B/GA/G
HI-HI
LEVEL
LAHH
002
HI-HI
LEVEL
LAHH
002
LEVEL
LI
002
LEVEL
LI
002
LSLL
002
A 120-X-7013
TO SANTA CRUZ
OUTFALL
B 240-X-7001
FROM OFF SPEC UV
EFFLUENT
C 230-X-7001
FROM RO FEED TANKS
OVERFLOW / RO BYPASS
A 260-X-7001
FROM PURIFIED WATER
PUMP STATION
OVERFLOW
LO-LO
LEVEL
LALL
002
LO-LO
LEVEL
LALL
002
IN
REMOTE
YI
008
IN
REMOTE
YI
008
RUNNING
YIR
008
RUNNING
YIR
008
FAIL
UA
008
FAIL
UA
008
RUN
CMD
UCR
008
RUN
CMD
UCR
008
SPEED
CNTRL
SC
008
SPEED
CNTRL
SC
008
SPEED
INDCTN
SI
008
SPEED
INDCTN
SI
008
PRESS
PI
003
PRESS
PI
003
FLOW
FI
001
FLOW
FI
001
TOTAL
AE CL2
007
TOTAL
CL2 120V
AIT
007
TOTAL
CL2
AI
007
TOTAL
CL2
AI
007
A 288-X-7004
FROM SODIUM BISULFITE
D 210-X-7001
FROM MF FEED TANK
OVERFLOW
B 220-X-7004
FROM FUTURE MF UNIT 4
BACKWASH
B 220-X-7003
FROM MF UNIT 3
BACKWASH
B 220-X-7002
FROM MF UNIT 2
BACKWASH
B 220-X-7001
FROM MF UNIT 1
BACKWASH
B/GA/G A/GB/G
LIT
002
A/G
B/G
G 230-X-7008
FROM RO CONCENTRATE
A 210-X-7002
FROM BACKWASHABLE
STRAINERS
PI
012
C 210-X-7001
FROM MF FEED TANK
PUMP STATION
D
PI
008
PI
009
HS
008B
SS
HS
008A
E-STOP
ESTOP
PRESSED
YA
008
ESTOP
PRESSED
YA
008
B 210-X-7001
FROM PLANT INFLUENT
PI
011
YARD PIPING PLANT PIPING
HS
009B
SS
HS
009A
E-STOP
PI
010
HS
010B
SS
HS
010A
E-STOP
IN
REMOTE
YI
009
IN
REMOTE
YI
009
RUNNING
YIR
009
RUNNING
YIR
009
FAIL
UA
009
FAIL
UA
009
RUN
CMD
UCR
009
RUN
CMD
UCR
009
SPEED
CNTRL
SC
009
SPEED
CNTRL
SC
009
SPEED
INDCTN
SI
009
SPEED
INDCTN
SI
009
ESTOP
PRESSED
YA
009
ESTOP
PRESSED
YA
009
IN
REMOTE
YI
010
IN
REMOTE
YI
010
RUNNING
YIR
010
RUNNING
YIR
010
FAIL
UA
010
FAIL
UA
010
RUN
CMD
UCR
010
RUN
CMD
UCR
010
SPEED
CNTRL
SC
010
SPEED
CNTRL
SC
010
SPEED
INDCTN
SI
010
SPEED
INDCTN
SI
010
ESTOP
PRESSED
YA
010
ESTOP
PRESSED
YA
010
ROC-VFD210008
HMS RST
008
HS
LOR
008A
YLR
008
HS
SS
008B
SIC
008
UA
008
FAIL
HMS
RST
009
HS
LOR
009A
YLR
009
HS
SS
009B
SIC
009
UA
009
FAIL
HMS
RST
010
HS
LOR
010A
YLR
010
HS
SS
010B
SIC
010
UA
010
FAIL
ROC-VFD210009 ROC-VFD210010
A 220-X-7011
FROM MF DRAIN LIFT
STATION
FG
007
J 210-X-7001
FROM PIG RECEIVING
STATION
C2
ROC WETWELL
NOTES:
1. SEE LEGEND AND ABBREVIATIONS ON DRAWINGS 000-X-0001, 000-X-0002 AND 000-X-0003.
2. UNLESS OTHERWISE INDICATED, ALL EQUIPMENT / INSTRUMENTS TAGS ARE PRECEDED BY 'A-'.
3. PROCESS CODE IS ROC AND AREA CODE IS 210 UNLESS OTHERWISE NOTED.
4. NOT USED.
5. REMOVABLE SPOOL PIECE FOR FUTURE CHECK VALVE INSTALLATION.
6. FUTURE I/O'S FOR FUTURE EQUIPMENT ARE LOCATED IN THE FUTURE RIO PANELS.
7. REMOVABLE SPOOL PIECE FOR FUTURE TEE INSTALLATION.
8. 16" TEE WITH BLIND FLANGE FOR CONNECTION OF TEMPORARY PIPE DURING START UP AND COMMISSIONING.
STATIC MIXER
ROC-MXS210001
SAMPLE
TAP
NHS-HV210018
NHS-CKV210001
16"-ROC-DIP-0030
SAMPLE
TAP
12"-BWW-PVC2-0034
12"-BWW-HDPE-0028
12"-BWW-DIP-0029 ROC-HV210010
ROC-AVRV210001 ROC-ARV210002
20"-ROC-DIP-0033
ROC-HV210009
16"-ROC-DIP-0032
6"-SBW-DIP-0024
OVERFLOW
FUTURE
ROC PUMP NO.1
ROC-P210008
FUTURE
ROC PUMP NO.2
ROC-P210009
8"-ROC-DIP-0211
8"-ROC-DIP-0213
8"-ROC-DIP-0212
8"-ROC-DIP-0214
ROC-HV210007
12"-BWW-PVC2-0035
12"-BWW-PVC2-0036
6"-ROC-DIP-0008
16"-PW-DIP-0017
18"-FIL-DIP-0010
14"-UVE-DIP-0008
18"-MFF-DIP-0003
1"-NHS-PVC2-0002
PIG
RECEIVING
STATION
NOTE 5
16"-ROC-PVCPP-0031
1/2"-NHS-PE4-0001
2"-NHS-PVC1-0001
MANWAY
12"-MFF-DIP-0014
ROC-HV210001
ROC-CKV210001
ROC-HV210002
ROC-HV210008
ROC-HV210003
ROC-CKV210002
ROC-HV210004
NOTE 6
NOTE 7
FUTURE
ROC PUMP NO.3
ROC-P210010
8"-ROC-DIP-0215
8"-ROC-DIP-0216
ROC-HV210005
ROC-CKV210003
ROC-HV210006
(EL-MCC201002) (EL-MCC201002) (EL-MCC201002)
12"-BWW-PVC2-0037
12"-BWW-PVC2-0038
14"-SW-DIP-0003
4"-DRN-DIP
8"-MFD-DIP-0003
ROC-HV210011
12"-MFF-DIP-0002
1"
ROC-HV210012
NOTE 8
ROC-HV210011
DRAWN:
PLOTTED:
D10000
REVISIONS
CHECKED:
DESIGNED:
CHECKED:
APPROVED:
REV DATE DESCRIPTION
FILENAME
BV PROJECT NUMBER
CLIENT PROJECT NUMBER
DRAWING NUMBER
SHEET NUMBER
OF
LINE IS 2 INCHES
AT FULL SIZE
CONSULTANT
8/20/2021 9:34:50 AM
PURE WATER
SOQUEL
TREATMENT
FACILITIES PROJECT
404790
JSL
VSD, AD
KAB, BLB
BLB
ISSUED FOR CONSTRUCTION
322 370
210-X-7003
INSTRUMENTATION
AWPF ROC WETWELL
P&ID
BDS
404790-210-Intake PS.rvt
0 08/26 ISSUED FOR CONSTRUCTION
11.91 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E TERTIARY TREATMENT FACILITY EVACUATOR SLAB SECONDARY CLARIFIER NO. 1UV DISINFECTION COLLECTION SYSTEM MAINTENANCE FACILITIES PRIMARY SEDIMENTATION TANKS ADMIN/LAB BUILDING POWER GENERATION BUILDING EFFLUENT PUMPING STATION TRANSFORMER AREA VALVE VAULT FLOW METER VAULT TUNNEL PORTAL BOX ADMINISTRATION BUILDING PREAERATION GRIT REMOVAL STRUCTURE BAR SCREENS SOURCE WATER PUMP STATION (NOTE 9) E E E E E E EE E E E E E E E E E SEE ENLARGE PLAN DRAWING NO. 150-E-1001 21KV MANHOLE EXISTING ELECTRICAL BUILDING (NOTE 12) RADIO TOWER MH-1 (NOTE 2) JUNCTION BOX (NOTE 6) (NOTE 8) (NOTE 12) ROUTE CABLES TO NOCL AREA ABOVE GROUND ON THE WALL JUNCTION BOX JUNCTION BOX (NOTE 11) SEE ENLARGE PLAN DRAWING NO. 110-E-1001 GROUND ROD WITH TEST WELL (NOTE 5) BIO-ASSAY BLDG. CONSULTANT PLOTTED: 8/24/2021 4:53 PM PURE WATER SOQUEL TREATMENT FACILITIES PROJECT DRAWN: REVISIONS CHECKED: DESIGNED: CHECKED: APPROVED: FILENAME BV PROJECT NUMBER CLIENT PROJECT NUMBER DRAWING NUMBER SHEET NUMBER OF LINE IS 2 INCHES AT FULL SIZE 404790 REV DATE DESCRIPTION D10000 1" = 25' ELECTRICAL TTF OVERALL SITE PLAN 1" = 25' 25' 15' 0 25' 50' ISSUED FOR CONSTRUCTION 001-E-1001 228 370 ELECTRICAL TTF OVERALL SITE PLAN ASM SBC JSL SJB MJK001-E-1001 0 08/26 ISSUED FOR CONSTRUCTION 1. SEE DRAWINGS 000-E-0001 AND 000-E-0002 FOR ELECTRICAL LEGENDS, ABBREVIATIONS AND NOTES. 2. SUBCONTRACTOR SHALL PROVIDE SEPARATE MANHOLE / HANDHOLE / JB FOR POWER AND SIGNAL CABLES. 3. THE CABLE ROUTING SHOWN ON THIS DRAWING IS INDICATIVE. REFER CIVIL DRAWING FOR EXACT CABLE ROUTING. 4. MANHOLES ARE NOT DRAWN PER SCALE. 5. TRANSITION CONDUITS ABOVE GROUND AT ROC OUTFALL AREA AND MOUNT ABOVE GROUND PULL BOXES BEFORE DISTRIBUTING POWER AND CONTROL TO INDIVIDUAL INSTRUMENTS. 6. TRANSITION ABOVE GROUND AT WALL AND ROUTE ALONG WITH CHEMICAL LINES TO CHEMICAL AREA. 7. REFER DRAWING 001-E-3001 FOR DUCTBANK SCHEDULE AND DRAWING 001-E-3002 FOR DUCTBANK SECTION . 8. THE CABLES WILL BE ROUTED ABOVE GROUND FROM CHEMICAL AREA TO TITLE 22 AREA ALONGSIDE THE CHEMICAL TRAYS. 9. REFER TO DRAWING 110-E-1001 FOR CABLE ROUTING TO THE SUBSTATION AND PWS SOURCE WATER PUMP STATION AREA. 10. CONTRACTOR SHALL CARRY THE VOLTAGE DROP CALCULATIONS FOR CABLES FROM PANELS/MCC/RIO INSIDE THE ELECTRICAL ROOM IN EFFLUENT PUMPING STATION TO RESPECTIVE EQUIPMENT. CABLES SHALL BE UPSIZED IF REQUIRED. 11. TRANSITION CABLES ABOVE GROUND INTO A JUNCTION BOX AND ROUTE THE CABLES ON WALL. PENETRATE THE WALL ON TOP TO ROUTE CABLES INSIDE THE BUILDING. 12. LOCATION OF EXISTING MCC, PLC AND EXISTING PANELS SHOWN IS TENTATIVE. 13. USE THE EXISTING 1" SPARE CONDUIT S40124 FROM THE BIO ASSAY BUILDING TO THE EFFLUENT PUMP STATION ELECTRICAL MCC401 ROOM FOR THE FIBER OPTIC CABLE. PP-401 (NOTE 8) NOTES: EL-DC001001 EL-TRF001001 CL-PLC101001 EL-MCC101001 12 001-E-3002 9 001-E-3002 10 001-E-3002 8 001-E-3002 11 001-E-3002 13 001-E-3002 LP-401 T-CL-RIO101001 5 001-E-3002 MCC911 CL-PLC101002 MCC401 #4/0 GROUND TO METAL PIPES (TYP OF 2) #6 GROUND TO FLOWMETER ROC-SPL120001 ROC-SMP120001 ROC-FE120013ROC-PIT120010 ROC-CV120025 A DETAIL 1" = 5' 1"=5' 5' 0 5' 10' FROM EXISTING ELECTRICAL ROOM INSIDE EFFLUENT PS ROC-P120001 ROC-P120002(NOTE 5) CL-RIO101002 PP501-1 (NOTE 12) (NOTE 13) ROC-FIT120013 A 001-E-1001 E POWER PULL BOX CONTROL PULL BOX
21 KV PG&E METERING ENCLOSURE (NOTE 8) TRANSITION FROM UNDER GROUND TO ABOVE GROUND THROUGH PULL BOX (SEE DETAIL A) CONSULTANT PLOTTED: 8/24/2021 5:59 PM THIS DRAWING IS NOT VALID FOR CONSTRUCTION PURPOSES UNLESS IT BEARS THE SEAL AND SIGNATURE OF A DULY REGISTERED PROFESSIONAL PURE WATER SOQUEL TREATMENT FACILITIES PROJECT DRAWN: REVISIONS CHECKED: DESIGNED: CHECKED: APPROVED: FILENAME BV PROJECT NUMBER CLIENT PROJECT NUMBER DRAWING NUMBER SHEET NUMBER OF LINE IS 2 INCHES AT FULL SIZE Black & Veatch Corporation Walnut Creek, California 404790 REV DATE DESCRIPTION D10000ISSUED FOR CONSTRUCTION 001-E-1002 229 370 ELECTRICAL TTF PG&E CABLE ROUTING ASM SBC JSL SJB MJK001-E-1002 0 08/26 ISSUED FOR CONSTRUCTION EE NOTES: 1. SEE DRAWINGS 000-E-0001 AND 000-E-0002 FOR ELECTRICAL LEGENDS, ABBREVIATIONS AND NOTES. 2. THIS CABLE SHALL BE ROUTED THROUGH THE CONDUIT MOUNTED ON THE WALL / FENCE. 3. SEE DRAWING NOS. 001-E-1001 AND 110-E-1001 FOR CABLE ROUTING DETAILS. 4. THE CONDUIT MOUNTED ON THE WALL SHALL BE RIGID GALVANIZED STEEL. 5. THE PULL BOXES SHALL BE NEMA 3R RATED. 6. THE CONDUIT SHALL BE ROUTED MINIMUM 8 FEET ABOVE GROUND LEVEL. 7. UNISTRUT HEIGHT TO BE ADJUSTED TO ROUTE CABLES MINIMUM 8 FEET ABOVE THE GROUND LEVEL. 8. CONTRACTOR SHALL PROVIDE GROUNDING FOR PG&E METER AS PER PG&E REQUIREMENT. ELECTRICAL TTF PG&E CABLE ROUTING 1"=50' 1"=50' 25'50' 0 50' 100' EE (SEE DETAIL C) (NOTE 2) PWS SOURCE WATER PUMP STATION (NOTE 3) TITLE 22 AREA A DETAIL - NO SCALE 1- SECTION NO SCALE 1- EXISTING CONCRETE WALL 4'-5"(W) X 2'-0"(H) X 1'-0"(D) PULL BOX 4'-5"(W) X 2'-0"(H) X 1'-0"(D) PULL BOX 1-5/8" UNISTRUT CHANNEL (NOTE 7) EPOXY ANCHORED ALL-THREAD EXISTING CONCRETE WALL 1-5/8" UNISTRUT CHANNEL (NOTE 7) UNISTRUT POST BASE EPOXY ANCHORED ALL-THREAD EXISTING CONCRETE WALL 4" CONDUIT TRANSITION FROM ABOVE GROUND TO UNDER GROUND THROUGH PULL BOX (SEE DETAIL A) PULL BOX (SEE DETAIL B) PULL BOX (SEE DETAIL B) 5'-10"(W) X 2'-0"(H) X 1'-0"(D) PULL BOX B DETAIL - NO SCALE 4" CONDUIT 8" PULL BOX (SEE DETAIL B) PULL BOX (SEE DETAIL B) FRONT VIEW SIDE VIEW STRUT CONDUIT STRUT STRAPS 3/8" STAINLESS STEEL SPRING NUT CONDUIT RACK "STOPS" 2" X 2" STANLESS STEEL SQUARE WASHER INSTALLED DIRECTLY AGAINST BOTTOM STRUT STRAP TO PREVENT CONDUIT FROM SLIPPING OFF STRUT DUE TO CONTRACTION AND EXPANSION 2"x 2"x 1/4" SQUARE WASHER 3/8" BOLT 3 OF STAINLESS STEEL WALL 2" X 2" STAINLESS STEEL SQUARE WASHER INSTALLED AGAINST BOTTOM STRUT STRAP 3/8" STAINLESS STEEL HEX BOLT AND 2" X 2" STAINLESS STEEL SQUARE WASHER 3/8" STAINLESS STEEL SPRING NUT C TYPICAL WALL SYSTEM SUPPORT - NO SCALE PROVIDE GROUNDING BUSHINGS FOR A CONTINUOUS GROUNDED RACEWAY. TYPICAL OF ALL PULL BOXES. 1' 4/0 BARE GROUND FROM PG&E ENCLOSURE ATTACH GROUND TO PULL BOX
TTF POWER DISTRIBUTION FUNCTIONAL DIAGRAM 600A3LA 18kV 20.8KV,15E,20KAIC T-EL-TRF001001 300KVA, KNAN 20,800 - 480/277V 3Ø,60Hz Z = 6.75% T-EL-MCC101001 600A,480V,3PH,3W,25KAIC,60Hz
20.8KV,3PH,60HZ FROM PG & E (NOTE 2) T-EL-DC001001 T-EL-US-001001 #4/0 BARE CU GND
#4/0 BARE CU GND
BOND TO GROUND RING
BOND TO PT KEY KEY PT DISC KWH 600A,20.8KV,3PH,3W,25KAIC(750MVA),60Hz S.A. 24KV (19.5MCOV) FU CPT-25KVA 21KV-120/240 MCCB KL KL INTLK TO AUX CKTS MAIN VCB 24KV,600A TS1 TS1 TS2 TS2 NON-LOAD TYPE TRANSFORMER DISCONNECT SW, MAX 50FT-LBS OPERATING FORCE PG&E PROVIDED CT'S, PT'S AND METER PER PG&E REQUIREMENTS PT ACCESS DOOR PRIMARY BACKUP 5150 51N 50N 5150 51N 50N MULTIFUNCTION RELAY MULTIFUNCTION RELAY #4/0 BARE CU GND
3P-600
600A,20.8KV,3PH,3W,25KAIC(750MVA),60Hz CT CT NEMA 3R METERING ENCLOSURE (SEE NOTE 4) TELUS001001-1:3#1,#1G,(1)4"
TELTRF001001-1:3-500KCMIL,#4G,3" 15'-3" 10'-2" 6" 8'-4" 15'-3" ELEVATION FLOOR PLAN PG&E METERING ENCLOSURE METERING MAIN BREAKER BATTERY GENERAL ARRANGEMENTS ARE SUBJECT TO CHANGE BASED ON SPECIFIC MANUFACTURER REQUIREMENTS. NO SCALE NO SCALE
GROUND RING
BOND TO
GROUND RING
TELDC001001-1:3#1,#1G,(1)4" CONSULTANT
PLOTTED: 8/23/2021 1:22 PM PURE WATER SOQUEL TREATMENT FACILITIES PROJECT DRAWN: REVISIONS CHECKED: DESIGNED: CHECKED: APPROVED: FILENAME BV PROJECT NUMBER CLIENT PROJECT NUMBER DRAWING NUMBER SHEET NUMBER OF LINE IS 2 INCHES AT FULL SIZE 404790 REV DATE DESCRIPTION D10000 NOTES: 1. SEE DRAWINGS 000-E-0001 AND 000-E-0002 FOR ELECTRICAL LEGENDS, ABBREVIATIONS AND NOTES. 2. REFER TO PACIFIC GAS AND ELECTRIC COMPANY UTILITY BULLETIN: TD-2999B-030, PUBLICATION DATE: 8/15/2018, REV: 3 - TECHNICAL REQUIREMENTS FOR ELECTRIC SERVICE INTERCONNECTION AT PRIMARY DISTRIBUTION VOLTAGES. PRIMARY DUCTBANK FROM PROPERTY LINE TO METERING ENCLOSURE WILL BE PROVIDED BY CONTRACTOR. PRIMARY FROM THE PROPERTY LINE TO THE BAY STREET OVERHEAD LINE WILL BE PROVIDED BY PG&E. PRIMARY CABLE FROM METERING ENCLOSURE TO THE BAY STREET WILL BE PROVIDED BY PG&E. 3. AN OUTDOOR, NEMA 3R, METERING ENCLOSURE WILL BE FURNISHED AND INSTALLED BY CONTRACTOR. THE METERING EQUIPMENT INSIDE THE METERING ENCLOSURE WILL BE FURNISHED AND INSTALLED BY PG&E. THE METERING ENCLOSURE WILL COMPLY WITH THE REQUIREMENTS OF PG&E UTILITY BULLETIN: TD-2999B-030 AND UG-1 SWITCHES. THE DIMENSIONS AND WORKING SPACE FOR THE METERING ENCLOSURE WILL BE PER THE REQUIREMENTS IN SECTION 5 OF PG&E'S GREEN BOOK. ISSUED FOR CONSTRUCTION 001-E-6001 234 370 ELECTRICAL TTF POWER DISTRIBUTION FUNCTIONAL DIAGRAM ASM SBC JSL SJB MJK001-E-6001 0 08/26 ISSUED FOR CONSTRUCTION
30814.00405\40709364.2
EXHIBIT B
11.95 PWS Assets at SC WWTF - Equipment
Tag Number Description Drawing Number Specification Section Location Powered? Power Source Beneficiary Agency (Sq / SC / Joint) T-SW-P110001 PWS SOURCE WATER PUMP NO. 1 110-X-7001 43 24 13 SWPS Y SqCWD Joint T-SW-P110002 PWS SOURCE WATER PUMP NO. 2 110-X-7001 43 24 13 SWPS Y SqCWD Joint T-SW-P110003 PWS SOURCE WATER PUMP NO. 3 110-X-7001 43 24 13 SWPS Y SqCWD Joint T-SW-SEP115001 AUTO STRAINER NO. 1 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-SEP115002 AUTO STRAINER NO. 2 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-MXS115001 STATIC MIXER 115-X-7001 46 42 24 TTF Y SC Sq T-ROC-P120001 CITY EFFLUENT SAMPLE FEED PUMP 120-X-7013 40 78 00 Tunnel Portal Box Y SC Sq T-ROC-P120002 AWPF ROC OUTFALL SAMPLE FEED PUMP 120-X-7013 40 78 00 Tunnel Portal Box Y SC Sq T-SW-T130002 PWS SOURCE WATER SURGE TANK 130-X-7002 43 42 41.10 TTF N -- Sq T-RW-FLT140001 CLOTH FILTER 140-X-7001 46 61 41 TTF N -- SC T-RW-P140001 CLOTH FILTER BACKWASH/WASTE PUMP NO. 1 140-X-7001 46 61 41 TTF Y SC SC T-RW-P140002 CLOTH FILTER BACKWASH/WASTE PUMP NO. 2 140-X-7001 46 61 41 TTF Y SC SC T-RW-T140001 TITLE 22 FILTER BREAK TANK 140-X-7002 43 41 43 TTF N -- SC T-RW-P140003 TITLE 22 UV FEED PUMP 140-X-7002 43 23 13.14 TTF Y SC SC T-RW-UVL140001 UV DISINFECTION UNIT NO. 1 140-X-7002 46 66 56.20 TTF Y SC SC T-RW-UVL140002 UV DISINFECTION UNIT NO. 2 140-X-7002 46 66 56.20 TTF Y SC SC T-UVE-T140002 T22 BACK-UP STORAGE TANK 140-X-7003 43 41 45.13 TTF N -- SC T-UVE-P140004 T22 BACK-UP PUMP NO. 1 140-X-7003 22 11 27 TTF Y SC SC T-UVE-P140005 T22 BACK-UP PUMP NO. 2 140-X-7003 22 11 27 TTF Y SC SC T-UVE-T140003 BLADDER TANK 140-X-7003 22 11 27 TTF N -- SC T-NOCL-P181001 SODIUM HYPOCHLORITE METERING PUMP NO. 1 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-P181002 SODIUM HYPOCHLORITE METERING PUMP NO. 2 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-P181003 SODIUM HYPOCHLORITE METERING PUMP NO. 3 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-P181004 SODIUM HYPOCHLORITE METERING PUMP NO. 4 181-X-7002 46 33 00 NaClO Facility Y SC Sq 20"-SW-HDPE-0001, 0002 SOURCE WATER PUMP STATION INFLUENT (BETWEEN CITY UV AND PUMP STATION) 110-X-7001 40 05 32 -- N -- Joint 18"-SW-HDPE-00008 SOURCE WATER PIPE (DOWNSTREAM OF SOURCE WATER PUMP STATION) 115-X-7001 40 05 32 -- N -- Sq 6"-SW-DIP-0020 PIPE TO T22 FEED 115-X-7001 40 05 19 -- N -- SC 16"-ROC-PVCPP-0031 ROC PIPE FROM CHANTICLEER 210-X-7003 40 05 31 -- N -- Sq Various PIGGING STATION ON SOURCE WATER PIPE 130-X-7002 Various Near Access Road Y SC Sq Various PIG RETRIEVAL ASSEMBLY ON ROC PIPE 210-X-7003 Various Near Tunnel Portal Box N -- Sq 3/4"-NOCL-CPVC1-0016 CHEMICAL FEED PIPES 115-X-7001 40 05 32 -- N -- Joint T-EL-MCC101001 MCC (SOURCE WATER PUMP STATION) 001-E-6001 26 24 323 SWPS Y Sq Sq NA RADIO TOWER 001-E-1001 40 66 53 SWPS Y Sq Sq
TELTRF001001-1:3-500KCMIL,#4G,3" 21KV CONDUIT 001-E-1002 26 05 11 -- Y Sq Sq T-EL-DC001001 MAIN SWITCH GEAR FOR NEW ELECTRICAL FEED 001-E-6001 26 05 11 -- Y Sq Sq
11.96 PWS Assets at SC WWTF - Valves (12"+)
Tag for Schedule Valve Size Drawing Number Specification Section Location Powered? Power Source Beneficiary Agency (Sq / SC / Joint) T-SW-CKV115001 12 115-X-7001 40 05 68 SWPS N -- Joint
T-SW-CKV115002 12 115-X-7001 40 05 68 SWPS N -- Joint
T-SW-CKV130006 16 130-X-7002 40 05 68 SWPS N -- Sq
T-SW-CKV130007 16 130-X-7002 40 05 68 SWPS N -- Sq
T-ROC-HV120010 16 120-X-7013 40 05 61 Tunnel Portal Box N -- Sq T-ROC-HV120026 16 120-X-7013 40 05 61 Tunnel Portal Box N -- Sq T-SW-HV130007 16 130-X-7002 40 05 61 SWPS N -- Sq
T-ROC-CV120025 14 120-X-7013 40 05 69 Tunnel Portal Box Y SqCWD Sq T-SW-HV115002 12 115-X-7001 40 05 64 SWPS N -- Joint
T-SW-HV115001 16 115-X-7001 40 05 64 SWPS N -- Joint
T-SW-HV115003 12 115-X-7001 40 05 64 SWPS N -- Joint
T-SW-HV115004 16 115-X-7001 40 05 64 SWPS N -- Joint
T-ROC-HV120011 20 120-X-7013 40 05 64 Tunnel Portal Box N -- Sq T-ROC-HV120001 16 120-X-7013 40 05 64 Tunnel Portal Box N -- Sq T-ROC-HV120003 14 120-X-7013 40 05 64 Tunnel Portal Box N -- Sq T-SW-HV130006 16 130-X-7002 40 05 64 SWPS N -- Sq
T-SW-HV130030 16 130-X-7002 40 05 64 SWPS N -- Sq
T-SW-HV110009 14 110-X-7001 40 05 64.22 SWPS N -- Joint T-SW-HV110010 12 110-X-7001 40 05 64 SWPS N -- Joint
T-SW-HV110004 12 110-X-7001 40 05 64.11 SWPS N -- Joint T-SW-HV110007 14 110-X-7001 40 05 64.22 SWPS N -- Joint T-SW-HV110005 14 110-X-7001 40 05 64.22 SWPS N -- Joint T-SW-HV110006 12 110-X-7001 40 05 64.11 SWPS N -- Joint T-SW-HV110003 20 110-X-7001 40 05 64.22 SWPS N -- Joint T-SW-HV110002 12 110-X-7001 40 05 64.11 SWPS N -- Joint T-SW-HV110001 20 110-X-7001 40 05 64.22 SWPS N -- Joint
11.97 PWS Assets at SC WWTF - Instrumentation
Tag Number Instrumentation Device Type Instrumentation Service Description Drawing Number Specification Section Location Powered? Power Source Beneficiary Agency (Sq / SC / Joint) T-SW-PDSH115001 DIFFERENTIAL PRESSURE SWITCH HIGH TTF AUTO STRAINER NO. 1 DIFF PRESSURE HIGH 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-PDSH115002 DIFFERENTIAL PRESSURE SWITCH HIGH TTF AUTO STRAINER NO. 2 DIFF PRESSURE HIGH 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-PIT115009 PRESSURE INDICATING TRANSMITTER TTF AUTO STRAINER OUTLET HEADER PRESSURE 115-X-7001 40 72 00 TTF Y SqCWD Joint T-SW-PDI115001 DIFFERENTIAL PRESSURE INDICATOR TTF AUTO STRAINER NO. 1 DIFF PRESSURE 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-PDI115002 DIFFERENTIAL PRESSURE INDICATOR TTF AUTO STRAINER NO. 2 DIFF PRESSURE 115-X-7001 46 61 73.1 TTF Y SqCWD Joint T-SW-AE115003 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AIT115003 TURB ANALYZER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AE115004 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS pH 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AIT115004 pH/COND ANALYZER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS pH/CONDUCTIVITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AE115005 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS CONDUCTIVITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FG115003 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS TURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FG115002 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS TOTAL CHLORINE 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AE115002 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TOTAL CHLORINE 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AIT115002 TOTAL CL2 ANALYZER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TOTAL CHLORINE 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FG115001 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS ORP 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AE115001 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS ORP 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AIT115001 ORP ANALYZER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS ORP 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FG115004 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS pH/CONDUCTIVITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AE115006 SENSOR TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TITLE 22 INFL TURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-AIT115006 TURB ANALYZER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS TITLE 22 INFL TURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FG115006 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS TITLE 22 INFLTURBIDITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-SW-FE115001 MAGNETIC FLOWMETER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS 115-X-7001 40 71 00 SWPS Y SqCWD Joint T-SW-FIT115001 MAGNETIC FLOWMETER SIGNAL CONVERTER TTF PWS SOURCE WATER PUMPS DISCHARGE FLOW POST AUTO STRAINERS 115-X-7001 40 71 00 SWPS Y SqCWD Joint T-SW-FG115005 LIQUID SERVICE ROTAMETER TTF PWS SOURCE WATER PUMPS DISCHARGE SAMPLE FLOW POST AUTO STRAINERS pH/CONDUCTIVITY 115-X-7001 40 75 00 SWPS Y SqCWD Joint T-ROC-PI120013 PRESSURE INDICATOR TTF ROC WETWELL TO PIG RECEIVING STATION PRESSURE 120-X-7013 40 72 00 Tunnel Portal Box Y SC Sq T-ROC-FE120013 MAGNETIC FLOWMETER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX FLOW 120-X-7013 40 71 00 Tunnel Portal Box Y SC Sq T-ROC-FIT120013 MAGNETIC FLOWMETER SIGNAL CONVERTER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX FLOW 120-X-7013 40 71 00 Tunnel Portal Box Y SC Sq T-ROC-PIT120010 PRESSURE INDICATING TRANSMITTER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX PRESSURE 120-X-7013 40 72 00 Tunnel Portal Box Y SC Sq T-ROC-AE120005 TOTAL CL2 SENSOR TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX TOTAL CL2 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-ROC-AIT120005 TOTAL CL2 ANALYZER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX TOTAL CL2 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-ROC-FG120005 LIQUID SERVICE ROTAMETER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX TOTAL CL2 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-ROC-AE120006 pH SENSOR TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX pH 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-ROC-AIT120006 pH ANALYZER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX pH 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-ROC-FG120006 LIQUID SERVICE ROTAMETER TTF ROC WETWELL TO EXISTING TUNNEL PORTAL BOX SAMPLE FLOW pH 120-X-7013 40 75 00 Tunnel Portal Box Y SC Sq T-SW-PI130006 PRESSURE INDICATOR TTF PWS SOURCE WATER POST AUTO STRAINER SURGE TANK PRESSURE 130-X-7002 40 72 00 SWPS Y SC Sq T-SW-PI130007 PRESSURE INDICATOR TTF PWS SOURCE WATER POST AUTO STRAINER HEADER PRESSURE 130-X-7002 40 72 00 SWPS Y SC Sq T-RW-LE140001 ULTRASONIC LEVEL TRANSMITTER TTF TITLE 22 FILTER UNIT SYSTEM LEVEL 140-X-7001 46 61 41 TTF Y SC SC T-RW-LIT140001 LEVEL INDICATING TRANSMITTER TTF TITLE 22 FILTER UNIT SYSTEM LEVEL 140-X-7001 46 61 41 TTF Y SC SC T-RW-PIT140002 PRESSURE INDICATING TRANSMITTER TTF TITLE 22 FILTER UNIT BACKWASH SYSTEM PRESSURE 140-X-7001 46 61 41 TTF Y SC SC T-RW-PIT140003 PRESSURE INDICATING TRANSMITTER TTF TITLE 22 FILTER UNIT PRESSURE 140-X-7001 46 61 41 TTF Y SC SC T-SW-FE140001 MAGNETIC FLOWMETER TTF TITLE 22 FILTER UNIT INLET FLOW 140-X-7001 40 71 00 TTF Y SC SC T-SW-FIT140001 MAGNETIC FLOWMETER SIGNAL CONVERTER TTF TITLE 22 FILTER UNIT INLET FLOW 140-X-7001 40 71 00 TTF Y SC SC T-RW-FIT140002 MAGNETIC FLOWMETER SIGNAL CONVERTER TTF UV DISINFECTANT UNIT NO.1 DISCHARGE FLOW 140-X-7002 40 71 00 TTF Y SC SC T-RW-FE140002 MAGNETIC FLOWMETER TTF UV DISINFECTANT UNIT NO.1 DISCHARGE FLOW 140-X-7002 40 71 00 TTF Y SC SC T-RW-PIT140001 PRESSURE INDICATING TRANSMITTER TTF TITLE 22 UV FEED PUMP DISCHARGE PRESSURE 140-X-7002 40 72 00 TTF Y SC SC T-RW-AIT140003 UV ANALYZER TTF UV UNIT NO.1 INLET UVT MEASUREMENT 140-X-7002 46 66 56.20 TTF Y SC SC T-RW-AE140003 UV SENSOR TTF UV UNIT NO.1 INLET UVT MEASUREMENT 140-X-7002 46 66 56.20 TTF Y SC SC T-RW-FG140003 LIQUID SERVICE ROTAMETER TTF UV UNIT NO.1 INLET UVT MEASUREMENT SAMPLE FLOW 140-X-7002 46 66 56.20 TTF Y SC SC T-RW-AIT140004 TOTAL CL2 ANALYZER TTF UV UNIT NO.1 TO REUSE TANK LINE TOTAL CHLORINE 140-X-7002 40 75 00 TTF Y SC SC T-RW-AE140004 TOTAL CL2 SENSOR TTF UV UNIT NO.1 TO REUSE TANK LINE TOTAL CHLORINE 140-X-7002 40 75 00 TTF Y SC SC T-RW-HS140003C THREE POSITION SELECTOR SWITCH TTF TITLE 22 UV FEED PUMP START STOP 140-X-7002 26 05 11 TTF Y SC SC T-RW-HS140003D THREE POSITION SELECTOR SWITCH TTF TITLE 22 UV FEED PUMP E-STOP 140-X-7002 26 05 11 TTF Y SC SC T-RW-LIT140001 LEVEL INDICATOR TRANSMITTER TTF TITLE 22 FILTER BREAK TANK LEVEL 140-X-7002 40 72 00 TTF Y SC SC T-RW-AIT140002 TURB ANALYZER TTF TITLE 22 FEED PUMP DISCHARGE TURBIDITY 140-X-7002 40 75 00 TTF Y SC SC T-RW-AE140002 SENSOR TTF TITLE 22 FEED PUMP DISCHARGE TURBIDITY 140-X-7002 40 75 00 TTF Y SC SC T-RW-FG140002 LIQUID SERVICE ROTAMETER TTF TITLE 22 FEED PUMP DISCHARGE SAMPLE FLOW TURBIDITY 140-X-7002 40 75 00 TTF Y SC SC T-RW-FG140004 LIQUID SERVICE ROTAMETER TTF TITLE 22 UV UNIT NO.1 TO REUSE TANK LINE SAMPLE FLOW TOTAL CHLORINE 140-X-7002 40 75 00 TTF Y SC SC T-UVE-LIT140002 LEVEL INDICATING TRANSMITTER TTF TITLE 22 BACK-UP STORAGE TANK LEVEL 140-X-7003 40 72 00 TTF Y SC SC T-UVE-LSLL140002 LEVEL SWITCH LOW LOW TTF TITLE 22 BACK-UP STORAGE TANK LEVEL LOW LOW 140-X-7003 40 72 00 TTF Y SC SC T-UVE-PIT140004 PRESSURE INDICATING TRANSMITTER TTF TITLE 22 BACK-UP PUMP DISCHARGE PRESSURE 140-X-7003 40 72 00 TTF Y SC SC T-UVE-PI140002 PRESSURE INDICATOR TTF TITLE 22 BACK-UP PUMP NO.2 DISCHARGE PRESSURE 140-X-7003 40 72 00 TTF Y SC SC T-UVE-HS140005D THREE POSITION SELECTOR SWITCH TTF TITLE 22 BACK-UP PUMP NO.2 START STOP 140-X-7003 40 78 00 TTF Y SC SC T-UVE-HS140005C THREE POSITION SELECTOR SWITCH TTF TITLE 22 BACK-UP PUMP NO.2 E-STOP 140-X-7003 40 78 00 TTF Y SC SC T-UVE-HS140004D THREE POSITION SELECTOR SWITCH TTF TITLE 22 BACK-UP PUMP NO.1 START STOP 140-X-7003 40 78 00 TTF Y SC SC T-UVE-HS140004C THREE POSITION SELECTOR SWITCH TTF TITLE 22 BACK-UP PUMP NO.1 E-STOP 140-X-7003 40 78 00 TTF Y SC SC T-UVE-PI140001 PRESSURE INDICATOR TTF TITLE 22 BACK-UP PUMP NO.1 DISCHARGE PRESSURE 140-X-7003 40 72 00 TTF Y SC SC T-SW-PI110003 PRESSURE INDICATOR TTF PWS SOURCE WATER PUMP NO.3 DISCHARGE PRESSURE 110-X-7001 40 72 00 SWPS Y SqCWD Joint T-SW-HS110003D THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.3 START STOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint
11.98 T-SW-PSH110003 PRESSURE SWITCH HIGH TTF PWS SOURCE WATER PUMP NO.3 HIGH DISCHARGE PRESSURE 110-X-7001 40 72 00 SWPS Y SqCWD Joint T-SW-HS110003C THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.3 E-STOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint T-SW-PI110002 PRESSURE INDICATOR TTF PWS SOURCE WATER PUMP NO.2 DISCHARGE PRESSURE 110-X-7001 40 78 00 SWPS Y SqCWD Joint T-SW-PSH110002 PRESSURE SWITCH HIGH TTF PWS SOURCE WATER PUMP NO.2 HIGH DISCHARGE PRESSURE 110-X-7001 40 72 00 SWPS Y SqCWD Joint T-SW-PI110001 PRESSURE INDICATOR TTF PWS SOURCE WATER PUMP NO.1 DISCHARGE PRESSURE 110-X-7001 40 78 00 SWPS Y SqCWD Joint T-SW-PSH110001 PRESSURE SWITCH HIGH TTF PWS SOURCE WATER PUMP NO.1 HIGH DISCHARGE PRESSURE 110-X-7001 40 72 00 SWPS Y SqCWD Joint T-SW-HS110002D THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.2 START STOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint T-SW-HS110002C THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.4 ESTOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint T-SW-HS110001D THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.1 START STOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint T-SW-HS110001C THREE POSITION SELECTOR SWITCH TTF PWS SOURCE WATER PUMP NO.1 ESTOP 110-X-7001 26 05 11 SWPS Y SqCWD Joint T-SW-TSH110002 TEMPERATURE SWITCH HIGH TTF PWS SOURCE WATER PUMP NO.2 MOTOR TEMPERATURE HIGH 110-X-7001 40 74 00 SWPS Y SqCWD Joint T-SW-TSH110001 TEMPERATURE SWITCH HIGH TTF PWS SOURCE WATER PUMP NO.1 MOTOR TEMPERATURE HIGH 110-X-7001 40 74 00 SWPS Y SqCWD Joint T-SW-PIT110008 PRESSURE INDICATING TRANSMITTER TTF PWS SOURCE WATER TO AUTO STRAINER INLET HEADER PRESSURE 110-X-7001 40 72 00 SWPS Y SqCWD Joint T-NOCL-PI181001 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 1 DISCHARGE PRESSURE 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-PSH181001 PRESSURE SWITCH HIGH TTF SODIUM HYPOCHLORITE METERING PUMP NO. 1 DISCHARGE PRESSURE HIGH 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-PI181002 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 2 DISCHARGE PRESSURE 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-PSH181002 PRESSURE SWITCH HIGH TTF SODIUM HYPOCHLORITE METERING PUMP NO. 2 DISCHARGE PRESSURE HIGH 181-X-7001 46 33 00 NaClO Facility Y SC SC T-NOCL-PSH181003 PRESSURE SWITCH HIGH TTF SODIUM HYPOCHLORITE METERING PUMP NO. 3 DISCHARGE PRESSURE HIGH 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-PSH181004 PRESSURE SWITCH HIGH TTF SODIUM HYPOCHLORITE METERING PUMP NO. 4 DISCHARGE PRESSURE HIGH 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-PI181003 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 1 DISCHARGE PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC SC T-NOCL-PI181004 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 1 DISCHARGE PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC SC T-NOCL-PI181005 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 3 SUCTION PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-PI181006 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 3 DISCHARGE PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-PI181008 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 4 DISCHARGE PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC Sq T-NOCL-PI181007 PRESSURE INDICATOR TTF SODIUM HYPOCHLORITE METERING PUMP NO. 4 SUCTION PRESSURE 181-X-7002 46 33 00 NaClO Facility Y SC Sq