Cities Index.
Agenda packet

Santa Cruz City Council
March 24, 2026

Document
Agenda packet
Meeting
March 24, 2026
Body
Santa Cruz City Council
Pages
73
Original file
119.8 MB
Text extracted from the city's file for reading and search. Open the original on ecm.cityofsantacruz.com. That file is the official record.

INTRODUCTION
This report summarizes the key Citywide actions in the calendar year 2025 that relate to the City of Santa Cruz 2030 General Plan (GP), including specific tasks undertaken by City departments, the Planning Commission, and City Council. This report is not intended to be a comprehensive audit of all the City’s General Plan implementation programs but includes the priorities and opportunities important to the community.

The General Plan Annual Progress Report meets the State requirements for reporting the City’s progress toward meeting General Plan goals and objectives. Topics recommended by the California Office of Land Use and Climate Innovation (LCI) are briefly discussed below. In addition, staff has highlighted Council Initiatives as well as several key City projects and programs undertaken in 2024 that support the goals and objectives identified in the 2030 General Plan.
_______________________________________________________________________________________________________________________

OPR RECOMMENDED TOPICS
2025 General Plan Updates
The City made the following updates to the General Plan in 2025:
 Downtown Plan Expansion: In May 2025, City Council adopted amendments to the General Plan related to the Downtown Plan Expansion that changed land use and development standards in the expanded downtown area south of Laurel Street. The amendments to the General Plan included changing the land use map amendments to change the land use designations for several parcels within the Downtown Plan Expansion area and General Plan text amendments to update text referring to the Downtown Plan and the Beach and South of Laurel Area consistent with the Downtown Plan Expansion.
 111-119 Leonard Street: In May 2025, City Council adopted amendments to the General Plan land use map to change the land use designations of 111-119 Leonard Street from Mixed-Use Visitor Commercial to Low-Medium Density Residential. This action was taken at the same time as the land use designation changes associated with the Downtown Plan Expansion to ensure no net loss of housing capacity citywide.
 2394 Delaware Avenue. In May 2025, City Council adopted amendments to the General Plan related to this site to facilitate the continued use of the northern portion of the site by the Homeless Garden Project. Amendments to the General Plan land use map changed the land use designation of the site from Low Density Residential to Agriculture/Grazing for the northern four acres of the site and to Low-Medium Density Residential for the southern portion of the site. General Plan text amendments updated policy related to future development of the site.

9.96 CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 2 ends

 Mixed-Use Designations: In June 2025, City Council adopted General Plan text amendments to amend the descriptions of two mixed-use land use designations, the Mixed-Use High Density designation and the Mixed-Use Visitor Commercial. These amendments were done in concert with Zoning Ordinance updates to the Objective Design Standards for Multifamily Housing to ensure full alignment with the General Plan.
 SB 1425: In 2025, following guidance from the Open Space Element Update Technical Advisory Discussion Draft, the City reviewed existing programs, goals, policies and actions to assess compliance with the requirements of California Senate Bill 1425, completing Step 3a of the Discussion Draft. Numerous area plans, climate adaptation plans, parks plans, and resource management plans were reviewed, in addition to the City’s 2030 General Plan. Based on this comprehensive assessment, the City is meets the majority of SB 1425 requirements. To enable access to open space for all residents in a manner that considers social, economic, and racial equity, the City undertook, as part of its Climate Adaptation and Resilient Coast initiatives, a series of interviews with socially vulnerable and underrepresented groups to understand how adaptation measures might impact these populations. Findings from these engagement efforts continue to inform climate adaptation, open space, and transportation plans in the City. To ensure climate resilience and other cobenefits of open space, the City is advancing projects to redesign San Lorenzo Park and the Jessie Street Marsh as both open spaces for recreational use and adaptive spaces that will buffer communities and infrastructure from flooding events caused by climate change. The Marsh also promotes rewilding opportunities within the City by creating new and preserving existing habitat for native plant and animal species. In 2026, the City will focus on identifying gaps in compliance with SB 1425 and developing policies, goals, programs, and actions to fill any such gaps to further comply with state law and advance the City’s own goals with regard to equitable access to open space, climate resiliency, and rewilding.
2025 Ordinance Amendments and Policy Updates
Several Zoning Ordinance Amendments and other ordinance and policy updates related to development and General Plan implementation were approved or took effect in 2025, as follows:
 Accessory Dwelling Unit (ADU) Owner Occupancy and Separate Sale: In January 2025, Council adopted an ordinance amending the City’s accessory dwelling unit regulations to allow owner-occupancy in keeping with State law but also even for properties where it could have been kept in place under the local owner occupancy ordinance. At this meeting, Council also adopted an ordinance allowing separate sale of ADUs and their primary dwellings in support of AB 1033. The City then submitted the requisite ordinance amendments to the Coastal Commission, and they were approved by that body on 9/12/25.

Commented [MV1]: This was adopted in Jan 2025.

Maybe move to separate line to further showcase this
because so few cities have it in place

9.97 CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 3 ends

 Downtown Plan Expansion: In May 2025, City Council approved the Downtown Plan Expansion, which expands the scope of the Downtown Plan to the neighborhood south of Laurel Street. The expanded area provides planning guidance for future development in that area, including mixed use buildings, a new stadium for the Santa Cruz Warriors basketball team, and an optional Downtown Density Bonus allowing additional building height and floor area in exchange for providing affordable units including moderate income and workforce housing.

Several parcels in this area were rezoned to allow for the type of development envisioned in the plan.  2394 Delaware Avenue Rezoning: In May 2025, City Council adopted a resolution to rezone the northern for acres of this site to exclusive agriculture to accommodate continued use of that portion of the site by the Homeless Garden Project. At the same time, the southern portion of the site was rezoned from Single Family Residential to Multiple Residential – Low Density to ensure no net loss of residential capacity across the whole site.
 Objective Standards Updates: Various State housing bills limit City review of housing projects to “objective standards” contained in the city’s Zoning Ordinance and General Plan. In 2022, City Council approved amendments to the Zoning Ordinance establishing objective development standards for multi-family and mixed-use housing developments. In 2025, City Council adopted updates to these standards in response to feedback from applicants and the public on the originally approved standards.  Energy Reach Code for Existing Single Family Homes: In December 2024, City Council adopted local amendments to the California Code of Regulations (California Energy Code) implementing an energy reach code for substantial additions or renovations to single family homes with an intent to provide owners with a range of options that will also meet goals to reduce greenhouse gas emissions associated with fossil fuel use citywide. In September 2025, this reach code was updated and adopted as local amendments to the California Energy Code within the 2025 California Building Code cycle.
 Energy Reach Code for Non-Residential Buildings: In 2023, the City adopted local amendments to the California Energy Code for all newly constructed buildings. In November 2025, City Council adopted additional requirements for new non-residential buildings to require a heat pump or additional energy measures for new or replaced heating and air conditioning units. These updates were approved as local amendments to the 2025 California Building Code Cycle.
 Anti-displacement policy update. In December 2025, City Council adopted an ordinance aligning local requirements for replacement housing and first right of refusal in replacement units associated with site redevelopment with those requirements under state law. The amendments also updated and clarified requirements for relocation assistance associated with enforcement of dangerous living conditions.  Ministerial Approval of Affordable Housing. In December 2025, the Planning Commission recommended approval of a proposed overlay district to allow the ministerial approval of 100 percent affordable housing developments within the overlay and that meet specified criteria,

9.98 CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 4 ends

including consistency with all objective development standards unless modified through a density bonus request. City Council is anticipated to consider this proposed overlay in 2026.
 Temporary Housing Updates. In December 2025, the Planning Commission recommended approval of a proposed overlay district that would allow a variety of temporary housing, affordable housing, supportive services, and commercial uses along Coral Street, which was envisioned for such uses in the 2023 Coral Street Visioning Report. The overlay district would also zone for emergency shelters with the capacity to accommodate the City’s unsheltered population as required under state law. City Council is anticipated to consider this proposed overlay in March 2026.
 Leaf blowers. City Council adopted an ordinance prohibiting the use of gasoline powered leaf blowers with limited exceptions in the city limits.
2025 Major Development Applications & Status Updates
Multiple significant development applications were processed and received building permits as shown in the Selected 2025 Key Projects and Programs table below.

Promotion of Infill Development
The list of 2025 Key Projects demonstrates that the City is committed to encouraging well-planned infill development. The City’s established greenbelt ensures that compact and focused development will continue to be a high priority, and virtually all development within the City is considered infill. The majority of the projects listed above are in the downtown area or along the major transportation corridors.

Intergovernmental Coordination
The City regularly coordinates with a variety of agencies and jurisdictions, including the County of Santa Cruz; the Cities of Scotts Valley, Capitola and Watsonville; Association of Monterey Bay Area Governments (AMBAG); California Coastal Commission (CCC); Santa Cruz Metropolitan Transit District (METRO); Santa Cruz County Regional Transportation Commission (SCCRTC); University of California Santa Cruz (UCSC); the Soquel Creek Water District (SCWD); the Scotts Valley Water District; the Santa Cruz Mid-County and Santa Margarita Groundwater Agencies (MGA and SMGWA, respectively); the Monterey Bay Community Power Board (MBCP); the Monterey Bay Air Resource District (MBARD); the Local Agency Formation Commission (LAFCO); the Federal Emergency Management Agency (FEMA); the State Housing and Community Development Department (HCD); the California Department of Fish and Wildlife (CDFW); and the Department of Alcoholic Beverage Control (ABC). Highlights from 2025 include:

9.99 CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 5 ends

Continuum of Care and County Collaboration. During 2025, the City continued to assist the County in the prior years’ transition of the County’s former Continuum of Care, the Housing Action Partnership, to the new Housing for Health Partnership (HHP). Through the HHP and through regular, weekly coordination the County, the City worked on a wide range of homeless services and homelessness response efforts. Collaboration regularly occurred on provision of shelter services, on establishing clear roles and responsibilities across jurisdictions, on applying for grants, on awarding grant monies, and on a variety of other items. The City, County, and HHP also coordinated closely with non-profit partners who deliver homeless services, including in preparation for a 2026 transition of various day services.

The City worked closely with Housing Matters and the County of Santa Cruz in working toward implementing the Coral Street Vision Report and providing more housing and services in the Coral Street area. The City received a grant that will facilitate the construction of a residential substance use disorder treatment facility and navigation center at 125 Coral Street. The property is owned by the City, and the City coordinated closely with County and non-profit partners in preparing the grant.

The City Water Department has been working with the Scotts Valley Water District to complete the City of Santa Cruz – Scotts valley Intertie Project.

The Intertie Project will link the treated water systems of the City of Santa Cruz and Scotts Valley Water District. This critical regional project, which was under construction in 2025, will enable the two agencies to better coordinate and maximize the use of surface and groundwater supplies, and ensure active and passive recharge in the Santa Margarita Groundwater Basin. The intertie will also improve fire protection through increased fireresponse flows, and will enable agencies to share water as available during water shortages.

The SCPD partnered with the Santa Cruz County Office of Education to implement its Project ASCEND (Achieving Success through Community, Education, and Nurturing Development) Initiative. This four-year, grant-funded initiative aims to support youth aged 12 to 17 who are at risk of becoming justice-involved for misdemeanors. The program aims to shift the focus away from punishment towards restoration and rehabilitation by providing diversion opportunities, tailored interventions from youth specialists, and connections to supportive services.

The City of Santa Cruz, UC Santa Cruz, County of Santa Cruz, City of Capitola, Cabrillo College and City of Watsonville have partnered to bring an electric Bike Share system to Santa Cruz County providing a convenient, fun and affordable way for community members and visitors to travel countywide. The bike share system now serves the City of Santa Cruz, UCSC campus, Capitola, and the unincorporated County. The system experiences over 20,000 trips per month.

9.100
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 6 ends

CITY COUNCIL INITIATIVES
In 2025, staff worked on policy initiatives and other supportive efforts to promote Downtown vibrancy, housing production, and the filling of vacant storefronts. The Council approved the Downtown Plan Expansion in mid-2025, and it was subsequently approved by the Coastal Commission. It increases housing capacity, supports the development of new commercial space, and facilitates the development of a permanent, multi-use arena that will be the home of the Santa Cruz Warriors. The Council approved a vacant storefront ordinance to encourage Downtown storefront occupancy in spring of 2025. These efforts all support a thriving downtown ecosystem.

Homelessness continues to be another important initiative. In 2025, City Council continued implementation of the 2024-2027 Homelessness Response Strategic Plan. The City continued to fund multiple safe parking programs and multiple shelter programs, as well as a homelessness response outreach team, a refuse removal team, and many other initiatives that support the unhoused. Staff also worked toward implementing the vision for Coral Street by presenting a zoning overlay district to the Planning Commission in 2025.

9.101
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 7 ends

Selected 2025 Key Projects and Programs

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
1 908 OCEAN ST
The City approved entitlements to demolish four
commercial buildings and 12 residential units on 21
lots, remove 16 heritage trees, and construct a
mixed-use development in three condominium lots
with 389 units and 9,570 square feet of commercial
space on a site in the CC (Community Commercial)
zone district and the Ocean Street Area Plan.

Status: Entitled
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
LU3.3.1 Discourage strip commercial
development in favor of clustered commercial
and mixed-use development along transit
corridors.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU3.7.1 Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site characteristics
and zoning development standards require a
lower density.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this chapter:

Density bonus units.

9.102
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 8 ends

CD3.3 Encourage the assembly of small
parcels along transit corridors to achieve
pedestrian-oriented development compatible
with neighborhoods.

CD4.1.1 Where possible, site buildings at the
street frontage and place parking areas away
from street corners and to the rear of
buildings.

CD4.1.3 On major corridors, encourage mixeduse development, especially projects with priority for commercial uses that can provide
services to the adjacent community.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

M3.2.11 Improve traffic flow and safety and
reduce impacts on arterial streets by limiting
driveways, mid-block access points, and
intersections; removing on-street parking;
clustering facilities around interconnected
parking areas; providing access from side
streets; and other similar measures.

M 4.1.7 Require that site and building
design facilitate pedestrian activity.

ED 1.1.3 Encourage the development of yearround businesses and visitor activities, resources, and destinations that can also
attract and engage local residents.

9.103
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 9 ends

ED 1.2.1 Encourage transportation
improvements and pedestrian activity along
Ocean Street to stimulate economic vitality
ED 5.2 Provide for residents’ daily shopping
needs in local-serving neighborhood
commercial centers.

ED 5.2.1 Encourage neighborhood shopping in
nodes of commercial development that serve
residential areas and have adequate transit,
pedestrian, and bicycle access.

ED 5.2.2 Support the development of
neighborhood gathering places in conjunction
with local-serving neighborhood commercial.

9.104
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 10 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
2 530 OCEAN ST
The City approved entitlements to demolish four
commercial buildings, combine three lots into one lot,
remove four heritage-sized trees and prune more
than 25-percent of the canopy of one heritage-sized
tree, and construct a six-story mixed use building with 225 residential units and ground floor commercial
area within the development setback area of a
Category B Creek on property located in the C-C/FP-O
(Community Commercial / Floodplain Overlay) zone
districts and within the Ocean Street Area Plan. The
applicant submitted a building permit application for
the project in December 2025.

Status: Entitled, building permit under review
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
GP Chapter 8: Hazards, Safety, and Noise
LU3.3.1 Discourage strip commercial
development in favor of clustered commercial
and mixed-use development along transit
corridors.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU3.7.1 - Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site characteristics
and zoning development standards require a
lower density.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this
chapter: Flexible density units (FDU)
and Density bonus units.

LU4.1.1 Support compact mixed-use
development Downtown, along primary

9.105
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 11 ends

transportation corridors, and in employment
centers.

LU4.1.3 On major corridors, encourage mixeduse development, especially projects with priority for commercial uses that can provide
services to the adjacent community.

CD3.3 Encourage the assembly of small parcels
along transit corridors to achieve pedestrianoriented development compatible with neighborhoods.

CD4.2.1 Where possible, site buildings at the
street frontage and place parking areas away
from street corners and to the rear of
buildings.

CD4.4 Improve the building design and
streetscape along the Ocean Street corridor to
emphasize its role as a gateway.

CD5.1 Create a well connected street and
pedestrian network.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

M4.4 Assure a high level of bicycle user
amenities.

ED 5.3 Support neighborhood commercial and
mixed-use development along the city’s

9.106
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 12 ends

transportation corridors.

HZ3.2.2 Establish Ldn noise level targets of 65
dBA for outdoor activity areas in new
multifamily residential developments.

HZ3.2.3 Require that interior noise in all new
multifamily housing not exceed an Ldn of 45
dBA with the windows and doors closed.

HZ6.4 Avoid or reduce the potential for life loss,
injury, and property and economic damage
from flooding.

HE 2.1 Encourage the production of affordable
rental and ownership housing through
inclusionary requirements.

HE 2.2 Facilitate the development of affordable
housing through the provision of regulatory
concessions, financial incentives
and assistance, density bonuses, and other
means.

9.107
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 13 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
3 313 SWIFT ST
The City approved entitlements for a new, fourstory, approximately 120,604 square-foot multifamily educator workforce housing project
encompassing approximately 100 residential units,
approximately 119 parking spaces, new landscaping,
and associated site modifications, including the
removal of six (6) Heritage trees, on a site located in the P-F/CZ-O (Public Facilities/Coastal Zone Overlay)
zone district. A building permit application was
submitted in November 2025.

Status: Entitled, building permit under
review
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
GP Chapter 7: Civic and Community Facilities
GP Chapter 9: Parks, Recreation, and Open
Space
GP Chapter 10: Natural Resources and
Conservation
LU1.1 Relate
residential, commercial and industrial
land use intensities to the capability
and location of the land while
ensuring optimum utilization of
infill parcels.

LU3.7 Encourage higher-intensity
residential uses and maximum
densities in accordance with the
general plan land use designations.

LU3.1 Foster land use patterns that
balance economic, housing,
community, and environmental
needs, and promote social diversity.

9.108
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 14 ends

CC2.1 Provide community services
and facilities in keeping with the needs
of a growing and diverse population
CC8.1 Cooperate with public and
private institutions seeking to meet
their educational objectives.

CD1.2 Ensure that the scale, bulk, and
setbacks of new development
preserve important public scenic
views and vistas.

CD1.3 Ensure that development is
designed to be in harmony with
natural topography and vegetation.

M1.6 Design parking areas and
parking garages that are
safe, pleasant and easy to use.

M4.1 Enable and encourage walking in
Santa Cruz
NRC5.1 Protect and manage tree
resources in the urban environment,
with emphasis on significant and
heritage trees.

PR1.7 Require developers to mitigate
the impacts of their property
improvements on city parks,
recreation facilities and open space
areas.

ED4.2 Retain and expand the existing
base of medium and large employers
in Santa Cruz.

ED4.1 Promote the education and

9.109
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 15 ends

training of the workforce to meet the
needs of emerging economies.

9.110
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 16 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
4 2020 N PACIFIC AVENUE
The City entitled demolition of the existing structures and site features and construction of a new, eightstory, approximately 169,791 square-foot commercial/residential mixed-use project including
approximately 178 residential units, approximately
2,727 sq. ft. of commercial/residential amenity space,
approximately 100 parking spaces, and associated site
improvements on a site located in the CBD/FP-O
(Central Business District/Floodplain Overlay) zone
district and within the North Pacific subarea of the
Downtown Plan.

Status: Entitled
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Land Use Element
LU1.1 Relate residential, commercial, and
industrial
land use intensities to the capability and
location of the land while ensuring
optimum utilization of infill parcels.

LU3.4 In neighborhoods near visitor areas,
give priority to uses that serve both visitors
and residents.

LU3.7 Encourage higher-intensity residential
uses
and maximum densities in accordance with
the General Plan Land Use
designations.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

M4.4.3 Increase the supply of bicycle parking
throughout the city.

HE 1.1 Provide adequate sites and supporting
infrastructure to
accommodate housing through land use,

9.111
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 17 ends

zoning, and specific plan designations that
encourage a broad range of housing
opportunities.

HE 1.2 Concentrate most new housing in the
central core, along major commercial
corridors, and on major opportunity sites
consistent with
the Land Use Element.

HE 1.3 Facilitate the production of residential
units through design and compatibility
review, use of objective development
standards, and regulatory and/or financial
incentives.

HE 2.2 Develop creative ways to facilitate
more affordable housing development in the
City.

9.112
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 18 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
5 130 CENTER STREET
The City extended entitlements to construct a six
story, mixed-use building with 233 Single Room
Occupancy (SRO) units and 2,618 sq. ft. of ground
floor commercial space on a parcel located in the
RTC/CZ-O/FP-O (Tourist Residential Beach
Commercial/Coastal Zone Overlay/Floodplain
Overlay) zone districts and Beach and South of Laurel
Area Plan.

Status: Entitled
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
LU3.4 - In neighborhoods near visitor areas,
give priority to uses that serve both visitors
and residents.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU3.7.1 Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site
characteristics and zoning development
standards require a lower density.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this chapter:

Density bonus units.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

9.113
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 19 ends

ED 1.1.2 Support the development and
expansion of businesses that make a balanced
contribution to the cultural, environmental,
and economic health of the city.

ED 1.1.3 Encourage the development of yearround businesses and visitor activities, resources, and destinations that can also
attract and engage local residents.

ED 5.2 Provide for residents’ daily shopping
needs in local-serving neighborhood
commercial centers.

ED 5.2.1 - Encourage neighborhood shopping
in nodes of commercial development that
serve residential areas and have adequate
transit, pedestrian, and bicycle access.

ED 5.2.2 Support the development of
neighborhood gathering places in conjunction
with local-serving neighborhood commercial.

9.114
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 20 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
6 525 WATER STREET
The City approved a ministerial design review
submitted pursuant to California State Assembly Bill
(AB) 2011, and Density Bonus request, to allow
construction of a new, five-story, approximately 60’-
6”- tall multifamily/ mixed-use building with
approximately 90, 100% affordable apartments and
approximately 6,000 square feet of ground-floor
space intended for residential amenity and/or
commercial use, on two adjacent lots located in the CC (Community Commercial) zone district and on land located in the Eastside Business Area Improvement
Plan. A building permit application was submitted in
November 2025.

Status: Ministerial Design Review Approved,
building permit under review.

GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU3.7.1 Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site
characteristics and zoning development
standards require a lower density.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this chapter:

Density bonus units.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

ED 1.1.2 Support the development and
expansion of businesses that make a balanced

9.115
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 21 ends

contribution to the cultural, environmental,
and economic health of the city.

ED 1.1.3 Encourage the development of yearround businesses and visitor activities, resources, and destinations that can also
attract and engage local residents.

9.116
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 22 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
7 1811 MISSION STREET
The City approved entitlements to demolish three
residential dwelling units, combine three lots into one lot, and construct a six-story mixed use building with
67 residential units and ground floor commercial area
on property located in the C-C (Community
Commercial) zone district and within the Mission
Street Urban Design Plan Area.

Status: Entitled
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
GP Chapter 8: Hazards, Safety, and Noise
GP Housing Element
LU3.3.1 Discourage strip commercial
development in favor of clustered commercial
and mixed-use development along transit
corridors.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU3.7.1 Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site characteristics
and zoning development standards require a
lower density.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this chapter:

Density bonus units.

LU4.1.1 Support compact mixed-use
development Downtown, along primary

9.117
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 23 ends

transportation corridors, and in employment
centers.

LU4.1.3 On major corridors, encourage mixeduse development, especially projects with priority for commercial uses that can provide
services to the adjacent community.

CD3.3 Encourage the assembly of small
parcels along transit corridors to achieve
pedestrian-oriented development compatible
with neighborhoods.

CD4.2.1 Where possible, site buildings at the
street frontage and place parking areas away
from street corners and to the rear of
buildings.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

M2.1.2 Encourage use of alternative modes of
transportation.

M2.3.1 Design for and accommodate multiple
transportation modes.

M4.4 Assure a high level of bicycle user
amenities.

ED 5.3 Support neighborhood commercial and
mixed-use development along the city’s
transportation corridors.

9.118
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 24 ends

HZ3.2.3 Require that interior noise in all new
multifamily housing not exceed an Ldn of 45
dBA with the windows and doors closed.

HE 1.2 Concentrate new housing in the Central
Core, along major commercial corridors, and
on major opportunity sites consistent with the
Land Use Element.

HE 2.1 Encourage the production of affordable
rental and ownership housing through
inclusionary requirements.

HE 2.2 Facilitate the development of
affordable housing through the provision of
regulatory concessions, financial incentives
and assistance, density bonuses, and other
means.

HE 5.2 Promote the repair, improvement, and
rehabilitation of housing and encourage
replacement of substandard housing to
enhance quality of life in neighborhoods.

HE 6.7 Promote transit-oriented, mixed-use
residential developments that are close to
services, reduce dependence on automobile
use, and are of high quality.

9.119
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 25 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
8 OCEAN STREET EXTENSION – 1930

OCEAN ST EXT
The City extended entitlements to construct a 32-unit
apartment/condo development in the R-1-10 zone
district, including a General Plan Amendment to
change land use designation of 2.74-acre parcel from
L(Low Density Residential) to LM (Low Medium
Density Residential) and Zoning Map Amendment to
rezone from R-1-10 to R-L.

Status: Entitled
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 7: Civic and Community Facilities
GP Chapter 8: Hazards, Safety, and Noise
GP Chapter 9: Parks, Recreation, and Open
Space
Chapter 10: Natural Resources and
Conservation
CD 1.2 Ensure that the scale, bulk and
setbacks of new development preserve
important public scenic views and vistas.

CD 1.3 Ensure that development is designed
to be in harmony with natural topography and
vegetation.

CD 3.2 Ensure that the scale, bulk and
setbacks of new development preserve public
views of city landmarks where possible.

LU 1.2 Ensure that growth and development
does not lead to the overdraft of any water
source, the creation of unacceptable levels of
air pollution, or the loss of prime agricultural
land.

9.120
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 26 ends

M 2.4.12 In coordination with the transit
district, require development along arterial
streets to provide adequate and accessible
bus shelters, with curb cuts leading to the
shelter and to destination and loading
platforms.

M 3.1.3 Strive to maintain the established
“level of service” D or better at signalized
intersections.

M 3.2 Ensure road safety for all users.

M 3.2.3 Ensure that street widths are
adequate to safely serve emergency vehicles
and freight trucks.

M 3.3.4 Mitigate safety, noise, and air quality
impacts from roadways on adjacent land uses
through setbacks, landscaping, and other
measures.

M 3.3.5 Require new development to be
designed to discourage through traffic in
adjacent neighborhoods and to encourage
bicycle or pedestrian connections.

M 4.1.7 Require that site and building design
facilitate pedestrian activity.

CC 5.1.8 Require new development to
maintain predevelopment runoff levels.

CC 5.1.9 Reduce stormwater pollution.

HZ 1.2.5 Continue to ensure that new
development design and circulation allow for
adequate emergency access.

HZ 2.2.1 Require future development projects
to implement applicable Monterey Bay

9.121
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 27 ends

Unified Air Pollution Control District
(MBUAPCD) control measure and/ or air
quality mitigations in the design of new
projects as set forth in the District’s “CEQA
Guidelines.”
HZ 3.1.1 Require land uses to operate at noise
levels that do not significantly increase
surrounding ambient noise.

HZ 3.1.3 Ensure that construction activities
are managed to minimize overall noise
impacts on surrounding land uses.

HZ 3.1.4 Minimize the impacts of intermittent
urban noise on residents.

HZ 3.1.6 Require evaluation of noise
mitigation measures for projects that would
substantially increase noise.

HZ 3.1.11 Require soundwalls, earth berms,
setbacks, and other noise reduction
techniques for new development, when
appropriate and necessary, as conditions of
approval.

HZ 6.2 Discourage development on unstable
slopes.

HZ 6.3 Reduce the potential for life loss, injury,
and property and economic damage from
earthquakes, liquefaction, and other seismic
hazards.

HZ 6.3.6 Require site specific geologic
investigation(s) by qualified professionals for
proposed development in potential
liquefaction areas shown on the Liquefaction

9.122
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 28 ends

Hazard Map to assess potential liquefaction
hazards, and require developments to
incorporate the design and other mitigation
measures recommended by the investigation(
s).

PR 1.3.1 Ensure that adequate park land is
provided in conjunction with new
development.

NRC 1.2.1 Evaluate new uses for potential
impacts to watershed, riverine, stream, and
riparian environments.

NRC 2.1.3 Evaluate development for impacts
to special-status plant and animal species.

NRC2.2.1 As part of the CEQA review process
for development projects, evaluate and
mitigate potential impacts to sensitive habitat
(including special-status species) for sites
located within or adjacent to these areas.

9.123
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 29 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
9 136 River Street
The City entitled a six-story mixed use building
consisting of a 50-unit, 100 percent affordable
apartment complex with one 1,970 square foot
commercial tenant space in the C C (Community
Commercial) zone district. The project has been
refined to meet FEMA requirements, including locating
residential units above the ground floor. Status:

Construction anticipated to begin Spring 2026.

Status: Entitled
GP Chapter 2: Historic Preservation, Arts, and
Culture
GP Chapter 4: Land Use
GP Chapter 5: Mobility
HA1.2.2 Require preparation of archaeological
investigations on sites proposed for
development within areas identified as “Highly
Sensitive” or “Sensitive” on the “Areas of
Historical Archaeological Sensitivity” map,
except for exempt uses within “Sensitive”
areas as described below, prior to approval of
development permits. The investigation shall
include archival research, site surveys and
necessary supplemental testing as may
be required, conducted by a qualified
archaeologist. The significance of identified
resources shall be ascertained in accordance
with CEQA definitions and impacts and
mitigation measures outlined if significant
impacts are identified, including, but not
limited to recovery options and onsite
monitoring by an archaeologist during
excavation activities. A written report
describing the archeological findings of the

9.124
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 30 ends

research or survey shall be provided to the
City.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while
ensuring optimum utilization of infill parcels.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

M3.1.1 Seek ways to reduce vehicle trip
demand and reduce the number of peak hour
vehicle trips.

9.125
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 31 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
10 Downtown Library and Affordable
Housing Project (119 Lincoln Street)
The City issued a building permit for
Downtown Library and Affordable Housing MixedUse Project which includes 124 housing units affordable to low- and very-low-income households,
approximately 38,000 square feet of space for a
modern, accessible City Library facility, a minimum
of 1,800 square feet for a childcare facility,
approximately 240 parking spaces, including 25 level
2 EV charging stations, for residents, library patrons, and visitors to the downtown area. The Library will
feature a sustainable design, outdoor rooftop deck,
large community room as well as updated Children’s
programming room, teen room, and local history
room. Additionally, the site will include around 203
Bicycle parking spaces varying in sizes including bike
lockers and e-bike charging stations.

The project has been the subject of extensive public
conversation and work by the City’s Economic
Development Department for several
years and won voter referendum in 2022.

Status: Building Permit Issued
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
GP Chapter 7: Civic and Community Facilities
CD4.2 Ensure that new development and
right-of-way improvements enhance the
visual quality of streetscapes.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

CD5.2.1 Encourage buildings to be oriented
towards sidewalks, public plazas, walkways,
or rivers and to include features such as
public benches and natural seating areas.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the
capability and location of the land while
ensuring optimum utilization of infill
parcels.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use
designations.

9.126
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 32 ends

LU4.1.1 Support compact mixed-use
development Downtown, along primary
transportation corridors, and in employment
centers.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M4.1.6: Enhance the pedestrian orientation
of the Downtown Central Business District.

ED5.5.4: Create a distinctive and active
pedestrian environment downtown.

ED5.5.6: Require continuity of active groundlevel uses (retail, restaurant, cultural, etc.) along Pacific Avenue.

CC2.1.4: Locate community facilities within
easy walking distance of residential areas or
in areas well-served by transit.

9.127
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 33 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
11 831 Water Street
The City issued a building permit for the demolition
of existing commercial buildings and construction of
a five-story mixed-use building consisting of 140
affordable units with shared underground parking
and involving density bonus incentives, concessions
and waivers to development standards, located on a
property in the Community Commercial (C-C) zone
district and within the Eastside Business
Improvement District Area
Status: Building Permit Issued
GP Chapter 4: Land Use
LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while
ensuring optimum utilization of infill parcels.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU4.1.1 Support compact mixed-use
development Downtown, along primary
transportation corridors, and in employment
centers.

9.128
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 34 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
12 126 Eucalyptus Avenue
The City issued a building permit to reconfigure five
lots into two, demolish two existing school buildings
(approx. 28,417 square feet), remove six Heritage
trees, and construct a 76 unit (including 13 full
dwelling units) senior housing facility on a site listed on the historic building survey (Vol. 1, p. 39) in the R 1 5/WCD O/CZ O/SP O (Single family residence/West
Cliff Drive Overlay/Coastal Zone Overlay/Shoreline
Protection Overlay) zone district.

Status: Building Permit Issued
GP Chapter 2: Historic Preservation, Arts, and
Culture
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 10: Natural Resources and
Conservation
HA1.8 Protect, encourage, and develop
guidelines for restoring and rehabilitating
historic or architecturallysignificant buildings, sites, and landmarks. Cf.

HA1.11, 1.11.1 and CD2.3.2.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

Cf. CD4.3.1, M1.3.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the
capability and location of the land while
ensuring optimum utilization of infill parcels.

LU3.1 Foster land use patterns that balance
economic, housing, community, and
environmental needs, and promote social
diversity.

9.129
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 35 ends

LU3.11.2 Ensure appropriate land uses and
development standards that do not adversely
impact adjacent open spaces.

LU4.1.2 Amend the Zoning Ordinance to
ensure that infill and intensified development
is sensitive to existing neighborhood and
business districts.

M3.3.5 Require new development to be
designed to discourage through traffic in
adjacent neighborhoods and to encourage
bicycle or pedestrian connections.

NRC2.2 Protect sensitive habitat areas and
important vegetation communities and
wildlife habitat, to include riparian, wetland
(salt marsh and freshwater wetland), coastal
prairie, coastal bird habitat, and habitat that
support special status species, as well
as, sensitive and edge habitats (“ecotones”).

Cf. CD4.3.3, CC3.3.6, and NRC2.1, 2.4, and

6.3. 9.130
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 36 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
13 850 ALMAR AVE
The City issued a building permit for a three-story
residential building consisting of a 38-unit, 100%
affordable apartment building located in the RL/CZ-O (Multiple Residence-Low Density District/Coastal Zone Overlay) zone districts.

Status: Entitled, Building Permit Issued
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Housing Element
LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while ensuring
optimum utilization of infill parcels.

LU3.7.1 Allow and encourage development
that meets the high end of the General Plan
Land Use designation density unless
constraints associated with site
characteristics and zoning development
standards require a lower density.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas. Cf. CD4.2, 4.2.1, 4.3.1, 5.2.

M2.1.2 Encourage use of alternative modes of
transportation.

M2.3.1 Design for and accommodate multiple
transportation modes.

M4.4 Assure a high level of bicycle user
amenities. Cf. PR1.6.4.

Housing Element Policy 2.1 Encourage the
production of affordable rental and

9.131
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 37 ends

ownership housing through inclusionary
requirements.

Housing Element Policy 2.2 Facilitate the
development of affordable housing through
the provision of regulatory concessions,
financial incentives and assistance, density
bonuses, and other means.

9.132
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 38 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
14 415 NATURAL BRIDGES
The City issued a certificate of occupancy for the 20
unit, 100-percent affordable housing development
with 20 Single Room Occupancy (SRO) units
constructed within a three-story building on a vacant
lot located at 415 Natural Bridges Drive. The
application was submitted by The Housing Authority
of the County of Santa Cruz.

The proposal dedicates 100% of the units for very
low-income households, and required a Planned
Development Permit to allow the use on the parcel
outside the zones where SROs are typically
permitted.

Status: Certificate of Occupancy Issued,
Leased Up
GP Chapter 4: Land Use
GP Chapter 5: Mobility
LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with General Plan Land Use designations.

LU3.8 Allow the following residential uses to
exceed the maximum densities in this chapter:
 Single-room occupancy (SRO) units;
 Small ownership units (SOU);
 Small studio and one-bedroom units;
 Accessory dwelling units (ADU);
 Density bonus units;
 Residential units within areas
designated High-Density Overlay
District.

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented areas.

9.133
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 39 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
15 PACIFIC STATION SOUTH (818 PACIFIC AVE)
The City in partnership with For the Future Housing,
has completed construction and the lease-up of
Pacific Station South. This development project will
include 70 family rental apartments (including one
onsite manager’s unit) with 22 of the units reserved
for disabled individuals. The units include studios,
one-bedroom and two-bedroom units will be
available to individuals or households with income
levels ranging from 30-60% Area Median Income
(AMI), or approximately between $33,570 and
$67,140 for a four-person household. This project will
also feature an onsite low-income medical and dental
clinic, as well as retail space (fronting along Pacific Avenue). As of initial lease up 86% of the tenants met
the local tenant preference.

This site also incorporates build-out of a paseo
connecting Pacific Avenue and Front Street,
ultimately leading up to the riverwalk and to overlook
the San Lorenzo River.

Status: Certificate of Occupancy, Leased Up
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
GP Chapter 7: Civic and Community Facilities
CD4.2.1 Where possible, site buildings at the
street frontage and place parking areas away
from street corners and to the rear of buildings.

CD 5.1 Create a well connected street and
pedestrian network.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

CD5.2.1 Encourage buildings to be oriented
towards sidewalks, public plazas, walkways, or
rivers and to include features such as public
benches and natural seating areas.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU4.1.1 Support compact mixed-use
development Downtown, along primary
transportation corridors, and in employment
centers.

9.134
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 40 ends

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M2.4: Support and promote efficient use of
transit.

M4.1.6: Enhance the pedestrian orientation of
the Downtown Central Business District.

M1.5: Reduce the need for parking and
promote parking efficiency.

ED5.5.4: Create a distinctive and active
pedestrian environment downtown.

ED5.5.6: Require continuity of active groundlevel uses (retail, restaurant, cultural, etc.) along Pacific Avenue.

ED5.5.6: Revitalize the Lower Pacific area
(Pacific Avenue south of Cathcart Street).

CC2.1.4: Locate community facilities within
easy walking distance of residential areas or in
areas well-served by transit.

9.135
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 41 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
16 PACIFIC STATION NORTH (902 PACIFIC AVE)
In partnership with the City, Eden Housing, and For
the Future Housing Pacific Station North Apartments,
a 128-unit family community in downtown Santa Cruz
is currently approaching the lease up process. This
development completes the final phase of Pacific
Station, a large-scale, transit-oriented redevelopment
program located between Pacific Avenue and Front
Street in downtown Santa Cruz. With funding from
the City of Santa Cruz, the Affordable Housing &
Sustainable Communities (AHSC) program, and the
Infill Infrastructure Grant (IIG) program, the project
constructed 128-units of affordable housing at Pacific
Station North Apartments, ground floor retail and
commercial space, a new METRO bus transit hub, a
pedestrian paseo, and key infrastructure to serve the
entirety of the Pacific Station redevelopment.

Pacific Station North Apartments includes a mix of
studio, 1-, 2-, and 3-bedroom apartments for
individuals and families. 32 units will be set aside for extremely low-income households, with 21 units
targeted for individuals and families who are
homeless or at risk of homelessness and 11 homes
available for families in the Housing Authority of the
County of Santa Cruz’s Family Unification Program.

Status: Building Permit Issued,
Modifications Entitled
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
CD4.2 Ensure that new development and rightof-way improvements enhance the visual quality of streetscapes.

CD5.2 Require new development to include
elements that relate to the pedestrian scale.

CD5.2.1 Encourage buildings to be oriented
towards sidewalks, public plazas, walkways, or
rivers and to include features such as public
benches and natural seating areas.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while
ensuring optimum utilization of infill parcels.

LU3.7 Encourage higher-intensity residential
uses and maximum densities in accordance
with the General Plan Land Use designations.

LU4.1.1 Support compact mixed-use
development Downtown, along primary

9.136
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 42 ends

The remaining units will be restricted to individuals
and families earning less than 50% and 60% of the
Area Median Income for Santa Cruz County. Initial
lease up is anticipated for Summer 2026.
transportation corridors, and in employment
centers.

M1.1 Reduce automobile dependence by
encouraging appropriate neighborhood and
activity center development.

M4.1.6: Enhance the pedestrian orientation of
the Downtown Central Business District.

ED5.5.4 Create a distinctive and active
pedestrian environment downtown.

ED5.5.6 Require continuity of active groundlevel uses (retail, restaurant, cultural, etc.) along Pacific Avenue.

ED5.5.6 Revitalize the Lower Pacific area
(Pacific Avenue south of Cathcart Street).

9.137
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 43 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
17 314 JESSIE STREET
The City issued a certificate of occupancy for a four
(4)-story, fifty (50)-unit 100% affordable multi-family development including housing and supportive
services.

Status: Certificate of Occupancy, Leased Up
GP Chapter 3: Community Design
GP Chapter 4: Land Use
Goal CD-1 A building environment in harmony
with its natural setting.

LU 1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while ensuring
optimum utilization of infill parcels.

9.138
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 44 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
18 DOWNTOWN PLAN EXPANSION
The City of Santa Cruz amended the Downtown Plan,
expanding its scope to the area south of Laurel Street
and providing specific development direction for this
area. Objectives include:

1. Providing additional affordable and marketrate housing in the downtown,

2. Creating public amenities like parks, public
plazas, or better pedestrian infrastructure,

3. Improving the connection to the San Lorenzo
River and beach areas

4. Creating new economic opportunities for
local businesses and workers, and

5. Planning for a new Santa Cruz Warriors arena
site.

Status: Approved by City Council in 2025,
Ongoing Implementation
GP Chapter 3: Community Design
GP Chapter 4: Land Use
GP Chapter 5: Mobility
GP Chapter 6: Economic Development
CD4.1 Make the city’s major gateways
defining, attractive, and welcoming.

CD4.2 Ensure that new development and rightof-way improvements enhance the visual quality of streetscapes.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while ensuring
optimum utilization of infill parcels.

LU3.1 Foster land use patterns that balance
economic, housing, community, and
environmental needs, and promote social
diversity.

LU4.1.2 Amend the Zoning Ordinance to
ensure that infill and intensified development
is sensitive to existing neighborhood and
business districts.

LU4.2 Encourage land use changes that reduce
the need for autos.

9.139
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 45 ends

M1.3 Create pedestrian-friendly frontage and
streetscapes and attractive pedestrianoriented uses.

M1.5.2 Encourage innovative solutions that
provide adequate parking while maximizing
living and working space.

M3.3.5 Require new development to be
designed to discourage through traffic in
adjacent neighborhoods and to encourage
bicycle or pedestrian connections.

M4.1.7 Require that site and building design
facilitate pedestrian activity.

ED5.1 Nurture activity centers and districts
that serve neighborhoods and businesses,
provide jobs, and meet local and regional
needs.

ED5.1.1 Provide for the development of
supporting land uses adjacent to retail
shopping areas, while assuring protection of
existing residential neighborhoods.

9.140
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 46 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
19 6TH CYCLE HOUSING ELEMENT
The City adopted its 6th Cycle Housing Element on
December 12, 2023, and the implementation period
runs through 2031. The Housing Element is one of the
10 State-mandated “elements” or chapters of a local
jurisdiction’s General Plan. The Housing Element
identifies policies and programs to meet existing and
projected housing needs for all segments of the
community, including various household types,
special needs populations, and all income levels of the jurisdiction.

To help meet its housing goals for this new cycle, the
Housing Element includes over 100 policy objectives
that the City seeks to achieve by 2031.

Status: Ongoing Implementation
GP Chapter 3: Community Design
GP Chapter 4: Land Use
CD2.2.2 Engage the public in long range
planning projects including Area Plans and
General Plan updates.

LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while ensuring
optimum utilization of infill parcels.

LU3.1 Foster land use patterns that balance
economic, housing, community, and
environmental needs, and promote social
diversity.

9.141
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 47 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
20 PROHOUSING DESIGNATION
The City achieved the State’s Prohousing Designation
in 2023. The application assigned point totals to
various policies a City can implement to support the
construction and preservation of housing, and the
City far exceeded the threshold for the Designation.

This recognition grants the City priority consideration for various housing funding programs administered
by HCD and further bolsters the City's commitment to
addressing the City’s wide variety of housing needs.

Status: Certified, ongoing grant applications
GP Chapter 4: Land Use
LU1.1 Relate residential, commercial, and
industrial land use intensities to the capability
and location of the land while ensuring
optimum utilization of infill parcels.

LU3.1 Foster land use patterns that balance
economic, housing, community, and
environmental needs, and promote social
diversity.

9.142
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 48 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
21 LOCAL HAZARD MITIGATION AND CLIMATE
ADAPTATION PLAN The 2025-2030 Local Hazard Mitigation and Climate Adaptation Plan and implementation program
were completed, adopted and approved by FEMA. The
Plan will enable funding for priority projects to address natural and climate hazards.

Status: Adopted, Ongoing Implementation
GP Chapter 8: Hazards, Safety, and Noise
HZ6.1 Reduce erosion hazards.

HZ1.5.1 Reduce wildfire hazards.

HZ6.1.1 Minimize hazards posed by coastal
cliff retreat
HZ6.3 Reduce the potential for life loss, injury,
and property and economic damage from
earthquakes, liquefaction, and other seismic
hazards.

Z6.4 Avoid or reduce the potential for life loss,
injury, and property and economic damage
from flooding.

HZ6.6 Avoid or reduce the potential for life
loss, injury, and property and economic
damage to the city from tsunamis and dam
failure.

9.143
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 49 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
22 MONTEREY BAY GREEN YOUTH SERVICE
CORPS The City was awarded a $2M grant to develop and
launch the Monterey Bay Green Youth Service Corps
with 4 non profit partners, hiring 107 young adults
from disadvantaged backgrounds for training and jobs
in sustainability fields.

Status: Complete
GP Chapter 6: Economic Development
ED4.1.1 Improve the match between
emerging job opportunities and training
programs.

ED4.3.1 Encourage businesses that provide
part-time and seasonal job opportunities for
people of all ages, skills, and experience levels.

9.144
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 50 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
23 ADVISORY BODY PILOT STIPEND PROGRAM
The City launched an advisory committee/commission
pilot stipend program to provide opt in compensation
to those who serve on committees and commissions.

Status: Complete
GP Chapter 7: Civic and Community Facilities
CC1.2.2 Increase public access to information
and involvement in City land-use decisionmaking.

9.145
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 51 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
24 COASTAL RECREATION AND ACCESS
Through a subaward from the NOAA Regional
Resilience Grant and California Marine Sanctuary
Foundation, the City has full funding for design,
permitting, environmental review and construction of
3 coastal restoration and access projects: the Main
Beach Living Shoreline, Jessie Street Marsh
Restoration and San Lorenzo Park Riverlands
Restoration Projects. Design and permitting
commenced in 2025. (Goal NRC1.3)
Status: In Design
GP Chapter 10: Natural Resources and
Conservation
NRC1.3 Encourage the restoration and
enhancement of existing riparian corridors,
wetlands, and water resources.

9.146
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 52 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
25 POLICE STAFFING STUDY
The study will analyze staffing models and explore
innovative approaches to responding to service calls
and improving retention. The study was initiated in
early 2025 and will conclude in Spring 2026.

Status: Study Underway
GP Chapter 7: Civic and Community Facilities
GP Chapter 8: Hazards, Safety, and Noise
CC2.1 Provide community services and
facilities in keeping with the needs of a
growing and diverse population. Cf. CD5.3,
LU4.3.

CC7.1 Ensure adequate police training and
resources. Cf. PR1.5.

CC7.1.1 Ensure appropriate police staff,
stations, equipment, and training to meet the
demands of increased population and tourism.

CC7.1.6 Provide rapid and timely response to
all emergencies and services. Cf. HZ1.2 and
HZ4.3.

CC7.2.4 Respond to community service and
special assistance calls; aid those who cannot
care for themselves.

HZ1.2 Respond to emergencies rapidly. Cf.

CC7.1.6 and HZ4.3.

9.147
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 53 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
26 PROJECT ASCEND
Project ASCEND (Achieving Success through
Community, Education, and Nurturing Development)
is a four-year, grant-funded initiative by the Santa
Cruz County Office of Education aimed at supporting
at-risk youth aged 12 to 17 who are at risk of
becoming justice-involved for misdemeanors. The
program aims to shift the focus away from
punishment towards restoration and rehabilitation by
providing diversion opportunities, tailored
interventions from youth specialists, and connections
to supportive services.

Status: Ongoing Implementation
GP Chapter 7: Civic and Community Facilities
CC2.1 Provide community services and
facilities in keeping with the needs of a
growing and diverse population. Cf. CD5.3,
LU4.3.

CC7.1.3 Participate in developing programs
aimed at preventing traumatic crimes and
violence.

CC7.2 Maintain Community Oriented Policing.

CC7.2.2 Reduce crime through neighborhoodbased crime prevention activities.

CC7.2.4 Respond to community service and
special assistance calls; aid those who cannot
care for themselves.

CC7.3 Cooperate with other agencies in
ensuring public safety and emergency
preparedness.

CC7.4 Enhance programs designed to reinforce
positive juvenile behavior and prevent
delinquency. Cf. PR1.5.

CC7.4.1 Provide diversion programs and
referrals for juvenile offenders.

9.148
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 54 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
27 TRAUMA K-9 PROGRAM
This program will introduce a specially trained dog to
comfort victims of crime, support officers and civilian staff coping with stress or trauma, and participate in
outreach and public safety education events. In 2025,
SCPD worked toward establishing the program and
locating a dog.

Status: Ongoing Implementation
GP Chapter 7: Civic and Community Facilities
CC2.1 Provide community services and
facilities in keeping with the needs of a
growing and diverse population. Cf. CD5.3,
LU4.3.

CC7.2 Maintain Community Oriented Policing.

CC7.2.4 Respond to community service and
special assistance calls; aid those who cannot
care for themselves.

CC7.1.5 Enhance response to and prevention
of domestic violence.

CC9.1 Promote activities and programs that
contribute to the physical and mental health
and well-being of all Santa Cruz residents.

9.149
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 55 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
28 CAREALERT PROGRAM
To enhance the safety and well-being of individuals
with special needs by providing law enforcement
officers with critical information during emergency
responses. By registering loved ones with special
needs, community members can help ensure officers
have access to information such as specific
limitations, communication preferences, and
potential triggers. This proactive approach helps to
prevent misunderstandings and enables law
enforcement to provide individuals with the
appropriate care and support during interactions
when appropriate and when this information is
available.

Status: Ongoing Implementation
GP Chapter 7: Civic and Community Facilities
CC2.1 Provide community services and
facilities in keeping with the needs of a
growing and diverse population. Cf. CD5.3,
LU4.3.

CC7.2 Maintain Community Oriented Policing.

CC7.2.4 Respond to community service and
special assistance calls; aid those who cannot
care for themselves.

CC9.1 Promote activities and programs that
contribute to the physical and mental health
and well-being of all Santa Cruz residents.

9.150
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 56 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
THE GENERAL PLAN 2030
29 2025 BEACH MANAGEMENT PLAN
The California Coastal Commission approved the
2025 Beach Management Plan, the latest update to a
plan that has guided beach use for more than three
decades. The plan guides activities at Main and
Cowell Beaches, including maintenance, recreation
programs, private events, and public safety. Among
several important updates, the revised plan
emphasizes the City’s commitment to equitable
access. It clarifies that non-profits and federally
recognized Native American Tribes with fewer than
30 participants may access and use the beach
without a special event permit. The plan also
describes the continued expansion of ADA
improvements, including the seasonal installation of a
roll-out mat to create an accessible pathway across
the beach to the water, as well as the continued
provision of beach wheelchairs designed for use on
sand.

Status: Approved, Ongoing Implementation
GP Chapter 9: Parks, Recreation, and Open
Space
PR1.6 Ensure that parks and recreation
facilities are accessible to all.

PR1.6.5 Coordinate with other public entities
in assuring public access to unrestricted open
space lands and coastline.

PR3.1 Enhance the outdoor educational and
recreational experience in appropriate open
space lands and coastline.

PR3.1.1 Provide recreational and educational
opportunities within the open space lands
and coastline consistent with adopted master
or management plans.

PR3.3 Protect, maintain, and enhance
publicly accessible coastal and open space
areas. Cf. CD1.4, LU3.11.

PR3.3.4 Maximize public access and
enjoyment of recreation areas along the
coastline.

9.151
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 57 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
30 SAN LORENZO PARK CONCEPTUAL

REDESIGN FINAL REPORT
The City Council accepted the San Lorenzo Park
Conceptual Redesign Final Report, which will help
guide future renovations to San Lorenzo Park. The
planning process included extensive community
engagement, such as surveys; stakeholder,
community, and public meetings; and written
correspondence. The final concept proposes
renovations to the uplands portion of the park,
featuring a range of facilities and design elements,
including a universally designed playground, event
space, overlooks, courts, and plazas. The riverlands
area along the San Lorenzo River will be restored as a
natural habitat.

Status: Report Accepted
GP Chapter 9: Parks, Recreation, and Open
Space
GP Chapter 10: Natural Resources and
Conservation
PR1.1.1 Update and modify the park system
and services to accommodate changes in the
population and its recreational needs
PR2.1.1 Solicit public input to determine
community interests and needs
NRC1.1 Protect the city’s river and wetland
areas while increasing and enhancing public
access where appropriate.

NRC1.3 Encourage the restoration and
enhancement of existing riparian corridors,
wetlands, and water resources.

9.152
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 58 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
31 HARVEY WEST PARK DESIGN AND
PROGRAM ASSESSMENT The City Council accepted the Harvey West Park Design and Program Assessment to guide renovations
to Harvey West Park. The project included a public
outreach process and an assessment of existing
conditions. The plan includes numerous
recommendations to address long-standing design,
maintenance, and recreational facility needs at the
park.

Status: Completed
GP Chapter 9: Parks, Recreation, and Open
Space
PR1.1.1 Update and modify the park system
and services to accommodate changes in the
population and its recreational needs
PR2.1.1 Solicit public input to determine
community interests and needs

9.153
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 59 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
32 HARVEY WEST POOL REOPENING
The Harvey West Pool reopened to the community in
Fall 2025 after substantial renovations and
improvements to the facility. Thousands of community
members enjoyed the City’s free “Dip In Days”
recreational swim and open lap swim opportunities.

Aquatics programming is at the heart of water safety,
especially in a seaside community.

Status: Completed
GP Chapter 9: Parks, Recreation, and Open
Space
PR1.1 Provide and manage a system of parks
and recreation-related facilities that serve
the needs of residents and visitors.

9.154
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 60 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
33 SANTA CRUZ WHARF
Following the December 2024 Wharf partial collapse,
the Parks & Recreation Department with support from
the City Council ad hoc subcommittee for Wharf
recovery and the City Economic Development
Department, took critical steps toward repairing the
end of the Wharf and advancing key components of
the Wharf Master Plan. Following extensive
engineering assessments, the Wharf is indeed strong
and sound. The 2025 summer season at the Wharf saw
an expanded Tuesday Night Live Concert Series with
the highest overall attendance yet for this summer
series. Beautiful weather welcomed classic summer
events including Woodies on the Wharf and the Aloha
Outrigger Races. The 2025 edition of Winter on the
Wharf was the largest and highest-attended one yet.

Status: Completed
GP Chapter 4: Land Use
GP Chapter 9: Parks, Recreation, and Open
Space
LU3.53 Foster improved recreational and
economic opportunities at the Municipal
Wharf.

PR2.1.2 Provide and support cultural and
recreational events, activities, and festivals
that relate to diverse community needs.

PR2.2 Encourage cultural and community
events and activities in parks and recreation
facilities, Downtown, and in the Beach area.

PR3.3 Protect, maintain, and enhance
publicly accessible coastal and open space
areas. Cf. CD1.4, LU3.11.

9.155
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 61 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
34 JESSIE STREET MARSH
As part of a NOAA grant, the Parks and Recreation
Department hired CMG Landscape Architects to
facilitate community outreach and design a wetland
expansion and an ADA accessible trail at Jessie Street
Marsh. The process is currently at the 30 percent
drawing stage and is advancing towards
environmental review and permitting completion.

Construction is anticipated in 2028.

Status: In Progress
GP Chapter 9: Parks, Recreation, and Open
Space
GP Chapter 10: Natural Resources and
Conservation
GOAL PR1 Ample, accessible, safe, and wellmaintained parks, open space, and active recreational facilities.

PR1.6 Ensure that parks and recreation
facilities are accessible to all.

PR3.1 Enhance the outdoor educational and
recreational experience in appropriate open
space lands and coastline.

PR3.3 Protect, maintain, and enhance
publicly accessible coastal and open space
areas. Cf. CD1.4, LU3.11.

PR4.1 Provide and maintain an accessible
citywide trail system within the city and
connect it to regional trails.

NRC1.1 Protect the city’s river and wetland
areas while increasing and enhancing public
access where appropriate.

NRC1.3 Encourage the restoration and
enhancement of existing riparian corridors,
wetlands, and water resources.

9.156
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 62 ends

NRC2.2 Protect sensitive habitat areas and
important vegetation communities and
wildlife habitat, to include riparian, wetland
(salt marsh and freshwater wetland), coastal
prairie, coastal bird habitat, and habitat that
support special status species, as well as
sensitive and edge habitats (“ecotones”). Cf.

CD4.3.3, CC3.3.6, and NRC2.1, 2.4, and 6.3

9.157
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 63 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
35 ANADROMOUS SALMONID HABITAT

CONSERVATION PLAN AND SANTA

CRUZ WATER RIGHTS PROJECT
Since May of 2001, the City of Santa Cruz (City) has
been working on Federal and State of
California Endangered Species Act (FESA and CESA,
respectively) compliance for its operations and
maintenance as well as several capital projects that
may affect special status anadromous salmonids. This
environmental regulatory compliance work involved
the development of an Anadromous Salmonid Habitat
Conservation Plan (ASHCP) in support of related FESA
and CESA permitting. The ASHCP and associated
permits provide coverage for "take" of coho and
steelhead while conducting otherwise legal activities
involved in municipal operations. The ASHCP project
involved a robust evaluation of coho and steelhead
recovery needs, effects of the City’s water and flood
control operations, and actions necessary to minimize
and fully mitigate the effects of those activities on these species and their habitat. Covered activities in the
ASHCP include operations, maintenance, and
rehabilitation of water supply, water system facilities, and municipal facilities; City lands management; and
monitoring.

The City of Santa Cruz holds two types of water rights:
appropriative and pre-1914. The City’s appropriative
rights cover diversions on the San Lorenzo River and
Newell Creek, whereas the pre-1914 rights are held for
the North Coast sources, including Reggiardo,
Laguna, and Majors creeks, as well as Liddell
Status: In Progress
GP Chapter 7: Civic and Community Facilities
GP Chapter 10: Natural Resources and
Conservation
CC3.3 Safeguard existing surface and
groundwater sources.

NRC2.1 Protect, enhance, or restore habitat
for special-status plant and animal species.

9.158
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 64 ends

Spring. Water rights, whether appropriative or pre1914, primarily govern the legal allocation and use of water resources for beneficial purposes, such as
municipal, agricultural, or industrial use. While water rights dictate who has the legal entitlement to divert
water and under what conditions, they do not consider
the ecological needs of species protected under CESA
or FESA. Water rights may not take into
account the minimum streamflows required to maintai
n fish habitat, water temperature, or migration
corridors critical to the survival of these species. The City made changes to its water rights address these
concerns, as described and detailed in the ASHCP, while simultaneously supporting the City’s efforts on
ensuring regional water supply reliability. These
changes were described in the Santa Cruz Water Rights
Project which was approved in 2021. The San Lorenzo
River appropriative water rights amendments were
approved by the State Water Resources Control Board
(SWRCB) on June 6, 2025. As the City’s pre-1914 North
Coast water rights are not generally subject to the
same SWRCB regulatory authority as the City’s San
Lorenzo rights, the City also dedicated portions of the North Coast rights to instream flow purposes as well.

Status: In September 2025, the City Council by
resolution accepted the amended appropriative water
rights, dedicated portions of its pre-1914 North Coast
water rights for the protection of special status aquatic species, approved the ASHCP, and authorized signature
of the FESA Section 10(a)(1)(b) permit. Finalization of CESA permitting is anticipated in 2026.

9.159
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 65 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
36 GRAHAM HILL WATER TREATMENT

PLANT CONCRETE TANKS

REPLACEMENT PROJECT
The Graham Hill Water Treatment Plant (GHWTP) was
originally commissioned in 1960. Condition
assessments of original concrete tanks and basins
concluded that three key process tanks were at the end
of their service life and in need of replacement. The
project includes the installation of two new 750,000-
gallon process tanks and a new 1,400,000-gallon
treated water tank, several new pump stations, and a
new electrical building. The project will improve the
seismic resiliency of the treatment plant as well as
enhance water quality. The Concrete Tanks Project
started construction in May of 2021. Two of the new
tanks and their pump stations and piping have been in
service since late 2023. The third tank, its hillside inlet pipe structure, a large pump station, and the remaining new potable water pipes are close to being ready for
disinfection, testing and commissioning in 2026.

Status: Construction is underway with expected
completion in 2026.

Status: In Progress
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

9.160
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 66 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
37 NEWELL CREEK PIPELINE REPLACEMENT
PROJECT: FELTON-GRAHAM HILL The Newell Creek Pipeline (NCP) conveys raw water from Loch Lomond Reservoir to the Graham Hill Water
Treatment Plant. The approximately 9.5-milelong pipeline is a critical piece of infrastructure, particularly during the dry season and drought, but
also for major storm events and
emergencies. Circa 1960, the NCP was constructed
through mountainous terrain and is reaching the end
of its useful life as evident by increased frequency of breaks caused by ongoing corrosion and land
movement along its alignment, which is in an active
geologic region of the Santa Cruz Mountains.

The Felton-Graham Hill segment includes replacement
and re-alignment of approximately 3.75 miles of
Newell Creek Pipeline from the Felton Booster Pump
Station continuing south along Graham Hill Road. This
project intends to restore reliability and enhance the
resiliency of this crucial raw water supply transmission system component. Now well under construction,
approximately 80% of the pipeline for the project has
been installed and the railroad crossing is complete.

Status: Construction is underway with expected
completion in 2026.

Status: Construction Underway
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

9.161
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 67 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
38 INTERTIE 1: SANTA CRUZ – SCOTTS
VALLEY The Intertie 1: Santa Cruz - Scotts Valley Project will link the treated water systems of the City of Santa
Cruz and Scotts Valley Water District. This regional
project will enable the two agencies to better
coordinate and maximize the use of surface and
groundwater supplies (i.e. conjunctive use) and allows
for active and passive recharge in the Santa Margarita
Groundwater Basin. In addition to water supply
benefits, the intertie improves fire protection through increased fire-response flows and new hydrants. It
also enables the agencies to share water as available
during water shortages and emergencies. The project
includes the construction of a new 2-mile pipeline and
an accompanying pump station. The pipeline has been
constructed along Firehouse Lane, Sims Road, and La
Madrona Drive between Santa Cruz and Scotts Valley.

The pump station is under construction on La
Madrona Drive. Key construction milestones
completed in 2025 include installation of over 8,000
lineal feet of 12-inch water main, stormwater
improvements and fabrication and testing for all
electrical and mechanical equipment.

Status: Construction is underway with expected
completion in 2026.

Status: Construction Underway
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

CC3.3 Safeguard existing surface and
groundwater sources.

9.162
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 68 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
39 UNIVERSITY TANK NUMBER 4
REPLACEMENT PROJECT University Tank No. 4 (U4) is a 400,000-gallon steel tank built in 1965 that has reach the end of its useful life. The tank primarily serves the University of
California, Santa Cruz as well as some residential
customers in the area. Key project elements include
the replacement of the U4 Tank in-kind, the addition
of a second bolted maintenance tank, improvements
to site access and drainage, and fire resilience
upgrades to the pump station building. Construction
accomplishments to date include the completion
of improvements to the site drainage features which
serve to reduce erosion to the adjacent
receiving ephemeral drainage channel, installation of
concrete foundations, roof replacement and firehardening of the pump station building, installation of check valves, and the installation of a critical tie-in to the existing pipeline for the surge tank.

Status: Construction is underway with expected
completion in 2027.

Status: Construction Underway
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

9.163
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 69 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
40 BELTZ 12 AMMONIA REMOVAL PROJECT The Beltz 12 facility was constructed in 2015 and includes a municipal water well and a water treatment
plant for the removal of iron and manganese. After
Beltz 12 was placed into service, naturally occurring
ammonia and hydrogen sulfide were found in the water
produced from this well. The current treatment process
can remove low concentrations of ammonia;
however, the facility must be turned off when ammonia
levels increase or accumulate. Improvements to the
facility are needed for the removal of ammonia in order to support current production levels from
the well, and maintain water quality and reliability
goals. The Beltz 12 Ammonia Removal Project was split
into two phases to facilitate design, manufacturing,
and construction of improvements. Phase One of
the project consists of installation of a new contact
tank and associated piping. Phase Two replaced the
chlorine generation and injection system, allowing the
facility to treat higher ammonia concentrations and
restore the reliable operation of the treatment plant
throughout the dry season.

Status: Phase 1 construction complete; Phase 2
Construction is underway with expected completion in
early 2026.

Status: Construction Underway
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

CC3.3 Safeguard existing surface and
groundwater sources.

9.164
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 70 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
41 AQUIFER STORAGE AND RECOVERY Efforts related to Aquifer Storage and Recovery (ASR) in 2025 were focused primarily within the Santa Cruz MidCounty Groundwater Basin (MGB) at the City’s existing Beltz well facilities. ASR is a water supply augmentation strategy that involves active recharge of the local
groundwater basin. At the ASR facilities, the City will inject surface water, treated to drinking water
standards, during normal or wet periods into the local
groundwater basin which would act as an underground
storage reservoir. The stored water would then be
withdrawn by the City during dry periods via well
extraction. Major milestones and accomplishments for
ASR in 2025 include: Beltz 9 ASR Pilot Test Summary of
Operations Report and Request for Proposals for a
designer of Beltz 9 Upgrades for ASR, final design for
Beltz 8 Upgrades for ASR and contractor solicitation,
awarded contract and began construction for Beltz 12
Upgrades for
ASR, completed a Business Case Evaluation for the
fourth ASR well and selected Beltz 10 as
the next ASR well, and submitted applications for a Re
gional Water Quality Control Board permit to
operate Beltz wells 8 & 12 as permanent ASR wells.

Status: Construction of permanent ASR facilities at Beltz 12 is underway with expected completion in 2026;
planning and design for additional well conversions is
underway.

Status: Construction Underway
GP Chapter 7: Civic and Community Facilities
CC3.4 Maintain and improve the integrity of
the water system.

CC3.3 Safeguard existing surface and
groundwater sources.

9.165
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 71 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
42 BAY CORRIDOR PROTECTED BIKE
LANES AND PEDESTRIAN PATH The City of Santa Cruz completed installation of protected bike lanes and pedestrian path on Bay
between Escalona and Nobel. The City continued
design for to similar complete streets elements on Bay
between California and High. The California and High
segments are anticipated to go to construction in 2027.

Status: partially complete, design underway for
remaining portions.

Status: Partially Complete
GP Chapter 5: Mobility
M1.1.3 Implement pedestrian and bicycle
improvements that support transit ridership.

M2.1 Provide leadership on sustainable
regional mobility.

M2.1.2 Encourage use of alternative modes
of transportation.

M2.3 Increase the efficiency of the
multimodal transportation system.

M2.3.1 Design for and accommodate
multiple transportation modes.

M2.5 Consider innovative transportation
solutions.

M2.5.1 Promote the use of new technologies
for transportation and other community
services.

M4.2.3 Facilitate bicycling connections to all
travel modes.

M4.4 Assure a high level of bicycle user
amenities.

9.166
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 72 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
43 RAIL TRAIL SEGMENT 7 PHASE 2
The City of Santa Cruz completed construction of Rail
Trail Segment 7 Phase 2, a .8 mile segment that
connects Bay/California to the Wharf roundabout. This
project is part of the 32-mile Coastal Rail Trail
connecting Davenport to Pajaro
Status: Completed
GP Chapter 5: Mobility
M1.1.3 Implement pedestrian and bicycle
improvements that support transit ridership.

M2.1 Provide leadership on sustainable
regional mobility.

M2.1.2 Encourage use of alternative modes
of transportation.

M2.3 Increase the efficiency of the
multimodal transportation system.

M2.3.1 Design for and accommodate
multiple transportation modes.

M2.5 Consider innovative transportation
solutions.

M2.5.1 Promote the use of new technologies
for transportation and other community
services.

M4.2.3 Facilitate bicycling connections to all
travel modes.

M4.4 Assure a high level of bicycle user
amenities.

9.167
CALENDAR YEAR 2025

GENERAL PLAN ANNUAL PROGRESS REPORT
MARCH 24, 2026
Community Development

Page 73 ends

PROJECT NAME DESCRIPTION HOW THIS PROJECT IMPLEMENTS
GENERAL PLAN 2030
44 RAIL TRAIL SEGMENTS 8 AND 9
The City of Santa Cruz is in design of Rail Trail Segments 8 and 9, a 2.1 mile segment that connects the Wharf
roundabout to 17th Avenue in Santa Cruz County. This
project is part of the 32-mile Coastal Rail Trail
connecting Davenport to Pajaro.

Status: In Design
GP Chapter 5: Mobility
M1.1.3 Implement pedestrian and bicycle
improvements that support transit ridership.

M2.1 Provide leadership on sustainable
regional mobility.

M2.1.2 Encourage use of alternative modes of
transportation.

M2.3 Increase the efficiency of the multimodal
transportation system.

M2.3.1 Design for and accommodate multiple
transportation modes.

M2.5 Consider innovative transportation
solutions.

M2.5.1 Promote the use of new technologies
for transportation and other community
services.

M4.2.3 Facilitate bicycling connections to all
travel modes.

M4.4 Assure a high level of bicycle user
amenities.

9.168
City Council

AGENDA REPORT
DATE: 03/03/2026
AGENDA OF: 03/24/2026
DEPARTMENT: City Manager
SUBJECT: Approve the Fifth Amendment to the Joint Powers Agreement Between the City of Santa Cruz and County of Santa Cruz and the Cities of Capitola and Scotts Valley, Relating to Library Services, to Extend the Term (CM) LOCATION: Citywide
RECOMMENDATION: Motion to:
1) Approve the Fifth Amendment to the Joint Powers Agreement between the City of Santa Cruz and the County of Santa Cruz and the Cities of Capitola and Scotts Valley, relating to library services, to extend the term effective January 1, 2026 through June 30, 2032; and 2) Authorize the City Manager or designee to sign the amendment.

BACKGROUND: The Fifth Amendment to the Joint Powers Agreement between the City of Santa Cruz and the County of Santa Cruz and the Cities of Capitola and Scotts Valley, relating to Library Services (Fifth Amendment) extends the term from January 1, 2026, through June 30, 2032, to align with the Santa Cruz County Library Financing Authority. The Library Joint Powers Authority Board of Directors accepted and filed the Fifth Amendment at its December 12, 2025, meeting and forwarded it to member agencies for approval.

DISCUSSION: The attached Fifth Amendment extends the term of the Library Joint Powers Authority (LJPA) to align with the current term of the Library Financing Authority (LFA). The LJPA’s new term will be effective January 1, 2026 through June 30, 2032. No other changes are proposed. The Fifth Amendment and prior Fourth Amendment are attached for reference.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This action is not a project under the CEQA because it will not “cause a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. (Public Resources Code § 21065.) Additionally, consistent with CEQA Guidelines Section 15378(b)(4), this action is not a CEQA project because it involves the creation of government funding mechanisms and does not involve any commitment to a specific project.

HEALTH IN ALL POLICIES (HiAP): Public libraries play an important role in promoting health, equity, lifelong learning, and civic engagement. By approving the Fifth Amendment, the

10.1 City reaffirms its commitment to a strong regional library system that enhances access to information, educational opportunities, digital inclusion, and safe public spaces – all of which align with the City’s HiAP goals.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: None.

Prepared By:

Bonnie Bush
City Clerk
Submitted By:

Michelle Templeton
Assistant City Manager
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. FIFTH AMENDMENT TO THE JOINT POWERS AGREEMENT.PDF

2. FOURTH AMENDMENT TO THE JOINT POWERS AGREEMENT.PDF

10.2 FIFTH AMENDMENT TO THE JOINT POWERS AGREEMENT BETWEEN

THE CITY OF SANTA CRUZ AND THE COUNTY OF SANTA CRUZ

AND THE CITIES OF CAPITOLA AND SCOTTS VALLEY,

RELATING TO LIBRARY SERVICES
This Fifth Amendment to the Joint Powers Agreement is effective as of January 1, 2026 once it has been duly approved and executed by all parties hereto by and among the County of Santa Cruz ("County"), the City of Santa Cruz ("Santa Cruz"), the City of Capitola ("Capitola"), and the City of Scotts Valley ("Scotts Valley"), each duly organized and existing under the laws of the State of California.

Recitals

1. Whereas, the above-referenced parties (collectively, “Parties”) executed a Joint Powers Agreement relating to the provision of library services within the cities of Santa Cruz, Capitola and Scotts Valley and the unincorporated area of Santa Cruz County through the establishment of a Library Services Joint Powers Authority (“LJPA” or “Services Authority”) with an effective date of June 24, 1996 ("the 1996 Agreement"); and

2. Whereas, the Parties entered into amendments to the 1996 Agreement:

First Amendment in or about June 1998, a Second Amendment in or about November 1999, Third Amendment in or about June 2007; and

3. Whereas, the Parties entered into a Fourth Amendment to the 1996 Agreement on or about December 16, 2015 (“Fourth Amendment” or “2015 LJPA Agreement”), which replaced and superseded the terms of the original 1996 Agreement and the prior three amendments thereto. The term of the 2015 LJPA Agreement expires on December 31, 2025; and

4. Whereas, the Parties agree to enter into this Fifth Amendment to the 1996 Agreement to extend the term of the 2015 LJPA Agreement, as specified herein.

AGREEMENT
NOW, THEREFORE, it is agreed between the Parties to incorporate the above Recitals hereto, and that the Parties agree to the following:

1. Section “4.Term” of the 2015 LJPA Agreement is hereby amended to extend the term from January 1, 2026 through June 30, 2032.

2. Except as amended by this Fifth Amendment, all other applicable terms and conditions of the 2015 LJPA Agreement shall remain in full force and effect. The terms of this Fifth Amendment shall control if any conflict exists.

3. Each party acknowledges that it has reviewed this Fifth Amendment and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Fifth Amendment.

4. The unenforceability, invalidity or illegality of any provision(s) of this Fifth Amendment shall not render the other provisions unenforceable, invalid or illegal.

10.3 5. The Parties may execute this Fifth Amendment in two or more counterparts, which shall, in the aggregate, be deemed an original but all of which, together, shall constitute one and the same instrument. A scanned, electronic, facsimile or other copy of a party’s signature shall be accepted and valid as an original.

6. The signatories to this Fifth Amendment warrant and represent that each is authorized to execute this Fifth Amendment and that their respective signatures serve to legally obligate their respective representatives, agents, successors and assigns to comply with the provisions of this Fifth Amendment.
[SIGNATURE PAGES FOLLOW]

10.4 IN WITNESS WHEREOF, the Parties have caused this Fifth Amendment to be effective as of the first date written above and is executed and attested by their proper officers thereunto duly authorized on the day and year stated below.

COUNTY OF SANTA CRUZ
Dated: ______________ By:_______________________________ Nicole D. Coburn
County Executive Officer, Santa Cruz County
ATTESTED:

By: ____________________
Clerk of the Board
Approved as to form:
_______________________________
Office of the Santa Cruz County Counsel

10.5 IN WITNESS WHEREOF, the Parties have caused this Fifth Amendment to be effective as of the first date written above and is executed and attested by their proper officers thereunto duly authorized on the day and year stated below.

CITY OF SANTA CRUZ
Dated: ________________ By:________________________________ Matt Huffaker, City Manager
ATTESTED:

By: ____________________
City Clerk
Approved as to form:
______________________________
Office of the Santa Cruz City Attorney

10.6 IN WITNESS WHEREOF, the Parties have caused this Fifth Amendment to be effective as of the first date written above and is executed and attested by their proper officers thereunto duly authorized on the day and year stated below.

CITY OF CAPITOLA
Dated: _________________ By:______________________________ Jamie Goldstein, City Manager
ATTESTED:

By: ____________________
City Clerk
Approved as to form:
______________________________
Capitola City Attorney

10.7 IN WITNESS WHEREOF, the Parties have caused this Fifth Amendment to be effective as of the first date written above and is executed and attested by their proper officers thereunto duly authorized on the day and year stated below.

CITY OF SCOTTS VALLEY
Dated: ____________________ By:________________________________ Mali LaGoe, City Manager
ATTESTED:

By: ____________________
City Clerk
Approved as to form:
______________________________
Scotts Valley City Attorney

10.8 10.9

10.10 10.11

10.12 10.13

10.14 10.15

10.16 10.17

10.18 10.19

10.20 10.21

10.22 10.23

10.24 10.25
City Council

AGENDA REPORT
DATE: 03/09/2026
AGENDA OF: 03/24/2026
DEPARTMENT: City Manager
SUBJECT: Approval of an Option Agreement for Site Lease to Support Direct Current Fast Charging Infrastructure (CM)
LOCATION: Districts 2, 3, and 5
RECOMMENDATION: Motion to:
1) Authorize the City Manager to execute an Option to Lease Agreement for Site Lease(s) for space at 3 public parking sites (Downtown Library Affordable Housing Parking Garage located at 119 Lincoln Street, the Parking Lot at 1111 Soquel Avenue, and Harvey West Park located at 326 Harvey West Boulevard) for the purpose of installing and operating Direct Current Fast Charging infrastructure; and
2) Adopt a CEQA finding of categorical exemption pursuant to: 14 CCR 15301 (Existing Facilities); 14 CCR 15304 (Minor Alterations to Land); and 14 CCR 15061(b)(3) (Common Sense Exemption).

BACKGROUND: To meet the City’s greenhouse gas emissions targets, the City’s Climate Action Plan 2030 (CAP 2030) calls for installing at least 1,247 new public electric vehicle (EV) charging stations, prioritizing frontline neighborhoods and high usage areas by 2030. The City is currently off pace from achieving its public EV charging measure. California’s National Electric Vehicle Infrastructure (NEVI) Formula Program – Solicitation 3 is a competitive grant solicitation for the deployment of EV charging stations with publicly accessible, high-powered, direct current fast chargers (DCFCs) to support light-duty EV travel along major corridors in California. Applications for this funding are open and due March 25, 2026. EV chargers eligible for funding must be located in sites available to the public 24 hours a day, 7 days a week, but local governments are not eligible to apply to the NEVI solicitation. Thus, the City is working with a development partner, Citizen Energy, who will prepare and apply for the funding, and the City will serve as a host of DCFC infrastructure.

DISCUSSION: Citizen’s Energy will apply to the NEVI grant for the installation of 12 DCFCs in high use areas. Award of this funding will advance progress on achievement of the City’s CAP 2030 EV charging measure. Specifically, should funds be awarded, Citizen’s Energy will install, own and maintain 4 DCFCs at each location: the Downtown Library Affordable Housing Parking Garage, the Parking Lot at 1111 Soquel Avenue, and Harvey West Park. These sites

11.1 were selected based on their ability to be competitive for award based on the solicitation’s criteria including project readiness, distance from Highway 1 exit and public availability 24 hours a day, 7 days a week, among others. Citizen’s Energy will meet and provide all grant match requirements including rebates committed from Central Coast Community Energy.

To demonstrate project readiness, it is necessary for the City to enter into an Option Agreement for Site Lease(s) (Attachment) of spaces in the 3 locations with Citizen’s Energy to include in the grant application. The parking locations to be leased would be at 119 Lincoln downtown library affordable housing project parking garage APN 005-141-22, 1111 Soquel parking lot 32 APN 010-042-19, and 326 Harvey West Blvd. parking lot APN 001-241-01. Should the grant be successful, staff will return with a final lease to be approved by Council to facilitate installation of the 12 DCFC EV charging stations.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The proposed Council action is categorically exempt from CEQA under the following:
 Class 1 Categorical Exemption (14 CCR 15301 for Existing Facilities) and Class 4 Categorical Exemption (14 CCR 15304 for Minor Alterations to Land) - The proposed Council action consists of approving an Option Agreement, where a developer would make minor alterations to public property to install DCFCs, involving negligible or no expansion of existing use of the public facilities. Project ground disturbance would occur within previously disturbed areas and is limited in scope.  Common Sense Exemption (14 CCR 15061(b)(3)) – The proposed Council action is not subject to CEQA because it can be seen with certainty that the project will have no significant effect on the environment.

HEALTH IN ALL POLICIES (HiAP): This project directly supports the sustainability pillar of Health in All Policies and implements the CAP 2030 Measure T4.1 which calls for installing at least 1,247 new public EV charging stations prioritizing frontline neighborhoods and high usage areas by 2030. While the project’s EV charging stations are not in frontline neighborhoods, they are in high usage areas. The City could not site EV charging stations included in this project in frontline neighborhoods because the City does not own lots in these neighborhoods and these neighborhoods did not meet the criteria for selection (e.g., distance from Highway 1 exit, number of other public EV chargers nearby and project readiness).

However, the City has partnered with Ecology Action to deliver outreach to frontline community members on how to cost effective purchase and charge EVs, supporting the equity pillar of HiAP. The use of EVs reduces the release of tailpipe emissions from internal combustion engines which lessens the potential for respiratory illness such as asthma, supporting the public health pillar of HiAP.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The option agreement will have no impact on the General Fund; a future final agreement could have positive benefit on the General Fund.

11.2 Prepared By:

Tiffany Wise-West, P.E.

Sustainability and Resiliency
Officer
Submitted By:

Michelle Templeton
Assistant City Manager
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. OPTION AGREEMENT FOR SITE LICENSE CITIZEN ENERGY SC FINAL LIBRARY.PDF

2. OPTION AGREEMENT FOR SITE LICENSE CITIZEN ENERGY SC FINAL SOQUEL.PDF

3. OPTION AGREEMENT FOR SITE LICENSE CITIZEN ENERGY SC FINAL GENERAL HARVEY WEST.PDF

11.3 OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE THIS OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE (this “Option Agreement”) is made and entered into as of ________________________________________ (the “Effective Date”) by and between ____________________________________________ (the “Developer” and _________________________________________________________ (the “Owner”).

WHEREAS, Owner owns certain real property located at
___________________________________________________________ (the “Property”); and WHEREAS, Developer is applying for grant funding through the California Energy Commission (CEC) Solicitation GFO-25-602 (the “NEVI Grant”) to install, own, and operate DCFC electric vehicle (EV) charging infrastructure; and
WHEREAS, Developer requires site control to satisfy the “Project Readiness” requirements of the NEVI Grant; and
WHEREAS, Owner desires to support the expansion of public EV charging and is willing to grant Developer an option to license a portion of the Property for such purposes under the terms set forth herein.

NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, the parties agree as follows.

1. Grant of Option. Owner hereby grants to Developer the exclusive and irrevocable right and option (the “Option”) to license a portion of the Property, as generally depicted in the Preliminary Site Plan attached hereto as Exhibit A (the “Premises”), for the purpose of constructing, installing, operating, and maintaining a NEVI-compliant EV charging station.

2. Option Period. The term of this Option (the “Option Period”) shall commence on the Effective Date and shall expire twenty four (24) months thereafter.

3. Exercise of Option. Developer may exercise the Option at any time during the Option Period, by written notice of exercise to Owner (the “Notice of Exercise”). Owner and Developer shall execute a “Site License Agreement” within thirty (30) days of Developer delivering a Notice of Exercise. The exercise of this Option is expressly contingent upon Developer receiving a "Notice of Proposed Award" (NOPA) from the California Energy Commission under NEVI Grant GFO-25-602 and the Due Diligence provisions set forth in Section 4. The Site License Agreement shall have a term of no less than ten (10) years.

4. Right of Entry and Due Diligence. During the Option Period, Developer and its agents, contractors, and consultants shall have the right to enter the Property at reasonable times and upon Owner’s prior written consent to perform "Due Diligence Activities," including but not limited to design, surveying, engineering, utility feasibility, and environmental assessments. Developer shall comply with all onsite health and safety requirements from City during such entry. Upon reasonable advance notice to Owner, Developer shall have access during normal business hours to any and all historic documents, drawings, plans, correspondence, and memoranda in the possession or control of Owner which relate to the Property and which may be needed for regulatory planning, permitting, utility, or general

11.4 design purposes. During the Option Period, Owner and its agents, contractors, and consultants shall confirm that the license proposed by Developer is consistent with all existing utility capacities and easement locations.

5. Representations, Warranties and Covenants. Owner represents and warrants to Developer that it owns the Property. Owner further represents and warrants to Developer that Owner and person signing this Option Agreement on behalf of Owner has the full and unrestricted power and authority to execute and deliver this Option Agreement and grant the interests herein granted. Owner also represents that, upon and/or in connection with the exercise of the Option by Developer, Owner will obtain any necessary consents and/or subordination agreements from any lienholders and any and all tenants having a possessory interest in the Property at the time the Option is exercised. Additionally, Owner represents and warrants to Developer that as of the date hereof: (i) no third party has any option or right to purchase, lease, license, or otherwise occupy or use all or any part of the Property to perform EV charging services; (ii) Owner has not received any written notice of any pending eminent domain proceedings or other governmental actions or any judicial actions of any kind against Owner’s interest in the Property; and (iii) Owner has not received written notice that it is in violation of any governmental law or regulation applicable to its interest in the Property or its operation thereon, including, without limitation, any environmental laws and has no reason to believe that there are grounds for any claim of any such violation.

6. Indemnification. Developer agrees to indemnify and hold harmless Owner, its officers, agents and employees from all liability, loss, claim, damage, cost and expense arising from or relating to the negligent acts or omissions or willful misconduct of Developer, its contractors or representatives, except to the extent such property damage, personal injury or death results from the gross negligence or willful misconduct of Owner, its contractors, employees or representatives. The foregoing indemnity provision shall survive the exercise of the Option or the termination of this Option Agreement for a period of twelve (12) months and shall thereafter terminate and expire.

7. Termination. Either party may terminate this Option Agreement if the Developer fails to receive a "Notice of Proposed Award" (NOPA) from the California Energy Commission under the NEVI Grant. This Option Agreement is also contingent upon both parties’ satisfaction of their due diligence investigations, as further specified in Section 4. If, in either party’s sole and absolute discretion, the results of such investigations are inconsistent with a Site License Agreement, either party may terminate this Agreement by providing written notice to the other prior to the expiration of the Option Period.

8. Effect of Option Agreement; Interest in Real Property. The parties intend that the Option Agreement create a valid and present interest in the Property in favor of Developer. Therefore, this Option Agreement shall be deemed an interest in and encumbrance upon the Property and shall be binding upon the Property and Owner and its successors and assigns and shall inure to the benefit of Developer and its successors and assigns. Owner covenants and agrees that during the Option Period, Owner shall not convey the Property or any interest therein or permit any lien or encumbrance to attach to the Property unless the transferee or lien holder, as the case may be, shall agree, in writing, to be bound by this Option Agreement. Owner shall also protect and defend Developer’s interest in the Property and its rights and benefits under this Option Agreement.

11.5 9. Property Improvements. During the Option Period, Owner shall notify Developer of any proposed improvements on the Property and shall work with Developer to minimize the impact of such improvements to the proposed EV charging infrastructure and services.

Developer acknowledges and agrees that the Property is currently undergoing a comprehensive redevelopment project. Developer understands that the Property is an active construction site.

Developer acknowledges and agrees that any timelines, schedules, or estimated completion dates provided by Owner are projections only, and timing of the redevelopment is subject to change. Owner further reserves the absolute right to modify the scope, design, or layout of the redevelopment at any time. Developer has not relied upon any specific completion date or specific feature of the redevelopment project in its decision to enter into this Agreement. The Parties agree that it is their mutual intent to install and operate DCFC EV charging infrastructure and related services into the redevelopment plans.

10. Assignment. Developer shall at all times have the right to sell, assign, encumber, or transfer all or any part of its rights and interests under this Option Agreement without Owner’s consent; provided, however, that the term of any such transfer shall not extend beyond the Option Period and that any and all such transfers shall be expressly made subject to all of the terms, covenants and conditions of this Option Agreement. Developer shall provide Owner prior notice of any proposed assignment and notice after any assignment is made.

11. No Waiver. No waiver of any right under this Option Agreement shall be effective for any purpose unless it is in writing and is signed by the party hereto possessing the right, nor shall any such waiver be construed to be a waiver of any subsequent right, term or provision of this Option Agreement.

12. Confidentiality. Owner shall maintain in the strictest confidence, for the sole benefit of Developer, Developer’s site design and product design, methods of operation and methods of construction and power production or availability of the Developer’s project, and, without written permission from Developer, unless otherwise required by law, Owner shall not share such confidential information to any person or in any form.

13. Relationship of Parties. The duties, obligations and liabilities of each of the parties are not joint or collective. This Option Agreement shall not be interpreted or construed to create an association, joint venture, fiduciary relationship or partnership between Owner and Developer or to impose any partnership obligation or liability or any trust or agency obligation or relationship upon either party. Owner and Developer shall not have any right, power, or authority to enter into any agreement or undertaking for, or act on behalf of, or to act or be an agent or representative of, or to otherwise bind, the other party.

14. No Representation. Developer makes no representation or warranty as to the likelihood that it will exercise the Option or as to the suitability of the Property for development of EV charging infrastructure and services project.

15. Partial Invalidity. Should any term or provision of this Option Agreement, or the application thereof to any person or circumstance, to any extent, be invalid or unenforceable, the remainder of this Option Agreement or the application of such term or provision to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be effected thereby, and each remaining term and provision of this Option Agreement shall be valid and enforceable to the fullest extent permitted by law.

11.6 16. Attorneys’ Fees. The prevailing party in any action or proceeding for the enforcement, protection, or establishment of any right or remedy under this Option Agreement or for the interpretation of this Option Agreement shall be entitled to recover its reasonable attorneys’ fees and costs in connection with such action or proceeding from the non-prevailing party.

17. Governing Law. The terms and provisions of this Option Agreement shall be interpreted in accordance with the laws of the State of California applicable to contracts made and to be performed within such State and without reference to the choice of law principles of such State or any other state.

18. Entire Agreement. This Option Agreement, together with its attached exhibits, contains the entire agreement between the parties hereto with respect to the subject matter hereof and any prior agreements, discussions or understandings, written or oral, are superseded by this Option Agreement and shall be of no force or effect. No addition or modification of any term or provision of this Option Agreement shall be effective unless set forth in writing and signed by each of the parties.

IN WITNESS WHEREOF the parties have through their duly authorized representatives set their respective hands and executed this Agreement as of the date first set forth above.

CITY OF SANTA CRUZ CITIZEN ENERGY, LLC
Signature Signature
Name Name
Title Title

APPROVED AS TO FORM
_______________________________
Office of the City Attorney

11.7 EXHIBIT A

PRELIMINARY SITE PLAN
Parking Garage, Level 1

11.8 OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE THIS OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE (this “Option Agreement”) is made and entered into as of ________________________________________ (the “Effective Date”) by and between ____________________________________________ (the “Developer” and _________________________________________________________ (the “Owner”).

WHEREAS, Owner owns certain real property located at
___________________________________________________________ (the “Property”); and WHEREAS, Developer is applying for grant funding through the California Energy Commission (CEC) Solicitation GFO-25-602 (the “NEVI Grant”) to install, own, and operate DCFC electric vehicle (EV) charging infrastructure; and
WHEREAS, Developer requires site control to satisfy the “Project Readiness” requirements of the NEVI Grant; and
WHEREAS, Owner desires to support the expansion of public EV charging and is willing to grant Developer an option to license a portion of the Property for such purposes under the terms set forth herein.

NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, the parties agree as follows.

1. Grant of Option. Owner hereby grants to Developer the exclusive and irrevocable right and option (the “Option”) to license a portion of the Property, as generally depicted in the Preliminary Site Plan attached hereto as Exhibit A (the “Premises”), for the purpose of constructing, installing, operating, and maintaining a NEVI-compliant EV charging station.

2. Option Period. The term of this Option (the “Option Period”) shall commence on the Effective Date and shall expire twenty four (24) months thereafter.

3. Exercise of Option. Developer may exercise the Option at any time during the Option Period, by written notice of exercise to Owner (the “Notice of Exercise”). Owner and Developer shall execute a “Site License Agreement” within thirty (30) days of Developer delivering a Notice of Exercise. The exercise of this Option is expressly contingent upon Developer receiving a "Notice of Proposed Award" (NOPA) from the California Energy Commission under NEVI Grant GFO-25-602 and the Due Diligence provisions set forth in Section 4. The Site License Agreement shall have a term of no less than ten (10) years.

4. Right of Entry and Due Diligence. During the Option Period, Developer and its agents, contractors, and consultants shall have the right to enter the Property at reasonable times and upon Owner’s prior written consent to perform "Due Diligence Activities," including but not limited to design, surveying, engineering, utility feasibility, and environmental assessments. Developer shall comply with all onsite health and safety requirements from City during such entry. Upon reasonable advance notice to Owner, Developer shall have access during normal business hours to any and all historic documents, drawings, plans, correspondence, and memoranda in the possession or control of Owner which relate to the Property and which may be needed for regulatory planning, permitting, utility, or general

11.9 design purposes. During the Option Period, Owner and its agents, contractors, and consultants shall confirm that the license proposed by Developer is consistent with all existing utility capacities and easement locations.

5. Representations, Warranties and Covenants. Owner represents and warrants to Developer that it owns the Property. Owner further represents and warrants to Developer that Owner and person signing this Option Agreement on behalf of Owner has the full and unrestricted power and authority to execute and deliver this Option Agreement and grant the interests herein granted. Owner also represents that, upon and/or in connection with the exercise of the Option by Developer, Owner will obtain any necessary consents and/or subordination agreements from any lienholders and any and all tenants having a possessory interest in the Property at the time the Option is exercised. Additionally, Owner represents and warrants to Developer that as of the date hereof: (i) no third party has any option or right to purchase, lease, license, or otherwise occupy or use all or any part of the Property to perform EV charging services; (ii) Owner has not received any written notice of any pending eminent domain proceedings or other governmental actions or any judicial actions of any kind against Owner’s interest in the Property; and (iii) Owner has not received written notice that it is in violation of any governmental law or regulation applicable to its interest in the Property or its operation thereon, including, without limitation, any environmental laws and has no reason to believe that there are grounds for any claim of any such violation.

6. Indemnification. Developer agrees to indemnify and hold harmless Owner, its officers, agents and employees from all liability, loss, claim, damage, cost and expense arising from or relating to the negligent acts or omissions or willful misconduct of Developer, its contractors or representatives, except to the extent such property damage, personal injury or death results from the gross negligence or willful misconduct of Owner, its contractors, employees or representatives. The foregoing indemnity provision shall survive the exercise of the Option or the termination of this Option Agreement for a period of twelve (12) months and shall thereafter terminate and expire.

7. Termination. Either party may terminate this Option Agreement if the Developer fails to receive a "Notice of Proposed Award" (NOPA) from the California Energy Commission under the NEVI Grant. This Option Agreement is also contingent upon both parties’ satisfaction of their due diligence investigations, as further specified in Section 4. If, in either party’s sole and absolute discretion, the results of such investigations are inconsistent with a Site License Agreement, either party may terminate this Agreement by providing written notice to the other prior to the expiration of the Option Period.

8. Effect of Option Agreement; Interest in Real Property. The parties intend that the Option Agreement create a valid and present interest in the Property in favor of Developer. Therefore, this Option Agreement shall be deemed an interest in and encumbrance upon the Property and shall be binding upon the Property and Owner and its successors and assigns and shall inure to the benefit of Developer and its successors and assigns. Owner covenants and agrees that during the Option Period, Owner shall not convey the Property or any interest therein or permit any lien or encumbrance to attach to the Property unless the transferee or lien holder, as the case may be, shall agree, in writing, to be bound by this Option Agreement. Owner shall also protect and defend Developer’s interest in the Property and its rights and benefits under this Option Agreement.

11.10 9. Property Improvements. During the Option Period, Owner shall notify Developer of any proposed improvements on the Property and shall work with Developer to minimize the impact of such improvements to the proposed EV charging infrastructure and services.

10. Assignment. Developer shall at all times have the right to sell, assign, encumber, or transfer all or any part of its rights and interests under this Option Agreement without Owner’s consent; provided, however, that the term of any such transfer shall not extend beyond the Option Period and that any and all such transfers shall be expressly made subject to all of the terms, covenants and conditions of this Option Agreement. Developer shall provide Owner prior notice of any proposed assignment and notice after any assignment is made.

11. No Waiver. No waiver of any right under this Option Agreement shall be effective for any purpose unless it is in writing and is signed by the party hereto possessing the right, nor shall any such waiver be construed to be a waiver of any subsequent right, term or provision of this Option Agreement.

12. Confidentiality. Owner shall maintain in the strictest confidence, for the sole benefit of Developer, Developer’s site design and product design, methods of operation and methods of construction and power production or availability of the Developer’s project, and, without written permission from Developer, unless otherwise required by law, Owner shall not share such confidential information to any person or in any form.

13. Relationship of Parties. The duties, obligations and liabilities of each of the parties are not joint or collective. This Option Agreement shall not be interpreted or construed to create an association, joint venture, fiduciary relationship or partnership between Owner and Developer or to impose any partnership obligation or liability or any trust or agency obligation or relationship upon either party. Owner and Developer shall not have any right, power, or authority to enter into any agreement or undertaking for, or act on behalf of, or to act or be an agent or representative of, or to otherwise bind, the other party.

14. No Representation. Developer makes no representation or warranty as to the likelihood that it will exercise the Option or as to the suitability of the Property for development of EV charging infrastructure and services project.

15. Partial Invalidity. Should any term or provision of this Option Agreement, or the application thereof to any person or circumstance, to any extent, be invalid or unenforceable, the remainder of this Option Agreement or the application of such term or provision to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be effected thereby, and each remaining term and provision of this Option Agreement shall be valid and enforceable to the fullest extent permitted by law.

16. Attorneys’ Fees. The prevailing party in any action or proceeding for the enforcement, protection, or establishment of any right or remedy under this Option Agreement or for the interpretation of this Option Agreement shall be entitled to recover its reasonable attorneys’ fees and costs in connection with such action or proceeding from the non-prevailing party.

17. Governing Law. The terms and provisions of this Option Agreement shall be interpreted in accordance with the laws of the State of California applicable to contracts made and to be performed within such State and without reference to the choice of law principles of such

11.11 State or any other state.

18. Entire Agreement. This Option Agreement, together with its attached exhibits, contains the entire agreement between the parties hereto with respect to the subject matter hereof and any prior agreements, discussions or understandings, written or oral, are superseded by this Option Agreement and shall be of no force or effect. No addition or modification of any term or provision of this Option Agreement shall be effective unless set forth in writing and signed by each of the parties.

IN WITNESS WHEREOF the parties have through their duly authorized representatives set their respective hands and executed this Agreement as of the date first set forth above.

CITY OF SANTA CRUZ CITIZEN ENERGY, LLC
Signature Signature
Name Name
Title Title

APPROVED AS TO FORM
_______________________________
Office of the City Attorney

11.12 EXHIBIT A

PRELIMINARY SITE PLAN

11.13 OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE THIS OPTION AGREEMENT FOR EV CHARGING SERVICES SITE LICENSE (this “Option Agreement”) is made and entered into as of ________________________________________ (the “Effective Date”) by and between ____________________________________________ (the “Developer” and _________________________________________________________ (the “Owner”).

WHEREAS, Owner owns certain real property located at
___________________________________________________________ (the “Property”); and WHEREAS, Developer is applying for grant funding through the California Energy Commission (CEC) Solicitation GFO-25-602 (the “NEVI Grant”) to install, own, and operate DCFC electric vehicle (EV) charging infrastructure; and
WHEREAS, Developer requires site control to satisfy the “Project Readiness” requirements of the NEVI Grant; and
WHEREAS, Owner desires to support the expansion of public EV charging and is willing to grant Developer an option to license a portion of the Property for such purposes under the terms set forth herein.

NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, the parties agree as follows.

1. Grant of Option. Owner hereby grants to Developer the exclusive and irrevocable right and option (the “Option”) to license a portion of the Property, as generally depicted in the Preliminary Site Plan attached hereto as Exhibit A (the “Premises”), for the purpose of constructing, installing, operating, and maintaining a NEVI-compliant EV charging station.

2. Option Period. The term of this Option (the “Option Period”) shall commence on the Effective Date and shall expire twenty four (24) months thereafter.

3. Exercise of Option. Developer may exercise the Option at any time during the Option Period, by written notice of exercise to Owner (the “Notice of Exercise”). Owner and Developer shall execute a “Site License Agreement” within thirty (30) days of Developer delivering a Notice of Exercise. The exercise of this Option is expressly contingent upon Developer receiving a "Notice of Proposed Award" (NOPA) from the California Energy Commission under NEVI Grant GFO-25-602 and the Due Diligence provisions set forth in Section 4. The Site License Agreement shall have a term of no less than ten (10) years.

4. Right of Entry and Due Diligence. During the Option Period, Developer and its agents, contractors, and consultants shall have the right to enter the Property at reasonable times and upon Owner’s prior written consent to perform "Due Diligence Activities," including but not limited to design, surveying, engineering, utility feasibility, and environmental assessments. Developer shall comply with all onsite health and safety requirements from City during such entry. Upon reasonable advance notice to Owner, Developer shall have access during normal business hours to any and all historic documents, drawings, plans, correspondence, and memoranda in the possession or control of Owner which relate to the Property and which may be needed for regulatory planning, permitting, utility, or general

11.14 design purposes. During the Option Period, Owner and its agents, contractors, and consultants shall confirm that the license proposed by Developer is consistent with all existing utility capacities and easement locations.

5. Representations, Warranties and Covenants. Owner represents and warrants to Developer that it owns the Property. Owner further represents and warrants to Developer that Owner and person signing this Option Agreement on behalf of Owner has the full and unrestricted power and authority to execute and deliver this Option Agreement and grant the interests herein granted. Owner also represents that, upon and/or in connection with the exercise of the Option by Developer, Owner will obtain any necessary consents and/or subordination agreements from any lienholders and any and all tenants having a possessory interest in the Property at the time the Option is exercised. Additionally, Owner represents and warrants to Developer that as of the date hereof: (i) no third party has any option or right to purchase, lease, license, or otherwise occupy or use all or any part of the Property to perform EV charging services; (ii) Owner has not received any written notice of any pending eminent domain proceedings or other governmental actions or any judicial actions of any kind against Owner’s interest in the Property; and (iii) Owner has not received written notice that it is in violation of any governmental law or regulation applicable to its interest in the Property or its operation thereon, including, without limitation, any environmental laws and has no reason to believe that there are grounds for any claim of any such violation.

6. Indemnification. Developer agrees to indemnify and hold harmless Owner, its officers, agents and employees from all liability, loss, claim, damage, cost and expense arising from or relating to the negligent acts or omissions or willful misconduct of Developer, its contractors or representatives, except to the extent such property damage, personal injury or death results from the gross negligence or willful misconduct of Owner, its contractors, employees or representatives. The foregoing indemnity provision shall survive the exercise of the Option or the termination of this Option Agreement for a period of twelve (12) months and shall thereafter terminate and expire.

7. Termination. Either party may terminate this Option Agreement if the Developer fails to receive a "Notice of Proposed Award" (NOPA) from the California Energy Commission under the NEVI Grant. This Option Agreement is also contingent upon both parties’ satisfaction of their due diligence investigations, as further specified in Section 4. If, in either party’s sole and absolute discretion, the results of such investigations are inconsistent with a Site License Agreement, either party may terminate this Agreement by providing written notice to the other prior to the expiration of the Option Period.

8. Effect of Option Agreement; Interest in Real Property. The parties intend that the Option Agreement create a valid and present interest in the Property in favor of Developer. Therefore, this Option Agreement shall be deemed an interest in and encumbrance upon the Property and shall be binding upon the Property and Owner and its successors and assigns and shall inure to the benefit of Developer and its successors and assigns. Owner covenants and agrees that during the Option Period, Owner shall not convey the Property or any interest therein or permit any lien or encumbrance to attach to the Property unless the transferee or lien holder, as the case may be, shall agree, in writing, to be bound by this Option Agreement. Owner shall also protect and defend Developer’s interest in the Property and its rights and benefits under this Option Agreement.

11.15 9. Property Improvements. During the Option Period, Owner shall notify Developer of any proposed improvements on the Property and shall work with Developer to minimize the impact of such improvements to the proposed EV charging infrastructure and services.

10. Assignment. Developer shall at all times have the right to sell, assign, encumber, or transfer all or any part of its rights and interests under this Option Agreement without Owner’s consent; provided, however, that the term of any such transfer shall not extend beyond the Option Period and that any and all such transfers shall be expressly made subject to all of the terms, covenants and conditions of this Option Agreement. Developer shall provide Owner prior notice of any proposed assignment and notice after any assignment is made.

11. No Waiver. No waiver of any right under this Option Agreement shall be effective for any purpose unless it is in writing and is signed by the party hereto possessing the right, nor shall any such waiver be construed to be a waiver of any subsequent right, term or provision of this Option Agreement.

12. Confidentiality. Owner shall maintain in the strictest confidence, for the sole benefit of Developer, Developer’s site design and product design, methods of operation and methods of construction and power production or availability of the Developer’s project, and, without written permission from Developer, unless otherwise required by law, Owner shall not share such confidential information to any person or in any form.

13. Relationship of Parties. The duties, obligations and liabilities of each of the parties are not joint or collective. This Option Agreement shall not be interpreted or construed to create an association, joint venture, fiduciary relationship or partnership between Owner and Developer or to impose any partnership obligation or liability or any trust or agency obligation or relationship upon either party. Owner and Developer shall not have any right, power, or authority to enter into any agreement or undertaking for, or act on behalf of, or to act or be an agent or representative of, or to otherwise bind, the other party.

14. No Representation. Developer makes no representation or warranty as to the likelihood that it will exercise the Option or as to the suitability of the Property for development of EV charging infrastructure and services project.

15. Partial Invalidity. Should any term or provision of this Option Agreement, or the application thereof to any person or circumstance, to any extent, be invalid or unenforceable, the remainder of this Option Agreement or the application of such term or provision to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be effected thereby, and each remaining term and provision of this Option Agreement shall be valid and enforceable to the fullest extent permitted by law.

16. Attorneys’ Fees. The prevailing party in any action or proceeding for the enforcement, protection, or establishment of any right or remedy under this Option Agreement or for the interpretation of this Option Agreement shall be entitled to recover its reasonable attorneys’ fees and costs in connection with such action or proceeding from the non-prevailing party.

17. Governing Law. The terms and provisions of this Option Agreement shall be interpreted in accordance with the laws of the State of California applicable to contracts made and to be performed within such State and without reference to the choice of law principles of such

11.16 State or any other state.

18. Entire Agreement. This Option Agreement, together with its attached exhibits, contains the entire agreement between the parties hereto with respect to the subject matter hereof and any prior agreements, discussions or understandings, written or oral, are superseded by this Option Agreement and shall be of no force or effect. No addition or modification of any term or provision of this Option Agreement shall be effective unless set forth in writing and signed by each of the parties.

IN WITNESS WHEREOF the parties have through their duly authorized representatives set their respective hands and executed this Agreement as of the date first set forth above.

CITY OF SANTA CRUZ CITIZEN ENERGY, LLC
Signature Signature
Name Name
Title Title

APPROVED AS TO FORM
_______________________________
Office of the City Attorney

11.17 EXHIBIT A

PRELIMINARY SITE PLAN

11.18 City Council

AGENDA REPORT
DATE: 03/04/2026
AGENDA OF: 03/24/2026
DEPARTMENT: Finance
SUBJECT: Liability Claims Filed Against the City of Santa Cruz (FN) RECOMMENDATION: Motion to reject the liability claims of 1) Wayne Jose Shaffer, 2) Adam M. Brightwell, 3) Deborah Kathleen Currier, and 4) James Patrick Shay, based on staff recommendation.

BACKGROUND: N/A
DISCUSSION: I. Claims to be rejected:

1. Claimant: Wayne Jose Shaffer
Date of occurrence: 10/30/2025
Date of claim: 1/28/2026
Amount of claim: $5,125.00
Claimant seeks reimbursement for costs to repair driveway allegedly damaged by tree roots.

Self-Represented

2. Claimant: Adam M. Brightwell
Date of occurrence: 8/14/2025
Date of claim: 2/13/2026
Amount of claim: Unspecified
Claimant seeks damages and reimbursement for injuries allegedly sustained in a fall on the SCCRTC railway trestle after a wooden board broke beneath him.

Represented by Legal Counsel

12.1 3. Claimant: Deborah Kathleen Currier
Date of occurrence: 1/19/2026
Date of claim: 2/11/2026
Amount of claim: Unspecified
Claimant seeks damages and reimbursement for injuries allegedly sustained in a trip-and-fall incident on a wheelchair ramp at the Municipal Wharf.

Represented by Legal Counsel

4. Claimant: James Patrick Shay
Date of occurrence: 8/19/2025
Date of claim: 2/18/2026
Amount of claim: Unspecified
Claimant seeks damages and reimbursement for injuries sustained while riding a Santa Cruz Metro bus.

Represented by Legal Counsel
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: N/A HEALTH IN ALL POLICIES (HiAP): N/A
FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: No fiscal impact.

Prepared By:

Ross Brandon
Risk & Safety Manager
Submitted By:

Elizabeth Cabell
Finance Director
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

None.

12.2 City Council

AGENDA REPORT
DATE: 03/05/2026
AGENDA OF: 03/24/2026
DEPARTMENT: Human Resources
SUBJECT: Resolution Amending the City of Santa Cruz Classification and Compensation Plan and Personnel Complement to Establish the Classification of Water Treatment Supervisor (Lead) (HR) LOCATION: Citywide
RECOMMENDATION: Motion to adopt a resolution amending the City of Santa Cruz Classification and Compensation Plan and Personnel Complement to establish the classification of Water Treatment Supervisor (Lead) in the Water Department.

Implementation of and funding for the classification action approved by the City Council will not occur until the required meet and confer process has been completed in accordance with the City’s obligations under the Meyers-Milias-Brown Act.

BACKGROUND: On occasion, operational needs within City departments evolve due to increases in service demands, regulatory requirements, or major capital improvement projects. In these cases, the creation of new classifications may be appropriate to ensure that adequate supervision and operational oversight are maintained.

The Water Department is currently undertaking a significant period of operational growth and capital investment, including implementation of the City’s ten-year Capital Improvement Program (CIP) including major upgrades to the Graham Hill Water Treatment Plant. These projects will significantly increase the complexity of treatment plant operations and the need for consistent frontline supervision during construction, commissioning, and ongoing plant operations.

DISCUSSION: The Water Department operates several critical water treatment facilities that ensure safe and reliable drinking water for the community. As the City advances the ten-year Capital Improvement Program, including the modernization and upgrade of the Graham Hill Water Treatment Plant, operational demands on the treatment division will increase.

The upcoming treatment plant upgrades will require expanded coordination between operators, maintenance staff, engineers, contractors, and regulatory agencies. These efforts will occur while maintaining uninterrupted treatment operations and regulatory compliance.

13.1 To ensure sufficient frontline daily supervision across multiple shifts and complex operational activities, the Water Department has identified a need for a dedicated lead-level supervisory role that provides day-to-day operational leadership within the treatment plant environment.

The proposed Water Treatment Supervisor (Lead) classification is intended to provide this additional operational oversight. This role is expected to:
 Provide frontline supervision and coordination of Water Treatment Operators and related staff.
 Assist with daily operational decision-making, scheduling, and work prioritization.  Support plant operations during the Graham Hill Treatment Plant upgrade and other CIP projects.
 Serve as a technical lead to ensure regulatory compliance and operational continuity during construction and commissioning phases.
 Coordinate communication between operations staff, engineering teams, and contractors working on treatment facilities.

Unlike situations where a classification study is necessary due to substantial changes in duties of an existing position, the creation of the Water Treatment Supervisor (Lead) classification is driven by increased operational complexity and supervisory needs associated with major infrastructure investment and system upgrades. Establishing this classification will strengthen operational oversight and ensure continued reliability of the City’s water treatment systems during this critical period of capital improvement.

The proposed classification will be incorporated into the City’s Classification and Compensation Plan and used by the Water Department to provide additional supervisory coverage and operational leadership within treatment operations.

The final job description for the Water Treatment Supervisor (Lead) classification will be developed internally by the Human Resources Department in coordination with the Water Department to ensure alignment with operational needs and the City’s classification standards.

Any aspects of the job description that fall within the scope of representation will be addressed through the meet and confer process with the appropriate employee organizations in accordance with the City’s obligations under the Meyers-Milias-Brown Act (MMBA). Implementation of the classification will not occur until all applicable meet and confer requirements have been satisfied.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: Not applicable.

HEALTH IN ALL POLICIES (HiAP): Establishing the Water Treatment Supervisor (Lead) classification supports the City’s Health in All Policies approach by strengthening operational oversight of critical drinking water infrastructure. Reliable treatment operations and regulatory compliance protect public health by ensuring the continued delivery of safe and high-quality drinking water to the community. This action also supports workforce sustainability by providing appropriate supervision during a period of significant infrastructure upgrades and operational demands.

13.2 FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: Yes FISCAL IMPACT DESCRIPTION: The fiscal impact associated with the creation of the Water Treatment Supervisor (Lead) classification will be funded through the Water Enterprise Fund. The estimated annual cost associated with the classification is outlined below:

Department Additional Annual Cost
(Enterprise Funds)
Total Annual
Water Treatment Supervisor (Lead) $146,412 (Salary) $221,082 $74,670 (Benefits)
Prepared and Submitted By:

Sara De Leon
HR Director
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. RESOLUTION.DOCX

13.3 RESOLUTION NO. NS-30,XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ AMENDING

THE PERSONNEL COMPLEMENT AND CLASSIFICATION AND COMPENSATION

PLAN FOR THE WATER DEPARTMENT
WHEREAS, staff has recommended certain modifications to the Personnel Complement and Classification and Compensation Plan to support operational needs within the Water Department; and
WHEREAS, the Water Department is implementing significant infrastructure improvements as part of the City’s ten-year Capital Improvement Program, including upgrades to the Graham Hill Water Treatment Plant; and
WHEREAS, these projects require significant involvement of existing supervisory and management staff to provide operational and maintenance subject matter expertise during planning, construction, and commissioning activities; and WHEREAS, additional frontline operational supervision is necessary to maintain effective treatment plant operations during this period of increased infrastructure investment; and WHEREAS, establishing the classification of Water Treatment Supervisor (Lead) will provide additional operational oversight and support safe and reliable drinking water treatment operations; and
WHEREAS, the City recognizes its obligations under the Meyers-Milias-Brown Act, Government Code Sections 3500-3511, and any applicable meet and confer obligations with affected employee organizations will be satisfied prior to implementation of this action.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz as follows:

Activity Classification No.
and Title
Compensation
WATER

DEPARTMENT
New Classification
and Position Add
TBD – Water
Treatment Supervisor
(Lead)
$8,210/mo-
$12,201/mo

13.4 RESOLUTION NO. NS-30,XXX
2 PASSED AND ADOPTED this 24th day of March, 2026 by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator

13.5 City Council

AGENDA REPORT
DATE: 03/03/2026
AGENDA OF: 03/24/2026
DEPARTMENT: Police/Public Works
SUBJECT: Authorize the Purchase of Two (2) Replacement Police Traffic Motorcycles and Two (2) Mounted Radios Using Traffic Offender 212 Funds – Budget Adjustment (PD/PW)
LOCATION: Citywide
RECOMMENDATION: Motion to adopt a resolution amending the FY 2026 budget to transfer funds from the Traffic Offender 212 Fund, in the amount of $95,718, to the General Fund and to increase revenues and expenditures in the General Fund by $95,718 to purchase two (2) replacement police traffic motorcycles and two (2) replacement mounted radios.

BACKGROUND: The Santa Cruz Police Department (SCPD) requires specialized patrol motorcycles to respond to calls for service, traffic accidents, and to conduct traffic enforcement.

The SCPD’s motorcycle fleet is customized with safety equipment, lighting, advanced communication systems and technology, and additional features to support officers in daily patrol operations.

City Administrative Procedure Order (APO) section I, #52 – Use of City Vehicles – outlines the minimum criteria for fleet replacement. When the threshold criteria are met, a vehicle can be considered a possible candidate for replacement after review by Fleet Maintenance. For police patrol vehicles, the minimum threshold criteria are five (5) years and/or 85,000 miles.

SCPD currently operates ten (10) traffic motorcycles for patrol use, which range between nine (9) and nineteen (19 ) years old.

DISCUSSION: Two (2) police traffic Harley Davidson motorcycles have been identified by the Fleet Services Supervisor for replacement in FY 2026 (Vehicles #309-2007, #314-2008) and were selected based on age and overall condition. Both motorcycles and radios are over 18 years old. The current mounted radios are not compatible with the anticipated countywide P25 Phase 2 radio system upgrade. The replacement motorcycles will provide enhanced reliability, improved maneuverability and braking, and advanced safety features.

Upon receiving the replacement motorcycles, the two (2) current motorcycles and radios will be retired from the City fleet and auctioned per City APO I-52. All auction revenue will be returned to the City’s General Fund.

14.1 The purchase of two (2) replacement police traffic motorcycles and accompanying mounted radios will be funded in full by the Traffic Offender 212 Fund.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The proposed replacement of police traffic motorcycles and accompanying mounted radios for the SCPD is not a “Project” under CEQA. (See Public Resources Code § 21065; 14 CCR 15379(b) – “’Project’ does not include . . . Continuing administrative or maintenance activities, such as purchases for supplies[.]”.)
HEALTH IN ALL POLICIES (HiAP): The purchase of police traffic motorcycles and mounted radios for the SCPD using the Traffic Offender 212 Fund supports the City’s HiAP pillar of public health by funding the maintenance of essential police vehicles, thereby sustaining an adequate level of service for existing and new residents, city employees, and visitors.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: Yes

2. This recommendation requires a budget adjustment: Yes

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The two (2) replacement police traffic motorcycles and mounted radios will be purchased out of the General Fund, with $95,718 in funding transferred from the Traffic Offender 212 Fund and General Fund revenues and expenditures increasing by the same amount. The net fiscal impact on the General Fund is zero (0) dollars.

Prepared By:

Catherine Brothers
Principal Management
Analyst
Submitted By:

Bernie Escalante
Chief of Police
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. BUDGET ADJUSTMENT.PDF

2. BMW MOTORCYCLE QUOTE.PDF

3. KENWOOD MOTORCYCLE RADIO QUOTE.PDF

14.2 City of Santa Cruz

BUDGET ADJUSTMENT REQUEST
$GPLQLVWUDWLYH$SSURYDO
)LVFDO<HDU

ACCOUNT 352-(&71$0(
LIDSSOLFDEOH
255(9(18($&&28177,7/(
ACCOUNT 352-(&71$0(
LIDSSOLFDEOH
25EXPENDITURE ACCOUNT TITLE
NET: $

REQUESTED BY DEPARTMENT HEAD

APPROVAL

BUDGET/ACCOUNTING
5(9,(:('

FINANCE DIRECTOR

APPROVAL

CITYMANAGER

APPROVAL
5HVR

352-(&7
352-(&7
$02817
$02817
&RXQFLO$SSURYDO

TOTAL EXPENDITURE

TOTALREVENUE
'DWH

1VSQPTF
3FWJTFE/PWFNCFS
 Clear Form
2026
02/23/2026
Transfer $94692 from Fund 212 Traffic Offender Fund to the Police Department's General Fund for the purchase of two (2) replacement BMW motorcycles and accompanying mounted radios.
101-00-00-0000-49189 p202602-971-0-0 Traffic Offender Fund 95,718 95,718
212-00-00-0000-59101 To General Fund 95,718
101-20-22-2106-57402 p202602-100-2020-351 Vehicles (motorcycles + radios) 95,718 191,436
-95,718
Catherine
Brothers
Digitally signed by
Catherine Brothers
Date: 2026.02.24
13:24:16 -08'00'
Bernie
Escalante
Digitally signed by
Bernie Escalante
Date: 2026.02.24
13:47:20 -08'00'
Digitally signed
by Emily Burton
Date: 2026.03.06
'11:52:23 -08'00
Elizabet
h Cabell
Digitally signed by
Elizabeth Cabell
Date: 2026.03.06
15:33:19 -08'00' 14.3
BMW R1300 RT-P Motor Pricing Form (2026 Model Year)
Color Option Code
1 Night Black & Alpine White III 753
0 Night Black 716
0 Alpine White III (special order) 751
0 Black Blue (special order +60 days) $119.60 999 (see below) 0 Saphir Blue (special order + 60 days) $119.60 999 (see below) 0 Violet Blue (special order +60 days) 756 Revised: December 8, 2025 0 Glacier Silver Metallic (special order) N99
Quotation: Motorcycle
Santa Cruz Police Department Option Code Retail Price $24,394.74 Factory Special-Order Options - Plan 90-120 Days for Delivery 0 Headlight Pro (includes 134) 219 $560.23 $0.00
0 Gear Shift Assist Pro 222 $304.55 $0.00
0 GPS Prep 272 $179.55 $0.00
0 Chrome Exhaust (Includes 340) 19F $229.55 $0.00
0 Dark Chrome Exhaust (Includes 34A) 19J $179.55 $0.00
0 Additional LED Headlights (driving lights) 562 $470.45 $470.45 0 High Seat Black 77E $0.00 $0.00
0 Low Seat Black 77D $0.00 $0.00
0 Dynamic Package 235 $2,114.77 $2,114.77
0 Dynamic Package with Auto Shift 22A 235 $3,055.68 $0.00 0 Rider Assistant Safety Package 5AS $825.00 $0.00
0 Black Blue 999 $119.60 $0.00
0 Sapphire Blue 999 $119.60 $0.00
The Features Below Denote Standard Order Deck $0.00
1 US Authority Package $339.77 $339.77
1 BMW Electronic Siren $1,220.45 $1,220.45
1 Weather Protection, Tire Pressure Monitors, Heated Seat, Cruise Control $0.00 $0.00 $730.00
$430.00
$1,100.00
$0.00
$0.00
$80.00
$37.00
$3.50
$0.00
-$400.00
$0.00
Units Quotation valid for 60 days Total Price - Page 1 $30,520.68 1 from date noted below. Total Price - Page 2 $0.00
Total Price - Page 3 $342.42
Date of Quote: Parts From Other Suppliers - Page 4 $6,320.90 $0.00
$1,095.00
$38,279.00

0.00% $4,114.67
$42,393.67
Dealer Basic Assembly / Preparation
Total Retail Price per Unit with Options
Note: Prices subject to change without notice. Final price is always determined by the selling authorized BMW Motorcycle dealer.

State Sales Tax (if applicable)
Additional Labor Operations Provided by Dealer
Local Discount
Radio Installation by Metro Mobile Communications
Doc Fee
CVR Fee
Tire Fee
Motorcycle Freight
Agency Supplied Axon by Metro Mobile Communications
PVP Wireless Motorkit
Total Retail Price per Unit with Options

14.4 BMW RT-P Motor Pricing Form - Page 2
See Special Notation Comment
Quotation for:

Santa Cruz Police Department
Per Dealer Installed Options / Retrofits BMW P/N Order # Retail $0.15 Total Retail 0 Shift Assistant Pro (hardware) 23 00 1 543 107 0 $95.73 $0.00 0 Screw Torx drive (order two) 07 12 9 904 977 0 $2.46 $0.00 0 Enabling Code 77 15 8 395 839 0 $45.00 $0.00
0 LED Additional Headlight (order 2) 63 17 9 898 785 0 $183.65 $0.00 0 Fillister Head Screw (order 2) 07 12 9 907 398 0 $3.36 $0.00 0 Fillister Head Screw (order 2) 07 12 9 907 377 0 $9.36 $0.00 0 Hex Nut With Plate (order 2) 07 11 9 905 544 0 $1.11 $0.00 0 Extra Ignition Key - Keyless Fob Transmitter 66 12 5 A94 F18 0 $454.69 $0.00 0 Heated Seat - Low TBD 52 53 5 A79 7B8 0 $690.98 $0.00 0 Heated Seat - High TBD 52 53 5 A79 7B9 0 $690.98 $0.00 0 Tire Pressure Gauge 82 12 0 140 377 0 $32.12 $0.00
0 BMW Battery Charger 61 43 2 408 594 0 $134.24 $0.00
0 Motorcycle Charging Plug 61 43 2 411 680 0 $22.64 $0.00 Qty Item Description
Per Additional Accessories BMW P/N Order # Retail Total Retail Engine Protection
0 Rocker Cover Protection Left Side (order 1) 77 14 5 A6E 645 0 $81.53 $0.00 0 Rocker Cover Protection Right Side (order 1) 77 14 5 A6E 646 0 $81.53 $0.00 0 Body Screw W/O collar (order 4) 46 63 8 568 780 0 $5.80 $0.00 0 Body Screw W/collar (order 4) 46 63 8 550 994 0 $6.59 $0.00 0 Gromet (order 4) 11 84 5 B38 938 0 $4.06 $0.00
0 Bush (order 1) 11 84 8 544 832 0 $7.06 $0.00
0 Large Skid Plate (order 1) 11 84 7 914 425 0 $342.42 $0.00 0 Fillister Head Screws (order 2) 07 12 9 907 402 0 $3.08 $0.00 0 Engine Guard Holder (order 1) 11 84 8 829 202 0 $27.18 $0.00 0 Skid Plate Holder Front (order 1) 11 84 5 A64 A34 0 $40.68 $0.00 0 Skid Plate Holder Rear (order 1) 11 84 5 A64 A35 0 $40.68 $0.00 0 Fillister Head Screw (order 4) 07 12 9 907 383 0 $3.60 $0.00 0 Spacer Bush (order 2) 11 84 5 A6A 026 0 $4.80 $0.00
0 Clip Nut (order 4) 07 14 7 693 887 0 $3.61 $0.00
0 Grommet (order 4) 13 53 1 341 283 0 $4.15 $0.00
0 Bush (order 4) 11 84 8 544 832 0 $7.06 $0.00
Adjustable Footrest System
0 Rider Foot Peg Left Adapter 46 71 5 A73 D11 0 $75.20 $0.00 0 Rider Foot Peg Right Adapter 47 71 5 A73 D12 0 $75.20 $0.00 0 Footbrake Lever, adjustable 77 23 5 A73 F61 0 $219.20 $0.00 0 Gearshift Lever, adjustable 77 25 5 A73 C87 0 $219.20 $0.00 0 Pin (order 2) 46 717 675 691 0 $18.21 $0.00
0 Circlip (order 2) 07 11 9 909 941 0 $2.76 $0.00
Final price is always determined by the selling authorized BMW Motorcycle dealer.

Note: Prices subject to change without notice. Always verify accuracy of part pricing before submitting quotations.

Final price is always determined by the selling authorized BMW Motorcycle dealer.

Note: Prices subject to change without notice. Always verify accuracy of part pricing before submitting quotations.

Additional Accessories - Page 3

14.5 Qty Description PN Price Each Total Price
1 FMS Standard Emergency Lighting Package 4,995.00$ $ 4,995.00 1 FMS Parts List 1,915.90$ $ 1,915.90
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Additional Accessories From Other Suppliers - Page 4

14.6 1. VM8000
VHF, UHF, 7/800 MHz, Mobile
1 Radio Type VM8000BF VM8000 $3,290.00
Frequency 832VM8000-V VHF $715.00
Frequency 832VM8000-U UHF (380 - 520 MHz) $715.00
Frequency 832VM8000-78 7/800 MHz $715.00
Configuration Mobile
Control Head KCH-19VM KCH-19 Single Remote $241.00
Remote Cable 1 KCT-71M2 17 ft $94.10
Remote Cable 2 N/A
Microphone KMC-65M KMC-65M Standard Mic $69.90
Basic Accessories 835VM8000PK001 VM8000 Packing Kit
Basic Accessories KRK-15BM KRK-15BM Remote-Kit $66.90
Basic Accessories KRK-14HV KCH-19 Rear Panel $212.00
Basic Accessories KCT-23M3 Standard Deck DC Cable $72.30 Basic Accessories KMB-33M Standard Deck Mounting Bracket $18.90 Basic Accessories 5018800102 GPS/Bluetooth/WiFi Antenna - thru-hole mount $220.00 Other Accessories 5975390200 USB-C Programming Cable $39.00 Other Accessories KCT-18 Hi Power/VM8000 Ignition Sense Cable $26.40 Other Accessories 835VM8000ADCL VM8000 Ethernet Adaptor Kit $98.35 Other Accessories Connect external speaker to radio
Other Accessories KES-5A KES-5 high power speaker $94.90 Protocol Analog FM
Protocol P25 CAI AMBE+2
System Analog Conventional
System 8322000002 P25 Conventional $415.00
System 8322000005 P25 Phase 1 Trunking $145.00
System 8322000006 P25 Phase 2 TDMA $475.00
Channels 8326000006 1024 Ch
Encryption 8323000004 Multi Key AES $560.00
Prog and Data Conventional Voting Scan
Prog and Data TrueVoice™ Noise Cancellation
Quote 5146443
CA, City of Santa Cruz, PD Subscribers
Prepared for on 2/19/2026.

Valid 90 days subject to acceptance by EFJohnson.

Billing Shipping
Ship Via Best Way
Instructions Ship Partial
Contact
Prepared By
Joshua Goodsell
[email protected]
240-708-5607
Comments

14.7 Prog and Data 8326000039 WiFi
Prog and Data 8326000025 Bluetooth
Prog and Data 8326000033 Bluetooth Low Energy
Prog and Data 8325000002 P25 Data Conventional (Included) Prog and Data 8325000001 P25 Data Trunking (Conventional incl) $235.00 Prog and Data 8324000002 P25 OTAR $890.00
Prog and Data 8325000003 GPS $120.00
Prog and Data 8326000015 25KHz Disabled
Prog and Data 8326000002 MDC1200 / GE-Star Signaling $60.00 Prog and Data 8324000003 OTAP (Over-the-Air Programming) $235.00 Prog and Data 8324000004 OTIP (Programming over WiFi) $235.00 Prog and Data 8326000027 P25 Two-Tone Paging Encode Decode $120.00 Prog and Data 8326000028 Instant Recording Replay $120.00 Prog and Data 8326000029 Voice Recording (included)
Prog and Data VL-8001 Factory Activation of Radio Option Licenses Other 3 Year Warranty
Other END-OF-CONFIG-FLAG *** End of Radio Configuration *** Subtotal: $10,298.75
Category Discount: ($4,119.50)
Flat Discount: ($715.00)
YOUR PRICE FOR 1: $5,464.25
PRICE PER UNIT: $5,464.25

14.8 City Council

AGENDA REPORT
DATE: 03/04/2026
AGENDA OF: 03/24/2026
DEPARTMENT: Parks and Recreation
SUBJECT: Lease Agreement and Construction Coordination Agreement with the Santa Cruz Museum of Natural History (PR)
LOCATION: District 2
RECOMMENDATION: Motion to approve and authorize the City Manager to execute, in a form approved by the City Attorney, the 1) Construction Coordination Agreement, and 2) Amended and Restated Lease Agreement between the City and the Santa Cruz Museum of Natural History.

BACKGROUND: The City of Santa Cruz owns and leases the building located at 1305 E. Cliff Drive to the Santa Cruz Museum of Natural History (Museum). The front portion of the building (e.g. closest to E. Cliff Dr.) is the historic Carnegie library. Two additions were added on the north side of the historic portion of the building in the 1960s to make up what is the current facility. Historically, the building was managed by the City as the first museum in Santa Cruz, dating back to 1904 with the founding collection of Santa Cruz lighthouse keeper and naturalist, Laura Hecox.

Today, the Museum is an independent 501(c)(3) non-profit organization with a mission oriented toward “Connecting people with nature and science to inspire stewardship of the natural world.” The Museum features educational, hands-on exhibits for children, families and adults who are curious about the world they live in and the natural history of one of the most scenic locations on the California coast. Many locals know the Museum by the life-size gray whale statue, created in 1982, that rests near its entrance, between Tyrrell Park and Seabright State Beach.

The Museum’s existing lease for the building expires December 15, 2030. In early 2024, the Museum leadership approached the City to discuss its future and its needs related to the building.

The current building is aging, needs improvements to address substandard storage and archives space, exhibits area, and office space, and lacks a dedicated education space. The Museum engaged the City and proposed initiating a public process to engage neighbors and key stakeholders to develop concepts for improvements.

The long-term goal for both the City and the Museum is to improve accessibility, protect the collections and archives, and invest in the historic building. While the City owns the building,

15.1 the Museum has taken the leadership role to fundraise and financially support a process to engage the community and ultimately design and implement the building improvements.

In May 2024, the City Council approved a Planning and Coordination Agreement between Parks and Recreation and the Museum to initiate a public process to engage with the community, and begin preliminary design and implementation of the building improvement project (the “Project”) (Exhibit 1 to Construction Coordination Agreement.pdf). An information report was provided to City Council in October 2024 with updates on the process (Museum of Natural History-Information Report.pdf). Since that time, the Museum facilitated outreach and engagement opportunities with the Seabright Neighborhood and community. It is fundraising to complete the project and recently selected a design-build entity to further design and construct the Project. It has also worked closely with City staff to prepare a Construction Coordination Agreement, AIA Construction Contract with the Museum’s proposed design-builder, and an Amended and Restated Lease Agreement to extend the term and update the terms and conditions of the original lease with the Museum for the building.

The City of Santa Cruz Planning Commission approved the Coastal Permit, Design Permit, and Special Use Permit for the Project on October 16, 2025.

DISCUSSION:

CONSTRUCTION COORDINATION AGREEMENT
In accordance with the language and direction established by the Planning and Coordination Agreement, the City and Museum have worked together in consultation with the City Attorney’s Office to draft the Construction Coordination Agreement (Museum of Natural History-DRAFT Construction Coordination Agreement.pdf). The Museum will be responsible for funding and overseeing complete design and construction activities, including improvements to the building, grading, paving, foundations, framing, and interior and exterior buildout for the primary building phase of the Project, with potential to oversee some improvements to Tyrell Park. Improvements to the building include, but are not limited to: structural improvements to the building, additions to the building’s footprint, upgraded HVAC and environmental control systems, improvements to accessibility to the leased area, including access pathways and parking areas adjacent to the building, compliance with the Americans with Disabilities Act, and interior improvements to exhibit halls, office, and collection spaces.

The Museum has completed preparation of conceptual, preliminary plans for the Project, incorporated within the Construction Coordination Agreement as Exhibit 3. The Museum intends to hire a Bogard Construction who will work with a subcontractor to complete the 100% design documents and specifications, construction documents and specifications and then construct all improvements contemplated to complete construction of the Project.

The City and Museum now seek approval from the City Council to enter into the Construction Coordination Agreement to set forth their respective obligations related specifically to the final design and construction of the Project.

The exhibits to the Construction Coordination Agreement include:
 The parties’ prior 2024 Planning and Coordination Agreement,  A description of the Leased Area for Project construction,

15.2  Project preliminary plans
 The draft AIA design-build construction contract,
 Contractor insurance and bond requirements,
 Contractor bonds, including Labor and Material Bond and Faithful Performance Bond

AMENDED AND RESTATED LEASE AGREEMENT
Concurrently with the City Council’s consideration of the Construction Coordination Agreement, the City and the Museum seek to enter into an Amended and Restated Lease Agreement (the “Lease,” attached).

The proposed Lease will replace and supersede the original lease agreement for the building, lease to the Museum the renovated building and the immediately surrounding entrance patio / terrace, and grant the Museum a license to use the surrounding Tyrrell Park.

The following are several relevant and highlighted terms included in the proposed Lease:
 30-year term plus two 10-year options to extend (50 years total)  The Lease will commence the date of the City’s issuance of the certificate of occupancy following construction. The original lease will be in effect through construction and up until the commencement date of this Lease.
 Lease rent payment of $1/year
 The Museum will contribute $10,000 per year to a City-held Capital Improvement Fund for future repairs and improvements to the building for the duration of the Lease. o The annual contribution minimum will increase by 10% every five years o At year 30 and year 40, the City may adjust the annual contribution amount, however such adjustment may not exceed 15% of the existing contribution amount at the time of the adjustment.
 The City will be responsible for the cost of utilities for the first five (5) years of the Lease. At years 6-10 of the Lease, the Museum will pay 25% of utility costs. At years 11- 15 of the Lease, the Museum will pay 50% of utility costs. At years 16-20 of the Lease, the Museum will pay 75% of the utility costs. Beginning year 20 and for the remainder of the Lease, the Museum will pay 100% of utility costs. The City’s payment responsibility for utilities, however, will be capped at $25,000/year and Museum will be responsible for paying any amount that exceeds $25,000.
 The City will be responsible for maintenance of the structural components of the building, the water meter and electrical service to the building, sanitary sewer, the roof, and fire sprinkler system. The Museum will be responsible for maintaining the HVAC system, interior walls, floor coverings, ceiling, fixtures, appliances, and electrical systems.
 The Museum will be responsible for procuring and maintaining various insurance coverages for the duration of the Lease to protect the Museum and City and insure against claims for injuries and/or damages to property. The Museum will be responsible for the costs of the insurance coverage and policies.

The staff recommendation is for the City Council to consider approving the Construction Coordination Agreement and Amended and Restated Lease Agreement.

15.3 CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This project has already been approved and CEQA exemptions were applied. The Planning Commission at its October 16, 2025 meeting acknowledged that the Project qualifies for two Categorial Exemptions (Section 15301, Class 1, Existing Facilities and Section 15331, Class 31, Historical Resource Rehabilitation).

HEALTH IN ALL POLICIES (HiAP): The Santa Cruz Museum of Natural History is a partner of the City of Santa Cruz and the Parks and Recreation Department and is aligned with both the mission of Parks and Recreation and the City’s Health in All Policies with respect to health/wellness, sustainability, and equity. The Museum embodies these elements through its mission, programs, and strategic plans. The proposed improvements of the Museum’s building would allow for sustainability, accessibility, and the long-term viability of a key community partner housed in a City park.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: Yes

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: Yes FISCAL IMPACT DESCRIPTION: Approval of the Construction Coordination Agreement and Amended and Restated Lease Agreement creates a long-term fiscal commitment for the General Fund through a phased utility cost-sharing model and ongoing structural maintenance.

While the Museum assumes 100% of the Project’s design and construction costs, the City will cover 100% of utilities for the first five years (capped at $25,000 annually), with the Museum’s share increasing by 25% every five years until year twenty. To offset future liabilities, the Museum will contribute an initial $10,000 annually to a City-held Capital Improvement Fund, which will increase by 10% every five years to support long-term building repairs.

Prepared and Submitted By:

Tony Elliot
Parks and Recreation Director
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. INFORMATION REPORT DATED 10.9.24.PDF

2. DRAFT CONSTRUCTION COORDINATION AGREEMENT.PDF

3. AMENDED AND RESTATED LEASE AGREEMENT.PDF

15.4 15.5

15.6 CONSTRUCTION COORDINATION AGREEMENT

BY AND BETWEEN

THE CITY OF SANTA CRUZ

AND THE

SANTA CRUZ MUSEUM OF NATURAL HISTORY
This Construction Coordination Agreement (“Construction Coordination Agreement”), dated xxxx, 2026 is entered into by and between the City of Santa Cruz, a municipal corporation (“City”), and the Santa Cruz Museum of Natural History, a California non-profit public benefit corporation (“Museum”). City and Museum may also be referred to individually as a “Party” and collectively as the “Parties”.

RECITALS
WHEREAS, on May 29, 2024, the City and Museum entered into the Planning and Coordination Agreement (“2024 Agreement”), attached and incorporated herein as Exhibit 1 for the purpose of the Parties working collaboratively to develop a project description and conceptual designs for certain building improvements at the historic former Carnegie Library building and immediately surrounding entrance patio or terrace (the “Building”) and surrounding property, including Tyrrell Park, at 1305 East Cliff Drive (collectively, the “Property”); WHEREAS, the City owns the Property, including Building, and leases the Building and surrounding environs (the “Leased Area”) as further identified in Exhibit 2, to the Museum pursuant to the Museum Association Lease Agreement, dated November 18, 2010 (the “Lease”); WHEREAS, the Museum intends to fully fund and construct upgrades and improvements to the Building that include, but are not limited to: structural improvements to the Building, additions to the Building’s footprint, upgraded HVAC and environmental control systems, improvements to accessibility to the Leased Area, including but not limited to access pathways and parking areas adjacent to the Building, including compliance with the Americans With Disabilities Act, and interior improvements to exhibit halls, office, and collection spaces (the “Project”); WHEREAS, the Museum has completed preparation of conceptual, preliminary plans for the Project (“Plans”), attached hereto as Exhibit 3, and incorporated herein; WHEREAS, the Museum intends to hire a design/build firm (“Contractor”) to complete the 100% Design Documents and Specifications (“Design Documents”), 100% Construction Documents and Specifications (“Construction Documents”), as well as to construct all improvements contemplated to complete construction of the Project (the “Work”); WHEREAS, on or about October 22, 2024, the City Council reviewed the preliminary drawings for the Project, including for Museum to upgrade and improve the Property; WHEREAS, concurrently with the execution of this Construction Coordination Agreement, and on or after January 13, 2026, the City and the Museum are entering into an Amended and Restated Lease Agreement (the “Amended Lease”) governing the Leased Area; and

15.7 WHEREAS, the Parties now desire to enter into this Construction Coordination Agreement to set forth their respective obligations relating specifically to the final design and construction of the Project, as stated herein.

AGREEMENT
NOW, THEREFORE, in consideration of the above recitals, the Parties hereto agree, as follows:

1. Purpose of this Construction Coordination Agreement. The Parties enter into this Construction Coordination Agreement to describe the Parties’ respective responsibilities related to the final design and construction of the Project by Museum.

2. Term. This Construction Coordination Agreement commences on the Effective Date and terminates upon the completion and acceptance of the work related to the Project.

This Construction Coordination Agreement may also be terminated upon a 30-day written notice by either Party to the other if adequate funding cannot be procured for the Project, or if either Party has made a determination that the Project is infeasible or undesirable.

This Construction Coordination Agreement may be extended or terminated by mutual written agreement of the Parties.

3. Funding. The Museum shall be solely responsible for funding the Project components, including but not limited to procurement, design, permit, construction, and operational costs. This does not preclude the City, or any other entity, from providing funding, fee waivers, grants or participating in grants to support the Project.

4. Party Representatives. The Parties agree that the representative for the City shall be the Director of the Parks & Recreation Department, or their designee (the “City Representative”) and the representative for the Museum shall be the Museum's Executive Director, or their designee (the “Museum Representative”).

5. Implementation of Project.
a. Proposals. Museum shall hire a design/build Contractor to complete the Project, wherein the Contractor will be hired to complete all Design and Construction Documents as well as to construct all improvements for the Project. Museum will provide City with the selected contractor's proposal for City's review. The City and Museum shall meet within five (5) business days and confer in good faith to discuss any concerns with the proposed Contractor or submitted proposal.
b. Construction Contract. Museum agrees to enter into a mutually approved AIA DesignBuild construction contract with the Contractor, subject to insertion of certain City-required terms (“Construction Contract”). The form and substance of such Construction Contract shall be substantially similar to the draft agreement attached hereto as Exhibit 4. The Museum agrees to obtain the City’s approval as to form before the Museum executes the Construction Contract with the Contractor. In the event Museum fails to require its Contractor to

15.8 comply with the terms of the Construction Contract, or fails to obtain City’s approval as to form, then Museum shall be solely responsible for any coverage, liability, or responsibility shortfalls between the Construction Contract and the Museum and Contractor’s agreement.
c. Scope of Work and Work Schedule. Museum agrees to fully design, construct, and install, in a good and workmanlike manner and through its qualified and properly licensed contractors, subcontractors, consultants, and agents, the Project’s scope of work consistent with the approved Plans, attached hereto as Exhibit 3. Museum shall commence the Work upon signing the Construction Contract with the Contractor. The Parties agree to meet and confer in good faith throughout the Project, including developing a detailed timeline after selection of Contractor, as further defined below. All time limits stated herein are of the essence.
d. Design Documents. Museum shall provide City Representative with a copy of Contractor’s Design Documents upon receipt from Contractor. The City and Museum shall meet within five (5) business days and confer in good faith to discuss any concerns with the proposed Design Documents. The City’s approval, by and through City Representative, shall not be unreasonably withheld.
e. Construction Documents. Museum shall follow City's Building Permit process and meet all pertinent code requirements. Construction Documents will be subject to City’s Building Department review and approval by City Building Department Officials and other responsible departments. f. No Lien. Museum agrees to furnish any and all required supervision, labor, equipment, material, and services, and will bear any and all other expense necessary or incidental to the performance of the Work under this Construction Coordination Agreement. Museum shall not permit or suffer any mechanic’s or materialman’s lien of any kind or nature to be enforced against City property for any work done or materials furnished thereon related to this Construction Coordination Agreement.
g. Change Orders. The Museum will be the lead agency for reviewing and approving change orders for the Work. The City will also be a signatory on Substantive Change Orders and will have access to change order logs of NonSubstantive Change Orders, as defined below. i. A “Substantive Change Order” resulting in the fundamental change to the design and scope of the Work, shall be subject to the advance written approval of both the Museum and the City, by and through the City Representative. A substantive change includes, but is not limited to, a change that materially alters the original Work, including adding, deleting, or significantly altering a major component of the Work, the

15.9 material quality of materials/services used for completion of the Work, affects the structural integrity, exterior appearance, or mechanical systems of the Building, violates any applicable building code or requirement within the Construction Contract, decreases the value of the Building, or materially increases City’s cost to operate or maintain the Building and Property. The Museum shall timely notify the City Representative of any Substantive Change Order. The City Representative shall respond to the Museum within forty-eight (48) hours of Museum’s notification, and the City’s approval of a Substantive Change Order shall not be unreasonably withheld. If the Museum specifies that an expedited response is needed to keep up with the course of construction and avoid delays and/or cost overruns, the City will use its best efforts to respond within twenty-four (24) hours.

In the event of an emergency Substantive Change Order, the Museum shall notify the City as soon as reasonably practicable for the City’s subsequent written approval. An emergency Substantive Change Order includes, but is not limited to a change required to prevent imminent danger, differing site conditions causing an imminent threat to the Work, significant property danger, or system failures.
ii. A “Non-Substantive Change Order” is subject to approval by Museum, with notification to the City Representative as soon as reasonably practicable. The City is not a signatory to a Non-Substantive Change Order, but shall have the right to access and review all Non-Substantive Change Orders. A Non-Substantive Change Order includes, but is not limited to, a change in the Building’s interior finishes that are aesthetic in nature, manufacturer or material supplier substitutions, subcontractor substitutions, minor corrections to clerical errors in the plans or design drawings, and minor scheduling revisions.
iii. The Construction Contract must state that no change orders will be approved without the Museum’s prior written consent, and for any requiring City approval, without the City’s prior written consent. iv. The Museum shall ensure the City has timely access to the Contractor's change order log and related documentation, and the City may, at its option, choose to attend Museum-Contractor meetings where change orders are reviewed and discussed.
h. Preservation of Public Property/Monuments/Repairs and Replacements. During the course of the Work, and as specified in the Construction Contract, Museum and its Contractor shall exercise due care and install suitable safeguards to protect and avoid damage to infrastructure and other features of City property and the public right-of-way which are unrelated to the Work. Museum shall replace, or have replaced, or repair, or have repaired any damage to the

15.10 infrastructure and other features of City property and the public right-of-way.

Any such repair or replacement shall be to the satisfaction, and subject to the reasonable approval, of the City.
i. Environmental Covenants.
i. Within the Leased Area, Museum shall not engage in any activity on, under, or about the City property or public right-of-way that violates any Federal, State, or local laws, rules or regulations pertaining to hazardous, toxic, or infectious substances or materials (“Hazardous Substances” or “Hazardous Materials”), and shall promptly, at Museum’s expense, take reasonable investigatory and/or remedial action to stabilize the site and prevent additional releases of any Hazardous Substances created, released, or exacerbated by Museum or its Contractor. Once the site has been stabilized, Museum and City will promptly meet and confer regarding any additional investigation and/or remediation. Museum is not responsible for remediation of Hazardous Substances that were not created, released, or exacerbated by Museum.

For the purposes of this Construction Coordination Agreement, the term “Hazardous Substances” or “Hazardous Materials” shall mean any substance or material which is capable of posing a risk of injury to health, safety or property, including all those materials and substances designated as hazardous or toxic by any Federal, State, or local laws, rules, ordinances, regulation, or policy, including but not limited to, all of those substances and materials defined as “Toxic Materials” in Sections 66680 through 66685 of Title 22 of the California Code of Regulations, Division 4, Chapter 30, as the same shall be amended from time to time, or any other materials requiring remediation under Federal, State, or Local laws, rules, ordinances, regulations, or policies. ii. Except as caused by the negligence or willful misconduct of City or its respective officials, officers, employees, and agents, and within the Leased Area, Museum shall defend, indemnify, and hold harmless the City and its respective officials, officers, employees, and agents from any and all costs, claims, expenses, penalties, and attorneys’ fees and costs arising out of a breach by Museum, its Contractor, employees or agents of the covenant included above, including but not limited to, the investigation, remediation, and abatement of any contamination therein involved where the contamination was caused, released, or exacerbated by the acts or omissions of Museum, Contractor, or their respective employees, agents, and invitees.
j. Permits; Compliance with Laws. Museum shall at its sole cost and expense obtain and conform to all necessary permits and approvals related to the Project, including zoning entitlements, building permits, encroachment permits, and

15.11 licenses for the construction of the Work, give all necessary notices, pay all applicable fees and taxes (unless otherwise waived by City Council or their designee), and comply with all applicable laws, rules, and regulations, environmental or otherwise, in the demolition, construction, and development of the Project. Museum also agrees that the Work shall comply with the Americans with Disabilities Act (ADA) and other applicable accessibility laws, and shall provide certification of compliance thereof. Museum agrees that its Contractor working in the City shall comply with any and all applicable federal, state, and local licensing requirements and agrees to provide proof of the Contractor’s current City of Santa Cruz Business license tax certificates. k. Site Access/Right of Entry and Site Conditions.
i. City maintains its rights of entry to the Property, as provided pursuant to the Lease, including access to the public right-of-way and other City facilities.
ii. Museum and/or its Contractor shall at all times maintain proper, safe, and secure facilities and provide safe access for inspection by City and its employees or agents, to all parts of the Work. Nothing in this Construction Coordination Agreement is intended or shall be construed to limit in any way access by the City to the Work area at all reasonable times during the duration of this Construction Coordination Agreement, or the right of entry or inspection that the City, and its employees, contractors, and consultants may have pursuant to the Amended Lease including access to the public right-of-way and other City facilities on the Property, or by operation of law.
iii. During the course of performing the Work, the security and safety of the Work area/site, and construction materials and equipment will be the Museum’s sole responsibility. Museum shall ensure that the Work site is properly maintained in accordance with applicable legal and safety requirements, that all necessary barriers or signage to deter unauthorized entry and to protect the public are in place, such as notifying, warning, and protecting the public of any dangerous conditions on the Property related to the Work, installing a secure construction fence, security surveillance and patrol, and other reasonable measures as further may be requested by City to protect public health and safety during the course of the Work. l. Acceptance of Public Improvements. Upon completion of any severable improvement or improvements that are public improvements, as reasonably determined by City, that are part of the Work, if such improvements are found to be in substantial compliance with the Plans, then the City, if required, will certify that the improvement(s) is/are complete and, no more than 30 days

15.12 following such certification, City will accept the improvement(s) on its Property. Museum shall bear all costs of inspection and certification for acceptance, unless otherwise waived by the City Council or its designee.

Acceptance by the City shall not constitute a waiver by the City of any defects in the improvement(s).
m. City-Ownership of Public Improvements. All permanent improvements and permanent fixtures on the Property, including the completed Work, shall, without compensation to Museum, automatically and without any act of Museum or any third party become City’s property. At the expiration of or earlier termination of the Amended Lease, the Museum shall surrender all such improvements to the City, free and clear of all liens, encumbrances, and thirdparty claims, as further specified in the Parties’ Amended Lease. n. State Prevailing Wage & Federal Labor Standard Wage Provisions. i. Museum and Contractor performing the Work shall conform the prevailing wage requirements and federal labor standard wage provisions applicable to the Work under this Construction Coordination Agreement. Museum, and its Contractors shall adhere to the prevailing wage determinations made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, applicable to the Work. The Parties acknowledge that all workers employed in the execution of a public works contract (as such term is defined in California Labor Code Section 1720 et seq. and Section 1782(d)(1)) must be paid not less than the specified prevailing wage rates for the type of work performed.
ii. Museum agrees to indemnify, defend, and hold harmless the City and its officers, officials, employees, and agents from and against any and all claims, liabilities, losses, costs, expenses, attorney’s fees, damages, fines, financial consequences, interest, and penalties, of any kind and nature, arising from or relating to any failure (or alleged failure) of the Museum and its Contractor to pay prevailing wages or to otherwise comply with the requirements of prevailing wage law relating to a public work, to the extent those requirements apply to the Work. o. Storm Water Requirements. To the extent applicable to the Work under this Construction Coordination Agreement, Museum, Contractor, and their employees, subcontractors, and agents are required to abide by the applicable City of Santa Cruz Storm Water Best Management Practices (BMPs) for the duration of the Work. The City’s mandatory Storm Water BMPs, which are listed according to the type of work, operations, or business, are located on the City’s website at: https://www.cityofsantacruz.com/government/citydepartments/public-works/stormwater/best-management-practices.

15.13 6. Museum’s Responsibilities.
a. Project Management. The Museum shall be responsible for all Project funding, management, and oversight, including but not limited to hiring and supervising the Contractor to complete all Construction Documents and to construct the Project. This does not preclude the City, or other entity, from providing funding, fee waivers, grants or participating in grants to support the Project. b. Consultants and Contractors. Museum will select all consultants and contractors, including Contractor, required to complete the Project. Museum will ensure that all contracts entered into by Museum in furtherance of the Project are consistent with the terms and conditions of this Construction Coordination Agreement. Museum will provide courtesy copies of all contracts it enters into for the Project to the City Representative.

Museum will oversee all selected consultants or contractors, including Contractor’s, work on the Project and will review and approve, in writing, all payment requests from the consultant(s)/contractor(s) on the Project. Museum is responsible for making all appropriate payments for any selected consultant’s or contractor’s work on the Project.

7. City’s Responsibilities.
a. Tyrrell Park. The City agrees to continue discussions and collaborate with the Museum to plan for upgrades, improvements, and/or changes to Tyrrell Park, including the amphitheater, pathways, lighting, and landscaping outside of the Leased Area, as shown on Exhibit 2, and as further contemplated by the Plans.

The Parties explicitly agree that the Project does not include upgrades, improvements, and/or changes to Tyrrell Park, outside the Leased Areas. Any upgrades, improvements, and/or changes to Tyrrell Park outside the Leased Areas shall be subject to a subsequent agreement between the Parties. b. Project Staging. The City agrees to assist the Museum and Contractor with locating and coordinating areas for construction staging, including possible staging areas within Tyrrell Park and on surrounding streets. c. Cooperation. The City will continue to communicate with the Museum on matters relating to the Project, including Contractor selection, final design, permitting, funding, grants, public communications, outreach, and construction.

To the extent that it has information to share, the Museum will work to keep the City informed on project progress, public communications, and actual or anticipated complications. To the extent practicable or feasible, the City will coordinate with the Museum to identify possible locations, including Cityowned and operated spaces, for storage of collections items as well as for temporary Museum operations during construction operations.

15.14 8. Indemnification Between Museum and City. The obligations under this Section of the Construction Coordination Agreement shall survive expiration or termination of this Construction Coordination Agreement to the fullest extent permitted by law. a. To the fullest extent permitted by law, Museum agrees to indemnify, defend, and hold harmless City of Santa Cruz, its officials, officers, employees and volunteers (“Indemnitees”) from and against any and all claims, demands, actions, liabilities, damages, or expenses, (including attorneys’ fees and costs) (“Losses”) arising from the acts or omissions of Museum, Museum’s employees or agents, and Contractor, Contractor’s employees or agents, in any way related to this Construction Coordination Agreement, except where caused by the negligence or willful misconduct of the City. The City does not, and shall not, waive any rights, against Museum, Contractor, or any of their contractors or subcontractors, which City may have pursuant to this Construction Coordination Agreement, because of City’s acceptance of work related to the Project. The obligation to defend Museum shall arise regardless of any claim or assertion that Indemnitees caused or contributed to the Losses. b. The City agrees to indemnify, defend, and hold harmless the Museum, its respective officials, officers, employees and agents from any and all claims, demands, actions, liabilities, damages, or expenses (including attorneys’ fees and costs), which Museum may sustain or incur or which may be imposed upon it, but only in proportion to and to the extent such Losses result from, arise out of, or in any manner are caused by the City’s negligent or intentional acts or omissions relating to this Construction Coordination Agreement.

9. Consultant Insurance Requirements. Unless otherwise agreed to in writing by the Parties, Museum shall continue to require that all consultant agreements related to the Project (including but not limited to agreements with architects, engineers, landscape architects, and design professionals) obligate Museum’s consultants performing work on this Project to maintain the type and amount of insurance coverage, as specified in the 2024 Agreement, Exhibit 1, Section 9. Any additional insurance or indemnity benefits that any consultant contract grants to the Museum will likewise be extended to the City.

10. Consultant Indemnity Requirements. Unless otherwise agreed to in writing by the Parties, Museum shall continue to require any consultant performing Project-related work to defend, indemnify, and hold harmless the City and its related parties, as specified in the 2024 Agreement, Exhibit 1, Section 10, to verify its Consultant’s compliance with these indemnification and insurance requirements.

11. Contractor Insurance Requirements. To support its obligations under this Construction Coordination Agreement, Museum shall require its Contractor to maintain the type and amount of insurance coverage specified in Exhibit 5 to this Agreement throughout the Project.

15.15 12. Amendments. Except as amended by this Construction Coordination Agreement, all other applicable terms and conditions of the 2024 Agreement and attachments shall remain in full force and effect. The terms of this Construction Coordination Agreement shall control if any conflict exists.

13. Contract Interpretation. Each party acknowledges that it has reviewed this Construction Coordination Agreement and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Construction Coordination Agreement.

14. Severability. The unenforceability, invalidity or illegality of any provision(s) of this Construction Coordination Agreement shall not render the other provisions unenforceable, invalid or illegal.

15. Counterparts. The Parties may execute this Construction Coordination Agreement in two or more counterparts, which shall, in the aggregate, be deemed an original but all of which, together, shall constitute one and the same instrument. A scanned, electronic, facsimile or other copy of a party’s signature shall be accepted and valid as an original.

16. Warranty of Authority. The signatories to this Construction Coordination Agreement warrant and represent that each is authorized to execute this Construction Coordination Agreement and that their respective signatures serve to legally obligate their respective representatives, agents, successors and assigns to comply with the provisions of this Construction Coordination Agreement.
[SIGNATURES ON FOLLOWING PAGE]

15.16 IN WITNESS WHEREOF, the Parties have executed this Construction Coordination Agreement as of the Effective Date.

CITY:

CITY OF SANTA CRUZ
By:______________________________
Name: Matt Huffaker
Its: City Manager
Approved as to form:
______________________________
Office of the City Attorney
MUSEUM:

SANTA CRUZ MUSEUM OF NATURAL HISTORY
a California Non-Profit Public Benefit Corporation
By:____________________________________
Name:_________________________________
Title:____________________________________

15.17 EXHIBIT 1
2024 Planning and Coordination Agreement

15.18 1
SCMNH/City Planning and Coordination Agreement

PLANNING AND COORDINATION AGREEMENT

BY AND BETWEEN

THE CITY OF SANTA CRUZ

AND THE

SANTA CRUZ MUSEUM OF NATURAL HISTORY
This Planning and Coordination Agreement (“Agreement”) is entered into on __________ 2024, by and between the City of Santa Cruz, a municipal corporation (“City”), and the Santa Cruz Museum of Natural History, a California non-profit public benefit corporation (“Museum”). City and Museum may also be referred individually as a “Party” and collectively, as the “Parties”.

RECITALS
WHEREAS, the City of Santa Cruz owns the historic former Carnegie Library building (“Building”) and surrounding property, including Tyrrell Park, at 1305 East Cliff Drive; and WHEREAS, the Museum is a 501(c)(3) non-profit organization and leases the Building from the City for the purposes of operating a museum of natural history. Additionally, Museum maintains parts of the surrounding property under an Adopt-a-Park agreement; and WHEREAS, the Museum has operated at the Building since 1954. The Museum took over operations from the City in 2009 as an independent non-profit organization, and currently offers important resources to the City, its residents and its visitors, including providing educational curriculum; care and oversight of the Building; family-friendly programs and events; stewardship of important local natural history and scientific collections; and a destination for tourism; and
WHEREAS, the Building is in need of upgrades and improvements in order to support its continued utility, improve accessibility, protect the Museum’s priceless natural history collections, and support the Museum’s continued use as a public and educational institution; and WHEREAS, the Museum and the City intend to work collaboratively to develop a project description for a building improvement project (“the Project”) to support the use and health of the Building and potentially surrounding property, improve accessibility, protect and preserve the Museum’s collections, and improve the Building for continued use by the Museum.

NOW, THEREFORE, in consideration of the above recitals, the Parties hereto agree, as follows:

1. Purpose of this Agreement. The Parties enter into this Agreement to describe the Parties’ respective goals and responsibilities related to planning, coordination, and developing the scope of the Project.

2. Term. This Agreement will commence upon execution by both Parties and will terminate upon completing and acceptance of the work related to this Project. This Agreement may also be terminated upon a 30-day written notice by either Party to the May 29
DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.19 2
SCMNH/City Planning and Coordination Agreement
other if adequate funding cannot be procured for the Project, or if either Party has made a determination that the Project is infeasible or undesirable. This Agreement may be extended or terminated by mutual written agreement of the Parties.

3. The Project.
a. The Parties desire to pursue the Project, intended to include upgrades and improvements to the former Carnegie Library building located at 1305 East Cliff Drive. These improvements may include, but are not limited to:
structural improvements to Building to address drainage and other structural concerns; addition(s) to Building’s footprint for a classroom and additional restroom(s); upgraded HVAC and environmental control systems; improvements to accessibility, such as Americans With Disabilities Act (ADA) entrance and elevator; and interior improvements to exhibit halls, office and collections spaces. In addition, the scope of the Project may include minor modifications to Tyrrell Park, including but not limited to improvements to pathways to support ADA access within the Park and the amphitheater, as well as safety, educational, and rehabilitative upgrades and improvements to the grey whale sculpture, the learning garden, and surrounding area. The Parties acknowledge that this anticipated scope is preliminary and is likely to change as a result of anticipated technical studies and information currently unknown to the Parties.
b. The Parties intend to have the final project scope memorialized in a later agreement related to the Project’s construction to be negotiated and approved by the Parties. The final Project scope, including the Project plans and specifications, must be approved by the City Council before the Museum proceeds with construction activities. The Parties further acknowledge that it is possible that the Project could be executed in phases and therefore may require more than one zoning permit and/or building permit. The Parties also acknowledge that this Agreement does not require or commit the Museum to commence or perform any improvements to the Building or Tyrrell Park, or to complete any specific improvements described in this Agreement.

4. Communication and Coordination. The Museum and the City will each designate a Representative, or primary “point of contact,” to be responsible for communications, coordination, oversight, and management of planning activities related to the Project, as set out below:

Museum Representative:

Felicia Van Stolk
Executive Director, Santa Cruz Museum of Natural History 831-420-6115, ext. 11; [email protected]
DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.20 3
SCMNH/City Planning and Coordination Agreement
City Representative:

Tony Elliot
Director of Parks and Recreation
831-420-5270; [email protected]
The Representatives will meet and work together on a regular basis to further the goals of the Project. The Representatives will participate in meetings with design professionals, consultants, and contractors. City’s Representative shall have the option, but not the obligation, to participate in such meetings. The Representatives may appoint one or more designees to perform tasks related to the Project. In the event that either Party wishes to change the Representative designated in this Agreement, that Party will notify the other Party.

5. Museum’s Responsibilities.
a. Project Management. The Museum intends to hire one or more Project Managers to assist the Museum with planning, coordination, outreach, and management related to the planning of the Project. The Project Manager(s) will be contracted by the Museum and will take direction from Museum staff.

The Museum will notify the City if it hires or replaces a Project Manager. b. Donations and Funding. The Museum intends to fund the Project using donations and grants from private and public sources. The Museum certifies that it follows best accounting practices. This Agreement does not commit the City to using public funds for the Project, but does not preclude City from contributing funds or participating in grant funding.
c. Technical Studies. The Museum will be responsible for procuring or providing all technical studies and related documents that will be required for planning or permit approval purposes, including biological resources, cultural resources, historical resources, and traffic and transportation studies. d. Design. The Museum will be responsible for creating and funding the interior and exterior designs, architectural plans, and construction drawings for the Project, subject to City approval.
e. Landscaping. Museum will prepare a proposed landscape plan for Tyrrell Park that enhances accessibility, drainage, and current uses of the park, including educational, recreational, and passive community use. This does not preclude the City from contributing funds or participating in grant funding for preparation of the proposed landscape plan. The proposed landscape plan will include improvements to the pathways throughout the park, and may also include improvements and rehabilitation to the existing amphitheater and the grey whale sculpture. These improvements may be executed as part of the initial improvement project or through subsequent project phases. The Museum and the City may also elect to execute only a portion of, or none of, the improvements. The proposed landscape plan will be subject to City DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.21 4
SCMNH/City Planning and Coordination Agreement
approval. The City and the Museum intend to collaborate with each other to try to secure funding for any improvements to Tyrrell Park. f. Consultants and Contractors. Museum will select the
consultants/contractors for technical studies, architectural design, public outreach, engineering, and other related services for the Project. Museum will ensure that all contracts entered into by Museum in furtherance of the Project are consistent with the terms and conditions of this Agreement. Museum will provide copies of any contract related to the conceptual phase of project to the City for review and approval, upon the request of City. The Museum will provide any proposed contracts related to the preparation of construction drawings, landscape designs, engineering plans, structural engineering plans, and similar trades that go beyond the conceptual phase to the City for review and approval, without the City having to request copies of the contract. The City will not be a party to any contract with any selected contractor for the Project, unless necessary as the Landlord of the Premises Museum will oversee any selected consultant’s or contractor’s work on the Project, and will review and approve, in writing, all payment requests from the consultant(s)/contractor(s) on the Project. Museum is responsible for making all appropriate payments for any selected consultant’s or contractor’s work on the Project.

As further specified in this Agreement, before Museum hires the construction contractor(s), the Parties will enter into a construction contract, setting forth the Parties’ and the construction contractors’ construction-related responsibilities in greater detail.
g. Permits and Approvals. The Museum will be responsible at its sole cost and expense for obtaining all necessary permits and approvals related to the Project, including zoning entitlements, building permits and construction related approvals. This does not preclude the City from potentially providing waivers, if legally permissible, or support for grant applications for these expenses. The Museum will respond to any permitting authority’s permitting questions and requests for documents or information.
h. Outreach and Communication. The Museum and the City will meet with each other to develop a shared understanding for how the Parties will address inquiries and outreach related to the Project. The Museum will be the lead party in charge of outreach and communication regarding the Project, in close consultation and cooperation with the City. The Museum will have primary responsibility for holding public information meetings and responding to public inquiries regarding the Project. City is responsible for holding any permit-related public hearings, to the extent required by law.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.22 5
SCMNH/City Planning and Coordination Agreement
i. Cooperation. The Museum will regularly communicate with the City on matters relating to the Project, including design, permitting, funding, grants, public communications, and outreach. The Museum will work to keep the City informed on Project progress and actual or anticipated complications.

6. City’s Responsibilities.
a. Lease. Assuming Museum has not breached or defaulted in its existing lease, and assuming the Parties can mutually agree to renewal terms, the City intends to renew the Museum’s existing lease for the Premises at a substantially similar rent base as that of the existing lease at or before the time the Parties enter into the separate construction contract. The City understands that the Museum requires a long-term lease in exchange for its investment in improving and preserving the Building and surrounding areas. The Parties will work to develop an updated lease outlining the City and Museum obligations for a 30-50 year period, which may take the form of a 30 year lease with an option to renew, subject to City approval.
b. Park. The City will collaborate with the Museum to plan for any upgrades, improvements, and/or changes to Tyrrell Park, including improvement or replacement of the grey whale sculpture, amphitheater, pathways, lighting, and landscaping.
c. Funding and Grants. The City has not committed any City funds to the Project; however, this Agreement does not preclude the City from exercising an option to commit its funds to the Project. The City will keep the Museum informed of potential grant opportunities that may support the Project, and will act as co-applicant on grants if appropriate and agreed to by both Parties. d. Permits and Approvals. The City will be responsible for conducting required public hearing processes to consider zoning entitlements, and issuing zoning and building permits for the Project, in accordance with local, state, and Federal laws and regulations. To the extent applicable, the City will be responsible for completing any CEQA review for the Project in accordance with its standard policies and procedures.
e. Cooperation. The City will communicate with the Museum on matters relating to the Project, including design, permitting, funding, grants, public communications, outreach, and construction. To the extent that it has information to share, the City will work to keep the Museum informed on project progress, public communications, and actual or anticipated complications. To the extent practicable or feasible, the City will coordinate with the Museum to identify possible locations, including City-owned and operated spaces, for storage of collections items as well as for temporary Museum operations during construction operations.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.23 6
SCMNH/City Planning and Coordination Agreement

7. Construction
a. After the Project description is finalized, the Parties intend to enter into a separate construction agreement, which will set forth the Parties’ agreement on matters such as the work schedule, construction contractor indemnity and insurance requirements, warranties, bonds/security, site access, change orders, and environmental covenants, among other construction-specific items. b. While the Parties intend to enter into a later detailed construction agreement, the Parties now agree that:
i. Museum will be responsible for funding and overseeing construction activities, including grading, paving, foundations, framing, and interior and exterior buildout for the primary building phase of the Project, with potential to oversee some park improvements, if identified in the landscape plan and agreed to by the Parties.
ii. The City will assist the Museum with locating and securing areas for construction staging, including possible staging areas within Tyrrell Park and on surrounding streets.
iii.Museum and any contractor performing Project-related work shall conform to the prevailing wage requirements and federal labor standard wage provisions applicable to Project-related work. Museum (and its contractors) shall adhere to the prevailing wage determinations made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, applicable to Project-related work. The Parties acknowledge that all workers employed in the execution of a public works contract (as such term is defined California Labor Code Section 1720 et seq. and Section 1782(d)(1)) must be paid not less than the specified prevailing wage rates for the type of work performed. Reference: California Labor Code Sections 1720, 1774 and 1782.
iv. Museum agrees to indemnify, defend and hold harmless City, officials, officers, directors, employees, and agents from and against any and all claims, liabilities, losses, costs, expenses, attorney’s fees, damages, expenses, fines, financial consequences, interest, and penalties, of any kind or nature, arising from or relating to any failure (or alleged failure) of the Museum and its contractor(s) to pay prevailing wages or to otherwise comply with the requirements of prevailing wage law relating to a public work, to the extent those requirements apply to Project-related work.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.24 7
SCMNH/City Planning and Coordination Agreement

8. Indemnification Between Museum and City. The obligations under this Section of the Agreement shall survive expiration or termination of this Agreement to the fullest extent permitted by law.
a. To the fullest extent permitted by law, Museum agrees to indemnify, defend, and hold harmless City of Santa Cruz, its officials, officers, employees and volunteers (“Indemnitees”) from and against any and all claims, demands, actions, liabilities, damages, or expenses, (including attorneys’ fees and costs) (“Losses”) arising from the acts or omissions of Museum, Museum’s employees or agents in any way related to this Agreement, except where caused by the sole negligence, or willful misconduct of the City. The City does not, and shall not, waive any rights, against Museum or any of its contractors, which City may have pursuant to this Agreement, because of City’s acceptance of work related to the Project. The obligation to defend by Museum shall arise regardless of any claim or assertion that Indemnitees caused or contributed to the Losses
b. The City agrees to indemnify, defend, and hold harmless the Museum, its respective officials, officers, employees and agents from any and all claims, demands, actions, liabilities, damages, or expenses (including attorneys’ fees and costs), which Museum may sustain or incur or which may be imposed upon it, but only in proportion to and to the extent such Losses result from, arise out of, or in any manner are caused by the City’s negligent or intentional acts or omissions relating to this Agreement.

9. Consultant Insurance Requirements. Unless otherwise agreed to in writing by the Parties, Museum shall require that all consultant agreements related to the Project (including but not limited to agreements with architects, engineers, landscape architects, and design professionals) obligate Museum’s consultants performing work on this Project to maintain the type and amount of insurance coverage, as specified in Exhibit A to this Agreement. Any additional insurance or indemnity benefits that any consultant contract grants to the Museum will likewise be given to the City.

10. Consultant Indemnity Requirements. Unless otherwise agreed to in writing by the Parties, Museum shall require any consultant performing Project-related work to defend, indemnify, and hold harmless the City and its related parties. Unless otherwise agreed to in writing by the Parties, Museum’s contracts with consultants shall include the following indemnity provision:
“Consultant agrees, to the fullest extent permitted by law, to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents, and volunteers (collectively, “Indemnitees”) from and against any and all liability, claim, action, loss, injury, damage, judgment, or expense, including attorneys’ DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.25 8
SCMNH/City Planning and Coordination Agreement
fees and costs (“Losses”) caused by or resulting from the negligence, recklessness, or willful misconduct of Consultant, Consultant’s officers, employees, agents, or subcontractors in any way related to this Agreement.

Consultant’s duty to indemnify and hold harmless Indemnitees shall not apply to the extent such Losses are caused by the sole or active negligence or willful misconduct of Indemnitees. Consultant’s obligation to defend shall arise regardless of any claim or assertion that Indemnitees caused or contributed to the Losses. In the event this Agreement involves the performance of design professional services by Consultant, Consultant’s officers, employees, agents, or subcontractors, Consultant’s costs to defend Indemnitees shall not exceed the Consultant’s proportionate percentage of fault per Civil Code § 2782.8. This indemnification clause shall survive termination of this Agreement.” a. Consultant Verification. Unless otherwise agreed to in writing by the Parties, Museum must require its Consultant to execute the Consultant Indemnification & Insurance Agreement, attached hereto as Exhibit B, to verify its Consultant’s compliance with these indemnification and insurance requirements.

11. Museum Insurance Requirements. To support its obligations under this Agreement, Museum shall maintain the type and amount of insurance coverage, as specified in Exhibit C to this Agreement.

12. Conflicts of Interest. No member, official, officer, employee, agent, representative, or consultant of the Parties will have any personal interest, direct or indirect, in this Agreement nor will any such member, official, officer, agent, representative, or employee participate in any decision relating to this Agreement which affects his or her personal interests or the interests of any corporation, partnership, or association in which he or she has a direct or indirect interest. Each Party warrants that it has not paid or given, and will not pay or give, any such member, official, officer, employee, agent, representative, or consultant of the other Party any money or other consideration for obtaining this Agreement.

13. Relationship of Parties. This Agreement does not create any joint venture, partnership, or agent relationship between any of the Parties.

14. Cooperation. The Parties acknowledge that this Agreement does not describe all of the actions, documents and approvals necessary for the Project; and each Party agrees to cooperate with the other Parties as may be necessary to achieve the purposes of this Agreement.

15. Contract Interpretation. Each party acknowledges that it has reviewed this Agreement. The Parties agree that the rule of construction that any ambiguities are to be resolved against the drafting party will not be employed in the interpretation of this Agreement.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.26 9
SCMNH/City Planning and Coordination Agreement

16. Museum’s Records. To the extent required by law, Museum will maintain accurate accounting records and other written documentation pertaining to the costs incurred relating to this Agreement for examination and audit by the City, State, or federal government, as applicable, during the period of this Agreement, and for a period of at least five years from the date of Project completion.

17. Force Majeure. Neither Party will be considered in default in the performance of its obligations described in this Agreement to the extent that the performance of any such obligation is prevented or delayed by an act of God, natural disaster, pandemic, acts of terrorism, war, a strike, lockout or other labor difficulty, or other peril, which is beyond the reasonable control of the affected Party and without the negligence of the respective Parties. Each Party will give notice promptly to the other of the nature and extent of any Force Majeure claimed to delay, hinder or prevent performance of the services under this Agreement. Each Party will, however, make all reasonable efforts to remove or eliminate such a cause of delay or default and will, upon the cessation of the cause, diligently pursue performance of its obligations in this Agreement.

18. Dispute Resolution. The Parties agree to attempt in good faith to resolve through negotiation any dispute, claim or controversy arising out of or relating to this Agreement.

Either party may initiate negotiations by providing written notice in letter form to the other Party, setting forth the subject of the dispute and the relief requested. Promptly upon such notification, the Parties will meet at a mutually agreeable time and place in order to exchange relevant information and perspective, and to attempt to resolve the dispute. In the event that no resolution is achieved, and if, but only if, the Parties mutually agree, then prior to pursuing formal legal action, the Parties shall make a good faith effort to resolve the dispute by non-binding mediation or negotiations between representatives with decision-making power, who, to the extent possible, shall not have had substantive involvement in the matters of the dispute. To the extent that the Project involves or qualifies as a public works project, the Parties agree to comply with Public Contract Code sections 9204(e) and 20104-20104.6, but without waiving the requirements of the California Tort Claims Act, Gov’t Code section 800 et seq. unless otherwise agreed to by the Parties.

19. Notices. If either Party desires or is required to give notice to the other, such notice shall be given in writing, via email, and concurrently delivered by: (a) personal delivery, in which case notice is effective upon delivery; or (b) overnight courier (i.e., Federal Express) with charges prepaid or charged to the sender’s account, in which case notice is effective when delivered; or (c) priority U.S. Mail, in which case notice shall be deemed delivered on the second business day after the deposit thereof with the U.S.

Postal Service. Notices should be addressed to recipient as follows:

If to City: City of Santa Cruz
Parks & Recreation Department
323 Church St.

Santa Cruz, CA 95060
Attn: Tony Elliot, Parks & Rec Director
DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.27 10
SCMNH/City Planning and Coordination Agreement
Email: [email protected]
If to Museum: Santa Cruz Museum of Natural History
1305 E Cliff Dr.

Santa Cruz, CA 95062
Attn: Felicia Van Stolk, Executive Director
Email: [email protected]
The Parties agree to provide notification of any changes to the above information in writing at least ten (10) business days before the change is effective.

20. Non-discrimination. Museum and its officers, agents, employees, contractors and subcontractors, if any, may not discriminate against any participant, employee or applicant for employment to be employed in the performance of this Agreement or the Project, with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment, because of race, sex, sexual orientation, gender identity, religion, color, national origin, ancestry, age, disability, or United States military service veteran status.

21. Successors and Assigns. Each Party binds itself and its partners, successors, executors, administrators and assigns to the other Party of this Agreement and to the partners, successors, executors, administrators and assigns of such other party, in respect to all covenants of this Agreement; except as otherwise provided herein, Museum may not assign, sublet or transfer its interest in this Agreement without the written consent of the City. Such consent will not be unreasonably withheld or delayed.

22. Entire Agreement. This Agreement constitutes the entire agreement between the Parties with respect to the Planning and Coordination of the Project and supersedes all prior agreements, written or verbal, between the City and Museum. No statements, promises or agreements whatsoever, in writing or verbal, in conflict with the terms of the Agreement have been made by the Parties which in any way modify, vary, alter, enlarge or invalidate any of the provisions and obligations herein stated. This Agreement may be amended and modified only in writing signed by both Parties.

23. Severability. The unenforceability, invalidity or illegality of any provision(s) of this Agreement will not render the other provisions unenforceable, invalid or illegal.

24. Governing Law. This Agreement is governed, construed, and enforced in accordance with the laws of the State of California.

25. Counterparts. The Parties may execute this Agreement in two or more counterparts, which will, in the aggregate, be deemed an original but all of which, together, will constitute one and the same instrument. A .pdf/electronic of a duly executed copy of this Agreement or of any document signed pursuant to this Agreement will be deemed for all purposes as receipt of an originally signed document, and any such copy bearing a .pdf/electronic signature will be binding upon, and enforceable against either Party.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.28 11
SCMNH/City Planning and Coordination Agreement

26. Warranty of Authority. The signatories to this Agreement warrant and represent that each is authorized to execute this Agreement and that their respective signatures serve to legally obligate their respective corporate entity, representatives, agents, successors, and assigns to comply with the provisions of this Agreement.

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date written above.

CITY:

CITY OF SANTA CRUZ
By:______________________________
Name: Matt Huffaker
Its: City Manager
Approved as to form:
______________________________
Office of the City Attorney
MUSEUM:

SANTA CRUZ MUSEUM OF NATURAL HISTORY
a California Non-Profit Public Benefit Corporation
By:____________________________________
Name:_________________________________
Title:____________________________________
Felicia Van Stolk
Executive Director
DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A For

15.29 12
SCMNH/City Planning and Coordination Agreement

EXHIBIT A

CONSULTANT INSURANCE REQUIREMENTS
Consultant shall procure and maintain insurance against claims for injuries to persons or damages to property and otherwise which may arise from or in connection with the performance of the work under this Agreement and the results of that work by Consultant, its agents, representatives, employees, contractors, or subcontractors.

A. CERTIFICATE REQUIREMENTS
The City will be issued a Certificate of Insurance (a Memorandum of Understanding will not be accepted) with the following minimum requirements:
● Certificate(s) will show current policy number(s) and effective dates, ● Coverage and policy limits will meet, or exceed, requirements below, o The Certificate Holder will be City of Santa Cruz, Risk Management, 1200 Pacific Avenue, Suite 290, Santa Cruz, CA 95060,
o Certificate will be signed by an authorized representative, o An endorsement, if required below, will be provided to show the City, its officers, officials, employees, and volunteers as additional insureds, and o Coverages must be maintained during the term of the Agreement with the City, unless a longer duration is required as specified below.

B. MINIMUM SCOPE AND LIMITS OF INSURANCE
Consultant acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. If Consultant maintains broader insurance coverage and/or higher limits than the minimums shown below, the City of Santa Cruz requires and shall be entitled to the broader insurance coverage and/or higher limits maintained by Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City of Santa Cruz.

Coverage will be at least as broad as:
● COMMERCIAL GENERAL LIABILITY (CGL): $2,000,000 PER OCCURRENCE; $2,000,000

AGGREGATE
Proof of coverage for $2 Million per occurrence including products and completed operations, property damage, bodily injury, personal and advertising injury will be provided on Insurance Services Office (ISO) Form CG 00 01 covering CGL. ● PROFESSIONAL LIABILITY (ERRORS AND OMISSIONS): $2,000,000 PER OCCURRENCE OR CLAIM, $2,000,000 AGGREGATE.

Consultant will maintain insurance appropriate to Consultant’s profession; with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after date of completion of the services under this Agreement. If coverage is canceled or nonrenewed and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date or start of work date, Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.30 13
SCMNH/City Planning and Coordination Agreement
● AUTOMOBILE LIABILITY:

Proof of coverage for $1,000,000 provided on ISO Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, hired, (Code 8) and non-owned autos (Code 9), per accident for bodily injury and property damage. ● WORKERS’ COMPENSATION AS REQUIRED BY THE STATE OF CALIFORNIA, WITH STATUTORY LIMITS, AND EMPLOYER’S LIABILITY INSURANCE: $1,000,000 per accident for bodily injury or disease.

The Worker’s Compensation policy must be endorsed with a waiver of subrogation in favor of the City for all work performed by the Consultant and its employees. (Not required if Consultant provides written verification it has no employees) - If Consultant has no employees, Consultant shall complete and sign a Workers’ Compensation Exemption Declaration and Release of Liability.

C. OTHER INSURANCE PROVISIONS
The insurance policies are to comply with the following provisions:
● ADDITIONAL INSURED STATUS
The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL, professional liability, and automobile insurance policies with respect to liability arising out of work or operations performed by or on behalf of Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage will be provided in the form of an endorsement to Consultant’s insurance at least as broad as ISO Form CG 20 10 11 85, or if not available, through the addition of both CG 20 10 CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 (if a later edition is used).
● PRIMARY COVERAGE
For any claims related to this Agreement, Consultant’s insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers.

Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, or volunteers will be excess of Consultant’s insurance and will not contribute with it.
● NOTICE OF CANCELLATION
Each insurance policy required above shall state that the coverage shall not be canceled, except with notice to the City.
● WAIVER OF SUBROGATION
Consultant hereby grants to the City a waiver of any right to subrogation, except as otherwise not applicable, which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss, including attorney’s fees under such insurance.

Consultant agrees to obtain any endorsement that may be necessary to effectuate this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. ● EXCESS LIABILITY/UMBRELLA INSURANCE POLICIES
Consultant may use excess liability/umbrella policies to meet the required liability limits on the condition that they provide all of the insurance coverages required herein, DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.31 14
SCMNH/City Planning and Coordination Agreement
including, but not limited to, primary and non-contributory, additional insured, SelfInsured Retentions (SIRs), indemnity, and defense requirements. The excess liability/umbrella insurance policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying CGL insurance. No insurance policies maintained by the additional insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Consultant’s primary and excess liability policies are exhausted.
● SELF-INSURED RETENTIONS
Self-insured retentions must be declared to and approved by the City. City may require Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City. ● ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A- :VII, unless otherwise acceptable to the City.
● CLAIMS MADE POLICIES
If any of the required policies provide coverage on a claims-made basis:

1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
● VERIFICATION OF COVERAGE
Consultant will furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL, CPL, and automobile Policies listing all policy endorsements to be approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning will not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

D. CONTRACTORS/SUBCONTRACTORS
Consultant shall require and verify that all contractors and subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.

E. SPECIAL RISKS/CIRCUMSTANCES
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances and provide notice to Consultant.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.32 15
SCMNH/City Planning and Coordination Agreement
DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.33 16
SCMNH/City Planning and Coordination Agreement

EXHIBIT B

CONSULTANT INDEMNIFICATION & INSURANCE AGREEMENT
This Consultant Indemnification & Insurance Agreement (“Consultant Indemnification Agreement”) is entered into this day of , 20__, by ________________ (“Consultant”) and the City of Santa Cruz (the “City”). Each are individually referred to as a “Party” or collectively as the “Parties”.

RECITALS
WHEREAS, Santa Cruz Museum of Natural History (“Museum”) entered into the Planning and Coordination Agreement (“Agreement”) with the City related to an improvement project (“Project”) to improve the Santa Cruz Museum of Natural History for continued use by the Museum (“Project”) and for Museum to take steps to implement the Project (“Work”) in the attached Agreement, which is incorporated as Exhibit A hereto; WHEREAS, Consultant has entered into a separate agreement with Museum to perform the Work for the Project; and
WHEREAS, as required by the Agreement, Consultant is required to agree to indemnify, defend, and hold harmless the City in the same manner as Museum, and also provide insurance for claims arising from the Consultant’s work in performing any portion of the Project described in the Agreement;
NOW, THEREFORE, the Parties agree to incorporate the above Recitals and further agree as follows:

1. Indemnification. Consultant agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, and agents in the same manner as the Museum, as described in Section 10 of the Agreement as follows:
a. The City, its officials, officers, employees, and agents (collectively, “Indemnitees”) shall not be liable for any injury to persons or property arising out of, pertaining to or relating to the acts or omissions of the Museum or its agents, officers, employees, consultants, contractors and subcontractors, or others under Museum’s control or authority in the performance of the Work or Agreement, unless such damages are caused by the gross negligence or willful misconduct of Indemnitees. b. To the fullest extent permitted by law, Consultant hereby agrees to, and shall indemnify, defend, and hold harmless City, its officials, officers, employees, and agents (collectively, “Indemnitees”), from any liability or damage or claims for damage for personal injury, including death, as well as from claims for property damage or any other type of claims, liabilities, actions, losses, damages, fines, penalties, judgments, costs, and expenses, including attorneys’ fees and costs (“Losses”) which may arise directly or indirectly from the acts or omissions of DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.34 17
SCMNH/City Planning and Coordination Agreement
Consultant or its subcontractors, agents, employees, or others acting under Consultant authority or control in connection with the Work under this Agreement. Consultant’s duty to indemnify, defend, and hold harmless the Indemnitees shall not apply to the extent such Losses are caused by the gross negligence or willful misconduct of the Indemnitees.
c. The obligation to defend by Consultant shall arise regardless of any claim or assertion that Indemnitees caused or contributed to the Losses.
d. In the event this Agreement involves the performance of design professional services by Consultant, Consultant’s officers, employees, agents, or subcontractors, Consultant’s costs to defend Indemnitees shall not exceed the Consultant’s proportionate percentage of fault per Civil Code §2782.8. This section shall survive the termination or expiration of this Agreement.
e. The obligations under this section shall survive expiration or termination of this Contractor Indemnification Agreement to the fullest extent permitted by law.

2. Insurance. Consultant agrees to provide the insurance as required in Section 9 of the underlying Agreement.

3. Miscellaneous.
a. Each party acknowledges that it has reviewed this Consultant Indemnification Agreement and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Contractor Indemnification Agreement. b. The unenforceability, invalidity or illegality of any provision(s) of this Consultant Indemnification Agreement shall not render the other provisions unenforceable, invalid or illegal.
c. The Parties may execute this Consultant Indemnification Agreement in two or more counterparts, which shall, in the aggregate, be deemed an original but all of which, together, shall constitute one and the same instrument. A scanned, electronic, facsimile or other copy of a party’s signature shall be accepted and valid as an original. d. The signatories to this Consultant Indemnification Agreement warrant and represent that each is authorized to execute this Consultant Indemnification Agreement and that their respective signatures serve to legally obligate their respective representatives, agents, successors and assigns to comply with the provisions of this Agreement.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.35 18
SCMNH/City Planning and Coordination Agreement
IN WITNESS WHEREOF, the Parties have executed this Consultant Indemnification Agreement the date and year first above written.

CITY OF SANTA CRUZ

By:___________________________
Name:_________________________
Its:____________________________

CONSULTANT
By:___________________________ By:______________________________ Name:_________________________ Name:___________________________ Its:____________________________ Its:______________________________ Signature Requirements for Business Entity:
a. Corporation – 2 officer signatures required (one from each group, unless person signing holds officer positions in both Group 1 and 2):

Group 1: Chief Executive Officer, Chairman of the Board, President, or Vice President Group 2: Secretary, Assistant Secretary, Chief Financial Officer, Treasurer, Assistant Treasurer b. Partnership - Signature of General Partner, or signature of partner who is authorized to execute documents per the Certificate of Partnership. If authorized partner is a corporation, follow Corporation signature requirement.
c. LLC- For a member-managed LLC, signature of any member. For a manager-managed LLC, signature of the manager. If the LLC has corporate officer designations, follow Corporation signature requirement.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.36 19
SCMNH/City Planning and Coordination Agreement

EXHIBIT C

MUSEUM INSURANCE REQUIREMENTS
Museum shall procure and maintain insurance against claims for injuries to persons or damages to property and otherwise which may arise from or in connection with the performance of the work under this Agreement and the results of that work by Museum, its agents, representatives, employees, contractors, or subcontractors.

A. CERTIFICATE REQUIREMENTS
The City will be issued a Certificate of Insurance (a Memorandum of Understanding will not be accepted) with the following minimum requirements:
● Certificate(s) will show current policy number(s) and effective dates, ● Coverage and policy limits will meet, or exceed, requirements below, o The Certificate Holder will be City of Santa Cruz, Risk Management, 1200 Pacific Avenue, Suite 290, Santa Cruz, CA 95060,
o Certificate will be signed by an authorized representative, o An endorsement, if required below, will be provided to show the City, its officers, officials, employees, and volunteers as additional insureds, and o Coverages must be maintained during the term of the Agreement with the City, unless a longer duration is required as specified below.

B. MINIMUM SCOPE AND LIMITS OF INSURANCE
Museum acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. If Museum maintains broader insurance coverage and/or higher limits than the minimums shown below, the City of Santa Cruz requires and shall be entitled to the broader insurance coverage and/or higher limits maintained by Museum. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City of Santa Cruz.

Coverage will be at least as broad as:
● COMMERCIAL GENERAL LIABILITY (CGL): $1,000,000 PER OCCURRENCE; $2,000,000

AGGREGATE
Proof of coverage for $1 Million per occurrence including products and completed operations, property damage, bodily injury, personal and advertising injury will be provided on Insurance Services Office (ISO) Form CG 00 01 covering CGL. ● WORKERS’ COMPENSATION AS REQUIRED BY THE STATE OF CALIFORNIA, WITH STATUTORY LIMITS, AND EMPLOYER’S LIABILITY INSURANCE: $1,000,000 per accident for bodily injury or disease.

The Worker’s Compensation policy must be endorsed with a waiver of subrogation in favor of the City for all work performed by the Museum and its employees. (Not required if Museum provides written verification it has no employees) - If Museum has no employees, Museum shall complete and sign a Workers’ Compensation Exemption Declaration and Release of Liability.

C. OTHER INSURANCE PROVISIONS
The insurance policies are to comply with the following provisions:

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.37 20
SCMNH/City Planning and Coordination Agreement
● ADDITIONAL INSURED STATUS
The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of Museum including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage will be provided in the form of an endorsement to Museum’s insurance at least as broad as ISO Form CG 20 10 11 85, or if not available, through the addition of both CG 20 10 CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 (if a later edition is used). ● PRIMARY COVERAGE
For any claims related to this Agreement, Museum’s insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers.

Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, or volunteers will be excess of Museum’s insurance and will not contribute with it. ● NOTICE OF CANCELLATION
Each insurance policy required above shall state that the coverage shall not be canceled, except with notice to the City.
● WAIVER OF SUBROGATION
Museum hereby grants to the City a waiver of any right to subrogation, except as otherwise not applicable, which any insurer of said Museum may acquire against the City by virtue of the payment of any loss, including attorney’s fees under such insurance. Museum agrees to obtain any endorsement that may be necessary to effectuate this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
● EXCESS LIABILITY/UMBRELLA INSURANCE POLICIES
Museum may use excess liability/umbrella policies to meet the required liability limits on the condition that they provide all of the insurance coverages required herein, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The excess liability/umbrella insurance policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying CGL insurance. No insurance policies maintained by the additional insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Museum’s primary and excess liability policies are exhausted. ● SELF-INSURED RETENTIONS
Self-insured retentions must be declared to and approved by the City. City may require Museum to purchase coverage with a lower retention or provide proof of ability to pay losses and related expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City. ● ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A- :VII, unless otherwise acceptable to the City.
● CLAIMS MADE POLICIES
If any of the required policies provide coverage on a claims-made basis:

4. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.38 21
SCMNH/City Planning and Coordination Agreement

5. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

6. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Museum must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
● VERIFICATION OF COVERAGE
Museum will furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL, CPL, and automobile Policies listing all policy endorsements to be approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning will not waive the Museum’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

D. SPECIAL RISKS/CIRCUMSTANCES
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances and provide notice to Museum.

DocuSign Envelope ID: 599D43C5-F5E7-45D7-B702-0BDCADDBC32A

15.39 Exhibit 2
Leased Area and Exempt Area - Tyrell Park Amphitheater

15.40 EXHIBIT 3
PROJECT PRELIMINARY PLANS (“Plans”)
[Preliminary Plans Attached]

15.41 S A N T A C R U Z M U S E U M OF N A T U R A L H I S T O R Y DESIGN ARCHITECT:

PROJECT TEAM

TOM THACHER ARCHITECT
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079
CONTACT:
[email protected]

NIELSEN STUDIOS
1509 SEABRIGHT AVENUE
SANTA CRUZ, CA 95062
(831) 621-3926 x 101
[email protected]
OWNER'S REPRESENTATIVE:

IFLAND ENGINEERS
1509 SEABRIGHT AVE. SUITE A2
SANTA CRUZ, CA 95062
(831) 426-5313
[email protected]
CIVIL ENGINEER:

SURVEYOR:

APPLICANT:

APPROVAL AGENCIES

PROJECT DATA

IN PARTNERSHIP WITH THE CITY OF SANTA CRUZ, THE

MUSEUM OF NATURAL HISTORY WILL RESTORE THE

HISTORIC CARNEGIE LIBRARY BUILDING AND REMODEL

AND EXPAND ON THE NON-HISTORIC PORTIONS OF THE
MUSEUM ADDED IN THE 1960s THROUGH ITS BUILDING
IMPROVEMENT PROJECT. THE PURPOSE OF THE PROJECT IS

TO RENOVATE AND MODERNIZE THE BUILDING TO

CONTINUE TO SERVE THE MUSEUM'S MISSION - TO

CONNECT PEOPLE WITH NATURE AND SCIENCE TO INSPIRE
STEWARDSHIP OF THE NATURAL WORLD. THE PROJECT
WILL: ADAPT THE PHYSICAL INFRASTRUCTURE TO PRESERVE

HISTORIC PARTS OF THE BUILDING, INCREASE SAFETY AND

EFFICIENCY AND PROTECT THE MUSEUM'S INVALUABLE
COLLECTION; ENHANCE ACCESSIBILITY AND FUNCTIONALITY THROUGH REMODELED SPACES THAT SERVE THE

MUSEUM'S NEEDS AND THOSE OF THE COMMUNITY AND

ADVANCE THE MUSEUM'S MISSION THROUGH ENHANCED
VISITOR EXPERIENCES AND ACCOMMODATIONS. THE

MUSEUM BUILDING CURRENTLY SERVES AS AN EXHIBIT

HALL, CLASSROOM, RETAIL SPACE, EVENT VENUE, OFFICE,
WORKSHOP AND COLLECTIONS STORAGE. WITH THE NEW

PROJECT THE SAME USES WILL OCCUR IN A PURPOSE

DESIGNED BUILDING AND NEW CLASSROOM TO SERVE THE
MUSEUM COMMUNITY FOR THE NEXT 50 YEARS.

SET IN TYRRELL PARK, THE MUSEUM WILL CONTINUE TO

MAINTAIN A LEARNING GARDEN SURROUNDING THE
BUILDING. THE AMPHITHEATER WILL BE REBUILT IN THE
SAME LOCATION TO IMPROVE ACCESSIBILITY. PATHWAYS

AROUND THE MUSEUM, IN THE PARK AND TO THE ICONIC
WHALE SCULPTURE WILL BE MADE ACCESSIBLE.

PLANNING & BUILDING: CITY OF SANTA CRUZ
FIRE: SANTA CRUZ FIRE DEPT.

WATER: SANTA CRUZ WATER DEPT.

ARCHITECTURAL
SHEET

FLOOR AREA CALCULATIONS VICINITY MAP

EDMUNSON SURVEYS
1512 SEABRIGHT AVE.

SANTA CRUZ, CA 95062
(831) 425-1796
[email protected]
A1: SITE PLAN, PROJECT DATA
A2: SITE PLAN
A3: EXISTING PLANS
A4: PROPOSED FLOOR PLANS
A5: PROPOSED ELEVATIONS
A6: ROOF PLAN & SECTIONS
A7: SHADOW STUDY
A8: SHADOW STUDY
A9: COLORS AND MATERIALS
A10: COLORS AND MATERIALS

CIVIL ENGINEERING
C1.0: GRADING AND DRAINAGE
C2.0: STORM WATER CONTROL

LANDSCAPE
L1.00: LANDSCAPE SITE PLAN
L1.01: PLANTING PLAN & SCHEDULE
L2.0: PLANTING PLAN & SCHEDULE
SURVEY SHEET 1
SURVEY SHEET 2
LANDSCAPE ARCHITECT: RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
(XXX) XXX-XXXX
xxxx
FELICIA VAN STOLK, EXEC. DIRECTOR
1305 E. CLIFF DRIVE
SANTA CRUZ, CA 95062
(831) 420-6115 x 11
[email protected]
ARCHITECTURAL HISTORIAN: STEVEN FARNETH

ARCHITECTURAL RESOURCES GROUP
PIER 9, THE EMBARCADERO, SUITE 107
SAN FRANCISCO, CA 94111
(415) 264-3082
[email protected]

LOWER LEVEL

EXISTING
OFFICE

COLLECTIONS

LOBBY / RESTROOMS

STORAGE

TOTAL LOWER LEVEL
1,159 SF
589 SF
56 SF
76 SF
1,880 SF

UPPER LEVEL

EXHIBIT AREA

RECEPTION
LOBBY

GIFT SHOP

STORAGE

RESTROOM

TOTAL UPPER LEVEL

TOTAL BUILDING AREA
2,534 SF
103 SF
58 SF
296 SF
27 SF
136 SF
3,154 SF
5,034 SF

PROPOSED

AREA LOWER LEVEL AREA

MID LEVEL

UPPER LEVEL

EXHIBIT AREA

RECEPTION
LOBBY

GIFT SHOP

STORAGE

RESTROOM

TOTAL UPPER LEVEL
3,565 SF
91 SF
57 SF
296 SF
240 SF
54 SF
4,303 SF

ATTIC STORAGE

TOTAL BUILDING AREA
1,103 SF
10,660 SF

SHEET INDEX

PROJECT DATA
PROJECT ADDRESS: 1305 EAST CLIFF DRIVE
SANTA CRUZ, CA 95062
APN #: 010-282-01
ZONING: PK-PARK,

PF-PUBLIC FACILITY

B U I L D I N G I M P R O V E M E N T P R O J E C T
VIEW FROM THE CORNER OF PILKINGTON AVE. AND E. CLIFF DR. LOOKING NORTH VIEW FROM PILKINGTON AVE. LOOKING SOUTH OFFICE

COLLECTIONS

RESTROOMS

STORAGE & ELEC

STAIRS / CIRCULATION

TOTAL LOWER LEVEL
1,642 SF
963 SF
93 SF
108 SF
384 SF
3,190 SF

COMMUNITY ROOM

LOBBY / RESTROOMS
ELEVATOR & MACH. RM

STORAGE

CATERING
TRASH

TOTAL MID LEVEL
1,090 SF
487 SF
136 SF
235 SF
85 SF
31 SF
2,064 SF

PROJECT INFORMATION
A1
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA

15.42 SITE PLAN 2 SCALE: 1" = 20'-0"

N O R T H
AERIAL VIEW 1 SCALE: 1" = 20'-0"
12"TREE
20"TREE
56"CYPRESS
48"EUC
28"OAK
24"OAK
24"RW
18"RW
12"RW
18"OAK
5"X5"TREE
12"TREE
15" TREE
26" TREE
10" TREE
8"TREE
8"TREE
10"TREE

MULTI EUCALYPTUS

CYPRESS

CYPRESS

CYPRESS

CYPRESS

TOP OF SLOPE

WHALE SCULPTURE
24" TREE

UTILITY POLE
(E)PATH

FLOWLINE OF CREEK
MUSEUM

B R O O K A V E N U E
E A S T C L I F F D R I V E 40 38

P I L K I N G T O N A V E N U E
30 F O R B E S S T R E E T
20 20 E A S T C L I F F D R I V E
30 30
40 TOP OF
BANK
TOP OF
SLOPE

D/G PATH

FLOWLINE

OF CREEK

CITY CURB, GUTTER

AND SIDEWALK

CITY CURB, GUTTER

AND SIDEWALK

CITY CURB, GUTTER

AND SIDEWALK
TOP OF
SLOPE
TOP OF
SLOPE
20 20
TOP OF
BANK

FLOWLINE

OF CREEK
EXIST. CONC. PATH

UTILITY POLE
36 34
32 UTILITY POLE
20 ADDITION

EXISTING MUSEUM
56'

SEE LANDSCAPE PLANS

FOR PATHWAY AND

AMPHITHEATER DETAILS

PROPOSED

ACCESSIBLE

PARKING

T Y R R E L L P A R K

GARDEN SHED

TERRACE
LOWER

TERRACE

SEE CIVIL
DWGS

SEE CIVIL DWGS
SEE
CIVIL
DWGS
BIKE
RACKS
(E)PATH

AMPHITHEATER

ACCESSIBLE
PATH
ENTRY
MAIN
ENTRY
PATIO
DN

DN SITE PLAN AND AIREAL VIEW
A2
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION LICENSED ARCHITECTSTATE OF CALIFORNIA

15.43 EXISTING UPPER LEVEL 1 SCALE: 1/8"=1'-0"
EXISTING LOWER LEVEL 2 SCALE: 1/8"=1'-0" ?
UP
UP
DN
UP
BENCH

BENCH BENCH
BENCH
EXISTING EAST ELEVATION 4 SCALE: 1/8"=1'-0"
EXISTING WEST ELEVATION 6 SCALE: 1/8"=1'-0"
EXISTING SOUTH ELEVATION 3 SCALE: 1/8"=1'-0"
EXISTING NORTH ELEVATION 5 SCALE: 1/8"=1'-0"

COLLECTIONS
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE

EXHIBIT AREA

EXHIBIT AREA

GIFT SHOP

RECEPTION

EXHIBIT AREA

COMPOSITION
ROOF
STUCCO

DASHED TEXTURE

ORIGINAL WOOD

FRAME WINDOWS

WOOD BELT LINE EXISTING PLANS AND ELEVATIONS
A3
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION LICENSED ARCHITECTSTATE OF CALIFORNIA

15.44 UP

GIFTSHOP
BENCH
REC.

FF 44.5'
FF +/- 35.5'
STOR
LOBBY
STORAGE:

OFFICE
RETAIL

40.0'
COMM. ROOM

35.5'

NEW FLOOR AREA
39'-8"
WC 2
WC 4
WC 3
MID AND LOWER LEVEL 3 SCALE: 1/8"=1'-0"
UPPER LEVEL 2 SCALE: 1/8"=1'-0"
UP

40.0'
DN

40.0'
DN
4'x12' TABLE 11'-5 1/2"
14'-0"

COLLECTIONS
29'-3" x 23'-6"

COLLECTIONS/

WORKSPACE
15'-3"
OFFICE 1
OFFICE 2
OFFICE 3
OPEN

UP WORKSPACE

44.5'

TERRACE
14'-0"
LOW

DIVIDER
2'x5' DESK
4'-9 1/2" 5'-6"
ELECTRICAL?

STORAGE

UNDER STAIR
WC 5
LOBBY

ASSUME COLUMNS

TO REPLACE WALL
EXIST. WALLS

53.5'
DN
ATTIC STORAGE 1 SCALE: 1/8"=1'-0"

ATTIC STORAGE
LOW
WALL
LOW
WALL
MOVE
WINDOW

E X H I B I T A R E A

STAIR TO
ATTIC

ASSUME COLUMNS

TO REPLACE WALL
PATIO
TRASH

CATERING

STATION
STOR?

BREAK ROOM
12'-7 x 17'-8
10' x 7'-4 10' x 10'-9
27' x 38'-7
WC 1
8' x 9'-6'
8' SGD 5'-0"
QUAR. 10'-0" 48'-8"
JAN

FLAT ROOF

MECH EQUIP

LOW ROOF

OVER TRASH

LOW WALL

RECEPTION
DESK 39'-6
ENTRY

EXHIBIT
EXIST. CONC. WALK

ENTRY FOYER
DBL. DOORS OR

OVERHEAD DOOR
CANVAS
AWNING
CANVAS
AWNING
6'-0"
BIKE 2'

RETRACTABLE

PROJECTOR
SCREEN
DN
UP

LOW GARDEN SHED
ELEV

MACHINE
ROOM
DN
UP

ELEVATOR ELEVATOR ELEVATOR

E X H I B I T A R E A

E X H I B I T A R E A

LOW ACCESS

DOOR TO

LOBBY ATTIC
4'-9"
SCUPPER 10'-7" 16'-7 1/2" 16'-5 1/2"
5'-1" 5'-2 17'-8"

LIMITED ATTIC

STORAGE
8'-5 1/2" 53'-8"

DN LOWER TERRACE
DN

DN PROPOSED FLOOR PLANS
A4
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA

15.45 WEST ELEVATION 2 SCALE: 1/8"=1'-0"
PARTIAL SOUTH ELEVATION 5 SCALE: 1/8"=1'-0"
NORTH ELEVATION 4 SCALE: 1/8"=1'-0"

ATTIC FLOOR
CLASSROOM FF /- 40.0'
FF +/- 44.5'
FF +/- 53.5'
8:12
FF +/- 35.5'
TRASH RM. DRS
ACCESS

TO ROOF

SCREEN WALL
SOUTH ELEVATION 1 SCALE: 1/8"=1'-0"
FF /- 44.5'
FF +/- 40.0'

MAIN ENTRANCE
8:12
FF +/- 53.5'
EAST ELEVATION 3 SCALE: 1/8"=1'-0"

HISTORIC

BUILDING
LATER

ADDITIONS

NEW SIDE

ENTRANCE
FF +/- 44.5'

EXISTING
STAIRS
NOTE:

SEE SHEETS A9 AND A10 FOR

PROPODED BUILDING
COLORS AND MATERIALS.

GARDEN

STORAGE
FF +/- 40.0'

ATTIC FLOOR
8:12

LOW SLOPE ROOF
BACK TO ELEV. TOWER

WEST LOBBY

ENTRANCE
SHADED AREA: DASHED

STUCCO TO MATCH
EXISTING BUILDING.

SMOOTH TEXTURE ABOVE
4:12

HISTORIC

BUILDING
LATER

ADDITIONS
MECH. ROOF
3:12
3:12

FALSE WINDOWS
@ ELEV. SHAFT
CRICKET, TYP. PROPOSED ELEVATIONS
A5
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION LICENSED ARCHITECTSTATE OF CALIFORNIA

15.46 LOBBY

TRSH STORAGE ROOM
ELEV
+/- 35.5'

ROOF ACCESS
MECH 8'-0"
+/- 40'-0"
ELEV.

DOOR TO STAIR

TO ATTIC
8:12
8:12 12'-0" +/-8' +/-8'

ATTIC STOR

COMMUNITY RM
SECTION C 3 SCALE: 1/8"=1'-0"
8:12
FF 44.5'
FF 35.5'
8'-0" 12'-0" 12'-0" 2'-6"

MUSEUM EXHIBIT SPACE
ATTIC

OFFICE OFFICE COLLETIONS
MECH
SECTION B 2 SCALE: 1/8"=1'-0"
SECTION A 1 SCALE: 1/8"=1'-0"

53.5'
+/- 35.5'
+/- 40.0'
+/- 44.5'

CATERING
ROOF PLAN 4 SCALE: 1/8"=1'-0"

FLAT ROOF
8:12 8:12
5:12
8:12
4:12

NEW ADDITION
EXIST. BLDG.

PARAPET

PARAPET
LOW
PITCH

ROOF A A BB C C

SCUPPER
3:12
FLAT
ROOF
MECH
DOWNSPOUTS, TYP. EQUIP

EXISTING

SKYLIGHT

APPROXIMATE LOCATION

OF SOLAR PANELS
ELEV.

MACHINE
ROOM
3:12
3:12

VERIFY CEILING

HEIGHT AT

STAIR LANDING
DOWNSPOUTS, TYP.

ALIGN
GUTTERS ?
ATTIC

ATTIC STORAGE

ABOVE LOBBY
5:12
3:12 SECTIONS AND ROOF PLAN
A6
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION LICENSED ARCHITECTSTATE OF CALIFORNIA

15.47 GSPublisherVersion 399.56.62.100

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE
NNN
NNN
SCALE: 1" = 30' 1
SUMMER SOLSTICE (JUNE 20TH) 9AM SHADOW STUDY
SCALE: 1" = 30' 2
SUMMER SOLSTICE (JUNE 20TH) 12PM SHADOW STUDY
SCALE: 1" = 30'
3 SUMMER SOLSTICE (JUNE 20TH) 3PM SHADOW STUDY
SCALE: 1" = 30' 4
WINTER SOLSTICE (DEC 21ST) 9AM SHADOW STUDY
SCALE: 1" = 30' 5
WINTER SOLSTICE (DEC 21ST) 12PM SHADOW STUDY
SCALE: 1" = 30'
6 WINTER SOLSTICE (DEC 21ST) 3PM SHADOW STUDY PROPOSED FLOOR PLANS A4
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA
A7SHADOW STUDY

15.48 GSPublisherVersion 399.56.62.100

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE

E CLIFF DR

BROOK AVE
NNN
NNN
SCALE: 1" = 30' 1
SPRING EQUINOX (MARCH 20TH) 9AM SHADOW STUDY
SCALE: 1" = 30' 2
SPRING EQUINOX (MARCH 20TH) 12PM SHADOW STUDY
SCALE: 1" = 30'
3 SPRING EQUINOX (MARCH 20TH) 3PM SHADOW STUDY
SCALE: 1" = 30' 4
FALL EQUINOX (SEP 22ND) 9AM SHADOW STUDY
SCALE: 1" = 30' 5
FALL EQUINOX (SEP 22ND) 12PM SHADOW STUDY
SCALE: 1" = 30'
6 FALL EQUINOX (SEP 22ND) 3PM SHADOW STUDY PROPOSED FLOOR PLANS A4
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA
A8SHADOW STUDY

15.49 GSPublisherVersion 399.56.62.100
WEST ELEVATION 2 SCALE: 1/8"=1'-0"

PARTIAL SOUTH ELEVATION
5 SCALE: 1/8"=1'-0"
NORTH ELEVATION 4 SCALE: 1/8"=1'-0"

ATTIC FLOOR
CLASSROOM FF /- 40.0'
FF +/- 44.5'
FF +/- 53.5'
8:12
FF +/- 35.5'
TRASH RM. DRS
ACCESS

TO ROOF

SCREEN WALL

SOUTH ELEVATION
1 SCALE: 1/8"=1'-0"
FF /- 44.5'
FF +/- 40.0'

MAIN ENTRANCE
8:12
FF +/- 53.5'

EAST ELEVATION
3 SCALE: 1/8"=1'-0"

HISTORIC

BUILDING
LATER

ADDITIONS

NEW SIDE

ENTRANCE
FF +/- 44.5'

EXISTING
STAIRS
NOTE:

SEE SHEETS A9 AND A10

FOR PROPODED BUILDING
COLORS AND MATERIALS.

GARDEN

STORAGE
FF +/- 40.0'

ATTIC FLOOR
8:12

LOW SLOPE ROOF
BACK TO ELEV. TOWER

WEST LOBBY

ENTRANCE
SHADED AREA: DASHED

STUCCO TO MATCH
EXISTING BUILDING.

SMOOTH TEXTURE ABOVE
4:12

HISTORIC

BUILDING
LATER

ADDITIONS
MECH. ROOF
3:12
3:12

FALSE WINDOWS
@ ELEV. SHAFT
CRICKET, TYP.

D1-4 A1-4 C1-2 A1-3 C1-1 A1-2 A1-1
D1-4 D1-2 A1-3 C1-2
B1-2
A1-4 A1-4 A1-4 C1-2 A1-3 C1-1 D1-1 B1-1 A1-1 A1-2 A1-2 D1-1 B1-1 C1-1 A1-1 D1-1 C1-1 A1-2 A1-1 C1-2 A1-4 A1-3 B1-3 B1-2 A1-4 A1-4 B1-2 C1-2 A1-4 D1-1
D1-1 A1-2
A1-4 A1-4 B1-2
D1-4 D1-4 D1-1
D1-1 D1-4 D1-4
A1-3 B1-3
D1-3 D1-3 D1-1 D1-1 D1-3 D1-3
D1-4 D1-3 D1-3
A1-4
D1-3 D1-3
A1-5
A1-5
A1-5 A1-5
A1-5
D1-1
D1-4
D1-4

HISTORIC

BUILDING
LATER

ADDITIONS
LATER

ADDITIONS PROPOSED FLOOR PLANS
A4
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA
A9COLORS AND MATERIALS

15.50 GSPublisherVersion 225.58.64.100
A1-1 EXISTING

BELTLINE TRIM TO BE

REPAIRED OR REPLACED

IF DAMAGED
C1-1 NEW

COMPOSITION ROOFING

AT THE EXISTING

BUILDING
C1-2 NEW STANDING

SEAM METAL ROOF
D1-1 EXISTING GUTTERS

AND DOWNSPOUTS ARE TO

REMAIN AND BE REPAIRED

AS NECESSARY
B1-2 NEW HIGHQUALITY ALUMINUM
WINDOWS.

DARK BRONZE COLOR
A1-3 NEW STUCCO

WITH DASHED TEXTURE

BELOW THE BELTLINE

TO MATCH EXISTING
A1-4 NEW STUCCO

WITH SMOOTH TEXTURE

ABOVE THE BELTLINE

FOR NEW ELEMENTS,

SHERWIN WILLIAMS

ALABASTER COLOR
A1-2 EXISTING STUCCO

TO REMAIN AND BE

REPAIRED WHERE

NECESSARY
B1-1 EXISTING WINDOWS

AND DOORS TO REMAIN AND
BE REPAIRED AS NECESSARY.

TO BE PAINTED A DARK

BRONZE COLOR TO MATCH

THE NEW DOORS AND

WINDOWS
D1-2 NEW POWDERCOATED STEEL

BRACKETS
B1-3 NEW STOREFRONT
DOORS AND WINDOWS.

COLOR TO BE DARK
BRONZE
D1-3 NEW AWNINGS TO

MATCH HISTORIC
A1-5 NEW BELTLINE

TRIM TO MATCH

EXISTING
D1-4 NEW GUTTERS
WITH 5" OGEE COPPER

GUTTERS AND COPPER

DOWNSPOUTS PROPOSED FLOOR PLANS
A4
THOMAS

THACHER
ARCHITECT 1305 EAST CLIFF DRIVE, SANTA CRUZ, CA MUSEUM OF NATURAL HISTORY 215 OREGON STREET
SANTA CRUZ, CA. 95060
(831) 566-3079
[email protected]
C 12725

THOMAS THACHER
DECEMBER 31, 2025

EXPIRATION

LICENSED ARCHITECT

STATE OF CALIFORNIA
A10 COLORS AND MATERIALS

15.51 42.03

27.94 39.31

41.11 38.72

41.18 34.42

18.62 42.01

41.10 42.05

39.30 42.03

27.92 34.41

18.61 41.03

37.68 41.0723

41.66 41.62

41.42 41.04 40.84

40.67 40.66

41.61 41.55

41.08 42.69

42.57 40.90

41.39 41.49

41.35 41.25

40.74 42.30

41.24 41.09

41.08 41.00

40.50 42.00

41.86 40.37 40.89

41.005 41.31

40.90 41.70

41.64 41.81 41.85

42.05 42.33

41.84 41.33

40.84 41.30 41.32

40.97 41.01

40.81 40.80

40.45 40.77

40.23 40.18

40.09 39.82

39.62 40.28

40.20 40.11

40.06 40.28

42.29 42.28 41.84 41.71 41.64

41.83 41.32 41.30 41.29

40.80 40.84

40.40 40.84 41.52

40.83 40.79

40.42 40.41

41.32 40.02

40.73 39.79

39.70 39.03

39.25 38.30

39.00 39.10

39.96 39.43

38.53 38.41

37.72 38.49

38.79 37.86

37.73 37.07

36.37 37.03

37.12 38.04

37.38 36.48

36.36 35.69

36.32 36.64

35.79 35.68

35.03 34.91

34.24 34.89

35.02 35.97

35.14 34.21

34.07 33.40

32.61 33.30

33.42 34.40

33.53 32.52

32.38 31.67

32.51 32.80

31.75 31.60

30.94 30.08

30.71 31.91

30.86 30.37

31.17 30.18

30.06 29.51 29.47

30.37 29.36

29.26 28.66

29.62 28.57

28.98 29.61

29.62 29.66

30.24 30.77

29.64 30.79

30.78 32.42 30.82 31.20

30.78 31.26

31.14 30.87 30.84

30.21 30.74 30.80

29.70 29.61

28.58 27.84

28.47 27.84

27.17 27.38

27.06 27.28

27.22 27.09

27.55 42.06

41.09 41.26

42.09 41.03

44.32 44.31

41.08 42.07

42.88 43.04 44.19 42.86

43.83 42.84

43.26 42.78

42.96 42.90

42.78 42.74

42.40 42.46

42.42 42.31 42.27

42.09 42.43

42.79 42.62

42.74 42.75

42.74 42.12

40.62 40.95

40.98 40.99

40.76 39.87

40.44 41.86

42.34 42.61

42.89 43.07

43.04 43.23 43.79

44.224.17

43.83 43.53

42.84 44.33

44.32 44.46

44.35 44.34

44.36 44.30

44.39 44.52

44.50 44.48

44.33 44.32

44.31 42.08

42.38 44.27

44.42 44.32

44.29 44.26

44.29 40.82

40.81 42.19

41.67 42.40

42.27 44.35

42.73 43.10

43.23 42.92

42.92 42.85 42.80

42.51 42.42

42.82 42.35

40.54 41.68

41.56 41.62

41.65 41.74

41.77 41.68

41.66 42.09

40.08 39.95

40.99 40.30

42.03 41.89

40.71 40.48 40.54

40.12 40.50

40.77 40.94

41.20 41.00

40.97 41.09

41.05 41.02

41.12 40.59

40.99 41.13

36.46 41.03

41.08 41.30

44.40 44.34

40.68 39.89

44.36 44.42

44.50 44.38

44.40 40.71

40.71 44.47

40.12 40.61

39.72 38.69

38.84 39.47

39.31 39.44

35.35 35.33

35.32 35.48

35.16 35.35

35.17 35.16

41.16 41.18

39.24 39.18

36.85 36.78

37.48 36.15

35.44 32.60

32.57 33.48

36.09 35.14

35.26 34.64 34.47

34.70 34.24

36.54 36.62

36.91 36.52

36.88 36.44

36.46 36.53

36.56 36.30

36.33 33.61

34.52 34.56

34.42 34.3133.84

33.03 32.93

32.87 32.82

33.61 32.60

32.63 32.65

32.65 32.59

32.59 32.55 32.38

31.38 31.32

31.45 31.41

31.37 31.37

30.62 31.06

31.10 31.30

31.30 31.32

31.26 31.31 30.99

30.11 29.78

29.82 30.09

30.143

30.28 31.63 32.30

32.61 31.30

30.13 32.61

32.67 31.33

34.06 34.60

34.60 34.08

32.71 31.38

31.37 32.69

34.09 34.62

31.32 31.32

30.69 30.70

30.72 30.60

31.36 30.72

30.80 30.63

30.59 30.58

30.64 30.83 30.80

30.71 30.76

30.79 30.75

30.09 29.56

29.49 30.17 30.27

29.43 28.99

28.96 29.47

29.76 29.75

29.08 29.52

29.53 30.11

31.05 29.75

30.74 30.70 30.74

29.61 29.53

29.08 29.38 29.57

29.75 29.94

30.35 30.75

32.27 33.56

34.01 34.45

33.97 34.24

34.43 34.13

33.73 33.30

32.67 31.95

30.94 36.02

36.57 36.62

36.67 36.35

36.30 36.96

37.21 37.66

38.02 38.25

38.45 37.92

37.44 37.81

37.58 37.70

37.88 38.64

36.13 37.74

38.61 38.48

39.96 39.91

40.02 40.31

41.13 41.12

41.00 40.89

40.72 40.60

41.03 41.14

41.34 41.37

40.04 40.27

40.38 40.75

40.57 40.31

40.17 40.37

40.06 39.97

39.62 39.96

40.24 39.42

39.82 39.28

39.00898

38.72 39.110

38.39 38.56

38.24 38.13

39.14 38.97 39.14

38.94 38.96

39.06 39.11 39.04

38.66 38.38

38.48 38.71

39.13 39.18

39.38 38.47

38.35 38.09

38.3438.26

38.38 38.54 38.45

38.48 38.87

38.64 38.37

38.20 38.22 38.15

38.22 35.28

35.31 35.25

35.46 35.23

35.20 35.47

37.10 38.29

37.82 36.95

37.03 37.37

39.10 39.05

38.16 38.64

39.19 39.14

39.34 39.28 38.53

38.14 38.05

42.41 42.26

41.51 39.88

38.52 36.58

35.57 33.86

33.86 34.65

35.18 35.12

34.71 34.21

33.50 33.10

33.10 37.23

37.23 37.77

39.20 39.79

37.71 35.85

32.65 33.77

34.23 36.51

35.23 35.26 35.19

35.15 35.09

34.87 35.01 35.20

35.83 35.99

35.87 36.06

36.31 35.27

35.26 35.22

35.20 35.42

35.09 35.08

34.89 35.00 35.02

34.99 35.05

35.01 44.32

44.47 44.32

44.29 35.16

35.12 34.56

34.96 34.63 34.29

34.41 35.05

34.90 34.89

34.34 34.36

34.68 34.91

34.80 28.94

29.67 30.22

30.84 30.80

30.76 29.40

30.14 30.25

30.07 30.29

30.07 30.04

29.97 29.95

29.95 29.56

29.56 29.85

30.19 29.91

29.45 29.73 29.42

27.76 30.18

30.00 26.64

29.71 26.52

26.12 29.11

27.76 27.68

27.86 27.89

27.89 27.93

27.77 28.45

27.76 35.52

33.71 33.02

36.09 36.09

35.30 34.80

34.77 33.94

34.45 34.68

34.92 34.29

33.19 30.72

31.05 31.40

32.69 33.10

34.12 34.59

34.57 35.26

36.13 36.61

37.20 36.33

35.88 35.53

34.44 34.24

33.92 33.79

34.16 27.62

28.11 27.66

26.66 26.23

26.34 25.99

25.55 25.98

26.36 26.44

35.50 42.20

34.67 34.08

34.80 32.61

32.15 31.28

30.72 31.37

32.66 26.69

27.81 27.93

27.66 27.76

27.87 27.76

28.54 22.42

21.42 19.20

20.22 21.84

21.51 17.46

16.98 17.64

17.40 15.81

15.62 12.76

36.76 35.71

34.39 32.90

31.89 100.00
©
© 15.52

42.03 27.94

39.31 41.11

38.72 41.18

34.42 18.62

28.59 42.01

41.10 42.05

39.30 42.03

27.92 34.41

18.61 41.03

37.68 41.2307

41.66 41.62

41.42 41.04 40.84

40.67 40.66

41.61 41.55

41.08 42.69

42.57 40.90

41.39 41.49

41.35 41.25

40.74 42.30

41.24 41.09

41.08 41.00

40.50 42.00

41.86 40.37 40.89

41.005 41.31

40.90 41.70

41.64 41.81 41.85

42.05 42.33

41.84 41.33

40.84 41.30 41.32

40.97 41.01

40.81 40.80

40.45 40.77

39.82 39.62

40.28 40.11

40.06 40.28

42.29 42.28 41.84 41.71 41.64

41.83 41.32 41.30 41.29

40.80 40.84

40.40 40.84 41.52

40.83 40.79

40.42 40.41

41.32 40.02

40.73 39.79

39.70 39.03

39.25 38.30

39.00 39.10

39.96 39.43

38.53 38.41

37.72 38.49

38.79 37.86

37.73 37.07

36.37 37.03

37.12 38.04

37.38 36.48

36.36 35.69

36.32 36.64

35.79 35.68

35.03 34.91

34.24 34.89

35.02 35.97

35.14 34.21

34.07 33.40

32.61 33.30

33.42 34.40

33.53 32.52

32.38 31.67

32.51 32.80

31.75 31.60

30.94 30.08

30.71 31.91

30.86 30.37

31.17 30.18

30.06 29.51 29.47

30.37 29.36

29.26 28.66

29.62 28.57

28.98 29.61

29.62 29.66

30.24 30.77

29.64 30.79

30.78 32.42 30.82 31.20

30.78 31.26

31.14 30.87 30.84

30.21 30.74 30.80

29.70 29.61

28.58 27.84

28.47 27.84

27.17 27.38

27.06 27.28

27.22 27.09

27.55 26.33

42.06 41.09

41.26 42.09

41.03 44.32

44.31 41.08

42.07 42.88

43.04 44.19 42.86

43.83 42.84

43.26 42.78

42.96 42.90

42.78 42.74

42.40 42.46

42.42 42.31 42.27

42.09 42.43

42.79 42.62

42.74 42.75

42.74 42.12

40.62 40.95

40.98 40.99

40.76 39.87

40.44 41.86

42.34 42.61

42.89 43.07

43.04 43.23 43.79

44.224.17

43.83 43.53

42.84 44.33

44.32 44.46

44.35 44.34

44.36 44.30

44.39 44.52

44.50 44.48

44.33 44.32

44.31 42.08

42.38 44.27

44.42 44.32

44.29 44.26

44.29 40.82

40.81 42.19

41.67 42.40

42.27 44.35

42.73 43.10

43.23 42.92

42.92 42.85 42.80

42.51 42.42

42.82 42.35

40.54 41.68

41.56 41.62

41.65 41.74

41.77 41.68

41.66 42.09

40.08 39.95

40.99 40.30

42.03 41.89

40.71 40.48 40.54

40.12 40.50

40.77 40.94

41.20 41.00

40.97 41.09

41.05 41.02

41.12 40.59

40.99 41.13

36.46 41.03

41.08 41.30

44.40 44.34

40.68 39.89

44.36 44.42

44.50 44.38

44.40 40.71

40.71 44.47

40.12 40.61

39.72 38.69

38.84 39.47

39.31 39.44

35.35 35.33

35.32 35.48

35.16 35.35

35.17 35.16

41.16 41.18

39.24 39.18

36.85 36.78

37.48 36.15

35.44 32.60

32.57 33.48

36.09 35.14

35.26 34.64 34.47

34.70 34.24

36.54 36.62

36.91 36.52

36.88 36.44

36.46 36.53

36.56 36.30

36.33 33.61

34.52 34.56

34.42 34.3133.84

33.03 32.93

32.87 32.82

33.61 32.60

32.63 32.65

32.65 32.59

32.59 32.55 32.38

31.38 31.32

31.45 31.41

31.37 31.37

30.62 31.06

31.10 31.30

31.30 31.32

31.26 31.31 30.99

30.11 29.78

29.82 30.09

30.143

30.28 31.63 32.30

32.61 31.30

30.13 32.61

32.67 31.33

34.06 34.60

34.60 34.08

32.71 31.38

31.37 32.69

34.09 34.62

31.32 31.32

30.69 30.70

30.72 30.60

31.36 30.72

30.80 30.63

30.59 30.58

30.64 30.83 30.80

30.71 30.76

30.79 30.75

30.09 29.56

29.49 30.17 30.27

29.43 28.99

28.96 29.47

29.76 29.75

29.08 29.52

29.53 30.11

31.05 29.75

30.74 30.70 30.74

29.61 29.53

29.08 29.38 29.57

29.75 29.94

30.35 30.75

32.27 33.56

34.01 34.45

33.97 34.24

34.43 34.13

33.73 33.30

32.67 31.95

30.94 36.02

36.57 36.62

36.67 36.35

36.30 36.96

37.21 37.66

38.02 38.25

38.45 37.92

37.44 37.81

37.58 37.70

37.88 38.64

36.13 37.74

38.61 38.48

39.96 39.91

40.02 40.31

41.13 41.12

41.00 40.89

40.72 40.60

41.03 41.14

41.34 41.37

40.04 40.27

40.38 40.75

40.57 40.31

40.17 40.37

40.06 39.97

39.62 39.96

40.24 39.42

39.82 39.28

39.00898

38.72 39.110

38.39 38.56

38.24 38.13

39.14 38.97 39.14

38.94 38.96

39.06 39.11 39.04

38.66 38.38

38.48 38.71

39.13 39.18

39.38 38.47

38.35 38.09

38.3438.26

38.38 38.54 38.45

38.48 38.87

38.64 38.37

38.20 38.22 38.15

38.22 35.28

35.31 35.25

35.46 35.23

35.20 35.47

37.10 38.29

37.82 36.95

37.03 37.37

39.10 39.05

38.16 38.64

39.19 39.14

39.34 39.28 38.53

38.14 38.05

42.41 42.26

41.51 39.88

38.52 36.58

35.57 33.86

33.86 34.65

35.18 35.12

34.71 34.21

33.50 33.10

33.10 37.23

37.23 37.77

39.20 39.79

37.71 35.85

32.65 33.77

34.23 36.51

35.23 35.26 35.19

35.15 35.09

34.87 35.01 35.20

35.83 35.99

35.87 36.06

36.31 35.27

35.26 35.22

35.20 35.42

35.09 35.08

34.89 35.00 35.02

34.99 35.05

35.01 44.32

44.47 44.32

44.29 35.16

35.12 34.56

34.96 34.63 34.29

34.41 35.05

34.90 34.89

34.34 34.36

34.68 34.91

34.80 28.94

29.67 30.22

30.84 30.80

30.76 29.40

30.14 30.25

30.07 30.29

30.07 30.04

29.97 29.95

29.95 29.56

29.56 29.85

30.19 29.91

29.45 29.73 29.42

27.76 30.18

30.00 26.64

29.71 26.52

26.12 29.11

27.76 27.68

27.86 27.89

27.89 27.93

27.77 27.00

28.45 27.76

35.52 33.71

33.02 36.09

36.09 35.30

34.80 34.77

33.94 34.45

34.68 34.92

34.29 33.19

30.72 31.05

31.40 32.69

33.10 34.12 34.59

34.57 35.26

36.13 36.61

37.20 36.33

35.88 35.53

34.44 34.24

33.92 33.79

34.16 27.62

26.39 26.35

28.11 27.66

26.66 26.23

26.34 25.99

25.55 25.98

26.36 26.44

35.50 42.20

34.67 34.08

34.80 32.61

32.15 31.28

30.72 31.37

32.66 19.73

26.69 27.81

27.93 27.66

27.76 27.87

27.76 28.54

22.42 21.42

18.00 11.49

11.24 12.69

13.59 13.45

13.03 13.35

19.20 20.22

21.84 21.51

17.46 16.98

17.64 17.40

15.81 15.62

12.47 12.76

10.90 13.53

11.71 12.78

11.41 11.46

11.36 10.54

10.85 10.44

10.42 10.38

10.18 10.40

10.57 12.72

17.83 15.64

36.76 35.71

34.39 32.90

31.89 100.00
©
© 15.53
40'-0'' WOOD DECKING BY ARCHITECTURE (N) CONCRETE STAIRS BY ARCHITECTURE (N) ADA CONCRETE PATH (N) CONCRETE PATH (E) STAIRS (E) STAIRS (E) CONCRETE PATH (N) CONCRETE STEPS (N) ADA STABILIZED GRANITECRETE DG (N) WOOD DECKING STONE SLABS ACCESSIBLE WHEELCHAIR PARKING SPACES, TYP OF 2 (E) CYPRESS TREE (E) EUCALYPTUS TREE (E) CYPRESS TREE 56'' (E) CYPRESS TREE (E) CYPRESS TREE (E) CYPRESS TREE (N) TREE, TYP (E) STAIRS (E) DG PATH (E) OAK TREE 24'' (E) OAK TREE 18'' (E) WHALE SCULPTURE ADA ENGINEERED WOOD FIBER (N) DG PATH (E) DG PATH PILKINGTON AVENUE

FORBES STREET

BROOK AVENUE

EAST CLIFF DRIVE
EAST CLIFF DRIVE L.O.W L.O.W L. O. W L. O. W (E) SIDEWALK +44.40 +38.00 +34.10 +29.80 +35.00 5.0% +34.00 +30.00 L. O. W 3.7% (E) PATH (E) PATH (E) SIDEWALK (N) PATH (E) PATH 4038363432 +35.50 +32.00 +32.50 +34.50 +34.00 +33.00 +34.50 +30.00 +30.00 5% MAX 30 +38.00 +37.00 +37.50 +37.00 +36.0 +36.5 +35.5 +35.00 +34.50 +33.50+34.00 +33.00 +32.5 +32.00 +32.00 +32.50 1%1% 3.3% 4.4% 4.6% 4.5%

4.7% 4.7% 2.7% (N) SIDEWALK 1% 0.25% (N) BIKE RACK - 10 BIKE SPOTS CREEK FLOWLINE (N) CONCRETE WALL 40' CREEK SETBACK 40' CREEK SETBACK 40' CREEK SETBACK (E) LAWN AREA BUILDING PA PAPAPA PA(N) AMPHITHEATER CREEK CREEK CREEK PA PA STPA PA STPA (N) HANDRAILS LIGHT BOLLARD, TYP (E) BIKE RACKS TO REMAIN NEW PROPOSED B-CYCLE RACK LOCATION. LOCATION TO BE COORDINATED WITH PUBLIC WORKS AT THE BUILDING PERMIT APPLICATION EXISTING B-CYCLE RACK LOCATION. TO BE RELOCATED 5'-6" 5'-6"5'-6" 5'-6" 40'-0'' (E) CYPRESS TREE 5'-6" PA STPA NOTE SEE SHEET L1.01 FOR ADDITIONAL INFORMATION ON MATERIALS AND FURNISHINGS MATERIALS LEGEND SYMBOL DESCRIPTION LIMIT OF WORK FURNITURE STONE SLABS BOULDER PLANTING NEW TREE EXISTING TREE TO REMAIN PLANTING AREA EXISTING TURF LAWN STORMWATER PLANTING AREA PAVING NEW CONCRETE PAVING WOOD DECKING ADA STABILIZED GRANITECRETE DG ADA ENGINEERED WOOD FIBER LIGHTING LIGHT BOLLARD CONSULTANT PROJECT/CLIENT NAME SANTA CRUZ MUSEUM OF NATURAL HISTORY 1305 E Cliff Dr, Santa Cruz, CA 95062 PROJECT NUMBER 24043 SUBMITTAL SHEET TITLE DRAWN BY: REGISTRATION AND SIGNATURE No. Date DescriptionCHECKED BY: DATE NOT FOR CONSTRUCTION JMU KM 1 REVISIONS SCALE3/5/2025 AMPHITHEATER REDESIGN 0 10' 20' 40' N LANDSCAPE SITE PLAN L1.00 1" = 20'-0" 15.54 CONSULTANT PROJECT/CLIENT NAME SANTA CRUZ MUSEUM OF NATURAL HISTORY 1305 E Cliff Dr, Santa Cruz, CA 95062 PROJECT NUMBER 24043 SUBMITTAL SHEET TITLE DRAWN BY: REGISTRATION AND SIGNATURE No. Date DescriptionCHECKED BY: DATE NOT FOR CONSTRUCTION JMU KM 1 REVISIONS SCALE3/5/2025 AMPHITHEATER REDESIGN 0 10' 20' 40' N MATERIALS & FURNISHING L1.01 CONCRETE PAVING 02 STABILIZED DG GRANITECRETE 01 ENGINEERED WOOD FIBER 04 WOOD DECKING 03 AMPHITHEATER STONE SLABS 06 BOULDERS 05 MATERIAL: P.I.P. CONCRETE PAVING COLOR: INTEGRAL COLOR BY DAVIS COLORS; COLOR: LIGHT GRAY (IRON OXIDE) FINISH: EXPOSED AGGREGATE FINISH W/ USE OF SURFACE RETARDER NOTE: MATERIAL: STABILIZED DECOMPOSED GRANITECRETE COLOR NATURAL GOLD MATERIAL: ENGINEERED WOOD FIBER, 100% VIRGIN WOOD FIBER, NOT USED WOOD COLOR: NATURAL FINISH: NOTE: LIGHTING BOLLARD 07 MFK: BEGA COLOR: POLYESTER POWDER OR LIQUID PAINT NOTE: BIKE RACK 08 MFR: LANDSCAPE FORMS PRODUCT: RIDE BIKE RACK COLOR: BRONZE METALLIC NOTE: BIKE RACK TO BE SURFACE MOUNTED PER MANUFACTURER RECOMMENDATION DESIGN INTENT DESIGN INTENT DESIGN INTENT 15.55 PLANTING LEGEND SYMBOL DESCRIPTION POLLINATOR GARDEN (CEANOTHUS ARBOREUS / GAMBELIA SPECIOSA / MIMULUS AURANTIACUS / ROSA CALIFORNICA / SCROPHULARIA CALIFORNICA) WOODLAND (FRANGULA CALIFORNICA / GARRYA ELLIPTICA / IRIS DOUGLASIANA / POLYSTICHUM MUNITUM / SALVIA SPATHACEA) COASTAL CREEKSIDE (CAREX PRAEGRACILIS / DICENTRA FORMOSA / JUNCUS PATENS / RUBUS PARVIFOLIUS / SALIX BABYLONICA) COASTAL TERRACE ( ACHILLEA MILLEFOLIUM / BACCHARIS PILULARIS / DESCHAMPSIACESPITOSA / ERIGERON GLAUCUS / ERIOGONUM ARBORESCENS / PRUNELLA VULGARIS ) STORMWATER PLANTING AREA NEW TREE QTY: 5 EXISTING TREE PLANT COMMUNITY AREAS AND PLANT SPECIES OUTLINED IN THIS SCHEDULE WERE DEVELOPED IN PARTNERSHIP WITH JONI L. JANECKI AND ASSOCIATES AND BASED ON THEIR PLANT COMMUNITY DIAGRAM DATED FEBRUARY 6TH, 2020 40' CREEK SETBACK BUILDING PILKINGTON AVENUE

FORBES STREET

BROOK AVENUE

EAST CLIFF DRIVE
EAST CLIFF DRIVE L.O.W L.O.W L. O. W L. O. W CONSULTANT PROJECT/CLIENT NAME SANTA CRUZ MUSEUM OF NATURAL HISTORY 1305 E Cliff Dr, Santa Cruz, CA 95062 PROJECT NUMBER 24043 SUBMITTAL SHEET TITLE DRAWN BY: REGISTRATION AND SIGNATURE No. Date DescriptionCHECKED BY: DATE NOT FOR CONSTRUCTION JMU KM 1 REVISIONS SCALE3/5/2025 AMPHITHEATER REDESIGN 0 10' 20' 40' PLANTING PLAN & SCHEDULE L2.00N1" = 20'-0" 15.56 EXHIBIT 4

CONSTRUCTION CONTRACT
[City-Approved AIA DesignBuild Contract]

15.57 EXHIBIT 5
Contractor Insurance and Bond Requirements
Contractor and its Subcontractor(s) shall procure and maintain insurance against claims for injuries to persons or damages to property and otherwise which may arise from or in connection with the performance of the work under this Contract and the results of that work by Contractor, its employees, subcontractors, and agents.

A. CERTIFICATE REQUIREMENTS
The Museum will be issued a Certificate of Insurance (a Memorandum of Understanding will not be accepted) with the following minimum requirements:
● Certificate(s) will show current policy number(s) and effective dates, ● Coverage and policy limits will meet, or exceed, requirements below, ● The Certificate Holder will be Santa Cruz Museum of Natural History, 1305 East Cliff Drive, Santa Cruz, CA 95062,
● Certificate will be signed by an authorized representative, ● An endorsement, if required below, will be provided to show the Museum and the City of Santa Cruz, their officers, officials, employees, and volunteers as additional insureds, and ● Coverages must be maintained during the term of the Agreement with the Museum, unless a longer duration is required as specified below.

B. MINIMUM SCOPE AND LIMITS OF INSURANCE
Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. If Contractor maintains broader insurance coverage and/or higher limits than the minimums shown below, the Santa Cruz Museum of Natural History requires and shall be entitled to the broader insurance coverage and/or higher limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Museum.

Contractor shall procure and maintain insurance coverage and surety bonds during the term of the Contract as follows:

1. Commercial General Liability Insurance. (CGL): $5,000,000 PER OCCURRENCE; $5,000,000 AGGREGATE. Proof of coverage for $5 Million per occurrence and $5 Million in the aggregate, including products and completed operations, property damage, bodily injury, personal and advertising injury will be provided on Insurance Services Office (ISO) Form CG 00 01 covering CGL. The policy must be endorsed or include coverage for employer liability.

2. Professional Liability (Errors And Omissions): $2,000,000 PER OCCURRENCE OR CLAIM, $2,000,000 AGGREGATE. Contractor will maintain insurance appropriate to Contractor’s profession; with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after date of completion of the services under this Agreement. If coverage is canceled or non-renewed and not replaced with another claimsmade policy form with a Retroactive Date prior to the contract effective date or start of

15.58 work date, Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of the contract of work.

3. Automobile Liability Insurance. Proof of coverage for not less than $1,000,000 per accident for bodily injury and property damage provided on ISO Form Number CA 00 01 covering any auto (Code 1), or if Contractor has no owned autos, hired, (Code 8) and nonowned autos (Code 9).

4. Workers’ Compensation and Employer’s Liability Insurance. Worker’s Compensation as required by the Labor Code of the State of California with statutory limits, and Employer’s Liability Insurance for all employees in workplaces involved in this Contract in the amount of, at least, $1,000,000 per accident for bodily injury or disease. The Certificate of Insurance shall include waiver of subrogation endorsement in favor of the Museum and the City of Santa Cruz for all work performed by the Contractor and its employees. (Not required if Contractor provides written verification it has no employees) - If Contractor has no employees, Contractor shall complete and sign a Workers’ Compensation Exemption Declaration and Release of Liability Workers’ Compensation Exemption Declaration and Release of Liability.

5. Contractors’ Pollution Liability and/or Asbestos Pollution Liability (CPL) with limits no less than $2,000,000 per occurrence or claim, and $3,000,000 policy aggregate. a. If the services involve lead-based paint or asbestos identification / remediation, the Pollution Liability shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification / remediation, the Pollution Liability shall not contain a mold exclusion and the definition of “Pollution” shall include microbial matter including mold. b. The Automobile Liability policy shall be endorsed to include Transportation Pollution Liability insurance, covering hazardous materials to be transported by Contractor pursuant to the Contract. This coverage may also be provided on the Contractors Pollution Liability policy.

6. Builder’s Risk (Course of Construction) Utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. Such coverage shall include the Museum and the City of Santa Cruz as loss payee.

7. Surety Bond.
a. Contractor shall provide a Labor and Material (Payment) Bond in a sum equal to the contract price, in a form substantially consistent with the template attached hereto as Exhibit 5, subject only to nonmaterial modifications as may be reasonably required by the surety and approved in advance by the City and Museum. b. Contractor shall provide a Performance Bond in a sum equal to the contract price, including a one-year warranty, in a form substantially consistent with the template attached hereto as Exhibit 6, subject only to nonmaterial modifications as may be reasonably required by the surety and approved in advance by the City and Museum. c. Bond(s) shall be duly executed by a responsible corporate surety, authorized to issue

15.59 such bonds in the State of California and secured through an authorized agent with an office in California. Bonds must also be notarized by both Contractor and Surety.

8. Other Requirements.
a. Additional Insured Endorsement. The Museum, the City, and their officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL, CPL, and automobile insurance (if transporting hazardous materials) policies with respect to liability arising out of work or operations performed by or on behalf of Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage will be provided in the form of an endorsement to Contractor’s insurance at least as broad as ISO Form CG 20 10 11 85, or if not available, through the addition of both CG 20 10 CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 (if a later edition is used).
b. Primary Insurance. For any claims related to this Contract, Contractor’s insurance shall be primary and non-contributory as respects Museum, the City, their officials, officers, and employees, individually and collectively. Any insurance, self-insurance, or other coverage maintained by the Museum, the City, their officials, officers, or employees shall be in excess of Contractor’s insurance and shall not contribute to it. c. Waiver of Subrogation. Contractor hereby grants to the Museum and the City of Santa Cruz a waiver of any right to subrogation, except as otherwise not applicable, which any insurer of said Contractor may acquire against the Museum and the City of Santa Cruz by virtue of the payment of any loss, including attorney’s fees under such insurance. Contractor agrees to obtain any endorsement that may be necessary to effectuate this waiver of subrogation, but this provision applies regardless of whether or not the Museum and/or the City of Santa Cruz has received a waiver of subrogation endorsement from the insurer.
d. Notice of Cancellation. The policies specified above are to state that coverage shall not be canceled by either party, except after prior written notice to the Museum. e. Self-Insured Retentions. Any self-insured retention must be declared to and approved by the Museum. Museum may require Contractor to provide proof of ability to pay losses and related expenses.
f. Acceptability of Insurers. Insurance is to be placed with insurers having a current A.M.

Best rating of no less than A-VII or equivalent or as otherwise approved by Museum and the City of Santa Cruz.
g. Subcontractors. The Contractor shall include all Subcontractors as additional insured under the policies or shall furnish separate certificates and endorsements for each Subcontractor. Contractor shall require and verify that all Subcontractors maintain insurance meeting all the requirements stated herein, and the amount of insurance for each Subcontractor is appropriate for that Subcontractor’s work. Contractor shall

15.60 ensure that City is an additional insured on insurance required from Subcontractors. h. Excess Liability/Umbrella Insurance Policies.

Contractor may use excess liability/umbrella policies to meet the required liability limits on the condition that they provide all of the insurance coverages required herein, including, but not limited to, primary and non-contributory, additional insured, SelfInsured Retentions (SIRs), indemnity, and defense requirements. The excess liability/umbrella insurance policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying CGL insurance. No insurance policies maintained by the additional insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.
i. Claims Made Policies. If any of the required policies provide coverage on a claimsmade basis:

1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Contractor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
j. Verification of Coverage. Contractor will furnish the Museum and the City of Santa Cruz with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL, CPL, and automobile Policies listing all policy endorsements to be approved by the Museum and the City of Santa Cruz before work commences. However, failure to obtain the required documents prior to the work beginning will not waive the Contractor’s obligation to provide them. The Museum and the City of Santa Cruz reserve the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. k. Special Risks or Circumstances. Museum reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

15.61 EXHIBIT 5

LABOR AND MATERIAL BOND
WHEREAS, the Santa Cruz Museum of Natural History, a California non-profit public benefit corporation, and __________________, hereinafter designated as the "Principal," entered into a contract identified as Construction Contract dated ___________ for work on the ____________________ project described in the contract document hereby referenced and made a part hereof;
WHEREAS, said Principal is required under the terms of said contract to furnish a Labor and Material Bond, the surety of this bond will pay the same to the extent hereinafter set forth; and NOW, THEREFORE, we the Principal, and a corporation
organized and existing under and by virtue of the laws of the State of California, as surety, are held and firmly bound unto the Santa Cruz Museum of Natural History and the City of Santa Cruz in the sum of __________________________________________________dollars ($________) such sum being not less than one hundred percent (100%) of the estimated contract cost of the work, lawful money of the United States of America, to be paid to the Santa Cruz Museum of Natural History and the City of Santa Cruz, for the payment of which sum, well and truly to be made, we hereby bind ourselves, our heirs, administrators, executors, successors and assign jointly and severally.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal or its heirs, executors, administrators, successors or assigns, shall fail to pay for any materials, provisions, vendor supplies, or equipment as provided in the contract documents, upon, for, or about the performance of the work contracted to be done, or for any work or waiver thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or fails to pay any of the persons authorized under Civil Code Section 9100 to assert a claim against a payment bond, or fails to pay for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board for the wages of employees of the Principal or his/her subcontractor pursuant to Section 18806 of the Revenue and Taxation Code, or fails to pay for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the principal and all subcontractors with respect to such work and labor that the surety or sureties will pay for the same, in an amount not exceeding the sum specified in this bond, and also, in case suit is brought upon the bond, will pay, in addition to the face amount hereof, a reasonable attorney's fee, to be fixed by the Court.

The condition of this obligation is such that its terms inure to the benefit of any of the persons and entities authorized in Civil Code Section 9100 to assert a claim against a payment bond so as to give a right of action to such persons or entities or their assigns in any suit brought upon or action to enforce liability on the bond.

The surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or to the work to be performed thereunder shall in any manner affect its obligation upon this bond, and it does hereby explicitly waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work

15.62 to be performed thereunder, and further explicitly hereby waives its rights under Civil Code Section 2819.

IN WITNESS WHEREOF, the above parties have executed this instrument under their seals this_____ day of____________________, 20__, and duly signed by its undersigned representation, pursuant to authority of its governing body.

PRINCIPAL:

Firm name:

Printed name:

Signature: Date:

Title:

SURETY:

Firm name:

Printed name:

Signature: Date:

Title:

Notice to Surety:

Address:______________________________________________________________________ Contact Person: ________________________________________________________________ Email: _________________________ Phone No.:_________________________________ I hereby approve the form of the within bond.

Office of the City Attorney Date
(Note: Signatures of those executing for the Principal and Surety must include a Notary Acknowledgement.)

15.63 ACKNOWLEDGMENT
State of California )
County of _____________________ )
On before me, ,
(insert name and title of the officer)
personally appeared ____________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

15.64 ACKNOWLEDGMENT
State of California )
County of _____________________ )
On before me, ,
(insert name and title of the officer)
personally appeared ____________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

15.65 EXHIBIT 6

FAITHFUL PERFORMANCE BOND
WHEREAS, the Santa Cruz Museum of Natural History, a California non-profit public benefit corporation, and ________________ hereinafter designated as “Principal” have entered into a contract identified as Contractor Agreement, dated _____________, whereby Principal agrees to install and complete the work on the _______________ project described in the contract document hereby referenced and made a part hereof:

WHEREAS, said Principal is required under the terms of said contract with the Santa Cruz Museum of Natural History to furnish security for the faithful performance of said contract; and NOW, THEREFORE, we, the Principal, and a corporation organized and existing under and by virtue of the laws of the State of , as surety, are held and firmly bound unto the Santa Cruz Museum of Natural History and the City of Santa Cruz, in the sum of ($ ), such sum being not less than
one hundred percent (100%) of the estimated contract cost of the work, lawful money of the United States of America, to be paid to the Santa Cruz Museum of Natural History and the City of Santa Cruz, for payment of which sum, well and truly to be paid, we hereby jointly and severally bind ourselves, our heirs, administrators, executors, successors and assigns, by these presents; NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bound Principal, its heirs, executors, administrators, successors, or assigns will in all things abide by and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or her part, to be kept and performed at the time and in the manner therein specified, and in all respects according to the true intent and meaning, and will indemnify and save harmless the Santa Cruz Museum of Natural History, the City of Santa Cruz, and their officials, officers, agents, and employees, as therein stipulated, then this obligation will become null and void, otherwise it will be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there will be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the Santa Cruz Museum of Natural History and the City of Santa Cruz.

As a condition precedent to the satisfactory completion of the said contract, an obligation in the amount of ($ ), being not less than ten percent (10%) of the estimated contract cost, will remain in force for a period of one (1) year after the official acceptance of said work, during which time if the Principal, its heirs, executors, administrators, successors or assigns will fail to make full, complete and satisfactory repairs and replacements or totally protect the Santa Cruz Museum of Natural History and the City of Santa Cruz from loss or damage made evident during said period of one (1) year from the date of official acceptance of said work and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, the above obligation in the sum of ($ ) shall remain in full force and effect, otherwise the obligation shall be discharged. However, notwithstanding any other

15.66 provisions of this paragraph, the obligation for the surety hereunder will continue so long as any obligation of the Principal remains.

The surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or to the work to be performed thereunder or the specifications shall in any manner affect this obligation upon this bond, and it does hereby explicitly waive notice of any such changes, extensions of time, alterations, or additions to the terms of the contract or to the work to be performed thereunder, or to the specifications, and it further explicitly hereby waives its rights under California Civil Code §2819.

IN WITNESS WHEREOF, the parties have executed this instrument under their seals this __ day of , 20__, and duly signed by its undersigned representative, pursuant to the authority of its governing body.

PRINCIPAL:

Firm name:

Printed name:

Signature: Date:

Title:

SURETY:

Firm name:

Printed name:

Signature: Date:

Title:

Notice to Surety:

Address:______________________________________________________________________ Contact Person: ________________________________________________________________ Email: _________________________ Phone No.:_________________________________ I hereby approve the form of the within bond.

Office of the City Attorney Date
(Note: Signatures of those executing for the Principal and Surety must include a Notary Acknowledgement.)

15.67 ACKNOWLEDGMENT
State of California )
County of _____________________ )
On before me, ,
(insert name and title of the officer)
personally appeared ____________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

15.68 ACKNOWLEDGMENT
State of California )
County of _____________________ )
On before me, ,
(insert name and title of the officer)
personally appeared ____________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________ (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

15.69 AMENDED AND RESTATED LEASE AGREEMENT

BETWEEN

THE CITY OF SANTA CRUZ
AND

SANTA CRUZ MUSEUM OF NATURAL HISTORY
1305 EAST CLIFF DRIVE
SANTA CRUZ, CA 95062

15.70

Page 1 of 35 ends
← All documents from this meeting