CITY OF SANTA FE SPRINGS
PROFESSIONAL SERVICES AGREEMENT
WITH
HARLEY ELLIS DEVEREAUX (HED)
This Professional Services Agreement (“Agreement”) is made and effective as of November 1, 2022, (“Effective Date”), by and between the City of Santa Fe Springs, a California municipal corporation, (“City”) and Harley Ellis Devereaux (HED), a corporation (“Consultant”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:
1. TERM
This Agreement shall commence on [Insert date] and shall remain and continue in effect until the services described herein are completed, but in no event later than [Insert date] unless sooner terminated pursuant to the provisions of this Agreement.
2. SERVICES
Consultant shall perform the services described and set forth in Exhibit A, attached hereto and incorporated herein as though set forth in full (“Request for Proposals”). Consultant shall complete the Services according to any schedule of performance set forth in Exhibit B. To the extent that Exhibit A is a proposal from Consultant and contains provisions inconsistent with this Agreement, the provisions of this Agreement shall govern. The Consultant is hereby directed to proceed with Base Design work only, and not on Specialty or Optional Design Services.
3. PERFORMANCE
Consultant shall at all times faithfully, competently and to the best of Consultant’s ability, experience, and talent, perform all tasks described herein. Consultant shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Consultant under this Agreement.
4. CITY MANAGEMENT
The City Manager or designee shall represent the City in all matters pertaining to the administration of this Agreement, including review and approval of all products submitted by Consultant.
5. PAYMENT
A. City agrees to pay Consultant monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C, attached hereto and incorporated herein by this reference as though set forth in full, based upon actual time spent on the above tasks. This amount shall not exceed One Million, Fifty-
Two Thousand and Four Hundred Dollars ($1,052.400).for the total term of the Agreement unless additional payment is approved as provided in this Agreement.
B. Consultant shall not be compensated for any services rendered in connection with its performance of this Agreement which are in addition to those set forth herein, unless such additional services are authorized in advance and in writing by the City Manager or designee. Consultant shall be compensated for any additional services in the amounts and in the manner as agreed to in writing by the City and Consultant at the time the City’s written authorization is given to Consultant for the performance of said services. The Consultant is hereby directed to proceed with Base Design work only, and not on Specialty or Optional Design Services.
C. Consultant will submit invoices monthly for actual Services performed. Payment shall be made within thirty (30) days of receipt of each invoice as to all nondisputed fees. If the City disputes any of Consultant's Services or fees, it shall give written notice to Consultant within thirty (30) days of receipt of an invoice of any disputed fees set forth on the invoice. Any final payment under this Agreement shall be made within forty-five (45) days of receipt of an invoice therefor.
6. SUSPENSION OR TERMINATION OF AGREEMENT WITHOUT CAUSE A. The City may at any time, for any reason, without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon Consultant at least ten (10) days’ prior written notice. Upon receipt of said notice, Consultant shall immediately cease all Services under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement, such suspension or termination shall not make void or invalidate the remainder of this Agreement.
B. In the event this Agreement is terminated pursuant to this section, the City shall pay to Consultant the actual value of the Services performed up to the time of termination, unless the City disputes any of the Services performed or fees. Upon termination of the Agreement pursuant to this section, Consultant will submit an invoice to the City pursuant to Section 5.
7. DEFAULT OF CONSULTANT
If the City determines that Consultant is in default in the performance of any of the terms or conditions of this Agreement, the City shall serve Consultant a written notice of the default. Consultant shall have seven (7) days after service of said notice to cure the default. In the event that Consultant fails to cure the default within such period of time or fails to present the City with a written plan for the diligent cure of default if such default cannot be cured within seven days, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. The City shall also have the right to offset against the amount
of any fees due to Consultant any costs incurred by the City as a result of Consultant’s default.
8. OWNERSHIP OF DOCUMENTS
A. Consultant shall maintain complete and accurate records with respect to tasks, costs, expenses, receipts, and other such information required by the City that relate to the performance of Services under this Agreement. Consultant shall maintain adequate records of Services provided in sufficient detail to permit an evaluation of Services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Consultant shall provide free access to the representatives of the City or its designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit the City to make transcripts or copies therefrom as necessary; and shall allow inspection of all Services, data, documents, proceedings, and activities related to this Agreement. Such records, together with supporting documents, shall be maintained for a period of three (3) years after receipt of final payment.
B. Upon completion of, or in the event of termination or suspension of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the Services shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of Consultant. With respect to computer files, Consultant shall make available to the City, at the Consultant's office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, copying and/or printing computer files. Consultant hereby grants to the City all right, title, and interest, including any copyright, in and to the documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared by Consultant in the course of providing the Services under this Agreement.
9. INDEMNIFICATION AND DEFENSE
A. Indemnity.
To the fullest extent permitted by law, Consultant shall indemnify and hold harmless the City and any and all of its officials, officers, employees, agents, and/or volunteers (“Indemnified Parties”) from and against any and all losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, caused in whole or in part by the acts, errors, or omissions of Consultant, its officers, agents, employees, or subconsultants (or any agency or individual that Consultant shall bear the legal liability thereof) in the performance of Services under this Agreement.
B. Duty to Defend.
In the event the City, its officials, officers, employees, agents, and/or volunteers are made a party to any claim, action, lawsuit, or other adversarial proceeding (“Action”) arising from the performance of the Services under this Agreement, whether or not Consultant is named in such Action, and upon demand by the City, Consultant shall defend the City at Consultant’s sole cost, or at the City’s option, to reimburse the City for its costs of defense, including reasonable attorney’s fees and costs incurred in the defense.
C. Payment by the City for Services is not a condition precedent to enforcement of this section. Consultant’s duty to defend, indemnify, and hold harmless the City shall not extend to the City’s sole or active negligence. In the event of any dispute between Consultant and the City as to whether liability arises from the sole or active negligence of the City or its officials, officers, employees, agents, and/or volunteers, Consultant will be obligated to pay for the City’s defense until such time as a final judgment has been entered adjudicating the City as solely or actively negligent. Consultant will not be entitled in the absence of such a determination to any reimbursement of defense costs including, but not limited to, attorney’s fees, expert fees and costs of litigation.
10. INSURANCE
Consultant shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit C attached hereto and made a part of this Agreement.
11. INDEPENDENT CONTRACTOR
A. Consultant is and shall at all times remain as to the City a wholly independent consultant and/or independent contractor. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant's exclusive direction and control. Neither the City nor any of its officers, employees, or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement.
Consultant shall not at any time or in any manner represent that Consultant or any of Consultant’s officers, employees, or agents are in any manner officers, employees, or agents of the City. Consultant shall not incur or have the power to incur any debt, obligation, or liability whatever against the City, or bind the City in any manner.
B. No employee benefits shall be available to Consultant in connection with the performance of this Agreement. Except for the fees paid to Consultant as provided in the Agreement, the City shall not pay salaries, wages, or other compensation to Consultant for performing services hereunder for the City. The City shall not be liable for compensation or indemnification to Consultant for injury or sickness arising out of performing services hereunder. Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment
Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold the City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. The City shall have the right to offset against the amount of any fees due to Consultant under this Agreement as a result of Consultant’s failure to promptly pay to the City any reimbursement or indemnification arising under this paragraph.
C. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing Services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (CalPERS) to be eligible for enrollment in CalPERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless the City for the payment of any employee and/or employer contributions for CalPERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of the City.
D. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by the City, including but not limited to eligibility to enroll in CalPERS as an employee of the City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for CalPERS benefits.
12. LEGAL RESPONSIBILITIES
Consultant shall keep itself informed of State and Federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of Services pursuant to this Agreement. Consultant shall at all times observe and comply with all such laws and regulations. The City and its officials, officers, employees, and agents, shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.
13. UNDUE INFLUENCE
Consultant declares and warrants that no undue influence or pressure was used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City has or will receive compensation, directly or indirectly, from Consultant, or from any officer,
employee or agent of Consultant, in connection with this Agreement or any Services to be conducted as a result of this Agreement. Violation of this section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity.
14. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES
No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one year thereafter, shall have any interest, direct or indirect, in any Agreement or sub-agreement, or the proceeds thereof, for Services to be performed under this Agreement.
15. RELEASE OF INFORMATION/CONFLICTS OF INTEREST
A. All information gained by Consultant in performance of this Agreement shall be considered confidential and shall not be released by Consultant without the City's prior written authorization, unless the information is clearly public. Consultant, its officers, employees, agents, or subconsultants, shall not without written authorization from the City Manager or designee, or unless requested by the City’s attorney, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories, or other information concerning the Services performed under this Agreement or relating to the City. Response to a subpoena or court order shall not be considered “voluntary” provided Consultant gives the City notice of such court order or subpoena.
B. Consultant shall promptly notify the City should Consultant, its officers, employees, agents, and/or subconsultants be served with any summons, complaint, notice of deposition, request for documents, interrogatories, request for admissions, or other discovery request (“Discovery”), court order, or subpoena from any person or party regarding this Agreement and the Services performed hereunder or the City, unless the City is a party to any lawsuit, arbitration, or administrative proceeding connected to such Discovery, or unless Consultant is prohibited by law from informing the City of such Discovery. The City retains the right, but has no obligation, to represent Consultant and/or be present at any deposition, hearing, or similar proceeding as allowed by law. Unless the City is a party to the lawsuit, arbitration, or administrative proceeding and is adverse to Consultant in such proceeding, Consultant agrees to cooperate fully with the City and to provide the opportunity to review any response to discovery requests provided by Consultant. However, the City's right to review any such response does not imply or mean the right by the City to control, direct, or rewrite said response, or that the City has an obligation to review any such response or verifies any response it has reviewed.
16. NOTICES
Any notices which either party may desire to give to the other party under this Agreement must be in writing and may be given either by (i) personal service, (ii)
delivery by a reputable document delivery service, such as but not limited to, Federal Express, which provides a receipt showing date and time of delivery, or (iii) mail by the United States Postal Service, certified mail, postage prepaid, return receipt requested, addressed to the address of the party as set forth below or at any other address as that party may later designate by notice:
IF TO CONSULTANT: IF TO CITY:
HED
550 South Hope Street, Suite 2500
Los Angeles, CA 90071
City of Santa Fe Springs
11710 E. Telegraph Road
Santa Fe Springs, CA 90670
Tel: (213) 542-4500 Tel: (562) 868-0511
Attn: John R. Dale, Principal Attn: Noe Negrete,
Director of Public Works
17. ASSIGNMENT
Consultant shall not assign the performance of this Agreement, nor any part thereof, nor any monies due hereunder, without prior written consent of the City. Before retaining or contracting with any subconsultant for any services under this Agreement, Consultant shall provide the City with the identity of the proposed subconsultant, a copy of the proposed written contract between Consultant and such subconsultant which shall include and indemnity provision similar to the one provided herein and identifying the City as an indemnified party, or an incorporation of the indemnity provision provided herein, and proof that such proposed subconsultant carries insurance at least equal to that required by this Agreement or obtain a written waiver from the City for such insurance.
18. LICENSES
At all times during the term of this Agreement, Consultant shall have in full force and effect all licenses required of it by law for the performance of the Services described in this Agreement.
19. GOVERNING LAW
The City and Consultant understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. Any litigation concerning this Agreement shall take place in the municipal, superior, or federal district court with jurisdiction over the City.
20. ENTIRE AGREEMENT
This Agreement contains the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written and pertaining to the subject of this Agreement or with respect to the terms and conditions of
this Agreement shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material.
21. AMENDMENTS
Any amendments to this Agreement must be in writing and executed by the parties hereto, or their respective successors and assigns, in order to be valid.
22. NON-EXCLUSIVE AGREEMENT
Consultant acknowledges that the City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement.
23. ATTORNEYS’ FEES
In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys’ fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof.
24. CONSTRUCTION
The parties hereto have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.
25. WAIVER
The delay or failure of any party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.
26. SEVERABILITY
If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision
in any other circumstance. Notwithstanding the foregoing, if the value of this Agreement, based upon the substantial benefit of the bargain for any party, is materially impaired, which determination made by the presiding court or arbitrator of competent jurisdiction shall be binding, then both parties agree to substitute such provision(s) through good faith negotiations.
27. COUNTERPARTS
This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement.
28. AUTHORITY TO EXECUTE THIS AGREEMENT
The persons executing this Agreement on behalf of the parties warrants and represents that they have the authority to execute this Agreement on behalf of said parties and has the authority to bind the parties to the provisions of this Agreement.
29. ELECTRONIC SIGNATURES
The parties acknowledge and agree that execution of this Agreement by electronic signatures or electronic transmittal of signatures are the same as handwritten signatures for the purposes of validity, enforceability, and admissibility.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written.
[If Consultant is a corporation, two signatures are required: Signature 1 – the Chairperson of the Board, the President, or any Vice President; Signature 2 – the Secretary, any Assistant Secretary, the Chief Financial Officer, or any Assistant Treasurer (Corp. Code § 313).]
CITY OF SANTA FE SPRINGS CONSULTANT
____________________________ ____________________________ Annette Rodriguez, Mayor Name: ______________________
Title: _______________________
Date: ______________________ Date: _______________________ ATTEST: CONSULTANT
__________________________ ____________________________ Janet Martinez, City Clerk Name: ______________________ Title: _______________________
Date: _______________________
APPROVED AS TO FORM:
_________________________
Ivy M. Tsai, City Attorney
Attachments: Exhibit A Request for Proposals
Exhibit B Proposal
Exhibit C Fee Schedule
Exhibit D Insurance Requirements
EXHIBIT A
REQUEST FOR PROPOSALS
CITY OF SANTA FE SPRINGS
REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICES FOR
THE SANTA FE SPRINGS AQUATIC CENTER
July 18, 2022
0 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
SUBMITTAL INFORMATION
Please submit quote in a sealed envelope, plainly marked on the outside “Request for Proposal – Santa Fe Springs Aquatic Center Design.” Submit quote by 4:00 p.m. on Thursday, August 18, 2022:
Noe Negrete
Director of Public Works/City Engineer
City of Santa Fe Springs
11710 Telegraph Road
Santa Fe Springs, CA 90670
Please contact Robert Garcia or Gus Hernandez should you have any questions regarding the RFQ. Please see contact information below.
Robert Garcia I Public Works CIP Manager
(562) 868-0511, Ext 7545 I (562) 409-7651 Fax
[email protected] I www.santafesprings.org OR
Gus Hernandez I Parks and Recreation Services Manager
(562) 863-4896, Ext 7873 I (562) 863-4321
[email protected] I www.santafesprings.org 1 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
TABLE OF CONTENTS
Page
GENERAL INFORMATION............................................................................................... 1 PROPOSAL INFORMATION ........................................................................................... 1 CITY’S RIGHT TO REJECT ............................................................................................ 8 COST OF PROPOSAL PREPARATION ......................................................................... 8 FORMAT FOR RFP RESPONSES ................................................................................. 8 FEE SCHEDULE ...........................................................................................................10 CRITERIA FOR SELECTION ........................................................................................ 11 PROPOSAL SUBMISSION ........................................................................................... 12 SCHEDULE ................................................................................................................... 12 CLIENT REFERENCES ................................................................................................ 13 LEGAL AND INSURANCE REQUIREMENTS ............................................................... 13 OTHER CITY REQUIREMENTS ................................................................................... 13 SCOPE OF WORK ........................................................................................................ 13
APPENDICES
Attachment A – Professional Services Agreement
4 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICES FOR
THE SANTA FE SPRINGS AQUATIC CENTER
The City of Santa Fe Springs (“City”) is requesting proposals from qualified design, architectural and engineering consultant firms (“Firms”) to provide a design, architectural and engineering services, including a public outreach component, for the Aquatics Center. The City of Santa Fe Springs (City) invites qualified architectural and engineering design teams to submit proposals to provide complete architectural and engineering design and construction cost estimating services for the demolition, remodel, and enlargement of the Santa Fe Springs Aquatics Center Project. The City is seeking the services of an architectural and engineering design team with aquatic center design experience as well as experience working with public municipal agencies.
Costs associated with preparation of proposals will be the sole responsibility of the consultants and will not be reimbursed by the City.
GENERAL INFORMATION
The Santa Fe Springs Aquatics Center is located at 10145 Pioneer Boulevard, accessible from Pioneer Boulevard. The Aquatics Center opened in 1985 and is the only aquatic facility for the City’s aquatic recreation program. The general scope of work includes an existing building, consisting of locker and shower facilities, a multi-purpose room for training, a lobby; concession stand, picnic area, spa/sauna area a large pool with diving boards (25m x 25 yards), a small pool (12.5m x 25 yards), pump house facility, pool equipment, storage rooms, a potential splash zone, a potential water slide and parking lot loading zone.
The Aquatics Center has undergone relatively few renovations since it was built over 37 years ago, and the configuration of the building, pool, and supporting elements are not flexible and efficient enough to meet the needs of a modern municipal aquatics program.
PROPOSAL INFORMATION
The purpose of this Request for Proposal (“RFP”) is to select a Firm to provide Design, Architecture and Engineering services for the Aquatics Center to the City. The City intends to select one Firm to perform all the items listed in the Scope of Work Section.
The overarching goal is to design a community-based aquatics center that provides a variety of features which meets the needs of residents of all ages in an all-inclusive facility. The new facility should provide a wide range of opportunities for the public to enjoy aquatic programs using state-of-the-art design, equipment, and technology to ensure a clean environment with a focus on safety awareness at all times. 5 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
The new design must be able to support, at a minimum, the following direct in-water programs:
Recreation: “Unstructured” play time, recreational swimming, and special community events.
Water Fitness: Water aerobics, water circuit training, lap swim, etc. Water Safety and Training: Swim lessons, safety classes. Competitive Aquatics: Youth and adults swim teams, water polo, triathletes.
Other features that the new facility should also have:
Accessibility: In the facility to support different needs (family, gender-norms, ability levels; must comply with the Americans with Disabilities Act). New Potential Amenities: New amenities such as, splash zone area, water slide, playground or fitness zone
Safety-Oriented Layout: For effective emergency response.
Project Goals:
In 2021, the City determined that the Aquatics Center was no longer operational due to maintenance and safety concerns. Since this time the Aquatic Center has been nonoperational. The City Council has directed staff to conduct public outreach (survey) in the Community that will drive the development of conceptual ideas. Survey results will be shared with the consultant.
Specific improvements of this project may include, but not limited to:
The rehabilitation of the existing building(s), pools and site improvements. o May include testing for potential hazardous materials. May include coordination and integration of Public Art. Design for the future construction/rehabilitation of the existing Building(s): The existing Aquatics building, at minimum, should consider the following program elements:
o Lobby Entrance and Reception
o Staff Offices
6 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
o Staff Lounge/Break Room
o Male and Female Staff Locker/Shower/Changing Areas
o Male and Female and Unisex (Family) Locker/Shower/Changing and Restrooms o Restrooms
o Janitor and Storage Rooms
o Pool Equipment Storage
o Mechanical Room
o Chemical Storage Room
o Leadership in Energy and Environmental Design (LEED) Silver criteria at a minimum or higher to the extent possible within the budget.
New Pools and Amenities: One or more pools and associated equipment with the following criteria/elements:
o One or more pools that individually, or in combination, provide:
Eight swim lanes suitable for competitive swimming 25 meter minimum length.
Starting blocks on one end with minimum two meter depth. Zero-depth entry for accessibility.
Wading/Recreational depth areas.
Water play structures and amenities.
Therapy pool/spas
County of Los Angeles Health Department Permit required. Water Slide: A new custom water slide.
Splash Zone: A new custom splash zone or splash pad.
State of California – Department of Occupational Safety and Health (CADOSH) Permanent Amusement Rides Administrative Permit required. Shade Structures and Picnic Area
o Tent or similar structures to shade pool patrons.
o Outdoor picnic benches and tables as well as other furnishings. Ancillary Pool Equipment and Site Storage Building
7 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
Site Work Requirements: Reconfiguration of path of travel to improve circulation. o All new utility connections (unless noted otherwise):
New electrical service (from existing main service board). Sanitary sewer (connect to existing).
Water service (connect to existing).
Fire water service
Storm water collection system
Telephone/Cable/WiFi
Preserve as many trees as possible.
New pervious hardscape pathways and parking areas where feasible. New landscaping to comply with City standards.
Fitness or playground zone.
Bicycle/pedestrian path around perimeter of Aquatic Center.
The City recognizes there may be questions or items requiring discussion and/or clarification prior to each Firm’s preparation and submission of its proposal. If questions do arise, direct all questions please contact the following:
Robert Garcia I Public Works CIP Manager
(562) 868-0511, Ext 7545 I (562) 409-7651 Fax
[email protected] I www.santafesprings.org Gus Hernandez I Parks and Recreation Services Manager
(562) 863-4896, Ext 7873 I (562) 863-4321
[email protected] I www.santafesprings.org If necessary, clarifications, explanations, or instructions shall be sent in writing or electronically to all firms having requested this RFP. Requests for Clarifications will not be accepted, nor responded to after 4:00 p.m. on Wednesday, August 10, 2022. Any interpretations or addenda issued by the City shall be incorporated into this RFP.
Proposers may not rely on any oral interpretations given by any City employee and may only rely upon officially issued, written addenda.
The City reserves the right to determine (in its sole discretion) if a formal pre-proposal session with candidate Firms will be required. The City's objective is to ensure an appropriate exchange of information prior to proposal preparation and submission to minimize both wasted effort by Firms and unnecessary follow-up by City personnel during the evaluation process.
8 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
CITY’S RIGHT TO REJECT; WAIVE IRREGULARITIES
The City reserves the right to reject any or all proposals received in response to this RFP for any reason or waive any irregularities or informalities contained in the proposals consistent with the law.
COST OF PROPOSAL PREPARATION
The Firm, including their sub-contractors, is responsible for any costs incurred in responding to this RFP.
FORMAT AND CONTENTS OF RESPONSES
The proposal shall consist of one package.
The Proposal shall describe the consultant’s understanding of the project, approach to accomplishing the project goals, relevant past experience, and any litigation brought against the firm within the last (5) five years. T h e p r o p o s a l shall be limited to (20) twenty pages (double-sided), including table of contents, cover letter, resumes of team members, fee schedule breakdown/total, and any promotional materials. Consultants shall submit (5) five hard copies and (1) one PDF file on PC-compatible USB drive.
In the proposal, the consultant shall, as a minimum:
1. Explain the general background, qualifications, and organizational structure of the firm and describe any special knowledge or capabilities material to the project that exist within the firm.
2. Outline the proposed approach to the scope of services, including organization and scheduling of tasks to be performed; capacity to keep the project on schedule and within budget; approaches to working with City staff and policymaking agencies and Aquatics groups; and other relevant factors pertaining to formulation and execution of a successful project.
3. Identify the name and title of the lead contact person and principal who will be assigned to this project. Provide a work history for key personnel. Give a description of their responsibilities and the percentage of time expected to be spent on this project. Identify the support staff available for this project.
4. Provide a list of recent projects for which the firm has provided services of a similar nature. Provide all pertinent information, including project description, contact person, phone number, location, duration, and current project status.
5. Submit a list of subconsultants to be utilized on the project and describe how each subconsultant will be utilized. Provide a list of their similar past projects with locations and brief descriptions of referenced projects. Identify principal staff assigned to this project from each subconsultant firm and their responsibilities on 9 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
this project.
6. As applicable, submit a list of lawsuits filed within the past (5) five years against the firm or its principals alleging misconduct and/or negligence. Submit a list of claims within the past (5) five years against the firm’s Professional Liability Insurance policy (errors and omissions), if any.
Accompanying each list shall be a declaration by a principal of the firm indicating careful review of such lists and adding appropriate information concerning the current status or disposition of the lawsuits or claims. This information may be submitted separately and confidentially if so desired.
7. As applicable, submit a list of all projects (completed within the past two (2) years or currently under construction or design).
8. Indicate the location(s) of the office(s) in which the work will be completed, and the amount of work presently under way.
9. Submit a project schedule with a start date as shown on the schedule listed below with the following milestones:
Project kick-off meeting with City staff.
Building and site walk-through and examination of existing plans. Review and confirmation project requirements and operational program with City staff.
o Submit itemized space and functional program for building, pool-side, and site features and amenities.
Completion of a minimum of three (3) conceptual and schematic designs and associated estimates of probable construction costs
o A minimum of five (5) outreach meetings; City Council subcommittee, Commission/Advisory meetings, City Council meetings necessary for approval of and input on final proposed concept design.
Project Design and Construction:
Completion of design development, and construction documents, plans and specifications.
o Submit and review design documents with City staff at 75 percent, 90 percent, and 100 percent completion of each milestone.
10 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
o Submit and review a construction cost estimate with City staff at the completion of each milestone.
o Finalize documents based on feedback from City staff and all authorities having jurisdiction.
Submit all project documents necessary to the City of Santa Fe Springs Building Inspection Division and CA-DOSH and obtain all permits. The consultant should also include a cost to complete the environmental preparation in accordance with the California Environmental Quality Act (CEQA). Submit all project documents necessary to the County of Los Angeles Health Department to obtain a permit for a public aquatics facility. Assist City staff with bidding project for construction. o Incorporate Bid Addendum, as required, to issue a conformed “For Construction Set” after the bid phase is completed.
Construction administration.
Preparation of record documents after construction is complete. Submit hard and soft copies of all project documents to City.
10. Submit evidence of the required insurance as set forth in the attached sample consultant agreement (see Attachment C of Agreement).
Fee Schedule
The Proposal shall a fee schedule. The elements of the fee schedule shall be submitted as follows:
1. A separate time and material not-to-exceed fee table for each subphase (e.g., “Conceptual Design,” “Schematic Design,” etc.) of the project, for each consultant, inclusive of appropriate meetings with City staff. The fees shall show the total for each consultant, each phase, and an overall total.
2. A fee for reimbursable expenses, including reproduction of plans, renderings, etc., which would not be considered planning or design services.
3. A list of potential additional services other than the basic services. These additional services will be reviewed on a case-by-case basis by the City and will be compensated on a hourly basis with proper written authorization prior to commencement of such work.
11 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
4. An hourly rate schedule, valid for the entire length of the project, for all staff working on the project.
CRITERIA FOR SELECTION
City staff will evaluate the proposals submitted and assign each a ranking. The following are the criteria for evaluation of the proposals (in random order):
1. Experience of the firm and project team in performing similar work for the City and/or other public agencies.
2. Demonstrated success on previous projects, especially of similar scope, including quality of work and meeting project schedule and budget.
3. Qualifications of key staff and subconsultants who will carry out the assignment.
4. Completeness in answering this Request for Proposals.
5. Effectiveness, clarity, and conciseness of project approach.
6. Ability to meet the project schedule.
7. Ability to meet insurance requirements.
8. Any litigation brought against the firm.
9. Fee Schedule
The City will check the references of the top-ranked consultants for such things as:
record in accomplishing work in a timely manner for similar projects within budget, quality of work completed for the City or other public agencies, ability to work with City staff and the public, as well as any outstanding litigation.
The City shall negotiate an agreement with the most qualified consultant. If negotiations with such consultant are unsuccessful, the City will negotiate with the second most qualified firm. The selection process will be complete once a contract is executed.
When the City has reached an agreement with a consultant, all firms submitting a proposal will be notified of the results in writing.
The evaluation panel may, if it deems necessary, select certain proposers for oral interviews and/or presentations. Interviews apply only to the top finalist(s), as determined by the evaluation panel. The oral interviews will allow finalists to demonstrate their understanding of the project objectives and to articulate their capability to meet or exceed the requirements of this RFP. 12 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
PROPOSAL SUBMISSION
All proposals must be received by the Public Works Office at City of Santa Fe Springs City Hall, no later than: August 18, 2022 at 4:00 p.m. in a sealed envelope. Proposals received after the time and date indicated above shall be deemed nonresponsive and returned unopened.
Address all proposals to:
Proposal for Design, Architecture and Engineering Services for Aquatics Center
Noe Negrete, Director of Public Works/City Engineer
City of Santa Fe Springs
11710 Telegraph Road
Santa Fe Springs, California 90670
No amendments, additions, or alternates will be accepted after the designated submission time and date.
Each proposal shall be considered valid and binding for a period of 120 days after the proposal due date.
All proposals and documents submitted will become the property of the City.
Anything considered to be proprietary should be so designated in writing by the proposing firm.
SCHEDULE
The schedule below is tentative and subject to change:
RFP Release Date July 18, 2022
Request for Information Deadline: 4:00 p.m., August 10, 2022 Bid Proposal Due Date August 18, 2022
City Staff Review of Proposals: Week of September 5, 2022 Interviews (City’s Option): Week of September 19, 2022
City Council Approval to Award Contract: October 4, 2022 Execution of Consultant Contract: October 11, 2022
Project Kick-Off Meeting with City Staff: October 24, 2022 Please note that these specific dates are tentative and subject to change 13 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
CLIENT REFERENCES
Firms are required to list at least five (5) professional references, three of which shall be in municipal or public agency reference related to an aquatics facility. Please list your client references in the Appendix section of this RFP and include for each one the following information: a complete description of the work/services provided, the name of the client, and the contact information of the client, including telephone number, and/or address. The information concerning the work/services provided for each client must be no more than five (5) years old.
LEGAL AND INSURANCE REQUIREMENTS
The insurance requirements listed in the sample consultant agreement (see Attachment C of agreement) are mandatory for the consultant.
OTHER CITY REQUIREMENTS
The City reserves the right (in its sole discretion) to reject any or all proposals. The City shall consider all proposals based on the entirety of the response to this RFP. The City reserves the right to negotiate specific requirements and cost using the selected proposal as a basis.
The City reserves the right to request additional information from each Firm and to request oral interviews.
The City also reserves the right to reject all RFP’s if they are deemed unsuitable to meet the City's needs. Late or incomplete proposals will not be considered, and the City reserves the right (in its sole discretion) to determine the completeness of all RFP’s.
AVAILABLE BACKGROUND MATERIALS
The following is a list of available background material:
Original drawings of the building and site constructed in 1985.
The City does not warrant the accuracy of the information contained in this document.
SCOPE OF WORK
The project shall be designed to meet the City’s current project budget between $3 million to $10 million. The project will consist of two parts with milestones of approximate durations as follows:
Program Verification and Feasibility – 3 weeks
Conceptual Design and Estimate – 3 weeks
14 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
Planning, Environmental Review – 3 weeks
Schematic Design and Project Estimate – 4 weeks
Design Development – 6 weeks
Construction Documents – 8 weeks
Permitting, Bidding, and Award – 3 to 4 months
Construction Administration – 12 months
The duration for the overall phases and milestones do not include the City review time of approximately two to three weeks added to the end of each milestone. The consultants shall not proceed with the next phase or milestone until receiving written approval from the City.
The required architectural and engineering design and construction cost estimating services for this project consist of the following general scope of services:
Predesign, Feasibility and Budget Verification:
Provide project schedule upon project commencement and update as milestones are achieved.
Review existing plans, specifications, reports, studies, and conduct site visit(s). Review the existing and proposed project program. Make recommendations for adjustments based on operational input from City staff, past experience on similar projects, results of study “year-round” versus “seasonal” operations, as well as potential project site boundary adjustments.
Regular meetings with City staff, including code review meetings with the City Engineer and Fire Protection Engineer (or their representative). The architect shall prepare meeting agendas prior to the meetings and summaries after the meetings.
Produce the concept and schematic designs for review and approval by the City.
Site and building designs should be modeled and produced in 3-D CAD with plans and full color presentation perspective renderings that are submitted in Adobe Portable Document Format (PDF) and other electronic formats acceptable to the City.
Construction cost estimating at the end of each design phase milestone, submitted with the design drawings and specifications.
15 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
Prepare materials and reports for presentation of at least (3) three preferred design options for review by the City. Consultant attendance and presentation of materials at up to (5) five meetings may be required.
Prepare materials and reports for presentation of at least (3) three preferred design options for City Council consideration. Provide pro/con analysis cost estimates, and schedules for all options presented.
Project Design and Construction
Produce design development, construction documents, permits, bid drawings, and technical specifications. Drawings should be produced and submitted to the City in AutoCAD and Adobe Portable Document Format (PDF). Incorporate construction phasing into the construction documents as required.
Incorporate option for issuance of separate demolition, site clearing, and utility package, if necessary, to align completing date with standard swim season. Submit the project for approval from the Los Angeles County Department of Health, the State Division of Occupational Safety and Health (i.e., DOSH – State Amusement Ride Inspectors), and all other authorities having jurisdiction on this project, including responding to their comments, modifying the drawings and specifications as required, and resubmitting as many times as required to obtain approval.
Submit the project for a building permit, including responding to Building Inspection Division comments, modifying the drawings and specifications as required and resubmitting as many times as required to obtain a building permit. Assist the City with bidding the project, including attending the pre-bid and preconstruction meetings, answering Requests for Information (RFIs), reviewing requests for substitutions, etc.
Preparation of space planning of the main building including recommended furniture, fixtures, and equipment selection and produce (1) one or more procurement package(s).
Construction administration, including attending project meetings and site visits as required to stay informed as to the progress of the project, responding to RFIs, reviewing submittals and making contract document changes necessary to support the completion of the project.
Preparation of as-built drawings and specifications in AutoCAD and Microsoft Word, respectively.
Management and implementation of all LEED reporting procedures, documentation and certification.
16 REQUEST FOR PROPOSAL
DESIGN, ARCHITECTURE AND ENGINEERING SERVICE FOR
THE SANTA FE SPRINGS AQUATIC CENTER
Attend the (11) eleven month post-occupancy inspection.
The architect shall retain and coordinate the work of subconsultants as needed to complete the above-requested services. The City of Santa Fe Springs reserves the right to select, approve, recommend or disapprove subconsultants for any of the above services at its discretion.
General Provisions (All Phases):
In the performance of all services, the consultant shall address the following requirements:
Correct existing spatial and functional deficiencies to maximize utility of the available site.
Allow for flexible use of interior and exterior spaces. Achieve an optimum balance between program requirements and project budget. Comply with the Americans with Disabilities Act, County Health Department, and CA-DOSH requirements and all applicable codes.
Design energy efficient facilities to the extent possible. Provide a design that minimizes both initial construction and long-term maintenance costs.
Incorporate LEED Silver (at a minimum) criteria within the project. Submit all project materials to the City, in both hard and soft copy formats acceptable to the City (e.g., MS Word, PDF, AutoCAD, etc.).
Although the City anticipates successful completion of all phases of work for this project, it reserves the right to terminate work at any time. The consultant’s work for this project shall be considered the property of the City to do with as it wishes, regardless of whether or not the project is fully completed.
.
EXHIBIT B
PROPOSAL
CITY OF
SANTA FE SPRINGS
PROPOSAL FOR PROFESSIONAL
CONSULTANT SERVICES
FOR THE SANTA FE SPRINGS AQUATIC CENTER
AUGUST 18, 2022
WWW.HED.DESIGN
Boston
Chicago
Dallas
Detroit
Los Angeles
Sacramento
San Diego
San Francisco
550 South Hope St.
Suite 2500
Los Angeles, CA 90071
T 213.542.4500
F 213.542.4515
August 18, 2022
Mr. Noe Negrete, Director of Public Works / City Engineer City of Santa Fe Springs | 11710 Telegraph Rd. | Santa Fe Springs, CA 90670 RE: Proposal for Professional Consultant Services, The Santa Fe Springs Aquatic Center Dear Mr. Negrete Members of the Selection Committee:
The renovation of your Aquatic Center offers a unique opportunity to revitalize an aquatic facility that will serve the Santa Fe Springs community for many years to come. Our team understands the configuration of the building, pool, and supporting elements are not flexible and efficient enough to meet the needs of your modern aquatics program. We will work collaboratively to fulfill your project objectives of a modern, multi-use facility that addresses the needs of competitive swim, instruction, water fitness, and recreational users of all ages. The following outlines why our team is best suited to partner with you on this exciting project:
• Aquatic Center Expertise: We offer a carefully assembled team with a deep, diverse set of skills and experience to redesign and engineer the swimming pools and support facilities to re-imagine the role of aquatics. We are pleased to have CH-H2O as our aquatic consultants.
CH-H2O has a deep understanding of both indoor and outdoor pools for competitive water and community aquatics, having worked on more than 850 aquatic projects nationally. The HED / CH-H2O team is currently designing the Belmont Plaza Pool Revitalization Project in Long Beach – an important recreation and Olympic training facility that combines indoor and outdoor facilities to create a major focal point for the City’s waterfront. • Public Outreach Advocates: Our team is supportive of diverse and inclusive environments.
From our workshops to cultivate and extract voices from all stakeholders, to the nuanced understanding of the students and community of Santa Fe Springs; our team embraces a process that promotes dialogue, nurtures inclusion and fosters a sense of community. We will work closely with all the stakeholders throughout every stage of the project from concept design to completion—listening closely to your needs, sharing ideas, keeping the project on budget, and on schedule. We will work with the user groups, facilities management and local community to develop a project that is innovative and inspiring. • Innovation and Flexibility: We are excited to share innovative ideas to help optimize space, enhance sustainability, support collaboration and facilitate more community connection. We will leverage the latest visualization and modeling technology to review options and build consensus. We recognize the importance of long-range planning in order to maintain high quality and performance, respond to changes and address evolving program needs. John Dale, Principal-in-Charge, has a strong focus on delivering flexible, adaptable and sustainable facilities that will remain vital for decades.
• Fulfilling Your Vision: We will partner with you to design a community-based aquatics center that meets the needs of residents of all ages in an all-inclusive facility. By integrating the latest technology, materials, equipment and sustainable principles, our team will deliver a high performance aquatic center with a focus on safety awareness.
Our approach to successful project delivery is collaborative and client-service oriented. We believe that successful projects need to be built on community consensus resulting from open, transparent communication. We look forward to further discussing our qualifications with you, introducing our team members, and engaging with your leadership to provide value to the community.
Sincerely,
John Dale faia, leed ap
Principal | Pre K-12 Sector Leadership
[email protected] | 213.542.4504 1
Contents
General Background,
Qualifications, and
Organizational Structure
Proposed Approach
Project Team, Key
Personnel, and Resumes
Recent Projects
Subconsultants
Lawsuits
List of All Projects
Office Completing Work
Project Schedule
Evidence of Required
Insurance
Fee Schedule
1 2
3 4
5 6
7 8
9 10
11 4
5 16
19 28
33 34
35 36
37 38
General Background,
Qualifications, and
Organizational Structure
4 About Us
FIRM OVERVIEW
At HED, great design is about thinking creatively to overcome challenges and improve real world outcomes. Our firm has a long history and reputation for excellence because we believe that all the facets of our design, from architecture, consulting, engineering, and planning, must create a positive impact for our clients, the community, and the world through responsive, innovative, and sustainable design solutions.
AQUATIC CENTER EXPERIENCE
Our integrated team of design professionals and operational specialist’s have a combined experience of more than 1,000 aquatic facilities. Providing this team with unmatched expertise, exceptional collaboration skills and in-depth understanding of the programming, functional and technical considerations for the City of Santa Fe Springs Aquatic Center.
EXPERIENCE WITH THE PUBLIC SECTOR
HED has demonstrated Public Sector experience on a variety of demolition, modernization / rehabilitation, new construction and new tenant build out of different spaces including civic centers, community athletic facilities, city halls, community health facilities, libraries, and office and administrative spaces. We also provided tenant development services for a multitude of federal level clients. Project locations range throughout the State of California to Nationwide.
ORGANIZATIONAL STRUCTURE
HED is a Privately Owned Corporation, incorporated and headquartered in Michigan.
AIA 2030
Commitment for All
New Projects to Be
Carbon Neutral by 2030
420+
Staff Members Just.
Committed Firm LOCATIONS
Boston
Chicago
Dallas
Detroit
Los Angeles
Sacramento
San Diego
San Francisco
SERVICES
Planning
Master Planning
Laboratory Planning
Architecture and Design
Architecture
Experiential Graphics
Interior
Landscape
Engineering
Electrical
Mechanical and Plumbing
Structural
Information and Communications
Technology Design (ICT)
Consulting
Sustainable Design
Net Zero
MARKET SECTORS
Community and Civic
Government (Federal)
Healthcare
Higher Education
Housing and Mixed-Use
Mission Critical
Pre K-12
Science
Transportation,
Manufacturing and
Product Development
Workplace
114
Years in
Business 8
Offices Across
the United States
Proposed Approach
PROJECT UNDERSTANDING
Our team has reviewed your Request for Proposal and we
understand the desire to renovate the Santa Fe Springs Aquatic Center in order to bring the relatively untouched 1985 facility into modern times. We recognize that key elements of this project include an existing building that consists of locker and shower facilities, a multi-purpose room for training, and lobby; a concession stand, picnic area, spa/sauna area, large pool with diving boards, small pool, pump house facility, pool equipment, storage rooms, potential splash zone and water slide, and parking lot loading zone. HED brings significant experience in addressing similar challenges on a variety of aquatic projects throughout California. Our team of professionals and operational specialists provides us with unmatched expertise, exceptional collaboration skills and in-depth understanding of the programming, functional and technical considerations for successful delivery of the Santa Fe Springs Aquatic Center renovation.
GUIDING PRINCIPLES
Our approach is driven by a set of guiding principles that are unique to each project. We have identified the following initial principles as essential to the successful development of the Santa Fe Springs Aquatic Center project:
• Ensure that the pool remains a favorite community resource accessible to all.
• Sensitively update its facilities to meet modern building and health code standards and provide ease of access
throughout without detracting from or compromising the
pool’s historic character.
• Upgrade the facilities with sustainability in mind.
• Embed health, safety and welfare considerations in each decision to renew and upgrade the facility.
UNDERSTANDING THE UNIQUE
CHALLENGES OF THIS PROJECT
HED’s firmwide mission is to have a positive impact on
our clients, the community, and the world through design excellence. Our definition of design excellence is a solution built from thoughtful decision-making that creates measurable, real world positive impact. Sustainability is inseparable from design excellence, and significantly benefits what we refer to as “the triple bottom line” - the social, economic, and environmental impacts of a project.
Project Approach
HIGH PERFORMANCE DESIGN: MAKING SANTA FE SPRINGS
AQUATIC CENTER RESILIENT AND SUSTAINABLE
Our team’s knowledge and experience with high performing building projects will bring added value to the Santa Fe Springs Aquatic Center renovation project. The city is undertaking a civic project that has long term community significance. Integrating architecture, engineering, and building science, we have been leaders in achieving high performance civic projects.
Successfully executing high performing projects requires an integrated approach to resource efficient design to maximize the effectiveness of building systems and minimize initial and operating costs. Our projects start with a series of integrated charettes involving all stakeholders to facilitate creative thinking, the cross-pollination of ideas, identification of sustainable design strategies focused on ten metrics: integration, community, ecology, water, economy, energy, wellness, resources, change, and discovery. These paradigms, taken from the AIA COTE Top Ten, provide a more comprehensive and analytical process that benefits our clients.
MAINTAINING BUDGET COMPLIANCE
Budget compliance is of paramount importance to HED and we have developed a rigorous process to keep our project costs on target, adhering to an established budget review and cost estimating process that includes multiple cost estimates.
At the conceptual and programming phase of a project, HED utilizes historical cost databases and past project results to validate the project budget in relation to the owner’s scope and quality expectations. We believe that it is important to validate the initial project budget to make sure that there is alignment between the scope and the budget.
Typically, HED enlists the expertise of a cost estimating consultant to provide regular cost estimates at each phase of the project.
At the conclusion of each phase of work, we schedule a scopebudget alignment meeting between the client, HED, and our cost estimating consultant. This meeting is intended to identify any discrepancies between the scope and the estimate of the work to ensure alignment with the client’s expectations. By conducting this meeting, we can make sound budget decisions early in the project, reducing or eliminating the need for value engineering at later phases. At all times, we seek to retain the quality, function, and durability that our clients are targeting in their projects. 5 7
Value Engineering
HED defines value engineering (VE) as the pursuit of maximum value for both initial and long-term investment. VE should result in achieving the same aesthetics and function at a lower cost.
Based on industry research, the potential cost efficiencies range between 10 – 20% if VE is applied early in the design process. We consider VE in the early phases of design,
however, it is equally important to consider a reduced project schedule, improved quality for durability, features that mitigate risk, and enhanced sustainability.
Being a LEAN practice, we prefer to engage in a Target Value Design (TVD) process whenever possible. TVD relies on an early feasibility study establishing the client’s values and constraints, the development of a target cost, which equates to the budget that the client is willing to pay and designing and constructing to that target cost. The TVD process requires the involvement of key participants early in design to foster collaboration, develop of common goals, and pursue continuous improvement, to keep the design on course to the target cost. TVD requires more upfront work to have a deeper understanding of the project but is usually more efficient than value engineering in subsequent phases as key decisions are made early with informed costing.
ANALYSIS OF PROPOSED PROJECT SCHEDULE
HED has the capacity and the intent to proceed in an efficient, expedited manner to meet the earliest possible delivery milestones. Successfully completing projects on time requires an experienced team, dedicated professionals, and solid communication from start to finish. Three key strategies are discussed further below:
• Organized Decision Approach: HED plans and shares a project schedule to ensure stakeholders are able to attend workshops; decision-making is timely; and the City has adequate review time. We schedule and continually monitor all aspects of the process. Tools include scheduling all design team activities with pool planning, establishing team-wide protocols, and scheduling weekly milestone meetings, as needed.
• Design and Constructability: We combine design excellence with construction knowledge. We collaborate with
stakeholders to achieve your program intentions and
optimal configuration. At the same time, our team focuses on constructability by working with you, the contracting community, and third- party reviewers. This results in a project that is easily scoped and constructed.
• Project Deliverables: HED is committed to meeting project deadlines. Knowing that the schedule(s) may be tight,
HED will work with the City’s team to best understand any options to streamline the schedule within your parameters for reviews and approvals.
This interactive process establishes the entire Project Team’s roles and responsibilities tied to a project schedule. This work plan will be generated with input by all project stakeholders to facilitate buy in and dedication to successful project execution.
We will facilitate communication between team members so that a coordinated effort can be sustained. We will include all appropriate meetings, design, cost estimating, consultant coordination, approval durations and agency reviews in all schedules. The work plan is reviewed at each meeting with updates for critical decision making and championed by the project manager, in this case, Grace Milenkov, for
team coordination.
PROJECT REQUIREMENTS IN TERMS OF
AQUATIC DESIGN AND ENGINEERING
HED has built up a strong alliance with Counsilman-Hunsaker (CH-H20), collaborating on six aquatic projects over the last decade. With 50+ years of proven experience in aquatic
design, CH-H20 leads the industry with the latest innovative pool design features and technical solutions when undertaking a new or renovated facility. From tile replacement to complete structural pool design, you can be assured that our team of professionals have the knowledge and expertise to complete your swimming pool project on schedule and within your
budgetary constraints. We create conceptual designs to
include additional recreation components to the facility to increase attendance and lower operating costs.
Like HED, CH-H20 is involved in the design of numerous
projects each year, ranging in size and scope. They have the available staff to accomplish the simultaneous management of over 200 projects per year for a wide variety of market sectors.
Utilizing a carefully calibrated project management system, we have demonstrated a successful track record in completing our projects on time and within budget, year after year.
WORKING APPROACH
Our design team will lead meetings aimed at finalizing the program for the facility. If the scope of the project is well defined, then the focus of the programming will be narrowed to fill in gaps. We will start the discussions at the very beginning to either confirm the decisions previously made or explore alternatives as the City of Santa Fe Springs may desire.
Likewise, in designing projects just like this one, we have developed a detailed list of items that need to be determined to set the direction of the project program. This technical checklist acts as a guiding document for a programming
meeting to ensure that we systematically walk through all the decisions that make up an aquatic facility.
We will address:
• Preliminary design / environmental & entitlements support, environmental reports
• Hazardous building materials removal and disposal
determination (hazmat)
• Geotechnical investigation, soils report, geotechnical report • Seismic Analysis
• Site Survey and Survey Report
• Demolition phasing and contract documents
• Development of complete specifications
• Architectural Design, including but not limited to design of locker room, restrooms, lobby area and support spaces,
bleachers and terrace levels, and storage spaces.
• Mechanical/Electrical/Plumbing Design – building systems, including ventilation
• Aquatics Design, including Mechanical/Electrical/Plumbing Design for pool systems and consolidation of pumps, filters, and pool equipment into one pump room.
• Reconfiguration of pools, gutters, and accessibility to meet health code and aquatics programming requirements.
• Filtration (DE, high-rate sand)
• Training features (lengths, lane count, lane width)
• Water safety and training: swim lessons, safety classes. • Other programming (learn-to-swim, water aerobics, youth and adult swim teams, practice water polo, therapy, lap swim, triathletes, etc.)
• Recreational amenities to provide “unobstructed” play time, recreational swimming, and special community events.
• Therapy/Exercise amenities
• Temperature (heating, differentiated temperatures
between pools)
• Lighting (in and above pool)
• Civil Engineering
• Wet and dry utilities design
• Fire Protection (Fire Sprinkler system for the entire building/ Fire protection of existing trusses, and fire alarm).
• Lighting (including in and above pool)
• Low Voltage Security
• Code Compliance and Accessibility (ADA) Compliance
• Audio Visual
• Acoustics
• Mosaic Art Design for entrance – coordination with Arts and Culture Committee will be required.
• Owner-Purchased, Contractor-Installed (OPCI)
recommendations for pool equipment and furniture.
Coordination with City Aquatics Supervisor will be required. • Cost estimating and scheduling
Discussions will also cover the functionality of the building at the facility, continuing the refinement of concepts developed in the feasibility study. Operationally, our team will consider how do they function and what needs within the facility are being met and which needs are unmet. Concepts will be developed that facilitate designing the function areas of point of entry, restrooms, showers, changing rooms, administrative staff rooms, pool equipment room, and all other spaces desired as part of the design. Additionally, the physical aspects of the facility alterations will be reviewed for compatibility with the historic structure including architecture styles, materials and finishes, plumbing fixtures, lighting, and security. Similarly, there will be additional conversations about site elements such as entry approach and short-term drop-off.
Your willingness
to explore design
solutions and to
continuously add
value to these
solutions has been
rewarding. It really is
an ‘iconic’ design,
and I mean that in
every positive way.” – Amy Bodek
Director of Development Services, City of Long Beach
Belmont Beach Aquatic Center
PROGRAMMING PHASE
The programming meeting will be an intensive effort to fully confirm, refine and clarify the desired characteristics of the facility. The outline of issues to discuss will provide a template for discussing the various decisions to be made. The value of having an experienced design team will become evident during these discussions where we can offer in depth guidance and recommendations to help the Santa Fe Springs representatives make knowledgeable decisions in meeting their goals.
Following the programming effort, we will develop an outline program that describes the project that is envisioned. This document will be a clear outline of the decisions made and will guide us in the further development of the project. With this information in hand, our team will perform a planning effort that incorporates the desired features into several conceptual alternatives for the facility. During this stage, we will provide an estimate of probable cost of construction and evaluate its relation to the proposed budget for the project.
Through an interactive process with Santa Fe Springs
representatives, these concepts and estimates will be refined for presentation. The deliverables at the end of this phase will be conceptual site plans, floor plans and renderings with the ultimate outcome of this process being a single concept that is approved for further development.
SCHEMATIC DESIGN PHASE
We believe that creating an open and efficient process of communication is the cornerstone of a successful project.
We have developed a detailed, key stakeholder process
methodology that identifies project needs and goals, project opportunities and constraints, and a process to optimize the possibilities for your project. Assembling and assessing the information gleaned from each stakeholder is critical to defining the aquatic program and physical functionality for each pool. Once the aquatics program has been verified, schematic layouts for the reconfiguration of the existing pools will be developed to illustrate various arrangements and space relationships of the program. These layouts elicit comments and suggestions from the stakeholders to confirm a common understanding of project parameters in reaching consensus on the overall functionality of the project. During the schematic design phase, we will also determine the relationship of the pools to the surrounding support spaces and to identify opportunities for improvement.
DESIGN DEVELOPMENT PHASE
This identifies all the questions that must be resolved by the design team including the coordination of issues such as the utilities, and the mechanical systems. CH-H20 takes a lead role during this phase with coordinating all the aquatic infrastructure requirements (e.g. domestic water, power, sewer, etc.)
required for the interfacing with the pool and pool systems.
Information is collected and compiled for completion of the Division 13 Swimming Pool Specifications which identify all the systems and components for the pools.
CONSTRUCTION DOCUMENT DEVELOPMENT
The development of the construction documents is a
continuation of the project design process with final
construction documents being utilized for project bidding and permitting. The construction documents and specifications provide the details for pool construction and the pool systems to be provided to the project. The internal Quality Control processes in place throughout the design phase of the project lead to quality plans and specifications that define the project, minimize questions during bidding, and allow contractors to provide quality bids. Under HED’s leadership, CH-H20 also commits to reviewing other design disciplines progress construction documents to ensure that there are no scope gaps or overlooked coordination items.
CONSTRUCTION ADMINISTRATION
This is a critical phase of the project to ensure construction follows the decisions made throughout the design process and in conformance with the construction documents. During the pool construction process, HED attends weekly construction meetings and observes the progress of the work. CH-H20 is on site at several pre-established construction milestones to observe the progress of the pool construction, including for punch list development and close-out. A formal report on pool construction activities and deficiencies is submitted following each observation of construction. Other responsibilities in the construction administration phase include the review of contractor submittals, shop drawings, product information and requested substitutions. HED and CH-H20 are diligent throughout the review process to maintain project quality. 9 OPTION 1
New 25M competition pool orienting north south direction for spectator to properly view swim events and competition from the existing viewing stand. New leisure pool and Spa conveniently locating directly adjacent to the viewing stand.
Waterslide play structure with fabric shade structures locating at the south west corner currently replacing existing courtyard picnic area. Sprayground locating north of the Leisure pool for conveniently access to the both pools. Existing northwest corner picnic area cover with fabric shade structures to enhance outdoor use of picnic area.
11 OPTION 2
New 25M competition pool orienting north south direction for spectator to properly view swim events and competition from existing viewing stand. New leisure pool and waterslide are conveniently locating directly adjacent to the viewing stand as resting area. Sprayground locating at the northwest corner replacing existing courtyard. New Spa locating at the southwest corner surrounds by fabric shade structures for outdoor seating.
13 OPTION 3
New 25M competition pool orienting east west direction
adjacent to new leisure pool buffering from parking lot with landscape hedges. New waterslide positioned at the north existing turf area is conveniently access from the competition pool and leisure pool. New Sprayground area locating at the southwest corner with fabric shade structures further activating this existing courtyard. New Spa area with shade structures locating at the northwest corner would enhance environment in this corner of the aquatic center.
15 Project Team, Key
Personnel, and Resumes
16 John Dale FAIA, LEED AP
Principal-in-Charge | HED
John Dale has been extensively involved in the master
planning, programming and design of public and private
educational projects. By defining small overall strategies focused on community involvement and sustainability, he has established widely recognized models of regional and national significance.
City of Long Beach
Belmont Beach Aquatic Center
Long Beach, CA
City of Piedmont
Aquatics Center Master Plan
Piedmont, CA
City of Walnut Creek
Aquatic Center Feasibility Study
Walnut Creek, CA
Santa Monica-Malibu USD
Santa Monica High School
• Discovery Building and Aquatic Center
• Phase 3 Exploration Building and
Gold Gymnasium
• Facilities Master Plan
Santa Monica, CA
Occidental College
Athletics and Recreation Facility
Los Angeles, CA
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Fred Kelly Stadium Renovation
• Phase 2 Modernization and Expansion
• Master Plan
Orange, CA
County of Riverside
James A. Venable Community Center
Cabazon, CA
EDUCATION
Master of Architecture
Massachusetts Institute of
Technology
Bachelor of Architecture
University of Toronto
CREDENTIALS
Registered Architect: CA
LEED Accredited Professional
At HED, great design is about thinking creatively to overcome challenges and improve real world outcomes. Our firm has a long history and reputation for design excellence because we believe that all the facets of our design, from architecture, consulting, engineering, and planning, must create a positive impact for our clients, the community, and the world.
Working closely with the City of Santa Fe Springs project’s stakeholders, we will develop an approach that is highly tailored to your unique needs and aims. In addition to our staff in local offices near you, we can support your project with a deep bench of technical experts from across the country. The team identified in this proposal were selected for their experience and availability to commit to your project. They will be dedicated to the success of this project and will perform the work necessary to meet the demands of the schedule and work plan put forth in our proposal.
John Dale faia, leed ap
Principal in Charge
LEAD CONTACT PERSON 30%
Grace Milenkov
Project Manager 25%
Duane Fisher aia, leed ap
Project Architect 50%
Binh Wong associate aia leed ap
Project Designer 40%
Megumi Hironaka aia, well ap,
leed ap bd+c, fitwel
Sustainability Specialist 10%
COMMITMENT
A Team Designed for the City of Santa Fe Springs
KEY HED TEAM MEMBER
Grace Milenkov ASSOC. AIA
Project Manger | HED
Grace Milenkov brings a wealth of knowledge on agency
approvals, building codes and team leadership to her projects.
Blending creativity with science and engineering, architecture has been a passion of Grace’s since childhood. Her innate ability to orchestrate a design team through what can sometimes be a complex process makes her an asset on any project.
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Fred Kelly Stadium Renovation
• Phase 2 Modernization and Expansion
Orange, CA
Santa Monica-Malibu USD
Santa Monica High School Phase 3
Exploration Building and Gold Gymnasium
Santa Monica, CA
Hacienda La Puente USD
• Grandview Academy Modernization
• Newton Middle School Modernization
• Sparks Middle Schools Modernization
• La Puente High School Pool*
Industry, CA
Oak Park Unified School District
• Red Oak Elementary School Container
• Brookside Elementary School Container
• Medea Creek Middle School Container
Oak Park, CA
La Crescenta Valley High School*
Pool Renovation
La Crescenta-Montrose, CA
La Crescenta Valley High School*
Pool Renovation
La Crescenta-Montrose, CA
Hoover High School*
Pool Renovation
Glendale, CA
*Experience Acquired from Prior Firm
EDUCATION
Master of Architecture
California State Polytechnic
University, Pomona
Bachelor of Architecture
California State Polytechnic
University, Pomona
Duane Fisher AIA, LEED AP BD+C
Project Architect | HED
Duane Fisher brings diverse project experience that includes educational, civic, high-rise, and mixed-use commercial developments. He is experienced in a variety of program types including lecture halls / classrooms, multi-use and multimedia instructional spaces, auditoriums, wellness and athletic facilities, and administration facilities.
City of Long Beach
• City of Long Beach Belmont Plaza
Pool Management
• Belmont Beach Aquatic Center
Long Beach, CA
City of Piedmont
Aquatics Center Master Plan
Piedmont, CA
Santa Monica-Malibu USD
Santa Monica High School Discovery Building
and Aquatic Center
Santa Monica, CA
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Phase 2 Modernization and Expansion
Orange, CA
Occidental College
Athletics and Recreation Facility
Los Angeles, CA
Los Angeles Valley College*
Student Pool
Los Angeles, CA
County of Los Angeles
Manhattan Beach Library
Manhattan Beach, CA
*Experience Acquired from Prior Firm
EDUCATION
Bachelor of Architecture
California State Polytechnic
University, Pomona
CREDENTIALS
Registered Architect: CA
LEED Accredited Professional,
Building Design and Construction
Binh Wong brings years of experience including all project types from small fast-tracked renovations to large new state-of-the-art buildings and master planning. Constantly striving to simplify and enhance people’s interactions with the built environment, Binh will work collaboratively to ensure alignment with your vision on the Santa Fe Springs Aquatic Center.
Santa Monica-Malibu USD
Santa Monica High School
• Discovery Building and Aquatic Center
• Phase 3 Exploration Building and
Gold Gymnasium
• Santa Monica-Malibu Facilities
Master Plan
Santa Monica, CA
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Fred Kelly Stadium Renovation
• Phase 2 Modernization and Expansion
Orange, CA
Oak Park Unified School District
• Red Oak Elementary School Container
• Brookside Elementary School Container
• Medea Creek Middle School Container
Oak Park, CA
Flintridge Preparatory Schools
Master Plan and New Construction
La Cañada Flintridge, CA
The Thacher School
Performing Arts Center
Ojai, CA
Milken Community High School
High School Masterplan
Los Angeles, CA
EDUCATION
Master of Architecture
Columbia University
Bachelor of Architecture
California State Polytechnic
University, Pomona
CREDENTIALS
LEED Accredited Professional
Megumi Hironaka brings experience in the planning, design, and construction of developments throughout California. She brings a technical expertise in managing and producing all architectural project documentation with a focus on designing and developing highly sustainable and healthy buildings.
Santa Monica-Malibu USD
Santa Monica High School
• Discovery Building and Aquatic Center
• Phase 3 Exploration Building and
Gold Gymnasium
Santa Monica, CA
County of Los Angeles
Manhattan Beach Library
Los Angeles, CA
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Phase 2 Modernization and Expansion
Orange, CA
City of Berkeley
West Berkeley Branch Library,
LEED Platinum / ZNE
Berkeley, CA
EDUCATION
Bachelor of Architecture
University of Southern California
Associate of Interior Design
Endicott College
CREDENTIALS
Registered Architect: CA
LEED Accredited Professional,
Building Design and Construction
WELL Accredited Professional
Fitwel Ambassador
MEMBERSHIPS
American Institute of
Architects (AIA)
Binh Wong ASSOC. AIA, LEED AP
Project Designer | HED
Megumi Hironaka AIA, WELL AP,
LEED AP BD+C, FITWEL
Sustainability Specialist | HED
18 Recent Projects
Excellence Through Experience
19 At HED, great design is about thinking creatively to overcome challenges and improve real world outcomes. Our firm has a long history and reputation for excellence because we believe that all the facets of our design, from architecture, consulting, engineering, and planning, must create a positive impact for our clients, the community, and the world through responsive, innovative, and sustainable design solutions.
We are excited to partner with Counsilman-Hunsaker (CH-H20) on your project, a best-in-class aquatics design firm that has completed over 500 pool projects for the Park and Recreation market sector. The HED | CH-H2O team is currently designing the Belmont Plaza Pool Revitalization Project in Long Beach— an important recreation and Olympic training facility that combines indoor and outdoor facilities to create a major focal point for the City’s waterfront in a highly public location.
Our combined team is committed to a seamless, transparent, consensus-building process, including effective community outreach through a structured workshop process. HED has successfully planned and completed aquatic, recreation and athletic facilities throughout the firm’s history. In recent years, we have frequently teamed with CH-H20 for major aquatic facilities and feasibility studies, including recently completed Aquatic / Recreation Facility Feasibility Studies for the Cities of Walnut Creek and Piedmont, and a newly constructed 50-meter pool at Santa Monica High School. Each of these projects requires a unique response and a design approach that is specifically crafted for the needs of the community.
The following projects, four of which have been jointly developed by our HED | CH-H2O team highlight the depth and relevance of our collective aquatic experience.
PUBLIC AGENCY REFERENCES
Belmont Beach and Aquatics Center
Tom Modica
Assistant City Manager
City of Long Beach
333 W Ocean Blvd
Long Beach, CA 90802
562.570.5091
[email protected]
City of Piedmont Aquatics
Center Master Plan
Sara Lillevand
City Administrator
City of Piedmont
120 Vista Ave
Piedmont, CA 94611
510.420.3042
[email protected]
Walnut Creek Aquatic Center
Kevin Safine
Arts and Recreation Director
City of Walnut Creek
1666 N Mais St
Walnut, CA 94956
925.256.3589
[email protected]
Santa Monica High School
Aquatics Center
Carey Upton
Chief Operations Officer
Santa Monica-Malibu Unified School
District
601 Pico Blvd
Santa Monica, CA 90405
310.399.5865 x79383
[email protected]
El Modena Aquatics Center
Mike Christensen
Former Superintendent
Orange Unified School District
951.965.1435
[email protected]
City of Long Beach
Location | Long Beach, CA
Construction Cost | $82.5 M
Project Size | 68,000 SF
50-Meter Competition Pool
Project Type | New Construction
Completion | 2024
Sustainability
Designed to LEED Silver
Contact
Tom Modica
Assistant City Manager
City of Long Beach
562.570.5091
[email protected]
BELMONT BEACH AQUATIC CENTER | HED AND COUNSILMAN HUNSAKER HED, in association CH-H20, is designing the revitalized Belmont Beach and Aquatic Center, including an indoor 50-meter competition, recreation pool with movable floor, separate dive well with 10-meter dive platform, spectator seating for 650, therapy/teaching pool, and two whirlpools. In addition, the project sports an outdoor 50-meter competition pool, shallow recreation pool and public plazas, and support spaces for the entire facility (lockers, restrooms, meeting rooms, administration, and concessions). The center supports recreational activities for all ages as well as multiple competitive activities including swimming, diving, and water polo.
The Center is located on a public beach at the site of an aging facility and is intended to become an iconic civic institution for the community of Long Beach as well as the aquatic competition community in general.
City of Piedmont
Location | Piedmont, CA
Construction Cost | $10 M
Project Size | 25,000 SF
10-Lane Competition Pool
Project Type | Master Plan
Completion | 2017
Contact
Sara Lillevand
City Administrator
City of Piedmont
510.420.3042
[email protected]
21 AQUATICS CENTER MASTER PLAN | HED AND COUNSILMAN HUNSAKER Originally constructed in 1964, the existing Aquatics Center was the only such facility providing for aquatics-related activities in the community including Piedmont Unified School District. HED, in association CH-H20, was hired by the City to conduct a feasibility study and develop a preliminary concept for transforming the Aquatics Center. The concept for transforming the facility was developed after meetings with staff, user interviews, public workshops, and an online survey. The new Recreation and Aquatics Center will include a 3,900 SF leisure pool as well as a 10-lane competitive lap pool with two one-meter diving boards to accommodate diving, interactive activity areas, administration offices, and a new bathhouse with multipurpose room for community events.
City of Walnut Creek
Location | Walnut Creek, CA
Construction Cost | $15 M
Project Size | 40,000 SF
Project Type | Feasibility Study,
Concept Design
Completion | 2017
Contact
Kevin Safine
Arts and Recreation Director
City of Walnut Creek
925.256.3589
[email protected]
RECREATION AND AQUATICS CENTER | HED AND COUNSILMAN HUNSAKER The Walnut Creek Recreation and Aquatics Center at Heather Farms Park provides multiple opportunities for varied recreation activities while acting as a focal point for aquatic teams within the city of Walnut Creek. HED was hired by the City to conduct a feasibility study and to generate options to bring about income for the site to help subsidize core activities and maintain long term viability. The design team of HED, in association with SFA|SFM and CH-H20 met with stakeholders such as the Walnut Creek Aquatic Foundation and the City’s Arts, Recreation and Community Services Department to gain insight and an understanding of community needs, and to ultimately offer a center that would foster community aquatics while raising the facility’s profile as an exciting destination for the region.
Santa Monica-Malibu Unified School District
Location | Santa Monica, CA
Construction Cost
$155 M (Total Project)
$5 M (Aquatics Only)
Project Size | 260,000 SF
50-Meter Competition Pool
Project Type | New Construction
Completion | 2021
Contact
Carey Upton
Chief Operations Officer
Santa Monica-Malibu
Unified School District
310.399.5865 x79383
[email protected]
23 SANTA MONICA HIGH SCHOOL DISCOVERY BUILDING
AND AQUATIC CENTER | HED AND COUNSILMAN-HUNSAKER
HED, in collaboration with Moore Ruble Yudell Architects & Planners, designed a dramatic new academic complex that transforms Santa Monica High School’s (SAMOHI’s) North Campus. Benefiting both school and the surrounding community, the complex elevates educational, cultural, and recreational pursuits; improves campus access and circulation; and supports whole child development and diverse learning styles.
HED and CH-H20 designed SAMOHI’s publicly accessible Aquatic Center to meet the needs of the school and the surrounding community for the next fifty years. The outdoor pool is a 50-meter competition pool constructed of concrete, tile, and plaster, with a regenerative media filter system and movable bulkhead that allows several events to take place simultaneously. Bleacher seating and viewing galleries surround the northeast and south sides of the pool, and the center also includes changing rooms, restrooms, team rooms, classroom, reception area, and equipment rooms. All loose and deck equipment are as required by Health Department Regulations and the requirements of USA Swimming and the NFSHSA. The Aquatic Center completed construction in August, 2021.
Orange Unified School District
EL MODENA HIGH SCHOOL AQUATIC CENTER | HED
The design team of HED is working on the new Aquatic Center, including a 30-meter competition pool that will replace the existing facility on the El Modena High School Campus. The building will maintain connectivity to the campus with CMU block walls and steel framed roof construction. During off hours, the community will be able to utilize the pool, lockers, and restrooms. Fixed bleacher seating and solar shade canopies are being placed on the pool deck.
Location | Orange, CA
Construction Cost | $7.6 M
Project Size | 12,600 SF
30-Meter Competition Pool
Project Type | New Construction,
Modernization
Completion | 2022
Contact
Mike Christensen
Former Superintendent
Orange Unified School District
951.965.1435
[email protected]
Livermore Valley Joint Unified School District
LIVERMORE HIGH SCHOOL ATHLETIC AND AQUATIC COMPLEX | HED Part of Measure J, a 2016 school bond measure passed by Livermore Valley residents, the Livermore High School athletic complex will include a multi-level, 45,000 SF event center and an 11-lane, 25-meter swimming pool with two diving platforms. The facility will sit adjacent to the school’s stadium, which hosts track, field, football, and soccer events. Internally, the athletic complex will house a main multiple-use gymnasium with bi-level home side bleachers. The second level of the structure will include an auxiliary gymnasium separated from the mezzanine bleachers with a partition topped with storefront openings to share daylight between the two spaces.
Location | Livermore, CA
Construction Cost | $38 M
Project Size | 45,000 SF
25-Meter Competition Pool
Project Type | New Construction
Completion | 2023
Contact
Kim McNeely
Director of Facilities
Livermore Valley JUSD
925.606.3200
[email protected]
25 City of La Mirada
“SPLASH” LA MIRADA REGIONAL AQUATICS CENTER | COUNSILMAN-HUNSAKER The facility is located on 18 acres on the western edge of La Mirada Regional Park and features a Spanish heritage, seafaring themed complex including both competition and leisure components such as a 13,000 SF 50-meter competition pool, a 25-yard fitness/ instructional pool with eight lap lanes, a 200SF 20 person therapeutic spa, a 1,200 SF children’s splash pad with interactive aquatic play features, a 12,500 SF leisure pool, a 600-foot long lazy river, and three large waterslides including body, tube and speed slides.
Location | La Mirada, CA
Construction Cost | $24 M
Project Size | 785,000 SF
50-Meter Competition Pool
Project Type | New Construction
Completion | 2007
Contact Unavailable
City of North Port
NORTH PORT AQUATIC CENTER | COUNSILMAN-HUNSAKER
The North Port Aquatic Center includes 25-meter stretch pool, a lazy river, a kids’ activity pool, two body flumes (or slides), a bowl slide, shade structures, a bath house with locker rooms, and a small concession area. The 25-meter stretch pool will be able to accommodate 25-yard or 25-meter lap swimming and competitions and will be open all year long.
Location | North Port, FL
Construction Cost | $12 M
Project Size | 75,500 SF
Project Type | New Construction
Completion | 2019
Contact Unavailable
27 5 Subconsultants
HED’s talented project team is focused on community work from programming and design to construction administration.
The continuity of these people working on and through all phases of project development is unique and assures that the original concepts from design through construction are not lost.
Counsilman-Hunsaker is made up of an integrated team of design professionals and operational specialists with unrivaled aquatic industry experience, bringing exceptional collaboration skills for the design and delivery of high-quality, innovative aquatic facilities while our operational specialists serve as your guide in achieving long-term operational success.
Pocock Design Solutions is a full service mechanical, plumbing, and fire protection engineering firm. They have worked in over 13 counties and cities throughout Southern California, including libraries, courthouses, rec centers, animal facilities, fire stations, and administration facilities.
A&F Engineering was founded in 1966, and has cultivated a tradition of design excellence across a wide variety of projects and disciplines. Committed to excellence, open communication, and delivering high-quality results - both for clients and staff.
Coffman Engineers has been providing engineering services since 1979 across the country. They pride themselves on working with integrity, honesty, and respect for all, striving to be good neighbors, supporting many charitable efforts with donations of time and capital. At the start of every new project, Coffman invests time in understanding client goals and strives to be the ultimate collaborators, helping to redefine and reenvision projects, not just execute them.
Miyamoto International is a global structural engineering and disaster-risk reduction firm providing resiliency expertise that sustains industries and safeguards communities around the world. They are experts in earthquake-resilient engineering that reduces damage and facilitates disaster recovery. Designing new construction and assessing existing buildings to address specific vulnerabilities to disasters.
Nuvis has maintained 50-years of commitment to responsible design of outdoor spaces, and is a full-service landscape architectural design firm, creating memorable project solutions that achieve sustainable results. They are team integrators, providing leadership skills and broad knowledge of the
Architecture, Engineering, and Construction industry. They facilitate each public and private project as a composition of site environmental factors, project programming, and input from all stakeholders.
KPJ Consulting (DBE / EBE / MBE / WBE / SBE) is an innovative consultancy firm focused on planning a course of action to achieve client goals with relevant strategic alliances and facilitate partnerships with aligned companies. They are small enough to care for each client personally but big enough to provide tailored services that achieve the best possible results in the least likely time. KPJ aims to be a low carbon company (encouraging team members to have a home-based office), operate ethically, and be valuable members of the community. They are experienced in all aspects of real estate development and capital improvements, including early planning, procurement, and close-out.
(KPJ Consulting resume not included.)
28 Our Team of Experts
Mike Gartland
Aquatics Consultant Principal | CH-H20
Jeff Prosswimmer
Aquatics Consultant Project Director | CH-H20
City of Long Beach**
Belmont Beach Aquatic Center
Long Beach, CA
City of Carson
Carson Park Pool and Hemingway
Park Pool Renovations
Carson, CA
City of Chehalem
Chehalem Aquatic Center
Newberg, OR
City of Long Beach**
Belmont Beach Aquatic Center
Long Beach, CA
Santa Monica-Malibu USD**
Santa Monica High School Aquatic Center
Santa Monica, CA
City of Chula Vista
Loma Verde Pool
Chula Vista, CA
City of Coronado
Coronado Municipal Pool Study
and Renovation
Coronado, CA
City of Los Angeles
Lincoln Park Pool
Los Angeles, CA
Newport Mesa Unified School District
Estancia High School Pool
Costa Mesa, CA
City of Seal Beach
Seal Beach Recreation and Aquatic Center
Study and Design
Seal Beach, CA
City of Butte-Silver Bow
Butte-Silver Bow Community Pool
Butte, MT
**Project Experience with HED
City of San Bruno
Recreation and Aquatic Center
San Bruno, CA
Sweetwater Union High School District
Mar Vista High School
Chula Vista, CA
Long Beach Unified School District
• Lakewood High School
• Wilson High School
Long Beach, CA
North Slope Borough School District
Alak School Natatorium
Wainwright, AK
City of Avondale
Aquatics Complex
Avondale, AZ
**Project Experience with HED
As Principal and Studio Director of the Pacific Studio, Mike Gartland is responsible for leading the CH-H20 team in the Western US, Hawaii, and Alaska. He has over 30 years of proven experience in the Energy and Building construction industries with a concentrated emphasis in team leadership, business development, engineering, service, and operations.
Jeff Proswimmer has over 50 years of aquatic experience having been an accomplished competitive swimmer as well as lifeguard, pool operator and swim coach. He is responsible for directing business in the Pacific Region Studio. He leads the teams that design, engineer, and operate aquatic facilities on the West Coast, Hawaii and Alaska.
EDUCATION
Master of Science
Engineering Management
Drexel University
Bachelor of Science
Mechanical Engineering
United States Merchant
Marine Academy
EDUCATION
Bachelor of Arts
Kenyon College
CREDENTIALS
Certified Energy Manager
Tim Pocock
Plumbing Designer | Pocock Design Solutions
Andrew Gossman PE, HFDP, LEED AP BD+C
Mechanical Engineer | Pocock Design Solutions
Glendale High School
Aquatic Center
Glendale, CA
Woodbridge High School
Aquatic Center
Irvine, CA
Long Beach Polytechnic High School
Natatorium Pool Equipment Replacement
Long Beach, CA
Costa Mesa High School
50 M Pool Equipment Upgrade
Costa Mesa, CA
Capistrano Valley High School
50 M Pool / Support Building,
San Juan Capistrano, CA
San Bernadino City USD
Indian Springs Stadium Improvements /
Aquatic Center Facility
San Bernardino, CA
Santa Ana College
Swim Facility Equipment Replacement Santa
Ana, CA
Irvine USD
University High School Pool
Refurbishment Modernization
Irvine, CA
Lakewood High School
HVAC Modernization
Long Beach, CA
As managing Principal of Pocock Design Solutions, Tim
Pocock is responsible for the overall operations of the company, including personnel, plumbing engineering and
computer operations. Tim will be involved with all plumbing aspects of the project, from the design development phase through construction phase and closeout.
As a Principal, Andrew Gossman is responsible for all
mechanical design and production activities, engineering of projects, communication and coordination with all disciplines, and maintaining quality control. Andrew will be directly involved in all aspects of the project, from the design development phase through construction phase and closeout.
EDUCATION
Sequential Program in Plumbing
System Design Certification
UCLA, Extension
MEMBERSHIPS
American Society of Plumbing
Engineers (ASPE)
National Fire Protection
Association (NFPA)
EDUCATION
Bachelor of Science
Mechanical Engineering
California Polytechnic State
University, San Luis Obispo
CREDENTIALS
Professional Engineer: CA
LEED Accredited Professional,
Building Design and Construction
30 Glendale High School
Aquatic Center
Glendale, CA
Woodbridge High School
Aquatic Center
Irvine, CA
Long Beach Polytechnic High School
Natatorium Pool Equipment Replacement
Long Beach, CA
Costa Mesa High School
50 M Pool Equipment Upgrade
Costa Mesa, CA
Capistrano Valley High School
50 M Pool / Support Building,
San Juan Capistrano, CA
San Bernadino City USD
Indian Springs Stadium Improvements /
Aquatic Center Facility
San Bernardino, CA
Santa Ana College
Swim Facility Equipment Replacement Santa
Ana, CA
Irvine USD
University High School Pool
Refurbishment Modernization
Irvine, CA
Lakewood High School
HVAC Modernization
Long Beach, CA
Rolando Sotelo PE
Electrical Engineer | A&F Engineering Group
Ken Wong M. ENG., SE
Structural Engineer | Miyamoto International, Inc.
Edgewood High School
Aquatic Facility
West Covina, CA
Sonora High School
Aquatic Facility
Sonora, CA
Chumash Community Center**
Community Center with Olympic-Sized
Swimming Pool
Chumash Reservation, CA
Whittier Aquatic Center
Design-Build Aquatic Center
Including Pool Building
Whittier, CA
Los Angeles Center for Enriched Studies
Natatorium and Pool Equipment Upgrade
Los Angeles, CA
Colton High School #3
Sports Complex and Aquatic Facility
Colton, CA
Martin Luther King Park, Pool Addition
Locker Room and Classroom Addition to
Existing Public Bathhouse and Enclosed Pool
Long Beach, CA
1130 South Hope Street Hotel, Seismic
Retrofit and Adaptive Reuse
Conversion of 3-Story Building into 11-Story
Type-1 Boutique Hotel
Los Angeles, CA
**Project Experience with HED
Rolando Sotelo serves as the Chief Engineer for A&F
Engineering Group, Inc. Ventures. He has over twenty years of experience and has complete projects throughout southern California. His expertise has been an integral part of large and small projects that include educational facilities, civic centers, office and commercial buildings, and industrial parks.
Ken Wong brings along a wealth of structural engineering experience in the public domain. As Principal, he manages integrated teams for opportunities and influences thought leadership in the industry. A highly-respected and accomplished engineer, Ken generates a diversity of design solutions that are both functional and innovative.
EDUCATION
Bachelor of Science
Electrical Engineering, Power
Systems California State
University, Long Beach
CREDENTIALS
Professional Engineer: CA
MEMBERSHIPS
National Society of Professional
Engineers (NSPE)
California Society of Professional
Engineers (CSPE)
Institute of Electrical and
Electronic Engineers (IEEE)
EDUCATION
Master of Engineering
Civil Engineering
Cornell University
Bachelor of Science
Engineering
Harvey Mudd College
CREDENTIALS
Structural Engineer: CA, NV
Civil Engineer: CA, NV
MEMBERSHIPS
American Concrete
Institute (ACE)
American Institute of Steel
Construction (AISC)
American Society of Civil
Engineers (ASCE)
Structural Engineers
Association of California (SEAC)
Asian American Architects and
Engineers Association (AAAEA)
32 Steve Witherow PE
Civil Engineer | Coffman Engineers
Bob Stone PLA, ASLA
Landscape Architect | Nuvis
Manhattan Beach Fire and Police Facility
New two-story Police and Fire Station in
downtown Manhattan Beach.
Manhattan Beach, CA
10 West Walnut Street
6.5 acre, mixed-use urban village project
featuring 620,000 SF of office use, 30,000 SF of
retail space, 10,000 SF of restaurant space and
475 residential units, including work/live units.
Pasadena, CA
LAUSD Central Region
Elementary School #22
The two-story school is approximately 50,000
SF of building space on 4.1 acres, and includes
26 classrooms, a library, administrative
spaces, food services, a multi-purpose room,
hardcourts, and a play field.
Playa Vista, CA
Mt. San Antonio College
Campus Utility Upgrades
Civil engineering design services for a water
main replacement project at Mt. San Antonio
College. The project replaced the main serving
the campus infrastructure maintenance
building while campus was occupied.
Walnut, CA
Steve is an accomplished professional with over 21 years of progressive experience in project management, civil
engineering, and construction. He is a natural team leader with a demonstrated ability to build strong project teams using internal staff and effective collaboration with other consultants.
Bob develops innovative public designs that provide strong visual character and seamless functionality for pedestrian and vehicular spaces. With more than 40 years of experience, Bob is the primary principal accountable for the management, fiscal productivity, and resource orchestration of our Orange County, Bay Area, Nevada, and international projects.
EDUCATION
Bachelor of Science
Civil Engineering
Oregon State University
CREDENTIALS
Professional Engineer: CA, HI, OR
EDUCATION
Bachelor of Science
Landscape Architecture
California State Polytechnic
University, Pomona
CREDENTIALS
Professional Landscape Arch.: CA
MEMBERSHIPS
American Society of Landscape
Architects (ASLA)
Santa Ana USD
• Willard Middle School Track and Field
• Valley High School Sports Complex
Santa Ana, CA
Saddleback College**
• Advanced Technology and Applied
Science Building
• Gateway Building
Mission Viejo, CA
Oak Park Unified School District**
• Medea Creek Middle School Modulars
• Brookside Elementary School Modulars
• Oak Hill Elementary School Core Building
• Red Oak Elementary School Modular Outdoor Learning Area Oak Park, CA
Los Angeles USD**
Topanga Charter Elementary School Portable
Replacements
Los Angeles, CA
Irvine USD
• College Park Elementary School
• South Lake Middle School Music Building
Irvine, CA
Anaheim Elementary School District
Dale ES School Renovation-Polaris Building
Anaheim, CA
**Project Experience with HED
Lawsuits
Project: Carlyle Residences High-Rise Condominiums;
Date of Claim: 10/4/2019;
Name of Claim/Parties: The Carlyle Residences Owners
Association -vs- El Ad Wilshire, LLC & Swinerton Builders; Court/Case No.: Los Angeles County Superior Court Case No. 19STCV35360;
Description/Status: The complaint generally alleges “construction defects” exist in a Los Angeles high-rise luxury condominium tower completed and occupied approximately 10 years ago.
HED was the Executive Architect for the project, Swinerton was the GC. HED was served with a cross-complaint, dated 2/13/2020, by Swinerton, naming HED and six other design professionals, trade subcontractors and suppliers as crossdefendants on a variety of legal theories. Neither plaintiff’s complaint nor Swinerton’s cross-complaint contained any factual details regarding building defects or deficiencies.
HED has been dismissed from this matter.
5-Year California Litigation History
33 List of All Projects
Project List
As a national firm, HED works on hundreds of projects each year across the country. Below is a list of our most relevant projects completed, currently under construction, or designed within the past two years.
County of San Diego
Lakeside Library
San Diego, CA
City of Long Beach
Belmont Beach Aquatic Center
Long Beach, CA
Sonoma County Junior College District
Pool Facility
San Francisco, CA
Sweetwater UHSD
Mar Vista High School Aquatic Center Study
Chula Vista, CA
Santa Monica-Malibu USD
Santa Monica High School
• Discovery Building and Aquatic Center
• Phase 3 Exploration Building and
Gold Gymnasium
• Facilities Master Plan
Santa Monica, CA
Occidental College
Athletics and Recreation Facility
Los Angeles, CA
Orange USD
El Modena High School
• Aquatic Center / Science Center
• Fred Kelly Stadium Renovation
• Phase 2 Modernization and Expansion
• Master Plan
Orange, CA
Livermore Valley Joint USD
Livermore High School Athletic and
Aquatic Complex
Livermore, CA
Hacienda La Puente USD
• Grandview Academy Modernization
• Newton Middle School Modernization
• Sparks Middle Schools Modernization
Industry, CA
Oak Park Unified School District
• Red Oak Elementary School Container
• Brookside Elementary School Container
• Medea Creek Middle School Container
Oak Park, CA
Flintridge Preparatory Schools
Bachmann Collaboration Building
La Cañada Flintridge, CA
Redwood City School District
• Selby Lane School Phase I
• Fair Oaks School Phase I
• Roosevelt Elementary School
Administration Relocation
• Kennedy Middle School Administration
and Welcome Building
• Kennedy Middle School Parking Lot
Redwood City, CA
Grossmont UHSD
Health Occupations Center
La Mesa, CA
Menlo Park City School District
Laurel School Shade Structure
Menlo Park, CA
Grossmont UHSD
• Multiple High Schools, Bleacher
Alteration and Repair
• Monta Vista High School Score Boards
Spring Valley, CA
Cajon Valley USD
Licker Room Egress
Cajon Valley
Inglewood USD
• Inglewood High School Campus Studies
• Warren Lane Elementary School Shade
Structure
Inglewood, CA
34 Office Completing Work
HED LOS ANGELES
Our Los Angeles office will be completing the majority of the work on this project. Our teams have the ability to leverage experience and knowledge from an national scale with a local understanding to ensure innovative and successful projects.
Address
550 South Hope Street
Suite 2500
Los Angeles, CA 90071
Amount of Work Presently Under Way:
Our Los Angeles office is presently working on 157
projects across 8 different sectors, with a local staff of 83 design professionals.
Local Team
35 Project Schedule
Proposed Project Schedule
Project kick-off meeting with City staff
Building and site walk-through and examination of existing plans Cost estimate review
City review and approval
Schematic Design
1/9/2023 -2/17/2023
2022 2023
2/20/2023 - 4/14/2023
Design Development
Construction Documents
4/17/2023 - 6/23/2023
Permitting, Bidding, and Award
6/23/2023 - 10/13/2023
Construction Administration
10/16/2023 - 10/25/2024
oct nov dec jan feb mar apr
11 weeks 10/24/2022 - 1/6/2023
Programming Verification and
Conceptual Design
6 weeks
may jun jul aug sep oct oct
2024
36 HED utilizes internal work plans on every project to organize the design and documentation work and to manage a project’s schedule. The work plan is tailored to each project’s needs and requirements and identifies every task and responsibility by all participants in a project’s development, including owner, users, associated design firms and consultants, and agencies; and ties these tasks and responsibilities to a project schedule.
These work plans are assembled with input and consensus from all participants and are an important agenda item for the project’s kick-off meeting. We then monitor the work plan throughout the project and use it to inform all parties of items requiring resolution, impacts, and possible resolutions.
8 weeks
10 weeks
16 weeks
52 weeks (12 months)
Evidence of Required
Insurance
9/28/2021
Professional Concepts Insurance Agency, Inc.
1127 South Old US Highway 23
Brighton MI 48114-9861
[email protected]
(800)969-4041 (800)969-4081
[email protected]
Harley Ellis Devereaux Corporation
550 HOPE STREET
LOS ANGELES CA 90071-2627
Travelers 541310
Travelers Indemnity Co 25658
Travelers Prop Casualty of Ame 25674
XL Group PLC
21-22 ALL LOS ANGELES
A
X
X
X Contractural Liability
X X,C,U
X
6602R16685ATIL21 10/1/2021 10/1/2022
1,000,000
1,000,000
5,000
1,000,000
2,000,000
2,000,000
B X
X X
BA4R5523372147 10/1/2021 10/1/2022
1,000,000
C
X X
X 10,000 CUP7R0266562147 10/1/2021 10/1/2022
10,000,000
10,000,000
C N UB4R5668882147 10/1/2021 10/1/2022
X
1,000,000
1,000,000
1,000,000
D Professional Liability DPR9984222 10/1/2021 10/1/2022 Per Claim $ 5,000,000 Aggregate $ 10,000,000
For Information Purposes Only
Mike Cosgrove/SUNNY
The ACORD name and logo are registered marks of ACORD
CERTIFICATE HOLDER
© 1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25 (2014/01)
AUTHORIZED REPRESENTATIVE
CANCELLATION
DATE (MM/DD/YYYY)
CERTIFICATE OF LIABILITY INSURANCE
JECT LOC PRO- POLICY
GEN'L AGGREGATE LIMIT APPLIES PER:
CLAIMS-MADE OCCUR
COMMERCIAL GENERAL LIABILITY
PREMISES (Ea occurrence) $ DAMAGE TO RENTED
EACH OCCURRENCE $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $
PRODUCTS - COMP/OP AGG $
DED RETENTION $
CLAIMS-MADE
OCCUR
$
AGGREGATE $
EACH OCCURRENCE $ UMBRELLA LIAB
EXCESS LIAB
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) INSR
LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFF
(MM/DD/YYYY) POLICY EXP(MM/DD/YYYY) LIMITS
PER
STATUTE OTHER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE
E.L. DISEASE - POLICY LIMIT
$
$
$
ANY PROPRIETOR/PARTNER/EXECUTIVE
If yes, describe under
DESCRIPTION OF OPERATIONS below
(Mandatory in NH)
OFFICER/MEMBER EXCLUDED?
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED SCHEDULED
HIRED AUTOS NON-OWNED
AUTOS AUTOS
AUTOS
COMBINED SINGLE LIMIT
BODILY INJURY (Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE $
$
$
$
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSD
ADDL
WVD
SUBR
N / A
$
$
(Ea accident)
(Per accident)
OTHER:
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
INSURED
PHONE
(A/C, No, Ext):
PRODUCER
ADDRESS:
E-MAIL
FAX
(A/C, No):
CONTACT
NAME:
NAIC #
INSURER A :
INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
INSURER(S) AFFORDING COVERAGE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INS025 (201401)
37 11 Fee Schedule
Fee Schedule
HED structures our fees from our internal staffing scale system, which associates hourly rates to professionals
based on industry expertise and education. We use industrystandard project management software, experience, and our understanding of the scope defined in our client’s request for proposal to forecast the time and expense necessary to determine a design solution that will be high quality, sustainable, and responsive to your needs. The following charts show the range of hourly rates we employ when
requested to structure our services hourly. Variations between offices reflect varying overhead factors affected by location.
CONTRACT
AMOUNT
NEW CONSTRUCTION
% RATE
MODERNIZATION
% RATE
First $500,000 9.00% 12.00%
Next $500,000 8.50% 11.50%
Next $1,000,000 8.00% 11.00%
Next $4,000,000 7.00% 10.00%
Next $4,000,000 6.00% 9.00%
Excess of $10,000,000 5.00% 8.00%
The results of the calculations for fees from the schedules outlined above can be treated as a blended percentage fee or converted into a lump sum.
If additional services are requested, we will prepare a fee proposal for said services with a scope, a schedule, and a fee based upon our hourly rate schedule as illustrated above.
Basic services include the following: • Site Analysis & Site Develop. • Building Elevation & Massing Studies • Architectural Design • Interior Architecture • Space Planning • Structural/Mechanical/Electrical/Plumbing Engineering • Fire Sprinkler Design • Project Scheduling for Design Services, and Project-Based Construction Schedules
• Code Review • Building Condition Surveys • Permitting • Construction Administration The phases included in basic services are Schematic
Design, Design Development, Construction Documents,
Permitting, Bidding and award of Contracts, and
Construction Administration.
BILLING PRACTICES
Sliding Fee Schedule: Architecture / Engineering Basic Services The following sliding fee schedule is typically used to develop a percentage fee for basic design services on civic projects.
Percentage fee calculations differ according to the categories of new construction and modernization, and modular buildings.
HED LOS ANGELES 2022 BILLING RATES
CLASSIFICATION RATE RANGE
Level 6: Principal
Architects / Engineers / Planners / Designers $265 - $399 Level 5: Associate Principal
Architects / Engineers / Planners / Designers $226 - $312 Level 5: Associate
Architects / Engineers / Planners / Designers $162 - $287 Level 4: Salary
Architects / Engineers / Planners / Designers $129 - $225 Level 3: Hourly*
Architects / Engineers / Planners / Designers $114 - $144 Level 2: Hourly*
Architects / Engineers / Planners / Designers $92 - $122 Level 1: Hourly*
Architects / Engineers / Planners / Designers $68 - $96 * Subject to Overtime premium of 1.5 times schedule rate.
Rates are subject to change annually and are effective through December 31, 2022
39 The following are potential additional services in addition to the sliding fee schedule: • SWPPP Design • Programming & Needs Assessment • Graphic Analysis of the Program • Feasibility Studies • Master Planning • Post Occupancy Evaluation • Strategic Facility Planning • 3D Visual Fly-Through Media
FIXED FEE / PERCENTAGE
The sliding fee scale provided for new construction is sometimes challenging, depending on the size and nature of the specific project under consideration, and may be subject to further discussion and negotiation. We understand the City’s preference is to set a fixed fee based on a percentage of construction cost.
ALTERNATIVE PRICING
It should be noted that HED has entered into a variety of fee arrangements for various Cities, including: • Lump-sum fees based on a fixed percentage of an established construction budget
• Sliding scale percentage-based fees based on final
construction cost
• Hourly fees with a not-to-exceed limit • Combinations of the above approach
RECORD DRAWINGS
HED will provide record drawings based on ‘As-Built Drawings’ provided by the General Contractor as part of our basic services defined as a percentage of construction or lump sum fee.
ADDITIONAL COSTS
Reimbursable Expenses
Reimbursable expenses and administrative markups associated with those expenses are negotiable. The following represents the typical categories of reimbursables and markups we seek, but we conform to the terms of a City’s master agreement and specific policies governing compensation. The following out-of-pocket expenses are typically reimbursed at the rate of One and Fifteen Hundredths (1.15) times the actual cost to HED, but we will abide by the allowed markups stipulated in the City’s form of agreement: • Travel expenses by HED for trips to the project site or other locations for purposes of investigation, meeting attendance as approved by the City.
• Reproduction and delivery-related expenses for documents to be used for client purposes.
• Out-of-pocket expenses for the preparation of presentation graphics, renderings, and models requested by the City. • Expenses for specialized consultants’ services authorized by the City. The cost of specialized consultants can be structured as separate proposals with lump-sum fees or
provided on the basis on hourly rates with a not to exceed.
Additional Services Fee
Additional Services would be provided for the project if authorized or confirmed in writing by the City. Additional Services include any other services not otherwise included in the base agreement.
HED’s fee for additional services beyond the scope of basic services can be negotiated as a lump sum or hourly time and materials basis according to the scope of services.
CONTRACT AMOUNT NEW CONSTRUCTION
% RATE CALCULATED FEE
First $500,000 9.00% $45,000
Next $500,000 8.50% $42,500
Next $1,000,000 8.00% $80,000
Next $4,000,000 7.00% $280,000
Next $4,000,000 6.00% $240,000
Excess of $10,000,000 5.00% N/A
Total Calculated Fee $687,500
Specialty Consultants
Pool Consultant $298,900
Cost Estimator $25,000
FF&E $18,500
LEED $32,500
Subtotal $374,900
A/E DESIGN SERVICES LUMP SUM $1,062,400
New Construction: New Multi-Pool Facility
ROM: $10,000,000 Construction Cost
Reimbursable Expenses* $31,500
*Reimbursable Expenses to be used on contract permissible expenses only.
Unused balance will not be billed.
DESCRIPTION
ARCHITECTURE
STRUCTURAL
MECHANICAL /
PLUMBING / FIRE
PROTECTION
ELECTRICAL
CIVIL
LANDSCAPE
FF&E
COST
LEED
POOL
CEQA
SUBMISSION
COORDINATION
TOTAL
Basic Services (Architectural and Engineering DesignProgram Verification, Conceptual Design, and Environmental Review $44,290 $2,400 $4,260 $3,700 $3,500 $5,500 $3,250 $14,950 $81,845Schematic Design and Project Estimate $66,435 $2,400 $6,390 $5,550 $6,000 $8,250 $3,000 $8,000 $4,875 $44,835 $155,735Design Development $88,580 $12,000 $8,520 $7,400 $20,000 $11,000 $4,000 $8,000 $6,500 $59,780 $225,780Construction Documents $110,725 $18,000 $10,650 $9,250 $24,000 $13,750 $11,500 $9,000 $8,125 $89,670 $304,670Permitting, Bidding, and Award $22,145 $3,600 $2,130 $1,850 $4,000 $2,750 $1,625 $14,945 Included $53,045Construction Administration $110,725 $9,600 $10,650 $9,250 $4,500 $13,750 $8,125 $74,725 $241,325SUBTOTAL | DESIGN FEES $442,900 $48,000 $42,600 $37,000 $62,000 $55,000 $18,500 $25,000 $32,500 $298,900 $1,062,400Reimbursable ExpensesReproduction and Printing Costs $12,000 Included Included Included Included Included Included Included Included Included Included $12,000Shipping / Overnight Services, and Postage $2,500 Included Included Included Included Included Included Included Included Included Included $2,500Mileage, Airfare, Lodging, Meals, and Travel Costs $17,000 Included Included Included Included Included Included Included Included Included Included $17,000SUBTOTAL | REIMBURSABLES $31,500 $31,500TOTAL OF FEES + REIMBURSABLES FOR BASIC SERVICES $474,400 $48,000 $42,600 $37,000 $62,000 $55,000 $18,500 $25,000 $32,500 $298,900 $1,093,900
FEE CALCULATION
(Based on ROM Construction
Cost Estimate of $10M)
SANTA FE SPRINGS AQUATIC CENTER | Architecture and Engineering Design Services Breakdown by Phase 40 WWW.HED.DESIGN
John Dale FAIA, LEED AP
Principal | Pre K-12 Sector Leadership
[email protected]
213.542.4504
550 South Hope St.
Suite 2500
Los Angeles, CA 90071
EXHIBIT C
FEE SCHEDULE
EXHIBIT D
INSURANCE REQUIREMENTS
Without limiting Consultant’s indemnification of the City, and prior to commencement of Services, Consultant shall obtain, provide, and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to the City. If Consultant maintains higher limits than the minimum limits shown below, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
General liability insurance. Consultant shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
Automobile liability insurance. Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
Professional liability (errors & omissions) insurance. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement.
Workers’ compensation insurance. Consultant shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000 per accident for bodily injury or disease).
Consultant shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
Umbrella or excess liability insurance. [Optional depending on limits required].
Consultant shall obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason;
• Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; • Policies shall “follow form” to the underlying primary policies; and • Insureds under primary policies shall also be insureds under the umbrella or excess policies.
Other provisions or requirements
Proof of insurance. Consultant shall provide certificates of insurance to the City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement. The City reserves the right to require complete, certified copies of all required insurance policies at any time.
Duration of coverage. Consultant shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Consultant, or Consultant’s agents, representatives, employees or subconsultants.
Primary/noncontributing. Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by the City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
The City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, the City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the City will be promptly reimbursed by Consultant or the City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, the City may immediately terminate this Agreement.
Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.
Waiver of subrogation. All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against the City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
Enforcement of Agreement provisions (non estoppel). Consultant acknowledges and agrees that any actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
Requirements not limiting. Requirements of specific coverage features or limits contained in this Agreement are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type.
Notice of cancellation. Consultant agrees to oblige its insurance agent or broker and insurers to provide to the City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
Additional insured status. General liability policies shall provide or be endorsed to provide that the City and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to the City and approved of in writing.
Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Pass through clause. Consultant agrees to ensure that its subconsultants, subcontractors, and any other party involved with the Services who is brought onto or involved in the Services by Consultant, provide the same minimum insurance coverage and endorsements required of Consultant. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Consultant agrees that upon request, all agreements with consultants, subconsultants, and others engaged in the Services will be submitted to the City for review.
The City’s right to revise specifications. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving Consultant ninety (90) days advance written notice of such change. If such change results in substantial additional cost to Consultant, City and Consultant may renegotiate Consultant’s compensation or come to some other agreement to address the additional cost.
Self-insured retentions. Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City.
Timely notice of claims. Consultant shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Consultant’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Services.
City of Santa Fe Springs
DESIGN OF AQUATIC CENTER
Evaluation Qualification Ratings
10/26/2022
Written Qualifications 1 2 3 4
SFS Aquatic Center - Architectural &
Engineering Services
Criteria
Reviewer
#1
Reviewer
#2
Reviewer
#3
Reviewer
#4
Reviewer
#5
Reviewer
#1
Reviewer
#2
Reviewer
#3
Reviewer
#4
Reviewer
#5
Reviewer
#1
Reviewer
#2
Reviewer
#3
Reviewer
#4
Reviewer
#5
Reviewer
#1
Reviewer
#2
Reviewer
#3
Reviewer
#4
Reviewer
#5
Experience and Capability of the Firm 12 14 12 14 14 15 14 13 14 13 12 13 13 12 13 12 13 11 14 14Project Manager 14 13 18 12 16 15 16 17 17 17 20 17 19 15 17 16 16 15 15 15Project Team 14 17 17 15 18 17 18 18 18 17 17 17 19 17 17 12 18 16 15 15Project Understanding and Approach 10 12 16 14 17 20 18 17 18 20 20 18 17 18 17 11 17 17 15 17Past Experience and References 10 7 9 8 8 10 10 9 9 8 7 9 9 8 8 9 7 8 10 7Pricing 14 13 13 13 12 13 13 11 14 11 13 13 14 15 13 10 10 10 12 10 Subtotal scores 74 76 85 76 85 90 89 85 90 86 89 87 91 85 85 70 81 77 81 78 Average Score, Written Prop.:
1 HED 882 SVA Architects 873 PBWS Architects 794 COAR Design Group 77 "Total Score" equals the average scores of the written Qualifications (100 points available) Qualifications/Pricing far exceed requirements.
Qualifications/Pricing fully satisfy requirements.
ABOVE AVERAGE (81-90)
Qualifications/Pricing more than satisfy requirements.
PBWS Architects SVA Architects COAR Design Group
EXCEPTIONAL (91-100)
Firms Written Final Rankings by Average Score
79 88 87 77
AVERAGE (71-80)
SCORING RANGES
FAIL (0-60)
Category evaluated nonresponsive.
BELOW AVERAGE (61-70)
Below minimally acceptable.
HED
Page. 1
Interview Summary
Criteria Reviewer #1 Reviewer #2 Reviewer #3 Reviewer #4 Reviewer #5 Reviewer #1 Reviewer #
2 Reviewer #3 Reviewer #4 Reviewer #5
Firm Experience and Capability 15 15 14 15 14 15 15 14 14 13Project Manager 16 15 16 17 17 17 17 17 16 17Project Team 20 20 17 19 18 20 20 18 18 16Project Understanding and Approach 20 20 17 18 20 17 18 19 17 18Creativity and Innovation 10 10 9 10 10 8 9 7 8 7Communication Skills 14 14 14 14 13 15 15 13 15 11 Subtotal scores 95 94 87 93 92 92 94 88 88 82
Average Score, Interview:
Final Rankings (Written + Interview)
Firm Total Score
HED 181SVA 178"Total Score" equals the average of rankings by the three reviewers of the written Proposals (100 points available) and the interviews (100 points available) HED
93 SVA
91