City of Santa Maria
Bid Results for Project 2023 CITYWIDE SEWER MANHOLE REHABILITATION PROJECT (2023‐09) Issued on 07/13/2023
Bid Due on September 12, 2023  2:00 PM (PDT)
BASE BID SCHEDULE
Item
Num Description Unit of
Measure Quantity Unit  Price Total Unit Price Total Unit Price Total 1 Mobilization  and Demobilization LS 1 $10,000.00 $10,000.00 $9,900.00 $9,900.00 $5,000.00 $5,000.00 2 Storm Water  Compliance LS 1 $1,500.00 $1,500.00 $1,750.00 $1,750.00 $1,500.00 $1,500.00 3 Traffic Control LS 1 $10,000.00 $10,000.00 $63,250.00 $63,250.00 $185,385.00 $185,385.00 4 Rehabilitate  Existing SSMH  Depth < 5 ft EA 1 $4,500.00 $4,500.00 $4,000.00 $4,000.00 $8,617.00 $8,617.00 5 Rehabilitate  Existing SSMH  Depth > 5 ft and < 10 ft EA 15 $5,900.00 $88,500.00 $4,475.00 $67,125.00 $12,563.00 $188,445.00 6 Rehabilitate  Existing SSMH  Depth > 10 ft and < 15 ft EA 16 $6,450.00 $103,200.00 $4,675.00 $74,800.00 $15,138.00 $242,208.00 7 Remove,  Replace, and Adjust to Grade Existing SSMH Frame and Cover EA 16 $4,250.00 $68,000.00 $4,225.00 $67,600.00 $2,213.00 $35,408.00 8 Record Drawings LS 1 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $500.00 $500.00 Subtotal $288,200.00 Subtotal $289,925.00 Subtotal $667,063.00 ADDITIVE BID SCHEDULE
A1 MH  ID 34: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $10,700.00 $10,700.00 $11,725.00 $11,725.00 $22,367.00 $22,367.00 A2 MH  ID 35: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $10,700.00 $10,700.00 $11,935.00 $11,935.00 $20,511.00 $20,511.00 A3 MH  ID 36: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $10,150.00 $10,150.00 $8,255.00 $8,255.00 $22,367.00 $22,367.00 A4 MH  ID 37: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $7,250.00 $7,250.00 $11,550.00 $11,550.00 $31,032.00 $31,032.00 A5 MH  ID 38: Rehabilitate Existing SSMH LS 1 $5,900.00 $5,900.00 $4,030.00 $4,030.00 $17,398.00 $17,398.00 A6 MH  ID 39: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $10,150.00 $10,150.00 $13,197.00 $13,197.00 $22,367.00 $22,367.00 A7 MH  ID 40: Rehabilitate Existing SSMH LS 1 $5,900.00 $5,900.00 $3,960.00 $3,960.00 $17,398.00 $17,398.00 A8 MH  ID 41: Rehabilitate Existing SSMH LS 1 $5,900.00 $5,900.00 $3,775.00 $3,775.00 $12,765.00 $12,765.00 A9 MH  ID 42: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $10,150.00 $10,150.00 $16,492.00 $16,492.00 $31,032.00 $31,032.00 A10 MH  ID 43: Rehabilitate Existing SSMH LS 1 $5,900.00 $5,900.00 $3,690.00 $3,690.00 $12,765.00 $12,765.00 A11 MH  ID 44: Rehabilitate Existing SSMH, Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover LS 1 $8,750.00 $8,750.00 $7,790.00 $7,790.00 $17,735.00 $17,735.00 A12 MH  ID 45: Rehabilitate Existing SSMH LS 1 $4,500.00 $4,500.00 $3,465.00 $3,465.00 $12,765.00 $12,765.00 A13 MH  ID 46: Rehabilitate Existing SSMH LS 1 $5,900.00 $5,900.00 $3,815.00 $3,815.00 $17,398.00 $17,398.00 Subtotal $101,850.00 Subtotal $103,679.00 Subtotal $257,900.00 Total $390,050.00 Total $393,604.00 Total $924,963.00
Ayala Engineering Inc. Sancon Technologies, Inc. V. Lopez Jr. & Sons G.E.C., Inc.