City of Santa Maria
Bid Results for Project MCCLELLAND WATERLINE REPLACEMENT PROJECT (2023‐16) Issued on 10/18/2023
Bid Due on December 12, 2023  2:00 PM (PST)
Bid Item
No. Description Quantity Unit of
Measure
1 Mobilization,  Demobilization, Bonds and Insurance 1 LS $45,000.00 $45,000.00 $113,808.64 $113,808.64 $47,040.00 $47,040.00 2 Traffic Control,  Construction Area Signs, Postings & Notifications 1 LS $25,000.00 $25,000.00 $35,400.00 $35,400.00 $98,560.00 $98,560.00 3 Water  Pollution Control Program 1 LS $10,000.00 $10,000.00 $20,012.80 $20,012.80 $5,264.00 $5,264.00 4 Disinfection  and Pressure Testing 1 LS $35,000.00 $35,000.00 $9,062.40 $9,062.40 $8,960.00 $8,960.00 51 2 ‐Inch Plastic Pipe Waterline 3150 LF $170.00 $535,500.00 $161.66 $509,229.00 $195.00 $614,250.00 61 0 ‐Inch Plastic Pipe Waterline 20 LF $350.00 $7,000.00 $312.24 $6,244.80 $833.00 $16,660.00 78 ‐Inch Plastic Pipe Waterline 30 LF $300.00 $9,000.00 $382.99 $11,489.70 $652.00 $19,560.00 86 ‐Inch Plastic Pipe Waterline 115 LF $320.00 $36,800.00 $160.65 $18,474.75 $559.00 $64,285.00 9 2.5‐Inch  Plastic Pipe Waterline 30 LF $320.00 $9,600.00 $92.71 $2,781.30 $215.00 $6,450.00 10 1 ‐Inch Copper Water Line Type "K" 500 LF $60.00 $30,000.00 $105.76 $52,880.00 $140.00 $70,000.00 11 Irrigation Backflow Assembly  & Enclosure 1 LS $15,000.00 $15,000.00 $13,466.66 $13,466.66 $15,540.00 $15,540.00 12 12"  Resilient Wedge Gate Valves 6 EA $8,400.00 $50,400.00 $4,602.34 $27,614.04 $6,467.00 $38,802.00 13 10"  Resilient Wedge Gate Valves 4 EA $6,300.00 $25,200.00 $4,019.32 $16,077.28 $7,241.00 $28,964.00 14 8"  Resilient Wedge Gate Valves 6 EA $6,000.00 $36,000.00 $3,714.22 $22,285.32 $4,036.00 $24,216.00 15 6"  Resilient Wedge Gate Valves 20 EA $5,200.00 $104,000.00 $2,502.37 $50,047.40 $2,879.00 $57,580.00 16 6"  Sanitary Sewer Line 120 LF $150.00 $18,000.00 $103.15 $12,378.00 $432.00 $51,840.00 17 Asphalt  Concrete (1/2" Type A) 730 TN $120.00 $87,600.00 $279.32 $203,903.60 $382.00 $278,860.00 18 Class  II Aggregate Base 813 TN $45.00 $36,585.00 $239.15 $194,428.95 $90.00 $73,170.00 19 PCC Removal & Replacement  (Cross Gutter & Spandrel, Concrete Approach at Alley, Sidewalk & Miscellaneous Curb & Gutter) 1780 SF $37.00 $65,860.00 $28.81 $51,281.80 $39.00 $69,420.00 20 24 ‐Inch Steel Casing  (to include provisions for night‐work) 100 LF $100.00 $10,000.00 $386.49 $38,649.00 $783.00 $78,300.00 21 Pothole Existing  Utilites 25 EA $710.00 $17,750.00 $3,104.63 $77,615.75 $840.00 $21,000.00 Total $1,209,295.00 $1,487,131.19 $1,688,721.00
Main Line Engineering The J. F. Will Company, Inc. V. Lopez Jr.  & Sons G.E.C., Inc.