City of Santa Maria
Bid Results for Project VETERANS MEMORIAL PARK PROJECT, PHASE II (Re‐Bid) (2023‐23) Issued on 12/06/2023
Bid Due on January 18, 2024 2:00 PM (PST)
BASE BID SCHEDULE
Item
Num
Item
Code Description QTY Unit of
Measure Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 1B ‐1 CONSTRUCTION COORDINATION 1 LS $44,800.00 $44,800.00 $20,000.00 $20,000.00 $47,017.00 $47,017.00 $42,041.00 $42,041.00 2B ‐2 EARTHWORK, AND SUBGRADE PREPARATION 1 LS $20,648.00 $20,648.00 $25,000.00 $25,000.00 $31,690.00 $31,690.00 $128,701.20 $128,701.20 3B ‐3 DEMOLITION, CLEARING AND GRUBBING 1 LS $56,224.00 $56,224.00 $50,000.00 $50,000.00 $30,975.00 $30,975.00 $88,553.54 $88,553.54 4B ‐4 EROSION/SEDIMENT CONTROL 1 LS $6,000.00 $6,000.00 $10,000.00 $10,000.00 $6,035.00 $6,035.00 $16,830.60 $16,830.60 5B ‐5 ELECTRICAL 1 LS $190,584.00 $190,584.00 $168,084.00 $168,084.00 $216,269.00 $216,269.00 $182,925.95 $182,925.95 6B ‐9 PLAYGROUND EQUIPMENT, EXERCISE UNITS RUBBERIZED SURFACING, CONCRETE MOWCURB AT EXERCISE AREA, GRADING AND DRAINAGE FOR PLAYGROUND AND 1 LS $38,564.00 $38,564.00 $10,000.00 $10,000.00 $59,707.00 $59,707.00 $30,364.84 $30,364.84 7B ‐10 SITE AMENITIES 1 LS $12,240.00 $12,240.00 $10,000.00 $10,000.00 $13,265.00 $13,265.00 $45,000.95 $45,000.95 8B ‐15 4" THICK CONCRETE 4000 SF $15.50 $62,000.00 $25.00 $100,000.00 $16.50 $66,000.00 $13.51 $54,040.00 9B ‐26 DECOMPOSED GRANITE 21000 SF $3.50 $73,500.00 $4.00 $84,000.00 $2.20 $46,200.00 $4.06 $85,260.00 10 B‐29 IRRIGATION SYSTEM 1 LS $168,000.00 $168,000.00 $217,982.00 $217,982.00 $198,900.00 $198,900.00 $173,826.89 $173,826.89 11 B‐30 IMPORTED TOPSOIL, SOIL PREPARATION, SHOVEL CUT AND MULCHING 1 LS $20,265.00 $20,265.00 $66,412.00 $66,412.00 $57,750.00 $57,750.00 $34,210.98 $34,210.98 12 B‐31 24 ‐INCH BOX TREES 15 EA $660.00 $9,900.00 $862.50 $12,937.50 $725.00 $10,875.00 $950.56 $14,258.40 13 B‐32 1 GALLON SHRUBS 217 EA $30.78 $6,679.26 $28.75 $6,238.75 $23.00 $4,991.00 $88.49 $19,202.33 14 B‐35 TURF HYDROSEEDING 45000 SF $0.20 $9,000.00 $0.23 $10,350.00 $0.21 $9,450.00 $0.20 $9,000.00 15 B‐36 PLANT ESTABLISHMENT 1 LS $8,880.00 $8,880.00 $6,900.00 $6,900.00 $6,300.00 $6,300.00 $12,589.46 $12,589.46 Subtotal $727,284.26 $797,904.25 $805,424.00 $936,806.14 ADDITIVE BID SCHEDULE
Item
Num
Item
Code Description QTY Unit of
Measure Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 16 B‐11 HALF BASKETBALL COURT AND FURNISHINGS 1 LS $61,152.00 $61,152.00 $5,000.00 $5,000.00 $79,075.00 $79,075.00 $69,290.10 $69,290.10 Subtotal $61,152.00 $5,000.00 $79,075.00 $69,290.10
Grande Total $788,436.26 $802,904.25 $884,499.00 $1,006,096.24 G Sosa Construction Inc. V. Lopez Jr. & Sons G.E.C., Inc. Rdz Contractors, Inc. Quincon, Inc.
Attachment A