City of Santa Maria
Bid Results for Project BATTLES ROAD GREEN CORRIDOR AND BEAUTIFICATION PROJECT (2024‐01) Issued on 01/15/2024
Bid Due on February 22, 2024  2:00 PM (PST)
BASE BID (FULL PROJECT) SCHEDULE
Item Num Description Quantity Unit  of Measure Unit  Price Line Total 1 Mobilization  and Demobilization 1 LS $169,000.00 $169,000.00 2 Stormwater  Compliance 1 LS $38,965.00 $38,965.00
3 Traffic Control 1 LS $37,800.00 $37,800.00
4 Temporary  Construction Fencing 1 LS $7,200.00 $7,200.00 5 Construction  Surveying and Staking 1 LS $27,104.00 $27,104.00 6 Demolition 1 LS $98,500.00 $98,500.00
7 Utility Potholing 1 LS $26,280.00 $26,280.00
8 Tree  & Stump Removal 1 LS $6,060.00 $6,060.00
9 Earthwork  ‐ Subgrade Preparation 1 LS $122,100.00 $122,100.00 10 Earthwork  ‐ Finish Grading 370000 SF $0.45 $166,500.00 11 Aggregate  Base 2800 CY $94.79 $265,412.00
12 Asphalt  Paving ‐ Slurry Seal 24700 SF $0.66 $16,302.00 13 Asphalt  Paving ‐ Pedestrian (New Section) 17100 SF $4.30 $73,530.00 14 Asphalt  Paving ‐ Vehicular 1850 SF $17.10 $31,635.00 15 Concrete Flatwork ‐ Curb, Gutter, Spandrel, and Cross Gutter 1 LS $169,405.00 $169,405.00 16 Concrete Flatwork ‐ Sidewalk 5650 SF $13.50 $76,275.00 17 Concrete Flatwork ‐ Curb Ramps 1 LS $43,440.00 $43,440.00 18 Truncated Domes 210 SF $35.00 $7,350.00 $296,470.00
19 Decomposed Granite Paving 14500 SF $7.26 $105,270.00 20 Pathway  Striping and Pavement Markings 1 LS $21,989.00 $21,989.00 21 Signage ‐ Interpretive  Signs 11 EA $13,000.00 $143,000.00 22 Signage ‐ Relocate Existing 1 LS $4,620.00 $4,620.00 23 Signage ‐ New  Trail Signage 1 LS $4,268.00 $4,268.00 24 Furnishings  ‐ Removable Bollards 1 LS $25,715.00 $25,715.00 25 Furnishings  ‐ Shade Structures 1 LS $93,978.00 $93,978.00 26 Furnishings  ‐ Bike Skills Elements 7 EA $14,400.00 $100,800.00 27 Furnishings  ‐ Precast Concrete Tree Planters 52 EA $4,410.00 $229,320.00 28 Art  ‐ Decorative Crosswalk Markings 250 SF $51.80 $12,950.00 29 Storm Drainage ‐ Bed Rock 90 SF $46.40 $4,176.00
30 Storm Drainage ‐ Under Sidewalk  Drain 12 EA $8,250.00 $99,000.00 31 Fencing ‐ Wire  Mesh 2950 LF $61.34 $180,953.00
32 Fencing ‐ Art  Panel 270 LF $78.50 $21,195.00
33 Lighting  ‐ Solar Lights 28 EA $18,050.00 $505,400.00 34 Landscape  ‐ New Boulder 1 LS $38,000.00 $38,000.00
35 Landscape  ‐ Relocate Boulder 1 LS $36,000.00 $36,000.00 36 Landscape  ‐ Irrigation 1 LS $567,100.00 $567,100.00 37 Landscape  ‐ Planting 1 LS $280,900.00 $280,900.00
38 Landscape  ‐ Wood Mulch 1 LS $171,190.00 $171,190.00 39 Landscape  ‐ Native Soil & DG Blend 1 LS $111,300.00 $111,300.00 40 Landscape  ‐ Maintenance Period 3 Month $4,452.00 $13,356.00 41 Record  Drawings 1 LS $5,000.00 $5,000.00
Subtotal $4,158,338.00
The J. F. Will Company, Inc.

ATTACHMENT A
DEDUCTIVE ALTERNATE A ‐ OMIT IMPROVEMENTS IN LOWER (SOUTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 42 Mobilization  and Demobilization 1 LS $39,000.00 $39,000.00 43 Stormwater  Compliance 1 LS $13,671.00 $13,671.00
44 Traffic  Control 1 LS $0.00 $0.00
45 Temporary  Construction Fencing 1 LS $0.00 $0.00
46 Construction  Surveying and Staking 1 LS $3,264.00 $3,264.00 47 Demolition 1 LS $4,610.00 $4,610.00
48 Utility  Potholing 1 LS $5,075.00 $5,075.00
49 Tree  & Stump Removal 1 LS $0.00 $0.00
50 Earthwork  ‐ Subgrade Prepreparation 1 LS $23,974.00 $23,974.00 51 Earthwork  ‐ Finish Grading 180000 SF $0.45 $81,000.00 52 Aggregate  Base 250 CY $94.78 $23,695.00
53 Decomposed  Granite Paving 12600 SF $6.98 $87,948.00 54 Signage  ‐ Relocate Existing 1 LS $3,672.00 $3,672.00 55 Furnishings  ‐ Removable Bollard 1 LS $25,715.00 $25,715.00 56 Furnishings  ‐ Bike Skills Elements 7 EA $14,400.00 $100,800.00 57 Storm  Drainage
‐ Bed Rock 90 SF $46.40 $4,176.00
58 Storm  Drainage ‐ Under Sidewalk Drain 12 EA $8,250.00 $99,000.00 59 Fencing  ‐ Wire Mesh 2950 LF $61.34 $180,953.00
60 Fencing  ‐ Art Panel 270 LF $78.50 $21,195.00
61 Lighting  ‐ Solar Lights 3 EA $18,050.00 $54,150.00
62 Landscape  ‐ New Boulders 1 LS $0.00 $0.00
63 Landscape  ‐ Relocate Boulders 1 LS $12,750.00 $12,750.00 64 Landscape  ‐ Irrigation 1 LS $105,060.00 $105,060.00 65 Landscape  ‐ Planting 1 LS $102,510.00 $102,510.00
66 Landscape  ‐ Mulch 1 LS $76,500.00 $76,500.00
67 Landscape  ‐ Native Soil & DG Blend 1 LS $44,520.00 $44,520.00 68 Landscape  ‐ Maintenance Period 3 Month $1,224.00 $3,672.00 69 Record  Drawings 1 LS $1,500.00 $1,500.00
Subtotal $1,118,410.00
DEDUCTIVE ALTERNATE B ‐ OMIT PLANTING AND IRRIGATION IMPROVEMENTS IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 70 Landscape  ‐ Irrigation 1 LS $440,640.00 $440,640.00 71 Landscape  ‐ Planting 1 LS $172,890.00 $172,890.00
72 Landscape  ‐ Mulch 1 LS $88,230.00 $88,230.00
73 Landscape  ‐ Native Soil & DG Blend 1 LS $64,260.00 $64,260.00 74 Landscape  ‐ Maintenance Period 3 Month $3,060.00 $9,180.00 Subtotal $775,200.00
DEDUCTIVE ALTERNATE C ‐ OMIT ALL PRECAST CONRETE TREE PLANTERS IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 75 Furnishings  ‐ Precast Concrete Tree Planters 52 EA $4,240.00 $220,480.00 Subtotal $220,480.00
DEDUCTIVE ALTERNATE D ‐ OMIT ALL SHADE STRUCTURES IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 76 Furnishings  ‐ Shade Structures 1 LS $93,978.00 $93,978.00 Subtotal $93,978.00
DEDUCTIVE ALTERNATE E ‐ OMIT ALL INTERPRETIVE PANEL SIGNS IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 77 Signage  ‐ Interpretive Signs 11 EA $13,000.00 $143,000.00 Subtotal $143,000.00
DEDUCTIVE ALTERNATE F ‐ OMIT ALL SOLAR LIGHTING IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 78 Lighting  ‐ Solar Lights 28 EA $18,050.00 $505,400.00 Subtotal $505,400.00
DEDUCTIVE ALTERNATE G ‐ OMIT ALL FENCING IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 79 Fencing  ‐ Wire Fencing 2950 LF $61.34 $180,953.00
Subtotal $180,953.00
DEDUCTIVE ALTERNATE H ‐ OMIT ALL DECORATIVE PANELS ON FENCING & DECORATIVE CROSSWALK PAVING IN UPPER (NORTHERN) 30 FT Item Num Description Quantity Unit  of Measure Unit  Price Line  Total 80 Art  ‐ Decorative Crosswalk Paving 250 SF $51.80 $12,950.00 81 Fencing  ‐ Art Panel 270 LF $78.50 $21,195.00
Subtotal $34,145.00