Bid Results for Project CITYWIDE SEWER MANHOLE REHABILITATION PROJECT (2024‐02) Issued on 07/02/2024
Bid Due on August 08, 2024 2:00 PM (PDT)
BASE BID SCHEDULE
Item Num Description Unit of Measure Quantity Unit Price Line Total Unit Price Line Total Unit Price Line Total 1 Mobilization and Demobilization LS 1 $14,250.00 $14,250.00 $6,216.00 $6,216.00 $31,712.81 $31,712.81 2 Storm Water Compliance LS 1 $2,500.00 $2,500.00 $1,680.00 $1,680.00 $220,110.00 $220,110.00 3 Traffic Control LS 1 $76,820.00 $76,820.00 $61,840.00 $61,840.00 $103,744.78 $103,744.78 4 Rehabilitate Existing SSMH Depth < 5 ft EA 2 $5,025.00 $10,050.00 $3,432.00 $6,864.00 $4,186.87 $8,373.74 5 Rehabilitate Existing SSMH Depth > 5 ft and < 10 ft EA 22 $6,770.00 $148,940.00 $7,386.00 $162,492.00 $4,785.00 $105,270.00 6 Rehabilitate Existing SSMH Depth > 10 ft and < 15 ft EA 22 $6,780.00 $149,160.00 $11,344.00 $249,568.00 $5,383.12 $118,428.64 7 Remove, Replace, and Adjust to Grade Existing SSMH Frame and Cover EA 15 $4,620.00 $69,300.00 $2,252.00 $33,780.00 $3,637.88 $54,568.20 8 Record Drawings LS 1 $1,500.00 $1,500.00 $50.00 $50.00 $5,981.25 $5,981.25 Total $472,520.00 $522,490.00 $648,189.42
Sancon Technologies V. Lopez Jr. & Sons Joseph Construction Attachment A
Attachment A - Detailed Bid Results.pdf
Santa Maria City Council
September 17, 2024
- Document
- Attachment A - Detailed Bid Results.pdf
- Meeting
- September 17, 2024
- Body
- Santa Maria City Council
- Original file
- 136 KB
Text extracted from the city's file for reading and search. Open the original on pub-santamaria.escribemeetings.com. That file is the official record.