City of Santa Maria
Bid Results for Project SANTA MARIA SPORTS COMPLEX PROJECT (2024‐06) Issued on 08/08/2024
Bid Due on September 19, 2024  10:00 AM (PDT)
BASE BID
Item Num Item Code Description Unit QTY Unit Price Total Unit Price Total Unit Price Total 1 1 MOBILIZATION & DEMOBILIZATION LS 1 $95,250.00 $95,250.00 $391,000.00 $391,000.00 $1,113,934.13 $1,113,934.13 2 2 CONSTRUCTION STAKING LS 1 $127,000.00 $127,000.00 $129,000.00 $129,000.00 $81,487.00 $81,487.00 3 3 CONSTRUCTION AREA SIGNS LS 1 $12,700.00 $12,700.00 $3,500.00 $3,500.00 $16,297.00 $16,297.00 4 4 TRAFFIC  CONTROL SYSTEM LS 1 $38,100.00 $38,100.00 $52,000.00 $52,000.00 $27,162.00 $27,162.00 5 5 PREPARE  WATER POLLUTION CONTROL PROGRAM LS 1 $63,500.00 $63,500.00 $398,000.00 $398,000.00 $28,792.00 $28,792.00 6 6 SHEETING, SHORING, AND BRACING LS 1 $25,400.00 $25,400.00 $577.70 $577.70 $21,730.00 $21,730.00 7 7 SOIL  REMEDIATION (BASED ON CONTAMINATED SOIL FINDINGS) CY 21243 $64.00 $1,359,552.00 $8.08 $171,643.44 $3,150,470.00 $66,925,434,210.00 8 8 SITE  DEMOLITION, CLEARING AND GRUBBING LS 1 $44,450.00 $44,450.00 $41,000.00 $41,000.00 $271,625.00 $271,625.00 9 9 SITE  GRADING LS 1 $1,206,500.00 $1,206,500.00 $1,732,000.00 $1,732,000.00 $1,358,125.00 $1,358,125.00 10 10 DOMESTIC  WATER UTILITIES LS 1 $222,250.00 $222,250.00 $128,812.00 $128,812.00 $54,325.00 $54,325.00 11 11 10"  PVC WATERLINE LS 1 $127,000.00 $127,000.00 $303,000.00 $303,000.00 $217,300.00 $217,300.00 12 12 STORM WATER SYSTEM LS 1 $444,500.00 $444,500.00 $837,000.00 $837,000.00 $217,300.00 $217,300.00 13 13 SEWER UTILITIES LS 1 $190,500.00 $190,500.00 $197,000.00 $197,000.00 $706,225.00 $706,225.00 14 14 FIRE SERVICE  AND HYDRANTS LS 1 $82,550.00 $82,550.00 $98,000.00 $98,000.00 $353,112.00 $353,112.00 15 15 CURB/GUTTER LS 1 $139,700.00 $139,700.00 $438,000.00 $438,000.00 $403,541.00 $403,541.00 16 16 BIORETENTION SOIL MEDIA (BSM) CY 875 $137.00 $119,875.00 $147.69 $129,228.75 $106,477.00 $93,167,375.00 17 17 BIORETENTION SOIL GRAVEL CY 762 $208.00 $158,496.00 $164.14 $125,074.68 $194,559.00 $148,253,958.00 18 18 IRRIGATION  SYSTEM LS 1 $1,524,000.00 $1,524,000.00 $1,384,026.00 $1,384,026.00 $1,253,784.00 $1,253,784.00 19 19 ELECTRICAL  SYSTEMS LS 1 $2,413,000.00 $2,413,000.00 $775,000.00 $775,000.00 $980,810.00 $980,810.00 20 20 ASPHALT  PAVING SF 129300 $6.00 $775,800.00 $5.73 $740,889.00 $324,194.00 $41,918,284,200.00 21 21 CONCRETE (WOOD STAMPED) SF 2240 $17.00 $38,080.00 $21.28 $47,667.20 $43,929.00 $98,400,960.00 22 22 CONCRETE PEDESTRIAN PAVING  & GENERAL CONCRETE SITE PAVING LS 1 $546,100.00 $546,100.00 $268,000.00 $268,000.00 $335,849.00 $335,849.00 23 23 CONCRETE VEHICULAR PAVING SF 4480 $17.00 $76,160.00 $21.21 $95,020.80 $94,994.00 $425,573,120.00 24 24 ENHANCED  CONCRETE BANDS (12") SF 1128 $64.00 $72,192.00 $25.16 $28,380.48 $26,165.00 $29,514,120.00 25 25 VEHICULAR PERMEABLE PAVERS SF 15326 $23.00 $352,498.00 $48.24 $739,326.24 $532,854.00 $8,166,520,404.00 26 26 PEDESTRIAN PERMEABLE PAVERS SF 400 $298.00 $119,200.00 $48.23 $19,292.00 $17,384.00 $6,953,600.00 27 27 PEDESTRIAN LINEAR PAVERS SF 2737 $23.00 $62,951.00 $28.19 $77,156.03 $148,687.00 $406,956,319.00 28 28 DECOMPOSED  GRANITE PAVING SF 17012 $9.00 $153,108.00 $8.08 $137,456.96 $214,011.00 $3,640,755,132.00 29 29 CRUSHED GRAVEL PAVING SF 5246 $5.00 $26,230.00 $7.54 $39,554.84 $24,223.00 $127,073,858.00 30 30 PLAYGROUND  SEAT WALL LF 92 $127.00 $11,684.00 $256.32 $23,581.44 $21,740.00 $2,000,080.00 31 31 PLAYGROUND  SURFACING & DRAINAGE LS 1 $152,400.00 $152,400.00 $251,000.00 $251,000.00 $267,864.00 $267,864.00 32 32 PLAYGROUND  EQUIPMENT LS 1 $546,100.00 $546,100.00 $95,000.00 $95,000.00 $68,416.00 $68,416.00 33 33 BASKETBALL COURTS EA 4 $15,875.00 $63,500.00 $51,000.00 $204,000.00 $186,247.00 $744,988.00 34 34 SITE FURNISHINGS LS 1 $63,500.00 $63,500.00 $115,000.00 $115,000.00 $138,050.00 $138,050.00 35 35 SITE FENCING & GATES LS 1 $177,800.00 $177,800.00 $250,000.00 $250,000.00 $194,918.00 $194,918.00 36 36 TURF LAWN  (HYDROSEED) SF 469091 $0.22 $103,200.02 $0.26 $121,963.66 $127,416.00 $59,769,698,856.00 37 37 LANDSCAPE  ‐ SHRUBS AND GROUNDCOVER LS 1 $698,500.00 $698,500.00 $600,000.00 $600,000.00 $768,329.00 $768,329.00 38 38 LANDSCAPE  ‐ TREES LS 1 $381,000.00 $381,000.00 $485,000.00 $485,000.00 $405,193.00 $405,193.00 39 39 SIGNAGE LS 1 $6,350.00 $6,350.00 $2,000.00 $2,000.00 $70,622.00 $70,622.00 40 40 SOIL PREPARATION LS 1 $139,700.00 $139,700.00 $148,000.00 $148,000.00 $371,952.00 $371,952.00 41 41 LANDSCAPE  MAINTENANCE LS 1 $76,200.00 $76,200.00 $91,000.00 $91,000.00 $86,920.00 $86,920.00 Subtotal $13,036,576.02 $11,913,151.22 $181,769,144,842.13 AMG & Associates, Inc. Specialty Construction, Inc. Edwards Construction Group, Inc.

Attachment A
ADDITIVE BID SCHEDULE 1‐A
42 Add‐1A MUSCO FIELD  LIGHTS LS 1 $1,353,640.00 $1,353,640.00 $1,628,000.00 $1,628,000.00 $2,001,000.00 $2,001,000.00 ADDITIVE BID SCHEDULE 1‐B
43 Add‐1B SITE  LIGHTING LS 1 $20,748.31 $20,748.31 $1,754,000.00 $1,754,000.00 $2,400,000.00 $2,400,000.00 ADDITIVE BID SCHEDULE 1‐C
44 Add‐1C ACCENT LIGHTING LS 1 $11,988.82 $11,988.82 $24,800.00 $24,800.00 $27,000.00 $27,000.00 ADDITIVE BID SCHEDULE 2‐A
45 Add‐2A PREFAB  RESTROOM NORTH LS 1 $71,982.00 $71,982.00 $167,100.00 $167,100.00 $295,000.00 $295,000.00 ADDITIVE BID SCHEDULE 2‐B
46 Add‐2B PREFAB RESTROOM  SOUTH LS 1 $71,982.00 $71,982.00 $167,100.00 $167,100.00 $300,000.00 $300,000.00 ADDITIVE BID SCHEDULE 2‐C
47 Add‐2C LARGE RESTROOM  AND CONCESSION BUILDING LS 1 $344,335.00 $344,335.00 $362,000.00 $362,000.00 $500,000.00 $500,000.00

ADDITIVE
BID SCHEDULE 3‐A
48 Add‐3A LARGE  PICNIC PAVILION LS 1 $201,799.00 $201,799.00 $164,000.00 $164,000.00 $240,385.00 $240,385.00 ADDITIVE BID SCHEDULE 3‐B
49 Add‐3B SMALL  PICNIC PERGOLAS EA 3 $105,122.00 $315,366.00 $92,000.00 $276,000.00 $318,670.00 $956,010.00 ADDITIVE BID SCHEDULE 3‐C
50 Add‐3C SMALL  PICNIC SHADE SAILS EA 3 $44,428.00 $133,284.00 $55,150.00 $165,450.00 $131,150.00 $393,450.00 ADDITIVE BID SCHEDULE 4
51 Add‐4 ENTRANCE MONUMENT  @ LA BREA ENTRANCE LS 1 $51,147.00 $51,147.00 $135,000.00 $135,000.00 $81,020.00 $81,020.00 Total $15,612,848.15 $16,756,601.22 $181,776,338,707.13 Attachment A