City of Santa Maria
Bid Results for Project CHURCH STREET SEWER PROJECT (2024‐07) Issued on 09/03/2024
Bid Due on October 31, 2024 2:00 PM (PDT)
BASE BID
Item Num Description Unit of Measure Quantity Unit Price Total Unit Price Total Unit Price Total 1 MOBILIZATION & DEMOBILIZATION LS 1 $40,000.00 $40,000.00 $150,149.10 $150,149.10 $26,000.00 $26,000.00 2 CONSTRUCTION SURVEY LS 1 $19,000.00 $19,000.00 $4,887.84 $4,887.84 $8,000.00 $8,000.00 3 TRAFFIC CONTROL LS 1 $77,000.00 $77,000.00 $71,917.65 $71,917.65 $92,000.00 $92,000.00 4 SHEETING, SHORING AND BRACING LS 1 $63,000.00 $63,000.00 $39,691.87 $39,691.87 $67,100.00 $67,100.00 5 STORM WATER COMPLIANCE LS 1 $16,000.00 $16,000.00 $24,386.16 $24,386.16 $3,100.00 $3,100.00 6 POTHOLING LS 1 $28,500.00 $28,500.00 $37,784.88 $37,784.88 $11,000.00 $11,000.00 7 SANITARY SEWER BYPASSING LS 1 $13,000.00 $13,000.00 $13,149.84 $13,149.84 $90,000.00 $90,000.00 8 12" GRAVITY SEWER LF 2110 $280.00 $590,800.00 $311.24 $656,716.40 $423.00 $892,530.00 98 " GRAVITY RELIEF SEWER LF 400 $360.00 $144,000.00 $311.24 $124,496.00 $397.00 $158,800.00 10 48" TIE‐IN MANHOLE AT S. DEPOT STREET EA 1 $22,200.00 $22,200.00 $27,152.40 $27,152.40 $32,000.00 $32,000.00 11 48" RELIEF DIVERSION MANHOLE AT S. PINE STREET EA 1 $21,000.00 $21,000.00 $27,351.30 $27,351.30 $31,000.00 $31,000.00 12 48" RELIEF DIVERSION MANHOLE AT S. BROADWAY STREET LS 1 $21,000.00 $21,000.00 $27,288.06 $27,288.06 $33,000.00 $33,000.00 13 8” WATER MAIN RELOCATION AT ALLEY WAY WEST OF S. BROADWAY LS 1 $26,500.00 $26,500.00 $21,932.04 $21,932.04 $51,846.00 $51,846.00 14 48" GRAVITY SEWER MANHOLE EA 7 $21,000.00 $147,000.00 $25,059.87 $175,419.09 $34,335.00 $240,345.00 15 REMOVE AND REPLACE TILES AT BROADWAY RELIEF SEWER LS 1 $11,000.00 $11,000.00 $5,385.60 $5,385.60 $16,800.00 $16,800.00 16 1 ‐SACK SLURRY CEMENT BACKFILL CY 15 $310.00 $4,650.00 $609.28 $9,139.20 $168.00 $2,520.00 17 GRIND AND OVERLAY TON 231 $550.00 $127,050.00 $463.93 $107,167.83 $358.00 $82,698.00 Subtotal $1,371,700.00 Subtotal $1,524,015.26 Subtotal $1,838,739.00 BID ALTERNATIVE 1
A1 6" PVC IRRIGATION AND 2" PVC CONTROL WIRING SLEEVES, SLIP CAPS AND WARNING TAPE IN CONNON TRENCH AND MAR LF 1968 $13.00 $25,584.00 $14.17 $27,886.56 $12.00 $23,616.00 Subtotal $25,584.00 Subtotal $27,886.56 Subtotal $23,616.00 BID ALTERNATIVE 2
A2.1 ADDITIONAL COST FOR POLYMER CONCRETE MANHOLES IN LIEU OF STANDARD CONCRETE MANHOLES (BASE BID) EA 7 $11,500.00 $80,500.00 $36,084.70 $252,592.90 $11,200.00 $78,400.00 A2.2 ADDITIONAL COST FOR POLYMER CONCRETE MANHOLES IN LIEU OF STANDARD CONCRETE MANHOLES (BASE BID) AT CHURCH/S. DEPOT, ALLEY/S. BROADWAY, ALLEY/S. PINE EA 3 $7,600.00 $22,800.00 $30,461.20 $91,383.60 $11,200.00 $33,600.00 Subtotal $103,300.00 Subtotal $343,976.50 Subtotal $112,000.00 Total $1,500,584.00 $1,895,878.32 $1,974,355.00
R Baker Inc. The J. F. Will Company, Inc. V. Lopez Jr. & Sons G.E.C., Inc.