City of Santa Maria
Bid Results for Project CITYWIDE WHARF FIRE HYDRANT REPLACEMENT PROJECT (2024‐12) Issued on 10/25/2024
Bid Due on November 26, 2024  2:00 PM (PST)
BASE BID SCHEDULE
Item Code Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 11 Mobilization, Demobilization, Bonds and Insurance LS 1 $15,000.00 $15,000.00 $12,000.00 $12,000.00 $41,445.60 $41,445.60 $65,063.00 $65,063.00 $89,177.74 $89,177.74 22 Traffic Control, Construction Area Signs, Postings & Notifications LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $5,407.36 $5,407.36 $30,019.00 $30,019.00 $53,381.87 $53,381.87 33 Water Pollution Control Program LS 1 $6,000.00 $6,000.00 $3,000.00 $3,000.00 $5,102.72 $5,102.72 $7,220.00 $7,220.00 $12,092.66 $12,092.66 44 Remove Existing Fire Hydrant EA
17 $2,500.00 $42,500.00 $2,400.00 $40,800.00 $3,918.95 $66,622.15 $4,372.60 $74,334.20 $5,435.31 $92,400.27 55 Install New Fire Hydrant EA 6 $11,500.00 $69,000.00 $12,000.00 $72,000.00 $10,547.41 $63,284.46 $10,543.91 $63,263.46 $15,372.46 $92,234.76 66 6‐Inch Plastic Pipe Waterline LF 80 $55.00 $4,400.00 $300.00 $24,000.00 $104.72 $8,377.60 $425.24 $34,019.20 $276.86 $22,148.80 77 6" Resilient Wedge Gate Valves EA 6 $2,900.00 $17,400.00 $2,500.00 $15,000.00 $1,662.35 $9,974.10 $2,982.38 $17,894.28 $5,615.47 $33,692.82 88 Asphalt Concrete Removal & Replacement (6" Thick ‐ 1/2" Type A) SF 300 $40.00 $12,000.00 $40.00 $12,000.00 $132.95 $39,885.00 $29.70 $8,910.00 $50.06 $15,018.00 99 PCC Removal & Replacement (To Include Cross Gutter & Spandrel, Concrete Approach at Alley, Sidewalk & Miscellaneous Curb & Gutter) SF 380 $65.00 $24,700.00 $47.00 $17,860.00 $64.21 $24,399.80 $35.72 $13,573.60 $84.54 $32,125.20 10 10 Pothole Existing  Utilities EA 5 $1,500.00 $7,500.00 $2,000.00 $10,000.00 $1,046.53 $5,232.65 $2,247.14 $11,235.70 $3,439.86 $17,199.30 Subtotal $208,500.00 Subtotal $212,660.00 Subtotal $269,731.44 Subtotal $325,532.44 Subtotal $459,471.42 Main Line Engineering AAAA
Engineering Contracting, Inc. The J. F. Will Company, Inc. RCH Construction Joseph Construction and Consulting Inc dba Joseph Engineering Attachment B