Cities Index.
Item 8.a (1) - Presentation

Santa Maria City Council
May 6, 2025

Document
Item 8.a (1) - Presentation
Meeting
May 6, 2025
Body
Santa Maria City Council
Original file
4.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-santamaria.escribemeetings.com. That file is the official record.

CITY OF SANTA MARIA

REMODEL OF FORMER SEARS BUILDING AND

FINDING OF PUBLIC CONVENIENCE OR

NECESSITY FOR EL SUPER
DOWNTOWN PERMIT – DT2023-0012
PLANNING PERMIT – P2025-0002
226 EAST MAIN STREET
MAY 6, 2025

PROJECT LOCATION – FORMER SEARS BUILDING
N

PROJECT SITE

PERLMAN
PARK

GATEWAY

MIXED USE

BROADWAY

MAIN ST

MILLER ST

CHURCH ST

CYPRESS ST
MACY’S

PROJECT LOCATION

PROJECT
SITE

EXISTING BUILDING – VIEW FROM MILLER STREET DRIVEWAY

EXISTING BUILDING – VIEW FROM MAIN STREET

EXISTING BUILDING – LOOKING SOUTHEAST

EXISTING BUILDING – LOOKING EAST

EXISTING SITE PLAN

LOADING DOCK

AUTOCENTER

ENTRANCE

ENTRANCE

ENTRANCECROSSWALK

PROPOSED SITE PLAN & PROJECT DESCRIPTION
• 5.4-acre site
• 110,086 square foot
existing building
• Remodel of north,
west, and east
facades
• Tenant improvements
for:
• El Super Grocery
Store and up to 4
small tenants on
ground floor.
• Two main tenants
on second floor
FLOOR PLAN – 1ST FLOOR
2nd floor access

EXTERIOR MALL

ENTRANCE
FLOOR PLAN – GROCERY STORE
DELI

HOT FOOD

AND SEATING
BAKERY
DAIRY
LIQUOR

BEER/WINE

CHECKOUT

WAREHOUSE
EXIT
FLOOR PLAN – 2ND FLOOR

PEDESTRIAN
BRIDGE

LANDING

NORTH ELEVATIONS LOOKING FROM MAIN STREET
Existing
AFTER
Proposed
Existing

ARTISTIC RENDERING OF MAIN STREET ELEVATION
BEFORE
AFTER

EAST ELEVATION LOOKING FROM MILLER STREET
Existing
Proposed

ARTISTIC RENDERING FROM ABOVE LOOKING WEST
BEFORE
AFTER
New Promenade
Plan

WEST ELEVATION LOOKING FROM BROADWAY

COLORS AND MATERIALS

EXISTING TREE INVENTORY

LANDSCAPE PLANS

ENVIRONMENTAL
The project was adequately covered in a previously certified programmatic Final Environmental Impact Report (EIR) for the Santa Maria Downtown Specific Plan (SCH 2007041105) pursuant to California Environmental Quality Act State Guidelines Section 15162.

No further environmental review is required.

RECOMMENDATION

1. Adopt a Resolution approving Downtown Permit
(DT2023-0012) for the Former Sears Building Remodel at
226 East Main Street; and

2. Adopt a Resolution approving a determination of public convenience or necessity for the issuance of a Type 21
(Off-sale General) Alcohol Beverage Control license for El Super located at 226 East Main Street.

← All documents from this meeting