City of Santa Maria
Bid Results for Project WELL 15 DRILLING PROJECT (2025-03) Issued on 05/28/2025
Bid Due on June 23, 2025 2:00 PM (PDT)
(Unit Price * Quantity)
Item # Description Unit Quantity Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 1 Mobilization/Demobilization LS 1 $100,000.00 $100,000.00 $190,000.00 $190,000.00 $200,000.00 $200,000.00 $146,380.00 $146,380.00 $148,000.00 $148,000.00 $200,000.00 $200,000.00 2 Conductor (Surface) Casing LF 50 $1,200.00 $60,000.00 $1,250.00 $62,500.00 $850.00 $42,500.00 $2,081.82 $104,091.00 $1,500.00 $75,000.00 $2,000.00 $100,000.00 3 Pilot Borehole Drilling LF 1550 $160.00 $248,000.00 $200.00 $310,000.00 $190.00 $294,500.00 $185.94 $288,207.00 $275.00 $426,250.00 $200.00 $310,000.00 4 Geophysical Logging EA 1 $25,000.00 $25,000.00 $10,500.00 $10,500.00 $10,000.00 $10,000.00 $12,590.94 $12,590.94 $25,000.00 $25,000.00 $5,000.00 $5,000.00 5 Aquifer Isolation Zone Testing EA 7 $35,000.00 $245,000.00 $25,000.00 $175,000.00 $30,000.00 $210,000.00 $66,773.02 $467,411.14 $36,500.00 $255,500.00 $40,000.00 $280,000.00 6 Upper Borehole Ream LF 430 $150.00 $64,500.00 $200.00 $86,000.00 $200.00 $86,000.00 $197.80 $85,054.00 $290.00 $124,700.00 $250.00 $107,500.00 7 Lower Borehole Ream LF 1120 $150.00 $168,000.00 $150.00 $168,000.00 $200.00 $224,000.00 $132.81 $148,747.20 $160.00 $179,200.00 $250.00 $280,000.00 8 Caliper Survey EA 1 $25,000.00 $25,000.00 $5,000.00 $5,000.00 $6,500.00 $6,500.00 $5,126.34 $5,126.34 $8,050.00 $8,050.00 $6,250.00 $6,250.00 9 Furnish & Install 22-Inch HSLA Steel Upper Casing LF 444 $350.00 $155,400.00 $405.00 $179,820.00 $355.00 $157,620.00 $352.01 $156,292.44 $400.00 $177,600.00 $250.00 $111,000.00 10 Furnish and install 22-inch to 16-inch diameter HSLA Steel Reducer LF 4 $2,000.00 $8,000.00 $1,860.00 $7,440.00 $1,650.00 $6,600.00 $2,511.32 $10,045.28 $2,000.00 $8,000.00 $10,000.00 $40,000.00 11 Furnish and install 16-inch diameter blank HSLA-to-Stainless Steel Dissilimilar Metal Dielectric Coupler EA 2 $12,000.00 $24,000.00 $6,750.00 $13,500.00 $12,000.00 $24,000.00 $5,960.22 $11,920.44 $8,500.00 $17,000.00 $10,000.00 $20,000.00 12 Furnish and install 16-inch diameter blank Stainless Steel Lower Water Well Casing LF 370 $480.00 $177,600.00 $580.00 $214,600.00 $500.00 $185,000.00 $487.72 $180,456.40 $550.00 $203,500.00 $600.00 $222,000.00 13 Furnish and install 16-inch diameter Ful-Flo Louvered Stainless Steel Water Well Casing LF 740 $560.00 $414,400.00 $670.00 $495,800.00 $585.00 $432,900.00 $570.65 $422,281.00 $600.00 $444,000.00 $700.00 $518,000.00 14 Furnish and install 16-inch diameter blank Stainless Steel Cellar Pipe with End Cap LF 20 $480.00 $9,600.00 $640.00 $12,800.00 $500.00 $10,000.00 $518.98 $10,379.60 $640.00 $12,800.00 $2,000.00 $40,000.00 15 Furnish and install vented 3-inch-diameter Mild Steel Gravel Feed Tube LF 470 $25.00 $11,750.00 $30.00 $14,100.00 $35.00 $16,450.00 $35.86 $16,854.20 $40.00 $18,800.00 $165.00 $77,550.00 16 Furnish and install two vented 3-inch-diameter HSLA Steel Sounding Tube LF 840 $80.00 $67,200.00 $52.00 $43,680.00 $55.00 $46,200.00 $65.64 $55,137.60 $60.00 $50,400.00 $165.00 $138,600.00 17 Two 3-inch-Diameter Angled Air-Vent/Access Tubes LF 4 $1,000.00 $4,000.00 $375.00 $1,500.00 $555.00 $2,220.00 $426.93 $1,707.72 $40.00 $160.00 $2,500.00 $10,000.00 18 Gravel Pack LF 1140 $125.00 $142,500.00 $80.00 $91,200.00 $85.00 $96,900.00 $184.34 $210,147.60 $210.00 $239,400.00 $200.00 $228,000.00 19 Cement Grout Seal LF 460 $125.00 $57,500.00 $150.00 $69,000.00 $85.00 $39,100.00 $214.64 $98,734.40 $300.00 $138,000.00 $250.00 $115,000.00 20 Mechanical Well Development hour 40 $750.00 $30,000.00 $450.00 $18,000.00 $850.00 $34,000.00 $2,791.47 $111,658.80 $1,190.00 $47,600.00 $999.00 $39,960.00 21 Chemicals for Well Development LS 1 $25,000.00 $25,000.00 $15,000.00 $15,000.00 $3,500.00 $3,500.00 $32,883.76 $32,883.76 $15,000.00 $15,000.00 $17,500.00 $17,500.00 22 Mobilization and Demobilization of Test Pump and Accessories LS 1 $60,000.00 $60,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 $105,621.56 $105,621.56 $160,000.00 $160,000.00 $50,000.00 $50,000.00 23 Pumping Development hour 40 $750.00 $30,000.00 $400.00 $16,000.00 $850.00 $34,000.00 $736.62 $29,464.80 $550.00 $22,000.00 $1,000.00 $40,000.00 24 Production Testing of Well, Including Dynamic Spinner and Video Surveys hour 84 $750.00 $63,000.00 $545.00 $45,780.00 $850.00 $71,400.00 $855.74 $71,882.16 $650.00 $54,600.00 $799.00 $67,116.00 25 Close-out Surveys ( Video, gyroscope deviation, Cement-Bond Log (CBL), & CITM LS 1 $45,000.00 $45,000.00 $25,000.00 $25,000.00 $10,000.00 $10,000.00 $24,688.46 $24,688.46 $20,000.00 $20,000.00 $35,000.00 $35,000.00 26 Disinfection of Well and Capping LS 1 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $50,000.00 $50,000.00 $11,034.43 $11,034.43 $15,000.00 $15,000.00 $20,000.00 $20,000.00 27 Standby Time hour 20 $500.00 $10,000.00 $250.00 $5,000.00 $650.00 $13,000.00 $597.11 $11,942.20 $550.00 $11,000.00 $1,000.00 $20,000.00 28 Abandonment and Destruction LF 1600 $20.00 $32,000.00 $25.00 $40,000.00 $65.00 $104,000.00 $54.19 $86,704.00 $20.00 $32,000.00 $50.00 $80,000.00 29 Title 22 Water Quality Laboratory Analyses LS 1 $15,000.00 $15,000.00 $10,000.00 $10,000.00 $7,500.00 $7,500.00 $4,787.25 $4,787.25 $8,450.00 $8,450.00 $25,000.00 $25,000.00 30 StormWater Pollution Prevention Plan LS 1 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $7,500.00 $7,500.00 $5,528.28 $5,528.28 $25,000.00 $25,000.00 $15,000.00 $15,000.00 Subtotal $2,382,450.00 Subtotal $2,425,220.00 Subtotal $2,470,390.00 Subtotal $2,927,760.00 Subtotal $2,962,010.00 Subtotal $3,218,476.00 Total $2,382,450.00 Total $2,425,220.00 Total $2,470,390.00 Total $2,927,760.00 Total $2,962,010.00 Total $3,218,476.00 Zim Industries, Inc. dba
Nor-Cal Pump & Well Drilling, Inc.South Valley Companies Inc. Bakersfield Well & Pump Company Well Industries Inc. Layne Christensen Company Pacific Coast Well Drilling, Inc.
Attachment B