Cities Index.
Attachment B - Detailed Bid Results.pdf

Santa Maria City Council
September 16, 2025

Document
Attachment B - Detailed Bid Results.pdf
Meeting
September 16, 2025
Body
Santa Maria City Council
Original file
145 KB
Text extracted from the city's file for reading and search. Open the original on pub-santamaria.escribemeetings.com. That file is the official record.

City of Santa Maria
Bid Results for Project ENOS HOUSE ‐ PHASE III (2025‐07) Issued on 07/25/2025
Bid Due on September 03, 2025  2:00 PM (PDT)
Line Totals (Unit Price * Quantity)
Item Num Item Code Description Unit Quantity Unit  Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 1B ‐1 CONSTRUCTION COORDINATION LS 1 $24,179.00 $24,179.00 $67,580.00 $67,580.00 $30,000.00 $30,000.00 $41,516.00 $41,516.00 $12,529.44 $12,529.44 2B ‐2 CONSTRUCTION SURVEYING LS 1 $13,202.00 $13,202.00 $12,199.00 $12,199.00 $9,300.00 $9,300.00 $12,035.00 $12,035.00 $11,777.67 $11,777.67 3B ‐3 PROTECT  EXISTING UTILITIES LS 1 $2,000.00 $2,000.00 $4,485.00 $4,485.00 $5,000.00 $5,000.00 $4,589.00 $4,589.00 $3,132.36 $3,132.36 4B ‐4 EARTHWORK, AND SUBGRADE PREPARATION LS 1 $68,292.00 $68,292.00 $60,004.00 $60,004.00 $55,000.00 $55,000.00 $65,645.00 $65,645.00 $175,913.34 $175,913.34 5B ‐5 ELECTRICAL LS 1 $229,154.00 $229,154.00 $242,198.00 $242,198.00 $287,616.00 $287,616.00 $308,039.00 $308,039.00 $315,528.89 $315,528.89 6B ‐64 "  CONCRETE SF 1900 $12.00 $22,800.00 $16.57 $31,483.00 $22.30 $42,370.00 $30.50 $57,950.00 $12.96 $24,624.00 7B ‐7 NOT USED SF 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8B ‐8 CONCRETE  STEPS SF 135 $110.00 $14,850.00 $182.88 $24,688.80 $200.00 $27,000.00 $332.00 $44,820.00 $85.20 $11,502.00 9B ‐96 "  MOWCURB LF 880 $35.00 $30,800.00 $21.59 $18,999.20 $38.00 $33,440.00 $50.00 $44,000.00 $26.15 $23,012.00 10 B‐10 ADA  AND REGULAR STRIPING LS 1 $4,600.00 $4,600.00 $6,534.30 $6,534.30 $15,000.00 $15,000.00 $4,165.00 $4,165.00 $6,878.66 $6,878.66 11 B‐11 TRUCATED DOMES SF 60 $50.00 $3,000.00 $92.31 $5,538.60 $100.00 $6,000.00 $67.00 $4,020.00 $77.68 $4,660.80 12 B‐12 ADA  SIGNAGE LS 1 $2,587.00 $2,587.00 $2,848.14 $2,848.14 $5,600.00 $5,600.00 $1,253.00 $1,253.00 $2,819.12 $2,819.12 13 B‐13 NOT  USED SF 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 B‐14 2"  HMA PAVING IN PARKING LOT SF 27657 $2.40 $66,376.80 $2.59 $71,631.63 $3.90 $107,862.30 $2.80 $77,439.60 $2.88 $79,652.16 15 B‐15 RAMP/STAIR  HANDRAILS LF 70 $178.00 $12,460.00 $281.52 $19,706.40 $197.00 $13,790.00 $195.00 $13,650.00 $304.29 $21,300.30 16 B‐16 PARKING  WHEEL STOP EA 6 $140.00 $840.00 $167.85 $1,007.10 $250.00 $1,500.00 $142.00 $852.00 $156.62 $939.72 17 B‐17 ADA  ACCESSIBLE PARKING STALLS LS 1 $1,690.00 $1,690.00 $10,258.00 $10,258.00 $8,000.00 $8,000.00 $1,365.00 $1,365.00 $7,517.66 $7,517.66 18 B‐ALT‐1 24"  CMU WALL WITH STONE VENEER LF 125 $748.00 $93,500.00 $513.34 $64,167.50 $483.00 $60,375.00 $508.50 $63,562.50 $705.17 $88,146.25 19 B‐ALT‐2 30"  CMU WALL WITH STONE VENEER LF 60 $844.00 $50,640.00 $614.92 $36,895.20 $605.00 $36,300.00 $589.00 $35,340.00 $936.60 $56,196.00 20 B‐ALT‐34 '  TALL SPLIT RAIL FENCE LF 190 $66.00 $12,540.00 $89.35 $16,976.50 $39.00 $7,410.00 $57.00 $10,830.00 $45.60 $8,664.00 21 B‐ALT‐4 VINEYARD WIRE FENCING LF 270 $41.00 $11,070.00 $26.77 $7,227.90 $79.00 $21,330.00 $75.00 $20,250.00 $72.97 $19,701.90 22 B‐ALT‐5 VINES 5 GALLON EA 62 $52.00 $3,224.00 $70.56 $4,374.72 $63.00 $3,906.00 $69.00 $4,278.00 $63.98 $3,966.76 23 B‐ALT‐63 6 ‐INCH BOX TREES EA 2 $1,050.00 $2,100.00 $1,655.84 $3,311.68 $1,475.00 $2,950.00 $1,651.00 $3,302.00 $1,505.72 $3,011.44 24 B‐ALT‐72 4 ‐INCH BOX TREES EA 62 $480.00 $29,760.00 $465.50 $28,861.00 $455.00 $28,210.00 $475.50 $29,481.00 $464.40 $28,792.80 25 B‐ALT‐81 5 ‐GALLON TREES EA 42 $212.00 $8,904.00 $198.04 $8,317.68 $181.00 $7,602.00 $193.00 $8,106.00 $184.26 $7,738.92 26 B‐ALT‐95  GALLON SHRUBS EA 1654 $51.00 $84,354.00 $33.13 $54,797.02 $33.00 $54,582.00 $34.00 $56,236.00 $33.09 $54,730.86 27 B‐ALT‐10 1  GALLON SHRUBS EA 3092 $17.00 $52,564.00 $14.35 $44,370.20 $14.00 $43,288.00 $15.00 $46,380.00 $14.34 $44,339.28 28 B‐ ALT‐11 1  GALLON GROUNDCOVER EA 930 $17.00 $15,810.00 $15.11 $14,052.30 $14.00 $13,020.00 $15.00 $13,950.00 $14.34 $13,336.20 29 B‐ALT‐12 TURF SOD SF 7850 $1.40 $10,990.00 $2.45 $19,232.50 $2.50 $19,625.00 $2.40 $18,840.00 $2.33 $18,290.50 30 B‐ALT‐13 DECOMPOSED  GRANITE SF 1700 $9.00 $15,300.00 $11.03 $18,751.00 $10.00 $17,000.00 $11.00 $18,700.00 $10.48 $17,816.00 31 B‐ALT‐14 TRASH ENCLOSURE LS 1 $38,875.00 $38,875.00 $34,133.15 $34,133.15 $61,000.00 $61,000.00 $45,886.00 $45,886.00 $42,685.13 $42,685.13 32 B‐ALT‐15 ENTRY OVERHEAD  MONUMENT LS 1 $35,534.00 $35,534.00 $26,597.20 $26,597.20 $27,000.00 $27,000.00 $5,699.00 $5,699.00 $26,474.14 $26,474.14 33 B‐ALT‐16 4"  COLORED CONCRETE SF 5500 $14.50 $79,750.00 $19.69 $108,295.00 $30.00 $165,000.00 $26.00 $143,000.00 $14.17 $77,935.00 34 B‐ALT‐17 IRRIGATION  SYSTEM LS 1 $221,400.00 $221,400.00 $189,622.00 $189,622.00 $184,356.00 $184,356.00 $191,429.00 $191,429.00 $188,297.30 $188,297.30 35 B‐ALT‐18 IMPORTED TOPSOIL, SOIL  PREPARATION AND MULCHING SF 54150 $1.30 $70,395.00 $1.70 $92,055.00 $1.60 $86,640.00 $1.75 $94,762.50 $1.70 $92,055.00 36 B‐ALT‐19 PLANT  ESTABLISHMENT LS 1 $10,000.00 $10,000.00 $11,115.28 $11,115.28 $10,800.00 $10,800.00 $11,200.00 $11,200.00 $11,030.89 $11,030.89 Total $1,343,540.80 Total $1,362,314.00 Total $1,497,872.30 Total $1,502,570.60 Total $1,504,996.49 G Sosa Construction Inc The J. F. Will Company, Inc. R Burke Corporation V. Lopez Jr. & Sons G.E.C., Inc. MD Construction Co., Inc.

Attachment B

← All documents from this meeting