City of Santa Maria
Bid Results for Project WELL 15 EQUIPPING PROJECT (2025-04) Issued on 07/22/2025
Bid Due on September 18, 2025 2:30 PM (PDT)
Line Totals (Unit Price * Quantity)
Item Num Description Unit Quantity Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total 1 Mobilization/Demobilization Pipelines and Well Equipping LS 1 $418,000.00 $418,000.00 $82,000.00 $82,000.00 $200,000.00 $200,000.00 $352,935.00 $352,935.00 $299,920.00 $299,920.00 $274,000.00 $274,000.00 $350,000.00 $350,000.00 2 Environmental Mitigation and Compliance LS 1 $23,000.00 $23,000.00 $38,000.00 $38,000.00 $3,270.00 $3,270.00 $126,900.00 $126,900.00 $50,600.00 $50,600.00 $35,000.00 $35,000.00 $30,000.00 $30,000.00 3 Site Work and Grading - Well Site LS 1 $135,000.00 $135,000.00 $92,000.00 $92,000.00 $52,110.00 $52,110.00 $98,101.00 $98,101.00 $114,425.00 $114,425.00 $375,000.00 $375,000.00 $250,000.00 $250,000.00 4 Class II Base for Entire Site CY 300 $217.00 $65,100.00 $200.00 $60,000.00 $130.00 $39,000.00 $108.13 $32,439.00 $162.53 $48,759.00 $250.00 $75,000.00 $165.00 $49,500.00 5 Concrete Well Head, Well Building slab and Discharge Piping slab LS 1 $29,000.00 $29,000.00 $34,000.00 $34,000.00 $67,590.00 $67,590.00 $62,020.80 $62,020.80 $78,775.00 $78,775.00 $158,000.00 $158,000.00 $125,000.00 $125,000.00 6 Furnish and Install 10" DIP Waste Line LF 2950 $145.00 $427,750.00 $260.00 $767,000.00 $200.00 $590,000.00 $211.65 $624,367.50 $273.20 $805,940.00 $322.71 $951,994.50 $269.00 $793,550.00 7 Furnish and install 12-inch Ductile Iron Discharge Piping Header including valves, Fittings, Restraint Fittings, Miscellaneous Appurtenances - ABOVE GROUND PIPING LS 1 $215,000.00 $215,000.00 $202,500.00 $202,500.00 $245,930.00 $245,930.00 $287,754.80 $287,754.80 $221,375.00 $221,375.00 $270,000.00 $270,000.00 $240,000.00 $240,000.00 8 14" buried Water Main Piping, fittings, ARV Piping and appurtenances -DIP LF 2930 $186.00 $544,980.00 $312.00 $914,160.00 $260.00 $761,800.00 $279.75 $819,667.50 $338.71 $992,420.30 $300.00 $879,000.00 $387.00 $1,133,910.00 9 Well Pump, Column, Tube Shaft and Motor Assembly per Plans and Specifications EA 1 $439,000.00 $439,000.00 $475,000.00 $475,000.00 $485,700.00 $485,700.00 $486,490.40 $486,490.40 $532,501.75 $532,501.75 $470,000.00 $470,000.00 $585,000.00 $585,000.00 10 Well Enclosure Structure- Furnish and Install LS 1 $70,000.00 $70,000.00 $59,000.00 $59,000.00 $67,970.00 $67,970.00 $40,922.40 $40,922.40 $104,650.00 $104,650.00 $90,000.00 $90,000.00 $95,000.00 $95,000.00 11 Sheeting, Shoring and Bracing LS 1 $10,000.00 $10,000.00 $65,000.00 $65,000.00 $8,800.00 $8,800.00 $40,497.60 $40,497.60 $69,000.00 $69,000.00 $15,000.00 $15,000.00 $55,000.00 $55,000.00 12 Storm Water Pollution Prevention Construction Activities LS 1 $29,000.00 $29,000.00 $16,400.00 $16,400.00 $37,800.00 $37,800.00 $67,604.80 $67,604.80 $40,250.00 $40,250.00 $15,000.00 $15,000.00 $38,000.00 $38,000.00 13 Chain Link Fencing with 2 manual drive Gates and 2 walk-gates LF 500 $110.00 $55,000.00 $105.00 $52,500.00 $210.00 $105,000.00 $183.99 $91,995.00 $96.95 $48,475.00 $100.00 $50,000.00 $167.00 $83,500.00 14 Chemical Facilities Building, Chemical Pump, Chem Tanks & Eye Wash LS 1 $163,000.00 $163,000.00 $245,000.00 $245,000.00 $250,200.00 $250,200.00 $198,956.26 $198,956.26 $332,350.00 $332,350.00 $225,000.00 $225,000.00 $350,000.00 $350,000.00 15 Furnish and Install Sand Separator EA 1 $131,000.00 $131,000.00 $135,000.00 $135,000.00 $150,700.00 $150,700.00 $134,484.60 $134,484.60 $156,400.00 $156,400.00 $185,000.00 $185,000.00 $170,000.00 $170,000.00 16 Furnish and Install Bladder Type Surge Tank & piping with Concrete Foundation EA 1 $151,000.00 $151,000.00 $164,000.00 $164,000.00 $104,700.00 $104,700.00 $116,666.50 $116,666.50 $218,500.00 $218,500.00 $225,000.00 $225,000.00 $195,000.00 $195,000.00 17 Drainage/Infiltration Chambers LS 1 $32,000.00 $32,000.00 $32,000.00 $32,000.00 $15,200.00 $15,200.00 $23,682.84 $23,682.84 $49,335.00 $49,335.00 $60,000.00 $60,000.00 $150,000.00 $150,000.00 18 Storm Drain Piping (15 inch & 18 inch) and Well site exterior Grading LF 320 $122.00 $39,040.00 $180.00 $57,600.00 $240.00 $76,800.00 $136.21 $43,587.20 $124.70 $39,904.00 $296.88 $95,001.60 $388.00 $124,160.00 19 Trench Stabilization (3/4 compacted gravel 1 ft below and above pipe with Mirafi wrap) LF 1000 $58.00 $58,000.00 $108.00 $108,000.00 $300.00 $300,000.00 $165.83 $165,830.00 $47.15 $47,150.00 $85.00 $85,000.00 $77.75 $77,750.00 20 Transformer Pad LS 1 $35,000.00 $35,000.00 $19,000.00 $19,000.00 $56,000.00 $56,000.00 $55,422.00 $55,422.00 $37,720.00 $37,720.00 $45,000.00 $45,000.00 $35,000.00 $35,000.00 21 Control Panel LS 1 $155,000.00 $155,000.00 $9,600.00 $9,600.00 $181,200.00 $181,200.00 $83,265.52 $83,265.52 $96,945.00 $96,945.00 $125,000.00 $125,000.00 $150,000.00 $150,000.00 22 Not Used LS 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 23 Electrical Main Service Conduit - 4 inch Schedule 40 PVC with Pull Boxes LF 3000 $20.00 $60,000.00 $47.00 $141,000.00 $41.00 $123,000.00 $16.57 $49,710.00 $42.09 $126,270.00 $75.00 $225,000.00 $64.00 $192,000.00 24 Fiber Optic Conduit - 2 inch Schedule 40 PVC and FOC with Pull boxes LF 3000 $32.00 $96,000.00 $37.00 $111,000.00 $42.00 $126,000.00 $12.95 $38,850.00 $43.36 $130,080.00 $75.00 $225,000.00 $69.00 $207,000.00 25 Electrical Conduit and Wire - Within Well Site LS 1 $154,000.00 $154,000.00 $154,000.00 $154,000.00 $160,900.00 $160,900.00 $44,712.56 $44,712.56 $190,325.00 $190,325.00 $35,000.00 $35,000.00 $225,000.00 $225,000.00 26 Well Main Switchboard & MCC LS 1 $123,000.00 $123,000.00 $190,000.00 $190,000.00 $143,500.00 $143,500.00 $225,049.60 $225,049.60 $133,400.00 $133,400.00 $250,000.00 $250,000.00 $150,000.00 $150,000.00 27 Instrumentation- Equipment, Conduit and Wiring fully terminated and commissioning LS 1 $23,000.00 $23,000.00 $50,000.00 $50,000.00 $36,500.00 $36,500.00 $83,331.60 $83,331.60 $196,650.00 $196,650.00 $5,000.00 $5,000.00 $72,000.00 $72,000.00 28 Automatic Transfer Switch LS 1 $24,000.00 $24,000.00 $24,000.00 $24,000.00 $27,300.00 $27,300.00 $69,856.00 $69,856.00 $25,990.00 $25,990.00 $7,500.00 $7,500.00 $30,000.00 $30,000.00 29 Furnish and Install Generator Slab and Generator LS 1 $282,000.00 $282,000.00 $349,000.00 $349,000.00 $311,300.00 $311,300.00 $321,986.60 $321,986.60 $339,135.00 $339,135.00 $335,000.00 $335,000.00 $350,000.00 $350,000.00 30 Metal Building for Generator and Motor Control Center & Concrete foundation LS 1 $234,000.00 $234,000.00 $253,000.00 $253,000.00 $330,400.00 $330,400.00 $431,943.72 $431,943.72 $315,675.00 $315,675.00 $250,000.00 $250,000.00 $421,000.00 $421,000.00 31 Electrical Testing and Arc Flash Study LS 1 $30,000.00 $30,000.00 $31,000.00 $31,000.00 $33,500.00 $33,500.00 $15,486.32 $15,486.32 $32,200.00 $32,200.00 $15,000.00 $15,000.00 $35,000.00 $35,000.00 32 Miscellaneous Electrical work including but not limited to Lights, Switches, Receptacles, Grounding, etc. for complete project
LS 1 $93,000.00 $93,000.00 $68,000.00 $68,000.00 $98,900.00 $98,900.00 $8,437.00 $8,437.00 $115,000.00 $115,000.00 $18,500.00 $18,500.00 $110,000.00 $110,000.00 Total $4,343,870.00 Total $4,998,760.00 Total $5,191,070.00 Total $5,242,954.12 Total $5,990,120.05 Total $6,068,996.10 Total $6,872,370.00 HPS Mechanical, Inc. Canyon Springs EnterprisesHartzell General Engineering Contractor, Inc. Brough Construction, Inc. W. M. Lyles Co The J. F. Will Company, Inc. Spiess Construction Co., Inc.
Attachment B