Bid Results for Project REAP PED IMPROVEMENTS - 2026 PHASE 2 (2026-05) Issued on 03/17/2026
Bid Due on March 31, 2026 2:00 PM (PDT)
Item Num Description Unit of Measure Quantity
Main Line Engineering - Unit
Price
Main Line Engineering - Line
Total
R Burke Corporation -
Unit Price
R Burke Corporation - Line
Total
1 Construction Coordination LS 1 $3,000.00 $3,000.00 $6,000.00 $6,000.00 2 Mobilization and Demobilization LS 1 $3,000.00 $3,000.00 $6,500.00 $6,500.00 3 Traffic Control LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 4 Ramp Concrete SQFT 414 $40.00 $16,560.00 $45.00 $18,630.00 5 Curb, Gutter, and Sidewalk Concrete SQFT 1351 $30.00 $40,530.00 $34.00 $45,934.00 6 Driveway Concrete SQFT 183 $35.00 $6,405.00 $70.00 $12,810.00 7 Striping LS 1 $3,000.00 $3,000.00 $6,800.00 $6,800.00 8 Sign Posts EA 1 $3,000.00 $3,000.00 $450.00 $450.00
9 Tree Removal EA 3 $7,500.00 $22,500.00 $8,500.00 $25,500.00 Subtotal $107,995.00 $132,624.00
Total $107,995.00 $132,624.00
Item Num Description Unit of Measure Quantity
V. Lopez Jr. & Sons G.E.C., Inc. -
Unit Price
V. Lopez Jr. & Sons G.E.C.,
Inc. - Line Total
G Sosa Construction Inc -
Unit Price
G Sosa Construction Inc -
Line Total
1 Construction Coordination LS 1 $10,000.00 $10,000.00 $10,279.00 $10,279.00 2 Mobilization and Demobilization LS 1 $10,000.00 $10,000.00 $2,000.00 $2,000.00 3 Traffic Control LS 1 $25,000.00 $25,000.00 $5,000.00 $5,000.00 4 Ramp Concrete SQFT 414 $75.00 $31,050.00 $55.00 $22,770.00 5 Curb, Gutter, and Sidewalk Concrete SQFT 1351 $30.00 $40,530.00 $55.00 $74,305.00 6 Driveway Concrete SQFT 183 $45.00 $8,235.00 $51.00 $9,333.00 7 Striping LS 1 $3,738.00 $3,738.00 $3,500.00 $3,500.00 8 Sign Posts EA 1 $625.00 $625.00 $600.00 $600.00
9 Tree Removal EA 3 $1,400.00 $4,200.00 $2,000.00 $6,000.00 $133,378.00 $133,787.00