zoning in the context of State law. Specifically, this paragraph states that under Government Code Section 65860, a property’s zoning must be consistent with its General Plan land use designation. It 2-83
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
also references Government Code Section 65860(c), which requires that when a General Plan is amended or updated in a way that creates inconsistency with the Zoning Ordinance, the zoning ordinance must be amended within a reasonable time to achieve consistency. This paragraph is intended to summarize applicable statutory requirements. The following paragraph describes the 2045 General Plan Update as containing goals and policies to base land use and resource decisions on but has no mention of land use or zoning plans. No revisions to the Draft EIR are required based on this comment.

Response 6.29
The commenter suggests including support for expansion of Vandenberg Space Force Base in the Vision statement.

The Vision reflects the City’s broad goals and priorities as defined in the 2045 General Plan Update.

This comment does not pertain to the environmental analysis presented in the Draft EIR. No revisions to the Draft EIR are required based on this comment.

Response 6.30
The commenter asks the City to revise the agricultural objective as noted in other sections.

Refer to Response 6.10 for a discussion of commenter’s suggested changes to the 2045 General Plan Update’s objectives.

Response 6.31
The commenter asks the City to revise the order of the General Plan Update Elements and to include the housing element in the bullet point list on page 2-7 of Chapter 2, Project Description, of the Draft EIR.

For a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis, refer to Response 6.9.

Response 6.32
The commenter expresses concerns over the number of land use designations.

This comment pertains to the content of the 2045 General Plan Update, and not to the environmental analysis presented in the Draft EIR. No revisions to the Draft EIR are required based on this comment.

Response 6.33
The commenter asks whether the Entrada Specific Plan will be retired.

This comment pertains to the content of the 2045 General Plan Update, and not to the environmental analysis presented in the Draft EIR. No revisions to the Draft EIR are required based on this comment.
2-84
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.34
The commenter states that the section lacks detail regarding planned land uses and zoning for the annexation area, which is expected to accommodate 8,000–9,000 residential units, commercial uses at interchanges, medical expansion, six new schools, 50 acres of parks, and employment-generating uses. The commenter asks if these details need to be included in the EIR, and recommends creating a concept plan on how the annexation area will be developed and suggests using the 1993 land use plan as a reference. The commenter also requests deletion of the phrase “and public land uses in annexed lands outside of the current city limits.”
As discussed in Response 6.8, the Draft EIR provides a program-level analysis consistent with CEQA Guidelines 15168 for long-range planning documents and does not require site-specific planning or design details. The preferred Land Use Alternative selected by the City Council notes that the proposed 985-acre annexation area would contain approximately 3,900 new residential units, not 8,000-9,000 units as the commenter mentions. An additional approximately 5,500 residential units would be located within infill areas within the existing city boundaries. A concept plan for the full build out of the proposed annexation area is not a part of the EIR for the 2045 General Plan Update and future planning efforts in coordination with property owners, including new Specific Plan(s), will be required. As noted on page 2-15 of Chapter 2, Project Description, of the Draft EIR, individual future projects may require separate environmental review under CEQA if they could result in impacts not addressed in the program-level analysis provided in the 2045 General Plan Update EIR.

This clarification reinforces that while annexation is proposed, additional environmental review may be required for future development within the annexation area.

The deletion of words requested by the applicant are editorial in nature and would not impact the adequacy of the Draft EIR and would not change any analysis within the EIR. For a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis, refer to Response 6.9. No revisions to the Draft EIR are required based on this comment.

Response 6.35
The commenter states that the maps in the Noise section are inaccurate because they do not show most of the sound walls installed along U.S. 101, which are intended to reduce community noise impacts. They identify this as a significant error that should be corrected in Figure 2-6, the Noise Element, and throughout the EIR.

The noise modeling presented in the Draft EIR is based on a conservative assumption that does not account for potential noise-reducing features such as topography, vegetation, sound walls, or other structures that may attenuate noise from transportation sources along area roadways. As a result, actual conditions may be lower than the projected noise levels described in the Draft EIR, ensuring that the analysis remains protective of noise-sensitive receptors. Figure 2-6 in Chapter 2, Project Description, and the Noise Element Figure N-3 show generalized noise conditions based on conservative assumptions and may not reflect all local features that may reduce noise levels, such as topography, vegetation, sound walls, or other physical barriers. In some locations, actual noise levels may be lower than those shown. The figures are intended to support City decision-making and should not be read as representing precise, site-specific conditions or all existing noise-reduction infrastructure. No revisions to the Draft EIR are required in response to this comment. 2-85
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.36
The commenter states there are errors in Figure 2-3 of Chapter 2, Project Description, including incorrect land use designations for the landfill, Santa Maria Cemetery, airport areas, Area 7, and Betteravia Plaza. They note that Special Planning (SP) lands are not shown and request that Figure 2- 3 be corrected to reflect accurate land use designations.

In response to this comment, Figure 2-3 in Chapter 2, Project Description, has been revised to update the land use designations for the landfill, Santa Maria Cemetery, airport areas, Area 7, and Betteravia Plaza.

Response 6.37
The commenter indicates potential errors but does not specify a specific issue or provide conflicting information or recommended corrections.

No changes to the Draft EIR are required in response to this comment.

Response 6.38
The commenter requests inclusion of an eastern island area in the annexation discussion. They also suggest that Figure 2-5 of the Draft EIR feature a concept layout illustrating the planned development of 8,000-9,000 units and associated uses. At minimum, they recommend including a list of anticipated needs for buildout within the annexation area.

The Draft EIR provides a program-level analysis consistent with CEQA Guidelines and does not require site-specific planning or design layouts, which have not yet been developed for the annexation area. Figure 2-5 in Chapter 2, Project Description, of the Draft EIR identifies the planned boundary of the proposed annexation area. The eastern island the commenter refers to is already incorporated into the city limits and does not require annexation. As stated in Response 6.8, the 2045 General Plan Update does not propose specific new development or individual projects, and it is not possible to evaluate project-specific details such as the layout of the future units in the annexation area, as it would be speculative at this time. No revisions to the Draft EIR are required based on this comment.

Response 6.39
The commenter states that the Figure 2-6, in Chapter 2, Project Description, is inaccurate, as it does not reflect existing sound walls along U.S. 101 and other areas such as Blosser Road. The commenter requests that the map be revised to account for these noise-reducing features.

Refer to Response 6.35 for a discussion of projected noise levels and noise attenuation from sound walls in figures.

Response 6.40
The commenter recommends extending the planning horizon of the General Plan Update to 2050, citing the lengthy process to date and the substantial work that remains to be completed.

For a discussion of the extension of the General Plan horizon year, refer to Response 6.14. 2-86
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.41
The commenter requests that Figure 2-1 be revised, noting inconsistencies with other tables that use different acreages.

For a discussion of comments, recommendations, and requests related to the description of the City of Santa Maria, refer to Response 6.24.

Response 6.42
The commenter requests clarification on the location and interpretation of the 1,504 acres of nonresidential development referenced on page 2-14 of Chapter 2, Project Description, of the Draft EIR, asking whether the area is within city limits and currently undeveloped, or if it includes other areas targeted for future development. The commenter also expresses confusion about the bullet points, particularly the meaning of the 463 acres of commercial use shown in parentheses and whether this reflects a potential loss or zoning change that could impact sales tax revenue. Additionally, the commenter questions the reference to 7 acres of airport use and suggests that a map be included to help clarify the information presented in the table.

The acreages listed on page 2-14 of Chapter 2, Project Description, of the Draft EIR, reflect net changes associated with the 2045 General Plan Update. Parentheses indicate reductions in acreage relative to existing conditions, as stated on page 2-14 of Chapter 2, Project Description. As such, the parenthetical “(463) acres of commercial uses” shown in Subsection 2.6.5, Proposed 2045 General Plan Buildout, indicates that the city would experience a reduction of approximately 463 acres of commercial uses through 2045. The Draft EIR provides a program-level analysis and does not include parcel-specific mapping of these changes. No revisions to the Draft EIR are required based on this comment.

Response 6.43
The commenter states that the percentages listed on page 2-14 of the Draft EIR are incorrect and should be revised. The commenter also states that there are no lands in the city classified as vacant or agriculture, and all lands have city land use and zoning for future development.

Refer to Response 5.2 for a discussion of conversion of agricultural lands in the city and refer to Response 6.24 for a discussion of revisions to the Final EIR regarding percentages of land occupied by land use types. No land within city limits is designated or zoned specifically for agriculture; agricultural uses operate as transitional uses until development is planned for an area. No revisions to the Draft EIR are required in response to this comment.

Response 6.44
The commenter states “Through 2050…” in reference to page 2-15.

The City acknowledges the commenter’s interest in extending the 2045 General Plan Update horizon year to 2050. This topic is addressed in Response 6.14. 2-87
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.45
The commenter states that the paragraph should clarify that most future housing projects will be exempt from CEQA based on newly adopted state laws. The commenter also states that the City will use this EIR as the primary environmental document for most future projects to streamline permitting and reduce costs, with only a few projects, such as future annexations, requiring additional review. They request adding this clarification to the “Intended Use of this EIR” section.

Section 2.7, Intended Use of this EIR, in Chapter 2, Project Description, explains that the EIR provides a programmatic review and can be used to focus environmental review for future activities under the 2045 General Plan. Section 2.7 also specifies that projects not anticipated by the 2045 General Plan or with effects not addressed in the EIR may require additional CEQA review. While the City recognizes that recent state laws may exempt certain housing projects from CEQA, this EIR is not intended to guarantee exemptions or replace CEQA requirements where applicable. Therefore, the existing Draft EIR language appropriately describes the intended use and flexibility of this document.

As a result, no changes to the Draft EIR are required in response to this comment.

Response 6.46
The commenter suggests editorial edits or provides comments that do not pertain to the adequacy of the environmental analysis presented in the Draft EIR. Specifically, they recommend updating the City Zoning Map and Zoning Ordinance, rezoning properties to align with the General Plan, adding references to infrastructure needs (water, wastewater, parks, schools), deleting references to natural/capital resource preservation or restoration, and making future study requirements more specific.

They also request the City forward the plan to LAFCo for approval of the Sphere of Influence and annexations.

For a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis, refer to Response 6.9. For a discussion of the timing of updates to the City’s zoning maps and the Zoning Ordinance following adoption of the 2045 General Plan Update, refer to Response 6.27.

The information provided by the commenter does not identify a new significant impact or provide substantial evidence of a deficiency in the environmental analysis. Therefore, no changes to the Draft EIR are required in response to this comment. However, as noted in the footnote on page 2-16 of Chapter 2, Project Description, the 2045 General Plan will be provided to Santa Barbara County LAFCo prior to a potential approval of the City’s annexation application. No changes to the Draft EIR are required in response to this comment.

Response 6.47
The commenter requests that the second sentence of Subsection 3.1, Setting, in Section 3, Environmental Setting, of the Draft EIR state that the Sphere of Influence will also be expanded to enable annexations. The commenter also states that it would be more efficient for the Sphere of Influence amendment and annexations to occur simultaneously.

The sentence the commenter is referring is a description of the “plan area,” stating it includes all land within the Sphere of Influence and includes the proposed annexation of 985-acres east of the city limits. The information the commenter is requesting is provided in Chapter 2, Project 2-88
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Description, Section 2.5, Plan Objectives, and Policy LU‑2.1: Planned Annexation Area on page 2‑16, which states:
“Expand Sphere of Influence and annex the Planned Annexation areas identified on the General Plan Land Use Map to meet housing and jobs development goals.” Because this clarification is already included in the Draft EIR, no revisions are required in response to this comment.

Response 6.48
The commenter requests that the description of the eastern edge of the city be updated to reference “a service road to the City of Santa Maria water tank complex” instead of “an internal farm road.” For a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis, refer to Response 6.9.

Response 6.49
The commenter states that regional transit including SMOOTH, medical and senior transit throughout the city and that medical transit transfers residents to doctors in Santa Barbara. They state these specific transit providers should be mentioned on page 3-1 of the Draft EIR stating that details are important. They also stated they would like to see specifics regarding the reference to regional rail services, specifically they would like it to be stated that there is a bus stop at the IHOP on Main Street off ramp and that freight transit is provided by a Amtrak and SM Railroad spur from Guadalupe to the city of Santa Maria.

For a discussion of regional transportation services within the city and where they are discussed in the Draft EIR, refer to Response 6.23. This comment is editorial in nature and does not pertain to the adequacy of the Draft EIR or the environmental impact analysis.

Response 6.50
The commenter states that the final paragraph on page 3-1 of the Draft EIR is redundant and should be changed. The commenter recommends deletion of references to “agricultural and vacant use.” The information in the paragraph referenced by the commenter is mentioned throughout the Draft EIR but is applicable to the Environmental Setting chapter and appropriately discussed on page 3-1.

Refer to Response 6.43 for a discussion of the use of the descriptive terms “vacant and agricultural” in the Draft EIR. No land within city limits is designated or zoned specifically for agriculture; agricultural uses operate as transitional uses until development is planned for an area. Refer to Response 5.2 for a discussion of conversion of agricultural lands in the city. No changes to the Draft EIR are required in response to this comment.

Response 6.51
The commenter states that there is a typo on page 3-2 of the Draft EIR.

The Final EIR language on page 3-2 has been revised as follows to correct the typo identified by the commenter:
2-89
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
“This EIR considers the potential impacts from buildout of the General Plan in 2045, compared to exiting existing conditions.”
Response 6.52
The commenter states that the discussion under Subsection 4.1.1.a, California Agricultural Resources, in Section 4.1, Agricultural Resources, should be revised to provide details on the County of Santa Barbara and the Santa Maria Valley. The commenter also states that the definition of “Urban and Built-up Land” does not include the definition of urban density of up to 30 units per acre or more. The commenter requests this definition be expanded to include city boundaries and allowed uses.

As described in Subsection 4.1.1.a, California Agricultural Resources, the definitions of “Urban and Built-up Land” used in the Draft EIR are derived from the California Department of Conservation.

The commenter’s requested revisions are inconsistent with how these terms are defined by the California Department of Conservation. As a result, no changes to the Draft EIR are required in response to this comment.

Response 6.53
The commenter states that the acreage totals in Table 4.1-1, Summary of Important Farmland in the Plan Area and Annexation Area, do not seem right. The commenter also states that previously analyzed planning areas, such as Area 5B7, Area 7, Area 9 and the Airport Specific plan, should not be included in this table.

The Draft EIR provides a program-level analysis of potential impacts to agricultural resources across the 2045 General Plan area, consistent with CEQA Guidelines Section 15168 (Program EIRs). Section

4.1, Agricultural Resources, of the Draft EIR includes acreage based on data from the California Department of Conservation. Areas previously evaluated under separate CEQA documents are discussed under Impact AG-1 in Subsection 4.1.3.b, Project Impacts and Mitigation Measures, and their prior determinations are incorporated into the analysis. No changes to the Draft EIR are required in response to this comment
Response 6.54
The commenter states that the Draft EIR should clarify that LAFCo is only responsible for consideration of the annexation areas.

As stated in Section 1.3, Lead, Responsible, and Trustee Agencies, Section 2.9, Required Approvals, and Subsection 4.1.1, Setting, LAFCo’s consideration applies specifically to proposed annexation areas. No changes to the Draft EIR are required in response to this comment.

Response 6.55
The commenter states that Figure 4.1-1 is inaccurate because it does not clearly depict areas that have already been developed or approved, including Area 5B, Area 7, Area 9, the Windset Farms development, and the Airport Specific Plan. The commenter states that the map and associated acreage should exclude land in Orcutt, as this open space is not used for agricultural purposes (i.e., no row crops or grazing). The commenter requests that the figure be revised to reflect previously approved actions by LAFCo and the City.
2-90
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
As discussed in Response 6.53, Figure 4.1‑1 was prepared to support the Draft EIR’s program‑level analysis of potential impacts to agricultural resources throughout the entire plan area, consistent with CEQA Guidelines Section 15168 (Program EIRs). No changes to the Draft EIR are required in response to this comment.

Response 6.56
The commenter requests the City add Agricultural Preserve contract numbers and expiration dates to Figure 4.1-2 and remove the “Williamson Act Enrollment 2023” note from the legend.

Figure 4.1-2, Williamson Act Lands in the Plan Area, in Subsection 4.1.1.b, Plan Area Agricultural Resources, reflects the most current available data from the California Department of Conservation.

The “Williamson Act Enrollment 2023” note corresponds to the yellow shaded lots on the map.

These shaded lots represent three lots currently under Williamson Act Contracts in the 2045 General Plan area, the “Nonrenewal” status indicates that the three lots do not have pending renewals of their Williamson Act Contracts. The Agricultural Preserve contract numbers and expiration dates for these three lots are included in Subsection 4.1.1.b, Plan Area Agricultural Resources. These Williamson Contracts are further discussed under Impact AG-1, in Subsection

4.1.3.b, Project Impacts and Mitigation Measures. This analysis also includes the Agricultural Preserve contract numbers and expiration dates for the three lots identified in Figure 4.1-2. No changes to the Draft EIR are required in response to this comment.

Response 6.57
The commenter suggests deleting content relating to “Regional Farmland Trends” from page 4.1-5 of the draft EIR as they believe it is not applicable to the project or the Santa Maria Valley.

The discussion is consistent with CEQA Guidelines Section 15125. C, Contents of Environmental Reports, which describes the knowledge of the regional setting as critical to the assessment of environmental impacts. While the commenter is correct that the information provided within the regional setting discussion on page 4.1-5, under Section 4.1, Agricultural Resources, in Subsection

4.1.1.b, Plan Area Agricultural Resources, may not directly relate to the plan area, the discussion on the regional setting is important to the overall environmental analysis and appropriately included per CEQA Guidelines Section 15125. No changes to the Draft EIR are required in response to this comment.

Response 6.58
The commenter states that Table 4.1-2 should be formatted to fit on one page. The commenter states that there has not been a loss of agricultural land since the annexations of the City of Santa Maria in 1993 and the 200 acres in the City of Guadalupe in 1995. The commenter states that the discussion under the Regional Farmland Trends heading on page 4.1-5 of the Draft EIR should refer to the history of the planning in the Santa Maria Valley over the last 30 years. The commenter requests that the City revise the whole section.

The comment related to the format of Table 4.1-2 does not pertain to the environmental analysis presented in the Draft EIR. The commenter’s knowledge of the loss of agricultural land in the City of Santa Maria and the City of Guadalupe is acknowledged. As discussed in Response 6.57, the regional setting discussion in Subsection 4.1.1.b, Plan Area Agricultural Resources, does not cover the changes in planning within the city over the last 30 years because the discussion focuses on regional 2-91
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
setting information. Specific plan area setting information can be found in Subsection 4.1.1, Setting.

No changes to the Draft EIR are required in response to this comment.

Response 6.59
The commenter requests that the City add a note to the discussion under the City of Santa Maria Uniform Rules for Agricultural Preserves discussion on page 4.1-8 that there are no agricultural preserves in the city of Santa Maria.

The discussion that the commenter is referring to can be found in Subsection 4.1.2.c, Local Regulations. The purpose of this discussion is to describe the local regulations that are applicable to the project, including the City of Santa Maria Uniform Rules for Agricultural Preserves. The information the commenter is requesting is provided on Figure 4.1-2, Williamson Act Lands in the Plan Area, as well as in Subsection 4.1.1.b, Plan Area Agricultural Resources, and under Impact AG-1, in Section 4.1, Agricultural Resources. As the Draft EIR acknowledges that there are no agricultural preserves within the city of Santa Maria, no changes to the Draft EIR are required in response to this comment.

Response 6.60
The commenter states that there are not 5,116 acres of ag land in the plan area and that the analysis within Impact AG-1 should be based on the annexation area exclusively. The commenter asks where there are nine acres of grazing land, and if that grazing land is located in the annexation area.

The acreage of grazing land in the city is shown in Table 4.1-1, Summary of Important Farmland in the Plan Area and Annexation Area, and Figure 4.1-1, Important Farmland in the Plan Area, in Section 4.1, Agricultural Resources. The approximately nine acres of the annexation area are listed as Farmland of Local Importance. The data shown in these locations are based on data from the California Department of Conservation’s Farmland Mapping & Monitoring Program. As discussed in Response 6.18, this Draft EIR includes environmental analysis of the whole plan area, consistent with CEQA Guidelines Section 15168 (Program EIRs). As shown in Figure 4.1-1, Important Farmland in the Plan Area and Annexation Area, Grazing Land is represented by a light tan color, which appears in the southern portion of the city as well as the southern portion of the Sphere of Influence. No changes to the Draft EIR are required in response to this comment.

Response 6.61
The commenter states that the analysis under Impact AG-1 should mention that agricultural land within the City of Santa Maria had been previously approved under other EIRs for urban development with Statements of Overriding Consideration. They also state that the second and third paragraphs under Impact AG-1 should be combined into one paragraph.

The analysis under Impact AG-1 in Section 4.1, Agricultural Resources, acknowledges that areas identified as important farmland within the city were previously evaluated and approved for conversion of agricultural resources to non‑agricultural uses under prior EIRs. The impact analysis also references the Statement of Overriding Considerations adopted by the City Council on September 15, 1994, for the EIR prepared for the City’s Sphere of Influence Expansion (SCH#90010930), which documented the conversion of agricultural resources to non‑agricultural uses.
2-92
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
For a discussion of comments, recommendations, and requests that do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis, refer to Response 6.9. No changes to the Draft EIR are required in response to this comment.

Response 6.62
The commenter states that the reference to the Greenbelt and Urban buffer within the impact analysis for Impact AG-1 is important because it has been the guiding planning tool for the city over the last 30 years. They also state this buffer will be adjusted in the new Sphere of Influence and annexation area.

The comment does not request a change to the Draft EIR. The City’s Greenbelt and Urban Buffer ordinance is discussed under Impact AG-1 in Section 4.1, Agricultural Resources. As discussed in the impact discussion, potential impacts to agricultural resources within the areas immediately adjacent to the Area 9 Specific Plan area were determined to be less than significant as impacts would be offset by the establishment of the Greenbelt and Urban Buffer. The project does not include specific amendments to the City's Greenbelt and Urban Buffer. No changes to the Draft EIR are required in response to this comment.

Response 6.63
The commenter requests changes to the 2045 General Plan Goal COS-2, Action COS 2.1.2 and Policy LU-1.2.

For a discussion of recommended changes to the General Plan Update policy framework, refer to Response 6.16. This comment is regarding policy language included within the 2045 General Plan Update that does not pertain to the analysis presented within the Draft EIR. Comments related to the 2045 General Plan Update are noted and will be passed on to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response to this comment.

Response 6.64
The commenter states that Figure 4.1-3 does not have a relationship with the proposed annexation and should be deleted. The commenter also states that the map shows incorrect land use designations and should include each of the Area numbers. The commenter ask specifically about the inclusion of Area 7 and the SMAP. They suggest either showing all the planning areas in the city or deleting the map.

In response to this comment, Figure 4.1-3, Previously Evaluated Land Use Changes, within Section

4.1, Agricultural Resources, has been deleted from the Final EIR.

In addition, the following revisions have been made to the discussion of Impact AG-1:

The California Department of Conservation currently lists several sites within the city as either Grazing Land, Prime Farmland, or Unique Farmland. However, these sites, shown as important farmland in Figure 4.1-3, have previously undergone environmental review for the conversion of agricultural land.
2-93
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.65
The commenter requests revisions to General Plan Update policies, including changes to Policies LU9.2, LU-9.3, and LU-9.4, as well as deletion of Policy LU-9.2.

For a discussion of recommended changes to the General Plan Update policy framework, refer to Response 6.16. Changes to Policy LU-9.3 in the 2045 General Plan Update have been carried over into the Final EIR, as appropriate. This comment is regarding policy language included within the 2045 General Plan Update that does not pertain to the analysis presented within the Draft EIR.

Comments related to the 2045 General Plan Update are noted and will be passed on to decisionmakers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response to this comment.

Response 6.66
The commenter requests specific edits to the “Significance After Mitigation” discussion on page 4.1- 13 of the Draft EIR. They request that the discussion state that the proposed Sphere of Influence expansion and annexation would convert agricultural land to urban uses. They also request deletion of the first sentence of the paragraph and inclusion of language stating that the City will plan land uses to incorporate a “Greenbelt and Urban Buffer” to respect surrounding agricultural lands outside the city.

The conversion of agricultural land to urban uses is discussed in Section 4.1, Agricultural Resources, Subsection 4.1.3.b, Project Impacts and Mitigation Measures. As discussed therein, implementation of the 2045 General Plan Update would allow for future conversion of Important Farmland and conflicts with agricultural zoning in the annexation area. The Draft EIR concludes this impact would be significant and unavoidable. Policies included in the 2045 General Plan Update would reduce potential adverse impacts related to the conversion of Important Farmland and Williamson Act contract lands in the annexation area to the extent feasible through preservation efforts and by requiring conservation easements. Refer to Response 6.62 for a discussion of comments related to “Greenbelt and Urban Buffer”. No changes to the Draft EIR are required in response to this comment.

Response 6.67
The commenter requests the first sentence of paragraph three on page 4.1-14 of the Draft EIR be changed from:
“Since the mid-20th century, the Santa Maria region has experienced steady urban expansion resulting in Important Farmland being incrementally converted to residential, commercial, and industrial uses (DOC 2015).”
to:
“The Santa Maria valley has over 180,000 (?) acres of prime land and an additional 100,000 (?) acres of non-prime and grazing lands. 30 years ago, the city of Santa Maria and Guadalupe annexed lands and there has been no annexations since. The city of Santa Maria annexed 2,000 acres and Guadalupe annexed 200 acres to provide land for the growth of these two cities. This is less than 1 % of the ag land in the valley.”
2-94
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The commenter states it is important to emphasize the efforts by the City, County, and LAFCo over the past 30 years to plan growth while protecting agriculture and asserts that now is the time to allow another small annexation for future growth. The commenter also states that most of the current paragraph is incorrect and needs revision.

The language presented in Subsection 4.1.a, Cumulative Impacts, in Section 4.1, Agricultural Resources, describes the potential cumulative impacts to agricultural resources due to implementation of the 2045 General Plan Update. The Draft EIR is intended to evaluate potential environmental impacts and does not advocate for or against approval of the 2045 General Plan Update. The commenter’s recommended revision would introduce language intended to justify annexation and emphasize policy efforts, which is outside of the scope of the Draft EIR. The commenter does not identify specific factual inaccuracies or provide evidence requiring correction.

Therefore, no changes are required in response to this comment.

Response 6.68
The commenter states that the first 14 pages of Section 4.2, Air Quality and Greenhouse Gas Emissions, are routine information in every EIR. the commenter recommends that Table 4.2-4, Ambient Air Quality Data, be shifted to the following page so the table is on one page opposed to being split between two pages.

The commenter is correct that the first 14 pages of Section 4.2, Air Quality and Greenhouse Gas, provide readers with context of the surrounding area, applicable regulatory setting, and an explanation for how air quality is quantified and evaluated. Refer to Response 6.9 for a discussion of editorial edits, such as reformatting Table 4.2-4, Ambient Air Quality Data.

Response 6.69
The commenter questions the accuracy of the first sentence regarding the Earth’s surface temperature and suggests including global population growth over the last 200 years.

The commenter is referring to the first sentence in the second paragraph of Subsection 4.2.1.a, Air Quality Setting. The statement that the Earth’s surface would be approximately 33 degrees Celsius cooler without greenhouse gases is supported by the World Meteorological Organization (2013), as cited in the Draft EIR. Global population trends are not relevant to this project and need not be discussed in this Draft EIR. No changes to the Draft EIR are required in response to this comment.

Response 6.70
The commenter states that the discussion under the heading “California GHG Emissions Inventory” on page 4.2-9 in Section 4.2, Air Quality and Greenhouse Gas, subsection 4.2.1.a, Air Quality Setting, should include a table provided by the California Air Resources Board (CARB) illustrating GHG levels beginning in 1990, which exceeded 500 million metric tons (MMT). The commenter notes that the State’s goal is to reduce GHG emissions by 40 percent by 2030 and that the requested table would illustrate the extent of reductions achieved to date. The commenter states these reductions have resulted from measures such as vehicle modifications, decreased oil production activities, and building code requirements. The commenter requests that this information be added to the paragraph under the “California GHG Emissions Inventory” heading.

Pursuant to Table 2, Greenhouse Gas Emissions by Sector in 1990, of the Staff Report for the California 1990 Greenhouse Gas Emissions Level and 2020 Emissions Limit, the total GHG emissions 2-95
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
in 1990 were 433 MMT CO₂e. This value does not exceed 500 MMT as suggested by the commenter.

The information provided by the commenter has no bearing on the analysis or conclusions of the Draft EIR, and therefore no changes are required in response to this comment.

Response 6.71
The commenter requests that all references to “1990 GHG levels” under the “California Global Warming Solutions Act of 2006 (Assembly Bill 32, and Senate Bill 32, and Assembly Bill 1279)” heading on page 4.2-14 in Section 4.2, Air Quality and Greenhouse Gas, Subsection 4.2.2.b, State Regulations, include the specific value of over 500 MMT to illustrate the State’s progress toward reduction goals.

Refer to Response 6.70 for a discussion of 1990 GHG emission levels.

Response 6.72
The commenter requests inclusion of 2013 baseline levels and current levels for each Senate Bill 1383 target, and states that the City has adopted organic waste collection in compliance with the law.

The level of detail provided on state regulations in Subsection 4.2.2.b, State Regulations, describes applicable state regulations for a programmatic analysis of the 2045 General Plan Update.

Additional details regarding organic waste collection goals are provided in Section 4.8, Utilities and Service Systems. No changes to the Draft EIR are required in response to this comment.

Response 6.73
The commenter suggests referencing the upcoming 2026 Building Code and its anticipated energy efficiency requirements.

The discussion under the “California Building Standards Code” heading in Subsection 4.2.2.b, State Regulations, explains the purpose and evolution of Title 24 standards, including the CALGreen Code and the recently adopted 2022 Energy Code. These standards are periodically updated to incorporate new technologies and methods that improve energy efficiency and reduce greenhouse gas emissions. Future updates, such as the 2026 Building Code, will be implemented through the City’s building permit process and are expected to further reduce GHG emissions. Future development facilitated by the 2045 General Plan Update would be required to comply with the most current California Building Code. No changes to the Draft EIR are required in response to this comment.

Response 6.74
The commenter states that the discussion under the “City of Santa Maria” heading at the bottom of page 4.2-17, in Section 4.2, Air Quality and Greenhouse Gas, Subsection 4.2.2.a, Local Regulations, implies all future projects in the City of Santa Maria will require greenhouse gas and air quality analyses, which they believe would be costly. The commenter questions why the City did not include GHG thresholds in the General Plan Update and asserts that infill projects should be considered GHGreducing and exempt from further studies. The commenter also notes that most housing projects will be exempt from CEQA under state law and requests that this clarification be added to the paragraph.

Refer to Response 6.8 for a discussion of individual projects requiring environmental review. 2-96
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.75
The commenter questions the assumptions used in Table 4.2-5, CalEEMod Land Use Assumptions, and states the land use inputs do not reflect realistic development patterns.

Table 4.2-5, CalEEMod Land Use Assumptions, included in Subsection 4.2.3, Impact Analysis, summarizes CalEEMod inputs based on net changes in land use under the 2045 General Plan Update. The assumptions that inform these inputs are based on the buildout information included in Subsection 2.6.5, Proposed 2045 General Plan Buildout, and are intended to support a conservative program-level emissions estimate, not to predict specific development outcomes.

Additional details regarding the land use assumptions reflected in Table 4.2-5 are provided in Subsection 2.6.5, Proposed 2045 General Plan Buildout, of Chapter 2, Project Description. Table 4.2- 5 in Section 4.2, Air Quality and Greenhouse Gas Emissions, has been revised to correct the transposition of 1,021 to 1,012, consistent with Subsection 2.6.5, Proposed 2045 General Plan Buildout:

Land Use Categories New Uses Reduction in Uses
Residential +16,140 units –
Mixed-Use (assumed to be office uses in CalEEMod) +452 ac – Industrial +7 ac –
Recreational Parks +33 ac –
Planned Future Development (assumed to be office uses in CalEEMod) +1,021 1,012 ac – Commercial – -463 ac
N/A = not applicable; ac = acres
Response 6.76
The commenter states that the assumptions used in CalEEMod are outdated because the building code has been updated multiple times since 2019 and will be updated again in 2026. They note that these updates continue to improve energy efficiency in building and housing construction.

The commenter is correct that the CalEEMod assumptions incorporate the 2019 Building Energy Efficiency Standards (Title 24). CalEEMod is an emissions estimation model developed and periodically updated by the California Air Pollution Control Officers Association. The most recent iteration of the model (Version 2022.1.0.14) used for the purposes of this analysis utilizes the 2019 California Building Code (CBC). It is not known when CalEEMod will be updated to incorporate the 2025 CBC. As stated in Subsection 4.2.3, Impact Analysis, the CalEEMod outputs represent a conservative assumption as the estimates do not account for additional energy efficiency improvements required by the 2022 Title 24 update or anticipated future updates, such as the 2025 standards. Using a conservative assumption is appropriate for a program EIR because there is insufficient detail to conduct project-level analysis, and attempting to do so would be inappropriately speculative. No changes to the Draft EIR are required in response to this comment.

Response 6.77
The commenter states that the VMT assumptions in Table 4.2-6 are incorrect and recommends referencing SBCAG’s January 2025 zero emission vehicle report. The commenter also asserts that VMT assumptions should reflect future conditions rather than past data. 2-97
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The VMT assumptions in Table 4.2-6, Plan 2045 VMT, in Subsection 4.2.3, Impact Analysis, are based on the Santa Maria Travel Demand Model prepared by GHD in June 2025 to support the Draft EIR.

Annual VMT was estimated by multiplying daily VMT per household and per employee by projected increases in residential units and employment and then applying it to 365 days per year. This approach represents a conservative assumption because it applies daily VMT rates uniformly across all days of the year without accounting for reduced travel on weekends or holidays. Consistent with CEQA Guidelines Section 15168, a conservative approach is appropriate for a program EIR because there is insufficient detail to conduct project-level analysis, and attempting to do so would be inappropriately speculative.

SBCAG did not produce a Zero-Emission Vehicle (ZEV) Report in 2025; however, the California Energy Commission released a Zero-Emission Resilient Transportation Blueprint report which was prepared by CALSTART. While the California Energy Commission’s Santa Barbara Zero-Emission Resilient Transportation Blueprint may provide useful context on future electrification and resiliency strategies, its inclusion in this EIR would not alter the methodology or assumptions used in this analysis. Incorporating it as a reference would not change the conclusions of the Draft EIR as the analysis must rely on existing, verifiable data rather than speculative projections about future technology adoption or behavioral changes. No changes to the Draft EIR are required in response to this comment.

Response 6.78
The commenter states that the City has not completed a review to establish GHG thresholds and questions why this has not been completed. They also ask if every project in the future is going to have to complete a GHG analysis. The commenter states that most housing projects are now exempt from CEQA and will continue to be exempt in the future, and requests that this information be included in the paragraph.

This comment regarding the City’s GHG threshold review does not pertain to the Draft EIR’s environmental analysis. Citywide GHG thresholds, though not included as part of the 2045 General Plan Update, are proposed to be established by Action COS-1.1.1 in Conservation and Open Space Element of the 2045 General Plan Update. Refer to Response 6.8 for a discussion regarding future individual projects requiring environmental review. No changes to the Draft EIR are required in response to this comment.

Response 6.79
The commenter requests changes to the 2045 General Plan Action COS-5.1.3 and also requests that any updates to the Conservation and Open Space Element are also made in the EIR for consistency.

In response to this comment, Action COS-5.1.3 was revised in the 2045 General Plan Update to remove mention of the Santa Barbara County Congestion Management Program and revisions have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

Response 6.80
The commenter states that Table 4.2-5 and Table 4.2-6 need to be recalculated because many of the buildout assumptions are incorrect. They assert that by 2045-2050, air quality impacts will be substantially reduced and that the Table 4.2-7 should average impacts over the next 20–25 years as 2-98
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
development occurs. The commenter also notes that the table does not indicate it assumes full buildout impacts in 2045 and requests that the table be corrected based on a new CalEEMod run.

Refer to Response 6.75 for a discussion regarding Table 4.2-5, CalEEMod Land Use Assumptions, in Subsection 4.2.3, Impact Analysis. Refer to Response 6.77 for a discussion regarding Table 4.2-6, Plan 2045 VMT. Table 4.2-7, Estimated Operational Emissions, was prepared using the same methodology and assumptions as the other two tables to ensure consistency throughout the Draft EIR. The analysis appropriately assumes full buildout conditions for 2045, consistent with CEQA Guidelines Section 15168, which governs program-level EIRs. Furthermore, CEQA Guidelines Section 15125(a)(3) requires an existing conditions baseline to not include hypothetical conditions.

Accordingly, emissions are representative of the full buildout of the 2045 General Plan Update compared to existing buildout. No changes to the Draft EIR are required in response to this comment.

Response 6.81
The commenter states that the first sentence under the operations discussion for Impact AQGHG-2 on page 4.2-25 should be deleted. They state that the Draft EIR already concludes there will be a significant impact and a statement of overriding considerations has been adopted, therefore requiring future projects to conduct air quality and GHG studies would be unnecessary and costly.

The commenter again states that many housing projects will be exempt from CEQA and requests that this be clarified. The commenter further asserts that, without adopted thresholds, requiring such studies is inefficient and recommends deleting mitigation measure AQGHG-2, stating that standard air quality and GHG measures are already addressed through building codes.

As analyzed Subsection 4.2.3, Impact Analysis, operational impacts from implementation of the 2045 General Plan Update would generate long term regional air pollutant emissions and concludes that operational air quality and greenhouse gas impacts would be significant and unavoidable. Refer to Responses 6.85 and 6.86 for a discussion regarding modeling assumptions and lack of projectspecific details. As such, the Draft EIR concluded operational impacts would be significant and unavoidable as future individual projects may still exceed SBCAPCD thresholds. It is important to note that a statement of overriding considerations has not yet been adopted for this Draft EIR and if a statement of overriding considerations were to be adopted, it would be done so by the City Council.

Mitigation Measure AQGHG-2 is included to reduce the severity of operational impacts to the extent feasible, consistent with CEQA Guidelines Section 15126.4(a)(1), which requires lead agencies to adopt feasible mitigation measures that minimize significant environmental effects, even if those effects cannot be completely avoided. In response to this comment, Mitigation Measure AQGHG-2 has been revised as follows:

AQGHG-2 Project-Level Air Quality Analysis and Mitigation The City shall require, where it is determined as necessary, applicants for future discretionary development projects facilitated by the 2045 General Plan Update to prepare a project-specific air quality analysis in accordance with SBCAPCD Environmental Review Guidelines. The analysis shall quantify construction and operational emissions and compare estimated emissions to the SBCAPCD’s adopted thresholds of significance for criteria air pollutants. If the analysis determines that emissions would exceed any of the applicable thresholds, the project applicant 2-99
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
shall implement all feasible mitigation measures to reduce emissions to below the thresholds.

All mitigation measures shall be documented and verified by the lead agency prior to project approval or issuance of grading/building permits.

Refer to Response 6.8 for a discussion of future environmental review for individual projects. No changes to the Draft EIR are required in response to this comment.

Response 6.82
The commenter suggests deleting or revising the “Significance After Mitigation” discussion following Mitigation Measure AQGHG-2. They state additional air quality and GHG studies based on this Programmatic EIR analysis that has already run CalEEMod on the proposed full build out should not be required.

The Significance After Mitigation discussion in Subsection 4.2.3, Impact Analysis, summarizes potential air quality and GHG impacts of the 2045 General Plan after mitigation. Refer to Response

6.8 for a discussion of potential future environmental review for individual projects. Refer to Response 6.81 for a discussion of the applicability of Mitigation Measure AQGHG-2. No changes to the Draft EIR are required in response to this comment.

Response 6.83
The commenter requests revising the discussion of construction-related activities under Impact AQGHG-3 to include that state law will soon require most construction equipment to be electric or hybrid, and that most diesel equipment will be retired.

Refer to Response 4.3 for a discussion of changes related to construction equipment in Mitigation Measure AQGHG-3. The analysis under Impact AQGHG-3 in Subsection 4.2.3, Impact Analysis, estimates potential construction-related emissions and associated health risks based on current conditions and regulatory requirements. Although the commenter is correct that state law may change in the future, the analysis in this EIR uses a conservative assumption based on existing environmental and regulatory conditions. This approach is standard for a program-level EIR because specific details of future projects are unknown, and predicting future equipment types or regulatory changes would be inappropriate speculative. No changes to the Draft EIR are required in response to this comment.

Response 6.84
The commenter suggests Mitigation Measure AQGHG-3 be reviewed by local contractors to receive their opinion on its relevance, and to delete the mitigation measure if it is no longer relevant.

Mitigation Measure AQGHG-3, Construction Equipment Exhaust Control Measures, in Subsection

4.2.3, Impact Analysis, remains relevant because it provides a feasible mechanism to reduce diesel particulate matter emissions from heavy-duty off-road equipment during construction near sensitive receptors. While future state regulations may reduce the use of diesel equipment, the timing and availability of compliant equipment cannot be guaranteed for all projects over the planning horizon. This measure ensures that, where commercially available, Tier 3 or higher engines or CARB-certified Level 3 diesel particulate filters are used.

The Draft EIR was available for public review from August 14, 2025, through September 28, 2025, and the City did not receive any comments from local contractors regarding the relevance or 2-100
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
feasibility of Mitigation Measure AQGHG-3. No changes to the Draft EIR are required in response to this comment.

Response 6.85
The commenter states that the City should have created thresholds of significance for greenhouse gas emissions concurrently with the General Plan update process.

The comment regarding the City’s GHG Thresholds does not pertain to the Draft EIR’s environmental analysis. Refer to Response 6.78 for a discussion of establishment of GHG thresholds for the city.

The commenter’s opinion will be passed on to decision makers for their consideration. No changes to the Draft EIR are required in response to this comment.

Response 6.86
The commenter asks clarification on the baseline of 1990 GHG levels.

Refer to Response 6.70, for a discussion of total GHG emissions in 1990. No changes to the Draft EIR are required in response to this comment.

Response 6.87
The commenter suggests revision of Goal COS-6, encourages the City to be carbon neutral per state law, and suggests GHG levels will be exceeded by full buildout of the General Plan.

In response to this comment, Goal COS-6 has been revised in the 2045 General Plan Update to indicate the City strives to be carbon neutral and revisions have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

The commenter’s recommendation to achieve carbon neutrality by 2045–2050 has been acknowledged, as well as their assertion that GHG levels will be exceeded with full buildout of the General Plan. No changes to the Draft EIR are required in response to this comment.

Response 6.88
The commenter states the City is served by PG&E and not Southern California Edison.

In response to the commenter’s statement, the following corrections have been made in Subsection

4.2.3, Impact Analysis, of the EIR:

Future development would also be served by Southern California Edison Pacific Gas and Electric or Central Coast Community Energy, both of which are required to increase its renewable energy procurement in accordance with SB 100 targets.

Response 6.89
The commenter requests that the instance of Goal COS 6 in Impact AQGHG-5 of Section 4.2, Air Quality and Greenhouse Gas, and subsequent instances are removed as it is previously listed.

Refer to Response 6.9 for a discussion of editorial changes which do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis. No changes to the Draft EIR are required in response to this comment.
2-101
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.90
The commenter suggests the plan consistency discussion on in Subsection 4.2.3, Impact Analysis, of Section 4.2, Air Quality and Greenhouse Gas be revised for clarity and to change the discussion of VMT inconsistency to consistent.

This discussion distinguishes between consistency with relevant regional plans such as SBCAG’s 2050 RTP/SCS and the California Air Resources Board’s (CARB’s) 2022 Scoping Plan, and applicable goals and policies and inconsistency with specific performance targets. CEQA Guidelines Section 15125(d) requires disclosure of both areas of consistency and areas where conflicts remain. The analysis discloses which applicable goals and policies the 2045 General Plan Update would be consistent with and which applicable goals and policies the 2045 General Plan Update may conflict with.

As discussed under Impact TRA-2 of Section 4.7, Transportation and Traffic, Subsection 4.7.3, Impact Analysis, 2045 citywide VMT rates with implementation of the 2045 General Plan Update would not meet the 17 percent VMT reduction target required for consistency with CEQA Guidelines Section 15064.3(b). Though there may be measures to reduce VMT in the future, there are no feasible General Plan policies or mitigation measures that could reduce citywide VMT rates below this target and the applicability of future VMT reduction measures would be speculative. Therefore, this impact would remain significant and unavoidable. No changes to the Draft EIR are required in response to this comment.

Response 6.91
The commenter suggests the first row of Table 4.2-8 be revised to clarify the number of planned residential units in infill locations and annexation areas.

The consistency statement provided in Table 4.2-8, Plan Consistency with the SBCAG 2050 RTP/SCS, in Subsection 4.2.3, Impact Analysis, describes the relationship between the 2045 General Plan Update and Policy 1.1: Land Use of the SBCAG 2050 RTP/SCS. The statement identifies that the plan would facilitate development of 16,140 net new residential units in infill and urbanized areas near services and transit, along with generating 23,750 net new jobs to improve the jobs-housing balance. The additional details requested by the commenter would not affect the determination that the 2045 General Plan Update is consistent with Policy 1.1: Land Use of the SBCAG 2050 RTP/SCS. No changes to the Draft EIR are required in response to this comment.

Response 6.92
The commenter suggests the second row of Table 4.2-8 is revised to make the discussion conclude consistent based on state law. The commenter suggests correcting that PG&E works with 3CE.

The consistency statement provided in Table 4.2-8, Plan Consistency with the SBCAG 2050 RTP/SCS, in Subsection 4.2.3, Impact Analysis, identifies consistency with some components of Policy 1.2, such as compliance with Title 24 and SBCAPCD rules, and inconsistency with others, specifically the potential inability to achieve State goals for carbon neutrality by 2045 as outlined in CARB’s 2022 Scoping Plan and AB 1279. CEQA Guidelines Section 15125(d) requires disclosure of inconsistencies with applicable regional plans, and this analysis fulfills that CEQA Guidelines requirement.

Refer to Response 6.88, for a discussion regarding applicable utility providers in Santa Maria. The following edit has been made to Subsection 4.2.3, Impact Analysis, of the EIR:
2-102
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Inconsistent: Future development facilitated by the plan would be required to comply with the latest Title 24 Green Building Code and Building Efficiency Energy Standards and would also be served by Southern California Edison Pacific Gas and Electric or Central Coast Community Energy, both of which are required to increase its renewable energy procurement in accordance with SB 100 targets.

Response 6.93
The commenter suggests removing the last two sentences of the first paragraph of Page 4.2-33 and suggests the City cannot be held to a 2022 Ozone Plan in 2045.

The sentences referenced by the commenter in Subsection 4.2.3, Impact Analysis, support the EIR’s obligation to disclose potential inconsistencies with currently adopted State and regional plans, including CARB’s 2022 Scoping Plan and SBCAG 2050 RTP/SCS. This disclosure is required under CEQA Guidelines Section 15125(d), which states that an EIR must discuss any inconsistencies between the proposed project and applicable regional plans. The discussion reflects the State’s adopted goal of achieving carbon neutrality by 2045 (AB 1279 and Executive Order B-55-18) and evaluates the plan against those requirements based on information available at the time of EIR preparation. The analysis does not speculate about future amendments and provides transparency regarding current standards. No changes to the Draft EIR are required in response to this comment.

Response 6.94
The commenter suggests that Table 4.2-9 be revised to fit onto one page, opposed to being split between two, and to clarify development will happen throughout the 2045 General Plan Update implementation and will include many air quality measures. The commenter suggests the energy discussion should reflect that the City is part of 3CE. The commenter suggests development will be net zero GHG emissions by 2045.

Refer to Response 6.9 for a discussion of editorial changes which do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

Table 4.2-9 in Subsection 4.2.3, Impact Analysis, presents a conservative estimate of operational GHG emissions based on full buildout conditions and current regulatory requirements. This approach is appropriate for a program-level EIR as specific project details and the timing of future regulatory changes cannot be predicted without speculation. While future development under the 2045 General Plan Update would occur over a 20-year horizon, and would be expected to implement additional air quality and GHG reduction measures, including compliance with SB 100 renewable energy targets and vehicle electrification goals, it would be inappropriately speculative to quantify these measures at this stage of review. Therefore, the table reflects a conservative assumption to ensure disclosure of potential impacts consistent with CEQA Guidelines Section 15144 and Section 15125(d). No changes to the Draft EIR are required in response to this comment.

Response 6.95
The commenter suggests the first two paragraphs on Page 4.2-34 are incorrect as new development will emit net zero GHG emissions by 2045-2050 based on state law.

Refer to Response 6.94 for a discussion of conservative assumption analysis based on current regulatory requirements. No changes to the Draft EIR are required in response to this comment. 2-103
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.96
The commenter suggests the cumulative discussion on Pages 4.2-34 through 4.2-36 be revised to address state requirements to be net zero by GHG. The commenter states it is not appropriate to hold future development to the standards of existing plans. The commenter suggests infill and annexation development will address the requirement to reduce air quality and GHG emissions through the 2045 General Plan Update horizon.

Refer to Responses 6.93 and 6.94 for discussions regarding the comparison of the proposed project’s emissions based on existing regulatory requirements and the appropriateness of comparing the proposed project to existing applicable emissions targets. No changes to the Draft EIR are required in response to this comment.

Response 6.97
The commenter suggests revising paragraph two on Page 4.3-1 to reference prior biological surveys conducted by Rincon and other consultants in the Santa Maria Valley. The commenter states that these reports show very few biological resources in the area due to historic agricultural use.

The paragraph referenced by the commenter, in Subsection 4.3.1, Setting, describes the most up-todate and publicly available information sources used to prepare the environmental setting for Section 4.3, Biological Resources. These sources include federal and State databases such as United States Fish and Wildlife Service Information for Planning and Consultation tool, California Department of Fish and Wildlife California Natural Diversity Database, and National Oceanic and Atmospheric Administration Protected Resources, as well as regional datasets and the City’s Existing Conditions Report. This approach is appropriate for a program-level EIR because it provides comprehensive coverage of sensitive biological resources across the entire plan area. While Rincon has conducted biological surveys in the plan area related to other projects, these surveys were conducted for specific projects and are not relevant to the General Plan Update considered in this EIR. Future development facilitated by the 2045 General Plan Update would be required to conduct site-specific surveys, as necessary, to assess site-specific biological resources at individual project sites. No changes to the Draft EIR are required in response to this comment.

Response 6.98
The commenter suggests the use of the phrase “open space” in the third paragraph on page 4.3-1 is not correct and state the land is agricultural land. They assert that the EIR should clarify that areas such as 5B, 7, 9, and the Santa Maria Public Airport are designated for future residential, commercial, and industrial uses. They also request revising the percentage to show that over 85 percent of this land is designated for urban uses and that the current 29 percent agricultural/open space designation is an interim condition before full development occurs.

The land use designations described in the third paragraph in Subsection 4.3.1.a, Land Cover and Vegetation Communities, are sourced from the General Plan Land Use Classifications table in the City’s Land Use and Community Design Existing Conditions Report (https://www.imaginesantamaria.com/_files/ugd/e3bef4_f63eb5691b0d4fd8bb3a312f68badc5b.pdf).

These designations reflect the most current and up-to-date land use classifications for the plan area and were used to describe existing setting for the biological resources analysis. No changes to the Draft EIR are required in response to this comment.
2-104
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.99
The commenter states that there is very little area with undistributed native habitat and Figure 4.3-1 shows most of this land located south of Orcutt.

As described in Subsection 4.3.1.a, Land Cover and Vegetation Communities, the plan area contains substantial urban and suburban development. However, there are some areas of relatively undisturbed natural habitats. Figure 4.3-1, Vegetation Communities in the Plan Area, corroborates this statement, showing the majority of the plan area containing “Developed-Ruderal-Landscaped” area with only a few occurrences of various natural habitats such as Western Oak Woodland and Savanna and Chaparral in the southern portion of the plan area. No changes to the Draft EIR are required in response to this comment.

Response 6.100
The commenter states that Figure 4.3-1 is incorrect and should be revised to reflect the existing biological conditions of various areas throughout Santa Maria. Specifically, the commenter requests changes to the display of the Santa Maria Cemetery, Santa Maria Landfill, Rivergate Specific Plan Area, Guggia and DeBarnardi property, Santa Maria Airport, Area 9, Area 7, and Area 5B.

In response to this comment, Figure 4.3-1, Vegetation Communities in the Plan Area, located in Subsection 4.3.1.a, Land Cover and Vegetation Communities has been revised in the Final EIR to remove sites that are now under construction or have already been developed and have little to no vegetation on the site.

Response 6.101
The commenter suggests that the last two sentences of paragraph one and paragraph three on page

4.3-3 be removed. The commenter states the California Department of Fish and Wildlife (CDFW) description is not an accurate reflection of the Santa Maria Valley. The commenter further states that agricultural operations occur in the plan area.

The language the commenter is referring to in Subsection 4.3.1.a, Land Cover and Vegetation Communities, provides a broad description of regional conditions from CDFW. This level of detail is appropriate for the Draft EIR as it is a programmatic EIR prepared pursuant to CEQA Guidelines Section 15168. Programmatic EIRs are intended to evaluate impacts on a plan-wide scale rather than provide site-specific detail. A generalized description provides consistency across the analysis and avoids unnecessary speculation about localized variations.

The environmental setting of agricultural operations in the plan area is described in the “Agricultural – Field and Row Crops” portion of the setting discussion, which explains the predominance of cultivated lands and why biological resources are generally limited in these areas. Agricultural lands typically lack native vegetation and provide minimal habitat value due to ongoing disturbance and crop management practices. This context supports the conclusion that the existing language is sufficient for describing biological conditions at the program level. No changes to the Draft EIR are required in response to this comment.

Response 6.102
The commenter suggests removing the fourth paragraph on page 4.3-3, stating barren land does not exist in the Santa Maria Valley.
2-105
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The paragraph in Subsection 4.3.1.a, Land Cover and Vegetation Communities, referred to by the commenter, provides a general description of what “barren land” describes. Barren land exists in the plan area as not all agricultural land is viable. Barren lands are discussed in Subsection 4.3.1a, Barren Lands, and are defined as habitat that is characterized by an absence of vegetation and includes any habitat with less than two percent total vegetation cover by herbaceous, desert, or non-wildland species and less than 10 percent cover by shrub or tree species. Barren lands include urban areas categorized as developed, ruderal, and landscaped and in agricultural areas, includes disked or plowed agricultural fields. No changes to the Draft EIR are required in response to this comment.

Response 6.103
The commenter suggests removing paragraph five on page 4.3-3 and asserts the information is not applicable to Santa Maria.

The commenter is referring to the discussion of evergreen orchards in Subsection 4.3.1.a, Land Cover and Vegetation Communities. Evergreen orchards exist in the Santa Maria River Valley in the plan area. Evergreen orchards as defined in the Draft EIR and by CDFW are orchards typically dominated by a single species of tree, such as almonds, apples, apricots, peaches, pecans, and walnuts for deciduous orchards and avocados, grapefruit, lemons, limes, olives, oranges, and tangerines for evergreen orchards. Agricultural – Orchard is identified on Figure 4.3-1, Vegetation Communities in the Plan Area, and is shown to occur in various parts of the city. No changes to the Draft EIR are required in response to this comment.

Response 6.104
The commenter asks to clarify paragraph two on page 4.3-4 the location of Pine/Cypress habitat.

The California Mixed Evergreen Forest and Woodland habitats in the plan area are identified as Agricultural – Vineyard and Bush Fruit on Figure 4.3-1, Vegetation Communities in the Plan Area, located in Subsection 4.3.1.a, Land Cover and Vegetation Communities, and is shown to occur in the western and southwestern portions of the city. No changes to the Draft EIR are required in response to this comment.

Response 6.105
The commenter suggests removing paragraphs four and five on page 4.3-4 and asserts the information is not applicable to Santa Maria.

The Chaparral habitat in the plan area are identified as Agricultural – Vineyard and Bush Fruit on Figure 4.3-1, Vegetation Communities in the Plan Area, located in Subsection 4.3.1.a, Land Cover and Vegetation Communities, and is shown to occur in the southern portion of the city. No changes to the Draft EIR are required in response to this comment.

Response 6.106
The commenter suggests removing the word ruderal from paragraph two of page 4.3-5. “Ruderal” describes areas where plants grow on ground disturbed by human activity. This term is defined in in Subsection 4.3.1.a, Land Cover and Vegetation Communities. Ruderal areas occur in the plan area and are therefore relevant to the Draft EIR. No changes to the Draft EIR are required in response to this comment.
2-106
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.107
The commenter suggests removing paragraph three of page 4.3-5 and asserts the information is not applicable to Santa Maria.

Refer to Response 6.102 for a discussion of barren lands and their presence in the city.

Response 6.108
The commenter suggests minor language changes to paragraph four of page 4.3-5 and states that vernal pools need to be described in this paragraph.

Vernal pools are defined as a type of temporary wetland that support plants and animals that are specifically adapted to living with very wet winter and spring conditions followed by very dry summer and fall conditions. This term is defined in Subsection 4.3.1.a, Land Cover and Vegetation Communities. Vernal pools are defined in the subsequent paragraph following the discussion of wetlands and streams. No revisions to the Draft EIR are required in response to this comment.

Response 6.109
The commenter suggests that Figure 4.3-2 should be corrected to include recent base aerial imagery.

Figure 4.3-2, Wetlands Within the Plan Area, located in Subsection 4.3.1.a, Land Cover and Vegetation Communities, uses the most up to date 2025 base aerial imagery provided by ESRI. No revisions to the Draft EIR are required in response to this comment.

Response 6.110
The commenter states that Figure 4.3-2 should show that Santa Maria Wastewater Treatment Plant and Laguna County Sanitation District discharge ponds are not freshwater ponds and identify basins for flood control recharge.

Based on on-the-ground expertise from the City of Santa Maria, Figure 4.3-2, Wetlands Within the Plan Area, located in Subsection 4.3.1.a, Land Cover and Vegetation Communities, has been updated to remove the “Freshwater Pond” label from the Santa Maria Wastewater plant and LCSD plant discharge ponds. Flood control and recharge basins are discussed in Section 4.8, Utilities and Service Systems.

Response 6.111
The commenter states paragraph two on page 4.3-7 should be deleted and states there are no barren lands in Santa Maria.

Refer to Response 6.102 for a discussion of barren lands and their presence in the city.

Response 6.112
The commenter suggests that the bulleted list on page 4.3-7 should be moved to precede the special status plant species discussion.

In response to the commenter’s statement, Subsection 4.3.1.b, Special Status Species, has been moved from its previous location following the “Barren Lands” paragraph to immediately follow the “Valley Foothill Riparian” paragraph, as shown below:
2-107
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Valley Foothill Riparian
Valley foothill riparian is a native vegetation community that contains mostly winter deciduous trees, such as native cottonwood (Populus spp.), California sycamore (Platanus racemosa), and valley oak (Quercus lobata). The canopy height can grow up to 98 feet in a mature riparian forest. Typical understory shrub layer species include native California blackberry, blue elderberry (Sambucus mexicana), poison oak, and willows (Salix spp.). This vegetation community is found in valleys bordered by sloping alluvial fans, slightly dissected terraces, lower foothills, and coastal plains. They are generally associated with low velocity flows, flood plains, and gentle topography. Valleys provide deep alluvial soils and a high water table. The substrate is coarse, gravelly or rocky soils more or less permanently moist. Valley foothill riparian habitats provide food, water, migration and dispersal corridors, and escape, nesting, and thermal cover for an abundance of wildlife (CDFW 2025a).
b. Special Status Species
For the purposes of this analysis, special-status species were considered listed or non-listed special-status species if they were classified as one or more of the following:
 Listed Special-Status Species
▫ Species listed as threatened or endangered under the Federal Endangered Species Act (FESA), including proposed and candidate species.
▫ Species listed as candidate, threatened, or endangered under the California Endangered Species Act (CESA).
▫ Plant species protected by the Native Plant Protection Act (NPPA) (State Rare).  Non-listed Special-Status Species
▫ Species designated as Fully Protected (FP), Species of Special Concern (SSC), or Watch List (WL) by the CDFW
▫ Birds designated as a Bird of Conservation Concern (BCC) by USFWS ▫ Sensitive species designated by USFWS
▫ Sensitive species designated by the United States Forest Service (USFS) ▫ Plants assigned a California Rare Plant Rank of 1 through 4 by the California Native Plant Society (CNPS)
▫ Species protected under the Bald and Golden Eagle Protection Act ▫ Bats considered by the Western Bat Working Group to be “High” or “Medium” priority ▫ Species designated as locally important by the Local Agency and/or otherwise protected through ordinance, local policy, Habitat Conservation Plans (HCPs), or Natural Community Conservation Plans (NCCPs).

Queries of the USFWS’s IPaC, CNDDB, and CNPS’s online Inventory of Rare and Endangered Plants of California (CRPR) were conducted to obtain comprehensive information regarding special-status species and sensitive vegetation communities known or with potential to occur in the plan area. Queries of the CNPS inventory and CNDDB database included the Santa Maria and Twitchell Dam United States Geological Service (USGS) 7.5-minute topographic quadrangle. The results of these scientific database queries are provided as Appendix B of this Environmental Impact Report (EIR). 2-108
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Special-Status Plant Species
Based on the database queries and literature review, a total of 17 special-status plant species were evaluated for their potential to occur within the plan area (Appendix B). Of these species, 13 were identified with low potential to occur within the plan area.

Appendix B shows the special-status plant species and habitat requirements for each species within the vicinity of the plan area.

Response 6.113
The commenter suggests that the reference to Appendix B in paragraph one on page 4.3-8 be changed to Appendix C.

In response to the commenter’s statement, the following revision has been made to Subsection

4.3.1.b, Special Status Species:

The results of these scientific database queries are provided as Appendix C B of this Environmental Impact Report (EIR).

Response 6.114
The commenter suggests paragraph two on page 4.3-8 is revised to be more specific to the Santa Maria Valley, including the use of grasslands for cattle grazing and California tiger salamander habitat and removing the description of Roosevelt Elk in Santa Maria Valley.

Refer to Response 6.101 for a discussion of the descriptions of regional conditions from CDFW.

Response 6.115
The commenter suggests revising paragraph one on page 4.3-9 to clarify oak woodlands are not located in Santa Maria.

As described on page 12 of the City’s Environmental Existing Conditions Report prepared by the City of Santa Maria in 2020, the Santa Maria River Valley includes oak woodland as a major plant association. The Draft EIR relies on readily available information including the previously prepared Existing Conditions Report to inform the EIR. No changes to the Draft EIR are required in response to this comment.

Response 6.116
The commenter suggests deleting paragraphs two and three on page 4.3-9 and asserts the information is not relevant to the area evaluated in the EIR.

As described on page 12 of the City’s Environmental Existing Conditions Report prepared by the City of Santa Maria in 2020, the Santa Maria River Valley includes riparian scrub as a major plant association. Therefore, the two paragraphs cited by the commenter, which address various types of riparian woodland and shrubland, are applicable to the analysis in this EIR. The Draft EIR relies on readily available information including the previously prepared Existing Conditions Report to inform the EIR. No revisions to the Draft EIR are required in response to this comment. 2-109
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.117
The commenter suggests revising the Appendix B reference on page 4.3-10 to Appendix C. The commenter requests clarification on the area evaluated for special status plant species to occur.

In response to the commenter’s statement, the following revisions have been made in Subsection

4.3.1.b, Special Status Species, of the EIR:

Based on the database queries and literature review, a total of 17 special-status plant species were evaluated for their potential to occur within the plan area (Appendix BC). Of these species, 13 were identified with low potential to occur within the plan area. Appendix BC shows the special-status plant species and habitat requirements for each species within the vicinity of the plan area.

Based on the database queries and literature review, a total of 31 special-status invertebrate, fish, amphibian, reptile, bird, and mammal species were evaluated for their potential to occur within the plan area (Appendix BC). Appendix BC, the Potential to Occur Table, describes habitat suitability for each special‑status species and identifies the distance from the plan area at which each associated habitat type occurs, typically within 2 or 5 miles.

Response 6.118
The commenter states that paragraphs two and three on page 4.3-10 clarify that the potential for the 13 special status plant species to occur in the plan area is very unlikely as infill development has already reduced suitable habitat and the annexation area has been in continuous agricultural production for more than 100 years.

The discussion referred to by the commenter regarding special status species in Subsection 4.3.1.b, Special Status Species, identifies the potential for these special status plant species to occur as low.

While urban infill has contributed to the low potential to occur for special status plant species, the reason for the plant species low potential to occur is not relevant to the potential impacts to these biological resources. No revisions to the Draft EIR are required in response to this comment.

Response 6.119
The commenter states the last two paragraphs on page 4.3-11 should be listed in bullets for clarity.

The commenter provides suggestions regarding the descriptions of habitat for southern vernal pools, steelhead trout, la Graciosa thistle, and California red-legged frog. The commenter also states there is no mention of Lompoc yerba santa.

Subsection 4.3.1.d, Sensitive Communities and Critical Habitat, provides separate headers for sensitive communities and critical habitats to distinguish between the two. The only sensitive community in the plan area, Southern Vernal Pool, is described under the Sensitive Communities header. Critical habitats, including those for steelhead trout, La Graciosa thistle, California red‑legged frog, and Lompoc yerba santa, are described under the Critical Habitat header.

Converting the text from paragraph format to a bullet list would not affect the analysis or conclusions of the Draft EIR. Refer to Response 6.9 for a discussion of editorial changes that do not pertain to the adequacy of the Draft EIR. No revisions to the Draft EIR are required in response to this comment.
2-110
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.120
The commenter states that paragraph three on page 4.3-12 should be deleted. The commenter states that this paragraph is confusing and not relevant to Santa Maria as it references the Sierra Madre and San Rafael Mountains. The commenter suggests Figure 4.3-4 is inaccurate, as Santa Maria may serve as an area of wildlife connectivity but only a portion of the city is identified as Connections with Implementation Flexibility.

The reference to the Sierra Madre and San Rafael Mountains in Subsection 4.3.1.e, Wildlife Movement Corridors, is consistent with the information presented on page 13 of the City’s Environmental Existing Conditions Report, as cited in the EIR. Although the Sierra Madre and San Rafael Mountains lie outside of the plan area, the riverbed is identified as a wildlife movement corridor in Figure 4.3-4, Wildlife Connectivity Within the Plan Area, extends into these ranges.

Figure 4.3-4, Wildlife Connectivity Within the Plan Area, located in Subsection 4.3.2.a, Federal Regulations, uses the most up to date 2025 base aerial imagery provided by ESRI. The plan area does not function entirely as a wildlife movement corridor because it is generally developed; however, as shown in Figure 4.3-4, some rural and undeveloped locations retain potential for habitat connectivity. No revisions to the Draft EIR are required in response to this comment.

Response 6.121
The commenter states that the Clean Water Act discussion on page 4.3-15 needs to discuss the Supreme Court’s decision on Water of the United States.

The Draft EIR does not identify any specific impacts to Waters of the United States. Therefore, discussion of Sackett vs. EPA (May 2023) in which the Supreme Court narrowed the definition of Waters of the United States under the Clean Water Act is not necessary in the Clean Water Act discussion in Subsection 4.3.2.a, Federal Regulations, as it is not relevant or applicable to the analysis in the Draft EIR.

The 2045 General Plan Update has the potential to impact “Waters of the State.” Waters of the State are discussed in Subsection 4.3.2.b, State Regulations, under the “Clean Water Act Section 401, Porter-Cologne Water Quality Control Act” heading. No revisions to the Draft EIR are required in response to this comment.

Response 6.122
The commenter asks if the United States Supreme Court’s decision on Water of the United States has an influence on the definition of Waters of the State.

This comment does not pertain to the analysis in the Draft EIR. However, the 2045 General Plan Update is subject to Section 401 of the Clean Water Act, and any updates or amendments to the Act resulting from the Supreme Court’s decision in Sackett vs. EPA (May 2023) would apply to the General Plan as relevant. Refer to Response 6.121 for a discussion on the rationale for not including a discussion of the Supreme Court’s decision in Sackett vs EPA (May 2023) on the definition of Waters of the United States. No revisions to the Draft EIR are required in response to this comment.

Response 6.123
The commenter states the methodology discussion on page 4.3-20 should be revised to clarify that future infill projects and development in the Planning Area will not have biological impacts or trigger 2-111
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
the need for surveys; the commenter suggests surveys would only be required for areas south of the airport and in the southernmost sections of the Orcutt Sphere of Influence.

Refer to Response 6.8 for a discussion on future individual projects requiring environmental review.

Response 6.124
The commenter suggests revising the Impact BIO-1 Summary to clarify biological impacts would only happen to the southernmost areas of the Orcutt area.

The Impact Summary statement under Impact BIO-1 is intended to provide a brief overview of the overall impact and is not meant to describe the specific locations where impacts may occur. The analysis under Impact BIO‑1 in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, identifies where biological impacts have the potential to occur in the plan area. This analysis specifically discusses grassland, chaparral, riparian, wetland, and oak woodland communities that could serve as habitat for special‑status species. Figure 4.3‑1, Vegetation Communities in the Plan Area, in Subsection 4.3.1.a, Land Cover and Vegetation Communities, illustrates the distribution of these habitat types in the plan area. No revisions to the Draft EIR are required in response to this comment.

Response 6.125
The commenter states the Impact BIO-1 discussion should clarify that special status species only occur in the southernmost areas of the Orcutt area. The commenter also states there is no incremental loss of habitat, fragmentation of open areas, or loss of wildlife corridors.

Grassland, chaparral, riparian, wetland, and oak woodland communities can serve as habitat for special‑status species. These vegetation communities are shown in Figure 4.3‑1, Vegetation Communities in the Plan Area, in Subsection 4.3.1.a, Land Cover and Vegetation Communities. While incremental habitat loss, fragmentation of open space, or disruption of wildlife corridors may not be occurring at present, such impacts could occur with implementation of the 2045 General Plan Update. Pursuant to CEQA Guidelines Section 15126.2(a), the EIR identifies all potentially significant environmental effects of a proposed project, including those related to biological resources. No revisions to the Draft EIR are required in response to this comment.

Response 6.126
The commenter states that Policy COS-1.1 should be deleted as it is infeasible and inconsistent with infill development and the annexation areas.

Policy COS‑1.1 is proposed as part of the 2045 General Plan Update. Therefore, removing its reference from the Draft EIR would not change its applicability to future development facilitated by the 2045 General Plan Update. In addition, the policy is relevant to the analysis under Impact BIO‑1 because it seeks to protect and expand natural habitat, wildlife corridors, natural wetlands, and other natural lands throughout the city and its Sphere of Influence. No revisions to the Draft EIR are required in response to this comment.

Response 6.127
The commenter states that Policy COS-1.3 should be revised to state the only place for planting biodiversity species is in City parks.
2-112
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
This comment does not pertain to the to the environmental analysis presented in the Draft EIR.

Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.128
The commenter states the Impact BIO-1 discussion should be revised to indicate the 13 special status plant species are not located in the City, Sphere of Influence, or annexation area.

Refer to Response 6.118 for a discussion of the location of special status plant species in the plan area.

Response 6.129
The commenter states that the second paragraph of the Impact BIO-1 discussion should be deleted since none of the special status plant species mentioned are located in Santa Maria.

As documented in Appendix C, Potential to Occur Table, either suitable habitat for 13 special status plant species exists in or near the plan area, or there have been recorded occurrences of these species in the plan area. Although the likelihood of these species occurring in the plan area is low, it is not zero. Because the potential to occur cannot be entirely ruled out, a potentially significant impact must still be disclosed and evaluated in the Draft EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.130
The commenter states that the Special-Status Wildlife species discussion in Impact BIO-1 clarifies that no wildlife species are found in Santa Maria or the annexation area, and no additional biological studies are needed in these areas.

Refer to Responses 6.124 and 6.125 for a discussion on where special‑status species may occur in the plan area. Refer to Response 6.8 for a discussion on future individual projects requiring environmental review.

Response 6.131
The commenter asks what the “Plan Area” is for reptiles. They also suggest revising the reptiles discussion in Impact BIO-1 to a no significant impact conclusion based on the idea that no species have been found in Santa Maria or the annexation area.

The “Plan Area” is defined in Subsection 2.3.1, Regional Location. It is defined as all land in the Santa Maria Sphere of Influence and includes the annexation of areas east of the city limits. Similar to the discussion in Response 6.129, although the likelihood of special status reptiles to occur in the plan area is low, it is not zero. Therefore, a potentially significant impact must be disclosed and evaluated in the Draft EIR. No revisions to the Draft EIR are required in response to this comment. 2-113
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.132
The commenter states the Mammals discussion in Impact BIO-1 is not relevant as there are no known bat colonies or badger dens in Santa Maria or the annexation area.

As disclosed in Appendix C, Potential to Occur Table, both pallid bat and American badger habitat exists in the plan area and there are recorded occurrences of these species within five miles of the plan area. As potential development facilitated by the 2045 General Plan Update could result in permanent loss of suitable habitat, significant impacts to special status mammals cannot be ruled out. No revisions to the Draft EIR are required in response to this comment.

Response 6.133
The commenter states the Invertebrates discussion in Impact BIO-1 should be revised to state none of the described invertebrates have been identified in Santa Maria or the annexation area.

As disclosed in Appendix C, Potential to Occur Table, there are recorded occurrences of vernal pool fairy shrimp and monarch butterflies within five miles of the plan area and suitable habitat for both species exist in the plan area. This information indicates these special status invertebrates have the potential to occur in the plan area and could therefore be impacted by potential development facilitated by the 2045 General Plan Update. No revisions to the Draft EIR are required in response to this comment.

Response 6.134
The commenter states the Birds discussion in Impact BIO-1 should be revised to remove the paragraph referencing burrowing owls claiming none have been identified in Santa Maria or the annexation area.

As disclosed in Appendix C, Potential to Occur Table, there are recorded occurrences of burrowing owls within five miles of the plan area and suitable habitat for them to exist in the plan area. This information indicates this special status bird has the potential to occur in the plan area and could therefore be impacted by potential development facilitated by the 2045 General Plan Update. No revisions to the Draft EIR are required in response to this comment.

Response 6.135
The commenter states the Amphibians discussion in Impact BIO-1 should be revised to clarify none of the described amphibians are located in the Santa Maria infill sites or the annexation area, and no additional studies are needed for these areas.

Refer to Response 6.8 for a discussion on future individual projects requiring environmental review.

Response 6.136
The commenter states that Mitigation Measure BIO-1(a) should be reduced to only focus on Santa Maria claiming it is not applicable to infill development or the annexation area. The commenter states most infill projects will be exempt from environmental review and the City should make clear there would be no need for most future biological studies.

Mitigation Measure BIO-1(a), in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, provides flexibility by stating that a Biological Resources Screening and Assessment is required only 2-114
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
“if determined necessary based on preliminary review conducted by City staff.” As such, the measure does not automatically require all future projects to prepare such an assessment; rather, it allows City staff to exempt projects when appropriate. No revisions to the Draft EIR are required in response to this comment.

Response 6.137
The commenter states that Mitigation Measure BIO-1(b) should be deleted or be revised to only apply to the southern area of Orcutt as no special-status plants are in Santa Maria or the annexation area.

Mitigation Measure BIO‑1(b) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, applies to development facilitated by the 2045 General Plan Update. Mitigation Measure BIO-1(b) would be required only if the Biological Resources Screening Assessment (if required under Mitigation Measure BIO-1[a]) determines that there is potential for significant impacts to federally or statelisted plants or regional population level impacts to species with a California Rare Plant Rank of 1B or 2B from project development. Refer to Response 6.136 for a discussion of the applicability of Mitigation Measure 1(a). If it is determined that a future individual project would not impact special status species, then this mitigation measure would not be triggered. No revisions to the Draft EIR are required in response to this comment.

Response 6.138
The commenter states that Mitigation Measures BIO-1(c) and BIO-1(d) should be deleted claiming they are not applicable to Santa Maria or the annexation area.

Mitigation Measures BIO-1(c) and (d) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, are applicable to development facilitated by the 2045 General Plan Update. Refer to Responses 6.129, 6.136, and 6.137 for an explanation of their applicability to future development facilitated by the 2045 General Plan Update. Additionally, the mitigation measures are clear in that they only apply to future development that has the potential to impact special status species, as determined by site specific biological surveys. If it is determined that a future individual project would not impact special status species, then these mitigation measures would not be triggered. No revisions to the Draft EIR are required in response to this comment.

Response 6.139
The commenter states that Mitigation Measures BIO-1(e) and BIO-1(f) should be deleted claiming they are not applicable to Santa Maria or the annexation area.

Mitigation Measures BIO-1(e) and (f) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, are applicable to development facilitated by the 2045 General Plan Update. Refer to Responses 6.130, 6.131, 6.132, 6.133, 6.134, 6.135, 6.136, 6.137, and 6.138 for an explanation of their applicability to future development facilitated by the 2045 General Plan Update. Additionally, the mitigation measures are clear in that they only apply to future development that has the potential to impact special status species, as determined by site specific biological surveys. If it is determined that a future individual project would not impact special status species, then these mitigation measures would not be triggered. No revisions to the Draft EIR are required in response to this comment.
2-115
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.140
The commenter states that Mitigation Measure BIO-1(g) is appropriate for inclusion in the EIR.

The commenter’s support for the inclusion of Mitigation Measure BIO-1(g) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, is acknowledged. No revisions to the Draft EIR are required in response to this comment.

Response 6.141
The commenter states that Mitigation Measure BIO-1(h) should be deleted claiming it is not applicable to Santa Maria or the annexation area.

Mitigation Measure BIO‑1(h) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, is applicable to development facilitated by the 2045 General Plan Update. Refer to Responses 6.131 and 6.136 for an explanation of its applicability to future development facilitated by the 2045 General Plan Update. Additionally, the mitigation measure is clear that it would apply to future development that has the potential to impact Northern California legless lizard, as determined by preliminary review conducted by City staff. If it is determined that a future individual project would not impact Northern California legless lizard, then this mitigation measure would not be triggered.

No revisions to the Draft EIR are warranted in response to this comment.

Response 6.142
The commenter states that Mitigation Measure BIO-1(i) should be reduced to only state if bats are discovered then a standard study will apply.

The level of detail in Mitigation Measure BIO-1(i) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, would ensure that the prescribed methods for avoidance and impact minimization to potential bat roosts are clear, enforceable, and practical. This level of detail is necessary because it provides specific steps and performance standards that agencies and contractors can follow, reducing ambiguity and ensuring compliance. No revisions to the Draft EIR are required in response to this comment.

Response 6.143
The commenter states that Mitigation Measure BIO-1(j) should be clarified to state it only applies to sites with eucalyptus trees in the southern part of Santa Maria and the Orcutt area.

Mitigation Measure BIO-1(j), in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, is intentionally broad to provide flexibility for future conditions. Rather than narrowly applying to a specific area, the measure requires a Biological Resources Screening and Assessment only “if determined necessary based on preliminary review conducted by City staff” and is further limited to development within undeveloped parcels. This approach allows City staff to evaluate potential impacts of development facilitated by the 2045 General Plan on monarch butterfly habitat as conditions evolve. While the southern portion of Santa Maria and the Orcutt area may currently represent the most likely locations for monarch butterflies, the measure avoids unnecessarily excluding other areas in the plan area that could support monarch habitat in the future. By allowing case-by-case review, the measure ensures that monarch butterflies receive appropriate protection wherever they occur, without imposing unnecessary requirements on projects where impacts are unlikely. Therefore, no revisions to the Draft EIR are required in response to this comment. 2-116
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.144
The commenter states that Mitigation Measure BIO-1(k) is too burdensome and states that very few projects in Santa Maria and the annexation area would require bird surveys.

The level of detail in Mitigation Measure BIO-1(k) in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, would ensure that the prescribed methods for avoidance and impact minimization to potential bird nests are clear, enforceable, and practical. This level of detail is required for the EIR because it provides specific steps and performance standards that agencies and contractors can follow, reducing ambiguity and ensuring compliance. No revisions to the Draft EIR are required in response to this comment.

Response 6.145
The commenter states that the Significance After Mitigation discussion should state that the city of Santa Maria and the annexation area have no known special-status species and do not require additional surveys, aside from birds or bats.

Refer to Response 6.124, 6.125, and 6.129 for a discussion on the potential for special-status species to occur in the plan area. Mitigation Measures BIO-1(a) through BIO-1(k), in Section 4.3, Biological Subsection, 4.3.3.b, Project Impact and Mitigation Measures, provide a comprehensive framework to address potential impacts by requiring site-specific biological assessments and surveys for future projects when warranted. These measures ensure that if nesting birds, bats, or other sensitive species are identified during project-level review, appropriate surveys and mitigation would be implemented. Therefore, the Draft EIR already accounts for the potential occurrence of specialstatus species and includes enforceable measures to protect biological resources as needed. No revisions to the Draft EIR are required in response to this comment.

Response 6.146
The commenter suggests revising the Significance After Mitigation discussion to remove mitigation based on previous comments.

None of the Mitigation Measures previously mentioned by the commenter, Mitigation Measures BIO-1(a) through BIO-1(k), in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, would be removed from the Draft EIR as they are all applicable and necessary to reduce potentially significant impacts to biological resources. Refer to Responses 6.136, 6.137, 6.140, 6.141, 6.142, 6.143, and

6.144 for a discussion of Mitigation Measures BIO-1(a), BIO-1(b), BIO-1(g), BIO-1(h), BIO-1(i), BIO1(j), and BIO-1(k). No revisions to the Draft EIR are required in response to this comment.

Response 6.147
The commenter suggests revising the Impact BIO-2 Summary to clarify there are no wetlands in the infill portions of the City or the annexation area, and the only impact to wetlands would be during construction which would be minimized with applicable National Pollutant Discharge Elimination System permits.

Refer to Response 6.110 for a discussion of revisions to Figure 4.3-2. Refer to Response 6.124 for a discussion on the Impact Summary statement and its intent in the Draft EIR. The analysis that immediately follows the Impact Summary statement, in Subsection, 4.3.3.b, Project Impact and Mitigation Measures, provides the specifics requested by the commenter, including location of 2-117
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
wetlands in the plan area. In addition, the analysis in Impact BIO-2 explains that development facilitated by the plan would be subject to National Pollutant Discharge Elimination System permit requirements to protect water quality prior to, during, and post-construction. No revisions to the Draft EIR are required in response to this comment.

Response 6.148
The commenter suggests revising the Impact BIO-2 discussion to state there are no marine habitats or freshwater ponds in Santa Maria or the annexation area. The commenter states Figure 4.3-2 needs corrections, and points out manmade basins and channels designed to dry up for most of the year.

Refer to Response 6.110 for a discussion of revisions to Figure 4.3-2. Additionally, the following revision has been made to Impact BIO-2:

The CNDDB identifies southern vernal pool as a sensitive natural community which could occur in the plan area. According to the USFWS NWI, wetlands in and surrounding the City consist of estuarine and marine habitats, freshwater ponds, freshwater emergent wetlands, freshwater forested and shrub wetlands, and riverine habitats (USFWS 2025c). Development facilitated by the plan is not likely to result in the removal of large areas of riparian, wetland, or other sensitive natural community habitat, as development would generally occur in areas of the City that are developed and surrounded by existing development.

However, there remains potential to affect the few freshwater ponds, freshwater emergent wetlands, freshwater forested and shrub wetlands, and riverine habitats that are identified throughout the plan area. As stated in Subsection 4.3.3.b, Project Impacts and Mitigation Measures, 2025 data from the United States Fish and Wildlife Service National Wetlands Inventory indicate that wetlands in and around the City include freshwater ponds, freshwater emergent wetlands, freshwater forested and shrub wetlands, and riverine habitats. The National Wetlands Inventory is a reliable, government-managed resource widely used for environmental analysis in EIRs because it provides comprehensive and up-to-date wetland mapping data. Refer to Response 6.110 for a discussion on revisions to Figure 4.3-2. No revisions to the Draft EIR are required in response to this comment.

Response 6.149
The commenter suggests deleting Policies COS-1.1 and COS-1.3 in the Impact BIO-2 discussion due to infeasibility, as well as revising Policy COS-1.5 to focus only on birds and bats.

As discussed under Response 6.126, Policy COS‑1.1 is proposed as part of the 2045 General Plan Update; therefore, removing its reference from the EIR would not change its applicability to future development facilitated by the Plan. This applies to all policies proposed in the 2045 General Plan Update. This comment does not pertain to the to the environmental analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response. 2-118
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.150
The commenter suggests revising the Mitigation Measure and Significance After Mitigation discussion in Impact BIO-2 to remove reference to any mitigation removed as a result of previous comments.

Refer to Response 6.146 for a discussion of mitigation measure applicability and changes to the Significance After Mitigation section.

Response 6.151
The commenter states Policies COS-1.1 and COS-1.3 should be deleted from Impact BIO-3 and Impact BIO-4 discussions, as well as revising Policy COS-1.5 to focus only on birds and bats. The commenter states Policy COS-3.1 should be revised stating an Urban Forest Management Plan has not been adopted and the infeasibility of expanding the urban canopy by 20 percent.

This comment does not pertain to the to the environmental analysis presented in the Draft EIR.

Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.152
The commenter states the Cumulative Impacts discussion on pages 4.3-38 and 4.3-39 should be revised to state there are no known special-status species or wetlands in the City or annexation area.

The commenter suggests focusing on California tiger salamander vernal pools in the south at the airport and Area 7.

Refer to Response 6.124 for a discussion on the potential for special-status species to occur in the plan area. Refer to Response 6.147 for a discussion on wetlands in the plan area.

Response 6.153
The commenter states the EIR should include figures to page 4.4-2 showing the Historic Overlay District and where known resources are located. They also state this suggested map should also show potential cultural resources in Santa Maria.

The Historic Overlay District is a zoning designation intended to encourage but not mandate the preservation of architecturally significant structures. This zoning designation is not relevant to the discussion of existing historic and cultural resources within the city. However, the City provides a map showing Zoning Designations on their website, this map includes the designated Historic Overlay District.
(https://www.cityofsantamaria.org/home/showpublisheddocument/10037/638563088414970000) Known historical resources within the plan area are listed in Subsection 4.4.1.b, Historic-Era Setting, the location of these resources can be found on the City’s website for Historical Landmarks and Objects of Historical Merit
(https://storymaps.arcgis.com/stories/fa9559c0f4f6467989211f32fb788073). Inclusion of these maps in the EIR would not impact the overall analysis or conclusion of the analysis, and these maps are available to the public through the City’s website. No revisions to the Draft EIR are required in response to this comment.
2-119
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.154
The commenter states that all regulations mentioned on pages 4.4-4 through 4.4-8 must include the respective dates of their adoption.

CEQA Guidelines Section 15125 requires an EIR to describe the existing environmental setting and identify applicable federal, state, and local plans, policies, and regulations relevant to the project. It requires a summary of these regulations to provide context for the analysis, but it does not explicitly require inclusion of adoption dates for all applicable federal and state laws. Subsection 4.4.2, Regulatory Setting identifies and summarizes applicable laws and regulations. No revisions to the Draft EIR are required in response to this comment.

Response 6.155
The commenter suggests revising the Santa Maria Municipal Code to change the age requirement for historic buildings.

This comment does not pertain to the environmental analysis presented in the Draft EIR. However, the commenter’s suggestion will be provided to the decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.156
The commenter suggests revising the Resource Management Element discussion on page 4.4-9 to state that this General Plan element is the old element, to include Figure RME-5 in the EIR and new General Plan elements, to add explanation to the low sensitivity for cultural resources in Santa Maria Valley, and to add that a historic riverbed is now a bluff north of Betteravia Road and some cultural resources sites are located in the Orcutt area near Orcutt and Solomon Creek. The commenter suggests adding this information to the Conservation and Open Space Element of the 2045 General Plan Update.

The discussion regarding the Resource Management Element in Subsection 4.4.2.c, Local Regulations, states that the element being discussed is the “City’s current Resource Management Element.” This discussion is a summary of the City’s current Resource Management Element and is not part of the environmental impact analysis. The information requested by the commenter regarding cultural sensitivity is addressed in the impact analysis in Section 4.4, Cultural Resources and Tribal Cultural Resources, Subsection 4.4.3.b, Project Impacts and Mitigation Measures.

Regarding the information provided by the commenter about a historical riverbed and flooding in the Santa Maria Valley, without proper citations to include supporting evidence, this information cannot be relied upon for the EIR analysis. The historical setting information in the EIR is based on a review of readily available sources, including the City’s list of Historical Landmarks and Objects of Historical Merit, the City’s current Resource Management Element, the State Office of Historic Preservation website, and the National Park Service. No revisions to the Draft EIR are required in response to this comment.

Response 6.157
The commenter states that the last paragraph on page 4.4-11 should clarify that before 1960 the City of Santa Maria had a population of about 35,000 and approximately 9,000 housing units, mostly 2-120
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
within a 4-square-mile area. The commenter notes that the City now has nearly 30,000 units, many of which were built over the last 70 years and are primarily tract homes and apartments. The commenter further suggests revising the City ordinance to specify that tract homes and units built after 1960 are not considered historic.

The specific information provided by the commenter does not pertain to the environmental analysis presented in the Draft EIR, nor would the referenced information change the conclusion that, over the 20-year planning horizon through 2045, additional buildings will exceed the benchmark age threshold and may qualify as potential historic resources. Suggestions for revisions to documents outside the Draft EIR, such as the City ordinance referenced by the commenter will provided to decision makers for their consideration. No revisions to the Draft EIR are required in response to this comment.

Response 6.158
In regards to Action COS 7.1.1, the commenter asks where the Historic Overlay District is located and where it should be expanded.

Refer to Response 6.153 for a discussion of the Historic Overlay District. This comment does not pertain to the to the environmental analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.159
The commenter states that Mitigation Measure CUL-1 should be revised to note the City’s ordinance is for buildings 50 years or older and development since 1960 should not be considered historic.

In response to the commenter’s suggestion, the following revisions have been made:

CUL-1 Historical Built Environment
If determined necessary based on preliminary review conducted by City staff, applicants for new discretionary development projects that propose to significantly alter or demolish any historicage features (i.e., structures determined to be over 50 45 years of age based on available City records, such as permitting records) shall be required to submit a historical resources evaluation prepared by a qualified architectural historian or historian who meets the Secretary of the Interior’s Professional Qualifications Standards in architectural history or history (36 CFR Part 61). The report shall address areas containing buildings, structures, objects, sites, landscape/site plans, or other features that are 50 45 years of age or older and are proposed to be altered or demolished as a part of the proposed project. The evaluation shall include an intensive-level evaluation in accordance with the guidelines and best practices meeting the State Office of Historic Preservation guidelines. All evaluated properties shall be documented on Department of Parks and Recreation Series 523 Forms. The historical resources evaluation report shall be submitted to the City for review and approval. If historical resources are identified through the survey and evaluation, the relocation, rehabilitation, or alteration of the resource shall be completed consistent with the Secretary of the Interior’s Standards for the Treatments of Historic Properties (Standards). Applicants shall submit a report to the City that identifies and 2-121
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
specifies the treatment of character-defining features and construction activities, and demonstrates how the project complies with the Standards and avoids the substantial adverse change in the significance of the historical resource as defined by CEQA Guidelines Section 15064.5(b). The report shall be prepared by an architectural historian or historical architect meeting the Professional Qualifications Standards as defined by 36 CFR Part 61 and provided to the City for review and concurrence prior to project approval.

Page 4 ends

New residential, commercial, and industrial uses would be introduced through both new construction and the conversion of existing properties to different land use designations. The plan’s emphasis on increased density and clustered development increases the likelihood of redevelopment, or additional development, on already-developed lots. Future development may involve renovations, demolitions, or new construction, which could affect historical resources that have not yet been formally evaluated but may be eligible for listing on the NRHP, CRHR, or local registers under CEQA. Over the 20-year planning horizon through 2045, additional buildings will surpass the 450-year age threshold, making them potential historic resources. As a result, redevelopment activities could lead to the physical demolition, destruction, relocation, or alteration of such resources.

Response 6.160
The commenter suggests the second paragraph of the Impact CUL-2 discussion should be revised to clarify impacts to archaeological resources would occur only south of Betteravia Road.

The commenter’s suggestion to limit the disclosure of potential impacts to archaeological resources in Subsection 4.4.3.b, Project Impacts and Mitigation Measures, to areas south of Betteravia Road would not provide adequate disclosure of the project’s potential environmental impacts under CEQA. It is not possible to determine with certainty where archaeological resources may exist below the ground surface, and restricting the analysis to a single portion of the city could omit locations from environmental review where resources may be present. CEQA Guidelines Section 15126.2 requires that an EIR evaluate all potentially significant environmental effects of a project throughout the entire plan area. For this reason, the Draft EIR considers the potential for archaeological resources across the full plan area. No revisions to the Draft EIR are required in response to this comment.

Response 6.161
The commenter suggests the third paragraph of the Impact CUL-2 discussion should be revised to clarify that impacts to archaeological resources would occur only south of Betteravia Road.

Refer to Response 6.160 for a discussion of potential impacts to archaeological resources.

Response 6.162
The commenter suggests Mitigation Measures CUL-2(a), CUL-2(b), and CUL-2(c) should only apply to development south of Betteravia Road.

Refer to Response 6.160 for a discussion of potential impacts to archaeological resources. 2-122
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.163
The commenter suggests the Impact CUL-4 discussion and Mitigation Measures CUL-4(a) and CUL4(b) are revised to only apply to development south of Betteravia Road.

Refer to Response 6.160 for a discussion of potential impacts to archaeological resources.

Response 6.164
The commenter states that the last paragraph of Impact CUL-4 implies all future projects will require tribal consultation, which the commenter views as unnecessary because consultation was already conducted for the General Plan update and planning area without response. The commenter expresses concern that requiring additional consultation would result in extra time and cost. They also request revisions to Mitigation Measures CUL-4(a) and (b) but do not specify which revisions they would like to see.

Subsection 4.4.3.b, Project Impacts and Mitigation Measures, explains that development facilitated by the plan would undergo project-specific tribal cultural resource consultation pursuant to Public Resources Code (PRC) Section 21084.2 and Policy COS-7.3. PRC Section 21084.2 requires consultation only for projects that may cause a substantial adverse change in the significance of a tribal cultural resource. This requirement does not apply to all future projects. For example, projects that are exempt from CEQA would not require consultation. The EIR accurately describes CEQA requirements, which mandate consultation only when a project could result in significant impacts to tribal cultural resources.

Because the commenter does not recommend any specific revisions to Mitigation Measures CUL4(a) and (b) or provide evidence that any revisions are necessary, no revisions to the Draft EIR are required in response to this comment.

Response 6.165
The commenter states that the Cumulative Impacts discussion on page 4.4-19 should specify that only structures within the 4-square-mile area are considered potentially historic based on construction dates. The commenter recommends limiting additional studies for future development to this area and suggests amending the ordinance to apply only to buildings in this area that were built before 1960, or possibly earlier.

Refer to Responses 6.157 and 6.160 for a discussion regarding structures that may qualify as potential historic resources and restricting environmental analysis to portions of the plan area, as opposed to the whole plan area. The comment regarding revisions to the ordinance does not pertain to the environmental analysis presented in the Draft EIR. Comments related to the revision of other City documents will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.166
The commenter suggests additional information regarding Twitchell Dam, the State Water Project, wastewater discharge, Santa Maria River Valley Groundwater Basin adjudication, agricultural conservation, and reduced urban water use be added to the setting of the Hydrology and Water Quality section.
2-123
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The information provided by the commenter pertains primarily to water management and water supply. These topics are discussed in detail in Section 4.8, Utilities and Service Systems. The evaluation of hydrology and water quality considers potential impacts related to impairment of water quality, groundwater recharge, alterations of drainage patterns, pollutant release, and conflicts with water quality control plans and sustainable groundwater management plans. No revisions to the Draft EIR are required in response to this comment.

Response 6.167
The commenter suggests revising the last sentence of the Groundwater discussion in Section 4.5, Hydrology and Water Quality, to state that groundwater blended is State water used for industrial, municipal, and government uses within the city.

The language the commenter refers to in Subsection 4.5.1.b, Groundwater, is accurate and describes the current use of groundwater in Santa Maria. No revisions to the Draft EIR are required in response to this comment.

Response 6.168
The commenter suggests revising the first paragraph of the Surface Water Quality discussion in Section 4.5, Hydrology and Water Quality, to clarify that agricultural operations are not a substantial source of pollutants in Santa Maria and that all urban agricultural operations are located to the west of Santa Maria and would not impact surface water in Santa Maria.

The information included within Subsection 4.5.1.c, Surface Water Quality, is derived from the General Plan Environmental Existing Conditions Report, prepared by the City of Santa Maria in 2020.

The General Plan Environmental Existing Conditions Report represents the most recent available information regarding stormwater runoff from agricultural operations in Santa Maria.

In response to this comment, the following revision has been made to Subsection 4.5.1.c, Surface Water Quality:

Land use affects the quality of surface water in the city. There are large agricultural operations uses within the city that may contribute to surface water pollution. These operations uses are a substantial source of sediment which enters the city’s storm drain system (City of Santa Maria 2020). Additionally, pesticides, herbicides, and fertilizer are pollutants associated with agricultural operations uses that affect surface water quality within the city. Pollutants within urbanized areas of the city, such as heavy metals hydrocarbons, detergents, fertilizers, and pesticides, and construction activities which can cause erosion are additional sources of surface water pollution which impact water quality within the city (City of Santa Maria 2020).

Response 6.169
The commenter suggests revising the second paragraph of the Surface Water Quality discussion in Section 4.5, Hydrology and Water Quality, to separate the discussion of the Santa Maria River from the rest of the paragraph, and to state that the chemicals mentioned in this discussion are being reduced by agricultural operators.

The comment pertaining to paragraph delineation does not pertain to the analysis presented in the Draft EIR, nor would it change the analysis within the Draft EIR. Refer to Response 6.9 for a 2-124
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

The information on chemicals and total maximum daily loads provided in Subsection 4.5.1.c, Surface Water Quality, in the Draft EIR are based on information from the California State Water Board and represent existing conditions. No revisions to the Draft EIR are required in response to this comment.

Response 6.170
The commenter states that the Groundwater Quality discussion in Section 4.5, Hydrology and Water Quality, should be revised to note that total dissolved solids levels have improved over the last 30 years. The commenter suggests adding the second sentence of the paragraph to the Surface Water Quality discussion and revising the whole paragraph.

The Groundwater Quality discussion in Subsection 4.5.1.c, Water Quality, accurately describes the current conditions of groundwater quality within the plan area and meets the requirements of CEQA Guidelines Section 15125, which requires an EIR to describe the existing environmental setting and identify applicable federal, state, and local plans, policies, and regulations relevant to the project.

This section specifies that the environmental setting must include a description of the physical environmental conditions in the vicinity of the project, which serves as the baseline for determining the significance of impacts. The commenter’s suggested revisions would not alter the analysis or conclusions within the EIR. Therefore, no revisions to the Draft EIR are required in response to this comment.

Response 6.171
The commenter suggests revising the Flood Hazards discussion to include information on City collaboration with the County of Santa Barbara Flood Control and Water Conservation District, the Santa Maria levee, and the Twitchell Dam. The commenter asks where the location of Guadalupe Lake is and what a seiche is.

The Flood Hazards discussion in Subsection 4.5.1.c, Water Quality, sufficiently describes the current conditions of flood hazards within the plan area and meets the requirements of CEQA Guidelines Section 15125, which requires an EIR to describe the existing environmental setting and identify applicable federal, state, and local plans, policies, and regulations relevant to the project. This section specifies that the environmental setting must include a description of the physical environmental conditions in the vicinity of the project, which serves as the baseline for determining the significance of impacts. The commenter’s suggested revisions would not alter the analysis or conclusions within the Draft EIR.

As discussed in Section 4.5.1.d, Guadalupe Lake is located approximately three miles from the city. A seiche is a standing wave that occurs in an enclosed or partially enclosed body of water, such as a lake. It is typically caused by external forces like strong winds, atmospheric pressure changes, or seismic activity. As discussed in Impact HYD-4, the city is not at risk of being inundated due to seiche. In response to this comment, the following revisions have been made to correct the spelling of “Guadalupe” in Subsection 4.5.1.c:
2-125
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Groundwater quality varies within the Santa Maria Valley. Total dissolved solids are known pollutants in groundwater within the Santa Maria Watershed. Additionally, petroleum production by-product (diluent) has been found in groundwater below the Guadalupe Dunes and nearby areas (City of Santa Maria 2020).

In addition, the following revisions have been made to correct the spelling of “Guadalupe” in Subsection 4.5.1.d:

Santa Maria is approximately 11.4 miles east of the Pacific Ocean. According to the California Department of Conservation, no part of the city is within a tsunami hazard zone (DOC 2025).

The city is approximately three miles from Guadalupe Lake. Due to the distance and intervening topography, the city is not at risk of being inundated due to a seiche.

Response 6.172
The commenter suggests revising Figure 4.5-1 to label the Santa Maria River, Santa Maria levee, and Orcutt Creek. The commenter suggest including a regional map to show the location of Twitchell Dam and Guadalupe Lake.

Figure 4.5‑1, Flood Hazards in Santa Maria, in Subsection 4.5.2.a, Federal Regulations, illustrates flood hazards within the City and highlights the Santa Maria River and Guadalupe Lake as being within the 100‑year floodplain. In response to this comment, Figure 4.5-1 has been updated in the Final EIR.

Response 6.173
The commenter suggests including a discussion on the Supreme Court decision regarding the definition of Waters of the United States in the Regulatory Setting discussion on page 4.5-5.

Refer to Response 6.121 for a discussion on the rationale for not including a discussion of the Supreme Court’s decision in Sackett v. EPA (May 2023) on Waters of the United States.

Response 6.174
The commenter suggests revising the language in Policy S-3.3 to read “onsite detention basins” rather than onsite detention ponds. The commenter suggests revising Policy S-3.4 to state “Coordinate with County Flood Control to maintain and upgrade…”.

This comment does not pertain to the to the environmental analysis presented in the Draft EIR.

Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.175
The commenter suggests revising the impact summary of Impact HYD-2 to state “Development facilitated by the 2045 General Plan would incrementally increase…”. The commenter suggests stating that the Santa Maria Water Conservation District and Twitchell Management Authority would assure adequate groundwater quality and groundwater elevations within the basin. 2-126
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The commenter is referring to the Impact Summary statement in Subsection 4.5.3.b, Project Impacts and Mitigation Measures. The Impact Summary statement is intended to provide a brief overview of the overall impact. The following impact analysis provides additional details regarding potential impacts of the 2045 General Plan Update. In addition, the first sentence of the impact analysis states that development facilitated by the plan would incrementally increase the amount of impervious surface area, as requested by the commenter. No revisions to the Draft EIR are required in response to this comment.

Response 6.176
The commenter suggests revising the first sentence of Impact HYD-2 to clarify that impervious surface areas could be increased within the infill areas of Santa Maria and the annexation area, which would result in incremental reductions in recharge and infiltration. The commenter also suggests removing the word “River” from “Santa Maria River Valley Basin.” The reference to the Santa Maria River Valley Basin in Subsection 4.5.3.b, Project Impacts and Mitigation Measures, is correct as written in the Draft EIR and does not need to be changed. The commenter’s statement that these changes would occur incrementally is conveyed in the first part of the sentence. No revisions to the Draft EIR are required in response to this comment.

Response 6.177
The commenter suggests removing the last sentence in the second paragraph of the Impact HYD-2 discussion.

The sentence referred to by the commenter in Subsection 4.5.3.b, Project Impacts and Mitigation Measures, states that implementation of general plan policy S-3.3 would help reduce impervious surfaces associated with construction under the 2045 General Plan Update by requiring low‑impact design features, such as permeable pavement. This policy is intended to minimize the amount of new impervious surfaces to the greatest extent feasible. No revisions to the Draft EIR are required in response to this comment.

Response 6.178
The commenter asks for details regarding groundwater rights the City has based on the adjudication of the groundwater basin and notes groundwater supplies are augmented by other water supplies.

The commenter also suggests removing the word “River” from instances of the use of “Santa Maria River Valley Basin.”
Additional information on the City’s groundwater rights is included in Subsection 4.5.2.c, Local Regulations. Refer to Response 6.176 for a discussion on the correct terminology for the Santa Maria River Valley Basin. No revisions to the Draft EIR are required in response to this comment.

Response 6.179
The commenter states the Rivergate Roemer Specific Plan area is within the 100-year floodplain and development in that area will need to be elevated above the floodplain and a map revision will need to be processed with FEMA.
2-127
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
All new development facilitated by the General Plan Update would comply with applicable local, state, and federal regulations governing development in flood hazard areas. No revisions to the Draft EIR are required in response to this comment.

Response 6.180
The commenter suggests correcting the spelling of Guadalupe Lake in Impact HYD-4, adding an explanation that the levee protects Santa Maria in the event of a Twitchell Dam failure, and removing the reference to Lopez Reservoir due to its distance from Santa Maria. The commenter also requests a definition of a seiche.

The following revision has been made to Subsection 4.5.3.b, Project Impacts and Mitigation Measures:
“The city is approximately three miles from Guadalupe Lake.” The analysis in Impact HYD-4 indicates that the city is not within the dam inundation area for Lopez Reservoir or Twitchell Reservoir. Therefore, if either dam failed, the floodwaters would not be anticipated to reach the city, based on the California Division of Safety of Dams information as cited in Impact HYD-4. Refer to Response 6.171 for a definition of seiche.

Response 6.181
The commenter suggests that the Bureau of Land Management, United States Army Corps of Engineers, and other federal agencies should be added to Policy S-3.6 for coordination regarding dam and levee safety and inundation.

This comment does not pertain to the to the environmental analysis presented in the Draft EIR.

Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.182
The commenter suggests that Impact HYD-5 is inaccurate, as there is an adjudicated order management plan coordinated with the Twitchell Management Authority and the Santa Maria Water Conservation District. The commenter requests the discussion be rewritten to define the agencies that manage the groundwater basin.

The Twitchell Management Authority prepares annual reports that document existing groundwater conditions in the Santa Maria Valley Basin and provide recommendations for management actions.

While the Twitchell Management Authority plays an important role in monitoring and reporting, it does not enforce policies or conservation measures. This management authority differs from government agencies that implement and enforce Sustainable Groundwater Management Plans under the Sustainable Groundwater Management Act. The Twitchell Management Authority’s reports do not constitute a Sustainable Groundwater Management Plan under the Sustainable Groundwater Management Act. A Sustainable Groundwater Management Plan includes components such as basin setting, water budgets, sustainable management criteria, projects and actions, and monitoring networks to achieve long-term groundwater sustainability. The Twitchell 2-128
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Management Authority’s role is focused on reporting and recommending actions within the adjudicated framework, rather than implementing a comprehensive sustainability plan.

According to the City of Santa Maria’s Urban Water Management Plan, the Twitchell Management Authority also functions as a transfer agency, facilitating permanent and temporary transfers of water rights within the Santa Maria River Valley Basin. However, these water transfers are administrative actions related to water allocation and are not connected to water quality, which is the focus of Section 4.5, Hydrology and Water Quality. No revisions to the Draft EIR are required in response to this comment.

Response 6.183
The commenter suggests revising the Cumulative Impacts discussion on pages 4.5-16 and 4.5-17 based on previous comments on the Hydrology and Water Quality section.

The commenter’s statement regarding the cumulative impacts discussion is general and does not include specific recommendations for edits or clarifications. Refer to Response 6.9 for a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis. No revisions to the Draft EIR are required in response to this comment.

Response 6.184
The commenter suggests revising the Cumulative Impacts discussion on pages 4.5-16 and 4.5-17 to discuss the Twitchell Management Authority’s influence on groundwater quality and quantity within the basin.

Refer to Response 6.182 for a discussion of the Twitchell Management Authority.

Response 6.185
The commenter suggests revising the Sensitive Receptors discussion on page 4.6-4 to clarify the noise-sensitive land uses listed are identified in the current General Plan.

The following revision has been made to Subsection 4.6.1.c, Sensitive Receptors, in response to this comment:

The current Santa Maria General Plan Noise Element identifies noise-sensitive land uses as residential areas (including single-family, duplex, multiple-family, and mobile home), motels/hotels, schools, libraries, hospitals, nursing homes, and places of worship (City of Santa Maria 2009), shown in Figure 4.6-1.

Response 6.186
The commenter suggests adding another column to Table 4.6-3 that identifies segments of roadways that have existing sound walls or abutting structures that limit noise levels.

The purpose of Table 4.6-3, Existing Traffic Noise Levels Along Roadway Segments within Subsection

4.6.1.d, Existing Noise Environment, is to list the existing traffic noise levels along roadway segments. This table displays the existing noise levels based on average daily trip roadway volume at a distance of 50-feet. The traffic noise levels in Table 4.6-3, as well as the noise contours depicted in Figure 4.6-3, are conservative estimates of existing noise along roadways. Traffic noise levels and 2-129
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
noise contours were determined using average daily traffic and estimated using the Federal Highway Administration Traffic Noise Prediction Model. The Traffic Noise Prediction Model takes into account speed limits, number of lanes, ground type, and vehicle mix. This approach provides a conservative estimate of actual noise levels, which may be attenuated as a result of sound walls, abutting structures, vegetation, or other obstructions to line-of-sight transmission. This approach to evaluating roadway noise levels follows the typical industry practice for General Plan level evaluation, and is appropriate for a programmatic environmental document. No revisions to the Draft EIR are required in response to this comment.

Response 6.187
The commenter suggests updating Figure 4.6-1 to include the Enos Ranch project, Skyview Project, and other projects approved within recent years.

Figure 4.6-1 of the Draft EIR depicts noise sensitive land uses utilizing the City’s existing land use map. Though additional noise sensitive land uses have been approved in recent years, this map is meant to be representative of land uses in the city and may not reflect all approved projects in the city. The figure is intended to support City decision-making and should not be read as representing precise, site-specific conditions or all existing noise sensitive land uses. In response to this comment, the following revision has been made to Subsection 4.6.1.c:

The current Santa Maria General Plan Noise Element identifies noise-sensitive land uses as residential areas (including single-family, duplex, multiple-family, and mobile home), motels/hotels, schools, libraries, hospitals, nursing homes, and places of worship (City of Santa Maria 2009), shown in Figure 4.6-1. Note, the figure is intended to support City decision-making and should not be read as representing precise, site-specific conditions or all existing noise sensitive land uses.

Response 6.188
The commenter suggests updating Figure 4.6-2 to include Waller Park, change the water label to vernal pools, and clarify this is the noise contour map adopted by the County Airport Land Use Commission.

Waller Park is not located within the city limits of Santa Maria and therefore is not included. In response to this comment, Figure 4.6-2 has been revised to remove water features.

For additional clarification regarding the source of the airport noise contours shown on Figure 4.6-2, the Aviation discussion in Subsection 4.6.1.d, Existing Noise Environment, is revised as follows:

As shown in Figure 4.6-2, the airport 60-65 dBA CNEL noise contours adopted by the Santa Barbara County Airport Land Use Commission extend primarily over areas of the plan area that are primarily agriculture or open space.

Response 6.189
The commenter suggests Figure 4.6-3 be revised to indicate the locations of sound walls and structures that mitigate noise impacts. The commenter suggests contours of 65 dBA and below should not be shown on the map as they do not apply to the area near US 101.

This comment pertains to a figure included within the 2045 General Plan Update. Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. Refer 2-130
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
to Response 6.186 for a discussion of the methodology for determining traffic noise levels and noise contours. Also refer to Response 6.35 for a discussion of how noise contours are represented in figures in the General Plan and Draft EIR. While areas of noise contours 65 dBA and below do not apply to areas directly adjacent to U.S. 101, these noise contours are applicable to several roadways throughout Santa Maria. The noise contour map shows generalized noise conditions based on conservative assumptions and may not reflect all local features that may reduce noise levels, such as topography, vegetation, sound walls, or other physical barriers. In some locations, actual noise levels may be lower than those shown. The figure is intended to support City decision-making and should not be read as representing precise, site-specific conditions or all existing noise-reduction infrastructure. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.190
The commenter suggests revising Table 4.6-4 to include the City ordinance that allows exterior noise to be 75 dBA along major corridors. The commenter notes the City is encouraging residential development without perimeter sound walls which would result in higher noise levels for these developments.

Table 4.6-4 is specific to the exterior noise standards established within the current Noise Element of the Santa Maria General Plan. A discussion of noise standards established by the City’s Municipal Code is provided in Table 4.6-5. In response to this comment, the following revision has been made to Subsection 4.6.2.c:

Municipal Code Section 5-5.09 requires the acquisition of a construction noise permit from the Noise Control Officer for exterior construction work conducted within a residential zone or within 500 feet of a residential zone only if such activities exceed the noise standards set forth in Municipal Code Sections 5-5.03 and 5-5.05. The permit would cover short-term or occasional, non-routine operations.

Municipal Code Section 12-7.14(a) allows outdoor living areas in R-2 and R-3 multifamily zones to exceed typical noise standards up to “Normally Unacceptable” levels (75 dB or more), provided residents receive a notice warning that the area regularly experiences elevated urban noise from sources such as traffic, trains, aircraft, industry, and general activity.

Municipal Code Section 12-49.09(c) prohibits vibration above the perception threshold of an individual at or beyond the property boundary of the source for more than three minutes in any one hour of the day between the hours of 7:00 a.m. and 10:00 p.m. and for more than 30 seconds in any one hour between the hours of 10:00 p.m. and 7:00 a.m.

Response 6.191
The commenter suggests revising Table 4.6-5 to 65 dBA for daytime exterior noise and 75 dBA for noise along major corridors.

Table 4.6-5 accurately describes the ambient base noise levels identified in Section 5-5.05 of the City’s Municipal Code. No revisions to the Draft EIR are required in response to this comment. 2-131
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.192
The commenter suggests the Traffic Noise discussion on page 4.6-15 mention electric vehicles and associated traffic noise reduction.

While the State did implement mandates to phase out natural gas vehicle sales, these mandates were blocked by the United States Senate in May 2025. Given the uncertainty of legislation, it is speculative to assume that a ban on the sale of natural gas vehicles would occur. Furthermore, if a ban on the sale of natural gas vehicles occurs, it is likely that natural gas vehicles would continue to be used during a transitory period to electric vehicles. Due to the uncertainty regarding State legislation mandating electric vehicles, the Draft EIR does not consider a reduction in traffic noise occurring from a shift from natural gas vehicle to electric vehicle use, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.193
The commenter suggests the Traffic Noise discussion on page 4.6-15 include a discussion of fairgrounds, sports fields, and high school sporting events near residential areas.

Roadway vehicle noise impacts are evaluated based on average daily trip roadway volume for existing conditions and the amount of growth expected from future development facilitated by the plan, as well as data regarding speeds and number of lanes. The average daily trips and trip distribution data consider periods of time for high traffic and traffic around residential areas. No revisions to the Draft EIR are required in response to this comment.

Response 6.194
The commenter suggests the Mobile Operational Noise discussion and exhibits in Impact NOI-1 are revised to reflect the concept that electric vehicles will occupy an increased number of cars on the roadway over time, thereby reducing traffic noise levels.

Refer to Response 6.192 for a discussion of electric vehicles and impacts to traffic noise levels. No revisions to the Draft EIR are required in response to this comment.

Response 6.195
The commenter suggests revising the Impact NOI-1 discussion to account for electric vehicles occupying an increased proportion of vehicles on the roadway over time, thereby reducing traffic noise levels. The commenter suggest that Impact NOI-1 be revised to include analysis of the 8,000 new units in the annexation areas along with new schools, parks, commercial uses, etc.

Refer to Response 6.192 for a discussion regarding traffic noise associated with electric vehicles.

As discussed in Impact NOI-1, roadway segments located within the annexation area, shown in Figure 4.6-4, were not analyzed as they are not currently within Santa Maria city limits. As the 2045 General Plan does not include specific development proposals, the location of individual development in the annexation area, as well as the potential future traffic volumes of roadway segments located within the annexation area, is speculative. At the time an individual project is proposed within the annexation area, it would be required to undergo individual environmental 2-132
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
review to determine potential noise impacts of the individual project. No revisions to the Draft EIR are required in response to this comment.

Response 6.196
The commenter suggests that Figure 4.6-4 be corrected to adjust contour lines where sound walls and buildings are located that reduce noise generated from traffic on US 101.

Refer to Responses 6.186 for a discussion of the methodology for determining traffic noise levels and noise contours. This comment pertains to a figure included within the 2045 General Plan Update. Comments related to the 2045 General Plan Update will be provided to decision makers for their consideration. The noise contour map shows generalized noise conditions based on conservative assumptions and may not reflect all local features that may reduce noise levels, such as topography, vegetation, sound walls, or other physical barriers. In some locations, actual noise levels may be lower than those shown. The figure is intended to support City decision-making and should not be read as representing precise, site-specific conditions or all existing noise-reduction infrastructure. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required.

Response 6.197
The commenter suggests revising Table 4.6-8 to account for electric vehicles occupying an increased proportion of vehicles on the roadway over time, thereby reducing traffic noise levels.

Refer to Response 6.192 for a discussion regarding traffic noise associated with electric vehicles. No revisions to the Draft EIR are required in response to this comment.

Response 6.198
The commenter suggests Policy N-1.1 and Actions N-1.1.1, N-1.1.2, and N-1.1.3 included on page

4.6-30 be deleted due to their infeasibility.

In response to this comment, Action N-1.1.3 has been deleted from the 2045 General Plan Update and the Final EIR. Editorial edits to Policy N-1.1 and Actions 1.1.1. and N-1.1.2 in the General Plan have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

Response 6.199
The commenter suggests ensuring the City has the provisions of Mitigation Measure NOI-1 reviewed by construction contractors for individual developments.

As stated in Mitigation Measure NOI-1, during future individual developments, the City would include the listed noise reduction measures as conditions of approval, at which time the requirements for individual development will be reviewed by the construction contractor. No revisions to the Draft EIR are required in response to this comment. 2-133
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.200
The commenter suggests the Significance After Mitigation discussion within Impact NOI-1 is revised to reflect the concept that electric vehicles will occupy an increased number of cars on the roadway over time, thereby reducing traffic noise levels. The commenter asserts that the plan needs to address noise levels in 25 years rather than current noise levels.

Refer to Response 6.192 for a discussion regarding traffic noise associated with electric vehicles. No revisions to the Draft EIR are required in response to this comment.

Response 6.201
The commenter suggests that the Cumulative Impacts discussion on pages 4.6-35 and 4.6-36 be revised to address noise reductions associated with the electrification of construction equipment and motor vehicles. The commenter states that traffic noise will be reduced compared to current conditions.

Refer to Response 6.192 for a discussion regarding traffic noise associated with electric vehicles. No revisions to the Draft EIR are required in response to this comment.

Response 6.202
The commenter suggests that the City’s transportation demand model evaluated by GHD should be included as an appendix and peer reviewed by local traffic engineers. The commenter asks why GHD did not do a VMT analysis. The commenter suggests that a map showing the locations of infill projects presumed to have a less than significant impact related to VMT are added to Section 4.7, Transportation and Traffic.

The methodology for determining VMT impacts in the Draft EIR is discussed in Subsection 4.7.3.a, Methodology and Significance Thresholds. This methodology relied on the City of Santa Maria travel demand model which includes a current baseline scenario and a 2045 future scenario to forecast traffic conditions on major roadways in the city and the Santa Maria Valley. This trip-based model estimates residential VMT per household and VMT per employee based on home-based trip activity to and from residences and workplaces within Santa Maria and the annexation area.

A standalone transportation report for the VMT analysis was not prepared as part of the project; instead, Subsection 4.7.3.b, includes a summary of VMT model methodology, supporting data, and outputs. No revisions to the Draft EIR are required in response to this comment.

Response 6.203
The commenter suggests revising the Roadway Network and Functional Classifications discussion on page 4.7-1 to include truck hauling routes and industrial hauling routes as uses for roadways in Santa Maria.

In response to this comment, the following revision has been made to Subsection 4.7.1.a, Roadway Network and Functional Classifications, of the Final EIR:

Santa Maria is served by a system of streets and paths that enable connections in the city and to the regional transportation system. They are classified by their function with different characteristics and accommodations for modes of travel and access to adjacent land uses. The system supports multiple modes of travel and contains network elements that support 2-134
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
vehicular, bicycle, pedestrian, and transit travel. In addition, roadways in Santa Maria provide routes for truck hauling and industrial uses hauling. The roadway classifications serve as the City’s policy guidance for the development of multi-modal streets and balance all network elements.

Response 6.204
The commenter suggests ensuring the accuracy of the description of Betteravia Road on page 4.7-2.

The description of Betteravia Road in Subsection 4.7.1.b is accurate. As described on page 16 of the Transportation and Mobility Existing Conditions Report prepared in December 2020 by the City of Santa Maria, the portion of Betteravia Road from U.S. 101 to SR 135 is designated in the National Highway System.

Response 6.205
The commenter suggests revising Table 4.7-1 to include road right-of-way widths, add a definition for public alleyways, add a definition for private roads and driveways for small lots. The commenter suggests including information on complete street standards as they relate to width and design of road segments, where complete street standards apply, and inclusion of a cross-section of a complete street.

Table 4.7-1, Current Circulation Element Roadway Classification in Subsection 4.7.1.c, Arterials, Collectors, and Local Roadways, is based on information from the City’s 2011 Circulation Element and includes the appropriate information to support the Traffic and Transportation environmental setting section of the Draft EIR. Additional definitions would not alter the conclusions or otherwise contribute substantively to the environmental analysis in the Draft EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.206
The commenter suggests the Active Transportation Plan should be included as an appendix to the EIR.

The City’s Active Transportation Plan is available on the City’s website for review. The Draft EIR discusses the 2045 General Plan Update’s consistency with the Active Transportation Plan but does not rely on the Active Transportation Plan to reach any conclusions regarding the environmental impacts of the 2045 General Plan Update. Therefore, this plan is not included as an appendix to the EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.207
The commenter suggests revising Figure 4.14-1 to include the connection to U.S. 101 and Union Valley Parkway and the extension of Seaward Drive to U.S. 101.

Figure 4.14-1 is derived from the General Plan Environmental Existing Conditions Report, prepared by the City of Santa Maria in 2020. The General Plan Environmental Existing Conditions Report represents the most recent available information regarding roadway classifications in Santa Maria.

Referencing the adopted roadway classifications directly ensures consistency with official documents and avoids duplicating material that is already clearly defined and accessible in the city’s 2-135
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
transportation planning framework. No revisions to the Draft EIR are required in response to this comment.

Response 6.208
The commenter suggests revising Figure 4.14-1 to revise the location of Bradley Road, include the road pattern for the Blosser Ranch Specific Plan, include the roads for Area 9 and Area 7 part of the Circulation Element, and identify all Measure A projects already funded.

Refer to Response 6.207 for a discussion of Figure 4.14-1 and its source material.

Response 6.209
The commenter suggests the Existing and Planned Bikeways discussion on page 4.7-5 include standards and widths for Class I-IV bikeways.

The City utilizes Caltrans standards for the widths of Class I trails, Class II bicycle lanes, and Class IV separated bikeways. Standards for Class III bicycle routes are incorporated into roadway width standards. In response to this comment, the following revisions have been made to the Existing and Planned Bikeways discussion in Subsection 4.7.1.d, Pedestrian and Bicycle Network:
 Class I Shared Use Paths. Class I shared use paths are completely separated rights-of-way designated for the exclusive use of bicycles and pedestrians, with crossflows by motorists minimized. Caltrans standards require a minimum width of eight feet for a one-way Class I bike path.
 Class II Bicycle Lanes. Class II bicycle lanes provide a striped or buffered right-of-way designated for the exclusive or semi-exclusive use of bicycles with through-travel by motor vehicles or pedestrians prohibited, but with vehicle parking and crossflows by pedestrians and motorists. Caltrans standards generally require a minimum width of four feet for a Class II bicycle lane.
 Class III Bicycle Routes. Class III bicycle routes are signed routes for bicyclists on low-speed, low-volume streets where lanes are shared with drivers. Caltrans standards for Class III bicycle routes are incorporated into roadway width requirements.  Class IV Separated Bikeways. Class IV separated bikeways are on-street bicycle facilities with a physical barrier between the bicycle space and motor vehicle lanes, including bollards, curbs, or parking. Caltrans standards require a minimum width of five feet for a one-way Class IV separated bikeway.

Response 6.210
The commenter suggests revising the Santa Maria Regional Transit discussion on page 4.7-5 to include a table of ridership over the last 10-20 years to prove ridership has been increasing.

The Santa Maria Regional Transit discussion states that transit ridership is rapidly growing. In response to this comment, the text in Subsection 4.7.1.e, Transit, has been revised to include a source for this statement:
 Santa Maria Regional Transit (SMRT). The City of Santa Maria operates SMRT’s local fixed route, regional bus service, and on-demand Microtransit and ADA paratransit bus services.

SMRT ridership demographics reflect a broad cross-section of the service area, including seniors, persons with disabilities, K-12 students, college students, working professionals, 2-136
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
tourists and riders who choose to use transit instead of driving. Transit ridership is rapidly growing and is expected to continue to grow over the years to come (City of Santa Maria 2025).

In addition, the following resource has been added to the Transportation references in Section 7.1, Bibliography:

Santa Maria, City of. 2020. General Plan Environmental Existing Conditions Report. Accessed June 2025.
______. 2025. SMRT Announces Route Adjustments in Response to Growing Ridership. https://www.cityofsantamaria.org/Home/Components/News/News/17738/ (accessed December 2025).

Response 6.211
The commenter suggests adding descriptions of the following transit services to the bulleted list on page 4.7-6: SMOOTH, Dial a Ride, and senior and medical transits provided by Marian and other medical services.

Medical transit provided by Marian relates to ambulance travel, which does not pertain to transit services such as buses and is therefore not discussed herein. In response to this comment, the following addition has been made in Subsection 4.7.1.e, Transit:
 SMOOTH. SMOOTH maintains and operates various contracts with local groups in Santa Barbara County to provide transportation assistance with emphasis for passengers requiring medical, physical, and social assistance. SMOOTH provides Senior Dial-A-Ride services in Santa Maria.

Response 6.212
The commenter suggests the AB 32 and SB 375 discussion on page 4.7-6 be revised to specify 1990 emissions levels, 2020 emissions levels, and discuss whether statewide emissions targets were met in 2020.

Refer to Response 6.70 for a discussion regarding greenhouse gas emissions levels. No revisions to the Draft EIR are required in response to this comment.

Response 6.213
The commenter states that the EIR needs to include the Santa Maria Active Transportation Plan and asks if this plan includes the annexation areas and suggests that the plan may need to be updated if not.

Diagrams of the existing street network, bikeway network, and pedestrian network are included in the Circulation Element of the 2045 General Plan Update. The Active Transportation Plan does not include the annexation areas, as the plan was adopted in January 2021, prior to preparation of the 2045 General Plan Update. Updating the Active Transportation Plan is outside of the scope of the Draft EIR and does not pertain to the environmental analysis of the 2045 General Plan Update. No revisions to the Draft EIR are required in response to this comment. 2-137
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.214
The commenter states maps from the Santa Maria Regional Transit Short Range Transit Plan Update should be included in the EIR and asks if this plan includes the annexation areas and suggests that the plan may need to be updated if not.

The Short Range Transit Plan Update does not include the annexation areas, as this plan was updated in 2021, prior to preparation of the 2045 General Plan Update. The Short Range Transit Plan Update includes figures regarding the transit system which are available for review in the Short Range Transit Plan Update. Updating the Short Range Transit Plan is outside of the scope of the Draft EIR and does not pertain to the environmental analysis of the 2045 General Plan Update. No revisions to the Draft EIR are required in response to this comment.

Response 6.215
The commenter suggests the Methodology discussion on page 4.7-8 include a map and table showing existing and proposed traffic in Santa Maria in 2045 along with level of service. The commenter acknowledges EIRs do not have to include level of service information. The commenter expresses concern for the future circulation with increased traffic and decreased level of service. The commenter requests a map in the EIR is included which shows circulation for 2045-2050. The commenter states the EIR and 2045 General Plan Update are not consistent with each other in regard to how they discuss LOS.

Refer to Response 6.6 for a discussion of LOS analysis in the Draft EIR. Consistent with CEQA Guidelines Section 15046.3, VMT has replaced LOS as the metric for determining transportation impacts under CEQA. Accordingly, a discussion of future traffic and LOS is neither necessary nor appropriate to include the Draft EIR. A discussion of LOS in the city can be found in the General Plan Circulation Element under the “Traffic Level of Service” heading. A map of the existing circulation system is provided in the General Plan as Figure 4.7-1, Current Circulation Element Roadway Functional Classification. No revisions to the Draft EIR are required in response to this comment.

Response 6.216
The commenter suggests Impact TRA-1 needs to include the Travel Demand Model and requests additional information regarding future transportation studies, specifically whether GHD would be required to complete all future transportation studies.

The Santa Maria Travel Demand Model is a trip-based model used in the evaluation of VMT and is discussed in Impact TRA-2 of the Draft EIR. The model is available by request to the City of Santa Maria and does not require future transportation studies to only be carried out by GHD. Refer to Response 6.202 for a discussion of the Travel Demand Model and the methodology for determining VMT impacts in the Draft EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.217
The commenter suggests deleting Policy CIR-1.2 from Impact TRA-1, as privately maintained streets and driveways would not be designed to meet complete street requirements. The commenter requests the Street Network, Bikeway Network, and Pedestrian Priority Improvement Network diagrams be included in the EIR.
2-138
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Policy CIR-1.2 was not deleted from the 2045 General Plan Update but editorial revisions to the policy have been incorporated into the 2045 General Plan Update and carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR. Diagrams of the street network, bikeway network, and pedestrian priority improvement network are included in the Circulation Element of the 2045 General Plan Update. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.218
The commenter suggests changes to the following polices and actions listed in Impact TRA-1:
 Delete the reference to private streets in Policy CIR-1.3.  Add a sentence in Action CIR-2.2.2 that states AB1600 traffic fees will be used as matching fund for future grants or funding programs.
 Delete Policy CIR-6.1.
 Delete the second bullet in Action CIR-6.4.3 as it is inconsistent with the Noise Element and EIR noise section. Delete the last two bullets as they are inconsistent with other policies. The last bullet is inconsistent with adopted Objective Design Standards.  Revise Policy CIR-7.2 to state infill and annexations areas will prioritize mixed-use development.

Policy CIR-1.3 and Policy CIR-7.2 have been revised in the 2045 General Plan Update and changes have been carried over into the Final EIR, as appropriate. Action CIR-2.2.2, Policy CIR-6.1, and Action CIR-6.4.3 have not been revised in the 2045 General Plan Update. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no other changes to the Draft EIR are required in response.

Response 6.219
The commenter suggests the Bikeway Network, Pedestrian Priority Improvement Network diagrams, and Santa Maria Active Transportation Plan maps referenced in 2045 General Plan policies be included in the EIR.

Diagrams of the street network, bikeway network, and pedestrian priority improvement network are included in the Circulation Element of the 2045 General Plan Update. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.220
The commenter asks if mitigation to Impact TRA-1 needs to be included to address road improvements that will be needed as a result of traffic increases over the next 25 years.

Because the 2045 General Plan Update does not include specific development plans, the Draft EIR does not evaluate the potential environmental impacts of specific roadway improvements, as such 2-139
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.221
The commenter asks why new development projects have to reduce VMT to 24.2 and 32.8 percent based on Table 4.7-4. The commenter states this is infeasible and the law only requires a 17 percent reduction. The commenter asks what AB 130 would do for VMT requirements.

Table 4.7-4 does not show mandatory VMT reductions; rather, this table shows projected per-unit VMT decreases from residential and non-residential developments from future development only (i.e., development facilitated by the 2045 General Plan Update).

AB 130 would not change the threshold of significance for VMT impacts pursuant to CEQA. Rather, AB 130 provides a means of mitigating VMT impacts from future projects through contribution to a state Transit-Oriented Development Implementation Fund. No revisions to the Draft EIR are required in response to this comment.

Response 6.222
The commenter suggests noting on page 4.7-15 that Policy CIR-7.1 and Action CIR-7.1.1 will not pertain to most infill housing projects, which the commenter states would be exempt from environmental review. The commenter suggests revising Policy CIR-7.2 consistent with the comment on 6.218.

In response to this comment, Policy CIR-7.1 has been revised in the 2045 General Plan Update and changes have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

Response 6.223
The commenter states that page 4.7-14 is inconsistent with the statement on 4.7-15 which states the City would be inconsistent with CARB standards.

Impact TRA-2 states that future development alone would meet CARB’s VMT reduction target, but concludes that future development combined with existing development (i.e., combined Future conditions forecast) would not meet the CARB reduction target. No revisions to the Draft EIR are required in response to this comment.

Response 6.224
The commenter asks for clarification if VMT is considered a significant and unavoidable impact, if every future non-residential project would require an EIR.

As described in Impact TRA-2, potential future VMT impacts from individual developments in Santa Maria would be evaluated based on local VMT thresholds established by the City. Future nonresidential projects would not by default be required to prepare an EIR. No revisions to the Draft EIR are required in response to this comment.
2-140
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.225
The commenter suggests removing the reference to private streets in Policy CIR-1.3 on page 4.7-16.

This comment pertains to policy language included in the 2045 General Plan Update that does not pertain to the environmental analysis in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.226
The commenter states they have the same comments as above on Policy CIR-1.4 and Actions CIR1.4.1 and CIR-1.4.2 on page 4.7-17.

This comment pertains to policy language included in the 2045 General Plan Update that does not pertain to the environmental analysis in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.227
The commenter suggests Policy CIR-1.9 should be separated into two policies covering level of service and bicyclists separately. The commenter states there is no need for deficiency plans as most intersections will be significantly impacted in the future.

In response to this comment, revisions to Policy CRI-1.9, CIR-1.10, and CIR-1.11 have been made in the 2045 General Plan Update to separate LOS and bicycle level of stress and changes have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

Response 6.228
The commenter suggests that infill development will result in significant traffic impacts that need to be addressed in the EIR, including a map that shows future roadways and intersections which will exceed level of service standards.

Refer to Response 6.6 for a discussion of LOS analysis in the Draft EIR. Consistent with CEQA Guidelines Section 15046.3, VMT has replaced LOS as the metric for determining transportation impacts under CEQA. Accordingly, LOS is not evaluated as a potential environmental impact in the Draft EIR. A map of the existing circulation system is also provided in the General Plan as Figure 4.7- 1, Current Circulation Element Roadway Functional Classification. No revisions to the Draft EIR are required in response to this comment.

Response 6.229
The commenter asks if the second paragraph of the Cumulative Impacts discussion on page 4.7-18 means the City will accept level of service deficiencies throughout Santa Maria at full buildout. The 2-141
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
commenter asks for clarification on the third paragraph of the Cumulative Impacts discussion related to exemptions from CEQA for housing projects.

The paragraph referenced by the commenter explains that the cumulative impacts analysis considers all development anticipated under the General Plan and confirms that such development would be required to comply with local regulations and policies, including those in the Circulation Element. These policies govern how the circulation system, including roads, transit, bicycle, and pedestrian facilities, will function as growth occurs. The conclusion is that cumulative projects would not conflict with applicable plans or policies, resulting in a less-than-significant impact. The Draft EIR does not establish or modify LOS standards.

Refer to Response 6.8 for a discussion of future individual projects requiring separate environmental review. No revisions to the Draft EIR are required in response to this comment.

Response 6.230
The commenter suggests adding to the Water Supply and Demand discussion on page 4.8-1 that the adjudication agreement included return flows from the wastewater treatment plant for percolation ponds. The commenter also suggests adding information that the City has been successful in reducing water consumption per capita and water use in agricultural operations.

Per capita water consumption is discussed in Impact UTIL-2 of the Draft EIR. Specifics regarding water types that are allocated to the City as result of the Santa Maria Groundwater Adjudication are not included in the evaluation of per capita water consumption as they do not have an influence on the environmental conclusions related to water supply in Impact UTIL-2. Impact UTIL-2 provides an analysis of the total amount of projected water supply and demand in the city. No revisions to the Draft EIR are required in response to this comment.

Response 6.231
The commenter suggests reformatting Table 4.8-1 to put the table on one full page. The commenter asks if the table and Annexation Study Technical Memorandum prepared by WSC qualify as a Water Supply Assessment per state law.

The comment pertaining to reformatting Table 4.8-1 focuses on editorial edits that do not pertain to the environmental analysis in the Draft EIR. Refer to Response 6.9 for a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

The Annexation Study Technical Memorandum prepared by WSC would not qualify as a Water Supply Assessment. A Water Supply Assessment would be required for a project-level development meeting any the definitions of project provided in California Water Code Section 10912(a). No revisions to the Draft EIR are required in response to this comment.

Response 6.232
The commenter suggests the Sewer Collection and Wastewater Treatment discussion on page 4.8-3 should include the current flow to the wastewater treatment plant, and an estimate of the capacity of the plant at full buildout of the 2045 General Plan Update. The commenter asks if there will be a need for upgrades to the wastewater treatment plant or development of a new plant, and if there will need to be upgrades to wastewater pipelines.
2-142
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Future wastewater generation is discussed in Impact UTIL-1 of the Draft EIR. Because the 2045 General Plan Update does not include specific development plans, the Draft EIR does not evaluate the potential environmental impacts of specific sewer pipeline upgrades, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.233
The commenter suggests the Stormwater Facilities discussion on page 4.8-4 should include information on the A Street basin and the North Blosser basins. The commenter provides information on the Blosser Channel and Blosser Basin. The commenter states that information should be added on the Green Canyon watershed and stormwater improvements constructed through the southern portions of Santa Maria. The commenter provides information on these improvements.

Subsection 4.8.1.c, Stormwater Facilities is based on information from the City’s 2020 Urban Water Management Plan, 2009 Sewer System Master Plan, 2005 Storm Water Management Plan, 2020 Infrastructure Existing Conditions Report, and city input as these are readily available resources, and provide sufficient baseline data to support Subsection 4.8.1.c, Stormwater Facilities. Additional information regarding stormwater projects intended to reduce stormwater runoff would not further the environmental analysis in the Draft EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.234
The commenter suggests that the Solid Waste discussion on page 4.8-5 should include information on the Los Flores Landfill, information on what occurs when the existing landfill is closed, a discussion of food organic waste, hazardous waste collection, and justification for the use of Cold Canyon Landfill.

Subsection 4.8.1.d, Solid Waste, states that the Santa Maria Regional Landfill is expected to remain operational through 2034, and that after operation of the Santa Maria Regional Landfill ends, the City may divert waste to nearby facilities such as the Cold Canyon Landfill, which has sufficient capacity and is anticipated to operate through 2040. Because the 2045 General Plan Update does not include future development plans for the Los Flores landfill mentioned by the commenter, the Draft EIR does not evaluate the potential environmental impacts of such development, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact.

Organic waste reduction requirements are described in the California Senate Bill 1383 discussion in Subsection 4.8.2.b, State Regulations, of the Draft EIR. Hazardous waste disposal is described in the Chapter 8-11 discussion in Subsection 4.8.2.c, Local Regulations, of the Draft EIR and in Subsection

4.9.4, Hazards and Hazardous Materials, of the Draft EIR.

No revisions to the Draft EIR are required in response to this comment. 2-143
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.235
The commenter suggests revising the Water discussion in Impact UTIL-1 to state that the City has installed a water line from water tanks east of Santa Maria to Panther Drive that will serve the annexation area.

Subsection 4.8.3.b, Project Impacts and Mitigation Measures, discusses existing infrastructure supporting the annexation area, and concludes that the existing infrastructure may not be adequate to support the level of development that would be facilitated by the 2045 General Plan Update. As development in the annexation area occurs, the City would be required to review existing infrastructure and determine whether additional improvements are necessary to ensure adequate service. No revisions to the Draft EIR are required in response to this comment.

Response 6.236
The commenter suggests revising the Wastewater discussion in Impact UTIL-1 to clarify the calculations of wastewater generation and the locations of wastewater pipelines that would convey effluent from the east to the existing plant and the sizing of these pipelines.

As stated in Impact UTIL-1, the 2045 General Plan would facilitate development which, at full buildout, would result in a wastewater generation of 11.4 million gallons per day based on a generation factor of 68 gallons per day as stated in the City’s 2020 UWMP. The wastewater treatment plant has a capacity of 13.5 million gallons per day.

Because the 2045 General Plan Update does not include future development plans, the Draft EIR does not evaluate the potential environmental impacts of specific wastewater treatment pipeline improvements, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.237
The commenter suggests revising the Stormwater discussion in Impact UTIL-1 to include information on how stormwater conveyance will be handled on the east side of the freeway. The commenter suggests regional drainage cannot be deferred to future projects.

Drainage patterns are discussed in the Impact HYD-3 discussion of the Draft EIR. As described therein, runoff would be regulated under the State Water Resources Control Board’s National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Small General Municipal Separate Storm Sewer Systems (Phase II MS4 Permit) and the Industrial General Permit. Individual developments that create or replace greater than or equal to 2,500 square feet of impervious surface would be required to implement BMPs and submit a Stormwater Control Plan listing applicable BMPs to the City for review and approval.

Because the 2045 General Plan Update does not include specific development plans, the Draft EIR does not evaluate the potential environmental impacts of drainage changes of such development, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.
2-144
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.238
The commenter suggests revising the goals and policies listed on page 4.8-16 in accordance with previous comments.

This comment pertains to policy language included in the 2045 General Plan Update that does not pertain to the environmental analysis in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Response 6.239
The commenter suggests that Impact UTIL-1 should include information regarding overall regional infill drainage and drainage in the annexation area. The commenter asks how drainage from the annexation area will be conveyed to the river.

Refer to Response 6.237 for a discussion regarding stormwater conveyance. No revisions to the Draft EIR are required in response to this comment.

Response 6.240
The commenter suggests that Impact UTIL-2 should include information from the 2024 Annual Report of the Santa Maria Valley Basin Management Plan, specifically page 38-39 of that plan, which includes a discussion of projected water use by 2040 of 18,700 acre-feet The 2024 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition uses the 2020 UWMP and describes projected 2045 water use in the city as approximately 18,700 acre-feet. Pages 38-39 of the 2024 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition refers specifically to intra-basin water transfers related to the Santa Maria Groundwater Basin, and discusses supply and demand of the basin. The Draft EIR discusses city water demand and supply from all applicable water sources. As such, relevant and applicable information from the 2024 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition has been incorporated into the Draft EIR.

The estimated 2045 water use of approximately 18,700 acre-feet is shown in Table 4.8-1 in the rows showing 2045 demand totals. No revisions to the Draft EIR are required in response to this comment.

Response 6.241
The commenter states that the 2024 Annual Report of the Santa Maria Valley Basin Management Plan includes a discussion of projected water use for Santa Maria by 2040.

Refer to Response 6.240 for a discussion of the Santa Maria Valley Basin Management Plan. No revisions to the Draft EIR are required in response to this comment.

Response 6.242
The commenter asks for additional information on the City’s Water Shortage Contingency Plan, including its adoption date and how often it is updated. 2-145
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The City’s Water Shortage Contingency Plan provides guidance to prepare and respond to water shortages in Santa Maria. The Water Shortage Contingency Plan is included as Appendix H of the City’s 2020 UWMP. The City first adopted its 2005 Water Shortage Contingency Plan in 2007 and made subsequent updates in 2011 and 2021.

This comment does not pertain to the environmental analysis in the Draft EIR or recommend additional information or analysis be added to the Draft EIR. No revisions to the Draft EIR are required in response to this comment.

Response 6.243
The commenter states that a 20 percent reduction in residential indoor water use, referenced on page 4.8-19, would result in water use to be 85 gallons per day per capita.

The City relies on a water demand factor of 118 gallons per capita per day, as stated in the City’s 2020 UWMP, as a basis for projecting water demand in Santa Maria. This demand factor accounts for existing water reduction measures, including those included in the California Green Building Standards Code. The 20 percent reduction in residential indoor water use that the commenter refers to has been enforced by the California Green Building Standards Code starting in 2016. As such, residential indoor water use would continue to be reduced by 20 percent and would not further reduce residential water use to the commenter’s estimated 85 gallons per capita per day. No revisions to the Draft EIR are required in response to this comment.

Response 6.244
The commenter states the last paragraph of Impact UTIL-2 should reference the 2024 Basin Management Plan and note the total water use for Santa Maria is estimated at 18,700 acre-feet.

Refer to Response 6.240 for a discussion of the Santa Maria Valley Basin Management Plan. No revisions to the Draft EIR are required in response to this comment.

Response 6.245
The commenter states that Impact UTIL-3 should clarify if the use of Cold Canyon landfill is temporary and if Los Flores landfill would be built.

As described in Impact UTIL-3, the Santa Maria Regional Landfill is expected to remain operational through 2034. After operation of the Santa Maria Regional Landfill ends, the City may divert waste to nearby facilities such as the Cold Canyon Landfill, which has sufficient capacity and is anticipated to operate through 2040. Because the 2045 General Plan Update does not include future development plans for the Los Flores landfill mentioned by the commenter, the Draft EIR does not evaluate the potential environmental impacts of such development, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.
2-146
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.246
The commenter states that the Cumulative Impacts discussion on page 4.8-21 needs to describe existing water use and projected water use at 2045 total buildout. The commenter asks if the City has determined what water lines need to be upgraded to serve buildout.

Existing water use is estimated in Table 4.8-1 in Subsection 4.8.1.a, Water Supply and Demand, of the Draft EIR. Projected water use at full buildout on 2045 is provided in Impact UTIL-2.

Because the 2045 General Plan Update does not include future development plans, the Draft EIR does not specify water lines that may need upgrades to serve future development, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.247
The commenter states that the Cumulative Impacts discussion on page 4.8-21 needs to account for up to 15 million gallons per day of wastewater effluent generation at full buildout. The commenter asks for clarification of how wastewater demand was calculated and which pipelines would be needed to serve development east of the freeway.

As stated in Impact UTIL-1, the 2045 General Plan would facilitate development which, at full buildout, would result in 11.4 million gallons of wastewater per day based on a generation factor of 68 gallons per day in the City’s 2020 UWMP. The wastewater treatment plant has a capacity of 13.5 million gallons per day.

Because the 2045 General Plan Update does not include future development plans, the Draft EIR does not evaluate the potential environmental impacts of specific wastewater treatment pipeline improvements, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.248
The commenter states that the Cumulative Impacts discussion on page 4.8-22 needs to clarify where future solid waste will be hauled and if the Los Flores landfill will be constructed.

Refer to Response 6.245 for a discussion of future solid waste. No revisions to the Draft EIR are required in response to this comment.

Response 6.249
The commenter suggests revising the Aesthetics discussion on page 4.9-1 as there is no view of the Santa Maria River except from U.S. 101 bridge or levee trail north of Santa Maria. The commenter suggests adding the names of ridges, rolling hills, and mountains to the east, and noting the locations of the Solomon Hills and Casmalia Hills.
2-147
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
As shown in Figure 2-2, Santa Maria city limits contain portions of land abutting the Santa Maria River where the river and its foothills are visible. No revisions to the Draft EIR are required in response to this comment.

The comment pertaining to adding names of landscape features focuses on editorial edits that do not pertain to the environmental analysis in the Draft EIR nor would it change the analysis in the Draft EIR. Refer to Response 6.9 for a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

Response 6.250
The commenter suggests revising the second paragraph of the Aesthetics discussion on page 4.9-1 to include information on Objective Design Standards.

In response to this comment, the following revision has been made to Subsection 4.9.1, Aesthetics:

The City has regulations for exterior lighting for commercial development, mixed-use development, Objective Design Standards for residential development, as well as specific standards for parking lots, signs, and for development within Airport Safety Zones (Chapters 12- 33, 12-49, 12-32, 12-34, 12-21 and 12-24 of the Zoning Ordinance).

Response 6.251
The commenter suggests adding Objective Design Standards to the third paragraph of the Aesthetics discussion on page 4.9-1.

Refer to Response 6.251 for a discussion of Objective Design Standards. As described therein, a reference to Objective Design Standards has been added to Subsection 4.9.1, Aesthetics, of the Final EIR.

Response 6.252
The commenter suggests deleting the first paragraph on page 4.9-2 as it is repetitive of previous information in the Aesthetics discussion on page 4.9-1.

This comment focuses on editorial edits that do not pertain to the environmental analysis in the Draft EIR nor would it change the analysis in the Draft EIR. Refer to Response 6.9 for a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

Response 6.253
The commenter suggests revisions to Policy REC-8.1 on page 4.9-2 as there is no publicly owned and designated open space in Santa Maria.

This comment pertains to policy language included in the 2045 General Plan Update that does not pertain to the environmental analysis in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.
2-148
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.254
The commenter suggests adding Executive Order N-79-20 described in the Energy discussion on page

4.9-2 in the Air Quality and Greenhouse Gas chapter of the EIR.

Executive Order N-79-20 directs California to end the sale of new gasoline-powered passenger vehicles by 2035 and transition the state’s transportation sector toward zero-emission electric vehicles. While the State did implement mandates to phase out natural gas vehicle sales, these mandates were blocked by the United States Senate in May 2025. Given the uncertainty of legislation, it is speculative to assume that a ban on the sale of natural gas vehicles would occur.

Furthermore, if a ban on the sale of natural gas vehicles occurs, it is likely that natural gas vehicles would continue to be used during a transitory period to electric vehicles. Due to the uncertainty regarding State legislation mandating electric vehicles, the Draft EIR does not consider a reduction in energy use occurring from a shift from natural gas vehicle use to electric vehicle use, as such an evaluation would be speculative at this time. Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. No revisions to the Draft EIR are required in response to this comment.

Response 6.255
The commenter suggests that the Operational Impacts discussion on page 4.9-3 should list all of the counties that 3CE serves.

In response to this comment, the following revision has been made to the Operational Impacts discussion in Subsection 4.9.2, Energy:

The City of Santa Maria is currently enrolled in the Central Coast Community Energy Program (3CE) which strives to source clean and renewable electricity at responsible rates for customers along the central coast of California within the 3CE service area which includes the counties of Santa Cruz, San Benito, Monterey, San Luis Obispo, and Santa Barbara.

Response 6.256
The commenter asks for clarification on Action S-1.1.4 on Page 4.9-5 related to the number of buildings constructed with unreinforced masonry.

This comment addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.257
The commenter suggests deleting Action S-1.2.1 as this is already in the Building Code and zoning ordinance.

This comment addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not 2-149
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.258
The commenter suggests deleting Action S-1.3.1 as this is already required by the building code.

This comment addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.259
The commenter suggests revising the Landslides discussion on Page 4.9-7 to clarify the escarpment is not subject to landscapes in Santa Maria or the annexation area.

As stated in Subsection 4.9.3, Geology and Soils, there is no proposed development or land use changes that would occur in the area of Santa Maria that contains the escarpment. No revisions to the Draft EIR are required in response to this comment.

Response 6.260
The commenter suggests revising the first paragraph of Page 4.9-8 to indicate areas of expansive soil are known to be unlikely within city limits.

Given that the majority of the City of Santa Maria is considered unlikely to contain expansive soils, as shown in Figure S-3 of the Draft 2045 General Plan, the following language has been added to Subsection 4.9.3, Geology and Soils:

Areas of expansive soils are known to exist in city limits; however, the majority of Santa Maria is considered unlikely to contain expansive soils (Safety Element of the 2045 Santa Maria General Plan Figure SE-3).

Response 6.261
The commenter suggests revising the Paleontological Resources discussion on Page 4.9-8 to state there have been few paleontological resources found in Santa Maria, and the Santa Maria Valley has been historically flooded and the Orcutt area consists of historic sand dunes.

The commenter’s suggested additions do not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures. No revisions to the Draft EIR are required in response to this comment.

Response 6.262
The commenter states there is no mention of Allan Hancock College and new school sites in Santa Maria in the Schools discussion on Page 4.9-11.
2-150
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
As discussed in Response 6.8, the Draft EIR provides a program-level analysis consistent with CEQA Guidelines 15168 for long-range planning documents and does not require site-specific planning or design details. The 2045 General Plan Update does not include specific proposals for the development of school facilities, including Allan Hancock College, and it is not possible to know project specific details at this time regarding potential improvements at school facilities or future new school facilities. Because the 2045 General Plan Update does not include future development plans for specific developments projects, the Draft EIR does not evaluate the potential environmental impacts of future potential development at a project level of detail, as such an evaluation would be speculative at this time.

In response to the commenter’s statement regarding Allan Hancock College, the following revision has been made to the Schools discussion in Subsection 4.9.8, Public Services and Recreation:

There are 23 schools within city limits, including elementary, junior high and high schools, and Allan Hancock College.

Response 6.263
The commenter suggests including a map of existing and new school sites from US 101 and truck routes in the Schools discussion on Page 4.9-11. The commenter asks if schools need to be 0.25-mile from truck routes.

As discussed in Response 6.8, the Draft EIR provides a program-level analysis consistent with CEQA Guidelines 15168 for long-range planning documents and does not require site-specific planning or design details. The proposed project does not include specific proposals for the development of school facilities and it is not possible to know project specific details at this time regarding potential improvements at school facilities or future new school facilities. Because the 2045 General Plan Update does not include future development plans for specific developments projects, the Draft EIR does not evaluate the potential environmental impacts of future potential development at a project level of detail, as such an evaluation would be speculative at this time. No revisions to the Draft EIR are required in response to this comment.

Response 6.264
The commenter suggests revising the Hazardous Materials Sites discussion on Page 4.9-11 to include a map that locates the 90 active hazardous materials sites in Santa Maria. The commenter asks if this number includes active and historic oil wells.

Subsection 4.9.4, Hazards and Hazardous Materials, describes the approximately 90 active hazardous materials sites identified on the DTSC EnviroStor and SWRCB GeoTracker databases.

These do not include all active and historic wells in Santa Maria as not all well sites have posed a potential hazard.

The Draft EIR provides a program-level analysis consistent with CEQA Guidelines 15168 for longrange planning documents and does not include specific development proposals as part of the proposed project. Proximity to hazardous materials sites would be evaluated on a case-by-case basis as part of City review for individual development projects. Accordingly, a map of hazardous materials sites throughout Santa Maria is not included in the Draft EIR. No revisions to the Draft EIR are required in response to this comment.
2-151
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.265
The commenter suggests the policies and actions on Page 4.9-12 should remove references to the City Petroleum Engineer and should refer to new state law regarding setback for new oil development. The commenter suggests deleting either Action S-4.1.3 or S-4.1.6 due to repetitive information.

Action S-4.1.6 has been revised in the 2045 General Plan Update and changes have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR. This comment addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.266
The commenter asks clarification on Action S-4.2.5 on Page 4.9-11 regarding if the City issues permits for railroad operations or if railroad operations are exempt from City permits.

Railroad operations and facilities permitting falls under the jurisdiction of the California Public Utilities Commission; the City does not issue permits for railroad operations. In response to this comment, Action S-4.2.5 has been deleted from the 2045 General Plan Update and changes have been carried over into the Final EIR, as appropriate. The revisions incorporated into the Final EIR do not otherwise change the environmental analysis or conclusions in the Final EIR.

Response 6.267
The commenter suggests a page break between two action items is needed on Page 4.9-15.

This comment focuses on editorial edits that do not pertain to the analysis presented in the Draft EIR, nor would it change the analysis in the Draft EIR. Refer to Response 6.9 for a discussion of comments, recommendations, and requests that are editorial in nature and do not pertain to the adequacy of the Draft EIR or alter the environmental impact analysis.

Response 6.268
The commenter states there is no land in Santa Maria zoned for agriculture. The commenter suggests revising the first paragraph of the Land Use and Planning discussion on Page 4.9-18 to clarify the number of infill units and units in the annexation area.

The commenter correctly notes that there is no land in Santa Maria zoned for agriculture. Specifics on the proposed 2045 General Plan Update buildout is discussed in Section 2.6.5, Proposed 2045 General Plan Buildout. No revisions to the Draft EIR are required in response to this comment.

Response 6.269
The commenter suggests revising the last sentence of the second paragraph of the Land Use and Planning Discussion on Page 4.9-18 to clarify that all neighborhoods can potentially have infill units. 2-152
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
In response to this comment, the following change has been made to the Land Use and Planning Discussion in Subsection 4.9.5, Land Use and Planning:

By cusing new development away from established neighborhoods and ensuring compatibility between new development and existing facilities through thoughtful land use planning, the policies help prevent community division and reduce the potential for significant environmental impacts.

Response 6.270
The commenter suggests deleting Action LU-1.1.2 on Page 4.9-19 as the Objective Design Standards have been adopted.

This comment addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.271
The commenter suggests revisions to Policies LU-1.2, LU-1.3, and LU-1.5 on Page 4.9-19. The commenter asks information on the current jobs-housing balance in Santa Maria.

This comment primarily addresses policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.272
The commenter suggests including a mention of mining in Santa Maria for gravel and sand in the Mineral Resources discussion on Pages 4.9-20 and 4.9-21.

As described in Subsection 4.9.6, Mineral Resources, there are no mines or mineral extraction operations in the city and none are proposed. No gravel or sand mining exists in the city and is not required to be discussed. No revisions to the Draft EIR are required in response to this comment.

Response 6.273
The commenter suggests revising the Population and Housing discussion on Page 4.9-22 to clarify there will be two additional RHNA cycles through the horizon of the 2045 General Plan Update.

In response this comment, the following revision has been made to Subsection 4.9.7, Population and Housing:

The City’s Sixth Cycle Housing Element indicates 5,418 residential units must be built by 2031 to satisfy the state required Regional Housing Needs Allocation. The plan would facilitate development that could help the City reach its housing needs goal. In addition, subsequent 2-153
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Housing Element revisions would be made throughout the horizon of the 2045 General Plan Update in accordance with state law. These plans would facilitate development that could help the City reach its housing needs goal.

Response 6.274
The commenter suggests revising the Fire Protection discussion on Page 4.9-23 to provide information on the number of existing fire stations and firefighters in Santa Maria and the future needs of the fire department.

The following revision has been made to Subsection 4.9.8, Public Services and Recreation:

Fire protection services in Santa Maria are provided by the Santa Maria Fire Department (SMFD). SMFD provides a wide range of programs, which include fire suppression, all risk emergency services, public education programs, fire prevention, and life safety measures. SMFD also administers a hazardous materials business plan program in cooperation with Santa Barbara County. There are six fire stations in the city (City of Santa Maria 2025a).

SMFD operates five stations that serve the entire community and Fire Station No. 6 only serves the Santa Maria Public Airport (City of Santa Maria n.d.). There are currently five frontline fire engines and one ladder truck in service for the Santa Maria Fire Department. In addition, the department has an aircraft rescue and firefighting vehicle at the airport station, an urban search and rescue vehicle, three reserve engines, and a Type-III brush engine. For purposes of responding to structure fires, there are four engines and a truck available, leaving one engine free to cover the city. The fire department is currently budgeted for a total of 63 suppression personnel, with a ratio of 0.59 firefighters per 1,000 residents. Daily minimum staffing is 20 department personnel, including the Aircraft Rescue and Firefighting Specialist and a Battalion Chief. The average response time of the Santa Maria Fire Department in 2019 was 4:06 minutes for all calls, and 5:32 minutes when considering only calls for structure fires (City of Santa Maria 2020a).

Development facilitated by the plan would be served by the Santa Maria Fire Department, which provides fire protection and emergency medical services throughout the city. As future buildout occurs, the City would evaluate fire service operations and deployment to ensure adequate coverage.

Response 6.275
The commenter suggests revising the Police Protection discussion on Page 4.9-23 to provide information on the number of existing police stations and police officers in Santa Maria and the future needs of the police department.

The following revision has been made to Subsection 4.9.8, Public Services and Recreation:

Law enforcement services are provided by the City of Santa Maria Police Department (SMPD).

There is one police station located at 1111 West Betteravia Road and approximately 700 police department personnel (City of Santa Maria 2024). Professional police services include maintaining civil order, preventive patrol, investigations, traffic control and enforcement, criminalistics, crime prevention, drug enforcement, and abuse prevention. The department houses the public safety dispatch center for police and fire, which receives all emergency 9-1-1 and non-emergency calls for services (City of Santa Maria 2020a). The Santa Maria Police 2-154
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Department Communications Center handles over 170,000 incoming calls for service every year (about 465 per day). There are 63,000 emergency 9-1-1 calls per year (about 172 per day).

Development facilitated by the plan would increase population and activity levels in Santa Maria, potentially leading to higher demand for police protection services. The Santa Maria Police Department would provide law enforcement citywide, with development required to undergo security review during the plan check process and to pay police mitigation fees under SMMC Chapter 8-15.

Response 6.276
The commenter suggests revising the Schools discussion on Pages 4.9-23 and 4.9-24 to include the number of new schools needed for full buildout, including the locations of such facilities, and any plans for Allan Hancock College.

Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. Because the 2045 General Plan Update does not include future development plans for new school facilities, the Draft EIR does not evaluate the potential environmental impacts of such development, as such an evaluation would be speculative at this time. No revisions to the Draft EIR are required in response to this comment.

Response 6.277
The commenter suggests revising the Parks and Recreation Facilities discussion on Pages 4.9-24 and

4.9-25 as there is not enough land in Santa Maria to meet parkland standards. The commenter suggests adding detail on where additional parkland will come from. The commenter suggests adding other calculations to the footnote on Page 4.9-24 to describe the parkland needed to meet parkland standards at full buildout. The commenter suggests adding information on parkland at Los Flores and states that having future residential developers pay for parkland is infeasible.

The discussion in Subsection 4.9.8, Public Facilities and Recreation, pertaining to parkland acknowledges that the city’s existing and future park service ratio with implementation of the 2045 General Plan Update would be below its service goal of 5 acres of parkland per 1,000 residents and additional parkland would be required.

Subsection 4.9.8, Public Facilities and Recreation, discusses potential environmental impacts related to park services at a programmatic level. Project-specific details, including acquiring and development of parkland, are required to be addressed through future planning and subsequent environmental review. Because the 2045 General Plan Update does not include future development plans for parkland at Los Flores, the Draft EIR does not evaluate the potential environmental impacts of such development. Furthermore, Los Flores Park is not a City park as it is not located within city limits, and it is not readily accessible to city residents. The Draft EIR does not evaluate the feasibility of existing Municipal Code requirements. Santa Maria Municipal Code Section Chapter 8- 15 currently requires developers to pay impact fees that would promote the maintenance and expansion of public parks. These impact fees would assist in maintaining and expanding parkland in Santa Maria. As such, the Draft EIR in accordance with California Government Code Section 65995(3)(h), deems the payment of impact fees to be full and complete mitigation. No revisions to the Draft EIR are required in response to this comment. 2-155
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.278
The commenter suggests revising the Other Public Facilities discussion on Page 4.9-25 to note that libraries are experiencing a reduction in use, note that all new school sites have library resources, and add information on where new library buildings would be located If needed.

Libraries are discussed in Subsection 4.9.8, Public Facilities and Recreation, of the Draft EIR, which concludes that impacts related to libraries would be less than significant. The commenter correctly notes that schools have library resources; however, library resources in schools are typically limited to use by students and not available to all members of the public. As a result, these library resources are not considered in Subsection 4.9.8, Public Facilities and Recreation, of the Draft EIR.

Pursuant to CEQA Guidelines Section 15145, if a lead agency finds that a particular impact is too speculative for evaluation, the agency should note its conclusion and terminate discussion of the impact. Because the 2045 General Plan Update does not include future development plans for a new library facility, the Draft EIR does not evaluate the potential environmental impacts of such development, as such an evaluation would be speculative at this time. No revisions to the Draft EIR are required in response to this comment.

Response 6.279
The commenter suggests revising the Wildfire discussion on Pages 4.9-25 and 4.9-26 to note the majority of Santa Maria is surrounded by agricultural production that limits wildfire. The commenter notes the new CalFire maps indicate there is potential for a fire hazard in the Santa Maria Riverbed and Solomon Hills area.

The discussion in Subsection 4.9.9, Wildfire, pertaining to fire risks states that Santa Maria is characterized by limited fire hazards, and describes the fire hazard severity zones identified by CalFire. The locations referenced by the commenter are designated as a Moderate Fire Hazard Severity Zone, but are not classified as a High or Very High Fire Hazard Severity Zone. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required.

Response 6.280
The commenter suggests revising the Wildfire discussion on Page 4.9-26 to note that the Santa Maria Police Department serves as the aerial firefighting base for CalFire.

In response to this comment, the following change has been made to Subsection 4.9.8, Public Facilities and Recreation, rather than the Subsection 4.9.9, Wildfire:

Development facilitated by the plan would increase population and activity levels in Santa Maria, potentially leading to higher demand for police protection services. The Santa Maria Police Department would provide law enforcement citywide, with development required to undergo security review during the plan check process and to pay police mitigation fees under SMMC Chapter 8-15. The Santa Maria Police Department also serves as an aerial firefighting base for CalFire.
2-156
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.281
The commenter suggests revising the Population and Economic Growth discussion on Page 5-1 to clarify the current job housing balance and explain how the 2045 General Plan Update is going to meet a jobs-to-housing ratio of 1.2.

This comment relates to the projected jobs included in the 2045 General Plan Update and does not pertain to the analysis presented in the Draft EIR. Balancing jobs and housing is a policy objective handled through the 2045 General Plan Update and Housing Element under state planning law and RHNA requirements. CEQA Guidelines Section 15131 explicitly states that economic or social effects are not treated as significant environmental impacts unless they lead to a physical change in the environment. As such, Chapter 5, Other CEQA Required Discussions, Section 5.1.1 of the Draft EIR evaluates whether the project could induce growth or create environmental impacts associated with housing or employment changes. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required.

Response 6.282
The commenter suggests revising Policy LU-1.1 to clarify the definition of a complete community.

This comment relates to policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required.

Response 6.283
The commenter asks why there is not an action item for future planning in annexation areas.

Policy LU-2.3 in the General Plan addresses future planning in annexation areas. Policy LU-2.3 states “Future specific plans. Require specific plans or master plans in support of annexation in the Planned Annexation Area that are consistent with the following objectives:
 Prioritize new employment uses near existing institutions, such as educational or research and development (R&D) near Marian Regional Medical Center and Allaen Hancock College, and industrial or commercial uses adjacent to US-101 and along East Main to provide convenient access to regional transportation.
 Provide a diversity of higher density housing types for rental and ownership at a range of price points, to minimize land area expansion and conversion of agricultural lands.  Design complete neighborhoods where residents have convenient walking and biking access to public facilities, services, and retail.
 Buffer schools, parks, and homes from infrastructure, major roadways, the Santa Maria regional landfill, industrial land uses, and other land uses that may produce odor or noise or negatively impact air quality.
 Support expansion of the Marian Regional Medical Center and other supportive medical offices in new development in close proximity to the existing Medical Center. 2-157
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
 Support higher education, including expansions of Allen Hancock College and other public, private, and post-secondary schools.
 Provide 5 acres of parks per 1,000 residents, per the City’s park service standard, and plan for new public and recreational facilities.
 Develop a safe, connected network of sidewalks and trails that provides ample connections to destinations
This comment relates to the actions included in the 2045 General Plan Update itself and does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.284
The commenter suggests revisions to Policy LU-1.2 in accordance with previous comments on this policy.

Action LU-9.1.1 in the Land Use Element states the following: “ As a part of the LAFCO Sphere of Influence boundary change and annexation process, the City will establish and maintain a stable Urban Growth Boundary to provide certainty for both urban development and agricultural operations.” This comment is regarding policy language included in the 2045 General Plan Update that does not pertain to the analysis presented in the Draft EIR. Comments related to the 2045 General Plan Update will be provided to decision-makers for their consideration. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required in response to this comment.

Response 6.285
The commenter suggests Page 5-3 should include a reference to the No Urban Growth agreement on areas outside of the Sphere of Influence and annexation area.

Areas located outside of the City’s proposed Sphere of Influence and annexation area are not currently in the jurisdiction of the City and could not be developed by the City until the boundary changes are approved by LAFCO. Accordingly, development located outside of the City’s jurisdiction is not applicable to this Draft EIR. However, in anticipation of future Sphere of Influence boundary changes and annexations, Action LU-9.1.1 in the Land Use Element states the following: “ As a part of the LAFCO Sphere of Influence boundary change and annexation process, the City will establish and maintain a stable Urban Growth Boundary to provide certainty for both urban development and agricultural operations.” No revisions to the Draft EIR are required in response to this comment.

Response 6.286
The commenter states Section 5.2, Irreversible Environmental Effects, should be revised to state that no known archeological sites have been identified in the city over the last 35 years and they are not expected to be found north of Betteravia so there would not be impacts north of Betteravia. The 2-158
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
commenter contends that even south of Betteravia, it is unlikely to find resources since there have been agricultural activities on the undeveloped land.

Refer to Responses 6.160 through 6.163 for a discussion of cultural resources and how they are evaluated in the Draft EIR.

Response 6.287
The commenter states the Agricultural Identity objective needs to be revised or it will be used against the City by LAFCO for the proposed annexation areas.

Refer to Response 6.10 for a discussion of project objectives and how they were developed for the 2045 General Plan Update.

Response 6.288
The commenter states that the words “urban footprint” should be changed to “city boundary”. The commenter also requests that the second and third sentences in Section 6.2.2.b., Biological Resources, are deleted or revised because the mitigation measures are standard requirements and would apply today for current development projects except housing projects that are exempt from environmental review.

Subsection 6.2.2.c., Biological Resources, has been updated as follows:

Less growth and development outside of the existing urban footprint city boundary under the No Project Alternative would reduce the potential for habitat disturbance, leading to reduced impacts to biological resources.

Mitigation Measures BIO-1(a) through BIO-1(k) are not standard City requirements. These mitigation measures go beyond existing City requirements contained in the Santa Maria Municipal Code and current General Plan. No revisions to the Draft EIR are required in response to this comment.

Response 6.289
The commenter states that the Cultural Resource analyses in the Alternatives chapter should be revised to reflect their previous comments about no cultural resources being located north of Betteravia, so no more surveys will be required.

Refer to Responses 6.160 through 6.163 for a discussion of cultural resources and how they are evaluated in the Draft EIR.

Response 6.290
The commenter requests that changes to Sections 6-4, 6-5, and 6-6 are made based on comments provided previously.

This comment does not provide a specific concern regarding the contents or adequacy of the Draft EIR. CEQA Guidelines Section 15088 provides guidance on the preparation of response to comments and indicates that while lead agencies must evaluate all comments on environmental issues received on a Draft EIR they need only respond to comments related to significant environmental issues. Therefore, no response to this comment or changes to the Draft EIR are required. 2-159
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.291
The commenter requests that the description of Alternative 2 (Infill Only Alternative) be updated to state that it will have 16,000 units and commercial office development within the existing city limits.

The commenter states that Alternative 2 is fatally flawed because there is no room in the city for 200 acres of new schools and hundreds of acres of new parks, and that the only way this could be accomplished is to allow many high-rise buildings and multi-level buildings on existing school sites.

The commenter states this would result in a negative impact on aesthetics.

Subsection 6.3.1, Description, has been updated as follows:

For the purpose of this analysis, the Infill Only Alternative is assumed to result in a similar overall level of buildout and population growth compared to the 2045 General Plan Update, despite the exclusion of future development in the eastern annexation area. Therefore, this analysis assumes that the Infill Only Alternative would result in the addition of approximately 16,000 new residential units and up to 23,750 new jobs associated with new commercial development within city limits.

The Draft EIR discusses potential environmental impacts related to Alternative 2 at a programmatic level in Subsection 6.3.2, Impact Analysis. The Draft EIR provides a program-level analysis of the proposed plan and plan alternatives, consistent with CEQA Guidelines 15168 for long-range planning documents. As Alternative 2 does not include proposals for specific projects, it is not possible to know project-specific details such as the locations and heights of new development, and the analysis in the Draft EIR analyzed the potential impacts that would result from implementation of Alternative 2 at a broad level. Project-specific details will be addressed through future planning and project-level environmental review.

Under CEQA, the alternatives analysis is intended to compare how reasonable alternatives would avoid or substantially lessen the significant environmental impacts identified for the proposed plan, consistent with the rule of reason (CEQA Guidelines Section 15126.6). Environmental topics, such as aesthetics, that were screened out of full analysis in the Draft EIR because they would not result in significant impacts are not required to be analyzed for each alternative, unless an alternative would itself result in a new significant impact in one of those topics. As described in Section 6.3.1, Description, Alternative 2 would adopt the 2045 General Plan Update, including all goals and policies, as it is described in Section 2, Project Description. Alternative 2 does not include any additional revised policies, amendments to the existing zoning and land use regulations, or other changes to City ordinances that would permit increased building heights in comparison to the proposed plan. The City’s Zoning Ordinance standards protect the visual character of the city by regulating the size, mass, and design of development projects. Consistent with the proposed plan, new development that would be facilitated by Alternative 2 would be subject to these standards, thereby preserving the city’s visual character and ensuring compatibility with surrounding development and impacts would be similar to the proposed plan. As such, no other revisions to the Draft EIR are required in response to this comment. Nonetheless, the commenter’s opinions regarding Alternative 2 will be shared with City decision makers.

Response 6.292
The commenter states Alternative 2 (Infill Only Alternative) would retain the No Urban Growth Boundary in its current location. The commenter requests that the last sentence of Section 6.3.2a., Agricultural Resources, be deleted because most urban agriculture has urban land use designations 2-160
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
on these lands for future development and these residentially designated lands have already been included in the Housing Element.

As stated in Subsection 6.3.2, Agricultural Resources, the Farmland Mapping and Monitoring Program still designates areas in the city as Important Farmland; however, the conversion of these areas and associated land use changes has been previously evaluated in earlier environmental documents which are listed in Section 4.1, Agricultural Resources.

The Draft EIR acknowledges that conversion of farmland could occur under Alternative 2; however, these impacts were previously addressed by previous EIRs, including the Spere of Influence Expansion EIR (SCH #90010930), Area 9 Specific Plan EIR (SCH #2008071018), Blosser-Southeast Specific Plan Amendment Supplemental EIR (SCH #1994107909), and Betteravia Plaza General Plan Amendment, Land Use and Zone Change and Development Agreement EIR (SCH #2015011029).

Though already identified as urban land use designations in City of Santa Maria planning documents, the Department of Conservation Important Farmland data has yet to be updated and information regarding previous environmental review has been provided to disclose all available information for the conversion of agricultural land in the city limits. As this comment does not identify a new or substantially different environmental impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no revisions to the Draft EIR are required.

Response 6.293
The commenter states that all other sections need to be revised per previous comments made in this comment letter.

This comment does not provide a specific concern regarding the contents or adequacy of the Draft EIR. CEQA Guidelines Section 15088 provides guidance on the preparation of response to comments and indicates that while lead agencies must evaluate all comments on environmental issues received on a Draft EIR they need only respond to comments related to significant environmental issues. Therefore, no response to this comment or changes to the Draft EIR are required.

Response 6.294
The commenter requests a map for Alternative 3 (Greater Annexation Alternative) that shows how many acres of land would be annexed. The commenter states that Alternative 3 might be the best because it would give the city additional land for buildout of the General Plan as well as for future school sites and parks.

Under CEQA, the alternatives analysis is intended to compare how reasonable alternatives would avoid or substantially lessen the significant environmental impacts identified for the proposed plan, consistent with the rule of reason (CEQA Guidelines Section 15126.6). In accordance with CEQA Guidelines Section 15126.6(d), the Draft EIR need only include sufficient information about each alternative to allow meaningful evaluation, analysis, and comparison with the proposed project.

Alternative 3, as described in Chapter 6, Alternatives, Section 6.4.1, includes a description of Alternative 3 which indicates this alternative would include the annexation of a larger area east of the city limits. Project specific details regarding acreage, exact location, and projects are not available for evaluation of this alternative as there are no specific project proposals included in Alternative 3. However, the information available is sufficient to complete a broad evaluation, analysis, and comparison of this alternative to the proposed project. The commenter’s opinion regarding the merits of Alternative 3 will be shared with City decisionmakers. 2-161
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Response 6.295
The commenter states that Sections 6-10-13 need to be revised per previous discussions.

This comment does not provide a specific concern regarding the contents or adequacy of the Draft EIR. CEQA Guidelines Section 15088 provides guidance on the preparation of response to comments and indicates that while lead agencies must evaluate all comments on environmental issues received on a Draft EIR they need only respond to comments related to significant environmental issues. Therefore, no response to this comment or changes to the Draft EIR are required.

Response 6.296
The commenter states the discussion of Alternative 2 (Infill Only Alternative) does not adequately discuss items that prove this alternative to be fatally flawed including the location of new school sites, the location of new parks, aesthetic impacts associated with high rise buildings and two-tothree-story school buildings on existing school campuses, and water and sewer upgrades required to serve 16,000 additional units. The commenter states Alternative 2 has only one net benefit impact and that is on agricultural resources.

Refer to Response 6.291 for a discussion of revisions to Chapter 6, Alternatives. A discussion of the feasibility of Alternative 2 is included in Section 6.5, Environmentally Superior Alternative, of the EIR, which states, “Although the Infill Only Alternative would be the Environmentally Superior Alternative, this alternative would not fulfill the primary objectives of the 2045 General Plan Update, including the provision of housing quality and various housing choices or improving opportunities for connected growth. Further, the Infill Only Alternative would not enhance new and existing neighborhoods such that each neighborhood would be a Complete Neighborhood or provide innovative housing and may result in the City failing to meeting its RHNA obligations in accordance with State law as it would significantly reduce the affordable housing options and limit new housing to infill only and redevelopment.” The Draft EIR discusses potential environmental impacts related to Alternative 2 at a programmatic level in Subsection 6.3.2, Impact Analysis. The Draft EIR provides a program-level analysis of the proposed plan and plan alternatives, consistent with CEQA Guidelines 15168 for long-range planning documents. As Alternative 2 does not include proposals for specific projects, it is not possible to know project specific details, including locations, heights, or localized infrastructure upgrades at this time, and the analysis in the Draft EIR analyzed the potential impacts that would result from implementation of Alternative 2 at a broad level.

Project-specific details will be addressed through future planning and project-level environmental review. No revisions to the Draft EIR are required in response to this comment.

Response 6.297
The commenter suggests that Table 6-1 should be formatted to fit on one page to make it easier to read.

The formatting of Table 6-1 has been updated so that the table fits on one page. This correction does not affect the analysis or conclusions of the Draft EIR. 2-162
September 28, 2025
Dana Eady
City of Santa Maria
[email protected]
Re: Draft General Plan and Draft EIR
Dear Dana,
On behalf of Santa Barbara County Action Network, we congratulate you and the entire General Plan team on completing a thorough Draft Plan and Draft EIR. As you know, SBCAN has urged that the plan be based on the infill alternative and remains disappointed that the plan is based on the expectation of annexing nearly 1,000 acres of prime agricultural land. Given the Local Agency Formation Commission’s history of not approving such annexations over the last couple of decades, this is a highly speculative expectation. Fortunately, the draft plan will provide sound guidance for the future even if the annexations don’t happen.

Unfortunately, a lot of planning effort is going into something that shouldn’t—and likely—won’t happen.

The Draft Environmental Impact Report identifies the impact of land use changes in the proposed annexation area on agricultural resources as significant and unavoidable, noting that no feasible mitigation is available. The fact is that these impacts are avoidable. The City’s Alternatives Analysis (Feb. 2023) found that each of the Land Use Alternatives would be able to meet the needs of the community. In fact, the Infill Alternative was found to be able to provide the most capacity for housing. The City, therefore, must not find that the impact of land use changes in the proposed annexation area on agricultural resources is significant and unavoidable. The impact would be significant, but not unavoidable.

On March 3, 2025, SBCAN submitted comments on the Policy Frameworks. Some of our comments were supportive of the content and others suggested actions that may be too detailed for a general plan. Some of our other comments that don’t appear to be addressed, but are at a level of detail that aligns with the rest of the document, are listed below. For reference we’re including the Policy Framework identifiers and please reference our March 3 letter for more details.

HEJ 1.1: Trees planted as buffers should be drought tolerant. Explore sources of methane pollution and adopt policy actions to reduce these.

HEJ 1.3: Adopt policies to cause truck drivers to go slower for lower emissions and better safety.

HEJ 1.6: Identify remaining idle oil wells and adopt actions to remediate those and previously abandoned wells that may not be properly abandoned.

HEJ 2.2: Adopt policies to require installation of clean energy technology in all new homes.

CIR 1.1: Implement traffic calming to slow vehicles down, crosswalks with bulbouts and other measures to reduce speed.

LETTER 7

7.1 7.2
2-163

BOARD OF DIRECTORS
Lawanda Lyons-Pruitt
Co-President North
Dick Flacks
Co-President South
Gale McNeeley
Secretary
Jonathan Abboud
Treasurer
Janet Blevins
Alhan Diaz-Correa
Carla Frisk
Robert Gibson
Jaime Tinoco
Stanley Tzankov

ADVISORY COUNCIL
Rich Appelbaum
Spencer Brandt
Pati Cantu
Gerry DeWitt
Geoff Green
Lee Heller
Christina Hernandez
Elizabeth Farnum
David Landecker
Gail Marshall
Harvey Molotch
Gail Osherenko
Karen Shapiro
Das Williams
Hilda Zacarias
Terri Zuniga
TEAM
Jeanne Sparks
Co-Executive Director
Ken Hough
Co-Executive Director
Nancy Avoce
Assistant Director
Joyce Howerton
Consultant

SANTA BARBARA COUNTY

ACTION NETWORK
P.O. Box6174
Santa Maria, CA 93456
[email protected]
www.sbcan.org
Facebook.com/SBCANorg
805.563.0463
Santa Barbara County Action Network, Page 2 of 2
We also urge you, as we said at a Planning Commission study session, to restructure drainage channels to make them more like the creeks they had been at one time and to be a source of beauty and recreation.

There is a need for more parks, open space, hiking trails, off-street bikeways and generally safer streets. We urge you to provide for those in the general plan update.

Finally, in the time since the City sought comments on the Policy Frameworks, several legislative bills aimed at streamlining approval of housing development across California have passed into law and more may be in our future.

In light of that, SBCAN urges the City to strongly consider health, environment, and safety impacts of all proposed developments in Santa Maria.

Thank you for your consideration of our comments.

Sincerely,
Ken Hough, Co-Executive Director Jeanne Sparks, Co-Executive Director cc: SBCAN Board of Directors

7.3 7.4
2-164
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter 7
COMMENTER: Ken Hough and Jeanne Sparks, Co-Executive Directors of Santa Barbara County Action Network
DATE: September 28, 2025
Response 7.1
The commenter commends the City and General Plan team for producing a thorough Draft General Plan and Draft EIR. The commenter reiterates their longstanding support for the Infill Only Alternative and expresses concern that the Draft General Plan is based on the assumption of annexing nearly 1,000 acres of prime agricultural land. The commenter states that such annexations have not been approved by the Local Agency Formation Commission in recent decades. While the commenter emphasizes that significant planning resources are being directed toward a scenario that is unlikely to be realized. The commenter also challenges the Draft EIR’s conclusion that impacts to agricultural resources from land use changes in the proposed annexation area are “significant and unavoidable,” arguing that these impacts are avoidable under the Land Use Alternatives.

The commenter’s preference for the Infill Only Alternative will be passed on to decision-makers for their consideration. While the commenter expresses concern about the likelihood of the proposed annexation being approved, the Draft EIR, in Chapter 1, Introduction, page 1-5, recognizes that annexation is a discretionary process subject to review and approval by the Local Agency Formation Commission (LAFCO). The 2045 General Plan Update establishes policies and land use designations intended to guide future growth within existing city limits and provide a framework for potential growth scenarios, including annexation, if approved by LAFCO. The Draft EIR evaluates impacts for both existing city limits and the proposed annexation area, and the 2045 General Plan Update is structured to function as a citywide policy document regardless of whether annexation is ultimately approved. Growth projections in the plan address annexation, and many policies, such as those for infill development, mixed-use corridors, housing diversity, and infrastructure planning, apply broadly and would continue to guide development even if annexation does not occur.

The commenter suggests that the impact of land use changes in the proposed annexation area on agricultural resources should not be considered unavoidable, citing the feasibility of meeting housing needs under the Infill Only Alternative. The commenter is correct that impacts to agricultural resources would be less than significant under the Infill Only Alternative. However, the detailed impact analysis in Chapter 4, Impact Analysis, evaluates the potential impacts of the 2045 General Plan Update as proposed, which includes the planned annexation areas. This approach is consistent with CEQA Guidelines Section 15126.2(a), which requires that the EIR evaluate the significant environmental effects of a proposed project.

As discussed in Section 4.1, Agricultural Resources, on pages 4.1-1 through 4.1-15 of the Draft EIR, implementation of the 2045 General Plan Update as proposed would result in significant and unavoidable impacts to agricultural resources. The commenter suggests this determination is inaccurate, claiming the City could avoid significant impacts to agricultural lands by adopting one of the alternatives described the City’s Alternatives Analysis prepared in 2023:
https://www.imaginesantamaria.com/_files/ugd/e3bef4_d80cf7b24f8e4aa580244179b5b883d1.pd f. Specifically, the commenter states the Infill Only Alternative as a feasible option that would meet community needs while avoiding annexation of agricultural lands, thereby reducing impacts to a less than significant level.
2-165
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The City acknowledges that some alternatives, including the Infill Only Alternative, would result in reduced or avoided impacts to agricultural lands. However, as explained in CEQA Guidelines Section 15126.6, potential impacts from alternatives are evaluated separately from the proposed project to explore feasible options that could reduce or avoid significant environmental effects. The project alternatives, discussed in Chapter 6, Alternatives, are not used to modify or reinterpret the impact conclusions of the proposed project.

As described in Section 15126 of the CEQA Guidelines, an EIR must evaluate potential significant impacts of the project as proposed, which is presented in Chapter 4, Impact Analysis, of the Draft EIR. This ensures that the environmental impacts of the actual project under consideration are clearly disclosed to decision-makers and the public. Therefore, while alternatives may demonstrate the potential to reduce impacts, they do not alter the significance determinations made for the proposed project Chapter 4, Impact Analysis.

In summary, the Draft EIR appropriately identifies impacts to agricultural resources based on the proposed project. The potential for reduced impacts under alternatives is addressed in Chapter 6, Alternatives. Therefore, consistent with the CEQA Guidelines Section 15126.2(a), the Draft EIR concludes that the conversion of agricultural land under the proposed General Plan Update would result in a significant and unavoidable impact, and that no feasible mitigation is available to reduce this impact to a less-than-significant level.

Response 7.2
The commenter mentions they previously submitted comments on the Policy Frameworks document.

The commenter reiterates several suggestions from their previously submitted comments that align with the level of detail in the 2045 General Plan Update and requests their consideration.

This comment pertains to the policies within the 2045 General Plan Update and does not raise a question or concern regarding the environmental analysis presented in the Draft EIR. As this comment does not identify a new significant impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Comments related to policy content will be passed on to decision-makers for their consideration.

Response 7.3
The commenter encourages the City to restructure existing drainage channels to resemble natural creeks, enhancing their aesthetic and recreational value. Additionally, the commenter urges the 2045 General Plan Update to include provisions for more parks, open space, hiking trails, off-street bikeways, and safer streets to improve community livability and access to outdoor amenities.

The General Plan Update includes goals and policies that support enhancement of open space, parks, and multimodal infrastructure. These topics are addressed in the Draft EIR in several resource sections:
 Subsection 4.9.1, Aesthetics, evaluates potential impacts related to scenic quality and visual character. The Draft EIR concludes that development facilitated by the 2045 General Plan Update would not substantially degrade public views or scenic resources and would result in less than significant impacts with adherence to existing Zoning Ordinance standards for size, mass, design, and lighting. While the comment suggests redesigning drainage channels to resemble natural creeks for aesthetic and recreational purposes, that specific topic is not part of 2-166
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
the proposed project and was not evaluated in the Draft EIR. This suggestion will be forwarded to decision-makers for consideration during the planning process.  Subsection 4.9.8, Recreation, assesses the adequacy of existing parkland and recreational facilities. The Draft EIR determined that the 2045 General Plan Update would not result in the need for new or expanded facilities beyond what is planned, and impacts would be less than significant.
 Section 4.7, Transportation and Traffic, evaluates impacts to pedestrian and bicycle infrastructure and supports improvements consistent with the 2020 City of Santa Maria Active Transportation Plan:
https://www.cityofsantamaria.org/home/showpublisheddocument/27722/6375104711934300

00. The Draft EIR concludes that the 2045 General Plan Update would not conflict with applicable transportation plans and would result in less than significant impacts.

No revisions to the Draft EIR are required in response to this comment.

Response 7.4
The commenter states that since the City solicited input on the Policy Frameworks, several new state laws have been enacted to streamline housing development approvals. In light of these changes, the commenter urges the City to carefully consider the health, environmental, and safety impacts of all proposed developments in Santa Maria.

The Draft EIR evaluates impacts related to air quality and greenhouse gas emissions, biological resources, hazards, noise exposure, and transportation across multiple sections:
 Section 4.2, Air Quality and Greenhouse Gas Emissions, a assesses emissions from construction and operation of future development, including impacts to sensitive receptors and consistency with regional air quality plans.
 Section 4.3, Biological Resources, evaluates impacts to sensitive species and habitats, and provides mitigation measures to reduce or avoid potential impacts to biological resources.  Section 4.5, Hydrology and Water Quality, addresses drainage, flood hazards, and water quality protection within the plan area.
 Section 4.6, Noise, evaluates construction and operational noise impacts, including vibration and noise exposure near sensitive land uses.
 Section 4.7, Transportation and Traffic, analyzes vehicle miles traveled, safety, and emergency access within the plan area.
 Subsection 4.9.3, Geology and Soils, reviews potential impacts related to seismic hazards, liquefaction, expansive soils, and other geotechnical conditions that could affect development under the 2045 General Plan Update.
 Subsection 4.9.4, Hazards and Hazardous Materials, reviews potential risks from the use and transport of hazardous materials, existing hazards, and emergency response.

The analysis within the Draft EIR considers the health, environmental, and safety impacts associated with implementation of the 2045 General Plan Update. The Draft EIR is a programmatic environmental document prepared under CEQA to evaluate the broad impacts of implementation of the 2045 General Plan Update. The 2045 General Plan Update does not include specific development projects. Future development facilitated by the 2045 General Plan Update would undergo separate environmental review as determined by the City at the time a project application is submitted. No revisions to the Draft EIR are required in response to this comment. 2-167
500 CAPITOL MALL, SUITE 1000, SACRAMENTO, CA 95814
OFFICE: 916-446-7979 FAX: 916-446-8199
SOMACHLAW.COM
September 29, 2025
Via Electronic Mail
Dana Eady, Planning Division Manager
City of Santa Maria
Community Development Department, Planning Division
110 South Pine Street, Suite 101
Santa Maria, CA 93458
[email protected]
Re: Comments on the Draft Santa Maria 2045 General Plan Update and Draft Environmental Impact Report
Dear Dana Eady:

On behalf of the Grower-Shipper Association of Santa Barbara and San Luis Obispo Counties (Grower-Shipper), we submit comments to the City of Santa Maria (City) on the Draft Santa Maria 2045 General Plan Update (General Plan) and its Draft Environmental Impact Report (EIR) (SCH# 2025020584).

Grower-Shipper represents 150 growers, shippers, farm labor contractors, and supporting agribusinesses on matters related to agriculture within Santa Barbara and San Luis Obispo Counties, including within and around Santa Maria. Grower-Shipper members grow important crops that are consumed locally, such as broccoli, strawberries, lettuce, vegetable transplants, flowers, tree fruit, and wine grapes, and statewide. Grower-Shipper’s mission is to maintain a vibrant agricultural industry in the region by assisting members to address challenges and capitalize on strengths and opportunities.

Grower-Shipper thanks the City for the opportunity to again comment on the formulation of its General Plan. Grower-Shipper submitted comments on the General Plan Policy Framework on February 28, 2025, which are attached hereto and fully incorporated herein. Grower-Shipper appreciates the City’s consideration of its initial comments and any revisions the City made to its proposed policies for the General Plan that are responsive to concerns expressed in Grower-Shipper’s comments.

However, Grower-Shipper remains concerned about several proposed policies and actions included in the General Plan, specifically ones that would result in locating sensitive LETTER 8

8.1 2-168

PROFE AL CO TION

AT YS AT
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 2 ends

uses and/or disadvantaged communities (DACs) near existing critical agricultural operations or that improperly identify the areas underlying those operations as DACs. Grower-Shipper is also concerned with potential regulatory conflicts and impediments to agriculture operations and transportation that appear likely with certain proposed policies and actions. GrowerShipper is further concerned that the 2045 General Plan Update Draft EIR may not comply with the California Environmental Quality Act (CEQA)1 regarding its treatment of Health and Environmental Justice (EJ) Element and policies and actions. These concerns and others are discussed in more detail below.

A. The General Plan Improperly Identifies Several Unpopulated Areas as DACs The General Plan EJ Element relies primarily on entire census tracts to determine DACs, which creates certain inaccuracies. The western portions of Census tracts 20.11, 24.09, and 24.10 are agricultural and industrial areas that are largely unpopulated and primarily include facilities and other operations rather than communities. Like census tract 25.03, which was excluded for a similar reason,2
these tracts should be excluded as DACs from the General Plan EJ Element. At a minimum, the City should take a more granular approach and only identify the specific block groups, if any, within those larger tracts that accurately qualify as DACs—as it appears to do with the “5 block groups that are distributed across the city.”3 The City is under no obligation to define DACs using entire census tracts. Senate Bill (SB) 1000 (2016), codified in relevant part in Government Code section 65302(h), identifies DACs as an unspecified “area.”4
Similarly, section 39711 of the Health and Safety Code—referenced in SB 1000—mandates the identification of DACs based only on “areas.”5 The General Plan’s imprecise determination of DACs can and likely will result in new and increased restrictions on existing operations that support agricultural uses, and on the agricultural uses themselves, throughout the City and region. These operations and uses may even be completely halted by future policies, actions, and decisions intended to protect DACs that do not exist in these unpopulated areas. Obstructing established agricultural operations and uses in this manner controverts the California Right to Farm Act6 and the Santa Barbara
County Right-to-Farm Ordinance,7
which prohibits a changed condition in a locality to result in agricultural operations and uses becoming nuisances.

Classifying large agricultural and industrial areas that are relatively unpopulated as DACs is unsupported and will result in significant adverse consequences for Grower-Shipper members. Restrictions placed upon these operations and uses can broadly affect local 1 Pub. Resources Code, § 21000 et seq.; Cal. Code Regs., tit. 14, § 15000 et seq. (CEQA Guidelines). 2 Draft 2045 General Plan EJ Element, p. 4, fn. 2. 3 Id., p. 3. 4 Gov. Code, § 65302, subd. (h)(4)(a).
5 Health and Safety Code, § 39711, subd. (a).
6 Cal. Civ. Code, § 3482.5, subd. (a).
7 Santa Barbara County Code, § 3-23, subd. (d).

8.1 8.2
2-169
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 3 ends

agricultural resources, resulting in adverse impacts to the local food supply and economy.

This cannot be the City’s desired result. Agricultural working lands and essential supporting land uses must not be identified as DACs. Accordingly, Grower-Shipper opposes the identification of census tracts 20.11, 24.09, and 24.10 as DACs and requests that the City reevaluate these areas for the next iteration of the General Plan EJ Element.

B. Several General Plan Policies and Actions Could Result in Adverse Consequences to Local Agricultural Operations and Resources and the Economy or May Conflict with or Impede Existing Statutes and Regulations Several General Plan proposed policies and actions, discussed below, could result in unintended adverse consequences for the City’s agricultural operations and resources and the local and regional economy and should be reconsidered.

Action COS-5.2.4, requiring an update to the Municipal Code to establish a minimum buffer between agricultural uses and development from sensitive land uses, directly threatens the City’s agricultural resources and operations. While buffers could be one tool with limited utility, the most effective way to protect agricultural resources is to refrain from inducing sensitive or residential uses into or next to agricultural areas, both within and adjacent to the City, and to protect the vitality of essential agricultural activities and support facilities, rather than hindering them. Policy HEJ-1.1, discussed more below, likewise threatens agricultural resources and operations by imposing new restrictions on existing operations instead of protecting these resources in a manner that benefits the City and the region. Further, as discussed, introducing policies and actions that would restrict and potentially eliminate existing agricultural resources controverts the California Agricultural Protection Act and the Santa Barbara County Right-to-Farm Ordinance, as well as the California Land Conservation Act (Williamson Act)8
and, without sufficient analysis in the EIR, CEQA (discussed below).

Actions COS-4.1.1, COS-4.1.3, and COS-5.2.3, Policy S-3.2, Policy HEJ-1.4 and its actions, and Policy HEJ-1.8 introduce air, pesticide, and water quantity and quality controls that may conflict with or impede existing statutory and regulatory requirements for resources and hazards that are already highly regulated by laws and agencies like the Porter-Cologne Water Quality Control Act, the Sustainable Groundwater Management Act, the Federal Clean Water Act, the Regional and State Water Quality Control Board, the U.S. Environmental Protection Agency, the California Department of Pesticide Regulation, and the County Agricultural Commissioner, to name only a few. Additional regulations of agricultural air emissions, pesticides, or water quantity and quality by the City are inappropriate and must be removed.

Actions CIR-4.2.2 and LU-4.1.2, Policy N-2.2 and its actions, and Policy HEJ-1.2 require transportation controls and related actions that will adversely affect the transportation of agricultural products. East-west movement of perishable and time-sensitive agricultural 8 Cal. Gov. Code, § 51200 et. seq.

8.2 8.3
2-170
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 4 ends

produce, vehicles, and equipment is essential to agriculture and the jobs and businesses it supports, both within and beyond the City. Transportation corridors must remain open and efficient. The City must provide adequate transportation options and must not allow its General Plan to restrict routes and timely movement of agricultural produce, equipment, and support vehicles.

Policies ECON-2.8, LU-2.1, and LU-2.3 (among others), and several General Plan maps, identify and discuss annexation of agricultural lands east of U.S. Highway 101 that would dramatically increase adverse impacts to agricultural resources, both from the immediate conversation of agricultural land and through additional regulatory requirements and conflicts from farming near unrelated urban uses. Grower-Shipper therefore opposes a subset of these annexations and notes that the resulting potentially significant impacts were not accurately identified, much less analyzed or mitigated to the maximum extent feasible, in the Draft EIR in violation of CEQA (discussed below). Grower-Shipper does not necessarily oppose the annexation of a limited portion of land north of Main Street, and the block immediately east of Marian Regional Medical Center, despite that these areas contain prime farmlands of exceptional quality, in recognition of the need to balance multiple priorities.

However, the proposed Specific Plans for these annexed areas must include policies and requirements to minimize conflicts between the new urban uses and existing agricultural operations, in large part by locating sensitive uses—especially schools and childcare facilities—and active recreation and residential uses as far as possible from existing agricultural operations.

Importantly, the specificity and detail in the General Plan’s proposed EJ policies and actions is not required. SB 1000 requires all general plans include an EJ Element and that the Element identify policies and objectives that, generally, reduce health risks to DACs by certain means such as a reduction in pollution exposure, and promote civic engagement and prioritize programs addressing the needs of DACs. It does not, however, require any level of specificity for these EJ policies or actions. Moreover, the Attorney General SB 1000 Best Practices9
is not controlling authority.10 At most, it may be considered persuasive, like a formal Attorney General legal opinion.11 Notwithstanding, SB 1000 Best Practices does not claim that SB 1000 mandates specific general plan EJ policies or actions and acknowledges that “an effective environmental justice policy in one jurisdiction may not be relevant or effective in another…” and that “[a]nyone reviewing this document to determine SB 1000 9 Available at https://oag.ca.gov/environment/sb1000.
10 See, e.g., Thorning v. Hollister School District (1992) 11 Cal.App.4th 1598, 1604. 11 Although, courts regularly find Attorney General opinions to not be persuasive (see, e.g., People ex rel.

Foundation for Taypayer & Consumer Rights v. Duque (2003) 105 Cal.App.4th 259, 268; Almond Alliance of California v. Fish & Game Com. (2022) 79 Cal.App.5th 337, 358; Sukut Construction, Inc. v. Rimrock CA LLC (2011) 199 Cal.App.4th 817, 830; Rideout Hospital Foundation, Inc. v. County of Yuba (1992) 8 Cal.App.4th 214, 227), and, in any event, best practices are not classified as a formal opinion. The Attorney General labels them informally as “colleague letters.”

8.3 2-171
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 5 ends

compliance responsibilities should consult their own attorney for legal advice.”12 The Attorney General’s suggestions and examples for policies and actions use flexible language, like “may” and could,” indicating an agency may exercise its discretion, where appropriate, to develop a policy to address a particular concern.13 At base, SB 1000 Best Practices does not give directions, it makes suggestions.

Thus, the City is not obligated to include the level of detail that it currently includes in some of its proposed EJ policies and actions. For example, proposed Policy HEJ-1.1 could and should be revised as follows:

Policy HEJ-1.1: Protect against industrial Reduce potential exposure to pollution.

Prevent industrial and commercial facilities from exposing Avoid siting sensitive land uses (e.g., schools, playgrounds, housing, hospitals, senior centers, and daycare centers), and/or land uses with a reasonable likelihood of accommodating DACs to harmful air pollution and toxic chemicals, especially in DACs that have experienced disproportionate pollution burdens, by carefully analyzing proposed development and the expansion of near agricultural, industrial, and commercial uses.

This policy revision would better address the fundamental need for good land use planning and compatibility to proactively prevent land use conflicts and resulting issues. It also better comports with the generalized directive in SB 1000 to “[i]dentify objectives and policies to reduce the unique or compounded health risks in disadvantaged communities by means that include, but are not limited to, the reduction of pollution exposure…”14 and would avoid conflicts with the California Agricultural Protection Act and the Santa Barbara County Rightto-Farm Ordinance.

Revising or eliminating the above-discussed proposed General Plan policies and actions would help to avoid unintended and significant adverse consequences to agricultural resources and operations and the economy and would not result in additional, increased, or disproportionate impacts to natural resources or DACs. The General Plan is in draft form, and its policies and actions are only proposed at this time. The City has the discretion to review and process feedback from stakeholders like Grower-Shipper and its members and make changes that will avoid the significant impacts discussed in this letter. Accordingly, GrowerShipper requests that the City make these changes, and any others it may deem problematic for the City’s agricultural community and local and regional economy. 12 Attorney General SB 1000 Best Practices, pp. 2, 13.
13 Id., pp. 13-14.
14 Gov. Code, § 65302, subd. (h)(1)(A).

8.3 2-172
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 6 ends

C. The General Plan Draft EIR Fails to Sufficiently Analyze All General Plan Policies and Actions, in Violation of CEQA
The Santa Maria 2045 General Plan Draft EIR omits necessary analysis of several General Plan policies and actions. Critically, the Draft EIR appears to omit any analysis whatsoever of the General Plan EJ Element and its proposed EJ policies and actions. This oversight is problematic because several proposed EJ policies and actions, such as those promoting new infrastructure, would result in changes to the physical environment that could cause direct and reasonably foreseeable indirect significant adverse environmental impacts requiring analysis commensurate with their level of detail,15 including in a cumulative scenario,16 and potentially requiring mitigation pursuant to CEQA.17 The Draft EIR also does not analyze the inherent conflict between some of the DACs identified in the EJ Element and existing zoning for agriculture and resulting impacts, and fails to identify any feasible mitigation measures that may reduce these impacts, in violation of CEQA.18 The Draft EIR further fails to adequately analyze the effects of the General Plan’s annexation policies on agricultural resources. The EIR summarizes previous environmental review of annexation areas located west of Highway 101 but does not analyze impacts to areas located east of the highway, despite that these areas contain important and prime farmland that will be threatened by urban encroachment resulting from annexation.

These omissions lessen the EIR’s value as an informational document for decisionmakers and the public.19 “The EIR is to inform other governmental agencies and the public generally of the environmental impact of a proposed project” and “to demonstrate to an apprehensive citizenry that the agency has, in fact, analyzed and considered the ecological implications of its action.” 20 Grower-Shipper represents the local agricultural citizenry that is apprehensive about the environmental effects of the General Plan on agricultural uses and 15 A program EIR (see CEQA Guidelines, § 15168), such as a general plan EIR, may analyze impacts at a less granular level than a project-specific EIR but still must address all reasonably foreseeable effects. (See fn. 17, post.) “The degree of specificity required in an EIR will correspond to the degree of specificity involved in the underlying activity which is described in the EIR.” (CEQA Guidelines, § 15146.) Here, where the EJ policies and actions have a high degree of specificity, the EIR must analyze impacts resulting from those policies and actions at a corresponding degree.
16 See CEQA Guidelines, § 15130.
17 See Pub. Resources Code, §§ 21002, 21002.1, 21065.3, 21068; CEQA Guidelines, §§ 15121, 15126.2, 15126.4, 15358, [an EIR must analyze a project’s direct and reasonably foreseeable indirect significant environmental effects related to a physical change and describe feasible measures that could minimize these effects]; see also, e.g., Save the El Dorado Canal v. El Dorado Irrigation Dist. (2022) 75 Cal.App.5th 239, 263.) 18 See Pub. Resources Code, § 21002.1; CEQA Guidelines, §§ 15126, 15126.2, 15126.4. 19 See Pub. Resources Code, §§ 21005, 21061; CEQA Guidelines, §§ 15003, subd. (c), 15121; Sierra Club v.

County of Fresno (2018) 6 Cal.5th 502, 516, 520-21, internal citation omitted [omission of required discussion can result in EIR not “serv[ing] its purpose as an informational document;” “[t]he relevant informational document here is the EIR, and the EIR must communicate [to] ‘the public and the government officials deciding on the project’”].
20 CEQA Guidelines, § 15003, subds. (c),(d), citing No Oil, Inc. v. City of Los Angeles, 13 C. 3d 68 and People v.

County of Kern, 39 Cal. App. 3d 830.

8.4 2-173
Dana Eady
Re: Comments on Draft Santa Maria 2045 General Plan Update and Draft EIR September 29, 2025

Page 7 ends

accordingly requests that the City prepare the analysis required under CEQA to adequately inform decisionmakers and the public about these impacts and mitigate them to the extent feasible.

Thank you for your consideration of this comment letter. Grower-Shipper retains the right to submit further comments and evidence, if warranted, up to the final public hearing on the matter.21 We are happy to answer any questions the City may have. Please feel free to contact me at [email protected]. Also, please add me the list of parties that receive all notices regarding the EIR and General Plan, including the Notice of Determination, when it is posted.

Sincerely,
Kelley M. Taber
Attachment
21 See, e.g., Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124.Cal.App.4th 1184, 1200 [CEQA comments considered up to final project hearing].

8.4 2-174

ATTACHMENT
2-175

GROWER-SHIPPER ASSOCIATION OF SANTA BARBARA AND SAN LUIS OBISPO COUNTIES PO Box 309, Santa Maria, CA 93456 • 534 E Chapel St, Santa Maria, CA 93454 • (805) 343-2215 February 28, 2025
Dana Eady
City of Santa Maria Planning Division Manager
[email protected]
Re: City of Santa Maria General Plan Policy Framework
Dear Ms. Eady,
Thank you for the opportunity to submit comments on the General Plan Policy Framework and to serve on the Technical Advisory Committee. In addition to the comments provided verbally at the most recent TAC meeting, we would like to highlight a few key points. We look forward to continuing to work with the City to further refine these policies as the foundational document for the forthcoming General Plan, and implementing the General Plan for many years to come.

In general, we suggest the documents are further refined to prevent potentially conflicting policy directives. We are also concerned with expansions of requirements that present feasibility limitations in the future (ex: wildlife corridors, ecological buffers, wilding). Several of the policies are beyond the scope and expertise of the City of Santa Maria and would be better left to the implementation and enforcement mechanisms already in place (ex: intent of ecological buffers addressed through CEQA, pesticide regulation within the regulatory authority of the County Ag Commissioner and CA DPR, and water quality regulatory authority of the Water Board, etc.).

Finally, we are concerned with the addition of development requirements and exactions, as well as regulatory policies, that go above and beyond the ample body of other existing and future regulatory mandates. If it moves forward in the Draft General Plan, this expansion will affect the feasibility and affordability of developing new and affordable housing, as well as business and employment opportunities (ex: Circulation, Community Benefits Agreements, Land Use, Recreation, Safety, etc.).

The following are some additional comments about the specific draft Goals, Policies, and Actions.

Conservation and Open Space Policy Framework

1. Reduce mowing. We support the regular maintenance of City lands to reduce invasive pests and diseases, but are concerned that a prescriptive reduction of mowing could also create problems with potential hosts and IPM practices,. One such example is the Impatiens Necrotic Spotted Virus (INSV):
weed management plays an important role in breaking the host cycle and disease management, which can have potentially devastating impacts to neighboring agricultural areas.

2. Agricultural Preservation. We support the preservation of agricultural lands. We are unclear on what is meant by 2.1.2 and the type of easements intended. Other options for technical assistance and education with more specialized expertise in agriculture are available than what would be expected from the City.

3. Sustainable Agriculture. We share the interest in promoting sustainable agriculture. However, we would not expect the City to develop technical expertise, as there are other, more specialized resources available.
2-176

ASSOCIATION
of Santa Barbara and San Luis Obispo Counties
Grower-Shipper Assoc of SB & SLO Counties Page 2 of 4

4. Water Resources, Action 4.1. Water is a very important resources for many beneficial uses in and around the City. This is also a very highly regulated space, both for municipal and agricultural uses, especially through the State and Regional Water Boards, not to mention the Basin Adjudication and SGMA. Many of the goals are already being addressed without the need for new programs or policy actions. We discourage the creation of additional layers of regulation or potential policy inconsistencies, as the requirements through other regulatory mechanisms only continue to increase.

5. 5.3 Agricultural air pollutant emissions. Agriculture continues to advance in its practices, but many of the items identified in this section are beyond the scope of the City and should not be included in the General Plan. Farming practices are best addressed through specific technical expertise and limited by economic and technical feasibility. Action 5.3.3 is already being implemented by the County Agricultural Commissioner, with additional restrictions from CA Department of Pesticide Regulations (DPR), CalEPA, and USEPA. We generally support Action 5.3.4, although its goals are likely best achieved through thoughtful land use planning, especially of prospective annexations and siting of schools. It is also worth noting that vegetative buffers, if immediately adjacent to agricultural operations, can create challenges related to food safety, pests, and diseases.

6. 6.1 Greenhouse Gas Emissions. Policies should balance what technology and practices are reasonably feasible, cost-effective, and available, and also consider potential impacts to jobs, businesses, and residents.

7. 8.2: Community environmental stewardship. We believe that 8.2.4, 8.2.6, and 8.2.7 are duplicative of existing efforts and/or are better served by other sectors, rather than creating a new City mandate.

Noise Policy Framework

1. N2.2 Industrial and agricultural traffic. We oppose policies that limit routes and times of essential movement of goods, equipment, and people. Many agricultural operations are time-sensitive, and delays in cooling and access to equipment, and especially for fresh produce, are irreversible. We do support policies that facilitate smooth east-west corridors, and opportunities for improved movement could also benefit the noise being generated from multiple users.

Circulation Policy Framework

1. CIR2.2 Transportation Planning. We support the City’s participation in multi-jurisdictional planning and funding efforts.

2. CIR 7.2. We support the City’s infill efforts to meet urban needs while reducing pressure to annex agricultural lands.

3. CIR-8.1: Parking. As expressed in our comments on the Housing Element, we are concerned with parking policies that could be barriers to the construction or redevelopment of affordable housing, especially in situations where group employee transportation, such as CalVans, is available.

Economic Development Policy Framework

1. Policy ED-2.1: Business-friendly regulation. We strongly support the City’s dedication to an environment that support business and jobs. We are concerned that some of the policies introduced elsewhere in the frameworks could inadvertently conflict with this important action. We further suggest that efficiency is prioritized for all businesses, including agriculture and supporting businesses, not just ag tech.

2. Policy ED-2.3: Infill development. As stated elsewhere, we support infill development as a means to achieve multiple goals.
2-177
Grower-Shipper Assoc of SB & SLO Counties Page 3 of 4
Health and Environmental Justice Policy Framework

1. We will restate our objections to the use and narrative surrounding CalEnviroScreen 4.0, especially surrounding pesticides. First, pesticide use is not the same as exposure. Next, the tool uses census tracts, which include agricultural production areas outside of the City limits, which is misleading for the purposes of the City of Santa Maria. Additionally, in many cases, a closer look at the underlying data show that the City’s “population characteristics scores” are almost always higher than the “pollution burden score.” We urge you to reach out to the County Agricultural Commissioner to better understand the difference between use and exposure, as well as the robust and continually evolving regulatory mechanisms and monitoring already in place.

2. We object to the inaccuracies, selective references, and implications made regarding H-2A housing in this Framework. We ask references to H-2A in this Framework be removed to better fulfill the City’s commitment to Fair Housing.

3. HEJ 1.1. This policy should also include the importance of citing sensitive sites away from existing and future commercial and industrial operations, and the concerns with the incursion of urban uses into industrial and commercial areas, including agricultural operations. A much deeper discussion on the implementation mechanism is warranted with stakeholders—in some cases, restrictions can be ¼ mile or more, and a 500 foot buffer would be far from adequate.

4. HEJ 1.5. This policy is beyond the scope of authority of the City of Santa Maria and duplicative of existing regulations and voluntary efforts. We ask that it be removed.

Land Use Policy Framework

1. LU-1.1.3: Area 9. We remain concerned with potential land use conflicts resulting from allowing low density residential development west of A Street in Area 9 that is unrelated to the neighboring industrial and agricultural uses. We are concerned that this would create predictable and significant conflicts for the existing and future industrial and agricultural uses, as well as prospective residents, and this change should be removed.

2. We support LU-1.2 re Infill for the reasons stated in the policy and throughout this letter.

3. LU-2 Annexation. We restate our previous objections to the annexation of certain agricultural lands (primarily along Highway 101). Although they are prime farmlands of exceptional quality, in recognition of the need to balance multiple priorities, we do not necessarily oppose the annexation of a limited portion north of Main Street and the block immediately east of Marian Regional Medical Center).

4. LU 4.1.2 and LU 4.2 Mixed Use. Preservation and improvement of east-west corridors in and through the City must remain a top priority for the safe and efficient movement of goods, equipment, and people. We are concerned with the scope of the proposed prohibitions on use, especially near but outside of the Downtown Specific Plan area.

5. LU 6.6 Neighborhood Commercial. The reductions seem contrary to other policies supportive of infill and an efficient urban footprint listed elsewhere.

6. Goal LU-9: Agricultural areas. We support policies that protect active agricultural cultivation and prevent predictable land use conflicts.

7. Goal LU-13: Land use conflicts. This goal and implementing policies are of the utmost importance.

The type of buffers depend on the neighboring uses—for example, active recreation such as walking and biking, would not be an effective buffer for neighboring agricultural operations. Residential encroachment and incompatible neighborhood uses should also discourage or prohibit the encroachment of residential uses into industrial spaces, including active agricultural operations. 2-178
Grower-Shipper Assoc of SB & SLO Counties Page 4 of 4
Public Facilities and Services Policy Framework

1. PFS-5.2: School siting. We are very concerned with the placement of schools in agricultural areas, as this will create a sensitive site and create numerous conflicts. Such school site placement must be discouraged by the sound planning practices listed throughout the Policy Frameworks. Language on school siting must also include strategic placement and prohibit encroachment to prevent significant land use conflicts, impacts to existing operations, and community discord.

2. PFS-8 Police. We have heard feedback from members concerned with response times, especially in the northern portion of the City. We further encourage close collaboration with the County Sheriff’s Rural Crime Unit and other law enforcement agencies, as theft and vandalism pose significant hardships and cross jurisdictional boundaries.

3. We are generally supportive of appropriately sited parks and recreation opportunities for our community. However, active recreation is generally not compatible with active agricultural operations. We encourage the policy to include language about appropriate siting to prevent predictable land use conflicts.

Safety Policy Framework

1. S-3.3: Agricultural runoff reduction. Agriculture is already regulated under the Regional and State Water Board’s Irrigated Lands Regulatory Program. This section contains inaccuracies and is beyond the City’s authority and should be deleted.

2. The portions related to flooding and dam operations and releases should be reviewed and updated by Public Works for improved accuracy.

3. S-4.3.2: City materials usage. We are concerned that dictating the type of materials might not be as feasible in effectively controlling weeds, pests, and diseases, which could have negative consequences for the City and neighboring agricultural operations. Flexibility in the materials and methods used should be included.

4. S-8.7.2: Water efficient and conservation. This is already regulated through the Water Board, SGMA, and basin adjudication and does not need to be included.

Thank you for incorporating these comments and concerns as the City moves forward with next steps in the General Plan update process.

Sincerely,
Claire Wineman
President
2-179
r
s
,
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter 8
COMMENTER: Kelley M. Taber, Attorney at Somach Simmons & Dunn DATE: September 29, 2025
Response 8.1
The commenter expresses appreciation for the City’s consideration of their previous input on the Policy Frameworks. The commenter raises concerns about several proposed policies and actions in the 2045 General Plan Update. Specifically, the commenter objects to policies that could result in the placement of sensitive uses or disadvantaged communities near existing agricultural operations, and to the designation of certain agricultural areas as disadvantaged communities. The commenter also identifies potential regulatory conflicts and operational impediments to agriculture and transportation stemming from the proposed policies. Additionally, the commenter questions whether the Draft EIR adequately addresses the Health and Environmental Justice Element compliance with CEQA.

The concerns raised in this comment primarily relate to the proposed 2045 General Plan Update policies and their potential implications for agricultural operations, land use compatibility, and the designation of disadvantaged communities. The comments related to the 2045 General Plan Update policies do not identify a new significant impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, and no changes to the Draft EIR are required in response.

While the 2045 General Plan Update includes policies that address environmental justice priorities, such as minimizing exposure to pollution for disadvantaged communities, the Draft EIR does not include a separate environmental justice chapter. These considerations are incorporated into the 2045 General Plan Update’s policy framework and are addressed in the Draft EIR where relevant, such as Section 4.2, Air Quality and Greenhouse Gas, Section 4.6, Noise, and Section 4.9.5, Land Use and Planning. However, for purposes of consistency with the 2045 General Plan Update, this response notes that the City has removed the census tracts referenced by the commenter from the designated disadvantaged communities in the 2045 General Plan Update mapping. No revisions to the Draft EIR are required in response to this comment.

Response 8.2
The commenter objects to the 2045 General Plan Update’s identification of certain census tracts, specifically 20.11, 24.09, and 24.10, as disadvantaged communities, arguing that these areas are largely unpopulated and consist primarily of agricultural and industrial operations rather than residential communities. They assert that the use of entire census tracts to define disadvantaged communities is imprecise and inconsistent with Senate Bill 1000 and Government Code section 65302(h), which refer to disadvantaged communities as “areas” without specifying tract boundaries.

The commenter warns that misclassifying these areas as disadvantaged communities could lead to inappropriate restrictions on agricultural operations, potentially violating the California Right to Farm Act and the Santa Barbara County Right-to-Farm Ordinance. They request that the City reevaluate these designations and, at minimum, apply a more granular approach using block group data to avoid unintended consequences for agricultural lands and supporting uses. 2-180
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
This comment pertains to specifics within the 2045 General Plan Update and does not raise a question or concern regarding the environmental analysis presented in the Draft EIR. However, for purposes of consistency with the 2045 General Plan Update, this response notes that the City has removed the census tracts referenced by the commenter from the designated disadvantaged communities in the 2045 General Plan Update mapping. As this comment does not identify a new significant impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response.

Comments related to policy content will be passed on to decision-makers for their consideration.

Response 8.3
The commenter objects to proposed 2045 General Plan Update policies that would impose new buffers and restrictions on agricultural operations, including COS-5.2.4 and HEJ-1.1, arguing they conflict with existing agricultural protections and CEQA. The commenter opposes additional City regulations on air, water, and pesticide use, stating these are already governed by state and federal agencies. The commenter objects to transportation policies that could impede movement of agricultural goods and oppose annexation of farmland east of U.S. 101 due to unmitigated impacts.

The commenter supports limited annexation near Main Street if land use conflicts are minimized. The commenter argues that SB 1000 does not require the level of specificity included in the General Plan’s environmental justice policies and actions. The commenter also recommends revising HEJ-1.1 to better reflect land use compatibility.

This comment pertains to specific policies in the 2045 General Plan Update and does not raise a question or concern regarding the environmental analysis presented in the Draft EIR. The commenter’s statement that 2045 General Plan Update policies aren’t sufficiently evaluated in the environmental review of potential agricultural resource impacts is discussed below in Response 8.4.

As this comment does not identify a new significant impact, provide substantial evidence of a deficiency in the environmental analysis, or propose feasible mitigation measures, no changes to the Draft EIR are required in response. However, it is important to note that the purpose of a General Plan is to provide a long-term, visionary framework for guiding future growth and development. It establishes goals and policies that reflect community values and aspirations, and often uses flexible language to allow for interpretation based on the context of individual projects.

Comments related to policy content of the 2045 General Plan Update will be passed on to decisionmakers for their consideration.

Response 8.4
The commenter asserts that the Draft EIR fails to analyze the environmental impacts of several proposed 2045 General Plan Update policies, particularly those in the Environmental Justice Element.

The commenter argues that the omission of analysis for Environmental Justice policies and infrastructure proposals violates CEQA, as these actions could result in significant direct and indirect impacts. The commenter states that the Draft EIR does not address conflicts between disadvantaged communities designations and agricultural zoning, nor does it analyze annexation impacts east of U.S. 101 where prime farmland exists. The commenter requests that the City revise the Draft EIR to include analysis of potential impacts from the General Plan’s Environmental Justice policies and actions, as well as annexation policies that could affect agricultural resources, and to identify feasible mitigation measures to reduce those impacts.
2-181
City of Santa Maria
2045 General Plan Update Responses to Comments on the Draft EIR Final Environmental Impact Report
The Draft EIR was prepared as a Program EIR pursuant to CEQA Guidelines Section 15168, which is appropriate for evaluating the broad environmental effects of a general plan. As described in Chapter 1, Introduction, Subsection 1.1.2 of the EIR (pages 1-2 to 1-3), the Program EIR format allows for comprehensive analysis of cumulative and program-level impacts, with the understanding that future project-specific CEQA review will be conducted as needed for individual developments facilitated by the 2045 General Plan Update. Consistent with CEQA, the Draft EIR is intended to provide decision-makers and the public with information that enables intelligent consideration of the environmental consequences of the plan. The Draft EIR identifies potentially significant environmental effects, discusses feasible mitigation measures, and evaluates alternatives to the proposed plan.

The Environmental Justice Element of the 2045 General Plan Update is addressed in the Draft EIR through its integration into the analysis of relevant environmental topics. For example, Section 4.1, Agricultural Resources, and Section 4.2, Air Quality and Greenhouse Gas Emissions, evaluate the potential for physical environmental changes resulting from implementation of General Plan policies, including those that may be associated with Environmental Justice objectives. The Draft EIR identifies where impacts may be significant and unavoidable, such as the conversion of agricultural land in annexation areas in Impact AG-1, pages 4.1-9 to 4.1-13 of the Draft EIR, and discusses mitigation measures and policy-level strategies to reduce those impacts to the furthest extent possible. Similarly, as discussed in Impact AQGHG‑1 on pages 4.2‑21 through 4.2‑23 of the Draft EIR, potentially significant impacts related to Air Quality and GHG are identified, such as increased emissions from future development, and includes mitigation measures and policy-level strategies to reduce potential impacts.

Regarding the annexation areas east of U.S. 101, the Draft EIR includes an analysis of land use changes and their potential to impact agricultural resources within Section 4.1, Agricultural Resources. As described in Chapter 2, Project Description, Subsection 2.6.3, Annexation, pages 2-12 to 2-13, the proposed annexation includes approximately 985 acres east of the highway, much of which is currently designated for agricultural use under County zoning and contains Prime Farmland, Unique Farmland, and Williamson Act lands in nonrenewal status. As discussed in Section 4.1, Agricultural Resources, Williamson Act lands in the annexation area are all currently in nonrenewal, which starts a countdown to the expiration of the contract. This includes three contracts that are set to expire in January of 2026 (71AP072), 2027 (85AP008) and 2028 (70AP148). The analysis within Section 4.1, Agricultural Resources, Subsection 4.1.3, Impact Analysis, pages 4.1-9 to 4.1-13, concludes that conversion of Important Farmland and conflicts with agricultural zoning in the plan area, including the annexation area east of U.S. 101, cannot be fully mitigated, even with policies promoting agricultural preservation and conservation easements. Accordingly, impacts to agricultural resources in the annexation areas are identified as significant and unavoidable, and cumulative impacts to farmland conversion would also be significant. Therefore, the Draft EIR does include both analysis of previously evaluated areas and new areas proposed for annexation and identifies significant and unavoidable impacts where appropriate.

No revisions to the Draft EIR are required in response to this comment. 2-182
“Improving lives and communities through transportation” CALTRANS DISTRICT 5
50 HIGUERA STREET | SAN LUIS OBISPO, CA 93401-5415
(805) 549-3101 | FAX (805) 549-3329 TTY 711
www.dot.ca.gov
September 29, 2025
SCH #2025020584
SB/Var.

Dana Eady
Planning Division Manager
City of Santa Maria
110 South Pine Street Suite 101
Santa Maria, CA 93442
Re: City of Santa Maria 2045 General Plan Update Draft Environmental Impact Report (DEIR)
Dear Ms. Eady:

Thank you for including the California Department of Transportation (Caltrans) in the environmental review process for the City of Santa Maria 2045 General Plan (General Plan) Update Draft Environmental Impact Report (DEIR). Caltrans’ Local Development Review (LDR) branch is the conduit for reviewing projects and plans (i.e., General Plans) that may impact the State Highway System (SHS). Proposed land use developments and local plans, proposed near the SHS, are reviewed to ensure consistency with our mission and statewide planning priorities. To make this vision a reality, California has identified eight priority areas. The California Transportation Plan 2050 Goals include: Safety, Climate, Equity, Accessibility, Quality of Life & Public Health, Economy, Environment, and Infrastructure.

The following comments are based on our review of the August 2025 General Plan DEIR and Circulation Element.

Project Understanding
The City of Santa Maria is updating their General Plan to reflect the City’s vision throughout the year 2045. The planning horizon is approximately twenty years, during which time City decision makers will rely on the General Plan as the basis for making decisions on matters such as land use, transportation, open space, environmental quality, and safety. The local highway network in the City of Santa Maria, consists of the following: US 101, State Route (SR)166, and SR 135.

LETTER 9

9.1 2-183

CALI FORN IA STATE TR ANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR California Department of Transportation
• •
lb/trans·
Ms. Dana Eady
City of Santa Maria 2045 General Plan - Draft Environmental Impact Report (DEIR) September 29, 2025

Page 2 ends