ATTACHMENT C
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD100 General
Fund FIN FIN-02 Consulting Services -
ACFR
Request to add consulting services to provide the City with targeted, temporary assistance to accelerate completion of outstanding financial reports, support audit preparation, and improve internal processes. The objective of this investment is to stabilize the City’s financial reporting cycle and return to timely issuance of audited financial statements by Fiscal Year 2027–28.
Achieving this goal will strengthen financial transparency, improve compliance with regulatory and reporting standards, and enhance the City’s credibility with stakeholders, including residents, bondholders, and oversight agencies. This is a strategic, three-year time-limited investment intended to address a structural backlog and position the organization for long-term sustainability, rather than an ongoing reliance on external support. $170,000 $175,000 FD100 General
Fund FIN FIN-03 ERP Licensing
Agreements
ERP Ongoing licensing and service agreements - Workday ERP Licensing. Specifically for Workday MSA, FTE Adjustment , Workday Success Plan and
Continued Value Support (CVS) $749,541 $768,429
FD100 General
Fund FIN FIN-04
Budgetary Cleanup:
Brinks Cash Pickup
Service
Brinks services the cash pickup from the Deposit counter. This is an existing service and not a new cost. It was paid out of Interest balance account in the previous legacy system which will now be budgeted in the new ERP system. $0 $0
FD100 General
Fund FIN FIN-04
Budgetary Cleanup:
Brinks Banking Service
Fees
Brinks services the cash pickup from the Deposit counter. This is an existing services, and not a new cost. It was paid out of Interest balance account in Eden. We will need to budget for it now. >This portion is for the Banking Service Fee $0 $0
FD100 General
Fund FIN FIN-05
ERP Budget /
Capital Module for
the City's ERP system
ERP Budget/Grants/Capital Module: There is no fiscal impact for FY 2026-27 as a result of this contract. There is sufficient appropriation in the adopted budget for the Financial / ERP System Project to procure and implement this type of Software-as-a-Service (SaaS).
Ongoing annual costs are included in the proposed budget for FY 2027-28. $0 $252,000
FD100 General
Fund PD PD-02
Artificial Intelligence
(AI) Software Platform
for Communications
Center
Purchase artificial intelligence (AI) software to enhance operational efficiency. The AI software will serve as a critical stop-gap measure, particularly during periods of high call volume by automating routine tasks, alowing dispatchers to focus on critical decision- making, emergency response, and officer safety. $100,000 $110,000 FD100 General
Fund PD PD-03 K9 Training Services
Request to increase appropriation to department to keep pace with increased K9 training services. These services are mission critical to the department, directly impacting officer safety, public protection, reducing City liability, and the effective handling of high- risk incidents. $14,100 $14,100
FD100 General
Fund PD PD-04
Fund Cellebrite
Inseyets Online Pro
Software Platform
Request is to permanently fund software services in the Detective Bureau and High Tech Crimes Investigations Unit that provides a tool for accessing cell phone data crucial to resolving major investigations of serious crimes including homicides, missing persons, human trafficking, child pornography, kidnappings, etc. $14,000 $14,500 FD100 General
Fund PD PD-05
Law Enforcement
Training Management
Software
Fund existing law enforcement training management software that was purchased with temporary savings. This software platform manages the officer training program, as well as staff in other units including Records Bureau, Police Services Technicians, Crime Lab, Property and Evidence, and Dispatchers. These bureaus require very specific training programs and the software manages all aspects from initial training as well as training maintenance to meet mandated training requirements in law enforcement. $16,500 $16,995
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD100 General
Fund PD PD-06
DVR Examiner Software
for High Tech Crimes
Investigations
Fund an existing service that was purchased in 2023 using one-time savings that are no longer available. This service provides access to surveillance videos and increases the solvability of crimes. $5,500 $5,500 FD100 General
Fund PD PD-07
Budgetary Cleanup:
Reclassify Police
Sergeant to Police
Lieutenant
Reclassify Sergent position to Lieutenant to provide adequate leadership at the Lieutenant level to meet operational needs within the police department's staffing structure. The Sergeant position has been performing duties of a Lieutenant with a Sergeant II assignment which will be eliminated with this permanent upgrade.
This request is budget neutral as savings from eliminating the Sergeant II assignment and downgrade of Program Leader to Outreach Coordinator in the department will provide more than adequate funds for this organizational update. - $0 $0 FD100 General
Fund PD PD-09
Background
Investigation/Recruitm
ent Integrated
Software Platform
Request to fund the background investigation and recruitment integrated software platform annual maintenance cost. This software platform is crucial to processing and integrating approximately 800 police department applicants annually with City's recruitment software platform while increasing effiiences in a secure, collaborative environment. $3,700 $3,848
FD100 General
Fund PD PD-11 Reimbursable Trainings
(Revenue-Backed)
This request is increasing the annual training budget to accommodate additional trainings that will be reimbursed. The request is to add funding for Cal OES Annual Training Allotment (ATA) reimbursable trainings. $0 $0
FD100 General
Fund PD PD-13
Increase Staffing by 1
Limited Service (.48 FTE)
Consultant II Position
Request to add a Limited Service Consultant II position to the staffing complement in the department to manage the Carry Concealed Weapon (CCW) Permit program. With U.S. Supreme Court eliminating subjective "good cause" requirements has driven an increase of demand that is unmanageable within the current staffing allocation. This position would carry the full load of managing this program and the cost would be partially offsest by the revenues collected as part of the CCW application fee, reducing the net fiscal impact to the City. 0.48 $36,000 $36,000 FD100 General
Fund PD PD-14 Increase appropriation
for Utilities-Electric costs Request is to increase budget line to keep pace with cost of electricity within the department. $20,000 $20,000
FD100 General
Fund PD PD-15
Access Control
Maintenance and
Support Services (1111
W. Betteravia)
This request is for the annual cost of software and hardware support and mainteance for the access control system for the Police Department building (1111 W. Betteravia). This system is an integral part of security and provides a secured environment for law enforcement activities and equipment, as well as the City-wide IT data center. $5,000 $5,200
FD100 Total FD100 General Fund Total- 1.92 $60,000 $1,215,337 $0 $1,556,391 FD110 Measure U
Fund FD FD-02 Wellness Physicals
The Department is requesting funding for annual physicals for its personnel to continue the successful program initiated in FY22-23 through a one-time Assistance to Firefighters Grant. Annual physicals provide an excellent tool for monitoring the health and wellbeing of firefighters during their careers. Monitoring for typical occupational risks establishes early detection from risk factors common throughout the industry, such as cancer, heart disease, and orthopedic injuries. $65,000 $65,000
FD110 Total FD110 Measure U Fund Total- - $0 $65,000 $0 $65,000
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD412
Fed/Sta Asset
Forfeiture
Fund
PD PD-16
Law Enforcement
Training and
Conference
Attendance
Appropriate funding from State Assset Forfeiture Fund to be used for one-time law enforcement training and conference expenses not included in existing training budget. $60,000 $0
FD412 Total FD412 Fed/Sta Asset Forfeiture Fund Total- - $60,000 $0 $0 $0 FD490 Library Fund LIB LIB-01 Black Gold The Black Gold Cooperative Library Systems membership fee has a marginal annual increase for services. $0 $18,433
FD490 Total FD490 Library Fund Total- - $0 $0 $0 $18,433 FD510
Business
Equipment
Fund
CMO CMO-03 Domain Controller
upgrade
Windows Domain Controllers are arguably one of the most crucial pieces of IT. The City has been without Microsoft support since 2023 and without Domain Controllers, the City's network will be inaccessible. $65,000 $0
FD510
Business
Equipment
Fund
CMO CMO-04
SOC as-a-service
(Security Operations
Center)
A City without a dedicated cyber engineer needs at least a SOC-as- a-Service because it provides 24/7 security monitoring, threat detection, and incident response. It gives the City immediate access to experienced security analysts, advanced tools, and proven processes that dramatically reduce the risk of ransomware, data breaches, and service disruptions. By outsourcing the SOC function, City IT teams can stay focused on delivering public services while maintaining a strong, continuously monitored cybersecurity posture. $55,000 $55,000
FD510
Business
Equipment
Fund
CMO CMO-05 Microsoft SQL server
upgrade licenses
The City is running on SQL server 2012 that is EOL (End-of-life) and EOS (End-of-Support), which is a huge business risk. This request will give the City enhanced cybersecurity and updates to make the SQL environment more stable and secure. $84,000 $0
FD510
Business
Equipment
Fund
CMO CMO-08
Business Equipment
Fund Replacements for
FY 26 and FY27IT Hardware Purchases $1,710,100 $1,660,300 FD570 Total FD510 Business Equipment Fund Total- - $1,859,100 $55,000 $1,660,300 $55,000 FD570
Insurance
Funds -
General
Liability
CAO CAO-05 Insurance PremiumInsurance premium for policies and ERMAC pool layer along with excess carrier insurance above our SIR and deductibles -$926,000 $2,800,000 FD570
Insurance
Funds -
General
Liability
CAO CAO-06 Claims Expense-Not
SBR actual costs
Current year claims expense at 85% Confidence level per actuary -$144,000 $187,500 FD570
Insurance
Funds -
General
Liability
CAO CAO-07 Contractual and
Professional ServicesFunds for contracts and services for Risk program, required for needed contractual vendors $2,000 $2,000
FD570 Total FD570 Insurance Funds - General Liability Total- - $0 -$1,068,000 $0 $2,989,500 FD585
Insurance
Funds -
Worker's
Compensati
on
CAO CAO-01 Insurance Premium
To accuretly reflect Premium costs per early indication. Final premium will be provided by LAWCX by Mid-June. This category funds the workers' compensation Pool and excess insurance for city's workers' compensation claims that exceed the City's SIR of $500,000 per claim. -$1,773,000 $180,000
FD585
Insurance
Funds -
Worker's
Compensati
on
CAO CAO-02 Third Party Claims
Administrator Payment for Third Party adminstrator to provide services for workers' compensastion claims adminstration and compliance -$158,682 $60,000
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD585
Insurance
Funds -
Worker's
Compensati
on
CAO CAO-03 Claims Expense-SBR
Current year claims expense at 85% Confidence lever per actuary $163,000 $200,000 FD585
Insurance
Funds -
Worker's
Compensati
on
CAO CAO-04 4850 Reimbursements-
Not SBR Actual CostsFunds required by Labor Code 4850 to provide full salary for Safety Officers while off work due to an approved workers' compensation claim -$200,000 $100,000
FD585 Total FD585 Insurance Funds - Worker's Compensation Total- - $0 -$1,968,682 $0 $540,000 FD610
Solid Waste
Disposal
Fund
UT UT-15 Professional Services
1) Contract with Fleet Clean to provide professional cleaning services for refuse trucks and landfill equipment.
2)Operations and management of the Santa Maria Regional Landfill (SMRL) Recycle Park agreement and Greenwaste costs agreement. $75,393 $78,683
FD610
Solid Waste
Disposal
Fund
UT UT-22 Grant Award
Adjustment Adjust budgets for CalRecycle grants to match award amount. -$1,374 $0 FD610
Solid Waste
Disposal
Fund
UT UT-25 Technology Operation
& MaintenanceAnnual licensing and support fees associated with equipment purchased to comply with the Landfill Methane Regulation (LMR). $4,770 $12,925 FD610
Solid Waste
Disposal
Fund
UT UT-27 Financial AssuranceAmount in conformance with CalRecycle pledge of revenue agreement. $312,181 $312,181
FD610
Solid Waste
Disposal
Fund
UT UT-28
Household Hazardous
Waste Facility (HHWF)
& E-Waste Operations
Agreement for HHWF operations at the Santa Maria Regional Landfill (SMRL). $16,250 $17,063
FD610 Total FD610 Solid Waste Disposal Fund Total- - -$1,374 $408,594 $0 $420,852 FD620 Water Fund FIN FIN-03 ERP Licensing
Agreements
ERP Ongoing licensing and service agreements - SpryPoint Utility Billing Licensing. $61,200 $61,200
FD620 Water Fund FIN FIN-04
Budgetary Cleanup:
Brinks Cash Pickup
Service
Brinks services the cash pickup from the Deposit counter. This is an existing service and not a new cost. It was paid out of Interest balance account in the previous legacy system which will now be budgeted in the new ERP system. $0 $0
FD620 Water Fund FIN FIN-06 Finance Clerk I/II
This request supports the City’s mission to provide high-quality customer service to the community. The addition of a Finance Clerk position will increase service capacity, reduce customer wait times, and enhance the department’s ability to deliver responsive and proactive customer support. The Finance counter currently serves approximately 300 customers per day and manages over 23,941 active utility accounts, which has contributed to increased service demand. 0.34 $30,229 $30,229
FD620 Water Fund FIN FIN-07
Utility Billing
Operational Cost
Increase
Operational costs increase: Mail processing, postage and janitorial cost going up $41,822 $43,913
FD620 Water Fund UT UT-09 Professional Services
1) Landscape Area Measurement (LAM's): The need for this request is to understand our outdoor and indoor water usage for a new regulation that must be in place by July 1, 2027.
2) Seismic assessment that will evaluate the Blending Disinfecting Facility (BDF), Reservoirs, Wells, and Scada System.
3) Assessment on the well headers. $75,000 $450,000
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD620 Water Fund UT UT-10 Other Maintenance
and Operations
Meter and Hydrant inventory, parts, and maintenance supplies for Hydrant and Meter Maintenance and Replacement Program. $1,168,500 $1,205,260 FD620 Water Fund UT UT-16 Professional Services
1) Develop a Request for Proposals for a Computerized
Maintenance Management System (CMMS) software.
2) Cybersecurity assessment and provide recommendations for system upgrades
3) Purchase and fund service and support subscription for compliance management and reporting software. $75,000 $25,480 $0 $28,415 FD620 Water Fund UT UT-18 Lease/Rental
Increase base budget to lease an additional modular building at the Wastewater Treatment Plant (WWTP) to meet ongoing
operational needs.
Related to CMEP UT-24. $30,000 $30,600
FD620 Water Fund UT UT-19
Central Coast Water
Authority (CCWA) and
State Water (DWR)Central Coast Water Authority and State Water. $3,375,761 $0 FD620 Water Fund UT UT-20 Reservoir Maintenance
and OperationsIncrease base budget in Reservoir maintenance and operations to clean two reservoirs. $150,000 $150,000
FD620 Water Fund UT UT-23 Rentals Emergency equipment rental contingency. $113,000 $113,000 FD620 Total FD620 Water Fund Total0.34 - $3,525,761 $1,620,231 $450,000 $1,662,617 FD630
Solid Waste
Collection
Fund
FIN FIN-03 ERP Licensing
Agreements ERP Ongoing licensing and service agreements - SpryPoint Utility Billing Licensing. $59,400 $59,400
FD630
Solid Waste
Collection
Fund
FIN FIN-04
Budgetary Cleanup:
Brinks Cash Pickup
Service
Brinks services the cash pickup from the Deposit counter. This is an existing service and not a new cost. It was paid out of Interest balance account in the previous legacy system which will now be budgeted in the new ERP system. $0 $0
FD630
Solid Waste
Collection
Fund
FIN FIN-06 Finance Clerk I/II
This request supports the City’s mission to provide high-quality customer service to the community. The addition of a Finance Clerk position will increase service capacity, reduce customer wait times, and enhance the department’s ability to deliver responsive and proactive customer support. The Finance counter currently serves approximately 300 customers per day and manages over 23,941 active utility accounts, which has contributed to increased service demand. 0.33 $29,341 $29,341
FD630
Solid Waste
Collection
Fund
FIN FIN-07
Utility Billing
Operational Cost
Increase
Operational costs increase: Mail processing, postage and janitorial cost going up $27,900 $29,295
FD630
Solid Waste
Collection
Fund
UT UT-14 Other Maintenance
and Operations
1) Purchase of residential refuse, recycling, and organic carts:
> Provide residential refuse, recycling, and organic carts to replace those in the field that are damaged, exceeded their useful life, or to accommodate for growth.
> Maintain compliance with California Code of Regulations (CCR) Title 14, Assembly Bill (AB) 939, Senate Bill (SB) 1383, and City Municipal Code.
2) Purchase of commercial refuse, recycling, and organic dumpsters:
> Provide commercial refuse, recycling, and organic dumpsters to replace those in the field that are damaged, exceeded their useful life, and accommodate for new account growth.
> Maintain compliance with California Code of Regulations (CCR) Title 14, Senate Bill (SB) 1383, and Assembly Bill (AB) 341. $455,000 $478,750
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD630
Solid Waste
Collection
Fund
UT UT-15 Professional Services
1) Contract with Fleet Clean to provide professional cleaning services for refuse trucks and landfill equipment.
2)Operations and management of the Santa Maria Regional Landfill (SMRL) Recycle Park agreement and Greenwaste costs agreement. $299,247 $313,489
FD630
Solid Waste
Collection
Fund
UT UT-22 Grant Award
Adjustment Adjust budgets for CalRecycle grants to match award amount. $2,842 $0 FD630
Solid Waste
Collection
Fund
UT UT-26 Professional Services
Increased City-wide solid waste, recycling, organics processing, street sweeping, software support, and landfill disposal service costs. $2,796,442 $3,222,818
FD630 Total FD630 Solid Waste Collection Fund Total0.33 - $2,842 $3,667,330 $0 $4,133,093 FD640 Wastewater
Fund FIN FIN-03 ERP Licensing
Agreements
ERP Ongoing licensing and service agreements - SpryPoint Utility Billing Licensing. $59,400 $59,400
FD640 Wastewater
Fund FIN FIN-04
Budgetary Cleanup:
Brinks Cash Pickup
Service
Brinks services the cash pickup from the Deposit counter. This is an existing service and not a new cost. It was paid out of Interest balance account in the previous legacy system which will now be budgeted in the new ERP system. $0 $0
FD640 Wastewater
Fund FIN FIN-06 Finance Clerk I/II
This request supports the City’s mission to provide high-quality customer service to the community. The addition of a Finance Clerk position will increase service capacity, reduce customer wait times, and enhance the department’s ability to deliver responsive and proactive customer support. The Finance counter currently serves approximately 300 customers per day and manages over 23,941 active utility accounts, which has contributed to increased service demand. 0.33 $29,341 $29,341
FD640 Wastewater
Fund FIN FIN-07
Utility Billing
Operational Cost
Increase
Operational costs increase: Mail processing, postage and janitorial cost going up $27,900 $29,295
FD640 Wastewater
Fund UT UT-11 Professional Services
1) SCADA support services from AVEVA: The need for this request is to cover support services that were previously shared between FD620 and FD640. Due to software changes in FD620, these costs are now fully allocated to FD640.
2) Survey of all the sewer manhole's in the City to collect and enter grade elevation and rim data: The need for this survey is to gather foundational data to inform future sewer system planning, capacity, and capital programs.
3) Utilities Capacity Study for the sewer collection system: The need for this is the assessment will identify system deficiencies, regulatory risks, infrastructure constraints, and recommended capital improvements. $500,000 $50,000 $50,000
FD640 Wastewater
Fund UT UT-12
Dewatering Equipment
Rental & Sludge Bed
Maintenance
Funding to rent specialized dewatering equipment necessary to maintain sludge drying bed capacity at the Wastewater Treatment Plant (WWTP). $268,600 $289,770
FD640 Wastewater
Fund UT UT-13 Water Refuse Sewer
Charges
Increase base budget for new water usage charges at the Wastewater Treatment Plant (WWTP) due to the completion of the Stowell to Black Road waterline project, that connected the WWTP to the City's water system. $140,000 $140,000
Fund Fund Name Dept SBR # SBR Title SBR Description FTE LS One-Time Ongoing One-Time Ongoing FY 2027-28FY 2026-27
FD640 Wastewater
Fund UT UT-16 Professional Services
1) Develop a Request for Proposals for a Computerized
Maintenance Management System (CMMS) software.
2) Cybersecurity assessment and provide recommendations for system upgrades
3) Purchase and fund service and support subscription for compliance management and reporting software. $45,000 $38,220 $0 $42,625 FD640 Wastewater
Fund UT UT-17
Equipment
Maintenance &
Operations
Perform condition assessment and repairs on Digesters #1 and #3 at the Wastewater Treatment Plant (WWTP). $200,000 $325,000 FD640 Wastewater
Fund UT UT-18 Lease/Rental
Increase base budget to lease an additional modular building at the Wastewater Treatment Plant (WWTP) to meet ongoing
operational needs.
Related to CMEP UT-24. $30,000 $30,600
FD640 Wastewater
Fund UT UT-21 Building Maintenance
& Repairs
Routine maintenance and repairs at the Wastewater Treatment Plant (WWTP):
> Maintenance and repairs to include but not limited to:
>> HVAC (ongoing)
>> Landscape maintenance (ongoing)
> Upgrade lights at the site by PG&E (one-time $6,000) - the WWTP was not included in the City's original lighting assessment. $6,000 $20,000 $20,000 FD640 Wastewater
Fund UT UT-23 Rentals Emergency equipment rental contingency. $50,000 $50,000 FD640 Wastewater
Fund UT UT-24 Sludge Cleaning &
Disposal
Digester cleaning services and additional disposal costs associated with the cleaning activities. $75,000 $0
FD640 Total FD640 Wastewater Fund Total0.33 - $826,000 $713,461 $325,000 $741,031 FD660 SMAT Public
Transit Fund PW PW-01 Transit Operations and
Maintenance contract
Previously approved contract extension with RATP-Dev expires June 30th 2026, with an additional two option years that the City could exercise. Due to increased labor costs and expansion of service, the Operations and maintenance contract will increase. This is funded by Federal Transit Administration funds, section 5307, and California Transportation Development funds (TDA). $1,785,070 $2,412,269 FD660 SMAT Public
Transit Fund PW PW-02 Contractual &
Professional Services
Requesting an increase in Contractual & Professional Services (ex:
cleaning at the transit center and maintenance of the Jones Trail).
This is funded by Federal Transit Administration funds, section 5307, and California Transportation Development funds (TDA). $200,000 $200,000 FD660 SMAT Public
Transit Fund PW PW-03 Advertising/Marketing
With the addition of the Transit Outreach Coordinator position and expansion of service, requesting to increase marketing budget. This is funded by Federal Transit Administration funds, section 5307, and California Transportation Development funds (TDA). $66,000 $66,000 FD660 SMAT Public
Transit Fund PW PW-04 IT SubscriptionsThis requested increase will go to pay for our yearly subscriptions to modeshift, tripshot, and genfare link. $100,000 $100,000 FD660 Total FD660 SMAT Public Transit Fund Total- - $0 $2,151,070 $0 $2,778,269 ALL FUNDS TOTAL1.00 1.92 $6,332,329 $6,859,341 $2,435,300 $14,960,186
COUNCIL AGENDA REPORT
TO: Mayor and City Council
FROM: Rebecca Campbell, Director of Finance
DATE: June 2, 2026
SUBJECT: Adoption of a Resolution Approving an Updated 202 6 User Fee Schedule
Description:
The City Council will hold a public hearing and consider approving the addition and update of the Citywide User Fees identified in the Annual User Fee Update and 202 6 User Fee Schedule.
Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.
RECOMMENDATION:
Adopt a Resolution approving the addition and update of Citywide User Fees identified in the Annual User Fee Update and 2026 User Fee Schedule.
BACKGROUND:
"User fee" activities are defined as services the City provides to individuals who receive some material benefit from these services. The user fee philosophy holds that the cost of providing these services should be borne by the group receiving the benefit, not the community as a whole. User fee services are differentiated from general public benefit services, such as police and fire, which are largely tax-supported. For the most part, City fees should be set at full cost recovery to avoid subsidizing the activities of specific groups/individuals. However, to promote activities and actions, fees may be set at less than full cost recovery. An example of sub sidizing a service to benefit the community is the establishment of swimming fees at less than full cost recovery to promote exercise and good health.
In October 2019, after a competitive Request for Proposal process, the City contracted Revenue and Cost Specialists (RCS) to conduct a year -long comprehensive study of services provided by the City and to develop user fees that represent "full cost" recovery as allowed by law. On May 4, 2021, based on the 2020 Comprehensive Fee Study, the City Council adopted a master fee Resolution increasing fees, effective July 1, 2021, to 50 percent of the increase of the Cost of Study proposed fees. In addition, the City Council 2 adopted a User Fee Cost Recovery Level Policy with a goal for full cost recovery of user fees by July 2026.
The City contracted with RCS to update user fees annually. In the calendar year 2022, and every even year forward, RCS will conduct a review of the City’s user fees, updating the City’s Cost Allocation Plan (CAP), salary, position data, and adopted budget. On April 4, 2023, the City Council was presented with the results of a comprehensive fee study.
The recommendations included consideration of user fee increases to full 100 percent recovery, which would have generated an increase in revenu e of $2.7 million. Another approach, which was adopted by the City Council was to increase user fees in a phased- in approach, which estimated an increase in revenue of $1.6 million. The City Council further directed staff to return with the Fiscal Year (FY ) 2024-25 budget development to consider raising fees to full cost recovery.
During the FY 2024-26 budget development process, RCS met with City staff to discuss the addition, removal, and/or adjustment of user fees. This round of recommended fee updates by RCS built on the prior year’s analysis and further addressed specific fee adjustment requests from Citywide departments. The presented fees represented full cost recovery. For the fees reviewed with that study, staff recommended and the City Council adopted a methodology of applying a Consumer Price Index to future fee schedules.
DISCUSSION:
During the FY 202 6-28 Full-Cycle Budget Update process, RCS met with City staff to discuss the addition, removal, and/or adjustment of user fees. This round of recommended fee updates by RCS builds on the prior year’s analysis and further addresses specific fee adjustment requests from Citywide departments.
The Fee Study Update report (Attachment B) recommends recovering the full cost of providing each fee -related service and calculates the potential revenues at full (100 percent) cost -recovery levels. The Executive Summary explains RCS’s philosophy concerning fee-based services and cost analysis with a discussion of Costs Generally Defined. The report then lists the Types of Costs included in the analysis and General Recommendations.
Exhibit A to Attachment A compares the current fee to the fee proposed to become effective August 1, 2026. There are user fees that are not proposed to be changed at this time. They are also presented to be included in the Master User Fee Schedule. Their current fees are included in the 202 6 User Fee Schedule (Exhibit A) so that the City Council may simply adopt a master fee Resolution. Lastly, fees for some services, such as services for special public events, cannot be determined until the service is provided and for that reason are not itemized on the proposed fee schedule. Rather, it is noted that fees that are not itemized on the fee schedule will be charged at a fully allocated rate for the position providing the service.
3 The proposed budget includes the assumption that most Governmental Fees are set to full recovery level. The table below shows the potential revenue growth Citywide of $2.012 million, of which $1.742 million impacts the General Fund.
SERVICE
TOTAL
FEE
REVENUE
TOTAL
SERVICE
COST
TOTAL
PROFIT /
(SUBSIDY)
PCT.
RECOVERY
FROM FEES
POSSIBLE
NEW
REVENUE
ACTUAL SUGGEST
PLANNING $ 1,815,974 $ 2,504,233 $ (688,259) 72.5% VAR. $ 688,500 BUILDING 4,589,137 4,298,979 290,158 106.7% VAR. 12,100 PUBLIC WORKS 1,129,846 1,596,939 (467,093) 70.8% VAR. 466,800 CODE
ENFORCEMENT
234,529 862,230 (627,701) 27.2% VAR. 203,500
FIRE 579,588 662,816 (83,228) 87.4% VAR. 11,600
POLICE 522,371 601,249 (78,878) 86.9% VAR. 65,000
SOLID WASTE 0 10,436 (10,436) 0.0% VAR. 10,500
WATER 99,273 172,427 (73,154) 57.6% VAR. 73,200
WASTEWATER 220,809 313,771 (92,962) 70.4% VAR. 92,600 FINANCE 1,108,464 1,303,120 (194,656) 85.1% VAR. 257,900 CITY CLERK 11,612 11,651 (39) 99.7% VAR. 0
CITY ATTORNEY 0 0 0 0.0% VAR. 0
SMCTV 0 367,437 (367,437) 0.0% VAR. 0
LIBRARY 68,123 393,135 (325,012) 17.3% VAR. 1,400
RECREATION 897,536 8,704,557 (7,807,021) 10.3% VAR. 0 PARKS 0 128,811 (128,811) 0.0% VAR. 128,900
SPECIAL PROJECTS 2,024 2,157 (133) 93.8% VAR. 200
$ 11,279,286 $ 21,933,948 $ (10,654,662) 51.4% VAR. $ 2,012,200
For fees that are not reviewed in next year’s study, staff recommends applying a Consumer Price Index to the FY 202 7-28 fee schedule based on the 12-month percent change to the Consumer Price Index (CPI) for All Urban Consumers, Los Angeles -Long Beach-Anaheim, CA area.
RCS recommends that the City Council adjust the fee schedule for the enumerated City services presented in Appendix A of the report. Continued use of the “full business costing” concept will create consistency in the establishment of fees and allow for timely adjustment to reflect chan ges in the cost of providing services. In addition, Recreation fees should be set by the market on an annual basis and should therefore not be included in the list of services that are increased annually by inflation. Staff agrees with these recommendations and is recommending the adoption of the user fees, effective August 1, 2026, based on the Full Cost Recovery Fee as shown in the Fee Study Update report (Attachment B). If the fees are not adjusted to 100 percent recovery, the City will be subsidizing the services.
Alternative(s)
The City Council can choose to adjust fees to less than the full cost recovery. If the City Council chooses not to increase the fees at this time, the City will continue to subsidize personal-choice services with other revenues.
Fiscal Considerations
The City set fees to full cost recovery starting in 2024, the proposed increased fees help the City maintain full cost recovery.
4 Impact to the Community
Adjusting the fee schedule using the “full business costing” concept ensures there is equity between taxpayers and fee -payers, as well as fairness between property -related and non -property-related service s, thereby assisting in the City’s continued financial sustainability into the future. Charging appropriate fees lessens subsidies and increases overall resources to provide general services to the public.
ATTACHMENT(S)
A. Resolution – User Fee Update 2026
B. RCS-Santa Maria Fee Study Update Report
ATTACHMENT A
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF SANTA MARIA, CALIFORNIA
APPROVING THE ADDITION AND UPDATE OF
CITYWIDE USER FEES IDENTIFIED IN THE ANNUAL
USER FEE UPDATE AND 2026 USER FEE SCHEDULE
WHEREAS, the City of Santa Maria’s last comprehensive Citywide User Fee Study was completed in 2021; and
WHEREAS, at the April 4, 2023, City Council Meeting, a public hearing was held, and the City Council adopted Resolution 202 3-58 approving the addition and update of User Fees identified in the Annual User Fee Update and Proposed Fee authorizing increase of user fees identified in phased-in category; and
WHEREAS, the City contracted with Revenue and Cost Specialist to complete an annual User Fee update and User Fee Schedule 2026 based on the 2020 Comprehensive Fee Study (Attachment B of the Council Agenda Report, and Exhibit A of the Resolution and incorporated herein by reference); and
WHEREAS, in accordance with Section 2-24.105 of the Santa Maria Municipal Code, cost and revenue data regarding the proposed new fees was made publicly available in the City Clerk’s Office at least 10 days prior to the June 2, 2026, public hearing date; and
WHEREAS, after deliberation, staff recommends that the City Council adopt th e fees as proposed in the Annual User Fee Update and Proposed User Fee Schedule (Attachment B, and Exhibit A of the Resolution and incorporated herein by reference ); and
WHEREAS, the City will continue to update user fees annually using the Consumer Price Index, in accordance with Section 2-24.202 of the Santa Maria Municipal Code; and
WHEREAS, to provide clarity for ratepayers as to the actual rates authorized by the City Council, the City has prepared a comprehensive itemization, User Fee Schedule (Exhibit A) of the individual fees to be imposed that will be become effective August 1, 2026.
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:
SECTION 1. The City Council finds and determines that Citywide user-specific services described in the Fee Study Update and User Fee Schedule 2026, and incorporated herein by reference, are provided for the benefit of specific individual groups and not for the benefit of the general public and taxpayers; and therefore, said services
ATTACHMENT A
should be paid by the user in an amount sufficient to adequately cover the cost to the City; and
SECTION 2. The City Council hereby establishes the fees for these services as set forth in the Fee Study Update and User Fee Schedule 2026, and is incorporated herein by reference, and directs the Department of Finance to update the fee schedule to reflect these fees effective August 1, 2026; and
SECTION 3. The City Council hereby adopts the updated fees, shown in Exhibit A, incorporated herein by reference , and directs the City Manager, or designee , to coordinate with the Department of Finance to implement the fees effective August 1, 2026; and
SECTION 4. The City Council hereby acknowledges, if not explicitly outlined in the Fee Study Update and User Fee Schedule 2026, fees including Building Permit Fees – New Construction, Police Department – Services for Special Public Events, Library Fees (non-facility rentals), and Recreation and Parks Facility Rental and Program Fees will be re-established with no change; and
SECTION 5. The Chief Deputy City Clerk is hereby authorized to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria, California, held this 2nd day of June 2026.
ATTEST:
Chief Deputy City Clerk
Exhibit A – User Fee Schedule 2026
Mayor
ATTACHMENT A
APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager
Fee Study Update
for the
City of Santa Maria
MAY 2026
Revenue & Cost Specialists
1519 East Chapman Ave, Suite C
Fullerton, CA 92831
www.revenuecost.com
(714) 992-9020
ATTACHMENT B
May 21, 2026
Ms. Rebecca Campbell, Finance Director
City of Santa Maria
110 E. Cook Street
Santa Maria, CA 93454
Dear Ms. Campbell,
This Report is submitted pursuant to our contract w ith the City to perform a revenue and cost analysis and to develop a cost distribution and cost control system for the City for its services.
The motivation for this study is the need of both the City Council and City staff to maintain City’s services at a level commensurate with the standards previously set by the City Council, and to maintain effective policy and management control of City services.
This Report provides currently useful information about the City’s status on recovery of costs for all City services. In addition, it will assist in projecting and determining the future level and equity of these City services.
RCS wishes to thank all City department heads and s taff for their assistance and cooperation extended to us during the accomplishment of our wor k, without whose aid this Report could not have been produced. The response, awareness and in formation gathered and supplied by numerous City employees make this Report the sound one we believe it to be.
Respectfully Submitted,
Eric S. Johnson
President
EXECUTIVE SUMMARY
By acceptance of the Revenue & Cost Specialists (RC
S) proposal, the City of Santa Maria decided
to subject its fee-based services to detailed analy
sis dedicated toward seeking alternate, and
more equitable, ways to finance City services provi
ded to the community. Due to the various
demands made of the City, it is essential that the City Counc il and management have complete
information upon which to assess fees charged to th
e public for services provided. Schedule 1
at the end of this Executive Summary lists each ser
vice reviewed in this study. It indicates that
the City could realize approximately $2,012,200 in
additional new revenue if the
recommendations provided here are adopted and implemen
ted.
Organization of Report. This Executive Summary exp
lains RCS’s philosophy concerning fee-
based services and cost analysis with a discussion
of Costs Generally Defined. The report then
lists the Types of Costs included in our analysis and our General Recommendations.
COSTS GENERALLY DEFINED
The basic costs of operating any business are direc
t labor and employee benefits, direct
materials, and overhead costs.
Determination of Costs. After the passage of Propo
sition 13, the California Taxpayers
Association, the California Chamber of Commerce, the Nati onal Tax Limitation Committee and
the California Association of Realtors put Proposit
ion 4 before the voters. It was adopted by
74.3% of the voters of California on November 6, 19
79, and became effective on July 1, 1980,
retroactive to Fiscal Year 1978-79.
This proposition, which became Article XIIIB of the
State Constitution, addressed all city
revenues and established a limit on the growth of tax reve nues. Also, because of Proposition 4,
fee services cannot exceed the “costs reasonably bo
rne” by the City in providing the service. If
the fee exceeds the cost, the excess fee is defined
as a special tax, which Proposition 13 requires
to be approved by two-thirds of the voters.
This report evaluates all recommended fees in accor
dance with Proposition 26 (California
Constitution Article XIIIC Section 1). Since each fe
e identified in this report meets one or more
of the Proposition 26 exceptions to the definition
of “tax,” the City Council is authorized to
approve the fees as recommended without seeking vot
er approval of a tax. The relevant
Proposition 26 exceptions include recommended City fees t hat incorporate:
The City’s costs of providing a specific benefit to the pay or
The City’s costs of providing a service or product to the pa yor
3 City of Santa Maria Fee Study Update
The City’s costs of regulation, such as licensing,
permitting, investigating, inspecting,
auditing, or enforcement.
The value of City land authorized by the City for use by the p ayor
A fine or penalty for a violation of law.
Principle Involved. A basic principle involved in
this Report is the recognition of those full
business costs as they are as defined by the author
s of the Constitutional amendment, NOT just
those costs which 1) the City might recognize and decide to b udget; or 2) which it might decide
to use in some other cost analysis methodology; or 3
) that other jurisdictions not so complying
might use; or 4) that some accounting or other consu
lting firm might decide it should use, based
on some external, non-California legal requirements.
These cost elements have been determined in accorda
nce with State law summarized above
and applied to each and every fee-financed or fee-f
inanceable service provided by the City. Thus
a logical, legal, and Constitutionally-mandated cos
t-consciousness can now be applied to City
operations.
TYPES OF COSTS
The following costs, identified above as part of "c
osts reasonably borne" by the Authors of
Proposition 4 and 26, make up the cost detail found
on the right-hand page in Appendix B for
each service center.
Salaries and Wages
City government is in fact a service industry, and
therefore, it is natural that salaries make up the
largest single element of cost for most services.
Interview Process. In order to allocate the salarie
s, interviews were held, documents sought and
researched, and reports and accounting records exam
ined by RCS. The result was, in most cases,
a percentage or hours distribution of individual employee personal services costs.
One hundred percent of the time of all City employees was dist ributed, including time spent on
service not funded by fee revenue. In other words,
everyone had to be someplace, all of their
time. No judgments were made about what personnel s
hould or might be doing. Their time was
distributed to those service centers where the time was expe nded.
Employee Fringe Benefits
Since fractional time -- to as low as three minutes
per unit of service or one-twentieth of a
percent of the annual time of an employee has been
allocated to service centers, fringe benefit
4 City of Santa Maria Fee Study Update
costs also must be fractionalized to carefully and accura tely distribute those ancillary personnel
costs.
The City finances numerous benefits for its employe
es, thereby incurring measurable costs for
these items such as Retirement and Medical Benefits.
All of these costs are current operating expenses,
and the amounts were isolated. Actual costs
were determined and reduced to a percentage of salary for each of the positions.
Available Work-Hours
.
After the individual elements of cost for positions
was compiled, the
total cost for each position was divided by the num
ber of available work-hours. Available work
hours were calculated as the total possible work-hours i n a year, 2,080, less the following away-
from-work benefit hours:
Holidays
Vacations
Sick Leave – 50% Usage
Morning/Afternoon Breaks
Start Up/Down Time
Maintenance and Operation Costs
All maintenance and operation costs, including non-
personnel expenses such as professional
services, insurance, operating supplies etc., were
derived from the 2025-2026 Council-approved
budget and allocated via percentages or through act
ual allocation to each of the service centers
identified in a department or division.
General and Departmental Overhead Costs
Overhead costs provide the vital glue that holds an
organization together operationally and
provide important coordinating capabilities. They a
lso provide the day-to-day support services
and facilities required for the organization to function e ffectively. RCS has used a detailed Cost
Allocation Plan (CAP) to identify and allocate these
costs to the remainder of the City
organization. In the CAP, costs were allocated to
end-user departments and divisions by
applying an overhead allocation factor. Each factor
was related to the work effort of its particular
overhead element and was assessed for relevance and reason ableness.
Full Cost Distribution. The purpose of deriving ov
erhead costs to apportion these amounts to
direct service program costs. By adopting this met
hod the City will be aware of its true costs
and be able to emulate business methods.
5 City of Santa Maria Fee Study Update
All of the above items make up the fully allocated
hourly rate which is calculated for each
position in the City.
Calculation of Revenues. Many of the revenues inclu
ded in this Report are calculated based on
the current fee and the number of projected units o
f service. This may be different than the
current budgeted revenues due to changes to project
ed volume, which comes from looking at
historic volume and estimates of current year levels.
6 City of Santa Maria Fee Study Update
GENERAL RECOMMENDATIONS
Adoption of Modifications to Current Fee Structure
It is recommended that the City Council adjust the f
ee schedule for the enumerated City services
presented in Appendix A of this Report.
Continued use of the "full business costing" conce
pt will
create consistency in the establishment of fees, an
d allow for timely adjustment to reflect
changes in the cost of providing services. In addit
ion, Recreation fees should be set by the
market on an annual basis and should therefore not
be included in the list of services that are
increased annually by inflation.
Review of Suggested Recovery Rates
The City Council should review each service and the s
uggested recovery rate to determine how
much of each service should be recovered through fe
es, and how much should be subsidized
through the City’s tax dollars. This review is very i
mportant because it gives City staff direction
as to what the Council wants to subsidize and what it does not .
Consumer Price Index changes. In the years in betw
een Fee Study Updates, the City should
continue increasing the fees by an inflationary fac
tor, such as the Consumer Price Index. This
allows for small incremental increases to the fees
so that there are not large changes when a
Study is performed.
CONCLUSION
If all the recommendations and suggestions made in
this Report are adopted, the City's financial
picture would be improved. Also, far more equity between tax payers and fee-payers, as well as
fairness between property-related and non-property-
related services could be secured, assisting
in the City's continued financial stability into th
e future. The following Schedule 1 portrays the
various services assessed during our analysis.
Appendix A – Summary of Current and Proposed Fees
Appendix A includes a summary of the current City fees matche d up with the proposed fees for
each service presented.
Appendix B - Detailed Worksheets
The substance of RCS’s work effort on this project
is primarily comprised of two different
worksheets shown in the detail of this report (see A
ppendix B). The first, "Revenue and Cost
7 City of Santa Maria Fee Study Update
Summary Worksheet" is on the left hand side. These
worksheets include a description of the
service, the current fee structure, the recommended
recovery rate, and other pertinent
information. Also included are the revenue and cos
t comparisons and suggestions for fee
modifications.
Presented on the facing page, titled "Cost Detail W
orksheet", is the worksheet which details the
costs involved with each service. This page identi
fies those employees providing the service, the
time spent, and their related costs.
Appendix C – Detail of Building & Safety Fees
The details of the current and proposed fees for Building & Safety are included in Appendix C.
Appendix D – Detail of Library Fees
The details of the current and proposed program and
facility rental fees for the Library are
included in Appendix D.
Appendix E – Detail of Recreation & Parks Facility & Field Rental Fees
The details of the current and proposed program and facili ty & field rental fees for Recreation &
Parks are included in Appendix E.
8 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
S-001
CUP W/O SITE DEVELOPMENT TO ZA
$45,000
$54,335
($9,335)
82.8%
100%
$9,300
S-001A
WTR-CUP W/O SITE DEVELOP TO ZA
$0
$1,375
($1,375)
0.0%
100%
$1,400
S-001B
WW-CUP W/O SITE DEVELOP TO ZA
$0
$1,190
($1,190)
0.0%
100%
$1,200
S-002
CUP WITH SITE DEVELOPMENT TO ZA
$62,188
$76,847
($14,659)
80.9%
100%
$14,700
S-002A
WTR-CUP WITH SITE DEVELOPMENT TO ZA
$0
$2,066
($2,066)
0.0%
100%
$2,100
S-002B
WW-CUP WITH SITE DEVELOPMENT TO ZA
$0
$1,788
($1,788)
0.0%
100%
$1,800
S-003
CUP W/O SITE DEVELOPMENT TO PC
$51,906
$70,800
($18,894)
73.3%
100%
$18,900
S-003A
WTR-CUP W/O SITE DEVELOPMENT TO PC
$0
$1,031
($1,031)
0.0%
100%
$1,000
S-003B
WW-CUP W/O SITE DEVELOPMENT TO PC
$0
$892
($892)
0.0%
100%
$900
S-004
CUP WITH SITE DEVELOPMENT TO PC
$107,104
$140,416
($33,312)
76.3%
100%
$33,300
S-004A
WTR-CUP WITH SITE DEVELOPMENT TO PC
$0
$3,051
($3,051)
0.0%
100%
$3,100
S-004B
WW-CUP WITH SITE DEVELOPMENT TO PC
$0
$2,644
($2,644)
0.0%
100%
$2,600
S-004C
SW-CUP WITH SITE DEVELOPMENT TO PC
$0
$2,865
($2,865)
0.0%
100%
$2,900
S-005
PLANNED DEVELOPMENT TO PC
$151,180
$192,620
($41,440)
78.5%
100%
$41,400
S-005A
WTR-PLANNED DEVELOPMENT TO PC
$0
$3,813
($3,813)
0.0%
100%
$3,800
S-005B
WW-PLANNED DEVELOPMENT TO PC
$0
$3,305
($3,305)
0.0%
100%
$3,300
S-005C
SW-PLANNED DEVELOPMENT TO PC
$0
$3,582
($3,582)
0.0%
100%
$3,600
S-006
CUP/PD TO CITY COUNCIL
$19,808
$27,058
($7,250)
73.2%
100%
$7,300
S-006A
WTR-CUP/PD TO CITY COUNCIL
$0
$381
($381)
0.0%
100%
$400
S-006B
WW-CUP/PD TO CITY COUNCIL
$0
$330
($330)
0.0%
100%
$300
S-006C
SW-CUP/PD TO CITY COUNCIL
$0
$358
($358)
0.0%
100%
$400
S-007
CUP/PD TO PLANNING COMMISSION
$159,768
$199,083
($39,315)
80.3%
100%
$39,300
S-007A
WTR-CUP/PD TO PLANNING COMMISSION
$0
$3,432
($3,432)
0.0%
100%
$3,400
S-007B
WW-CUP/PD TO PLANNING COMMISSION
$0
$2,974
($2,974)
0.0%
100%
$3,000
S-007C
SW-CUP/PD TO PLANNING COMMISSION
$0
$3,223
($3,223)
0.0%
100%
$3,200
S-008
ADMIN DOWNTOWN PMT-OVER THE COUNTER
$4,002
$4,928
($926)
81.2%
100%
$900
S-009
ADMIN DOWNTOWN PRMT - MINOR
$32,218
$40,326
($8,108)
79.9%
100%
$8,100
S-010
ADMIN DOWNTOWN PRMT - MAJOR
$26,751
$40,017
($13,266)
66.9%
100%
$13,300
S-011
ADMIN DOWNTOWN PRMT - WITH SITE DEV
$164,900
$300,098
($135,198)
55.0%
100%
$135,200
S-011A
WTR-ADMIN DOWNTOWN PRMT-W/SITE DEV
$0
$10,035
($10,035)
0.0%
100%
$10,000
S-011B
WW-ADMIN DOWNTOWN PRMT-W/SITE DEV
$0
$8,684
($8,684)
0.0%
100%
$8,700
S-012
DOWNTOWN PERMIT TO PLAN. COMM.
$38,108
$44,197
($6,089)
86.2%
100%
$6,100
S-012A
WTR-DOWNTOWN PERMIT TO PLAN. COMM.
$0
$763
($763)
0.0%
100%
$800
S-012B
WW-DOWNTOWN PERMIT TO PLAN. COMM.
$0
$661
($661)
0.0%
100%
$700
S-012C
SW-DOWNTOWN PERMIT TO PLAN. COMM.
$0
$272
($272)
0.0%
100%
$300
S-013
DOWNTOWN PERMIT TO CITY COUNCIL
$19,978
$28,957
($8,979)
69.0%
100%
$9,000
PCT. RECOVERY
FROM FEES
9 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-013A
WTR-DOWNTOWN PERMIT TO CITY COUNCIL
$0
$381
($381)
0.0%
100%
$400
S-013B
WW-DOWNTOWN PERMIT TO CITY COUNCIL
$0
$330
($330)
0.0%
100%
$300
S-013C
SW-DOWNTOWN PERMIT TO CITY COUNCIL
$0
$136
($136)
0.0%
100%
$100
S-014
VARIANCE
$12,241
$15,925
($3,684)
76.9%
100%
$3,700
S-015
ENVIRON. INITIAL STUDY/NEG DEC
$7,500
$71,898
($64,398)
10.4%
100%
$64,400
S-016
ENVIRONMENTAL IMPACT REPORT
$0
$0
$0
0.0%
100%
$0
S-017
TENTATIVE PARCEL MAP - PLANNING
$30,417
$36,614
($6,197)
83.1%
100%
$6,200
S-017A
WTR-TENTATIVE PACEL MAP
$0
$885
($885)
0.0%
100%
$900
S-017B
WW-TENTATIVE PARCEL MAP
$0
$671
($671)
0.0%
100%
$700
S-018
TENTATIVE PARCEL MAP (ADDL FOR CC)
$2,898
$3,562
($664)
81.4%
100%
$700
S-019
TENTATIVE TRACT MAP - PLANNING
$29,884
$35,794
($5,910)
83.5%
100%
$5,900
S-019A
WTR-TENTATIVE TRACT MAP
$0
$1,181
($1,181)
0.0%
100%
$1,200
S-019B
WW-TENTATIVE TRACT MAP
$0
$1,022
($1,022)
0.0%
100%
$1,000
S-020
FINAL PARCEL MAP - PLANNING
$1,840
$4,189
($2,349)
43.9%
100%
$2,300
S-020A
WTR-FINAL PARCEL MAP
$0
$1,181
($1,181)
0.0%
100%
$1,200
S-020B
WW-FINAL PARCEL MAP
$0
$1,022
($1,022)
0.0%
100%
$1,000
S-021
FINAL TRACT MAP - PLANNING
$3,274
$4,134
($860)
79.2%
100%
$900
S-021A
WTR-FINAL TRACT MAP
$0
$1,868
($1,868)
0.0%
100%
$1,900
S-021B
WW-FINAL TRACT MAP
$0
$1,617
($1,617)
0.0%
100%
$1,600
S-022
LOT LINE ADJUSTMENT - PLANNING
$7,065
$8,976
($1,911)
78.7%
100%
$1,900
S-023
LOT MERGER - PLANNING
$5,997
$7,617
($1,620)
78.7%
100%
$1,600
S-024
PRE-APPLICATION - ADMINISTRATIVE
$109,464
$151,069
($41,605)
72.5%
100%
$41,600
S-024A
WTR-PRE-APPLICATION-ADMINISTRATIVE
$0
$7,083
($7,083)
0.0%
100%
$7,100
S-024B
WW-PRE-APPLICATION-ADMINISTRATIVE
$0
$6,130
($6,130)
0.0%
100%
$6,100
S-025
PRE-APPLICATION - PC STUDY SESSION
$32,270
$63,369
($31,099)
50.9%
100%
$31,100
S-025A
WTR-PRE-APPLICATION-PC STUDY SESS.
$0
$2,066
($2,066)
0.0%
100%
$2,100
S-025B
WW-PRE-APPLICATION-PC STUDY SESS.
$0
$1,788
($1,788)
0.0%
100%
$1,800
S-026
CONCEPTUAL REVIEW (CITY COUNCIL)
$8,853
$10,625
($1,772)
83.3%
100%
$1,800
S-026A
WTR-CONCEPTUAL REVIEW
$0
$295
($295)
0.0%
100%
$300
S-026B
WW-CONCEPTUAL REVIEW
$0
$255
($255)
0.0%
100%
$300
S-027
ADMIN INTERPRETATION/SUBST. CONFORM
$2,257
$3,112
($855)
72.5%
100%
$900
S-028
SIGN PROGRAM
$1,942
$2,411
($469)
80.6%
100%
$500
S-029
PLANNING SIGN PERMIT
$6,776
$8,723
($1,947)
77.7%
100%
$1,900
S-030
LANDSCAPE PLAN (0-5,000 SQ FT)
$2,697
$3,207
($510)
84.1%
100%
$500
S-031
LANDSCAPE PLAN (5,000+ SQ FT)
$53,132
$64,703
($11,571)
82.1%
100%
$11,600
S-032
AMENDMENT - SIGN PROGRAM
$1,131
$1,392
($261)
81.3%
100%
$300
10 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-033
AMENDMENT - TO PC/COUNCIL
$75,000
$98,373
($23,373)
76.2%
100%
$23,400
S-033A
WTR-AMENDMENT - TO PC/COUNCIL
$0
$1,476
($1,476)
0.0%
100%
$1,500
S-033B
WW-AMENDMENT - TO PC/COUNCIL
$0
$1,277
($1,277)
0.0%
100%
$1,300
S-034
AMENDMENT - ADMIN
$30,000
$45,710
($15,710)
65.6%
100%
$15,700
S-034A
WTR-AMENDMENT - ADMIN
$0
$859
($859)
0.0%
100%
$900
S-034B
WW-AMENDMENT - ADMIN
$0
$744
($744)
0.0%
100%
$700
S-035
TEMP ACTIVITY PMT-OVER THE COUNTER
$4,462
$5,494
($1,032)
81.2%
100%
$1,000
S-036
TEMP ACTIVITY PERMIT - MINOR
$5,792
$7,250
($1,458)
79.9%
100%
$1,500
S-037
TEMP ACTIVITY PERMIT - MAJOR
$8,676
$13,403
($4,727)
64.7%
100%
$4,700
S-038
BUS LIC ZONING REVIEW - STANDARD
$20,976
$25,828
($4,852)
81.2%
100%
$4,900
S-039
BUS LIC ZONING REVIEW - SUPPLEMENTL
$17,600
$22,656
($5,056)
77.7%
100%
$5,100
S-040
PUBLIC CONVENIENCE & NECESS FINDING
$11,280
$13,894
($2,614)
81.2%
100%
$2,600
S-041
APPEAL TO PLANNING COMMISSION
$7,061
$8,634
($1,573)
81.8%
100%
$1,600
S-042
APPEAL TO CITY COUNCIL
$14,276
$17,382
($3,106)
82.1%
100%
$3,100
S-043
TIME EXT/RECONSID - ADMIN
$5,392
$7,673
($2,281)
70.3%
100%
$2,300
S-043A
WTR-TIME EXT/RECONSID - ADMIN
$0
$344
($344)
0.0%
100%
$300
S-043B
WW-TIME EXT/RECONSID - ADMIN
$0
$297
($297)
0.0%
100%
$300
S-044
TIME EXT/RECONSID - PC/COUNCIL
$167,904
$220,404
($52,500)
76.2%
100%
$52,500
S-044A
WTR-TIME EXT/RECONSID - PC/COUNCIL
$0
$2,219
($2,219)
0.0%
100%
$2,200
S-044B
WW-TIME EXT/RECONSID - PC/COUNCIL
$0
$1,920
($1,920)
0.0%
100%
$1,900
S-045
CONTINUANCE REQUESTED BY APPLICANT
$764
$823
($59)
92.8%
100%
$100
S-046
GENERAL PLAN MAINTENANCE
$165,000
$176,050
($11,050)
93.7%
100%
$11,100
S-046A
ANNEXATION
$24,900
$34,363
($9,463)
72.5%
100%
$9,500
S-046C
AMEND GENERAL PLAN AND/OR ZONING
$18,331
$22,616
($4,285)
81.1%
100%
$4,300
S-046E.1
SPECIFIC PLAN AMENDMENT [MAJOR]
$16,936
$24,585
($7,649)
68.9%
100%
$7,600
S-046E.2
SPECIFIC PLAN AMENDMENT [MINOR]
$10,754
$14,335
($3,581)
75.0%
100%
$3,600
S-046F
DEVELOPMENT AGREEMENT
$3,977
$15,892
($11,915)
25.0%
100%
$11,900
S-046G
CERTIFICATION OF COMPLIANCE - PLAN
$362
$453
($91)
79.9%
100%
$100
S-046H
ZONING VERIFICATION
$3,620
$4,531
($911)
79.9%
100%
$900
S-046I
DOCUMENT COPY - COLOR 11X17
$2
$2
$0
100.0%
100%
$0
S-046J
EXTRA PLANNING PLAN CHECK
$180
$227
($47)
79.3%
100%
$0
S-046K
EXTRA PLANNING INSPECTION
$180
$227
($47)
79.3%
100%
$0
S-046L
EXTRA DEVELOPMENT REVIEW MEETING
$0
$6,204
($6,204)
0.0%
100%
$6,200
S-046M
WTR-EXTRA DEVELOPMENT REV. MEETING
$0
$1,674
($1,674)
0.0%
100%
$1,700
S-046N
FILM PERMIT
$0
$222
($222)
0.0%
100%
$200
S-047
BUILDING PLAN CHECK/INSPECTION
$4,401,839
$4,100,732
$301,107
107.3%
100%
$0
11 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-047A
EXPRESS BUILDING PLAN CHECK
$97,994
$98,000
($6)
100.0%
100%
$0
S-047C
TEMPORARY CERTIFICATE OF OCCUPANCY
$66
$3,184
($3,118)
2.1%
100%
$3,100
S-047D
SPECIAL INSPECTOR REGISTRATION
$0
$553
($553)
0.0%
100%
$600
S-047E
PERMIT EXPIRATION/REINSTATEMENT
$0
$670
($670)
0.0%
100%
$700
S-047F
PLAN CHECK EXPIRATION/REINSTATEMENT
$0
$685
($685)
0.0%
100%
$700
S-047G
BUILDING PERMIT EXTENSION
$0
$255
($255)
0.0%
100%
$300
S-047H
MISCELLANEOUS BUILDING INSPECTION
$0
$0
$0
0.0%
100%
$0
S-048
COM DEV TECHNOLOGY SURCHARGE
$76,042
$75,000
$1,042
101.4%
100%
$0
S-049
NEW METER SET/INITIAL READ
$362
$198
$164
182.8%
100%
($200)
S-049A
WTR-NEW METER SET/INITIAL READ
$0
$247
($247)
0.0%
100%
$200
S-050
DEVELOPMENT FEE ESTIMATION
$6,950
$13,729
($6,779)
50.6%
100%
$6,800
S-051
BUILDING PLAN COPY
$5,884
$5,973
($89)
98.5%
100%
$100
S-052
ENCROACHMENT PERMIT - SIDEWALK
$23,953
$37,355
($13,402)
64.1%
100%
$13,400
S-053
ENCROACHMENT PERMIT - CURB/GUTTER
$15,439
$27,592
($12,153)
56.0%
100%
$12,200
S-054
ENCROACHMENT PERMIT - DRIVEWAY APPR
$41,286
$71,151
($29,865)
58.0%
100%
$29,900
S-055
ENCROACHMENT PERMIT - STREET EXCAV
$171,805
$232,458
($60,653)
73.9%
100%
$60,700
S-055A
ENRCROACH PERMIT - ADA CURB RAMP
$850
$1,163
($313)
73.1%
100%
$300
S-055B
ENCROACHMENT PERMIT - SEWER MANHOLE
$1,090
$1,556
($466)
70.1%
100%
$500
S-055C
ENCROACHMENT PERMIT - STORM MANHOLE
$985
$1,408
($423)
70.0%
100%
$400
S-055D
ENCROACH PERMIT - STORM DRAIN INLET
$55
$771
($716)
7.1%
100%
$700
S-055F
ENCROACHMENT PERMIT - STREET LIGHT
$610
$869
($259)
70.2%
100%
$300
S-055G
ENCROACH PERMIT - TRAFFIC SIGNAL
$2,255
$3,222
($967)
70.0%
100%
$1,000
S-055H
ENCROACH PERMIT - UTIL VAULT/CAB
$1,100
$1,556
($456)
70.7%
100%
$500
S-055I
ENCROACHMENT PERMIT EXTENSION
$0
$170
($170)
0.0%
100%
$200
S-055J
ENCROACHMENT PERMIT REISSUANCE
$0
$170
($170)
0.0%
100%
$200
S-055K
MISSED ENGINEERING INSPECTION
$0
$196
($196)
0.0%
100%
$200
S-055L
AFTER-HOURS ENGINEERING INSPECTION
$0
$869
($869)
0.0%
100%
$900
S-056
TEMPORARY ENCROACHMENT PERMIT
$2,070
$2,809
($739)
73.7%
100%
$700
S-057
PUBLIC IMPROVEMENT INSPECTION
$252,420
$310,406
($57,986)
81.3%
100%
$58,000
S-058
PUBLIC IMPROVEMENT PLAN CHECK
$122,545
$155,609
($33,064)
78.8%
100%
$33,100
S-058A
WTR-PUBLIC IMPROVEMENT PLAN CHECK
$0
$15,123
($15,123)
0.0%
100%
$15,100
S-058B
WW-PUBLIC IMPROVEMENT PLAN CHECK
$0
$13,087
($13,087)
0.0%
100%
$13,100
S-059
TRAFFIC CONTROL PLAN CHECK/INSPECT
$107,625
$149,403
($41,778)
72.0%
100%
$41,800
S-060
ROUGH GRADING PLAN CHECK
$10,802
$27,599
($16,797)
39.1%
100%
$16,800
S-061
FINE GRADING PLAN CHECK
$56,942
$93,339
($36,397)
61.0%
100%
$36,400
S-062
GRADING INSPECTION
$63,514
$87,853
($24,339)
72.3%
100%
$24,300
12 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-063
SWPP BMP INSPECTION
$0
$0
$0
0.0%
100%
$0
S-064
POST-MITIGATION INSPECTION
$0
$0
$0
0.0%
100%
$0
S-065
TENTATIVE PARCEL MAP - ENGINEERING
$20,660
$36,044
($15,384)
57.3%
100%
$15,400
S-066
TENTATIVE TRACT MAP - ENGINEERING
$67,609
$115,682
($48,073)
58.4%
100%
$48,100
S-067
FINAL PARCEL MAP - ENGINEERING
$13,792
$19,279
($5,487)
71.5%
100%
$5,500
S-068
FINAL TRACT MAP - ENGINEERING
$40,920
$63,884
($22,964)
64.1%
100%
$23,000
S-069
LOT LINE ADJUSTMENT - ENGINEERING
$13,820
$18,608
($4,788)
74.3%
100%
$4,800
S-070
LOT MERGER - ENGINEERING
$8,136
$11,174
($3,038)
72.8%
100%
$3,000
S-071
CERTIFICATE OF COMPLIANCE - ENGIN.
$7,892
$10,851
($2,959)
72.7%
100%
$3,000
S-072
MAP AMENDMENT
$7,396
$9,542
($2,146)
77.5%
100%
$2,100
S-073
REIMBURSEMENT MAP AGREEMENT
$4,814
$6,980
($2,166)
69.0%
100%
$2,200
S-074
STREET/EASEMENT ABANDONMENT
$12,840
$17,662
($4,822)
72.7%
100%
$4,800
S-075
DEDICATION/EASEMENT CREATION
$30,220
$48,215
($17,995)
62.7%
100%
$18,000
S-076
TRAFFIC STUDY REVIEW
$0
$0
$0
0.0%
100%
$0
S-076A
NEIGHBORHOOD PARKING PERMIT REVIEW
$0
$1,628
($1,628)
0.0%
100%
$1,600
S-077
APPEAL TO THE TRAFFIC COMMITTEE
$434
$627
($193)
69.2%
100%
$200
S-078
APPEAL OF TRAF COMM TO CITY COUNCIL
$1,467
$4,034
($2,567)
36.4%
100%
$2,600
S-079
TRENCH RESURFACING
$500
$500
$0
100.0%
100%
$0
S-080
MISCELLANEOUS ENGINEERING SERVICES
$0
$0
$0
0.0%
100%
$0
S-081
CONSULTANT/OUTSIDE PLAN CHECK
$0
$0
$0
0.0%
100%
$0
S-082
WORK WITHOUT ENCROACHMENT PERMIT
$0
$0
$0
0.0%
100%
$0
S-083
PUBLIC WORKS ADMINISTRATION
$0
$0
$0
0.0%
100%
$0
S-084
TRAFFIC MODEL MAINTENANCE
$24,000
$24,705
($705)
97.2%
100%
$0
S-085
CODE ENFORCEMENT STANDARD INSPECT
$0
$424,156
($424,156)
0.0%
100%
$0
S-085A
CODE ENFORCEMENT SPECIAL INSPECT
$0
$268
($268)
0.0%
100%
$300
S-086
INSPECTION WARRANT
$3,045
$5,168
($2,123)
58.9%
100%
$2,100
S-087
ABATEMENT WARRANT
$3,300
$5,776
($2,476)
57.1%
100%
$2,500
S-088
ABATEMENT PROCESSING
$29,768
$33,267
($3,499)
89.5%
100%
$3,500
S-089
CODE ENFORCEMENT LIEN SETUP
$1,086
$1,610
($524)
67.5%
100%
$500
S-090
CODE ENFORCEMENT APPEAL
$19,530
$29,441
($9,911)
66.3%
100%
$9,900
S-091
COMPLIANCE ORDER HEARING
$157,960
$260,869
($102,909)
60.6%
100%
$102,900
S-092
UNPERMITTED CONSTR SPEC INVESTIG
$0
$0
$0
0.0%
100%
$0
S-093
SPECIAL BUSINESS INSPECTION
$19,840
$31,294
($11,454)
63.4%
100%
$11,500
S-093A
MOBILE CAR WASH PERMIT
$0
$300
($300)
0.0%
100%
$300
S-093B
SHORT TERM RENTAL PERMIT
$0
$69,544
($69,544)
0.0%
100%
$69,500
S-093C
BUSINESS LICENSE INVESTIGATION
$0
$537
($537)
0.0%
100%
$500
13 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-094
WEED ABATEMENT
$0
$0
$0
0.0%
100%
$0
S-095
CODE ENFORCEMENT FINES
$0
$0
$0
0.0%
100%
$0
S-096
NEW FIRE SPRINKLER SYSTEM PC/INSP
$9,403
$9,179
$224
102.4%
100%
$0
S-097
TI FIRE SPRINKLER SYSTEM PC/INSP
$6,696
$9,422
($2,726)
71.1%
100%
$2,700
S-098
STAND PIPE PLAN CHECK/INSPECTION
$640
$1,300
($660)
49.2%
100%
$700
S-099
UNDERGROUND PIPING PC/INSPECTION
$1,344
$1,300
$44
103.4%
100%
$0
S-100
FIRE CYCLE SYSTEM PC/INSPECTION
$672
$650
$22
103.4%
100%
$0
S-101
DRY CHEMICAL SYSTEM PC/INSPECTION
$672
$650
$22
103.4%
100%
$0
S-102
NEW WET CHEM/KITCHEN HOOD PC/INSP
$336
$325
$11
103.4%
100%
$0
S-103
FIRE ALARM SYSTEM PC/INSPECTION
$7,014
$5,767
$1,247
121.6%
100%
($1,200)
S-104
FIRE ALARM MONITOR PC/INSPECTION
$4,125
$6,092
($1,967)
67.7%
100%
$2,000
S-105
NEW KITCHEN HOOD SYST PC/INSPECTION
$294
$284
$10
103.5%
100%
$0
S-106
NEW HIGH PILED STORAGE PC/INSPECT
$3,330
$2,031
$1,299
164.0%
100%
($1,300)
S-107
FIRE HYDRANT FLOW TEST WITNESS
$1,980
$1,949
$31
101.6%
100%
$0
S-108
NEW OCC/TENANT IMPR FIRE PC/INSPECT
$232,400
$319,750
($87,350)
72.7%
100%
$0
S-109
CODE INSP - KITCHEN HOOD SYSTEM
$124
$122
$2
101.6%
100%
$0
S-110
CODE INSP - HIGH PILED STORAGE
$248
$244
$4
101.6%
100%
$0
S-111
FIRE PRMT - EXHIBITS & TRADE
$2,832
$2,762
$70
102.5%
100%
$0
S-112
FIRE PRMT - EXPLOSIVES
$920
$893
$27
103.0%
100%
$0
S-113
FIRE PRMT - FIREWORKS AERIAL
$0
$0
$0
0.0%
100%
$0
S-114
FIRE PRMT - TANKS & WELLS
$2,168
$2,112
$56
102.7%
100%
$0
S-115
FIRE PRMT - LUMBER YARDS
$1,508
$1,462
$46
103.2%
100%
$0
S-116
FIRE PRMT - CARNIVALS, FAIRS
$2,832
$2,762
$70
102.5%
100%
$0
S-117
FIRE PRMT - PYROTECHNIC
$0
$0
$0
0.0%
100%
$0
S-118
FIRE PRMT - REFRIGERATION EQUIP
$0
$0
$0
0.0%
100%
$0
S-119
FIRE PRMT - TEMP MEMBRANE/TENT
$2,772
$2,802
($30)
98.9%
100%
$0
S-120
FIRE PRMT - TIRE REBUILDING PLANT
$377
$366
$11
103.0%
100%
$0
S-121
FIRE PRMT - COMBUSTIBLE DUST
$754
$731
$23
103.2%
100%
$0
S-122
FIRE PRMT - MULTIPLE PERMITS
$0
$0
$0
0.0%
100%
$0
S-123
LIVE AUDIENCE FIRE INSPECTION
$0
$0
$0
0.0%
100%
$0
S-124
GENERAL FIRE CODE PERMIT
$1,242
$1,218
$24
102.0%
100%
$0
S-125
LIFE SAFETY - HOTELS/MOTELS
$10,790
$10,568
$222
102.1%
100%
$0
S-126
LIFE SAFETY - ASSEMBLY OCCUPANCY
$39,408
$30,784
$8,624
128.0%
100%
$0
S-127
LIFE SAFETY - HAZ MAT FACILITY
$22,990
$22,337
$653
102.9%
100%
$0
S-128
MULTI-FAMILY DWELLING INSPECTION
$60,180
$59,051
$1,129
101.9%
100%
$0
S-129
OCCUPANCY INSP - BOARD & CARE HOME
$3,310
$3,249
$61
101.9%
100%
$0
14 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-130
OCCUPANCY INSP - DAY CARE FACILITY
$8,690
$8,529
$161
101.9%
100%
$0
S-131
OCCUPANCY INSP - CONVALESCENT HOSP
$1,508
$1,625
($117)
92.8%
100%
$100
S-132
OCCUPANCY INSP - OTHER HOSPITAL
$1,290
$1,300
($10)
99.2%
100%
$0
S-133
OCCUPANCY INSP - PUBLIC/PRIV SCHOOL
$17,535
$17,057
$478
102.8%
100%
$0
S-134
OCCUPANCY INSP - OTHER STATE PROG
$1,650
$1,625
$25
101.5%
100%
$0
S-135
ENGINE COMPANY INSPECTION
$181
$185
($4)
97.8%
100%
$0
S-136
COMMERCIAL BUSINESS INSPECTION
$59,660
$59,203
$457
100.8%
100%
$0
S-137
BUSINESS LICENSE FIRE REVIEW
$35,112
$39,608
($4,496)
88.7%
100%
$4,500
S-138
FIRE CODE ENFORCEMENT INSPECTION
$825
$812
$13
101.6%
100%
$0
S-139
ADDITIONAL FIRE PLAN REVIEW
$480
$487
($7)
98.6%
100%
$0
S-140
ADDITIONAL FIRE INSPECTION
$495
$487
$8
101.6%
100%
$0
S-141
FALSE ALARM RESPONSE
$7,750
$4,645
$3,105
166.9%
100%
$0
S-142
FIRE INVESTIGATION
$0
$0
$0
0.0%
100%
$0
S-143
EMERG RESP - AMBULANCE TO HOSPITAL
$850
$928
($78)
91.6%
100%
$100
S-144
EMERG RESP - LIFT ASSIST NON-EMER
$850
$929
($79)
91.5%
100%
$100
S-145
FIRE DUI ACCIDENT RESPONSE
$0
$0
$0
0.0%
100%
$0
S-146
SMALL FUELS CLEAN-UP
$0
$0
$0
0.0%
100%
$0
S-147
HAZ MAT INCIDENT RESPONSE
$0
$0
$0
0.0%
100%
$0
S-148
FIREWORKS BOOTH REVIEW/INSPECTION
$21,346
$25,229
($3,883)
84.6%
100%
$3,900
S-149
FIRE INCIDENT REPORT COPY
$0
$1
($1)
0.0%
100%
$0
S-150
FIRE ELECTRONIC FILE COPY
$5
$4
$1
125.0%
100%
$0
S-151
POLICE FALSE ALARM RESPONSE
$48,100
$85,631
($37,531)
56.2%
100%
$37,500
S-152
POLICE ALARM PERMIT
$0
$0
$0
0.0%
100%
$0
S-153
SPECIAL BUSINESS REVIEW - NEW
$108
$122
($14)
88.5%
100%
$0
S-154
SPECIAL BUSINESS REVIEW - RENEWAL
$108
$61
$47
177.1%
100%
$0
S-155
GUN DEALER PERMIT
$120
$122
($2)
98.4%
100%
$0
S-156
MASSAGE TECH/PARLOR LICENSE
$2,700
$3,059
($359)
88.3%
100%
$400
S-157
TOBACCO RETAILER PERMIT
$29,564
$24,704
$4,860
119.7%
100%
($4,900)
S-158
ABC ONE-DAY LICENSE
$5,160
$5,833
($673)
88.5%
100%
$700
S-159
TAXI CAB INSPECTION
$88
$97
($9)
90.7%
100%
$0
S-160
REPOSSESSED VEHICLE RELEASE
$7,500
$19,865
($12,365)
37.8%
46%
$1,600
S-161
STORED VEHICLE RELEASE
$309,400
$333,034
($23,634)
92.9%
100%
$23,600
S-162
CITATION SIGN OFF
$3,000
$12,256
($9,256)
24.5%
100%
$9,300
S-163
POLICE DUI ACCIDENT RESPONSE
$0
$0
$0
0.0%
100%
$0
S-164
CONCEALED WEAPON PERMIT
$24,327
$19,096
$5,231
127.4%
60%
($5,400)
S-165
CLEARANCE LETTER
$26,000
$26,630
($630)
97.6%
100%
$600
15 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-166
FINGERPRINT / LIVESCAN
$64,896
$66,468
($1,572)
97.6%
100%
$1,600
S-167
POLICE REPORT COPY
$0
$3,210
($3,210)
0.0%
25%
$0
S-168
POLICE ELECTRONIC FILE COPY
$1,300
$1,061
$239
122.5%
100%
$0
S-188
TEMPORARY DUMPSTER BIN
$0
$0
$0
0.0%
100%
$0
S-189
DUMPSTER GRAVITY LOCK INSTALLATION
$0
$0
$0
0.0%
100%
$0
S-190
CONTAINER SIZE EXCHANGE/DELIVERY
$0
$0
$0
0.0%
100%
$0
S-191
SOLID WASTE EXTRA HAUL
$0
$0
$0
0.0%
100%
$0
S-192
OVERLOADED SOLID WASTE CONTAINER
$0
$0
$0
0.0%
100%
$0
S-193
SOLID WASTE CLEAN UP HAULING/DISP
$0
$0
$0
0.0%
100%
$0
S-195
SOLID WASTE TUB-OUT SERVICE
$0
$0
$0
0.0%
73%
$0
S-196
RECYCLE SERVICE ONLY
$0
$0
$0
0.0%
100%
$0
S-196A
RECYCLE BIN - 8 YARD
$0
$0
$0
0.0%
100%
$0
S-196B
COMPACTOR SERVICE
$0
$0
$0
0.0%
100%
$0
S-197
CONSTRUCTION WATER METER RENTAL
$39,287
$43,035
($3,748)
91.3%
100%
$3,700
S-198
ANNUAL FIRE SERVICES CONNECTION REV
$0
$0
$0
0.0%
100%
$0
S-199
WATER WELL PERMIT
$4,340
$4,441
($101)
97.7%
100%
$100
S-200
REPAIR BROKEN ANGLE-STOP
$5,840
$6,882
($1,042)
84.9%
100%
$1,000
S-201
BROKEN WATER METER
$1,700
$1,938
($238)
87.7%
100%
$200
S-201A
EXCESS OR LOST WATER
$0
$0
$0
0.0%
100%
$0
S-201B
WATER USE AFTER DISCONNECT
$0
$0
$0
0.0%
100%
$0
S-202
UTILITY AGREEMENT
$0
$0
$0
0.0%
100%
$0
S-203
PRETREAT CLASS III PERMIT - NEW
$9,324
$9,833
($509)
94.8%
100%
$500
S-204
PRETREAT CLASS III PERMIT - RENEWAL
$7,632
$11,836
($4,204)
64.5%
100%
$4,200
S-205
PRETREAT CLASS III PERMIT - INSPECT
$117,126
$123,610
($6,484)
94.8%
100%
$6,500
S-206
PRETREAT CLASS III PERMIT - REINSP
$7,950
$9,163
($1,213)
86.8%
100%
$1,200
S-207
PRETREAT HAULER PERMIT - NEW
$444
$468
($24)
94.9%
100%
$0
S-208
PRETREAT HAULER PERMIT - RENEWAL
$1,500
$1,729
($229)
86.8%
100%
$200
S-209
SEPTAGE STATION ACCESS CARD
$180
$279
($99)
64.5%
100%
$100
S-210
PRETREAT CLASS IV PERMIT - NEW
$1,193
$1,030
$163
115.8%
100%
($200)
S-211
PRETREAT CLASS IV PERMIT - RENEWAL
$1,188
$1,080
$108
110.0%
100%
($100)
S-212
PRETREAT CLASS IV PERMIT - INSPECT
$4,490
$4,178
$312
107.5%
100%
($300)
S-213
QUARTERLY POTW SAMPLING
$2,138
$2,985
($847)
71.6%
100%
$800
S-214
GREASE WASTE HAULER TANK DEPOSIT
$0
$0
$0
0.0%
100%
$0
S-215
PRETREAT CLASS IV MNTHLY METER READ
$2,592
$4,020
($1,428)
64.5%
100%
$1,400
S-216
PRETREATMENT PLAN REVIEW PRE-SCREEN
$5,040
$11,346
($6,306)
44.4%
100%
$6,300
S-217
PRETREATMENT PLAN REVIEW
$38,166
$43,466
($5,300)
87.8%
100%
$5,300
16 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-218
CROSS-CONNECTION CONTROL PROGRAM
$48,106
$53,302
($5,196)
90.3%
100%
$5,200
S-219
POST-CONSTRUCTION REPORTING
$9,672
$10,581
($909)
91.4%
100%
$900
S-220
SEWER FLOW ANALYSIS
$0
$101
($101)
0.0%
100%
$0
S-221
SEWER MAIN CAPACITY VERIFICATION
$8,060
$13,915
($5,855)
57.9%
100%
$5,900
S-222
VIDEO SEWER LATERAL VERIFICATION
$3,250
$10,083
($6,833)
32.2%
100%
$6,800
S-222A.1
SEPTAGE/CHEMICAL TOILET DISPOSAL
$0
$50
($50)
0.0%
100%
$0
S-222A.2
GREASE DISPOSAL FEE
$0
$50
($50)
0.0%
100%
$0
S-222B.1
EXPEDITED PLAN REVIEW - WATER
$0
$0
$0
0.0%
100%
$0
S-222B.2
EXPEDITED PLAN REVIEW - WASTEWATER
$0
$0
$0
0.0%
100%
$0
S-222B.3
EXPEDITED PLAN REVIEW - SOLID WASTE
$0
$0
$0
0.0%
100%
$0
S-222D
LIQUID HAULER PERMIT UPDATE
$864
$1,340
($476)
64.5%
100%
$500
S-223
NEW UTILITY ACCOUNT SETUP
$149,400
$129,321
$20,079
115.5%
100%
($20,100)
S-223A
UTILITY BILL DUPLICATE COPY
$0
$506
($506)
0.0%
100%
$0
S-224
DELINQUENT WATER TURN-OFF/ON
$452,719
$379,977
$72,742
119.1%
50%
$0
S-225
AFTER HOURS UTILITY TURN-ON
$7,200
$16,506
($9,306)
43.6%
45%
$200
S-226
WATER METER LOCK INSTALLATION
$19,250
$17,070
$2,180
112.8%
100%
($2,200)
S-227
BROKEN WATER METER LOCK
$9,625
$8,535
$1,090
112.8%
100%
($1,100)
S-228
PULLED WATER METER
$13,500
$16,291
($2,791)
82.9%
100%
$2,800
S-229
BUSINESS LICENSE - NEW
$29,808
$51,882
($22,074)
57.5%
100%
$22,100
S-230
BUSINESS LICENSE RENEWAL PROCESSING
$253,764
$320,730
($66,966)
79.1%
100%
$67,000
S-231
BUSINESS LICENSE - CHANGE
$2,232
$3,172
($940)
70.4%
100%
$900
S-232
BUSINESS LICENSE - DUPLICATE COPY
$730
$787
($57)
92.8%
100%
$0
S-232A
BUSINESS LICENSE - ADA FEE
$0
$0
$0
0.0%
100%
$0
S-232B
PARKING PERMIT PROCESSING
$7,105
$6,851
$254
103.7%
100%
$0
S-233
GOOD NEIGHBOR LICENSE
$263
$299
($36)
88.0%
100%
$0
S-234
NSF CHECK / ACH CHARGEBACK
$15,450
$18,963
($3,513)
81.5%
100%
$3,500
S-235
CREDIT CARD PROCESSING
$147,000
$332,000
($185,000)
44.3%
100%
$185,000
S-236
DOCUMENT COPY/SCAN
$0
$7
($7)
0.0%
100%
$0
S-237
ELECTRONIC DOCUMENT COPY
$5
$7
($2)
71.4%
100%
$0
S-238
DOCUMENT CERTIFICATION
$52
$23
$29
226.1%
100%
$0
S-239
NOTARY PUBLIC
$105
$164
($59)
64.0%
65%
$0
S-241
LEGAL AD NOTICING
$11,450
$11,450
$0
100.0%
100%
$0
S-242
DOCUMENT/REPORT COMPILATION
$0
$0
$0
0.0%
100%
$0
S-242A
PUBLIC CONVENIENCE & NECESSITY
$418
$230
$188
181.7%
100%
($200)
S-243
CIVIL LITIGATION ATTORNEY SERVICE
$0
$0
$0
0.0%
100%
$0
S-244
AFFORDABLE HOUSING LIEN PROCESS
$253
$217
$36
116.6%
100%
$0
17 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
S-245
AFFORDABLE HOUSING RECONVEYANCE
$1,771
$1,940
($169)
91.3%
100%
$200
S-246
PUBLIC ACCESS TV/AV SERVICES
$0
$367,437
($367,437)
0.0%
100%
$0
S-250
INTER-LIBRARY LOAN
$0
$215,878
($215,878)
0.0%
32%
$0
S-251
LIBRARY CARD REPLACEMENT
$1,358
$6,885
($5,527)
19.7%
40%
$1,400
S-252
OVERDUE LIBRARY MATERIAL PROCESSING
$19,495
$5,022
$14,473
388.2%
100%
$0
S-253
PASSPORT PROCESSING
$20,370
$97,241
($76,871)
21.0%
20%
$0
S-254
LIBRARY ROOM RENTAL
$26,900
$68,109
($41,209)
39.5%
100%
$0
S-255
ADULT SPORTS PROGRAMS
$100,700
$744,377
($643,677)
13.5%
51%
$0
S-256
YOUTH SPORTS PROGRAMS
$15,000
$303,827
($288,827)
4.9%
18%
$0
S-257
RECREATION CLASSES
$54,060
$219,524
($165,464)
24.6%
20%
$0
S-258
YOUTH RECREATION PROGRAMS
$0
$955,483
($955,483)
0.0%
0%
$0
S-259
TEEN RECREATION PROGRAMS
$0
$971,161
($971,161)
0.0%
0%
$0
S-260
ADAPTIVE RECREATION PROGRAMS
$0
$10,803
($10,803)
0.0%
0%
$0
S-261
GENERAL RECREATION PROGRAMS
$26,500
$1,027,010
($1,000,510)
2.6%
10%
$0
S-262
SENIOR PROGRAMS
$0
$1,254,021
($1,254,021)
0.0%
0%
$0
S-263
RECREATION/LAP SWIM
$30,764
$984,526
($953,762)
3.1%
6%
$0
S-264
SWIM LESSONS
$32,597
$354,429
($321,832)
9.2%
14%
$0
S-265
POOL ACTIVITIES
$10,438
$59,072
($48,634)
17.7%
34%
$0
S-266
POOL RENTAL
$232,140
$571,055
($338,915)
40.7%
24%
$0
S-267
RECREATION FACILITY RENTAL
$303,454
$769,807
($466,353)
39.4%
23%
$0
S-268
BALLFIELD RENTAL
$91,883
$479,462
($387,579)
19.2%
20%
$0
S-270
PARKS BUILDING PLAN CHECK
$0
$68,674
($68,674)
0.0%
100%
$68,700
S-271
PARKS BUILDING PERMIT
$0
$40,673
($40,673)
0.0%
100%
$40,700
S-272
L/S DIST AREA PUB IMPROVE PLAN CHK
$0
$11,214
($11,214)
0.0%
100%
$11,200
S-273
L/S DIST AREA PUB IMPROVE PERMIT
$0
$8,250
($8,250)
0.0%
100%
$8,300
S-274
MISCELLANEOUS PARKS PLAN CHECK/INSP
$0
$0
$0
0.0%
100%
$0
$11,279,286
$21,933,948
($10,654,662)
51.4%
$2,012,200
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
PCT. RECOVERY
FROM FEES
18 CITY OF SANTA MARIA
SUMMARY OF REVENUES, COSTS, AND SUBSIDIES
FISCAL YEAR 2025-2026
TOTAL
TOTAL
TOTAL
POSSIBLE
FEE
SERVICE
PROFIT/
NEW
REF #
SERVICE
REVENUE
COST
(SUBSIDY)
ACTUAL
SUGGEST
REVENUE
(1) (2) (3) (4) (5) (6) (7) (8)
PCT. RECOVERY
FROM FEES
PLANNING
$1,815,974
$2,504,233
($688,259)
72.5%
VAR.
$688,500
BUILDING
$4,589,137
$4,298,979
$290,158
106.7%
VAR.
$12,100
PUBLIC WORKS
$1,129,846
$1,596,939
($467,093)
70.8%
VAR.
$466,800
CODE ENFORCEMENT
$234,529
$862,230
($627,701)
27.2%
VAR.
$203,500
FIRE
$579,588
$662,816
($83,228)
87.4%
VAR.
$11,600
POLICE
$522,371
$601,249
($78,878)
86.9%
VAR.
$65,000
SOLID WASTE
$0
$10,436
($10,436)
0.0%
VAR.
$10,500
WATER
$99,273
$172,427
($73,154)
57.6%
VAR.
$73,200
WASTEWATER
$220,809
$313,771
($92,962)
70.4%
VAR.
$92,600
FINANCE
$1,108,464
$1,303,120
($194,656)
85.1%
VAR.
$257,900
CITY CLERK
$11,612
$11,651
($39)
99.7%
VAR.
$0
CITY ATTORNEY
$0
$0
$0
0.0%
VAR.
$0
SMCTV
$0
$367,437
($367,437)
0.0%
VAR.
$0
LIBRARY
$68,123
$393,135
($325,012)
17.3%
VAR.
$1,400
RECREATION
$897,536
$8,704,557
($7,807,021)
10.3%
VAR.
$0
PARKS
$0
$128,811
($128,811)
0.0%
VAR.
$128,900
SPECIAL PROJECTS
$2,024
$2,157
($133)
93.8%
VAR.
$200
$11,279,286
$21,933,948
($10,654,662)
51.4%
VAR.
$2,012,200
19 THIS PAGE
INTENTIONALLY BLANK
20 APPENDIX A
SUMMARY
OF
CURRENT FEES
AND
PROPOSED FEES
21 CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-001
CUP W/O SITE DEVELOPMENT TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$6,790 per application
$5,625 per application
S-001A
WTR-CUP W/O SITE DEVELOP TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$170 per application
None
S-001B
WW-CUP W/O SITE DEVELOP TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$150 per application
None
S-002
CUP WITH SITE DEVELOPMENT TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$10,980 per application
$8,884 per application
S-002A
WTR-CUP WITH SITE DEVELOPMENT TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
None
S-002B
WW-CUP WITH SITE DEVELOPMENT TO ZA
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per application
None
May 21, 2026
1 22
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-003
CUP W/O SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$11,800 per application
$8,651 per application
S-003A
WTR-CUP W/O SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$170 per application
None
S-003B
WW-CUP W/O SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$150 per application
None
S-004
CUP WITH SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$17,550 per application
$13,388 per application
S-004A
WTR-CUP WITH SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-004B
WW-CUP WITH SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
May 21, 2026
2 23
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-004C
SW-CUP WITH SITE DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$360 per application
None
S-005
PLANNED DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$19,260 per application
$15,118 per application
S-005A
WTR-PLANNED DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-005B
WW-PLANNED DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
S-005C
SW-PLANNED DEVELOPMENT TO PC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$360 per application
None
S-006
CUP/PD TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$27,060 per application
$19,808 per application
May 21, 2026
3 24
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-006A
WTR-CUP/PD TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-006B
WW-CUP/PD TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
S-006C
SW-CUP/PD TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$360 per application
None
S-007
CUP/PD TO PLANNING COMMISSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$22,120 per application
$17,752 per application
S-007A
WTR-CUP/PD TO PLANNING COMMISSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-007B
WW-CUP/PD TO PLANNING COMMISSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
May 21, 2026
4 25
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-007C
SW-CUP/PD TO PLANNING COMMISSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$360 per application
None
S-008
ADMIN DOWNTOWN PMT-OVER THE COUNTER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per application
$46 per application
S-009
ADMIN DOWNTOWN PRMT - MINOR
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$225 per application
$181 per application
S-010
ADMIN DOWNTOWN PRMT - MAJOR
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,080 per application
$723 per application
S-011
ADMIN DOWNTOWN PRMT - WITH SITE DEV
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$8,825 per application
$4,850 per application
S-011A
WTR-ADMIN DOWNTOWN PRMT-W/SITE DEV
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
None
May 21, 2026
5 26
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-011B
WW-ADMIN DOWNTOWN PRMT-W/SITE DEV
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per application
None
S-012
DOWNTOWN PERMIT TO PLAN. COMM.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$22,100 per application
$19,054 per application
S-012A
WTR-DOWNTOWN PERMIT TO PLAN. COMM.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-012B
WW-DOWNTOWN PERMIT TO PLAN. COMM.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
S-012C
SW-DOWNTOWN PERMIT TO PLAN. COMM.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$135 per application
None
S-013
DOWNTOWN PERMIT TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$28,955 per application
$19,978 per application
May 21, 2026
6 27
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-013A
WTR-DOWNTOWN PERMIT TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per application
None
S-013B
WW-DOWNTOWN PERMIT TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$330 per application
None
S-013C
SW-DOWNTOWN PERMIT TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$135 per application
None
S-014
VARIANCE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$15,925 per application
$12,241 per application
S-015
ENVIRON. INITIAL STUDY/NEG DEC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
S-016
ENVIRONMENTAL IMPACT REPORT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
May 21, 2026
7 28
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-017
TENTATIVE PARCEL MAP - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$12,205 per map
$7,985 per map
S-017A
WTR-TENTATIVE PACEL MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
None
S-017B
WW-TENTATIVE PARCEL MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$225 per application
None
S-018
TENTATIVE PARCEL MAP (ADDL FOR CC)
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,560 per map plus Legal Ad Noticing fee
This fee is in addition to the Tentative Parcel Map fee $2,898 per map plus Legal Ad Noticing fee
This fee is in addition to the Tentative Parcel Map fee S-019
TENTATIVE TRACT MAP - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$17,895 per map
$14,942 per map
S-019A
WTR-TENTATIVE TRACT MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$590 per application
None
May 21, 2026
8 29
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-019B
WW-TENTATIVE TRACT MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$510 per application
None
S-020
FINAL PARCEL MAP - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,045 per map
$460 per map
S-020A
WTR-FINAL PARCEL MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per map
None
S-020B
WW-FINAL PARCEL MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per map
None
S-021
FINAL TRACT MAP - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,065 per map
$1,637 per map
S-021A
WTR-FINAL TRACT MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$935 per map
None
May 21, 2026
9 30
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-021B
WW-FINAL TRACT MAP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$810 per map
None
S-022
LOT LINE ADJUSTMENT - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,990 per application
$2,355 per application
S-023
LOT MERGER - PLANNING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,540 per application
$1,999 per application
S-024
PRE-APPLICATION - ADMINISTRATIVE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$6,295 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal $4,561 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
S-024A
WTR-PRE-APPLICATION-ADMINISTRATIVE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal None
S-024B
WW-PRE-APPLICATION-ADMINISTRATIVE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal None
May 21, 2026
10 31
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-025
PRE-APPLICATION - PC STUDY SESSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$9,055 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal. $4,610 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
S-025A
WTR-PRE-APPLICATION-PC STUDY SESS.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
None
S-025B
WW-PRE-APPLICATION-PC STUDY SESS.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
None
S-026
CONCEPTUAL REVIEW (CITY COUNCIL)
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$10,625 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal. $8,853 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
S-026A
WTR-CONCEPTUAL REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
None
May 21, 2026
11 32
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-026B
WW-CONCEPTUAL REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
None
S-027
ADMIN INTERPRETATION/SUBST. CONFORM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,110 per application
$2,257 per application
S-028
SIGN PROGRAM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,410 per application
$1,942 per application
S-029
PLANNING SIGN PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$115 per application
$88 per application
S-030
LANDSCAPE PLAN (0-5,000 SQ FT)
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,070 per plan
$899 per plan
S-031
LANDSCAPE PLAN (5,000+ SQ FT)
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,750 per plan
$1,436 per plan
May 21, 2026
12 33
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-032
AMENDMENT - SIGN PROGRAM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,390 per application
$1,131 per application
S-033
AMENDMENT - TO PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
80% of original application fee.
S-033A
WTR-AMENDMENT - TO PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
None
S-033B
WW-AMENDMENT - TO PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
None
S-034
AMENDMENT - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
80% of original application fee
S-034A
WTR-AMENDMENT - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
None
May 21, 2026
13 34
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-034B
WW-AMENDMENT - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
80% of original application fee
None
S-035
TEMP ACTIVITY PMT-OVER THE COUNTER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per application
$46 per application
S-036
TEMP ACTIVITY PERMIT - MINOR
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$225 per application
$181 per application
S-037
TEMP ACTIVITY PERMIT - MAJOR
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,115 per application
$723 per application
S-038
BUS LIC ZONING REVIEW - STANDARD
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per business
$46 per business
S-039
BUS LIC ZONING REVIEW - SUPPLEMENTL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$115 per business
$88 per business
May 21, 2026
14 35
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-040
PUBLIC CONVENIENCE & NECESS FINDING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$6,945 per application plus Legal Ad Noticing fee
$5,640 per application plus Legal Ad Noticing fee
S-041
APPEAL TO PLANNING COMMISSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$8,635 per appeal plus Legal Ad Noticing fee
$7,061 per appeal plus Legal Ad Noticing fee
S-042
APPEAL TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$17,380 per appeal plus Legal Ad Noticing fee
$14,276 per appeal plus Legal Ad Noticing fee
S-043
TIME EXT/RECONSID - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,835 per application
$2,696 per application
S-043A
WTR-TIME EXT/RECONSID - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$170 per application
None
S-043B
WW-TIME EXT/RECONSID - ADMIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$150 per application
None
May 21, 2026
15 36
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-044
TIME EXT/RECONSID - PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$12,245 per request
$9,328 per request
S-044A
WTR-TIME EXT/RECONSID - PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$125 per application
None
S-044B
WW-TIME EXT/RECONSID - PC/COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$105 per application
None
S-045
CONTINUANCE REQUESTED BY APPLICANT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$410 per request plus any additional noticing costs
$382 per request plus any additional noticing costs
S-046
GENERAL PLAN MAINTENANCE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
5% of Building Permit fees
5% of Building Permit fees
S-046A
ANNEXATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$34,365 per application plus Legal Ad Noticing fee
OR
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus outside contract costs. $24,900 per application plus Legal Ad Noticing fee
May 21, 2026
16 37
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-046C
AMEND GENERAL PLAN AND/OR ZONING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$22,615 per application plus Legal Ad Noticing fee
$18,331 per application plus Legal Ad Noticing fee
S-046E.1
SPECIFIC PLAN AMENDMENT [MAJOR]
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$24,585 per application plus Legal Ad Noticing fee
$16,936 per application
S-046E.2
SPECIFIC PLAN AMENDMENT [MINOR]
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$14,335 per application plus Legal Ad Noticing fee
$10,754 per application plus Legal Ad Noticing fee
S-046F
DEVELOPMENT AGREEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$15,890 per application
OR
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus outside contract costs. $3,977 per application
S-046G
CERTIFICATION OF COMPLIANCE - PLAN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$455 per application
$362 per application
S-046H
ZONING VERIFICATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$455 per letter
$362 per letter
May 21, 2026
17 38
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-046I
DOCUMENT COPY - COLOR 11X17
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2 per page
$2 per page
S-046J
EXTRA PLANNING PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
S-046K
EXTRA PLANNING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
S-046L
EXTRA DEVELOPMENT REVIEW MEETING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$6,205 per meeting
None
S-046M
WTR-EXTRA DEVELOPMENT REV. MEETING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,675 per meeting
None
S-046N
FILM PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$220 per permit
None
May 21, 2026
18 39
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-047
BUILDING PLAN CHECK/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
No changes are recommended.
Various fees based on construction type, square footage, or type of permit, including ADU Permit at $7 per square foot.
S-047A
EXPRESS BUILDING PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Additional 100% over standard building plan check fees
Additional 100% over standard building plan check fees
S-047C
TEMPORARY CERTIFICATE OF OCCUPANCY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,185 per permit
Extension - $1,000 deposit with charges at the fully allocated hourly rates for all personnel involved.
$66 per permit
S-047D
SPECIAL INSPECTOR REGISTRATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$555 per company
None
S-047E
PERMIT EXPIRATION/REINSTATEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$670 per request
None
S-047F
PLAN CHECK EXPIRATION/REINSTATEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$685 per request
None
May 21, 2026
19 40
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-047G
BUILDING PERMIT EXTENSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per request
None
S-047H
MISCELLANEOUS BUILDING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the fully allocated hourly rate for personnel involved plus any outside contract costs.
None
S-048
COM DEV TECHNOLOGY SURCHARGE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
2.5% of all Building & Safety fees
2.5% of all Building & Safety fees
S-049
NEW METER SET/INITIAL READ
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$200 per meter
$362 per meter
S-049A
WTR-NEW METER SET/INITIAL READ
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$245 per meter
None
S-050
DEVELOPMENT FEE ESTIMATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$275 per project
$139 per project
May 21, 2026
20 41
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-051
BUILDING PLAN COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$140 per plan $47 each additional design professional
Plus actual cost of reproduction to the City
$139 per plan plus $46 each additional design professional Plus actual cost of reproduction to the City
S-052
ENCROACHMENT PERMIT - SIDEWALK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$760 - 1st 50 ft
$195 - ea addl 50 ft
$496 - 1st 50 ft
$145 - ea addl 50 ft
S-053
ENCROACHMENT PERMIT - CURB/GUTTER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$955 - 1st 50 ft
$295 - ea addl 50 ft
$532 - 1st 50 ft
$181 - ea addl 50 ft
S-054
ENCROACHMENT PERMIT - DRIVEWAY APPR
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$760 - Residential
$955 - Commercial
$2,130 - At-grade
$496 - Residential
$640 - Commercial
$790 - At-grade
S-055
ENCROACHMENT PERMIT - STREET EXCAV
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Trench - $1,065 + $390 ea 50 linear ft over 50 linear ft Patch - $675
Pothole - $475 + $390 for ea 50 linear ft over 50 linear ft Bore Pit - $575
In addition to above fees:
Water T/Cross Connection - $1,655
Water Hot Tap (up to 2") - $1,260
Water Hot Tap (4"+) - $1,490
Sewer Tie-In Connection - $1,490
Trench - $790 + $289 for ea 50 linear ft over 50 linear ft Patch - $496
Pothole - $351 + $289 for ea 50 linear ft over 50 linear ft Bore Pit - $424
In addition to above fees:
Water T/Cross Connection - $1,224
Water Hot Tap (up to 2") - $935
Water Hot Tap (4"+) - $1,085
Sewer Tie-In Connection - $1,085
May 21, 2026
21 42
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-055A
ENRCROACH PERMIT - ADA CURB RAMP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,165 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055B
ENCROACHMENT PERMIT - SEWER MANHOLE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,555 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055C
ENCROACHMENT PERMIT - STORM MANHOLE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,410 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055D
ENCROACH PERMIT - STORM DRAIN INLET
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$770 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055F
ENCROACHMENT PERMIT - STREET LIGHT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$870 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055G
ENCROACH PERMIT - TRAFFIC SIGNAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,220 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
May 21, 2026
22 43
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-055H
ENCROACH PERMIT - UTIL VAULT/CAB
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,555 per permit
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
S-055I
ENCROACHMENT PERMIT EXTENSION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$170 per request
None
S-055J
ENCROACHMENT PERMIT REISSUANCE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$170 per request
None
S-055K
MISSED ENGINEERING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$195 per inspection
None
S-055L
AFTER-HOURS ENGINEERING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$870 per inspection
None
S-056
TEMPORARY ENCROACHMENT PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$280 per permit
$165 per permit
May 21, 2026
23 44
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-057
PUBLIC IMPROVEMENT INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$10,000 - 15% of project valuation
$10,001- $25,000 - $1,500 plus 10.55% of project valuation over $10,000
$25,001- $250,000 - $3,083 plus 4.38% of project valuation over $25,000
$250,001+ - $12,938 plus 7.57% of project valuation over $250,000 $0-$10,000 - 12% of project valuation
$10,001- $25,000 - $1,245 plus 8.3% of project valuation over $10,000
$25,001- $250,000 - $2,495 plus 4.7% of project valuation over $25,000
$250,001+ - $13,145 plus 5.1% of project valuation over $250,000 S-058
PUBLIC IMPROVEMENT PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$10,000 - 19% of the project valuation
$10,001- $25,000 - $1,900 plus 4.6% of valuation over $10,000 $25,001- $250,000 - $2,590 plus 2.67% of valuation over $25,000 $251,001+ - $8,600 plus 2.25% of valuation over $250,000 $0-$10,000 - 11% of the project valuation
$10,001- $25,000 - $1,100 plus 2.8% of valuation over $10,000 $25,001- $250,000 - $1,520 plus 1.6% of valuation over $25,000 $251,001+ - $5,135 plus 1.1% of valuation over $250,000 S-058A
WTR-PUBLIC IMPROVEMENT PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$10,000 - 1.9% of the project valuation
$10,001- $25,000 - $190 plus 0.46% of valuation over $10,000 $25,001- $250,000 - $259 plus 0.27% of valuation over $25,000 $251,001+ - $867 plus 0.225% of valuation over $250,000 None
S-058B
WW-PUBLIC IMPROVEMENT PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$10,000 - 1.6% of the project valuation
$10,001- $25,000 - $160 plus 0.4% of valuation over $10,000 $25,001- $250,000 - $220 plus 0.23% of valuation over $25,000 $251,001+ - $738 plus 0.2% of valuation over $250,000
None
May 21, 2026
24 45
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-059
TRAFFIC CONTROL PLAN CHECK/INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Residential $235 plus $50 for each additional day
Arterial/collector lane closure - $390 plus $100 for each additional day
Arterial/collector street closure - $910 plus $100 for each additional day
Residential $170 plus $36 for each additional day
Arterial/collector lane closure - $279 plus $72 for each additional day
Arterial/collector street closure - $413 plus $72 for each additional day
S-060
ROUGH GRADING PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,255 per plan
$335 per plan
S-061
FINE GRADING PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
0-20,000 sq ft - $2,970
20,001 sq ft - 1 acre - $3,600
1-2 acres - $4,685
2-4 acres - $5,940
4-10 acres - $8,450
10+ acres - $11,880
0-20,000 sq ft - $1,797
20,001 sq ft - 1 acre - $2,123
1-2 acres - $3,221
2-4 acres - $4,184
4-10 acres - $5,046
10+ acres - $5,909
S-062
GRADING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
0-20,000 sq ft - $1,570
20,001 sq ft - 1 acre - $3,140
1-2 acres - $4,705
2-4 acres - $9,415
4-10 acres - $12,550
10+ acres - $14,120
0-20,000 sq ft - $1,162
20,001 sq ft - 1 acre - $2,329
1-2 acres - $3,078
2-4 acres - $6,983
4-10 acres - $9,312
10+ acres - $10,475
S-063
SWPP BMP INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fee is based on the estimated hours and costs related to a particular project
Fee is based on the estimated hours and costs related to a particular project
May 21, 2026
25 46
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-064
POST-MITIGATION INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fee is based on the estimated hours and costs related to a particular project
Fee is based on the estimated hours and costs related to a particular project
S-065
TENTATIVE PARCEL MAP - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$9,010 per map
$5,165 per map
S-066
TENTATIVE TRACT MAP - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
5-20 lots - $9,180
21-40 lots - $13,835
41-80 lots - $18,790
81-120 lots - $24,040
121+ lots - $31,475
5-20 lots - $4,865
21-40 lots - $7,417
41-80 lots - $10,604
81-120 lots - $15,278
121+ lots - $19,715
S-067
FINAL PARCEL MAP - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$4,820 per map
$3,448 per map
S-068
FINAL TRACT MAP - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
5-20 lots - $7,630 plus $163 per lot
21-50 lots - $10,075 plus $118 per lot over 20 lots
51+ lots - $13,615 plus $74 per lot over 50 lots
5-20 lots - $3,765 plus $139 per lot
21-50 lots - $5,867 plus $124 per lot over 20 lots
51+ lots - $9,633 plus $83 per lot over 50 lots
S-069
LOT LINE ADJUSTMENT - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$4,650 per application
$3,455 per application
May 21, 2026
26 47
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-070
LOT MERGER - ENGINEERING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$3,725 per application
$2,712 per application
S-071
CERTIFICATE OF COMPLIANCE - ENGIN.
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$5,425 per application
$3,946 per application
S-072
MAP AMENDMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,385 per map
$1,849 per map
S-073
REIMBURSEMENT MAP AGREEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$6,980 per application
$4,814 per application
S-074
STREET/EASEMENT ABANDONMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$8,830 per application
$6,420 per application
S-075
DEDICATION/EASEMENT CREATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$4,820 per application
$3,022 per application
May 21, 2026
27 48
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-076
TRAFFIC STUDY REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
110% of consultant costs
- 100% to consultant
- 10% to City for review
110% of consultant costs
- 100% to consultant
- 10% to City for review
S-076A
NEIGHBORHOOD PARKING PERMIT REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
None
S-077
APPEAL TO THE TRAFFIC COMMITTEE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$625 per appeal
$434 per appeal
S-078
APPEAL OF TRAF COMM TO CITY COUNCIL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$4,035 per appeal
$1,467 per appeal
S-079
TRENCH RESURFACING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
0-50 square feet - $110
50-100 square feet - $220
101+ square feet - $2.50 square feet ($250 minimum)
For areas greater than 1,000 square feet, the customer can get quotes and self-perform the work as long as it meets City specifications.
0-50 square feet - $103
50-100 square feet - $207
101+ square feet - $1.50 square feet ($207 minimum)
For areas greater than 1,000 square feet, the customer can get quotes and self-perform the work as long as it meets City specifications.
S-080
MISCELLANEOUS ENGINEERING SERVICES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
May 21, 2026
28 49
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-081
CONSULTANT/OUTSIDE PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the actual costs of the consultant plus 20%
Charge the actual costs of the consultant plus 20%
S-082
WORK WITHOUT ENCROACHMENT PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$250 - 1st violation (plus notification to Code Enforcement) $500 - 2nd violation (plus notification to Code Enforcement and potential additional fees)
$1,000 - Each additional violation (plus notification to Code Enforcement, potential additional fees, and potential revocation of right to work on City ROW projects)
Inspection time will be added at the fully allocated hourly rates when violation requires time of City staff in excess of violation fee charged.
$258 - 1st violation (plus notification to Code Enforcement) $516 - 2nd violation (plus notification to Code Enforcement and potential additional fees)
$1,033 - Each additional violation (plus notification to Code Enforcement, potential additional fees, and potential revocation of right to work on City ROW projects)
Inspection time will be added at the fully allocated hourly rates when violation requires time of City staff in excess of violation fee charged.
S-083
PUBLIC WORKS ADMINISTRATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
This fee should be removed from the fee schedule as this service is included in another fee.
110% of consultant costs
-100% to consultant
- 10% to City for review
S-084
TRAFFIC MODEL MAINTENANCE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
6% of Construction-related Conditional Use Permit and Planned Development fees
6% of Construction-related Conditional Use Permit and Planned Development fees
S-085
CODE ENFORCEMENT STANDARD INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$160 per inspection
$98 per inspection
May 21, 2026
29 50
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-085A
CODE ENFORCEMENT SPECIAL INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$270 per inspection
None
S-086
INSPECTION WARRANT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,035 per warrant
$609 per warrant
S-087
ABATEMENT WARRANT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,925 per warrant
$1,100 per warrant
S-088
ABATEMENT PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$2,750 per abatement plus actual cost of abatement
$1,586 per abatement plus actual cost of abatement
S-089
CODE ENFORCEMENT LIEN SETUP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$535 per lien plus any County filing fees
$362 per lien plus any County filing fees
S-090
CODE ENFORCEMENT APPEAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$980 per appeal plus amount of citation
Appeal fee is refunded if the citation amount is refunded. $651 per appeal plus amount of citation
May 21, 2026
30 51
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-091
COMPLIANCE ORDER HEARING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,185 per hearing
$718 per hearing
S-092
UNPERMITTED CONSTR SPEC INVESTIG
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs S-093
SPECIAL BUSINESS INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$390 per business
$248 per business
S-093A
MOBILE CAR WASH PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$300 per permit
None
S-093B
SHORT TERM RENTAL PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Initial Application - $890
Inspection - $160
Annual Renewal - $495
None
S-093C
BUSINESS LICENSE INVESTIGATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$535 per investigation
None
May 21, 2026
31 52
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-094
WEED ABATEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
This fee should be removed from the fee schedule as this service is included in another fee.
$160 plus actual clearance cost if lots needs to be cleared $310 per lien processing plus any County filing fees
S-095
CODE ENFORCEMENT FINES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$250 - 1st violation
$500 - 2nd violation
$1,000 - 3rd violation
$2,500 - Each additional violation
These fines are for all code violations
$175 - 1st violation
$500 - 2nd violation
$1,000 - Each additional violation
These fines are for all code violations
S-096
NEW FIRE SPRINKLER SYSTEM PC/INSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
1 to 100 heads - $250 per permit plus $1 per head
101 to 250 heads - $350 per permit plus $1 per head
251+ heads - $500 per permit plus $1 per head
$248 - 1 to 100 heads
$336 - 101 to 200 heads
$418 - 201 to 350 heads
$ 83 - ea addl 25 heads beyond 350
S-097
TI FIRE SPRINKLER SYSTEM PC/INSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
First Test/Inspection - $165 plus $1 per head
Each Additional Test/Inspection - $165 plus $1 per head $ 83 - 1 to 20 heads
$165 - 21 to 100 heads
$248 - 101 to 200 heads
$336 - 201 to 350 heads
$ 83 - each additional 25 heads beyond 350
S-098
STAND PIPE PLAN CHECK/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$340 per plan/permit
$160 per plan/permit
May 21, 2026
32 53
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-099
UNDERGROUND PIPING PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$340 per plan/permit
$336 per plan/permit
S-100
FIRE CYCLE SYSTEM PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$340 per plan/permit
$336 per plan/permit
S-101
DRY CHEMICAL SYSTEM PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$340 per plan/permit
$336 per plan/permit
S-102
NEW WET CHEM/KITCHEN HOOD PC/INSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$340 per plan/permit
$336 per plan/permit
S-103
FIRE ALARM SYSTEM PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$405 per plan/permit plus $3 per device
$501 per plan/permit
S-104
FIRE ALARM MONITOR PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$245 per plan/permit
$165 per plan/permit
May 21, 2026
33 54
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-105
NEW KITCHEN HOOD SYST PC/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$295 per plan/permit
$294 per plan/permit
S-106
NEW HIGH PILED STORAGE PC/INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$405 per plan/permit
$666 per plan/permit
S-107
FIRE HYDRANT FLOW TEST WITNESS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$165 per test
$165 per test
S-108
NEW OCC/TENANT IMPR FIRE PC/INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
35% of Building Plan Check and Permit fees for this project. 35% of Building Plan Check and Permit fees for this project S-109
CODE INSP - KITCHEN HOOD SYSTEM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$125 per inspection
$124 per inspection
S-110
CODE INSP - HIGH PILED STORAGE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$250 per inspection
$248 per inspection
May 21, 2026
34 55
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-111
FIRE PRMT - EXHIBITS & TRADE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$710 per permit
$708 per permit
S-112
FIRE PRMT - EXPLOSIVES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$460 per permit
$460 per permit
S-113
FIRE PRMT - FIREWORKS AERIAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs. $873 per permit
S-114
FIRE PRMT - TANKS & WELLS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$545 per permit
$542 per permit
S-115
FIRE PRMT - LUMBER YARDS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per permit
$377 per permit
S-116
FIRE PRMT - CARNIVALS, FAIRS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$710 per permit
$708 per permit
May 21, 2026
35 56
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-117
FIRE PRMT - PYROTECHNIC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs.
Actual staff time at fully allocated hourly rate plus any actual costs S-118
FIRE PRMT - REFRIGERATION EQUIP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
This fee should be removed from the fee schedule as this service is included in another fee.
$542 per permit
S-119
FIRE PRMT - TEMP MEMBRANE/TENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
1 to 4 tents - $210
5 to 8 tents - $380
9 to 12 tents - $530
13+ tents - $710
1 to 4 tents - $208
5 to 8 tents - $377
9 to 12 tents - $439
13+ tents - $708
S-120
FIRE PRMT - TIRE REBUILDING PLANT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per permit
$377 per permit
S-121
FIRE PRMT - COMBUSTIBLE DUST
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$380 per permit
$377 per permit
S-122
FIRE PRMT - MULTIPLE PERMITS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the highest applicable fee
Charge the highest applicable fee
May 21, 2026
36 57
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-123
LIVE AUDIENCE FIRE INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs.
Actual staff time at fully allocated hourly rate plus any outside costs S-124
GENERAL FIRE CODE PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$210 per permit
$207 per permit
S-125
LIFE SAFETY - HOTELS/MOTELS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
4 to 15 units - $165
16 to 30 units - $250
31 to 50 units - $420
Each addl 25 units over 50 - $28
4 to 15 units - $165
16 to 30 units - $248
31 to 50 units - $418
Each addl 25 units over 50 - $26
S-126
LIFE SAFETY - ASSEMBLY OCCUPANCY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
50 to 100 occupants - $165
101-200 occupants - $205
201-300 occupants - $245
301-500 occupants - $285
501+ occupants - $325
50 to 100 occupants - $165
101+ occupants - $336
S-127
LIFE SAFETY - HAZ MAT FACILITY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$420 per inspection
$418 per inspection
S-128
MULTI-FAMILY DWELLING INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
3 to 15 units - $165
16 to 30 units - $250
31 to 50 units - $420
Each addl 25 units over 50 - $28
3 to 15 units - $165
16 to 30 units - $248
31 to 50 units - $418
Each addl 25 units over 50 - $26
May 21, 2026
37 58
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-129
OCCUPANCY INSP - BOARD & CARE HOME
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
1st 10 bedrooms - $250
Each addl 10 bedrooms - $85
1st 10 bedrooms - $248
Each addl 10 bedrooms - $83
S-130
OCCUPANCY INSP - DAY CARE FACILITY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
9-14 occupants - $210
15+ occupants - $250
9-14 occupants - $207
15+ occupants - $248
S-131
OCCUPANCY INSP - CONVALESCENT HOSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
1st 10 beds - $165
Each addl 10 beds over 10 - $85
1st 10 beds - $150
Each addl 10 beds over 10 - $77
S-132
OCCUPANCY INSP - OTHER HOSPITAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$650 per inspection
$645 per inspection
S-133
OCCUPANCY INSP - PUBLIC/PRIV SCHOOL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Elementary - $505
Secondary - $1,005
Elementary - $501
Secondary - $1,002
S-134
OCCUPANCY INSP - OTHER STATE PROG
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$165 per inspection
$165 per inspection
May 21, 2026
38 59
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-135
ENGINE COMPANY INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$185 per inspection
$181 per inspection
S-136
COMMERCIAL BUSINESS INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
0-2,000 square feet - $125
2,001-5,000 square feet - $155
5,001-10,000 square feet - $190
10,001-25,000 square feet - $225
25,001-50,000 square feet - $260
50,001-100,000 square feet - $310
100,001-200,000 square feet - $375
200,001+ square feet - $435
$160 per inspection OR
0-2,000 square feet - $124
2,001-5,000 square feet - $155
5,001-10,000 square feet - $186
10,001-25,000 square feet - $217
25,001-50,000 square feet - $248
50,001-100,000 square feet - $310
100,001-200,000 square feet - $371
200,001+ square feet - $434
S-137
BUSINESS LICENSE FIRE REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$85 per business
$77 per business
S-138
FIRE CODE ENFORCEMENT INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$165 per inspection after the 3rd visit
$165 per inspection after the 3rd visit
S-139
ADDITIONAL FIRE PLAN REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$165 per re-submittal after the second submittal
$160 per re-submittal after the second submittal
S-140
ADDITIONAL FIRE INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$165 per additional visit
$165 per additional visit
May 21, 2026
39 60
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-141
FALSE ALARM RESPONSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$370 per response after 1st visit and subsequent false alarms in any 12 month period
$310 per response after 1st visit and subsequent false alarms in any 12 month period
S-142
FIRE INVESTIGATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs S-143
EMERG RESP - AMBULANCE TO HOSPITAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$185 per response
$170 per response
S-144
EMERG RESP - LIFT ASSIST NON-EMER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$185 per response
$155 per response
S-145
FIRE DUI ACCIDENT RESPONSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel S-146
SMALL FUELS CLEAN-UP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs May 21, 2026
40 61
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-147
HAZ MAT INCIDENT RESPONSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs S-148
FIREWORKS BOOTH REVIEW/INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$970 per booth
$821 per booth
S-149
FIRE INCIDENT REPORT COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
First 10 pages - No Charge
Each page after 10 - $0.25 per page
First 10 pages - No Charge
Each page after 10 - $0.25 per page
S-150
FIRE ELECTRONIC FILE COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$5 per disk/device
$5 per disk/device
S-151
POLICE FALSE ALARM RESPONSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$372 per response after the third response
$372 per response after the third response
S-152
POLICE ALARM PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$15 per permit
$15 per permit
May 21, 2026
41 62
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-153
SPECIAL BUSINESS REVIEW - NEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$120 per business
$108 per business
S-154
SPECIAL BUSINESS REVIEW - RENEWAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$60 per business
$108 per business
S-155
GUN DEALER PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$120 per permit
$120 per permit
S-156
MASSAGE TECH/PARLOR LICENSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$120 per permit
$108 per permit
S-157
TOBACCO RETAILER PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$690 - New
$160 - Renewal
$604 - New
$362 - Renewal
S-158
ABC ONE-DAY LICENSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$145 per application
$110 per application
May 21, 2026
42 63
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-159
TAXI CAB INSPECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$95 per taxi/business
$88 per taxi/business
S-160
REPOSSESSED VEHICLE RELEASE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
California Government Code 26751
$15 per vehicle
California Government Code 26751
$15 per vehicle
S-161
STORED VEHICLE RELEASE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$255 per vehicle
$238 per vehicle
S-162
CITATION SIGN OFF
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$60 per citation
$15 per citation
S-163
POLICE DUI ACCIDENT RESPONSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel S-164
CONCEALED WEAPON PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
New Permit - $966 (50% paid at time of application with remaining amount paid upon issuing of permit)
Renewal Permit - $25
Amended Permit - $10
Applicant must also pay outside party for LiveScan
California Penal Code Sections 12050-12054 and 26190a
New Permit - $966 (50% paid at time of application with remaining amount paid upon issuing of permit)
Renewal Permit - $640
Amended Permit - $563
Psychological testing costs are added to the above
May 21, 2026
43 64
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-165
CLEARANCE LETTER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per letter
$52 per letter
S-166
FINGERPRINT / LIVESCAN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per request
$52 per request
S-167
POLICE REPORT COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
First 10 pages - No Charge
Each page after 10 - $0.25 per page
First 10 pages - No Charge
Each page after 10 - $0.25 per page
S-168
POLICE ELECTRONIC FILE COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$5 per disk/device
$5 per disk/device
S-188
TEMPORARY DUMPSTER BIN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fees include volume charges
95 gallon - $45 Extra Haul - $45
Cancellation - $45
(after delivery but before use)
4 yard - $175 Extra Haul - $165 Cancellation - $175 6 yard - $190 Extra Haul - $240 Cancellation - $190 (after delivery but before use)
Fees include volume charges
90 gallon - $40
Cancellation - $37
(after delivery but before use)
4 yard - $167
6 yard - $178
Cancellation - $72
(after delivery but before use)
S-189
DUMPSTER GRAVITY LOCK INSTALLATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$195 per lock plus cost of lock
$180 per lock plus cost of lock
May 21, 2026
44 65
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-190
CONTAINER SIZE EXCHANGE/DELIVERY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Cart - $40 per visit
Bin - $75 per visit
Cart - $37 per visit
Bin - $72 per visit
S-191
SOLID WASTE EXTRA HAUL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fees below include volume charges
65 gallon - $25
95 gallon - $35
2 yard - $90
3 yard - $125
4 yard - $165
6 yard - $240
8 yard - $350
Fees below include volume charges
60 gallon - $17
90 gallon - $21
350 gallon - $72
2 yard - $83
3 yard - $93
4 yard - $93
6 yard - $103
S-192
OVERLOADED SOLID WASTE CONTAINER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fees include volume charges
65 gallon - $25
95 gallon - $35
2 yard - $90
3 yard - $125
4 yard - $165
6 yard - $240
8 yard - $350
Fees include volume charges
60 gallon - $4
90 gallon - $6
350 gallon - $10
2 yard - $10
3 yard - $17
4 yard - $21
6 yard - $31
S-193
SOLID WASTE CLEAN UP HAULING/DISP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Cost determined by staff with charges at 100% of the fully allocated hourly rate for all personnel involved plus any outside costs Cost determined by staff with charges at 100% of the fully allocated hourly rate for all personnel involved plus any outside costs.
S-195
SOLID WASTE TUB-OUT SERVICE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$20 per account per month
$17 per account per month
May 21, 2026
45 66
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-196
RECYCLE SERVICE ONLY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge monthly refuse services
Charge monthly refuse services
S-196A
RECYCLE BIN - 8 YARD
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Remove this fee from the fee schedule as it is included in the Solid Waste rates.
1st Bin Ea Addl
1 pickup per week: $ 350.00 $ 290.00
2 pickup per week: $ 659.00 $ 552.00
3 pickup per week: $ 938.00 $ 815.00
4 pickup per week: $1,277.00 $1,077.00
5 pickup per week: $1,586.00 $1,339.00
6 pickup per week: $1,895.00 $1,602.00
S-196B
COMPACTOR SERVICE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Four times the equivalent Container Size Refuse Rate Minimum. (Additional charges may be applicable based on compaction rate.) Double the rate of equivalent sized dumpster (minimum charge); additional charges may apply based on overall density as determined by staff
S-197
CONSTRUCTION WATER METER RENTAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$325 - Installation
$ 72 - Monthly read
$325 - Relocation
$195 - Removal
$30 - Daily Rental (includes water meter and backflow device) Water Usage - Current water rates based on water usage
$170 - Installation
$ 67 - Monthly read
$170 - Relocation
$170 - Removal
$15 - Daily Rental
Water Usage - Current water rates based on water usage
S-198
PRIVATE FIRE PROTECTION CONNECTION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$36 per meter
$36 per meter
May 21, 2026
46 67
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-199
WATER WELL PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$890 per permit
$868 per permit
S-200
REPAIR BROKEN ANGLE-STOP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$690 per repair
$584 per repair
S-201
BROKEN WATER METER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$195 plus actual costs of replacement meter
$170 plus actual costs of replacement meter
S-201A
EXCESS OR LOST WATER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
50% of excess/lost water over the average
50% of excess/lost water over the average
S-201B
WATER USE AFTER DISCONNECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$75 per incident
$73 per incident
S-202
UTILITY AGREEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Deposit determined by staff, but not less than $3,000, with charges at the fully allocated hourly rates for all personnel involved plus any outside costs
Deposit determined by staff, but not less than $3,000, with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
May 21, 2026
47 68
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-203
PRETREAT CLASS III PERMIT - NEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$235 per permit
$222 per permit
S-204
PRETREAT CLASS III PERMIT - RENEWAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$110 per permit
$72 per permit
S-205
PRETREAT CLASS III PERMIT - INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$235 per inspection
$222 per inspection
S-206
PRETREAT CLASS III PERMIT - REINSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$175 per reinspection
$150 per reinspection
S-207
PRETREAT HAULER PERMIT - NEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$235 per permit
$222 per permit
S-208
PRETREAT HAULER PERMIT - RENEWAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$175 per permit
$150 per permit
May 21, 2026
48 69
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-209
SEPTAGE STATION ACCESS CARD
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$55 per card
$36 per card
S-210
PRETREAT CLASS IV PERMIT - NEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,030 per permit
$1,193 per permit
S-211
PRETREAT CLASS IV PERMIT - RENEWAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$540 per permit
$594 per permit
S-212
PRETREAT CLASS IV PERMIT - INSPECT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$420 per inspection
$449 per inspection
S-213
QUARTERLY POTW SAMPLING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Tier 1 - $660 per sampling event
Tier 2 - $1,090 per sampling event
Tier 3 - $1,235 per sampling event
These fees include contract lab costs.
Tier 1 - $372 per sampling event
Tier 2 - $630 per sampling event
Tier 3 - $1,136 per sampling event
These fees include contract lab costs.
May 21, 2026
49 70
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-214
GREASE WASTE HAULER TANK DEPOSIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Security deposit - $2,700 per tank (based on cost to remove and dispose of grease tank) plus current cost of disposal plus 10% to account for pass-through costs based on the size of the tank (based on the cost to dispose of grease)
The security deposit is refundable when the tank and contents have been removed from City property and the area has been
satisfactorily cleaned.
Security deposit - $2,700 per tank (based on cost to remove and dispose of grease tank) plus $0.54 per gallon based on the size of the tank (based on the cost to dispose of grease)
The security deposit is refundable when the tank and contents have been removed from City property and the area has been
satisfactorily cleaned.
S-215
PRETREAT CLASS IV MNTHLY METER READ
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$110 per reading
$72 per reading
S-216
PRETREATMENT PLAN REVIEW PRE-SCREEN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$80 per plan review
$36 per plan review
S-217
PRETREATMENT PLAN REVIEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$235 - Initial plan review
$110 - Each additional plan review
$175 - Sign-off inspection for pretreatment
$222 - Initial plan review
$ 72 - Each additional plan review
$150 - Sign-off inspection for pretreatment
S-218
CROSS-CONNECTION CONTROL PROGRAM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$ 35 - Prescreen determination
$230 - Initial review
$ 65 - Each additional review
$130 - Sign-off inspection
$ 36 - Prescreen determination
$248 - Initial review
$ 72 - Each additional review
$150 - Sign-off inspection
May 21, 2026
50 71
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-219
POST-CONSTRUCTION REPORTING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$405 per facility
$372 per facility per year
S-220
SEWER FLOW ANALYSIS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Fee determined by staff estimate for each review
Fee determined by staff estimate for each review.
S-221
SEWER MAIN CAPACITY VERIFICATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$695 per application
$403 per application
S-222
VIDEO SEWER LATERAL VERIFICATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$1,010 per application
$325 per application
S-222A
LIQUID WASTE DISPOSAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Septage Disposal Fee per Gallon based on Holding Tank Capacity - $0.1501
(For Vehicles with Holding Tank Capacity exceeding 100 Gallons) Septage Waste Disposal Fee - $46.53
(For Vehicles with Holding Tank Capacity exceeding 100 Gallons) Chemical Toilet Waste Disposal Fee per Gallon based on Holding Tank Capacity - $0.1501
Grease Disposal Fee per Gallon - $0.2502
$0.1339 per gallon
S-222B.1
EXPEDITED PLAN REVIEW - WATER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Additional 100% over standard plan review fees
None
May 21, 2026
51 72
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-222B.2
EXPEDITED PLAN REVIEW - WASTEWATER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Additional 100% over standard plan review fees
Additional 50% over standard plan review fees
S-222B.3
EXPEDITED PLAN REVIEW - SOLID WASTE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Additional 100% over standard plan review fees
None
S-222D
LIQUID HAULER PERMIT UPDATE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$110 per update
$72 per update
S-223
NEW UTILITY ACCOUNT SETUP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$72 per account
$83 per account
S-223A
UTILITY BILL DUPLICATE COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$7 per bill
$7 per bill
S-224
DELINQUENT WATER TURN-OFF/ON
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Late payment penalty - $15
48 hour notice - $5
Delinquent tagging - $26
Reconnection - $50 (limited by SB 998)
Late payment penalty - $15
48 hour notice - $5
Delinquent tagging - $26
Reconnection - $50 (limited by SB 998)
May 21, 2026
52 73
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-225
AFTER HOURS UTILITY TURN-ON
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$150 per reconnection due to the limits set in SB 998
$150 per reconnection due to the limits set in SB 998
S-226
WATER METER LOCK INSTALLATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$70 per lock
$77 per lock
S-227
BROKEN WATER METER LOCK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$70 per lock plus cost of the lock
$77 per lock plus cost of the lock
S-228
PULLED WATER METER
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$130 per meter
$108 per meter
S-229
BUSINESS LICENSE - NEW
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$63 per application
$36 per application
S-230
BUSINESS LICENSE RENEWAL PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$46 per renewal
$36 per renewal
May 21, 2026
53 74
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-231
BUSINESS LICENSE - CHANGE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$50 per business
$36 per business
S-232
BUSINESS LICENSE - DUPLICATE COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$10 per business
$10 per business
S-232A
BUSINESS LICENSE - ADA FEE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$4 per business license
$4 per business license
S-232B
PARKING PERMIT PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$7 per permit
$7 per permit
S-233
GOOD NEIGHBOR LICENSE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$300 per license
$263 per license
S-234
NSF CHECK / ACH CHARGEBACK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$125 per check/chargeback
Per Govt Code Section 6157, public agencies are permitted to charge full cost for this service.
$103 per check/chargeback
Per Govt Code Section 6157, public agencies are permitted to charge full cost for this service.
May 21, 2026
54 75
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-235
CREDIT CARD PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
3.5% of the amount charged
2.5% of the amount charged
S-236
DOCUMENT COPY/SCAN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
First 10 pages - No Charge
Each page after 10 - $0.25 per page
First 10 pages - No Charge
Each page after 10 - $0.25 per page
S-237
ELECTRONIC DOCUMENT COPY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$7 per device
$5 per device
S-238
DOCUMENT CERTIFICATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$25 per document
$52 per document
S-239
NOTARY PUBLIC
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
California Government Code 8211
$15 per signature
$15 per signature
California Government Code 8211
S-241
LEGAL AD NOTICING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$599 per notice - 1/8 page
$155 per notice - 1/4 column
$310 per Ordinance - includes 2 notices
$599 per notice - 1/8 page
$155 per notice - 1/4 column
$310 per Ordinance - includes 2 notices
May 21, 2026
55 76
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-242
DOCUMENT/REPORT COMPILATION
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs S-242A
PUBLIC CONVENIENCE & NECESSITY
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$230 per business
$418 per business
S-243
CIVIL LITIGATION ATTORNEY SERVICE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge market rates for attorney services, which should at a minimum be the fully allocated hourly rate for each position Charge market rates for attorney services, which should at a minimum be the fully allocated hourly rate for each position.
S-244
AFFORDABLE HOUSING LIEN PROCESS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$220 per lien plus any County filing fees
$253 per lien plus any County filing fees
S-245
AFFORDABLE HOUSING RECONVEYANCE
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$275 per lien plus any County filing fees
$253 per lien plus any County filing fees
S-246
PUBLIC ACCESS TV/AV SERVICES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Audio/Visual services
Staff - $106 per hour
Equipment - $64 per hour
None
May 21, 2026
56 77
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-250
INTER-LIBRARY LOAN
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix D for all Library fee detail
Within Black Gold System - No Charge
Outside Black Gold System - $15 per request
S-251
LIBRARY CARD REPLACEMENT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix D for all Library fee detail
$1 per card
S-252
OVERDUE LIBRARY MATERIAL PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix D for all Library fee detail
$.25 per item per day
Book Club in a Bag - $1 per day
S-253
PASSPORT PROCESSING
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix D for all Library fee detail
$35 per application (set by the Federal government)
$10 - photo
S-254
LIBRARY ROOM RENTAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix D for all Library fee detail
See Appendix D of this Report
S-255
ADULT SPORTS PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Various fees ranging from $313 to $597 per team
Various fees ranging from $313 to $597 per team
May 21, 2026
57 78
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-256
YOUTH SPORTS PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Resident - $39 per participant
Non-Resident - $49 per participant
Resident - $39 per participant
Non-Resident - $49 per participant
S-257
RECREATION CLASSES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Various fees determined by the instructor
The City receives 20% of the fee plus negotiated room rental rates.
Various fees determined by the instructor
The City receives 20% of the fee plus negotiated room rental rates.
S-258
YOUTH RECREATION PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Minimal fees for specialized user-benefit programs
Minimal fees for specialized user-benefit programs
S-259
TEEN RECREATION PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Minimal fees for specialized user-benefit programs
Minimal fees for specialized user-benefit programs
S-260
ADAPTIVE RECREATION PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
None
None
S-261
GENERAL RECREATION PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Various MOU agreements and festival/event rentals
Various MOU agreements and festival/event rentals
May 21, 2026
58 79
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-262
SENIOR PROGRAMS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
None
None
S-263
RECREATION/LAP SWIM
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
5 years and under/65 years and up - free
6-16 years - $1.50
17-54 years - $3
55-64 years - $1.50
Annual Pool Pass - $58 (up to 6 family members per visit) Fitness Center/Pool - $3 per visit or $35 for a 30 day pass 5 years and under/65 years and up - free
6-16 years - $1.50
17-54 years - $3
55-64 years - $1.50
Annual Pool Pass - $58 (up to 6 family members per visit) Fitness Center/Pool - $3 per visit or $35 for a 30 day pass S-264
SWIM LESSONS
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Resident - $35
Non-Resident - $43.50
Resident - $35
Non-Resident - $43.50
S-265
POOL ACTIVITIES
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Resident - $28.50
Non-Resident - $35.50
Resident - $28.50
Non-Resident - $35.50
S-266
POOL RENTAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Various rental rates and High Schools contributions
Various rental rates and High Schools contributions
S-267
RECREATION FACILITY RENTAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Various fees based on facility, duration, day of the week, and alcohol use
See Appendix E of this Report for fee detail
Various fees based on facility, duration, day of the week, and alcohol use
See Appendix E of this Report for fee detail
May 21, 2026
59 80
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-268
BALLFIELD RENTAL
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
See Appendix E of this Report for fee detail
Unlighted - $17 per hour
Lighted - additional $17 per hour
S-270
PARKS BUILDING PLAN CHECK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Residential - $120 per plan
ADU - $60 per plan
Commercial - $175 per plan
None
S-271
PARKS BUILDING PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Residential - $175 per permit
Commercial - $175 per permit
None
S-272
L/S DIST AREA PUB IMPROVE PLAN CHK
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$200,000 - $0.90% of construction value ($500 minimum) $200,001-$500,000 - $1,800 plus 0.1% of the construction value over $200,000
$500,001-$1,000,000 - $2,100 plus 0.2% of the construction value over $500,000
$1,000,001+ - $3,100 plus 0.13% of the construction value over $1,000,000
None
S-273
L/S DIST AREA PUB IMPROVE PERMIT
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
$0-$200,000 - $0.38% of construction value ($500 minimum) $200,001-$500,000 - $760 plus 0.25% of the construction value over $200,000
$500,001-$1,000,000 - $1,510 plus 0.2% of the construction value over $500,000
$1,000,001+ - $2,510 plus 0.1% of the construction value over $1,000,000
Plus a bond amount determined by staff to cover the cost of the tree and planting.
None
May 21, 2026
60 81
CITY OF SANTA MARIA
FY 2025-26
FEE COMPARISON REPORT
S-274
MISCELLANEOUS PARKS PLAN CHECK/INSP
REF #:
TITLE:
CURRENT FEE
RECOMMENDED FEE
Charge the fully allocated hourly rate for all personnel involved plus any outside contract costs
None
May 21, 2026
61 82
APPENDIX B
REVENUE AND COST
SUMMARY WORKSHEETS
Matched With
COST DETAIL WORKSHEETS
83 THIS PAGE
INTENTIONALLY BLANK
84 S-001
CUP W/O SITE DEVELOPMENT TO ZA
APPLICATION
PLANNING
Zoning Administrator consideration of a conditional use permit without a site development plan. $5,625 per application
$6,790 per application
100%
$5,625.00
$6,791.88
$(1,166.88)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
82.82%
$(9,335)
$54,335
$45,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
85 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP W/O SITE DEVELOPMENT TO ZA
S-001
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
8 $2,662
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
8 $5,143
CD-PLANNING
PLANNING DIV MGR
1.67 $703.74
8 $5,630
CD-PLANNING
PRINCIPAL PLANNER
2.50 $876.65
8 $7,013
CD-PLANNING
PROJECT PLANNER
15.00 $3,398.25
8 $27,186
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
8 $2,779
PD-OPERATIONS
POLICE SERGEANT
0.50 $176.49
8 $1,412
PW-ENGINEERING
SR CIVIL ENGINEER
1.00 $313.62
8 $2,509
$54,335
$6,791.82
24.92 TYPE SUBTOTAL
$54,335
24.92 TOTALS
$6,791.88
86 S-001A
WTR-CUP W/O SITE DEVELOP TO ZA
APPLICATION
WATER
Water review of a Zoning Administrator consideration of a conditional use permit without a site development plan.
None
$170 per application
100%
$0.00
$171.88
$(171.88)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,375)
$1,375
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
87 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP W/O SITE DEVELOP TO ZA
S-001A
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
8 $1,375
$1,375
$171.86
0.50 TYPE SUBTOTAL
$1,375
0.50 TOTALS
$171.88
88 S-001B
WW-CUP W/O SITE DEVELOP TO ZA
APPLICATION
WASTEWATER
Wastewater review of a Zoning Administrator consideration of a conditional use permit without a site development plan.
None
$150 per application
100%
$0.00
$148.75
$(148.75)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,190)
$1,190
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
89 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP W/O SITE DEVELOP TO ZA
S-001B
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
8 $1,190
$1,190
$148.72
0.50 TYPE SUBTOTAL
$1,190
0.50 TOTALS
$148.75
90 S-002
CUP WITH SITE DEVELOPMENT TO ZA
APPLICATION
PLANNING
Zoning Administrator consideration of a conditional use permit with a site development plan. $8,884 per application
$10,980 per application
100%
$8,884.00
$10,978.14
$(2,094.14)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
80.92%
$(14,659)
$76,847
$62,188
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
91 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP WITH SITE DEVELOPMENT TO ZA
S-002
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
7 $2,329
CD-PLANNING
COM DEV DIRECTOR
2.00 $1,285.80
7 $9,001
CD-PLANNING
PLANNING DIV MGR
2.00 $842.80
7 $5,900
CD-PLANNING
PRINCIPAL PLANNER
2.50 $876.65
7 $6,137
CD-PLANNING
PROJECT PLANNER
20.50 $4,644.28
7 $32,510
FIRE-OPERATIONS
FIRE MARSHAL
3.00 $1,042.26
7 $7,296
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
7 $2,471
PW-ENGINEERING
SR CIVIL ENGINEER
4.00 $1,254.48
7 $8,781
PW-ENGINEERING
PRINCIPAL CIVIL ENG
0.75 $346.14
7 $2,423
$76,847
$10,978.13
38.00 TYPE SUBTOTAL
$76,847
38.00 TOTALS
$10,978.14
92 S-002A
WTR-CUP WITH SITE DEVELOPMENT TO ZA
APPLICATION
WATER
Water review of a Zoning Administrator consideration of a conditional use permit with a site development plan.
None
$295 per application
100%
$0.00
$295.14
$(295.14)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,066)
$2,066
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
93 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP WITH SITE DEVELOPMENT TO ZA
S-002A
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
7 $863
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
7 $1,203
$2,066
$295.14
0.75 TYPE SUBTOTAL
$2,066
0.75 TOTALS
$295.14
94 S-002B
WW-CUP WITH SITE DEVELOPMENT TO ZA
APPLICATION
WASTEWATER
Wastewater review of a Zoning Administrator consideration of a conditional use permit with a site development plan.
None
$255 per application
100%
$0.00
$255.43
$(255.43)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,788)
$1,788
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
95 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP WITH SITE DEVELOPMENT TO ZA
S-002B
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
7 $747
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
7 $1,041
$1,788
$255.41
0.75 TYPE SUBTOTAL
$1,788
0.75 TOTALS
$255.43
96 S-003
CUP W/O SITE DEVELOPMENT TO PC
APPLICATION
PLANNING
Planning Commission consideration of a conditional use permit without a site development plan. $8,651 per application
$11,800 per application
100%
$8,651.00
$11,800.00
$(3,149.00)
6 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
73.31%
$(18,894)
$70,800
$51,906
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
97 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP W/O SITE DEVELOPMENT TO PC
S-003
6 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
6 $1,997
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
6 $1,929
CD-PLANNING
PLANNING DIV MGR
2.67 $1,125.14
6 $6,751
CD-PLANNING
PRINCIPAL PLANNER
4.00 $1,402.64
6 $8,416
CD-PLANNING
PROJECT PLANNER
27.50 $6,230.13
6 $37,381
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
6 $2,085
PD-OPERATIONS
POLICE SERGEANT
0.50 $176.49
6 $1,059
PW-ENGINEERING
SR CIVIL ENGINEER
3.00 $940.86
6 $5,645
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
6 $5,538
$70,800
$11,799.92
43.42 TYPE SUBTOTAL
$70,800
43.42 TOTALS
$11,800.00
98 S-003A
WTR-CUP W/O SITE DEVELOPMENT TO PC
APPLICATION
WATER
Water review of a Planning Commission consideration of a conditional use permit without a site development plan.
None
$170 per application
100%
$0.00
$171.83
$(171.83)
6 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,031)
$1,031
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
99 May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP W/O SITE DEVELOPMENT TO PC
S-003A
6 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
6 $1,031
$1,031
$171.86
0.50 TYPE SUBTOTAL
$1,031
0.50 TOTALS
$171.83
100
S-003B
WW-CUP W/O SITE DEVELOPMENT TO PC
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission consideration of a conditional use permit without a site development plan.
None
$150 per application
100%
$0.00
$148.67
$(148.67)
6 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(892)
$892
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
101
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP W/O SITE DEVELOPMENT TO PC
S-003B
6 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
6 $892
$892
$148.72
0.50 TYPE SUBTOTAL
$892
0.50 TOTALS
$148.67
102
S-004
CUP WITH SITE DEVELOPMENT TO PC
APPLICATION
PLANNING
Planning Commission consideration of a conditional use permit with a site development plan. $13,388 per application
$17,550 per application
100%
$13,388.00
$17,552.00
$(4,164.00)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
76.28%
$(33,312)
$140,416
$107,104
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
103
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP WITH SITE DEVELOPMENT TO PC
S-004
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
8 $2,662
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
8 $2,572
CD-PLANNING
PLANNING DIV MGR
2.67 $1,125.14
8 $9,001
CD-PLANNING
PRINCIPAL PLANNER
5.00 $1,753.30
8 $14,026
CD-PLANNING
PROJECT PLANNER
36.50 $8,269.08
8 $66,153
FIRE-OPERATIONS
FIRE MARSHAL
3.00 $1,042.26
8 $8,338
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
8 $2,824
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
8 $20,072
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
8 $14,769
$140,416
$17,551.99
62.92 TYPE SUBTOTAL
$140,416
62.92 TOTALS
$17,552.00
104
S-004A
WTR-CUP WITH SITE DEVELOPMENT TO PC
APPLICATION
WATER
Water review of a Planning Commission consideration of a conditional use permit with a site development plan.
None
$380 per application
100%
$0.00
$381.38
$(381.38)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,051)
$3,051
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
105
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP WITH SITE DEVELOPMENT TO PC
S-004A
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
8 $986
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
8 $1,375
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
8 $690
$3,051
$381.34
1.00 TYPE SUBTOTAL
$3,051
1.00 TOTALS
$381.38
106
S-004B
WW-CUP WITH SITE DEVELOPMENT TO PC
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission consideration of a conditional use permit with a site development plan.
None
$330 per application
100%
$0.00
$330.50
$(330.50)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,644)
$2,644
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
107
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP WITH SITE DEVELOPMENT TO PC
S-004B
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
8 $854
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
8 $1,190
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
8 $600
$2,644
$330.47
1.00 TYPE SUBTOTAL
$2,644
1.00 TOTALS
$330.50
108
S-004C
SW-CUP WITH SITE DEVELOPMENT TO PC
APPLICATION
SOLID WASTE
Solid Waste review of a Planning Commission consideration of a conditional use permit with a site development plan.
None
$360 per application
100%
$0.00
$358.13
$(358.13)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,865)
$2,865
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
109
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-CUP WITH SITE DEVELOPMENT TO PC
S-004C
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
1.00 $296.19
8 $2,370
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
8 $496
$2,865
$358.16
1.25 TYPE SUBTOTAL
$2,865
1.25 TOTALS
$358.13
110
S-005
PLANNED DEVELOPMENT TO PC
APPLICATION
PLANNING
Planning Commission consideration of a planned development. $15,118 per application
$19,260 per application
100%
$15,118.00
$19,262.00
$(4,144.00)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
78.49%
$(41,440)
$192,620
$151,180
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
111
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PLANNED DEVELOPMENT TO PC
S-005
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
10 $3,328
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
10 $3,215
CD-PLANNING
PLANNING DIV MGR
2.67 $1,125.14
10 $11,251
CD-PLANNING
PRINCIPAL PLANNER
6.00 $2,103.96
10 $21,040
CD-PLANNING
PROJECT PLANNER
42.50 $9,628.38
10 $96,284
FIRE-OPERATIONS
FIRE MARSHAL
3.00 $1,042.26
10 $10,423
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
10 $3,530
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
10 $25,090
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
10 $18,461
$192,620
$19,261.95
69.92 TYPE SUBTOTAL
$192,620
69.92 TOTALS
$19,262.00
112
S-005A
WTR-PLANNED DEVELOPMENT TO PC
APPLICATION
WATER
Water review of a Planning Commission consideration of a planned development.
None
$380 per application
100%
$0.00
$381.30
$(381.30)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,813)
$3,813
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
113
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-PLANNED DEVELOPMENT TO PC
S-005A
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
10 $1,233
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
10 $1,719
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
10 $862
$3,813
$381.34
1.00 TYPE SUBTOTAL
$3,813
1.00 TOTALS
$381.30
114
S-005B
WW-PLANNED DEVELOPMENT TO PC
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission consideration of a planned development.
None
$330 per application
100%
$0.00
$330.50
$(330.50)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,305)
$3,305
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
115
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-PLANNED DEVELOPMENT TO PC
S-005B
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
10 $1,067
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
10 $1,487
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
10 $751
$3,305
$330.47
1.00 TYPE SUBTOTAL
$3,305
1.00 TOTALS
$330.50
116
S-005C
SW-PLANNED DEVELOPMENT TO PC
APPLICATION
SOLID WASTE
Solid Waste review of a Planning Commission consideration of a planned development.
None
$360 per application
100%
$0.00
$358.20
$(358.20)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,582)
$3,582
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
117
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-PLANNED DEVELOPMENT TO PC
S-005C
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
1.00 $296.19
10 $2,962
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
10 $620
$3,582
$358.16
1.25 TYPE SUBTOTAL
$3,582
1.25 TOTALS
$358.20
118
S-006
CUP/PD TO CITY COUNCIL
APPLICATION
PLANNING
City Council consideration of a planned development with conditional use permit. $19,808 per application
$27,060 per application
100%
$19,808.00
$27,058.00
$(7,250.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
73.21%
$(7,250)
$27,058
$19,808
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
119
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP/PD TO CITY COUNCIL
S-006
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
1 $333
CD-PLANNING
COM DEV DIRECTOR
2.00 $1,285.80
1 $1,286
CD-PLANNING
PLANNING DIV MGR
6.17 $2,600.04
1 $2,600
CD-PLANNING
PRINCIPAL PLANNER
10.00 $3,506.60
1 $3,507
CD-PLANNING
PROJECT PLANNER
50.25 $11,384.14
1 $11,384
FIRE-OPERATIONS
FIRE MARSHAL
4.00 $1,389.68
1 $1,390
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
1 $353
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
10.00 $3,136.20
1 $3,136
PW-ENGINEERING
PRINCIPAL CIVIL ENG
6.00 $2,769.12
1 $2,769
$27,058
$27,058.16
92.67 TYPE SUBTOTAL
$27,058
92.67 TOTALS
$27,058.00
120
S-006A
WTR-CUP/PD TO CITY COUNCIL
APPLICATION
WATER
Water review of a City Council consideration of a planned development with conditional use permit.
None
$380 per application
100%
$0.00
$381.00
$(381.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(381)
$381
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
121
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP/PD TO CITY COUNCIL
S-006A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
1 $123
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
1 $172
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
1 $86
$381
$381.34
1.00 TYPE SUBTOTAL
$381
1.00 TOTALS
$381.00
122
S-006B
WW-CUP/PD TO CITY COUNCIL
APPLICATION
WASTEWATER
Wastewater review of a City Council consideration of a planned development with conditional use permit.
None
$330 per application
100%
$0.00
$330.00
$(330.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(330)
$330
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
123
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP/PD TO CITY COUNCIL
S-006B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
1 $107
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
1 $149
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
1 $75
$330
$330.47
1.00 TYPE SUBTOTAL
$330
1.00 TOTALS
$330.00
124
S-006C
SW-CUP/PD TO CITY COUNCIL
APPLICATION
SOLID WASTE
Solid Waste review of a City Council consideration of a planned development with conditional use permit.
None
$360 per application
100%
$0.00
$358.00
$(358.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(358)
$358
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
125
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-CUP/PD TO CITY COUNCIL
S-006C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
1.00 $296.19
1 $296
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
1 $62
$358
$358.16
1.25 TYPE SUBTOTAL
$358
1.25 TOTALS
$358.00
126
S-007
CUP/PD TO PLANNING COMMISSION
APPLICATION
PLANNING
Planning Commission consideration of a planned development with conditional use permit. $17,752 per application
$22,120 per application
100%
$17,752.00
$22,120.33
$(4,368.33)
9 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
80.25%
$(39,315)
$199,083
$159,768
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
127
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CUP/PD TO PLANNING COMMISSION
S-007
9 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
9 $2,995
CD-PLANNING
COM DEV DIRECTOR
2.50 $1,607.25
9 $14,465
CD-PLANNING
PLANNING DIV MGR
3.67 $1,546.54
9 $13,919
CD-PLANNING
PRINCIPAL PLANNER
7.00 $2,454.62
9 $22,092
CD-PLANNING
PROJECT PLANNER
44.50 $10,081.48
9 $90,733
FIRE-OPERATIONS
FIRE MARSHAL
4.00 $1,389.68
9 $12,507
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
9 $3,177
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
9 $22,581
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
9 $16,615
$199,083
$22,120.33
76.92 TYPE SUBTOTAL
$199,083
76.92 TOTALS
$22,120.33
128
S-007A
WTR-CUP/PD TO PLANNING COMMISSION
APPLICATION
WATER
Water review of a Planning Commission consideration of a planned development with conditional use permit.
None
$380 per application
100%
$0.00
$381.33
$(381.33)
9 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,432)
$3,432
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
129
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CUP/PD TO PLANNING COMMISSION
S-007A
9 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
9 $1,110
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
9 $1,547
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
9 $776
$3,432
$381.34
1.00 TYPE SUBTOTAL
$3,432
1.00 TOTALS
$381.33
130
S-007B
WW-CUP/PD TO PLANNING COMMISSION
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission consideration of a planned development with conditional use permit.
None
$330 per application
100%
$0.00
$330.44
$(330.44)
9 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,974)
$2,974
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
131
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CUP/PD TO PLANNING COMMISSION
S-007B
9 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
9 $960
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
9 $1,338
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
9 $676
$2,974
$330.47
1.00 TYPE SUBTOTAL
$2,974
1.00 TOTALS
$330.44
132
S-007C
SW-CUP/PD TO PLANNING COMMISSION
APPLICATION
SOLID WASTE
Solid Waste review of a Planning Commission consideration of a planned development with conditional use permit.
None
$360 per application
100%
$0.00
$358.11
$(358.11)
9 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,223)
$3,223
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
133
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-CUP/PD TO PLANNING COMMISSION
S-007C
9 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
1.00 $296.19
9 $2,666
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
9 $558
$3,223
$358.16
1.25 TYPE SUBTOTAL
$3,223
1.25 TOTALS
$358.11
134
S-008
ADMIN DOWNTOWN PMT-OVER THE COUNTER
APPLICATION
PLANNING
Administrative planning review for business license retail shop. $46 per application
$55 per application
100%
$46.00
$56.64
$(10.64)
87 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.21%
$(926)
$4,928
$4,002
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
135
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADMIN DOWNTOWN PMT-OVER THE COUNTER
S-008
87 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.25 $56.64
87 $4,928
$4,928
$56.64
0.25 TYPE SUBTOTAL
$4,928
0.25 TOTALS
$56.64
136
S-009
ADMIN DOWNTOWN PRMT - MINOR
APPLICATION
PLANNING
Administrative planning review for events, minor exterior improvements and minor modifications. $181 per application
$225 per application
100%
$181.00
$226.55
$(45.55)
178
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.89%
$(8,108)
$40,326
$32,218
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
137
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADMIN DOWNTOWN PRMT - MINOR
S-009
178
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
1.00 $226.55
178
$40,326
$40,326
$226.55
1.00 TYPE SUBTOTAL
$40,326
1.00 TOTALS
$226.55
138
S-010
ADMIN DOWNTOWN PRMT - MAJOR
APPLICATION
PLANNING
Administrative planning review for larger on-going events. $723 per application
$1,080 per application
100%
$723.00
$1,081.54
$(358.54)
37 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
66.85%
$(13,266)
$40,017
$26,751
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
139
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADMIN DOWNTOWN PRMT - MAJOR
S-010
37 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PRINCIPAL PLANNER
0.50 $175.33
37 $6,487
CD-PLANNING
PROJECT PLANNER
4.00 $906.20
37 $33,529
$40,017
$1,081.53
4.50 TYPE SUBTOTAL
$40,017
4.50 TOTALS
$1,081.54
140
S-011
ADMIN DOWNTOWN PRMT - WITH SITE DEV
APPLICATION
PLANNING
Review of administrative downtown permit with site development plan. $4,850 per application
$8,825 per application
100%
$4,850.00
$8,826.41
$(3,976.41)
34 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
54.95%
$(135,198)
$300,098
$164,900
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
141
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADMIN DOWNTOWN PRMT - WITH SITE DEV
S-011
34 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
34 $2,514
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
34 $10,929
CD-PLANNING
PLANNING DIV MGR
1.17 $493.04
34 $16,763
CD-PLANNING
PRINCIPAL PLANNER
2.00 $701.32
34 $23,845
CD-PLANNING
PROJECT PLANNER
17.25 $3,907.99
34 $132,872
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
34 $11,812
PD-OPERATIONS
POLICE SERGEANT
0.50 $176.49
34 $6,001
PW-ENGINEERING
SR CIVIL ENGINEER
6.00 $1,881.72
34 $63,978
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
34 $31,383
$300,098
$8,826.42
30.92 TYPE SUBTOTAL
$300,098
30.92 TOTALS
$8,826.41
142
S-011A
WTR-ADMIN DOWNTOWN PRMT-W/SITE DEV
APPLICATION
WATER
Water Review of administrative downtown permit with site development plan.
None
$295 per application
100%
$0.00
$295.15
$(295.15)
34 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(10,035)
$10,035
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
143
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-ADMIN DOWNTOWN PRMT-W/SITE DEV
S-011A
34 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
34 $4,192
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
34 $5,843
$10,035
$295.14
0.75 TYPE SUBTOTAL
$10,035
0.75 TOTALS
$295.15
144
S-011B
WW-ADMIN DOWNTOWN PRMT-W/SITE DEV
APPLICATION
WASTEWATER
Wastewater review of administrative downtown permit with site development plan.
None
$255 per application
100%
$0.00
$255.41
$(255.41)
34 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(8,684)
$8,684
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
145
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-ADMIN DOWNTOWN PRMT-W/SITE DEV
S-011B
34 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
34 $3,627
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
34 $5,056
$8,684
$255.41
0.75 TYPE SUBTOTAL
$8,684
0.75 TOTALS
$255.41
146
S-012
DOWNTOWN PERMIT TO PLAN. COMM.
APPLICATION
PLANNING
Planning Commission consideration of a downtown permit. $19,054 per application
$22,100 per application
100%
$19,054.00
$22,098.50
$(3,044.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
86.22%
$(6,089)
$44,197
$38,108
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
147
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DOWNTOWN PERMIT TO PLAN. COMM.
S-012
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
2 $666
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
2 $643
CD-PLANNING
PLANNING DIV MGR
4.92 $2,073.29
2 $4,147
CD-PLANNING
PRINCIPAL PLANNER
8.50 $2,980.61
2 $5,961
CD-PLANNING
PROJECT PLANNER
48.50 $10,987.68
2 $21,975
FIRE-OPERATIONS
FIRE MARSHAL
2.00 $694.84
2 $1,390
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
2 $706
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
2 $5,018
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
2 $3,692
$44,197
$22,098.63
79.67 TYPE SUBTOTAL
$44,197
79.67 TOTALS
$22,098.50
148
S-012A
WTR-DOWNTOWN PERMIT TO PLAN. COMM.
APPLICATION
WATER
Water review of a Planning Commission consideration of a downtown permit.
None
$380 per application
100%
$0.00
$381.50
$(381.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(763)
$763
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
149
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-DOWNTOWN PERMIT TO PLAN. COMM.
S-012A
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
2 $247
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
2 $344
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
2 $172
$763
$381.34
1.00 TYPE SUBTOTAL
$763
1.00 TOTALS
$381.50
150
S-012B
WW-DOWNTOWN PERMIT TO PLAN. COMM.
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission consideration of a downtown permit.
None
$330 per application
100%
$0.00
$330.50
$(330.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(661)
$661
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
151
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-DOWNTOWN PERMIT TO PLAN. COMM.
S-012B
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
2 $213
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
2 $297
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
2 $150
$661
$330.47
1.00 TYPE SUBTOTAL
$661
1.00 TOTALS
$330.50
152
S-012C
SW-DOWNTOWN PERMIT TO PLAN. COMM.
APPLICATION
SOLID WASTE
Solid Waste review of a Planning Commission consideration of a downtown permit.
None
$135 per application
100%
$0.00
$136.00
$(136.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(272)
$272
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
153
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-DOWNTOWN PERMIT TO PLAN. COMM.
S-012C
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
0.25 $74.05
2 $148
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
2 $124
$272
$136.02
0.50 TYPE SUBTOTAL
$272
0.50 TOTALS
$136.00
154
S-013
DOWNTOWN PERMIT TO CITY COUNCIL
APPLICATION
PLANNING
City Council consideration of a downtown permit.
$19,978 per application
$28,955 per application
100%
$19,978.00
$28,957.00
$(8,979.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
68.99%
$(8,979)
$28,957
$19,978
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
155
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DOWNTOWN PERMIT TO CITY COUNCIL
S-013
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
1 $333
CD-PLANNING
COM DEV DIRECTOR
8.00 $5,143.20
1 $5,143
CD-PLANNING
PLANNING DIV MGR
4.92 $2,073.29
1 $2,073
CD-PLANNING
PRINCIPAL PLANNER
8.50 $2,980.61
1 $2,981
CD-PLANNING
PROJECT PLANNER
46.25 $10,477.94
1 $10,478
FIRE-OPERATIONS
FIRE MARSHAL
4.00 $1,389.68
1 $1,390
PD-OPERATIONS
POLICE SERGEANT
1.00 $352.97
1 $353
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
10.00 $3,136.20
1 $3,136
PW-ENGINEERING
PRINCIPAL CIVIL ENG
6.00 $2,769.12
1 $2,769
$28,957
$28,956.62
91.92 TYPE SUBTOTAL
$28,957
91.92 TOTALS
$28,957.00
156
S-013A
WTR-DOWNTOWN PERMIT TO CITY COUNCIL
APPLICATION
WATER
Water review of a City Council consideration of a downtown permit.
None
$380 per application
100%
$0.00
$381.00
$(381.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(381)
$381
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
157
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-DOWNTOWN PERMIT TO CITY COUNCIL
S-013A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
1 $123
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
1 $172
UTIL-WATER
WATER RESOURCES MANAGER
0.25 $86.20
1 $86
$381
$381.34
1.00 TYPE SUBTOTAL
$381
1.00 TOTALS
$381.00
158
S-013B
WW-DOWNTOWN PERMIT TO CITY COUNCIL
APPLICATION
WASTEWATER
Wastewater review of a City Council consideration of a downtown permit.
None
$330 per application
100%
$0.00
$330.00
$(330.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(330)
$330
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
159
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-DOWNTOWN PERMIT TO CITY COUNCIL
S-013B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
1 $107
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
1 $149
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
1 $75
$330
$330.47
1.00 TYPE SUBTOTAL
$330
1.00 TOTALS
$330.00
160
S-013C
SW-DOWNTOWN PERMIT TO CITY COUNCIL
APPLICATION
SOLID WASTE
Solid Waste review of a City Council consideration of a downtown permit.
None
$135 per application
100%
$0.00
$136.00
$(136.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(136)
$136
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
161
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SW-DOWNTOWN PERMIT TO CITY COUNCIL
S-013C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE DISP.
PRINCIPAL CIVIL ENG
0.25 $74.05
1 $74
UTIL-REFUSE COMM.
SOLID WASTE MANAGER
0.25 $61.97
1 $62
$136
$136.02
0.50 TYPE SUBTOTAL
$136
0.50 TOTALS
$136.00
162
S-014
VARIANCE
APPLICATION
PLANNING
Review of a request for a Variance by the Planning Commission for compliance with City codes and guidelines. $12,241 per application
$15,925 per application
100%
$12,241.00
$15,925.00
$(3,684.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
76.87%
$(3,684)
$15,925
$12,241
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
163
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
VARIANCE
S-014
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
1 $333
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
1 $321
CD-PLANNING
PLANNING DIV MGR
3.67 $1,546.54
1 $1,547
CD-PLANNING
PRINCIPAL PLANNER
7.00 $2,454.62
1 $2,455
CD-PLANNING
PROJECT PLANNER
44.50 $10,081.48
1 $10,081
FIRE-OPERATIONS
FIRE MARSHAL
2.00 $694.84
1 $695
PD-OPERATIONS
POLICE SERGEANT
0.51 $180.01
1 $180
PW-ENGINEERING
SR CIVIL ENGINEER
1.00 $313.62
1 $314
$15,925
$15,925.31
61.43 TYPE SUBTOTAL
$15,925
61.43 TOTALS
$15,925.00
164
S-015
ENVIRON. INITIAL STUDY/NEG DEC
APPLICATION
PLANNING
Review of draft environmental initial study, negative declaration, or mitigated negative declaration for proposed development.
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs
100%
$937.50
$8,987.25
$(8,049.75)
8 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
10.43%
$(64,398)
$71,898
$7,500
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
165
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENVIRON. INITIAL STUDY/NEG DEC
S-015
8 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
8 $1,183
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
8 $5,143
CD-PLANNING
PLANNING DIV MGR
4.00 $1,685.60
8 $13,485
CD-PLANNING
PRINCIPAL PLANNER
5.00 $1,753.30
8 $14,026
CD-PLANNING
PROJECT PLANNER
21.00 $4,757.55
8 $38,060
$71,898
$8,987.24
32.00 TYPE SUBTOTAL
$71,898
32.00 TOTALS
$8,987.25
166
S-016
ENVIRONMENTAL IMPACT REPORT
APPLICATION
PLANNING
Review of a proposed Environmental Impact Report under the terms of the California Environmental Quality Act.
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any outside costs.
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
167
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENVIRONMENTAL IMPACT REPORT
S-016
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
168
S-017
TENTATIVE PARCEL MAP - PLANNING
MAP
PLANNING
Planning review of a tentative parcel map to assure accuracy and compliance with City codes and standards. $7,985 per map
$12,205 per map
100%
$10,139.00
$12,204.67
$(2,065.67)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
83.07%
$(6,197)
$36,614
$30,417
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
169
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE PARCEL MAP - PLANNING
S-017
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
3 $998
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
3 $1,929
CD-PLANNING
PLANNING DIV MGR
3.67 $1,546.54
3 $4,640
CD-PLANNING
PRINCIPAL PLANNER
5.00 $1,753.30
3 $5,260
CD-PLANNING
PROJECT PLANNER
35.00 $7,929.25
3 $23,788
$36,614
$12,204.74
46.92 TYPE SUBTOTAL
$36,614
46.92 TOTALS
$12,204.67
170
S-017A
WTR-TENTATIVE PACEL MAP
APPLICATION
WATER
Water review of a tentative parcel map to assure accuracy and compliance with City codes and standards.
None
$295 per application
100%
$0.00
$295.00
$(295.00)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(885)
$885
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
171
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-TENTATIVE PACEL MAP
S-017A
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
3 $370
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
3 $516
$885
$295.14
0.75 TYPE SUBTOTAL
$885
0.75 TOTALS
$295.00
172
S-017B
WW-TENTATIVE PARCEL MAP
APPLICATION
WASTEWATER
Wastewater review of a tentative parcel map to assure accuracy and compliance with City codes and standards.
None
$225 per application
100%
$0.00
$223.67
$(223.67)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(671)
$671
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
173
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-TENTATIVE PARCEL MAP
S-017B
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
3 $446
UTIL-WW TREATMENT
WATER RESOURCES MANAGER
0.25 $75.06
3 $225
$671
$223.78
0.75 TYPE SUBTOTAL
$671
0.75 TOTALS
$223.67
174
S-018
TENTATIVE PARCEL MAP (ADDL FOR CC)
MAP
PLANNING
City Council review of a tentative parcel map to assure accuracy and compliance with City codes and standards. $2,898 per map plus Legal Ad Noticing fee
This fee is in addition to the Tentative Parcel Map fee $3,560 per map plus Legal Ad Noticing fee
This fee is in addition to the Tentative Parcel Map fee 100%
$2,898.00
$3,562.00
$(664.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.36%
$(664)
$3,562
$2,898
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
175
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE PARCEL MAP (ADDL FOR CC)
S-018
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
1 $643
CD-PLANNING
PLANNING DIV MGR
1.50 $632.10
1 $632
CD-PLANNING
PRINCIPAL PLANNER
2.00 $701.32
1 $701
CD-PLANNING
PROJECT PLANNER
7.00 $1,585.85
1 $1,586
$3,562
$3,562.17
11.50 TYPE SUBTOTAL
$3,562
11.50 TOTALS
$3,562.00
176
S-019
TENTATIVE TRACT MAP - PLANNING
MAP
PLANNING
Planning review of a tentative tract map to assure accuracy and compliance with City codes and standards. $14,942 per map
$17,895 per map
100%
$14,942.00
$17,897.00
$(2,955.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
83.49%
$(5,910)
$35,794
$29,884
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
177
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE TRACT MAP - PLANNING
S-019
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
2 $666
CD-PLANNING
COM DEV DIRECTOR
1.50 $964.35
2 $1,929
CD-PLANNING
PLANNING DIV MGR
5.17 $2,178.64
2 $4,357
CD-PLANNING
PRINCIPAL PLANNER
8.50 $2,980.61
2 $5,961
CD-PLANNING
PROJECT PLANNER
50.50 $11,440.78
2 $22,882
$35,794
$17,897.13
67.92 TYPE SUBTOTAL
$35,794
67.92 TOTALS
$17,897.00
178
S-019A
WTR-TENTATIVE TRACT MAP
APPLICATION
WATER
Water review of a tentative tract map to assure accuracy and compliance with City codes and standards.
None
$590 per application
100%
$0.00
$590.50
$(590.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,181)
$1,181
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
179
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-TENTATIVE TRACT MAP
S-019A
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.50 $246.56
2 $493
UTIL-WATER
PRINCIPAL CIVIL ENG
1.00 $343.71
2 $687
$1,181
$590.27
1.50 TYPE SUBTOTAL
$1,181
1.50 TOTALS
$590.50
180
S-019B
WW-TENTATIVE TRACT MAP
APPLICATION
WASTEWATER
Wastewater review of a tentative tract map to assure accuracy and compliance with City codes and standards.
None
$510 per application
100%
$0.00
$511.00
$(511.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,022)
$1,022
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
181
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-TENTATIVE TRACT MAP
S-019B
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.50 $213.37
2 $427
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
1.00 $297.44
2 $595
$1,022
$510.81
1.50 TYPE SUBTOTAL
$1,022
1.50 TOTALS
$511.00
182
S-020
FINAL PARCEL MAP - PLANNING
MAP
PLANNING
Planning review of a final parcel map (4 lots or less) for compliance with City codes and standards, as well as the Subdivision Map Act.
$460 per map
$1,045 per map
100%
$460.00
$1,047.25
$(587.25)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
43.92%
$(2,349)
$4,189
$1,840
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
183
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINAL PARCEL MAP - PLANNING
S-020
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
4 $1,286
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
4 $843
CD-PLANNING
PRINCIPAL PLANNER
0.50 $175.33
4 $701
CD-PLANNING
PROJECT PLANNER
1.50 $339.83
4 $1,359
$4,189
$1,047.31
3.00 TYPE SUBTOTAL
$4,189
3.00 TOTALS
$1,047.25
184
S-020A
WTR-FINAL PARCEL MAP
MAP
WATER
Water review of a final parcel map (4 lots or less) for compliance with City codes and standards, as well as the Subdivision Map Act.
None
$295 per map
100%
$0.00
$295.25
$(295.25)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,181)
$1,181
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
185
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-FINAL PARCEL MAP
S-020A
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
4 $493
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
4 $687
$1,181
$295.14
0.75 TYPE SUBTOTAL
$1,181
0.75 TOTALS
$295.25
186
S-020B
WW-FINAL PARCEL MAP
MAP
WASTEWATER
Wastewater review of a final parcel map (4 lots or less) for compliance with City codes and standards, as well as the Subdivision Map Act.
None
$255 per map
100%
$0.00
$255.50
$(255.50)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,022)
$1,022
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
187
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-FINAL PARCEL MAP
S-020B
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
4 $427
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
4 $595
$1,022
$255.41
0.75 TYPE SUBTOTAL
$1,022
0.75 TOTALS
$255.50
188
S-021
FINAL TRACT MAP - PLANNING
MAP
PLANNING
Planning review of a final map (5 or more lots) for compliance with City codes and standards, as well as the Subdivision Map Act.
$1,637 per map
$2,065 per map
100%
$1,637.00
$2,067.00
$(430.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.20%
$(860)
$4,134
$3,274
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
189
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINAL TRACT MAP - PLANNING
S-021
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
2 $643
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
2 $421
CD-PLANNING
PRINCIPAL PLANNER
0.50 $175.33
2 $351
CD-PLANNING
PROJECT PLANNER
6.00 $1,359.30
2 $2,719
$4,134
$2,066.78
7.50 TYPE SUBTOTAL
$4,134
7.50 TOTALS
$2,067.00
190
S-021A
WTR-FINAL TRACT MAP
MAP
WATER
Water review of a final map (5 or more lots) for compliance with City codes and standards, as well as the Subdivision Map Act.
None
$935 per map
100%
$0.00
$934.00
$(934.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,868)
$1,868
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
191
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-FINAL TRACT MAP
S-021A
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.50 $246.56
2 $493
UTIL-WATER
PRINCIPAL CIVIL ENG
2.00 $687.42
2 $1,375
$1,868
$933.98
2.50 TYPE SUBTOTAL
$1,868
2.50 TOTALS
$934.00
192
S-021B
WW-FINAL TRACT MAP
MAP
WASTEWATER
Wastewater review of a final map (5 or more lots) for compliance with City codes and standards, as well as the Subdivision Map Act.
None
$810 per map
100%
$0.00
$808.50
$(808.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,617)
$1,617
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
193
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-FINAL TRACT MAP
S-021B
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.50 $213.37
2 $427
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
2.00 $594.88
2 $1,190
$1,617
$808.25
2.50 TYPE SUBTOTAL
$1,617
2.50 TOTALS
$808.50
194
S-022
LOT LINE ADJUSTMENT - PLANNING
APPLICATION
PLANNING
Planning review of a lot line adjustment or subdivision creating two lots from one lot by the Planning Commission for compliance with City codes, guidelines and the Subdivision Map Act. $2,355 per application
$2,990 per application
100%
$2,355.00
$2,992.00
$(637.00)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
78.71%
$(1,911)
$8,976
$7,065
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
195
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LOT LINE ADJUSTMENT - PLANNING
S-022
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.50 $221.84
3 $666
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
3 $632
CD-PLANNING
PRINCIPAL PLANNER
1.00 $350.66
3 $1,052
CD-PLANNING
PROJECT PLANNER
9.75 $2,208.86
3 $6,627
$8,976
$2,992.06
12.75 TYPE SUBTOTAL
$8,976
12.75 TOTALS
$2,992.00
196
S-023
LOT MERGER - PLANNING
APPLICATION
PLANNING
Planning review of a property owner request to consolidate lots and/or lot fragments or merge small lots into larger lots for compliance with City codes, guidelines and the Subdivision Map Act. $1,999 per application
$2,540 per application
100%
$1,999.00
$2,539.00
$(540.00)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
78.73%
$(1,620)
$7,617
$5,997
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
197
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LOT MERGER - PLANNING
S-023
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.50 $221.84
3 $666
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
3 $632
CD-PLANNING
PRINCIPAL PLANNER
1.00 $350.66
3 $1,052
CD-PLANNING
PROJECT PLANNER
7.75 $1,755.76
3 $5,267
$7,617
$2,538.96
10.75 TYPE SUBTOTAL
$7,617
10.75 TOTALS
$2,539.00
198
S-024
PRE-APPLICATION - ADMINISTRATIVE
APPLICATION
PLANNING
Review of a request for a preliminary review of a proposed project by staff. $4,561 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
$6,295 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal
100%
$4,561.00
$6,294.54
$(1,733.54)
24 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.46%
$(41,605)
$151,069
$109,464
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
199
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PRE-APPLICATION - ADMINISTRATIVE
S-024
24 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
24 $1,775
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
24 $15,430
CD-PLANNING
PLANNING DIV MGR
1.50 $632.10
24 $15,170
CD-PLANNING
PRINCIPAL PLANNER
2.00 $701.32
24 $16,832
CD-PLANNING
PROJECT PLANNER
8.50 $1,925.68
24 $46,216
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
24 $8,338
PD-OPERATIONS
POLICE SERGEANT
2.50 $882.43
24 $21,178
PW-ENGINEERING
SR CIVIL ENGINEER
2.00 $627.24
24 $15,054
PW-ENGINEERING
PRINCIPAL CIVIL ENG
1.00 $461.52
24 $11,076
$151,069
$6,294.56
20.00 TYPE SUBTOTAL
$151,069
20.00 TOTALS
$6,294.54
200
S-024A
WTR-PRE-APPLICATION-ADMINISTRATIVE
APPLICATION
WATER
Water review of a request for a preliminary review of a proposed project by staff.
None
$295 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal
100%
$0.00
$295.13
$(295.13)
24 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(7,083)
$7,083
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
201
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-PRE-APPLICATION-ADMINISTRATIVE
S-024A
24 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
24 $2,959
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
24 $4,125
$7,083
$295.14
0.75 TYPE SUBTOTAL
$7,083
0.75 TOTALS
$295.13
202
S-024B
WW-PRE-APPLICATION-ADMINISTRATIVE
APPLICATION
WASTEWATER
Wastewater review of a request for a preliminary review of a proposed project by staff.
None
$255 per application
100% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal
100%
$0.00
$255.42
$(255.42)
24 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(6,130)
$6,130
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
203
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-PRE-APPLICATION-ADMINISTRATIVE
S-024B
24 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
24 $2,561
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
24 $3,569
$6,130
$255.41
0.75 TYPE SUBTOTAL
$6,130
0.75 TOTALS
$255.42
204
S-025
PRE-APPLICATION - PC STUDY SESSION
APPLICATION
PLANNING
Planning Commission Study Session to review a request for a preliminary review of a proposed project. $4,610 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
$9,055 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$4,610.00
$9,052.71
$(4,442.71)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
50.92%
$(31,099)
$63,369
$32,270
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
205
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PRE-APPLICATION - PC STUDY SESSION
S-025
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
7 $518
CD-PLANNING
COM DEV DIRECTOR
1.50 $964.35
7 $6,750
CD-PLANNING
PLANNING DIV MGR
1.67 $703.74
7 $4,926
CD-PLANNING
PRINCIPAL PLANNER
2.50 $876.65
7 $6,137
CD-PLANNING
PROJECT PLANNER
11.50 $2,605.33
7 $18,237
FIRE-OPERATIONS
FIRE MARSHAL
2.00 $694.84
7 $4,864
PD-OPERATIONS
POLICE SERGEANT
2.50 $882.43
7 $6,177
PW-ENGINEERING
SR CIVIL ENGINEER
3.50 $1,097.67
7 $7,684
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.50 $1,153.80
7 $8,077
$63,369
$9,052.76
28.17 TYPE SUBTOTAL
$63,369
28.17 TOTALS
$9,052.71
206
S-025A
WTR-PRE-APPLICATION-PC STUDY SESS.
APPLICATION
WATER
Water review of a Planning Commission Study Session to review a request for a preliminary review of a proposed project.
None
$295 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$0.00
$295.14
$(295.14)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,066)
$2,066
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
207
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-PRE-APPLICATION-PC STUDY SESS.
S-025A
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
7 $863
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
7 $1,203
$2,066
$295.14
0.75 TYPE SUBTOTAL
$2,066
0.75 TOTALS
$295.14
208
S-025B
WW-PRE-APPLICATION-PC STUDY SESS.
APPLICATION
WASTEWATER
Wastewater review of a Planning Commission Study Session to review a request for a preliminary review of a proposed project.
None
$255 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$0.00
$255.43
$(255.43)
7 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,788)
$1,788
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
209
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-PRE-APPLICATION-PC STUDY SESS.
S-025B
7 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
7 $747
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
7 $1,041
$1,788
$255.41
0.75 TYPE SUBTOTAL
$1,788
0.75 TOTALS
$255.43
210
S-026
CONCEPTUAL REVIEW (CITY COUNCIL)
APPLICATION
PLANNING
Conceptual review of a proposed development project by the City Council at the request of the applicant. $8,853 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
$10,625 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$8,853.00
$10,625.00
$(1,772.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
83.32%
$(1,772)
$10,625
$8,853
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
211
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONCEPTUAL REVIEW (CITY COUNCIL)
S-026
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
1 $74
CD-PLANNING
COM DEV DIRECTOR
2.50 $1,607.25
1 $1,607
CD-PLANNING
PLANNING DIV MGR
2.67 $1,125.14
1 $1,125
CD-PLANNING
PRINCIPAL PLANNER
4.00 $1,402.64
1 $1,403
CD-PLANNING
PROJECT PLANNER
14.50 $3,284.98
1 $3,285
FIRE-OPERATIONS
FIRE MARSHAL
2.00 $694.84
1 $695
PD-OPERATIONS
POLICE SERGEANT
2.51 $885.95
1 $886
PW-ENGINEERING
SR CIVIL ENGINEER
2.00 $627.24
1 $627
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
1 $923
$10,625
$10,625.03
32.68 TYPE SUBTOTAL
$10,625
32.68 TOTALS
$10,625.00
212
S-026A
WTR-CONCEPTUAL REVIEW
APPLICATION
WATER
Water review of a Conceptual review of a proposed development project by the City Council at the request of the applicant.
None
$295 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$0.00
$295.00
$(295.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(295)
$295
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
213
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-CONCEPTUAL REVIEW
S-026A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
1 $123
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
1 $172
$295
$295.14
0.75 TYPE SUBTOTAL
$295
0.75 TOTALS
$295.00
214
S-026B
WW-CONCEPTUAL REVIEW
APPLICATION
WASTEWATER
Wastewater review of a Conceptual review of a proposed development project by the City Council at the request of the applicant.
None
$255 per application
70% of the fee will be credited towards application fees for the same project if filed within six months of pre-application submittal.
100%
$0.00
$255.00
$(255.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(255)
$255
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
215
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-CONCEPTUAL REVIEW
S-026B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
1 $107
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
1 $149
$255
$255.41
0.75 TYPE SUBTOTAL
$255
0.75 TOTALS
$255.00
216
S-027
ADMIN INTERPRETATION/SUBST. CONFORM
APPLICATION
PLANNING
Review of a request for an interpretation of the Zoning Code at the request of the applicant. $2,257 per application
$3,110 per application
100%
$2,257.00
$3,112.00
$(855.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.53%
$(855)
$3,112
$2,257
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
217
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADMIN INTERPRETATION/SUBST. CONFORM
S-027
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
1 $74
CD-PLANNING
COM DEV DIRECTOR
1.50 $964.35
1 $964
CD-PLANNING
PLANNING DIV MGR
1.67 $703.74
1 $704
CD-PLANNING
PRINCIPAL PLANNER
1.00 $350.66
1 $351
CD-PLANNING
PROJECT PLANNER
4.50 $1,019.48
1 $1,019
$3,112
$3,112.18
9.17 TYPE SUBTOTAL
$3,112
9.17 TOTALS
$3,112.00
218
S-028
SIGN PROGRAM
APPLICATION
PLANNING
Review of a proposed sign program with multiple signs for compliance with City codes and standards. $1,942 per application
$2,410 per application
100%
$1,942.00
$2,411.00
$(469.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
80.55%
$(469)
$2,411
$1,942
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
219
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SIGN PROGRAM
S-028
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
1 $74
CD-PLANNING
PLANNING DIV MGR
0.17 $71.64
1 $72
CD-PLANNING
PROJECT PLANNER
10.00 $2,265.50
1 $2,266
$2,411
$2,411.09
10.67 TYPE SUBTOTAL
$2,411
10.67 TOTALS
$2,411.00
220
S-029
PLANNING SIGN PERMIT
SIGN
PLANNING
Planning staff review of a sign or banner to assure compliance with City codes and standards. $88 per application
$115 per application
100%
$88.00
$113.29
$(25.29)
77 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
77.68%
$(1,947)
$8,723
$6,776
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
221
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PLANNING SIGN PERMIT
S-029
77 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.50 $113.28
77 $8,723
$8,723
$113.28
0.50 TYPE SUBTOTAL
$8,723
0.50 TOTALS
$113.29
222
S-030
LANDSCAPE PLAN (0-5,000 SQ FT)
PLAN
PLANNING
Review of a stand-alone landscape plan, 5,000 square feet or under, for compliance with City codes and standards, and inspection of the construction.
$899 per plan
$1,070 per plan
100%
$899.00
$1,069.00
$(170.00)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
84.10%
$(510)
$3,207
$2,697
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
223
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LANDSCAPE PLAN (0-5,000 SQ FT)
S-030
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
3 $444
CD-PLANNING
PLANNING DIV MGR
0.17 $71.64
3 $215
CD-PLANNING
PROJECT PLANNER
3.75 $849.56
3 $2,549
$3,207
$1,069.09
4.92 TYPE SUBTOTAL
$3,207
4.92 TOTALS
$1,069.00
224
S-031
LANDSCAPE PLAN (5,000+ SQ FT)
PLAN
PLANNING
Review of a stand-alone landscape plan, over 5,000 square feet, for compliance with City codes and standards, and inspection of the construction.
$1,436 per plan
$1,750 per plan
100%
$1,436.00
$1,748.73
$(312.73)
37 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
82.12%
$(11,571)
$64,703
$53,132
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
225
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LANDSCAPE PLAN (5,000+ SQ FT)
S-031
37 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
37 $5,472
CD-PLANNING
PLANNING DIV MGR
0.17 $71.64
37 $2,651
CD-PLANNING
PROJECT PLANNER
6.75 $1,529.21
37 $56,581
$64,703
$1,748.74
7.92 TYPE SUBTOTAL
$64,703
7.92 TOTALS
$1,748.73
226
S-032
AMENDMENT - SIGN PROGRAM
APPLICATION
PLANNING
Review of an amendment to an approved sign program.
$1,131 per application
$1,390 per application
100%
$1,131.00
$1,392.00
$(261.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.25%
$(261)
$1,392
$1,131
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
227
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
AMENDMENT - SIGN PROGRAM
S-032
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
1 $74
CD-PLANNING
PLANNING DIV MGR
0.17 $71.64
1 $72
CD-PLANNING
PROJECT PLANNER
5.50 $1,246.03
1 $1,246
$1,392
$1,391.62
6.17 TYPE SUBTOTAL
$1,392
6.17 TOTALS
$1,392.00
228
S-033
AMENDMENT - TO PC/COUNCIL
APPLICATION
PLANNING
Review by Planning Commission or City Council of a proposed amendment to an already approved project. 80% of original application fee.
80% of original application fee
100%
$15,000.00
$19,674.60
$(4,674.60)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
76.24%
$(23,373)
$98,373
$75,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
229
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
AMENDMENT - TO PC/COUNCIL
S-033
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
5 $1,664
CD-PLANNING
COM DEV DIRECTOR
2.00 $1,285.80
5 $6,429
CD-PLANNING
PLANNING DIV MGR
3.67 $1,546.54
5 $7,733
CD-PLANNING
PRINCIPAL PLANNER
7.00 $2,454.62
5 $12,273
CD-PLANNING
PROJECT PLANNER
40.50 $9,175.28
5 $45,876
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
5 $1,737
PD-OPERATIONS
POLICE SERGEANT
0.50 $177.19
5 $886
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
5 $12,545
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
5 $9,230
$98,373
$19,674.64
68.92 TYPE SUBTOTAL
$98,373
68.92 TOTALS
$19,674.60
230
S-033A
WTR-AMENDMENT - TO PC/COUNCIL
APPLICATION
WATER
Water review of a review by Planning Commission or City Council of a proposed amendment to an already approved project.
None
80% of original application fee
100%
$0.00
$295.20
$(295.20)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,476)
$1,476
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
231
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-AMENDMENT - TO PC/COUNCIL
S-033A
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
5 $616
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
5 $859
$1,476
$295.14
0.75 TYPE SUBTOTAL
$1,476
0.75 TOTALS
$295.20
232
S-033B
WW-AMENDMENT - TO PC/COUNCIL
APPLICATION
WASTEWATER
Wastewater review of a review by Planning Commission or City Council of a proposed amendment to an already approved project.
None
80% of original application fee
100%
$0.00
$255.40
$(255.40)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,277)
$1,277
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
233
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-AMENDMENT - TO PC/COUNCIL
S-033B
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
5 $533
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
5 $744
$1,277
$255.41
0.75 TYPE SUBTOTAL
$1,277
0.75 TOTALS
$255.40
234
S-034
AMENDMENT - ADMIN
APPLICATION
PLANNING
Review by city staff of a proposed amendment to an already approved project. 80% of original application fee
80% of original application fee
100%
$3,000.00
$4,571.00
$(1,571.00)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
65.63%
$(15,710)
$45,710
$30,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
235
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
AMENDMENT - ADMIN
S-034
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
10 $1,479
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
10 $3,215
CD-PLANNING
PLANNING DIV MGR
1.00 $421.40
10 $4,214
CD-PLANNING
PRINCIPAL PLANNER
1.00 $350.66
10 $3,507
CD-PLANNING
PROJECT PLANNER
11.00 $2,492.05
10 $24,921
FIRE-OPERATIONS
FIRE MARSHAL
1.00 $347.42
10 $3,474
PD-OPERATIONS
POLICE SERGEANT
0.50 $176.49
10 $1,765
PW-ENGINEERING
SR CIVIL ENGINEER
1.00 $313.62
10 $3,136
$45,710
$4,570.98
17.00 TYPE SUBTOTAL
$45,710
17.00 TOTALS
$4,571.00
236
S-034A
WTR-AMENDMENT - ADMIN
APPLICATION
WATER
Review by Water staff of a proposed amendment to an already approved project.
None
80% of original application fee
100%
$0.00
$85.90
$(85.90)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(859)
$859
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
237
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-AMENDMENT - ADMIN
S-034A
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
PRINCIPAL CIVIL ENG
0.25 $85.93
10 $859
$859
$85.93
0.25 TYPE SUBTOTAL
$859
0.25 TOTALS
$85.90
238
S-034B
WW-AMENDMENT - ADMIN
APPLICATION
WASTEWATER
Review by Wastewater staff of a proposed amendment to an already approved project.
None
80% of original application fee
100%
$0.00
$74.40
$(74.40)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(744)
$744
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
239
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-AMENDMENT - ADMIN
S-034B
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.25 $74.36
10 $744
$744
$74.36
0.25 TYPE SUBTOTAL
$744
0.25 TOTALS
$74.40
240
S-035
TEMP ACTIVITY PMT-OVER THE COUNTER
APPLICATION
PLANNING
Review by Planning counter staff for BBQ, garage sale, flower sales and temporary signs. $46 per application
$55 per application
100%
$46.00
$56.64
$(10.64)
97 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.22%
$(1,032)
$5,494
$4,462
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
241
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMP ACTIVITY PMT-OVER THE COUNTER
S-035
97 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.25 $56.64
97 $5,494
$5,494
$56.64
0.25 TYPE SUBTOTAL
$5,494
0.25 TOTALS
$56.64
242
S-036
TEMP ACTIVITY PERMIT - MINOR
APPLICATION
PLANNING
Review by Planning counter staff for holiday sales and model home sales office. $181 per application
$225 per application
100%
$181.00
$226.56
$(45.56)
32 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.89%
$(1,458)
$7,250
$5,792
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
243
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMP ACTIVITY PERMIT - MINOR
S-036
32 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
1.00 $226.55
32 $7,250
$7,250
$226.55
1.00 TYPE SUBTOTAL
$7,250
1.00 TOTALS
$226.56
244
S-037
TEMP ACTIVITY PERMIT - MAJOR
APPLICATION
PLANNING
Review by Planning counter staff for carnivals, construction trailers, temporary storage, and off-site auto sales. $723 per application
$1,115 per application
100%
$723.00
$1,116.92
$(393.92)
12 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
64.73%
$(4,727)
$13,403
$8,676
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
245
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMP ACTIVITY PERMIT - MAJOR
S-037
12 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
12 $2,528
CD-PLANNING
PROJECT PLANNER
4.00 $906.20
12 $10,874
$13,403
$1,116.90
4.50 TYPE SUBTOTAL
$13,403
4.50 TOTALS
$1,116.92
246
S-038
BUS LIC ZONING REVIEW - STANDARD
BUSINESS
PLANNING
Planning review of business license application for compliance with zoning codes. $46 per business
$55 per business
100%
$46.00
$56.64
$(10.64)
456
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.21%
$(4,852)
$25,828
$20,976
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
247
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUS LIC ZONING REVIEW - STANDARD
S-038
456
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.25 $56.64
456
$25,828
$25,828
$56.64
0.25 TYPE SUBTOTAL
$25,828
0.25 TOTALS
$56.64
248
S-039
BUS LIC ZONING REVIEW - SUPPLEMENTL
BUSINESS
PLANNING
Planning review of home occupation or catering truck business license application. $88 per business
$115 per business
100%
$88.00
$113.28
$(25.28)
200
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
77.68%
$(5,056)
$22,656
$17,600
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
249
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUS LIC ZONING REVIEW - SUPPLEMENTL
S-039
200
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.50 $113.28
200
$22,656
$22,656
$113.28
0.50 TYPE SUBTOTAL
$22,656
0.50 TOTALS
$113.28
250
S-040
PUBLIC CONVENIENCE & NECESS FINDING
APPLICATION
PLANNING
Review of a request for an alcohol-related business for public convenience and necessity. $5,640 per application plus Legal Ad Noticing fee
$6,945 per application plus Legal Ad Noticing fee
100%
$5,640.00
$6,947.00
$(1,307.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.19%
$(2,614)
$13,894
$11,280
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
251
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC CONVENIENCE & NECESS FINDING
S-040
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
2 $148
CD-PLANNING
COM DEV DIRECTOR
2.75 $1,767.98
2 $3,536
CD-PLANNING
PLANNING DIV MGR
0.92 $387.69
2 $775
CD-PLANNING
PRINCIPAL PLANNER
1.50 $525.99
2 $1,052
CD-PLANNING
PROJECT PLANNER
18.50 $4,191.18
2 $8,382
$13,894
$6,946.79
24.17 TYPE SUBTOTAL
$13,894
24.17 TOTALS
$6,947.00
252
S-041
APPEAL TO PLANNING COMMISSION
APPEAL
PLANNING
Processing and review of an appeal of a staff decision to the Planning Commission. $7,061 per appeal plus Legal Ad Noticing fee
$8,635 per appeal plus Legal Ad Noticing fee
100%
$7,061.00
$8,634.00
$(1,573.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.78%
$(1,573)
$8,634
$7,061
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
253
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
APPEAL TO PLANNING COMMISSION
S-041
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.75 $258.81
1 $259
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
1 $643
CD-PLANNING
PLANNING DIV MGR
4.00 $1,685.60
1 $1,686
CD-PLANNING
PRINCIPAL PLANNER
4.00 $1,402.64
1 $1,403
CD-PLANNING
PROJECT PLANNER
20.50 $4,644.28
1 $4,644
$8,634
$8,634.23
31.25 TYPE SUBTOTAL
$8,634
31.25 TOTALS
$8,634.00
254
S-042
APPEAL TO CITY COUNCIL
APPEAL
PLANNING
Review of a request for a preliminary review of a proposed project by City Council. $14,276 per appeal plus Legal Ad Noticing fee
$17,380 per appeal plus Legal Ad Noticing fee
100%
$14,276.00
$17,382.00
$(3,106.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
82.13%
$(3,106)
$17,382
$14,276
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
255
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
APPEAL TO CITY COUNCIL
S-042
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.75 $258.81
1 $259
CD-PLANNING
COM DEV DIRECTOR
7.00 $4,500.30
1 $4,500
CD-PLANNING
PLANNING DIV MGR
9.00 $3,792.60
1 $3,793
CD-PLANNING
PRINCIPAL PLANNER
10.00 $3,506.60
1 $3,507
CD-PLANNING
PROJECT PLANNER
23.50 $5,323.93
1 $5,324
$17,382
$17,382.24
51.25 TYPE SUBTOTAL
$17,382
51.25 TOTALS
$17,382.00
256
S-043
TIME EXT/RECONSID - ADMIN
REQUEST
PLANNING
Review of a request for a time extension for a planning project approved by staff. $2,696 per application
$3,835 per application
100%
$2,696.00
$3,836.50
$(1,140.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
70.27%
$(2,281)
$7,673
$5,392
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
257
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TIME EXT/RECONSID - ADMIN
S-043
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
2 $296
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
2 $643
CD-PLANNING
PLANNING DIV MGR
0.50 $210.70
2 $421
CD-PLANNING
PRINCIPAL PLANNER
1.00 $350.66
2 $701
CD-PLANNING
PROJECT PLANNER
11.00 $2,492.05
2 $4,984
PW-ENGINEERING
SR CIVIL ENGINEER
1.00 $313.62
2 $627
$7,673
$3,836.37
15.00 TYPE SUBTOTAL
$7,673
15.00 TOTALS
$3,836.50
258
S-043A
WTR-TIME EXT/RECONSID - ADMIN
APPLICATION
WATER
Water review of a request for a time extension for a planning project approved by staff.
None
$170 per application
100%
$0.00
$172.00
$(172.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(344)
$344
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
259
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-TIME EXT/RECONSID - ADMIN
S-043A
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
PRINCIPAL CIVIL ENG
0.50 $171.86
2 $344
$344
$171.86
0.50 TYPE SUBTOTAL
$344
0.50 TOTALS
$172.00
260
S-043B
WW-TIME EXT/RECONSID - ADMIN
APPLICATION
WASTEWATER
Wastewater review of a request for a time extension for a planning project approved by staff.
None
$150 per application
100%
$0.00
$148.50
$(148.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(297)
$297
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
261
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-TIME EXT/RECONSID - ADMIN
S-043B
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
0.50 $148.72
2 $297
$297
$148.72
0.50 TYPE SUBTOTAL
$297
0.50 TOTALS
$148.50
262
S-044
TIME EXT/RECONSID - PC/COUNCIL
REQUEST
PLANNING
Review of a request for a time extension for a planning project approved by the Planning Commission or City Council.
$9,328 per request
$12,245 per request
100%
$9,328.00
$12,244.67
$(2,916.67)
18 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
76.18%
$(52,500)
$220,404
$167,904
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
263
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TIME EXT/RECONSID - PC/COUNCIL
S-044
18 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
2.25 $332.75
18 $5,990
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
18 $11,572
CD-PLANNING
PLANNING DIV MGR
2.42 $1,019.79
18 $18,356
CD-PLANNING
PRINCIPAL PLANNER
5.50 $1,928.63
18 $34,715
CD-PLANNING
PROJECT PLANNER
28.50 $6,456.68
18 $116,220
PW-ENGINEERING
SR CIVIL ENGINEER
3.00 $940.86
18 $16,935
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
18 $16,615
$220,404
$12,244.65
44.67 TYPE SUBTOTAL
$220,404
44.67 TOTALS
$12,244.67
264
S-044A
WTR-TIME EXT/RECONSID - PC/COUNCIL
APPLICATION
WATER
Water review of a request for a time extension for a planning project approved by the Planning Commission or City Council.
None
$125 per application
100%
$0.00
$123.28
$(123.28)
18 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(2,219)
$2,219
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
265
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-TIME EXT/RECONSID - PC/COUNCIL
S-044A
18 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
0.25 $123.28
18 $2,219
$2,219
$123.28
0.25 TYPE SUBTOTAL
$2,219
0.25 TOTALS
$123.28
266
S-044B
WW-TIME EXT/RECONSID - PC/COUNCIL
APPLICATION
WASTEWATER
Wastewater review of a request for a time extension for a planning project approved by the Planning Commission or City Council.
None
$105 per application
100%
$0.00
$106.67
$(106.67)
18 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,920)
$1,920
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
267
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-TIME EXT/RECONSID - PC/COUNCIL
S-044B
18 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
DIRECTOR OF UTILITIES
0.25 $106.69
18 $1,920
$1,920
$106.69
0.25 TYPE SUBTOTAL
$1,920
0.25 TOTALS
$106.67
268
S-045
CONTINUANCE REQUESTED BY APPLICANT
REQUEST
PLANNING
Request by an applicant to continue a hearing to a date uncertain. $382 per request plus any additional noticing costs
$410 per request plus any additional noticing costs
100%
$382.00
$411.50
$(29.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
92.83%
$(59)
$823
$764
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
269
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONTINUANCE REQUESTED BY APPLICANT
S-045
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.25 $184.86
2 $370
CD-PLANNING
PROJECT PLANNER
1.00 $226.55
2 $453
$823
$411.41
2.25 TYPE SUBTOTAL
$823
2.25 TOTALS
$411.50
270
S-046
GENERAL PLAN MAINTENANCE
N/A
PLANNING
Maintenance and update of the City General Plan
5% of Building Permit fees
5% of Building Permit fees
100%
$165,000.00
$176,050.00
$(11,050.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
93.72%
$(11,050)
$176,050
$165,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
271
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
GENERAL PLAN MAINTENANCE
S-046
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
$1.76 Mil Over 10 Yr
0.00 $176,050.00
1 $176,050
$176,050
$176,050.00
0.00 TYPE SUBTOTAL
$176,050
0.00 TOTALS
$176,050.00
272
S-046A
ANNEXATION
APPLICATION
PLANNING
Review of a proposed annexation into the City for compliance with LAFCo and City codes and standards. $24,900 per application plus Legal Ad Noticing fee
$34,365 per application plus Legal Ad Noticing fee
OR
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus outside contract costs.
100%
$24,900.00
$34,363.00
$(9,463.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.46%
$(9,463)
$34,363
$24,900
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
273
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ANNEXATION
S-046A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY MANAGER
ASST CITY MANAGER
2.00 $738.72
1 $739
CD-PLANNING
ADMIN ASSISTANT
1.00 $147.89
1 $148
CD-PLANNING
COM DEV DIRECTOR
6.00 $3,857.40
1 $3,857
CD-PLANNING
PLANNING DIV MGR
11.00 $4,635.40
1 $4,635
CD-PLANNING
PRINCIPAL PLANNER
14.00 $4,909.24
1 $4,909
CD-PLANNING
PROJECT PLANNER
77.00 $17,444.35
1 $17,444
FIRE-OPERATIONS
FIRE MARSHAL
3.00 $1,042.26
1 $1,042
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
1 $602
UTIL-WATER
DIRECTOR OF UTILITIES
2.00 $986.24
1 $986
$34,363
$34,363.22
118.00
TYPE SUBTOTAL
$34,363
118.00
TOTALS
$34,363.00
274
S-046C
AMEND GENERAL PLAN AND/OR ZONING
APPLICATION
PLANNING
Review of a proposed General Plan amendment and/or Zoning change for compliance with City codes and standards.
$18,331 per application plus Legal Ad Noticing fee
$22,615 per application plus Legal Ad Noticing fee
100%
$18,331.00
$22,616.00
$(4,285.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.05%
$(4,285)
$22,616
$18,331
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
275
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
AMEND GENERAL PLAN AND/OR ZONING
S-046C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
3.00 $1,928.70
1 $1,929
CD-PLANNING
PLANNING DIV MGR
9.00 $3,792.60
1 $3,793
CD-PLANNING
PRINCIPAL PLANNER
12.00 $4,207.92
1 $4,208
CD-PLANNING
PROJECT PLANNER
56.00 $12,686.80
1 $12,687
$22,616
$22,616.02
80.00 TYPE SUBTOTAL
$22,616
80.00 TOTALS
$22,616.00
276
S-046E.1
SPECIFIC PLAN AMENDMENT [MAJOR]
APPLICATION
PLANNING
Review of a proposed major amendment to an existing Specific Plan for compliance with City codes and standards.
$16,936 per application
$24,585 per application plus Legal Ad Noticing fee
100%
$16,936.00
$24,585.00
$(7,649.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
68.89%
$(7,649)
$24,585
$16,936
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
277
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIFIC PLAN AMENDMENT [MAJOR]
S-046E.1
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
3.00 $1,928.70
1 $1,929
CD-PLANNING
PLANNING DIV MGR
6.00 $2,528.40
1 $2,528
CD-PLANNING
PRINCIPAL PLANNER
7.00 $2,454.62
1 $2,455
CD-PLANNING
PROJECT PLANNER
71.00 $16,085.05
1 $16,085
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
1 $602
UTIL-WATER
DIRECTOR OF UTILITIES
2.00 $986.24
1 $986
$24,585
$24,584.73
91.00 TYPE SUBTOTAL
$24,585
91.00 TOTALS
$24,585.00
278
S-046E.2
SPECIFIC PLAN AMENDMENT [MINOR]
APPLICATION
PLANNING
Review of a proposed minor amendment to an existing Specific Plan for compliance with City codes and standards.
$10,754 per application plus Legal Ad Noticing fee
$14,335 per application plus Legal Ad Noticing fee
100%
$10,754.00
$14,335.00
$(3,581.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
75.02%
$(3,581)
$14,335
$10,754
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
279
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIFIC PLAN AMENDMENT [MINOR]
S-046E.2
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
COM DEV DIRECTOR
1.00 $642.90
1 $643
CD-PLANNING
PLANNING DIV MGR
5.00 $2,107.00
1 $2,107
CD-PLANNING
PRINCIPAL PLANNER
8.00 $2,805.28
1 $2,805
CD-PLANNING
PROJECT PLANNER
37.00 $8,382.35
1 $8,382
PW-ADMIN
DIR OF PW-CITY ENGR
0.50 $150.43
1 $150
UTIL-WATER
DIRECTOR OF UTILITIES
0.50 $246.56
1 $247
$14,335
$14,334.52
52.00 TYPE SUBTOTAL
$14,335
52.00 TOTALS
$14,335.00
280
S-046F
DEVELOPMENT AGREEMENT
APPLICATION
PLANNING
Review of a proposed development and provide recommendations for acceptability as to form, content, and compatibility with the General Plan and City code.
$3,977 per application
$15,890 per application
OR
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus outside contract costs.
100%
$3,977.00
$15,892.00
$(11,915.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
25.03%
$(11,915)
$15,892
$3,977
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
281
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DEVELOPMENT AGREEMENT
S-046F
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
ASST CITY ATTORNEY
5.00 $2,309.00
1 $2,309
CD-PLANNING
COM DEV DIRECTOR
5.00 $3,214.50
1 $3,215
CD-PLANNING
PLANNING DIV MGR
5.00 $2,107.00
1 $2,107
CD-PLANNING
PRINCIPAL PLANNER
7.50 $2,629.95
1 $2,630
CD-PLANNING
PROJECT PLANNER
15.00 $3,398.25
1 $3,398
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
1 $602
PW-ENGINEERING
PRINCIPAL CIVIL ENG
3.00 $1,384.56
1 $1,385
UTIL-WATER
DIRECTOR OF UTILITIES
0.50 $246.56
1 $247
$15,892
$15,891.54
43.00 TYPE SUBTOTAL
$15,892
43.00 TOTALS
$15,892.00
282
S-046G
CERTIFICATION OF COMPLIANCE - PLAN
APPLICATION
PLANNING
Review and process a conditional certificate of compliance to establish a record officially recognizing that a parcel was legally created and compliant.
$362 per application
$455 per application
100%
$362.00
$453.00
$(91.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.91%
$(91)
$453
$362
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
283
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CERTIFICATION OF COMPLIANCE - PLAN
S-046G
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
2.00 $453.10
1 $453
$453
$453.10
2.00 TYPE SUBTOTAL
$453
2.00 TOTALS
$453.00
284
S-046H
ZONING VERIFICATION
LETTER
PLANNING
Preparation of a letter detailing the zoning and development history of a particular parcel on request. $362 per letter
$455 per letter
100%
$362.00
$453.10
$(91.10)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.89%
$(911)
$4,531
$3,620
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
285
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ZONING VERIFICATION
S-046H
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
2.00 $453.10
10 $4,531
$4,531
$453.10
2.00 TYPE SUBTOTAL
$4,531
2.00 TOTALS
$453.10
286
S-046I
DOCUMENT COPY - COLOR 11X17
PAGE
PLANNING
Providing an 11x17" color copy of a document on request. $2 per page
$2 per page
100%
$2.00
$2.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
100.00%
$0
$2
$2
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
287
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DOCUMENT COPY - COLOR 11X17
S-046I
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
Per Page
0.00 $2.00
1 $2
$2
$2.00
0.00 TYPE SUBTOTAL
$2
0.00 TOTALS
$2.00
288
S-046J
EXTRA PLANNING PLAN CHECK
PLAN
PLANNING
Additional review of a project, after the standard number of plan reviews needed, due to the actions of the applicant.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum. 100%
$180.00
$227.00
$(47.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.30%
$(47)
$227
$180
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
289
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EXTRA PLANNING PLAN CHECK
S-046J
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
1.00 $226.55
1 $227
$227
$226.55
1.00 TYPE SUBTOTAL
$227
1.00 TOTALS
$227.00
290
S-046K
EXTRA PLANNING INSPECTION
INSPECTION
PLANNING
Additional inspection of a project, after the standard number inspections needed, due to the actions of the applicant.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum.
Charge the fully allocated hourly rates for all personnel involved, with a 1 hour minimum. 100%
$180.00
$227.00
$(47.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
79.30%
$(47)
$227
$180
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
291
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EXTRA PLANNING INSPECTION
S-046K
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
1.00 $226.55
1 $227
$227
$226.55
1.00 TYPE SUBTOTAL
$227
1.00 TOTALS
$227.00
292
S-046L
EXTRA DEVELOPMENT REVIEW MEETING
MEETING
PLANNING
Extra meetings with development staff at the request of the applicant after the standard number of meetings.
None
$6,205 per meeting
100%
$0.00
$6,204.00
$(6,204.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(6,204)
$6,204
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
293
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EXTRA DEVELOPMENT REVIEW MEETING
S-046L
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
0.50 $73.95
1 $74
CD-PLANNING
COM DEV DIRECTOR
2.00 $1,285.80
1 $1,286
CD-PLANNING
PLANNING DIV MGR
2.00 $842.80
1 $843
CD-PLANNING
PRINCIPAL PLANNER
2.00 $701.32
1 $701
CD-PLANNING
PROJECT PLANNER
2.00 $453.10
1 $453
FIRE-OPERATIONS
FIRE MARSHAL
2.00 $694.84
1 $695
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
1 $602
PW-ENGINEERING
SR CIVIL ENGINEER
2.00 $627.24
1 $627
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
1 $923
$6,204
$6,203.81
16.50 TYPE SUBTOTAL
$6,204
16.50 TOTALS
$6,204.00
294
S-046M
WTR-EXTRA DEVELOPMENT REV. MEETING
MEETING
WATER
Extra meetings with Water staff at the request of the applicant after the standard number of meetings.
None
$1,675 per meeting
100%
$0.00
$1,674.00
$(1,674.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,674)
$1,674
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
295
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-EXTRA DEVELOPMENT REV. MEETING
S-046M
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
2.00 $986.24
1 $986
UTIL-WATER
PRINCIPAL CIVIL ENG
2.00 $687.42
1 $687
$1,674
$1,673.66
4.00 TYPE SUBTOTAL
$1,674
4.00 TOTALS
$1,674.00
296
S-046N
FILM PERMIT
PERMIT
PLANNING
Processing and review of a request to film within the City.
None
$220 per permit
100%
$0.00
$222.00
$(222.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(222)
$222
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
297
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FILM PERMIT
S-046N
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
ADMIN ASSISTANT
1.50 $221.84
1 $222
$222
$221.84
1.50 TYPE SUBTOTAL
$222
1.50 TOTALS
$222.00
298
S-047
BUILDING PLAN CHECK/INSPECTION
PERMIT
BUILDING
Plan check and inspection of new building and remodels to assure compliance with City codes and standards.
Various fees based on construction type, square footage, or type of permit, including ADU Permit at $7 per square foot.
No changes are recommended.
100%
$4,401,839.00
$4,100,732.00
$301,107.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
107.34%
$301,107
$4,100,732
$4,401,839
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
299
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUILDING PLAN CHECK/INSPECTION
S-047
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PRINCIPAL PLANNER
.2 Fte
317.00
$111,159.22
1 $111,159
CD-PLANNING
PROJECT PLANNER
.3 Fte
493.20
$111,734.46
1 $111,734
CD-PLANNING
TEMPORARY PLANNER-P/T
50%
960.00
$107,040.00
1 $107,040
CD-BLDG & SAFETY
BLDG DIV MANAGER
Remainder Of Time
1,181.49
$455,558.91
1 $455,559
CD-BLDG & SAFETY
BLDG INSPECTOR I
75% Of 2
2,465.50
$453,997.17
1 $453,997
CD-BLDG & SAFETY
BLDG INSPECTOR II
75% Of 2
2,458.00
$465,840.16
1 $465,840
CD-BLDG & SAFETY
BLDG PERMIT TECH I
Remainder Of Time
778.92
$109,905.61
1 $109,906
CD-BLDG & SAFETY
BLDG PERMIT TECH II
Remainder Of 2
3,284.00
$550,431.24
1 $550,431
CD-BLDG & SAFETY
CHIEF BLDG INSPECTOR
60%
985.90
$186,197.07
1 $186,197
CD-BLDG & SAFETY
PLANS EXAMINER
70% Of 2
2,301.60
$505,730.57
1 $505,731
CD-BLDG & SAFETY
SR BLDG PERMIT TECH
50%
747.00
$136,738.35
1 $136,738
CD-BLDG & SAFETY
SR PLANS EXAMINER
50%
821.75
$206,398.95
1 $206,399
CD-BLDG & SAFETY
Plan Check Reimburse
0.00 $700,000.00
1 $700,000
$4,100,732
$4,100,731.71
16,794.36
TYPE SUBTOTAL
$4,100,732
16,794.36
TOTALS
$4,100,732.00
300
S-047A
EXPRESS BUILDING PLAN CHECK
PERMIT
BUILDING
Express processing of building plans, by increasing staff resources and/or utilizing outside consultants.
Additional 100% over standard building plan check fees
Additional 100% over standard building plan check fees
100%
$97,994.00
$98,000.00
$(6.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
99.99%
$(6)
$98,000
$97,994
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
301
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EXPRESS BUILDING PLAN CHECK
S-047A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
Reimb Expedite Plans
0.00 $98,000.00
1 $98,000
$98,000
$98,000.00
0.00 TYPE SUBTOTAL
$98,000
0.00 TOTALS
$98,000.00
302
S-047C
TEMPORARY CERTIFICATE OF OCCUPANCY
PERMIT
BUILDING
Review of a request for a temporary certificate of occupancy at the request of the applicant before the property is ready for final occupancy.
$66 per permit
$3,185 per permit
Extension - $1,000 deposit with charges at the fully allocated hourly rates for all personnel involved. 100%
$66.00
$3,184.00
$(3,118.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
2.07%
$(3,118)
$3,184
$66
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
303
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMPORARY CERTIFICATE OF OCCUPANCY
S-047C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG DIV MANAGER
4.00 $1,542.32
1 $1,542
CD-BLDG & SAFETY
BLDG INSPECTOR II
8.00 $1,516.16
1 $1,516
CD-BLDG & SAFETY
BLDG PERMIT TECH II
0.75 $125.71
1 $126
$3,184
$3,184.19
12.75 TYPE SUBTOTAL
CD-BLDG & SAFETY
BLDG PERMIT TECH II
Extension - Hourly
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$3,184
12.75 TOTALS
$3,184.00
304
S-047D
SPECIAL INSPECTOR REGISTRATION
COMPANY
BUILDING
Review and registration of special inspectors to be used for a particular development.
None
$555 per company
100%
$0.00
$553.00
$(553.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(553)
$553
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
305
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIAL INSPECTOR REGISTRATION
S-047D
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG DIV MANAGER
1.00 $385.58
1 $386
CD-BLDG & SAFETY
BLDG PERMIT TECH II
1.00 $167.61
1 $168
$553
$553.19
2.00 TYPE SUBTOTAL
$553
2.00 TOTALS
$553.00
306
S-047E
PERMIT EXPIRATION/REINSTATEMENT
REQUEST
BUILDING
Review of a request for the reinstatement of a permit which has been issued and has expired.
None
$670 per request
100%
$0.00
$670.00
$(670.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(670)
$670
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
307
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PERMIT EXPIRATION/REINSTATEMENT
S-047E
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG DIV MANAGER
1.00 $385.58
1 $386
CD-BLDG & SAFETY
BLDG PERMIT TECH II
1.00 $167.61
1 $168
CD-BLDG & SAFETY
CHIEF BLDG INSPECTOR
0.25 $47.22
1 $47
CD-BLDG & SAFETY
DEPUTY BLDG OFFICIAL
0.25 $69.50
1 $70
$670
$669.91
2.50 TYPE SUBTOTAL
$670
2.50 TOTALS
$670.00
308
S-047F
PLAN CHECK EXPIRATION/REINSTATEMENT
REQUEST
BUILDING
Review of a request for a reinstatement of a set of plans which have expired.
None
$685 per request
100%
$0.00
$685.00
$(685.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(685)
$685
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
309
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PLAN CHECK EXPIRATION/REINSTATEMENT
S-047F
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG DIV MANAGER
1.00 $385.58
1 $386
CD-BLDG & SAFETY
BLDG PERMIT TECH II
1.00 $167.61
1 $168
CD-BLDG & SAFETY
DEPUTY BLDG OFFICIAL
0.25 $69.50
1 $70
CD-BLDG & SAFETY
SR PLANS EXAMINER
0.25 $62.79
1 $63
$685
$685.48
2.50 TYPE SUBTOTAL
$685
2.50 TOTALS
$685.00
310
S-047G
BUILDING PERMIT EXTENSION
REQUEST
BUILDING
Review of a request for the extension of a permit which has not yet expired.
None
$255 per request
100%
$0.00
$255.00
$(255.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(255)
$255
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
311
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUILDING PERMIT EXTENSION
S-047G
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG DIV MANAGER
0.25 $96.40
1 $96
CD-BLDG & SAFETY
BLDG PERMIT TECH II
0.25 $41.90
1 $42
CD-BLDG & SAFETY
CHIEF BLDG INSPECTOR
0.25 $47.22
1 $47
CD-BLDG & SAFETY
DEPUTY BLDG OFFICIAL
0.25 $69.50
1 $70
$255
$255.02
1.00 TYPE SUBTOTAL
$255
1.00 TOTALS
$255.00
312
S-047H
MISCELLANEOUS BUILDING INSPECTION
HOUR
BUILDING
Miscellaneous Building inspection which is not otherwise covered in the fee schedule.
None
Charge the fully allocated hourly rate for personnel involved plus any outside contract costs. 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
313
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MISCELLANEOUS BUILDING INSPECTION
S-047H
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG INSPECTOR II
Hourly
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
314
S-048
COM DEV TECHNOLOGY SURCHARGE
N/A
BUILDING
Replacement and maintenance of technology needed for Community Development.
2.5% of all Building & Safety fees
2.5% of all Building & Safety fees
100%
$76,042.00
$75,000.00
$1,042.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.39%
$1,042
$75,000
$76,042
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
315
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
COM DEV TECHNOLOGY SURCHARGE
S-048
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
Permit Syst Replace
0.00 $75,000.00
1 $75,000
$75,000
$75,000.00
0.00 TYPE SUBTOTAL
$75,000
0.00 TOTALS
$75,000.00
316
S-049
NEW METER SET/INITIAL READ
METER
BUILDING
Processing a new water meter and initial read.
$362 per meter
$200 per meter
100%
$362.00
$198.00
$164.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
182.83%
$164
$198
$362
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
317
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW METER SET/INITIAL READ
S-049
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG INSPECTOR I
0.50 $92.07
1 $92
CD-BLDG & SAFETY
BLDG PERMIT TECH I
0.75 $105.83
1 $106
$198
$197.90
1.25 TYPE SUBTOTAL
$198
1.25 TOTALS
$198.00
318
S-049A
WTR-NEW METER SET/INITIAL READ
METER
WATER
Installation of a new water meter and initial read.
None
$245 per meter
100%
$0.00
$247.00
$(247.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(247)
$247
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
319
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-NEW METER SET/INITIAL READ
S-049A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
WATER OPERATOR I/II/III
1.50 $247.16
1 $247
$247
$247.16
1.50 TYPE SUBTOTAL
$247
1.50 TOTALS
$247.00
320
S-050
DEVELOPMENT FEE ESTIMATION
REQUEST
BUILDING
Providing a detailed estimate of development fees for a proposed project on request. $139 per project
$275 per project
100%
$139.00
$274.58
$(135.58)
50 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
50.62%
$(6,779)
$13,729
$6,950
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
321
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DEVELOPMENT FEE ESTIMATION
S-050
50 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
SR BLDG PERMIT TECH
1.50 $274.58
50 $13,729
$13,729
$274.58
1.50 TYPE SUBTOTAL
$13,729
1.50 TOTALS
$274.58
322
S-051
BUILDING PLAN COPY
PLAN
BUILDING
Obtaining permission and providing copyrighted design plans on request. $139 per plan plus $46 each additional design professional Plus actual cost of reproduction to the City
$140 per plan $47 each additional design professional
Plus actual cost of reproduction to the City
100%
$140.10
$142.21
$(2.11)
42 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
98.51%
$(89)
$5,973
$5,884
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
323
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUILDING PLAN COPY
S-051
42 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
BLDG PERMIT TECH I
1.00 $141.10
42 $5,926
$5,926
$141.10
1.00 TYPE SUBTOTAL
CD-BLDG & SAFETY
BLDG PERMIT TECH I
Ea Add'l Design Prof
0.33 $46.56
1 $47
$47
$46.56
0.33 TYPE SUBTOTAL
$5,973
1.33 TOTALS
$142.21
324
S-052
ENCROACHMENT PERMIT - SIDEWALK
PERMIT
PUBLIC WORKS
Review and inspection of sidewalk encroachment in the public right-of-way. $496 - 1st 50 ft
$145 - ea addl 50 ft
$760 - 1st 50 ft
$195 - ea addl 50 ft
100%
$499.02
$778.23
$(279.21)
48 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
64.12%
$(13,402)
$37,355
$23,953
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
325
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - SIDEWALK
S-052
48 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
1st 50ft
3.00 $588.30
48 $28,238
PW-ENGINEERING
ENGINEERING TECH II
1st 50ft
1.00 $169.51
48 $8,136
$36,375
$757.81
4.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl 50 ft
1.00 $196.10
5 $981
$981
$196.10
1.00 TYPE SUBTOTAL
$37,355
5.00 TOTALS
$778.23
326
S-053
ENCROACHMENT PERMIT - CURB/GUTTER
PERMIT
PUBLIC WORKS
Review and inspection of curb/gutter encroachment in the public right-of-way. $532 - 1st 50 ft
$181 - ea addl 50 ft
$955 - 1st 50 ft
$295 - ea addl 50 ft
100%
$551.39
$985.43
$(434.04)
28 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
55.95%
$(12,153)
$27,592
$15,439
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
327
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - CURB/GUTTER
S-053
28 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
1st 50ft
4.00 $784.40
28 $21,963
PW-ENGINEERING
ENGINEERING TECH II
1st 50ft
1.00 $169.51
28 $4,746
$26,709
$953.91
5.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl 50 ft
1.50 $294.15
3 $882
$882
$294.15
1.50 TYPE SUBTOTAL
$27,592
6.50 TOTALS
$985.43
328
S-054
ENCROACHMENT PERMIT - DRIVEWAY APPR
PERMIT
PUBLIC WORKS
Review and inspection of driveway approach encroachment in the public right-of-way. $496 - Residential
$640 - Commercial
$790 - At-grade
$760 - Residential
$955 - Commercial
$2,130 - At-grade
100%
$550.48
$948.68
$(398.20)
75 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
58.03%
$(29,865)
$71,151
$41,286
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
329
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - DRIVEWAY APPR
S-054
75 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
Residential
3.00 $588.30
56 $32,945
PW-ENGINEERING
ENGINEERING TECH II
Residential
1.00 $169.51
56 $9,493
$42,437
$757.81
4.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Commercial
4.00 $784.40
10 $7,844
PW-ENGINEERING
ENGINEERING TECH II
Commercial
1.00 $169.51
10 $1,695
$9,539
$953.91
5.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
At-Grade
10.00 $1,961.00
9 $17,649
PW-ENGINEERING
ENGINEERING TECH II
At-Grade
1.00 $169.51
9 $1,526
$19,175
$2,130.51
11.00 TYPE SUBTOTAL
$71,151
20.00 TOTALS
$948.68
330
S-055
ENCROACHMENT PERMIT - STREET EXCAV
PERMIT
PUBLIC WORKS
Review and inspection of a street excavation encroachment in the public right-of-way.
Trench - $790 + $289 for ea 50 linear ft over 50 linear ft Patch - $496
Pothole - $351 + $289 for ea 50 linear ft over 50 linear ft Bore Pit - $424
In addition to above fees:
Water T/Cross Connection - $1,224
Water Hot Tap (up to 2") - $935
Water Hot Tap (4"+) - $1,085
Sewer Tie-In Connection - $1,085
Trench - $1,065 + $390 ea 50 linear ft over 50 linear ft Patch - $675
Pothole - $475 + $390 for ea 50 linear ft over 50 linear ft Bore Pit - $575
In addition to above fees:
Water T/Cross Connection - $1,655
Water Hot Tap (up to 2") - $1,260
Water Hot Tap (4"+) - $1,490
Sewer Tie-In Connection - $1,490
100%
$592.43
$801.58
$(209.15)
290
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
73.91%
$(60,653)
$232,458
$171,805
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
331
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - STREET EXCAV
S-055
290
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
50ft Trench
5.00 $980.50
104
$101,972
PW-ENGINEERING
ENGINEERING TECH II
50ft Trench
0.50 $84.76
104
$8,815
$110,787
$1,065.26
5.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl 50 ft
2.00 $392.20
10 $3,922
$3,922
$392.20
2.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
10x10ft Patch
3.00 $588.30
104
$61,183
PW-ENGINEERING
ENGINEERING TECH II
10x10ft Patch
0.50 $84.76
104
$8,815
$69,998
$673.06
3.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Pothole Up To 50 ft
2.00 $392.20
25 $9,805
PW-ENGINEERING
ENGINEERING TECH II
Pothole Up To 50 ft
0.50 $84.76
25 $2,119
$11,924
$476.96
2.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Pothole Ea Addl 50ft
2.00 $392.20
3 $1,177
$1,177
$392.20
2.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Bore Pit
2.50 $490.25
50 $24,513
PW-ENGINEERING
ENGINEERING TECH II
Bore Pit
0.50 $84.76
50 $4,238
$28,751
$575.01
3.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
T/Crossover
8.00 $1,568.80
1 $1,569
PW-ENGINEERING
ENGINEERING TECH II
T/Crossover
0.50 $84.76
1 $85
$1,654
$1,653.56
8.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Hot Tap Up To 2"
6.00 $1,176.60
1 $1,177
PW-ENGINEERING
ENGINEERING TECH II
Hot Tap Up To 2"
0.50 $84.76
1 $85
$1,261
$1,261.36
6.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Hot Tap 4"+
6.00 $1,176.60
1 $1,177
332
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
333
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - STREET EXCAV
S-055
290
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
ENGINEERING TECH II
Hot Tap 4"+
0.50 $84.76
1 $85
PW-ENGINEERING
PRINCIPAL CIVIL ENG
Hot Tap 4"+
0.50 $230.76
1 $231
$1,492
$1,492.12
7.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Sewer Tie-In
6.00 $1,176.60
1 $1,177
PW-ENGINEERING
ENGINEERING TECH II
Sewer Tie-In
0.50 $84.76
1 $85
PW-ENGINEERING
PRINCIPAL CIVIL ENG
Sewer Tie-In
0.50 $230.76
1 $231
$1,492
$1,492.12
7.00 TYPE SUBTOTAL
$232,458
47.50 TOTALS
$801.58
334
S-055A
ENRCROACH PERMIT - ADA CURB RAMP
PERMIT
PUBLIC WORKS
Review and inspection of the construction of an ADA ramp in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $1,165 per permit
100%
$850.00
$1,163.00
$(313.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
73.09%
$(313)
$1,163
$850
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
335
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENRCROACH PERMIT - ADA CURB RAMP
S-055A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
5.50 $1,078.55
1 $1,079
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$1,163
$1,163.31
6.00 TYPE SUBTOTAL
$1,163
6.00 TOTALS
$1,163.00
336
S-055B
ENCROACHMENT PERMIT - SEWER MANHOLE
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a sewer manhole in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $1,555 per permit
100%
$1,090.00
$1,556.00
$(466.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
70.05%
$(466)
$1,556
$1,090
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
337
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - SEWER MANHOLE
S-055B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
7.50 $1,470.75
1 $1,471
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$1,556
$1,555.51
8.00 TYPE SUBTOTAL
$1,556
8.00 TOTALS
$1,556.00
338
S-055C
ENCROACHMENT PERMIT - STORM MANHOLE
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a storm drain manhole in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $1,410 per permit
100%
$985.00
$1,408.00
$(423.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
69.96%
$(423)
$1,408
$985
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
339
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - STORM MANHOLE
S-055C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
6.75 $1,323.68
1 $1,324
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$1,408
$1,408.44
7.25 TYPE SUBTOTAL
$1,408
7.25 TOTALS
$1,408.00
340
S-055D
ENCROACH PERMIT - STORM DRAIN INLET
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a storm drain inlet in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $770 per permit
100%
$55.00
$771.00
$(716.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
7.13%
$(716)
$771
$55
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
341
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACH PERMIT - STORM DRAIN INLET
S-055D
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
3.50 $686.35
1 $686
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$771
$771.11
4.00 TYPE SUBTOTAL
$771
4.00 TOTALS
$771.00
342
S-055F
ENCROACHMENT PERMIT - STREET LIGHT
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a street light in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $870 per permit
100%
$610.00
$869.00
$(259.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
70.20%
$(259)
$869
$610
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
343
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT - STREET LIGHT
S-055F
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
4.00 $784.40
1 $784
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$869
$869.16
4.50 TYPE SUBTOTAL
$869
4.50 TOTALS
$869.00
344
S-055G
ENCROACH PERMIT - TRAFFIC SIGNAL
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a traffic signal in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $3,220 per permit
100%
$2,255.00
$3,222.00
$(967.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
69.99%
$(967)
$3,222
$2,255
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
345
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACH PERMIT - TRAFFIC SIGNAL
S-055G
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
16.00 $3,137.60
1 $3,138
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$3,222
$3,222.36
16.50 TYPE SUBTOTAL
$3,222
16.50 TOTALS
$3,222.00
346
S-055H
ENCROACH PERMIT - UTIL VAULT/CAB
PERMIT
PUBLIC WORKS
Review and inspection of the construction of a utility vault and cabinet in the public right-of-way.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. $1,555 per permit
100%
$1,100.00
$1,556.00
$(456.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
70.69%
$(456)
$1,556
$1,100
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
347
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACH PERMIT - UTIL VAULT/CAB
S-055H
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
7.50 $1,470.75
1 $1,471
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$1,556
$1,555.51
8.00 TYPE SUBTOTAL
$1,556
8.00 TOTALS
$1,556.00
348
S-055I
ENCROACHMENT PERMIT EXTENSION
REQUEST
PUBLIC WORKS
Review of a request for an extension of an unexpired encroachment permit.
None
$170 per request
100%
$0.00
$170.00
$(170.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(170)
$170
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
349
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT EXTENSION
S-055I
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
1 $170
$170
$169.51
1.00 TYPE SUBTOTAL
$170
1.00 TOTALS
$170.00
350
S-055J
ENCROACHMENT PERMIT REISSUANCE
REQUEST
PUBLIC WORKS
Review of a request for a reissuance of an expired encroachment permit.
None
$170 per request
100%
$0.00
$170.00
$(170.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(170)
$170
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
351
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENCROACHMENT PERMIT REISSUANCE
S-055J
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
1 $170
$170
$169.51
1.00 TYPE SUBTOTAL
$170
1.00 TOTALS
$170.00
352
S-055K
MISSED ENGINEERING INSPECTION
INSPECTION
PUBLIC WORKS
Reimbursement for a missed inspection that was scheduled by the applicant.
None
$195 per inspection
100%
$0.00
$196.00
$(196.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(196)
$196
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
353
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MISSED ENGINEERING INSPECTION
S-055K
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
1.00 $196.10
1 $196
$196
$196.10
1.00 TYPE SUBTOTAL
$196
1.00 TOTALS
$196.00
354
S-055L
AFTER-HOURS ENGINEERING INSPECTION
INSPECTION
PUBLIC WORKS
Request for an Engineering inspection after normal working hours.
None
$870 per inspection
100%
$0.00
$869.00
$(869.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(869)
$869
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
355
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
AFTER-HOURS ENGINEERING INSPECTION
S-055L
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
4.00 $784.40
1 $784
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
1 $85
$869
$869.16
4.50 TYPE SUBTOTAL
$869
4.50 TOTALS
$869.00
356
S-056
TEMPORARY ENCROACHMENT PERMIT
PERMIT
PUBLIC WORKS
Review of a temporary encroachment in the public right-of-way, such as cranes, dumpsters, pods, or lane closures.
$165 per permit
$280 per permit
100%
$207.00
$280.90
$(73.90)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
73.69%
$(739)
$2,809
$2,070
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
357
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMPORARY ENCROACHMENT PERMIT
S-056
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
1.00 $196.10
10 $1,961
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
10 $848
$2,809
$280.86
1.50 TYPE SUBTOTAL
$2,809
1.50 TOTALS
$280.90
358
S-057
PUBLIC IMPROVEMENT INSPECTION
PROJECT
PUBLIC WORKS
Inspection all new public improvements to assure compliance with City codes and standards. $0-$10,000 - 12% of project valuation
$10,001- $25,000 - $1,245 plus 8.3% of project valuation over $10,000 $25,001- $250,000 - $2,495 plus 4.7% of project valuation over $25,000 $250,001+ - $13,145 plus 5.1% of project valuation over $250,000 $0-$10,000 - 15% of project valuation
$10,001- $25,000 - $1,500 plus 10.55% of project valuation over $10,000 $25,001- $250,000 - $3,083 plus 4.38% of project valuation over $25,000 $250,001+ - $12,938 plus 7.57% of project valuation over $250,000 100%
$11,473.64
$14,109.36
$(2,635.72)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
81.32%
$(57,986)
$310,406
$252,420
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
359
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC IMPROVEMENT INSPECTION
S-057
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
$10k
7.00 $1,372.70
4 $5,491
$5,491
$1,372.70
7.00 TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$10k
1.00 $169.51
4 $678
$678
$169.51
1.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
$25k
14.00 $2,745.40
4 $10,982
$10,982
$2,745.40
14.00 TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$25k
2.00 $339.02
4 $1,356
$1,356
$339.02
2.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
$100k
36.00 $7,059.60
5 $35,298
$35,298
$7,059.60
36.00 TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$100k
2.00 $339.02
5 $1,695
$1,695
$339.02
2.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
$250k
80.00 $15,688.00
4 $62,752
$62,752
$15,688.00
80.00 TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$250k
2.00 $339.02
4 $1,356
$1,356
$339.02
2.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
$500k
160.00
$31,376.00
4 $125,504
$125,504
$31,376.00
160.00
TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$500k
3.00 $508.53
4 $2,034
$2,034
$508.53
3.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
$1m
320.00
$62,752.00
1 $62,752
360
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
361
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC IMPROVEMENT INSPECTION
S-057
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
$62,752
$62,752.00
320.00
TYPE SUBTOTAL
PW-ENGINEERING
ENGINEERING TECH II
$1m
3.00 $508.53
1 $509
$509
$508.53
3.00 TYPE SUBTOTAL
$310,406
630.00
TOTALS
$14,109.36
362
S-058
PUBLIC IMPROVEMENT PLAN CHECK
PLAN
PUBLIC WORKS
Plan check for all new public improvements to assure compliance with City codes and standards, which includes up to 3 plan checks.
$0-$10,000 - 11% of the project valuation
$10,001- $25,000 - $1,100 plus 2.8% of valuation over $10,000 $25,001- $250,000 - $1,520 plus 1.6% of valuation over $25,000 $251,001+ - $5,135 plus 1.1% of valuation over $250,000 $0-$10,000 - 19% of the project valuation
$10,001- $25,000 - $1,900 plus 4.6% of valuation over $10,000 $25,001- $250,000 - $2,590 plus 2.67% of valuation over $25,000 $251,001+ - $8,600 plus 2.25% of valuation over $250,000 100%
$5,570.23
$7,073.14
$(1,502.91)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
78.75%
$(33,064)
$155,609
$122,545
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
363
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC IMPROVEMENT PLAN CHECK
S-058
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
$10k
6.00 $1,881.72
4 $7,527
PW-ENGINEERING
ENGINEERING TECH II
$10k
0.50 $84.76
4 $339
$7,866
$1,966.48
6.50 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
$25k
8.00 $2,508.96
4 $10,036
PW-ENGINEERING
ENGINEERING TECH II
$25k
0.50 $84.76
4 $339
$10,375
$2,593.72
8.50 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
$100k
1.00 $300.86
5 $1,504
PW-ENGINEERING
SR CIVIL ENGINEER
$100k
10.00 $3,136.20
5 $15,681
PW-ENGINEERING
ENGINEERING TECH II
$100k
1.00 $169.51
5 $848
PW-ENGINEERING
PRINCIPAL CIVIL ENG
$100k
2.00 $923.04
5 $4,615
$22,648
$4,529.61
14.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
$250k
1.00 $300.86
4 $1,203
PW-ENGINEERING
SR CIVIL ENGINEER
$250k
20.00 $6,272.40
4 $25,090
PW-ENGINEERING
ENGINEERING TECH II
$250k
1.00 $169.51
4 $678
PW-ENGINEERING
PRINCIPAL CIVIL ENG
$250k
4.00 $1,846.08
4 $7,384
$34,355
$8,588.85
26.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
$500k
1.00 $300.86
4 $1,203
PW-ENGINEERING
SR CIVIL ENGINEER
$500k
32.00 $10,035.84
4 $40,143
PW-ENGINEERING
ENGINEERING TECH II
$500k
1.00 $169.51
4 $678
PW-ENGINEERING
PRINCIPAL CIVIL ENG
$500k
8.00 $3,692.16
4 $14,769
$56,793
$14,198.37
42.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
$1m
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
$1m
56.00 $17,562.72
1 $17,563
PW-ENGINEERING
ENGINEERING TECH II
$1m
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
$1m
12.00 $5,538.24
1 $5,538
364
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
365
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC IMPROVEMENT PLAN CHECK
S-058
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
$23,571
$23,571.33
70.00 TYPE SUBTOTAL
$155,609
167.00
TOTALS
$7,073.14
366
S-058A
WTR-PUBLIC IMPROVEMENT PLAN CHECK
PLAN
WATER
Water plan check for all new public improvements to assure compliance with City codes and standards, which includes up to 3 plan checks.
None
$0-$10,000 - 1.9% of the project valuation
$10,001- $25,000 - $190 plus 0.46% of valuation over $10,000 $25,001- $250,000 - $259 plus 0.27% of valuation over $25,000 $251,001+ - $867 plus 0.225% of valuation over $250,000 100%
$0.00
$687.41
$(687.41)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(15,123)
$15,123
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
367
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WTR-PUBLIC IMPROVEMENT PLAN CHECK
S-058A
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
PRINCIPAL CIVIL ENG
2.00 $687.42
22 $15,123
$15,123
$687.42
2.00 TYPE SUBTOTAL
$15,123
2.00 TOTALS
$687.41
368
S-058B
WW-PUBLIC IMPROVEMENT PLAN CHECK
PLAN
WASTEWATER
Wastewater plan check for all new public improvements to assure compliance with City codes and standards, which includes up to 3 plan checks.
None
$0-$10,000 - 1.6% of the project valuation
$10,001- $25,000 - $160 plus 0.4% of valuation over $10,000 $25,001- $250,000 - $220 plus 0.23% of valuation over $25,000 $251,001+ - $738 plus 0.2% of valuation over $250,000
100%
$0.00
$594.86
$(594.86)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(13,087)
$13,087
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
369
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WW-PUBLIC IMPROVEMENT PLAN CHECK
S-058B
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WW TREATMENT
PRINCIPAL CIVIL ENG
2.00 $594.88
22 $13,087
$13,087
$594.88
2.00 TYPE SUBTOTAL
$13,087
2.00 TOTALS
$594.86
370
S-059
TRAFFIC CONTROL PLAN CHECK/INSPECT
APPLICATION
PUBLIC WORKS
Review of a traffic control plan and site inspection(s) for compliance with safety codes and standards.
Residential $170 plus $36 for each additional day
Arterial/collector lane closure - $279 plus $72 for each additional day Arterial/collector street closure - $413 plus $72 for each additional day Residential $235 plus $50 for each additional day
Arterial/collector lane closure - $390 plus $100 for each additional day Arterial/collector street closure - $910 plus $100 for each additional day 100%
$336.33
$466.88
$(130.55)
320
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.04%
$(41,778)
$149,403
$107,625
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
371
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TRAFFIC CONTROL PLAN CHECK/INSPECT
S-059
320
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
Residential
0.50 $98.05
237
$23,238
PW-ENGINEERING
SR CIVIL ENGINEER
Residential
0.17 $53.32
237
$12,637
PW-ENGINEERING
ENGINEERING TECH II
Residential
0.50 $84.76
237
$20,088
$55,963
$236.13
1.17 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl Day
0.25 $49.03
534
$26,182
$26,182
$49.03
0.25 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Art/Coll Lane Close
0.75 $147.08
80 $11,766
PW-ENGINEERING
SR CIVIL ENGINEER
Art/Coll Lane Close
0.50 $156.81
80 $12,545
PW-ENGINEERING
ENGINEERING TECH II
Art/Coll Lane Close
0.50 $84.76
80 $6,781
$31,092
$388.65
1.75 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl Day
0.50 $98.05
340
$33,337
$33,337
$98.05
0.50 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Art/Coll Street Clse
1.25 $245.13
3 $735
PW-ENGINEERING
SR CIVIL ENGINEER
Art/Coll Street Clse
0.50 $156.81
3 $470
PW-ENGINEERING
ENGINEERING TECH II
Art/Coll Street Clse
3.00 $508.53
3 $1,526
$2,731
$910.47
4.75 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
Ea Addl Day
0.50 $98.05
1 $98
$98
$98.05
0.50 TYPE SUBTOTAL
$149,403
8.92 TOTALS
$466.88
372
S-060
ROUGH GRADING PLAN CHECK
PLAN
PUBLIC WORKS
Plan review of rough grading to assure conformance with appropriate codes and standards. $335 per plan
$1,255 per plan
100%
$491.00
$1,254.50
$(763.50)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
39.14%
$(16,797)
$27,599
$10,802
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
373
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ROUGH GRADING PLAN CHECK
S-060
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
4.00 $1,254.48
22 $27,599
$27,599
$1,254.48
4.00 TYPE SUBTOTAL
$27,599
4.00 TOTALS
$1,254.50
374
S-061
FINE GRADING PLAN CHECK
PLAN
PUBLIC WORKS
Plan review of fine grading to assure conformance with appropriate codes and standards. 0-20,000 sq ft - $1,797
20,001 sq ft - 1 acre - $2,123
1-2 acres - $3,221
2-4 acres - $4,184
4-10 acres - $5,046
10+ acres - $5,909
0-20,000 sq ft - $2,970
20,001 sq ft - 1 acre - $3,600
1-2 acres - $4,685
2-4 acres - $5,940
4-10 acres - $8,450
10+ acres - $11,880
100%
$2,588.27
$4,242.68
$(1,654.41)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
61.01%
$(36,397)
$93,339
$56,942
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
375
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINE GRADING PLAN CHECK
S-061
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
20k Sqft
8.00 $2,508.96
9 $22,581
PW-ENGINEERING
PRINCIPAL CIVIL ENG
20k Sqft
1.00 $461.52
9 $4,154
$26,734
$2,970.48
9.00 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
1 Acre
10.00 $3,136.20
6 $18,817
PW-ENGINEERING
PRINCIPAL CIVIL ENG
1 Acre
1.00 $461.52
6 $2,769
$21,586
$3,597.72
11.00 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
2 Acres
12.00 $3,763.44
4 $15,054
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2 Acres
2.00 $923.04
4 $3,692
$18,746
$4,686.48
14.00 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
4 Acres
16.00 $5,017.92
1 $5,018
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4 Acres
2.00 $923.04
1 $923
$5,941
$5,940.96
18.00 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
10 Acres
24.00 $7,526.88
1 $7,527
PW-ENGINEERING
PRINCIPAL CIVIL ENG
10 Acres
2.00 $923.04
1 $923
$8,450
$8,449.92
26.00 TYPE SUBTOTAL
PW-ENGINEERING
SR CIVIL ENGINEER
15 Acres
32.00 $10,035.84
1 $10,036
PW-ENGINEERING
PRINCIPAL CIVIL ENG
15 Acres
4.00 $1,846.08
1 $1,846
$11,882
$11,881.92
36.00 TYPE SUBTOTAL
$93,339
114.00
TOTALS
$4,242.68
376
S-062
GRADING INSPECTION
PLAN
PUBLIC WORKS
Inspection of grading to assure conformance with appropriate codes and standards. 0-20,000 sq ft - $1,162
20,001 sq ft - 1 acre - $2,329
1-2 acres - $3,078
2-4 acres - $6,983
4-10 acres - $9,312
10+ acres - $10,475
0-20,000 sq ft - $1,570
20,001 sq ft - 1 acre - $3,140
1-2 acres - $4,705
2-4 acres - $9,415
4-10 acres - $12,550
10+ acres - $14,120
100%
$2,887.00
$3,993.32
$(1,106.32)
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.30%
$(24,339)
$87,853
$63,514
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
377
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
GRADING INSPECTION
S-062
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
CHIEF PW INSPECTOR
20,000 Sq Ft
8.00 $1,568.80
9 $14,119
$14,119
$1,568.80
8.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
1 Acre
16.00 $3,137.60
6 $18,826
$18,826
$3,137.60
16.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
2 Acres
24.00 $4,706.40
4 $18,826
$18,826
$4,706.40
24.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
4 Acres
48.00 $9,412.80
1 $9,413
$9,413
$9,412.80
48.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
10 Acres
64.00 $12,550.40
1 $12,550
$12,550
$12,550.40
64.00 TYPE SUBTOTAL
PW-ENGINEERING
CHIEF PW INSPECTOR
15 Acres
72.00 $14,119.20
1 $14,119
$14,119
$14,119.20
72.00 TYPE SUBTOTAL
$87,853
232.00
TOTALS
$3,993.32
378
S-063
SWPP BMP INSPECTION
APPLICATION
PUBLIC WORKS
Reviewing a Stormwater Pollution Prevention Plan (SWPP) to insure conformance with the stormwater run-off requirements of the Federal NPDES Program.
Fee is based on the estimated hours and costs related to a particular project Fee is based on the estimated hours and costs related to a particular project 100%
$0.00
$0.00
$0.00
67 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
379
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SWPP BMP INSPECTION
S-063
67 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
Job Estimate
0.00 $0.00
67 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
380
S-064
POST-MITIGATION INSPECTION
APPLICATION
PUBLIC WORKS
Post-construction inspection of mitigation measures to insure proper installation and maintenance.
Fee is based on the estimated hours and costs related to a particular project Fee is based on the estimated hours and costs related to a particular project 100%
$0.00
$0.00
$0.00
22 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
381
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POST-MITIGATION INSPECTION
S-064
22 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
Job Estimate
0.00 $0.00
22 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
382
S-065
TENTATIVE PARCEL MAP - ENGINEERING
MAP
PUBLIC WORKS
Engineering preview of a tentative parcel map to assure accuracy and compliance with City codes and standards. $5,165 per map
$9,010 per map
100%
$5,165.00
$9,011.00
$(3,846.00)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
57.32%
$(15,384)
$36,044
$20,660
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
383
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE PARCEL MAP - ENGINEERING
S-065
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
4 $1,203
PW-ENGINEERING
SR CIVIL ENGINEER
16.00 $5,017.92
4 $20,072
PW-ENGINEERING
PRINCIPAL CIVIL ENG
8.00 $3,692.16
4 $14,769
$36,044
$9,010.94
25.00 TYPE SUBTOTAL
$36,044
25.00 TOTALS
$9,011.00
384
S-066
TENTATIVE TRACT MAP - ENGINEERING
MAP
PUBLIC WORKS
Engineering review of a tentative tract map to assure accuracy and compliance with City codes and standards. 5-20 lots - $4,865
21-40 lots - $7,417
41-80 lots - $10,604
81-120 lots - $15,278
121+ lots - $19,715
5-20 lots - $9,180
21-40 lots - $13,835
41-80 lots - $18,790
81-120 lots - $24,040
121+ lots - $31,475
100%
$16,902.25
$28,920.50
$(12,018.25)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
58.44%
$(48,073)
$115,682
$67,609
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
385
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE TRACT MAP - ENGINEERING
S-066
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
20 Lots
1.00 $300.86
3 $903
PW-ENGINEERING
SR CIVIL ENGINEER
20 Lots
16.00 $5,017.92
3 $15,054
PW-ENGINEERING
ENGINEERING TECH II
20 Lots
1.00 $169.51
3 $509
PW-ENGINEERING
PRINCIPAL CIVIL ENG
20 Lots
8.00 $3,692.16
3 $11,076
$27,541
$9,180.45
26.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
40 Lots
2.00 $601.72
1 $602
PW-ENGINEERING
SR CIVIL ENGINEER
40 Lots
24.00 $7,526.88
1 $7,527
PW-ENGINEERING
ENGINEERING TECH II
40 Lots
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
40 Lots
12.00 $5,538.24
1 $5,538
$13,836
$13,836.35
39.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
80 Lots
3.00 $902.58
1 $903
PW-ENGINEERING
SR CIVIL ENGINEER
80 Lots
30.00 $9,408.60
1 $9,409
PW-ENGINEERING
ENGINEERING TECH II
80 Lots
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
80 Lots
18.00 $8,307.36
1 $8,307
$18,788
$18,788.05
52.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
120 Lots
5.00 $1,504.30
1 $1,504
PW-ENGINEERING
SR CIVIL ENGINEER
120 Lots
36.00 $11,290.32
1 $11,290
PW-ENGINEERING
ENGINEERING TECH II
120 Lots
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
120 Lots
24.00 $11,076.48
1 $11,076
$24,041
$24,040.61
66.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
200 Lots
8.00 $2,406.88
1 $2,407
PW-ENGINEERING
SR CIVIL ENGINEER
200 Lots
48.00 $15,053.76
1 $15,054
PW-ENGINEERING
ENGINEERING TECH II
200 Lots
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
200 Lots
30.00 $13,845.60
1 $13,846
386
THIS PAGE
INTENTIONALLY BLANK
The costs shown on the facing page are
a continued listing of costs listed on
the page immediately preceding.
387
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TENTATIVE TRACT MAP - ENGINEERING
S-066
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
$31,476
$31,475.75
87.00 TYPE SUBTOTAL
$115,682
270.00
TOTALS
$28,920.50
388
S-067
FINAL PARCEL MAP - ENGINEERING
MAP
PUBLIC WORKS
Engineering review of a final parcel map (4 lots or less) for compliance with City codes and standards, as well as the Subdivision Map Act.
$3,448 per map
$4,820 per map
100%
$3,448.00
$4,819.75
$(1,371.75)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
71.54%
$(5,487)
$19,279
$13,792
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
389
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINAL PARCEL MAP - ENGINEERING
S-067
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
4 $1,203
PW-ENGINEERING
SR CIVIL ENGINEER
7.00 $2,195.34
4 $8,781
PW-ENGINEERING
ENGINEERING TECH II
2.00 $339.02
4 $1,356
PW-ENGINEERING
PRINCIPAL CIVIL ENG
3.00 $1,384.56
4 $5,538
PW-ENGINEERING
4 Hr Contract Survey
0.00 $600.00
4 $2,400
$19,279
$4,819.78
13.00 TYPE SUBTOTAL
$19,279
13.00 TOTALS
$4,819.75
390
S-068
FINAL TRACT MAP - ENGINEERING
MAP
PUBLIC WORKS
Engineering review of a final map (5 or more lots) for compliance with City codes and standards, as well as the Subdivision Map Act.
5-20 lots - $3,765 plus $139 per lot
21-50 lots - $5,867 plus $124 per lot over 20 lots
51+ lots - $9,633 plus $83 per lot over 50 lots
5-20 lots - $7,630 plus $163 per lot
21-50 lots - $10,075 plus $118 per lot over 20 lots
51+ lots - $13,615 plus $74 per lot over 50 lots
100%
$10,230.00
$15,971.00
$(5,741.00)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
64.05%
$(22,964)
$63,884
$40,920
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
391
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINAL TRACT MAP - ENGINEERING
S-068
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
5 Lots
0.50 $150.43
3 $451
PW-ENGINEERING
SR CIVIL ENGINEER
5 Lots
16.00 $5,017.92
3 $15,054
PW-ENGINEERING
ENGINEERING TECH II
5 Lots
2.00 $339.02
3 $1,017
PW-ENGINEERING
PRINCIPAL CIVIL ENG
5 Lots
2.00 $923.04
3 $2,769
PW-ENGINEERING
8 Hr Contract Survey
0.00 $1,200.00
3 $3,600
$22,891
$7,630.41
20.50 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
20 Lots
0.50 $150.43
1 $150
PW-ENGINEERING
SR CIVIL ENGINEER
20 Lots
20.00 $6,272.40
1 $6,272
PW-ENGINEERING
ENGINEERING TECH II
20 Lots
2.00 $339.02
1 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
20 Lots
2.00 $923.04
1 $923
PW-ENGINEERING
16 Hr Contrct Survey
0.00 $2,400.00
1 $2,400
$10,085
$10,084.89
24.50 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
50 Lots
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
50 Lots
24.00 $7,526.88
1 $7,527
PW-ENGINEERING
ENGINEERING TECH II
50 Lots
2.00 $339.02
1 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
50 Lots
4.00 $1,846.08
1 $1,846
PW-ENGINEERING
24 Hr Contrct Survey
0.00 $3,600.00
1 $3,600
$13,613
$13,612.84
31.00 TYPE SUBTOTAL
PW-ADMIN
DIR OF PW-CITY ENGR
100 Lots
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
100 Lots
30.00 $9,408.60
1 $9,409
PW-ENGINEERING
ENGINEERING TECH II
100 Lots
2.00 $339.02
1 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
100 Lots
4.00 $1,846.08
1 $1,846
PW-ENGINEERING
36 Hr Contrct Survey
0.00 $5,400.00
1 $5,400
$17,295
$17,294.56
37.00 TYPE SUBTOTAL
$63,884
113.00
TOTALS
$15,971.00
392
S-069
LOT LINE ADJUSTMENT - ENGINEERING
APPLICATION
PUBLIC WORKS
Engineering review of a lot line adjustment or subdivision creating two lots from one lot by the Planning Commission for compliance with City codes, guidelines and the Subdivision Map Act. $3,455 per application
$4,650 per application
100%
$3,455.00
$4,652.00
$(1,197.00)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
74.27%
$(4,788)
$18,608
$13,820
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
393
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LOT LINE ADJUSTMENT - ENGINEERING
S-069
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
0.50 $150.43
4 $602
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
4 $10,036
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
4 $678
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
4 $3,692
PW-ENGINEERING
6 Hr Contract Survey
0.00 $900.00
4 $3,600
$18,608
$4,651.94
11.50 TYPE SUBTOTAL
$18,608
11.50 TOTALS
$4,652.00
394
S-070
LOT MERGER - ENGINEERING
APPLICATION
PUBLIC WORKS
Engineering review of a property owner request to consolidate lots and/or lot fragments or merge small lots into larger lots for compliance with City codes, guidelines and the Subdivision Map Act. $2,712 per application
$3,725 per application
100%
$2,712.00
$3,724.67
$(1,012.67)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.81%
$(3,038)
$11,174
$8,136
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
395
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LOT MERGER - ENGINEERING
S-070
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
0.50 $150.43
3 $451
PW-ENGINEERING
SR CIVIL ENGINEER
6.00 $1,881.72
3 $5,645
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
3 $509
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
3 $2,769
PW-ENGINEERING
4 Hr Contract Survey
0.00 $600.00
3 $1,800
$11,174
$3,724.70
9.50 TYPE SUBTOTAL
$11,174
9.50 TOTALS
$3,724.67
396
S-071
CERTIFICATE OF COMPLIANCE - ENGIN.
APPLICATION
PUBLIC WORKS
Request for a Certificate of Compliance prepared by staff in accordance with City codes, guidelines and the Subdivision Map Act.
$3,946 per application
$5,425 per application
100%
$3,946.00
$5,425.50
$(1,479.50)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.73%
$(2,959)
$10,851
$7,892
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
397
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CERTIFICATE OF COMPLIANCE - ENGIN.
S-071
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
2 $602
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
2 $5,018
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
2 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
2 $3,692
PW-ENGINEERING
4 Hr Contract Survey
0.00 $600.00
2 $1,200
$10,851
$5,425.41
14.00 TYPE SUBTOTAL
$10,851
14.00 TOTALS
$5,425.50
398
S-072
MAP AMENDMENT
MAP
PUBLIC WORKS
Planning Commission and City Council consideration of an amendment to the zoning map. $1,849 per map
$2,385 per map
100%
$1,849.00
$2,385.50
$(536.50)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
77.51%
$(2,146)
$9,542
$7,396
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
399
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MAP AMENDMENT
S-072
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
0.50 $150.43
4 $602
PW-ENGINEERING
SR CIVIL ENGINEER
2.00 $627.24
4 $2,509
PW-ENGINEERING
ENGINEERING TECH II
0.50 $84.76
4 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
4 $3,692
PW-ENGINEERING
4 Hr Contract Survey
0.00 $600.00
4 $2,400
$9,542
$2,385.47
5.00 TYPE SUBTOTAL
$9,542
5.00 TOTALS
$2,385.50
400
S-073
REIMBURSEMENT MAP AGREEMENT
AGREEMENT
PUBLIC WORKS
Preparation and review of a public improvement reimbursement agreement for a new development. $4,814 per application
$6,980 per application
100%
$4,814.00
$6,980.00
$(2,166.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
68.97%
$(2,166)
$6,980
$4,814
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
401
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
REIMBURSEMENT MAP AGREEMENT
S-073
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
1.00 $300.86
1 $301
PW-ENGINEERING
SR CIVIL ENGINEER
12.00 $3,763.44
1 $3,763
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
1 $170
PW-ENGINEERING
PRINCIPAL CIVIL ENG
4.00 $1,846.08
1 $1,846
PW-ENGINEERING
6 Hr Contract Survey
0.00 $900.00
1 $900
$6,980
$6,979.89
18.00 TYPE SUBTOTAL
$6,980
18.00 TOTALS
$6,980.00
402
S-074
STREET/EASEMENT ABANDONMENT
APPLICATION
PUBLIC WORKS
Review and provide a report and opinion on the advisability of abandoning or vacating all or a portion of public right-of-way.
$6,420 per application
$8,830 per application
100%
$6,420.00
$8,831.00
$(2,411.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.70%
$(4,822)
$17,662
$12,840
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
403
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
STREET/EASEMENT ABANDONMENT
S-074
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
2 $1,203
PW-ENGINEERING
SR CIVIL ENGINEER
14.00 $4,390.68
2 $8,781
PW-ENGINEERING
ENGINEERING TECH II
1.00 $169.51
2 $339
PW-ENGINEERING
PRINCIPAL CIVIL ENG
6.00 $2,769.12
2 $5,538
PW-ENGINEERING
6 Hr Contract Survey
0.00 $900.00
2 $1,800
$17,662
$8,831.03
23.00 TYPE SUBTOTAL
$17,662
23.00 TOTALS
$8,831.00
404
S-075
DEDICATION/EASEMENT CREATION
APPLICATION
PUBLIC WORKS
Review and provide a report and opinion on the advisability of dedication or easement creation as public right-of-way.
$3,022 per application
$4,820 per application
100%
$3,022.00
$4,821.50
$(1,799.50)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
62.68%
$(17,995)
$48,215
$30,220
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
405
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DEDICATION/EASEMENT CREATION
S-075
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
0.50 $150.43
10 $1,504
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
10 $25,090
PW-ENGINEERING
ENGINEERING TECH II
2.00 $339.02
10 $3,390
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
10 $9,230
PW-ENGINEERING
6 Hr Contract Survey
0.00 $900.00
10 $9,000
$48,215
$4,821.45
12.50 TYPE SUBTOTAL
$48,215
12.50 TOTALS
$4,821.50
406
S-076
TRAFFIC STUDY REVIEW
APPLICATION
PUBLIC WORKS
Review of a traffic study for a new development to determine if mitigation measures are needed due to traffic impacts.
110% of consultant costs
- 100% to consultant
- 10% to City for review
110% of consultant costs
- 100% to consultant
- 10% to City for review
100%
$0.00
$0.00
$0.00
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
407
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TRAFFIC STUDY REVIEW
S-076
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
408
S-076A
NEIGHBORHOOD PARKING PERMIT REVIEW
APPLICATION
PUBLIC WORKS
Review of a request for a new Neighborhood Parking Permit area.
None
$1,000 deposit with charges at the fully allocated hourly rates for all personnel involved plus any outside costs. 100%
$0.00
$1,628.00
$(1,628.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1,628)
$1,628
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
409
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEIGHBORHOOD PARKING PERMIT REVIEW
S-076A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-PLANNING
PROJECT PLANNER
0.50 $113.28
1 $113
FIRE-OPERATIONS
FIRE MARSHAL
0.50 $173.71
1 $174
PD-OPERATIONS
POLICE SERGEANT
0.51 $180.01
1 $180
PW-ENGINEERING
SR CIVIL ENGINEER
3.00 $940.86
1 $941
PW-STREETS
SR CREW LEADER-MAINT SPEC
0.50 $105.68
1 $106
PW-STREETS
STREET MAINT SUPV
0.50 $113.98
1 $114
$1,628
$1,627.52
5.51 TYPE SUBTOTAL
$1,628
5.51 TOTALS
$1,628.00
410
S-077
APPEAL TO THE TRAFFIC COMMITTEE
APPEAL
PUBLIC WORKS
Appeal of a staff decision to the Traffic Committee.
$434 per appeal
$625 per appeal
100%
$434.00
$627.00
$(193.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
69.22%
$(193)
$627
$434
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
411
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
APPEAL TO THE TRAFFIC COMMITTEE
S-077
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
SR CIVIL ENGINEER
2.00 $627.24
1 $627
$627
$627.24
2.00 TYPE SUBTOTAL
$627
2.00 TOTALS
$627.00
412
S-078
APPEAL OF TRAF COMM TO CITY COUNCIL
APPEAL
PUBLIC WORKS
Appeal of a Traffic Committee decision to the City Council. $1,467 per appeal
$4,035 per appeal
100%
$1,467.00
$4,034.00
$(2,567.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
36.37%
$(2,567)
$4,034
$1,467
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
413
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
APPEAL OF TRAF COMM TO CITY COUNCIL
S-078
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ADMIN
DIR OF PW-CITY ENGR
2.00 $601.72
1 $602
PW-ENGINEERING
SR CIVIL ENGINEER
8.00 $2,508.96
1 $2,509
PW-ENGINEERING
PRINCIPAL CIVIL ENG
2.00 $923.04
1 $923
$4,034
$4,033.72
12.00 TYPE SUBTOTAL
$4,034
12.00 TOTALS
$4,034.00
414
S-079
TRENCH RESURFACING
SQUARE FOOT
PUBLIC WORKS
Surface resurfacing over a trench repaving in the public right-of-way by the City in lieu of the applicant providing the surface treatment, for any roads that have been surface treated in the previous 5 year period. 0-50 square feet - $103
50-100 square feet - $207
101+ square feet - $1.50 square feet ($207 minimum)
For areas greater than 1,000 square feet, the customer can get quotes and self-perform the work as long as it meets City specifications.
0-50 square feet - $110
50-100 square feet - $220
101+ square feet - $2.50 square feet ($250 minimum)
For areas greater than 1,000 square feet, the customer can get quotes and self-perform the work as long as it meets City specifications.
100%
$500.00
$500.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
100.00%
$0
$500
$500
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
415
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TRENCH RESURFACING
S-079
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
0-50 Sq Ft
0.00 $100.00
1 $100
$100
$100.00
0.00 TYPE SUBTOTAL
PW-ENGINEERING
50-100 Sq Ft
0.00 $200.00
1 $200
$200
$200.00
0.00 TYPE SUBTOTAL
PW-ENGINEERING
101+ Sq Ft
0.00 $200.00
1 $200
$200
$200.00
0.00 TYPE SUBTOTAL
$500
0.00 TOTALS
$500.00
416
S-080
MISCELLANEOUS ENGINEERING SERVICES
HOUR
PUBLIC WORKS
Providing miscellaneous services that are not covered by other fees.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs.
Charge the fully allocated hourly rates for all personnel involved plus any outside costs. 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
417
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MISCELLANEOUS ENGINEERING SERVICES
S-080
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
418
S-081
CONSULTANT/OUTSIDE PLAN CHECK
HOUR
PUBLIC WORKS
Plan check services provided by a consultant.
Charge the actual costs of the consultant plus 20%
Charge the actual costs of the consultant plus 20%
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
419
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONSULTANT/OUTSIDE PLAN CHECK
S-081
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
420
S-082
WORK WITHOUT ENCROACHMENT PERMIT
VIOLATION
PUBLIC WORKS
Fines levied due to performing encroachment work without a permit. $258 - 1st violation (plus notification to Code Enforcement) $516 - 2nd violation (plus notification to Code Enforcement and potential additional fees) $1,033 - Each additional violation (plus notification to Code Enforcement, potential additional fees, and potential revocation of right to work on City ROW projects)
Inspection time will be added at the fully allocated hourly rates when violation requires time of City staff in excess of violation fee charged.
$250 - 1st violation (plus notification to Code Enforcement) $500 - 2nd violation (plus notification to Code Enforcement and potential additional fees) $1,000 - Each additional violation (plus notification to Code Enforcement, potential additional fees, and potential revocation of right to work on City ROW projects)
Inspection time will be added at the fully allocated hourly rates when violation requires time of City staff in excess of violation fee charged.
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
421
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WORK WITHOUT ENCROACHMENT PERMIT
S-082
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
422
S-083
PUBLIC WORKS ADMINISTRATION
APPLICATION
PUBLIC WORKS
Staff review of work performed by a consultant.
110% of consultant costs
-100% to consultant
- 10% to City for review
This fee should be removed from the fee schedule as this service is included in another fee. 100%
$0.00
$0.00
$0.00
0 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
423
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
PUBLIC WORKS ADMINISTRATION
S-083
0 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
424
S-084
TRAFFIC MODEL MAINTENANCE
N/A
PUBLIC WORKS
Maintenance of the Traffic Modeling system used to assist in the determination of traffic impacts of construction-related development.
6% of Construction-related Conditional Use Permit and Planned Development fees 6% of Construction-related Conditional Use Permit and Planned Development fees 100%
$24,000.00
$24,705.00
$(705.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
97.15%
$(705)
$24,705
$24,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
425
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TRAFFIC MODEL MAINTENANCE
S-084
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PW-ENGINEERING
Update/Maintenance
0.00 $24,705.00
1 $24,705
$24,705
$24,705.00
0.00 TYPE SUBTOTAL
$24,705
0.00 TOTALS
$24,705.00
426
S-085
CODE ENFORCEMENT STANDARD INSPECT
INSPECTION
CODE ENFORCEMENT
Providing standard code enforcement inspections.
$98 per inspection
$160 per inspection
100%
$0.00
$160.97
$(160.97)
2,635
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(424,156)
$424,156
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
427
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE ENFORCEMENT STANDARD INSPECT
S-085
2,635
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
1.50 $160.97
2,635
$424,156
$424,156
$160.97
1.50 TYPE SUBTOTAL
$424,156
1.50 TOTALS
$160.97
428
S-085A
CODE ENFORCEMENT SPECIAL INSPECT
INSPECTION
CODE ENFORCEMENT
Providing special code enforcement inspections.
None
$270 per inspection
100%
$0.00
$268.00
$(268.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(268)
$268
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
429
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE ENFORCEMENT SPECIAL INSPECT
S-085A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
2.50 $268.28
1 $268
$268
$268.28
2.50 TYPE SUBTOTAL
$268
2.50 TOTALS
$268.00
430
S-086
INSPECTION WARRANT
WARRANT
CODE ENFORCEMENT
Processing of inspection warrant.
$609 per warrant
$1,035 per warrant
100%
$609.00
$1,033.60
$(424.60)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
58.92%
$(2,123)
$5,168
$3,045
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
431
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
INSPECTION WARRANT
S-086
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
CITY ATTY/RISK MGMT DIR
0.50 $338.67
5 $1,693
CITY ATTORNEY
LEGAL OFFICE SPEC
0.25 $49.82
5 $249
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
3.00 $321.93
5 $1,610
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
1.00 $146.14
5 $731
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
2.00 $176.94
5 $885
$5,168
$1,033.50
6.75 TYPE SUBTOTAL
$5,168
6.75 TOTALS
$1,033.60
432
S-087
ABATEMENT WARRANT
WARRANT
CODE ENFORCEMENT
Processing of abatement warrant.
$1,100 per warrant
$1,925 per warrant
100%
$1,100.00
$1,925.33
$(825.33)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
57.13%
$(2,476)
$5,776
$3,300
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
433
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ABATEMENT WARRANT
S-087
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
CITY ATTY/RISK MGMT DIR
1.50 $1,016.01
3 $3,048
CITY ATTORNEY
LEGAL OFFICE SPEC
0.25 $49.82
3 $149
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
5.00 $536.55
3 $1,610
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
1.00 $146.14
3 $438
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
2.00 $176.94
3 $531
$5,776
$1,925.46
9.75 TYPE SUBTOTAL
$5,776
9.75 TOTALS
$1,925.33
434
S-088
ABATEMENT PROCESSING
ABATEMENT
CODE ENFORCEMENT
Administrative processing of property abatements.
$1,586 per abatement plus actual cost of abatement
$2,750 per abatement plus actual cost of abatement
100%
$9,922.67
$11,089.00
$(1,166.33)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
89.48%
$(3,499)
$33,267
$29,768
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
435
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ABATEMENT PROCESSING
S-088
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
CITY ATTY/RISK MGMT DIR
0.50 $338.67
3 $1,016
CITY ATTORNEY
Abatement Expense
0.00 $8,336.67
3 $25,010
CD-PLANNING
COM DEV DIRECTOR
0.50 $321.45
3 $964
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
15.00 $1,609.65
3 $4,829
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
3.00 $438.42
3 $1,315
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
0.50 $44.24
3 $133
$33,267
$11,089.10
19.50 TYPE SUBTOTAL
$33,267
19.50 TOTALS
$11,089.00
436
S-089
CODE ENFORCEMENT LIEN SETUP
LIEN
CODE ENFORCEMENT
Setup of a Code Enforcement lien.
$362 per lien plus any County filing fees
$535 per lien plus any County filing fees
100%
$362.00
$536.67
$(174.67)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
67.45%
$(524)
$1,610
$1,086
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
437
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE ENFORCEMENT LIEN SETUP
S-089
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
5.00 $536.55
3 $1,610
$1,610
$536.55
5.00 TYPE SUBTOTAL
$1,610
5.00 TOTALS
$536.67
438
S-090
CODE ENFORCEMENT APPEAL
APPEAL
CODE ENFORCEMENT
Appeal of a Code Enforcement staff decision.
$651 per appeal plus amount of citation
$980 per appeal plus amount of citation
Appeal fee is refunded if the citation amount is refunded. 100%
$651.00
$981.37
$(330.37)
30 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
66.34%
$(9,911)
$29,441
$19,530
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
439
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE ENFORCEMENT APPEAL
S-090
30 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
LEGAL OFFICE SPEC
0.25 $49.82
30 $1,495
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
3.00 $321.93
30 $9,658
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
5.00 $536.55
30 $16,097
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
0.50 $73.07
30 $2,192
$29,441
$981.37
8.75 TYPE SUBTOTAL
$29,441
8.75 TOTALS
$981.37
440
S-091
COMPLIANCE ORDER HEARING
HEARING
CODE ENFORCEMENT
Providing a Code Enforcement compliance order hearing.
$718 per hearing
$1,185 per hearing
100%
$718.00
$1,185.77
$(467.77)
220
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
60.55%
$(102,909)
$260,869
$157,960
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
441
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
COMPLIANCE ORDER HEARING
S-091
220
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
LEGAL OFFICE SPEC
0.25 $49.82
220
$10,960
CD-CODE ENFORCE.
CODE ENF MANAGER
1.00 $172.45
220
$37,939
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
5.00 $536.55
220
$118,041
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
0.50 $73.07
220
$16,075
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
4.00 $353.88
220
$77,854
$260,869
$1,185.77
10.75 TYPE SUBTOTAL
$260,869
10.75 TOTALS
$1,185.77
442
S-092
UNPERMITTED CONSTR SPEC INVESTIG
INVESTIGATION
CODE ENFORCEMENT
Investigation of unpermitted construction.
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs 100%
$0.00
$0.00
$0.00
127
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
443
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
UNPERMITTED CONSTR SPEC INVESTIG
S-092
127
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-BLDG & SAFETY
CHIEF BLDG INSPECTOR
Hourly
0.00 $0.00
127
$0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
444
S-093
SPECIAL BUSINESS INSPECTION
INSPECTION
CODE ENFORCEMENT
Annual business inspection of pool halls, gaming rooms, massage parlors, and other special businesses within the city.
$248 per business
$390 per business
100%
$248.00
$391.18
$(143.18)
80 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
63.40%
$(11,454)
$31,294
$19,840
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
445
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIAL BUSINESS INSPECTION
S-093
80 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
LEGAL OFFICE SPEC
0.25 $49.82
80 $3,986
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
2.50 $268.28
80 $21,462
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
0.50 $73.07
80 $5,846
$31,294
$391.17
3.25 TYPE SUBTOTAL
$31,294
3.25 TOTALS
$391.18
446
S-093A
MOBILE CAR WASH PERMIT
PERMIT
CODE ENFORCEMENT
Annual inspection of a mobile car wash business operating within the City.
None
$300 per permit
100%
$0.00
$300.00
$(300.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(300)
$300
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
447
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MOBILE CAR WASH PERMIT
S-093A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
1.50 $160.97
1 $161
CD-CODE ENFORCE.
CODE ENF SUPERVISOR
0.50 $73.07
1 $73
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
0.75 $66.35
1 $66
$300
$300.39
2.75 TYPE SUBTOTAL
$300
2.75 TOTALS
$300.00
448
S-093B
SHORT TERM RENTAL PERMIT
PERMIT
CODE ENFORCEMENT
Review and inspection of short-term rental businesses operating within the City.
None
Initial Application - $890
Inspection - $160
Annual Renewal - $495
100%
$0.00
$1,545.42
$(1,545.42)
45 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(69,544)
$69,544
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
449
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SHORT TERM RENTAL PERMIT
S-093B
45 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF MANAGER
Application
3.00 $517.35
45 $23,281
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
Application
1.00 $107.31
45 $4,829
CD-CODE ENFORCE.
CODE ENF TECHNICIAN
Application
3.00 $265.41
45 $11,943
$40,053
$890.07
7.00 TYPE SUBTOTAL
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
Inspection
1.50 $160.97
45 $7,244
$7,244
$160.97
1.50 TYPE SUBTOTAL
CD-CODE ENFORCE.
CODE ENF MANAGER
Renewal
1.00 $172.45
45 $7,760
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
Renewal
3.00 $321.93
45 $14,487
$22,247
$494.38
4.00 TYPE SUBTOTAL
$69,544
12.50 TOTALS
$1,545.42
450
S-093C
BUSINESS LICENSE INVESTIGATION
INVESTIGATION
CODE ENFORCEMENT
Investigation of a business operating in the City without a business license.
None
$535 per investigation
100%
$0.00
$537.00
$(537.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(537)
$537
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
451
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUSINESS LICENSE INVESTIGATION
S-093C
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CD-CODE ENFORCE.
CODE ENF OFFICER I/II
5.00 $536.55
1 $537
$537
$536.55
5.00 TYPE SUBTOTAL
$537
5.00 TOTALS
$537.00
452
S-094
WEED ABATEMENT
LOT
CODE ENFORCEMENT
Inspection and clearing of weeds from private properties. $160 plus actual clearance cost if lots needs to be cleared $310 per lien processing plus any County filing fees
This fee should be removed from the fee schedule as this service is included in another fee. 100%
$0.00
$0.00
$0.00
0 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
453
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WEED ABATEMENT
S-094
0 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
454
S-095
CODE ENFORCEMENT FINES
VIOLATION
CODE ENFORCEMENT
Fines levied due to non-compliance with the Municipal Code or Building Code. $175 - 1st violation
$500 - 2nd violation
$1,000 - Each additional violation
These fines are for all code violations
$250 - 1st violation
$500 - 2nd violation
$1,000 - 3rd violation
$2,500 - Each additional violation
These fines are for all code violations
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
455
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE ENFORCEMENT FINES
S-095
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
456
S-096
NEW FIRE SPRINKLER SYSTEM PC/INSP
PERMIT
FIRE
Plan check and inspection of a new fire sprinkler system. $248 - 1 to 100 heads
$336 - 101 to 200 heads
$418 - 201 to 350 heads
$ 83 - ea addl 25 heads beyond 350
1 to 100 heads - $250 per permit plus $1 per head
101 to 250 heads - $350 per permit plus $1 per head
251+ heads - $500 per permit plus $1 per head
100%
$313.43
$305.97
$7.46
30 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.44%
$224
$9,179
$9,403
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
457
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW FIRE SPRINKLER SYSTEM PC/INSP
S-096
30 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1-100 Heads
1.50 $243.68
20 $4,874
$4,874
$243.68
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
101-250 Heads
2.00 $324.90
8 $2,599
$2,599
$324.90
2.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
251+ Heads
2.50 $406.13
4 $1,625
$1,625
$406.13
2.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Ea Addl 25 Heads
0.50 $81.23
1 $81
$81
$81.23
0.50 TYPE SUBTOTAL
$9,179
6.50 TOTALS
$305.97
458
S-097
TI FIRE SPRINKLER SYSTEM PC/INSP
PERMIT
FIRE
Plan check and inspection of tenant improvement fire sprinkler system. $ 83 - 1 to 20 heads
$165 - 21 to 100 heads
$248 - 101 to 200 heads
$336 - 201 to 350 heads
$ 83 - each additional 25 heads beyond 350
First Test/Inspection - $165 plus $1 per head
Each Additional Test/Inspection - $165 plus $1 per head 100%
$115.45
$162.45
$(47.00)
58 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
71.07%
$(2,726)
$9,422
$6,696
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
459
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TI FIRE SPRINKLER SYSTEM PC/INSP
S-097
58 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Base
1.00 $162.45
54 $8,772
$8,772
$162.45
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Add'l Test/Inspect
1.00 $162.45
4 $650
$650
$162.45
1.00 TYPE SUBTOTAL
$9,422
2.00 TOTALS
$162.45
460
S-098
STAND PIPE PLAN CHECK/INSPECTION
PERMIT
FIRE
Plan check and inspection of standalone stand pipe system. $160 per plan/permit
$340 per plan/permit
100%
$160.00
$325.00
$(165.00)
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
49.23%
$(660)
$1,300
$640
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
461
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
STAND PIPE PLAN CHECK/INSPECTION
S-098
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.00 $324.90
4 $1,300
$1,300
$324.90
2.00 TYPE SUBTOTAL
$1,300
2.00 TOTALS
$325.00
462
S-099
UNDERGROUND PIPING PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of standalone underground piping system. $336 per plan/permit
$340 per plan/permit
100%
$336.00
$325.00
$11.00
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.38%
$44
$1,300
$1,344
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
463
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
UNDERGROUND PIPING PC/INSPECTION
S-099
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.00 $324.90
4 $1,300
$1,300
$324.90
2.00 TYPE SUBTOTAL
$1,300
2.00 TOTALS
$325.00
464
S-100
FIRE CYCLE SYSTEM PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of fire cycle system.
$336 per plan/permit
$340 per plan/permit
100%
$336.00
$325.00
$11.00
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.38%
$22
$650
$672
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
465
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE CYCLE SYSTEM PC/INSPECTION
S-100
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.00 $324.90
2 $650
$650
$324.90
2.00 TYPE SUBTOTAL
$650
2.00 TOTALS
$325.00
466
S-101
DRY CHEMICAL SYSTEM PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of a new dry chemical system. $336 per plan/permit
$340 per plan/permit
100%
$336.00
$325.00
$11.00
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.38%
$22
$650
$672
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
467
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DRY CHEMICAL SYSTEM PC/INSPECTION
S-101
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.00 $324.90
2 $650
$650
$324.90
2.00 TYPE SUBTOTAL
$650
2.00 TOTALS
$325.00
468
S-102
NEW WET CHEM/KITCHEN HOOD PC/INSP
PERMIT
FIRE
Plan check and inspection of wet chemical/kitchen hood system. $336 per plan/permit
$340 per plan/permit
100%
$336.00
$325.00
$11.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.38%
$11
$325
$336
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
469
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW WET CHEM/KITCHEN HOOD PC/INSP
S-102
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.00 $324.90
1 $325
$325
$324.90
2.00 TYPE SUBTOTAL
$325
2.00 TOTALS
$325.00
470
S-103
FIRE ALARM SYSTEM PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of fire alarm system.
$501 per plan/permit
$405 per plan/permit plus $3 per device
100%
$467.60
$384.47
$83.13
15 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
121.62%
$1,247
$5,767
$7,014
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
471
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE ALARM SYSTEM PC/INSPECTION
S-103
15 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Base
2.50 $406.13
14 $5,686
$5,686
$406.13
2.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Time Per 25 Devices
0.50 $81.23
1 $81
$81
$81.23
0.50 TYPE SUBTOTAL
$5,767
3.00 TOTALS
$384.47
472
S-104
FIRE ALARM MONITOR PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of fire alarm monitoring system. $165 per plan/permit
$245 per plan/permit
100%
$165.00
$243.68
$(78.68)
25 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
67.71%
$(1,967)
$6,092
$4,125
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
473
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE ALARM MONITOR PC/INSPECTION
S-104
25 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1.50 $243.68
25 $6,092
$6,092
$243.68
1.50 TYPE SUBTOTAL
$6,092
1.50 TOTALS
$243.68
474
S-105
NEW KITCHEN HOOD SYST PC/INSPECTION
PERMIT
FIRE
Plan check and inspection of a new commercial kitchen hood suppression system. $294 per plan/permit
$295 per plan/permit
100%
$294.00
$284.00
$10.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.52%
$10
$284
$294
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
475
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW KITCHEN HOOD SYST PC/INSPECTION
S-105
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
????
1.75 $284.29
1 $284
$284
$284.29
1.75 TYPE SUBTOTAL
$284
1.75 TOTALS
$284.00
476
S-106
NEW HIGH PILED STORAGE PC/INSPECT
PERMIT
FIRE
Plan check and inspection of a new high pile storage system. $666 per plan/permit
$405 per plan/permit
100%
$666.00
$406.20
$259.80
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
163.96%
$1,299
$2,031
$3,330
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
477
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW HIGH PILED STORAGE PC/INSPECT
S-106
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.50 $406.13
5 $2,031
$2,031
$406.13
2.50 TYPE SUBTOTAL
$2,031
2.50 TOTALS
$406.20
478
S-107
FIRE HYDRANT FLOW TEST WITNESS
TEST
FIRE
Witnessing a fire hydrant flow test.
$165 per test
$165 per test
100%
$165.00
$162.42
$2.58
12 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.59%
$31
$1,949
$1,980
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
479
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE HYDRANT FLOW TEST WITNESS
S-107
12 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1.00 $162.45
12 $1,949
$1,949
$162.45
1.00 TYPE SUBTOTAL
$1,949
1.00 TOTALS
$162.42
480
S-108
NEW OCC/TENANT IMPR FIRE PC/INSPECT
PERMIT
FIRE
Plan check and inspection of a new occupancy/tenant improvement. 35% of Building Plan Check and Permit fees for this project 35% of Building Plan Check and Permit fees for this project. 100%
$232.40
$319.75
$(87.35)
1,000
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
72.68%
$(87,350)
$319,750
$232,400
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
481
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
NEW OCC/TENANT IMPR FIRE PC/INSPECT
S-108
1,000
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR I
20 Hrs/Wk
1.00 $149.86
1,000
$149,860
FIRE-OPERATIONS
FIRE MARSHAL
30%
0.49 $169.89
1,000
$169,890
$319,750
$319.75
1.49 TYPE SUBTOTAL
$319,750
1.49 TOTALS
$319.75
482
S-109
CODE INSP - KITCHEN HOOD SYSTEM
INSPECTION
FIRE
Fire code inspection of commercial kitchen hood suppression system. $124 per inspection
$125 per inspection
100%
$124.00
$122.00
$2.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.64%
$2
$122
$124
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
483
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE INSP - KITCHEN HOOD SYSTEM
S-109
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
????
0.75 $121.84
1 $122
$122
$121.84
0.75 TYPE SUBTOTAL
$122
0.75 TOTALS
$122.00
484
S-110
CODE INSP - HIGH PILED STORAGE
INSPECTION
FIRE
Fire code inspection of high pile storage system.
$248 per inspection
$250 per inspection
100%
$248.00
$244.00
$4.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.64%
$4
$244
$248
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
485
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CODE INSP - HIGH PILED STORAGE
S-110
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
????
1.50 $243.68
1 $244
$244
$243.68
1.50 TYPE SUBTOTAL
$244
1.50 TOTALS
$244.00
486
S-111
FIRE PRMT - EXHIBITS & TRADE
PERMIT
FIRE
Issuance and inspection of Exhibits and Trades Fire Code Permit. $708 per permit
$710 per permit
100%
$708.00
$690.50
$17.50
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.53%
$70
$2,762
$2,832
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
487
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - EXHIBITS & TRADE
S-111
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
4.25 $690.41
4 $2,762
$2,762
$690.41
4.25 TYPE SUBTOTAL
$2,762
4.25 TOTALS
$690.50
488
S-112
FIRE PRMT - EXPLOSIVES
PERMIT
FIRE
Issuance and inspection of Explosives Fire Code Permit, excluding safe and sane fireworks. $460 per permit
$460 per permit
100%
$460.00
$446.50
$13.50
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.02%
$27
$893
$920
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
489
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - EXPLOSIVES
S-112
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.75 $446.74
2 $893
$893
$446.74
2.75 TYPE SUBTOTAL
$893
2.75 TOTALS
$446.50
490
S-113
FIRE PRMT - FIREWORKS AERIAL
PERMIT
FIRE
Issuance and inspection of Aerial Fireworks Fire Code Permit. $873 per permit
Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs.
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
491
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - FIREWORKS AERIAL
S-113
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Actual Costs
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
492
S-114
FIRE PRMT - TANKS & WELLS
PERMIT
FIRE
Issuance and inspection of tanks and wells Fire Code Permit. $542 per permit
$545 per permit
100%
$542.00
$528.00
$14.00
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.65%
$56
$2,112
$2,168
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
493
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - TANKS & WELLS
S-114
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
3.25 $527.96
4 $2,112
$2,112
$527.96
3.25 TYPE SUBTOTAL
$2,112
3.25 TOTALS
$528.00
494
S-115
FIRE PRMT - LUMBER YARDS
PERMIT
FIRE
Issuance and inspection of Lumber Yards Fire Code Permit. $377 per permit
$380 per permit
100%
$377.00
$365.50
$11.50
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.15%
$46
$1,462
$1,508
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
495
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - LUMBER YARDS
S-115
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.25 $365.51
4 $1,462
$1,462
$365.51
2.25 TYPE SUBTOTAL
$1,462
2.25 TOTALS
$365.50
496
S-116
FIRE PRMT - CARNIVALS, FAIRS
PERMIT
FIRE
Issuance and inspection of Carnivals and Fairs Fire Code Permit. $708 per permit
$710 per permit
100%
$708.00
$690.50
$17.50
4 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.53%
$70
$2,762
$2,832
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
497
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - CARNIVALS, FAIRS
S-116
4 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
4.25 $690.41
4 $2,762
$2,762
$690.41
4.25 TYPE SUBTOTAL
$2,762
4.25 TOTALS
$690.50
498
S-117
FIRE PRMT - PYROTECHNIC
PERMIT
FIRE
Issuance and inspection of Pyrotechnic Fire Code Permit.
Actual staff time at fully allocated hourly rate plus any actual costs Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs.
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
499
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - PYROTECHNIC
S-117
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Actual Time
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
500
S-118
FIRE PRMT - REFRIGERATION EQUIP
PERMIT
FIRE
Issuance and inspection of Refrigeration Equipment Fire Code Permit. $542 per permit
This fee should be removed from the fee schedule as this service is included in another fee. 100%
$0.00
$0.00
$0.00
0 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
501
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - REFRIGERATION EQUIP
S-118
0 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
502
S-119
FIRE PRMT - TEMP MEMBRANE/TENT
PERMIT
FIRE
Issuance and inspection of Temporary Membrane or Tent Fire Code Permit. 1 to 4 tents - $208
5 to 8 tents - $377
9 to 12 tents - $439
13+ tents - $708
1 to 4 tents - $210
5 to 8 tents - $380
9 to 12 tents - $530
13+ tents - $710
100%
$308.00
$311.33
$(3.33)
9 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
98.93%
$(30)
$2,802
$2,772
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
503
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - TEMP MEMBRANE/TENT
S-119
9 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1-4
1.25 $203.06
6 $1,218
$1,218
$203.06
1.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
5-8
2.25 $365.51
1 $366
$366
$365.51
2.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
9-12
3.25 $527.96
1 $528
$528
$527.96
3.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
13+
4.25 $690.41
1 $690
$690
$690.41
4.25 TYPE SUBTOTAL
$2,802
11.00 TOTALS
$311.33
504
S-120
FIRE PRMT - TIRE REBUILDING PLANT
PERMIT
FIRE
Issuance and inspection of Tire Rebuilding Permit Fire Code Permit. $377 per permit
$380 per permit
100%
$377.00
$366.00
$11.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.01%
$11
$366
$377
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
505
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - TIRE REBUILDING PLANT
S-120
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.25 $365.51
1 $366
$366
$365.51
2.25 TYPE SUBTOTAL
$366
2.25 TOTALS
$366.00
506
S-121
FIRE PRMT - COMBUSTIBLE DUST
PERMIT
FIRE
Issuance and inspection of Combustible Dust Fire Code Permit. $377 per permit
$380 per permit
100%
$377.00
$365.50
$11.50
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
103.15%
$23
$731
$754
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
507
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - COMBUSTIBLE DUST
S-121
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.25 $365.51
2 $731
$731
$365.51
2.25 TYPE SUBTOTAL
$731
2.25 TOTALS
$365.50
508
S-122
FIRE PRMT - MULTIPLE PERMITS
PERMIT
FIRE
Issuance and inspection of multiple Fire Code Permits at same location.
Charge the highest applicable fee
Charge the highest applicable fee
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
509
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE PRMT - MULTIPLE PERMITS
S-122
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
510
S-123
LIVE AUDIENCE FIRE INSPECTION
PERMIT
FIRE
Issuance and inspection of live audience permit.
Actual staff time at fully allocated hourly rate plus any outside costs Deposit determined by staff with charges at the fully allocated hourly rates for all personnel involved plus any contract costs.
100%
$0.00
$0.00
$0.00
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
511
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LIVE AUDIENCE FIRE INSPECTION
S-123
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Actual Time
0.00 $0.00
2 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
512
S-124
GENERAL FIRE CODE PERMIT
PERMIT
FIRE
Issuance and inspection of a general Fire Code Permit not otherwise listed. $207 per permit
$210 per permit
100%
$207.00
$203.00
$4.00
6 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.97%
$24
$1,218
$1,242
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
513
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
GENERAL FIRE CODE PERMIT
S-124
6 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1.25 $203.06
6 $1,218
$1,218
$203.06
1.25 TYPE SUBTOTAL
$1,218
1.25 TOTALS
$203.00
514
S-125
LIFE SAFETY - HOTELS/MOTELS
INSPECTION
FIRE
Providing annual hotel/motel Fire life safety inspections. 4 to 15 units - $165
16 to 30 units - $248
31 to 50 units - $418
Each addl 25 units over 50 - $26
4 to 15 units - $165
16 to 30 units - $250
31 to 50 units - $420
Each addl 25 units over 50 - $28
100%
$215.80
$211.36
$4.44
50 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.10%
$222
$10,568
$10,790
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
515
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LIFE SAFETY - HOTELS/MOTELS
S-125
50 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
4-15 Units
1.00 $162.45
10 $1,625
$1,625
$162.45
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
16-30 Units
1.50 $243.68
10 $2,437
$2,437
$243.68
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
31-50 Units
2.50 $406.13
15 $6,092
$6,092
$406.13
2.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Ea Addl 25
0.17 $27.62
15 $414
$414
$27.62
0.17 TYPE SUBTOTAL
$10,568
5.17 TOTALS
$211.36
516
S-126
LIFE SAFETY - ASSEMBLY OCCUPANCY
INSPECTION
FIRE
Providing annual assembly occupancy Fire life safety inspections. 50 to 100 occupants - $165
101+ occupants - $336
50 to 100 occupants - $165
101-200 occupants - $205
201-300 occupants - $245
301-500 occupants - $285
501+ occupants - $325
100%
$249.42
$194.84
$54.58
158
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
128.01%
$8,624
$30,784
$39,408
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
517
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LIFE SAFETY - ASSEMBLY OCCUPANCY
S-126
158
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
50-100 Occ
1.00 $162.45
80 $12,996
$12,996
$162.45
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
101-200 Occ
1.25 $203.06
46 $9,341
$9,341
$203.06
1.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
201-300 Occ
1.50 $243.68
20 $4,874
$4,874
$243.68
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
301-500 Occ
1.75 $284.29
8 $2,274
$2,274
$284.29
1.75 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
501+ Occ
2.00 $324.90
4 $1,300
$1,300
$324.90
2.00 TYPE SUBTOTAL
$30,784
7.50 TOTALS
$194.84
518
S-127
LIFE SAFETY - HAZ MAT FACILITY
INSPECTION
FIRE
Providing annual hazardous material facility Fire life safety inspections. $418 per inspection
$420 per inspection
100%
$418.00
$406.13
$11.87
55 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.92%
$653
$22,337
$22,990
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
519
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
LIFE SAFETY - HAZ MAT FACILITY
S-127
55 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
2.50 $406.13
55 $22,337
$22,337
$406.13
2.50 TYPE SUBTOTAL
$22,337
2.50 TOTALS
$406.13
520
S-128
MULTI-FAMILY DWELLING INSPECTION
INSPECTION
FIRE
Annual Fire safety inspection of multi-family dwelling. 3 to 15 units - $165
16 to 30 units - $248
31 to 50 units - $418
Each addl 25 units over 50 - $26
3 to 15 units - $165
16 to 30 units - $250
31 to 50 units - $420
Each addl 25 units over 50 - $28
100%
$200.60
$196.84
$3.76
300
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.91%
$1,129
$59,051
$60,180
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
521
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MULTI-FAMILY DWELLING INSPECTION
S-128
300
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
3-15 Units
1.00 $162.45
140
$22,743
$22,743
$162.45
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
16-30 Units
1.50 $243.68
60 $14,621
$14,621
$243.68
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
31-50 Units
2.50 $406.13
50 $20,307
$20,307
$406.13
2.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Ea Addl 25
0.17 $27.62
50 $1,381
$1,381
$27.62
0.17 TYPE SUBTOTAL
$59,051
5.17 TOTALS
$196.84
522
S-129
OCCUPANCY INSP - BOARD & CARE HOME
INSPECTION
FIRE
Inspection of board and care home to assure conformance with appropriate codes and standards. 1st 10 bedrooms - $248
Each addl 10 bedrooms - $83
1st 10 bedrooms - $250
Each addl 10 bedrooms - $85
100%
$165.50
$162.45
$3.05
20 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.88%
$61
$3,249
$3,310
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
523
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - BOARD & CARE HOME
S-129
20 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1st 10 Bedrooms
1.50 $243.68
10 $2,437
$2,437
$243.68
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Ea Addl 10 Bedrooms
0.50 $81.23
10 $812
$812
$81.23
0.50 TYPE SUBTOTAL
$3,249
2.00 TOTALS
$162.45
524
S-130
OCCUPANCY INSP - DAY CARE FACILITY
INSPECTION
FIRE
Inspection of day care facility to assure conformance with appropriate codes and standards. 9-14 occupants - $207
15+ occupants - $248
9-14 occupants - $210
15+ occupants - $250
100%
$217.25
$213.23
$4.02
40 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.89%
$161
$8,529
$8,690
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
525
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - DAY CARE FACILITY
S-130
40 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
9-14 Occupants
1.25 $203.06
30 $6,092
$6,092
$203.06
1.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
15+ Occupants
1.50 $243.68
10 $2,437
$2,437
$243.68
1.50 TYPE SUBTOTAL
$8,529
2.75 TOTALS
$213.23
526
S-131
OCCUPANCY INSP - CONVALESCENT HOSP
INSPECTION
FIRE
Inspection of convalescent hospital to assure conformance with appropriate codes and standards. 1st 10 beds - $150
Each addl 10 beds over 10 - $77
1st 10 beds - $165
Each addl 10 beds over 10 - $85
100%
$125.67
$135.42
$(9.75)
12 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
92.80%
$(117)
$1,625
$1,508
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
527
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - CONVALESCENT HOSP
S-131
12 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1st 10 Beds
1.00 $162.45
8 $1,300
$1,300
$162.45
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Ea Addl 10 Over 10
0.50 $81.23
4 $325
$325
$81.23
0.50 TYPE SUBTOTAL
$1,625
1.50 TOTALS
$135.42
528
S-132
OCCUPANCY INSP - OTHER HOSPITAL
INSPECTION
FIRE
Inspection of other hospital to assure conformance with appropriate codes and standards. $645 per inspection
$650 per inspection
100%
$645.00
$650.00
$(5.00)
2 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
99.23%
$(10)
$1,300
$1,290
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
529
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - OTHER HOSPITAL
S-132
2 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
4.00 $649.80
2 $1,300
$1,300
$649.80
4.00 TYPE SUBTOTAL
$1,300
4.00 TOTALS
$650.00
530
S-133
OCCUPANCY INSP - PUBLIC/PRIV SCHOOL
INSPECTION
FIRE
Inspection of public/private school to assure conformance with appropriate codes and standards.
Elementary - $501
Secondary - $1,002
Elementary - $505
Secondary - $1,005
100%
$584.50
$568.57
$15.93
30 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
102.80%
$478
$17,057
$17,535
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
531
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - PUBLIC/PRIV SCHOOL
S-133
30 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Elementary
3.00 $487.35
25 $12,184
$12,184
$487.35
3.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR II
Secondary
6.00 $974.70
5 $4,874
$4,874
$974.70
6.00 TYPE SUBTOTAL
$17,057
9.00 TOTALS
$568.57
532
S-134
OCCUPANCY INSP - OTHER STATE PROG
INSPECTION
FIRE
Inspection of other state program facilities to assure conformance with appropriate codes and standards. $165 per inspection
$165 per inspection
100%
$165.00
$162.50
$2.50
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.54%
$25
$1,625
$1,650
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
533
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OCCUPANCY INSP - OTHER STATE PROG
S-134
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
1.00 $162.45
10 $1,625
$1,625
$162.45
1.00 TYPE SUBTOTAL
$1,625
1.00 TOTALS
$162.50
534
S-135
ENGINE COMPANY INSPECTION
INSPECTION
FIRE
Annual Fire safety inspections of businesses by Engine Companies. $181 per inspection
$185 per inspection
100%
$181.00
$185.00
$(4.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
97.84%
$(4)
$185
$181
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
535
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ENGINE COMPANY INSPECTION
S-135
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
0.51 $74.59
1 $75
FIRE-OPERATIONS
FIRE ENGINEER
0.49 $60.76
1 $61
FIRE-OPERATIONS
FIRE FIGHTER
0.49 $49.67
1 $50
$185
$185.02
1.49 TYPE SUBTOTAL
$185
1.49 TOTALS
$185.00
536
S-136
COMMERCIAL BUSINESS INSPECTION
INSPECTION
FIRE
Annual Fire safety inspections of commercial buildings (Occupancy Type B, F, M, S). $160 per inspection OR
0-2,000 square feet - $124
2,001-5,000 square feet - $155
5,001-10,000 square feet - $186
10,001-25,000 square feet - $217
25,001-50,000 square feet - $248
50,001-100,000 square feet - $310
100,001-200,000 square feet - $371
200,001+ square feet - $434
0-2,000 square feet - $125
2,001-5,000 square feet - $155
5,001-10,000 square feet - $190
10,001-25,000 square feet - $225
25,001-50,000 square feet - $260
50,001-100,000 square feet - $310
100,001-200,000 square feet - $375
200,001+ square feet - $435
100%
$198.87
$197.34
$1.53
300
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
100.77%
$457
$59,203
$59,660
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
537
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
COMMERCIAL BUSINESS INSPECTION
S-136
300
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR I
Up To 2k Sq Ft
0.75 $112.41
20 $2,248
$2,248
$112.41
0.75 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
2k-5k Sq Ft
1.00 $149.88
115
$17,236
$17,236
$149.88
1.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
5k-10k Sq Ft
1.25 $187.35
75 $14,051
$14,051
$187.35
1.25 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
10k-25k Sq Ft
1.50 $224.82
30 $6,745
$6,745
$224.82
1.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
25k-50k Sq Ft
1.75 $262.29
20 $5,246
$5,246
$262.29
1.75 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
50k-100k Sq Ft
2.00 $299.76
20 $5,995
$5,995
$299.76
2.00 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
100k-200k Sq Ft
2.50 $374.70
15 $5,621
$5,621
$374.70
2.50 TYPE SUBTOTAL
FIRE-OPERATIONS
FIRE INSPECTOR I
Over 200k Sq Ft
2.75 $412.17
5 $2,061
$2,061
$412.17
2.75 TYPE SUBTOTAL
$59,203
13.50 TOTALS
$197.34
538
S-137
BUSINESS LICENSE FIRE REVIEW
BUSINESS
FIRE
Fire review of new business license applications for compliance with fire codes. $77 per business
$85 per business
100%
$77.00
$86.86
$(9.86)
456
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
88.65%
$(4,496)
$39,608
$35,112
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
539
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BUSINESS LICENSE FIRE REVIEW
S-137
456
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE MARSHAL
0.25 $86.86
456
$39,608
$39,608
$86.86
0.25 TYPE SUBTOTAL
$39,608
0.25 TOTALS
$86.86
540
S-138
FIRE CODE ENFORCEMENT INSPECTION
INSPECTION
FIRE
Inspection of Fire Code Enforcement issues.
$165 per inspection after the 3rd visit
$165 per inspection after the 3rd visit
100%
$165.00
$162.40
$2.60
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.60%
$13
$812
$825
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
541
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE CODE ENFORCEMENT INSPECTION
S-138
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
After 3rd Visit
1.00 $162.45
5 $812
$812
$162.45
1.00 TYPE SUBTOTAL
$812
1.00 TOTALS
$162.40
542
S-139
ADDITIONAL FIRE PLAN REVIEW
RESUBMITTAL
FIRE
Providing additional fire plan review services needed due to the actions of the applicant. Fee applies after the second submittal.
$160 per re-submittal after the second submittal
$165 per re-submittal after the second submittal
100%
$160.00
$162.33
$(2.33)
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
98.56%
$(7)
$487
$480
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
543
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADDITIONAL FIRE PLAN REVIEW
S-139
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Per Re-Submittal
1.00 $162.45
3 $487
$487
$162.45
1.00 TYPE SUBTOTAL
$487
1.00 TOTALS
$162.33
544
S-140
ADDITIONAL FIRE INSPECTION
VISIT
FIRE
Additional fire inspections provided when needed due to the actions of the applicant. $165 per additional visit
$165 per additional visit
100%
$165.00
$162.33
$2.67
3 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
101.64%
$8
$487
$495
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
545
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ADDITIONAL FIRE INSPECTION
S-140
3 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE INSPECTOR II
Per Visit
1.00 $162.45
3 $487
$487
$162.45
1.00 TYPE SUBTOTAL
$487
1.00 TOTALS
$162.33
546
S-141
FALSE ALARM RESPONSE
RESPONSE
FIRE
Response to a fire alarm which is determined to be due to error or malfunction. $310 per response after 1st visit and subsequent false alarms in any 12 month period $370 per response after 1st visit and subsequent false alarms in any 12 month period 100%
$310.00
$185.80
$124.20
25 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
166.85%
$3,105
$4,645
$7,750
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
547
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FALSE ALARM RESPONSE
S-141
25 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
0.50 $73.13
25 $1,828
FIRE-OPERATIONS
FIRE ENGINEER
0.50 $61.99
25 $1,550
FIRE-OPERATIONS
FIRE FIGHTER
0.50 $50.68
25 $1,267
$4,645
$185.80
1.50 TYPE SUBTOTAL
$4,645
1.50 TOTALS
$185.80
548
S-142
FIRE INVESTIGATION
INVESTIGATION
FIRE
Investigation of a potential arson-related fire.
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
549
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE INVESTIGATION
S-142
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE MARSHAL
Actual Cost
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
550
S-143
EMERG RESP - AMBULANCE TO HOSPITAL
RESPONSE
FIRE
Fire emergency response with ambulance assistance at the hospital. $170 per response
$185 per response
100%
$170.00
$185.60
$(15.60)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
91.59%
$(78)
$928
$850
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
551
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EMERG RESP - AMBULANCE TO HOSPITAL
S-143
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
0.50 $73.01
5 $365
FIRE-OPERATIONS
FIRE ENGINEER
0.50 $61.89
5 $309
FIRE-OPERATIONS
FIRE FIGHTER
0.50 $50.69
5 $253
$928
$185.59
1.50 TYPE SUBTOTAL
$928
1.50 TOTALS
$185.60
552
S-144
EMERG RESP - LIFT ASSIST NON-EMER
RESPONSE
FIRE
Fire response with non-emergency lift assistance.
$155 per response
$185 per response
100%
$170.00
$185.80
$(15.80)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
91.50%
$(79)
$929
$850
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
553
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EMERG RESP - LIFT ASSIST NON-EMER
S-144
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
0.50 $73.13
5 $366
FIRE-OPERATIONS
FIRE ENGINEER
0.50 $62.00
5 $310
FIRE-OPERATIONS
FIRE FIGHTER
0.50 $50.69
5 $253
$929
$185.82
1.50 TYPE SUBTOTAL
$929
1.50 TOTALS
$185.80
554
S-145
FIRE DUI ACCIDENT RESPONSE
RESPONSE
FIRE
Emergency response to a collision involving a driver under the influence.
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
555
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE DUI ACCIDENT RESPONSE
S-145
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
Actual Costs
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
556
S-146
SMALL FUELS CLEAN-UP
RESPONSE
FIRE
Cleanup of a small fuel leakage or contamination.
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
557
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SMALL FUELS CLEAN-UP
S-146
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
Hourly
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
558
S-147
HAZ MAT INCIDENT RESPONSE
RESPONSE
FIRE
Fire emergency response to a hazardous materials incident.
Actual staff time at fully allocated hourly rate plus any outside costs Actual staff time at fully allocated hourly rate plus any outside costs 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
559
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
HAZ MAT INCIDENT RESPONSE
S-147
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
FIRE CAPTAIN
Hourly
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
560
S-148
FIREWORKS BOOTH REVIEW/INSPECTION
BOOTH
FIRE
Fire safety inspections of a fireworks booth.
$821 per booth
$970 per booth
100%
$821.00
$970.35
$(149.35)
26 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
84.61%
$(3,883)
$25,229
$21,346
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
561
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIREWORKS BOOTH REVIEW/INSPECTION
S-148
26 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY MANAGER
COMMUNICATIONS MGR
Selection Process
2.00 $451.14
26 $11,730
Outreach Materials
0.00 $136.65
26 $3,553
FIRE-OPERATIONS
ADMIN ASSISTANT
Selection Process
2.00 $260.70
26 $6,778
FIRE-OPERATIONS
FIRE INSPECTOR II
Inspection
0.75 $121.84
26 $3,168
$25,229
$970.33
4.75 TYPE SUBTOTAL
$25,229
4.75 TOTALS
$970.35
562
S-149
FIRE INCIDENT REPORT COPY
PAGE
FIRE
Providing a copy of a Fire incident report.
First 10 pages - No Charge
Each page after 10 - $0.25 per page
First 10 pages - No Charge
Each page after 10 - $0.25 per page
100%
$0.00
$1.00
$(1.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(1)
$1
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
563
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE INCIDENT REPORT COPY
S-149
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
ADMIN ASSISTANT
Ea Page
0.01 $1.30
1 $1
$1
$1.30
0.01 TYPE SUBTOTAL
$1
0.01 TOTALS
$1.00
564
S-150
FIRE ELECTRONIC FILE COPY
DISK/DEVICE
FIRE
Providing copies of Fire Department electronic files.
$5 per disk/device
$5 per disk/device
100%
$5.00
$4.00
$1.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
125.00%
$1
$4
$5
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
565
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FIRE ELECTRONIC FILE COPY
S-150
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
FIRE-OPERATIONS
ADMIN ASSISTANT
0.03 $3.91
1 $4
$4
$3.91
0.03 TYPE SUBTOTAL
$4
0.03 TOTALS
$4.00
566
S-151
POLICE FALSE ALARM RESPONSE
RESPONSE
POLICE
Police response to a false burglar alarm.
$372 per response after the third response
$372 per response after the third response
100%
$212.83
$378.90
$(166.07)
226
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
56.17%
$(37,531)
$85,631
$48,100
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
567
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POLICE FALSE ALARM RESPONSE
S-151
226
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-ADMIN
3rd Party Contract
0.00 $74.49
226
$16,835
PD-OPERATIONS
POLICE OFFICER
.75 Hrs X 2 Offcr
1.50 $304.41
226
$68,797
$85,631
$378.90
1.50 TYPE SUBTOTAL
$85,631
1.50 TOTALS
$378.90
568
S-152
POLICE ALARM PERMIT
PERMIT
POLICE
Processing the contact information for a burglary alarm within the City. $15 per permit
$15 per permit
100%
$0.00
$0.00
$0.00
1,670
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
569
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POLICE ALARM PERMIT
S-152
1,670
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
POLICE RECORDS TECH II
Contract-35% Of Rev
0.00 $0.00
1,670
$0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
570
S-153
SPECIAL BUSINESS REVIEW - NEW
BUSINESS
POLICE
Police review of new businesses as required by the municipal code. $108 per business
$120 per business
100%
$108.00
$122.00
$(14.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
88.52%
$(14)
$122
$108
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
571
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIAL BUSINESS REVIEW - NEW
S-153
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
SR POLICE RECORDS TECH
1.00 $122.36
1 $122
$122
$122.36
1.00 TYPE SUBTOTAL
$122
1.00 TOTALS
$122.00
572
S-154
SPECIAL BUSINESS REVIEW - RENEWAL
BUSINESS
POLICE
Annual Police review of businesses as required by the municipal code. $108 per business
$60 per business
100%
$108.00
$61.00
$47.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
177.05%
$47
$61
$108
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
573
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SPECIAL BUSINESS REVIEW - RENEWAL
S-154
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
SR POLICE RECORDS TECH
0.50 $61.18
1 $61
$61
$61.18
0.50 TYPE SUBTOTAL
$61
0.50 TOTALS
$61.00
574
S-155
GUN DEALER PERMIT
PERMIT
POLICE
Police review of gun dealer business.
$120 per permit
$120 per permit
100%
$120.00
$122.00
$(2.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
98.36%
$(2)
$122
$120
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
575
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
GUN DEALER PERMIT
S-155
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
SR POLICE RECORDS TECH
1.00 $122.36
1 $122
$122
$122.36
1.00 TYPE SUBTOTAL
$122
1.00 TOTALS
$122.00
576
S-156
MASSAGE TECH/PARLOR LICENSE
PERMIT
POLICE
Review of a request to operate as a massage business or technician in the City who is not state certified. $108 per permit
$120 per permit
100%
$108.00
$122.36
$(14.36)
25 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
88.26%
$(359)
$3,059
$2,700
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
577
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
MASSAGE TECH/PARLOR LICENSE
S-156
25 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
SR POLICE RECORDS TECH
1.00 $122.36
25 $3,059
$3,059
$122.36
1.00 TYPE SUBTOTAL
$3,059
1.00 TOTALS
$122.36
578
S-157
TOBACCO RETAILER PERMIT
PERMIT
POLICE
Review and enforcement of businesses within the City which sell tobacco products. $604 - New
$362 - Renewal
$690 - New
$160 - Renewal
100%
$364.99
$304.99
$60.00
81 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
119.67%
$4,860
$24,704
$29,564
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
579
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TOBACCO RETAILER PERMIT
S-157
81 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
CITY ATTORNEY
CITY ATTY/RISK MGMT DIR
New
0.33 $223.52
1 $224
PD-OPERATIONS
POLICE OFFICER
New
2.02 $409.90
1 $410
PD-OPERATIONS
POLICE SERGEANT
New
0.16 $56.48
1 $56
$690
$689.90
2.51 TYPE SUBTOTAL
PD-OPERATIONS
POLICE OFFICER
Renewal
0.50 $101.43
80 $8,114
PD-OPERATIONS
POLICE SERGEANT
Renewal
0.17 $59.96
80 $4,797
$12,911
$161.39
0.67 TYPE SUBTOTAL
REC-PARK SVCS OFFICERS
PARK SVCS OFFICER
Enforce - 50 Hr/Yr
0.62 $54.68
80 $4,374
REC-PARK SVCS OFFICERS
SR PARK SVCS OFCR
Enforce - 5 Hrs/Yr
0.06 $10.92
80 $874
PD-OPERATIONS
POLICE OFFICER
Enforce - 20 Hr/Yr
0.36 $73.18
80 $5,854
$11,102
$138.78
1.05 TYPE SUBTOTAL
$24,704
4.23 TOTALS
$304.99
580
S-158
ABC ONE-DAY LICENSE
APPLICATION
POLICE
Review of a request to serve alcohol at a one-time event. $110 per application
$145 per application
100%
$129.00
$145.83
$(16.83)
40 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
88.46%
$(673)
$5,833
$5,160
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
581
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ABC ONE-DAY LICENSE
S-158
40 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-OPERATIONS
POLICE OFFICER
0.33 $67.12
40 $2,685
PD-OPERATIONS
POLICE SERGEANT
0.17 $60.00
40 $2,400
PD-SUPPORT
POLICE RECORDS TECH I
0.17 $18.70
40 $748
$5,833
$145.82
0.67 TYPE SUBTOTAL
$5,833
0.67 TOTALS
$145.83
582
S-159
TAXI CAB INSPECTION
TAXI/BUSINESS
POLICE
Conduct background check for either a taxi cab business owner or driver in order to preserve and insure the public peace, health, safety, and welfare.
$88 per taxi/business
$95 per taxi/business
100%
$88.00
$97.00
$(9.00)
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
90.72%
$(9)
$97
$88
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
583
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TAXI CAB INSPECTION
S-159
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-OPERATIONS
POLICE OFFICER
0.48 $97.40
1 $97
$97
$97.40
0.48 TYPE SUBTOTAL
$97
0.48 TOTALS
$97.00
584
S-160
REPOSSESSED VEHICLE RELEASE
VEHICLE
POLICE
Release of a repossessed vehicle.
California Government Code 26751
$15 per vehicle
California Government Code 26751
$15 per vehicle
46%
$15.00
$39.73
$(24.73)
500
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
37.75%
$(12,365)
$19,865
$7,500
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
585
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
REPOSSESSED VEHICLE RELEASE
S-160
500
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
POLICE RECORDS TECH II
0.25 $26.63
500
$13,315
PD-DISPATCH
DISPATCHER II
0.08 $13.10
500
$6,550
$19,865
$39.73
0.33 TYPE SUBTOTAL
$19,865
0.33 TOTALS
$39.73
586
S-161
STORED VEHICLE RELEASE
VEHICLE
POLICE
Impound and a release of a vehicle.
$238 per vehicle
$255 per vehicle
100%
$238.00
$256.18
$(18.18)
1,300
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
92.90%
$(23,634)
$333,034
$309,400
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
587
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
STORED VEHICLE RELEASE
S-161
1,300
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-OPERATIONS
POLICE OFFICER
1.00 $202.92
1,300
$263,796
PD-SUPPORT
POLICE RECORDS TECH II
0.50 $53.26
1,300
$69,238
$333,034
$256.18
1.50 TYPE SUBTOTAL
$333,034
1.50 TOTALS
$256.18
588
S-162
CITATION SIGN OFF
CITATION
POLICE
Sign-off a police mechanical failure citation.
$15 per citation
$60 per citation
100%
$15.00
$61.28
$(46.28)
200
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
24.48%
$(9,256)
$12,256
$3,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
589
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CITATION SIGN OFF
S-162
200
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-OPERATIONS
POLICE OFFICER
0.26 $52.76
200
$10,552
PD-SUPPORT
POLICE RECORDS TECH II
0.08 $8.52
200
$1,704
$12,256
$61.28
0.34 TYPE SUBTOTAL
$12,256
0.34 TOTALS
$61.28
590
S-163
POLICE DUI ACCIDENT RESPONSE
RESPONSE
POLICE
Responding to an accident in which a driver was driving under the influence.
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel
Per California Government Code 53155, charge the actual costs incurred up to $12,000 per response for all responding personnel
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
591
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POLICE DUI ACCIDENT RESPONSE
S-163
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-OPERATIONS
POLICE OFFICER
Actual Time
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
592
S-164
CONCEALED WEAPON PERMIT
PERMIT
POLICE
Processing a request to be able to carry a concealed weapon with in the City.
California Penal Code Sections 12050-12054 and 26190a
New Permit - $966 (50% paid at time of application with remaining amount paid upon issuing of permit) Renewal Permit - $640
Amended Permit - $563
Psychological testing costs are added to the above
New Permit - $966 (50% paid at time of application with remaining amount paid upon issuing of permit) Renewal Permit - $25
Amended Permit - $10
Applicant must also pay outside party for LiveScan
60%
$784.74
$616.00
$168.74
31 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
127.39%
$5,231
$19,096
$24,327
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
593
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONCEALED WEAPON PERMIT
S-164
31 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-ADMIN
PART TIME CONSULTANT
New
6.00 $640.14
14 $8,962
PD-ADMIN
CHIEF OF POLICE
New
0.25 $147.27
14 $2,062
PD-OPERATIONS
POLICE COMMANDER
New
0.25 $138.61
14 $1,941
PD-SUPPORT
SR POLICE RECORDS TECH
New
0.25 $30.59
14 $428
$13,393
$956.61
6.75 TYPE SUBTOTAL
PD-ADMIN
PART TIME CONSULTANT
Renewal
0.50 $53.35
16 $854
PD-ADMIN
CHIEF OF POLICE
Renewal
0.25 $147.27
16 $2,356
PD-OPERATIONS
POLICE COMMANDER
Renewal
0.25 $138.61
16 $2,218
PD-SUPPORT
SR POLICE RECORDS TECH
Renewal
0.08 $9.79
16 $157
$5,584
$349.02
1.08 TYPE SUBTOTAL
PD-ADMIN
PART TIME CONSULTANT
Amendment
0.17 $18.14
1 $18
PD-ADMIN
CHIEF OF POLICE
Amendment
0.08 $47.13
1 $47
PD-OPERATIONS
POLICE COMMANDER
Amendment
0.08 $44.35
1 $44
PD-SUPPORT
SR POLICE RECORDS TECH
Amendment
0.08 $9.79
1 $10
$119
$119.41
0.41 TYPE SUBTOTAL
$19,096
8.24 TOTALS
$616.00
594
S-165
CLEARANCE LETTER
LETTER
POLICE
Processing and review of a request for a local background check and providing a letter with the results. $52 per letter
$55 per letter
100%
$52.00
$53.26
$(1.26)
500
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
97.63%
$(630)
$26,630
$26,000
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
595
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CLEARANCE LETTER
S-165
500
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
POLICE RECORDS TECH II
0.50 $53.26
500
$26,630
$26,630
$53.26
0.50 TYPE SUBTOTAL
$26,630
0.50 TOTALS
$53.26
596
S-166
FINGERPRINT / LIVESCAN
REQUEST
POLICE
Processing a request for a fingerprint/LiveScan identification. $52 per request
$55 per request
100%
$52.00
$53.26
$(1.26)
1,248
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
97.63%
$(1,572)
$66,468
$64,896
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
597
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
FINGERPRINT / LIVESCAN
S-166
1,248
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
POLICE RECORDS TECH II
0.50 $53.26
1,248
$66,468
$66,468
$53.26
0.50 TYPE SUBTOTAL
$66,468
0.50 TOTALS
$53.26
598
S-167
POLICE REPORT COPY
PAGE
POLICE
Providing a copy of a police report on request.
First 10 pages - No Charge
Each page after 10 - $0.25 per page
First 10 pages - No Charge
Each page after 10 - $0.25 per page
25%
$0.00
$1.07
$(1.07)
3,000
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$(3,210)
$3,210
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
599
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POLICE REPORT COPY
S-167
3,000
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
POLICE RECORDS TECH II
0.01 $1.07
3,000
$3,210
$3,210
$1.07
0.01 TYPE SUBTOTAL
$3,210
0.01 TOTALS
$1.07
600
S-168
POLICE ELECTRONIC FILE COPY
DISK/DEVICE
POLICE
Digital reproduction of a police photo.
$5 per disk/device
$5 per disk/device
100%
$5.00
$4.08
$0.92
260
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
122.53%
$239
$1,061
$1,300
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
601
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
POLICE ELECTRONIC FILE COPY
S-168
260
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
PD-SUPPORT
PROPERTY-EVIDENCE CLERK
0.03 $4.08
260
$1,061
$1,061
$4.08
0.03 TYPE SUBTOTAL
$1,061
0.03 TOTALS
$4.08
602
S-188
TEMPORARY DUMPSTER BIN
BIN
SOLID WASTE
Providing temporary refuse dumpster bin on request.
Fees include volume charges
90 gallon - $40
Cancellation - $37
(after delivery but before use)
4 yard - $167
6 yard - $178
Cancellation - $72
(after delivery but before use)
Fees include volume charges
95 gallon - $45 Extra Haul - $45
Cancellation - $45
(after delivery but before use)
4 yard - $175 Extra Haul - $165 Cancellation - $175 6 yard - $190 Extra Haul - $240 Cancellation - $190 (after delivery but before use)
100%
$0.00
$0.00
$0.00
61 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
603
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
TEMPORARY DUMPSTER BIN
S-188
61 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
604
S-189
DUMPSTER GRAVITY LOCK INSTALLATION
LOCK
SOLID WASTE
Installation of a dumpster gravity lock.
$180 per lock plus cost of lock
$195 per lock plus cost of lock
100%
$0.00
$0.00
$0.00
15 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
605
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
DUMPSTER GRAVITY LOCK INSTALLATION
S-189
15 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
606
S-190
CONTAINER SIZE EXCHANGE/DELIVERY
CONTAINER
SOLID WASTE
Exchanging a solid waste container to a different size on request. There is one courtesy exchange within a 12 month period.
Cart - $37 per visit
Bin - $72 per visit
Cart - $40 per visit
Bin - $75 per visit
100%
$0.00
$0.00
$0.00
537
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
607
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONTAINER SIZE EXCHANGE/DELIVERY
S-190
537
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
608
S-191
SOLID WASTE EXTRA HAUL
HAUL
SOLID WASTE
Providing a solid waste extra haul on request.
Fees below include volume charges
60 gallon - $17
90 gallon - $21
350 gallon - $72
2 yard - $83
3 yard - $93
4 yard - $93
6 yard - $103
Fees below include volume charges
60 gallon - $25
95 gallon - $35
2 yard - $90
3 yard - $125
4 yard - $165
6 yard - $240
8 yard - $350
100%
$0.00
$0.00
$0.00
163
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
609
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SOLID WASTE EXTRA HAUL
S-191
163
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
610
S-192
OVERLOADED SOLID WASTE CONTAINER
CONTAINER
SOLID WASTE
Collection of an overloaded solid waste container.
Fees include volume charges
60 gallon - $4
90 gallon - $6
350 gallon - $10
2 yard - $10
3 yard - $17
4 yard - $21
6 yard - $31
Fees include volume charges
60 gallon - $25
90 gallon - $35
2 yard - $90
3 yard - $125
4 yard - $165
6 yard - $240
8 yard - $350
100%
$0.00
$0.00
$0.00
1,300
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
611
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
OVERLOADED SOLID WASTE CONTAINER
S-192
1,300
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
612
S-193
SOLID WASTE CLEAN UP HAULING/DISP
INCIDENT
SOLID WASTE
Clean up of hauling and disposal.
Cost determined by staff with charges at 100% of the fully allocated hourly rate for all personnel involved plus any outside costs.
Cost determined by staff with charges at 100% of the fully allocated hourly rate for all personnel involved plus any outside costs
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
613
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SOLID WASTE CLEAN UP HAULING/DISP
S-193
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-REFUSE COMM.
SOLID WASTE EQUIP CREW LD
Actual Cost
0.00 $0.00
1 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
614
S-195
SOLID WASTE TUB-OUT SERVICE
ACCOUNT
SOLID WASTE
Collection of residential solid waste containers from locations other than the curbside. $17 per account per month
$20 per account per month
73%
$0.00
$0.00
$0.00
18 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 21, 2026
615
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
SOLID WASTE TUB-OUT SERVICE
S-195
18 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
616
S-196
RECYCLE SERVICE ONLY
CUSTOMER
SOLID WASTE
Providing only recycling services to a customer.
Charge monthly refuse services
Charge monthly refuse services
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
617
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
RECYCLE SERVICE ONLY
S-196
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
618
S-196A
RECYCLE BIN - 8 YARD
BIN/MONTH
SOLID WASTE
Monthly rate for 8 yard recycle bins. This is adding a new rate to the already existing 2 yard - 6 yard recycle bins. 1st Bin Ea Addl
1 pickup per week: $ 350.00 $ 290.00
2 pickup per week: $ 659.00 $ 552.00
3 pickup per week: $ 938.00 $ 815.00
4 pickup per week: $1,277.00 $1,077.00
5 pickup per week: $1,586.00 $1,339.00
6 pickup per week: $1,895.00 $1,602.00
Remove this fee from the fee schedule as it is included in the Solid Waste rates. 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
619
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
RECYCLE BIN - 8 YARD
S-196A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
620
S-196B
COMPACTOR SERVICE
DUMPSTER
SOLID WASTE
Providing solid waste collection services for compactor dumpsters.
Double the rate of equivalent sized dumpster (minimum charge); additional charges may apply based on overall density as determined by staff
Four times the equivalent Container Size Refuse Rate Minimum. (Additional charges may be applicable based on compaction rate.) 100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
621
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
COMPACTOR SERVICE
S-196B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
622
S-197
CONSTRUCTION WATER METER RENTAL
METER
WATER
Rental of a construction water meter on request.
$170 - Installation
$ 67 - Monthly read
$170 - Relocation
$170 - Removal
$15 - Daily Rental
Water Usage - Current water rates based on water usage
$325 - Installation
$ 72 - Monthly read
$325 - Relocation
$195 - Removal
$30 - Daily Rental (includes water meter and backflow device) Water Usage - Current water rates based on water usage
100%
$958.22
$1,049.63
$(91.41)
41 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
91.29%
$(3,748)
$43,035
$39,287
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
623
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
CONSTRUCTION WATER METER RENTAL
S-197
41 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
ACCOUNT CLERK I/II
Set Up/Removal
0.25 $28.98
36 $1,043
UTIL-WATER
REG COMPLIANCE SPEC I/II
Backflow Testing
1.00 $131.69
36 $4,741
UTIL-WATER
WATER OPERATOR I/II/III
Install/Remove
1.00 $164.77
36 $5,932
$11,716
$325.44
2.25 TYPE SUBTOTAL
UTIL-WATER
CUSTOMER SVC TECH
Monthly Read
0.25 $30.76
391
$12,027
UTIL-WATER
WATER OPERATOR I/II/III
Monthly Read
0.25 $41.19
391
$16,105
$28,132
$71.95
0.50 TYPE SUBTOTAL
UTIL-WATER
ACCOUNT CLERK I/II
Relocation
0.25 $28.98
5 $145
UTIL-WATER
REG COMPLIANCE SPEC I/II
Backflow Testing
1.00 $131.69
5 $658
UTIL-WATER
WATER OPERATOR I/II/III
Relocation
1.00 $164.77
5 $824
$1,627
$325.44
2.25 TYPE SUBTOTAL
UTIL-WATER
Backflow Device Cost
0.00 $1,560.00
1 $1,560
$1,560
$1,560.00
0.00 TYPE SUBTOTAL
$43,035
5.00 TOTALS
$1,049.63
624
S-198
PRIVATE FIRE PROTECTION CONNECTION
METER
WATER
Connection of a private fire protection system to the City’s water system. $36 per meter
$36 per meter
100%
$0.00
$0.00
$0.00
248
CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 21, 2026
625
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
ANNUAL FIRE SERVICES CONNECTION REV
S-198
248
REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
626
S-199
WATER WELL PERMIT
PERMIT
WATER
Review, inspection, and issuance of water well permit for well drilling, or well destruction/abandonment, or well modification.
$868 per permit
$890 per permit
100%
$868.00
$888.20
$(20.20)
5 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
97.73%
$(101)
$4,441
$4,340
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
627
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WATER WELL PERMIT
S-199
5 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
DIRECTOR OF UTILITIES
Review
0.50 $246.56
5 $1,233
UTIL-WATER
DIRECTOR OF UTILITIES
Approval
0.50 $246.56
5 $1,233
UTIL-WATER
REG COMPLIANCE SPEC I/II
Final Inspection
1.00 $131.69
5 $658
UTIL-WATER
REG COMPLIANCE SPEC I/II
Application Review
1.00 $131.69
5 $658
UTIL-WATER
REG COMPLIANCE SPEC I/II
Initial Inspection
1.00 $131.69
5 $658
$4,441
$888.19
4.00 TYPE SUBTOTAL
$4,441
4.00 TOTALS
$888.20
628
S-200
REPAIR BROKEN ANGLE-STOP
REPAIR
WATER
Repair a broken angle-stop due to the actions of the customer. $584 per repair
$690 per repair
100%
$584.00
$688.20
$(104.20)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
84.86%
$(1,042)
$6,882
$5,840
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
629
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
REPAIR BROKEN ANGLE-STOP
S-200
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
ACCOUNT CLERK I/II
0.25 $28.98
10 $290
UTIL-WATER
WATER OPERATOR I/II/III
2 Hrs Of 2
4.00 $659.24
10 $6,592
$6,882
$688.22
4.25 TYPE SUBTOTAL
$6,882
4.25 TOTALS
$688.20
630
S-201
BROKEN WATER METER
METER
WATER
Replacement and repair of a broken water meter due to customer tampering. $170 plus actual costs of replacement meter
$195 plus actual costs of replacement meter
100%
$170.00
$193.80
$(23.80)
10 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
87.72%
$(238)
$1,938
$1,700
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
631
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
BROKEN WATER METER
S-201
10 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
UTIL-WATER
ACCOUNT CLERK I/II
0.25 $28.98
10 $290
UTIL-WATER
WATER OPERATOR I/II/III
+ Meter Cost
1.00 $164.77
10 $1,648
$1,938
$193.75
1.25 TYPE SUBTOTAL
$1,938
1.25 TOTALS
$193.80
632
S-201A
EXCESS OR LOST WATER
INCIDENT
WATER
Section 8-10.31. Disputed account where a significant excess of water has been metered, and upon investigation by the Utilities Department, is found to have been due to hidden leaks or causes not detectable by the account holder.
50% of excess/lost water over the average
50% of excess/lost water over the average
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
633
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
EXCESS OR LOST WATER
S-201A
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
634
S-201B
WATER USE AFTER DISCONNECT
INCIDENT
WATER
When the meter registration shows consumption after service has been officially disconnected, the owner of the property shall be held responsible for such consumption, plus a service charge. SMMC 8-10.18 $73 per incident
$75 per incident
100%
$0.00
$0.00
$0.00
1 CITY OF SANTA MARIA
FY 2025-26
REVENUE AND COST SUMMARY WORKSHEET
SERVICE
REFERENCE NO.
PRIMARY DEPARTMENT
UNIT OF SERVICE
SERVICE RECIPIENT
DESCRIPTION OF SERVICE
CURRENT FEE STRUCTURE
REVENUE AND COST COMPARISON
UNIT REVENUE:
UNIT COST:
UNIT PROFIT (SUBSIDY):
TOTAL UNITS:
TOTAL REVENUE:
TOTAL COST:
TOTAL PROFIT (SUBSIDY):
PCT. COST RECOVERY:
0.00%
$0
$0
$0
SUGGESTED FEE FOR COST RECOVERY OF:
May 18, 2026
635
May 18, 2026
CITY OF SANTA MARIA
FY 2025-26
COST DETAIL WORKSHEET
SERVICE
WATER USE AFTER DISCONNECT
S-201B
1 REFERENCE NO.
TOTAL UNITS
NOTE
Unit Costs are an Average of Total Units
DEPARTMENT
POSITION
TYPE
UNIT TIME
UNIT COST
ANN. UNITS
TOTAL COST
0.00 $0.00
0 $0
$0
$0.00
0.00 TYPE SUBTOTAL
$0
0.00 TOTALS
$0.00
636
S-202
UTILITY AGREEMENT