Work Order Signature Document
EZIQC Contract No.: CA-R7-GB-101723-NCM
Santa Maria
Transit Center Display Panels. Supp 01
New Work Order
152715.01
Modify an Existing Work Order
Work Order Title:

Work Order Number.: Work Order Date:

X
07/09/2026
Contractor Name:

Contact:

Phone:

Contact:

Phone:

Darin Terrazas
805-544-5583
Owner Name: City of Santa Maria
Sam Angulo
805-925-0951
Newton Construction & Management
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Sourcewell EZIQC Contract No CA-R7-GB-101723-NCM.

Brief W
ork Order Description:

Will not apply:Liquidated Damages Will apply:

Estimated Completion Date:

Estimated Start Date: Time of Performance
X
Work Order Firm Fixed Price: $220,576.43
Owner Purchase Order Number:

Approvals
Date DateNewton Construction & ManagementCity of Santa Maria

2.00

Page 1 of 1 ends

7/9/2026
Work Order Signature Document
Attachment C

3.00 Detailed Scope of Work
Sam AnguloDarin TerrazasT o: From:

Newton Construction & Management
2436 Broad St
San Luis Obispo, CA 93401
805-544-5583
City of Santa Maria
110 E. Cook Street
Santa Maria, CA 93454
805-925-0951
Work Order Number:

July 09, 2026Date Printed:
152715.01
Santa Maria Transit Center Display Panels. Supp 01Work Order Title:

Brief Scope:

Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work.

See attached.

Subject to the terms and conditions of ezIQC Contract CA-R7-GB-101723-NCM.

Newton Construction & Management Date
DateCity of Santa Maria

Page 1 of 1 ends

7/9/2026
Scope of Work
Attachment C
7/9/2026
Transit Center Display Panels
Scope of Work
Owner:

Project Address:

GC:

City of Santa Maria
400 E Boone St, Santa Maria , CA 93454
Newton Construction & Management (NCM)

1. Project Overview
Install 138 small display panels, install 2 large display panels, energize lights on trees, place 2 electrical outlets on roof, and reroof the flat part of the roof .

2. Scope Inclusions
• Fabricat e and install structural skeleton for panels to attach to • Attach panels to structural skeleton and wire/energize • Mount a total of 138 small panels and 2 large panels
• Energize lights on tree. This is assuming that we can pull power from the lights at the end of the concrete for the tree lights, meaning trenching in the dirt. If we cannot, the price would increase and we would need to cut up some concrete
• Reroof flat part of roof. This excludes any repairs of damage underneath the roof. Roof does include removal and disposal of existing built -up roof and coping cap around the perimeter, mechanically fastened 1/2" DensDeck over roof area, new coping cap around perimeter, new 60 mil TPO single ply membrane, new pipe flashings and roof vents . Includes 20 -year NDL.

3. Scope Exclusions
• Controls system package provided by others .
• Panels provided by others .
• Permits and fees .
• Repairs to surface underneath roof.
• Signage on top of roof.
• Lights/light system for trees.
• Installation of lights on tree or sign on top of roof.

Attachment C

4.00 Contractor's Price Proposal - Summary
Owner PO #:

Santa Maria
Transit Center Display Panels. Supp 01
152715.01
CA-R7-GB-101723-NCMIQC Master Contract #:

Work Order #:

Title:

Re:

July 09, 2026Date:

Proposal Value:

Contractor: Newton Construction & Management
$220,576.43
$4,748.22Bond
$15,375.42Display Panel
$82,101.28Electrical
$66,826.20Frame
$2,387.91Landscaping
$47,268.36Roof
$1,869.04Safety
Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$220,576.43
The Percentage of NPP on this Proposal: %

Page 1 of 1 ends

7/9/2026
Contractor's Price Proposal - Summary
Attachment C

5.00 Contractor's Price Proposal - Detail
Santa Maria
Transit Center Display Panels. Supp 01
152715.01
CA-R7-GB-101723-NCMIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 09, 2026Date:

Proposal Value:

Contractor: Newton Construction & Management
$220,576.43
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.

Bond
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A
copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal. 1 $4,748.22EA
Installation =x x 4,748.22
FactorUnit PriceQuantity T
otal

1.00 1.1000 4,316.56
$4,748.22Subtotal for Bond
Display Panel
1 1 52 33 00 0039 39" To 75" Display, Flat Wall Monitor Mount (Peerless SFL670)2 $15,375.42EA Installation =x x 15,375.42
FactorUnit PriceQuantity T
otal
X X 90.02 1.2200 140.00
Labor for mounting display screens (Excludes materials & equipment) $15,375.42Subtotal for Display Panel
Electrical
01 31 33 00 0002 Minimum Charge For CarpenterThis task should not be used in conjunction with any other tasks utilizing this labor trade, unless approved by owner. T ask
quantity is 1, unless approved by owner.
3 $1,263.42EA
Installation =x x 1,263.42
FactorUnit PriceQuantity T
otal
1,035.59 1.2200 1.00
Used for fire proofing electrical penetrations
01 74 19 00 0018 15 CY Low-Boy Dumpster Clean RecyclableFor clean dirt, rock, concrete brick or asphalt with no trash or organics. Includes service to deliver and pick-up dumpster, hauling, rental and disposal fee.
4 $1,067.11
EA
Installation =x x 1,067. 11
FactorUnit PriceQuantity Total
874.68 1.2200 1.00
Used for hauling off native soil spoils.
26 05 13 16 0063 #4 AWG, Ethylene-Propylene Rubber (EPR) Insulation, 5 KV, Shielded, Single Copper Conductor, 133% Insulation Cable, Direct Burial
5 $654.50
MLF
Installation =x x 654.50
FactorUnit PriceQuantity T
otal
4,470.60 1.2200 0.12
New panel conductors.
26 05 13 16 0181 #6 To 4/0 AWG Cable Termination Without Stress Cone, Medium Voltage To 5 KV
6 $7,385.59
EA
Installation =x x 7,385.59
FactorUnit PriceQuantity T
otal
756.72 1.2200 8.00
New panel conductors.
26 05 19 13 0010 Dual, Direct Connected, Receptacle With Box7 $2,112.03EA Installation =x x 2, 112.03
FactorUnit PriceQuantity Total
247.31 1.2200 7.00
Tree lighting circuits.

Page 1 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Electrical
26 05 19 16 0125 #12 A
WG, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable
8 $5,448.08MLF
Installation =x x 5,448.08
FactorUnit PriceQuantity T
otal
826.97 1.2200 5.40
18 connections x 3 conductors x 100'
26 05 19 16 0126 #10 AWG, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable
9 $3,065.03MLF
Installation =x x 3,065.03
FactorUnit PriceQuantity T
otal
1,046.80 1.2200 2.40
Tree lighting circuits.
26 05 26 00 0180 1/2" x 4" x 10" Insulated Ground Bar10 $364.74EA Installation =x x 364.74
FactorUnit PriceQuantity T
otal
298.97 1.2200 1.00
New electrical panel.
26 05 26 00 0185 Up To #6 AWG Cadweld Connection For Splice, Lug, Ground Rod, Rebar Or Structural SteelIncludes molds, materials and all necessary tools to make connections.
11 $309.29
EA
Installation =x x 309.29
FactorUnit PriceQuantity T
otal
126.76 1.2200 2.00
New ground bus.
26 05 33 13 0602 3/4" Electrical Metallic Tubing (EMT) Conduit12 $6,533.10LF Installation =x x 6,533.10
FactorUnit PriceQuantity T
otal

5.95 1.2200 900.00
26 05 33 13 0602 0496 For >500 To 1,000, Deduct13 -$362.34MOD Installation =x x -362.34
FactorUnit PriceQuantity T
otal
-0.33 1.2200 900.00
26 05 33 13 0735 3/4" Electrical Metallic Tubing (EMT) To Flexible Conduit Compression Adapter14 $264.62EA Installation =x x 264.62
FactorUnit PriceQuantity T
otal

12.05 1.2200 18.00
26 05 33 13 1492 1" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End15 $1,529.73LF Installation =x x 1,529.73
FactorUnit PriceQuantity T
otal

7.29 1.2200 172.00
26 05 33 13 1886 1" Schedule 40 Polyvinyl Chloride (PVC) Conduit 90 Degree Elbow, Direct Burial
16 $636.06
EA
Installation =x x 636.06
FactorUnit PriceQuantity T
otal

37.24 1.2200 14.00
26 05 33 13 2358 3/4" Flexible Liquid Tight Metallic Conduit17 $1,337.36LF Installation =x x 1,337.36
FactorUnit PriceQuantity T
otal

6.09 1.2200 180.00
Low voltage connections to new panel displays.
26 05 33 13 2358 3/4" Flexible Liquid Tight Metallic Conduit18 $1,337.36LF Installation =x x 1,337.36
FactorUnit PriceQuantity T
otal

6.09 1.2200 180.00
Line voltage connections to new panel displays.
26 05 33 13 2521 3/4" Liquid Tight Non-Metallic 90 Degree Angle Connector19 $442.05EA Installation =x x 442.05
FactorUnit PriceQuantity T
otal

20.13 1.2200 18.00
Low voltage connections to new panel displays.

Page 2 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Electrical
26 05 33 13 2521 3/4" Liquid
Tight Non-Metallic 90 Degree Angle Connector20 $442.05EA Installation =x x 442.05
FactorUnit PriceQuantity T
otal

20.13 1.2200 18.00
Line voltage connections to new panel displays.
26 05 33 16 0113 2-1/8" Deep, 4" x 2" Steel Handy Box21 $693.55EA Installation =x x 693.55
FactorUnit PriceQuantity T
otal

29.92 1.2200 19.00
Junction boxes per plan @ new display panel installation. 26 05 33 16 0121 Flat, 2" x 4" Steel Handy Box Exposed Work Cover22 $138.62EA Installation =x x 138.62
FactorUnit PriceQuantity T
otal

5.98 1.2200 19.00
Junction boxes per plan @ new display panel installation. 26 09 23 00 0766 5 Conductor, Plenum Rated, Low Voltage Grafik Eye Cable (Lutron® GRX-PCBL-346S)
23 $8,286.99MLF
Installation =x x 8,286.99
FactorUnit PriceQuantity T
otal
3,018.94 1.2200 2.25
Low voltage conductors.
26 24 13 00 0301 125 To 400 Amperes, 600 Volt, Type LBB, 3 Pole, Panel Mounted, Molded Case Circuit Breaker
24 $4,005.36
EA
Installation =x x 4,005.36
FactorUnit PriceQuantity T
otal
3,283.08 1.2200 1.00
New electrical panel.
26 24 13 00 0305 15 To 60 Amperes, 600 Volt, Type EHB, 2 Pole, Panel Mounted, Molded Case Circuit Breaker
25 $10,354.04
EA
Installation =x x 10,354.04
FactorUnit PriceQuantity T
otal
446.68 1.2200 19.00
New electrical panel.
26 24 16 00 0409 125 Ampere Rating, 24 Circuit, Main Breaker Load Center, 3 Wire, 120/240 Volt, Single Phase, Unassembled Panelboard
26 $2,398.15
EA
Installation =x x 2,398.15
FactorUnit PriceQuantity T
otal
1,965.70 1.2200 1.00
New electrical panel.
27 05 29 00 0005 2" Hook Size, Pre-Galvanized Finish, Screw On, Communications And Low Voltage Cable Hook (J-Hook) (Cooper B-line BCH32)
27 $303.93
EA
Installation =x x 303.93
FactorUnit PriceQuantity T
otal

10.38 1.2200 24.00
Low voltage conductor installation.
31 05 13 00 0002 Bank Run/Fill Sand28 $255.37CY
Installation =x x 255.37
FactorUnit PriceQuantity T
otal

32.86 1.2200 6.37

6.37 CY sand to be placed above and below conduit installation. 31 05 13 00 0002 0053 For Up To 8, Add29 $51.06
Installation =x x 51.06
FactorUnit PriceQuantity Total

6.57 1.2200 6.37
31 23 16 13 0008 Excavation For Trenching By Hand In Loose Rock Or Compacted AggregateIncludes stockpiling excess materials and trimming sides and bottom of trench.
30 $4,183.81
CY
Installation =x x 4,183.81
FactorUnit PriceQuantity T
otal
269.18 1.2200 12.74
Electrical conduit trench excavation.

Page 3 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Electrical
31 23 16 13 0013 Backfilling or Placing Subbase for Trenches with Imported or Stockpiled
Materials by Hand
31 $677.51CY
Installation =x x 677.51
FactorUnit PriceQuantity T
otal

43.59 1.2200 12.74
Backfill electrical conduit trench excavation.
31 23 16 13 0016 Compaction of Fill or Subbase for Trenches by Hand32 $382.12CY Installation =x x 382.12
FactorUnit PriceQuantity T
otal

49.17 1.2200 6.37
Trench compaction.
31 23 16 13 0019 Load Excess Material by Hand for Removal from Excavation for Trenching33 $894.26CY Installation =x x 894.25
FactorUnit PriceQuantity T
otal
115.07 1.2200 6.37

6.37 CY native soil to be removed for placement of sand above and below conduit installation. 31 23 16 46 0013 Compaction of Fill or Subbase by Hand At Exposed Underground Pipe Or Structures
34 $458.59CY
Installation =x x 458.59
FactorUnit PriceQuantity T
otal

59.01 1.2200 6.37
Trench compaction.
33 71 19 13 0011 14" x 20" x 12", Electric Pull Boxes, Precast Concrete35 $11,494.33EA Installation =x x 11,494.33
FactorUnit PriceQuantity Total
1,345.94 1.2200 7.00
34 41 13 00 0364 #5 pull box lid (Steel, Bolt down) (Christy N30-61J)36 $3,693.81EA Installation =x x 3,693.81
FactorUnit PriceQuantity T
otal
432.53 1.2200 7.00
$82,101.28Subtotal for Electrical
Frame
01 22 20 00 0061 W
elderFor tasks not included in the Construction Task Catalog® and as directed by owner only.
37 $5,530.50HR
Installation =x x 5,530.50
FactorUnit PriceQuantity T
otal
113.33 1.2200 40.00
Used for fabrication of frame. (5 days)
01 22 23 00 0054 17' Electric, Scissor Platform Lift38 $1,927.21MO Installation =x x 1,927.21
FactorUnit PriceQuantity T
otal
789.84 1.2200 2.00
2 lifts for 1 month each for installing electrical, mounting brackets, and display screens. 01 71 13 00 0002 First 25 Miles, Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial warehouse forklifts, sweepers, scissor platform lifts, telescoping and articulating boom man lifts with up to 40' boom lengths, etc.
39 $1,202.11
EA
Installation =x x 1,202. 11
FactorUnit PriceQuantity Total
492.67 1.2200 2.00
Scissor lifts.
05 05 23 00 1170 1/4" x 8", 28 TPI, Hex Washer Head, Teks® 5 Self Drilling Screw40 $6,883.75EA Installation =x x 6,883.75
FactorUnit PriceQuantity T
otal

9.83 1.2200 574.00
Self-drilling screws. 4 per small panel and 11 per large panel

Page 4 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Frame
05 05 23 00
1170 0222 For >100, Deduct41 -$903.36
Installation =x x -903.36
FactorUnit PriceQuantity Total
-1.29 1.2200 574.00
05 12 23 00 0091 3" Diameter Galvanized Steel Pipe Tubing, Standard Weight42 $34,990.82LF Installation =x x 34,990.82
FactorUnit PriceQuantity T
otal

49.45 1.2200 580.00
Galvanized steel frame for small panels
05 12 23 00 0141 Brush Applied Cold Galvanizing43 $463.60SF Installation =x x 463.60
FactorUnit PriceQuantity T
otal

1.90 1.2200 200.00
Used for regalvanizing mounting brackets after welding. 23 05 29 00 0207 3" Diameter Size, Steel Pipe Clamp (Cooper B-Line B3140)44 $16,731.57EA Installation =x x 16,731.57
FactorUnit PriceQuantity T
otal

24.49 1.2200 560.00
Used to attach metal framing channel and mounting hardware to galvanized steel pipe frame for display panel installation. 140 display panels requiring 4 pipe clamps each (560 total). $66,826.20Subtotal for Frame
Landscaping
01 31 33 00 00
11 Minimum Charge For Landscape Maintenance WorkerThis task should not be used in conjunction with any other tasks utilizing this labor trade, unless approved by owner. Task quantity is 1, unless approved by owner. 45 $1,198.14
EA
Installation =x x 1,198.14
FactorUnit PriceQuantity T
otal
982.08 1.2200 1.00
Used for sod removal and replacement.
01 31 33 00 0019 Minimum Charge For Sprinkler InstallerThis task should not be used in conjunction with any other tasks utilizing this labor trade, unless approved by owner. Task quantity is 1, unless approved by owner.
46 $1,189.77
EA
Installation =x x 1,189.77
FactorUnit PriceQuantity T
otal
975.22 1.2200 1.00
Used for irrigation sprinkler system repairs/modifications to accommodate electrical installation. $2,387.91Subtotal for Landscaping
Roof
01 74 19 00 0014 20 C
Y Dumpster (3 Ton) "Construction Debris"Includes delivery of dumpster, rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. 47 $1,434.96EA
Installation =x x 1,434.96
FactorUnit PriceQuantity T
otal
588.10 1.2200 2.00
07 01 50 81 0014 Heat Weld Roofing Seams For Repair48 $1,413.25LF Installation =x x 1,413.25
FactorUnit PriceQuantity T
otal

7.24 1.2200 160.00
Heat weld seams at perimeter wall.
07 51 13 00 0069 Demolish Cap Sheet Surfaced, Built Up Roofing SystemIncludes protective surfacing.
49 $7,393.90
SQ
Installation =x x 7,393.90
FactorUnit PriceQuantity T
otal
294.06 1.2200 20.61
Demo of existing cap sheet roofing
07 51 13 00 0069 0154 For >10 To 25, Add50 $1,100.31 Installation =x x 1,100.31
FactorUnit PriceQuantity Total

43.76 1.2200 20.61

Page 5 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Roof
07 51 13 00 0193 Up
To 10,000 SF 20 Year Roofing System Warranty51 $2,440.00EA Installation =x x 2,440.00
FactorUnit PriceQuantity T
otal
2,000.00 1.2200 1.00
07 54 23 00 0004 60 Mil, Single Ply Thermoplastic Polyolefin (TPO) Roofing Membrane, Fully AdheredIncludes adhesive.
52 $12,685.50SQ
Installation =x x 12,685.50
FactorUnit PriceQuantity T
otal
504.51 1.2200 20.61
New TPO roof
07 54 23 00 0014 >3" To 8" Pipe Diameter, Prefabricated Thermoplastic Polyolefin (TPO) Pipe Cone/BootIncludes attaching the boot to the membrane, caulking around the pipe and installing a draw band.
53 $430.60
EA
Installation =x x 430.60
FactorUnit PriceQuantity T
otal

70.59 1.2200 5.00
Replace existing roof penetration flashings with prefab TPO boots 07 54 23 00 0017 Thermoplastic Polyolefin (TPO) Membrane Base Flashing54 $336.98SF Installation =x x 336.98
FactorUnit PriceQuantity T
otal

8.37 1.2200 33.00
07 62 13 00 0032 24 Gauge, 0.028" Thick, Galvanized Steel Flashing55 $3,367.20SF Installation =x x 2,588.35
FactorUnit PriceQuantity T
otal

13.26 1.2200 160.00
Demolition x x = 778.85 3.99 1.2200 160.00
1 ft wide by 160 lf roof perimeter flashing
07 72 23 00 0005 12" Neck Diameter, 26 Gauge, Galvanized Steel, Outside Braced, Wind Driven T
urbine Ventilator
56 $1,368.40EA
Installation =x x 1,163.05
FactorUnit PriceQuantity T
otal
238.33 1.2200 4.00
Demolition x x = 205.35 42.08 1.2200 4.00
Remove and replace whirlybird vents
07 73 00 00 0021 1/2" Thick, Surface Primed, Fiberglass Mat Faced, Moisture Resistant Gypsum Core, Roof Protection Board, Mechanically Fastened (Georgia-Pacific DensDeck® Prime)
57 $
11,264.60SF
Installation =x x 11,264.60
FactorUnit PriceQuantity Total

4.48 1.2200 2,061.00
1/2" Densdeck under TPO roof
22 14 26 13 0053 Copolymer Retrofit 6" Roof Drains, With Copolymer Dome58 $4,032.66EA Installation =x x 3,130.23
FactorUnit PriceQuantity T
otal
1,282.88 1.2200 2.00
Demolition x x = 902.43 369.85 1.2200 2.00
Used for replacement of 2 roof drains
$47,268.36Subtotal for Roof
Safety
01 56 26 00 0182 48" High With Posts
At 8' On Center, Plastic Mesh Temporary Safety Fence59 $1,869.04LF Installation =x x 1,869.04
FactorUnit PriceQuantity T
otal

3.83 1.2200 400.00
Used to safe off areas of overhead installations.
$1,869.04Subtotal for Safety

Page 6 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Contractor's Price Proposal - Detail Continues..

W
ork Order Title:

Work Order Number: 152715.01
Santa Maria Transit Center Display Panels. Supp 01
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$220,576.43
The Percentage of NP
P on this Proposal: %

Page 7 of 7 ends

7/9/2026
Contractor's Price Proposal - Detail
Attachment C
Subcontractor Listing
152715.01
Santa Maria
Transit Center Display Panels. Supp 01
CA-R7-GB-101723-NCMIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 09, 2026Date:

Proposal Value:

Contractor: Newton Construction & Management
$220,576.43
%DutiesName of Contractor Amount
No Subcontractors have been
selected for this Work Order

0.00$0.00

6.00

Page 1 of 1 ends

7/9/2026
Subcontractor Listing
Attachment C