Cities Index.
Agenda packet

Santa Maria City Council
November 3, 2026

Document
Agenda packet
Meeting
November 3, 2026
Body
Santa Maria City Council
Pages
26
Original file
320 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

CITY OF SANTA MARIA CITY COUNCIL
Mayor Alice Patino
Mayor Pro-Tem Gloria Flores
Councilmember Maribel Aguilera
Councilmember Richard Batalla
Councilmember Gloria Soto

AGENDA

City Hall, 110 East Cook Street
Santa Maria, California

Tuesday, November 3, 2026
CLOSED SESSION - 4:30 P.M.

REGULAR SESSION - 5:30 P.M.

HOW TO PARTICIPATE (SB 707 COMPLIANT)
HOW TO VIEW MEETINGS:

Meetings can be viewed in video format alongside the online interactive agenda at https://www.cityofsantamaria.org/services/departments/city-clerk-records/agenda-center- meetings-portal.

1. The City of Santa Maria Broadcasts City Council Meetings Live on local Comcast Cable Channel 23, at cityofsantamaria.org/tv. Closed Captioning is available in English and Spanish.

2. YouTube.com/@CityofSantaMariaCalifornia. Closed Captioning is available in English and Spanish.

3. Meetings are replayed on local Comcast Cable Channel 23 and cityofsantamaria.org/tv on Thursdays at 9:00 a.m. and Tuesdays at 5:30 p.m. Meetings are available on demand at YouTube.com/@CityofSantaMariaCalifornia.

4. HOW TO PARTICIPATE REMOTELY WITH TWO-WAY AUDIO:

Join via Zoom to register to speak during the Public Comment portion of the meeting or on a particular Agenda Item. Use the Zoom link below or dial-in via telephone:

Link: https://zoom.us/j/91234686810•
Dial Phone #: 1 669 444 9171•
Webinar ID #: 912 3468 6810•
**Press *6 to un-mute your phone. Press *9 to raise your hand to speak. Watch an instructional Video on Participating using Zoom

HOW TO SUBMIT WRITTEN PUBLIC COMMENT:
(Must be received by 2:00 p.m. in advance of the meeting) Members of the public who are not attending the meeting but wish to submit a public comment on any item on the agenda or within the City's jurisdiction may do so by emailing [email protected] or mailing correspondence to:

City Council
Attn.: City Clerk's Office
110 East Cook Street
Santa Maria, CA 93454
Letters/emails will not be read aloud during the meeting; however, all correspondence will be distributed to Councilmembers. Submissions received after the deadline will be uploaded to the City's agenda webpage under the applicable meeting on the following day and will become a part of the official record.

AMERICANS WITH DISABILITIES ACT
In accordance with the Americans with Disabilities Act of 1990, if you require a disability-related modification or accommodation to attend or participate in this meeting, including auxiliary aids or services, please call the City Clerk’s Office at (805) 925-0951 extension 2306, or by email at [email protected] at least 48 hours before the meeting. Assisted Listening devices are available for those who attend in Council Chambers. Closed Captioning is available during meetings in English and Spanish on Comcast Channel 23 and at CityofSantaMaria.org/tv.

MEETINGS
The City Council holds regular meetings on the first and third Tuesday of every month. Regular meetings start at 5:30 p.m. in the Council Chambers at City Hall, 110 East Cook Street, Santa Maria, California. Special and Adjourned Regular meetings start time are to be determined.

POSTING LOCATIONS OF AGENDA AND/OR

CANCELLATION NOTICES
Regular meeting agendas will be posted at least 72 hours before the meeting (GC§ 54954(a)(1)).

Agenda and Cancellation Notices can be viewed online and are also posted at Santa Maria City Hall located at 110 East Cook Street, Santa Maria, California.

Page 2 of 186 ends

CLOSED SESSION

1. CALL TO ORDER
ROLL CALL: Councilmember Aguilera, Councilmember Batalla, Councilmember Soto, Mayor Pro Tem Flores, and Mayor Patino

2. PUBLIC COMMENT PERIOD
(Remote Participation is not available during closed session. Once the Public Comment Period has commenced, no further comments will be accepted per City Council Policy 2005- 01 Rules of Decorum.)
Speakers may provide public comments on any matter within the subject matter jurisdiction of the City Council. Each speaker will be limited to 3 minutes, maximum 15 minutes for Public Comment Period. Unless a majority of the Council objects, the Mayor may provide speakers more or less time to speak. All comments or queries shall be addressed to the Council as a body and not to any specific member thereof. Pursuant to Government Code §54954.2(a)(2), the Ralph M. Brown Act, no action or discussion by the City Council shall be undertaken on any item not appearing on the posted agenda, except to briefly provide information, ask for clarification, provide direction to staff, or schedule a matter for a future meeting.

3. RECESS-CLOSED SESSION
The City Council will immediately recess to a closed session for the following:

3.a Public Employee Performance Evaluation, Pursuant to Government Code §54957(b)(1)
Title: City Manager

3.b Conference with Labor Negotiators, Pursuant to Government Code §54957.6 Agency Representatives: City Manager David W. Rowlands, City Attorney Thomas Watson, Chief Human Resources Officer Graciela Reynoso, and Negotiations Team.

Employee Organizations: All bargaining units, unrepresented employees, managers, and executives.

4. RECONVENE TO REGULAR SESSION
REGULAR SESSION - 5:30 P.M.

5. INVOCATION

6. PLEDGE OF ALLEGIANCE

7. CALL TO ORDER
ROLL CALL: Councilmember Aguilera, Councilmember Batalla, Councilmember Soto, Mayor Pro Tem Flores, and Mayor Patino

8. REPORT BY THE CITY ATTORNEY FROM CLOSED SESSION

Page 3 of 186 ends

9. PRESENTATIONS

9.a Presentation – Commander Nathan Totorica’s Graduation from the FBI National Academy
The City Council will receive a presentation regarding Commander Nathan Totorica’s Recent Attendance and Graduation from the FBI National Academy

9.b Retirement Resolution Honoring Senior Dispatcher Laura Brannon The City Council will present a Retirement Resolution honoring and commending Senior Dispatcher Laura Brannon for 25 years of service with the Santa Maria Police Department, her contributions to the department, and congratulating her on her upcoming retirement.

9.c Business of the Quarter – October to December 2026
The City Council will present certificates to the featured Businesses of the Quarter (October to December 2026) – Mario A. Juarez, Attorney at Law and American Self Storage Santa Maria.

10. PUBLIC COMMENT PERIOD (Not to exceed 15 Minutes)
(Once the Public Comment Period has commenced, no further comments will be accepted per City Council Policy 2005-01 Rules of Decorum.)
Speakers may provide public comments on any matter within the subject matter jurisdiction of the City Council. Each speaker will be limited to 3 minutes, maximum 15 minutes for Public Comment Period. Unless a majority of the Council objects, the Mayor may provide speakers more or less time to speak. All comments or queries shall be addressed to the Council as a body and not to any specific member thereof. Pursuant to Government Code §54954.2(a)(2), the Ralph M. Brown Act, no action or discussion by the City Council shall be undertaken on any item not appearing on the posted agenda, except to briefly provide information, ask for clarification, provide direction to staff, or schedule a matter for a future meeting.

11. CONSENT CALENDAR
Items on the consent calendar are considered to be routine and customary and are enacted by a single motion with the exception of items removed by a member of the City Council for individual consideration, which shall be individually considered immediately after taking action on the Consent Calendar.

RECOMMENDATION:

Adopt the Consent Calendar as submitted.

11.a CITY MANAGER/CITY CLERK DEPARTMENT

11.a.1 Ordinances and Resolutions
RECOMMENDATION:

Waive the reading in full of all Ordinances and Resolutions.

11.a.2 Approval of Minutes
RECOMMENDATION:

Approve the Minutes of the regular City Council meeting of October 20, 2026.

Page 4 of 186 ends

11.a.3 Request for Bond Release for Planned Development Permit Number PD2023- 0008
The City Council will consider authorizing the bond release for Planned Development Permit Number PD2023-0008.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

By motion, authorize the release of Performance Bond – Public Improvements [#CIC1953133] in the full amount of $308,578.76 posted in the form of a Surety to guarantee the construction and installation of public improvements; and order the Labor and Material Bond in the amount of $308,578.76 and the Guarantee and Defective Material Bond in the amount of $308,578.76, be retained for six month and one year, respectively, from the date of the release of the Faithful Performance Bond for public improvements.

11.b FINANCE DEPARTMENT

11.b.1 Payment of Warrants
RECOMMENDATION:

Order ratified subject to having been certified as being in conformity with the budget and having been approved for payment by the Director of Finance.

11.b.2 Payment of Payroll
RECOMMENDATION:

Order ratified subject to having been certified by the proper Department Directors, as shown on records on file in the Department of Finance, and having been approved for payment by the Director of Finance.

11.b.3 Adoption of a Resolution Approving Participation in the Public Agency Retirement Services (PARS) Post-Employment Benefits Trust Program RECOMMENDATION:

Adopt a Resolution approving the Adoption of the Public Agencies Post-Employment Benefits Trust Administered by Public Agency Retirement Services (PARS); and

1. Authorize the establishment of the Post-Employment Benefits Trust Program to be administered by Public Agency Retirement Services (PARS) and U.S. Bank; and

2. Appoint the Finance Director or designee as the City’s Plan Administrator and authorization to execute the documents to implement the Program.

3.

Page 5 of 186 ends

11.c LIBRARY DEPARTMENT

11.c.1 Adoption of a Resolution Approving an Agreement with the County of Santa Barbara and the Cities of Lompoc, Goleta, Santa Barbara, and Carpinteria for the Operation of a Free Countywide Library System for Fiscal Year 2026-2027 The City Council will consider adopting a Resolution approving an Agreement with the County of Santa Barbara to provide for the operation of a Free Countywide Library System for Fiscal Year (FY) 2026-2027 Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

Adopt a Resolution approving an Agreement with the County of Santa Barbara and the cities of Lompoc, Goleta, Santa Barbara, and Carpinteria for the operation of a Free Countywide Library System for Fiscal Year 2026-2027; and

1. Authorize City Manager or designee to execute agreement.2.

11.d PUBLIC WORKS DEPARTMENT

11.d.1 Adoption of a Resolution Awarding a Professional Services Agreement to Nichols Consulting Engineers for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements Project The City Council will consider adopting a Resolution awarding an Agreement to Nichols Consulting Engineers (NCE) for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project.

Environmental Notice: The Project qualifies for a Statutory Exemption pursuant to Section 15301 - Class 1: Existing facilities pursuant to the California Environmental Quality Act State Guidelines.

RECOMMENDATION:

Adopt a Resolution awarding a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of Plans, Specifications, and Estimate and associated services for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project in a not-to-exceed amount of $978,949; and

1. Authorize the City Manager or designee to execute the agreement.2.

Page 6 of 186 ends

11.d.2 Adoption of a Resolution Approving a Professional Services Agreement with Nichols Consulting Engineers for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor Improvements Project The City Council will consider adopting a Resolution approving the award of a Professional Services Agreement to Nichols Consulting Engineers for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor Improvements project.

Environmental Notice: The Project qualifies for a Statutory Exemption pursuant to Section 15301 - Class 1: Existing facilities pursuant to the California Environmental Quality Act State Guidelines.

RECOMMENDATION:

Adopt a Resolution awarding a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of Plans, Specifications, and Estimate and associated services for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor Improvements project in a not-to-exceed amount of $790,230; and

1. Authorize the City Manager or designee to execute the agreement.2.

11.d.3 Adoption of a Resolution Approving Submission of Applications to the California Department of Transportation for Highway Safety Improvement Program Cycle 13 Funding
The City Council will consider adopting a Resolution approving submission of one or more Highway Safety Improvement Program (HSIP) Cycle 13 applications for eligible roadway safety improvements in Santa Maria.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

Adopt a Resolution authorizing the submittal of one or more applications to the California Department of Transportation (Caltrans) for Highway Safety Improvement Program (HSIP) Cycle 13 funding; and

1. Authorize the City Manager or designee to prepare, execute, and submit the applications including required certifications and supporting documents.

2.

Page 7 of 186 ends

11.e RECREATION & PARKS DEPARTMENT

11.e.1 Adoption of a Resolution Approving the Appropriation of Landscape District Operating Funds for Shade Sail Installation
The City Council will consider adopting a Resolution authorizing the appropriation of $14,950 from the Southwest Landscape District operating budget to the Battles Road Corridor Rehabilitation & Beautification capital project to fund the installation of two shade sails along the Battles Road multi- use path.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

Adopt a Resolution authorizing the appropriation of $14,950 from the Southwest Landscape District operating budget to the Battles Road Corridor Rehabilitation & Beautification capital project for shade sail installation; and

1. Authorize Director of Finance or designee to complete the necessary budgetary transactions to implement the appropriation.

2. 11.f UTILITIES DEPARTMENT

11.f.1 Adoption of a Resolution Approving a Supplemental Water Purchase Agreement with JP Development Group and FOCAL Investments LLC for Key Site 1 Townhomes
The City Council will consider adopting a Resolution authorizing an agreement to sell supplemental water for residential use at Key Site 1.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

Adopt a Resolution approving a supplemental water purchase agreement with JP Development Group and FOCAL Investments LLC for the purchase of up to 6 acre-feet per year of supplemental water to serve residential uses at Key Site 1; and

1. Authorize the City Manager or designee to execute the agreement and record the revenue associated with this sale to the Water Enterprise Fund; and

2. Authorize the City Manager or designee to enter into amendments to reduce the supplemental water requirement if less than six acre-feet per year is required, as determined by Golden State Water Company.

3.

Page 8 of 186 ends

12. REPORT BY CITY MANAGER

13. ORAL REPORTS OF COUNCILMEMBERS AND OFFICERS (INCLUDING AB 1234

REPORTS)

14. ADJOURNMENT

If you challenge a determination made on a matter on this agenda in court, you may be limited to raising only those issues you or someone else raised at the public hearing described on this agenda, or in written correspondence to the city council at, or prior to, the public hearing.

I, Donna G. Schwartz, hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted not less than 72 hours at City of Santa Maria City Hall and made available at
https://www.cityofsantamaria.org/services/departments/city-clerk-records/agenda-center- meetings-portal on this 30th day of October 2026.
/s/ DONNA G. SCHWARTZ, CMC
Chief Deputy City Clerk

Page 9 of 186 ends

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Christopher Williams, Chief of Police

DATE: November 3, 2026

SUBJECT: Presentation – Commander Nathan Totorica’s Graduation from the FBI National Academy

The City Council will receive a presentation regarding Commander Nathan Totorica’s Recent Attendance and Graduation from the FBI National Academy

BACKGROUND:

Established in 1935 , the FBI National Academy (FBINA) in Quantico, Virginia, is a prestigious 10-week residential training program for law enforcement leaders, aimed at standardizing and professionalizing police forces. Internationally known for its academic excellence, the National Academy offers 10 weeks of advanced communication, leadership, and fitness training. Participants must have proven records as professionals within their agencies to attend. On average, these officers have 21 years of law enforcement experience and usually return to their agencies to serve in executive -level positions.

The Academy was founded by J. Edgar Hoover to "raise the level of professionalism nationwide" by providing federal assistance to local police departments. It is often regarded as a p remier training school for law enforcement managers, having trained thousands of law enforcement leaders from all 50 states, U.S. territories, and more than 160 countries.

DISCUSSION:

Commander Nathan Totorica was selected to attend the 299th session of the FBI National Academy and graduated on September 17 , 2026, alongside 265 law enforcement leaders. The 299 th session of the National Academy consisted of members of law enforcement agencies from 29 countries and three military organizations. On ly the top one percent of law enforcement leaders is selected to attend this prestigious leadership program.

Commander Nathan Totorica grew up in the San Francisco Bay Area and graduated from Berean Christian High School. He earned a Bachelor’s Degree in Physical Education from Azusa Pacific University and a Master’s Degree in Organizational Leadership from California Coast University. Commander Totorica graduated from Class #2 of the California Association of Tactical Officers Strategic Leadership Progra m. During his 2 career with the Santa Maria Police Department, Commander Totorica has served in a wide variety of assignments, including Field Training Officer, Gang Suppression Team Officer, Detective, Patrol Sergeant, SWAT Operator, SWAT Team Leader, Tacti cal Commander, Sergeant of the Special Enforcement Team, Patrol Watch Commander, and Professional Standards Unit Lieutenant.

Commander Totorica has served on the Southern California Law Enforcement Torch Run for Special Olympics Council since 2012 and has been recognized for his commitment to service, receiving the Special Olympics Community Service Award in 2021. He currently serves on the Boards of Directors for the YMCA and Santa Barbara County Court Appointed Special Advocates (CASA). He has also volu nteered his time feeding the homeless through a local church program and coaching youth basketball, baseball, and soccer. His career reflects a dedication to the Santa Maria Police Department, its employees, and the community it proudly serves.

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Christopher Williams, Chief of Police

DATE: November 3, 2026

SUBJECT: Retirement Resolution Honoring Senior Dispatcher Laura Brannon

The City Council will present a Retirement Resolution honoring and commending Senior Dispatcher Laura Brannon for 25 years of service with the Santa Maria Police Department, her contributions to the department, and congratulating her on her upcoming retirement.

BACKGROUND:

Laura Brannon will retire on November 13, 2026, after 25 years of service to the residents of Santa Maria. In August of 2001, Laura was hired by the Santa Maria Police Department as a Dispatcher, and in October 2004 was promoted to Senior Dispatcher. The Santa Maria Police Department would like to recognize Laura for her years of dedicated public service to the City of Santa Maria and its residents.

Attachment(s):

A - Retirement Resolution

Resolution

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

COMMENDING SENIOR DISPATCHER LAURA BRANNON
FOR HER 25 YEARS OF OUTSTANDING SERVICE TO THE

CITY OF SANTA MARIA AND CONGRATULATING

HER ON HER RETIREMENT
WHEREAS, Laura Brannon has been employed by, and has faithfully served, the City of Santa Maria for 25 years as a public safety dispatcher demonstrating unwavering dedication, professionalism, and a steadfast commitment to her profession; and

WHEREAS, Laura’s outstanding organizational and administrative abilities have strengthened the operations of the dispatch center, including assisting in the preparation of Fire Station 6 and responding to various requests from numerous departments and agencies, including Police Administration, Patrol, Fire Administration, Code Enforcement, and the District Attorney’s Office; and

WHEREAS, Laura’s technical expertise and commitment to operational excellence were instrumental in the successful implementation of the Motorola Computer -Aided Dispatch (CAD) system in 2019, through her service on the Premier -1 CAD team and two years of dedicated effort while simultaneously fulfilling her responsibilities as a working dispatcher; and

WHEREAS, Laura’s extraordinary work ethic and commitment to public safety are reflected in her handling of more than 1,500 calls per month, and her lasting contributions will be deeply appreciated for years to come.

NOW, THEREFORE, IT IS HEREBY RESOLVED on this 3rd day of November 2026, by the City Council of the City of Santa Maria, as follows:

LAURA BRANNON, SENIOR DISPATCHER
is hereby recognized and commended for her faithful, distinguished, and devoted service to the Santa Maria community, is congratulated on her retirement, and she and her family are wished good health and many years of happiness.

Mayor Alice M. Patino Mayor Pro-Tem Gloria Flores

_______ ________________________________
Councilmember Maribel Aguilera Councilmember Richard Batalla

___________________________
Councilmember Gloria Soto

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: David Rowlands, City Manager

DATE: November 3, 2026

SUBJECT: Business of the Quarter – October to December 2026

The City Council will present certificates to the feature d Businesses of the Quarter (October to December 2026 ) – Mario A. Juarez, Attorney at Law and American Self Storage Santa Maria.

BACKGROUND:

The City of Santa Maria and the Santa Maria Valley Chamber of Commerce are partnering to highlight different businesses in the City through a Business of the Quarter Program.

On four occasions this calendar year, this program will recognize local businesses chosen by the Chamber. The criteria are: In operation for at least five years , physically located within the City Limits, and being a local Chamber of Commerce member in good standing.

Not only does this give them valuable exposure, it also reminds the community of the unique, diverse, and long-standing businesses we are fortunate to have in Santa Maria.

Established in 2 000, this local law practice provides a broad range of legal services, including estate planning, contracts, real estate, trust litigation, business law, land use, and personal injury. With a team of four employees, the practice has expanded its scope of s ervices over the years to meet the evolving needs of individuals, families, and businesses throughout the community. As a lifelong Santa Maria resident, Mr. Juarez is committed to providing high -quality legal services in both English and Spanish, helping make legal guidance more accessible to the diverse local population. Beyond the practice of law, the attorney has demonstrated an exceptional commitment to philanthropy, leadership, and community service through involvement with numerous nonprofit organizations, educational institutions, and charitable foundations. Notable contributions include board service with the Marian Hospital Foundation, Allan Hancock College Foundation, and Habitat for Humanity of Northern Santa Barbara County. The attorney has also devoted significant time to coaching youth sports, supporting local schools and faith-based organizations, and mentoring young people. In recognition of this longstanding dedication to philanthropy, the attorney was named a 2023 Santa Barbara Foundation Ce lebrate Philanthropy honoree. Representing the business tonight is Attorney at Law Mario A. Juarez.

2 Established in 2005, American Self Storage Santa Maria has proudly served the Santa Maria and Orcutt communities for more than two decades, providing con venient and reliable storage solutions for residents and businesses. The business offers drive-up self- storage and is the only facility in the area to provide covered RV and boat parking along with an on-site wash station and dump site. With a dedicated team of two employees, the business adapts to changing market conditions and seasonal storage needs while maintaining a strong commitment to customer service. American Self Storage also plays an important role in the community by helping residents navigate major life transitions, including relocation, divorce, and the loss of a loved one, by providing a dependable place to store their belongings. In addition to serving customers, Paula Fuller demonstrates community leadership through her role as Chair of th e Ambassador Committee.

Representing the business tonight is Manager Paula Fuller.

1 CITY COUNCIL MEETING MINUTES CITY OF SANTA MARIA, CALIFORNIA

October 20, 2026, 5:30 p.m.

City Hall Council Chambers
110 East Cook Street
Santa Maria

Roll Call: Councilmember Maribel Aguilera, Councilmember Richard Batalla, Councilmember Gloria Soto, Mayor Pro Tem Gloria Flores

Members Absent: Mayor Alice Patino

Staff Present: Assistant City Manager Chuen Wu, City Attorney Thomas Watson, Director of Finance Rebecca Campbell, Fire Chief Bradley Dandridge, Director of Community Development Chenin Dow, Director of Recreation and Parks Ramon Galo, Director of Public Works Brett Fulgoni, Library Director Dawn Jackson, Chief Human Resources Officer Graciela Reynoso, Director of Utilities Shad Springer, Police Chief Christopher Williams, Chief Deputy City Clerk Donna Schwartz, Assistant City Clerk Alexandra Valadez

_____________________________________________________________________

1. INVOCATION
Pastor Loren Hicks from Pacific Christian Center gave the Invocation.

2. PLEDGE OF ALLEGIANCE
Councilmember Batalla led the Pledge of Allegiance.

3. CALL TO ORDER
Mayor Pro Tem Flores called the meeting to order at 5:32 p.m.

4. PRESENTATIONS

4.a Proclamation Proclaiming October 24, 2026, as “World Polio Day” The City Council presented a Proclamatio n to Dr. Holly Edds, proclaiming October 24,2026, as "World Polio Day" in the City of Santa Maria.

4.b Proclamation Proclaiming October 11 through 17, 2026, as “Code Enforcement Officer Appreciation Week”
The City Council presented a Proclamation to Code E nforcement Manager Dawn Palacios, proclaiming October 11 through 17, 2026, as "Code Enforcement Officer Appreciation Week" in the City of Santa Maria.

5. PUBLIC COMMENT PERIOD (Not to exceed 15 Minutes)
Mayor Pro Tem Flores invited public comment. Speaking from the public was Gary Hall, Damian Davis, and Cynthia Gudino.

2 6. CONSENT CALENDAR
Consent Calendar Items 6.a.1 through 6.d.1 were approved as presented, including the adoption of Resolution Nos. 2026 -217, 2026 -218, 2026 -219 and Ordinance No. 2026 -10. The recorded vote appears with each item below.

Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Adopted the Consent Calendar as submitted.

Ayes (4): Councilmember Aguilera, Councilmember Richard Batalla, Councilmember Soto, and Mayor Pro Tem Gloria Flores
Absent (1): Mayor Patino
Motion carried by a recorded vote (4 to 0)

6.a CITY MANAGER/CITY CLERK DEPARTMENT

6.a.1 Ordinances and Resolutions
Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Waived the reading in full of all Ordinances and Resolutions.

Motion carried by a recorded vote

6.a.2 Approval of Minutes
Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Approved the Minutes of the special City Council meeting of October 8, 2026.

Motion carried by a recorded vote

6.a.3 Adoption of a Resolution Approving the Donation of Computers to Allan Hancock College, Santa Maria Historical Society Museum, and the Children’s Resource & Referral Discovery Museum
Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Adopted a Resolution approving a donation of computers to Allan Hancock College, Santa Maria Valley Historical Society Museum and the Children’s Resource & Referral Discovery Museum.

Motion carried by a recorded vote

6.a.4 Adoption of a Resolution Approving a Continued Support and Maintenance Agreement with Motorola Solutions for an Additional Year of Radio System and Audio Logging Support.

Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla

1. Adopted a Resolution awarding a continued Support and Maintenance Agreement to Motorola Solutions for an additional year of radio system and audio logging support; and

2. Authorized the City Manager or designee to execute agreement.

Motion carried by a recorded vote

3 6.b FINANCE DEPARTMENT

6.b.1 Payment of Warrants
Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Order ratified subject to having been certified as being in conformity with the budget and having been approved for payment by the Director of Finance.

Motion carried by a recorded vote

6.b.2 Payment of Payroll
Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Order ratified subject to having been certified by the proper Department Directors, as shown on records on file in the Department of Finance, and having been approved for payment by the Director of Finance.

Motion carried by a recorded vote

6.c PUBLIC WORKS DEPARTMENT

6.c.1 Adoption of a Resolution Approving Amendment No. 2 to the Agreement with CalPortland Construction, Inc., for the Mahoney and Black Road Paving 2026, Formal Bid No. 2026-03 Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla

1. Adopted a Resolution approving Amendment No. 2 to the Agreement with CalPortland Construction for the Mahoney and Black Road Paving 2026, PW Bid No. 2026-03, and increasing the total amount not -to-exceed contract amount by $649,578, for a revised total amount not -to-exceed $2,637,576 and extending the contract time by nine working days; and

2. Authorized the City Manager or designee to execute Amendment No. 2 and any future amendments or change orders necessary, provided such amendments are within the scope of the project and consistent with the adopted pr oject budget; and

3. Authorized the City Manager or designee to execute necessary project amendments to the agreement not to exceed the contingency amount.

Motion carried by a recorded vote

6.d UTILITIES DEPARTMENT

6.d.1 Adoption of Ordinance No. 2026-10, Amending Section 8-10.33 Water Waste: Outdoor Water Use Restrictions of Title 8 of the Santa Maria Municipal Code Moved by: Councilmember Aguilera
Seconded by: Councilmember Richard Batalla
Waived the second reading and adopt Ordinance No. 2026-10, amending Section 8-10.33 Water Waste: Outdoor Water Use Restrictions of Title 8 of the Santa Maria Municipal Code.

Motion carried by a recorded vote

4 7. REPORT BY CITY MANAGER
Assistant City Manager Chuen Wu, reporting on behalf of City Manager Rowlands, announced that the next City Council meeting is scheduled for Tuesday, November 3, 2026. Agenda items will include a Business of the Quarter presentation, recognition of Command er Totorica’s graduation from the FBI National Academy, and a retirement resolution honoring Senior Dispatcher Laura Brannon. He also announced that the final Measure C Town Hall meeting will be held on Thursday, October 29, 2026, from 4:00 to 5:00 p.m. at the Elwin Mussell Senior Center.

8. ORAL REPORTS OF COUNCILMEMBERS AND OFFICERS (INCLUDING AB 1234 REPORTS) Mayor Pro Tem Flores reported attending the Hispanic Heritage Mega Mixer, the annual Northern Santa Barbara County United Way Mayors’ Ball, the State of the City annual briefing, and the Mexican Ladies Social Club’s Annual Black and White Ball.

Councilmember Batalla shared he attended the Hispanic Heritage Mega Mixer, and the State of the City annual briefing.

Councilmember Aguilera stated attendi ng the California Women Lawyers Gala, the State of the City annual briefing, a meeting regarding hospitals in Santa Barbara County, and the Mexican Ladies Social Club’s Annual Black and White Ball.

Councilmember Soto reported attending the ribbon-cutting ceremony celebrating Klondike Pizza’s 30th anniversary, the State of the City annual briefing, and a press conference regarding local U.S.

Immigration and Customs Enforcement (ICE) detainments.

Mayor Patino was not present to report.

9. ADJOURNMENT
There being no further business before the City Council, Mayor Pro Tem Flores declared the City Council meeting adjourned at 5:54 p.m.

Chief Deputy City Clerk Alice M. Patino, Mayor

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Donna G. Schwartz, Chief Deputy City Clerk

DATE: November 3, 2026

SUBJECT: Request for Bond Release for Planned Development Permit Number PD2023-0008

Description:

The City Council will consider authorizing the bond release for Planned Development Permit Number PD2023-0008.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

By motion, authorize the release of Performance Bond – Public Improvements [#CIC1953133] in the full amount of $ 308,578.76 posted in the form of a Surety to guarantee the construction and installation of public improvements ; and order the Labor and Material Bond in the amount of $ 308,578.76 and the Guarantee and Defective Material Bond in the amount of $ 308,578.76, be retaine d for six month and one year, respectively, from the date of the release of the Faithful Performance Bond for public improvements.

BACKGROUND:

Planned Development Permit Number 202 3-0008 for the project located at 1925 South Broadway was approved on September 6, 2023. Public Improvements were included as part of the Conditions of Approval. Sureties were required to guarantee the completion of the Public Improvements.

DISCUSSION:

At the request of the developer, inquiries were sent to various departments on August 25, 2026, requesting authorization to release the Faithful Performance Bond – Public Improvements [#CIC1953133] in the original amount of $308,578.76. Full releases were granted by each department.

2 Fiscal Considerations – None.

ATTACHMENT(S)
A. Department Requests for Release

Attachment A

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Rebecca Campbell, Director of Finance

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving Participation in the Public Agency Retirement Services ( PARS) Post-Employment Benefits Trust Program

Description:

The City Council will consider adopting a Resolution approving participation in the PARS Post-Employment Benefits Trust Program.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

1. Adopt a Resolution approving the Adoption of the Public Agencies Post-Employment Benefits Trust Administered by Public Agency Retirement Services (PARS); and

2. Authorize the establishment of the Post -Employment Benefits Trust Program to be administered by Public Agency Retirement Services (PARS) and U.S. Bank; and

3. Appoint the Finance Director or designee as the City’s Plan Administrator and authorization to execute the documents to implement the Program.

BACKGROUND:

At the September 3, 2024, City Council meeting, the City Council directed staff to move forward with an agreement PARS to open an Internal Revenue Code Section 115 Trust for the purpose of prefunding Other Post-Retirement Benefits (OPEB) and defined benefit pension liabilities after receiving a presentation from PARS and city staff.

About PARS and the Post-Employment Benefits Trust Program In 2012, the Government Accounting Standards Board (GASB) issued Statement No. 68, Accounting and Financial Reporting for Pensions. GASB 68 re quires that governmental employers that sponsor Defined Benefit plans (i.e., CalPERS) recognize a Net Pension Liability on their balance sheet, which is the difference between the City’s total pension liability (actuarial accrued liability) and actual plan assets. GASB 68 (which replaces the requirements of GASB 27) became effective for fiscal years starting after June 15, 2014.

In 2015, the GASB issued Statement No. 75, Accounting and Financial Reporting for Postemployment Benefits Other Than Pensions. GASB 75 requires the City to report 2 costs and obligations for post -employment healthcare and other post -employment benefits (called “OPEBs”) much like the current accounting requirement to report pension obligations. Like GASB 68, the City must also report its net OPEB liability (difference between the total OPEB liability and assets accumulated in an irrevocable trust) on its Financial Statements. GASB 75 (which replaces the requirements of GASB 45) became effective for fiscal years beginning after June 15, 2017.

To help public agencies address and manage their GASB 68 and 75 liabilities, PARS has sought and received approval from the IRS in the form of a Private Letter Ruling on its Post-Employment Benefits Trust Program. PARS has assembled leading prof essionals to provide the City with the necessary services required under one program to pre -fund both pension and retiree health care liabilities. This would provide the City with an alternative to CalPERS that would allow for greater local control over assets, investment by a professional fund management team selected and monitored by the City, with contributions and distributions from the trust determined at the discretion of the City.

The program has been established as a multiple employer trust so that public agencies regardless of size can join the program to receive the necessary economies of scale to keep administrative fees low and avoid any setup costs. To be able to properly offset liabilities on the City’s financial statements, funds must be set aside in an exclusive benefit, irrevocable trust that cannot be accessed by creditors. The trust permits the City, under federal and state law, to invest in a more diversified array of investments to maximize investment returns long term and reduce the City’s liabilities.

To date, more than 550 public agencies have adopted programs through PARS to reduce their liabilities, including Cities of Morro Bay, Goleta, Santa Barbara, Solvang and Port Hueneme.

PARS has partnered with US Bank to serve as truste e and its sub -adviser PFM Asset Management LLC, to provide investment management services for the program.

DISCUSSION:

Pension Liability
The City of Santa Maria, like most cities in California, has an unfunded accrued liability (“UAL”) associated with it s CalPERS pension plan. A UAL occurs when the current pension plan assets are not projected to be sufficient to pay total pension costs in future years. The City’s UAL has fluctuated in the past couple of years, mainly due to CalPERS’ annual investment returns. As of June 30, 202 4, the City's total UAL was approximately $195.7 million, which was a 2% decrease from the City’s UAL of $199.4 million at the end of FY 20 22-23. This was due to a strong investment return of 9.3% in FY 202 3-24.

CalPERS charges t he City a 6.8% interest rate on the UAL and requires a repayment schedule that escalates over the next decade.

The City’s combined annual UAL payment increased 11% from $16.1 million in FY 2025- 26 to $17.9 million in FY 2026-27. Santa Maria's pension funding position improved during FY 2023-24, but the City is still paying down unfunded liabilities accumulated over many 3 previous years. The City's UAL payments are projected to increase because the City is still experiencing the scheduled increases in payments associated with pension liabilities and investment losses from prior years. The City of Santa Maria will continue making annual UAL payments beyond FY 2031 -32 as long as it has outstanding unfunded pension liabilities. This is illustrated of CALPERS’ six-year projections in the chart below:

OPEB Liability
The City provides post-retirement health benefits, in accordance with State statues, to all employees retiring from the City and enrolled in an insurance program under the California Public Employees’ Medical and Hospital Care Act (PEMHCA). The CalPERS’ PEMHCA Plan is a defined contribution, cost sharing multiemployer defined benefit healthcare plan providing benefits to active and retired employees. The healthcare plan is administered by the Cal ifornia Public Employees Retirement Agency. PEMHCA determines the amount contributed by the City toward retiree health insurance. The City was required to contribute $151 per month during calendar year 2023 and $157 per month during calendar year 2024 towards the cost of the retiree health insurance, which is the same amount contributed toward active employee health insurance. No assets are accumulated in a trust that meets the criteria in paragraph 4 of GASB Statement 75. The City's OPEB Liability was measured and determined by an actuarial valuation as of June 30, 2023 was $18,618,290.

Decision to Pursue the Trust
On July 7, 2026, the City Council passed a motion to direct staff to establish the Trust for OPEB and pension obligations. The City Council adopted a new General Fund Reserve Policy and directed staff to establish and fund the 115 Trust. The City Council approved by motion a deposit of $7,728,000 from reserves as the initial deposit into the trust.

4 Expected Benefits Offered by the PARS Trust
Setting aside funds in the Trust should, over time, allow the City to earn more on its reserves than it otherwise would if those funds were left in the General Fund (which is restricted in investment options due to CA Government Code Section 5 3601). Other benefits offered by the PARS Post -Employment Benefits Trust Program to the City include:

 Contributions placed in an exclusive benefit trust can offset unfunded liabilities, which will lower the City’s Net OPEB Liability and address its Net Pe nsion Liability.
 Investment flexibility with Section 115 Trust compared to restrictions on general fund investments.
 Increased risk diversification of plan assets through different asset management  Investments can be tailored to the City’s unique demographics.  Oversight and control of fund management selection, monitoring of performance and ability to replace fund management based on performance criteria.  Increased flexibility on use of trust assets (i.e., trust assets can be accessed at any time if the assets are used to fund the City’s pension and OPEB obligations and defray reasonable expenses associated therewith)
 Even after fees and budget impacts, Higher-yield strategies that significantly outperform other investment options, even after fees and budget impacts.  Potential for positive rating agency and investor consideration.

Proposed Funding Plan
On July 7, 2026 , the City Council reviewed the allocation of the City’s General Fund reserve balance and approved a funding policy proposing a $7,700,000 initial contribution to the Trust. Any additional future deposits to the Trust will be determined at a later date.

Fees
There is no fee to set up the Trust with PARS, but there is an annual Trust fee based on the amount of assets the City has in the Trust. Based on a $1,000,000 initial deposit into the Trust proposed by the City’s funding policy, the total annual fee is $6,000 (0.60% of $1,000,000), which is composed of $2,500 (0.25% of $1,000,000) for Trust administration services and $3,500 (0.35% of $1,000,000) for trustee/investment management services.

Annual fees are paid from the Trust assets. A complete list of fees based on asset amount is as follows:
 Trust Administration Fees:
o 0.25% for assets $0-10 million
o 0.20% for assets $10-15 million
o 0.15% for assets $15-50 million
o 0.10% for assets over $50 million

 Trustee/Investment Management Fees:
o 0.35% for assets under $5 million
o 0.25% for assets $5-10 million
5 o 0.20% for assets $10-15 million
o 0.15% for assets $15-50 million
o 0.10% for assets over $50 million

Next Steps
If the resolution is approved as presented, the City Council adopts the PARS Public Agencies Post-Employment Benefits Trust and authorizes the City Manager to execute the administrative services agreement with PARS and any other legal and administrative documents required to set up the Trust.

The resolution also appropriates from fund balance and authorizes the deposit of $6,248,000 as the initial contribution to the City ’s Trust for OPEB and $1,500.000 in the City’s Trust for Pensio n. The City Manager will work with PARS, U.S. Bank, and PFM Asset Management to complete the necessary documents and have the $7,700,000 initial deposit transferred to the Trust and invested in the desired portfolio.

Alternative(s)
Alternatives include keeping funds in existing accounts or moving to CalPER S 115 trust account. Options were reviewed by staff, and it remains recommended to open a PAR S 115 trust account.

Fiscal Considerations
The City plans on depositing $7.7 million into the trust. The administrative fees and trustee fees for this amount of assets under management are 0. 56% annually. This equates to approximately $43,500 per year for plan management fees. The cost is $1 9,630 higher than keeping the funding in the City’s investment pool. However, the anticipated return in the PARS trust will more than cover the increased cost.

Impact on the Community
Prefunding pension and OPEB obligations through a Section 115 trust benefits both the community and employees by ensuring these long -term commitments are funded in a disciplined, transparent, and sustainable way. For the community, it helps stabilize budgets, reduce long-term costs, and protect service levels by avoiding sharp increases in future contributions. For employees, it provides great er security that promised retirement benefits will be paid, backed by dedicated assets that are professionally managed and legally restricted for that purpose.

Other Agency Review
The report and draft agreements have been reviewed by the City Attorney’s Office. The PARS plan has been reviewed by the Investment Advisory Committee. As the plan is set up the Finance Director will continue to review options with the Investment Advisory Committee.

ATTACHMENT(S)
A. Resolution
B. Agreement
Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF SANTA MARIA, CALIFORNIA, APPROVING THE

ADOPTION OF THE PUBLIC AGENCIES POST-EMPLOYMENT

BENEFITS TRUST ADMINISTERED BY PUBLIC AGENCY

RETIREMENT SERVICES (PARS)

WHEREAS, PARS has made available the PARS Public Agencies Post - Employment Benefits Trust (the “Program”) for the purpose of prefunding pension obligations and/or OPEB obligations; and

WHEREAS, the City of Santa Maria (“City”) is eligible to participate in the Program, a tax-exempt trust performing an essential governmental function within the meaning of Section 115 of the Internal Revenue Code, as amended, and the Regulations issued there under, and is a tax -exempt trust under the relevant statutory provisions o f the State of California; and

WHEREAS, the City’s adoption and operation of the Program has no effect on any current or former employee’s entitlement to post-employment benefits; and

WHEREAS, the terms and conditions of post -employment benefit entitlem ent, if any, are governed by contracts separate from and independent of the Program; and

WHEREAS, the City’s funding of the Program does not, and is not intended to, create any new vested right to any benefit nor strengthen any existing vested right; and

WHEREAS, the City reserves the right to make contributions, if any, to the Program.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Adopt the PARS Public Agencies Post-Employment Benefits Trust.

SECTION 2. Appoint the Director of Finance or designee as the City’s plan Administrator for the Program.

SECTION 3. Authorize the City’s Plan Administrator to execute the PARS legal and administrative documents on behalf of the City and to take whatever additional actions are necessary to maintain the City’s participation in the Program and to maintain compliance of any relevant regulation issued or as may be issued; therefore, authorizing him/her to take whatever additional actions are required to administer the City’s Program.

Attachment A

Page 2 of 2 ends

SECTION 4. The Chief Deputy City Clerk is hereby authorized to make m inor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on this 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

Page 1 ends

AGREEMENT FOR ADMINISTRATIVE SERVICES
T
his agreement (“Agreement”) is made this 3rd day of November 2026 , between Phase II Systems, a corporation organized and existing under the laws of the State of California, doing business as Public Agency Retirement Services and PARS (hereinafter “PARS” and “Consultant”) and the City of Santa Maria (“Agency” and “City”).

W
HEREAS, the Agency has adopted the PARS Public Agencies Post-Employment Benefits Trust for the purpose of prefunding pension obligations and/or Other Post -Employment Benefits (“ OPEB”) obligations (“Plan”) and is desirous of retaining PARS as Trust Administrator to the Trust, to provide administrative services.

NOW THEREFORE, the parties agree:

1. S
ervices. PARS will provide the services pertaining to the Plan as described in the exhibit attached hereto as “Exhibit 1A” (“Services”) in a timely manner, subject to the further provisions of this Agreement.

2. Fees for Services. PARS will be compensated for performance of the Services as described in the exhibit attached hereto as “Exhibit 1B”.

3. Payment Terms. Payment for the Services will be remitted directly from Plan assets unless the Agency chooses to make payment directly to PARS. In the event that the Agency chooses to make payment directly to PARS, it shall be the responsibility of the Agency to remit payment directly to PARS based upon an invoice prepared by PARS and delivered to the Agency. If payment is not received by PARS within thirty (30) days of the invoice delivery date, the balance due shall bear interest at the rate of 1.5% per month. If payment is not received from the Agency within sixty (60) days of the invoice delivery date, payment plus accrued interest will be remitted directly from Plan assets, unless PARS has previously received written communication disputing the subject invoice that is signed by a duly authorized representative of the Agency.

4. Fees for Services Beyond Scope. Fees for services beyond those specified in this Agreement will be billed to the Agency at the rates indicated in the PARS ’ standard fee schedule in effect at the time the services are provided and shall be payable as described in Section 3 of this Agreement. Before any such services are performed, PARS will provide the Agency with a detailed description of the services, terms, and applicable rates for such services. Such services, terms, and applicable rates shall be agreed upon in writing and executed by both parties.

5. Information Furnished to PARS. PARS will provide the Service s contingent upon the Agency providing PARS the information specified in the exhibit attached hereto as “Exhibit 1C” (“Data”). It shall be the responsibility of the Agency to certify the accuracy, content , and completeness of the Data so that PARS may rely on such information without further audit. It shall further be the responsibility of the Agency to deliver the Data to PARS in such a manner that allows for a reasonable amount of time for the Services to be performed. Unless specified in Exhibit 1A, PARS shall be under no duty to question Data received from the Agency, to compute contributions made to the Attachment B

Page 2 ends

Plan, to determine or inquire whether contributions are adequate to meet and discharge liabilities under the Plan, or to determine or inquire whether contributions made to the Plan are in compliance with the Plan or applicable law. In addition, PARS shall not be liable for nonperformance of Services to the extent such nonperformance is caused by or results from erroneous and/or late delivery of Data from the Agency. In the event that the Agency fails to provide Data in a complete, accurate and timely manner and pursuant to the specifications in Exhibit 1C, PARS reserves the right, notwithstanding the further provisions of this Agreement, to terminate this Agreement upon no less than ninety (90) days’ written notice to the Agency.

6. Records. Throughout the duration of this Agreement, and for a period of five (5) years after termination of this Agreement, PARS shall provide duly authorized representatives of Agency access to all records and material relati ng to calculation of PARS’ fees under this Agreement. Such access shall include the right to inspect, audit and reproduce such records and material and to verify reports furnished in compliance with the provisions of this Agreement. All information so obtained shall be accorded confidential treatment as provided under applicable law.

7. Confidentiality. Without the Agency’s consent, PARS shall not disclose any information relating to the Plan except to duly authorized officials of the Agency, subject to applicable law, and to parties retained by PARS to perform specific services within this Agreement. The Agency shall not disclose any information relating to the Plan to individuals not employed by the Agency without the prior written consent of PARS, except as such disclosures may be required by applicable law.

8. Independent Contractor. PARS is and at all times hereunder shall be an independent contractor. As such, neither the Agency nor any of its officers, employees or agents shall have the power to control the conduct of PARS, its officers, employees, or agents, except as specifically set forth and provided for herein. PARS shall pay all wages, salaries, and other amounts due its employees in connection with this Agreement and shall be responsible for all reports and obligations respecting them, such as social security, income tax withholding, unemployment compensation, workers’ compensation, and similar matters.

9. Insurance. Prior to commencing performance under this Agreement and for the duration of this Agreement, PARS shall maintain insurance coverage as specified in Exhibit 1D attached hereto and incorporated as part of this Agreement.

10. Indemnification. PARS and Agency hereby indemnify each other and hold the other harmless, including their respective officers, directors, and employees, from any claim, loss, demand, liability, or expense, including reasonable attorneys’ fees and costs, incurred by the other as a consequence of , to the extent, PARS’ or Agency’s, as the case may be, negligent acts, errors or omissions with respect to the performance of their respective duties hereunder.

11. Compliance with Applicable Law. The Agency shall observe and comply with federal, state, and local laws in effect when this Agreement is executed, or which may come into effect during the term of this Agreement, regarding the administration of the Plan.

Page 3 ends

PARS shall observe and comply with federal, state, and local laws in effect when this Agreement is executed, or which may come into effect during the term of this Agreement, regarding Plan administrative services provided under this Agreement.

12. Applicable Law. This Agreement shall be governed by and construed in accordance with the laws of the State of California . In the event any party institutes legal proceedings to enforce or interpret this Agreement, venue and jurisdiction shall be in any state court of competent jurisdiction.

13. Force Majeure. When a party’s nonperformance hereunder was beyond the control and not due to the fault of the party not performing, a party shall be excused from performing its obligations under this Agreement during the time and to the extent that its performance is prevented by such cause. Such cause shall include, but not be limited to:
any incidence of fire, flood, ac ts of God or unanticipated communicable disease, acts of terrorism or war commandeering of material, products, plants or facilities by the federal, state or local government, a material act or omission by the other party or any law, ordinance, rule, guidance or recommendation by the federal, state or local government, or any agency thereof, which becomes effective after the date of this Agreement that delays or renders impractical either party’s performance under the Agreement.

14. Ownership of Reports and Documents. The originals of all letters, documents, reports, and data produced for the purposes of this Agreement shall be delivered to and become the property of the Agency. Copies may be made for PARS but shall not be furnished to others without written authorization from Agency.

15. Designees. The Plan Administrator of the Agency, or their designee, shall have the authority to act for and exercise any of the rights of the Agency as set forth in this Agreement, subsequent to and in accordance with the written authorit y granted by the Governing Body of the Agency, a copy of which writing shall be delivered to PARS.

Any officer of PARS, or his or her designees, shall have the authority to act for and exercise any of the rights of PARS as set forth in this Agreement.

16. Notices. All notices hereunder and communications regarding the interpretation of the terms of this Agreement, or changes thereto, shall be effected by delivery of the notices in person or by depositing the notices in the U.S. mail, registered or cer tified mail, return receipt requested, postage prepaid and addressed as follows:
(A) To PARS: PARS; 4350 Von Karman Avenue, Suite 100, Newport Beach, CA 92660; Attention: President
(B) To Agency: City of Santa Maria ; 110 East Cook Street, Santa Maria, CA 93454; Attention: Finance Director
Notices shall be deemed given on the date received by the addressee.

17. Term of Agreement. This Agreement shall remain in effect for the period beginning November 3, 2026 and ending November 2, 2029 (“Term”). This Agreement may be terminated at any t ime by giving thirty (30) days written notice to the other party of the intent to terminate. Absent a thirty (30) day written notice to the other party of the intent

Page 4 ends

to terminate, this Agreement will continue unchanged for successive twelve -month periods following the Term.

18. Amendment. This Agreement may not be amended orally, but only by a written instrument executed by the parties hereto.

19. Entire Agreement. This Agreement, including exhibits, contains the entire understanding of the parties with respect to the subject matter set forth in this Agreement.

In the event a conflict arises between the parties with respect to any term, condition or provision of this Agreement, the remaining terms, conditions, and provisions shall remain in full force and legal effect. No waiver of any term or condition of this Agreement by any party shall be construed by the other as a continuing waiver of such term or condition.

20. Counterparts. Electronic Signatures. This Agreement may be executed in any number of counterparts, and in that event, each counterpart shall be deemed a complete original and be enforceable without reference to any other counterpart. The words “execution,” “signed,” “signature,” and words of like import in this Agreement or in any other certificate, agreement or document related to this Agreement, shall include digital electronic signatures (e.g., DocuSign). The use of digital electronic signatures and electronic records (including, without limitation, any contract or other record created, generated, sent, communicated, received, or stored by electronic means) shall be of the same legal effect, validity and enforceability as a manually executed signature or use of a paper-based record-keeping system to the fullest extent permitted by applicable law.

21. Headings. Headings in this Agreement are for convenience only and shall not be used to interpret or construe its provisions.

22. Effective Date. This Agreement shall be effective on the date first above written and also shall be the date the Agreement is executed.

AGENCY:

BY:

Rebecca Campbell
TITLE: Finance Director
DATE:

PARS:

BY:

Tod Hammeras
TITLE: Chief Financial Officer
DATE:

Page 5 ends

EXHIBIT 1A

SERVICES

PARS will provide the following services for the City of Santa Maria Public Agencies Post- Employment Benefits Trust:

1. Plan Installation Services:
(A) Meeting with appropria te Agency personnel to discuss plan provisions, implementation timelines, actuarial valuation process, funding strategies, benefit communication strategies, data reporting , and submission requirements for contributions/reimbursements/distributions;
(B) Providing the necessary analysis and advisory services to finalize these elements of the Plan;
(C) Providing the documentation needed to establish the Plan to be reviewed and approved by Agency legal counsel. Resulting final Plan document ation must be approved by the Agency prior to the commencement of PARS Plan Administration Services outlined in Exhibit 1A, paragraph 2 below.

2. Plan Administration Services:
(A) Monitoring the receipt of Plan contributions made by the Agency to the trustee of the PARS Public Agencies Post -Employment Benefits Trust (“Trustee”), based upon information received from the Agency and the Trustee;
(B) Performing periodic accounting of Plan assets, reimbursements /distributions, and investment activity, based upon information received from the Agency and/or Trustee;
(C) Coordinating the processing of distribution payments pursuant to authorized direction by the Agency, and the provisions of the Plan, and, to the extent poss ible, based upon Agency-provided Data;
(D) Coordinating actions with the Trustee as directed by the Plan Administrator within the scope of this Agreement;
(E) Preparing and submitting a monthly report of Plan activity to the Agency, unless directed by the Agency otherwise;
(F) Preparing and submitting an annual report of Plan activity to the Agency; (G) Facilitating actuarial valuation updates and funding modifications for compliance with the applicable GASB pronouncements and/or statement s, if prefunding OPEB obligations;
(H) Coordinating periodic audits of the Trust;
(I) Monitoring Plan and Trust compliance with federal and state laws.

3. PARS is not licensed to provide and does not offer tax, accounting, legal, investment or actuarial advice.

Page 6 ends

EXHIBIT 1B

FEES FOR SERVICES

PARS will be compensated for performance of Services, as described in Exhibit 1A based upon the following schedule:

An annual asset fee shall be paid from Plan assets based on the following schedule:

For Plan Assets from: Annual Rate:

$1 to $10,000,000 0.25%
$10,000,001 to $15,000,000 0.20%
$15,000,001 to $50,000,000 0.15%
$50,000,001 and Above 0.10%

Annual rates are prorated and paid monthly. The annual asset fee shall be calculated by the following formula [Annual rate divided by 12 (months of the year) multiplied by the Plan asset balance at the end of the month]. Trustee and Investment Management Fees are not included.

Page 7 ends

EXHIBIT 1C

DATA REQUIREMENTS

PARS will provide the Services under this Agreement cont ingent upon receiving the following information. Agency is solely responsible for ensuring that all information and documentation provided to PARS is true, correct, and authorized:

1. Executed Legal Documents:
(A) Certified Resolution
(B) Adoption Agreement to the Public Agencies Post-Employment Benefits Trust (C) Trustee Investment Forms

2. Contribution – completed Contribution Transmittal Form signed by the Plan Administrator (or authorized Designee) which contains the following information:
(A) Agency name
(B) Contribution amount
(C) Contribution date
(D) Contribution method (Check, ACH, Wire)

3. Distribution – completed Payment Reimbursement /Distribution Form signed by the Plan Administrator (or authorized Designee) which contains the following information:
(A) Agency name
(B) Payment reimbursement/distribution amount
(C) Applicable statement date
(D) Copy of applicable premium, claim, statement, warrant, and/or administrative expense evidencing payment
(E) Signed certification of reimbursement /distribution from the Plan Administrator (or authorized Designee)

4. Other information pertinent to the Services as reasonably requested by PARS and Actuarial Provider.

Page 8 ends

EXHIBIT 1D

INSURANCE REQUIREMENTS

Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, his/her agents, representatives, or employees. If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant.

A. Minimum Scope of Insurance

Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001), including products and completed operations, property damage, bodily injury and personal & advertising injury.

2. Insurance Services Office Business Auto Coverage Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, covering hired (Code 8) and non-owned autos (Code 9).

3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance.

4. Errors and Omissions liability insurance appropriate to the Consultant's profession.

B. Cyber Liability Insurance, Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.

C. Minimum Limits of Insurance

Consultant shall maintain limits no less than:

1. General Liability - $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Page 9 ends

2. Automobile Liability - $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: Statutory limits.

4. Employer's Liability - $1,000,000 per accident for bodily injury or disease.

5. Errors and Omissions Liability - $1,000,000 per occurrence or claim, $2,000,000 aggregate.

6. Cyber Liability- $2,000,000 per occurrence or claim, $2,000,000 aggregate.

D. Self-insured Retentions

Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration and defense expenses within the retention.

E. Other Insurance Provisions

The liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form or an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38 and CG 20 37 forms if later revisions are used or their equivalent).

2. For any claims related to this project, the Consultant's insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees and volunteers. Any insurance or self -insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled or reduced, except with notice stating the title of this contract to the City. All notices provided pursuant to this Agreement shall be given to the City representative listed for notice in this agreement and shall specify the title of this Agreement. Notice may be given by First Class U.S. Mail.

4. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any

Page 10 ends

loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

5. If any of the required policies provide claims-made coverage:
a. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. c. If coverage is canceled or non- renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

F. Acceptability of Insurers

Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.

G. Verification of Coverage

Consultant shall furnish the City with original certificates and amendatory endorsements of the applicable policy language effecting coverage required by this clause.

All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

H. Special Risks or Circumstances

The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Dawn Jackson, Library Director

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving an Agreement with the County of Santa Barbara and the Cities of Lompoc, Goleta, Santa Barbara, and Carpinteria for the Operation of a Free Countywide Library System for Fiscal Year 2026-2027

Description:

The City Council will consider adopting a Resolution approving an Agreement with the County of Santa Barbara to provide for the operation of a Free Countywide Library System for Fiscal Year (FY) 2026-2027

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

1. Adopt a Resolution approving an Agreement with the County of Santa Barbara and the cities of Lompoc, Goleta, Santa Barbara, and Carpinteria for the operation of a Free Countywide Library System for Fiscal Year 2026-2027; and

2. Authorize City Manager or designee to execute agreement.

BACKGROUND:

Since 1962, the County of Santa Barbara (County) has contracted annually with the cities of Lompoc, Santa Barbara, and Santa Maria to provide free library service to the cities and unincorporated areas of Santa Barbara County. The cities of Goleta and Carpinteria have contracted with the County since the formation of their city libraries in 2018 and 2022, respectively. Library funding is a discretionary matter decided each year by the Board of Supervisors.

Each city library is responsible for a separate "zone." Santa Maria is designated as Zone 3 which includes the cities and unincorporated areas located within or in close proximity to Cuyama, Guadalupe, Los Alamos, and Orcutt. With County funds, which have been allocated historically on a per-capita basis, the Santa Maria Public Library operates four branch libraries in Cuyama, Guadalupe, Los Alamos, and Orcutt. All County residents have free and equal access to all public libraries within the County.

2 Last year's Agreement for FY 2025-2026 was brought to the City Council and approved on March 3, 2026.

DISCUSSION:

On October 6, 2026 , the Board of Supervisors approved the Free Countywide Library System contract for FY 2026-2027. The per capita base allocation for FY 2026-2027 is $9.00 with additional funding allocated to County branches to mitigate a potential loss of open hours and programming reductions. The County contribution to library services in Zone 3 for FY 2026-2027 is based on a total population of 160,347. The fiscal year funding totals $1,706,186. This figure includes the additional allocation of $189,164 from cannabis funding, which provides an additional $ 18,408 for Cuyama , $30,249 for Guadalupe, $29,742 for Los Alamos, and $ 110,765 for Orcutt. Additionally, Orcutt will receive $55,000 from the small library fund for rent and Los Alamos will receive $10,000 for operational expenses. The Main Library will receive $8,900 from the small library fund to expand Bookmobile services to unincorporated locations within Zone 3, such as school visits and occasional stops that will not impact service to Santa Maria residents.

The term of the County agreement commenced on July 1, 2026, and continues until June 30, 2027.

The payments are to be made by the County to cities in two inst allments: the first after execution of the Agreement by all parties, and no earlier than November 1, 2026, but no later than February 1, 2027, and the second payment no earlier than March 1, 2027, but no later than April 1, 2027. Cities are to provide the County with an annual statement of receipts and disbursements no later than 60 days after the end of the fiscal year (Agreement Section 6D, Deposit of Allotment of Funds and Section 17, Reports of Receipts and Disbursements).

The County's Community Services Director is the designated representative for the County and the city’s Chief Librarians are the designated representatives for each of their cities for the purpose of notices and correspondence (Agreement Section 1, Designated Representative and Section 22, Notices).

Alternative
An alternative would be to decline the agreement and lose valuable funding to operate County branches.

Fiscal Considerations
Library Zone 3 (Santa Maria) will receive a total of $1,706,186. The City Main Library is allocated $1,055,349 or 62 percent of all County funds based on a population of 160,347 and small branch funding for the Bookmobile. The County branches will receive $650,837 calculated on a population estimate of 44,074 and cannabis fund ing allocated by the County Supervisors to cover projected deficits. County branch total budgets will be set as follows: Cuyama $26,593, Guadalupe $109,066, Los Alamos $61 ,154, and Orcutt $454,024.

3 Impact on the Community
The funds received under this Agreement are an important segment of the budget for the Main Library, as well as the County branches operated by the Santa Maria Public Library, located in Cuyama, Los Alamos, Guadalupe, and Orcutt. Renewal of this Agreement is essential to maintain fundi ng for library programs and to continue providing library services to all Zone 3 libraries and surrounding communities.

ATTACHMENT(S)
A. Resolution
B. Agreement for Operation of a Free Countywide Library System Fiscal Year 2026-2027

Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

APPROVING AN AGREEMENT WITH THE COUNTY OF SANTA BARBARA

AND THE CITIES OF LOMPOC, GOLETA, SANTA BARBARA, AND

CARPINTERIA FOR THE OPERATION OF A FREE COUNTYWIDE
LIBRARY SYSTEM FOR FISCAL YEAR 2026-2027

WHEREAS, the City of Santa Maria has contracted with the County of Santa Barbara since 1962 to provide library service to the unincorporated areas of the County; and

WHEREAS, the City of Santa Maria is responsible for Zone 3, which is comprised of County branch libraries in Cuyama, Los Alamos, Orcutt, and Guadalupe with funds provided by the County; and

WHEREAS, all County residents have free and equal access to all public libraries within the County; and

WHEREAS, the Fiscal Year 2026-2027 Agreement provides revenue and appropriations of $9.00 per capita and additional funding for branches based on projected deficits for a total of $1,706,186.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1 . Approve agreement with County of Santa Barbara and the cities of Lompoc, Goleta, Santa Barbara , and Carpinteria to provide for the operation of a Countywide Free Library system,

SECTION 2 . Authorize t he City Manager or designee to execute the Agreement.

SECTION 3. Authorize t he City Manager or designee to appropriate, release, and expend funds and issue warrants to comply with the terms of the agreement.

SECTION 4. The Chief Deputy City Clerk is hereby authorized to make minor changes herein to address clerical errors, so long as substantial conformance with the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

Attachment A

Page 2 of 2 ends

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held this 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney

APPROVED AS TO CONTENT:
_______________________________
Department Director

_______________________________
City Manager

FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 1 of 26 ends

AGREEMENT FOR OPERATION OF A FREE COUNTYWIDE LIBRARY
SYSTEM

THIS AGREEMENT FOR OPERATION OF A FREE COUNTYWIDE LIBRARY SYSTEM (“Agreement”) is hereby made by and among:

THE COUNTY OF SANTA BARBARA, a political subdivision of the State of California hereinafter, referred to as “County,”
CITY OF SANTA BARBARA, a municipal corporation, hereinafter referred to as “Santa Barbara,” and
CITY OF LOMPOC, a municipal corporation, hereinafter referred to as “Lompoc,” and CITY OF SANTA MARIA, a municipal corporation, hereinafter referred to as “Santa Maria,” and
CITY OF CARPINTERIA, a municipal corporation, hereinafter referred to as “Carpinteria,” and
CITY OF GOLETA, a municipal corporation, hereinafter referred to as “Goleta” (Santa Barbara, Carpinteria, Lompoc, Santa Maria, and Goleta hereinafter referred to collectively as the “Managing Cities” and each individually as a “Managing City”).

WITNESSETH THAT:

WHEREAS, the parties hereto desire to operate a Countywide network of library services that provide for all inhabitants of the County of Santa Barbara open access to diverse resources and ideas that inspire learning, promote reading and enhance community life; and WHEREAS, the parties hereto desire to contract for the furnishing to all inhabitants of the County, including residents within cities, an equitable level of Countywide library services; and WHEREAS, the parties hereto recognize that, because library users cross jurisdictional boundaries, a Countywide network of library services best serves the needs of all users; and WHEREAS, the parties hereto believe such services can be most efficiently provided through the use of existing facilities within and outside of the five Managing Cities without the creation of County-operated duplicate establishments; and WHEREAS, the parties hereto believe the fairest method of equalizing County funding for library services is for the County to contribute to the Managing Cities a given and equal amount Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 Attachment B
FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 2 of 26 ends

of money for each person residing within their respective zones , with additional funds allocated annually for County branch libraries as hereinafter provided; and WHEREAS, the parties hereto desire to memorialize herein their agreement that the sums hereinafter specified will be sufficient contribution by the County during the term of this Agreement; and
WHEREAS, each Managing City, with the exception of Santa Barbara, is a member of the Black Gold cooperative library system, a service agency established by the authorization of the Public Library Development Act of 1963, since such membership is extended to the incorporated as well as the unincorporated areas of the County; and
WHEREAS, it is the intent of the parties hereto to use reliable local public revenue to fund core library services; federal, state and philanthropic money, if available, shall be used to supplement, but not supplant, local revenues appropriated for public libraries; and WHEREAS, in order to maintain service levels, funding from the County, Managing Cities and other jurisdictions should include annual increases according to an accepted regional consumer price index; and
WHEREAS, the parties hereto desire to work together and with other jurisdictions to increase funding and service levels for the Countywide network of library services.

NOW, THEREFORE, the parties hereto agree as follows:

1. Designated Representative
County’s Community Services Department ( “CSD”) Director is the designated representative of County, and will administer this Agreement for and on behalf of County. Each of the Managing Cities’ respective Library Directors is the designated representative for such Managing City. Each party hereto shall notify each of the other parties hereto in the event of a change of such party’s designated representative.

2. Services to be Rendered
A map of Santa Barbara County Library Zones (“Zones,” and each a “Zone”) is attached hereto as Exhibit A and incorporated herein by reference (“Zone Map”). Each Managing City shall assume and provide the services of a public library for the Zone assigned to such Managing Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 3 of 26 ends

City hereunder, including, but not limited to, within the incorporated cities within such Zone, as described in greater detail in Section 5, below. The Library Director for each Managing City shall plan and administer a consolidated library program in the incorporated and unincorporated areas of the Managing City’s Zone.

All materials purchased by a jurisdiction within the County of Santa Barbara shall be available to all residents within the County of Santa Barbara via a direct loan or interlibrary loan, without charge. Each Managing City is encouraged to build collections that reflect community needs and wants within its assigned Zone, and may set restrictions on interlibrary loans of certain materials such as new titles and high demand items (for a period up to six (6) months), reference materials, and rotating or rental collections.

3. Term
The term of this Agreement shall be for the Fiscal Year 2026-2027, commencing on July 1, 2026, and terminating on June 30, 2027 (“Term”), unless earlier terminated in accordance with the provisions of this Agreement.

4. Termination by County or Withdrawal by Cities
At any time during the Term of this Agreement, County may, upon six -months’ prior written notice to each of the Managing Cities, terminate this Agreement. At any time during the Term of this Agreement, each Managing City may, upon six -months’ prior written notice to County and each of the other Managing Cities, withdraw from and cease to be a party to this Agreement. If any Managing City withdraws from this Agreement, then such Managing City shall repay to the County funds previously distributed to that Managing City hereunder on a pro rata basis with respect to the number of days remaining in the Term after such withdrawal becomes effective.

5. Library Zones
Each Managing City shall have the primary obligation to provide library services within the Zone assigned to such Managing City, as described in greater detail below.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 4 of 26 ends

a. Santa Barbara shall furnish library services to all persons inhabiting Zone 1 , including the City of Santa Barbara, and the unincorporated areas of Montecito, Summerland, and Mission Canyon.
b. Lompoc shall furnish library services to all persons inhabiting Zone 2, including the City of Lompoc , and the unincorporated areas of the communities of Mission Hills, Vandenberg Village, and all of Vandenberg Space Force Base. c. Santa Maria shall furnish library services to all persons inhabiting Zone 3 , including the Cities of Guadalupe and Santa Maria , and the unincorporated areas of the communities of Cuyama, Los Alamos, and Orcutt.
d. Goleta shall furnish library services to all persons inhabiting Zone 4, including the Cities of Goleta, Solvang, and Buellton , and the unincorporated areas of the communities of the Eastern Goleta Valley, Community Service Area 3 (CSA 3), Isla Vista, Gaviota, Hope Ranch, Los Olivos, and Santa Ynez.
e. Carpinteria shall furnish library services to all persons inhabiting Zone 5, including the City of Carpinteria and the unincorporated area of Toro Canyon. f. Subject to County’s contribution as set forth in Section 6.a, below, no Managing City may change the level of service ( i.e., hours of operations or staffing) provided at County library branches (defined below) within such Managing City’s Zone (“Service Level Change”) without first complying with the provisions of this Section 5.f. the CSD Director or his or her designee (“CSD Director”). Any changes to the level of service must also be presented to the Library Advisory Committee for input. Each Managing City must provide written notice of each proposed or pending Service Level C hange to the CSD Director and the Library Advisory Committee at least 90 days prior to implementation of such Service Level Change. Following receipt of such Service Level Change notice, the CSD Director will schedule a time for such Managing City to present such proposed Service Level Change to, and consult with, the Library Advisory Committee regarding same. The CSD Director or his or her designee will consult with such Managing City’s Library Director within 30 days of the CSD Director’s receipt of such Service Level Change notice. Such Managing City and its Library Director shall duly take into consideration input from the CSD Director and the Library Advisory Committee regarding such proposed Service Level Change. “County library branches” include: County/City branch libraries within the Cities of Buellton, Solvang, and Guadalupe, referred to in this agreement as a “partner Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 5 of 26 ends

city” or “partner cities ,” as well as County branch libraries in the unincorporated areas of Montecito, Vandenberg Village, Orcutt, Los Alamos, and Cuyama.

6. Deposit and Allotment of Funds
Contribution for FY 2026/27:
a. County agrees to contribute $4,803,585 in Fiscal Year 2026/27 (“County Contribution”), which sum includes (i) $4,004,766 for library services (a per capita level of support of approximately $9.00), to be used for operations and acquisition of books and materials for inhabitant s of the County of Santa Barbara , and (ii) $627,419 allocated to mitigate hours and programming reductions of County library branches at risk of reducing service levels. For the purpose of allocating the County Contribution among the Managing Cities for the 2026/27 Fiscal Year, the parties hereto agree that the population count in each of the Zones, as determined in accordance with subpart 6.b, below, is as follows:

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 6 of 26 ends

Table 1:

b. Subject to County budgetary appropriations and availability of funds, the portion of the County Contribution to be allocated and paid to each Managing City shall be based on: population figures certified for January 1 of the immediately preceding fiscal year, and published in June of that year, as shown in the California State Library (Certification of Population Figures), but one year in arrears (e.g., FY 26/27 population based upon June 1, 20 25 data). Notwithstanding the foregoing, i n no event shall the amount paid to a Managing City hereunder exceed the amount set Library Branch
FY 26-27
Population
Estimates
FY 26-27
$9.00 Base - Per
Capita (incl. CPI)
FY 26-27
Other GFC Funding
FY 26-27
Small Library
Fund
FY 26-27 Total
County Funding by
Zone
Santa Barbara/Eastside 90,270 812,427 - - 812,427 Montecito 9,216 82,947 230,294 50,000 363,241 Zone 1 99,486 895,374 230,294 50,000 1,175,668 Lompoc 48,793 439,139 - - 439,139 Vandenberg Village 10,422 93,796 40,033 15,000 148,829 Zone 2 59,215 532,935 40,033 15,000 587,968 Santa Maria 116,272 1,046,449 - 8,900 1,055,349 Cuyama 909 8,185 18,408 - 26,593 Guadalupe 8,757 78,817 30,249 - 109,066 Los Alamos 2,379 21,412 29,742 10,000 61,154 Orcutt 32,029 288,259 110,765 55,000 454,024 Zone 3 160,347 1,443,122 189,164 73,900 1,706,186 Goleta 63,648 572,830 - - 572,830 Isla Vista 25,630 230,670 - 12,500 243,170 Buellton 10,206 91,851 71,777 - 163,628 Solvang 10,206 91,851 96,151 - 188,002 Zone 4 109,689 987,202 167,928 12,500 1,167,630 Carpinteria 16,237 146,133 - - 146,133 Zone 5 16,237 146,133 - - 146,133 General - - - 20,000 20,000 Total 444,974 4,004,766 627,419 171,400 4,803,585 Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 7 of 26 ends

forth in the “FY 26/27 Total County Funding by Zone” column for such Managing City in Table 1, above.
c. Although the parties hereto acknowledge that Goleta may, in addition to the funds provided hereunder, receive other funds during the Term from County Service Area Number Three (“CSA No. 3”), established in 1990 by Measure L to fund the Goleta Valley Library via parcel tax assessment (“Measure L Funds”), this Agreement does not create, and shall not be construed as creating or giving rise to any duty, responsibility, obligation, promise, or liability on the part of the County with respect to the provision of Measure L Funds to Goleta or CSA No. 3 . Goleta covenants and agrees that and Measure L Funds received by Goleta shall only be used for extended library facilities and services in CSA No. 3, d. Except as otherwise provided herein, the payments to be made by County to each Managing City hereunder shall be made in two installments: the first after execution of this Agreement by such Managing City, no earlier than November 1, 2026, but no later than February 1, 2026, and the second payment no earlier than March 1, 2026, but no later than April 1 , 202 6; provided, however, that payment to a Managing City hereunder shall be conditioned on such Managing City’s compliance with the reporting requirements hereunder.
e. In the event that any of the funds allocated to a library hereunder are not expended during the Term, such unspent funds shall be retained by the Managing City that is assigned hereunder to the Zone in which such library is located for use after the Term for library services at such library branch.
f. No funds paid by County to any Managing City hereunder shall be used for purposes other than such Managing City’s administration, maintenance , and operation of consolidated library services within such Managing City’s Zone. Any funds provided hereunder which are used for other
purposes shall be reimbursed to County by the Managing City to whom such funds were disbursed hereunder.
g. In addition to the County Contribution , the County shall work in good faith to secure funding commitments from each city in which a branch library is operated through separate agreements with those cities. Partner cities are expected to Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 8 of 26 ends

contribute an amount at least equal to County funding for libraries within their jurisdiction as shown in Table 1, above. Payments from partner cities shall be made according to the schedule set forth in Section 6.d, above. h. If a branch library moves from one Zone to another, or a new Zone is created for a branch library , the County may reserve a portion of funding allocated to the Managing City for the new Zone to reimburse the Managing City that administered such re-zoned branch library in its prior Zone for residual expenses for a period of one year after such relocation or re-zoning.

7. County Buildings
Ownership of branch library buildings and the land on which such buildings are situated or are to be situated, if situated on County land or purchased with County funds, shall be vested in County, and this Agreement shall not confer any rights on any Managing City to any such County- owned branch library building or real property in any Zone. County may designate any such County building(s) for use by a particular Managing City or Managing Cities to serve a particular Zone or Zones, or any portion thereof. In so designating County buildings, County shall consider the recommendations of the Library Advisory Committee, as well as public comments and other relevant information.

Each Managing City to which a branch building is designated shall maintain, repair , and operate such branch library building to the extent funding is available and in accordance with Section 9, below. Upon a change or termination of such building designations, the Managing City shall vacate such building and return such building to County in the same condition as the Managing City received it, usual wear and tear excepted.

8. Furnishings, Equipment and Supplies
The parties hereto agree all furnishings and equipment, including, but not limited to, books, shelves, desks, tables, chairs, study carrels, telecommunication and computer equipment and systems, office machines, appliances, fixtures and HVAC systems, that are contained in and designated for use solely in a branch library for which the County is responsible for the property insurance. Such branch library locations include Cuyama, Montecito, Solvang and Vandenberg Village. In all other locations, the furnishings and equipment of each branch library shall be Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 9 of 26 ends

deemed to be the property of the Managing City responsible for administering the Zone where such branch library is located.

Each Managing City shall solely be responsible for the cost of purchasing all office and restroom supplies needed for the operation of the branch libraries located within such Managing City’s respective Zone (“Essential Supplies”), and shall notify the CSD Director in writing in the event that such Managing City lacks sufficient funding for such Essential Supplies, in which case, such Managing City may use funds provided hereunder for the stated purpose of purchasing such otherwise unaffordable Essential Supplies.

9. Facility Maintenance and Repair
Each Managing City shall perform all necessary maintenance, repairs, and replacements with respect to the branch libraries at locations owned by the County (i.e., Cuyama, Montecito, Solvang and Vandenberg Village) within such Managing City’s Zone , in accordance with the Maintenance and Repair Responsibilities schedule attached hereto as Exhibit B and incorporated herein by reference, with the exception of the City of Carpinteria, which is subject to a separate 99-year lease agreement with the County. All such maintenance and repair work shall be done in a competent and workmanlike manner. Each Managing City shall notify the CSD Director in writing of any necessary maintenance or repairs to a County-owned branch within such Managing City’s Zone that exceed the funds available to such Managing City hereunder. For maintenance and repairs that are the responsibility of County hereunder, each Managing City shall send a written request for service of such facilities within such Managing City’s Zone to County at the address set forth below:

County of Santa Barbara, General Services Department
Attn: General Services Facilities Manager, William Collier 1105 Santa Barbara Street, 2nd Floor
Santa Barbara, CA, 93101
Email: [email protected]
Phone: 805.568.2533
Each Managing City is allowed to use the funds provided to such Managing City hereunder for the stated purpose of facility maintenance and repair of such Managing City’s branch locations.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 10 of 26 ends

10. Janitorial Services
Each Managing City shall be responsible for directly managing and paying costs for janitorial services at each branch location in its respective Zone, unless a supplemental agreement is made with a partner city. Each Managing City is allowed to use the funds provided to such Managing City hereunder for the stated purpose of janitorial services.

11. Utilities
Each Managing City shall be responsible for paying the utilities and connection costs associated with the branch locations in its respective Zone, unless a supplemental agreement is made with a partner city. The utility service costs shall include charges for electricity, water, natural gas, telephone, cable, internet, and sewer services. Each Managing City is allowed to use the funds provided to such Managing City hereunder for the stated purpose of paying utilities at its branch locations.

Since County is assuming responsibility for paying utilities (electricity, natural gas, refuse, and water) at the Solvang branch (located within Zone 4) and the Cuyama branch (located within Zone 3), County will withhold $5,000 from its allocations to both Goleta (Zone 4) and Santa Maria (Zone 3), to cover the costs of such utilities.

12. Administration Charges
Each Managing City may recover from the funds allocated to it hereunder an administrative charge, in an amount not to exceed 25% of such Managing City’s annual operating budget, that is reasonable and sufficient to reimburse the Managing City for the costs and expenses necessary to provide library services pursuant to this Agreement. Such administration charges may include the following items:
a. Administrative oversight including meetings with municipal leaders, Friends of the Library, and management from zone branch libraries; City Council meetings and presentations; County Library Advisory representation and reporting; development and management of annual budgets; and strategic planning. b. Human Resources Management, including time sheets; payroll; staff evaluations processing; promotions; new hire and termination processing; scheduling; training; and, internal communications.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 11 of 26 ends

c. Risk Management, including on the job injury and workers’ compensation forms and reporting processing; and, building insurance reporting. d. Accounting, including reconciliation of cash receipts; materials (books, magazines, audio books, DVDs) purchases, receipts, and verification; invoice payment; digital vendor service initiation, purchase, and monitoring; and gift funds accounting. e. Information technology (IT), including the development, maintenance, and use of computer systems, software, networks , and equipment for the processing and distribution of voice and data communications.
f. Reporting, including creation of reports to Federal, State and/or local authorities; quarterly and annual report generation for Santa Barbara County. g. Adult literacy , including tutor training; supervision of tutors and learners , workforce development.
h. User account management, including shipment, returns, holds, problem solving accounts, managing disputes, and damaged and lost item management. i. Research and material access , including advanced research by librarians ; interlibrary materials requests outside the cooperative system; gift materials processing; and collection management.
j. Other, including ordering supplies and equipment; centralized liaison for services and communications with external parties; publicity and public relations support; technical troubleshooting; and, website and social media updates. k. Allocated costs from Central ized City Departments, such as Information Technology, City Manager’s Office, Legal Services, and Human Resources, in alignment with generally accepted cost accounting allocation principles.

Each Managing City shall document the financial basis for such administration charges if the total combined branch administration charges exceed 10% of the total County payments to the Managing City hereunder.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 12 of 26 ends

13. Library Advisory Committee
County’s Board of Supervisors has by appointment created a Library Advisory Committee.

The term of office of each member of the Library Advisory Committee shall annually and automatically renew each year, unless replaced at the pleasure of the Board of Supervisors or by request of the nominating jurisdiction.

Each Managing City shall nominate one member for appointment by the Board of Supervisors. In addition, the partner cities of Buellton, Guadalupe, and Solvang, in recognition of their significant contributions to free library service within the County, may each nominate one member for appointment by the Board of Supervisors, and the County Supervisor of each supervisorial district shall nominate one member. In recognition of County Service Area 3’s significant contributions to free library servic e, County’s Board of Supervisors shall appoint one member from the residents of County Service Area 3. The Supervisors shall further appoint one member of its Board, or a designee, to chair the Library Advisory Committee.

The Library Advisory Committee shall meet at least quarterly to review services and operations and to make advisory recommendations to the Board of Supervisors as follows:
a. Ensure adequate library services to all the inhabitants of County; b. Review the operation of the library system and this Agreement; c. Submit advisory recommendations to ensure adequate service to branch libraries; d. Promote collaborative exchange of information among libraries; ● Review annual library budgets and reports of service levels; and ● Receive notices of reductions to the level of library services; and ● Receive citizen input regarding library -related issues and make recommendations thereon.

14. Indemnification
In lieu of and notwithstanding the pro rata risk allocation which might otherwise be imposed between the parties pursuant to California Government Code Section 895.6, the parties hereto agree that all losses or liabilities incurred by a party hereto shall not be shared pro rata, but instead all parties hereto agree that, pursuant to California Government Code Section 895.4, each of the parties hereto shall fully indemnify and hold each of the other parties hereto, and their officers, board members, employees and agents, harmless from any claim, expense or cost, damage Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 13 of 26 ends

or liability imposed for injury (as defined by California Government Code Section 810.8) occurring by reason of the negligent acts or omissions or willful misconduct of the indemnifying party, its officers, board members, employees or agents, under or in connection with or arising out of any work, authority or jurisdiction delegated to such party under this Agreement. No party, nor any officer, board member, employee or agent thereof , shall be responsible for any damage or liability occurring by reason of the negligent acts or omissions or willful misconduct of any of the other parties hereto, or their officers, board members, employees or agents, under or in connection with or arising out of any work, authority or jurisdiction delegated to such other parties under this Agreement.

15. Insurance
Each Managing City to which a building is designated shall obtain and maintain in effect during the period of such designation general and automobile liability insurance covering the use of such building by that Managing City to which it is designated, and by its officers, agents, employees or volunteers acting on Managing City's behalf or at Managing City’s direction, with single limit coverage of not less than $1 million. Each Managing City shall also maintain Workers' Compensation coverage as required by the California Labor Code and employers' liability insurance. All insurance coverages are to be placed with insurers which (1) have a Best's rating of no less than A VII, and (2) are admitted ins urance companies in the State of California. All other insurers require the prior approval of County. The general and automobile liability insurance policy shall name County, its officers, agents and employees as additional insured, and shall not be canceled without giving at least thirty -days' prior written notice to County. County shall be furnished with a certificate of insurance by Managing City to which a branch library building has been designated prior to performance by Managing City. A copy of the endorsement evidencing County has been added as a named additional insured on the policy must be attached to the certificate of insurance. The policy or policies shall include severability of interest or cross liability clause or equivalent wording. The policy or policies shall contain a provision of the following form: “Such insurance as is afforded by this policy shall be primary and contributory to the full limits stated in the declarations, and if County has other valid and collectible i nsurance for a loss covered by this policy, that other insurance shall be excess only”.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 14 of 26 ends

As an alternative to the liability insurance requirements contained above, a Managing City can provide evidence in writing to County showing that it has an approved self-insurance program and will then only be required to submit a certificate of insurance for the difference, if any, between its self-insurance limit and $1 Million combined single limit coverage.

The property insurance for each building shall be borne by the party that owns the building.

For branch locations housed within a County -owned building, County shall be responsible for property insurance for both the building and its contents. Such locatio ns include Carpinteria, Cuyama, Montecito, Solvang and Vandenberg Village. For each branch library located within a leased building, Managing City that is the lessee of the building space shall be responsible for property insurance for both the building and its contents. For the purpose of this Agreement, “content” includes furnishings, equipment , and supplies as identified in Section 8, as well as audiovisual and electronic materials such as books, subscriptions, government documents , and microfilm used by library patrons. Each Managing City is allowed to use the funds herein made available for the stated purpose of property insurance for contents in its respective branch facilities.

16. Budget, Revenue/Expenditure and Services Plan
a. On or before December 31 , 2026, each Library Director shall confer with the County and a representative from each city in which a branch library operates in its zone to review expected funding and service levels for the next fiscal year. The CSD Director or his or her designee will initiate and lead this effort. b. Upon completion of review of expected funding and service levels under subsection

16.a, above, the County shall work in good faith to secure funding commitments from each branch library’s partner city (and friends organization if the operating budget relies on more than $50,000 from friends organizations) and notify the Library Director of expected funding amounts from the County, partner city, friends organizations, and other sources for the upcoming fiscal year. c. Upon completion of the activities in both subsections 16.a and 16.b, above, but no later than March 1 of each year, each Library Director shall submit to the County a Revenue/Expenditure plan and proposed budget for each branch. Such plan shall include:

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 15 of 26 ends

● Operations budget for the previous, current, and upcoming fiscal year by branch library, as well as current reserves, if any, held by Managing City, broken out by branch library;
● Report of service levels in relation to adopted minimum or agreed upon target service levels, with estimated costs to reach adopted minimum or agreed upon target service levels;
● Anticipated changes to service levels;
● Capital/infrastructure needs and estimated costs; and ● A library services plan for any unincorporated community within its zone that has a population of more than 10,000 and does not have a branch library.

17. Reports of Receipts and Disbursements
Upon adoption of a library budget by each Managing City, the Managing City shall provide to the County’s designated representative a written copy of such budget showing the amount to be spent in each branch including anticipated disbursements from reserves and gifts. Amendments to branch budgets must be reviewed by the Library Advisory Committee prior to review by the Board of Supervisors. Such amendments may include unanticipated or required reductions or increases in revenue via any source. Managing Cities shall provide County with copies of amendments to branch budgets upon County’s request.

Annually, each Managing City shall provide County with a statement o f all receipts and disbursements made pursuant to this Agreement, listing all items of receipt and expenditure throughout the year. Such statements showing the amount spent in each respective County branch located in that Managing City’s Zone shall include an itemization of salaries and wages, materials, supplies, and services, capital outlay , and use of reserves and gifts. In particular, such statement shall show as separate items those obligations and expenditures which are made or incurred for the purpose set forth in Section 6. The annual financial statements shall be submitted no later than sixty (60) days after the end of the fiscal year. Each Managing City shall keep accurate accounts and records for funds expended to accomplish the purpose of this Agreement, and shall make such accounts and records available at all times for inspection and audit by authorized agents of the County of Santa Barbara. All such accounts and records shall be retained for at least a period of Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 16 of 26 ends

five (5) years after the fiscal year to which such records relate. All accounting records shall be kept in accordance with generally accepted accounting principles. COUNTY shall have the right to audit and review all such documents and records at any time during Managing City’s regular business hours or upon reasonable notice. In addition, if this Agreement exceeds ten thousand dollars ($10,000.00), each Managing City shall be subject to the examination and audit of the California State Auditor, at the request of the COUNTY or as part of any audit of the COUNTY, for a period of three (3) years after final payment under the Agreement (Cal. Govt. Code Section 8546.7). Managing Cities shall be subject to, participate in, and cooperate with , all audits, examinations or reviews, whether by COUNTY, the State, or the Federal Government.

If federal, state or COUNTY audit, examination or review exceptions, findings, adjustments or disallowances are made relating to this Agreement, each Managing City shall reimburse its share respectively of all such exceptions, adjustments, and disallowances.

18. Gifts
Each Managing City shall have or adopt a gift policy, to inventory, characterize, track, and report on gifts made directly to a Managing City’s individual branch library. Each Managing City shall provide a copy of its gift policy to the County. Each Managing City shall notify County of any changes made in the gift policy. In the event any person gives or bequeaths any gift directly to any library herein referred to, such gift shall be treated according to the gift policy of Managing City or County, as applicable. Any gift accepted for a library in the unincorporated areas of County shall become the property of County. Any gift accepted by a Main Library shall become the property of that Managing City. Each gift given directly to a library shall, to the extent desired by the presenter, contain specific reference regarding preferred use (i.e., programs, equipment, books etc.).

19. Emergency
In the event of an emergency (a) which results in a loss of library materials, and/or (b) which affects the ability of any branch library to maintain the current level of library service, any party hereto may request the assistance of any other party in ob taining replacement library materials necessary for the functioning of the affected branch; provided, that all expenditures for replacement materials are approved in advance and in writing by the requesting party, the assisting Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 17 of 26 ends

party shall be entitled to full reimbursement from the requesting party for all expenditures made in accordance with applicable laws governing the assisting party.

20. Assignment
No Managing City shall assign or otherwise transfer, in whole or in part, directly or indirectly, whether by operation of law or otherwise, this Agreement or any of such Managing City’s rights or obligations hereunder, or any monies payable hereunder, without the prior written consent of County in each instance . Any attempt to so transfer without County’s prior written consent shall be voidable by County.

21. Provisions Required by Law Deemed Inserted
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein, and this Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted or is not correctly inserted, then upon request of any party hereto this Agreement shall forthwith be physically amended to make such insertion or correction.

22. Notices
Any notice or consent required or permitted to be given under this Agreement shall be given to the respective parties in writing, by first class mail, postage prepaid, or otherwise delivered as follows:

County of Santa Barbara
Jesús Armas,
Community Services Director
123 East Anapamu Street, 2nd Floor
Santa Barbara, CA 93101
~~
Dawn Jackson, Library Director
Santa Maria Public Library
421 S. McClelland Street
Santa Maria, CA 93454
~~

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 18 of 26 ends

Sarah Bleyl, Library Director
Lompoc Public Library
501 E. North Avenue
Lompoc, CA 93436

Elizabeth Saucedo, Library Director
Goleta Valley Library
500 North Fairview
Goleta, CA 93117

~~
Brandon Beaudette, Library Director
Santa Barbara Public Library
P.O. Box 1019
Santa Barbara, CA 93102
~~
Eric Castro, Library Director
Carpinteria Public Library
5141 Carpinteria Avenue
Carpinteria, CA 93013

or at such other address or to such other person that the parties may from time to time designate.

Notices and consents under this section, which are sent by mail, shall be deemed to be received five (5) days following their deposit in the U.S. mail.

23. Section Headings
The headings of the several sections, and any table of contents appended hereto, shall be solely for convenience of reference and shall not affect the meaning, construction or effect hereof.

24. Severability
If any one or more of the provisions contained herein shall for any reason be held to be invalid, illegal, or unenforceable in any respect by a court of competent jurisdiction, then such provision or provisions shall be deemed severable from the remaining provisions hereof, and such invalidity, illegality or unenforceability shall not affect any other provision hereof, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein.

25. Remedies Not Exclusive
No remedy herein conferred upon or reserved to County is intended to be exclusive of any other remedy or remedies, and each and every such remedy, to the extent permitted by law, shall Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 19 of 26 ends

be cumulative and in addition to any other remedy given hereunder or now or hereafter existing at law or in equity or otherwise.

26. Entire Agreement and Amendment
In conjunction with the matters considered herein, this Agreement contains the entire understanding and agreement of the parties hereto regarding the subject matter hereof , and there have been no promises, representations, agreements, warranties , or undertakings by any of the parties, either oral or written, of any character or nature hereafter binding except as set forth herein.

This Agreement may be altered, amended, or modified only by an instrument in writing, executed by all the parties to this Agreement and by no other means. Each party waives its future rights to claim or assert that this agreement was modified, canceled, superseded, or changed by any oral agreements, course of conduct, waiver, or estoppel.

27. Successors and Assigns
All representations, covenants, and warranties set forth in this Agreement, by or on behalf of, or for the benefit of any or all of the parties hereto, shall be binding upon and inure to the benefit of such party and its permitted successors and assigns.

28. Compliance with Law
Each party hereto shall, at its sole cost and expense, comply with all County, State, and Federal ordinances, regulations, and statutes now in force or which may hereafter be in force with regard to this Agreement. The judgment of any court of competent jurisdiction, or the admission of any such party in any action or proceeding against such party that such party has violated any such ordinance or statute, shall be conclusive of that fact as between such party and County, whether or not County is a party in such litigation.

29. California Law
This Agreement shall be governed by the laws of the State of California. Any litigation regarding this Agreement or its contents shall be filed in the County of Santa Barbara, if in state court, or in the federal district court nearest to Santa Barbara County, if in federal court.

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 20 of 26 ends

30. Execution of Counterparts
This Agreement may be executed in any number of counterparts and each of such counterparts shall for all purposes be deemed to be an original; and all such counterparts, or as many of them as the parties shall preserve undestroyed, shall together constitute one and the same instrument.

31. Authority
All signatories to this Agreement warrant and represent that they have the power and authority to enter into this Agreement in the names, titles , and capacities herein stated and on behalf of any entities, persons, or firms represented or purported to be represented by such signatories and that all formal requirements necessary or required by any local, state and/or federal law in order to enter into this Agreement have been fully complied with. Furthermore, by entering into this Agreement, each party hereby warrants that it shall not have breached the terms or conditions of any other contract or agreement to which that party is obligated, which breach would have a material effect hereon.

32. Digital and/or Electronic Signatures
Digital and/or electronic signatures created in a manner consistent with the County’s Electronic and Digital Signature Policy ITAM -0430 (12/8/2020) shall satisfy the County’s requirements for signing this document. Signatures can be made by electronic, sca nned, faxed, and/or digital means. Contracts signed with proper electronic and digital signatures are valid and enforceable.

ATTACHMENTS:
● Exhibit A – County Zone Service Delivery Map
● Exhibit B – Maintenance and Repair Responsibilities for County Owned Library Facilities

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 21 of 26 ends

IN WITNESS WHEREOF, the parties have executed this Agreement to be effective as of the date executed by County.

ATTEST:

JANA PETERSEN

COUNTY EXECUTIVE OFFICER

CLERK OF THE BOARD

By: __________________________
Deputy Clerk of the Board
“COUNTY”
County of Santa Barbara

By: __________________________
Bob Nelson, Chair
Board of Supervisors
APPROVED AS TO FORM:

COUNTY COUNSEL

RACHEL VAN MULLEM

By: __________________________
Deputy County Counsel

DEPARTMENT HEAD
Community Services Department

By: __________________________
Jesús Armas, Director
APPROVED AS TO FORM:

Risk Management
Marisa Kahn

By: __________________________
Risk Manager
APPROVED AS TO ACCOUNTING FORM:

Betsy Schaffer, CPA
Auditor-Controller

By: __________________________
Deputy Auditor-Controller

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B James E Munro
Tyler Sprague
Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 22 of 26 ends

IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the _______ day of__________________, 2026.

CITY OF SANTA MARIA

ATTEST:

By: _____________________________ By: ____________________________ Mayor City Clerk

APPROVED AS TO FORM:

APPROVED AS TO FORM:

By: _____________________________ By: _______________________________ City Attorney Risk Manager

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 23 of 26 ends

IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the _______ day of __________________, 2026.

CITY OF SANTA BARBARA

ATTEST:

By: _____________________________ By: ____________________________ City Administrator City Clerk

APPROVED AS TO FORM: APPROVED AS TO FORM:

By: _____________________________ By: _______________________________ City Attorney Risk Manager

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 24 of 26 ends

IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the _______ day of __________________, 2026.

CITY OF LOMPOC

ATTEST:

By:__________________________
Mayor ________________

By:_________________________
City Clerk ______________________

APPROVED AS TO FORM:

By: _____________________________
City Attorney

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 25 of 26 ends

IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the _______ day of __________________, 2026.

CITY OF GOLETA

ATTEST:

By:______________________________
Mayor _______________________

By:______________________
City Clerk ____________________

APPROVED AS TO FORM:

By: _____________________________
City Attorney

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 FY 2026-2027 Agreement for Operation of a Countywide Library System

Page 26 of 26 ends

IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the _______ day of __________________, 2026.

CITY OF CARPINTERIA

ATTEST:

By:______________________________
Mayor _______________________

By:______________________
City Clerk ____________________

APPROVED AS TO FORM:

By: _____________________________
City Attorney

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59 Drum Canyon Rd
Foxen Canyon Rd
Santa Rita Rd
|}166
£¤101
Happy Canyon Rd
Zone 5
|}166
|}1
|}246
|}154
|}33
|}135
|}192
|}217
|}150
|}225
|}166
|}135
|}1
|}1
|}1
|}135
|}192
£¤101
Zone 3
Zone 1
Zone 2
Zone 4
San Antonio Creek
CuyamaRiver
Orcutt Creek
ZacaCreek
IndianCreek
Manzana Creek
Sisqu oc River
ElJaro
Creek
Santa Ynez River
Santa Cruz Creek
Jalama Creek
Daw
n
Drive
Tepusqu
etCreek
Santa Maria River
Asphaltum Creek
MonoCreek
CachumaCreek
Tinta Creek
Gato Creek
LisqueCreek
NorthFo
rk
la Brea Creek
San Jose Creek
BitterCreek
Aliso Creek
Forbush Creek
SteerCreek
Cebada
Creek
Ellwood Creek
Mission Creek
Tecolote Creek
La Brea Creek
Canada Honda Creek
SalisburyCanyonRoad
AtascaderoCreek
SantaLuciaCreek
DosPueblosCreek
Espada
Creek
Cuaslui Creek
Lacosa Creek
Oak Creek
Buckhorn Creek
Barka Slough
Carpinteria Creek
GasperCreek
Camuesa Creek
Bear Creek
Salsipuedes Creek
Santa Monica Creek
Las Veras Creek
Adler Creek
PurismaCreek
Yridisis Creek
Gidney Creek
Coche Creek
Winchester Creek
FishCreek
San Lucas Creek
Dry Creek
Las Vegas Creek
Tajiguas Creek
Franklin Creek
Happy Canyon Creek
Rancho Nuevo Creek
Romero Creek
Kelly Creek
Maria Ygnacio Creek
SheepCamp Road
North
Fork Juncal Creek
SouthForklaBreaCreek
El Callejon Creek
South Fork Sisquoc River
Tecolutito Creek
Hot Springs Creek
Arroyo Quemaddo
Orcutt Creek
Cuyama River
Sisquoc River
Cuyama River
Cuyama River
Cuyama River
Dry Creek
Santa Ynez River
Cuyama River
Bear Creek
Sisquoc River
Cuyama River
CuyamaRiver
Santa MariaRiver
Cuyama River
SantaMaria River
Santa Ynez River
South Fork la Brea Creek
Cuyama River
SanAntonioCreek
Mono Creek
Santa Maria River
CuyamaRiver
Santa Maria River
Cuyam
aRiver
Santa Maria River
US Hwy 101
Main St
State Hwy 166
Refugio
Rd
FoxenCanyonRd
SierraMadreRdBlack Rd
Coast Rd
Camino Cielo
StateHwy154
Foothill Rd
AlisalRd
Pt Sal Rd
Clark Ave
Jalama Rd
Stowell RdBrown Rd
Cab rillo Hwy
State Hwy 246
SurfRd
PalmerRd
Cliff D r
TangairRd
Graciosa
Rd
O St
Via Real
Utah Ave
V St
State Hwy 33
Central Ave
Lompoc-casmaliaRd
D St
Figueroa Mountain Rd
Cat CanyonRd
Sa nta Rosa Rd
Blosser Rd
Dom
inion
Rd
Telephone Rd
Ray Rd
TepusquetRd
ThirteenthSt
WasiojaRd
Perkins
Rd
Roblar AveSweeney Rd
Alisos Canyon Rd
Prell Rd
State
Hwy
1 GrantRd
Alvin Ave
Edison
St
M ission Dr
H St
Baseline Ave
BallardCanyonRd
Ocean Ave
Camuesa Rd
Olive Ave
BellRd
Alisos Ave
Depot St
SantaBarbaraCanyonRd
Calle Real
Gibraltar R d
Foster Rd
CaliforniaBlvd
Zaca Lake Rd
Woodstock Rd
College Dr
Modoc Rd
Cross R d
San Antonio Rd
Betteravia Rd
Farm Rd
Miranda
Pine Rd
Dione Rd
Bell St
Simas St
ZacaStationRd
Juncal Hot SpringsRd
Artesia
Ave
Mira Rd
Railroad
Ave
Honda RidgeRd
Cebada CanyonRd
C ombar Rd
NewBeach Blvd
Watt Rd
Seventh St
Colson Canyon R d
Foot hill Td
Philbric Rd
Alisos St
Spur Rd
Chino St
Viola Ln
Ai r field Rd
Tank Rd
Bishop Rd
Airpark Dr
Marina Dr
Obispo St
Trigo Rd
Phelps Rd
Rigel Ave
A St
Battles Rd
Onstott Rd
Via Alta
State St
Hill Rd
Las CanoasRd
First St
Brown
Rd
State Hwy 1
Foothill Rd
Santa Rosa Rd
Camino Cielo
State Hwy 154
A St
Camino Cielo
US Hwy 101
US Hwy 101
CabrilloHwy
US Hwy 101
BlosserRd
State Hwy 33
State Hwy 166
Sierra Madre Rd
Ocean Ave
Camino Cielo
State Hwy 1
Calle Real
CoastRd
USHwy101
Santa Barbara
Santa Maria
Lompoc
Goleta
Carpinteria
Solvang
Buellton
Guadalupe
Twitchell Reservoir
Cachuma Reservoir
Gibraltar Reservoir
Jameson Lake
Montecito
Orcutt
Vandenberg AFB
Toro Canyon
Eastern Goleta Valley
Ballard
Garey
Summerland
Santa Ynez
Vandenberg Village
Sisquoc
Los Olivos
Mission Canyon
Mission Hills
Los Alamos
Isla Vista
Cuyama
New Cuyama
University of California-Santa Barbara
Casmalia

GRAPHIC SCALE
Santa Barbara County Library Zones
Compiled by the Office of the County Surveyor in September 2022. 0 5 10 15 202.5
Miles
Legend
Roads
Rivers
Lakes
Places
Cities
Library Zones
1 2
3 4
5 C a l i f o r n i a
q
NOTICE OF DISCLAIMER: This data is for reference only. Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected in this data. Santa Barbara County shall not be liable for any errors, omissions, or damages that result from inappropriate use of this document. No level of accuracy is claimed for the boundary lines shown hereon and lines should not be used to obtain coordinate values, bearings or distances.

Vicinity Map
C a r t o gr ap hy by A dr i an F ost er
Based on 2020 US Census Blocks
Revising 2019 Library Zones to establish Zone 5, as approved on 7/12/2022 by Board of Supervisors Minute Order (File Reference 22-00640).

Note: Library Zone 1 also includes San Miguel, Santa Rosa, Santa Cruz and Santa Barbara Islands. 22GI004
P a c i f i c O c e a n
San Luis Obispo
County
Ventura
County
Kern
County
October 6 2026
BOS Hearing
EXHIBIT A - County Zone Service Delivery Map
Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

EXHIBIT B

MAINTENANCE AND REPAIR RESPONSIBILITIES FOR COUNTY LIBRARY FACILITIES

CUYAMA, MONTECITO, SOLVANG AND VANDENBERG VILLAGE

Page 1 ends

ITEM
NO. ITEM
NOT

APPLICABLE

COUNTY MANAGING
CITY

1. Building Exterior
Repair Walls X
Painted Surfaces* X
Door and Window Trim X
Doors, Hardware X
Windows: Hardware and Screens X
Locks X
Roof X
Rain Gutters X
Flashing X
Down Spouts X
Lighting
Bulbs X
Fixtures X
Transformers X
Fluorescent Lights X
Ballast X
Handrails X
Signs (County Designation) X
Timers X
Gutters X
Decking Walkways Replace Maintain
Exterior Patios X
Decking (Overdecking on roof top area) X
Water Softener, Filter and Conditioner X
Stairs X
Roof Drains X
Gates X
Gas/Water Lines X
Elect. Lines X
Phone/ Computer Lines X
Sewer Lines X

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

Page 2 of 5 ends

ITEM
NO. ITEM
NOT

APPLICABLE

COUNTY MANAGING
CITY

2. Building Interior
Repair Walls X
Painted Surfaces X
Doors, Hardware X
Locks X
General Cleaning X
Floor, Sweeping and Cleaning X
Carpet, Vacuum and Cleaning X
Window Coverings X
Lighting
Bulbs X
Fixtures X
Transformers X
Fluorescent Lights X
Ballast X
Handrails (ADA) X
Signs X
Timers X
Drinking Fountains X
Ceiling X
Showers X
Toilet/Urinals (Replacement) X
Toilet/Urinals (Maintenance) X
Sink & Faucets (Replacement) X
Sink & Faucets (Maintenance) X
Gas Lines X
Water Lines X
Sewer Lines/Drains X
Phone Lines & Jacks X
Computer Lines & Jacks X
T.V. Cable & Jacks X
Phones X
Towel Racks X

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

Page 3 of 5 ends

ITEM
NO. ITEM
NOT

APPLICABLE

COUNTY MANAGING
CITY
Garbage Disposal X
Refrigerator/ Microwave X
Stove X
Counter Tops, replacement X
Cabinets, replacement X
Dish Washer X
Trash Compactor X

3. Grounds
Drinking Fountains X
Mail Boxes X
Fences X
Trash Bins X
Trash Enclosures Replace Maintain
Bike Racks X
Signs (County) X
Litter Pick-up X
Lighting
Parking Lot X
Driveways X
Walkways X
Timers (external) X
Timers (internal) X
Signs X
Cleaning, Sidewalks, Walkways, Parking Lot X

4. Landscaping
Trees X
Shrubs X
Flowers X
Lawn X

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

Page 4 of 5 ends

ITEM
NO. ITEM
NOT

APPLICABLE

COUNTY MANAGING
CITY
Watering X
Sprinkler, Repair and Replace X
Headers X
Rodent/Pest X
Seeding X
Fertilizer X
Plant Trimming X
Plant Removal X
Plant Replacement X
Tree Care & Trimming X

5. Mechanical Systems
Electrical Panels, Breaker, Interior X
Electrical Fuses, Interior Replace Maintain
Electrical Receptacle, Switches, Interior X
Electrical Central Switches X
Elevator X
Heating Replace Maintain
Air Conditioning Replace Maintain
Water Heater Replace Maintain

6. Roadways/Parking Lots
Repair & Maintenance
Striping X
Handicap Signage X
Asphalt Surface, Curbing X
Cement Surface, Curbing X
Wheel Stops X
Drainage X
Signs X

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

Page 5 of 5 ends

ITEM
NO. ITEM
NOT

APPLICABLE

COUNTY MANAGING
CITY

7. Fire Equipment
Sprinklers X
Hoses X
Extinguisher (interior) X
Alarm Systems X
Smoke Detectors Replace Maintain

8. Other Items
Paper supplies, dispensers, waste containers,
soap in restrooms and kitchens
X
Interior janitorial products and services X
Interior Floor Waxing, Sweeping X
Window Washing (interior & exterior) X
Exterior sweeping entry, sidewalks and
walkways
X
Janitorial service for public areas or
common use areas
X
Broken window glass or door glass** X
Refuse, Rubbish and Garbage Disposal X
Cleaning Storage Rooms, Utility Rooms X
Exterminating X
Carpet Replacement,
Linoleum Replacement, and/or
Tile Replacement
X
Building Foundation X
Flooring (wood & concrete) X
Utility mains & appurtenances X
Library Drop Box X

Docusign Envelope ID: 693DB191-6C43-8661-8031-28DE51C79F5B Docusign Envelope ID: B8F05A19-4D9A-8140-81AF-FF222858BF59

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Brett Fulgoni, Director of Public Works

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Awarding a Professional Services Agreement to Nichols Consulting Engineers for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements Project

Description:

The City Council will consider adopting a Resolution awarding an Agreement to Nichols Consulting Engineers (NCE) for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project.

Environmental Notice: The Project qualifies for a Statutory Exemption pursuant to Section 15301 - Class 1: Existing facilities pursuant to the California Environmental Quality Act State Guidelines.

RECOMMENDATION:

1. Adopt a Resolution awarding a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of Plans, Specifications, and Estimate and associated services for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project in a not- to-exceed amount of $978,949; and

2. Authorize the City Manager or designee to execute the agreement.

BACKGROUND:

The City received Active Transportation Program (ATP) Cycle 6 grant funding for the Active Santa Maria Safe Routes to School Corridor Improvements project. The project includes bicycle and pedestrian improvements along Fesler Street, Bradley Road, East Jones Street, and connecting neighborhood routes. Improvements include Class I, II, III, and IV bicycle facilities, accessible curb ramps, painted curb extensions, enhanced crossings, rectangular rapid -flashing beacons, signing and striping, drainage and utility adjustments, and trail landscaping and amenities.

The project has advanced through Project Approval and Environmental Documentation (PA&ED) and approximately 30 percent conceptual design. Nichols Consulting Engineers (NCE) prepared concept plans, cost estimat e, and supporting environmental documentation. The Jones Street trail includes an off-street segment on City-owned land adjacent to Allan Hancock College and a segment east of US -101 within the existing 2 Jones Street right -of-way through Suey Road. The City has completed California Environmental Quality Act documentation, and final design will incorporate applicable environmental commitments.

DISCUSSION:

The city solicited proposals through PlanetBids using a qualifications -based selection process, with a proposal submission deadline of October 9, 2026. Following review of the proposals, staff selected NCE as the most qualified firm to provide the services requested.

The proposed Agreement includes surveying, existing conditions verification, utility and right-of-way coordination, supplemental environmental investigation, and preparation of preliminary through final PS&E. Design will address drainage, utility, and traffic signal modifications needed to implement the bicycle and pedestrian improvements. The Agreement also includes optional services for updated aerial imagery, bidding and construction-phase design support, record drawings, and Department of Toxic Substances Control (DTSC) coordination and site management regulatory services.

Staff recommends awarding the full not-to-exceed amount of $978,949, including optional updated ortho aerial imagery, bid and construction -phase design support, record drawings/as-built support, and additional DTSC and site management regulatory services if needed. These services will be used as needed and directed by the City.

The Engineering Division will manage the Agreement and coordinate with NCE on a schedule supporting a Ready to List in January 2028 and the City’s construction allocation request no later than Febru ary 29, 2028. The City will lead right -of-way certification and required property approvals, with mapping and technical support from NCE. City ownership of the off-street trail strip will be documented separately from dedicated street right-of-way.

Alternative(s)
The City Council could decline to award the Agreement and direct staff to revise the scope or issue another Request for Proposals. These alternatives are not recommended because they would delay final design and could affect the City’s abili ty to meet grant delivery milestones.

Fiscal Considerations
The proposed Agreement has a total not -to-exceed amount of $978,949, consisting of $881,718 for base services and $97,231 for optional services. The optional services include:
 Updated aerial ortho imagery: $12,001.
 Bidding and construction-phase design support: $45,655.  Record drawings/as-built support: $12,865.
 DTSC and site management regulatory services: $26,710.

The Agreement will be funded through the ATP CMEP PW -04 project account (FD464 | CC1120 | SC7425), with Measure A, Alternative Transportation funds supplementing the 3 project account as necessary. These funds support bicycle and pedestrian transportation improvements.

Impact on the Community
The project will improve safety, accessibili ty, and connectivity for people walking and bicycling to schools, Allan Hancock College, transit, and surrounding neighborhoods.

Improvements will reduce pedestrian crossing distances, increase visibility, upgrade curb ramps and bicycle facilities, and create a paved Jones Street trail connection.

Other Agency Review
The project will require coordination with Caltrans regarding grant administration, construction allocation, and interfaces at US -101, Broadway/State Route 135, and Main Street/State Route 166 . NCE will also coordinate with Santa Barbara County Flood Control District regarding Bradley Channel, utility providers, Allan Hancock College, and school stakeholders. DTSC coordination will establish the appropriate regulatory pathway for contaminated-soil management.

ATTACHMENT(S)

A. Resolution
B. Agreement

Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

AWARDING A PROFESSIONAL SERVICES AGREEMENT TO

NICHOLS CONSULTING ENGINEERS FOR FINAL DESIGN AND PREPARATION

OF PLANS, SPECIFICATIONS, AND ESTIMATE AND ASSOCIATED SERVICES FOR THE ACTIVE TRANSPORTATION PROGRAM CYCLE 6 ACTIVE SANTA MARIA

SAFE ROUTES TO SCHOOL CORRIDOR IMPROVEMENTS PROJECT
IN A NOT-TO-EXCEED AMOUNT OF $978,949

WHEREAS, the City Council adopted an Active Transportation Plan in January 2021; and

WHEREAS, on December 7, 2022, the California Transportation Commission adopted the Statewide and Small Urban and Rural Components of the 2023 Active Transportation Program (ATP), Cycle 6, awarding $7,721,000 to the City of Santa Maria for the Active Santa Maria Safe Routes to School Corridor Improvements project; and

WHEREAS, the City issued a Request for Proposal (RFP) for professional engineering services for final design and preparation of Plans, Sp ecifications, and Estimate (PS&E) for the ATP Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project, using qualifications-based selection procedures; and

WHEREAS, on October 9, 2026, the City received three proposals from firms providing professional engineering services for the project; and

WHEREAS, City staff independently reviewed and scored the proposals based on specific criteria in the RFP; and

WHEREAS, City staff determined that Nichols Consulting Engineers (NCE) satisfied the requirements of the RFP and was deemed a qualified firm to provide the professional engineering services needed for final design and preparation of PS&E; and

WHEREAS, the firm will provide services to fulfill the requirements of the RFP, including final design, preparation of PS&E, surveying and mapping, utility and right -of- way coordination, supplemental environmental investigation, drainage design, updated aerial imagery, bidding and construction -phase design support, record drawings, and Department of Toxic Substances Control regulatory services as defined by the City; and

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Approve a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of PS&E and associated services for the ATP Attachment A

Page 2 of 2 ends

Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project for a term of one year, with a not-to-exceed amount of $978,949.

SECTION 2. Authorize the City Manager or designee to execute the Agreement upon receipt of information required by the RFP. The City Manager or designee is further authorized to execute an amendment extending the Agreement term for up to one additional year, if needed to complete the authorized services, upon mutual written agreement between the City and NCE, without increasin g the approved not -to-exceed amount.

SECTION 3. Authorize th e Chief Deputy City Clerk is hereby to make m inor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on this 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

Attachment B

AGREEMENT FOR SERVICES

This Agreement is made on November 3, 2026, by and between Nichols Consulting Engineers, Chtd. (NCE), a Nevada Corporation (“Contractor”) and the City of Santa Maria, a California Municipal Corporation and charter city (“City”), in Santa Maria, California, based on the following recitals:

WHEREAS, City has determined it is in the public interest to proceed with the work hereinafter described as "Project"; and

WHEREAS, City does not have available employees to perform the services for the Project; and

WHEREAS, City has requested the Contractor to provide manpower to complete the Project; and

WHEREAS, Contractor is registered or licensed in California to perform desired services for the Project.

NOW, THEREFORE, IT IS AGREED:

1. Recitals true. The above recitals are true.

2. General.

2.01. Term and Termination. The term of this contract is one year, beginning on the date first written above. This contract may be extended by mutual consent of the parties, consistent with the terms identified in the Request for Proposals. This contract may be terminated for breach of its terms or conditions, or because of discovery of any act which violates local, state or federal law. Termination is effective 14 days after deposit of notice as specified in this Agreement.

2.02. Services to be Performed. Contractor shall determine the method, details and means of providing professional engineering services for final design and preparation of Plans, Specifications, and Estimate (PS&E) and associated services for the ATP Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project. More specifically, Contractor agrees to perform the specific services listed in Exhibit A.

2.03 City’s Duties. City’s duties under this Agreement are to cooperate with Contractor in the performance of the contract and timely pay invoices.

2.04. Payment. Payment terms under this Agreement are listed in Exhibit B.

2.05. Insurance. Contractor shall provide insurance as listed in Exhibit C.

2.06. Prevailing wage. Where applicable, Contractor shall follow the prevailing wage requirements listed in Exhibit D and applicable law.

2.07. Exhibits. Exhibits “A, B, C, and D are attached and incorporated.

3. Contractor’s Obligations.

3.01. Minimum Amount of Service. Contractor shall devote sufficient time to perform services under this agreement efficiently and effectively. Contractor may represent, perform services for and be employed by additional individuals or entities, in Contractor’s sole discretion, as long as the performance of these extra-contractual services does not interfere with or present a conflict with City's business.

3.02. Tools and Equipment. Except as otherwise stated in this Agreement, Contractor will supply all tools and equipment necessary to perform this Agreement.

Attachment B

3.03. Status. Contractor (including its employees) is an independent contractor.

No employer/employee relationship exists between Contractor and the City. Contractor's assigned personnel shall not be entitled to any benefits payable to employees of the City. The City is not required to make any deductions or withholdings from the compensation payable to Contractor under this agreement.

3.04. Indemnification. To the fullest extent permitted by law, the Contractor shall indemnify, defend (with independent counsel approved by the City) and hold harmless the City, and its directors, officers, and employees from and against all liabilities (including without limitation all claims, losses, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, including but not limited to reasonable attorneys’ fees, court costs and costs of alternative dispute resolution) regardless of nature or type that arise out of, pertain to, or relate to the negligence, reckless, or willful misconduct of the Contractor or the acts or omissions of an employee, agent or subcontractor of the Contractor. The provisions of this paragraph survive completion of the services or the termination of this contract. The provisions of this Section are not limited by the provisions of the Section relating to insurance.

4. Miscellaneous

4.01. Notices. All communication relating to the day-to-day activities of this Agreement shall be exchanged between a designated representative of the CITY and a representative of CONTRACTOR, listed below. All notices shall be addressed as follows unless a written change is filed with the City:

To City: To Contractor:

Zoe Glick, P.E. Jim Bui, P.E.

Senior Civil Engineer Project Manager
City of Santa Maria, Public Works Nichols Consulting Engineers, Chtd. 110 S. Pine Street, Suite 221 2300 E. Katella Avenue, Suite 125 Santa Maria, CA 93458 Anaheim, CA 92806

If the designated Representative or address of either party changes during the term of this agreement, a written notice shall be given to the other party prior to the effective date of change. Any written notices required under this agreement shall be effective five (5) days after deposit into United States mail, postage prepaid, addressed to the designated Representative, or upon confirmation of receipt of delivery if another notification process is used.

4.02. Compliance With Laws, etc. Contractor shall comply with all laws, including but not limited to the rules and policies of the City, in performing this agreement.

4.03. Integration. This agreement constitutes the entire agreement of the parties with respect to the subject matter. All modifications, amendments, or waivers of the terms of this agreement must be in writing and signed by the appropriate representatives of the parties.

4.04. Interpretation. This agreement shall be interpreted in accordance with the laws of the State of California.

4.05. Jurisdiction. Jurisdiction and venue of all disputes over the terms of this agreement shall be in the County of Northern Santa Barbara, State of California.

4.06. Warranty of authority. Each person signing this agreement on behalf of a party warrants that he or she has authority to do so.

4.07. No Waiver. Failure to enforce with respect to a default shall not be construed as a waiver.

4.08. Severability. The provisions of this agreement are severable. If any part Attachment B

of this agreement is held invalid by a court of competent jurisdiction, the remainder of the agreement shall remain in full force and effect unless amended or modified by mutual written consent of the parties.

4.09. Submittals. In addition to any other submittals r equired by this agreement, Contractor shall submit copies of its current business license and current certificate of workers compensation coverage to the City before beginning work on this project.

4.10 Prevailing Wage. Prevailing Wage. If applicable, Contractor and all subcontractors are required to pay the general prevailing wage rates of per diem wages and overtime and holiday wages determined by the Director of the Department of Industrial Relations under Section 1720 et seq. of the California Labor Code. The Director's determination is on file and open to inspection at www.dir.ca.gov and is referred to and made a part hereof; the wage rates therein ascertained, determined and specified are referred to and made a part hereof as though fully set forth herein. Further requirements are attached as Exhibit D.

IN WITNESS WHEREOF, this agreement is executed by the parties on the date first written above.

NICHOLS CONSULTING ENGINEERS,
CHTD. (NCE)

___________________________
Margot Yapp
President

CITY OF SANTA MARIA, a Municipal Corporation

Brett Fulgoni
Public Works Director

ATTEST:

Donna G. Schwartz
Chief Deputy City Clerk
APPROVED AS TO FORM:

_______________________________
Risk Manager
_______________________________
City Attorney

Attachment B

EXHIBIT A

SCOPE OF SERVICES
Project scope and delivery requirements
Contractor shall provide final design and PS&E and associated services for the ATP Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project. The task descriptions below are drawn from NCE’s technical proposal dated October 9, 2026. Optional services require separate written authorization from the City.

The current project footprint includes improvements within existing City street right-of-way and the off- street Jones Street trail on City-owned land adjacent to Allan Hancock College. City-owned property is not necessarily dedicated street right-of-way. No new property acquisition is currently anticipated.

Survey and mapping shall confirm the improvement footprint and any temporary access or easement needs. Trail construction or investigation on the private agricultural property south of Jones Street and east of US-101 is excluded.

Contractor shall incorporate the project’s environmental commitments, including at least 24 inches of vertical separation between the finished Jones Street trail surface and impacted soil. Contractor shall provide technical mapping and documentation within the scope of Tasks 2 and 3 to support the City’s right-of-way certification. The City will lead certification and secure required property approvals.

Contractor shall submit a City-approved schedule supporting a January 2027 Notice to Proceed, Ready to List in January 2028, and the City’s construction allocation request no later than February 29, 2028.

Progress meetings shall be biweekly. The City-approved schedule shall govern performance.

Task 1: Project Management, Coordination, and Quality Control Task 1.A: Project Management
NCE’s Project Manager (PM) will serve as the City’s single point of contact and will have primary responsibility for coordinating the efforts of the project team. Specific project management tasks to be conducted by the PM include monthly budgeting, invoicing, scheduling, and general project administration. The PM will arrange a kick-off meeting with the City to initiate the work. The objectives of the kick-off meeting will be:
• Review the scope of work.
• Establish paths of communication.
• Review project schedule and critical milestones.
• Review project requirements, including design objectives, budget, constraints, and criteria. The City’s requirements will be further defined during the meeting. • Request the pertinent ATP Grant Application and environmental approvals. • Review City Standard Design Criteria and latest City-adopted formats. • Request background information and as-builts.
• Obtain electronic file of the City’s cover sheet template, title block, and CAD Standards. At the kick- off meeting, key deliverables and the project schedule will be reviewed and adjusted to meet the City's needs.

The following meetings are included in the scope: kick-off/preliminary meeting (1 hour) and biweekly virtual progress meetings. The purpose of these meetings will be to confirm project assumptions, identify and resolve design issues that may surface, present design alternatives and recommendations, and continue coordination with project stakeholders, as necessary.

Deliverables: Kick-Off meeting and biweekly progress meeting agendas and minutes.

Attachment B

Task 1.B: Stakeholder Coordination
NCE can assist the City with coordination between the following stakeholders: other City departments, utility owners, Allan Hancock College, local school stakeholders, Santa Barbara County Flood Control District, and others as needed.

Deliverables: As-needed Stakeholder Coordination
Task 2: Design Basis Validation and Existing Conditions Task 2.A: Review Existing Conditions and Public Outreach Comments NCE will review available basemap information for the corridor provided by the City, including topographic survey information, utility information, drainage information, and traffic as-builts. We’ll also review the City’s ATP Grant Application and Environmental Commitments for data needs. This information combined with the Concept Plans included in the RFP will be the basis for evaluating the site constraints and required design data.

NCE’s staff will walk or drive the corridor as appropriate, focusing on the discrete intersection improvements. At this time, special attention will be given to the 3 intersections with “direct” storm drain impacts, 3 intersections with likely traffic signal conflicts, and the proposed Class I Trail on Jones St.

For specific areas of concern, we will also take photographs of the potential issues and brief measurements to help quantify the issue.

NCE will conduct up to one (1) day of pavement coring to determine the existing roadway thickness for the Jones Street re-grading including clearing the site with DigAlert and backfill with AC cold patch. This effort will also collect up to three (3) bulk subgrade samples for lab testing. We assume the City will issue NCE a no-fee encroachment permit for the work.

At this time we will also confirm drainage design criteria and methodology for the anticipated storm drain relocations at the Fesler Street and Depot Street intersection and re-grading for Jones Street and relocation of catch basins near the Bradley Channel. This may include coordination with City, the Santa Barbara Flood Control District. This may also include a consult with the local Water Board regarding the project’s exemption status from additional water quality improvements.

We will prepare a brief technical memorandum with our observations and submit to the City for their review and input. If needed, based on the City’s preliminary review, we may also conduct up to one (1) follow-up site meeting with City staff to clarify the site issues and finalize the approach for the 60% design phase.

NCE will also review the Public Outreach Comments and create a comment-response matrix. The comments that NCE and the City agree on will be incorporated into the 60% Submittal.

Deliverables: Field review summary and existing conditions constraints memo; design criteria memo; Public Comment- Response Matrix; Pavement Coring and Lab Testing Summary Task 2.B Basemap Preparation
Task 2.B.1 Topographic Survey
NCE’s project surveyor will conduct a topographic ground surveying effort augmenting the existing aerial basemap previously conducted by NCE. The effort will be divided into roadway improvement surveys and Jones St Trail survey. The mapping for roadway improvements will be compiled at an agreed-upon scale (1” = 40’ or similar) with a 1-foot contour interval focusing on the intersections and at least 1 cross section per block. The Jones St Trail survey will be compiled at an agreed upon scale (1” = 20’ or similar) with a 1-foot contour intervals and 50’ cross-sections suitable for corridor design. Both surveys will be horizontally tied to the California State Plane coordinate system (NAD83) based upon the current Santa Barbara County adjustment and vertically tied to the Santa Barbara County benchmark network (NAVD88).

The roadway improvement surveys will include top of curb, flowline, gutters, storm drain inlets (rim and invert elevations, pipe size and type), manholes (rim and invert elevations, pipe size and type), utility boxes and vaults, striping and other markings, driveways, sidewalks, fences, walls, gates, tree and tree wells, street furniture, light and utility poles, traffic signals, and signs. The intersection surveys will Attachment B

include 10’ grid spacing, including visible grade breaks. Medians will be included if they exist at the intersection. Limits covered by the intersection topo will extend 50 feet beyond the curb returns and up to the right of way lines.

The Jones St Trail survey will be similar to the roadway improvement surveys and also the following:
lateral extents to include existing off-street trail, part of Allan Hancock parking lot, and adjacent farmland, required elevations and breaklines, and storm drain outfalls (rim and invert elevations, pipe size and type).

Survey work will be performed under the direct supervision of a Professional Land Surveyor Licensed in the State of California. Work will be conducted in accordance with standard acceptable surveying practices.

Deliverables: CAD Basemap (DWG format)
Task 2.B.2 ROW Mapping
NCE’s project surveyor will collect supplemental ROW mapping information at intersections to confirm available ROW for bulb-outs, curb ramps, intersection improvements, and the proposed trail. Using recorded maps for the area around the corridor, the project surveyor will search for and collect survey monuments to be able to plot the recorded boundary. We will also gather grant deed and Caltrans descriptions of the right of way where available. In the area of Allan Hancock College, Flood Control Bradley Channel Crossing, Fairlawn Elementary School, Jones St along APN 128-064-010, Caltrans ROW at Broadway (SR-135) and Fesler St, and Caltrans ROW at US-101 and Jones St we will perform a more detailed boundary survey for your use in engaging with those entities in obtaining as-needed encroachment permits and temporary construction easements.

As the remainder of the corridor outside of the intersections envisions work primarily within the roadway pavement, it is assumed that the City already has sufficient ROW for those improvements. Therefore, only a high-level, Geographic Information Systems (GIS) based ROW boundary will be prepared for the remaining segments.

Deliverables: CAD ROW Map (DWG format)
Task 2.B.3 Underground Utility Locating and Potholing
Due to planned storm drain relocation work, NCE will collect additional underground mapping information for the Jones Street Corridor and intersection of Fesler and Depot Street. This investigation will include non-destructive underground utility locating such as ground penetrating radar (GPR) to supplement the previous topographic surveying effort. The utility locating will collect utility location data including possible utility type, approximate alignment, and approximate depth with markings painted on the pavement.

If needed for utility relocation and conflict checking, NCE’s utility locating sub-consultant can also direct the collection of various utility potholes in the pavement to determine actual utility depths. NCE will execute a no-fee encroachment permit with the City for performing utility potholing. Our utility locator will pre-mark locations and clear locations with DigAlert. Holes will be backfilled with excavated materials and capped with Asphalt Concrete cold patch.

Deliverables: Supplemental utility surveying data added to Basemap (DWG format), Utility Locating/Pothole Report (PDF).

Task 2.B.4 Updated Ortho Aerial Imagery (Optional)
As part of this task, NCE’s project surveyor will set temporary control points and collect up to 4.9 linear miles of color, aerial ortho-imagery of the project corridors to provide a more up to date aerial background as the existing project site may have been altered since the PA&ED phase, such as the in- fill of the original roadside drainage ditch along Jones Street. The mapping efforts will generally extend laterally 25’ behind the back of walk or edge of shared used path and longitudinally 100’ beyond the start/end limits.

Deliverables: Aerial Ortho-Imagery (GeoTIFF or similar) Attachment B

Task 2.C Supplemental Phase II ESA
Previous environmental sampling was performed within the trail footprint from S. College Dr to under US-101 to assess for the presence of contaminants related to a historical railroad corridor along the current proposed trail footprint. Contaminants including arsenic, lead, and organochlorine pesticides (OCPs) were detected at concentrations above select screening levels. The historical railroad corridor extends along the revised proposed trail footprint to the east of US-101. Therefore, it is possible previously detected contaminants are also present in this stretch of the trail footprint.

Task 2.C.1 Supplemental Phase II ESA Work Plan
NCE will prepare a Phase II ESA Work Plan proposing the location and number of soil samples to be collected, and the laboratory analytical analyses to be performed on the samples. To assess shallow soil conditions and to be consistent with the previous Phase II ESA, samples will be collected approximately every 150 linear feet along the approximately 2,500 linear feet of proposed trail footprint from east of US-101 to S. Suey Rd. Samples will be collected from the surface (0-0.5 feet below ground surface [bgs]) and 1.5 to 2 feet bgs using a hand auger and analyzed for lead and arsenic by United States Environmental Protection Agency (EPA) Method 6020, OCPs by EPA Method 8081, and polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270.

Deliverables: Supplemental Phase II ESA Work Plan (PDF).

Task 2.C.2 Supplemental Phase II ESA Sampling and Reporting NCE will implement the City-approved Phase II ESA Work Plan by contracting, coordinating, and overseeing a C-57 licensed drilling subcontractor and California-certified analytical laboratory. It is assumed that a Santa Barbara County Environmental Soil Boring permit will be required for the soil borings. It is anticipated that a total of 32 soil samples will be collected from 16 soil borings (2 samples per boring) over 2 days. Samples will be submitted to the analytical laboratory for chemical analysis on a standard 7- to 10-business day turnaround time. Upon receipt of the analytical results, NCE will prepare a Supplemental Phase II ESA Report summarizing sampling activities performed, results of the analytical analyses, and provide conclusions and recommendations to support final design, soil management, worker protection, and disposal requirements. Phase II ESA activities will be performed under the direct supervision of a Professional Geologist licensed in the State of California.

Based on the previous Phase I and II ESA documents and results of the Supplemental Phase II ESA, NCE will prepare a hazardous materials design-basis memorandum to compare capping contaminated soil in-place against excavation and disposal. The memorandum will identify locations where the preferred approach of capping in-place can occur and locations where excavation, characterization, transport, and disposal of contaminated soil is unavoidable.

Deliverables: Supplemental Phase II ESA Report (PDF), Hazardous Materials Design-Basis Memorandum (PDF).

Task 3: Agency, Right-of-Way, Utility, and Permit Coordination Task 3.A Utility Notification Letters
Working with other agencies, we have observed that utility letters receive more prompt attention when distributed by a City. Therefore, NCE will utilize a City-provided utility contact list and prepare a Utility “A Letter” on City letterhead for City distribution to both notify the utilities of impending intersection concrete/utility work and request available utility mapping information. NCE will track the progress of inbound and outbound responses in a utility tracking matrix.

Once the 90% PS&E has been prepared, or at a later City-preferred milestone NCE will also prepare a Utility “B Letter” on City letterhead for City distribution. This second letter will inform utility agencies of impending construction and clear the way for successful project bidding and construction.

Deliverables: Utility Tracking Matrix (Excel/PDF).

Attachment B

Task 3.B ROW Coordination Support
NCE can provide the City with as-needed Caltrans ROW support at US-101, Broadway (SR-135), and Main Street (SR-166). Support may include minor exhibits and technical information needed for Caltrans approval, environmental re-evaluation or documentation updates, and permit/encroachment submittals. This will also include identifying temporary construction access or easements with private homeowners and coordinating with the Santa Barbara County Flood Control District.

Deliverables: As needed ROW support
Task 3.C Department of Toxic Substances Control (DTSC) Pre-Application Should the preferred design option of capping contaminated soil in-place occur, DTSC oversight and long-term management of the cap will likely be required. NCE anticipates attending up to 1 meeting with the DTSC to discuss results of the Phase II ESA activities and establish the appropriate regulatory pathway for the project. NCE will prepare a memorandum to document the outcome of the regulatory meeting and identify anticipated long-term requirements for capping in-place such as land use restrictions, Operation & Maintenance (O&M) Plan/Agreement, and annual and 5-year reviews should DTSC oversight be required.

Deliverables: Regulatory Pathway Memorandum (PDF)
Task 4: 60% PS&E Submittal
The 60% draft PS&E will incorporate the various data collection efforts compiled as part of previous tasks, including available as-built information from the City. The improvements will incorporate typical design elements, including Public Right-of-Way Accessibility Guidelines (PROWAG)-compliant curb ramp layouts, bulb-out layouts, concrete flatwork, curb and gutter relocation, storm drain infrastructure relocation, and required Hot Mix Asphalt conforms. The curb ramp layouts will generally be included directly on the plan sheets, except where detailed curb ramp sheets are required due to utility conflicts or other existing complications. The bikeway improvements will include lane dimensions, required tapers, and bikeway barrier information. The Trail improvements will include pedestrian crossing enhancements, place making elements, pedestrian amenities, shade trees, site furnishing and irrigated plantings, Surface visible utility structures within the project footprint will be identified on the Plans for either adjustment or protection as appropriate.

Hydrologic and hydraulic calculations will be performed to determine drainage impacts and to support the design of the project improvements. Where large bulb-outs require substantial relocation or reconstruction of the adjacent storm drain system, dedicated utility relocation plans may be developed to ensure improvements do not impact other crossing underground utilities.

Impacted traffic signals and push buttons will be shown for relocation or adjustment as needed. Traffic signal modification plans will be included to relocate traffic signals and pedestrian pushbuttons conflicting with the proposed curb ramps and striping. We generally assume signal modification plans can be prepared as a streamlined plan set. Improvement information for the 12 Rectangular Rapid- Flashing Beacons (RRFBs) intersections will also be streamlined and typically include equipment schedules and conductor schedules directly on the roadway improvement plans.

Landscaping and irrigation plans for the Jones St Trail will indicate the relative locations for site improvements including placemaking features, plantings, aggregate mulches, boulders, irrigation, details, and plant palette.

Draft Soil Management and Air Monitoring Plans will be prepared for trail segments where soil disturbance and contaminated soil will be encountered. An Environmental Commitments Matrix will be prepared to identify responsible parties and their involvement with the project. A drainage memorandum will document the criteria, methodology, and results of the hydrologic and hydraulic calculations to support design development.

The Plans will be prepared in AutoCAD format on 24” x 36” sheets, utilizing the City Title Block and CAD Template as agreed upon during Task 1 and drawn at a scale of 1” = 40’ for street improvements Attachment B

and 1” = 20’ for Jones Street Trail improvements. Striping and signage plans will be prepared at a scale of 1” = 40’.

Anticipated 60% Street Improvement Plan List:
• (1) – Cover Page
• (1) – Notes, Legends, and Abbreviations
• (1) – Construction Details
• (14) – Improvement Plans (Plan/Plan)
• (10) – Improvement Plans Jones Street (Plan/Profile)
• (19) – Striping and Signage Plans (Plan/Plan)
• (3) – Storm Drain Relocation Plan (Intersection)
• (3) – Traffic Signal Modification Plan (Intersection) • (5) – Planting and Details Plans for all landscaped areas • (5) – Irrigation Plans and Details for irrigated areas • (14) – Curb Ramp Details [3 for bulb-outs, 11 for other locations] The Engineer’s Estimate of Probable Construction Cost will be prepared in Microsoft Excel format using a Bid Item format and will be based on recent construction cost data available to NCE for projects of this type.

NCE assumes the City will provide boilerplate specifications suitable for the development of the roadway rehabilitation project in Microsoft Word format. NCE will provide revisions to the Special Provisions related to the specifications for materials or construction related to our bid items using Caltrans Specifications. NCE assumes the City will develop the “front-end” specifications, including the overall bid book. An appendix to the Specifications will be prepared for environmental commitments and inspection schedules for items such as nesting-bird surveys and legless lizard surveys.

Deliverables: 60% Engineering Plans (PDF), Draft Soil Management Plan (MS Word), Draft Air Monitoring Plan (MS Word), Cost Estimate (PDF), and Technical Specifications (MS Word); Draft Environmental Commitments Matrix (MS Word), Draft Drainage Memorandum (PDF) Task 5: 90% PS&E Submittal
The 60% PS&E will be revised to incorporate design review comments received from the City. NCE will meet with the City to review these comments, from which the Draft 90% PS&E will be prepared. NCE will further refine the design to a 90% level of design at this stage. This will include fine-tuning of grading and improvement plans for the bulb-outs, adjusting the traffic signal plans, adjusting the storm drain design as needed, incorporating stakeholder feedback, and refining the Draft Soil Management and Air Monitoring Plans. The draft 90% PS&E will then be packaged and submitted similarly to the 60% PS&E, unless directed otherwise. The drainage memorandum will be revised to reflect the 90% design.

Deliverables: 90% Engineering Plans (PDF), Draft Soil Management Plan (MS Word), Draft Air Monitoring Plan (MS Word), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix, 90% Drainage Memorandum.

Task 6: Final (100%) PS&E and Ready-to-List Package
The 90% PS&E will be prepared to incorporate final design review comments received from the City.

NCE will meet with the City to review these comments, from which the Final PS&E will be prepared.

The Final PS&E will be prepared and sent to the City in a bid-ready format. The Soil Management and Air Monitoring Plans will be finalized and included with the Final PS&E. The drainage memorandum will be revised, as needed, to reflect the final design.

Deliverables: Final Engineering Plans (PDF), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix, Final Soil Management Plan (PDF), and Final Air Monitoring Plan (PDF), Final Drainage Memorandum.

Attachment B

Task 7: Bid and Construction Support (Optional)
Task 7.A Design Services During Bidding
NCE may provide design services during bidding as an optional task. During the bidding period, this may include responding to one round of written contractors’ inquiries from a question and answer (Q&A) phase, providing revisions to the bid documents due to clarifications from the Q&A phase, and preparing up to 1 Bid Document Addendum.

Deliverables: As-needed bidding Q&A responses and bid document addenda (up to one [1]) Task 7.B Design Services During Construction
NCE may provide design services during construction as an optional task. We assume the construction project will be professionally managed by the City’s Construction Manager (CM), including the required inspection staff. Once the project has been awarded to a Contractor, NCE anticipates attendance at the construction kick-off meeting, responding to contractor requests for information (assume up to three [3] Request for Information [RFI]), and providing recommendations for necessary changes to the construction documents due to unforeseen field conditions. Construction support will also include material submittal review for conformance with the NCE-developed Technical Provisions.

The limited number of hours to provide construction phase design support in the Fee Estimate is an estimate only. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: As-needed RFI responses (up to three [3]) and submittal review during construction.

Task 8: Record Drawings / As-Built Support (Optional)
NCE may provide record drawings and as-built support as an optional task. We assume the City’s CM will provide legible, consolidated as-built plan redlines for NCE to develop into a digital as-built of the project Plans. NCE will submit an electronic copy of the as-builts to the City in PDF format. We assume a limited number of hours to prepare as-built drawings. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: Digital as-built of the Plans (PDF) and CAD E-Transmittal.

Task 9: DTSC and Site Management Regulatory Services (Optional) NCE may provide support and enrollment in the DTSC Voluntary Cleanup Program (VCP) as an optional task if it is determined DTSC oversight is required. NCE will assist the City with preparation and submittal of a VCP application and any other technical submittals required by DTSC such as a Preliminary Endangerment Assessment or Health Risk Assessment. Additionally, NCE will prepare technical submittals for the long-term management of the capped contaminated soil, including an O&M Plan that incorporates a framework for routine annual and 5-year reviews. Preparation of the technical submittals assumes no additional environmental sampling, other than the Supplemental Phase II ESA, will be necessary.

Deliverables: Regulatory applications and agreements (PDF), Preliminary Endangerment Assessment (PDF), Health Risk Assessment (PDF), and an O&M Plan (PDF).

Attachment B

EXHIBIT B

PAYMENT

I. Progress Authorization
Written authorization to proceed from the City authorizes Contractor to incur costs up to the total not-to-exceed amount of NINE HUNDRED SEVENTY-EIGHT THOUSAND NINE HUNDRED FORTY-NINE DOLLARS AND ZERO CENTS ($978,949) for all services under this Agreement, including authorized optional services identified below. No work shall commence until the City issues a written Notice to Proceed.

Compensation shall be based on NCE’s negotiated ATP Cycle 6 cost proposal dated October 9, to be attached to and incorporated into this Exhibit “B.”

The total includes $881,718 for base services and $97,231 for optional services. Optional services consist of:
 Updated ortho aerial imagery (Task 2.B.4): $12,001.
 Bid and construction support (Task 7): $45,655.
 Record drawings/as-built support (Task 8): $12,865.
 DTSC and site management regulatory services (Task 9): $26,710.

Optional services shall be performed only as needed and directed in writing by the City.

Inclusion of an optional service in the budget does not require the City to authorize its use.

Contractor shall bill only for services performed and authorized costs incurred.

II. Invoice procedure.

A. Payment shall be monthly based on the billable charges.

Task Description Budget
1 Project Management, Coordination, and Quality Control $51,840 2 Design Basis Validation and Existing Conditions (with Optional) $205,444
3 Agency, Right-of-Way, Utility, and Permit Coordination $34,750 4 PS&E – 60% Design Submittal $301,155
5 PS&E – 90% Design Submittal $181,290
6 Final (100%) PS&E and Ready-to-List Package $119,240
7 Bid and Construction Support (Optional) $45,655
8 Record Drawings/As-Built Support (Optional) $12,865
9 DTSC and Site Management Regulatory Services (Optional) $26,710 Total Not-to-Exceed Amount $978,949
Attachment B

B. The Contractor shall present the bill for charges from the previous month.

C. The Contractor's bill shall be substantiated by appropriate documentation, and include an itemized listing of personnel, subcontractors, and other direct costs incurred.

D. City may withhold payment for disputed work. Payment of fees shall not constitute an acceptance of work.

Rates shall be billed according to Contractor’s attached fee schedule, up to the not-to- exceed amount. Work Authorized by Change Order/Amendment shall be billed at on a time and materials basis according to the attached fee schedule, unless another payment method is agreed to in writing by the City prior to ini tiation of work.

III. Maximum billable amounts

Under no circumstance shall the total of all payments to the Consultant exceed ninety percent (90%) of the maximum not-to-exceed cost, prior to acceptance by the City of all items to be completed as noted within Exhibit "A".

IV. Consultant Fee Schedule (continued on next page)
Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

EXHIBIT C

INSURANCE REQUIREMENTS

Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereu nder by the Consultant, his/her agents, representatives, or employees. If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits ma intained by the Consultant.

A. Minimum Scope of Insurance

Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001), including products and completed operations, property damage, bodily injury and personal & advertising injury.

2. Insurance Services Office Business Auto Coverage Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, covering hired (Code 8) and non-owned autos (Code 9).

3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance.

4. Errors and Omissions liability insurance appropriate to the Consultant's profession.

Architects' and engineers' coverage is to be endorsed to include contractual liability.

5. Cyber Liability Insurance, Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private informati on, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.

B. Minimum Limits of Insurance

Consultant shall maintain limits no less than:

1. General Liability - $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability - $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: Statutory limits.

4. Employer's Liability - $1,000,000 per accident for bodily injury or disease.

5. Errors and Omissions Liability - $1,000,000 per occurrence or claim, $2,000,000 aggregate.

Attachment B

6. Cyber Liability- $2,000,000 per occurrence or claim, $2,000,000 aggregate.

C. Self-insured Retentions

Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration and defense expenses within the retention.

D. Other Insurance Provisions

The liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form or an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38 and CG 20 37 forms if later revisions are used).

2. For any claims related to this project, the Consultant's insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled or reduced, except with notice stating the title of this contract to the City. All notices provided pursuant to this Agreement shall be given to the City representative listed for notice in this agreement and shall specify the title of this Agreement. Notice may be given by overnight mail, facsimile with confirmation of receipt, or certified mail with return-receipt requested.

4. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

5. If any of the required policies provide claims-made coverage:
a. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. c. If coverage is canceled or non -renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

E. Acceptability of Insurers

Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.

F. Verification of Coverage

Attachment B

Consultant shall furnish the City with original certificates and amendatory endorsements of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before wor k commences.

However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

G. Special Risks or Circumstances

The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Attachment B

EXHIBIT D

PREVAILING WAGE REQUIREMENTS FOR MAINTENANCE WORK, DESIGN AND PRECONSTRUCTION

PHASES OF CONSTRUCTION, AND INSTALLATIONS

The terms of this Exhibit apply to all Public Works projects for over $1,000.

For purposes of this Exhibit, “Public Works” includes any project of a type defined in California Labor Code section 1720 when paid for in whole or in part by public funds. These projects include: construction, alteration, demolition, installation, or repair work done under contract.

For purposes of this definition, "construction" includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including, but not limited to, inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. For purposes of this definition, "installation" includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.

Pursuant to California Labor Code sections 1720 and 1771, construction, alteration, demolition, installation, repair and maintenance work performed under this Agreement is subject to State prevailing wage laws. State prevailing wage laws require certain provisions be included in all contracts for public works. The CONTRACTOR and any subcontractors shall comply with all applicable State prevailing wage laws, whether included in this agreement or inadvertently omitted, including but not limited to the requirements listed below:

1. Compliance with Prevailing Wage Requirements. Pursuant to California Labor Code sections 1720 through 1861, the CONTRACTOR and all subcontractors shall ensure that all workers who perform work under this Agreement are paid not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations (DIR). This includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including but not limited to inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the post-construction phases of construction, including but not limited to all cleanup work at the jobsite.

1.1. Copies of such prevailing rate of per diem wages are on file at the City Public Works Department and are available for inspection to any interested party on request.

Copies of the prevailing rate of per diem wages also may be found at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. The CONTRACTOR and all subcontractors shall post a copy of the prevailing rate of per diem wages determination at each job site and shall make them available to any interested party upon request.

1.2. The wage rates determined by the DIR refer to expiration dates. If the published wage rate does not refer to a predetermined wage rate to be paid after the expiration date, then the published rate of wage shall be in effect for the life of this Agreement. If the published wage rate refers to a predetermined wage rate to become effective upon expiration of the published wage rate and the predetermined wage rate is on file with the DIR, such predetermined wage rate shall become effective on the date following the expiration date and shall apply to this Agreement in the same manner as if it had been published in said publication. If the predetermined wage rate refers to one or more Attachment B

additional expiration dates with additional predetermined wage rates, which expiration dates occur during the life of this Agreement, each successive predetermined wage rate shall apply to this Agreement on the date following the expiration date of the previous wage rate.

If the last of such predetermined wage rates expires during the life of this Agreement, such wage rate shall apply to the balance of the Agreement.

2. Penalties for Violations. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1775 in the event a worker is paid less than the prevailing wage rate for the work or craft in which the worker is employed. This shall be in addition to any other applicable penalties allowed under California Labor Code sections 1720 through 1861.

3. Payroll Records. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection.

The CONTRACTOR shall require all subcontractors to also comply with section 1776. The CONTRACTOR and all subcontractors shall furnish records specified in section 1776 on a monthly basis, both to the City and directly to the Labor Commissioner in the manner required by California Labor Code section 1771.4. The CONTRACTOR shall ensure its subcontractors prepare and submit payroll records to the City and the DIR as required by this section. The City may require the CONTRACTOR and its subcontractors to prepare and submit records specified in section 1776 to the City and the Labor Commissioner on a weekly basis, at no additional cost to the City.

4. Apprentices. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1777.5, 1777.6 and 1777.7 concerning the employment and wages of apprentices. The CONTRACTOR is responsible for compliance with this section for all apprenticeable occupations pursuant to California Labor Code section 1777.5(n).

5. Working Hours. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1810 through 1815, including but not limited to: (i) restrict working hours on public works contracts to eight hours a day and forty hours a week, unless all hours worked in excess of 8 hours per day are compensated at not less than 1½ times the basic rate of pay; and (ii) specify penalties to be imposed on CONTRACTORs and subcontractors of $25 per worker per day for each day the worker works more than 8 hours per day and 40 hours per week in violation of California Labor Code sections 1810 through 1815.

6. Required Provisions for Subcontracts. The CONTRACTOR shall include, at a minimum, a copy of the following provisions in any contract they enter into with a subcontractor: California Labor Code sections 1771, 1771.1, 1775, 1776, 1777.5, 1810, 1813, 1815, 1860 and 1861.

7. Labor Code Section 1861 Certification. In accordance with California Labor Code section 3700, the CONTRACTOR is required to secure the payment of compensation of its employees. By signing the Agreement, to which this is an exhibit, the CONTRACTOR certifies that:

“I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers’ compensation or to Attachment B

undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Agreement.”

8. Compliance Monitoring and Enforcement. This project is subject to compliance monitoring and enforcement by the DIR. The City must withhold contract payments from the CONTRACTOR as directed by the DIR, pursuant to California Labor Code section 1727.

9. CONTRACTOR and Subcontractor Registration Requirements. The CONTRACTOR and all subcontractors shall not engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to California Labor Code section 1725.5 CONTRACTOR certifies that the CONTRACTOR has verified that all CONTRACTOR and all subcontractors (if any approved by City) used on this project are registered with the DIR in compliance with California Labor Code sections 1771.1 and 1725.5. The CONTRACTOR shall provide proof of registration for themselves and all listed subcontractors to the City at the time of signature of contract and immediately upon any changes or City’s request.

10. Stop Order. Where a CONTRACTOR or subcontractor engages in the performance of any public work contract without having been registered in violation of California Labor Code sections 1725.5 or 1771.1, the Labor Commissioner must issue and serve a stop order prohibiting the use of the unregistered CONTRACTOR or subcontractor on ALL public works until the unregistered CONTRACTOR or subcontractor is registered. Failure to observe a stop order is a misdemeanor.

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Brett Fulgoni, Director of Public Works

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving a Professional Services Agreement with Nichols Consulting Engineers for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor Improvements Project

Description:

The City Council will consider a dopting a Resolution a pproving the award of a Professional Services Agreement to Nichols Consulting Engineers for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor Improvements project.

Environmental Notice: The Project qualifies for a Statutory Exemption pursuant to Section 15301 - Class 1: Existing facilities pursuant to the California Environmental Quality Act State Guidelines.

RECOMMENDATION:

1. Adopt a Resolution awarding a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of Plans, Specifications, and Estimate and associated services for the Active Transportation Program Cycle 7 Railroad Avenue/Depot Street Corridor I mprovements project in a not -to-exceed amount of $790,230; and

2. Authorize the City Manager or designee to execute the agreement.

BACKGROUND:

The City received Active Transportation Program (ATP) Cycle 7 state grant funding for bicycle and pedestrian imp rovements along approximately 4.1 miles of the Railroad Avenue/Depot Street corridor. Proposed improvements include Class IV separated bikeways, accessible curb ramps, curb extensions, and enhanced pedestrian crossings, consistent with the City’s adopted ATP.

Consultant services are needed to prepare final construction plans, specifications, and an engineer’s estimate in accordance with City standards and applicable Caltrans requirements. The City has filed a CEQA Notice of Exemption for the project and will lead right-of-way certification and related agency coordination, with technical support from Nichols Consulting Engineers (NCE).

2 DISCUSSION:

The City solicited proposals through PlanetBids using a qualifications -based selection process. Three addenda cl arified the submission requirements and project scope, with the final proposal deadline established as June 19, 2026. Following consultant selection, staff negotiated the scope and fee with NCE, resulting in revised proposals dated September 11, 2026.

The proposed Agreement includes surveying, existing conditions verification, utility coordination, and preparation of preliminary through final Plans, Specifications, and Estimate (PS&E). Design will address potential drainage, utility, and traffic signal conflicts while refining curb extensions to minimize impacts to existing infrastructure.

Staff recommends awarding the full not-to-exceed amount of $790,230, including optional utility locating and potholing, Caltrans encroachment permit support, bidding and construction-phase design support, and record drawings. These services will be used as needed and directed by the City.

The Engineering Division will manage the Agreement, update the project schedule with NCE, and coordinate with Caltrans regarding gr ant milestones and any necessary extension requests.

Alternative(s)
The City Council could decline to award the Agreement and direct staff to revise the scope or issue another Request for Proposals. These alternatives are not recommended because they wou ld delay final design and could affect the City’s ability to meet grant delivery milestones.

Fiscal Considerations
The proposed Agreement has a total not -to-exceed amount of $790,230, consisting of $668,370 for base services and $121,860 for optional serv ices. The optional services include:

 Utility locating and potholing: $45,130.
 Caltrans encroachment permit support: $40,450.
 Bidding and construction-phase design support: $26,015.  Record drawings/as-built support: $10,265.

The Agreement will be fun ded through the ATP CMEP PW -04 project account (FD464 | CC1120 | SC7425), with Measure A Alternative Transportation funds supplementing the project account as necessary. These funds support bicycle and pedestrian transportation improvements.

Impact on the Community
The project will improve accessibility and connectivity for people walking and bicycling along the Railroad Avenue/Depot Street corridor. Proposed improvements will shorten 3 pedestrian crossing distances, improve visibility at crossings, upgrade curb ramps, and provide separated bicycle facilities.

Other Agency Review
The project will require coordination with Caltrans regarding grant administration, applicable project delivery requirements, construction allocation, and improvements affecting Main Street/State Route 166. Utility providers and other affected agencies wil l be consulted as needed during design.

ATTACHMENT(S)

A. Resolution
B. Agreement

Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

AWARDING A PROFESSIONAL SERVICES AGREEMENT

TO NICHOLS CONSULTING ENGINEERS FOR FINAL DESIGN

AND PREPARATION OF PLANS, SPECIFICATIONS, AND ESTIMATE

AND ASSOCIATED SERVICES FOR THE ACTIVE TRANSPORTATION
PROGRAM CYCLE 7 RAILROAD AVENUE/DEPOT STREET CORRIDOR
IMPROVEMENTS PROJECT IN A NOT-TO-EXCEED AMOUNT OF $790,230

WHEREAS, the City Council adopted an Active Transportation Plan in January 2021; and

WHEREAS, on June 27, 2025, the California Transportation Commission adopted the Metropolitan Planning Organization Component of the 2025 Active Transportation Program (ATP), Cycle 7, awarding $1,021,000 to the City of Santa Maria for the Railroad Avenue and Depot Street Corridor Enhancement project; and

WHEREAS, the City issued a Request for Proposal (RFP) for professional engineering services for final design and preparation of Plans, Specifications, and Estimate (PS&E) for the ATP Cycle 7 Railroad Avenue/Depot Stree t Corridor Improvements project, using qualifications-based selection procedures; and

WHEREAS, on June 19, 2026, the City received five proposals from firms providing professional engineering services for the project; and

WHEREAS, City staff independently reviewed and scored the proposals based on specific criteria in the RFP; and

WHEREAS, City staff determined that Nichols Consulting Engineers (NCE) satisfied the requirements of the RFP and was deemed a qualified firm to provide the professional engineering services needed for final design and preparation of PS&E; and

WHEREAS, the firm will provide services to fulfill the requirements of the RFP, including final design, preparation of PS&E, utility coordination, Caltrans encroachment permit support, bidding and construction-phase design support, and record drawings as defined by the City; and

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Approve the Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of PS&E and associated services for the ATP Cycle 7 Railroad Avenue/Depot Street Corridor Improvements project, for a term of one year, with a not-to-exceed amount of $790,230.

Attachment A

Page 2 of 2 ends

SECTION 2. Authorize the City Manager or designee to execute the Agreement upon receipt of information required by the RFP. The City Manager, or designee, is further authorized to execute an amendment extending the Agreement term for up to one additional year, if needed to complete the authorized services, upon mutual written agreement between the City and NCE, without increasing the approved not -to-exceed amount.

SECTION 3. Authorize the Chief Deputy City Clerk to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held the 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

Attachment B

AGREEMENT FOR SERVICES

This Agreement is made on November 3, 2026, by and between Nichols Consulting Engineers, Chtd. (NCE), a Nevada Corporation (“Contractor”) and the City of Santa Maria, a California Municipal Corporation and charter city (“City”), in Santa Maria, California, based on the following recitals:

WHEREAS, City has determined it is in the public interest to proceed with the work hereinafter described as "Project"; and

WHEREAS, City does not have available employees to perform the services for the Project; and

WHEREAS, City has requested the Contractor to provide manpower to complete the Project; and

WHEREAS, Contractor is registered or licensed in California to perform desired services for the Project.

NOW, THEREFORE, IT IS AGREED:

1. Recitals true. The above recitals are true.

2. General.

2.01. Term and Termination. The term of this contract is one year, beginning on the date first written above. This contract may be extended by mutual consent of the parties, consistent with the terms identified in the Request for Proposals. This contract may be terminated for breach of its terms or conditions, or because of discovery of any act which violates local, state or federal law. Termination is effective 14 days after deposit of notice as specified in this Agreement.

2.02. Services to be Performed. Contractor shall determine the method, details and means of providing professional engineering services for final design and preparation of Plans, Specifications, and Estimate (PS&E) and associated services for the ATP Cycle 7 Railroad Avenue/Depot Street Corridor Improvements project. More specifically, Contractor agrees to perform the specific services listed in Exhibit A.

2.03 City’s Duties. City’s duties under this Agreement are to cooperate with Contractor in the performance of the contract and timely pay invoices.

2.04. Payment. Payment terms under this Agreement are listed in Exhibit B.

2.05. Insurance. Contractor shall provide insurance as listed in Exhibit C.

2.06. Prevailing wage. Where applicable, Contractor shall follow the prevailing wage requirements listed in Exhibit D and applicable law.

2.07. Exhibits. Exhibits “A, B, C, and D are attached and incorporated.

3. Contractor’s Obligations.

3.01. Minimum Amount of Service. Contractor shall devote sufficient time to perform services under this agreement efficiently and effectively. Contractor may represent, perform services for and be employed by additional individuals or entities, in Contractor’s sole discretion, as long as the performance of these extra-contractual services does not interfere with or present a conflict with City's business.

3.02. Tools and Equipment. Except as otherwise stated in this Agreement, Contractor will supply all tools and equipment necessary to perform this Agreement.

Attachment B

3.03. Status. Contractor (including its employees) is an independent contractor.

No employer/employee relationship exists between Contractor and the City. Contractor's assigned personnel shall not be entitled to any benefits payable to employees of the City. The City is not required to make any deductions or withholdings from the co mpensation payable to Contractor under this agreement.

3.04. Indemnification. To the fullest extent permitted by law, the Contractor shall indemnify, defend (with independent counsel approved by the City) and hold harmless the City, and its directors, officers, and employees from and against all liabilities (including without limitation all claims, losses, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, including but not limited to reasonable attorneys’ fees, court costs and costs of alternative dispute resolution) regardless of nature or type that arise out of, pertain to, or relate to the negligence, reckless, or willful misconduct of the Contractor or the acts or omissions of an employee, agent or subcontractor of the Contractor. The provisions of this paragraph survive completion of the services or the termination of this contract. The provisions of this Section are not limited by the provisions of the Section relating to insurance.

4. Miscellaneous

4.01. Notices. All communication relating to the day-to-day activities of this Agreement shall be exchanged between a designated representative of the CITY and a representative of CONTRACTOR, listed below. All notices shall be addressed as follows unless a written change is filed with the City:

To City: To Contractor:

Zoe Glick, P.E. Jim Bui, P.E.

Senior Civil Engineer Project Manager
City of Santa Maria, Public Works Nichols Consulting Engineers, Chtd. 110 S. Pine Street, Suite 221 2300 E. Katella Avenue, Suite 125 Santa Maria, CA 93458 Anaheim, CA 92806

If the designated Representative or address of either party changes during the term of this agreement, a written notice shall be given to the other party prior to the effective date of change. Any written notices required under this agreement shall be effective five (5) days after deposit into United States mail, postage prepaid, addressed to the designated Representative, or upon confirmation of receipt of delivery if another notification process is used.

4.02. Compliance With Laws, etc. Contractor shall comply with all laws, including but not limited to the rules and policies of the City, in performing this agreement.

4.03. Integration. This agreement constitutes the entire agreement of the parties with respect to the subject matter. All modifications, amendments, or waivers of the terms of this agreement must be in writing and signed by the appropriate representatives of the parties.

4.04. Interpretation. This agreement shall be interpreted in accordance with the laws of the State of California.

4.05. Jurisdiction. Jurisdiction and venue of all disputes over the terms of this agreement shall be in the County of Northern Santa Barbara, State of California.

4.06. Warranty of authority. Each person signing this agreement on behalf of a party warrants that he or she has authority to do so.

4.07. No Waiver. Failure to enforce with respect to a default shall not be construed as a waiver.

4.08. Severability. The provisions of this agreement are severable. If any part Attachment B

of this agreement is held invalid by a court of competent jurisdiction, the remainder of the agreement shall remain in full force and effect unless amended or modified by mutual written consent of the parties.

4.09. Submittals. In addition to any other submittals required by this agreement, Contractor shall submit copies of its current busines s license and current certificate of workers compensation coverage to the City before beginning work on this project.

4.10 Prevailing Wage. Prevailing Wage. If applicable, Contractor and all subcontractors are required to pay the general prevailing wage rates of per diem wages and overtime and holiday wages determined by the Director of the Department of Industrial Relations under Section 1720 et seq. of the California Labor Code. The Director's determination is on file and open to inspection at www.dir.ca.gov and is referred to and made a part hereof; the wage rates therein ascertained, determined and specified are referred to and made a part hereof as though fully set forth herein. Further requirements are attached as Exhibit D.

IN WITNESS WHEREOF, this agreement is executed by the parties on the date first written above.

NICHOLS CONSULTING ENGINEERS,
CHTD. (NCE)

___________________________
Margot Yapp
President

CITY OF SANTA MARIA, a Municipal Corporation

Brett Fulgoni
Public Works Director

ATTEST:

Donna G. Schwartz
Chief Deputy City Clerk
APPROVED AS TO FORM:

_______________________________
Risk Manager
_______________________________
City Attorney

Attachment B

EXHIBIT A

SCOPE OF SERVICES
Task 1: Project Management and Meetings
NCE’s Project Manager (PM) will serve as the City’s single point of contact and will have primary responsibility for coordinating the efforts of the project team. Specific project management tasks to be conducted by the PM include monthly budgeting, invoicing, scheduling, and general project administration. The PM will arrange a kick-off meeting with the City to initiate the work. The objectives of the kick-off meeting will be:
 Review the scope of work.
 Establish paths of communication.
 Review project schedule and critical milestones.
 Review project requirements, including design objectives, budget, constraints, and criteria. The City’s requirements will be further defined during the meeting.  Request the pertinent ATP Grant Application and environmental approvals.  Review City Standard Design Criteria and latest City-adopted formats.  Request background information and as-builts.
 Obtain electronic file of the City’s cover sheet template, title block, and CAD Standards.

At the kick-off meeting, key deliverables and the project schedule will be reviewed and adjusted to meet the City’s needs.

The following meetings are included in the scope: kick-off/preliminary meeting (1 hour) and monthly virtual progress meetings. The purpose of these meetings will be to confirm project limits, identify and resolve design issues that may surface, present design alternatives and recommendations, and continue coordination with project stakeholders, as necessary.

Deliverables: Kick-Off meeting and monthly progress meeting agendas and minutes.

Task 2: Existing Conditions Verification and Technical Support NCE will review available basemap information for the corridor provided by the City, including topographic survey information, utility information, drainage information, and traffic as-builts. We’ll also review the City’s ATP Grant Application and Environmental Commitments for data needs. This information combined with the City’s concept plans included in the RFP will be the basis for evaluating the site constraints and required design data.

NCE’s staff will walk or drive the corridor as appropriate, focusing on the discrete intersection improvements and note possible data gaps, the need for supplemental topographic surveying, or other technical studies. At this time, special attention will be given to the 4 intersections with “direct” storm Attachment B

drain impacts, and 4 intersections with likely traffic signal conflicts. For specific areas of concern, we will also take photographs of the potential issues and brief measurements to help quantify the issue.

We will prepare a brief technical memorandum with our observations and submit to the City for their review and input. If needed, based on the City’s preliminary review, we may also conduct up to one (1) follow-up site meeting with City staff to clarify the site issues and finalize the approach for the 30% design phase.

Deliverables: Field review summary and existing conditions constraints memo.

Task 3: PS&E – 30% Design Submittal
Task 3.A Basemap Preparation
Task 3A.1 Topographic Survey
NCE’s project surveyor will conduct a topographic surveying effort with the effort divided into discrete intersection surveys and a separate longitudinal corridor mapping effort. The mapping will be compiled at an agreed-upon scale (1” = 40’ or similar) with a 1-foot contour interval and horizontally tied to the California State Plane coordinate system (NAD83) based upon the current Santa Barbara County adjustment and vertically tied to the Santa Barbara County benchmark network (NAVD88).

The intersection surveys will include top of curb, flowline, gutters, manholes (rim and invert elevations), utility boxes and vaults, striping and other markings, driveways, sidewalks, fences, walls, gates, tree and tree wells, street furniture, light and utility poles, traffic signals, and signs. The intersection will include 10’ grid spacing, including visible grade breaks. Medians will be included if they exist at the intersection. Limits covered by the intersection topo will extend 50 feet beyond the curb returns and up to the right of way lines. A TIN surface will be provided for each intersection.

For the remaining corridor, topographic information will be taken at cross sections with 250’ intervals on the straight sections of the roadway (at least one per block) and will extend from back of sidewalk to back of sidewalk. Where the road curves, cross sections will be taken at the beginning of the curve and end of curve. Curb, gutter, sidewalk, striping, and grade breaks will be included in the cross sections. It will be combined with planimetric aerial mapping to create a composite corridor basemap.

Approximately 90 - 110 cross sections will be taken but may be adjusted to meet City accuracy goals for the Class IV bikeway.

Survey work will be performed under the direct supervision of a Professional Land Surveyor Licensed in the State of California. Work will be conducted in accordance with standard acceptable surveying practices.

Deliverables: CAD Basemap (DWG format), Aerial Ortho-Imagery (GeoTIFF or similar).

Task 3A.2 Underground Utility Locating and Potholing (Optional) At up to four (4) intersections, NCE’s project surveyor will collect detailed storm drain invert elevation information for manholes and catch basins. This investigation will include non-destructive underground Attachment B

utility locating such as ground penetrating radar combined with surveying the invert elevations of storm drain facilities. The utility locating will collect utility location data including possible utility type, approximate alignment, and approximate depth with markings painted on the pavement.

If needed for utility relocation and conflict checking, NCE’s utility locating sub-consultant can also direct the collection of various utility potholes in the pavement to determine actual utility depths. This effort assumes only up to one (1) day of field effort to collect the utility potholes, which may include 4-6 test locations depending on the proximity of test sites. NCE will execute a no-fee encroachment permit with the City for performing utility potholing. Our utility locator will pre-mark locations and clear locations with DigAlert. Holes will be backfilled with excavated materials and capped with Asphalt Concrete cold patch.

Deliverables: Supplemental utility surveying data added to Basemap (DWG format), Utility Locating/Pothole Report (PDF).

Task 3A.3 ROW Mapping
If the City has not yet conducted ROW Mapping to identify ROW constraints, NCE’s project surveyor will collect ROW mapping information at intersections to confirm available ROW for bulb-outs and intersection improvements. Using recorded maps for the area around the corridor, the project surveyor will search for and collect survey monuments to be able to plot the recorded boundary. We will also gather grant deed descriptions of the right of way where available. In the area of the Santa Maria Valley Railroad crossing, Main Street crossing, and the Flood Control Channel Crossing, we will perform a more detailed boundary survey for your use in engaging with those entities in obtaining as-needed encroachment permits and temporary construction easements.

As the remainder of the corridor outside of the intersections has worked primarily within the roadway pavement, it is assumed that the City already has sufficient ROW for those improvements. Therefore, only a high-level, Geographic Information Systems (GIS) based ROW boundary will be prepared.

Alternatively, as an optional task, the ROW for the larger corridor may also be mapped to the same standards as those of the intersections. A preliminary search of recorded maps for the entire corridor resulted in approximately 60 maps to search for monumentation.

Task 3.B Utility “A” Letter
Working with other agencies, we have observed that utility letters receive more prompt attention when distributed by a City. Therefore, NCE will utilize a City-provided utility contact list and prepare a Utility “A Letter” on City letterhead for City distribution to both notify the utilities of impending intersection concrete/utility work and request available utility mapping information. NCE will track the progress of inbound and outbound responses in a utility tracking matrix.

Deliverables: Utility Tracking Matrix (Excel/PDF).

Task 3.C 30% Plans and Estimate
Attachment B

NCE will utilize the basemap, compiled background information, and results of our site verification to develop 30% conceptual plans. The importance of the concept plans will be to better understand possible conflicts between the proposed bulb-outs with the existing drainage conditions and traffic signal systems. Also, bikeway barrier elements can be evaluated for long-term maintenance and access needs like street sweeping.

Large bulb-outs may require the installation of underdrains or trench drains to intercept drainage, as the widened sidewalks may create negative drainage areas flowing backwards towards the existing sidewalk. In some instances, more sizeable bulb-outs like several of the 20’ bulb-outs along the project may trigger significant grading issues requiring full reconstruction of the intersection pavement. In those instances, the design will evaluate the tradeoffs and costs between pavement reconstruction versus installing intermediate storm drain catch basins or manholes to connect to the larger storm drain systems. However, NCE understands that intersection re-grading and new storm drain facilities are a last resort and the City would first prefer reducing the size of the bulb-outs to be compatible with existing drainage features. Therefore, NCE’s proposal assumes a limited effort of reducing the size of the bulb-outs, which will in turn reduce the anticipated design effort in subsequent design phases.

Once the conceptual bulb-outs footprints are better understood, a preliminary review of impacted traffic signal systems can be performed, and the approach to relocating or adjusting various pedestrian pushbuttons and signal heads can be evaluated. NCE will also attempt to minimize the amount of pedestrian pushbutton impacts with the reduced bulb-out sizes.

Deliverables: 30% Engineering Plans and Estimate of Probable Construction Cost (PDF).

Task 4: PS&E – 60% Design Submittal
The 60% draft PS&E will incorporate the various data collection efforts compiled as part of previous tasks, including available as-built information from the City. The 65% intersection improvements will incorporate typical design elements, including Public Right-of-Way Accessibility Guidelines-compliant curb ramp layouts, bulb-outs layouts, concrete flatwork, curb and gutter, and required Hot Mix Asphalt conforms. Based on the assumption that the bulb-out sizes will be effectively reduced, we anticipate only a minimal amount of roadway re-grading design and need for HMA conforms. The bikeway improvements will include lane dimensions, required tapers, and bikeway barrier information. Surface visible utility structures within the project footprint will be identified on the Plans for either adjustment or protection as appropriate. Where large bulb-outs require substantial relocation or reconstruction of the adjacent storm drain system, dedicated utility relocation plans may be developed to ensure improvements do not impact other crossing underground utilities. However, we assume that the need for this storm drain system relocation or reconstruction work will be extremely limited due to the successful reduction in size of the bulb-out footprints during the 30% design. Impacted traffic signals and push buttons will be shown for relocation or adjustment as needed. Traffic signal modifications will be included to relocate traffic signals and pedestrian pushbuttons conflicting with the proposed curb ramps and striping.

Attachment B

We generally assume signal modification plans can be prepared as a streamlined plan set. However, at Stowell Street the new crosswalk will require new traffic signal equipment and a more in-depth design, and at Alvin Avenue, the large bulb-out may require more extensive relocation such as relocation of the traffic signal mast-arm.

The Plans will be prepared in AutoCAD format on 24” x 36” sheets, utilizing the City Title Block and CAD Template as agreed upon during Task 1 and drawn at a scale of 1” = 20’. Striping and signage plans will be prepared at a scale of 1” = 40’.

Anticipated 65% Street Improvement Plan List (62 total):
 (1) – Cover Page
 (1) – Notes, Legends, and Abbreviations
 (1) – Construction Details
 (11) – Improvement Plans (Plan/Plan)
 (11) – Striping and Signage Plans (Plan/Plan)
 (4) – Storm Drain Relocation Plan (Intersection)
 (4) – Traffic Signal Modification Plan (Intersection)  (29) – Curb Ramp Details [25 for bulb-outs, 4 for other locations] The Engineer’s Estimate of Probable Construction Cost will be prepared in Microsoft Excel format using a Bid Item format and will be based on recent construction cost data available to NCE for projects of this type.

NCE assumes the City will provide boilerplate specifications suitable for the development of the roadway rehabilitation project in Microsoft Word format. NCE will provide revisions to the Special Provisions related to the specifications for materials or construction related to our bid items using Caltrans Specifications. NCE assumes the City will develop the “front-end” specifications, including the overall bid book.

Deliverables: 60% Engineering Plans (PDF), Cost Estimate (PDF), and Technical Specifications (MS Word).

Task 5: PS&E – 90% Design Submittal
The 60% PS&E will be revised to incorporate design review comments received from the City. NCE will meet with the City to review these comments, from which the Draft 90% PS&E will be prepared. NCE will further refine the design to a 90% level of design at this stage. This will include fine-tuning of grading and improvement plans for the bulb-outs, adjusting the traffic signal plans, and making adjustments to the storm drain design as needed. The draft 90% PS&E will then be packaged and submitted similarly to the 65% PS&E, unless directed otherwise.

Attachment B

Deliverables: 90% Engineering Plans (PDF), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix.

Task 6: Final PS&E and Advertisement Package
Task 6.A Final PS&E
The 90% PS&E will be prepared to incorporate final design review comments received from the City.

NCE will meet with the City to review these comments, from which the Final PS&E will be prepared.

The Final PS&E will be prepared and sent to the City in a bid-ready format.

Deliverables: Final Engineering Plans (PDF), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix.

Task 6.B Caltrans Encroachment Permit Support (Optional) As an optional task, NCE can provide the City with as-needed encroachment permit application support led for a City-led encroachment permit application related to improvements adjacent to Main Street (SR-166). Support may include modifications to electrical plans to Caltrans standards, including plan view, removal plan, conductor schedule, equipment schedule, and notes for modifications to signal equipment and detection. We have included a limited number of hours in our scope and only anticipate the need to develop 1-2 electrical modification sheets and minor turning template exhibits. However, this task will be billed on a time and materials basis for the work requested by the City. We will be able to refine the scope in more detail with the City after receiving initial review comments from Caltrans regarding the proposed project elements and elimination of the dedicated northbound right-turn pocket.

Deliverables: As-needed design support.

Task 7: Construction Phase Design Support (OPTIONAL)
NCE may provide construction phase support services to the City as an optional task, including design services during bidding and construction. During the bidding period, this may include responding to one round of written contractors’ inquiries from a question and answer (Q&A) phase, providing revisions to the bid documents due to clarifications from the Q&A phase, and preparing up to 1 Bid Document Addendum.

We assume the construction project will be professionally managed by the City’s Construction Manager (CM), including the required inspection staff. Once the project has been awarded to a Contractor, NCE anticipates attendance at the construction kick-off meeting, responding to contractor requests for information (assume up to three [3] Request for Information [RFI]), and providing recommendations for necessary changes to the construction documents due to unforeseen field conditions. Construction support will also include material submittal review for conformance with the NCE-developed Technical Provisions.

Attachment B

The limited number of hours to provide construction phase design support in the Fee Estimate is an estimate only. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: As-needed bidding Q&A responses and bid document addenda (up to one [1]); As- needed RFI responses (up to three [3]) and submittal review during construction.

Task 8: Record Drawings/As-Built Support (OPTIONAL)
NCE may provide records drawings and as-built support as an optional task. We assume the City’s CM will provide legible, consolidated as-built plan redlines for NCE to develop into a digital as-built of the project Plans. NCE will submit an electronic copy of the as-builts to the City in PDF format. We assume a limited number of hours to prepare as-built drawings. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: Digital as-built of the Plans (PDF) and CAD E-Transmittal.

Attachment B

EXHIBIT B

PAYMENT

I. Progress Authorization
Written authorization to proceed from the City authorizes Contractor to incur costs up to the total not-to-exceed amount of SEVEN HUNDRED NINETY THOUSAND TWO HUNDRED THIRTY DOLLARS AND ZERO CENTS ($790,230) for all services under this Agreement, including the optional services identified below. No work shall commence until the City issues a written Notice to Proceed.

Compensation shall be based on NCE’s cost proposal dated June 19, 2026, revised September 11, 2026, attached hereto and incorporated into this Exhibit “B.” Task Description Budget
1 Project Management and Meetings $32,900
2 Existing Conditions Verification and Technical Support $24,070 3 PS&E – 30% Design Submittal, including optional underground utility locating and potholing $239,040
4 PS&E – 60% Design Submittal $231,590
5 PS&E – 90% Design Submittal $116,600
6 Final PS&E and Advertisement Package, including optional Caltrans encroachment permit support $109,750
7 Construction Phase Design Support (Optional) $26,015
8 Record Drawings/As-Built Support (Optional) $10,265
Total Not-to-Exceed Amount $790,230
The total includes $668,370 for base services and $121,860 for optional services. Optional services consist of:
 Underground utility locating and potholing: $45,130.
 Caltrans encroachment permit support: $40,450.
 Bidding and construction-phase design support: $26,015.  Record drawings/as-built support: $10,265.

Optional services shall be performed only as needed and directed in writing by the City.

Inclusion of an optional service in the budget does not require the City to authorize its use.

Contractor shall bill only for services performed and authorized costs incurred.

II. Invoice procedure.

A. Payment shall be monthly based on the billable charges.

B. The Contractor shall present the bill for charges from the previous month.

Attachment B

C. The Contractor's bill shall be substantiated by appropriate documentation, and include an itemized listing of personnel, subcontractors, and other direct costs incurred.

D. City may withhold payment for disputed work. Payment of fees shall not constitute an acceptance of work.

Rates shall be billed according to Contractor’s attached fee schedule, up to the not -to- exceed amount. Work Authorized by Change Order/Amendment shall be billed at on a time and materials basis according to the attached fee schedule, unless another payment method is agreed to in writing by the City prior to initiation of work.

III. Maximum billable amounts

Under no circumstance shall the total of all payments to the Consultant exceed ninety percent (90%) of the maximum not-to-exceed cost, prior to acceptance by the City of all items to be completed as noted within Exhibit "A".

IV. IV. Consultant Fee Schedule (continued on next page) Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

Attachment B

EXHIBIT C

INSURANCE REQUIREMENTS

Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, his/her agents, representatives, or employees. If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant.

A. Minimum Scope of Insurance

Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001), including products and completed operations, property damage, bodily injury and personal & advertising injury.

2. Insurance Services Office Business Auto Coverage Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, covering hired (Code 8) and non-owned autos (Code 9).

3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance.

4. Errors and Omissions liability insurance appropriate to the Consultant's profession.

Architects' and engineers' coverage is to be endorsed to include contractual liability.

5. Cyber Liability Insurance, Cov erage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringem ent of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.

B. Minimum Limits of Insurance

Consultant shall maintain limits no less than:

1. General Liability - $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability - $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: Statutory limits.

4. Employer's Liability - $1,000,000 per accident for bodily injury or disease.

5. Errors and Omissions Liability - $1,000,000 per occurrence or claim, $2,000,000 aggregate.

Attachment B

6. Cyber Liability- $2,000,000 per occurrence or claim, $2,000,000 aggregate.

C. Self-insured Retentions

Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration and defense expenses within the retention.

D. Other Insurance Provisions

The liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form or an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38 and CG 20 37 forms if later revisions are used).

2. For any claims related to this project, the Consultant's insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled or reduced, except with notice stating the title of this contract to the City. All notices provided pursuant to this Agreement shall be given to the City representative listed for notice in this agreement and shall specify the title of thi s Agreement. Notice may be given by overnight mail, facsimile with confirmation of receipt, or certified mail with return-receipt requested.

4. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

5. If any of the required policies provide claims-made coverage:
a. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. c. If coverage is canceled or non -renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

E. Acceptability of Insurers

Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.

F. Verification of Coverage

Attachment B

Consultant shall furnish the City with original certificates and amendatory endorsements of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences.

However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

G. Special Risks or Circumstances

The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Attachment B

EXHIBIT D

PREVAILING WAGE REQUIREMENTS FOR MAINTENANCE WORK, DESIGN AND PRECONSTRUCTION

PHASES OF CONSTRUCTION, AND INSTALLATIONS

The terms of this Exhibit apply to all Public Works projects for over $1,000.

For purposes of this Exhibit, “Public Works” includes any project of a type defined in California Labor Code section 1720 when paid for in whole or in part by public funds. These projects include: construction, alteration, demolition, installation, or repair work done under contract.

For purposes of this definition, "construction" includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including, but not limited to, inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. For purposes of this definition, "installation" includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.

Pursuant to California Labor Code sections 1720 and 1771, construction, alteration, demolition, installation, repair and maintenance work performed under this Agreement is subject to State prevailing wage laws. State prevailing wage laws require certain provisions be included in all contracts for public works. The CONTRACTOR and any subcontractors shall comply with all applicable State prevailing wage laws, whether included in this agreement or inadvertently omitted, including but not limited to the requirements listed below:

1. Compliance with Prevailing Wage Requirements. Pursuant to California Labor Code sections 1720 through 1861, the CONTRACTOR and all subcontractors shall ensure that all workers who perform work under this Agreement are paid not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations (DIR). This includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including but not limited to inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the post-construction phases of construction, including but not limited to all cleanup work at the jobsite.

1.1. Copies of such prevailing rate of per diem wages are on file at the City Public Works Department and are available for inspection to any interested party on request.

Copies of the prevailing rate of per diem wages also may be found at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. The CONTRACTOR and all subcontractors shall post a copy of the prevailing rate of per diem wages determination at each job site and shall make them available to any interested party upon request.

1.2. The wage rates determined by the DIR refer to expiration dates. If the published wage rate does not refer to a predetermined wage rate to be paid after the expiration date, then the published rate of wage shall be in effect for the life of this Agreement. If the published wage rate refers to a predetermined wage rate to become effective upon expiration of the published wage rate and the predetermined wage rate is on file with the DIR, such predetermined wage rate shall become effective on the date following the expiration date and shall apply to this Agreement in the same manner as if it had been published in said publication. If the predetermined wage rate refers to one or more Attachment B

additional expiration dates with additional predetermined wage rates, which expiration dates occur during the life of this Agreement, each successive predetermined wage rate shall apply to this Agreement on the date following the expiration date of the previous wage rate.

If the last of such predetermined wage rates expires during the life of this Agreement, such wage rate shall apply to the balance of the Agreement.

2. Penalties for Violations. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1775 in the event a worker is paid less than the prevailing wage rate for the work or craft in which the worker is employed. This shall be in addition to any other applicable penalties allowed under California Labor Code sections 1720 through 1861.

3. Payroll Records. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection.

The CONTRACTOR shall require all subcontractors to also comply with section 1776. The CONTRACTOR and all subcontractors shall furnish records specified in section 1776 on a monthly basis, both to the City and directly to the Labor Commissioner in the manner required by California Labor Code section 1771.4. The CONTRACTOR shall ensure its subcontractors prepare and submit payroll records to the City and the DIR as required by this section. The City may require the CONTRACTOR and its subcontractors to prepare and submit records specified in section 1776 to the City and the Labor Commissioner on a weekly basis, at no additional cost to the City.

4. Apprentices. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1777.5, 1777.6 and 1777.7 concerning the employment and wages of apprentices. The CONTRACTOR is responsible for compliance with this section for all apprenticeable occupations pursuant to California Labor Code section 1777.5(n).

5. Working Hours. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1810 through 1815, including but not limited to: (i) restrict working hours on public works contracts to eight hours a day and forty hours a week, unless all hours worked in excess of 8 hours per day are compensated at not less than 1½ times the basic rate of pay; and (ii) specify penalties to be imposed on CONTRACTORs and subcontractors of $25 per worker per day for each day the worker works more than 8 hours per day and 40 hours per week in violation of California Labor Code sections 1810 through 1815.

6. Required Provisions for Subcontracts. The CONTRACTOR shall include, at a minimum, a copy of the following provisions in any contract they enter into with a subcontractor: California Labor Code sections 1771, 1771.1, 1775, 1776, 1777.5, 1810, 1813, 1815, 1860 and 1861.

7. Labor Code Section 1861 Certification. In accordance with California Labor Code section 3700, the CONTRACTOR is required to secure the payment of compensation of its employees. By signing the Agreement, to which this is an exhibit, the CONTRACTOR certifies that:

“I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers’ compensation or to Attachment B

undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Agreement.”

8. Compliance Monitoring and Enforcement. This project is subject to compliance monitoring and enforcement by the DIR. The City must withhold contract payments from the CONTRACTOR as directed by the DIR, pursuant to California Labor Code section 1727.

9. CONTRACTOR and Subcontractor Registration Requirements. The CONTRACTOR and all subcontractors shall not engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to California Labor Code section 1725.5 CONTRACTOR certifies that the CONTRACTOR has verified that all CONTRACTOR and all subcontractors (if any approved by City) used on this project are registered with the DIR in compliance with California Labor Code sections 1771.1 and 1725.5. The CONTRACTOR shall provide proof of registration for themselves and all listed subcontractors to the City at the time of signature of contract and immediately upon any changes or City’s request.

10. Stop Order. Where a CONTRACTOR or subcontractor engages in the performance of any public work contract without having been registered in violation of California Labor Code sections 1725.5 or 1771.1, the Labor Commissioner must issue and serve a stop order prohibiting the use of the unregistered CONTRACTOR or subcontractor on ALL public works until the unregistered CONTRACTOR or subcontractor is registered. Failure to observe a stop order is a misdemeanor.

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Brett Fulgoni, Director of Public Works

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving Submission of Applications to the California Department of Transportation fo r Highway Safety Improvement Program Cycle 13 Funding

Description:

The City Council will consider adopting a Resolution approving submission of one or more Highway Safety Improvement Program (HSIP) Cycle 13 applications for eligible roadway safety improvements in Santa Maria.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

1. Adopt a Resolution authorizing the submittal of one or more applications to the California Department of Transportation (Caltrans) for H ighway Safety Improvement Program (HSIP) Cycle 13 funding; and

2. Authorize the City Manager or designee to prepare, execute, and submit the applications including required certifications and supporting documents.

BACKGROUND:

HSIP funds safety improvements intended to reduce fatalities and serious injuries on public roads. Projects are developed using crash history, roadway conditions, and other safety data. Caltrans opened the Cycle 13 call for projects on July 1, 2026, and applications are due November 2, 2026.

The program offers competitive funding based on benefit-cost ratios and separate funding set-asides for specified improvements. Applicants must meet Caltrans requirements for a Local Roadway Safety Plan (LRSP) or equivalent and for delivery of existing HSIP projects.

DISCUSSION:

Public Works staff have evaluated candidate projects using the City’s roadway safety priorities, crash data, and Caltrans eligibility criteria. Applications may address intersection and traffic signal safety, pedestrian and bicycle safety, signing, striping, or 2 other eligible improvements. Staff will finalize project locations, scopes, cost estimates, and funding requests based on expected safety benefits, competitiveness, and delivery feasibility.

A brief description of the three anticipated applications:

1. Benefit-Cost Ratio Applicati on #1 : Permissive to Protected Left Turn Signal Enhancements
a. Provides dedicated signal phasing for left turns to reduce driver confusion and improve safety for drivers and pedestrians.

2. Benefit-Cost Ratio Application #2 : Broadway (SR -135)/Fesler Street Intersection Pedestrian Safety Enhancements
a. Curb extensions, bike boxes, striping, signage, and possible signal modifications to improve pedestrian safety at this intersection.

3. Pedestrian Set -Aside Application #1 : Mid -block and Uncontrolled Crosswalk Rectangular Rapid Flashing Beacons (RRFBs)
a. Previous HSIP project had improved mid-block and uncontrolled crosswalks Citywide with enhanced signage and striping. This project would iterate on that project and enhance with RRFBs to improve driver awareness of pedestrians at these crosswalks.

The requested authorization allows submission under the benefit-cost ratio category and applicable set-asides, within Cycle 13 funding limits. Staff will verify application eligibility, prepare the required HSIP Analyzer and supporting materials, and coordinate with Caltrans District 5 as needed.

Alternative(s)
The Council may decline to authorize the applications, in which case the City would not compete for this funding in Cycle 13.

Fiscal Considerations
Cycle 13 provides reimbursement of up to 90 percent of eligible project costs, requiring a 10 percent local share. Grant requests and local funding needs will depend on the projects submitted and applicable funding limits. Costs exceeding the grant award or determined ineligible for reimbursement would require other funding. Local match funding has been included in the adopted budget, using Measure A funds.

Impact on the Community
If awarded, HSIP funds would help the City deliver improvements that reduce the risk and severity of traffic collisions and improve safety for people walking, bicycling, and driving

ATTACHMENT(S)

A. Resolution

Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

AUTHORIZING THE SUBMITTAL OF ONE OR MORE APPLICATIONS

TO THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) CYCLE 13 FUNDING

WHEREAS, the California Department of Transportation (Caltrans) is accepting Highway Safety Improvement Program (HSIP) Cycle 13 applications through November 2, 2026; and

WHEREAS, the City of Santa Maria seeks funding for eligible roadway safety improvements to reduce fatalities and serious injuries using crash data and identified safety needs.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Authorize the City Manager or designee to prepare, execute, and submit one or more applications to Caltrans for HSIP Cycle 13 funding for eligible roadway safety improvements in Santa Maria, including required application certifications and supporting documents.

SECTION 2. Authorize the City Manager or designee to finalize application project locations, scopes, cost estimates, and funding requests, including proposed local shares, within Cycle 13 requirements and funding limits. Applications may be submitted under the benefit-cost ratio category and applicable funding set-asides.

SECTION 3. Authorize submittal of applications only and does not appropriate funds or approve construction. Staff shall return to the City Council for project approval and award of construction con tracts. P roposed improvements remain subject to applicable environmental review before project approval.

SECTION 4. The Chief Deputy City Clerk is hereby authorized to make m inor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

///

///

///

Attachment A

Page 2 of 2 ends

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held this 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Ramon Galo, Recreation and Parks Director

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving the A ppropriation of Landscape District Operating Funds for Shade Sail Installation

Description:

The City Council will consider adopting a Resolution authorizing the appropriation of $14,950 from the South west Landscape District operating budget to the Battles Road Corridor Rehabilitation & Beautification capital project to fund the installation of two shade sails along the Battles Road multi-use path.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

Adopt a Resolution a uthorizing the appropriation of $14,950 from the Southwest Landscape District operating budget to the Battles Road Corridor Rehabilitation & Beautification capital project for shade sail installation.

BACKGROUND:

The Battles Road Corridor Rehabilitation & Beautification project includes improvements to the Battles Road corridor, including the installation of shade structures along the multi- use path. These structures are intended to provide shade for path users and enhance the overall functionality and comfort of the corridor.

As part of the project, two shade sails are planned for installation. The proposed installation work will be completed by Capstone Concrete Design Inc. for $14,950 . The City will purchase the necessary materials and provide assistance with a portion of the labor to help expedite project completion and manage costs.

2 DISCUSSION:

The installation of shade sails is a component of the Battles Road Corridor Rehabilitation & Beautification project and will provide shaded areas for users of the multi-use path.

The proposed installation cost of $14,950 will be funded through an appropriation from the Southwest Landscape District operating budget to the capital project. Because these funds were not originally allocated to this project, Finance Department review has determined that City Council approval is required before the funds can be used.

Approval of the requested appropriation will allow staff to proceed with the required procurement and contracting processes. Following Council approval, staff will submit the required documentation through Workday Strategic Sourcing and obtain the necessary approvals before proceeding with the installation.

Alternative(s)
The City Council may choose not to approve the appropriation of $14,950 from the Southwest Landscape District operating budget. If the appropriation is not approved, staff will need to identify an alternative funding source or defer the installation of the shade sails along the Battles Road multi-use path.

Fiscal Considerations
Approval of the recommended action will convert operating budget appropriation of $14,950 in the Southwest Landscape District Fund (Fu nd 433|CC0850|SC4225) to a capital budget for the Battles Road Corridor Rehabilitation and Beautification Project (FD433|CC0850|SC7300|PRJ-0000017) in the Southwest Landscape District Fund.

The proposed cost from Capstone Concrete Design Inc. for installation of the two shade sails is $14,950 (Attachment B). The City will separately purchase the necessary materials and provide assistance with a portion of the labor.

The requested appropriation will provide funding for the contractor's installation work. The availability of sufficient funds within the Southwest Landscape District operating budget should be confirmed by Finance prior to processing the appropriation.

ATTACHMENT(S)
A. Resolution
B. Capstone Proposal

Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA
AUTHORIZING THE APPROPRIATION OF $14,950 FROM

THE SOUTHWEST LANDSCAPE DISTRICT OPERATING BUDGET TO

THE BATTLES ROAD CORRIDOR REHABILITATION & BEAUTIFICATION

CAPITAL PROJECT FOR SHADE SAIL INSTALLATION

WHEREAS, the City of Santa Maria is undertaking the Battles Road Corridor Rehabilitation & Beautification project to improve the Battles Road corridor and its associated multi-use path; and

WHEREAS, the project incl udes the installation of two shade sails along the Battles Road multi-use path to provide shaded areas for path users; and

WHEREAS, the estimated contractor cost to install both shade sails is $14,950, with the City purchasing the necessary materials and assisting with a portion of the labor to help expedite completion of the work; and

WHEREAS, the proposed funding was not originally allocated to the capital project, and approval by the City Council is required to appropriate funds from the Southwest Landscape District operating budget; and

WHEREAS, the appropriation of $14,950 will provide funding for the contractor's installation work and support completion of this component of the Battles Road Corridor Rehabilitation & Beautification project.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Authorize the appropriation of $14,950 from the Southwest Landscape District operating budget to the Battles Road Corridor Rehabilitation & Beautification capital project for the installation of two shade sails along the Battles Road multi-use path.

SECTION 2. Authorize the Director of Finance or designee to complete the necessary budgetary transactions to implement the appropriation authori zed by this Resolution.

SECTION 3. The approval of this appropriation does not eliminate the requirement to complete applicable procurement procedures and obtain all other required approvals before the installation work proceeds.

Attachment A

Page 2 of 2 ends

SECTION 4. The Chief De puty City Clerk is hereby authorized to make m inor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held this 3rd day of November 2026.

ATTEST:

Chief Deputy City Clerk

Mayor

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

Attachment B

COUNCIL AGENDA REPORT

TO: Mayor and City Council

FROM: Shad S. Springer, Director of Utilities

DATE: November 3, 2026

SUBJECT: Adoption of a Resolution Approving a Supplemental Water Purchase Agreement with JP Development Group and FOCAL Investments LLC for Key Site 1 Townhomes

Description:

The City Council will consider adopting a Resolution authorizing an agreement to sell supplemental water for residential use at Key Site 1.

Environmental Notice: The activity is not a “Project” as defined under Section 15378 of the California Environmental Quality Act State Guidelines; therefore, pursuant to State Guidelines Section 15060(c)(3) no environmental review is required.

RECOMMENDATION:

1. Adopt a Resolution approving a supplemental water purchase agreement with JP Development Group and FOCAL Investments LLC for the purchase of up to 6 acre- feet per year of supplemental water to serve residential uses at Key Site 1; and

2. Authorize the City Manager or designee to execute the agreement a nd record the revenue associated with this sale to the Water Enterprise Fund; and

3. Authorize the City Manager or designee to enter into amendment s to reduce the supplemental water requirement if less than six acre -feet per year is required , as determined by Golden State Water Company.

BACKGROUND:

On August 4, 2026, the City Council adopted Resolution 2026-127 approving an updated administrative framework for future supplemental water sales. The Resolution provides that supplemental water to serve new res idential projects located outside the City limits may only be made available upon approval by the City Council.

DISCUSSION:

Key Site 1 is located at the northwest corner of Highway 101 and Clark Avenue within the Orcutt Community Plan (OCP) area. The pro posed development includes commercial, mixed-use residential, and townhome uses. Golden State Water Company will provide water service to the project. The Developer is requesting up to 6 acre -feet (AF) of supplemental water specifically to serve the residential townhome component. Water for the project's other uses will be provided by Golden State Water Company. 2 Golden State Water Company has identified a total project water demand of 54.4 AF and a previously reserved allocation of 51 AF, resulting in a calculated supplemental water need of 3.4 AF. However, the Developer has requested an allocation of up to 6 AF to accommodate the residential uses, pending final water demand analysis.

Consistent with t he Supplemental Water Purchase Agreement (Attachment B), the amount of City -provided supplemental water may be reduced if Golden State Water Company subsequently determines that the project's water demand calculation is less than projected.

If approved, the Developer will enter into the Supplemental Water Purchase Agreement and make a one-time payment to the City for the supplemental water. The Developer will then assign the associated water to Golden State Water Company for delivery to the project site.

This request is within the 900 AF supplemental water allocation previously authorized by the City Council. Following this sale, approximately 45 percent of the authorized supplemental water allocation will remain available for potential use by other projects.

Alternative
The City Council may choose not to provide supplemental water to serve this project.

Under this alternative, the Developer would need to identify an alternative source of water to serve the residential component of the project.

Fiscal Considerations
The sale of up to 6 AF at the current rate of $64,688/AF will generate $388,128 in revenue for the Water Enterprise Fund.

Impact on the Community
Approval of the agreement does not require the City to provide water service or infrastructure to the property. Golden State Water Company will remain responsible for serving the site since it is in its water service area.

ATTACHMENT(S)
A. Resolution
B. Agreement
Attachment A

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA

APPROVING A SUPPLEMENTAL WATER PURCHASE AGREEMENT

WITH JP DEVELOPMENT GROUP AND FOCAL INVESTMENTS LLC

FOR THE PURCHASE OF UP TO SIX ACRE-FEET OF SUPPLEMENTAL WATER TO SERVE RESIDENTIAL USES AT KEY SITE 1

WHEREAS, consistent with the administrative framework established by the Santa Maria City Council on August 4, 2026, for surplus water sales, the purchase of up to six acre-feet per year of supplemental water has been requested to serve residential uses at Key Site 1 in Orcutt, California; and

WHEREAS, the requested supplemental water is within the surplus water allocation previously authorized by the City Council, and the proposed sale will generate approximately $388,128 in revenue to the City's Water Enterprise Fund.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Approve the Supplemental Water Purchase Agreement, incorporated herein by reference, with JP Development Group and FOCAL Investments LLC for the purchase of up to six acre-feet per year of supplemental water to serve residential uses at Key Site 1; and

SECTION 2. Authorize the City Manager or designee t o execute agreement and record the revenue associated with this sale to the Water Enterprise Fund; and

SECTION 3. Authorize the City Manager or designee to enter into amendments to reduce the supplemental water requirement if less than six acre-feet per year is required, as determined by Golden State Water Company.

SECTION 4. The Chief Deputy City Clerk is hereby authorized to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

///

///

///

Attachment A

Page 2 of 2 ends

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on this 3rd day of November 2026.

________________________
Mayor
ATTEST:

_________________________
Chief Deputy City Clerk

APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager

Atty Rev. Dec 2025

SUPPLEMENTAL WATER PURCHASE AGREEMENT
KEY SITE 1 TOWNHOMES - APN 129-120-024

This Supplemental Water Purchase Agreement (“AGREEMENT”) is made and entered into as of November 3, 2026 by and between the City of Santa Maria, a California Municipal Corporation and charter city ("CITY"), and JP Development Group, a California corporation and FOCAL Investments LLC , a California limited liability company ( collectively, the "DEVELOPER"). CITY and DEVELOPER are referred to individually as a “PARTY” and collectively as the “PARTIES”.

RECITALS

WHEREAS, CITY provides retail potable water service to customers within its service area in the Santa Maria Valley, in northern Santa Barbara County. CITY holds contracts to receive water from the State Water Project (“SWP”) and rights to pump groundwater from the Santa Maria Valley Groundwater Basin (“BASIN”); and

WHEREAS, in 1997, the County of Santa Barbara (“COUNTY”) adopted the Orcutt Community Plan (“OCP”), which establishes, among other things, certain policies regarding water supplies to be secured for new development projects in Orcutt; and

WHEREAS, the OCP was amended in 2001 ; in particular, the OCP requires the water demand associated with projects be offset by supplemental water supplies that do not result in further overdraft of the BASIN; and

WHEREAS, CITY and Golden State Water Company (“GOLDEN STATE”) are parties to a certain groundwater adjudication lawsuit commonly referred to as the Santa Maria Groundwater Litigation (Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al.; Superior Court of California, County of Santa Clara, case no. 1- 97- CV-770214) (“BASIN LITIGATION”); and

WHEREAS, o n August 3, 2005, the Court approved a Stipulated Settlement (“STIPULATION”) that was signed by many of the litigants, related to the BASIN LITIGATION which, among other things, provides that “New Urban Uses” shall obtain water service from the local public water supplier and shall provide a source of supplemental water to offset the water demand associated with a development classified as a “New Urban Use”; and

WHEREAS, the STIPULATION was later incorporated into a Final Judgment in the BASIN LITIGATION; and

WHEREAS, DEVELOPER is in the process of developing a project, a description of which is attached hereto as Exhibit “A” (the “PROJECT”). The PROJECT is a New Urban Use and may be located within the OCP. Therefore, DEVELOPER must obtain a water supply that will satisfy the New Urban Use provisions of the STIPULATION, and the Attachment B
Supplemental Water Purchase Agreement

Page 2 of 23 ends

CAO Rev. Oct. 2025
OCP water policy requirements if applicable, and desires to purchase such supplemental water from CITY; and

WHEREAS, GOLDEN STATE provides retail water service to the Orcutt community and certain areas covered under the New Urban Use provisions.

DEVELOPER intends to obtain retail water service for the PROJECT from GOLDEN STATE. DEVELOPER also intends to enter into an agreement with GOLDEN STATE (“SERVICE AGREEMENT”) to obtain delivery of the Supplemental Water (defined below), as contemplated in this AGREEMENT; and

WHEREAS, on a long-term basis, CITY has water available for use in the Orcutt and New Urban Use areas that is surplus to that needed to serve Santa Maria’s current and long- term future anticipated demands. Accordingly, CITY is willing to provide Supplemental Water to GOLDEN STATE for the benefit of DEVELOPER and its PROJECT.

NOW THEREFORE, in consideration of the foregoing recitals and the promises and covenants contained herein, the PARTIES agree as follows:

1) Purpose. The purpose of this AGREEMENT is to enable DEVELOPER to satisfy OCP water policy requirements, if applicable, and the New Urban Use provisions of the STIPULATION by providing Supplemental Water (defined in Section 2) to GOLDEN STATE for the benefit of DEVELOPER and to serve the PROJECT, and in exchange, to provide payment to CITY to offset the costs of its use of SWP water for the benefit of its customers and the BASIN generally.

2) Supplemental Water. “Supplemental Water” shall mean a portion of the SWP entitlement held by CITY, return flows associated with CITY’s SWP entitlement, or as otherwise defined in the STIPULATION.

3) Term and Effective Date.

a) Effective Date. This AGREEMENT shall become effective upon payment of the DEPOSIT required by Section 4 (“EFFECTIVE DATE”), provided, however, that CITY’s obligation shall not become effective until receipt by CITY of the PURCHASE PRICE (defined by Section 5) (the date up on which all payments contemplated in this AGREEMENT have been tendered to CITY is the “PAYMENT DATE”).

b) Performance Period . DEVELOPER shall have three (3) years from the EFFECTIVE DATE to provide CITY with the PURCHASE PRICE
(“PERFORMANCE PERIOD”). If the PURCHASE PRICE ha s not been tendered by the end of the PERFORMANCE PERIOD, then this AGREEMENT shall terminate and CITY shall retain the DEPOSIT.

Supplemental Water Purchase Agreement

Page 3 of 23 ends

CAO Rev. Oct. 2025
c) Option to Extend Performance Period. At any point prior to the conclusion of the PERFORMANCE PERIOD, in the sole discretion of CITY, DEVELOPER may purchase an option (“OPTION”) to extend the PERFORMANCE PERIOD by one year at a cost of five percent (5%) of the PURCHASE PRICE. The OPTION price shall not apply as credit to the PURCHASE PRICE. Any extension of the PERFORMANCE PERIOD shall include adjustment of the PURCHASE PRICE of this AGREEMENT, calculated at the then-current rate for Supplemental Water as determined by City Council of CITY. The OPTION shall be documented in the form of written amendment entered into by both Parties. Additional OPTIONS may be purchased on an annual basis, in sole discretion of CITY, consistent with the terms of this provision.

d) Term. The term of this AGREEMENT shall commence on the EFFECTIVE DATE and, unless terminated pursuant to the terms of this AGREEMENT, shall continue from the PAYMENT DATE for a period of One Hundred (100) Years, and thereafter shall remain in effect for so long as CITY remains a SWP contractor, or until CITY permanently assigns to the PROJECT a portion of any adjudicated right it obtains to the BASIN equal to the net water demand of the PROJECT (“TERM”).

e) Termination. This AGREEMENT shall terminate at the end of the TERM.

Furthermore, this AGREEMENT may be terminated upon exercise of any express right of termination contained in this AGREEMENT. If this AGREEMENT is terminated prior to the expiration of the PAYMENT DATE in accordance with the terms of Section 3, or this AGREEMENT is terminated as a result of a final court judgment invalidating either this AGREEMENT or the PROJECT in accordance with the terms of Section 14, then the obligations of the PARTIES hereunder shall terminate and the PARTIES shall have the rights and obligations set forth in those respective sections.

4) Right to Acquire Water.

a) Acquisition of Supplemental Water. Subject to the terms and conditions of this AGREEMENT, CITY shall sell to DEVELOPER and DEVELOPER shall purchase from CITY, the right to take delivery of six (6) acre- feet of Supplemental Water each year for the TERM of the AGREEMENT, subject to the adjustment described below.

b) Deposit. Prior to or concurrent with the entering of this AGREEMENT , DEVELOPER shall provide payment to CITY of ten percent (10%) of the PURCHASE PRICE for the Supplemental Water associated with the request (“DEPOSIT”). The DEPOSIT shall be applied as a credit against the PURCHASE PRICE, as defined in Section 5. The PARTIES acknowledge the COUNTY or GOLDEN STATE will determine the quantity of Supplemental Water required for the PROJECT, and that the quantity may not be finally determined until the PROJECT receives Final Approval, defined below. The PARTIES acknowledge and agree the DEPOSIT will be based upon a good faith estimate of the quantity Supplemental Water Purchase Agreement

Page 4 of 23 ends

CAO Rev. Oct. 2025
of Supplemental Water required for the PROJECT. However, the PARTIES agree the quantity of Supplemental Water for which the PURCHASE PRICE is made for the PROJECT will be that amount finally determined by the COUNTY or GOLDEN STATE as a part of the Final Approval process, whether more or less than the amount set forth above.

c) Refundability of Deposit. The DEPOSIT shall be refunded to DEVELOPER, less the EXPENSE PAYMENT required by Section 6, within thirty (30) calendar days of DEVELOPER’s request if DEVELOPER provides proof the Final Approval for the associated PROJECT was denied, whether by the COUNTY or as a result of legal challenge. The DEPOSIT becomes nonrefundable once the PROJECT receives Final Approval. For this AGREEMENT, “Final Approval” shall mean approval of the first ministerial or discretionary action necessary for the PROJECT along with the exhaustion of any statutes of limitations applicable to any legal challenge to the approval of the PROJECT (including any applicable environmental review) or the final resolution of any legal challenge to the PROJECT that affirms the approval of the PROJECT in substantially the same form as described in Exhibit “A”.

d) Payment of Purchase Price. DEVELOPER shall pay to CITY the full remaining balance of the PURCHASE PRICE less the DEPOSIT for Supplemental Water by cashier’s check at the earliest occurrence of any of the following events:

(1) The setting of a new water service or upsize of an existing water service by GOLDEN STATE; or
(2) No less than one (1) business day prior to recording of any subdivision or parcel map for the PROJECT; or
(3) Approval of any ministerial or discretionary action; or (4) The final calendar day of the PERFORMANCE PERIOD.

CITY’s obligation, and DEVELOPER’s right to Supplemental Water for the PROJECT, shall not become effective until CITY has received full payment.

Failure to meet the deadlines required by this section shall result in automatic termination of the AGREEMENT and forfeiture of all amounts paid under this AGREEMENT.

5) Purchase Price. DEVELOPER shall pay CITY the sum of Sixty-Four Thousand, Six Hundred Eighty -Eight Dollars and Zero Cents ($64,688.00) per acre- foot of Supplemental Water purchased (the “PURCHASE PRICE”). The PURCHASE PRICE shall constitute a one- time fee for the annual use of each acre- foot of Supplemental Water purchased for the TERM of this AGREEMENT. The PURCHASE PRICE constitutes a payment for the right to take delivery of the Supplemental Water and is due and payable as required in Section 4 regardless of whether DEVELOPER actually takes delivery of any Supplemental Water for the duration of the TERM.

Supplemental Water Purchase Agreement

Page 5 of 23 ends
← All documents from this meeting