Attachment B

AGREEMENT FOR SERVICES
This Agreement is made on November 3, 2026, by and between Nichols Consulting Engineers, Chtd. (NCE), a Nevada Corporation (“Contractor”) and the City of Santa Maria, a California Municipal Corporation and charter city (“City”), in Santa Maria, California, based on the following recitals:

WHEREAS, City has determined it is in the public interest to proceed with the work hereinafter described as "Project"; and
WHEREAS, City does not have available employees to perform the services for the Project; and
WHEREAS, City has requested the Contractor to provide manpower to complete the Project; and
WHEREAS, Contractor is registered or licensed in California to perform desired services for the Project.

NOW, THEREFORE, IT IS AGREED:

1. Recitals true. The above recitals are true.

2. General.

2.01. Term and Termination. The term of this contract is one year, beginning on the date first written above. This contract may be extended by mutual consent of the parties, consistent with the terms identified in the Request for Proposals. This contract may be terminated for breach of its terms or conditions, or because of discovery of any act which violates local, state or federal law. Termination is effective 14 days after deposit of notice as specified in this Agreement.

2.02. Services to be Performed. Contractor shall determine the method, details and means of providing professional engineering services for final design and preparation of Plans, Specifications, and Estimate (PS&E) and associated services for the ATP Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project. More specifically, Contractor agrees to perform the specific services listed in Exhibit A.

2.03 City’s Duties. City’s duties under this Agreement are to cooperate with Contractor in the performance of the contract and timely pay invoices.

2.04. Payment. Payment terms under this Agreement are listed in Exhibit B.

2.05. Insurance. Contractor shall provide insurance as listed in Exhibit C.

2.06. Prevailing wage. Where applicable, Contractor shall follow the prevailing wage requirements listed in Exhibit D and applicable law.

2.07. Exhibits. Exhibits “A, B, C, and D are attached and incorporated.

3. Contractor’s Obligations.

3.01. Minimum Amount of Service. Contractor shall devote sufficient time to perform services under this agreement efficiently and effectively. Contractor may represent, perform services for and be employed by additional individuals or entities, in Contractor’s sole discretion, as long as the performance of these extra-contractual services does not interfere with or present a conflict with City's business.

3.02. Tools and Equipment. Except as otherwise stated in this Agreement, Contractor will supply all tools and equipment necessary to perform this Agreement.

Attachment B

3.03. Status. Contractor (including its employees) is an independent contractor.

No employer/employee relationship exists between Contractor and the City. Contractor's assigned personnel shall not be entitled to any benefits payable to employees of the City. The City is not required to make any deductions or withholdings from the compensation payable to Contractor under this agreement.

3.04. Indemnification. To the fullest extent permitted by law, the Contractor shall indemnify, defend (with independent counsel approved by the City) and hold harmless the City, and its directors, officers, and employees from and against all liabilities (including without limitation all claims, losses, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, including but not limited to reasonable attorneys’ fees, court costs and costs of alternative dispute resolution) regardless of nature or type that arise out of, pertain to, or relate to the negligence, reckless, or willful misconduct of the Contractor or the acts or omissions of an employee, agent or subcontractor of the Contractor. The provisions of this paragraph survive completion of the services or the termination of this contract. The provisions of this Section are not limited by the provisions of the Section relating to insurance.

4. Miscellaneous

4.01. Notices. All communication relating to the day-to-day activities of this Agreement shall be exchanged between a designated representative of the CITY and a representative of CONTRACTOR, listed below. All notices shall be addressed as follows unless a written change is filed with the City:

To City: To Contractor:

Zoe Glick, P.E. Jim Bui, P.E.

Senior Civil Engineer Project Manager
City of Santa Maria, Public Works Nichols Consulting Engineers, Chtd. 110 S. Pine Street, Suite 221 2300 E. Katella Avenue, Suite 125 Santa Maria, CA 93458 Anaheim, CA 92806
If the designated Representative or address of either party changes during the term of this agreement, a written notice shall be given to the other party prior to the effective date of change. Any written notices required under this agreement shall be effective five (5) days after deposit into United States mail, postage prepaid, addressed to the designated Representative, or upon confirmation of receipt of delivery if another notification process is used.

4.02. Compliance With Laws, etc. Contractor shall comply with all laws, including but not limited to the rules and policies of the City, in performing this agreement.

4.03. Integration. This agreement constitutes the entire agreement of the parties with respect to the subject matter. All modifications, amendments, or waivers of the terms of this agreement must be in writing and signed by the appropriate representatives of the parties.

4.04. Interpretation. This agreement shall be interpreted in accordance with the laws of the State of California.

4.05. Jurisdiction. Jurisdiction and venue of all disputes over the terms of this agreement shall be in the County of Northern Santa Barbara, State of California.

4.06. Warranty of authority. Each person signing this agreement on behalf of a party warrants that he or she has authority to do so.

4.07. No Waiver. Failure to enforce with respect to a default shall not be construed as a waiver.

4.08. Severability. The provisions of this agreement are severable. If any part Attachment B
of this agreement is held invalid by a court of competent jurisdiction, the remainder of the agreement shall remain in full force and effect unless amended or modified by mutual written consent of the parties.

4.09. Submittals. In addition to any other submittals required by this agreement, Contractor shall submit copies of its current business license and current certificate of workers compensation coverage to the City before beginning work on this project.

4.10 Prevailing Wage. Prevailing Wage. If applicable, Contractor and all subcontractors are required to pay the general prevailing wage rates of per diem wages and overtime and holiday wages determined by the Director of the Department of Industrial Relations under Section 1720 et seq. of the California Labor Code. The Director's determination is on file and open to inspection at www.dir.ca.gov and is referred to and made a part hereof; the wage rates therein ascertained, determined and specified are referred to and made a part hereof as though fully set forth herein. Further requirements are attached as Exhibit D.

IN WITNESS WHEREOF, this agreement is executed by the parties on the date first written above.

NICHOLS CONSULTING ENGINEERS,
CHTD. (NCE)
___________________________
Margot Yapp
President
CITY OF SANTA MARIA, a Municipal Corporation
Brett Fulgoni
Public Works Director
ATTEST:

Donna G. Schwartz
Chief Deputy City Clerk
APPROVED AS TO FORM:
_______________________________
Risk Manager
_______________________________
City Attorney
Attachment B

EXHIBIT A

SCOPE OF SERVICES
Project scope and delivery requirements
Contractor shall provide final design and PS&E and associated services for the ATP Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project. The task descriptions below are drawn from NCE’s technical proposal dated October 9, 2026. Optional services require separate written authorization from the City.

The current project footprint includes improvements within existing City street right-of-way and the off-street Jones Street trail on City-owned land adjacent to Allan Hancock College. City-owned property is not necessarily dedicated street right-of-way. No new property acquisition is currently anticipated.

Survey and mapping shall confirm the improvement footprint and any temporary access or easement needs. Trail construction or investigation on the private agricultural property south of Jones Street and east of US-101 is excluded.

Contractor shall incorporate the project’s environmental commitments, including at least 24 inches of vertical separation between the finished Jones Street trail surface and impacted soil. Contractor shall provide technical mapping and documentation within the scope of Tasks 2 and 3 to support the City’s right-of-way certification. The City will lead certification and secure required property approvals.

Contractor shall submit a City-approved schedule supporting a January 2027 Notice to Proceed, Ready to List in January 2028, and the City’s construction allocation request no later than February 29, 2028.

Progress meetings shall be biweekly. The City-approved schedule shall govern performance.

Task 1: Project Management, Coordination, and Quality Control Task 1.A: Project Management
NCE’s Project Manager (PM) will serve as the City’s single point of contact and will have primary responsibility for coordinating the efforts of the project team. Specific project management tasks to be conducted by the PM include monthly budgeting, invoicing, scheduling, and general project administration. The PM will arrange a kick-off meeting with the City to initiate the work. The objectives of the kick-off meeting will be:
• Review the scope of work.
• Establish paths of communication.
• Review project schedule and critical milestones.
• Review project requirements, including design objectives, budget, constraints, and criteria. The City’s requirements will be further defined during the meeting. • Request the pertinent ATP Grant Application and environmental approvals. • Review City Standard Design Criteria and latest City-adopted formats. • Request background information and as-builts.
• Obtain electronic file of the City’s cover sheet template, title block, and CAD Standards. At the kick-off meeting, key deliverables and the project schedule will be reviewed and adjusted to meet the City's needs.

The following meetings are included in the scope: kick-off/preliminary meeting (1 hour) and biweekly virtual progress meetings. The purpose of these meetings will be to confirm project assumptions, identify and resolve design issues that may surface, present design alternatives and recommendations, and continue coordination with project stakeholders, as necessary.

Deliverables: Kick-Off meeting and biweekly progress meeting agendas and minutes.

Attachment B
Task 1.B: Stakeholder Coordination
NCE can assist the City with coordination between the following stakeholders: other City departments, utility owners, Allan Hancock College, local school stakeholders, Santa Barbara County Flood Control District, and others as needed.

Deliverables: As-needed Stakeholder Coordination
Task 2: Design Basis Validation and Existing Conditions Task 2.A: Review Existing Conditions and Public Outreach Comments NCE will review available basemap information for the corridor provided by the City, including topographic survey information, utility information, drainage information, and traffic as-builts. We’ll also review the City’s ATP Grant Application and Environmental Commitments for data needs. This information combined with the Concept Plans included in the RFP will be the basis for evaluating the site constraints and required design data.

NCE’s staff will walk or drive the corridor as appropriate, focusing on the discrete intersection improvements. At this time, special attention will be given to the 3 intersections with “direct” storm drain impacts, 3 intersections with likely traffic signal conflicts, and the proposed Class I Trail on Jones St.

For specific areas of concern, we will also take photographs of the potential issues and brief measurements to help quantify the issue.

NCE will conduct up to one (1) day of pavement coring to determine the existing roadway thickness for the Jones Street re-grading including clearing the site with DigAlert and backfill with AC cold patch. This effort will also collect up to three (3) bulk subgrade samples for lab testing. We assume the City will issue NCE a no-fee encroachment permit for the work.

At this time we will also confirm drainage design criteria and methodology for the anticipated storm drain relocations at the Fesler Street and Depot Street intersection and re-grading for Jones Street and relocation of catch basins near the Bradley Channel. This may include coordination with City, the Santa Barbara Flood Control District. This may also include a consult with the local Water Board regarding the project’s exemption status from additional water quality improvements.

We will prepare a brief technical memorandum with our observations and submit to the City for their review and input. If needed, based on the City’s preliminary review, we may also conduct up to one (1) follow-up site meeting with City staff to clarify the site issues and finalize the approach for the 60% design phase.

NCE will also review the Public Outreach Comments and create a comment-response matrix. The comments that NCE and the City agree on will be incorporated into the 60% Submittal.

Deliverables: Field review summary and existing conditions constraints memo; design criteria memo; Public Comment- Response Matrix; Pavement Coring and Lab Testing Summary Task 2.B Basemap Preparation
Task 2.B.1 Topographic Survey
NCE’s project surveyor will conduct a topographic ground surveying effort augmenting the existing aerial basemap previously conducted by NCE. The effort will be divided into roadway improvement surveys and Jones St Trail survey. The mapping for roadway improvements will be compiled at an agreed-upon scale (1” = 40’ or similar) with a 1-foot contour interval focusing on the intersections and at least 1 cross section per block. The Jones St Trail survey will be compiled at an agreed upon scale (1” = 20’ or similar) with a 1-foot contour intervals and 50’ cross-sections suitable for corridor design. Both surveys will be horizontally tied to the California State Plane coordinate system (NAD83) based upon the current Santa Barbara County adjustment and vertically tied to the Santa Barbara County benchmark network (NAVD88).

The roadway improvement surveys will include top of curb, flowline, gutters, storm drain inlets (rim and invert elevations, pipe size and type), manholes (rim and invert elevations, pipe size and type), utility boxes and vaults, striping and other markings, driveways, sidewalks, fences, walls, gates, tree and tree wells, street furniture, light and utility poles, traffic signals, and signs. The intersection surveys will Attachment B
include 10’ grid spacing, including visible grade breaks. Medians will be included if they exist at the intersection. Limits covered by the intersection topo will extend 50 feet beyond the curb returns and up to the right of way lines.

The Jones St Trail survey will be similar to the roadway improvement surveys and also the following:
lateral extents to include existing off-street trail, part of Allan Hancock parking lot, and adjacent farmland, required elevations and breaklines, and storm drain outfalls (rim and invert elevations, pipe size and type).

Survey work will be performed under the direct supervision of a Professional Land Surveyor Licensed in the State of California. Work will be conducted in accordance with standard acceptable surveying practices.

Deliverables: CAD Basemap (DWG format)
Task 2.B.2 ROW Mapping
NCE’s project surveyor will collect supplemental ROW mapping information at intersections to confirm available ROW for bulb-outs, curb ramps, intersection improvements, and the proposed trail. Using recorded maps for the area around the corridor, the project surveyor will search for and collect survey monuments to be able to plot the recorded boundary. We will also gather grant deed and Caltrans descriptions of the right of way where available. In the area of Allan Hancock College, Flood Control Bradley Channel Crossing, Fairlawn Elementary School, Jones St along APN 128-064-010, Caltrans ROW at Broadway (SR-135) and Fesler St, and Caltrans ROW at US-101 and Jones St we will perform a more detailed boundary survey for your use in engaging with those entities in obtaining as-needed encroachment permits and temporary construction easements.

As the remainder of the corridor outside of the intersections envisions work primarily within the roadway pavement, it is assumed that the City already has sufficient ROW for those improvements. Therefore, only a high-level, Geographic Information Systems (GIS) based ROW boundary will be prepared for the remaining segments.

Deliverables: CAD ROW Map (DWG format)
Task 2.B.3 Underground Utility Locating and Potholing
Due to planned storm drain relocation work, NCE will collect additional underground mapping information for the Jones Street Corridor and intersection of Fesler and Depot Street. This investigation will include non-destructive underground utility locating such as ground penetrating radar (GPR) to supplement the previous topographic surveying effort. The utility locating will collect utility location data including possible utility type, approximate alignment, and approximate depth with markings painted on the pavement.

If needed for utility relocation and conflict checking, NCE’s utility locating sub-consultant can also direct the collection of various utility potholes in the pavement to determine actual utility depths. NCE will execute a no-fee encroachment permit with the City for performing utility potholing. Our utility locator will pre-mark locations and clear locations with DigAlert. Holes will be backfilled with excavated materials and capped with Asphalt Concrete cold patch.

Deliverables: Supplemental utility surveying data added to Basemap (DWG format), Utility Locating/Pothole Report (PDF).

Task 2.B.4 Updated Ortho Aerial Imagery (Optional)
As part of this task, NCE’s project surveyor will set temporary control points and collect up to 4.9 linear miles of color, aerial ortho-imagery of the project corridors to provide a more up to date aerial background as the existing project site may have been altered since the PA&ED phase, such as the in-fill of the original roadside drainage ditch along Jones Street. The mapping efforts will generally extend laterally 25’ behind the back of walk or edge of shared used path and longitudinally 100’ beyond the start/end limits.

Deliverables: Aerial Ortho-Imagery (GeoTIFF or similar) Attachment B
Task 2.C Supplemental Phase II ESA
Previous environmental sampling was performed within the trail footprint from S. College Dr to under US-101 to assess for the presence of contaminants related to a historical railroad corridor along the current proposed trail footprint. Contaminants including arsenic, lead, and organochlorine pesticides (OCPs) were detected at concentrations above select screening levels. The historical railroad corridor extends along the revised proposed trail footprint to the east of US-101. Therefore, it is possible previously detected contaminants are also present in this stretch of the trail footprint.

Task 2.C.1 Supplemental Phase II ESA Work Plan
NCE will prepare a Phase II ESA Work Plan proposing the location and number of soil samples to be collected, and the laboratory analytical analyses to be performed on the samples. To assess shallow soil conditions and to be consistent with the previous Phase II ESA, samples will be collected approximately every 150 linear feet along the approximately 2,500 linear feet of proposed trail footprint from east of US-101 to S. Suey Rd. Samples will be collected from the surface (0-0.5 feet below ground surface [bgs]) and 1.5 to 2 feet bgs using a hand auger and analyzed for lead and arsenic by United States Environmental Protection Agency (EPA) Method 6020, OCPs by EPA Method 8081, and polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270.

Deliverables: Supplemental Phase II ESA Work Plan (PDF).

Task 2.C.2 Supplemental Phase II ESA Sampling and Reporting NCE will implement the City-approved Phase II ESA Work Plan by contracting, coordinating, and overseeing a C-57 licensed drilling subcontractor and California-certified analytical laboratory. It is assumed that a Santa Barbara County Environmental Soil Boring permit will be required for the soil borings. It is anticipated that a total of 32 soil samples will be collected from 16 soil borings (2 samples per boring) over 2 days. Samples will be submitted to the analytical laboratory for chemical analysis on a standard 7- to 10-business day turnaround time. Upon receipt of the analytical results, NCE will prepare a Supplemental Phase II ESA Report summarizing sampling activities performed, results of the analytical analyses, and provide conclusions and recommendations to support final design, soil management, worker protection, and disposal requirements. Phase II ESA activities will be performed under the direct supervision of a Professional Geologist licensed in the State of California.

Based on the previous Phase I and II ESA documents and results of the Supplemental Phase II ESA, NCE will prepare a hazardous materials design-basis memorandum to compare capping contaminated soil in-place against excavation and disposal. The memorandum will identify locations where the preferred approach of capping in-place can occur and locations where excavation, characterization, transport, and disposal of contaminated soil is unavoidable.

Deliverables: Supplemental Phase II ESA Report (PDF), Hazardous Materials Design-Basis Memorandum (PDF).

Task 3: Agency, Right-of-Way, Utility, and Permit Coordination Task 3.A Utility Notification Letters
Working with other agencies, we have observed that utility letters receive more prompt attention when distributed by a City. Therefore, NCE will utilize a City-provided utility contact list and prepare a Utility “A Letter” on City letterhead for City distribution to both notify the utilities of impending intersection concrete/utility work and request available utility mapping information. NCE will track the progress of inbound and outbound responses in a utility tracking matrix.

Once the 90% PS&E has been prepared, or at a later City-preferred milestone NCE will also prepare a Utility “B Letter” on City letterhead for City distribution. This second letter will inform utility agencies of impending construction and clear the way for successful project bidding and construction.

Deliverables: Utility Tracking Matrix (Excel/PDF).

Attachment B
Task 3.B ROW Coordination Support
NCE can provide the City with as-needed Caltrans ROW support at US-101, Broadway (SR-135), and Main Street (SR-166). Support may include minor exhibits and technical information needed for Caltrans approval, environmental re-evaluation or documentation updates, and permit/encroachment submittals. This will also include identifying temporary construction access or easements with private homeowners and coordinating with the Santa Barbara County Flood Control District.

Deliverables: As needed ROW support
Task 3.C Department of Toxic Substances Control (DTSC) Pre-Application Should the preferred design option of capping contaminated soil in-place occur, DTSC oversight and long-term management of the cap will likely be required. NCE anticipates attending up to 1 meeting with the DTSC to discuss results of the Phase II ESA activities and establish the appropriate regulatory pathway for the project. NCE will prepare a memorandum to document the outcome of the regulatory meeting and identify anticipated long-term requirements for capping in-place such as land use restrictions, Operation & Maintenance (O&M) Plan/Agreement, and annual and 5-year reviews should DTSC oversight be required.

Deliverables: Regulatory Pathway Memorandum (PDF)
Task 4: 60% PS&E Submittal
The 60% draft PS&E will incorporate the various data collection efforts compiled as part of previous tasks, including available as-built information from the City. The improvements will incorporate typical design elements, including Public Right-of-Way Accessibility Guidelines (PROWAG)-compliant curb ramp layouts, bulb-out layouts, concrete flatwork, curb and gutter relocation, storm drain infrastructure relocation, and required Hot Mix Asphalt conforms. The curb ramp layouts will generally be included directly on the plan sheets, except where detailed curb ramp sheets are required due to utility conflicts or other existing complications. The bikeway improvements will include lane dimensions, required tapers, and bikeway barrier information. The Trail improvements will include pedestrian crossing enhancements, place making elements, pedestrian amenities, shade trees, site furnishing and irrigated plantings, Surface visible utility structures within the project footprint will be identified on the Plans for either adjustment or protection as appropriate.

Hydrologic and hydraulic calculations will be performed to determine drainage impacts and to support the design of the project improvements. Where large bulb-outs require substantial relocation or reconstruction of the adjacent storm drain system, dedicated utility relocation plans may be developed to ensure improvements do not impact other crossing underground utilities.

Impacted traffic signals and push buttons will be shown for relocation or adjustment as needed. Traffic signal modification plans will be included to relocate traffic signals and pedestrian pushbuttons conflicting with the proposed curb ramps and striping. We generally assume signal modification plans can be prepared as a streamlined plan set. Improvement information for the 12 Rectangular Rapid-Flashing Beacons (RRFBs) intersections will also be streamlined and typically include equipment schedules and conductor schedules directly on the roadway improvement plans.

Landscaping and irrigation plans for the Jones St Trail will indicate the relative locations for site improvements including placemaking features, plantings, aggregate mulches, boulders, irrigation, details, and plant palette.

Draft Soil Management and Air Monitoring Plans will be prepared for trail segments where soil disturbance and contaminated soil will be encountered. An Environmental Commitments Matrix will be prepared to identify responsible parties and their involvement with the project. A drainage memorandum will document the criteria, methodology, and results of the hydrologic and hydraulic calculations to support design development.

The Plans will be prepared in AutoCAD format on 24” x 36” sheets, utilizing the City Title Block and CAD Template as agreed upon during Task 1 and drawn at a scale of 1” = 40’ for street improvements Attachment B
and 1” = 20’ for Jones Street Trail improvements. Striping and signage plans will be prepared at a scale of 1” = 40’.

Anticipated 60% Street Improvement Plan List:
• (1) – Cover Page
• (1) – Notes, Legends, and Abbreviations
• (1) – Construction Details
• (14) – Improvement Plans (Plan/Plan)
• (10) – Improvement Plans Jones Street (Plan/Profile)
• (19) – Striping and Signage Plans (Plan/Plan)
• (3) – Storm Drain Relocation Plan (Intersection)
• (3) – Traffic Signal Modification Plan (Intersection) • (5) – Planting and Details Plans for all landscaped areas • (5) – Irrigation Plans and Details for irrigated areas • (14) – Curb Ramp Details [3 for bulb-outs, 11 for other locations] The Engineer’s Estimate of Probable Construction Cost will be prepared in Microsoft Excel format using a Bid Item format and will be based on recent construction cost data available to NCE for projects of this type.

NCE assumes the City will provide boilerplate specifications suitable for the development of the roadway rehabilitation project in Microsoft Word format. NCE will provide revisions to the Special Provisions related to the specifications for materials or construction related to our bid items using Caltrans Specifications. NCE assumes the City will develop the “front-end” specifications, including the overall bid book. An appendix to the Specifications will be prepared for environmental commitments and inspection schedules for items such as nesting-bird surveys and legless lizard surveys.

Deliverables: 60% Engineering Plans (PDF), Draft Soil Management Plan (MS Word), Draft Air Monitoring Plan (MS Word), Cost Estimate (PDF), and Technical Specifications (MS Word); Draft Environmental Commitments Matrix (MS Word), Draft Drainage Memorandum (PDF) Task 5: 90% PS&E Submittal
The 60% PS&E will be revised to incorporate design review comments received from the City. NCE will meet with the City to review these comments, from which the Draft 90% PS&E will be prepared. NCE will further refine the design to a 90% level of design at this stage. This will include fine-tuning of grading and improvement plans for the bulb-outs, adjusting the traffic signal plans, adjusting the storm drain design as needed, incorporating stakeholder feedback, and refining the Draft Soil Management and Air Monitoring Plans. The draft 90% PS&E will then be packaged and submitted similarly to the 60% PS&E, unless directed otherwise. The drainage memorandum will be revised to reflect the 90% design.

Deliverables: 90% Engineering Plans (PDF), Draft Soil Management Plan (MS Word), Draft Air Monitoring Plan (MS Word), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix, 90% Drainage Memorandum.

Task 6: Final (100%) PS&E and Ready-to-List Package
The 90% PS&E will be prepared to incorporate final design review comments received from the City.

NCE will meet with the City to review these comments, from which the Final PS&E will be prepared.

The Final PS&E will be prepared and sent to the City in a bid-ready format. The Soil Management and Air Monitoring Plans will be finalized and included with the Final PS&E. The drainage memorandum will be revised, as needed, to reflect the final design.

Deliverables: Final Engineering Plans (PDF), Cost Estimate (PDF), and Technical Specifications (MS Word), Comment Resolution Matrix, Final Soil Management Plan (PDF), and Final Air Monitoring Plan (PDF), Final Drainage Memorandum.

Attachment B
Task 7: Bid and Construction Support (Optional)
Task 7.A Design Services During Bidding
NCE may provide design services during bidding as an optional task. During the bidding period, this may include responding to one round of written contractors’ inquiries from a question and answer (Q&A) phase, providing revisions to the bid documents due to clarifications from the Q&A phase, and preparing up to 1 Bid Document Addendum.

Deliverables: As-needed bidding Q&A responses and bid document addenda (up to one [1]) Task 7.B Design Services During Construction
NCE may provide design services during construction as an optional task. We assume the construction project will be professionally managed by the City’s Construction Manager (CM), including the required inspection staff. Once the project has been awarded to a Contractor, NCE anticipates attendance at the construction kick-off meeting, responding to contractor requests for information (assume up to three [3] Request for Information [RFI]), and providing recommendations for necessary changes to the construction documents due to unforeseen field conditions. Construction support will also include material submittal review for conformance with the NCE-developed Technical Provisions.

The limited number of hours to provide construction phase design support in the Fee Estimate is an estimate only. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: As-needed RFI responses (up to three [3]) and submittal review during construction.

Task 8: Record Drawings / As-Built Support (Optional)
NCE may provide record drawings and as-built support as an optional task. We assume the City’s CM will provide legible, consolidated as-built plan redlines for NCE to develop into a digital as-built of the project Plans. NCE will submit an electronic copy of the as-builts to the City in PDF format. We assume a limited number of hours to prepare as-built drawings. The actual cost will be dependent on the City and Contractor and will be billed on a time and materials basis.

Deliverables: Digital as-built of the Plans (PDF) and CAD E-Transmittal.

Task 9: DTSC and Site Management Regulatory Services (Optional) NCE may provide support and enrollment in the DTSC Voluntary Cleanup Program (VCP) as an optional task if it is determined DTSC oversight is required. NCE will assist the City with preparation and submittal of a VCP application and any other technical submittals required by DTSC such as a Preliminary Endangerment Assessment or Health Risk Assessment. Additionally, NCE will prepare technical submittals for the long-term management of the capped contaminated soil, including an O&M Plan that incorporates a framework for routine annual and 5-year reviews. Preparation of the technical submittals assumes no additional environmental sampling, other than the Supplemental Phase II ESA, will be necessary.

Deliverables: Regulatory applications and agreements (PDF), Preliminary Endangerment Assessment (PDF), Health Risk Assessment (PDF), and an O&M Plan (PDF).

Attachment B

EXHIBIT B

PAYMENT
I. Progress Authorization
Written authorization to proceed from the City authorizes Contractor to incur costs up to the total not-to-exceed amount of NINE HUNDRED SEVENTY-EIGHT THOUSAND NINE HUNDRED FORTY-NINE DOLLARS AND ZERO CENTS ($978,949) for all services under this Agreement, including authorized optional services identified below. No work shall commence until the City issues a written Notice to Proceed.

Compensation shall be based on NCE’s negotiated ATP Cycle 6 cost proposal dated October 9, to be attached to and incorporated into this Exhibit “B.” The total includes $881,718 for base services and $97,231 for optional services. Optional services consist of:
 Updated ortho aerial imagery (Task 2.B.4): $12,001.
 Bid and construction support (Task 7): $45,655.
 Record drawings/as-built support (Task 8): $12,865.
 DTSC and site management regulatory services (Task 9): $26,710.

Optional services shall be performed only as needed and directed in writing by the City.

Inclusion of an optional service in the budget does not require the City to authorize its use.

Contractor shall bill only for services performed and authorized costs incurred.

II. Invoice procedure.

A. Payment shall be monthly based on the billable charges.

Task Description Budget
1 Project Management, Coordination, and Quality Control $51,840 2 Design Basis Validation and Existing Conditions (with Optional) $205,444
3 Agency, Right-of-Way, Utility, and Permit Coordination $34,750 4 PS&E – 60% Design Submittal $301,155
5 PS&E – 90% Design Submittal $181,290
6 Final (100%) PS&E and Ready-to-List Package $119,240
7 Bid and Construction Support (Optional) $45,655
8 Record Drawings/As-Built Support (Optional) $12,865
9 DTSC and Site Management Regulatory Services (Optional) $26,710 Total Not-to-Exceed Amount $978,949
Attachment B
B. The Contractor shall present the bill for charges from the previous month.

C. The Contractor's bill shall be substantiated by appropriate documentation, and include an itemized listing of personnel, subcontractors, and other direct costs incurred.

D. City may withhold payment for disputed work. Payment of fees shall not constitute an acceptance of work.

Rates shall be billed according to Contractor’s attached fee schedule, up to the not-to-exceed amount. Work Authorized by Change Order/Amendment shall be billed at on a time and materials basis according to the attached fee schedule, unless another payment method is agreed to in writing by the City prior to initiation of work.

III. Maximum billable amounts
Under no circumstance shall the total of all payments to the Consultant exceed ninety percent (90%) of the maximum not-to-exceed cost, prior to acceptance by the City of all items to be completed as noted within Exhibit "A".

IV. Consultant Fee Schedule (continued on next page)
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B

EXHIBIT C

INSURANCE REQUIREMENTS
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, his/her agents, representatives, or employees. If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant.

A. Minimum Scope of Insurance
Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001), including products and completed operations, property damage, bodily injury and personal & advertising injury.

2. Insurance Services Office Business Auto Coverage Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, covering hired (Code 8) and non-owned autos (Code 9).

3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance.

4. Errors and Omissions liability insurance appropriate to the Consultant's profession.

Architects' and engineers' coverage is to be endorsed to include contractual liability.

5. Cyber Liability Insurance, Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.

B. Minimum Limits of Insurance
Consultant shall maintain limits no less than:

1. General Liability - $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability - $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: Statutory limits.

4. Employer's Liability - $1,000,000 per accident for bodily injury or disease.

5. Errors and Omissions Liability - $1,000,000 per occurrence or claim, $2,000,000 aggregate.

Attachment B

6. Cyber Liability- $2,000,000 per occurrence or claim, $2,000,000 aggregate.

C. Self-insured Retentions
Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration and defense expenses within the retention.

D. Other Insurance Provisions
The liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form or an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38 and CG 20 37 forms if later revisions are used).

2. For any claims related to this project, the Consultant's insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled or reduced, except with notice stating the title of this contract to the City. All notices provided pursuant to this Agreement shall be given to the City representative listed for notice in this agreement and shall specify the title of this Agreement. Notice may be given by overnight mail, facsimile with confirmation of receipt, or certified mail with return-receipt requested.

4. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

5. If any of the required policies provide claims-made coverage:
a. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. c. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

E. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.

F. Verification of Coverage
Attachment B
Consultant shall furnish the City with original certificates and amendatory endorsements of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences.

However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

G. Special Risks or Circumstances
The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Attachment B

EXHIBIT D

PREVAILING WAGE REQUIREMENTS FOR MAINTENANCE WORK, DESIGN AND PRECONSTRUCTION

PHASES OF CONSTRUCTION, AND INSTALLATIONS
The terms of this Exhibit apply to all Public Works projects for over $1,000.

For purposes of this Exhibit, “Public Works” includes any project of a type defined in California Labor Code section 1720 when paid for in whole or in part by public funds. These projects include: construction, alteration, demolition, installation, or repair work done under contract.

For purposes of this definition, "construction" includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including, but not limited to, inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. For purposes of this definition, "installation" includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.

Pursuant to California Labor Code sections 1720 and 1771, construction, alteration, demolition, installation, repair and maintenance work performed under this Agreement is subject to State prevailing wage laws. State prevailing wage laws require certain provisions be included in all contracts for public works. The CONTRACTOR and any subcontractors shall comply with all applicable State prevailing wage laws, whether included in this agreement or inadvertently omitted, including but not limited to the requirements listed below:

1. Compliance with Prevailing Wage Requirements. Pursuant to California Labor Code sections 1720 through 1861, the CONTRACTOR and all subcontractors shall ensure that all workers who perform work under this Agreement are paid not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations (DIR). This includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including but not limited to inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the post-construction phases of construction, including but not limited to all cleanup work at the jobsite.

1.1. Copies of such prevailing rate of per diem wages are on file at the City Public Works Department and are available for inspection to any interested party on request.

Copies of the prevailing rate of per diem wages also may be found at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. The CONTRACTOR and all subcontractors shall post a copy of the prevailing rate of per diem wages determination at each job site and shall make them available to any interested party upon request.

1.2. The wage rates determined by the DIR refer to expiration dates. If the published wage rate does not refer to a predetermined wage rate to be paid after the expiration date, then the published rate of wage shall be in effect for the life of this Agreement. If the published wage rate refers to a predetermined wage rate to become effective upon expiration of the published wage rate and the predetermined wage rate is on file with the DIR, such predetermined wage rate shall become effective on the date following the expiration date and shall apply to this Agreement in the same manner as if it had been published in said publication. If the predetermined wage rate refers to one or more Attachment B
additional expiration dates with additional predetermined wage rates, which expiration dates occur during the life of this Agreement, each successive predetermined wage rate shall apply to this Agreement on the date following the expiration date of the previous wage rate.

If the last of such predetermined wage rates expires during the life of this Agreement, such wage rate shall apply to the balance of the Agreement.

2.Penalties for Violations. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1775 in the event a worker is paid less than the prevailing wage rate for the work or craft in which the worker is employed. This shall be in addition to any other applicable penalties allowed under California Labor Code sections 1720 through 1861.

3. Payroll Records. The CONTRACTOR and all subcontractors shall comply with California Labor Code section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection.

The CONTRACTOR shall require all subcontractors to also comply with section 1776. The CONTRACTOR and all subcontractors shall furnish records specified in section 1776 on a monthly basis, both to the City and directly to the Labor Commissioner in the manner required by California Labor Code section 1771.4. The CONTRACTOR shall ensure its subcontractors prepare and submit payroll records to the City and the DIR as required by this section. The City may require the CONTRACTOR and its subcontractors to prepare and submit records specified in section 1776 to the City and the Labor Commissioner on a weekly basis, at no additional cost to the City.

4. Apprentices. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1777.5, 1777.6 and 1777.7 concerning the employment and wages of apprentices. The CONTRACTOR is responsible for compliance with this section for all apprenticeable occupations pursuant to California Labor Code section 1777.5(n).

5. Working Hours. The CONTRACTOR and all subcontractors shall comply with California Labor Code sections 1810 through 1815, including but not limited to: (i) restrict working hours on public works contracts to eight hours a day and forty hours a week, unless all hours worked in excess of 8 hours per day are compensated at not less than 1½ times the basic rate of pay; and (ii) specify penalties to be imposed on CONTRACTORs and subcontractors of $25 per worker per day for each day the worker works more than 8 hours per day and 40 hours per week in violation of California Labor Code sections 1810 through 1815.

6. Required Provisions for Subcontracts. The CONTRACTOR shall include, at a minimum, a copy of the following provisions in any contract they enter into with a subcontractor: California Labor Code sections 1771, 1771.1, 1775, 1776, 1777.5, 1810, 1813, 1815, 1860 and 1861.

7. Labor Code Section 1861 Certification. In accordance with California Labor Code section 3700, the CONTRACTOR is required to secure the payment of compensation of its employees. By signing the Agreement, to which this is an exhibit, the CONTRACTOR certifies that:
“I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers’ compensation or to Attachment B
undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Agreement.”

8. Compliance Monitoring and Enforcement. This project is subject to compliance monitoring and enforcement by the DIR. The City must withhold contract payments from the CONTRACTOR as directed by the DIR, pursuant to California Labor Code section 1727.

9. CONTRACTOR and Subcontractor Registration Requirements. The CONTRACTOR and all subcontractors shall not engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to California Labor Code section 1725.5 CONTRACTOR certifies that the CONTRACTOR has verified that all CONTRACTOR and all subcontractors (if any approved by City) used on this project are registered with the DIR in compliance with California Labor Code sections 1771.1 and 1725.5. The CONTRACTOR shall provide proof of registration for themselves and all listed subcontractors to the City at the time of signature of contract and immediately upon any changes or City’s request.

10.Stop Order. Where a CONTRACTOR or subcontractor engages in the performance of any public work contract without having been registered in violation of California Labor Code sections 1725.5 or 1771.1, the Labor Commissioner must issue and serve a stop order prohibiting the use of the unregistered CONTRACTOR or subcontractor on ALL public works until the unregistered CONTRACTOR or subcontractor is registered. Failure to observe a stop order is a misdemeanor.