COUNCIL AGENDA REPORT
TO: Mayor and City Council
FROM: Brett Fulgoni, Director of Public Works
DATE: November 3, 2026
SUBJECT: Adoption of a Resolution Awarding a Professional Services Agreement to Nichols Consulting Engineers for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements Project
Description:

The City Council will consider adopting a Resolution awarding an Agreement to Nichols Consulting Engineers (NCE) for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project.

Environmental Notice: The Project qualifies for a Statutory Exemption pursuant to Section 15301 - Class 1: Existing facilities pursuant to the California Environmental Quality Act State Guidelines.

RECOMMENDATION:

1. Adopt a Resolution awarding a Professional Services Agreement to Nichols Consulting Engineers for final design and preparation of Plans, Specifications, and Estimate and associated services for the Active Transportation Program Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements project in a not-to-exceed amount of $978,949; and

2. Authorize the City Manager or designee to execute the agreement.

BACKGROUND:

The City received Active Transportation Program (ATP) Cycle 6 grant funding for the Active Santa Maria Safe Routes to School Corridor Improvements project. The project includes bicycle and pedestrian improvements along Fesler Street, Bradley Road, East Jones Street, and connecting neighborhood routes. Improvements include Class I, II, III, and IV bicycle facilities, accessible curb ramps, painted curb extensions, enhanced crossings, rectangular rapid-flashing beacons, signing and striping, drainage and utility adjustments, and trail landscaping and amenities.

The project has advanced through Project Approval and Environmental Documentation (PA&ED) and approximately 30 percent conceptual design. Nichols Consulting Engineers (NCE) prepared concept plans, cost estimate, and supporting environmental documentation. The Jones Street trail includes an off-street segment on City-owned land adjacent to Allan Hancock College and a segment east of US-101 within the existing 2 Jones Street right-of-way through Suey Road. The City has completed California Environmental Quality Act documentation, and final design will incorporate applicable environmental commitments.

DISCUSSION:

The city solicited proposals through PlanetBids using a qualifications-based selection process, with a proposal submission deadline of October 9, 2026. Following review of the proposals, staff selected NCE as the most qualified firm to provide the services requested.

The proposed Agreement includes surveying, existing conditions verification, utility and right-of-way coordination, supplemental environmental investigation, and preparation of preliminary through final PS&E. Design will address drainage, utility, and traffic signal modifications needed to implement the bicycle and pedestrian improvements. The Agreement also includes optional services for updated aerial imagery, bidding and construction-phase design support, record drawings, and Department of Toxic Substances Control (DTSC) coordination and site management regulatory services.

Staff recommends awarding the full not-to-exceed amount of $978,949, including optional updated ortho aerial imagery, bid and construction-phase design support, record drawings/as-built support, and additional DTSC and site management regulatory services if needed. These services will be used as needed and directed by the City.

The Engineering Division will manage the Agreement and coordinate with NCE on a schedule supporting a Ready to List in January 2028 and the City’s construction allocation request no later than February 29, 2028. The City will lead right-of-way certification and required property approvals, with mapping and technical support from NCE. City ownership of the off-street trail strip will be documented separately from dedicated street right-of-way.

Alternative(s)
The City Council could decline to award the Agreement and direct staff to revise the scope or issue another Request for Proposals. These alternatives are not recommended because they would delay final design and could affect the City’s ability to meet grant delivery milestones.

Fiscal Considerations
The proposed Agreement has a total not-to-exceed amount of $978,949, consisting of $881,718 for base services and $97,231 for optional services. The optional services include:
 Updated aerial ortho imagery: $12,001.
 Bidding and construction-phase design support: $45,655.  Record drawings/as-built support: $12,865.
 DTSC and site management regulatory services: $26,710.

The Agreement will be funded through the ATP CMEP PW-04 project account (FD464 | CC1120 | SC7425), with Measure A, Alternative Transportation funds supplementing the 3 project account as necessary. These funds support bicycle and pedestrian transportation improvements.

Impact on the Community
The project will improve safety, accessibility, and connectivity for people walking and bicycling to schools, Allan Hancock College, transit, and surrounding neighborhoods.

Improvements will reduce pedestrian crossing distances, increase visibility, upgrade curb ramps and bicycle facilities, and create a paved Jones Street trail connection.

Other Agency Review
The project will require coordination with Caltrans regarding grant administration, construction allocation, and interfaces at US-101, Broadway/State Route 135, and Main Street/State Route 166. NCE will also coordinate with Santa Barbara County Flood Control District regarding Bradley Channel, utility providers, Allan Hancock College, and school stakeholders. DTSC coordination will establish the appropriate regulatory pathway for contaminated-soil management.