Cities Index.
Attachment N - Planned Development and Conditional Use Permit.pdf

Santa Maria City Council
November 17, 2026

Document
Attachment N - Planned Development and Conditional Use Permit.pdf
Meeting
November 17, 2026
Body
Santa Maria City Council
Original file
464 KB
Text extracted from the city's file for reading and search. Open the original on pub-santamaria.escribemeetings.com. That file is the official record.

Attachment N

CITY OF SANTA MARIA

PLANNED DEVELOPMENT PERMIT AND

CONDITIONAL USE PERMIT
PLANNING DIVISION  110 SOUTH PINE STREET ROOM 101  SANTA MARIA, CA 93458  805.925.0951 X 2244 PERMIT NO. PD2025-0001 and U2025-0002_____________________

APPROVAL DATE November 17, 2026 _________________________________________ PROJECT NAME Courtyard at Hidden Pines
APPLICANT/OWNER Urban Planning Concepts, Inc./Dan Patin ADDRESS/LOCATION 2415 North Railroad Avenue
DESCRIPTION Planned Development Permit (PD2025-0001) and Conditional Use Permit (U2025-0002) for Dan Patin to establish a mixed-use subdivision to create seven lots consisting of six attached single-family dwellings each on their own lot, and a common lot with eight market-rate apartments, 21,041-square-feet of neighborhood-scale commercial, outdoor gathering space and amenities, 72 parking spaces, and associated improvements on a 2.8-acre site in a proposed PD/R-2 (Planned Development/Medium Density Residential) zone of the North Preisker Ranch Specific Plan.

FINDINGS
The City Council of Santa Maria hereby approves the following project in accordance with the application submitted and hereby makes the required findings in accordance with Section 12-35.105 and 12-35.203 of the Municipal Code, including the following:

A. That the project meets the vision, intent, and requirements of the North Preisker Ranch Specific Plan and the General Plan because the mixed-use development is proposed with for-sale residential attached single family and walk up multi-family housing units and neighborhood-scale commercial which is consistent with Goal LU-5: Housing stock, which aims to ensure an adequate supply of high-quality local housing stock is available to residents of all ages and abilities. The project would implement Policy LU-5.1: Housing variety. Continue to support a variety of housing types, unit sizes, and building densities in Santa Maria to support residents at differing life stages and socio-economic statuses. The project would meet Policy LU-5.2: Siting of infill development. Promote new infill housing in areas that are underutilized and in close proximity to parks, recreation, public amenities, and local goods and services. The commercial component would bring local goods and PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 2 -
services to an area that does not currently have such goods and services in close proximity. The development would contribute to attainment of Goal LU-1, which calls for a balanced mix of land uses that meets the present and future housing, employment, and recreation needs of the community by incorporating both neighborhood scale commercial and recreational uses into the project for the surrounding neighborhood. Except for the requested modifications to setbacks and development standards discussed below, the project is consistent with the North Preisker Ranch Specific Plan and the City of Santa Maria Municipal Code.

B. That the site for the proposed use is adequate in size and topography to accommodate the use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly adapt such use with the land and uses in the vicinity. With approval of the requested modifications in this permit and accompanying Tentative Tract Map, the project will be consistent with applicable Municipal Code design measures and development standards for the PD/R-2 zone, including but not limited to density, landscaping, building height and vehicular access. The site is adequately sized to accommodate the proposed residential use, and the construction of the six-unit small lot single-family residential development and mixed-use development of an eight-unit two-story walk-up residential building with neighborhood scale commercial and recreation buildings would adapt with the land and uses in the vicinity which includes a similar land use pattern of lower and medium density residential development.

C. That the site for the proposed use relates to streets and highways adequate in width and pavement type to carry the quantity and kind of traffic generated by the proposed use. The design of the new private driveways within the project site has been reviewed and approved by the City’s Public Works Engineering Division and the Fire Department for access and safety. Railroad Avenue and Hidden Pines Drive, as well as the area intersections, are all adequately designed in width and pavement type to serve the project.

D. That the proposed use will have no adverse effect upon abutting property as the construction of the mixed-use development and establishment of the residential and neighborhood commercial mixed-uses would be self-sustained by providing on-site parking, including two-car garages for the single-family residences, one-space-per-unit for the multi-family residential units, two spaces per court for the pickleball center, sufficient parking for the neighborhood-serving retail uses, and additional parking for the courtyard open-air temporary seasonal event uses. The latter open-air use would be subject to separate Special Temporary Activity Permitting requirements and conditions to ensure these uses are also self-sustained on site.

E. That the establishment, maintenance and/or conducting of the use for which the planned development review is sought will not, under the circumstances of the particular case, be detrimental to the health, safety, morals, or welfare of persons residing or working in the neighborhood of such use and will not, under the circumstances of the particular case, be detrimental to the public welfare, injurious to property or improvements in the neighborhood; nor shall the use be inconsistent PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 3 -
with the character of the neighborhood or contrary to its orderly development. With the approval of the requested modifications, the project will be consistent with applicable Municipal Code design measures and development standards for the PD/R-2 zone, including but not limited to parking, landscaping, setbacks, building height and vehicular access. The project would provide adequate space for setbacks, parking, and landscaping to ensure that no nuisances would be created by the establishment of the project.

The mitigation measures from the 1992 Final Environmental Impact Report (EIR; State Clearinghouse [SCH] #90010930) for the City of Santa Maria Sphere of Influence Boundary Amendment and Concurrent Annexation, conditions of approval and development standards required for this project address and alleviate any potential adverse impacts that could result from the proposed use. Therefore, the project would be compatible with the adjoining land uses and would not be more obnoxious or detrimental to the health of the public than any of the uses established at the project area, or any of the uses listed in the PD/R-2 section of the Municipal Code or North Preisker Ranch Specific Plan.

F. That the conditions stated in the decision are necessary to protect the public health, safety and general welfare.

G. The proposed modification(s) are otherwise consistent with the General Plan, Municipal Code and applicable Specific Plans. The requested modifications to the front and side yard setback standards for Lots 1 through 6, zero-foot setbacks for the commercial buildings along the street frontage, establishment of a parking ratio of two parking spaces per indoor pickleball court, and a parking reduction of one space for the open air courtyard event space, are otherwise consistent with applicable Municipal Code and North Preisker Ranch Specific Plan design measures and development standards for the PD/R-2 zone. The Mixed-Use Ordinance seeks projects such as this that are compact in that it contains the highest and best use for the land it occupies, it is connected by safe streets, sidewalks and multi-purpose trails, and is walkable/transit accessible so it is easily accessible without the benefit of an automobile. The commercial buildings are set back from the street by an average of 18 feet, which is more than the ten-foot setback required for Community Commercial uses elsewhere in the city. Further, mixed-use development is encouraged by the City’s Housing Element Policy 1.3, and Program 1.C allows decisionmakers to grant reduced standards for parking, and setbacks.

H. The project includes superior design elements that mitigate or compensate for any potential impact of the proposed modification(s) on the surrounding area. The requested modification to the required yard setbacks and parking will allow the project to provide a compact, affordable for-sale housing type, and a commercial component both of which are encouraged by the general plan and the Mixed-Use ordinance of the Municipal Code for mixed-use development.

The project includes superior design elements such as ample amenities and open space for residents in the subdivision through creation of a courtyard area and PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 4 -
gazebo, neighborhood scale commercial goods and services for necessities, and recreational opportunities at the proposed recreation center. Each single-family lot would have 350-square-feet of private open space areas, consistent with the requirements of the R-2 development standards. The mixed-use component provides sufficient safe and accessible plazas and greenways for active and passive enjoyment, provides ample trees, bicycle parking and electric vehicle charging, and encourages neighbors to reduce traffic by providing safe and comfortable access for bicycles and pedestrians.

I. The proposed modification(s) are essential to the design of the project. The requested modifications to the side yard setback standards for Lots 1 through 6, zero-foot street frontage setbacks for the commercial buildings, establishment of a parking ratio of two parking spaces per indoor pickleball court, and parking reduction of one space for the open air courtyard event space are essential to allow the project to comply with the North Preisker Ranch Specific Plan development standards and allow for the proposed density of development at five dwelling units per acre while providing space to create a neighborhood commercial mixed-use component. The project provides the city with needed housing variety by providing attached single-family homes and walk-up multi-family residential units at the density allowed by the LMDR land use designation. Incorporation of the commercial uses on the project site would provide the surrounding residences with day-to-day essentials, which is consistent with the goals of the General Plan to create complete communities with a balanced mix of land uses that meet the present and future housing, employment, and recreation needs of the community.

J. The proposed modifications have been minimized to the maximum extent possible consistent with Subsections (a) through (c) of Section 12-35.203 of the Municipal Code. The requested setback reduction is required in order to provide an attached single-family housing type as well as a mixed-use commercial component. The proposed parking ratio for the pickleball courts is required as none of the parking standards in the Municipal Code provide an equivalent to the proposed indoor sports courts, and the open-air courtyard event space would be utilized on an occasional, seasonal basis. Any event in the courtyard would be required to obtain a Special Temporary Activity Permit, which would require its own findings for approval, and incorporate conditions of approval that would manage and control event operations. The proposed project would comply with all other setback and parking requirements, as well as Specific Plan development standards.

K. The Project was adequately covered in a previously adopted Environmental Impact Report (SCH# 90010930) and only minor technical changes were required; therefore, an Addendum has been prepared pursuant to California Environmental Quality Act State Guidelines Section 15164.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 5 -

CONDITIONS OF APPROVAL
The project is approved subject to the following Conditions of Approval:

Community Development Department

1. Project Description: The permittee shall comply with the project description, plan set entitled Courtyard at Hidden Pines consisting of 25 pages dated April 29, 2025, and Conditions of Approval of this permit.

Commercial uses for the project are to be limited to those permitted in the Community Commercial (CC) zone district unless otherwise allowed through this permit or a separate conditional use permit. The recreation building is proposed for pickleball recreation use only. Accessory use and activities must be incidental to, and do not substantially alter the character of, any permitted principal use.

Any changes from the project description, Plan Set, or conditions may require a permit amendment. Contact the Planning Division prior to changing anything described on the Plan Set or in the project description.

2. Color and Materials: A sample of all paint colors and materials to be used on the project site shall be submitted to the Planning Division for review for consistency with City Council approval prior to issuance of building permits. Paint colors shall be provided in the form of paint chips.

3. Architectural Elements: All architectural elements such as parapet walls, tower features, and architectural features shall include architectural details on all sides to provide 360-degree architecture and eliminate the appearance of a false façade.

4. Parking Area: 79 parking spaces are required, and 72 spaces are provided. The off-street parking area and access shall be paved and double striped in accordance with City parking standards. The parking area shall be maintained and regularly resealed and restriped. Please note that a building permit is required for restriping. The striping shall be visible at all times, and the parking area shall be void of potholes and depressions.

5. Events: Any event proposed on the project site requires a separate Special Temporary Activity Permit in accordance with Chapter 12-35, Article 6 of the Santa Maria Municipal Code.

6. Parking Management Plan: The operator of any community events, farmers markets, sports tournaments or similar events in the open-air courtyard or in the recreation building, shall apply for a Temporary Special Activity Permit with the Planning Division. Application materials shall include a parking and event traffic management plan to minimize the potential overflow of vehicles from the project site into the surrounding neighborhood.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 6 -

7. Bike Racks/Storage: Bike racks and/or storage shall be installed. The location, design and number shall be approved by the Planning Division during the building permit review process and in conformance with the standards of City’s Active Transportation Plan.

8. Trash Enclosure: Each trash receptacle shall be stored in an enclosure. The final development plan submitted for the building permit shall specify size and location of all trash collection areas and the enclosure shall be constructed in accordance with the approved plan. The location and design shall be approved by the Community Development Department and the Public Works Department. The trash enclosure shall meet City Standards as well as be designed in keeping with the architecture and style of the project.

Trash areas that are located adjacent to parking spaces shall be set back a minimum of ten feet to provide sight distance for automobiles backing out of the parking space.

9. Ongoing Site Maintenance: The entire site shall be permanently maintained free of accumulated dirt and litter and in an otherwise neat and attractive manner and adhere to the requirements of the Santa Maria Municipal Code. Any graffiti on the property shall be promptly painted out. All landscaping areas on the property shall be permanently maintained with healthy, growing plant material, free from weeds.

Dead or dying plant material shall be replaced within one month of plant deterioration.

Failure to comply with this condition is a public nuisance and is subject to the adopted Citation Ordinance of the City of Santa Maria.

10. CC&Rs: CC&Rs shall be reviewed and approved by the Planning Division prior to first occupancy, if not already recorded with the Final Map for Tract 6044, and shall contain the following provisions:

A. Maintenance of all required landscaping.

B. Maintenance of stormwater control measures/underground basins C. Maintenance of subdivision boundary walls
D. Maintenance of residential fences
E. Site maintenance
F. Private street maintenance
G. Maintenance of the common area plazas
H. Storage of oversized trucks, trailers, recreation vehicles, boats, etc.

I. Events in the neighborhood commercial center procedures and expectations

11. Landscape Plan: A Landscape Plan, which includes the size and species of plants, a layout of the irrigation system incorporating time clocks and/or moisture sensors, and a maintenance and watering schedule, shall be submitted to the Community Development Department for plan checking and approval. The specific planting design of the landscape area and species of trees and plants shall be subject to approval of the Planning Division during the plan check review process. The PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 7 -
landscape plan shall be prepared in accordance with Chapter 12-44 of the Municipal Code, Landscape Standards. Backflow prevention devices shall be screened with plant material and located to maximize aesthetics.

12. Landscape and Tree Maintenance: The applicant shall develop landscape and tree maintenance standards that shall be provided to any landscape contractor hired to work on the site. The standards shall be reviewed and approved by the Planning Division prior to first occupancy. The program shall require:

A. All on-site trees be properly maintained to retain a natural shape and size for the long-term health of the tree consistent with the natural growth pattern of its particular species and current ANSI A300 standards; B. Any tree topped, severely pruned or severely thinned out, subject to the determination of the Planning Division, requires a large-size replacement.

C. Ground cover and shrubbery shall be regularly maintained and pruned in a manner that encourages healthy growth and flower production. Shrubs shall not be severely sheered or formed into unnatural shapes.

13. Tree Planting: The project shall provide the trees depicted on the landscape plan.

The trees species selected shall be subject to Planning Staff review according to City Council approval. Trees shall be a minimum of 15-gallon size.

14. Landscape Irrigation Water Meter: A separate appropriately-sized irrigation meter is required for new non-residential projects with irrigated landscape areas totaling 1,000 square feet or greater, and for new residential projects with irrigated landscape areas totaling 5,000 square feet or greater. If a sub-meter is proposed for irrigation, it shall be a privately held and maintained meter, provided by the applicant, installed after the main water meter.

15. Light Standards: A photometric plan is required at the building permit stage, subject to Planning Division approval and shall comply with the following:

A. Outdoor lighting. Outdoor lighting shall be shielded in a manner that prevents a direct line between its luminary and any residentially zoned, planned, or developed parcel. Within 50 feet of a residential zoning district or within 50 feet of the lot line of a lot containing a residential use, lighting shall be installed no higher than 20 feet above the ground directly below the light fixture.

B. Outdoor lighting shall not exceed the following levels:
i. 0.50 foot-candles at the property line if the subject property abuts a residential zoning district or a lot containing a residential use. ii. 2.00 foot-candles at the property line if the subject property abuts a non-residential zoning district or lot containing only non-residential uses.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 8 -

16. Utilities: All electrical, telephone, television and communication utility distribution and services wires shall be placed underground in accordance with Santa Maria Municipal Code Section 12-28.06.

The proposed locations of all transformer boxes and utility equipment shall be approved by the Planning Division prior to installation. All transformer boxes and utility equipment shall be underground wherever feasible. If undergrounding is not possible, the equipment should be painted to match the surroundings, placed in inconspicuous areas out of public view, and screened with landscape plantings.

17. Mechanical Equipment: Mechanical equipment located on the roof of a building shall be completely screened. The height of the screening shall be as high, or higher, than the top of the mechanical equipment. The screening may be provided by an architecturally designed screen wall of solid material surrounding the equipment, or by the building wall parapet.

18. Shopping Carts: Any tenant requiring shopping carts will need to provide a cart collection process approved by the Planning Division. This may require the installation of architectural designed cart enclosures on the site in keeping with the design of the project. The design and location of the cart enclosures shall be reviewed and approved by the Planning Division. A cart guard method for controlling cart migration off-site shall also be incorporated.

19. Outdoor Display: Outdoor display and storage shall comply with Section 12-33.211 of the Municipal Code.

20. Serving of Alcoholic Beverages (on-sale): Alcoholic beverages shall only be served in conjunction with the serving of food and requires the submittal of a separate Conditional Use Permit to be reviewed and approved by the Zoning Administrator.

21. Business License: A City business license is required.

22. Hours of Operation: The hours of operation for any mixed-use project with a residential component shall not begin before 7:00 a.m. or continue after 11:00 p.m.

This standard shall include other activities directly related to the operation of the commercial component, including but not limited to pick-up and/or deliveries.

23. Performance Standards: The requirements of the City's performance standards with respect to odor, noise, smoke, vibration and discharge of liquid and solid waste shall be maintained.

A. Odor. The odors released from any operation or activity shall not exceed detectable concentration beyond lot lines, measured at any location on the lot lines. Commercial or industrial uses with attached residential units shall provide state-of-the-art ventilation systems to prevent odors from penetrating residential units.

B. Vibration. No use, activity, or process shall produce vibrations that are perceptible without instruments at the property line for more than three minutes in any one PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 9 -
hour of the day between the hours of 7:00 a.m. and 10:00 p.m. No use, activity or process shall produce vibrations for more than 30 seconds in any one-hour between the hours of 10:00 p.m. and 7:00 a.m.

C. Noise. All mixed-use developments shall comply with the City of Santa Maria adopted standards for noise. Where a mix of uses is provided, the most strict noise standards for the provided use shall apply.
i. Exception to allow elevated noise levels in outdoor living areas. Outdoor living areas such as patios and balconies may be incorporated into multifamily development projects in areas which experience elevated noise levels. These noise levels may not exceed the "Normally Unacceptable" Community Noise Exposure levels (75dB and above) specified in Figure 2 of the "Noise Element Guidelines" (Appendix C of the California General Plan Guidelines). Furthermore, prospective buyers and future occupants of dwellings shall be provided with the following notice:

This property is presently located in an urban area which periodically and regularly experiences elevated noise levels. Potential sources of this noise may be automobile traffic, railroad operations, flying aircraft, industrial/commercial uses and general human activity in an urban environment. You may wish to consider what noise level annoyances, if any, are associated with the property before you complete your purchase and/or rental agreement and determine whether they are acceptable to you.

24. Health Department Requirements: Detailed plans shall be submitted to the Santa Barbara County Health Department for review and approval prior to plans being submitted to the City for approval and issuance of a building permit.

25. AB 1600 Fees: AB 1600 fees apply to this project.

26. Indemnification: The applicant shall agree to indemnify, defend (with counsel reasonably approved by the City), and hold harmless the City of Santa Maria and its officers, officials, employees, and agents from and against any and all claims, demands, actions, proceedings, lawsuits, losses, damages, judgments and/or liabilities by third parties arising out of, related to, or in connection with the project application or to attack, set aside, void, or annul, in whole or in part, an approval of the project application by the City and any related environmental approvals, development approvals or project conditions. The Applicant shall reimburse the City, its agents, officers, officials, or employees, for any court costs and attorney’s fees that the City, its agents, officers, officials, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve Applicant of his/her obligations under this provision.

27. Agency Requirements: The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 10 -

28. Construction Documents: A copy of these conditions shall be incorporated into all construction documents.

29. Construction Hours: Construction activities shall be limited to the hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, and 8:00 a.m. to 5:00 p.m. on Saturdays. No construction activities are to occur on Sundays or holidays. A note to this effect shall appear on all construction documents.

30. Mitigation Monitoring and Reporting Program: The mitigation measures in the Mitigation Monitoring and Reporting Program for the previously adopted Environmental Impact Report (SCH# 90010930) are hereby incorporated and attached for reference.

Public Works Department

ENGINEERING CONDITIONS

31. Public Improvement Plans: Public Improvement Plans (PIPs) are required for the development of this site. The improvement plans shall show complete plans, profiles, and details for all required improvements to be constructed, both public and private, including common areas. Reference may be made to the Standard City Engineering Specifications and Drawings in lieu of duplicating the standard drawings. All standards of agencies other than the City of Santa Maria shall appear on the plans in full and not by reference. PIPs shall be reviewed and approved by the City Engineer prior to building permit issuance and incomplete submittals may delay building permit issuance. The PIPs shall include the following:

A. Plan and profile drawings for all surface and underground improvements. Plans and profiles shall be drawn to the scale of one-inch equals 40 feet or larger unless otherwise approved by the City Engineer. Details shall be drawn to a scale that clearly shows the facility being constructed. The scales for various portions of the plans shall be shown on each sheet. These may include, but are not limited to:
i. Public Water Mains
ii. Public Sewer Mains
iii. Public Storm Drain Mains
iv. Traffic Signal and/or Roundabout
v. Frontage Improvements

1. Curb

2. Gutter

3. Sidewalk

4. Driveways

5. Streetlights

6. Fire Hydrants
vi. Traffic signs for all streets. These may include, but are not limited to:

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 11 -

1. Regulatory signs

2. Warning signs

3. Guide signs
B. Landscaping and irrigation plans for any area of public right-of-way where landscaping is required (such as medians) or where landscaping is to be maintained as part of a city landscape maintenance district. Confirm requirements with the Recreation and Parks Department regarding necessary landscaping, irrigation, and water meters to be installed.

C. The Engineer shall submit four full size copies of the Public Improvement Plans to the Public Works Department for review, in addition to an electronic copy.

D. All public improvements shall be constructed according to City and State standards. Plan check and inspection fees per City Council Resolution 2005-101 will apply. The developer shall submit a cost estimate completed by a registered civil engineer for the proposed public improvements and make a monetary deposit with the City. Cost estimates shall include a separate item for contingencies in the amount of ten percent of the estimated actual cost. The estimate submitted by the subdivider’s engineer shall be subject to review and approval by the City Engineer. An approved final estimate shall be used to establish construction inspection fees, to establish the plan checking fee, and for establishing required amounts of security as required by Section 11-

8.06 of the City of Santa Maria Municipal Code. The form of security shall be subject to the approval of the City Attorney.

32. Building Plans: At time of building plan submittal, the developer shall identify the following items on the site or utility plan for the subject project:

A. Location and sizes of all existing water mains, sewer mains, water meters, water service lines, backflow prevention devices, private sewer lateral connections, and storm drainage facilities in abutting streets or on the project site.
i. Each unit or lot shall be served by a sanitary sewer system, adequate domestic water system, natural gas, electric, and telephone facilities.

Cable television facilities shall be provided pursuant to Chapter 15 of Title 9 of Santa Maria’s Municipal Code.

B. Location and sizes of all proposed water mains, sewer mains, water meters, water service lines, backflow prevention devices, private sewer lateral connections, and storm drainage facilities in abutting streets or on the project site.
i. Each unit or lot shall be served by a sanitary sewer system, adequate domestic water system, natural gas, electric, and telephone facilities.

Cable television facilities shall be provided pursuant to Chapter 15 of Title 9 of Santa Maria’s Municipal Code. If these are not existing, they shall be proposed to be installed as part of this project.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 12 -
C. Location, quantity, and orientation of trash enclosures D. All parcel lines and easements crossing the project site.

E. Locations and dimensions of all existing and proposed driveways and sidewalks
F. Location of waste grease containers. Waste grease containers shall not be placed within trash enclosure.

G. Location of existing and proposed fire hydrants
H. Required public improvements.

I. Limits of frontage improvements
J. Curb treatment and any required fire-lane or no-parking designation

33. Utilities Connection Fees: For all development projects already connected to the utility system, the water and wastewater fees shall be based solely on an increase in water meter size or a change in use and shall be calculated and collected prior to installation of the larger meter or making a change in use. The State Water Reimbursement Fee shall be collected concurrently with the Growth Mitigation Fee. The following fees are to be paid by the applicant and will be collected at time of request for connection at the Building Division, 110 South Pine Street, Suite 101.

A. Water Mitigation Fee: The fee is calculated based on the size of water meters (domestic, landscape, fire) serving the site. The fee shall be based upon the codes and rates in effect at the time of building permit issuance (Santa Maria Municipal Code (S.M.M.C.) Sections 8-15.01 through 8-15.15 and 8-15.19).

B. Wastewater Mitigation Fee: The fee is calculated based on the size of water meters (domestic) serving the site. The fee shall be based on the codes and rates in effect at the time of building permit issuance (S.M.M.C. Sections 8-

15.01 through 8-15.15 and 8-15.20).

C. State Water Reimbursement Fee: The fee is calculated based on the size of water meters (domestic, landscape, fire) serving the site. The fee shall be based on the codes and rates in effect at the time of building permit issuance (S.M.M.C. Section 8-10.05.01).

D. Traffic Mitigation Fee: The traffic mitigation fee shall be paid by the applicant at time of occupancy. The fee is based on the size and proposed use of the project. The final fee calculation is based on the fee schedule in effect at the time of building permit issuance (S.M.M.C. Sections 8-15).

E. The City Council may consider allowing qualifying commercial and industrial development the ability to pay growth mitigation fees as outlined in the current PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 13 -
fee schedule over a period of time. The maximum amount of time for payback shall be five years. The payments shall be made yearly, and interest shall be paid. Interest calculations shall be based on the average annual interest rate for the Local Agency Investment Fund. Qualifying companies who wish to pursue this option shall sign an agreement, in a form approved by the City Attorney, and shall provide financial security guaranteeing payment.

F. Other Fees: The following fees are to be paid by the applicant and will be collected prior to issuance of building permit.
i. Streetlight Fee: When the building site does not meet the minimum frontage described S.M.M.C. Section 12-28.05, a streetlight fee shall be paid to the City according to the most current streetlight fee schedule.
ii. Alley Light Fee: When the building site does not meet the minimum frontage described S.M.M.C. Section 12-28.05, an alley light fee shall be paid to the City according to the most current alley light fee schedule. In lieu of paying the alley light fee, the applicant may elect to install an alley light.
iii. The Planning Commission may modify the street and alley light requirements when reviewing a conditional use permit or planned development permit if it makes written findings based on substantial evidence considering the entire record of proceedings that the requirements would result in a unique hardship based on special circumstance applicable to the property (S.M.M.C. Section 12-28.05).

STREET AND FRONTAGE CONDITIONS

34. Street Light Conduit Location: Refer to City Standard Drawing RD-31 regarding typical utility location and spacing. Streetlight conduit shall be located on the north side of an east/west street, or east side of a north/south street.

A. Exact relocation of existing streetlight(s) on Railroad Avenue shall be per the direction of the City Engineer.

35. Standard Driveway: Driveways shall be installed per City Standard Drawing RD-12A/RD-13A and have ADA compliant pedestrian access. Driveways shall have minimum throat width of 24 feet.

Nearest edge of driveway shall be located a minimum of five feet from any above-ground utility such as streetlights or fire hydrants, and ten feet from any street trees. A minimum 20 foot separation between driveways is required and the aggregate width of all driveways shall not exceed 50 percent of the property’s frontage along the street (S.M.M.C. Section 8-6.07).

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 14 -

36. ADA Compliance: Curb ramps located at the Railroad Ave and Hidden Pines Way roundabout shall be removed and replaced to current ADA requirements. See Caltrans Standard Drawing A88A.

37. Frontage Repair: The developer shall repair any cracked, broken, or uplifted curb, gutter, sidewalk, or alley within the project frontage. City Public Works Inspection staff will determine the extent of the frontage repair in the field prior to construction. An encroachment permit will be required prior to issuance of a building permit for these repairs.

38. New Frontage Improvements: The developer shall be required to install full frontage improvements including curb, gutter, sidewalk, streetlights, and landscaping wherever missing or required by the Public Works Department.

A. The existing sidewalk along the project frontage on Railroad Avenue shall be removed and replaced with a new sidewalk having a minimum clear width of five feet.

39. Sidewalk ADA Compliance: The developer shall remove and replace any sidewalk within the project frontage that does not meet ADA cross-slope requirements.

40. Intersections: Sight distance requirements shall be maintained at the intersection of any street, alley, or driveway improved for vehicular traffic per S.M.M.C.

Sections 12-27.02 and 12-27.03.

A. Prior to occupancy, the developer shall install red curb and any associated parking restrictions adjacent to the project driveways on Hidden Pines Way and Railroad Avenue, consistent with the approved traffic study and as approved by the City Engineer. Final limits shall be established during Public Improvement Plan review based on sight-distance requirements.

41. City Encroachment Permit: The developer shall obtain an encroachment permit from the Public Works Engineering Division prior to any work in public streets, alleys, or easements (S.M.M.C. Section 8-6.06).

42. Facility Easements: Prior to issuance of building permits, the developer shall provide reciprocal access or utility and drainage easements if required by the Public Works Department for the subject project.

A. Dedicate public water and sewer easements over all public water and sewer mains and appurtenant facilities located within the project site. The location and width of each easement shall be approved by the City Engineer and Utilities Department.

B. Dedicate a blanket reciprocal drainage easement over all lots within the project site for shared drainage, including access for the construction, inspection, operation, maintenance, repair, and replacement of the project’s shared drainage facilities.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 15 -

43. City Dedicated Easements: If any easements are required to be dedicated or vacated, the developer shall submit legal descriptions, sketches (8.5” x 11” City Standard Format), closure calculations, current title report, and payment of processing fees. All paperwork shall be approved prior to issuance of building permits and recorded prior to occupancy.

A. This will be required for any easement(s) not recorded via the Tract Map.

B. Prior to issuance of building permits, the developer shall dedicate additional public street right-of-way along the Railroad Avenue project frontage as necessary to accommodate the ultimate street section and required public frontage improvements. The final width, location, and limits of dedication shall be shown on the Public Improvement Plans and approved by the City Engineer. The dedication shall be completed and recorded prior to issuance of building permits, unless otherwise approved by the City Engineer.

44. Chip Seal: Developer shall be required to restore asphalt pavement surface to the pre-development condition by placing chip seal compliant with City Standards along the property frontage where trenching and utility cuts are required within City right-of-way. The chip seal shall be applied for the full width of the roadway for 50’ beyond all cuts within the asphalt pavement and the roadway striping shall be restored to pre-construction layout.

WATER CONDITIONS

45. Privately Owned On-site Water Lines: Water lines for fire suppression shall be separated from water lines used for domestic water.

46. Fire Suppression Line: Fire suppression lines shall be constructed with appropriate Double Check Detector Assembly (DCDA) fire service backflow prevention assemblies per Standard Detail WA-27F at connection to the public main, located at the property line. These fire service backflow prevention assemblies separate privately owned and maintained water lines from public water lines. On-site fire hydrants and fire sprinklers shall be supplied from this on-site water line and connections shall occur after the backflow prevention assembly. If multiple connections or a looped system is required to meet fire flow requirements, each connection to the Public main shall have an appropriate DCDA.

47. Fire Hydrants: The location, placement, and sizing of on-site water lines and fire hydrants shall be approved by the City Fire Department and Public Works Department.

48. Backflow Prevention: Reduced pressure principle (RP) type backflow prevention assemblies shall be installed on all domestic water services. The devices shall be installed near the property line before any branches by a licensed plumber according to City specifications and standard drawings. The devices shall be tested by a certified backflow prevention tester with test results submitted to the City’s Regulatory Compliance Specialist prior to final occupancy.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 16 -

WASTEWATER CONDITIONS

49. Acceptance of Public Infrastructure: Prior to issuance of Certificate of Occupancy, the developer shall clean and verify the integrity of all sanitary sewer infrastructure to the satisfaction of the Public Works Inspector. Inspections at installation do not waive the requirement for re-inspection prior to acceptance by the City.

50. Municipal Code: Discharge into the City’s sewer system shall comply with municipal code discharge restrictions and requirements (S.M.M.C. Section 8- 12).

51. Traps: Grease, oil, lint, hair and/or sand traps shall be provided and maintained in good working order at all times when, in the opinion of the Utilities Manager, they are necessary for the protection of the wastewater collection and treatment. (S.M.M.C. Section 8-12.413)

52. New Sewer Lines: All sewer pipes crossing or parallel to public water facilities shall be constructed according to the requirements of the State Water Resources Control Board Division of Drinking Water.

53. New Sewer Lateral: All sewer laterals shall be constructed in compliance with City Standard Drawing SS-14B. Sewer laterals shall be
privately maintained infrastructure and connect to City infrastructure with a wye connection. Sewer laterals shall not tie in at a Public manhole.

STORM WATER CONDITIONS

54. Construction Storm Water Requirements (Site > 1 Acre): The developer shall obtain a Storm Water Pollution Prevention Plan (SWPPP) prepared by Qualified SWPPP Developer (QSD). The SWPPP must be reviewed and approved by the Public Works Department prior to issuance of grading and encroachment permits. The developer shall submit the SWPPP and file a Notice of Intent (NOI) with the Central Coast Regional Water Quality Control Board. The submittal is typically handled online through the Regional Board’s SMARTs website. (https://smarts.waterboards.ca.gov/smarts/).

55. SWPPP Review Fee: The developer shall submit a hard copy and an electronic copy of the SWPPP for review and approval prior to any building permit issuance. A SWPPP review fee will be invoiced prior to approval.

56. Cost Estimate and Treasurer’s Trust: A detailed cost estimate for the installation and maintenance of the Best Management Practices (BMPs) to be implemented as defined by the SWPPP will be generated from the City’s SWPPP review. Prior to grading permit issuance, the developer shall submit a cash deposit in the amount of the approved cost estimate to be held as a Treasurers Trust. The Treasurer’s Trust is intended to guarantee installation and maintenance of the required BMPs. The City will draw from this Treasurer’s Trust in the event the developer/contractor does not install or maintain the required BMPs. The PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 17 -
Treasurer’s Trust shall be returned after Certificate of Occupancy is issued, minus any funds expended by the City to install/maintain the required BMPs on behalf of the developer/contractor.

57. SWPPP/Post-Construction Requirement Monitoring Encroachment Permit: Prior to issuance of grading permits, the developer shall obtain an encroachment permit from the Public Works Office to cover inspection of the approved SWPPP and installation of required Post-Construction Requirements. Permit and inspection fees will be due when the permit is issued and expiration of the encroachment permit will be based on the construction schedule identified in the SWPPP Notice of Intent. Time extensions will require additional funds to be provided to cover the additional inspections.

FLOOD CONTROL CONDITIONS

58. Regional Basin Storm Drainage: On-site retardation is not required for this site because it is served by a regional retardation basin
constructed with North Preisker Ranch Tract 5764.

POST-CONSTRUCTION STORM WATER CONDITIONS

59. Post-Construction Storm Water: The Central Coast Regional Water Quality Control Board requires that all new projects that create or replace 2,500 square feet or more of impervious area must follow the post-construction requirements (PCRs). The Stormwater Technical Manual and further guidance on completing an SCP are available online (https://www.countyofsb.org/2324/New-Redevelopment).

A. The developer shall demonstrate project compliance with the PCRs by submitting a Stormwater Control Plan (SCP) using the template provided in the Stormwater Technical Guide.

B. The SCP shall include a site plan, Stormwater Control Measure (SCM) sizing calculations, details of bioretention design, and dimensions of drainage management areas.

C. The SCP shall include an Operation and Maintenance (O&M) plan, detailing how the site and required post-construction improvements shall be maintained into perpetuity by the owner.

D. A SCP is required and shall receive preliminary approval from the Public Works Department prior to discretionary approval of the Planning Permit. The developer shall resubmit the SCP with the Building Plan submittal for final review and approval. The resubmittal is to account for any necessary changes to the site plan between entitlement and construction.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 18 -
E. Underground Chambers: For developments proposing to utilize underground chamber systems for the basis of stormwater management, the inlets, chambers, and any infrastructure that drains to the underground chamber system shall be cleaned, and video inspection provided to verify the performance of the underground chamber system wasn’t compromised during project construction activities. Cleaning and maintenance of this infrastructure shall be followed as per the manufacturer’s specifications and the approved stormwater operations and maintenance plan. All cleaning and maintenance activities shall be documented and provided to the Utilities Department, Regulatory Compliance Division on an annual basis.

F. As required by Section D, Field Verification of Post-Construction Stormwater Measures, of the California Central Coast Regional Water Board Resolution R3-2013-0032, Post-Construction Stormwater Management Requirements for Developments Projects in the Central Coast Region, the Developer shall secure a qualified third-party (registered professional engineer, geologist, architect and/or landscape architect) for purposes of inspection, verification, and certification of all Stormwater Control Measures (SCMs) to ensure site design, water quality treatment, runoff retention, and/or peak management controls have been implemented in accordance with the Regional Water Board’s Post-Construction Requirements.

G. Grading plans shall include the following language:
i. Provide installation elevation by licensed surveyor to Public Works Department, Engineering Division within 7 calendar days of installation. ii. Provide basin dimension and depth, including outlet structure cross section with elevations, signed and stamped by the Engineer of Record who prepared the Stormwater Control Plan to the Public Works Department, Engineering Division, within 7 calendar days of installation. iii. Provide copy of invoice of installed gravel and bioretention soil media, along with photo-documentation of complete structure cross sections to Public Works Department, Engineering Division, within 7 calendar days of installation.

H. The following shall occur prior to final SCP approval:
i. Engineer of Record that prepares the SCP shall provide documentation of critical design elements in structures that are underground, buried, or otherwise hard to verify after installation. Critical elements include elevations of the bottom of bioretention, top of gravel, and overflow structures.
ii. The property owner shall sign a Post-Construction Stormwater Control Measures Maintenance Agreement form with the City of Santa Maria. The form will be provided by Public Works after the final review PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 19 -
of the SCP. The agreements shall be approved, signed, and attached to the property address prior to issuing the Certificate of Occupancy.

60. Multi-family and Commercial/Industrial Facilities: As mandated by state law, this development is required to comply with all applicable laws and regulations pertaining to solid waste disposal and recycling, the City of Santa Maria Mandatory Organic Waste Disposal Reduction Ordinance No. 2021-10, Chapter 8-21, and Title 8, Chapter 8-11 of the City of Santa Maria Municipal Code.

A. The developer shall submit a site plan identifying location(s) of each solid waste enclosure (“Enclosure”) to contain refuse and recycling (including single stream recycling and organics) bin(s)/container(s). The proposed location of each enclosure shall enable tenants to dispose of their refuse and recyclable materials safely and efficiently. The site plan shall be reviewed and approved by the City prior to issuance of building permits.

B. All Enclosures shall be constructed per City standard drawing MS-16B.

C. The proposed quantity of Enclosure(s) for the subject site shall be reviewed and approved by the City.

D. The service frequency of each bin/container shall be determined by the City.

E. In cases where Enclosure(s) are proposed to be installed abutting structures, the common wall shall be of a non-combustible masonry-type material with no openings for vents or windows.

F. Enclosure(s) shall be reserved exclusively for solid waste bin(s)/container(s) storage. Miscellaneous boxes, bins, racks, grease containers, etc., is not permitted within the enclosure.

G. If City collection vehicles (“Collection Vehicles”) will be traveling through a gated area to service bin(s)/container(s), the gates shall be equipped with a coded electronic keypad system.

H. The developer shall design site travel ways, entrance, and exit areas with sufficient space, free of obstructions (trees, oversized islands, etc.) to allow for Collection Vehicles to safely enter/exit the subject site to avoid damage to site property or Collection Vehicles. See City standard drawing MS-16B for guidance.

I. The developer shall design all site vehicle travel ways to withstand loads imposed by Collection Vehicles.

J. The developer shall submit a truck turning template route for solid waste service area. The Collection Vehicles must be able to enter and exit the site to gain access to the Enclosure(s) with minimal backing. Collection Vehicles have an inside turning radius of 38 feet and an outside turning radius of 55 feet. See City standard drawing MS-16B for guidance.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 20 -

MODIFICATION OF CONDITIONS

61. The Director of Public Works, Planning Commission, and Council reserve the right to modify these conditions if they deem it necessary to ensure compliance of the project with Chapter 8-6 of the S.M.M.C. (S.M.M.C. Section 8-6.09).

Fire Department

62. Key Box: A SMFD approved key box shall be provided at the main entrance to each commercial building/tenant space and common spaces for the residential buildings such as fire sprinkler riser rooms. The box shall contain all the keys necessary to allow Fire Department access to all portions of the building or tenant space (CFC Section 506).

A. The box shall be installed in accordance with the manufacturer's specifications and placed so the bottom of the box is 60 inches above the adjacent grade.

The proposed location of the box shall be shown, or this note placed on the plans.

B. Key box application is available online at http://www.ci.santa-maria.ca.us/40463-KnoxBoxRequestForm.pdf. The key box shall be ordered prior to occupancy request.

C. Knox Box 3200 Series is the minimum acceptable box for commercial installations. Knox boxes identified as "Residential" shall not be used for commercial applications.

63. Address Numbers: Numbers shall be clearly visible from the centerline of the roadway fronting the building and shall contrast with their background. Number height shall be a minimum of six inches for single family residential buildings and a minimum of 12 inches for multi-family residential and commercial buildings. The proposed location and design of address numbers shall be shown, or this note placed on the plans CFC Section 505 & SMMC Section 9-28.050).

64. Access Roads: An approved SMFD access road shall extend to within 150 feet of all portions of the exterior walls of the first story of the building, as measured by an approved route around the exterior of the building CFC Section 503 & SMMC Section 9-28.050).

A. Minimum road standards shall be 4-inch class II road base compacted to 95 percent and an all-weather surface such as asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing up to 75,000 pounds (CFC Appendix D102.1 and SMMC Section 9-

28.050).

B. The minimum unobstructed width for buildings below 30 feet is 24 feet (CFC Appendix D105 and SMMC Section 9-28.050).

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 21 -
C. Overhead vertical clearance shall be a minimum of 15½ feet (CFC Section 503.2.1 & SMMC Section 9-28.050).

D. Access roads, permanent or temporary, shall be installed and approved by the SMFD prior to vertical combustible construction (CFC Section 501.4).

65. Turning Radius: The minimum turning radius shall be designed to accommodate the SMFD’s ladder truck. The proposed fire access turning radii shall be verified by submittal of design drawings created by Auto Turn software or equivalent. Turn radius specifications are available by request CFC Appendix Section D103.3).

66. Temporary Fire Access Road Signage: Temporary access signage shall be placed at each entrance to the project (when necessary) to delineate construction and fire access. Signage design is provided in SMFD Development Guidelines. These signs shall be installed prior to combustible construction (CFC Appendix D101.1).

67. Temporary Access Roads: Plans for temporary access roads shall be reviewed, inspected and approved by the SMFD prior to construction in accordance with CFC Section 501. Temporary access roads shall be constructed with compacted base, curbs and gutters prior to vertical combustible construction. Access roads shall be maintained clear and unobstructed for the duration of the construction project (CFC Section 503.2.2).

68. Fire Lane Signs: "No Parking, Fire Lane" signs shall be posted at entrances. Signs shall be designed per SMFD Development Guidelines. All curbing in a designated Fire Lane or fire access way shall be painted red with “Fire Lane, No Parking” graphics stenciled every 100 linear feet or as otherwise designated on approved plans (CFC Section 503.3, Appendix D103.6 & SMMC Section 9-28.050).

69. Fire Flow: Fire flow shall comply with CFC, Appendix B. The minimum fire flow for this project shall be 1500 gallons per minute (based on Type 5B Construction, with fire sprinklers, as required).

70. Fire Hydrants: Fire hydrants shall be installed per City of Santa Maria Public Works Standards.

A. Fire hydrant spacing and distribution shall comply with CFC Section 507 and CFC Appendix C. The new hydrants shall be spaced at an average of 500 feet and at no point shall exceed 250 feet from a fire hydrant on a fire apparatus access road. Fire hydrants shall be installed and operational prior to vertical combustible construction.

B. Hydrants shall be equipped with one four and a half inch (4 ½”) outlet and two 2 and half inch (2 ½”) outlets.

C. The SMFD, or a designated representative, shall inspect and approve all fire hydrant installations for operational readiness prior to combustible construction (CFC Section 501.4).

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 22 -

71. Fire Hydrant Protection: On-site fire hydrants shall be painted red and protected from impact in accordance with City Of Santa Maria Public Works Standards and SMFD Development Guidelines (CFC Section 507.5.6 & SMMC).

72. Water Mains: Water Mains shall be installed per City of Santa Maria Public Works and NFPA standards. The minimum main size shall be 8 inches, or as determined by hydraulic calculations (CFC Section 507 & SMMC).

73. Hydrant Markers: Reflective blue dot fire hydrant location markers shall be installed (SMMC).

74. Fire Sprinkler Systems: Automatic fire sprinkler systems are required for residential buildings in accordance with CFC and NFPA Standards. The following commercial occupancies shall be equipped with an automatic fire sprinkler system (CFC Section 903 & SMMC Section 9-28.060):
 Group “A” Occupancies when the gross floor area is 5,000 square feet or more.
 Group "B" Occupancies when the gross floor area is 5,000 square feet or more.
 Group “M” Occupancies when the gross floor area is 5,000 square feet or more.

A. All commercial fire sprinkler systems shall be equipped with a local water flow alarm.

B. Deferred submittal of fire sprinkler plans, and calculations is required. The plans and calculations shall be wet stamped by a registered Fire Protection Engineer (FPE) licensed in California when required by the fire code official.

75. Fire Department Connection (FDC): FDCs shall be located on the front access side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the Fire Chief or his/her designee (CFC Section 912). The FDC shall:

A. Face the public street or fire lane fronting the protected building and be installed so the center line of the connection is a minimum of 36 inches above finished grade.

B. Within 40 feet of an approved roadway or driveway and arranged so that hose lines can be readily attached to the inlets without interference.

C. Within 75 feet of an approved fire hydrant.

D. Be equipped with Knox Brand locking caps.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 23 -

76. Fire Alarm System: A fire alarm system shall be installed in accordance with the CFC and NFPA 72 standards. The fire alarm system shall be certificated by Underwriters Laboratories or an equivalent nationally recognized organization CFC Section 907 & SMMC 9-28.060).

A. Deferred submittal of fire alarm plans is required. The plans shall be wet stamped, on every sheet, by a registered FPE licensed in California if required by the fire code official.

B. A Fire alarm system, at a minimum incorporating tamper switches on control valves and a Central Station service for the water flow alarm shall be installed for the fire sprinkler system.

77. Smoke Detectors/Alarms: Smoke detectors/alarms shall be installed in accordance with the CFC, CBC, and NFPA 72.

78. Fire Extinguishers: Fire extinguishers shall be located and sized in accordance with CFC Section 906.

79. Directory Signs: A project directory, including a map and listing of all units on the site shall be posted at the entrance to the property and indicated on the project plans (SMFD Policy).

Recreation and Parks Department

80. Tree Species: Five street trees will be required along Railroad Avenue, and six street trees will be required along the frontage of Hidden Pines Way. A minimum of one street tree shall be planted in front of each residence. All street trees shall be placed a minimum of five feet from all impervious structures. City street trees are to be selected from the medium to large City approved street tree list and complement the surrounding streetscape.

81. Tree Specifications: The street trees shall be 24-inch box in size and have a minimum caliper of 1.5 inches. The trees shall be planted six feet behind the sidewalk by a licensed landscape contractor in accordance with the plans and specifications of the Recreation and Parks Department. An irrigation system shall be provided for the trees.

82. Tree Bonding: Street tree bonding shall be for eleven tree plantings at $275 each totaling $3,025.00. Tree bonds are to cover a one-year establishment starting at issuance of the Occupancy Permit. Street tree requirements and bond amount are a maximum subject to change during building permit review. The tree bond is due at time of building permit issuance as a cash or surety bond delivered to Recreation and Parks at 615 S. McClelland St.

PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026

COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 24 -

83. Tree Planting: Any nursery stock tree planted without inspection and approval by the Recreation and Parks Department shall be deemed defective and be removed by the person(s) responsible for the planting at their own expense. All plant material shall not be root bound or contain girdling roots. Street tree location(s) shall be approved onsite by the Special Districts Supervisor prior to installation.

84. Landscape Plans: The following shall be noted on the landscape plan: “the final locations of street trees shall be determined on-site by the Special Districts Supervisor. Twenty-four-hour notice is required for inspection prior to planting, (805) 925-0951 ext. 2346. Installation shall be in accordance with Recreation and Parks Department specifications.”

85. Park Impact: Residents of the Courtyard at Hidden Pines are prohibited from parking their cars at North Preisker Ranch park overnight or for extended periods during the day. Violators may face penalties, including fines and towing of vehicles.

86. Development Fees: Per the Municipal Code, several Recreation and Parks Development Fees may apply to this project.

A. Subdivision in Lieu $2,764.00
B. Residential Development Tax $185.00
C. Single Family Growth Mitigation $2.14/square foot
D. Multi-family/Senior Growth Mitigation $3.27/square foot E. Commercial Growth Mitigation $0.01/square foot Note: fees are reviewed annually and are subject to change.

87. Landscape district advisory: This project is included in the Northwest landscape maintenance district.

NOTES:

In accordance with Section 12-35.109 of the Municipal Code, this permit is not valid until the 15th calendar day following the issuance of the permit, providing no appeal is filed; or if an appeal is filed, this permit is not valid until the effective date of the final action on the appeal.

In accordance with Section 12-35.504 of the Municipal Code, the City may modify conditions of approval of the permit, or may revoke the permit for non-compliance with any of the conditions of approval, or if any operations under the approved permit result in detriment to the public health, safety or welfare.

This permit will not be valid until the applicant and property owner have submitted signed acknowledgment of their consent to the conditions, in accordance with Section 12-35.109 of the Santa Maria Municipal Code, to the Planning Division of the Community Development Department.

In accordance with Section 12-35.501 of the Municipal Code, this permit shall become null and void if the permit is not established within three years of the permit’s effective date or after establishment the use is discontinued or abandoned for a period of six months. However, the approval body may consider extensions of time for additional periods of up to two years. A written request justifying the need and the appropriate filing fee filed with the Community Development Department shall be submitted prior to the expiration date.

Failure to comply with any of the conditions stated above may be cause for revocation or modification of this permit, in addition to any other penalties provided by law. All conditions of approval are to be completed prior to occupancy unless otherwise stated, and are to be maintained in perpetuity.

← All documents from this meeting