Providence Saint John's Health Center Sewer Flow
Study 2017
Santa Monica, CA
April 20, 2017 - May 03, 2017
Prepared for:
Ms. Karen Weylandt
Providence Health & Services
4400 NE Halsey, Building 2, Suite 190
Portland, OR 97213
Prepared by:
ADS, LLC
15201 Springdale Street
Huntington Beach, CA 92649
Letter of Transmittal
ADSLLC
May 30, 2017
Ms. Karen Weylandt
Providence Health & Services
4400 N.E. Halsey, Building 2, Suite 190
Portland, OR 97213
SUBJECT: Providence Saint John's Health Center Sewer Flow Monitoring Report 2017 Dear Ms. Weylandt,
ADS is pleased to submit the Final Report for the Providence Saint John's Health Center Sewer Flow Monitoring Temporary Study. The metering was contracted for a fourteen (14) day period at nine (9) locations. The study period is April 20, 2017 - May 03, 2017. The report contains a depth, velocity, and quantity hydrograph as well as a daily long table for the metering period in pdf format. An Excel file containing 5-minute depth, quantity, and velocity entities has been provided previously.
In addition, we would be happy to further explain any details about the report that may seem unclear. Should you have any questions or comments, you may contact the Project Manager, Paul Mitchell at (714) 379-9778 ext 223.
Thank you for choosing ADS products and services to meet your flow monitoring needs.
Sincerely,
ADS ENVIRONMENTAL SERVICES
Abel Jaramillo
Data Analyst I
15201 Springdale Street · Huntington Beach, CA 92649 · Phone: 714-379-9778
Scope and Methodology
Introduction
Providence Health & Services entered into an agreement with ADS Environmental Services to conduct flow monitoring at (9) nine metering locations in the Santa Monica,CA Sanitary Sewer Collection System. The study was contracted for a fourteen (14) day period. The objective of this study was to measure depth, velocity, and quantify flows. Data obtained will be used for development planning purposes.
Project Scope
The scope of this study involved using a flow monitor to quantify wastewater flows at the designated locations for the 14-day time period. Specifically, the study included the following key components.
• Investigate the proposed flow-monitoring site for adequate hydraulic conditions. • Flow monitor installation.
• Flow monitor confirmations and data collections.
• Flow data analysis.
Equipment installation was accomplished on April 19, 2017. The monitoring period began on April 20, 2017 and was completed on May 03, 2017 . At the conclusion of the study period, the equipment was removed.
Flow Monitoring Equipment
The ADS FlowShark Triton monitor was selected for this project. This flow monitor is an area velocity flow monitor that uses both the Continuity and Manning's equations to measure flow.
The ADS FlowShark Triton monitor consists of data acquisition sensors and a batterypowered microcomputer. The microcomputer includes a processor unit, data storage, and an on-board clock to control and synchronize the sensor recordings. The monitor was programmed to acquire and store depth of flow and velocity readings at 5-minute intervals.
The FS Triton monitor features cross-checking using multiple technologies in each sensor for continuous running of comparisons and tolerances. The FS Triton monitor can support two (2) sets of sensors. The sensor option used for this project was: The Peak Combo Sensor. This sensor is installed at the bottom of the pipe and includes three types of data acquisition technologies.
The up looking ultrasonic depth uses sound waves from two independent transceivers to measure the distance from the sensor upward toward the flow surface; applying the speed of sound in the water and the temperature measured by sensor to calculate depth.
The pressure depth is calculated by using a piezo-resistive crystal to determine the difference between hydrostatic and atmospheric pressure. The pressure sensor is temperature compensated and vented to the atmosphere through a desiccant filled breather tube.
To obtain peak velocity, the sensor sends an ultrasonic signal at an angle upward through the widest cross-section of the oncoming flow. The signal is reflected by suspended particles, air bubbles, or organic matter with a frequency shift proportional to the velocity of the reflecting objects. The reflected signal is received by the sensor and processed using digital spectrum analysis to determine the peak flow velocity.
Installation
Installation of flow monitoring equipment typically proceeds in four steps. First, the site is investigated for safety and to determine physical and hydraulic suitability for the flow monitoring equipment. Second, the equipment is physically installed at the selected location. Third, the monitor is tested to assure proper operation of the velocity and depth of flow sensors and verify that the monitor clock is operational and synchronized to the master computer clock. Fourth, the depth and velocity sensors are confirmed and line confirmations are performed.
In pipes up to 42 inches in diameter, the sensors are mounted on expandable stainless steel rings, inserted at least a foot upstream into influent pipes and tightened against the inside walls of the pipes. Influent pipe installations reduce the influences of turbulence and backwater often caused by changes in channel geometry in manholes.
Data Collection, Confirmation, and Quality Assurance
Data collects were done remotely via wireless connect on a weekly basis via ADS Field Representatives. Weekly, during the monitoring period, field crews visit each monitoring location to verify proper monitor operation and document field conditions.
The following quality assurance steps are taken to assure the integrity of the collected data:
Measure power supplies: monitors were powered by dry cell battery packs.
Voltages were recorded and battery packs replaced, as necessary. Separate batteries provided back-up power to memory allowing primary batteries to be replaced without loss of data.
Clock synchronization: Field crews synchronized monitor clocks to master clocks.
Confirm depth and velocity readings: Field crews descended into meter manholes to manually measure depths and velocities and compare them meter readings to confirm that they agreed. They also measured silt levels, if any, in the inverts of the pipes. Silt areas were subtracted from flow areas to compute true areas of flow.
Confirm average velocities through cross-sectional velocity profiles: Since ADS velocity sensors measure peak velocity, field crews collected cross-sectional velocity profiles in order to develop a relationship between peak and average velocity in lines that meet the hydraulic criteria.
Upload and Review Data: Data collected from the monitors were uploaded and reviewed by a Data Analyst for completeness, outliers and deviations in the flow patterns, which indicate system anomalies or equipment failure.
Flow Quantification Methods
There are two main equations used to measure open channel flow: the Continuity Equation and the Manning Equation. The Continuity Equation, which is considered
the most accurate, can be used if both depth of flow and velocity are available. In cases where velocity measurements are not available or not practical to obtain, the Manning Equation can be used to estimate velocity from the depth data based on certain physical characteristics of the pipe (i.e. the slope and roughness of the pipe being measured). However, the Manning equation assumes uniform, steady flow hydraulic conditions with non-varying roughness, which are typically invalid assumptions in most sanitary sewers. The Continuity Equation was used exclusively for this study.
Continuity Equation
The Continuity Equation states that the flow quantity (Q) is equal to the wetted area (A) multiplied by the average velocity (V) of the flow.
Q = A * V
This equation is applicable in a variety of conditions including backwater, surcharge, and reverse flow.
Data Analysis and Presentation
Data Analysis
A flow monitor is typically programmed to collect data at 5-minute intervals throughout the monitoring period. The monitor stores raw data consisting of (1) the ultrasonic depth, (2) the peak velocity and (3) the pressure depth. The data is imported into ADS's proprietary software and is examined by a data analyst to verify its integrity. The data analyst also reviews the daily field reports and site visit records to identify conditions that would affect the collected data.
Velocity profiles and the line confirmation data developed by the field personnel are reviewed by the data analyst to identify inconsistencies and verify data integrity.
Velocity profiles are reviewed and an average to peak velocity ratio is calculated for the site. This ratio is used in converting the peak velocity measured by the sensor to the average velocity used in the Continuity equation. The data analyst selects which depth sensor entity will be used to calculate the final depth information. Silt levels present at each site visit are reviewed and representative silt levels established.
Occasionally the velocity sensor's performance may be compromised resulting in invalid readings sporadically during the monitoring period. This is generally caused by excessive debris (silt) blocking the sensor's crystals, shallow flows (~< 2") that may drop below the top of the sensor or very clear flows lacking the particles needed to measure rate. In order to use the Continuity equation to quantify the flow during these periods, a Data Analyst and/or Engineer will use the site's historical pipe curve (depth vs. velocity) data along with valid field confirmations to reconstitute and replace the false velocity recordings with expected velocity readings for a given historical depth along the curve.
Selections for the above parameters can be constant or can change during the monitoring period. While the data analysis process is described in a linear manner, it often requires an iterative approach to accurately complete.
Data Presentation
This type of flow monitoring project generates a large volume of data. To facilitate review of the data, results have been provided in graphical and tabular formats. The flow data is presented graphically in the form of scattergraphs and hydrographs.
These tables show the flow rate for each day, along with the daily minimum and maximums, the times they were observed, the total daily flow, and total flow for the month (or monitoring period). The following explanation of terms may aid in interpretation of the tables and hydrographs.
DEPTH - Final calculated depth measurement (in inches)
QUANTITY - Final calculated flow rate (in MGD)
VELOCITY - Final calculated flow velocity (in feet per second) REPORT TOTAL - Total volume of flow recorded for the indicated time period (in MG)
Site Commentary
Site Information
20th01
Pipe Dimensions 12.25 "
Silt Level 0.00"
Overview
Site 20th01 functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table Below For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 18.5% full during the typical average depth of 2.27 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.27 4.61 0.321
Minimum 1.46 2.70 0.094
Maximum 3.82 6.00 0.821
Time of Minimum 5/1/2017 04:00 5/1/2017 04:05 5/1/2017 04:05 Time of Maximum 4/21/2017 09:35 4/21/2017 13:30 4/21/2017 09:35 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
20th01
12.25 Good straight through flow
Not investigated
0.13"
3.72 12'
Precast/OK
VCP/Good
1.50 3/21/17
Standard Traffic Control with No Safety Concerns
1320 20th St.
Not investigated
12.00 4/19/17
Sensor
Location
12'
12.25 x 12.00
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 03:20 1.50 07:30 3.48 2.32 03:50 3.08 10:55 5.75 4.64 04:40 0.119 07:30 0.695 0.334 0.334 04/21/2017 04:50 1.52 09:35 3.82 2.30 03:50 2.98 13:30 6.00 4.65 03:50 0.115 09:35 0.821 0.331 0.331 04/22/2017 05:15 1.50 12:25 3.35 2.20 04:40 2.80 12:25 5.70 4.53 04:40 0.107 12:25 0.655 0.299 0.299 04/23/2017 04:25 1.49 09:35 3.35 2.20 04:45 3.16 09:35 5.72 4.52 04:45 0.118 09:35 0.658 0.300 0.300 04/24/2017 04:50 1.48 14:05 3.48 2.30 04:55 3.08 14:05 5.83 4.64 04:45 0.114 14:05 0.707 0.329 0.329 04/25/2017 04:25 1.53 10:50 3.21 2.27 03:55 2.98 10:50 5.64 4.63 03:55 0.116 10:50 0.610 0.321 0.321 04/26/2017 02:10 1.49 09:20 3.42 2.29 04:35 3.15 09:20 5.84 4.64 02:00 0.120 09:20 0.692 0.326 0.326 04/27/2017 05:15 1.50 08:10 3.49 2.31 04:15 2.94 08:10 5.78 4.64 04:15 0.112 08:10 0.702 0.332 0.332 04/28/2017 02:30 1.48 19:00 3.50 2.36 04:20 2.96 19:00 5.82 4.73 04:20 0.117 19:00 0.712 0.345 0.345 04/29/2017 04:10 1.49 11:20 3.34 2.15 04:40 2.82 11:20 5.65 4.45 04:55 0.105 11:20 0.648 0.285 0.285 04/30/2017 03:15 1.49 10:00 3.04 2.12 03:30 2.88 10:45 5.38 4.41 03:30 0.109 10:00 0.536 0.275 0.275 05/01/2017 04:00 1.46 12:50 3.49 2.34 04:05 2.70 09:55 5.82 4.66 04:05 0.094 12:50 0.698 0.343 0.343 05/02/2017 03:05 1.49 08:05 3.73 2.32 04:00 2.89 19:55 5.89 4.66 04:30 0.112 08:05 0.773 0.336 0.336 05/03/2017 02:55 1.47 08:25 3.45 2.35 04:25 2.97 08:25 5.81 4.70 03:45 0.112 08:25 0.695 0.345 0.345 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 20th01, Pipe Height: 12.25 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.27 4.61
4.501
0.321
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
Broad05
Pipe Dimensions 12 "
Silt Level 0.00"
Overview
Site Broad05 functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . This line exhibits the presence of an hydraulic jump with some waves when operating between 1.5 and 2.5 inches in depth. This condition is experienced when flow transitions from supercritical to subcritical flow. No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 18.3% full during the typical average depth of 2.20 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.20 3.29 0.221
Minimum 1.32 1.34 0.058
Maximum 4.95 5.10 0.997
Time of Minimum 4/26/2017 09:30 4/27/2017 02:45 4/30/2017 04:25 Time of Maximum 5/2/2017 11:50 5/2/2017 11:50 5/2/2017 11:50 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality
and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
Broad05
12.00 Fast straight through flow
Not investigated
0.13"
3.85 10'
Brick/OK
VCP/Good
2.25 3/21/17
Standard Traffic Control with No Safety Concerns
2020 Broadway
Not investigated
11.88 4/19/17
Sensor
Location
10'
12.00 x 11.88
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 03:45 1.63 12:00 4.51 2.25 04:10 1.79 12:00 4.88 3.37 04:10 0.074 12:00 0.842 0.235 0.235 04/21/2017 03:55 1.60 10:50 4.35 2.22 03:35 1.75 10:50 4.90 3.32 03:35 0.071 10:50 0.805 0.226 0.226 04/22/2017 04:40 1.68 09:30 4.53 2.14 04:50 1.87 09:30 4.93 3.28 04:50 0.081 09:30 0.857 0.208 0.208 04/23/2017 04:15 1.58 13:30 4.02 2.08 04:10 1.60 13:30 4.77 3.14 04:10 0.063 13:30 0.704 0.192 0.192 04/24/2017 04:25 1.49 09:30 4.07 2.21 04:20 1.60 09:30 4.84 3.26 04:20 0.059 09:30 0.727 0.222 0.222 04/25/2017 03:10 1.54 17:50 4.02 2.25 04:35 1.75 13:55 4.73 3.34 03:10 0.069 17:50 0.697 0.229 0.229 04/26/2017 09:30 1.32 07:30 4.19 2.24 03:20 1.54 18:30 4.75 3.31 03:20 0.060 07:30 0.740 0.231 0.231 04/27/2017 03:55 1.61 09:15 4.13 2.24 02:45 1.34 09:15 4.80 3.33 02:45 0.060 09:15 0.736 0.229 0.229 04/28/2017 03:30 1.66 12:05 4.34 2.25 01:15 1.58 12:05 4.73 3.32 03:30 0.073 12:05 0.774 0.229 0.229 04/29/2017 04:50 1.70 18:25 4.05 2.13 03:45 1.66 18:25 4.77 3.26 03:45 0.078 18:25 0.712 0.205 0.205 04/30/2017 05:05 1.57 16:25 3.98 2.06 04:25 1.42 16:25 4.81 3.15 04:25 0.058 16:25 0.700 0.191 0.191 05/01/2017 04:50 1.54 12:40 4.44 2.23 03:55 1.58 12:40 4.90 3.30 04:15 0.062 12:40 0.829 0.227 0.227 05/02/2017 04:05 1.53 11:50 4.95 2.24 03:05 1.56 11:50 5.10 3.31 03:05 0.061 11:50 0.997 0.229 0.229 05/03/2017 04:40 1.56 23:45 4.65 2.28 01:30 1.67 23:45 4.90 3.36 03:35 0.068 23:45 0.883 0.240 0.239 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 Broad05, Pipe Height: 12.00 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.20 3.29
3.091
0.221
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
Broad06E
Pipe Dimensions 12.13 "
Silt Level 0.00"
Overview
Site Broad06E functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 23.1% full during the typical average depth of 2.80 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.80 0.44 0.042
Minimum 1.82 0.16 0.009
Maximum 4.46 1.11 0.190
Time of Minimum 4/20/2017 03:55 4/21/2017 03:30 4/21/2017 03:30 Time of Maximum 4/22/2017 09:25 4/22/2017 09:25 4/22/2017 09:25 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
Broad06E
12.13 Low flow and slow velocity
during install
Not investigated
0.13"
.21
8'
Precast/OK
VCP/Good
2.00 3/21/17
Standard Traffic Control with No Safety Concerns
2230 Broadway
Not investigated
12.00 4/19/17
Sensor
Location
8'
12.13 x 12.00
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 03:55 1.82 13:45 3.95 2.83 03:35 0.20 13:35 1.09 0.55 03:35 0.010 13:35 0.158 0.054 0.054 04/21/2017 03:55 1.91 14:35 3.92 2.79 03:30 0.16 14:25 0.82 0.47 03:30 0.009 14:45 0.114 0.045 0.045 04/22/2017 04:35 1.97 09:25 4.46 2.58 04:05 0.17 09:25 1.11 0.37 04:05 0.009 09:25 0.190 0.031 0.031 04/23/2017 03:50 1.87 17:40 3.22 2.58 07:05 0.18 10:05 0.66 0.36 05:45 0.009 10:05 0.071 0.030 0.030 04/24/2017 04:30 1.90 16:35 3.81 2.87 03:00 0.17 16:00 0.82 0.46 03:00 0.009 16:00 0.110 0.046 0.046 04/25/2017 04:40 1.95 16:20 3.91 2.87 02:35 0.19 10:35 0.85 0.42 02:35 0.011 10:35 0.112 0.042 0.042 04/26/2017 03:30 1.86 14:10 3.78 2.85 01:40 0.18 17:10 0.79 0.50 01:40 0.011 10:05 0.101 0.049 0.049 04/27/2017 03:20 2.04 11:35 3.78 2.91 05:05 0.18 11:35 0.78 0.41 05:05 0.012 11:35 0.106 0.041 0.041 04/28/2017 04:15 1.94 23:50 4.11 2.89 02:45 0.20 17:10 0.69 0.43 02:45 0.011 23:50 0.093 0.042 0.042 04/29/2017 03:35 2.19 08:30 3.80 2.68 03:35 0.33 08:35 0.56 0.43 03:35 0.021 08:30 0.065 0.037 0.037 04/30/2017 03:25 2.18 09:15 3.35 2.69 08:20 0.30 13:45 0.50 0.40 03:25 0.019 13:45 0.054 0.035 0.035 05/01/2017 03:00 2.11 15:15 4.37 2.98 04:25 0.29 15:15 0.86 0.46 04:25 0.017 15:15 0.144 0.048 0.048 05/02/2017 04:00 1.91 09:35 3.69 2.79 04:10 0.28 13:55 0.62 0.44 04:10 0.015 13:55 0.081 0.042 0.042 05/03/2017 02:05 1.90 12:10 4.01 2.86 02:05 0.29 12:10 0.74 0.45 02:05 0.015 12:10 0.109 0.045 0.045 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 Broad06E, Pipe Height: 12.13 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.80 0.44
0.588
0.042
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
Broad06N
Pipe Dimensions 5 "
Silt Level 0.00"
Overview
Site Broad06N functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location. Confidence in data accuracy is lower than typical, due to low flow conditions and the small pipe.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 17.2% full during the typical average depth of 0.86 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 0.86 0.44 0.005
Minimum 0.30 0.14 0.000
Maximum 1.70 1.29 0.036
Time of Minimum 4/21/2017 03:20 5/3/2017 17:10 4/30/2017 04:25 Time of Maximum 4/21/2017 09:25 4/21/2017 09:25 4/21/2017 09:25 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
Broad06N
5.00 Low flow during install
Not investigated
0.13"
.09
8'
Precast/OK
VCP/Good
.63
3/21/17
Standard Traffic Control with No Safety Concerns
2230 Broadway
Not investigated
5.25 4/19/17
Sensor
Location
8'
5.00 x 5.25
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 02:30 0.34 09:05 1.39 0.84 01:05 0.19 09:05 0.73 0.43 02:30 0.001 09:05 0.015 0.005 0.005 04/21/2017 03:20 0.30 09:25 1.70 0.84 03:20 0.20 09:25 1.29 0.43 03:20 0.000 09:25 0.036 0.005 0.005 04/22/2017 02:10 0.45 10:10 1.43 0.87 02:10 0.22 10:10 0.82 0.45 02:10 0.001 10:10 0.018 0.005 0.005 04/23/2017 05:45 0.39 17:45 1.32 0.86 03:40 0.19 17:45 0.76 0.45 05:25 0.001 17:45 0.015 0.005 0.005 04/24/2017 12:55 0.37 20:10 1.52 0.89 01:45 0.17 19:10 0.86 0.46 12:55 0.001 19:10 0.020 0.006 0.006 04/25/2017 04:25 0.41 07:50 1.37 0.85 03:45 0.23 07:50 0.76 0.44 04:25 0.001 07:50 0.016 0.005 0.005 04/26/2017 04:05 0.41 20:05 1.50 0.85 04:35 0.24 20:05 0.78 0.42 05:30 0.001 20:05 0.018 0.005 0.005 04/27/2017 03:40 0.39 07:25 1.37 0.85 04:15 0.22 07:30 0.75 0.45 04:15 0.001 07:30 0.015 0.005 0.005 04/28/2017 05:10 0.42 16:45 1.40 0.80 03:10 0.15 09:20 0.75 0.41 03:10 0.001 08:35 0.015 0.004 0.004 04/29/2017 03:05 0.34 12:55 1.35 0.84 03:05 0.19 12:55 0.74 0.43 03:05 0.001 12:55 0.015 0.005 0.005 04/30/2017 04:25 0.32 08:45 1.34 0.88 04:25 0.17 20:15 0.81 0.46 04:25 0.000 20:15 0.016 0.006 0.006 05/01/2017 01:55 0.58 08:40 1.38 0.89 19:15 0.27 07:45 0.78 0.47 01:55 0.002 08:40 0.015 0.006 0.006 05/02/2017 02:45 0.49 09:40 1.52 0.88 03:10 0.24 09:40 0.87 0.45 03:15 0.001 09:40 0.021 0.005 0.005 05/03/2017 03:45 0.41 07:55 1.59 0.85 17:10 0.14 07:55 0.95 0.45 17:10 0.001 07:55 0.024 0.005 0.005 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 Broad06N, Pipe Height: 5.00 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
0.86 0.44
0.073
0.005
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
SAN02E
Pipe Dimensions 12 "
Silt Level 0.00"
Overview
Site SAN02E functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 23.7% full during the typical average depth of 2.84 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.84 0.55 0.061
Minimum 1.14 0.12 0.003
Maximum 8.58 2.68 1.039
Time of Minimum 5/2/2017 04:25 4/30/2017 04:50 4/30/2017 04:50 Time of Maximum 5/3/2017 14:50 5/3/2017 14:50 5/3/2017 14:50 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
San02E
12.00 Low straight through flow
Not investigated
0.13"
1.05 12'
Precast/OK
VCP/Good
3.25 3/21/17
Standard Traffic Control with No Safety Concerns
20th & Santa Monica Blvd.
Not investigated
12.00 4/19/17
Sensor
Location
12'
12.00 x 12.00
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 02:55 1.22 11:00 5.42 3.04 02:10 0.15 16:35 1.45 0.61 02:10 0.004 12:05 0.258 0.072 0.072 04/21/2017 02:35 1.22 13:10 5.32 3.07 00:20 0.20 13:10 1.40 0.63 02:35 0.007 13:10 0.303 0.075 0.075 04/22/2017 03:50 1.21 11:00 4.70 2.40 04:25 0.19 17:30 1.12 0.40 04:45 0.006 11:00 0.202 0.034 0.034 04/23/2017 03:20 1.15 15:20 4.69 2.31 03:35 0.18 15:20 1.24 0.37 03:35 0.005 15:20 0.227 0.029 0.029 04/24/2017 02:25 1.25 13:10 5.23 3.04 00:25 0.22 12:25 1.38 0.64 02:25 0.008 13:10 0.280 0.075 0.075 04/25/2017 04:10 1.20 11:40 5.18 2.97 02:15 0.23 15:45 1.36 0.60 04:10 0.007 15:45 0.245 0.069 0.069 04/26/2017 02:00 1.25 09:50 5.42 3.02 23:30 0.26 19:40 1.36 0.64 02:00 0.008 09:50 0.272 0.073 0.073 04/27/2017 02:40 1.18 13:50 5.67 2.94 02:10 0.20 13:50 1.63 0.62 02:40 0.006 13:50 0.384 0.070 0.070 04/28/2017 02:45 1.26 12:10 5.27 3.09 00:40 0.19 06:25 1.35 0.63 02:45 0.006 06:25 0.232 0.074 0.074 04/29/2017 03:00 1.16 08:35 4.42 2.28 03:45 0.13 08:35 1.07 0.38 03:45 0.004 08:35 0.182 0.029 0.029 04/30/2017 03:35 1.17 10:05 4.82 2.23 04:50 0.12 10:05 1.06 0.36 04:50 0.003 10:05 0.201 0.027 0.027 05/01/2017 03:40 1.22 09:55 5.38 3.12 04:20 0.13 16:50 1.38 0.64 04:20 0.004 16:50 0.285 0.076 0.076 05/02/2017 04:25 1.14 13:50 5.61 3.13 00:40 0.17 13:50 1.23 0.55 04:25 0.006 13:50 0.285 0.067 0.067 05/03/2017 02:40 1.39 14:50 8.58 3.19 03:30 0.20 14:50 2.68 0.65 03:30 0.008 14:50 1.039 0.086 0.086 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 SAN02E, Pipe Height: 12.00 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.84 0.55
0.855
0.061
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
SAN02N
Pipe Dimensions 12 "
Silt Level 0.00"
Overview
Site SAN02N functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . This line exhibits the presence of an hydraulic jump when operating between 2.0 and 2.7 inches in depth. This condition is experienced when flow transitions from supercritical to subcritical flow. No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 22.9% full during the typical average depth of 2.75 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.75 3.86 0.353
Minimum 1.79 1.44 0.073
Maximum 4.21 5.42 0.826
Time of Minimum 5/1/2017 04:05 4/30/2017 04:00 4/29/2017 04:15 Time of Maximum 4/21/2017 09:35 4/24/2017 14:05 4/21/2017 09:35 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality
and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
San02N
12.00 Good straight through flow
Not investigated
0.13"
3.51 12'
Precast/OK
VCP/Good
2.38 3/21/17
Standard Traffic Control with No Safety Concerns
20th & Santa Monica Blvd.
Not investigated
12.00 4/19/17
Sensor
Location
12'
12.00 x 12.00
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 03:50 1.94 07:30 4.07 2.81 03:55 1.92 10:10 5.20 3.87 03:55 0.104 07:30 0.786 0.366 0.366 04/21/2017 03:50 2.01 09:35 4.21 2.80 03:50 1.55 09:35 5.19 3.88 03:50 0.086 09:35 0.826 0.365 0.365 04/22/2017 03:20 1.99 08:00 3.61 2.68 02:50 1.95 12:25 4.96 3.73 03:20 0.118 08:00 0.631 0.328 0.328 04/23/2017 03:20 1.98 09:35 3.82 2.69 03:20 1.91 17:45 4.99 3.81 03:20 0.104 09:35 0.654 0.335 0.335 04/24/2017 02:40 1.97 14:50 3.95 2.78 02:35 1.65 14:05 5.42 3.89 02:40 0.090 14:05 0.764 0.362 0.362 04/25/2017 04:10 1.95 10:50 3.62 2.77 04:10 1.65 10:50 4.91 3.84 04:10 0.089 10:50 0.634 0.352 0.352 04/26/2017 02:50 2.09 09:55 3.67 2.74 02:15 1.92 09:55 5.38 3.91 02:10 0.115 09:55 0.707 0.354 0.354 04/27/2017 03:25 2.01 11:45 3.78 2.76 04:20 1.75 10:30 5.34 3.91 04:20 0.099 10:30 0.693 0.359 0.359 04/28/2017 04:20 2.02 08:35 3.56 2.77 04:20 1.81 07:55 5.08 3.98 04:20 0.102 08:35 0.639 0.365 0.365 04/29/2017 04:10 1.84 09:30 3.76 2.61 04:15 1.48 11:20 5.26 3.68 04:15 0.073 09:30 0.706 0.313 0.313 04/30/2017 04:00 1.90 17:45 3.44 2.56 04:00 1.44 16:30 4.74 3.61 04:00 0.074 17:45 0.569 0.298 0.298 05/01/2017 04:05 1.79 09:50 3.79 2.81 03:35 1.60 12:50 5.19 3.89 03:35 0.082 09:50 0.703 0.372 0.372 05/02/2017 03:45 2.30 08:50 3.77 2.90 03:45 2.85 08:50 5.29 4.20 03:45 0.194 08:50 0.721 0.406 0.406 05/03/2017 03:30 1.92 10:15 3.97 2.79 03:20 1.71 10:15 5.14 3.90 03:20 0.091 10:15 0.752 0.367 0.366 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 SAN02N, Pipe Height: 12.00 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.75 3.86
4.942
0.353
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
SAN03
Pipe Dimensions 12 "
Silt Level 0.00"
Overview
Site SAN03 functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . The hydraulic conditions in this stretch of pipe are near the lower detection limit of an area velocity type meter. Depth in this line is typically low and stagnant. No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location. Confidence in data accuracy is lower than typical, due to hydraulic conditions.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 9.0% full during the typical average depth of 1.08 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 1.08 0.00 0.000
Minimum 1.05 0.00 0.000
Maximum 4.80 0.44 0.060
Time of Minimum 4/20/2017 00:00 4/20/2017 00:00 4/20/2017 00:00 Time of Maximum 5/3/2017 14:50 5/3/2017 15:00 5/3/2017 15:00 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality
and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
San03
12.00 No flow present during install
and heavy root intrusion
Not investigated
0.13"
0.00 8'
Brick/OK
VCP/Good
0.00 3/21/17
Standard Traffic Control with No Safety Concerns
Santa Monica Blvd & 21st St.
Not investigated
12.00 4/19/17
Sensor
Location
8'
12.00 x 12.00
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 00:00 1.05 23:20 1.06 1.05 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/21/2017 17:10 1.05 23:25 1.06 1.06 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/22/2017 00:05 1.06 02:00 1.07 1.06 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/23/2017 01:20 1.06 23:55 1.07 1.06 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/24/2017 00:00 1.07 14:30 1.07 1.07 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/25/2017 12:40 1.07 23:00 1.07 1.07 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/26/2017 02:55 1.07 19:15 1.07 1.07 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/27/2017 04:20 1.07 07:20 1.09 1.09 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/28/2017 16:00 1.07 23:00 1.09 1.08 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/29/2017 22:35 1.08 01:05 1.09 1.08 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 04/30/2017 11:45 1.07 23:55 1.08 1.08 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 05/01/2017 04:00 1.08 15:45 1.09 1.08 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 05/02/2017 01:30 1.08 23:55 1.10 1.09 00:00 0.00 00:00 0.00 0.00 00:00 0.000 00:00 0.000 0.000 0.000 05/03/2017 14:40 1.08 14:50 4.80 1.21 00:00 0.00 15:00 0.44 0.01 00:00 0.000 15:00 0.060 0.001 0.001 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 SAN03, Pipe Height: 12.00 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
1.08 0.00
0.001
0.000
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
San04E
Pipe Dimensions 14.38 "
Silt Level 0.00"
Overview
Site San04E functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that this line was impacted by debris. Free flow conditions were maintained throughout most of the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 16.3% full during the typical average depth of 2.35 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.35 0.76 0.065
Minimum 1.29 0.22 0.010
Maximum 4.87 1.25 0.177
Time of Minimum 4/20/2017 03:35 5/3/2017 00:10 4/21/2017 04:20 Time of Maximum 5/2/2017 11:45 4/23/2017 11:20 4/23/2017 11:20 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
San04E
14.38 Good straight through flow
Not investigated
0.13"
1.01 10'
Precast/OK
VCP/Good
2.75 3/21/17
Standard Traffic Control with No Safety Concerns
2314 Santa Monica Blvd
Not investigated
14.50 4/19/17
Sensor
Location
10'
14.38 x 14.50
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 03:35 1.29 10:45 3.97 2.14 04:25 0.31 08:25 1.14 0.77 04:25 0.011 08:25 0.151 0.057 0.057 04/21/2017 04:25 1.32 10:45 3.83 2.26 04:20 0.27 13:45 1.22 0.79 04:20 0.010 13:50 0.149 0.064 0.064 04/22/2017 04:45 1.45 19:05 3.91 2.40 02:45 0.23 10:05 1.04 0.74 02:45 0.011 09:05 0.122 0.064 0.064 04/23/2017 05:00 1.74 13:25 3.81 2.43 04:10 0.28 11:20 1.25 0.68 04:10 0.015 11:20 0.177 0.061 0.061 04/24/2017 23:45 1.93 07:35 3.68 2.47 03:25 0.28 19:30 1.16 0.76 03:25 0.017 19:30 0.144 0.067 0.067 04/25/2017 04:05 1.51 17:45 3.93 2.42 03:15 0.27 13:40 1.10 0.79 03:15 0.012 21:05 0.128 0.069 0.069 04/26/2017 04:05 1.36 09:25 4.08 2.36 04:05 0.33 18:05 1.17 0.77 04:05 0.012 18:25 0.130 0.066 0.066 04/27/2017 03:15 1.38 09:10 4.27 2.39 00:15 0.28 12:15 1.17 0.77 04:55 0.013 12:15 0.139 0.067 0.067 04/28/2017 02:35 1.63 12:00 4.20 2.41 01:55 0.27 10:45 1.11 0.76 02:35 0.017 08:55 0.141 0.065 0.065 04/29/2017 04:40 1.40 18:20 3.92 2.31 00:45 0.26 17:40 1.13 0.77 04:40 0.013 14:45 0.138 0.063 0.063 04/30/2017 04:45 1.43 16:20 3.89 2.28 05:40 0.30 10:55 1.11 0.74 05:00 0.017 10:55 0.122 0.060 0.060 05/01/2017 04:05 1.40 12:30 4.11 2.34 23:50 0.26 13:00 1.18 0.78 04:25 0.012 12:35 0.144 0.066 0.066 05/02/2017 05:15 1.38 11:45 4.87 2.36 03:05 0.32 08:00 1.24 0.81 05:15 0.013 08:00 0.153 0.068 0.068 05/03/2017 04:30 1.33 23:40 4.39 2.37 00:10 0.22 19:10 1.21 0.78 04:25 0.012 11:40 0.146 0.067 0.067 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 San04E, Pipe Height: 14.38 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.35 0.76
0.904
0.065
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
Site Commentary
Site Information
San04N
Pipe Dimensions 9.38 "
Silt Level 0.00"
Overview
Site San04N functioned under normal conditions during the period Thursday, April 20, 2017 to Wednesday, May 03, 2017 . No surcharge conditions were experienced at this location (See Observation Table For More Details).
Review of the Scattergraph shows that free flow conditions were maintained throughout the study period.
Flow depth and velocity measurements recorded by the flow monitor are consistent with field confirmations conducted and support the relative accuracy of the flow monitor at this location.
Observations
Average flow depth, velocity, and quantity data observed during Thursday, April 20, 2017 to Wednesday, May 03, 2017 , along with observed minimum and maximum data, are provided in the following table. The values presented are based on 5-minute data. In regards to depth, this site flows at approximately 22.7% full during the typical average depth of 2.13 inches.
Observed Flow Conditions
Item Depth
(in)
Velocity
(ft/s)
Quantity
(MGD)
Average 2.13 1.26 0.084
Minimum 0.99 0.24 0.006
Maximum 6.58 4.44 0.894
Time of Minimum 5/2/2017 03:40 5/2/2017 02:25 5/2/2017 02:25 Time of Maximum 5/3/2017 23:35 4/22/2017 09:00 4/27/2017 09:10 Data Quality
Data uptime observed during the Thursday, April 20, 2017 to the Wednesday, May 03, 2017 monitoring period is provided in the table below. Based upon the quality and consistency of the observed flow depth and velocity data, the Continuity equation was used to calculate flow rate and quantities during the monitoring period.
Percent Uptime
Depth (in) 100
Velocity (ft/s) 100
Quantity (MGD) 100
ADS Site Report
Project Name: FM Initials:
Site Name:
City:
Access: Type of
System:
Sanitary
Investigation Information:
Manhole Depth:
Manhole Material /
Pipe Material / Condition:
Commercial
Oxygen:
Safety Notes:
Date/Time of Investigation:
Site Hydraulics:
Upstream Input: (L/S, P/S)
Upstream Manhole:
Downstream Manhole:
Depth of Flow:
Range (Air DOF):
Peak Velocity:
Silt: Inches
fps
+/-
+/-
Cross Section
Installation Information
Installation Type: Standard
Sensors Devices: Ultrasonic / Pressure/Velocity
Surcharge Height:
Rain Gauge Zone:
Yes No ? Distance
Trunk
Lift / Pump Station
WWTP
Other
Monitor Type
Pipe Height:
Pipe Width:
Data Acquisition
Manhole ID
Quality Form
Address/Location:
SK
Drive
Storm Combined
X
Manhole Information: Investigation Information:
Condition
Land Use:
Residential Industrial Trunk
N N
Other Information:
Additional Site Information / Comments:
x
x
x
x
Monitor Model
x
Install Date:
Agency:
Triton
Peak Doppler
0 Backup
Santa Monica KPFF TFM 2017 Santa Monica
San04N
9.38 Good straight through flow
Not investigated
0.13"
2.38 10'
Precast/OK
VCP/Good
2.38 3/21/17
Standard Traffic Control with No Safety Concerns
2314 Santa Monica Blvd
Not investigated
9.50 4/19/17
Sensor
Location
10'
9.38 x 9.50
“
“
Santa Monica
--
0.00 Plan N
20.9 0 H2S: LEL: 0 CO: 0
2 man crew required and one blower is to be
operated at all times.
Manual Collect
"
ADS Site
Location
ADS Site
Location
Date Depth
(in)
Velocity
(ft/s)
Quantity
(MGD - Total MG)
Rain
(in)
Time Min Time Max Avg Time Min Time Max Avg Time Min Time Max Avg Total Total 04/20/2017 04:40 1.19 11:55 5.71 2.15 03:35 0.47 11:55 4.28 1.38 03:35 0.011 11:55 0.857 0.096 0.096 04/21/2017 04:55 1.23 10:45 5.49 2.09 03:50 0.43 10:45 4.08 1.29 03:50 0.011 10:45 0.779 0.084 0.084 04/22/2017 03:35 1.26 19:05 5.26 2.14 04:40 0.54 09:00 4.44 1.36 04:15 0.014 09:00 0.760 0.091 0.091 04/23/2017 03:55 1.22 13:25 5.24 1.99 03:50 0.48 13:10 3.96 1.22 03:50 0.012 13:25 0.710 0.072 0.072 04/24/2017 05:25 1.10 07:30 4.98 2.05 05:10 0.41 09:25 4.01 1.27 05:10 0.009 09:25 0.654 0.080 0.080 04/25/2017 03:05 1.23 03:15 5.22 2.12 04:20 0.42 03:15 4.00 1.31 04:20 0.010 03:15 0.717 0.087 0.087 04/26/2017 03:55 1.23 07:25 5.71 2.19 04:10 0.40 07:20 4.06 1.31 03:55 0.011 07:25 0.776 0.095 0.095 04/27/2017 05:00 1.21 09:10 5.90 2.10 03:05 0.42 09:10 4.30 1.19 03:05 0.010 09:10 0.894 0.080 0.080 04/28/2017 02:55 1.21 12:00 5.61 2.14 04:15 0.35 14:05 3.86 1.22 04:15 0.009 12:00 0.748 0.082 0.082 04/29/2017 03:55 1.22 18:20 5.12 2.13 02:45 0.42 14:45 3.82 1.19 02:45 0.011 06:40 0.612 0.080 0.080 04/30/2017 00:30 1.22 16:20 5.54 2.18 00:55 0.37 05:40 3.71 1.24 00:55 0.012 16:20 0.667 0.082 0.082 05/01/2017 22:40 1.14 12:30 5.45 2.24 04:30 0.32 23:05 3.77 1.29 06:15 0.009 12:30 0.688 0.089 0.089 05/02/2017 03:40 0.99 11:45 6.30 2.11 02:25 0.24 11:40 4.07 1.17 02:25 0.006 11:45 0.885 0.077 0.077 05/03/2017 03:30 1.18 23:35 6.58 2.18 03:25 0.34 23:40 3.91 1.22 03:25 0.008 23:35 0.868 0.086 0.086 Daily Tabular Report
Daily Tabular Report For The Period 04/20/2017 00:00 - 05/03/2017 23:59 San04N, Pipe Height: 9.38 in, Silt: 0.00 in
Depth
(in)
Velocity
(ft/s)
Quantity
(MGD -
Total MG)
Avg
Total
2.13 1.26
1.180
0.084
Report Summary For The Period 04/20/2017 00:00 - 05/03/2017 23:59
700 South Flower Street, Suite 2100 Los Angeles, CA 90017 213.418.0201 kpff.com
APPENDIX E
AsBuilt Drawings
ClibPDF - www.fastio.com
700 South Flower Street, Suite 2100 Los Angeles, CA 90017 213.418.0201 kpff.com
APPENDIX F
DEVELOPMENT AGREEMENT VESTED USE
“BLUE CHART”
Providence Saint John’s Phase Two
Development Details
September 6, 2017
1 PHASE TWO BUILDINGS
Building Name Types of DA Vested Uses in Building Floor Area/ Units per Use*
Max. Building
Floor Area
S1 Child &
Family
Development
Center
Child & Family Development Center
Mental Health Therapy Rooms
Consultation Rooms
Administration and Support (Approximately 3,200 sf)
25,500 sf
(Current assumption is
25,500 sf)
34,500 sf
Day Care
Multi-Purpose Rooms
Five Classrooms
Administration and Support (Approximately 1,200 sf)
15,000 sf
(Current assumption is
9,000 sf)
Up to 5 levels of subterranean parking
S2 Multifamily
Housing
Multifamily Housing
Ten 2 bedroom, 1 bath units
10 units 10 units plus
800 sf
Neighborhood Commercial Uses 800 sf commercial
(Current assumption is
800 sf)
Up to 2 levels of subterranean parking
S3 West
Ambulatory
Care &
Research
Building -
South
Campus
Hospital/Health Care
Clinic Space
Administration and Support (Approx. 3,500 sf)
65,000 sf
(Current assumption is
61,500 sf)
123,000 sf
Medical Research Facilities (JWCI)
Research/Lab (e.g. Molecular Biology and Genomics/gene sequencing, Immunology/cell processing)
Administrative and Support (Approx. 7,868 sf)
115,000 sf
(Current assumption is
59,000 sf)
Restaurant or Neighborhood Commercial Uses or Health Related Services
5,000 sf
(Current assumption is
2,500 sf)
Up to 5 levels of subterranean parking
Providence Saint John’s Phase Two
Development Details
September 6, 2017
2 PHASE TWO BUILDINGS
Building Name Types of DA Vested Uses in Building Floor Area/ Units per Use*
Max. Building
Floor Area
S4 Education &
Conference
Center and
East
Ambulatory
Care &
Research
Building -
South
Campus
Education & Conference Center (See detailed description of use below)
Auditorium (approximately 250 seats)
Eight Education Rooms
Administrative and Support (Approx. 2,300 sf)
60,000 sf
(Current assumption is
59,000 sf)
199,000 sf
Hospital/Health Care
Sport Medicine Clinic & Physical Therapy (Outpatient) (Approx. 26,000 sf)
Joint Replacement & Sports Medicine (Outpatient) (Approx. 26,000 sf)
Ambulatory Surgery Center (Surgery Pre-op & Sterile
Processing and Surgery (Approx. 43,000 sf)
Longer appointment times than traditional clinic space Administrative and Support (Approx. 10,000 sf)
120,000 sf
(Current assumption is
105,000 sf)
Health & Wellness Center
Exercise and Fitness Rooms
Therapy Rooms (Outpatient)
Common Area (Approximately 1,750)
35,000 sf
(Current assumption is
28,300 sf)
Medical Research Facilities
Potential expansion for Research/Lab (e.g. Molecular Biology and Genomics/gene sequencing, Immunology/cell processing) 50,000 sf
(Current assumption is
0 sf)
Health-Related Services
Restaurant or Neighborhood Commercial Uses
10,000 sf
(Current assumption is
6,700 sf)
Up to 5 levels of subterranean parking
Providence Saint John’s Phase Two
Development Details
September 6, 2017
3 PHASE TWO BUILDINGS
Building Name Types of DA Vested Uses in Building Floor Area/ Units per Use*
Max. Building
Floor Area
S5 Visitor
Housing
Visitor Housing (See detailed description of use below) Approx. 34 units, including a mix of one-bedroom units, singles, and suites
Approx. 12 of the units have private kitchens
Approx. 2,500 sf of common area, including kitchen
30-34 units
(Current assumption is
34 units)
38,000 sf
Up to 5 levels of subterranean parking
Saint John’s
Café
Restaurant or Neighborhood Commercial Uses 900 sf 900 sf 2C West
Ambulatory
& Acute Care
Building -
North
Campus
Hospital/Health Care
If Ambulatory (Outpatient):
Imaging (serving both patients that are already on-site as well as patients arriving from off-site for imaging services) Clinics (e.g. Cardiovascular)
Support (Approximately 5,000 sf)
If Inpatient:
Approximately 80 beds
Med surg units and ICU
Support (Approximately 6,000 sf)
117,500 sf
(Current assumption is
108,500 sf abovegrade
3,500 below-grade)
123,350 sf
above-grade
6,150 sf belowgrade
Health-Related Services
Restaurant or Neighborhood Commercial Uses
5,500 sf
Pedestrian Connection 12,000 sf
(9,350 sf above-grade,
2,650 sf below-grade)
Up to 4 levels of subterranean parking
Providence Saint John’s Phase Two
Development Details
September 6, 2017
4 PHASE TWO BUILDINGS
Building Name Types of DA Vested Uses in Building Floor Area/ Units per Use*
Max. Building
Floor Area
2D/E East
Ambulatory
& Acute Care
Building -
North
Campus
Hospital/Health Care
If Ambulatory (Outpatient):
Clinic (e.g. Women’s & Pediatrics)
Short Stay/Observation Units (stays up to 23 hours)
Support (Approximately 4,000 sf)
If Inpatient:
Approximately 36 beds (assuming three levels of ICU)
ICU
Support (Approximately 5,000 sf)
78,500 sf
(Current assumption is
59,500 sf above-grade
16,000 sf belowgrade)
65,800 sf
above-grade
16,400 sf belowgrade
Health-Related Services
Restaurant or Neighborhood Commercial Uses
3,000 sf
Pedestrian Connection 3,700 sf
(3,300 sf above-grade,
400 sf below-grade)
Up to 4 levels of subterranean parking
Providence Saint John’s Phase Two
Development Details
September 6, 2017
5 PHASE TWO BUILDINGS
Building Name Types of DA Vested Uses in Building Floor Area/ Units per Use*
Max. Building
Floor Area
2I Medical
Office
Building
Medical Office 50,000 sf 73,300 sf
Health-Related Services
Restaurant or Neighborhood Commercial Uses
4,500 sf
Parking (at grade) 18,800 sf
Up to 4 levels of subterranean parking
Mullin Plaza
Café
Restaurant or Neighborhood Commercial Uses 1,500 sf 1,500 sf Phase Two Total 660,150 sf
above-grade
22,550 sf belowgrade
(15,700 sf is
Pedestrian
Connection/nonprogram space)
*For some buildings, the sum of the maximum floor areas for the Vested Uses within the building exceed the overall building floor area in order to allow flexibility with respect to the location and amount of certain Vested Uses. The current assumption about the use of the building is noted in the Floor Area/Units per Use column in red.
\\hlkk-dc01\sys\WPDATA\22238\Docs 001 Phase 2\Annotated Blue Chart 2017.09.05 (with 2I update) .docx