Phase II Master Plan
Partial Street Vacation
City of Santa Monica | City Council
April 26, 2022
Partial Vacation
of 21st Street
2 • Included in Master Plan, DA, and
EIR that came before City Council
on March 22, 2022
Exhibit depicts ground-level conceptual building footprints demonstrating 3 implementation of the Master Plan, building design is subject to change.
Conceptual Development
of Phase II Sites
• Implementation of Master Plan – connected
campus
• Active and passive open space
• Circulation – Access to Santa Monica Blvd
and Broadway for pedestrians, bicyclists,
and vehicles
Existing Circulation
4 1
2 2 Existing 21st Street
Private Driveway
City Street
1 Existing North CampusDriveway
Proposed Circulation
Proposed South Campus EastDriveway
3 Proposed South Campus WestDriveway
Proposed North CampusDriveway
Proposed 20th Place
Proposed SoutheastDriveway
1 2
4 Proposed Saint John’sWay
Restricted Access Areas
PrivateDriveway
City Street
Subterranean Loop
8 5
6 7
3 Proposed Partial Street Vacation of 21st Street
9 8
• Supports creation of the campus environment
• Implements Master Plan Circulation
• Aligned with City priorities related to bikes on Broadway and better connectivity to bus and light rail transportation options Street Vacation Overview
Thank You
?
24/7 Pedestrian Connections
Sidewalks/pedestrian connections between
Broadway and Santa Monica Boulevard
through the South Campus better integrate
the Campus into the City’s urban fabric and
substantially enhance the walk to/from the
Expo line.