Cities Index.
Applicant's PowerPoint Presentation

Santa Monica City Council
April 26, 2022

Document
Applicant's PowerPoint Presentation
Meeting
April 26, 2022
Body
Santa Monica City Council
Original file
2.0 MB
Text extracted from the city's file for reading and search. Open the original on santamonicacityca.iqm2.com. That file is the official record.

Phase II Master Plan
Partial Street Vacation
City of Santa Monica | City Council
April 26, 2022
Partial Vacation
of 21st Street
2 • Included in Master Plan, DA, and
EIR that came before City Council
on March 22, 2022
Exhibit depicts ground-level conceptual building footprints demonstrating 3 implementation of the Master Plan, building design is subject to change.

Conceptual Development
of Phase II Sites
• Implementation of Master Plan – connected
campus
• Active and passive open space
• Circulation – Access to Santa Monica Blvd
and Broadway for pedestrians, bicyclists,
and vehicles
Existing Circulation
4 1
2 2 Existing 21st Street
Private Driveway
City Street
1 Existing North CampusDriveway
Proposed Circulation
Proposed South Campus EastDriveway
3 Proposed South Campus WestDriveway
Proposed North CampusDriveway
Proposed 20th Place
Proposed SoutheastDriveway
1 2
4 Proposed Saint John’sWay
Restricted Access Areas
PrivateDriveway
City Street
Subterranean Loop
8 5
6 7
3 Proposed Partial Street Vacation of 21st Street
9 8
• Supports creation of the campus environment
• Implements Master Plan Circulation
• Aligned with City priorities related to bikes on Broadway and better connectivity to bus and light rail transportation options Street Vacation Overview
Thank You
?
24/7 Pedestrian Connections
Sidewalks/pedestrian connections between
Broadway and Santa Monica Boulevard
through the South Campus better integrate
the Campus into the City’s urban fabric and
substantially enhance the walk to/from the
Expo line.

← All documents from this meeting