Cities Index.
Contract 11112 - Wood

Santa Monica City Council
April 26, 2022

Document
Contract 11112 - Wood
Meeting
April 26, 2022
Body
Santa Monica City Council
Pages
56
Original file
3.8 MB
Text extracted from the city's file for reading and search. Open the original on santamonicacityca.iqm2.com. That file is the official record.

Taylor Lane
Technical Professional – Environmental
Analyst and Air Quality Specialist
Professional Summary
Mr. Lane, a Lead Technical Analyst and Deputy Project Manager, has gathered experience working to prepare Environmental Impact Reports (EIRs) and Initial Studies (IS) in accordance to the California Environmental Quality Act (CEQA). Mr. Lane has also provided analyst-level services for the preparation of several Environmental Assessments (EAs) in accordance to the National Environmental Policy Act (NEPA). Analytical experience includes assessing projectrelated impacts to land use, aesthetic and visual resources, agricultural, biological, noise, air quality, hydrology, utilities, public services, and energy resources and conservation for several EIRs, IS/MNDs, and EAs. Through his educational career, Mr. Taylor Lane has acquired knowledge and skills relating to technical writing, GIS, and field survey/delineation techniques.

Wood Experience
x Deputy Project Manager, Mendota Pool Water Exchange
Agreements EIS/EIR, U.S. Bureau of Reclamation and Westlands Water District, Fresno, CA (2016-Present)
x Deputy Project Manager, Yolo Gardens Initial Study-Mitigated Negative Declaration, County of Yolo, CA (2018-Present) x Deputy Project Manager, Vogel Lot Division Initial StudyMitigated Negative Declaration, County of Marin, CA (2016- 2017)
x Deputy Project Manager, Baron Ranch Trail Realignment Initial Study-Mitigated Negative Declaration, County of Santa Barbara, CA (2016-2017)
x Deputy Project Manager, Cate School Master Plan Update, County of Santa Barbara, CA (2016)
x Deputy Project Manager, Fountain Valley Crossings Specific Plan EIR, City of Fountain Valley, CA (2016-2018)
x Lead Environmental Analyst, East Cherry Avenue Specific Plan EIR, City of Arroyo Grande, CA (2016)
x Environmental Analyst/Air Quality Specialist, Froom Ranch Specific Plan EIR, City of San Luis Obispo, CA (2018-Present) x Environmental Analyst/Air Quality Specialist, Strand & Pier Hotel Project EIR, City of Hermosa Beach, CA (2016-2017)
Years of Experience
3 (3 with Wood)
Office of Employment
West US – Santa Barbara, CA
Languages
x English
Professional Associations
x Member, Association of
Environmental Professionals
Education
x Member, Association of
Environmental Professionals
Training
x California Emissions Estimator
Model (CalEEMod) Technical
Specialist
x U.S. Army Corps of Engineers
Wetland Delineation (Certified
by the Wetlands Training
Institute)
Areas of Expertise
x Air Quality Emissions Modeling
x Greenhouse Gases
x Biological Resources
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 © 2018 Wood

Page 1 ends

Sydnie Margallo
Technical Professional - Environmental
Professional Summary
Ms. Margallo is an environmental science professional with over 2 years of environmental planning experience serving a diverse range of clients, including Federal, state, and local government, academic institutions (e.g., University of California San Diego), and private developers. She has experience in preparing National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) compliant planning documents, as a lead technical analyst. As such, Ms. Margallo is knowledgeable on a diverse range of environmental policies and regulations. Ms. Margallo has contributed to the preparation of numerous NEPA-compliant documents for a widevariety of Federal agencies in support of capital improvement programs, management plans, and development plans. She has also contributed to the preparation of a variety of CEQA-compliant documents including Initial Studies and Mitigated Negative Declarations (IS/MNDs), Project-level Environmental Impact Reports (EIRs), and Programmatic EIRs with high levels of public interest (e.g., County of Santa Barbara Cannabis Land Use Ordinance and Licensing Program).

Ms. Margallo regularly analyzes technical studies necessary to support NEPA- and CEQA-compliant analyses (e.g., Phase I Cultural Resources Studies, Jurisdictional Wetland Delineations, Traffic Studies, Noise Analyses, etc.). Ms. Margallo has experience with using the California Emissions Estimator Model (CalEEMod) to create emissions estimates for various development projects (e.g., hotels, event centers, expanded parking lots, etc.). She is also familiar with noise modeling software and accepted metrics for analyzing aircraft noise as well as noise from construction and traffic. In addition, Ms.

Margallo has experience in conducting field work, including noise modeling, site visits, and cultural surveys.

Wood Experience
x Deputy Project Manager, Cole Grade Road Improvements EIR, County of San Diego, 2017
x Environmental Analyst/Air Quality Specialist, Ventura Hilton Project IS/MND, City of Ventura, 2017
x Environmental Analyst, Cannabis Land Use Ordinance and Licensing Program, County of Santa Barbara, 2017
x Environmental Analyst, Los Angeles Zoo Vision Plan EIR, City of Los Angeles, 2019
Years of Experience
3 (2 with Wood)
Office of Employment
West US - Santa Barbara
Languages
x English – Proficient
x French - Basic
Professional Associations
x Association of Environmental
Professionals
Education
x Bachelor of Science,
Environmental Management
and Protection, California
Polytechnic State University, San
Luis Obispo, 2016
x Minor, City and Regional
Planning, California Polytechnic
State University, San Luis
Obispo, CA, 2016
Areas of Expertise
x Air Quality and Greenhouse Gas
Emissions
x Climate Action Plans
Training
x California Air Pollution Control
Officers Association (CAPCOA)
California Emissions Estimator
Model® (CalEEMod)
x United States Air Force’s
(USAF’s) Air Conformity
Applicability Model (ACAM)
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 Tom Gaul
Principal-in-Charge

EDUCATION
Graduate Course Work, University of
California, Berkeley, 1982
Bachelor of Science, Civil Engineering,
Massachusetts Institute of Technology, 1981

AFFILIATIONS
Institute of Transportation Engineers

PUBLICATIONS AND PRESENTATIONS
x Measuring the Miles: Developing New
Metrics for Vehicle Travel in Los Angeles,
2018 ITE Joint Western & Texas District
Annual Meeting
x Growing Without Vehicle Trips: The
Santa Monica LUCE, 2011 AEP California
State Conference
x Planning in Motion: The 2030 Oahu
Regional Transportation Plan, 2006 ITE
District 6 Annual Meeting
x Warner Center: A Plan for the 21st
Century, 1993 ITE District 6 Annual
Meeting
x The Making of Iniki Express (The Kauai
Emergency Bus System), 1993 ITE District
6 Annual Meeting
ABOUT
Tom has over 35 years of experience as a transportation planner and engineer, and has conducted studies for public agencies, private firms and institutions throughout the western United States. Tom has managed areawide transportation planning studies involving needs assessment, travel demand modeling, alternatives evaluation and public outreach, including general plans, specific plans and corridor studies. He has conducted traffic impact, circulation, parking and site access studies for residential, commercial, institutional, industrial, mixed-use and entertainment developments. He is experienced at recreational and special events planning, including circulation studies for the Disneyland Resort in Anaheim and parking and circulation improvements for Los Angeles Dodger Stadium. He has conducted alternatives analysis, station access planning and rail/traffic integration studies for rail transit projects in Los Angeles and Honolulu and was a task manager for the Los Angeles County HOV Performance Program and HOV System Integration Plan studies for MTA and Caltrans. He has managed preparation of Caltrans Project Study Reports and/or Project Reports for various improvement projects on the state highway system. Finally, Tom is experienced with multimodal planning including complete streets, streetscape plans and bicycle/pedestrian studies.

PROJECT EXPERIENCE
Santa Monica Land Use and Circulation Elements (Santa Monica, CA) With Tom as Principal-in-Charge and Project Manager, Fehr & Peers developed a citywide travel demand model for the award-winning Santa Monica General Plan Land Use and Circulation Elements (LUCE) update. The study included development of performance measures for evaluating and monitoring transportation-related goals, development of a travel demand model to evaluate proposed land use scenarios and circulation strategies, a transportation analysis for the LUCE EIR, and a nexus study to develop multi-modal transportation-based impact fees. The model incorporated many state-of-the-art and unusual features, including smart growth sensitivity to fully capture the potential effects of the General Plan alternatives on vehicle travel, greenhouse gas emissions, a Saturday model, a walking and bicycling demand GIS model, and a rail transit direct ridership model. In addition to traditional LOS, the model was used to evaluate innovative performance measures including travel times, greenhouse gases, and the ability of the City to achieve its groundbreaking “no net new PM peak trips” policy. Fehr & Peers is currently updating the model and assisting the City of Santa Monica with development of VMT metrics and thresholds in response to SB 743. Tom is Principal-in-Charge.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 Capturing VMT Impacts and Benefits to CEQA (Los
Angeles, CA)
The City of Los Angeles is shifting from an auto-oriented metropolis to a city built around transit, compact transit-oriented development, and multi-modal “Complete Streets” which
emphasize all travel modes. However, these dynamic policy shifts have been significantly impeded by requirements under CEQA to mitigate automobile delay. The City has seized the historic opportunity, mandated by SB 743, to realign the environmental review processes with policies that support infill development and Complete Streets transportation projects. Fehr & Peers was selected to work closely with the LADCP and LADOT to develop new VMT-based CEQA thresholds and to update the tools
necessary to implement the new procedures. In addition to developing the new thresholds, Fehr & Peers updated the City’s travel demand model and developed a sketch model tool to perform project-level VMT analysis; quantifying the parking demand and vehicle trip reduction benefits for mixed-use projects, creative office buildings, market rate housing, and affordable housing, and Transportation Demand Management (TDM) strategies. The affordable housing sites are broken down based on population (senior, family, special needs, permanent supportive) and location (inside or outside a transit priority area).

Transportation and Outreach Consultant Services for
the City of Los Angeles General Plan Mobility Element
Fehr & Peers led a team updating the General Plan Mobility Element for the City of Los Angeles. From a selection of alternative approaches, the City chose a multimodal layerednetwork approach with a context sensitive overlay to update its street classification system. Fehr & Peers picked up where its LA Street Classification and Benchmarking System study left off and working with the City to develop concepts for a layered network.

Fehr & Peers worked with the City to create new street standards based on the development of that layered network. Through an extensive social media campaign and a series of meetings and workshops, Fehr & Peers framed the conversation in terms of transportation choices, where options and tradeoffs are clearly defined to reflect both aspirational goals and the constraints of conditions on the ground. This framing allows for the productive exchange of ideas between the public and the City. The Fehr & Peers team worked with the City to prepare a Streetscape Manual that identifies required improvements associated with each street type and addresses the existing disconnects between policy goals and current street standards. Throughout the project, our team performed outreach and branding related to public engagement for the Mobility Element. Using an innovative social media approach, the engagement approach includes crowdsourced idea generation and dialogue, a custom contest for ideas, and in-person workshops across the City. Tom was Principal-in-Charge.

Santa Monica Exposition LRT/Downtown Area
Circulation Planning (Santa Monica, CA)
Fehr & Peers assisted the City of Santa Monica with travel demand modeling and simulation in support of Exposition LRT multimodal circulation planning for Downtown Santa Monica, potentially considering Expo LRT integration, the Downtown Expo LRT Station Plaza, the Colorado Esplanade project, and potential future redevelopment of the 4th/5th Street & Arizona Avenue site. As part of this assignment, Fehr & Peers conducted travel demand forecasting model runs and VISSIM simulation model runs to analyze weekday peak hour traffic conditions and traffic/LRT interaction issues along Colorado Avenue and used this information to assist the City of Santa Monica and the Exposition Authority with resolution regarding the ultimate configuration of the LRT trackage leading into the 4th & Colorado terminus station. Fehr & Peers also evaluated issues associated with different development alternatives for the 4th/5th & Arizona site.

Santa Monica Civic Center Specific Plan Update and EIR
(Santa Monica, CA)
Tom led a team that prepared a circulation and parking study for the City of Santa Monica as part of updating the Civic Center Specific Plan (CCSP). The CCSP is a long-range plan that will guide the development of the civic center area, which includes the Santa Monica City Hall, the Public Safety Facility, the civic auditorium, a county courthouse, the RAND office complex, and planned residential uses. Fehr & Peers assisted the design team and the public working group with an evaluation of parking and circulation implications of various options regarding future development of the CCSP area. Land use options studied
included a new city government building, reuse of the old RAND site as open space, reuse/reprogramming of the civic auditorium, and the level of intensity of planned affordable residential units.

Fehr & Peers conducted traffic impact analyses and projected potential parking demands for each alternative. The firm also identified and evaluated alternative street system configurations and parking supply locations.

Westside Mobility Plan (Los Angeles, CA)
Fehr & Peers led a multi-disciplinary team to develop a long-term comprehensive Mobility Plan for the Westside of the City of Los Angeles, California. The study included development of a stateof-the-art travel demand model; a mobility and rail connectivity study including the potential for north/south rail transit connections from the LAX area through the Westside and
integration of transit, highway, bicycle and pedestrian modes; a comprehensive Westside parking study; updates to the Coastal Transportation Corridor and the West Los Angeles
Transportation Specific Plans (including VMT-based trip fee nexus studies for each); and a livable boulevards study addressing the integration of urban design/streetscape and transportation planning. The study included a substantial public outreach program to engage the community throughout the process.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 Fatemeh Ranaiefar, PhD
Associate

EDUCATION
Doctor of Philosophy, Transportation Science
University of California, Irvine, 2013
Master of Science, Industrial Engineering,
Socioeconomic System Engineering
Tarbiat Modares University, Tehran, Iran
Bachelor of Science, Industrial Engineering
Alzahra University, Tehran, Iran

AFFILIATIONS
Standing Committee on Urban Freight
Transportation (AT025) – Communication
Coordinator
Standing Committee on Freight
Transportation Data (ABJ90) -
Communication Coordinator
Standing Committee on Freight
Transportation Planning and Logistics
(AT015) - Research coordinator
ABOUT
Fatemeh has been working with Fehr & Peers since 2013. She started and leads the freight discipline group at Fehr & Peers. She specializes in freight transportation modeling, developing performance measures, and developing decision support tools for prioritizing projects to address freight issues. She recently led the team of national experts to update California Freight Mobility Plan (CFMP 2019). Fatemeh gain very deep understanding of freight transportation challenges at various level through the outreach and engaging with industry stakeholders. She is one of the main developers of California Statewide Freight Forecasting Model (CSFFM). CSFFM is a commoditybased freight forecasting model sensitive to supply chain policies and green transportation strategies.

She is passionate about research community and developing next generation of Transportation enthusiasts. She serves on the multiple TRB committees and teaches Transportation Network Modeling to Master students at USC. She has provided over 150 hours training for public agencies’ empowering staff to develop and evaluate freight modeling scenario alternatives, assess projects based on comprehensive freight performance measures and understand the application of new freight data sources and its role in their decision-making process by enhanced visual infographics.

PROJECT EXPERIENCE
Santa Monica TDF Model Update & SB 743 Implementation (Santa Monica, CA)
Fehr & Peers is currently assisting the City of Santa Monica with an update its travel demand forecasting (TDF) model and with developing the City’s transportation impact assessment metrics in response to Senate Bill (SB) 743. The model update includes extending the model focus area, refreshing the model with updated socioeconomic and land use data, calibrating the model distribution using mobile source (i.e., “big”) data, and recalibrating to recent traffic volume data. The metrics update focuses on developing appropriate screening thresholds, impact significance thresholds, and methodologies for evaluating impacts on vehicle miles of travel (VMT), customized to City of Santa Monica characteristics and values.

San Bernardino Transportation Analysis Model (SBTAM)
Fehr & Peers helped the San Bernardino Associated Governments (SANBAG) with travel demand modeling support services. Ms. Ranaiefar prepared a baseline 2040 DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 SBTAM scenario consistent with the 2016 Regional Transportation Plan (RTP) 2040 horizon year timeframe.

California State Freight Mobility Plan (CFMP 2019)
Fatemeh led a team of national experts to assist Caltrans in developing CFMP 2019 to create a powerful and effective instrument for freight mobility improvement. The team’s approach is based on effective public relationships and targeted, productive industry involvement to merge public and private visions and define implementable action steps. During the course of the project, Fatemeh worked closely with the Caltrans office of freight planning, California Freight Advisory Committee (CFAC) and California Transportation Commission. Major issues
addressed in the plan include:
• Using the freight system to strengthen economic development, efficiency, and competitiveness
• Reducing congestion on the freight system, and freight’s contribution to passenger system congestion
• Improving freight system safety, security, and resilience • Improving freight system maintenance and condition
• Incorporating advanced technology, performance management techniques, innovation, and accountability in system operation and maintenance
• Reducing freight’s adverse community and environmental impacts
• Reducing freight’s urban footprint in conjunction with increased passenger use of non-auto modes
• Merging freight transportation planning with Smart Growth, Complete Streets, and Transit Oriented Development initiatives Metro Regional Bike Share Plan
Fehr & Peers prepared the Regional Bike Share Plan for Metro to establish the parameters and framework for a Regional Bike Share program that encompasses Los Angeles County.

Development of the Plan is a collaborative effort that includes three pilot cities (Los Angeles, Pasadena and Santa Monica) and Long Beach. Fehr & Peers developed criteria for determining local jurisdiction participation in the initial and future expansion phases of the program. Ms. Ranaiefar developed a
geographically transferable bike share direct demand ridership forecasting model using clustering approach and structural equation methodology. She and her group prepared a large set of sample data from five major bike share systems to resemble different characteristics of a new bike share system in a different city. The model was later used for other studies such as the Beverly Hills Bike Share Study.

San Joaquin Valley Goods Movement Sustainable
Implementation Plan (SJV GM SIP)
As part of a team, Fehr & Peers used the San Joaquin freight model and MIP models to evaluate needs for high priority connectors. Truck routing and truck parking are priorities to ensure the movement of goods through SJV communities. To propose the best framework for the model, Fehr & Peers
reviewed other freight models’ data sources, model development process and model maintenance. Fehr & Peers reviewed statemandated sustainable communities strategies in depth and providing a summary of strategies with potential impacts on goods movements in the Valley, especially those aiming to reduce greenhouse gas emissions, and are integrated with each MPO’s RTP. Fatemeh is modeling lead.

Santa Monica TDF Model Update & Vistro Conversion
(Santa Monica, CA)
Fehr & Peers assisted the City of Santa Monica with updating its transportation analysis tools, including the travel demand forecasting (TDF) model and its traffic analysis database. Fehr & Peers built the first TDF model in 2009 for the Santa Monica LUCE, and it is good practice to update a model every three to five years. The City collected newer citywide traffic counts in Fall 2013 and SCAG released its updated 2012 Regional
Transportation Plan (RTP) model in late 2012. The updated TDF model is to provide a more reliable base for long-range planning and for development review and environmental compliance. In addition to the travel demand model update, Fehr & Peers converted the City’s existing TRAFFIX database to VISTRO, a new traffic analysis software package. Ms. Ranaiefar was responsible for development of the VISTRO model for the City and helped to update and validate the City’s TDF Model update, Fehr & Peers converted the City’s existing TRAFFIX database to VISTRO, a new traffic analysis software package.

NCHRP 08-106 Metropolitan Freight Transportation:

Implementing Effective Strategies
Fatemeh led the team to develop an interactive sketch-planning tool: “Urban Freight Implementation Tool (UFT)” to aid
practitioners in assessing freight strategies for possible implementation based on user inputs. The tool provides visually appealing output that compares and contrasts composite scores of the selected transportation strategies to aid in identifying the most promising strategies for each problem.

Community Impact Study (Long Beach, CA)
Fehr & Peers conducted technical analysis in support of the Port’s Community Impact Study and wrote the Traffic & Mobility chapter of the study itself. The Port Area Travel Demand Model (PortTAM) was used to identify the magnitude, location and geographic extent of Port-related truck trips in the region. The modeling results were integrated with GIS mapping of other metrics to help Port staff and the project team better explore the data. Based on the results of the analysis and professional literature research, specific mitigation strategies were identified to help offset those impacts. Fatemeh was the modeler on this project and attended PorTAM training sessions.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 PAUL D. TRAVIS, AICP

MANAGING PRINCIPAL
Experience Profile
Paul Travis has been with HRG since 2006 and specializes in master planning, CEQA, NEPA and Section 106 environmental review, and historic resources assessment.

At HRG, Paul manages planning-related projects with a focus on large, multiproperty sites including college campuses, historic downtowns, neighborhoods and districts, industrial sites, motion picture studios, and military bases. Paul has drafted preservation plans for the University of Southern California, NBC Universal Studios, Hollywood, and Los Angeles International Airport. He has participated in the development of community plans or specific plans for Paso Robles, Fresno, and Whittier; and has been involved in the master planning process for Loyola Marymount University, Occidental College, Mount St.

Mary’s College, Fox Studios, the Alameda Naval Station, and the Downey NASA site. Recent survey experience includes historic resource surveys for the cities of Los Angeles, Ventura, Glendale, Paso Robles, San Diego, and Fresno.

Prior to working at HRG, Paul worked as a research assistant at the Lewis Center for Regional Policy Studies performing academic research for study of transit-oriented development along the Pasadena Gold Line light rail system.

Responsibilities include gathering and analysis of ridership data and adjacent development activity, and field observation of conditions surrounding transit stops.

Paul Travis meets the Secretary of the Interior’s Professional Qualification Standards in Historic Preservation in Historic Preservation Planning and History.

Selected Projects
Fresno Fulton Corridor Specific Plan, Fresno
Fox Studios Master Plan, Century City
Gamble House Cultural Landscape Report, Pasadena
LAX Historic Assessments, Environmental Review, Preservation Plan NBC Universal Evolution Plan, Universal City
Sunset Bronson Studios, Hollywood
SurveyLA, Los Angeles
Thacher School, Ojai
Years of Experience: 14
Education
Master of Arts in Urban Planning,
University of California, Los
Angeles, 2006
Bachelor of Fine Arts, Printmaking,
San Jose State University, San Jose,
1985
Speaking Engagements
California Preservation Foundation
x Historic Resources and the
California Environmental
Quality Act
x Historic Resources Surveys
x Preservation Planning
American Planning Association,
California Chapter
x Preservation Planning
Professional Affiliations
American Institute of Certified
Planners, Member
American Planning Association,
Urban Design & Preservation
Division, Member
American Planning Association,
Los Angeles Chapter, Member
California Preservation
Foundation, Guest Speaker,
Workshop Leader
National Trust for Historic
Preservation, Member
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09

CHRISTINE LAZZARETTO

MANAGING PRINCIPAL
Experience Profile
Christine Lazzaretto is an Architectural Historian who has been working in historic preservation in Southern California since 2003 and at Historic Resources Group since 2008. At HRG, Christine works on environmental review, policy development, historic resources surveys, historic context statements, and federal tax credit projects. She has worked on numerous large-scale historic resources surveys, authored a wide range of historic context statements and successful National Register nominations. Her deep understanding of CEQA principles, significance, context and environmental impacts make her a leading expert in cultural resources analysis for environmental review and she is a frequent guest speaker at USC on CEQA. Christine also manages teams of professional colleagues on large-scale planning and mitigation efforts.

Prior to joining HRG, Christine worked at Pasadena Heritage as Preservation Director and Program Director, where her responsibilities included administering the Preservation Easement Program; assisting with advocacy efforts; attending local hearings and advising neighborhood groups on preservation issues; conceiving, organizing and implementing all of the organization’s highly successful educational tours and programs; conducting historic research; producing written architectural descriptions and detailed histories.

Christine Lazzaretto meets the Secretary of the Interior’s Professional Qualifications Standards in History and Architectural History.

Selected Projects
Archer School for Girls Master Plan, Los Angeles
CBS Columbia Square Adaptive Reuse
City of Goleta Comprehensive Preservation Planning
City of Santa Monica Citywide Survey Update
City of Santa Monica On-Call Historic Resources Consulting City of Long Beach Historic Preservation Element
Forum Rehabilitation and Historic Tax Credit Project, Los Angeles Fulton Corridor & Downtown Neighborhoods Specific Plans, Fresno Herald-Examiner Technical Report, Los Angeles
Hill & Fifth Technical Report, Los Angeles
Modernism in Riverside Survey
Paramount Pictures Master Plan, Los Angeles
SurveyLA, Los Angeles
University of Southern California Master Plan and Additional Services Years of Experience: 16
Education
Master of Heritage Conservation,
University of Southern California,
Los Angeles
Bachelor of Arts Degree with High
Distinction, Art History, The
Pennsylvania State University,
State College, PA, Phi Beta Kappa
Honors and Awards
Los Angeles Conservancy
Preservation Award
• SurveyLA
Speaking Engagements
California Preservation Foundation
• Topics: CEQA, Historic
Resource Surveys, Context
Statements
University of Southern California
• Lecturer, Heritage
Conservation Summer
Course
Professional Affiliations
California Preservation Foundation
• Board of Trustees, 2016-
Present, Current President
• Education Committee CoChair, 2015-Present
DOCOMOMO Southern
California
• Founding & Current VicePresident
Los Angeles Conservancy
National Trust for Historic
Preservation
Society of Architectural Historians
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 LUIS F. PEREZ
LUIS F. PEREZ
Project Role: Project Manager
Education: M.A. Organizational Management Fielding Graduate University, B.A. Environmental Science and Public Relations, Northern Arizona University
Expertise: CEQA Project Management, Land Use Analysis, Permitting and Compliance - 30 years Mr. Perez is a Senior Project Manager with MRS Environmental. Before joining MRS, Mr. Perez acquired extensive public agency experience working for Santa Barbara County, which included interpretation of land use and environmental policies and regulations for large development projects, recommendations to decision-makers and public presentations. He was an Energy Specialist with the Santa Barbara County Energy Division for 16 years, working on permitting and environmental review for onshore and offshore oil and gas projects. Mr. Perez is involved with the management and preparation of environmental studies, primarily focusing on the implementation of CEQA for oil and gas development projects in California. His major areas of expertise are in land use issues of major oil and gas development and transportation projects.

Mr. Perez has extensive experience in the preparation of environmental documents, staff reports for decision-makers, presentations for decision-makers, public workshops and hearings.

PROFESSIONAL EXPERIENCE
While working for MRS Environmental, for the last 13 years Mr. Perez has worked as Project Manager for the preparation of the Hermosa Beach Oil Development Project EIR, the Whittier Main Oil Field EIR, Paredon EIR, the Baldwin Hills Community Standards District EIR, the Conoco-Phillips Santa Maria Refinery Expansion EIR, the Chevron El Segundo Marine Terminal Lease Extension EIR, the Guadalupe Oil Field Fencing Plan, and the preparation of the Venoco Full Field Development Project EIR.

Mr. Perez was the Project Manager for multiple oil and gas development projects for the County of Santa Barbara. Those projects included:
ƒ The Pacific Pipeline Project, which was a proposal for construction of a pipeline from the Gaviota Area to refineries in Los Angeles. The Molino Gas Development Project, which was the first project approved for drilling from an onshore location into an offshore reservoir. The Chevron Point Arguello Project, which included three platforms, oil and gas pipeline and an onshore processing facility. Mr. Perez reviewed applications, conducted environmental review and processed permits for various proposals, including Marine Tankering, Process Reconfiguration, and the Rocky Point Unit drilling project, among others. ƒ Mr. Perez was also the Project Manager for a number of decommissioning of oil and gas projects that had reached the end of their economic life. Those projects included the abandonment of the Texaco Pipeline through Hollister Ranch, the decommissioning of the Unocal Cojo Marine Terminal and the decommissioning of the Texaco Gaviota Gas Plant, among others. In addition, Mr. Perez led the team effort required to oversee compliance with mitigation required for the execution of the different projects.
ƒ While working for the County, Mr. Perez was also tasked with the management and supervision of the contract to provide Oil and Gas permitting and compliance services to the City of Goleta by Santa Barbara County. The efforts included to manage and supervise teams, report writing, public hearings and presentations for the Venoco Full Field Development Project, Venoco State Lease 421 Repairs, and Venoco Line 96 SCADA system.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 LUIS F. PEREZ
ƒ Mr. Perez also managed the contract to provide oil and gas permitting and compliance services to the City of Carpinteria, which included application completeness review, policy considerations, and preparation of environmental documents.
ƒ Mr. Perez has also acquired significant experience in the implementation and compliance of oil and gas and construction projects by overseeing the operation of the All American Pipeline Project, the Chevron Point Arguello Project, the Gaviota Marine Terminal Project, the Exxon Santa Ynez Unit Project, the Santa Maria Asphalt Refinery, among others.

Mr. Perez was the government liaison for the permitting and compliance of the construction of the Cano Limon-Rio Zulia Pipeline Project in Colombia, South America for Mannesmann Anlagenbau, AG. The project involved coordination with multiple agencies, preparation of documents, emergency response preparedness training, and environmental restoration.
.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09

GREG CHITTICK

GREG CHITTICK
Project Role: Hazardous Materials and Air Quality
Education: M.S. Mechanical Engineering, B.S Mechanical Engineering, UC Berkeley Expertise: Project Management, Air Quality and modeling, Health Risk, GHG, Hazardous Materials, Risk Assessments and Hazard Modeling, Technical Analysis. 30 years Mr. Chittick is a Senior Scientist and Project Manager with MRS Environmental with more than 30 years of experience specializing in project management in combination with the technical analysis areas of safety, risk, air quality analysis, noise, aesthetics, visual, traffic and GIS systems. At MRS, he has been involved in preparing and managing numerous air quality studies, health risk assessments, environmental technology studies, computer mapping analysis, modeling accidental releases of hazardous materials, and conducting risk analysis studies for small and large facilities. Mr. Chittick has worked with a large range of industry and government agencies including the County of Los Angeles, City of Los Angeles, County of Santa Barbara, County of San Luis Obispo, California State Lands Commission, Federal Bureau of Ocean Energy management and various APCDs and AQMDs. His combination of effective and efficient project management with extensive experience in technical analysis makes him an exceptionally well qualified asset to any project.

Mr. Chittick also worked for more than 10 years with Arthur D. Little, Inc., based in Boston, on risk, air quality and EIR analysis. Mr. Chittick previously worked at Lawrence Berkeley Laboratory on studies related to building energy efficiency. Mr. Chittick is a member of the American Society of Mechanical Engineers, Southern California Association of Risk Analysis, the Chlorine Institute, and the International Institute of Ammonia Refrigeration.

Mr. Chittick’s areas of expertise include:

Key Expertise:
x Air Quality Analysis
x Air Quality Modeling
x Health Risk Assessment Modeling
x Hazardous Materials Assessment
x Quantitative Risk Assessment
x Modeling of Accidental releases
x Acoustics Analysis
x Traffic Analysis
x Visual Assessment
x GIS Analysis

ENVIRONMENTAL IMPACT ASSESSMENTS HIGHLIGHTS
ƒ Mr. Chittick has completed numerous air quality analyses for more than 50 environmental assessment documents over the past 30 years. Analyses have included assessment of criteria pollutants, including emissions from hydrocarbon impacted soil handling activities; toxic pollutants, including AB2588 health risk assessments; CO hot spots analysis and greenhouse gas emissions analysis, including electrical grid assessments; and indirect emissions. Modeling DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09

GREG CHITTICK
conducted as part of these analyses included ISC, AERMOD, SLAB, ACE, HARP, HARP2, CALINE4, CAL3QHC, URBEMIS, CalEEMod, SupeChems and CANARY among numerous others.
ƒ Conducted numerous health risk assessment studies for AB2588 compliance, on development projects operational activities, large industrial facilities, oil and gas developments, mining and gravel plants, utility-scale battery installations, railroad loading/unloading facilities, cannabis installations and emergency generator projects.
ƒ Assessments of highway toxic pollutant emissions impacts on nearby residential developments, including use of HARP2 and AERMOD models to examine impacts from the full range of vehicles on Highway 101 (diesel trucks, gasoline automobiles, buses, motorcycles, etc) on proposed nearby residential developments. Included recommendations and quantification of mitigation measures effectiveness systems to reduce cancer impacts of highway emissions to nearby residents.
ƒ Extensive experience with CalEEMod for operational and construction emissions estimates for development projects in California, including the development of mitigation and quantification of mitigation measure effectiveness. Development projects have included large, multi-year construction and overlapping operational-construction emissions, as well as coordination with SCAQMD on the implementation of CalEEMod as part of CEQA analysis projects. ƒ Air quality impacts of traffic congestion associated with CO hot spots includes numerous studies associated with development projects and congested intersections utilizing EPA models, conducted in close coordination with traffic studies.
ƒ Mr. Chittick assessed the quantitative risk impacts using QRA techniques on development projects, industrial oil and gas, hydrogen plants and pipelines, offshore drilling, and production units as well as pipelines and marine terminals. Risk analysis examines risks to public health as well as the quantitative analysis and hazardous materials spill probabilities and impacts to the environment.
ƒ Mr. Chittick has conducted quantitative risk analysis for a broad range of transportation related projects, including transportation of gas liquids and ammonia on highways and pipeline transportation of crude oils and hydrocarbon products. His studies have included developing QRA models, FN curves and mitigation measures to reduce risk impacts. ƒ Mr. Chittick has conducted numerous chemical release and dispersion modeling analyses, including releases of hydrogen, ammonia, gas liquids, hydrocarbons, produced gas containing hydrogen sulfide, and vapor from spilled combustible liquids, including fuels and crude oil.

Models include CANARY, SuperChems, SLAB, AERMOD, Aloha, and multi-component models.
ƒ His experience with noise analysis has included impacts of increased traffic, construction equipment operations, as well as in-field measurements of noise levels. Analysis included modeling of noise generated from a range of equipment, including assessing the attenuation of noise levels over barriers and terrain and assessing the effectiveness of a range of noise mitigation methods. The analysis included the development of location-specific models to assess potential noise impacts.
ƒ Mr. Chittick has conducted over 20 in-field noise measurement and assessments studies, including noise associated with construction equipment, sheetpile installation, railway noise, truck noise, processing equipment noise, including pumps and compressors, and natural noise DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09

GREG CHITTICK
sources, including ocean waves and surf. Studies of noise mitigation have included the measurement of the effect of noise barriers, noise blankets and the effects of vegetation on noise attenuation. Assessments have included A weighted, linear, and octave band analysis. ƒ Mr. Chittick’s traffic impact experience includes analysis of level of concern and intersection traffic flow changes due to project related increases in traffic volumes utilizing the Intersection Capacity Utilization approach and the Highway Capacity Manual software. ƒ His experience with visual impacts has been acquired conducting visual simulations of proposed projects, including industrial plant equipment removals and additions, grading and land contouring impacts on visual resources, drill rig impacts, viewpoint analysis and 3D flythrough assessments.
ƒ Mr. Chittick has also conducted fire protection and emergency response analysis associated with many industrial project EIRs. All included analysis of pertinent issues, including water supply and demand estimates and availability of emergency response and mutual aid assistance. He also examined and compared projects to applicable codes and guidelines, including IRI, ANSI, and NFPA.

Experience for Environmental Projects
ƒ Montebello Hills Residential Development Project
ƒ Numerous Santa Barbara County development projects CalEEMod analysis’ ƒ E&B Oil Drilling and Production Project EIR: City of Hermosa Beach ƒ Baldwin Hills Oil Field Monitoring Project: County of Los Angeles ƒ Assisting County of Santa Barbara for Analysis for Energy Projects ƒ City of Carson Oil and Gas Support
ƒ GHG CEQA Thresholds Development: Santa Barbara County APCD ƒ Phillips 66 Company Rail Spur Extension and Crude Unloading Project EIR: County of San Luis Obispo
ƒ Orcutt Hill Resource Enhancement Plan Project
ƒ ERG Operating Company Foxen Petroleum Pipeline Project ƒ Santa Maria Energy Production Plan and Development Plan ƒ Venoco South Ellwood Field Project: California State Lands Commission ƒ Becker and Legacy Wells Abandonment and Remediation Project: California State Lands Commission
ƒ Huasna Valley Excelaron Oil Exploration and Production Project: County of San Luis Obispo ƒ Chevron Tank Farm Project: County of San Luis Obispo
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 www.woodplc.com
Wood Environment &
Infrastructure Solutions, Inc.
104 West Anapamu Street, Suite 204A
Santa Barbara, CA 93105
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 Exhibit B
Budget
DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 Exhibit C
Insurance Requirements and Verifications
WOOD shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the work hereunder by WOOD, its agents, representatives, employees or subcontractors.

Minimum Scope and Limits of Insurance
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal and advertising injury, with limits of no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (Insurance Services Office Form CG 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Services Office Form CA 00 01 covering Code 1 (any auto), or if WOOD has no owned autos, Code 8 (hired) and Code 9 (non-owned), with limits of no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: Workers’ Compensation insurance as required by the State of California, with Statutory Limits and Employers’ Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease (see footnote #1).

4. Professional Liability: Insurance appropriate to WOOD’s profession with limits of no less than $1,000,000 per occurrence or claim/$2,000,000 in the annual aggregate.

If WOOD maintains broader coverage or higher limits than the minimums shown above, the City of Santa Monica requires and shall be entitled to any broader coverage and higher limits maintained by WOOD. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City of Santa Monica.

Other Insurance Provisions

1. The insurance policies are to contain, or be endorsed to contain, the following provisions:
a. Additional Insured Status: The City of Santa Monica, its officers, officials, employees and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 behalf of WOOD including materials, parts, or equipment furnished in connection with such work or operations. CGL coverage can be provided in the form of an endorsement to WOOD’s insurance (at least as broad as Insurance Services Office Form CG 20 10 11 85, or if not available, through the addition of a combination of (1) CG 20 10, CG 20 26, CG 20 33, or CG 20 38 and (2) CG 20 37). b. Primary Coverage: For any claims related to this Agreement, WOOD’s insurance shall be primary coverage at least as broad as Insurance Services Offices Form CG 20 01 04 13 as respects the City of Santa Monica, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City of Santa Monica, its officers, officials, employees or volunteers shall be in excess of WOOD’s insurance and shall not contribute with it.
c. Notice of Cancellation: Each insurance policy required herein shall state that coverage shall not be cancelled except after notice has been given to the City of Santa Monica.
d. Waiver of Subrogation: WOOD hereby grants to the City of Santa Monica a waiver of any right of subrogation which any insurer of said WOOD may acquire against the City of Santa Monica by virtue of payment of any loss. WOOD agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Santa Monica has received a waiver of subrogation endorsement from the insurer.

Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City of Santa Monica. The City of Santa Monica may require WOOD to purchase coverage with a lower retention or provide satisfactory proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Santa Monica.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to the City of Santa Monica.

Claims Made Policies

1. If the Professional Liability policy provides “claims made” coverage:
a. The Retroactive Date must be shown and must be before the date of this Agreement or the start of work.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09 b. The insurance must be maintained, and evidence of insurance must be provided for at least 5 years after completion of work.
c. If the policy is cancelled or not renewed, and not replaced with another “claims made” policy form with a Retroactive Date prior to the effective Agreement date, WOOD must purchase “extended reporting” coverage for a minimum of 5 years after completion of work.

Verification of Coverage
WOOD shall furnish the City of Santa Monica with original certificates and amendatory endorsements (or copies of the applicable policy language effecting coverage provided by this clause). All certificates and endorsements are to be received and approved by the City of Santa Monica before work commences. However, failure to obtain required documents prior to the work beginning shall not waive WOOD’s obligation to provide them. The City of Santa Monica reserves the right to require complete, certified copies of all required insurance policies, including the endorsements required herein, at any time.

Failure to Maintain Insurance Coverage
If WOOD, for any reason, fails to maintain insurance coverage which is required pursuant to this Agreement, the same shall be deemed a material breach of contract. The City of Santa Monica, at its sole option, may terminate this Agreement and obtain damages from WOOD resulting from said breach.

Subconsultants
WOOD shall require and verify that all subconsultants maintain insurance meeting all the requirements stated herein. All exceptions must be approved in writing by the Risk Manager.

Footnotes
# 1: Workers’ Compensation insurance coverage is not required if WOOD does not have employees. WOOD must, however, execute the City’s Workers’ Compensation Coverage Exemption Declaration Form.

DocuSign Envelope ID: 9B16548E-019F-4705-A4C7-AE19F25BFD09

← All documents from this meeting