Cities Index.
Agenda packet

Santa Monica City Council
October 11, 2022

Document
Agenda packet
Meeting
October 11, 2022
Body
Santa Monica City Council
Pages
26
Original file
80.2 MB
Text extracted from the city's file for reading and search. Open the original on santamonicacityca.iqm2.com. That file is the official record.

11.A.a
Packet Pg. 1303 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Area Coating -
Energy Use -
Construction Off-road Equipment Mitigation - All construction equipment Tier 4 final Vehicle speed reduction 15 mph standard mitigation measure Mobile Land Use Mitigation - X
Area Mitigation - Gas powered leaf blanners banned in City limits.

No fireplaces.

Coatings per SCAQMD Rule 1113 for building envelope coatings 50 g/l, default coatings 50 g/l, and traffic paint 100 g/l.

Energy Mitigation - On-site renewable energy use based City of Santa Monica Solar Ordinance of 2 watts per square foot buidling footprint = sufficient for 100% energy requirements
Water Mitigation - Green building code requires water efficent landscape and irrigation 50 Percent reduction per Los Angeles Coastal Cities Sustainable Landscaping Fundamentals, www.sm.watersavingplants.com Table Name Column Name Default Value New Value
tblAreaMitigation UseLowVOCPaintParkingCheck False True tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation Tier No Change Tier 4 Final
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1304 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 10,850.00 1,500.00
tblConstructionPhase NumDays 700.00 100.00
tblConstructionPhase NumDays 1,085.00 150.00
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 420.00 50.00
tblFireplaces NumberGas 10,684.50 10,684.00
tblFireplaces NumberGas 2,670.70 2,671.00
tblFireplaces NumberNoFireplace 1,257.00 1,886.00
tblFireplaces NumberNoFireplace 314.20 471.00
tblFireplaces NumberWood 628.50 0.00
tblFireplaces NumberWood 157.10 0.00
tblGrading AcresOfGrading 450.00 3,255.00
tblGrading AcresOfGrading 75.00 630.00
tblLandUse LandUseSquareFeet 12,570,000.00 9,200,947.00 tblLandUse LandUseSquareFeet 3,142,000.00 2,300,237.00
CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1305 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.0 Emissions Summary
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HW_TL 14.70 7.67
tblVehicleTrips HW_TL 14.70 7.67
tblWoodstoves NumberCatalytic 628.50 0.00
tblWoodstoves NumberCatalytic 157.10 0.00
tblWoodstoves NumberNoncatalytic 628.50 0.00
tblWoodstoves NumberNoncatalytic 157.10 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1306 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 6.9258 79.6056 50.1897 0.1606 62.8653 3.2500 65.8960 17.2812 2.9900 20.2712 0.0000 16,589.59 39 16,589.59
39 3.1465 1.4078 17,077.28
46 2023 57.9244 203.3961 635.2662 2.2096 223.0637 3.8032 226.8668 57.7386 3.5399 61.2785 0.0000 228,858.1 571
228,858.1
571

8.4597 12.9805 232,937.8
460
2024 51.0860 164.9374 569.2321 2.0922 193.8051 2.2523 196.0574 51.8842 2.1110 53.9953 0.0000 218,379.4 825
218,379.4
825

6.1591 12.6128 222,292.0
599
2025 47.9946 160.4150 534.7948 2.0309 193.8050 2.1260 195.9310 51.8842 1.9931 53.8773 0.0000 213,500.0 927
213,500.0
927

5.8358 12.2420 217,294.1
049
2026 45.4182 157.1284 506.1845 1.9760 193.8049 2.0796 195.8845 51.8842 1.9503 53.8345 0.0000 208,952.8 793
208,952.8
793

5.5627 11.9060 212,639.9
433
2027 43.0723 154.2009 481.9282 1.9256 193.8049 2.0260 195.8309 51.8841 1.9008 53.7849 0.0000 204,742.5 005
204,742.5
005

5.3211 11.5919 208,329.9
019
2028 46.9708 160.3333 476.7962 1.9042 193.9725 2.3887 196.3612 51.9286 2.2343 54.1629 0.0000 203,318.8 882
203,318.8
882

5.8395 11.3087 206,834.8
748
2029 899.6737 13.5236 93.4451 0.2809 34.6507 0.6086 35.2593 9.1895 0.5641 9.7536 0.0000 29,888.71 73 29,888.71
73 1.1565 0.5016 30,067.11
29 Maximum 899.6737 203.3961 635.2662 2.2096 223.0637 3.8032 226.8668 57.7386 3.5399 61.2785 0.0000 228,858.1 571
228,858.1
571

8.4597 12.9805 232,937.8
460
Unmitigated Construction
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1307 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 1.6027 24.8234 55.3186 0.1606 29.7701 0.2992 30.0693 7.8385 0.2915 8.1027 0.0000 16,589.59 39 16,589.59
39 3.1465 1.4078 17,077.28
46 2023 54.1193 160.0303 641.4304 2.2096 207.0945 1.8213 208.9157 54.5513 1.7133 56.2646 0.0000 228,858.1 571
228,858.1
571

8.4597 12.9805 232,937.8
460
2024 49.9423 153.7283 570.5256 2.0922 193.8051 1.6798 195.4849 51.8842 1.5749 53.4591 0.0000 218,379.4 825
218,379.4
825

6.1591 12.6128 222,292.0
599
2025 46.9550 150.1800 536.1704 2.0309 193.8050 1.6392 195.4442 51.8842 1.5376 53.4218 0.0000 213,500.0 927
213,500.0
927

5.8358 12.2420 217,294.1
049
2026 44.3786 146.8935 507.5601 1.9760 193.8049 1.5928 195.3978 51.8842 1.4948 53.3790 0.0000 208,952.8 793
208,952.8
793

5.5627 11.9060 212,639.9
433
2027 42.0328 143.9659 483.3038 1.9256 193.8049 1.5392 195.3441 51.8841 1.4453 53.3294 0.0000 204,742.5 005
204,742.5
005

5.3211 11.5919 208,329.9
019
2028 45.2965 142.7320 480.8895 1.9042 193.9725 1.5208 195.4933 51.9286 1.4312 53.3598 0.0000 203,318.8 882
203,318.8
882

5.8395 11.3087 206,834.8
748
2029 898.8979 5.1406 96.1861 0.2809 34.6507 0.1800 34.8307 9.1895 0.1689 9.3584 0.0000 29,888.71 73 29,888.71
73 1.1565 0.5016 30,067.11
29 Maximum 898.8979 160.0303 641.4304 2.2096 207.0945 1.8213 208.9157 54.5513 1.7133 56.2646 0.0000 228,858.1 571
228,858.1
571

8.4597 12.9805 232,937.8
460
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

1.32 15.18 -0.70 0.00 3.80 44.58 4.37 3.67 44.12 5.62 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1308 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954
Energy 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mobile 180.6441 147.8663 1,447.534
8 3.0066 363.4064 2.0067 365.4131 96.8498 1.8676 98.7174 324,095.4 602
324,095.4
602

21.7837 14.3835 328,926.3
233
Total 536.4627 430.6792 2,858.478
4 4.7835 363.4064 30.8419 394.2483 96.8498 30.7028 127.5526 0.0000 668,091.7 670
668,091.7
670

30.5689 20.6472 675,008.8
476
Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Energy 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mobile 180.6441 147.8663 1,447.534
8 3.0066 363.4064 2.0067 365.4131 96.8498 1.8676 98.7174 324,095.4 602
324,095.4
602

21.7837 14.3835 328,926.3
233
Total 508.8373 209.0923 2,758.341
5 3.3688 363.4064 12.9213 376.3276 96.8498 12.7822 109.6320 0.0000 385,264.1 478
385,264.1
478

25.0426 15.4623 390,497.9
766
Mitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1309 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/3/2022 5/23/2022 5 100
2 Site Preparation Site Preparation 5/23/2022 8/1/2022 5 50 3 Grading Grading 8/1/2022 2/27/2023 5 150
4 Building Construction Building Construction 2/27/2023 11/27/2028 5 1500 5 Paving Paving 11/27/2028 4/16/2029 5 100
6 Architectural Coating Architectural Coating 4/16/2029 9/3/2029 5 100 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 3 8.00 158 0.38
Demolition Rubber Tired Dozers 2 8.00 247 0.40
Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

5.15 51.45 3.50 29.57 0.00 58.10 4.55 0.00 58.37 14.05 0.00 42.33 42.33 18.08 25.11 42.15 Residential Indoor: 23,289,898; Residential Outdoor: 7,763,299; Non-Residential Indoor: 2,314,500; Non-Residential Outdoor: 771,500; Striped Parking Area: 516,600 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 630
Acres of Grading (Grading Phase): 3255
Acres of Paving: 193.72
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1310 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.1 Mitigation Measures Construction
Use Cleaner Engines for Construction Equipment
Water Exposed Area
Grading Excavators 2 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Scrapers 2 8.00 367 0.48
Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 6 15.00 0.00 13,282.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 15,423.00 3,344.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3,085.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1311 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 28.7447 0.0000 28.7447 4.3522 0.0000 4.3522 0.0000 0.0000 Off-Road 2.6392 25.7194 20.5941 0.0388 1.2427 1.2427 1.1553 1.1553 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Total 2.6392 25.7194 20.5941 0.0388 28.7447 1.2427 29.9873 4.3522 1.1553 5.5075 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Unmitigated Construction On-Site
Reduce Vehicle Speed on Unpaved Roads
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1312 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.5612 20.7228 4.9524 0.0804 2.3233 0.1733 2.4965 0.6368 0.1658 0.8026 8,817.132 3 8,817.132
3 0.4736 1.3997 9,246.082
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0517 0.0363 0.5726 1.5200e0030.1677 1.0000e0030.1687 0.0445 9.2000e0040.0454 154.3721 154.3721 4.0100e0033.6700e003155.5659 Total 0.6129 20.7591 5.5249 0.0819 2.4909 0.1743 2.6652 0.6813 0.1667 0.8480 8,971.504 4 8,971.504
4 0.4776 1.4034 9,401.648
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 12.9351 0.0000 12.9351 1.9585 0.0000 1.9585 0.0000 0.0000 Off-Road 0.4623 2.0032 23.2798 0.0388 0.0616 0.0616 0.0616 0.0616 0.0000 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Total 0.4623 2.0032 23.2798 0.0388 12.9351 0.0616 12.9967 1.9585 0.0616 2.0201 0.0000 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1313 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.5612 20.7228 4.9524 0.0804 2.3233 0.1733 2.4965 0.6368 0.1658 0.8026 8,817.132 3 8,817.132
3 0.4736 1.3997 9,246.082
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0517 0.0363 0.5726 1.5200e0030.1677 1.0000e0030.1687 0.0445 9.2000e0040.0454 154.3721 154.3721 4.0100e0033.6700e003155.5659 Total 0.6129 20.7591 5.5249 0.0819 2.4909 0.1743 2.6652 0.6813 0.1667 0.8480 8,971.504 4 8,971.504
4 0.4776 1.4034 9,401.648
0 Mitigated Construction Off-Site

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 31.4286 0.0000 31.4286 11.3735 0.0000 11.3735 0.0000 0.0000 Off-Road 3.1701 33.0835 19.6978 0.0380 1.6126 1.6126 1.4836 1.4836 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Total 3.1701 33.0835 19.6978 0.0380 31.4286 1.6126 33.0411 11.3735 1.4836 12.8571 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1314 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0436 0.6871 1.8200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 185.2465 185.2465 4.8100e0034.4000e003186.6790 Total 0.0620 0.0436 0.6871 1.8200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 185.2465 185.2465 4.8100e0034.4000e003186.6790 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 14.1429 0.0000 14.1429 5.1181 0.0000 5.1181 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0380 0.0621 0.0621 0.0621 0.0621 0.0000 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Total 0.4656 2.0175 20.8690 0.0380 14.1429 0.0621 14.2049 5.1181 0.0621 5.1802 0.0000 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1315 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0620 0.0436 0.6871 1.8200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 185.2465 185.2465 4.8100e0034.4000e003186.6790 Total 0.0620 0.0436 0.6871 1.8200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 185.2465 185.2465 4.8100e0034.4000e003186.6790 Mitigated Construction Off-Site

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 29.0349 0.0000 29.0349 5.7951 0.0000 5.7951 0.0000 0.0000 Off-Road 3.6248 38.8435 29.0415 0.0621 1.6349 1.6349 1.5041 1.5041 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Total 3.6248 38.8435 29.0415 0.0621 29.0349 1.6349 30.6698 5.7951 1.5041 7.2992 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1316 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0689 0.0485 0.7634 2.0200e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 205.8294 205.8294 5.3500e0034.8900e003207.4211 Total 0.0689 0.0485 0.7634 2.0200e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 205.8294 205.8294 5.3500e0034.8900e003207.4211 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 13.0657 0.0000 13.0657 2.6078 0.0000 2.6078 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Total 0.7616 3.3000 32.9991 0.0621 13.0657 0.1015 13.1673 2.6078 0.1015 2.7093 0.0000 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1317 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0689 0.0485 0.7634 2.0200e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 205.8294 205.8294 5.3500e0034.8900e003207.4211 Total 0.0689 0.0485 0.7634 2.0200e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 205.8294 205.8294 5.3500e0034.8900e003207.4211 Mitigated Construction Off-Site

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 29.0349 0.0000 29.0349 5.7951 0.0000 5.7951 0.0000 0.0000 Off-Road 3.3217 34.5156 28.0512 0.0621 1.4245 1.4245 1.3105 1.3105 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Total 3.3217 34.5156 28.0512 0.0621 29.0349 1.4245 30.4594 5.7951 1.3105 7.1056 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1318 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0639 0.0429 0.7035 1.9600e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 200.3998 200.3998 4.8000e0034.5200e003201.8669 Total 0.0639 0.0429 0.7035 1.9600e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 200.3998 200.3998 4.8000e0034.5200e003201.8669 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 13.0657 0.0000 13.0657 2.6078 0.0000 2.6078 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Total 0.7616 3.3000 32.9991 0.0621 13.0657 0.1015 13.1673 2.6078 0.1015 2.7093 0.0000 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1319 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0639 0.0429 0.7035 1.9600e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 200.3998 200.3998 4.8000e0034.5200e003201.8669 Total 0.0639 0.0429 0.7035 1.9600e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 200.3998 200.3998 4.8000e0034.5200e003201.8669 Mitigated Construction Off-Site

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1320 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6978 121.3874 47.7897 0.6086 21.4124 0.7069 22.1192 6.1649 0.6761 6.8410 65,552.74 04 65,552.74
04 2.2033 9.4900 68,435.84
35 Worker 49.2682 33.0653 542.4779 1.5100 172.3928 0.9708 173.3636 45.7194 0.8937 46.6131 154,538.3 293
154,538.3
293

3.6995 3.4860 155,669.6
460
Total 52.9660 154.4527 590.2675 2.1186 193.8052 1.6777 195.4829 51.8842 1.5698 53.4540 220,091.0 697
220,091.0
697

5.9028 12.9760 224,105.4
895
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0269 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 0.3278 2.2347 17.4603 0.0269 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1321 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6978 121.3874 47.7897 0.6086 21.4124 0.7069 22.1192 6.1649 0.6761 6.8410 65,552.74 04 65,552.74
04 2.2033 9.4900 68,435.84
35 Worker 49.2682 33.0653 542.4779 1.5100 172.3928 0.9708 173.3636 45.7194 0.8937 46.6131 154,538.3 293
154,538.3
293

3.6995 3.4860 155,669.6
460
Total 52.9660 154.4527 590.2675 2.1186 193.8052 1.6777 195.4829 51.8842 1.5698 53.4540 220,091.0 697
220,091.0
697

5.9028 12.9760 224,105.4
895
Mitigated Construction Off-Site

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1322 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6103 121.9392 47.0036 0.5994 21.4123 0.7086 22.1209 6.1648 0.6778 6.8426 64,609.70 44 64,609.70
44 2.2034 9.3673 67,456.23
62 Worker 46.0041 29.5544 506.0617 1.4659 172.3928 0.9304 173.3232 45.7194 0.8564 46.5758 151,214.0 792
151,214.0
792

3.3513 3.2455 152,265.0
160
Total 49.6144 151.4936 553.0653 2.0653 193.8051 1.6390 195.4441 51.8842 1.5341 53.4184 215,823.7 836
215,823.7
836

5.5547 12.6128 219,721.2
522
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1323 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.6103 121.9392 47.0036 0.5994 21.4123 0.7086 22.1209 6.1648 0.6778 6.8426 64,609.70 44 64,609.70
44 2.2034 9.3673 67,456.23
62 Worker 46.0041 29.5544 506.0617 1.4659 172.3928 0.9304 173.3232 45.7194 0.8564 46.5758 151,214.0 792
151,214.0
792

3.3513 3.2455 152,265.0
160
Total 49.6144 151.4936 553.0653 2.0653 193.8051 1.6390 195.4441 51.8842 1.5341 53.4184 215,823.7 836
215,823.7
836

5.5547 12.6128 219,721.2
522
Mitigated Construction Off-Site

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1324 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5309 121.3623 46.2962 0.5881 21.4122 0.7109 22.1231 6.1648 0.6800 6.8447 63,432.08 70 63,432.08
70 2.2102 9.2071 66,231.05
80 Worker 43.0963 26.5830 472.4139 1.4159 172.3928 0.8876 173.2804 45.7194 0.8169 46.5363 147,511.5 313
147,511.5
313

3.0247 3.0349 148,491.5
488
Total 46.6272 147.9453 518.7102 2.0039 193.8050 1.5984 195.4034 51.8842 1.4969 53.3810 210,943.6 183
210,943.6
183

5.2349 12.2420 214,722.6
068
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1325 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5309 121.3623 46.2962 0.5881 21.4122 0.7109 22.1231 6.1648 0.6800 6.8447 63,432.08 70 63,432.08
70 2.2102 9.2071 66,231.05
80 Worker 43.0963 26.5830 472.4139 1.4159 172.3928 0.8876 173.2804 45.7194 0.8169 46.5363 147,511.5 313
147,511.5
313

3.0247 3.0349 148,491.5
488
Total 46.6272 147.9453 518.7102 2.0039 193.8050 1.5984 195.4034 51.8842 1.4969 53.3810 210,943.6 183
210,943.6
183

5.2349 12.2420 214,722.6
068
Mitigated Construction Off-Site

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1326 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4602 120.5031 45.7360 0.5766 21.4122 0.7091 22.1213 6.1648 0.6783 6.8431 62,242.46 53 62,242.46
53 2.2143 9.0433 64,992.73
34 Worker 40.5906 24.1557 444.3639 1.3724 172.3928 0.8429 173.2357 45.7194 0.7757 46.4951 144,153.9 396
144,153.9
396

2.7474 2.8627 145,075.7
118
Total 44.0508 144.6588 490.0998 1.9490 193.8049 1.5521 195.3570 51.8842 1.4540 53.3382 206,396.4 049
206,396.4
049

4.9617 11.9060 210,068.4
452
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1327 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4602 120.5031 45.7360 0.5766 21.4122 0.7091 22.1213 6.1648 0.6783 6.8431 62,242.46 53 62,242.46
53 2.2143 9.0433 64,992.73
34 Worker 40.5906 24.1557 444.3639 1.3724 172.3928 0.8429 173.2357 45.7194 0.7757 46.4951 144,153.9 396
144,153.9
396

2.7474 2.8627 145,075.7
118
Total 44.0508 144.6588 490.0998 1.9490 193.8049 1.5521 195.3570 51.8842 1.4540 53.3382 206,396.4 049
206,396.4
049

4.9617 11.9060 210,068.4
452
Mitigated Construction Off-Site

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1328 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3987 119.6239 45.2691 0.5648 21.4121 0.7061 22.1182 6.1647 0.6754 6.8402 61,001.84 37 61,001.84
37 2.2109 8.8731 63,701.29
60 Worker 38.3062 22.1073 420.5744 1.3338 172.3928 0.7923 173.1851 45.7194 0.7291 46.4485 141,184.1 825
141,184.1
825

2.5093 2.7188 142,057.1
079
Total 41.7049 141.7312 465.8435 1.8986 193.8049 1.4984 195.3033 51.8841 1.4045 53.2886 202,186.0 261
202,186.0
261

4.7202 11.5919 205,758.4
038
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1329 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3987 119.6239 45.2691 0.5648 21.4121 0.7061 22.1182 6.1647 0.6754 6.8402 61,001.84 37 61,001.84
37 2.2109 8.8731 63,701.29
60 Worker 38.3062 22.1073 420.5744 1.3338 172.3928 0.7923 173.1851 45.7194 0.7291 46.4485 141,184.1 825
141,184.1
825

2.5093 2.7188 142,057.1
079
Total 41.7049 141.7312 465.8435 1.8986 193.8049 1.4984 195.3033 51.8841 1.4045 53.2886 202,186.0 261
202,186.0
261

4.7202 11.5919 205,758.4
038
Mitigated Construction Off-Site

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1330 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3491 118.8725 44.9431 0.5535 21.4121 0.7030 22.1151 6.1647 0.6724 6.8371 59,818.29 71 59,818.29
71 2.2161 8.7075 62,468.52
02 Worker 36.2285 20.3896 400.8007 1.2997 172.3928 0.7389 173.1317 45.7194 0.6799 46.3993 138,602.5 705
138,602.5
705

2.3065 2.5988 139,434.6
584
Total 39.5776 139.2621 445.7438 1.8532 193.8049 1.4419 195.2468 51.8841 1.3523 53.2365 198,420.8 675
198,420.8
675

4.5226 11.3062 201,903.1
785
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1331 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3491 118.8725 44.9431 0.5535 21.4121 0.7030 22.1151 6.1647 0.6724 6.8371 59,818.29 71 59,818.29
71 2.2161 8.7075 62,468.52
02 Worker 36.2285 20.3896 400.8007 1.2997 172.3928 0.7389 173.1317 45.7194 0.6799 46.3993 138,602.5 705
138,602.5
705

2.3065 2.5988 139,434.6
584
Total 39.5776 139.2621 445.7438 1.8532 193.8049 1.4419 195.2468 51.8841 1.3523 53.2365 198,420.8 675
198,420.8
675

4.5226 11.3062 201,903.1
785
Mitigated Construction Off-Site

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.9906 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1332 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0352 0.0198 0.3898 1.2600e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 134.8012 134.8012 2.2400e0032.5300e003135.6104 Total 0.0352 0.0198 0.3898 1.2600e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 134.8012 134.8012 2.2400e0032.5300e003135.6104 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3559 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 31 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1333 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0352 0.0198 0.3898 1.2600e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 134.8012 134.8012 2.2400e0032.5300e003135.6104 Total 0.0352 0.0198 0.3898 1.2600e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 134.8012 134.8012 2.2400e0032.5300e003135.6104 Mitigated Construction Off-Site

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.9906 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 32 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1334 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0333 0.0184 0.3729 1.2300e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 132.5832 132.5832 2.0700e0032.4300e003133.3582 Total 0.0333 0.0184 0.3729 1.2300e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 132.5832 132.5832 2.0700e0032.4300e003133.3582 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3559 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 33 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1335 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0333 0.0184 0.3729 1.2300e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 132.5832 132.5832 2.0700e0032.4300e003133.3582 Total 0.0333 0.0184 0.3729 1.2300e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 132.5832 132.5832 2.0700e0032.4300e003133.3582 Mitigated Construction Off-Site

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 886.6384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 886.8092 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 34 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1336 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8406 3.7781 76.6852 0.2539 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 27,267.94 09 27,267.94
09 0.4254 0.4992 27,427.33
50 Total 6.8406 3.7781 76.6852 0.2539 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 27,267.94 09 27,267.94
09 0.4254 0.4992 27,427.33
50 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 886.6384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 886.6681 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 35 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1337 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 6.8406 3.7781 76.6852 0.2539 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 27,267.94 09 27,267.94
09 0.4254 0.4992 27,427.33
50 Total 6.8406 3.7781 76.6852 0.2539 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 27,267.94 09 27,267.94
09 0.4254 0.4992 27,427.33
50 Mitigated Construction Off-Site

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 36 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1338 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 180.6441 147.8663 1,447.534
8 3.0066 363.4064 2.0067 365.4131 96.8498 1.8676 98.7174 324,095.4 602
324,095.4
602

21.7837 14.3835 328,926.3
233
Unmitigated 180.6441 147.8663 1,447.534
8 3.0066 363.4064 2.0067 365.4131 96.8498 1.8676 98.7174 324,095.4 602
324,095.4
602

21.7837 14.3835 328,926.3
233

4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments High Rise 55,936.50 56,942.10 45126.30 97,273,539 97,273,539 Condo/Townhouse 22,999.44 25,575.88 19731.76 40,847,105 40,847,105 General Office Building 15,028.82 3,410.03 1080.10 19,123,598 19,123,598 Parking Lot 0.00 0.00 0.00
Total 93,964.76 85,928.01 65,938.16 157,244,242 157,244,242 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments High Rise 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 Condo/Townhouse 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 General Office Building 8.66 4.38 3.60 33.00 48.00 19.00 77 19 4 Parking Lot 8.66 4.38 3.60 0.00 0.00 0.00 0 0 0

4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 37 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1339 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments High Rise 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Condo/Townhouse 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 General Office Building 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Parking Lot 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406

5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated

5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 NaturalGas
Unmitigated

5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 5.1 Mitigation Measures Energy
Percent of Electricity Use Generated with Renewable Energy Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 38 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1340 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments High
Rise
310317 3.3466 28.5979 12.1693 0.1825 2.3122 2.3122 2.3122 2.3122 36,507.89 88 36,507.89
88 0.6997 0.6693 36,724.84
70 Condo/Townhous
e
146285 1.5776 13.4811 5.7367 0.0861 1.0900 1.0900 1.0900 1.0900 17,209.95 69 17,209.95
69 0.3299 0.3155 17,312.22
70 General Office
Building
43584.5 0.4700 4.2730 3.5893 0.0256 0.3248 0.3248 0.3248 0.3248 5,127.584 2 5,127.584
2 0.0983 0.0940 5,158.054
9 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 39 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1341 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Use Electric Leafblower
Use Low VOC Paint - Residential Interior
Use Low VOC Paint - Residential Exterior
Use Low VOC Paint - Non-Residential Interior
Use Low VOC Paint - Non-Residential Exterior
No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments High
Rise
310.317 3.3466 28.5979 12.1693 0.1825 2.3122 2.3122 2.3122 2.3122 36,507.89 88 36,507.89
88 0.6997 0.6693 36,724.84
70 Condo/Townhous
e
146.285 1.5776 13.4811 5.7367 0.0861 1.0900 1.0900 1.0900 1.0900 17,209.95 69 17,209.95
69 0.3299 0.3155 17,312.22
70 General Office
Building

43.5845 0.4700 4.2730 3.5893 0.0256 0.3248 0.3248 0.3248 0.3248 5,127.584 2 5,127.584
2 0.0983 0.0940 5,158.054
9 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 40 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1342 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Unmitigated 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

24.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
261.3245 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 25.9244 221.5359 94.2706 1.4141 17.9114 17.9114 17.9114 17.9114 0.0000 282,811.7 647
282,811.7
647

5.4206 5.1849 284,492.3
736
Landscaping 38.8841 14.9251 1,295.177
8 0.0686 7.1969 7.1969 7.1969 7.1969 2,339.102
2 2,339.102
2 2.2368 2,395.021
8 Total 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 41 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1343 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Install Low Flow Bathroom Faucet
Install Low Flow Kitchen Faucet
Install Low Flow Toilet
Install Low Flow Shower
Use Water Efficient Irrigation System

7.1 Mitigation Measures Water

7.0 Water Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

24.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
261.3245 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 37.1830 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 2,323.247
8 2,323.247
8 2.1311 2,376.524
4 Total 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 42 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1344 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

11.0 Vegetation

8.1 Mitigation Measures Waste

8.0 Waste Detail

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 43 of 43 Date: 9/22/2022 3:35 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1345 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Santa Monica Housing Element SEIR - Future Project Operational South Coast AQMD Air District, Winter
Project Characteristics - File Name Future Project Ops SEIR 15,712 DUs
Land Use - 732 ft2/DU
Total DU 20% Condo Townhouse and 80% Apartment High Rise Construction Phase - Adjusted based on total DU
Demolition -
Grading - X
Vehicle Trips - Trip length modified to ensure total VMT matches the Sept 2022 Transportation Study Woodstoves - No wood stoves
85% Gas Fireplace as per CalEEMod

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population General Office Building 1,543.00 1000sqft 35.42 1,543,000.00 0 Parking Lot 21,525.00 Space 193.72 8,610,000.00 0
Apartments High Rise 12,570.00 Dwelling Unit 202.74 9,200,947.00 35950 Condo/Townhouse 3,142.00 Dwelling Unit 196.38 2,300,237.00 8986

1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
11 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2030
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1346 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Area Coating -
Energy Use -
Construction Off-road Equipment Mitigation - All construction equipment Tier 4 final Vehicle speed reduction 15 mph standard mitigation measure Mobile Land Use Mitigation - X
Area Mitigation - Gas powered leaf blanners banned in City limits.

No fireplaces.

Coatings per SCAQMD Rule 1113 for building envelope coatings 50 g/l, default coatings 50 g/l, and traffic paint 100 g/l.

Energy Mitigation - On-site renewable energy use based City of Santa Monica Solar Ordinance of 2 watts per square foot buidling footprint = sufficient for 100% energy requirements
Water Mitigation - Green building code requires water efficent landscape and irrigation 50 Percent reduction per Los Angeles Coastal Cities Sustainable Landscaping Fundamentals, www.sm.watersavingplants.com Table Name Column Name Default Value New Value
tblAreaMitigation UseLowVOCPaintParkingCheck False True tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation Tier No Change Tier 4 Final
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1347 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 10,850.00 1,500.00
tblConstructionPhase NumDays 700.00 100.00
tblConstructionPhase NumDays 1,085.00 150.00
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 420.00 50.00
tblFireplaces NumberGas 10,684.50 10,684.00
tblFireplaces NumberGas 2,670.70 2,671.00
tblFireplaces NumberNoFireplace 1,257.00 1,886.00
tblFireplaces NumberNoFireplace 314.20 471.00
tblFireplaces NumberWood 628.50 0.00
tblFireplaces NumberWood 157.10 0.00
tblGrading AcresOfGrading 450.00 3,255.00
tblGrading AcresOfGrading 75.00 630.00
tblLandUse LandUseSquareFeet 12,570,000.00 9,200,947.00 tblLandUse LandUseSquareFeet 3,142,000.00 2,300,237.00
CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1348 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.0 Emissions Summary
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HW_TL 14.70 7.67
tblVehicleTrips HW_TL 14.70 7.67
tblWoodstoves NumberCatalytic 628.50 0.00
tblWoodstoves NumberCatalytic 157.10 0.00
tblWoodstoves NumberNoncatalytic 628.50 0.00
tblWoodstoves NumberNoncatalytic 157.10 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1349 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 6.9327 80.5237 50.0505 0.1604 62.8653 3.2500 65.8963 17.2812 2.9900 20.2712 0.0000 16,573.09 40 16,573.09
40 3.1466 1.4088 17,061.07
65 2023 60.5069 212.5146 585.1912 2.1230 223.0637 3.8069 226.8706 57.7386 3.5435 61.2821 0.0000 219,996.5 460
219,996.5
460

8.5004 13.2178 224,147.9
672
2024 53.6291 173.7412 522.8695 2.0083 193.8051 2.2558 196.0609 51.8842 2.1144 53.9986 0.0000 209,727.9 749
209,727.9
749

6.1983 12.8332 213,707.2
237
2025 50.5036 168.9111 491.8898 1.9500 193.8050 2.1294 195.9343 51.8842 1.9963 53.8805 0.0000 205,073.9 643
205,073.9
643

5.8751 12.4481 208,930.3
807
2026 47.9067 165.3581 466.0893 1.8977 193.8049 2.0828 195.8877 51.8842 1.9533 53.8375 0.0000 200,727.4 293
200,727.4
293

5.6011 12.1004 204,473.3
746
2027 45.5231 162.2011 444.1883 1.8495 193.8049 2.0290 195.8339 51.8841 1.9036 53.7878 0.0000 196,691.1 083
196,691.1
083

5.3587 11.7763 200,334.4
268
2028 49.3721 168.1434 440.9641 1.8300 193.9725 2.3916 196.3641 51.9286 2.2370 54.1656 0.0000 195,407.9 813
195,407.9
813

5.8760 11.4851 198,977.4
300
2029 900.1780 13.8707 86.2961 0.2661 34.6507 0.6086 35.2593 9.1895 0.5641 9.7536 0.0000 28,302.81 85 28,302.81
85 1.1658 0.5311 28,490.23
16 Maximum 900.1780 212.5146 585.1912 2.1230 223.0637 3.8069 226.8706 57.7386 3.5435 61.2821 0.0000 219,996.5 460
219,996.5
460

8.5004 13.2178 224,147.9
672
Unmitigated Construction
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1350 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 1.5931 25.7415 55.1793 0.1604 29.7701 0.2995 30.0696 7.8385 0.2918 8.1030 0.0000 16,573.09 40 16,573.09
40 3.1466 1.4088 17,061.07
65 2023 56.7018 169.1489 591.3554 2.1230 207.0945 1.8250 208.9195 54.5513 1.7169 56.2682 0.0000 219,996.5 460
219,996.5
460

8.5004 13.2178 224,147.9
672
2024 52.4853 162.5322 524.1629 2.0083 193.8051 1.6833 195.4884 51.8842 1.5783 53.4625 0.0000 209,727.9 749
209,727.9
749

6.1983 12.8332 213,707.2
237
2025 49.4640 158.6761 493.2654 1.9500 193.8050 1.6426 195.4476 51.8842 1.5409 53.4250 0.0000 205,073.9 643
205,073.9
643

5.8751 12.4481 208,930.3
807
2026 46.8671 155.1232 467.4649 1.8977 193.8049 1.5960 195.4009 51.8842 1.4979 53.3820 0.0000 200,727.4 293
200,727.4
293

5.6011 12.1004 204,473.3
746
2027 44.4836 151.9662 445.5639 1.8495 193.8049 1.5422 195.3471 51.8841 1.4482 53.3323 0.0000 196,691.1 083
196,691.1
083

5.3587 11.7763 200,334.4
268
2028 47.6978 150.5422 445.0573 1.8300 193.9725 1.5237 195.4962 51.9286 1.4339 53.3625 0.0000 195,407.9 813
195,407.9
813

5.8760 11.4851 198,977.4
300
2029 899.4021 5.4877 89.0371 0.2661 34.6507 0.1800 34.8307 9.1895 0.1689 9.3584 0.0000 28,302.81 85 28,302.81
85 1.1658 0.5311 28,490.23
16 Maximum 899.4021 169.1489 591.3554 2.1230 207.0945 1.8250 208.9195 54.5513 1.7169 56.2682 0.0000 219,996.5 460
219,996.5
460

8.5004 13.2178 224,147.9
672
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

1.31 14.50 -0.76 0.00 3.80 44.53 4.37 3.67 44.07 5.62 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1351 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954
Energy 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mobile 170.7277 158.8382 1,443.266
5 2.8724 363.4064 2.0082 365.4146 96.8498 1.8691 98.7189 309,554.3 428
309,554.3
428

22.6925 14.9494 314,576.5
664
Total 526.5463 441.6511 2,854.210
1 4.6493 363.4064 30.8434 394.2498 96.8498 30.7043 127.5541 0.0000 653,550.6 496
653,550.6
496

31.4777 21.2131 660,659.0
907
Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Energy 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mobile 170.7277 158.8382 1,443.266
5 2.8724 363.4064 2.0082 365.4146 96.8498 1.8691 98.7189 309,554.3 428
309,554.3
428

22.6925 14.9494 314,576.5
664
Total 498.9209 220.0642 2,754.073
2 3.2346 363.4064 12.9228 376.3292 96.8498 12.7836 109.6334 0.0000 370,723.0 304
370,723.0
304

25.9515 16.0282 376,148.2
197
Mitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1352 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/3/2022 5/23/2022 5 100
2 Site Preparation Site Preparation 5/23/2022 8/1/2022 5 50 3 Grading Grading 8/1/2022 2/27/2023 5 150
4 Building Construction Building Construction 2/27/2023 11/27/2028 5 1500 5 Paving Paving 11/27/2028 4/16/2029 5 100
6 Architectural Coating Architectural Coating 4/16/2029 9/3/2029 5 100 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 3 8.00 158 0.38
Demolition Rubber Tired Dozers 2 8.00 247 0.40
Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

5.25 50.17 3.51 30.43 0.00 58.10 4.55 0.00 58.37 14.05 0.00 43.28 43.28 17.56 24.44 43.06 Residential Indoor: 23,289,898; Residential Outdoor: 7,763,299; Non-Residential Indoor: 2,314,500; Non-Residential Outdoor: 771,500; Striped Parking Area: 516,600 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 630
Acres of Grading (Grading Phase): 3255
Acres of Paving: 193.72
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1353 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.1 Mitigation Measures Construction
Use Cleaner Engines for Construction Equipment
Water Exposed Area
Grading Excavators 2 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Scrapers 2 8.00 367 0.48
Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 6 15.00 0.00 13,282.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 15,423.00 3,344.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3,085.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1354 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 28.7447 0.0000 28.7447 4.3522 0.0000 4.3522 0.0000 0.0000 Off-Road 2.6392 25.7194 20.5941 0.0388 1.2427 1.2427 1.1553 1.1553 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Total 2.6392 25.7194 20.5941 0.0388 28.7447 1.2427 29.9873 4.3522 1.1553 5.5075 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Unmitigated Construction On-Site
Reduce Vehicle Speed on Unpaved Roads
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1355 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.5457 21.6333 5.0455 0.0804 2.3233 0.1736 2.4968 0.6368 0.1661 0.8029 8,820.380 2 8,820.380
2 0.4728 1.4002 9,249.472
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0544 0.0398 0.5176 1.4300e0030.1677 1.0000e0030.1687 0.0445 9.2000e0040.0454 145.3958 145.3958 4.0600e0033.8900e003146.6576 Total 0.6000 21.6731 5.5631 0.0819 2.4909 0.1746 2.6655 0.6813 0.1670 0.8483 8,965.776 0 8,965.776
0 0.4768 1.4041 9,396.129
8 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 12.9351 0.0000 12.9351 1.9585 0.0000 1.9585 0.0000 0.0000 Off-Road 0.4623 2.0032 23.2798 0.0388 0.0616 0.0616 0.0616 0.0616 0.0000 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Total 0.4623 2.0032 23.2798 0.0388 12.9351 0.0616 12.9967 1.9585 0.0616 2.0201 0.0000 3,746.781 2 3,746.781
2 1.0524 3,773.092
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1356 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.5457 21.6333 5.0455 0.0804 2.3233 0.1736 2.4968 0.6368 0.1661 0.8029 8,820.380 2 8,820.380
2 0.4728 1.4002 9,249.472
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0544 0.0398 0.5176 1.4300e0030.1677 1.0000e0030.1687 0.0445 9.2000e0040.0454 145.3958 145.3958 4.0600e0033.8900e003146.6576 Total 0.6000 21.6731 5.5631 0.0819 2.4909 0.1746 2.6655 0.6813 0.1670 0.8483 8,965.776 0 8,965.776
0 0.4768 1.4041 9,396.129
8 Mitigated Construction Off-Site

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 31.4286 0.0000 31.4286 11.3735 0.0000 11.3735 0.0000 0.0000 Off-Road 3.1701 33.0835 19.6978 0.0380 1.6126 1.6126 1.4836 1.4836 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Total 3.1701 33.0835 19.6978 0.0380 31.4286 1.6126 33.0411 11.3735 1.4836 12.8571 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1357 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0652 0.0477 0.6211 1.7200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 174.4750 174.4750 4.8700e0034.6700e003175.9891 Total 0.0652 0.0477 0.6211 1.7200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 174.4750 174.4750 4.8700e0034.6700e003175.9891 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 14.1429 0.0000 14.1429 5.1181 0.0000 5.1181 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0380 0.0621 0.0621 0.0621 0.0621 0.0000 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Total 0.4656 2.0175 20.8690 0.0380 14.1429 0.0621 14.2049 5.1181 0.0621 5.1802 0.0000 3,686.061 9 3,686.061
9 1.1922 3,715.865
5 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1358 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0652 0.0477 0.6211 1.7200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 174.4750 174.4750 4.8700e0034.6700e003175.9891 Total 0.0652 0.0477 0.6211 1.7200e0030.2012 1.2000e0030.2024 0.0534 1.1100e0030.0545 174.4750 174.4750 4.8700e0034.6700e003175.9891 Mitigated Construction Off-Site

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 29.0349 0.0000 29.0349 5.7951 0.0000 5.7951 0.0000 0.0000 Off-Road 3.6248 38.8435 29.0415 0.0621 1.6349 1.6349 1.5041 1.5041 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Total 3.6248 38.8435 29.0415 0.0621 29.0349 1.6349 30.6698 5.7951 1.5041 7.2992 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1359 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0725 0.0530 0.6901 1.9100e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 193.8611 193.8611 5.4100e0035.1900e003195.5435 Total 0.0725 0.0530 0.6901 1.9100e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 193.8611 193.8611 5.4100e0035.1900e003195.5435 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 13.0657 0.0000 13.0657 2.6078 0.0000 2.6078 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Total 0.7616 3.3000 32.9991 0.0621 13.0657 0.1015 13.1673 2.6078 0.1015 2.7093 0.0000 6,011.410 5 6,011.410
5 1.9442 6,060.015
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1360 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0725 0.0530 0.6901 1.9100e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 193.8611 193.8611 5.4100e0035.1900e003195.5435 Total 0.0725 0.0530 0.6901 1.9100e0030.2236 1.3400e0030.2249 0.0593 1.2300e0030.0605 193.8611 193.8611 5.4100e0035.1900e003195.5435 Mitigated Construction Off-Site

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 29.0349 0.0000 29.0349 5.7951 0.0000 5.7951 0.0000 0.0000 Off-Road 3.3217 34.5156 28.0512 0.0621 1.4245 1.4245 1.3105 1.3105 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Total 3.3217 34.5156 28.0512 0.0621 29.0349 1.4245 30.4594 5.7951 1.3105 7.1056 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1361 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0674 0.0469 0.6366 1.8400e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 188.7698 188.7698 4.8600e0034.7900e003190.3203 Total 0.0674 0.0469 0.6366 1.8400e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 188.7698 188.7698 4.8600e0034.7900e003190.3203 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 13.0657 0.0000 13.0657 2.6078 0.0000 2.6078 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Total 0.7616 3.3000 32.9991 0.0621 13.0657 0.1015 13.1673 2.6078 0.1015 2.7093 0.0000 6,011.477 7 6,011.477
7 1.9442 6,060.083
6 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1362 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0674 0.0469 0.6366 1.8400e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 188.7698 188.7698 4.8600e0034.7900e003190.3203 Total 0.0674 0.0469 0.6366 1.8400e0030.2236 1.2600e0030.2248 0.0593 1.1600e0030.0605 188.7698 188.7698 4.8600e0034.7900e003190.3203 Mitigated Construction Off-Site

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1363 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5391 127.4074 49.3313 0.6097 21.4124 0.7106 22.1230 6.1649 0.6797 6.8445 65,671.26 10 65,671.26
10 2.1930 9.5154 68,561.68
43 Worker 52.0059 36.1598 490.9281 1.4224 172.3928 0.9708 173.3636 45.7194 0.8937 46.6131 145,569.8 276
145,569.8
276

3.7505 3.6976 146,765.4
730
Total 55.5450 163.5672 540.2594 2.0321 193.8052 1.6814 195.4866 51.8842 1.5734 53.4576 211,241.0 886
211,241.0
886

5.9434 13.2130 215,327.1
573
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0269 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 0.3278 2.2347 17.4603 0.0269 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1364 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.5391 127.4074 49.3313 0.6097 21.4124 0.7106 22.1230 6.1649 0.6797 6.8445 65,671.26 10 65,671.26
10 2.1930 9.5154 68,561.68
43 Worker 52.0059 36.1598 490.9281 1.4224 172.3928 0.9708 173.3636 45.7194 0.8937 46.6131 145,569.8 276
145,569.8
276

3.7505 3.6976 146,765.4
730
Total 55.5450 163.5672 540.2594 2.0321 193.8052 1.6814 195.4866 51.8842 1.5734 53.4576 211,241.0 886
211,241.0
886

5.9434 13.2130 215,327.1
573
Mitigated Construction Off-Site

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1365 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4481 127.9893 48.5246 0.6006 21.4123 0.7121 22.1244 6.1648 0.6812 6.8460 64,728.44 15 64,728.44
15 2.1929 9.3921 67,582.10
05 Worker 48.7094 32.3082 458.1781 1.3808 172.3928 0.9304 173.3232 45.7194 0.8564 46.5758 142,443.8 345
142,443.8
345

3.4011 3.4411 143,554.3
155
Total 52.1575 160.2975 506.7027 1.9814 193.8051 1.6425 195.4476 51.8842 1.5375 53.4217 207,172.2 760
207,172.2
760

5.5940 12.8332 211,136.4
160
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1366 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.4481 127.9893 48.5246 0.6006 21.4123 0.7121 22.1244 6.1648 0.6812 6.8460 64,728.44 15 64,728.44
15 2.1929 9.3921 67,582.10
05 Worker 48.7094 32.3082 458.1781 1.3808 172.3928 0.9304 173.3232 45.7194 0.8564 46.5758 142,443.8 345
142,443.8
345

3.4011 3.4411 143,554.3
155
Total 52.1575 160.2975 506.7027 1.9814 193.8051 1.6425 195.4476 51.8842 1.5375 53.4217 207,172.2 760
207,172.2
760

5.5940 12.8332 211,136.4
160
Mitigated Construction Off-Site

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1367 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3661 127.3901 47.7979 0.5892 21.4122 0.7142 22.1264 6.1648 0.6832 6.8479 63,550.41 62 63,550.41
62 2.1995 9.2313 66,356.33
33 Worker 45.7701 29.0513 428.0072 1.3339 172.3928 0.8876 173.2804 45.7194 0.8169 46.5363 138,967.0 738
138,967.0
738

3.0746 3.2168 140,002.5
493
Total 49.1362 156.4414 475.8051 1.9230 193.8050 1.6018 195.4068 51.8842 1.5001 53.3842 202,517.4 899
202,517.4
899

5.2741 12.4481 206,358.8
827
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1368 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.3661 127.3901 47.7979 0.5892 21.4122 0.7142 22.1264 6.1648 0.6832 6.8479 63,550.41 62 63,550.41
62 2.1995 9.2313 66,356.33
33 Worker 45.7701 29.0513 428.0072 1.3339 172.3928 0.8876 173.2804 45.7194 0.8169 46.5363 138,967.0 738
138,967.0
738

3.0746 3.2168 140,002.5
493
Total 49.1362 156.4414 475.8051 1.9230 193.8050 1.6018 195.4068 51.8842 1.5001 53.3842 202,517.4 899
202,517.4
899

5.2741 12.4481 206,358.8
827
Mitigated Construction Off-Site

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1369 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.2928 126.4974 47.2183 0.5777 21.4122 0.7123 22.1244 6.1648 0.6813 6.8461 62,360.10 04 62,360.10
04 2.2035 9.0670 65,117.15
05 Worker 43.2465 26.3911 402.7864 1.2930 172.3928 0.8429 173.2357 45.7194 0.7757 46.4951 135,810.8 546
135,810.8
546

2.7967 3.0334 136,784.7
260
Total 46.5393 152.8884 450.0047 1.8707 193.8049 1.5552 195.3602 51.8842 1.4571 53.3412 198,170.9 550
198,170.9
550

5.0002 12.1004 201,901.8
765
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1370 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.2928 126.4974 47.2183 0.5777 21.4122 0.7123 22.1244 6.1648 0.6813 6.8461 62,360.10 04 62,360.10
04 2.2035 9.0670 65,117.15
05 Worker 43.2465 26.3911 402.7864 1.2930 172.3928 0.8429 173.2357 45.7194 0.7757 46.4951 135,810.8 546
135,810.8
546

2.7967 3.0334 136,784.7
260
Total 46.5393 152.8884 450.0047 1.8707 193.8049 1.5552 195.3602 51.8842 1.4571 53.3412 198,170.9 550
198,170.9
550

5.0002 12.1004 201,901.8
765
Mitigated Construction Off-Site

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1371 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.2287 125.5854 46.7329 0.5659 21.4121 0.7091 22.1212 6.1647 0.6783 6.8430 61,118.65 61 61,118.65
61 2.1999 8.8963 63,824.74
15 Worker 40.9271 24.1461 381.3707 1.2566 172.3928 0.7923 173.1851 45.7194 0.7291 46.4485 133,015.9 778
133,015.9
778

2.5579 2.8801 133,938.1
872
Total 44.1557 149.7315 428.1036 1.8225 193.8049 1.5014 195.3063 51.8841 1.4074 53.2915 194,134.6 339
194,134.6
339

4.7578 11.7763 197,762.9
287
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1372 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.2287 125.5854 46.7329 0.5659 21.4121 0.7091 22.1212 6.1647 0.6783 6.8430 61,118.65 61 61,118.65
61 2.1999 8.8963 63,824.74
15 Worker 40.9271 24.1461 381.3707 1.2566 172.3928 0.7923 173.1851 45.7194 0.7291 46.4485 133,015.9 778
133,015.9
778

2.5579 2.8801 133,938.1
872
Total 44.1557 149.7315 428.1036 1.8225 193.8049 1.5014 195.3063 51.8841 1.4074 53.2915 194,134.6 339
194,134.6
339

4.7578 11.7763 197,762.9
287
Mitigated Construction Off-Site

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1373 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.1768 124.8075 46.3918 0.5546 21.4121 0.7058 22.1179 6.1647 0.6752 6.8399 59,934.05 12 59,934.05
12 2.2049 8.7302 62,590.77
21 Worker 38.7996 22.2629 363.5561 1.2245 172.3928 0.7389 173.1317 45.7194 0.6799 46.3993 130,583.7 084
130,583.7
084

2.3541 2.7522 131,462.7
149
Total 41.9764 147.0704 409.9478 1.7791 193.8049 1.4448 195.2496 51.8841 1.3551 53.2392 190,517.7 596
190,517.7
596

4.5590 11.4824 194,053.4
870
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1374 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 3.1768 124.8075 46.3918 0.5546 21.4121 0.7058 22.1179 6.1647 0.6752 6.8399 59,934.05 12 59,934.05
12 2.2049 8.7302 62,590.77
21 Worker 38.7996 22.2629 363.5561 1.2245 172.3928 0.7389 173.1317 45.7194 0.6799 46.3993 130,583.7 084
130,583.7
084

2.3541 2.7522 131,462.7
149
Total 41.9764 147.0704 409.9478 1.7791 193.8049 1.4448 195.2496 51.8841 1.3551 53.2392 190,517.7 596
190,517.7
596

4.5590 11.4824 194,053.4
870
Mitigated Construction Off-Site

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.9906 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1375 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0377 0.0217 0.3536 1.1900e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 127.0023 127.0023 2.2900e0032.6800e003127.8571 Total 0.0377 0.0217 0.3536 1.1900e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 127.0023 127.0023 2.2900e0032.6800e003127.8571 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3559 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 31 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1376 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0377 0.0217 0.3536 1.1900e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 127.0023 127.0023 2.2900e0032.6800e003127.8571 Total 0.0377 0.0217 0.3536 1.1900e0030.1677 7.2000e0040.1684 0.0445 6.6000e0040.0451 127.0023 127.0023 2.2900e0032.6800e003127.8571 Mitigated Construction Off-Site

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.9906 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 32 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1377 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0201 0.3383 1.1600e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 124.9095 124.9095 2.1100e0032.5700e003125.7281 Total 0.0357 0.0201 0.3383 1.1600e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 124.9095 124.9095 2.1100e0032.5700e003125.7281 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 5.0755 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3559 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 33 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1378 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0201 0.3383 1.1600e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 124.9095 124.9095 2.1100e0032.5700e003125.7281 Total 0.0357 0.0201 0.3383 1.1600e0030.1677 6.7000e0040.1683 0.0445 6.2000e0040.0451 124.9095 124.9095 2.1100e0032.5700e003125.7281 Mitigated Construction Off-Site

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 886.6384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 886.8092 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 34 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1379 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.3425 4.1235 69.5707 0.2392 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 25,689.71 58 25,689.71
58 0.4347 0.5285 25,858.08
38 Total 7.3425 4.1235 69.5707 0.2392 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 25,689.71 58 25,689.71
58 0.4347 0.5285 25,858.08
38 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 886.6384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 886.6681 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 35 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1380 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.3425 4.1235 69.5707 0.2392 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 25,689.71 58 25,689.71
58 0.4347 0.5285 25,858.08
38 Total 7.3425 4.1235 69.5707 0.2392 34.4830 0.1379 34.6210 9.1451 0.1269 9.2720 25,689.71 58 25,689.71
58 0.4347 0.5285 25,858.08
38 Mitigated Construction Off-Site

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 36 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1381 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 170.7277 158.8382 1,443.266
5 2.8724 363.4064 2.0082 365.4146 96.8498 1.8691 98.7189 309,554.3 428
309,554.3
428

22.6925 14.9494 314,576.5
664
Unmitigated 170.7277 158.8382 1,443.266
5 2.8724 363.4064 2.0082 365.4146 96.8498 1.8691 98.7189 309,554.3 428
309,554.3
428

22.6925 14.9494 314,576.5
664

4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments High Rise 55,936.50 56,942.10 45126.30 97,273,539 97,273,539 Condo/Townhouse 22,999.44 25,575.88 19731.76 40,847,105 40,847,105 General Office Building 15,028.82 3,410.03 1080.10 19,123,598 19,123,598 Parking Lot 0.00 0.00 0.00
Total 93,964.76 85,928.01 65,938.16 157,244,242 157,244,242 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments High Rise 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 Condo/Townhouse 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 General Office Building 8.66 4.38 3.60 33.00 48.00 19.00 77 19 4 Parking Lot 8.66 4.38 3.60 0.00 0.00 0.00 0 0 0

4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 37 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1382 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments High Rise 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Condo/Townhouse 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 General Office Building 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Parking Lot 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406

5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated

5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 NaturalGas
Unmitigated

5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 5.1 Mitigation Measures Energy
Percent of Electricity Use Generated with Renewable Energy Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 38 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1383 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments High
Rise
310317 3.3466 28.5979 12.1693 0.1825 2.3122 2.3122 2.3122 2.3122 36,507.89 88 36,507.89
88 0.6997 0.6693 36,724.84
70 Condo/Townhous
e
146285 1.5776 13.4811 5.7367 0.0861 1.0900 1.0900 1.0900 1.0900 17,209.95 69 17,209.95
69 0.3299 0.3155 17,312.22
70 General Office
Building
43584.5 0.4700 4.2730 3.5893 0.0256 0.3248 0.3248 0.3248 0.3248 5,127.584 2 5,127.584
2 0.0983 0.0940 5,158.054
9 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 39 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1384 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Use Electric Leafblower
Use Low VOC Paint - Residential Interior
Use Low VOC Paint - Residential Exterior
Use Low VOC Paint - Non-Residential Interior
Use Low VOC Paint - Non-Residential Exterior
No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments High
Rise
310.317 3.3466 28.5979 12.1693 0.1825 2.3122 2.3122 2.3122 2.3122 36,507.89 88 36,507.89
88 0.6997 0.6693 36,724.84
70 Condo/Townhous
e
146.285 1.5776 13.4811 5.7367 0.0861 1.0900 1.0900 1.0900 1.0900 17,209.95 69 17,209.95
69 0.3299 0.3155 17,312.22
70 General Office
Building

43.5845 0.4700 4.2730 3.5893 0.0256 0.3248 0.3248 0.3248 0.3248 5,127.584 2 5,127.584
2 0.0983 0.0940 5,158.054
9 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 5.3942 46.3520 21.4953 0.2942 3.7269 3.7269 3.7269 3.7269 58,845.43 99 58,845.43
99 1.1279 1.0788 59,195.12
89 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 40 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1385 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Unmitigated 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

24.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
261.3245 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 25.9244 221.5359 94.2706 1.4141 17.9114 17.9114 17.9114 17.9114 0.0000 282,811.7 647
282,811.7
647

5.4206 5.1849 284,492.3
736
Landscaping 38.8841 14.9251 1,295.177
8 0.0686 7.1969 7.1969 7.1969 7.1969 2,339.102
2 2,339.102
2 2.2368 2,395.021
8 Total 350.4245 236.4610 1,389.448
4 1.4827 25.1083 25.1083 25.1083 25.1083 0.0000 285,150.8 669
285,150.8
669

7.6573 5.1849 286,887.3
954
Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 41 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1386 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Install Low Flow Bathroom Faucet
Install Low Flow Kitchen Faucet
Install Low Flow Toilet
Install Low Flow Shower
Use Water Efficient Irrigation System

7.1 Mitigation Measures Water

7.0 Water Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

24.2915 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
261.3245 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 37.1830 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 2,323.247
8 2,323.247
8 2.1311 2,376.524
4 Total 322.7990 14.8741 1,289.311
5 0.0680 7.1877 7.1877 7.1877 7.1877 0.0000 2,323.247
8 2,323.247
8 2.1311 0.0000 2,376.524
4 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 42 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1387 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

11.0 Vegetation

8.1 Mitigation Measures Waste

8.0 Waste Detail

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 43 of 43 Date: 9/22/2022 3:34 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1388 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Santa Monica Housing Element SEIR - Future Project Operational South Coast AQMD Air District, Annual
Project Characteristics - File Name Future Project Ops SEIR 15,712 DUs
Land Use - 732 ft2/DU
Total DU 20% Condo Townhouse and 80% Apartment High Rise Construction Phase - Adjusted based on total DU
Demolition -
Grading - X
Vehicle Trips - Trip length modified to ensure total VMT matches the Sept 2022 Transportation Study Woodstoves - No wood stoves
85% Gas Fireplace as per CalEEMod

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population General Office Building 1,543.00 1000sqft 35.42 1,543,000.00 0 Parking Lot 21,525.00 Space 193.72 8,610,000.00 0
Apartments High Rise 12,570.00 Dwelling Unit 202.74 9,200,947.00 35950 Condo/Townhouse 3,142.00 Dwelling Unit 196.38 2,300,237.00 8986

1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
11 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics
Utility Company Southern California Edison
Operational Year 2030
CO2 Intensity
(lb/MWhr)
390.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1389 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Area Coating -
Energy Use -
Construction Off-road Equipment Mitigation - All construction equipment Tier 4 final Vehicle speed reduction 15 mph standard mitigation measure Mobile Land Use Mitigation - X
Area Mitigation - Gas powered leaf blanners banned in City limits.

No fireplaces.

Coatings per SCAQMD Rule 1113 for building envelope coatings 50 g/l, default coatings 50 g/l, and traffic paint 100 g/l.

Energy Mitigation - On-site renewable energy use based City of Santa Monica Solar Ordinance of 2 watts per square foot buidling footprint = sufficient for 100% energy requirements
Water Mitigation - Green building code requires water efficent landscape and irrigation 50 Percent reduction per Los Angeles Coastal Cities Sustainable Landscaping Fundamentals, www.sm.watersavingplants.com Table Name Column Name Default Value New Value
tblAreaMitigation UseLowVOCPaintParkingCheck False True tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation Tier No Change Tier 4 Final
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1390 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 10,850.00 1,500.00
tblConstructionPhase NumDays 700.00 100.00
tblConstructionPhase NumDays 1,085.00 150.00
tblConstructionPhase NumDays 770.00 100.00
tblConstructionPhase NumDays 420.00 50.00
tblFireplaces NumberGas 10,684.50 10,684.00
tblFireplaces NumberGas 2,670.70 2,671.00
tblFireplaces NumberNoFireplace 1,257.00 1,886.00
tblFireplaces NumberNoFireplace 314.20 471.00
tblFireplaces NumberWood 628.50 0.00
tblFireplaces NumberWood 157.10 0.00
tblGrading AcresOfGrading 450.00 3,255.00
tblGrading AcresOfGrading 75.00 630.00
tblLandUse LandUseSquareFeet 12,570,000.00 9,200,947.00 tblLandUse LandUseSquareFeet 3,142,000.00 2,300,237.00
CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1391 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.0 Emissions Summary
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CC_TL 8.40 4.38
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CNW_TL 6.90 3.60
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips CW_TL 16.60 8.66
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HO_TL 8.70 4.54
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HS_TL 5.90 3.08
tblVehicleTrips HW_TL 14.70 7.67
tblVehicleTrips HW_TL 14.70 7.67
tblWoodstoves NumberCatalytic 628.50 0.00
tblWoodstoves NumberCatalytic 157.10 0.00
tblWoodstoves NumberNoncatalytic 628.50 0.00
tblWoodstoves NumberNoncatalytic 157.10 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveDayYear 25.00 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
tblWoodstoves WoodstoveWoodMass 999.60 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1392 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2022 0.4493 5.3876 3.4738 0.0106 4.4626 0.2027 4.6653 0.9179 0.1874 1.1053 0.0000 981.5440 981.5440 0.1951 0.0647 1,005.698 0 2023 5.9309 20.3719 63.2196 0.2301 22.7983 0.2909 23.0892 5.8693 0.2722 6.1414 0.0000 21,665.62 64 21,665.62
64 0.6908 1.3234 22,077.27
09 2024 6.5451 22.8533 70.0582 0.2658 24.9292 0.2953 25.2244 6.6841 0.2767 6.9608 0.0000 25,174.99 05 25,174.99
05 0.7374 1.5303 25,649.44
30 2025 6.1309 22.1237 65.6315 0.2571 24.8340 0.2776 25.1116 6.6586 0.2603 6.9189 0.0000 24,521.15 95 24,521.15
95 0.6962 1.4784 24,979.11
91 2026 5.8077 21.6495 62.1694 0.2501 24.8340 0.2716 25.1056 6.6586 0.2547 6.9133 0.0000 24,000.58 03 24,000.58
03 0.6637 1.4368 24,445.35
13 2027 5.5126 21.2282 59.2315 0.2438 24.8340 0.2646 25.0985 6.6586 0.2482 6.9068 0.0000 23,517.52 94 23,517.52
94 0.6350 1.3982 23,950.05
99 2028 4.8171 18.9812 51.5428 0.2155 22.4573 0.2378 22.6951 6.0213 0.2231 6.2444 0.0000 20,900.19 93 20,900.19
93 0.5610 1.2326 21,281.53
64 2029 45.3520 0.5974 4.2681 0.0133 1.7155 0.0255 1.7410 0.4556 0.0237 0.4793 0.0000 1,288.165 3 1,288.165
3 0.0453 0.0247 1,296.649
4 Maximum 45.3520 22.8533 70.0582 0.2658 24.9292 0.2953 25.2244 6.6841 0.2767 6.9608 0.0000 25,174.99 05 25,174.99
05 0.7374 1.5303 25,649.44
30 Unmitigated Construction
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1393 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2022 0.1129 1.4428 3.8569 0.0106 2.0856 0.0192 2.1048 0.4342 0.0188 0.4530 0.0000 981.5434 981.5434 0.1951 0.0647 1,005.697 3 2023 5.7414 18.3954 63.4548 0.2301 21.7748 0.1913 21.9661 5.7288 0.1794 5.9082 0.0000 21,665.62 59 21,665.62
59 0.6908 1.3234 22,077.27
05 2024 6.3953 21.3849 70.2277 0.2658 24.9292 0.2203 25.1494 6.6841 0.2065 6.8906 0.0000 25,174.99 01 25,174.99
01 0.7374 1.5303 25,649.44
26 2025 5.9953 20.7880 65.8110 0.2571 24.8340 0.2141 25.0481 6.6586 0.2008 6.8594 0.0000 24,521.15 91 24,521.15
91 0.6962 1.4784 24,979.11
88 2026 5.6721 20.3139 62.3490 0.2501 24.8340 0.2080 25.0420 6.6586 0.1952 6.8538 0.0000 24,000.57 99 24,000.57
99 0.6637 1.4368 24,445.35
10 2027 5.3770 19.8925 59.4111 0.2438 24.8340 0.2010 25.0350 6.6586 0.1888 6.8473 0.0000 23,517.52 91 23,517.52
91 0.6350 1.3982 23,950.05
95 2028 4.6865 17.6814 51.7391 0.2155 22.4573 0.1756 22.6329 6.0213 0.1650 6.1863 0.0000 20,900.19 90 20,900.19
90 0.5610 1.2326 21,281.53
60 2029 45.3208 0.2661 4.3725 0.0133 1.7155 8.6100e0031.7241 0.4556 8.0500e0030.4637 0.0000 1,288.165 2 1,288.165
2 0.0453 0.0247 1,296.649
2 Maximum 45.3208 21.3849 70.2277 0.2658 24.9292 0.2203 25.1494 6.6841 0.2065 6.8906 0.0000 25,174.99 01 25,174.99
01 0.7374 1.5303 25,649.44
26 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

1.55 9.78 -0.43 0.00 2.25 33.65 2.64 1.56 33.42 2.90 0.00 0.00 0.00 0.00 0.00 0.00 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-3-2022 4-2-2022 1.6268 0.7945
2 4-3-2022 7-2-2022 1.4382 0.4721
3 7-3-2022 10-2-2022 1.3477 0.1218
CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1394 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element 4 10-3-2022 1-2-2023 1.3962 0.1376
5 1-3-2023 4-2-2023 3.6891 2.8461
6 4-3-2023 7-2-2023 7.2597 6.8244
7 7-3-2023 10-2-2023 7.3479 6.9077
8 10-3-2023 1-2-2024 7.7182 7.2788
9 1-3-2024 4-2-2024 7.3814 6.9800
10 4-3-2024 7-2-2024 7.0208 6.6193
11 7-3-2024 10-2-2024 7.1060 6.7001
12 10-3-2024 1-2-2025 7.4651 7.0599
13 1-3-2025 4-2-2025 7.0448 6.6824
14 4-3-2025 7-2-2025 6.7733 6.4069
15 7-3-2025 10-2-2025 6.8556 6.4852
16 10-3-2025 1-2-2026 7.2049 6.8345
17 1-3-2026 4-2-2026 6.8473 6.4849
18 4-3-2026 7-2-2026 6.5828 6.2163
19 7-3-2026 10-2-2026 6.6628 6.2923
20 10-3-2026 1-2-2027 7.0033 6.6329
21 1-3-2027 4-2-2027 6.6694 6.3070
22 4-3-2027 7-2-2027 6.4114 6.0450
23 7-3-2027 10-2-2027 6.4893 6.1188
24 10-3-2027 1-2-2028 6.8218 6.4513
25 1-3-2028 4-2-2028 6.5864 6.2200
26 4-3-2028 7-2-2028 6.2620 5.8956
27 7-3-2028 10-2-2028 6.3381 5.9676
28 10-3-2028 1-2-2029 4.2510 3.9198
29 1-3-2029 4-2-2029 0.4702 0.2130
30 4-3-2029 7-2-2029 25.1048 25.0325
31 7-3-2029 9-30-2029 20.2179 20.1918
Highest 25.1048 25.0325
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1395 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 57.3095 4.6348 163.0756 0.0263 1.1235 1.1235 1.1235 1.1235 0.0000 3,472.281 2 3,472.281
2 0.3151 0.0588 3,497.680
2 Energy 0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 24,931.10 95 24,931.10
95 1.4687 0.3340 25,067.35
98 Mobile 27.8001 26.5067 240.4800 0.4816 59.2053 0.3327 59.5380 15.8018 0.3096 16.1114 0.0000 47,083.28 62 47,083.28
62 3.3904 2.2545 47,839.89
56 Waste 0.0000 0.0000 0.0000 0.0000 1,758.411
3 0.0000 1,758.411
3 103.9191 0.0000 4,356.389
4 Water 0.0000 0.0000 0.0000 0.0000 411.7775 4,600.000
5 5,011.778
0 42.6818 1.0457 6,390.441
2 Total 86.0940 39.6008 407.4785 0.5615 59.2053 2.1363 61.3417 15.8018 2.1133 17.9151 2,170.188 8 80,086.67
74 82,256.86
62 151.7751 3.6930 87,151.76
62 Unmitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1396 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 56.7728 1.8593 161.1639 8.5000e0030.8985 0.8985 0.8985 0.8985 0.0000 263.4519 263.4519 0.2417 0.0000 269.4933 Energy 0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 9,742.522 5 9,742.522
5 0.1867 0.1786 9,800.417
5 Mobile 27.8001 26.5067 240.4800 0.4816 59.2053 0.3327 59.5380 15.8018 0.3096 16.1114 0.0000 47,083.28 62 47,083.28
62 3.3904 2.2545 47,839.89
56 Waste 0.0000 0.0000 0.0000 0.0000 1,758.411
3 0.0000 1,758.411
3 103.9191 0.0000 4,356.389
4 Water 0.0000 0.0000 0.0000 0.0000 329.4220 3,902.785
3 4,232.207
3 34.1642 0.8388 5,336.287
1 Total 85.5573 36.8252 405.5668 0.5438 59.2053 1.9113 61.1166 15.8018 1.8882 17.6900 2,087.833 3 60,992.04
59 63,079.87
92 141.9021 3.2720 67,602.48
30 Mitigated Operational

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/3/2022 5/23/2022 5 100
2 Site Preparation Site Preparation 5/23/2022 8/1/2022 5 50 3 Grading Grading 8/1/2022 2/27/2023 5 150
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.62 7.01 0.47 3.16 0.00 10.53 0.37 0.00 10.65 1.26 3.79 23.84 23.31 6.50 11.40 22.43 CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1397 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element 4 Building Construction Building Construction 2/27/2023 11/27/2028 5 1500 5 Paving Paving 11/27/2028 4/16/2029 5 100
6 Architectural Coating Architectural Coating 4/16/2029 9/3/2029 5 100 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 3 8.00 158 0.38
Demolition Rubber Tired Dozers 2 8.00 247 0.40
Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Scrapers 2 8.00 367 0.48
Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Residential Indoor: 23,289,898; Residential Outdoor: 7,763,299; Non-Residential Indoor: 2,314,500; Non-Residential Outdoor: 771,500; Striped Parking Area: 516,600 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 630
Acres of Grading (Grading Phase): 3255
Acres of Paving: 193.72
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1398 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.1 Mitigation Measures Construction
Use Cleaner Engines for Construction Equipment
Water Exposed Area
Reduce Vehicle Speed on Unpaved Roads
Paving Rollers 2 8.00 80 0.38
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 6 15.00 0.00 13,282.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Site Preparation 7 18.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 15,423.00 3,344.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 3,085.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1399 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 1.4516 0.0000 1.4516 0.2198 0.0000 0.2198 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1333 1.2988 1.0400 1.9600e0030.0628 0.0628 0.0583 0.0583 0.0000 171.6507 171.6507 0.0482 0.0000 172.8560 Total 0.1333 1.2988 1.0400 1.9600e0031.4516 0.0628 1.5144 0.2198 0.0583 0.2781 0.0000 171.6507 171.6507 0.0482 0.0000 172.8560 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0280 1.1024 0.2520 4.0600e0030.1154 8.7600e0030.1242 0.0317 8.3800e0030.0401 0.0000 404.0002 404.0002 0.0217 0.0641 423.6547 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5400e0032.0500e0030.0269 7.0000e0058.3100e0035.0000e0058.3600e0032.2100e0035.0000e0052.2500e0030.0000 6.7632 6.7632 1.9000e0041.8000e0046.8219 Total 0.0306 1.1045 0.2789 4.1300e0030.1238 8.8100e0030.1326 0.0339 8.4300e0030.0423 0.0000 410.7634 410.7634 0.0219 0.0643 430.4766 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1400 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.6532 0.0000 0.6532 0.0989 0.0000 0.0989 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0234 0.1012 1.1756 1.9600e0033.1100e0033.1100e0033.1100e0033.1100e0030.0000 171.6504 171.6504 0.0482 0.0000 172.8558 Total 0.0234 0.1012 1.1756 1.9600e0030.6532 3.1100e0030.6563 0.0989 3.1100e0030.1020 0.0000 171.6504 171.6504 0.0482 0.0000 172.8558 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0280 1.1024 0.2520 4.0600e0030.1154 8.7600e0030.1242 0.0317 8.3800e0030.0401 0.0000 404.0002 404.0002 0.0217 0.0641 423.6547 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5400e0032.0500e0030.0269 7.0000e0058.3100e0035.0000e0058.3600e0032.2100e0035.0000e0052.2500e0030.0000 6.7632 6.7632 1.9000e0041.8000e0046.8219 Total 0.0306 1.1045 0.2789 4.1300e0030.1238 8.8100e0030.1326 0.0339 8.4300e0030.0423 0.0000 410.7634 410.7634 0.0219 0.0643 430.4766 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1401 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.8014 0.0000 0.8014 0.2900 0.0000 0.2900 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0808 0.8436 0.5023 9.7000e0040.0411 0.0411 0.0378 0.0378 0.0000 85.2705 85.2705 0.0276 0.0000 85.9599 Total 0.0808 0.8436 0.5023 9.7000e0040.8014 0.0411 0.8426 0.2900 0.0378 0.3279 0.0000 85.2705 85.2705 0.0276 0.0000 85.9599 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5400e0031.2400e0030.0163 4.0000e0055.0400e0033.0000e0055.0700e0031.3400e0033.0000e0051.3700e0030.0000 4.0981 4.0981 1.1000e0041.1000e0044.1337 Total 1.5400e0031.2400e0030.0163 4.0000e0055.0400e0033.0000e0055.0700e0031.3400e0033.0000e0051.3700e0030.0000 4.0981 4.0981 1.1000e0041.1000e0044.1337 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1402 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.3 Site Preparation - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3606 0.0000 0.3606 0.1305 0.0000 0.1305 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0119 0.0515 0.5322 9.7000e0041.5800e0031.5800e0031.5800e0031.5800e0030.0000 85.2703 85.2703 0.0276 0.0000 85.9598 Total 0.0119 0.0515 0.5322 9.7000e0040.3606 1.5800e0030.3622 0.1305 1.5800e0030.1321 0.0000 85.2703 85.2703 0.0276 0.0000 85.9598 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5400e0031.2400e0030.0163 4.0000e0055.0400e0033.0000e0055.0700e0031.3400e0033.0000e0051.3700e0030.0000 4.0981 4.0981 1.1000e0041.1000e0044.1337 Total 1.5400e0031.2400e0030.0163 4.0000e0055.0400e0033.0000e0055.0700e0031.3400e0033.0000e0051.3700e0030.0000 4.0981 4.0981 1.1000e0041.1000e0044.1337 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1403 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 2.0687 0.0000 2.0687 0.3697 0.0000 0.3697 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1994 2.1364 1.5973 3.4100e0030.0899 0.0899 0.0827 0.0827 0.0000 299.9403 299.9403 0.0970 0.0000 302.3655 Total 0.1994 2.1364 1.5973 3.4100e0032.0687 0.0899 2.1586 0.3697 0.0827 0.4524 0.0000 299.9403 299.9403 0.0970 0.0000 302.3655 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6900e0032.9800e0030.0390 1.1000e0040.0121 7.0000e0050.0121 3.2100e0037.0000e0053.2700e0030.0000 9.8212 9.8212 2.7000e0042.6000e0049.9063 Total 3.6900e0032.9800e0030.0390 1.1000e0040.0121 7.0000e0050.0121 3.2100e0037.0000e0053.2700e0030.0000 9.8212 9.8212 2.7000e0042.6000e0049.9063 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1404 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.9309 0.0000 0.9309 0.1664 0.0000 0.1664 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0419 0.1815 1.8150 3.4100e0035.5800e0035.5800e0035.5800e0035.5800e0030.0000 299.9399 299.9399 0.0970 0.0000 302.3651 Total 0.0419 0.1815 1.8150 3.4100e0030.9309 5.5800e0030.9365 0.1664 5.5800e0030.1719 0.0000 299.9399 299.9399 0.0970 0.0000 302.3651 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.6900e0032.9800e0030.0390 1.1000e0040.0121 7.0000e0050.0121 3.2100e0037.0000e0053.2700e0030.0000 9.8212 9.8212 2.7000e0042.6000e0049.9063 Total 3.6900e0032.9800e0030.0390 1.1000e0040.0121 7.0000e0050.0121 3.2100e0037.0000e0053.2700e0030.0000 9.8212 9.8212 2.7000e0042.6000e0049.9063 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1405 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 1.8609 0.0000 1.8609 0.2555 0.0000 0.2555 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0681 0.7076 0.5751 1.2700e0030.0292 0.0292 0.0269 0.0269 0.0000 111.7972 111.7972 0.0362 0.0000 112.7011 Total 0.0681 0.7076 0.5751 1.2700e0031.8609 0.0292 1.8901 0.2555 0.0269 0.2823 0.0000 111.7972 111.7972 0.0362 0.0000 112.7011 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e0039.8000e0040.0134 4.0000e0054.5000e0033.0000e0054.5200e0031.1900e0032.0000e0051.2200e0030.0000 3.5643 3.5643 9.0000e0059.0000e0053.5936 Total 1.2800e0039.8000e0040.0134 4.0000e0054.5000e0033.0000e0054.5200e0031.1900e0032.0000e0051.2200e0030.0000 3.5643 3.5643 9.0000e0059.0000e0053.5936 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1406 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.4 Grading - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.8374 0.0000 0.8374 0.1150 0.0000 0.1150 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0156 0.0677 0.6765 1.2700e0032.0800e0032.0800e0032.0800e0032.0800e0030.0000 111.7970 111.7970 0.0362 0.0000 112.7010 Total 0.0156 0.0677 0.6765 1.2700e0030.8374 2.0800e0030.8395 0.1150 2.0800e0030.1170 0.0000 111.7970 111.7970 0.0362 0.0000 112.7010 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2800e0039.8000e0040.0134 4.0000e0054.5000e0033.0000e0054.5200e0031.1900e0032.0000e0051.2200e0030.0000 3.5643 3.5643 9.0000e0059.0000e0053.5936 Total 1.2800e0039.8000e0040.0134 4.0000e0054.5000e0033.0000e0054.5200e0031.1900e0032.0000e0051.2200e0030.0000 3.5643 3.5643 9.0000e0059.0000e0053.5936 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1407 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1730 1.5823 1.7868 2.9600e0030.0770 0.0770 0.0724 0.0724 0.0000 254.9852 254.9852 0.0607 0.0000 256.5017 Total 0.1730 1.5823 1.7868 2.9600e0030.0770 0.0770 0.0724 0.0724 0.0000 254.9852 254.9852 0.0607 0.0000 256.5017 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3976 14.0131 5.3350 0.0670 2.3197 0.0779 2.3977 0.6694 0.0745 0.7439 0.0000 6,546.508 3 6,546.508
3 0.2195 0.9485 6,834.657
9 Worker 5.2909 4.0679 55.5092 0.1589 18.6132 0.1068 18.7200 4.9432 0.0983 5.0415 0.0000 14,748.77 14 14,748.77
14 0.3744 0.3748 14,869.81
66 Total 5.6885 18.0810 60.8443 0.2259 20.9329 0.1847 21.1176 5.6126 0.1729 5.7855 0.0000 21,295.27 96 21,295.27
96 0.5939 1.3233 21,704.47
46 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1408 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0361 0.2458 1.9206 2.9600e0034.4900e0034.4900e0034.4900e0034.4900e0030.0000 254.9849 254.9849 0.0607 0.0000 256.5013 Total 0.0361 0.2458 1.9206 2.9600e0034.4900e0034.4900e0034.4900e0034.4900e0030.0000 254.9849 254.9849 0.0607 0.0000 256.5013 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3976 14.0131 5.3350 0.0670 2.3197 0.0779 2.3977 0.6694 0.0745 0.7439 0.0000 6,546.508 3 6,546.508
3 0.2195 0.9485 6,834.657
9 Worker 5.2909 4.0679 55.5092 0.1589 18.6132 0.1068 18.7200 4.9432 0.0983 5.0415 0.0000 14,748.77 14 14,748.77
14 0.3744 0.3748 14,869.81
66 Total 5.6885 18.0810 60.8443 0.2259 20.9329 0.1847 21.1176 5.6126 0.1729 5.7855 0.0000 21,295.27 96 21,295.27
96 0.5939 1.3233 21,704.47
46 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1409 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1928 1.7611 2.1179 3.5300e0030.0803 0.0803 0.0756 0.0756 0.0000 303.7223 303.7223 0.0718 0.0000 305.5179 Total 0.1928 1.7611 2.1179 3.5300e0030.0803 0.0803 0.0756 0.0756 0.0000 303.7223 303.7223 0.0718 0.0000 305.5179 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4620 16.7649 6.2494 0.0786 2.7626 0.0930 2.8556 0.7972 0.0890 0.8862 0.0000 7,684.235 5 7,684.235
5 0.2614 1.1149 8,023.021
9 Worker 5.8903 4.3273 61.6909 0.1837 22.1666 0.1219 22.2885 5.8869 0.1122 5.9991 0.0000 17,187.03 27 17,187.03
27 0.4042 0.4153 17,320.90
32 Total 6.3523 21.0922 67.9404 0.2622 24.9292 0.2149 25.1441 6.6841 0.2012 6.8853 0.0000 24,871.26 82 24,871.26
82 0.6656 1.5303 25,343.92
51 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1410 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0429 0.2928 2.2873 3.5300e0035.3400e0035.3400e0035.3400e0035.3400e0030.0000 303.7220 303.7220 0.0718 0.0000 305.5175 Total 0.0429 0.2928 2.2873 3.5300e0035.3400e0035.3400e0035.3400e0035.3400e0030.0000 303.7220 303.7220 0.0718 0.0000 305.5175 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4620 16.7649 6.2494 0.0786 2.7626 0.0930 2.8556 0.7972 0.0890 0.8862 0.0000 7,684.235 5 7,684.235
5 0.2614 1.1149 8,023.021
9 Worker 5.8903 4.3273 61.6909 0.1837 22.1666 0.1219 22.2885 5.8869 0.1122 5.9991 0.0000 17,187.03 27 17,187.03
27 0.4042 0.4153 17,320.90
32 Total 6.3523 21.0922 67.9404 0.2622 24.9292 0.2149 25.1441 6.6841 0.2012 6.8853 0.0000 24,871.26 82 24,871.26
82 0.6656 1.5303 25,343.92
51 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1411 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Total 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4499 16.6211 6.1322 0.0768 2.7520 0.0930 2.8450 0.7941 0.0889 0.8830 0.0000 7,515.470 7 7,515.470
7 0.2612 1.0917 7,847.310
5 Worker 5.5026 3.8753 57.4002 0.1767 22.0820 0.1158 22.1978 5.8645 0.1066 5.9711 0.0000 16,703.03 39 16,703.03
39 0.3639 0.3867 16,827.37
51 Total 5.9525 20.4964 63.5324 0.2535 24.8340 0.2088 25.0428 6.6586 0.1955 6.8541 0.0000 24,218.50 46 24,218.50
46 0.6251 1.4784 24,674.68
56 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1412 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Total 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4499 16.6211 6.1322 0.0768 2.7520 0.0930 2.8450 0.7941 0.0889 0.8830 0.0000 7,515.470 7 7,515.470
7 0.2612 1.0917 7,847.310
5 Worker 5.5026 3.8753 57.4002 0.1767 22.0820 0.1158 22.1978 5.8645 0.1066 5.9711 0.0000 16,703.03 39 16,703.03
39 0.3639 0.3867 16,827.37
51 Total 5.9525 20.4964 63.5324 0.2535 24.8340 0.2088 25.0428 6.6586 0.1955 6.8541 0.0000 24,218.50 46 24,218.50
46 0.6251 1.4784 24,674.68
56 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1413 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Total 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4407 16.5026 6.0579 0.0753 2.7520 0.0927 2.8447 0.7941 0.0887 0.8828 0.0000 7,374.599 6 7,374.599
6 0.2617 1.0722 7,700.654
1 Worker 5.1886 3.5196 54.0125 0.1713 22.0820 0.1100 22.1920 5.8645 0.1012 5.9657 0.0000 16,323.32 58 16,323.32
58 0.3309 0.3647 16,440.26
37 Total 5.6293 20.0223 60.0704 0.2466 24.8340 0.2027 25.0367 6.6586 0.1899 6.8485 0.0000 23,697.92 54 23,697.92
54 0.5926 1.4368 24,140.91
78 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1414 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Total 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4407 16.5026 6.0579 0.0753 2.7520 0.0927 2.8447 0.7941 0.0887 0.8828 0.0000 7,374.599 6 7,374.599
6 0.2617 1.0722 7,700.654
1 Worker 5.1886 3.5196 54.0125 0.1713 22.0820 0.1100 22.1920 5.8645 0.1012 5.9657 0.0000 16,323.32 58 16,323.32
58 0.3309 0.3647 16,440.26
37 Total 5.6293 20.0223 60.0704 0.2466 24.8340 0.2027 25.0367 6.6586 0.1899 6.8485 0.0000 23,697.92 54 23,697.92
54 0.5926 1.4368 24,140.91
78 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1415 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Total 0.1785 1.6273 2.0991 3.5200e0030.0689 0.0689 0.0648 0.0648 0.0000 302.6549 302.6549 0.0711 0.0000 304.4335 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4326 16.3814 5.9958 0.0738 2.7520 0.0923 2.8443 0.7941 0.0883 0.8824 0.0000 7,227.684 2 7,227.684
2 0.2612 1.0520 7,547.706
1 Worker 4.9016 3.2195 51.1367 0.1665 22.0820 0.1034 22.1854 5.8645 0.0952 5.9596 0.0000 15,987.19 04 15,987.19
04 0.3026 0.3462 16,097.92
03 Total 5.3342 19.6009 57.1325 0.2403 24.8340 0.1957 25.0297 6.6586 0.1835 6.8420 0.0000 23,214.87 46 23,214.87
46 0.5638 1.3982 23,645.62
64 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1416 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Total 0.0428 0.2916 2.2786 3.5200e0035.3200e0035.3200e0035.3200e0035.3200e0030.0000 302.6545 302.6545 0.0711 0.0000 304.4331 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.4326 16.3814 5.9958 0.0738 2.7520 0.0923 2.8443 0.7941 0.0883 0.8824 0.0000 7,227.684 2 7,227.684
2 0.2612 1.0520 7,547.706
1 Worker 4.9016 3.2195 51.1367 0.1665 22.0820 0.1034 22.1854 5.8645 0.0952 5.9596 0.0000 15,987.19 04 15,987.19
04 0.3026 0.3462 16,097.92
03 Total 5.3342 19.6009 57.1325 0.2403 24.8340 0.1957 25.0297 6.6586 0.1835 6.8420 0.0000 23,214.87 46 23,214.87
46 0.5638 1.3982 23,645.62
64 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1417 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1614 1.4714 1.8980 3.1800e0030.0623 0.0623 0.0586 0.0586 0.0000 273.6650 273.6650 0.0643 0.0000 275.2732 Total 0.1614 1.4714 1.8980 3.1800e0030.0623 0.0623 0.0586 0.0586 0.0000 273.6650 273.6650 0.0643 0.0000 275.2732 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3853 14.7188 5.3822 0.0654 2.4884 0.0831 2.5715 0.7181 0.0795 0.7975 0.0000 6,408.633 4 6,408.633
4 0.2368 0.9335 6,692.719
5 Worker 4.1951 2.6835 44.0759 0.1467 19.9668 0.0872 20.0540 5.3027 0.0802 5.3830 0.0000 14,191.41 48 14,191.41
48 0.2518 0.2991 14,286.84
54 Total 4.5804 17.4023 49.4580 0.2121 22.4553 0.1703 22.6255 6.0208 0.1597 6.1805 0.0000 20,600.04 82 20,600.04
82 0.4885 1.2326 20,979.56
48 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1418 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0387 0.2637 2.0603 3.1800e0034.8100e0034.8100e0034.8100e0034.8100e0030.0000 273.6646 273.6646 0.0643 0.0000 275.2729 Total 0.0387 0.2637 2.0603 3.1800e0034.8100e0034.8100e0034.8100e0034.8100e0030.0000 273.6646 273.6646 0.0643 0.0000 275.2729 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3853 14.7188 5.3822 0.0654 2.4884 0.0831 2.5715 0.7181 0.0795 0.7975 0.0000 6,408.633 4 6,408.633
4 0.2368 0.9335 6,692.719
5 Worker 4.1951 2.6835 44.0759 0.1467 19.9668 0.0872 20.0540 5.3027 0.0802 5.3830 0.0000 14,191.41 48 14,191.41
48 0.2518 0.2991 14,286.84
54 Total 4.5804 17.4023 49.4580 0.2121 22.4553 0.1703 22.6255 6.0208 0.1597 6.1805 0.0000 20,600.04 82 20,600.04
82 0.4885 1.2326 20,979.56
48 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 31 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1419 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0114 0.1073 0.1822 2.8000e0045.2300e0035.2300e0034.8100e0034.8100e0030.0000 25.0241 25.0241 8.0900e0030.0000 25.2264 Paving 0.0634 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0749 0.1073 0.1822 2.8000e0045.2300e0035.2300e0034.8100e0034.8100e0030.0000 25.0241 25.0241 8.0900e0030.0000 25.2264 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e0042.8000e0044.5400e0032.0000e0052.0600e0031.0000e0052.0700e0035.5000e0041.0000e0055.5000e0040.0000 1.4621 1.4621 3.0000e0053.0000e0051.4719 Total 4.3000e0042.8000e0044.5400e0032.0000e0052.0600e0031.0000e0052.0700e0035.5000e0041.0000e0055.5000e0040.0000 1.4621 1.4621 3.0000e0053.0000e0051.4719 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 32 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1420 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 3.5100e0030.0152 0.2162 2.8000e0044.7000e0044.7000e0044.7000e0044.7000e0040.0000 25.0240 25.0240 8.0900e0030.0000 25.2264 Paving 0.0634 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0670 0.0152 0.2162 2.8000e0044.7000e0044.7000e0044.7000e0044.7000e0040.0000 25.0240 25.0240 8.0900e0030.0000 25.2264 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3000e0042.8000e0044.5400e0032.0000e0052.0600e0031.0000e0052.0700e0035.5000e0041.0000e0055.5000e0040.0000 1.4621 1.4621 3.0000e0053.0000e0051.4719 Total 4.3000e0042.8000e0044.5400e0032.0000e0052.0600e0031.0000e0052.0700e0035.5000e0041.0000e0055.5000e0040.0000 1.4621 1.4621 3.0000e0053.0000e0051.4719 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 33 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1421 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0348 0.3261 0.5540 8.7000e0040.0159 0.0159 0.0146 0.0146 0.0000 76.0732 76.0732 0.0246 0.0000 76.6883 Paving 0.1929 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.2277 0.3261 0.5540 8.7000e0040.0159 0.0159 0.0146 0.0146 0.0000 76.0732 76.0732 0.0246 0.0000 76.6883 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2400e0037.8000e0040.0132 4.0000e0056.2500e0033.0000e0056.2800e0031.6600e0032.0000e0051.6800e0030.0000 4.3715 4.3715 7.0000e0059.0000e0054.4002 Total 1.2400e0037.8000e0040.0132 4.0000e0056.2500e0033.0000e0056.2800e0031.6600e0032.0000e0051.6800e0030.0000 4.3715 4.3715 7.0000e0059.0000e0054.4002 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 34 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1422 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.6 Paving - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0107 0.0462 0.6572 8.7000e0041.4200e0031.4200e0031.4200e0031.4200e0030.0000 76.0731 76.0731 0.0246 0.0000 76.6882 Paving 0.1929 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.2035 0.0462 0.6572 8.7000e0041.4200e0031.4200e0031.4200e0031.4200e0030.0000 76.0731 76.0731 0.0246 0.0000 76.6882 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2400e0037.8000e0040.0132 4.0000e0056.2500e0033.0000e0056.2800e0031.6600e0032.0000e0051.6800e0030.0000 4.3715 4.3715 7.0000e0059.0000e0054.4002 Total 1.2400e0037.8000e0040.0132 4.0000e0056.2500e0033.0000e0056.2800e0031.6600e0032.0000e0051.6800e0030.0000 4.3715 4.3715 7.0000e0059.0000e0054.4002 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 35 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1423 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 44.7752 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 8.6300e0030.0579 0.0914 1.5000e0042.6000e0032.6000e0032.6000e0032.6000e0030.0000 12.8939 12.8939 7.0000e0040.0000 12.9115 Total 44.7839 0.0579 0.0914 1.5000e0042.6000e0032.6000e0032.6000e0032.6000e0030.0000 12.8939 12.8939 7.0000e0040.0000 12.9115 Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.3393 0.2127 3.6096 0.0123 1.7093 6.9700e0031.7162 0.4539 6.4100e0030.4604 0.0000 1,194.826 7 1,194.826
7 0.0199 0.0246 1,202.649
4 Total 0.3393 0.2127 3.6096 0.0123 1.7093 6.9700e0031.7162 0.4539 6.4100e0030.4604 0.0000 1,194.826 7 1,194.826
7 0.0199 0.0246 1,202.649
4 Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 36 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1424 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

3.7 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 44.7752 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.5000e0036.5000e0030.0925 1.5000e0042.0000e0042.0000e0042.0000e0042.0000e0040.0000 12.8939 12.8939 7.0000e0040.0000 12.9115 Total 44.7767 6.5000e0030.0925 1.5000e0042.0000e0042.0000e0042.0000e0042.0000e0040.0000 12.8939 12.8939 7.0000e0040.0000 12.9115 Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.3393 0.2127 3.6096 0.0123 1.7093 6.9700e0031.7162 0.4539 6.4100e0030.4604 0.0000 1,194.826 7 1,194.826
7 0.0199 0.0246 1,202.649
4 Total 0.3393 0.2127 3.6096 0.0123 1.7093 6.9700e0031.7162 0.4539 6.4100e0030.4604 0.0000 1,194.826 7 1,194.826
7 0.0199 0.0246 1,202.649
4 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 37 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1425 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

4.0 Operational Detail - Mobile
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 27.8001 26.5067 240.4800 0.4816 59.2053 0.3327 59.5380 15.8018 0.3096 16.1114 0.0000 47,083.28 62 47,083.28
62 3.3904 2.2545 47,839.89
56 Unmitigated 27.8001 26.5067 240.4800 0.4816 59.2053 0.3327 59.5380 15.8018 0.3096 16.1114 0.0000 47,083.28 62 47,083.28
62 3.3904 2.2545 47,839.89
56 4.1 Mitigation Measures Mobile

4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments High Rise 55,936.50 56,942.10 45126.30 97,273,539 97,273,539 Condo/Townhouse 22,999.44 25,575.88 19731.76 40,847,105 40,847,105 General Office Building 15,028.82 3,410.03 1080.10 19,123,598 19,123,598 Parking Lot 0.00 0.00 0.00
Total 93,964.76 85,928.01 65,938.16 157,244,242 157,244,242 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments High Rise 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 Condo/Townhouse 7.67 3.08 4.54 40.20 19.20 40.60 86 11 3 General Office Building 8.66 4.38 3.60 33.00 48.00 19.00 77 19 4 CalEEMod Version: CalEEMod.2020.4.0 Page 38 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1426 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Parking Lot 8.66 4.38 3.60 0.00 0.00 0.00 0 0 0

4.4 Fleet Mix
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments High Rise 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Condo/Townhouse 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 General Office Building 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406 Parking Lot 0.537356 0.064746 0.188411 0.126034 0.023886 0.006883 0.012812 0.008954 0.000819 0.000470 0.025457 0.000765 0.003406

5.0 Energy Detail

5.1 Mitigation Measures Energy
Percent of Electricity Use Generated with Renewable Energy Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 39 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1427 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Electricity
Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 15,188.58
70 15,188.58
70 1.2820 0.1554 15,266.94
23 NaturalGas
Mitigated

0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 9,742.522 5 9,742.522
5 0.1867 0.1786 9,800.417
5 NaturalGas
Unmitigated

0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 9,742.522 5 9,742.522
5 0.1867 0.1786 9,800.417
5 CalEEMod Version: CalEEMod.2020.4.0 Page 40 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1428 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments High
Rise

1.13266e
+008

0.6108 5.2191 2.2209 0.0333 0.4220 0.4220 0.4220 0.4220 0.0000 6,044.292 1 6,044.292
1 0.1159 0.1108 6,080.210
3 Condo/Townhous
e

5.33939e
+007

0.2879 2.4603 1.0469 0.0157 0.1989 0.1989 0.1989 0.1989 0.0000 2,849.301 4 2,849.301
4 0.0546 0.0522 2,866.233
3 General Office
Building

1.59083e
+007

0.0858 0.7798 0.6551 4.6800e0030.0593 0.0593 0.0593 0.0593 0.0000 848.9291 848.9291 0.0163 0.0156 853.9738 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 9,742.522 5 9,742.522
5 0.1867 0.1786 9,800.417
5 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 41 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1429 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments High
Rise

1.13266e
+008

0.6108 5.2191 2.2209 0.0333 0.4220 0.4220 0.4220 0.4220 0.0000 6,044.292 1 6,044.292
1 0.1159 0.1108 6,080.210
3 Condo/Townhous
e

5.33939e
+007

0.2879 2.4603 1.0469 0.0157 0.1989 0.1989 0.1989 0.1989 0.0000 2,849.301 4 2,849.301
4 0.0546 0.0522 2,866.233
3 General Office
Building

1.59083e
+007

0.0858 0.7798 0.6551 4.6800e0030.0593 0.0593 0.0593 0.0593 0.0000 848.9291 848.9291 0.0163 0.0156 853.9738 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9844 8.4592 3.9229 0.0537 0.6802 0.6802 0.6802 0.6802 0.0000 9,742.522 5 9,742.522
5 0.1867 0.1786 9,800.417
5 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 42 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1430 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments High
Rise

4.81505e
+007
8,539.279
6 0.7207 0.0874 8,583.332
3 Condo/Townhous
e

1.51925e
+007
2,694.324
4 0.2274 0.0276 2,708.224
0 General Office
Building

1.92875e
+007
3,420.552
2 0.2887 0.0350 3,438.198
3 Parking Lot 3.0135e
+006
534.4308 0.0451 5.4700e003537.1878
Total 15,188.58
70 1.2820 0.1554 15,266.94
23 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 43 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1431 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Use Electric Leafblower
Use Low VOC Paint - Residential Interior
Use Low VOC Paint - Residential Exterior
Use Low VOC Paint - Non-Residential Interior
Use Low VOC Paint - Non-Residential Exterior
No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments High
Rise
0 0.0000 0.0000 0.0000 0.0000
Condo/Townhous
e
0 0.0000 0.0000 0.0000 0.0000
General Office
Building
0 0.0000 0.0000 0.0000 0.0000
Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000
Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 44 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1432 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 56.7728 1.8593 161.1639 8.5000e0030.8985 0.8985 0.8985 0.8985 0.0000 263.4519 263.4519 0.2417 0.0000 269.4933 Unmitigated 57.3095 4.6348 163.0756 0.0263 1.1235 1.1235 1.1235 1.1235 0.0000 3,472.281 2 3,472.281
2 0.3151 0.0588 3,497.680
2 6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating

4.4332 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products

47.6917 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.3241 2.7692 1.1784 0.0177 0.2239 0.2239 0.2239 0.2239 0.0000 3,207.031 5 3,207.031
5 0.0615 0.0588 3,226.089
3 Landscaping 4.8605 1.8656 161.8972 8.5800e0030.8996 0.8996 0.8996 0.8996 0.0000 265.2497 265.2497 0.2537 0.0000 271.5909 Total 57.3095 4.6348 163.0756 0.0263 1.1235 1.1235 1.1235 1.1235 0.0000 3,472.281 2 3,472.281
2 0.3151 0.0588 3,497.680
2 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 45 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1433 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Install Low Flow Bathroom Faucet
Install Low Flow Kitchen Faucet
Install Low Flow Toilet
Install Low Flow Shower
Use Water Efficient Irrigation System

7.1 Mitigation Measures Water

7.0 Water Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating

4.4332 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products

47.6917 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 4.6479 1.8593 161.1639 8.5000e0030.8985 0.8985 0.8985 0.8985 0.0000 263.4519 263.4519 0.2417 0.0000 269.4933 Total 56.7728 1.8593 161.1639 8.5000e0030.8985 0.8985 0.8985 0.8985 0.0000 263.4519 263.4519 0.2417 0.0000 269.4933 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 46 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1434 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 4,232.207
3 34.1642 0.8388 5,336.287
1 Unmitigated 5,011.778
0 42.6818 1.0457 6,390.441
2 7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments High
Rise
818.986 /
516.317
3,168.347
3 26.9322 0.6599 4,038.297
5 Condo/Townhous
e
204.714 /
129.059
791.9608 6.7320 0.1650 1,009.413
7 General Office
Building
274.243 /
168.085
1,051.470
0 9.0176 0.2209 1,342.730
0 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 5,011.778
0 42.6818 1.0457 6,390.441
2 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 47 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1435 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments High
Rise
655.189 /
484.822
2,676.083
2 21.5577 0.5294 3,372.772
8 Condo/Townhous
e
163.771 /
121.186
668.9143 5.3886 0.1323 843.0591
General Office
Building
219.395 /
157.831
887.2098 7.2180 0.1772 1,120.455
3 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 4,232.207
3 34.1642 0.8389 5,336.287
1 Mitigated

8.1 Mitigation Measures Waste

8.0 Waste Detail
CalEEMod Version: CalEEMod.2020.4.0 Page 48 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1436 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 1,758.411
3 103.9191 0.0000 4,356.389
4 Unmitigated 1,758.411
3 103.9191 0.0000 4,356.389
4 Category/Year

8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments High
Rise
5782.2 1,173.734
4 69.3657 0.0000 2,907.877
2 Condo/Townhous
e
1445.32 293.3869 17.3387 0.0000 726.8536
General Office
Building
1434.99 291.2900 17.2148 0.0000 721.6587
Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 1,758.411
3 103.9191 0.0000 4,356.389
4 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 49 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1437 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments High
Rise
5782.2 1,173.734
4 69.3657 0.0000 2,907.877
2 Condo/Townhous
e
1445.32 293.3869 17.3387 0.0000 726.8536
General Office
Building
1434.99 291.2900 17.2148 0.0000 721.6587
Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 1,758.411
3 103.9191 0.0000 4,356.389
4 Mitigated

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
CalEEMod Version: CalEEMod.2020.4.0 Page 50 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1438 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element

11.0 Vegetation
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 51 of 51 Date: 9/22/2022 3:36 PM Santa Monica Housing Element SEIR - Future Project Operational - South Coast AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied

11.A.a
Packet Pg. 1439 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Addendum to City of Santa Monica 6th Cycle 2021-2029 Housing Element Update EIR Appendix B
Transportation Impact Analysis

11.A.a
Packet Pg. 1440 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Addendum to City of Santa Monica 6th Cycle 2021-2029 Housing Element Update EIR This Page Intentionally Left Blank

11.A.a
Packet Pg. 1441 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) 600 Wilshire Boulevard | Suite 1050 | Los Angeles, CA 90017 | (213) 261-3050 | Fax (310) 394-7663 www.fehrandpeers.com
Technical Memorandum
Date: September 21, 2022
To: Nick Meisinger, Wood Environment & Infrastructure, Inc.

From: Netai Basu, Fatemeh Ranaiefar, Tom Gaul
Subject: Transportation Impact Analysis for the City of Santa Monica 2022 Housing Element LA22-3238.01
Introduction
In 2021 the City of Santa Monica prepared an environmental impact report (2021 EIR) for the 6th Cycle 2021-2029 Housing Element Update (Wood Environment & Infrastructure Solutions, Inc., June 2021). In response to comments from the California Department of Housing and Community Development (HCD), changes were made to the policies and strategies in the 2021 project which would result in an increased capacity for new housing development in the city relative to what was analyzed in the 2021 EIR. The regional housing needs allocation (RHNA) for Santa Monica remains 8,895 housing units, approximately 69% of which must be affordable to very low- and low-income households.

The purpose of this technical memorandum is to document analysis conducted in support of the subsequent environmental document for the revised 2021-2029 Santa Monica Housing Element.

This study follows the same methodologies that were used in the Transportation Impact Report for the Santa Monica Housing Element Update (Fehr & Peers, June 2021), which was included as Appendix G to the 2021 EIR. The 2021 report provides extensive information on the transportation environmental setting, the 2020 Adjusted Baseline scenario, the development of future analysis scenarios, and the analytical methods, tools and techniques. It provides detailed information on the background of VMT analysis and the City’s adopted methodologies and impact criteria for studies prepared under CEQA. It also provides discussion of the 2021 project’s consistency with one of the City’s adopted policies related to transportation. This technical memorandum incorporates the setting, background and methodology information 2021 Transportation Impact Report by reference. Because the 2022 project is also citywide, has the same horizon year, proceeds from the same 2020 Adjusted Baseline and uses the same analytical techniques, this technical memorandum presents only the inputs and results of the new analysis conducted for the 2022 project.

11.A.a
Packet Pg. 1442 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 2 of 14 ends

Future Analysis Scenarios
Table 1 presents the land use and socio-economic assumptions for the Future No Project and Future with Project scenarios that were provided for use in this study. Data for the Adjusted Baseline represents 2020 conditions in the city. Because a portion of the City’s RHNA allocation can be accommodated within existing zoning across the city, a portion of the allocation is included in the Future No Project scenario. Projects which were completed or which began construction after the Adjusted 2020 Baseline was created are included in the future scenarios.

The Future with Project scenario analyzes approximately 15,712 units, which includes the City’s RHNA allocation of 8,895 units plus a buffer of 30 percent within the current RHNA cycle.

Table 1: Future (2030) Land Use and Population Assumptions Category Adjusted Baseline Future No Project2 Future with Project Percent
Change
from Adj.

Baseline
Percent
Change
from
Future No
Project
Population 92,357 105,733 123,425 34% 17%
Employment 90,992 98,605 98,640 8% 0%
Total Dwelling
units 52,589 59,465 68,301 30% 15%
Total
Commercial
Space1(sf)
33,074,000 35,005,000 34,617,000 6% -1%
Notes: Source: Fehr & Peers, 2022.

1. Commercial space includes office, retail, restaurant, hotel, hospital, entertainment, etc.

2. No Project accounts for projects that are under construction and assumes the following: 90% of approved and pending units will be constructed by the future year; projected growth per the adopted DCP, and anticipated ADU production of 376 units consistent with past trends.

Figure 1 and Figure 2 show the projected changes in dwelling units and commercial space across the city under the Future No Project scenario relative to the Adjusted Baseline scenario. Figure 3 and Figure 4 show the projected changes in dwelling units and commercial space across the city under the Future with Project scenario relative to the Adjusted Baseline scenario

11.A.a
Packet Pg. 1443 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Venice Blvd
Sunset Blvd
Pacific Coast Hwy
Lincoln Blvd
S Centinela Ave
Olympic Blvd
S Bundy Dr
Wilshire Blvd
San Vicente Blvd
Santa Monica Blvd
132 DU
2 DU
82 DU 0 DU
199 DU
60 DU
75 DU
575 DU
2613 DU
111 DU
153 DU
264 DU
56 DU
82 DU
3 DU
2 DU
194 DU
97 DU
689 DU
99 DU
11 DU
57 DU
173 DU
City of
Santa Monica

BRENTWOOD

CULVER CITY DEL
REY

MAR VISTA

PACIFIC

PALISADES
PALMS
RANCHO
PARK

SAWTELLE
VENICE

VETERANS

ADMINISTRATION

WEST LOS

ANGELES

WESTWOOD
ADJUSTED BASELINE TO 2030 FUTURE
Figure 1
No Project Change in Residential Dwelling Units (DU)
Santa Monica Housing Element EIR
Net Change in Dwelling Units (DU)
0 0 - 10
10 - 20
20 - 50
50 - 100
100 - 200
200 - 500
500 - 1000
1000 - 2000
2000 - 5000

11.A.a
Packet Pg. 1444 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Venice Blvd
Sunset Blvd
Pacific Coast Hwy
Lincoln Blvd
S Centinela Ave
Olympic Blvd
S Bundy Dr
Wilshire Blvd
San Vicente Blvd
Santa Monica Blvd
4 ksf
11 ksf
0 ksf 2 ksf
96 ksf
0 ksf
4 ksf
36 ksf
351 ksf
60 ksf
17 ksf
108 ksf
0 ksf
0 ksf
0 ksf
0 ksf
27 ksf
561 ksf
324 ksf
47 ksf
17 ksf
1 ksf
26 ksf
City of
Santa Monica

BRENTWOOD

CULVER CITY DEL
REY

MAR VISTA

PACIFIC

PALISADES
PALMS
RANCHO
PARK

SAWTELLE
VENICE

VETERANS

ADMINISTRATION

WEST LOS

ANGELES

WESTWOOD
Net Change by KSF
0 0 - 10
10 - 20
20 - 50
50 - 100
100 - 200
200 - 500
500 - 1,000
ADJUSTED BASELINE TO 2030 FUTURE
Figure 2
No Project Change in Commercial Space (Thousands of Square Feet, KSF) Santa Monica Housing Element EIR

11.A.a
Packet Pg. 1445 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Venice Blvd
Sunset Blvd
Pacific Coast Hwy
Lincoln Blvd
S Centinela Ave
Olympic Blvd
S Bundy Dr
Wilshire Blvd
San Vicente Blvd
Santa Monica Blvd
166 DU
715 DU
82 DU 0 DU
927 DU
82 DU
162 DU
657 DU
3369 DU
126 DU
913 DU
922 DU
62 DU
82 DU
3 DU
32 DU
1470 DU
906 DU
2686 DU
154 DU
109 DU
604 DU
336 DU
City of
Santa Monica

BRENTWOOD

CULVER CITY DEL
REY

MAR VISTA

PACIFIC

PALISADES
PALMS
RANCHO
PARK

SAWTELLE
VENICE

VETERANS

ADMINISTRATION

WEST LOS

ANGELES

WESTWOOD
Net Change in Dwelling Units (DU)
0 0 - 10
10 - 20
20 - 50
50 - 100
100 - 200
200 - 500
500 - 1000
1000 - 2000
2000 - 5000
ADJUSTED BASELINE TO 2030 FUTURE
Figure 3
With Project Change in Residential Dwelling Units (DU)
Santa Monica Housing Element EIR

11.A.a
Packet Pg. 1446 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Venice Blvd
Sunset Blvd
Pacific Coast Hwy
Lincoln Blvd
S Centinela Ave
Olympic Blvd
S Bundy Dr
Wilshire Blvd
San Vicente Blvd
Santa Monica Blvd
-8 ksf
15 ksf
0 ksf 2 ksf
120 ksf
-1 ksf
0 ksf
32 ksf
296 ksf
60 ksf
-15 ksf
88 ksf
0 ksf
0 ksf
0 ksf
0 ksf
-20 ksf
485
ksf
216 ksf
42 ksf
14 ksf
-51 ksf
28 ksf
City of
Santa Monica

BRENTWOOD

CULVER CITY DEL
REY

MAR VISTA

PACIFIC

PALISADES
PALMS
RANCHO
PARK

SAWTELLE
VENICE

VETERANS

ADMINISTRATION

WEST LOS

ANGELES

WESTWOOD
Net Change by KSF
-100 - -50
-50 - -20
-20 - -10
-10 - 0
0 0 - 10
10 - 20
20 - 50
50 - 100
100 - 200
200 - 500
ADJUSTED BASELINE TO 2030 FUTURE
Figure 4
With Project Change in Commercial Space (Thousands of Square Feet, KSF) Santa Monica Housing Element EIR

11.A.a
Packet Pg. 1447 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Nick Meisinger
September 21, 2022

Page 7 of 14 ends

Transportation Impact Analysis
This section documents the transportation impact analysis conducted to determine the potential for the proposed Project, implementation of the Housing Element Update, to result in significant transportation impacts under CEQA. The City’s adopted methodologies and threshold criteria were used. The consistency of the Project with the City’s “No Net New PM Peak Hour Trips” policy was also assessed.

City of Santa Monica VMT Guidance
Screening Criteria for VMT Analysis
As a first step in the transportation review of projects, the City has adopted screening criteria that can be used to “screen” out projects from VMT analysis. Projects meeting the VMT screening criteria are deemed to have a less than significant impact and no further VMT analysis is necessary. The tiered screening criteria for land use projects are described below.

Tier 1: Does the project include the development of the following land uses, which are screened out from further analysis?
If yes, no further analysis is required. If no, move to Tier 2.

Land Uses Screened from VMT Analysis
o 200 residential dwelling units or less
o 100% affordable housing
o 50,000 sf or less of commercial floor area by land use type1 o New construction of educational facilities/institutions (such as increased classrooms, gym/recreational space, and other supportive areas) provided that there would be no student enrollment increase or if student enrollment is increased, 75% of the student body comes from within 2.0 miles of the school
o Expansions of civic/government use (such as fire and police stations) and utility facilities less than 50,000 sf or replacement of such uses/facilities (in same or another location) to serve the community, or if larger than 50,000 sf, the project would not result in more than 50 net new additional full time equivalent employees o Local serving Parks and Recreational facilities, as determined by City Staff 1 Commercial uses covered under this screening criteria include retail, restaurant, movie theater, gym/fitness, grocery store/market, hotel, medical office, office, and hospital uses less than 50,000 sf. Excludes museums, amusement parks, and other large regional trip attractors as may be determined by City Staff.

11.A.a
Packet Pg. 1448 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 8 of 14 ends

For a mixed-use project, the individual components of the project should be evaluated to determine if each can be screened out. For example, a mixed-use project with 150 units and 75,000 sf of office area cannot be screened out at the Tier 1 level and would be required to move to Tier 2.

Tier 2: Is the project located within 0.5-mile walking distance of an Expo LRT station or 0.25 walking distance of Rapid BRT stop?
If no, conduct VMT analysis. If yes, move to Tier 3.

Tier 3: Would the project provide more parking than required by Code (or if located in the Downtown, exceed parking maximums)?
If no, no further analysis is required. If yes, conduct VMT analysis.

Additionally, a land use project would be screened from VMT analysis and concluded to have a less than significant impact if:
• A project decreases [total] vehicle miles traveled in the project area compared to existing conditions or
• A redevelopment project replaces existing VMT generating land uses with new uses that result in a net overall decrease in VMT.

Screening Evaluation
Projects that are screened out based on the criteria above are presumed to have a less than significant impact on transportation and as such, no VMT analysis is required. This Project, the 2022 Housing Element Update is a citywide housing plan and does not meet the screening criteria and is therefore not screened out from VMT analysis under this screening criteria.

Achieving the RHNA allocation of 8,895 units throughout the city within the next 8 years would result in housing projects that would fall within and outside of the pre-screened thresholds.

Specific development projects that occur following adoption of the proposed Housing Element Update will be subject to subsequent individual review to determine compliance with CEQA and analysis of VMT as necessary. These aspects of individual projects cannot be known at this time.

VMT Significance Thresholds
The proposed Housing Element Update is a citywide plan and as such cannot be screened out, as described above, and a VMT analysis is required. The VMT estimates of the proposed Housing Element Update were compared against the City’s adopted VMT significance thresholds. The City on June 9, 2020 adopted two sets of VMT significance thresholds, both of which are applied to

11.A.a
Packet Pg. 1449 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 9 of 14 ends

land use projects.1 For the proposed Housing Element update, which is a land use plan, the City has elected to apply the same thresholds that are used for land use projects.

Threshold 1: VMT per capita
A project’s VMT per capita must not exceed the existing Citywide average VMT per capita for that particular land use. Metrics are citywide average daily residential VMT/capita for residential land uses and citywide average daily work VMT/employee for commercial land uses.

Table 2: VMT Threshold: Significance Criteria 1 (VMT per Capita) Land Use Threshold
Residential No greater than existing Citywide average daily residential VMT/capita
Commercial Employee No greater than existing Citywide average daily work VMT/employee
Retail Any net increase in total City VMT
Source: City of Santa Monica, 2020.

Threshold 2: Total VMT
The Project’s combined total VMT for residents and commercial employees must be at least

16.8% below existing Citywide “business as usual” VMT per capita. Business as Usual VMT is defined as what the calculated VMT for the Project would be if the Project were generating VMT per capita at the existing citywide average.

Projects exceeding either or both of these thresholds are considered to have a significant transportation impact on the environment. These City-specific thresholds reflect a local consideration to the City’s existing transportation conditions as well as State and local land use and sustainability goals. This strategic approach would also ensure that new development will not hinder the City’s progress towards reducing GHG emissions, improving mobility options, and implementation of the LUCE.
1 City of Santa Monica, Staff Report 3988 Adoption of New CEQA Transportation Guidelines and Thresholds, June 9, 2020; online at http://santamonicacityca.iqm2.com/Citizens/Detail_LegiFile.aspx?Frame=&MeetingID=1229&MediaPosition=&ID=3988&CssCla ss=

11.A.a
Packet Pg. 1450 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 10 of 14 ends

Project VMT Impact Analysis
Project Comparison to Significance Threshold 1
Based on the most recent data available from the City’s travel demand forecasting model, the Adjusted Baseline citywide average daily residential VMT per capita is 11.1 and the existing Adjusted Baseline citywide average daily work VMT per employee is 15.3. Therefore, these are the current thresholds applied to the Project.

Table 3 presents results from the City’s TDFM runs for this Project for the Adjusted Baseline (2020), Future No Project (2030) and Future with Project (2030) scenarios. Under Future with Project conditions the future population of 123,425 is estimated to produce a total of 207,731 daily trips and 1,189,292 daily residential VMT, with an average of 9.6 miles per capita. The 98,640 employees are estimated to generate a total of 123,206 commute trips and 1,407,858 commute VMT, with an average of 14.3 miles per employee. Thus, the Project’s daily VMT per capita and VMT per employee would not exceed the City’s VMT Significance Threshold 1.

Project Comparison to Significance Threshold 2
The Future With Project (2030) scenario would have an estimated 123,425 residents and 98,640 employees. In terms of the City’s VMT Significance Threshold 2, the sum of residential and employee VMT are estimated at 2,879,210 miles calculated with the baseline (Business as Usual) residential VMT per capita and VMT per employee. Under Future With Project conditions, the residential VMT per capita would be reduced by 13.5% (from 11.1 to 9.6) and the work VMT per employee would be reduced by 6.5% (from 15.3 to 14.3). Applying the future VMT values to the projected number of future residents and employees yields a calculated total of 2,597,150 total residential and employee VMT, which is 9.8% lower than the “business as usual” residential and employment VMT. The City’s threshold for significance is a minimum reduction of 16.8% VMT.

The Future with Project scenario shows a reduction in VMT, but a lesser reduction than the 16.8% threshold of significance. With the Proposed Project, the decreases in citywide average VMT metrics are greater for employee trips than for residential trips, which may reflect the improved jobs-housing balance and the fact that existing TDM activities are more effective in reducing commute trips than home-based trips. The proposed Project’s total residential and employee VMT would exceed the City’s VMT Significance Threshold 2. Table 4 provides a detailed summary of the analysis. Since the VMT per capita and VMT per employee would not exceed VMT Significance Threshold 1 but would exceed Significance Threshold 2, the proposed Project would have a significant impact on VMT.

It should be noted that the 16.8% lower than BAU VMT target was based in part on achieving the City’s Climate Action and Adaption Plan (CAAP) greenhouse gas reduction goals and was established by the California Air Resources Board (CARB) to help the State achieve its GHG emission goals. While the proposed Housing Element Update would create significant housing

11.A.a
Packet Pg. 1451 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 11 of 14 ends

Table 3: Santa Monica 2022 Housing Element Update Summary of Vehicle Miles Traveled
VMT Metrics 2020 Adjusted
Baseline
2030 No
Project
2030 With
Project
SocioEconomic
Data
(SED)
Population 92,357 105,733 123,425
Employment 90,992 98,605 98,640
Vehicle
Trips (VT)
Total Vehicle Trips 954,436 1,009,019 1,038,644
Home Based Vehicle Trips (Production) 164,861 185,956 207,731 Home Based Work Vehicle Trips
(Attraction) 118,939 124,038 123,206
Total Vehicle Trips per Service Population 5.2 4.9 4.7
Home Based Vehicle Trips per Capita 1.8 1.8 1.7
Home Based Work Vehicle Trips per
Employee 1.3 1.3 1.3
Average
Trip
Length
(VMT/VT)
Average Trip Length (Total Trip) 6.9 7.2 6.8
Average Trip Length (Home-Based Trip
Production) 6.2 6.0 5.7
Average Trip Length (Home-Based Work
Trip Attraction) 11.7 11.9 11.4
Vehicle
Miles
Traveled
(VMT)
Total VMT 6,617,899 7,226,206 7,048,600
Home-Based VMT (Production) 1,025,163 1,107,140 1,189,292 Home-Based Work VMT (Attraction) 1,392,162 1,480,303 1,407,858 Home-Based VMT per Capita 11.1 10.5 9.6
Home-Based Work VMT per Employee 15.3 15.0 14.3
Source: Fehr & Peers, 2022.
opportunities for many of the workers in the City and would decrease VMT per capita, meeting the 16.8% lower than BAU VMT target would require complementary investments in the City’s transportation network and mobility programs. Merely providing housing closer to jobs would not be sufficient to reduce total citywide VMT to below the targeted goal. A more aggressive

11.A.a
Packet Pg. 1452 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 12 of 14 ends

transportation approach that is integrated with implementation of the proposed Housing Element Update would be required.

Table 4: VMT Threshold: Significance Criteria 2 (Total VMT) and Analysis Project VMT City Average
VMT/capita
Project
Population
Business as Usual
(BAU) VMT
Residential A (Baseline) 11.1 123,425 1,370,018
Commercial Employee B (Baseline) 15.3 98,640 1,509,192
Total Resident + Employee (Baseline) BAU VMT 2,879,210
Residential A (Future) 9.6 123,425 1,189,292
Commercial Employee B (Future) 14.3 98,640 1,407,858
Total Resident + Employee Future VMT 2,597,150
Is Total Resident + Employee Future VMT at least 16.8% lower than Total BAU VMT? No, the estimated reduction of 286.060 VMT is 9.8% less than Total BAU VMT.

Source: Fehr & Peers, 2022.

Mitigation Measures
As detailed above, the proposed Project would result in an exceedance of the adopted threshold for Total Resident + Employee Future VMT because, while this measure would be 9.8% below the estimated Total Resident + Employee BAU VMT, it would not be 16.8% or more below that threshold. In order to reduce the Total Resident + Employee Future VMT to a less than significant level, a further reduction of 7.0%, or 201,647 VMT, would be needed. In order to achieve this reduction, a range of potential policy actions, infrastructure and transportation service improvements were considered for the City to undertake. These included the following:
• Residential TDM Program - Conduct a future study of programmatic transportation demand management (TDM) activities to reduce residential automobile trips, such as promoting (1) resident travel support and incentives to reduce vehicle-based trips, (2) the expansion of car-sharing businesses/activities in the city, (3) the expansion of micromobility services in city, (4) autonomous and/or low-emission goods delivery (such as ebikes and other land-based delivery modes) and other programs and services.

Collaborate with private sector partners and the Transportation Management Organization to improve and expand use of these services.

11.A.a
Packet Pg. 1453 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 13 of 14 ends

• Update the Transportation Impact Fee - Conduct an update to the Transportation Impact Fee (TIF) to change the basic metric from trips to VMT. The nexus study conducted when the City’s TIF was adopted in 2013 reflects the costs associated with specified transportation improvements and the amount of new auto trips that can be attributed to projected land use changes. Using VMT as the metric to relate the trip fee to land uses would better align with the City’s current analytical framework for analyzing transportation impacts. Transportation Impact Fee revenues are used to construct infrastructure that support transit, bicycle, pedestrian and active transportation trips for all purposes.
• Connections to Purple Line - Investigate the potential for improving bus transit connections through higher frequency service and route adjustments between Santa Monica and the planned stations on the Metro Purple Line (D Line) at the West Los Angeles Veterans Affairs Campus station or from the Westwood station. Construction on this section of the subway extension began in 2019 and operation is planned to begin in 2027. Investigate the potential for creating a protected bicycle facility to complement high frequency transit service to the Metro Purple Line (D Line).

Because empirical data is difficult to collect for these programmatic interventions, it is not possible to quantify the VMT reduction from these efforts in the context of a CEQA-required analysis. The evidence criteria are higher for a CEQA-required analysis than are needed to guide policy and infrastructure decisions. Research organizations like the Transportation Research Board, UCLA and UCB transportation institutes regularly study interventions like the ones described with positive results in terms of vehicle trip and VMT reductions. As a result, these interventions continue to be recommended for Santa Monica to facilitate access and to manage vehicle congestion. However, because it cannot be assured that these measures would be fully effective in reducing total VMT to below adopted VMT Significance Threshold 2, the impact would be considered to remain significant and unavoidable.
“No Net New PM Peak Hour Trips” Policy Consistency Analysis The LUCE was adopted in 2010 and set a policy-driven cap of 60,100 PM peak hour trips, based on the anticipated growth in the city through 2030. The Future With Project (2030) scenario is estimated using the current version of the City’s travel demand forecasting model (TDFM) which reflects on-going updates that have been made to incorporate current data and improved transportation modeling practices. This is done to increase the accuracy and level of detail of the model, so that as it is used it provides the most current and best information possible to inform decision-making.

The current TDFM estimates that there were 56,000 PM peak hour trips under baseline (2020) conditions. However because of changes in the structure of the TDFM and the model enhancements described above made as it was updated and recalibrated to 2019 conditions, the

11.A.a
Packet Pg. 1454 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Nick Meisinger
September 21, 2022

Page 14 of 14 ends

current estimate cannot be directly compared to the policy-driven threshold of 60,100 PM peak hour trips that was produced by the earlier version of the TDFM. It is possible, however, to make direct comparisons of actual traffic counts on the City streets over the past decade. These comparisons uniformly show that, on a citywide level, traffic volumes have decreased. Detailed traffic volume data documenting this trend is provided in Appendix C to the 2021 report.

The TDFM estimates 56,000 PM peak hour trips in the Adjusted Baseline (2020) and approximately 57,100 PM peak hour trips in 2030 with the proposed Housing Element update. Therefore, the proposed Housing Element Update is consistent with the citywide No Net New PM Peak Hour Trips policy articulated in the LUCE.

Summary and Conclusions
The proposed Santa Monica 2022 Housing Element Update was reviewed against the City’s VMT screening criteria to determine if a VMT analysis would be required. The project includes development across the entire city whose size, location and specific characteristics cannot be know at this time. While it can be anticipated that some individual housing projects would fall within the pre-screened thresholds, it can also be anticipated that some would not. Each development project would be subject to subsequent individual review to determine CEQA compliance and analysis of VMT as necessary. Because this project cannot be screened out, detailed VMT analysis was conducted relative to the City’s two significance thresholds related to VMT and the potential impact of the proposed Project was assessed.

The first threshold test relates to VMT per capita. A project’s VMT per capita must not exceed the existing Citywide average VMT per capita for that particular land use. As summarized above in Table 3, under the proposed Project, home-based VMT per capita would decline from 11.1 to 9.6 and home-based work VMT per employee would decline from 15.3 to14.3, a less than significant impact under this impact criteria.

The second threshold test specifies that a project’s combined total VMT for residents and commercial employees must be at least 16.8% below existing Citywide “business as usual” (BAU) VMT per capita. Business as Usual VMT is defined as what the calculated VMT for the project would be if it were to generate VMT per capita at the existing citywide average. The proposed Project was found to result in a reduction of 9.8% from the BAU VMT. Because that is less than the

16.8% threshold, the Project was found to result in a significant impact under this impact criteria.

Feasible mitigation measures were identified but it was found that this impact could not be reduced to a less than significant level.

The proposed project was found to be compliant with the City’s No Net New Evening Peak Period Vehicle Trips policy, which sets a threshold of 60,100 PM peak hour trips. The City’s travel demand forecasting model estimates 56,000 PM peak hour trips in the Adjusted Baseline (2020) and approximately 57,100 PM peak hour trips in 2030 with the proposed Project.

11.A.a
Packet Pg. 1455 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Addendum to City of Santa Monica 6th Cycle 2021-2029 Housing Element Update EIR Appendix C
Fuel Consumption Calculations

11.A.a
Packet Pg. 1456 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Addendum to City of Santa Monica 6th Cycle 2021-2029 Housing Element Update EIR This Page Intentionally Left Blank

11.A.a
Packet Pg. 1457 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Average Development Project - Construction Equipment 1
Phase Equipment Quantity
Hours Each
Day
Total Number of
Days Worked Horse Power Load Factor
Fuel Consumption
Rate (Gallons per
Hour)
Duration (Total
Hours)
Total Fuel
Consumption
Concrete/Industrial Saws 1 8 20 81 0.73 2.9565 160 473.04 Rubber Tired Dozers 1 8 20 247 0.4 4.94 160 790.40
Tractors/Loaders/Backhoes 3 8 20 97 0.37 1.7945 480 861.36 Graders 1 8 2 187 0.41 3.8335 16 61.34
Rubber Tired Dozers 1 7 2 247 0.4 4.94 14 69.16
Tractors/Loaders/Backhoes 1 8 2 97 0.37 1.7945 16 28.71 Graders 1 8 4 187 0.41 3.8335 32 122.67
Rubber Tired Dozers 1 8 4 247 0.4 4.94 32 158.08
Tractors/Loaders/Backhoes 2 7 4 97 0.37 1.7945 56 100.49 Cranes 1 6 200 231 0.29 3.3495 1,200 4,019.40
Forklifts 1 6 200 89 0.2 0.89 1,200 1,068.00
Generator Sets 1 8 200 84 0.74 3.108 1,600 4,972.80
Tractors/Loaders/Backhoes 1 6 200 97 0.37 1.7945 1,200 2,153.40 Welders 3 8 200 46 0.45 1.035 4,800 4,968.00
Cement and Mortar Mixers 1 6 10 9 0.56 0.252 60 15.12
Pavers 1 6 10 130 0.42 2.73 60 163.80
Paving Equipment 1 8 10 132 0.36 2.376 80 190.08
Rollers 1 7 10 80 0.38 1.52 70 106.40
Tractors/Loaders/Backhoes 1 8 10 97 0.37 1.7945 80 143.56

6. Architectural Coating Air Compressors 1 6 10 78 0.48 1.872 60 112.32 20,578.13
Average Development Project - Vehicle Trips
Phase Category Vehicle Type
Number of
Trips Trip Length
Number of
Days VMT Total Trips
Fuel
Consumption
Rate (Gallons
per Hour)
Total Fuel
Consumption
Worker Trips Light-duty vehicle 13 14.7 20 3,822.0 260 21 182.00 Vendor Trips Heavy-duty vehicle 0 6.9 20 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 21 20 20 8,400.0 420 6.2 1,354.84 Worker Trips Light-duty vehicle 8 14.7 2 235.2 16 21 11.20 Vendor Trips Heavy-duty vehicle 0 6.9 2 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 2 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 10 14.7 4 588.0 40 21 28.00 Vendor Trips Heavy-duty vehicle 0 6.9 4 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 4 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 25 14.7 200 73,500.0 5,000 21 3,500.00 Vendor Trips Heavy-duty vehicle 5 6.9 200 6,900.0 1,000 8 862.50 Haul Trips Heavy-heavy-duty vehicle 0 20 200 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 13 14.7 10 1,911.0 130 21 91.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 5 14.7 10 735.0 50 21 35.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 6,064.54
Total Fuel Consumption
Number of Developments
per Year
Total Annual
Fuel
Consumption Number of Years Total Fuel Consumption
Construction Equipment 20,578.13 15.4 316,903.23 8 2,535,225.86 Construction Vehicle Trips 6,064.54 15.4 93,393.90 8 747,151.17 Total 3,282,377.03

1. Demolition

2. Site Preparation

3. Grading

4. Building Construction

5. Paving
Total Fuel Consumption for Construction Vehicle Trips

1. Demolition

4. Building Construction
Total Fuel Consumption for Construction Equipment

3. Grading

5. Paving

2. Site Preparation

6. Architectural Coating

11.A.a
Packet Pg. 1458 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) Maximum Development Project - Construction Equipment 2
Phase Equipment Quantity Hours Each Day
Total Number of
Days Worked Horse Power Load Factor
Fuel
Consumption
Rate (Gallons
per Hour)
Duration (Total
Hours)
Total Fuel
Consumption
Concrete/Industrial Saws 1 8 20 81 0.73 2.9565 160 473.04 Excavators 3 8 20 158 0.38 3.002 480 1,440.96
Rubber Tired Dozers 2 8 20 247 0.4 4.94 320 1,580.80
Rubber Tired Dozers 3 8 3 247 0.4 4.94 72 355.68
Tractors/Loaders/Backhoes 4 8 3 97 0.37 1.7945 96 172.27 Excavators 2 8 6 158 0.38 3.002 96 288.19
Graders 1 8 6 187 0.41 3.8335 48 184.01
Rubber Tired Dozers 1 8 6 247 0.4 4.94 48 237.12
Scrapers 2 8 6 367 0.48 8.808 96 845.57
Tractors/Loaders/Backhoes 2 8 6 97 0.37 1.7945 96 172.27 Cranes 1 7 200 231 0.29 3.3495 1,400 4,689.30
Forklifts 3 8 200 89 0.2 0.89 4,800 4,272.00
Generator Sets 1 8 200 84 0.74 3.108 1,600 4,972.80
Tractors/Loaders/Backhoes 3 7 200 97 0.37 1.7945 4,200 7,536.90 Welders 1 8 200 46 0.45 1.035 1,600 1,656.00
Pavers 2 8 10 130 0.42 2.73 160 436.80
Paving Equipment 2 8 10 132 0.36 2.376 160 380.16
Rollers 2 8 10 80 0.38 1.52 160 243.20

6. Architectural Coating Air Compressors 1 6 10 78 0.48 1.872 60 112.32 30,049.39
Maximum Development Project - Vehicle Trips
Phase Category Vehicle Type Number of Trips Trip Length Number of Days VMT Total Trips Consumption

Consumption
Worker Trips Light-duty vehicle 15 14.7 20 4,410.0 300 21 210.00 Vendor Trips Heavy-duty vehicle 0 6.9 20 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 371 20 20 148,400.0 7,420 6.2 23,935.48 Worker Trips Light-duty vehicle 18 14.7 3 793.8 54 21 37.80 Vendor Trips Heavy-duty vehicle 0 6.9 3 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 3 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 20 14.7 6 1,764.0 120 21 84.00 Vendor Trips Heavy-duty vehicle 0 6.9 6 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 6 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 388 14.7 200 1,140,720.0 77,600 21 54,320.00 Vendor Trips Heavy-duty vehicle 84 6.9 200 115,920.0 16,800 8 14,490.00 Haul Trips Heavy-heavy-duty vehicle 0 20 200 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 15 14.7 10 2,205.0 150 21 105.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 78 14.7 10 11,466.0 780 21 546.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 93,728.28
Total Fuel Consumption
Number of Developments
per Year
Total Annual Fuel
Consumption Number of Years Total Fuel Consumption
Construction Equipment 30,049.39 4 120,197.57 8 961,580.54 Construction Vehicle Trips 93,728.28 4 374,913.14 8 2,999,305.08 Total 495,110.70 3,960,885.63

1. Demolition

2. Site Preparation

4. Building Construction

5. Paving

3. Grading
Total Fuel Consumption for Construction Equipment

1. Demolition

2. Site Preparation

3. Grading

4. Building Construction

5. Paving

6. Architectural Coating
Total Fuel Consumption for Construction Vehicle Trips

11.A.a
Packet Pg. 1459 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) elopment Scenario - Construction Equipment 3
Phase Equipment Quantity
Hours
Each Day
Total
Number
of Days
Worked
Horse
Power Load Factor
Fuel
Consump
tion Rate
(Gallons
per Hour)
Duration (Total
Hours)
Total Fuel
Consumption
Concrete/Industrial Saws 1 8 20 81 0.73 2.9565 160 473.04 Excavators 3 8 20 158 0.38 3.002 480 1,440.96
Rubber Tired Dozers 2 8 20 247 0.4 4.94 320 1,580.80
Rubber Tired Dozers 3 8 3 247 0.4 4.94 72 355.68
Tractors/Loaders/Backhoes 4 8 3 97 0.37 1.7945 96 172.27 Excavators 2 8 6 158 0.38 3.002 96 288.19
Graders 1 8 6 187 0.41 3.8335 48 184.01
Rubber Tired Dozers 1 8 6 247 0.4 4.94 48 237.12
Scrapers 2 8 6 367 0.48 8.808 96 845.57
Tractors/Loaders/Backhoes 2 8 6 97 0.37 1.7945 96 172.27 Cranes 1 7 200 231 0.29 3.3495 1,400 4,689.30
Forklifts 3 8 200 89 0.2 0.89 4,800 4,272.00
Generator Sets 1 8 200 84 0.74 3.108 1,600 4,972.80
Tractors/Loaders/Backhoes 3 7 200 97 0.37 1.7945 4,200 7,536.90 Welders 1 8 200 46 0.45 1.035 1,600 1,656.00
Pavers 2 8 10 130 0.42 2.73 160 436.80
Paving Equipment 2 8 10 132 0.36 2.376 160 380.16
Rollers 2 8 10 80 0.38 1.52 160 243.20

6. Architectural Coating Air Compressors 1 6 10 78 0.48 1.872 60 112.32 30,049.39 8x 240,395.14 gallons
Continuous Development Scenario - Vehicle Trips
Phase Category Vehicle Type
Number
of Trips
Trip
Length
Number
of Days VMT
Total
Trips
Fuel
Consumption
Rate (Gallons
per Hour)
Total Fuel
Consumption
Worker Trips Light-duty vehicle 15 14.7 20 4,410.0 300 21 210.00 Vendor Trips Heavy-duty vehicle 0 6.9 20 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 1,660 20 20 664,000.0 33,200 6.2 107,096.77 Worker Trips Light-duty vehicle 18 14.7 2 529.2 36 21 25.20 Vendor Trips Heavy-duty vehicle 0 6.9 2 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 2 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 20 14.7 4 1,176.0 80 21 56.00 Vendor Trips Heavy-duty vehicle 0 6.9 4 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 4 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 1,928 14.7 200 5,668,320.0 385,600 21 269,920.00 Vendor Trips Heavy-duty vehicle 418 6.9 200 576,840.0 83,600 8 72,105.00 Haul Trips Heavy-heavy-duty vehicle 0 20 200 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 15 14.7 10 2,205.0 150 21 105.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 Worker Trips Light-duty vehicle 386 14.7 10 56,742.0 3,860 21 2,702.00 Vendor Trips Heavy-duty vehicle 0 6.9 10 0.0 0 8 0.00
Haul Trips Heavy-heavy-duty vehicle 0 20 10 0.0 0 6.2 0.00 Total Fuel Consumption for Construction Vehicle Trips 452,219.97 8x 3,617,759.79 gallons

1. Demolition

2. Site Preparation

3. Grading

4. Building Construction

5. Paving

6. Architectural Coating
Total Fuel Consumption for Construction Equipment

1. Demolition

2. Site Preparation

3. Grading

4. Building Construction

11.A.a
Packet Pg. 1460 Attachment: Addendum to 6th Cycle (2021-2029) Housing Element Update EIR (5191 : Housing Element Adoption (90 mins)) 1 City Council Meeting: October 11, 2022 Santa Monica, California RESOLUTION NUMBER ______ (CCS)
(City Council Series)

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA ADOPTING AN AMENDED 6TH CYCLE (2021-2029) HOUSING ELEMENT OF THE CITY’S GENERAL PLAN
WHEREAS, State Housing Element Law, California Government Code Sections 65580 et seq., requires the City to review and update the Housing Element of its General Plan every eight years; and
WHEREAS, as the City prepares its 6th Cycle (2021-2029) Housing Element (the “6th Cycle Housing Element”), the State is experiencing a housing supply crisis, with housing demand far outstripping supply; and
WHEREAS, in 2018, California ranked 49th out of the 50 states in housing units per capita; and
WHEREAS, the housing crisis has particularly exacerbated the need for affordable homes at prices below market rates; and
WHEREAS, the housing crisis has resulted in increased poverty and homelessness, especially first-time homelessness, forced lower income residents into crowded and unsafe housing in urban areas, and forced families into lower cost new housing in greenfields at the urban-rural interface with longer commute times and a higher exposure to fire hazard; and

11.A.b
Packet Pg. 1461 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 2 WHEREAS, California needs an estimated 180,000 additional homes annually to keep up with population growth, and the Governor has called for 3.5 million new homes to be built over 7 years; and
WHEREAS, the City has received a Regional Housing Needs Assessment (“RHNA”) allocation for the 6th Cycle Housing Element of approximately 8,895 housing units, with approximately 70 percent allocated as affordable housing; and WHEREAS, this RHNA allocation will require the City to permit approximately 1,000 housing units annually between 2021 and 2029, 700 of which are required to be affordable housing, representing an increase of approximately five times over the City’s RHNA allocation for the 5th Cycle (2013-2021) Housing Element; and WHEREAS, in September 2020, the City commenced a public outreach process for the 6th Cycle Housing Element, which has consisted of creation of a dedicated website, presenting informational webinars, seeking input through questionnaires and surveys, forming two technical working groups, and conducting a series of study sessions with the Planning Commission, Housing Commission, Rent Control Board, and the City Council; and
WHEREAS, on or about May 24, 2021, City staff published a draft 6th Cycle Housing Element (“Draft Housing Element”) built around four primary principles: 1) housing production—providing access to increase housing production, with an emphasis on affordable housing; 2) housing stability—ensuring that existing residents are protected from displacement; 3) location—incentivizing and locating housing close to daily services and amenities like parks and schools in addition to places around the city that have historically not accommodated housing; and 4) equitable housing access—overcoming

11.A.b
Packet Pg. 1462 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 3 historic patterns of segregation by expanding access to housing choices in high opportunity areas; and
WHEREAS, on June 2 and 3, 2021, the Planning Commission conducted a public hearing on the Draft Housing Element and made recommendations to the City Council; and
WHEREAS, on June 15, 2021, the City Council conducted a public hearing to discuss the Draft Housing Element and directed staff to transmit the Draft Housing Element to the California Department of Housing and Community Development (“HCD”) with revisions; and
WHEREAS, on July 1, 2021, City staff transmitted the Draft Housing Element, as revised by the City Council, to HCD for a 60-day review period; and WHEREAS on August 4, 2021, in accordance with Santa Monica Municipal Code Section 9.45.060(A), the Planning Commission adopted a Resolution of Intention, Resolution Number 21-006 (PCS), declaring its intention to consider recommending to the City Council that the City Council adopt the 6th Cycle (2021-2029) Housing Element of the City’s General Plan and amendments to the Land Use and Circulation of the City’s General Plan, the Bergamot Area Plan and the Downtown Specific Plan for consistency with the goals, policies and programs set forth in the Housing Element; and WHEREAS, on August 30, 2021, in accordance with Government Code Section 65585, HCD issued a letter to report on its review of the Draft Housing Element; and WHEREAS, HCD’s review concluded that the draft Housing Element addressed many statutory requirements, but that revisions would be necessary to comply with State Housing Element Law; and

11.A.b
Packet Pg. 1463 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 4 WHEREAS, in its review letter, HCD set forth recommended revisions to the Draft Housing Element to, among other things, provide additional information and analysis of the City’s: housing needs, resources, and constraints related to fair housing; population and employment trends; household characteristics; Suitable Sites Inventory (“SSI”); zoning regulations for a variety of housing types; governmental and nongovernmental constraints on housing; special housing needs; and “at risk” housing units; and WHEREAS, HCD further recommended that the City make revisions to housing programs set forth in the Draft Housing Element to: demonstrate adequate capacity for the RHNA allocation; address, and where legally possible, remove, constraints to the maintenance, improvement and development of housing; promote and affirmatively further fair housing; and preserve assisted housing development for low-income households; and
WHEREAS, on September 8, 2021, the Planning Commission held a discussion to consider HCD’s review and recommendations and to discuss concepts that would address those recommendations; and
WHEREAS, on September 20, 2021, the Planning Commission conducted a discussion to review proposed revisions to the Draft Housing Element to address HCD’s recommendations; and
WHEREAS, on September 24, 2021, Planning Commission conducted a duly noticed public hearing, and after considering oral and written testimony, adopted a Resolution of Recommendation, Resolution Number 21-011 (PCS), recommending to the City Council that the City Council adopt the 6th Cycle Housing Element; and

11.A.b
Packet Pg. 1464 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 5 WHEREAS, on October 12, 2021, the City Council conducted a duly noticed public hearing to consider HCD’s comments and the recommendation of the Planning Commission, and, after considering oral and written testimony, adopted Resolution Number 11371 (CCS) adopting the 6th Cycle Housing Element; and WHEREAS, on November 10, 2021, the City transmitted the adopted 6th Cycle Housing Element to HCD for review; and
WHEREAS, the Housing Element includes a variety of programs intended to achieve goals and policies related to new housing production for all income categories and the preservation of existing housing, ensuring there is equitable housing access to all neighborhoods, housing for the homeless including housing assistance and supportive services to low-income households, and eliminating housing discrimination; and WHEREAS, the Housing Element sets forth a range of goals, policies and programs, including, but not limited to, procedural changes related to streamlining the review of housing projects, updating development standards and the Affordable Housing Production Program (“AHPP”) to ensure housing projects are feasible, providing opportunities for housing in areas of the City that do not currently permit housing, incentivizing housing in areas of the City that have not historically supported housing production, amending the City’s density bonus ordinance to ensure consistency with State law and integration into the City’s land use system, and committing to the production of affordable housing on City-owned/publicly owned land; and WHEREAS, on February 8, 2022, the City received a letter from HCD determining that although the Adopted 6th Cycle Housing Element addressed “many statutory

11.A.b
Packet Pg. 1465 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 6 requirements,” “revisions would be necessary to comply with State Housing Element Law”; and
WHEREAS, the City immediately began efforts to address HCD’s letter, including scheduling a teleconference with HCD staff on February 14, 2022 to determine the City’s required next steps in order to achieve an HCD-compliant Housing Element and conducting a Study Session with the Planning Commission on March 2, 2022; and WHEREAS, since that February 14, 2022 teleconference, the City has continued to meet with HCD on a consistent basis, including most recently on August 18, 2022, in an effort to work toward addressing HCD’s concerns to allow for the submission of a compliant Housing Element; and
WHEREAS, the City also initiated other efforts to bring the 6th Cycle Housing Element into compliance, including an April 26, 2022 study session with Council, and Study Sessions with the Planning Commission on May 11 and June 1, 2022; and WHEREAS, in consideration of the comments received in the February 8, 2022 letter, consultations with HCD, and input received during study sessions with the City Council and Planning Commission, City staff prepared draft redline revisions to the Housing Element to primarily: 1) make technical revisions; 2) address affirmatively furthering fair housing obligations; and 3) strengthen the City’s commitment to development of affordable housing on City-owned sites; and WHEREAS on June 15, 2022, the Planning Commission considered the draft redline amendments to the 6th Cycle Housing Element in response to HCD’s comments, that, among other things, made technical revisions, and proposed amendments to the element’s affirmatively furthering fair housing requirements and program related to City11.A.b Packet Pg. 1466 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 7 owned sites, made recommended revisions, and recommended that the City Council direct staff to transmit the redline revisions to HCD for review; and WHEREAS, on June 21, 2022, the City Council reviewed the draft revisions to the 6th Cycle Housing Element, made recommended revisions, and directed staff to transmit to HCD for review and comment; and
WHEREAS, on September 6, 2022, HCD issued a letter determining that the Draft Revised Housing Element will comply with State Housing Element Law once adopted, submitted to, and reviewed by, HCD; and
WHEREAS, AB 1398, which became effective on January 1, 2022, requires local governments that did not adopt a 6th Cycle Housing Element that HCD determined to be in substantial compliance with State Housing Element Law within 120 days of the statutory deadline for adoption to rezone to accommodate the local government’s RHNA for the 6th Cycle within one year of the statutory deadline; and WHEREAS, in accordance with AB 1398, the June 21, 2022 amended draft of the 6th Cycle Housing Element sets forth implementation dates for rezoning and related programs as of October 15, 2022, one-year after the City’s statutory deadline of October 15, 2021; and
WHEREAS, on June 30, 2022, SB 197 amended the Government Code to add Section 65583.4, which extends the one-year deadline for rezoning set forth in AB 1398 to three years, or October 15, 2024, for local governments that meet certain conditions, including adopting a 6th Cycle Housing Element that is compliant with State Housing Element law within one year of the statutory deadline, or October 15, 2022; and

11.A.b
Packet Pg. 1467 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 8 WHEREAS, implementation dates for the June 21, 2022 draft amended 6th Cycle Housing Element have been updated to allow for an extension for rezoning should the City meet all conditions set forth in Government Code Section 65583.4; and WHEREAS, on September 22, 2022, Planning Commission conducted a duly noticed public hearing to consider recommending to the City Council that the City Council adopt the amended 6th Cycle Housing Element, and after considering oral and written testimony, adopted Resolution Number 220-18 (PCS) recommending that the City Council adopt the amended the 6th Cycle Housing Element; and WHEREAS, on September 26, 2022, in accordance with Government Code Section 65585(b), the City posted the final draft of the amended 6th Cycle Housing Element incorporating the Planning Commission’s recommendations for updated implementation dates on the City’s website for public review, and emailed a link to all individuals and organizations that previously requested notices relating to the City’s 6th Cycle Housing Element; and
WHEREAS, on October 11, 2022, the City Council adopted a duly noticed public hearing to consider HCD’s comments and the recommendation of the Planning Commission.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES RESOLVE AS FOLLOWS:

SECTION 1. Pursuant to Santa Monica Municipal Code Section 9.45.080, after consideration of all oral and written testimony presented on October 11, 2022, including, but not limited to, public comments received by the City and compiled by City staff, the City Council does hereby adopt the amended 6th Cycle (2021-2029) Housing Element as

11.A.b
Packet Pg. 1468 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 9 set forth in Exhibits A and B, attached to this Resolution and incorporated herein by reference.

SECTION 2. Pursuant to Government Code Section 65585(e), the City Council has considered the findings and recommendations set forth HCD’s letter dated September 6, 2022, determining that the draft amended Housing Element will comply with State Housing Element Law once adopted, submitted to, and reviewed by, HCD.

SECTION 3. Pursuant to Government Code Section 65583.2(g)(2), based on substantial evidence set forth in Chapter 4, Summary of Land Available for Housing, and Appendix F, Suitable Sites Inventory Report of the amended 6th Cycle Housing Element, after examining such factors as physical characteristics; existing uses; redevelopment potential (including improvements to land value ratio, ownership, and known developer interest); location and context; local knowledge; and environmental and infrastructure constraints, the City determined that the existing uses on nonvacant sites identified in the SSI to accommodate lower income housing are likely to be discontinued during the planning period, and therefore do not constitute an impediment to additional residential development during the period covered by the Housing Element.

A. Parcels with existing uses that were not likely to be discontinued during the planning period were not examined for suitability, as follows:
 Parcels in the RMH (Residential Mobile Home) and OS (Open Space) Districts;
 Parcels with existing historic resources;
 Parcels that are under construction, or have recently completed projects, approved entitlements, or pending entitlements for commercial uses only;

11.A.b
Packet Pg. 1469 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 10  Parcels that have unique land uses, such as Santa Monica City Hall, Los Angeles County Courthouse, Civic Auditorium, hospitals, cemetery, schools, parks, churches/religious facilities, utilities, government offices, libraries, police/fire stations, transportation infrastructure/Metro Expo Light Rail, and airport;
 Parcels developed with affordable housing, condominium units, and rent control units; and
 Parcels with newer buildings developed post 1980.

B. All remaining parcels (approximately 1,300) were placed into categories and examined for suitability. Parcels with existing uses were selected for the SSI based on the following factors and evidence:

1. Category 1 (Approved/Pending Project Sites): Sites for which entitlements have been issued for housing development projects or applications have been received for housing development projects; evidence that in the previous planning period, only 15 percent of approved or pending projects are withdrawn and/or have had permits expire.

2. Category 2 (Prior 5th Cycle Housing Element Sites): Evidence that property owners have expressed past or current development interest; the properties are underdeveloped below current maximum floor area ratio (“FAR”) allowed, or have single tenants. Evidence that past and current proposed housing projects all occurred on similar nonvacant sites with existing uses consisting of older buildings (at least 40 years of age) or surface parking lots. Evidence that in the past decade development in Santa Monica has trended towards new

11.A.b
Packet Pg. 1470 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 11 residential development rather than new commercial development, and recent financial feasibility studies that concluded residential projects will be more likely to occur than commercial projects with increased development potential (i.e., greater permitted FAR and height) for housing development projects, as proposed by Program 1 J of the Housing Element. Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial

3. Category 3 (Downtown Community Plan buildout): Evidence that the sites have low improvements to land ratio (“ILR”) (less than 0.5), are developed with low-scale buildings more than 40 years of age, are developed below current maximum FAR allowed, are located in proximity to many other recent housing projects in the Downtown, and have been previously identified as high potential for redevelopment in the 2017 Downtown Community Plan. Evidence that in the past decade development in Santa Monica has trended towards new residential development rather than new commercial development, and that past and current proposed housing projects all occurred on similar nonvacant sites with existing uses consisting of older buildings (at least 40 years of age) or surface parking lots.

Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial.

4. Category 4 (City-owned Sites): Evidence that these City-owned sites do not have long-term leases with outside parties that extend beyond the 6th Cycle

11.A.b
Packet Pg. 1471 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 12 Housing Element planning period and do not have existing uses that are non-City operated.

5. Category 5 (Parking Lot Sites): Evidence that these surface parking lots do not serve existing uses that have demonstrated longevity (e.g., uses that are more unique in a particular location such as a successful grocer in a residential neighborhood, a popular restaurant, long-standing reputable business, etc.) and that past and current proposed housing projects occurred on similar nonvacant sites with existing uses consisting of surface parking lots. Evidence that in the past decade development in Santa Monica has trended towards new residential development rather than new commercial development, and recent financial feasibility studies that concluded residential projects will be more likely to occur than commercial projects with increased development potential (i.e., greater permitted FAR and height) for housing development projects, as proposed by Program 1 J of the Housing Element. Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial

6. Category 6 (Auto Inventory Sites): Evidence that property owners of such sites have expressed past or current development interest; there is common ownership with adjacent parcels, or there are other multiple parcels located elsewhere that are also owned by the same property owner. Evidence that in the past decade development in Santa Monica has trended towards new residential development rather than new commercial development, and recent financial feasibility studies that concluded residential projects will be more likely to occur

11.A.b
Packet Pg. 1472 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 13 than commercial projects with increased development potential (i.e., greater permitted FAR and height) for housing development projects, as proposed by Program 1 J of the Housing Element. Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial.

7. Category 7 (Recently Sold/For Sale Sites): Evidence that the sites are for sale or recently sold, and existing buildings on the sites are vacant or have upcoming expiring lease terms. Evidence that in the past decade development in Santa Monica has trended towards new residential development rather than new commercial development, and recent financial feasibility studies that concluded residential projects will be more likely to occur than commercial projects with increased development potential (i.e., greater permitted FAR and height) for housing development projects, as proposed by Program 1 J of the Housing Element. Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial

8. Categories 8, 9, and 10 (Underutilized Sites, Remaining Large Parcels, Remaining Sites with 0.5 ILR or Less): Evidence that the existing buildings on the sites are low-scale buildings and more than 40 years old, have single tenancy or minimal tenancy, there is known developer interest, or the existing use does not appear to have longevity (e.g.,uses that are more unique in a particular location such as a successful grocer in a residential neighborhood, a popular restaurant, long-standing reputable business, etc.). Evidence that in the

11.A.b
Packet Pg. 1473 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 14 past decade development in Santa Monica has trended towards new residential development rather than new commercial development, and recent financial feasibility studies that concluded residential projects will be more likely to occur than commercial projects with increased development potential (i.e., greater permitted FAR and height) for housing development projects, as proposed by Program 1 J of the Housing Element. Evidence that in the previous planning period, on parcels that allowed for 100% commercial or residential projects, only 15 percent of development projects were 100% commercial.

SECTION 4. The City Council hereby authorizes staff to make non-substantive changes to the Housing Element as necessary to make it internally consistent, including, but not limited to, typographical errors, in conformity with the final City Council action, and approved as to form by the City Attorney. Should HCD require substantive changes to the Housing Element adopted herein, staff shall bring such changes back to City Council for review and adoption.

SECTION 5. The City Clerk shall certify to the adoption of this Resolution, and thenceforth and thereafter the same shall be in full force and effect.

APPROVED AS TO FORM:
_________________________

DOUGLAS SLOAN
City Attorney

11.A.b
Packet Pg. 1474 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 15 EXHIBIT A
JUNE 21, 2022 DRAFT REVISED 6TH CYCLE (2021-2029) HOUSING ELEMENT Proposed Redline Changes to Housing Element (Chapters 1-5) Appendix A, Outreach Summary (no change)
Appendix B, Housing Needs Assessment (no change)
Appendix C, LUCE Goals and Policies (no change)
Appendix D, Housing Resources (no change)
Proposed Redline Changes to Appendix E, Housing Constraints Proposed Redline Changes to Appendix F, Report on Suitable Sites Inventory Analysis Appendix G, Review of Past Performance (no change)
Appendix H, Opportunities for Energy Conservation (no change) Appendix I, 2020 Assessment of Fair Housing (no change)

11.A.b
Packet Pg. 1475 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) 16 EXHIBIT B

AMENDMENTS TO EXHIBIT A TO REFLECT UPDATED IMPLEMENTATION

DEADLINES
September 2022 Redline Draft (changes to June 2022 draft)

11.A.b
Packet Pg. 1476 Attachment: Resolution Adopting Revised 6th Cycle Housing Element [Revision 1] (5191 : Housing Element Adoption (90 mins)) From: Wrenn, Lauren
To: Housing Update
Cc: Marsiglia, Lauren
Subject: AB 1398 Interpretations
Date: Monday, February 28, 2022 11:24:51 AM

EXTERNAL
Hello,
I’m a new member of the Advance Planning division at Culver City and was hoping you could help us with some research on the interpretation of the Housing Element Update deadlines in AB 1398.

We’re trying to compare our situation to other cities in the region to include in a progress update for our City Council. The 3 interpretations we considered were:

1. The HEU must receive a determination of substantial compliance from HCD by February 12th

2. The HEU must be submitted to HCD by February 12th

3. The HEU must be adopted by February 12th with no specific deadline for submittal to HCD.

If you could let us know how your department interpreted the law and the current status of Santa Monica’s HE update, we’d be very grateful.

Thank you!
Lauren Wrenn
Planning Technician II
Culver City Advance Planning
[email protected] / (310) 253-5766
The City of Culver City keeps a copy of all E-mails sent and received for a minimum of 2 years. All retained E-mails will be treated as a Public Record per the California Public Records Act, and may be subject to disclosure pursuant to the terms, and subject to the exemptions, of that Act.

11.A.h
Packet Pg. 1477 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Annspun
To: Housing Update
Subject: Add me to your housing update list please...

Date: Wednesday, May 18, 2022 8:00:35 PM

EXTERNAL
Wold you please send me housing updates as they occur? I get emails from the city of SM, but rarely from the Housing Committee.

Many thanks,
Ann Greenspun
Resident
[email protected]
NOMA Boardmember

11.A.h
Packet Pg. 1478 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Carmen Joseph
To: Housing Update
Subject: ADU grant funding
Date: Tuesday, May 24, 2022 4:12:16 PM

EXTERNAL
I am interested in attending the virtual workshop on ADU grants. Please include me. Thank you.

Carmen Joseph

11.A.h
Packet Pg. 1479 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: JerseyBoy
To: Housing Update
Cc: Ellie Schneir
Subject: ADU Meeting
Date: Friday, May 27, 2022 7:51:14 AM

EXTERNAL
Hi, do you have a recording of this meeting? We were unable to make it last night. Thanks. -- Marc Vesta
JerseyBoy Construction
(323) 697-0960

11.A.h
Packet Pg. 1480 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Joanna Rodriguez-Noyola
To: Housing Update
Subject: ADU Prototype Plans
Date: Wednesday, March 2, 2022 6:54:05 PM

EXTERNAL
Hi,
I’m an architect working on several ADUs in Santa Monica and am interested in submitting Prototypical ADU plans through the city of Santa Monica, what is the process for this? I have filled out the housing element ADU survey but would also like to provide input to the planners based on comments I receive from clients (please increase the upper story deck area!).

Thank you!
Joanna Rodríguez-Noyola, AIA
R-ND+A
r-nda.com
[email protected]
+1.760.209.3050

11.A.h
Packet Pg. 1481 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Jennifer Polhemus
To: Housing Update
Subject: ADU survey
Date: Wednesday, March 2, 2022 4:41:05 PM

EXTERNAL
Questions 6,7,8,& 11 presume the respondent wants to consider an ADU, with no button for "Not interested" or similar. This is a problem with the survey design & biases the results.

Jennifer Polhemus
SM Resident & Business Owner

11.A.h
Packet Pg. 1482 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Ross Fehrman
To: Housing Update
Subject: ADU
Date: Thursday, May 19, 2022 10:18:16 AM
Attachments: image001.png
Ross Fehrman, AICP
Associate City Planner
santamonica.gov
Facebook
| Twitter| Instagram
Subscribe to City Planning Email Updates

11.A.h
Packet Pg. 1483 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Pamela Bell via Adobe Acrobat
To: Housing Update
Subject: AGIROInv-671882617 4
Date: Wednesday, March 16, 2022 7:37:33 AM

EXTERNAL
Adobe
Pamela Bell ([email protected])
has shared AGIROInv-671882617 4.pdf
Open
SENT BY Pamela Bell ([email protected])
SHARED ON 16-March-2022 07:37 AM PDT
Manage Your Account | Customer Support | Forums | Terms of Use | Report Abuse Adobe, the Adobe logo, the Adobe PDF logo, and Acrobat are either registered trademarks or trademarks of Adobe in the United States and/or other countries. All other trademarks are the property of their respective owners.

Adobe, 345 Park Ave., San Jose, CA 95110 USA

11.A.h
Packet Pg. 1484 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Matthew Stevens
To: Housing Update
Subject: Annual Progress Report
Date: Monday, September 26, 2022 8:24:30 PM

EXTERNAL
Hello,
Could you please send me our 2021 Annual Progress Report we submit to HCD? I’ve looked online but could not find it.

Also, are there any plans to update the Housing Dashboard? I’m curious to know what’s been proposed this year.

Thank you,
Matt

11.A.h
Packet Pg. 1485 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) From: Grace Page
To: Housing Update
Subject: Automatic reply: Lincoln / Ocean Park Project
Date: Thursday, July 14, 2022 1:43:46 PM
Thank you for your email. I am currently out of the office and will return on Thursday, July 21, 2022.

For urgent matters, please contact Tony Kim, Principal Planner.

Cheers,
Grace

11.A.h
Packet Pg. 1486 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) 1 Jing Yeo
From: McDougall, Paul@HCD <[email protected]>
Sent: Wednesday, March 16, 2022 4:19 PM
To: Jing Yeo
Subject: FW: Mail
Attachments: 3rd party comments recd via US mail 3-16-2022.pdf

EXTERNAL
FYI
From: Mendoza, Kathyren@HCD <[email protected]> Sent: Wednesday, March 16, 2022 2:27 PM
To: McDougall, Paul@HCD <[email protected]>
Subject: Mail
Kathyren Mendoza | Division of Housing Policy Development Office Technician
California Department of Housing & Community Development 2020 W. El Camino Avenue, Suite 500 | Sacramento, CA 95833 Phone (916) 694-2607

11.A.h
Packet Pg. 1487 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1488 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1489 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1490 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1491 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1492 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1493 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1494 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1495 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins))

11.A.h
Packet Pg. 1496 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) 1 Jing Yeo
From: McDougall, Paul@HCD <[email protected]>
Sent: Tuesday, April 26, 2022 8:00 AM
To: Jing Yeo
Subject: FW: March 17 meeting, Agenda item 9, HCD, FHA comments Attachments: Housing Commission Meeting Comments March 17 2022 HCD and FHA.docx

EXTERNAL
FYI
From: Elizabeth Lutz <[email protected]>
Sent: Sunday, April 24, 2022 11:11 AM
To: McDougall, Paul@HCD <[email protected]>
Subject: Fwd: March 17 meeting, Agenda item 9, HCD, FHA comments Dear Mr. McDougall,
Thank you for carefully reflecting on the Housing Plan for the City of Santa Monica.

Please look at the attached comments that were submitted to the Santa Monica Commission. The comments were not included in the March meeting or posted for public review because, as Mr. Kemper said, they were overlooked‐‐there is no one in the role of a community liaison at the Housing Authority. This week's recent Commission meeting was canceled due to lack of quorum so I am sending this directly to you.

Considerable effort and time from community organizations for elderly, disabled, displaced, and individuals currently in affordable housing was invested in these comments.

There is no legitimate, empowered position of authority in our City to influence Planning for elderly, disabled, displaced, or low‐moderate income. There is no plan for  sustainable, healthy housing and neighborhood building. There is no provision for home ownership or building of condominiums or co‐housing alternatives. Our City development plan is mostly Luxury Hotels and condominiums and separate low‐income apartments built to minimal standards and maximum profit in undesirable or "mixed use" locations. There are very few projects where affordable housing is integrated into the plans for hotels and expensive condominiums‐‐the people are housed "off‐site" in housing built cheaply and quickly.

Large‐corporation builders are developing block‐housing on major roads, commercial areas, and freeways and no "garden housing" or development "North of Wilshire Blvd" where the air quality and density is quantitatively lower.

The intensifying segregation is shocking. Last month the Fairmont rushed through approval for a project that maintains segregation in many ways. Lip Service was given to "family housing" where plans are actually for HUD minimum requirements. Corporate influence on housing policy is the norm in our incorporated City.

Please encourage our City to invest in creative leadership and long‐term neighborhood planning and divest the corporation identity. I am sending this email to you because there is no place on a local level for our feedback to be considered.

We have a unique opportunity to reshape our City right now.

Thank you,

11.A.h
Packet Pg. 1497 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) 2 Elizabeth Lutz Ph.D
Disabled, Low‐income Resident of City of Santa Monica
‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐
From: Elizabeth Lutz <[email protected]>
Date: Thu, Apr 21, 2022 at 7:10 PM
Subject: Re: March 17 meeting, Agenda item 9, HCD, FHA comments To: James Kemper <[email protected]>
Hi,
What is the status of the housing element?
Elizabeth Lutz
On Apr 21, 2022, at 6:40 PM, James Kemper <[email protected]> wrote:

Hi Ms. Lutz,
I guess the staff monitoring the smhousing email box must have missed your email and for that we apologize.

Jim Kemper (he/him)
Housing Program Manager
310-434-2647
santamonica.gov [santamonica.gov]
Facebook [facebook.com] | Twitter [twitter.com] | Instagram [instagram.com] Subscribe to City of Santa Monica Email Updates [smgov.us12.list-manage.com]

11.A.h
Packet Pg. 1498 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) 3 From: Elizabeth Lutz <[email protected]>
Sent: Wednesday, April 20, 2022 12:37 PM
To: James Kemper <[email protected]>
Subject: Fwd: March 17 meeting, Agenda item 9, HCD, FHA comments

EXTERNAL

[email protected] is the email address that was listed for the submission of public comments.

Thanks for your speedy response.

‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐
From: Elizabeth Lutz <[email protected]>
Date: Thu, Mar 17, 2022 at 10:33 AM
Subject: March 17 meeting, Agenda item 9, HCD, FHA comments To: <[email protected]>
Cc: <[email protected]>, <[email protected]>, <[email protected]>, <[email protected]>, <[email protected]>, Ramon Alvarado <[email protected]>, <[email protected]>

Attached please find comments ideas gathered from conversations with stakeholders in our community for consideration in the meeting of the Housing Commission this evening.

11.A.h
Packet Pg. 1499 Attachment: Public Comments Received by City on Housing Element since February 2022 (5191 : Housing Element Adoption (90 mins)) Housing Commission Member Discussion Items, Comments on HCD and FHA 1 of 3
To Whom It May Concern: March 17, 2022
This letter is written for submission to the Santa Monica Housing Commission Meeting March 17, 2022. These comments address four areas: 1) Identification of Reasonable Accommodation and implementation into existing development processes; 2) Governmental Constraints and Institutional Discrimination Practices in the City of Santa Monica; 3) New Program Ideas; 4) Possible actions to recognize existing systemic discriminatory policies and practices.

2. “Address and, where appropriate and legally possible, remove governmental and nongovernmental constraints to the maintenance, improvement, and development of housing, including housing for all income levels and housing for persons with disabilities. The program shall remove constraints to, and provide reasonable accommodations for housing designed for, intended for occupancy by, or with supportive services for, persons with disabilities. (Gov. Code, § 65583, subd. (c)(3).) Review of the City of Santa Monica’s 6th Cycle Adopted Housing Element

Page 5 ends
← All documents from this meeting