Cities Index.
PowerPoint Presentation

Santa Monica City Council
September 10, 2024

Document
PowerPoint Presentation
Meeting
September 10, 2024
Body
Santa Monica City Council
Original file
946 KB
Text extracted from the city's file for reading and search. Open the original on santamonicacityca.iqm2.com. That file is the official record.

Skilled Labor Policy for
Renewable Energy and Electrical
Vehicle Supply Equipment
Projects
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
Staff recommends that Council:

1. Adopt a finding of no possibility of significant effect pursuant to Section 15061 (b)(3) (Common Sense
Exemption) of the California Environmental Quality
Act (CEQA) Guidelines.

2. Approve the proposed Santa Monica Skilled Labor
Policy for Renewable Energy and Electrical Vehicle
Supply Equipment Projects for the Public Works
Department.

Tonight’s Meeting Request
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
• On July 25, 2023, City Council introduced a Discussion Item requesting recommendations to address skilled
and trained labor requirements for renewable energy
projects, electrical vehicle supply equipment, and
related City funded infrastructure and projects placed
upon City property.
• City staff drafted responses to the proposed
requirements and developed recommendations for City
Council consideration in an Information Item posted
publicly on March 20, 2024.

Background
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
The policy applies to:
• Installation of electrical vehicle supply equipment
(EVSE), photovoltaics (PV), battery energy storage
systems (BESS) and microgrid-related infrastructure
Applicability
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
Project Thresholds:
• The project construction costs exceed $250,000;
• The project scope includes a PV system that is 100 kW or greater; or, • The project scope includes EVSE of at least six Level 2 EV chargers or at least three DC Fast Chargers.

Thresholds
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
Minimum Project Requirements:

1. All contracted electrical work shall be performed by state-licensed C-10 Electrical contractors and comply with the requirements thereof set forth in California law.

2. Electrical work will be performed by California state-certified general electricians and apprentices registered in a state of California approved joint labor management apprenticeship program incrementally as outlined below:
a. Year 1: 30% graduation, Year 3: 40% graduation, Year 5: 50% graduation

3. “Journeyman” electricians must be graduates of a Joint Labor Management State of California Approved Electrical Apprenticeship Training Program incrementally as outlined below:
a. Year 1: 30% graduation, Year 3: 40% graduation, Year 5: 50% graduation

4. A minimum of 25% of job site electrical workers must be OSHA 10-Hour General Industry Safety & Health Certified.

5. At least one job site electrical worker must be OSHA 30-Hour General Industry Safety & Health Certified.

Proposed Policy
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
Electric Vehicle Supply Equipment installations will meet the following requirements:
• At a minimum, at least one electrician on the crew installing the EV Work at each job site is required to hold an Electrical Vehicle Infrastructure Training Program (“EVITP”) certification.
• At a minimum, at least twenty-five percent (25%) of the state certified general electricians performing the EV Work on each job site of projects that install a charging port supplying 25 kilowatts or more to a vehicle shall hold an EVITP certification.
• EVITP certification requirements do not apply to apprentices.

Proposed Policy
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
• Requested by Council
• Supports Sustainable and Connected Council Priority
• Builds a local green economy
• Increases grant eligibility
• Creates a pathway for higher wage jobs
• Creates a healthier, cleaner and safer city
Summary
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024
Staff recommends that Council:

1. Adopt a finding of no possibility of significant effect pursuant to Section 15061 (b)(3) (Common Sense Exemption) of the California Environmental Quality Act (CEQA) Guidelines.

2. Approve the proposed Santa Monica Skilled Labor Policy for Renewable Energy and Electrical Vehicle Supply
Equipment Projects for the Public Works Department.

Recommended Action
Item 11-A
September 10, 2024
Item 11-A
September 10, 2024

← All documents from this meeting