Draft Plan Revisions
May 12, 2026
SANTA MONICA BLVD
SAFETY STUDY
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
SAFETY STUDY REVISIONS
Lane widths at 19th St.
Lane widths at 10th St.
Travel Lane Widths
• General lanes for cars: 10’ – 11’
• Lanes for cars and buses: 12’
• Bus-only lanes: 12’ – 13’
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
SAFETY STUDY REVISIONS
Bus Only Lanes
• Peak-hour bus-only lanes from Centinela
Avenue to Harvard Street.
• Transit plaza / bus-only lane will extend
from 5th Street to Lincoln Boulevard (one
eastbound vehicle travel lane repurposed)
• New curbside transit plaza (block long
bus stop) between 6th Street and 7th
Street, in the westbound direction (onstreet parking repurposed) • Full time bus-only lanes from 14th Street
to Lincoln Boulevard (2 travel lanes
repurposed)
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
SAFETY STUDY REVISIONS
Far Side Bus Stops
• Relocate the nearside, eastbound
bus stop at 26th Street. Include
bus bulb to support boarding and
bus furniture.
• Keep WB bus stop at nearside,
add bus bulb.
• Other near side stops will remain
due to driveway constraints.
26th Street
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
SAFETY STUDY REVISIONS
Vertical Deflection
• Potential candidate locations:
• 16th Street
• 21st Street
• 22nd Street
• Chelsea Avenue
• Princeton Street
• Franklin Street
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
SAFETY STUDY REVISIONS
Pedestrian Signals
• On recall in both directions from 7:00 AM to
10:00 PM
Evaluation Metrics (Counts+)
• Crash reduction
• Speed reduction
• Yield compliance
• Transit performance
• Parent / user satisfaction and comfort
• Use of designated crossing locations
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
PHASING
Immediate Term Improvements (6-12 mo.)
• Signal timing adjustments, Leading Pedestrian
Intervals (LPIs), pedestrian recall, turn restrictions, and far side bus stop relocations.
Phase 1 Improvements (before Olympics)
• Signing and striping improvements: crosswalks,
RRFBs, curb extensions, RT only restrictions. Bus
only lanes!
• Chelsea Avenue/Park Drive will be designed in this
phase.
Phase 2 Improvements (after Olympics)
• Chelsea Avenue to be constructed after Olympics
• ATP Cycle 8 grant application for phase 2.
• Performance metrics (Counts+ methodology)
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
TIMELINE
Item 4.I
May 12, 2026
Item 4.I
May 12, 2026
QUESTIONS