FISCAL YEAR 2024 RECONNECTING COMMUNITIES PILOT (RCP) PROGRAM This agreement is between the United States Department of Transportation (the “USDOT”) and the California Department of Transportation (the “Recipient”).
This agreement reflects the selection of the Recipient to receive an RCP Grant for the Reconnecting Pico Neighborhood Project (Reconnecting Pico).
If schedule A to this agreement identifies a Designated Subrecipient, that Designated Subrecipient is also a party to this agreement, and the parties want the Designated Subrecipient to carry out the project with the Recipient’s assistance and oversight.
The parties therefore agree to the following:
ARTICLE 1
GENERAL TERMS AND CONDITIONS.
1.1 General Terms and Conditions.
(a) In this agreement, “General Terms and Conditions” means the content of the document titled “General Terms and Conditions Under the Fiscal Years 2024-2026 Reconnecting Communities Pilot (RCP) Program: FHWA Projects,” dated November 4, 2025, which is available on the RCP website. The General Terms and Conditions reference the information contained in the schedules to this agreement. The General Terms and Conditions are part of this agreement.
(b) The Recipient states that it has knowledge of the General Terms and Conditions. (c) The Recipient acknowledges that the General Terms and Conditions impose obligations on the Recipient and that the Recipient’s non-compliance with the General Terms and Conditions may result in remedial action, terminating of the RCP Grant, disallowing costs incurred for the Project, requiring the Recipient to refund to the USDOT the RCP Grant, and reporting the non-compliance in the Federal-government-wide integrity and performance system.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
2 of 17
ARTICLE 2
SPECIAL TERMS AND CONDITIONS.
2.1 [Special Term Title].
Pursuant to the court’s preliminary injunction order in King County v. Turner, 2:25-cv-814-BJR (W.D. Wash.), ECF No. 169 (June 3, 2025), DOT will not be imposing or enforcing the challenged conditions,* or any materially similar terms and conditions, to any grant funds awarded, directly or indirectly, to DOT Plaintiffs and subrecipients, or otherwise rescinding, withholding, cancelling, not processing, pausing, freezing, impeding, blocking, cancelling, terminating, delaying, or conditioning DOT funds based on such conditions to the DOT Plaintiffs or their subrecipients while subject to an injunction. Further, DOT will not require DOT Plaintiffs or their subrecipients to make any certification or other representation related to compliance with such terms and conditions nor will DOT refuse to issue, process, or sign grant agreements based on DOT Plaintiffs’ participation in this litigation. Should DOT prevail in the District Court or on appeal, then DOT will require that recipients agree to the original terms and conditions if they wish to continue with the grant in place. Further, pursuant to the ruling in State of California v. Duffy, 1:25-cv-00208-JJM-PAS (D.R.I.), DOT grant agreements have been modified to remove terms and conditions pertaining to cooperation with federal immigration enforcement.
*The challenged conditions are:
1. “Pursuant to section (3)(b)(iv)(A), Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity, the Recipient agrees that its compliance in all respects with all applicable Federal anti-discrimination laws is material to the government’s payment decisions for purposes of [the False Claims Act, 31 U.S.C. § 3729(b)(4)]”;
2. “Pursuant to section (3)(b)(iv)(B), Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity, by entering into this Agreement, Recipient certifies that it does not operate any programs promoting diversity, equity, and inclusion (DEI) initiatives that violate any applicable Federal anti-discrimination laws”;
3. “[T]he Recipient will cooperate with Federal officials in the enforcement of Federal law, including cooperating with and not impeding U.S. Immigration and Customs Enforcement (ICE) and other Federal offices and components of the Department of Homeland Security in the enforcement of Federal immigration law”; and
4. A requirement that recipient comply with “executive orders.” TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
3 of 17
SCHEDULE A
ADMINISTRATIVE INFORMATION
1. Application.
Application Title: The Reconnecting Pico Neighborhood Project (Reconnecting Pico) Application Date: September 30, 2024
2. Recipient’s Unique Entity Identifier.
See section 24.3 of the General Terms and Conditions; also see FMIS.
3. Recipient Contact(s).
Steve Novotny, P.E.
District Local Assistance Engineer
California Department of Transportation (Caltrans; District 7) 100 S. Main Street; 12th Floor
Los Angeles, CA 90012
(213) 792-3130
[email protected]
4. Recipient Key Personnel.
Anmol Mishra
RCP Grant Program Coordinator
California Department of Transportation (Caltrans)
1120 N Street
Sacramento, CA 95814
(279) 599-4996
[email protected]
Discretionary Grants Coordinator
Federal Infrastructure Programs Branch
Division of Local Assistance
P.O. Box 942874, MS-1
Sacramento, CA 942874-0001
[email protected]
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
4 of 17
5. USDOT Project Contact(s).
Doug Hecox
Acting Division Administrator
FHWA California Division
Agreement Officer Representative (AOR)
650 Capitol Mall,
Ste. 4-100
Sacramento, CA 95814
[email protected]
and
Kenneth N. Petty II
Director, Office of Planning
Federal Highway Administration
Office of Planning, Environment, and Realty
1200 New Jersey Avenue SE, Room W51-302
Washington, DC 20590
[email protected]
6. Payment System.
USDOT Payment System: FMIS
7. Office for Subaward and Contract Authorization.
USDOT Office for Subaward and Contract Authorization: FHWA Division
8. Federal Award Identification Number.
See section 24.2 of the General Terms and Conditions.
9. Designated Subrecipient.
Designated Subrecipient: City of Santa Monica, California Designated Subrecipient Project Contacts:
Tony Lopez
Senior Park Planner
City of Santa Monica
1485 Main Street, Mail Stop 15
Santa Monica CA 90401
(310) 452-2201 x.5081 (310) 625-4922 c
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
5 of 17
Christopher Dishlip
Assistant Director of Public Works
City of Santa Monica
1485 Main Street, Mail Stop 15
Santa Monica CA 90401
(310) 458-2201 x.5989
Amelia Feichtner
City Architect
City of Santa Monica
1485 Main Street, Mail Stop 15
Santa Monica CA 90401
(310) 434-2611
Alex Nazarchuk
City Engineer
City of Santa Monica
1485 Main Street, Mail Stop 15
Santa Monica CA 90401
(310) 458-8736
Robert Zak
Senior Civil Engineer
City of Santa Monica
1485 Main Street, Mail Stop 15
Santa Monica CA 90401
(310) 458-2201 x.2283
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
6 of 17
SCHEDULE B
PROJECT ACTIVITIES
1. General Project Description.
The Reconnecting Pico Neighborhood Project (Reconnecting Pico) is committed to enhancing community-centered transportation, improving access to economic opportunity, education, health, and the creation of green spaces, while simultaneously alleviating environmental burdens for the residents of the Pico Neighborhood. To achieve this, staff will conduct a thorough investigation into the feasibility, optimal placement, and phasing of cap parks along the I-10 freeway segment from 11th to 20th Streets as well as bike and pedestrian improvements to the area.
2. Statement of Work.
Reconnecting Pico is divided into four phases: Phase 1 focuses on the 14-17th Street section and builds upon the previously uncompleted and unpublished feasibility draft from 2014. Phase 2 extends the study to the 11-14th Street section, Phase 3 examines the 17-20th Street section, and Phase 4 involves evaluating each feasibility study to create a final Project Plan. This plan will prioritize cap park locations in alignment with available funding sources and an implementation timeline. The project envisions the development of a pedestrian-friendly environment featuring improved sidewalks, dedicated bikeways, and potential integration with public transit systems, ensuring accessibility for individuals of all abilities. Each phase will provide valuable insights into feasibility, costs, and impacts, helping to identify priority areas for development.
Proposed Planning Improvements:
1. Existing Conditions Analysis/Site Research:
1.1 Review background information, obtain long-range plans, and update existing preliminary studies such as land surveys, geotechnical reports, and traffic pattern studies.
1.2 Establish baseline data on the freeway’s impacts on the environment, public health, economy, and community.
1.3 Evaluate right-of-way impacts and investigate air-rights issues and opportunities.
2. Community Outreach/Public Engagement:
2.1 Compile a list of all potential local stakeholders to be used throughout the entirety of this project.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
7 of 17
2.2 Conduct public outreach to establish a community vision for future green space and surrounding areas.
2.3 Engage a broad cross-section of the community through various outreach methods and events.
2.4 Prepare project guiding principles, design and phasing concepts, cost-benefit analysis, and funding scenarios to determine a preferred alternative based on feedback and outcomes of the community/public engagement.
3. Develop Concepts, Conduct Constructability Review:
3.1-3.6 Determine Preferred Alternative, Evaluate Funding Sources, and Prepare Final Feasibility Study Document with all necessary components including executive summary, project history, existing conditions, project description, construction phasing options, cost estimates, and funding strategies.
4. Pre-Development Activities:
4.1 Prepare conceptual engineering plans and studies to support environmental review for a construction project.
4.2 Coordinate closely with CalTrans regarding project scope approvals, encroachment permits, airspace leases, and other project acceptance requirements.
5. Final Report:
5.1 Prepare Final Report for feasibility cap feasibility and site recommendation TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
8 of 17
SCHEDULE C
AWARD DATES AND PROJECT SCHEDULE
1. Award Dates.
Budget Period End Date: 01/31/2030
Period of Performance End Date: See section 4.5 of the General Terms and Conditions; also see FMIS.
2. Estimated Project Schedule.
Milestone Schedule Date
Planned Project Completion Date: 07/31/2029
3. Special Milestone Deadlines.
None.
4. Mandatory Prerequisite Dates.
Milestone Date
Added to Unified Planning Work Program (UPWP) Not required.
Added to Statewide Planning Work Program Not required.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
9 of 17
SCHEDULE D
AWARD AND PROJECT FINANCIAL INFORMATION
1. Award Amount.
Funding Fiscal Year: FY2024
RCP Grant Amount: $2,000,000
2. Federal Obligation Information.
Federal Obligation Type: Single
3. Approved Project Budget.
Eligible Project Costs
Total
RCP Funds: $2,000,000
RCP Funds (2): $0
Other Federal Funds: $0
Non-Federal Funds: $505,712
Total: $2,505,712
4. Approved Pre-award Costs
None. The USDOT has not approved under this award any pre-award costs under 2 CFR 200.458. Because unapproved costs incurred before the date of this agreement are not allowable costs under this award, the USDOT will neither reimburse those costs under this award nor consider them as a non-Federal cost sharing contribution to this award.
Costs incurred before the date of this agreement are allowable costs under this award only if approved in writing by USDOT before being included in the Project costs and documented in this section 5. See section 13.3(b) of the General Terms and Conditions.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
10 of 17
SCHEDULE E
CHANGES FROM APPLICATION
Scope:
No changes.
Schedule:
The original project schedule reflected in the supplementary SF-424 budget document submitted with the application would have extended 24 months from January 1, 2025 to December 31, 2026. Given delays in the award confirmation, processing, and in anticipation of other possible delays, the new period of performance is estimated for 40 months, from Spring 2026 to July 31, 2029. FHWA notified the City of Santa Monica on October 15, 2025 that the City was cleared to work with the FHWA CA Division Office on the grant agreement. The revised project schedule reflects time required to coordinate the grant agreement and the anticipated timeline necessary to execute the agreement.
Budget:
Overall, the City will slightly increase its non-Federal share. It will increase cash match and decrease local in-kind match components of the non-Federal share. The City’s application noted a $357,000 local in-kind match for staff time for project administration and committed to providing a $143,000 cash match contribution. The City, in evaluation of recent project precedent, will revise that breakdown to instead provide $190,240 local in-kind match for staff time for project administration and increase to a $315,472 its cash match contribution.
The table below provides a summary comparison of the Project budget.
Fund Source
Application Schedule D
$ % $ %
Previously Incurred Costs
Federal Funds
Non-Federal Funds
Total Previously Incurred Costs
Future Eligible Project Costs
RCP Funds 2,000,000 80% $2,000,000 80%
Other Federal Funds
Non-Federal Funds 500,000 20% $505,712 20%
Total Future Eligible Project
Costs
Total Project Costs 2,500,000 100% $2,505,712 100%
Other: No other changes
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
11 of 17
SCHEDULE F
RCP PROGRAM DESIGNATIONS
1. Capital Construction or Planning Designation.
Capital-Planning- Designation: Planning
2. Economically Disadvantaged Community Designation.
Economically Disadvantaged Community Designation: Yes
3. Funding Source.
Funding Source: General Fund
4. Security Risk Designation.
Security Risk Designation: Low
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
12 of 17
SCHEDULE G
RCP PERFORMANCE MEASUREMENT INFORMATION
Reserved.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
13 of 17
SCHEDULE H
LABOR AND WORK
1. Efforts to Support Good-Paying Jobs and Strong Labor Standards The Recipient states that rows marked with “X” in the following table are accurate:
X
The Recipient or a project partner promotes robust job creation by supporting good-paying jobs directly related to the project with free and fair choice to join a union. (Describe robust job creation and identify the good-paying jobs in the supporting narrative below.)
The Recipient or a project partner will invest in high-quality workforce training programs such as registered apprenticeship programs to recruit, train, and retain skilled workers, and implement policies such as targeted hiring preferences. (Describe the training programs in the supporting narrative below.) The Recipient or a project partner will partner with high-quality workforce development programs with supportive services to help train, place, and retain workers in good-paying jobs or registered apprenticeships including through the use of local and economic hiring preferences, linkage agreements with workforce programs, and proactive plans to prevent harassment. (Describe the supportive services provided to trainees and employees, preferences, and policies in the supporting narrative below.)
The Recipient or a project partner will partner and engage with local unions or other worker-based organizations in the development and lifecycle of the project, including through evidence of project labor agreements and/or community benefit agreements. (Describe the partnership or engagement with unions and/or other worker-based organizations and agreements in the supporting narrative below.) The Recipient or a project partner will partner with communities or community groups to develop workforce strategies. (Describe the partnership and workforce strategies in the supporting narrative below.)
The Recipient or a project partner has taken other actions related to the Project to create good-paying jobs with the free and fair choice to join a union and incorporate strong labor standards. (Describe those actions in the supporting narrative below.)
The Recipient or a project partner has not yet taken actions related to the Project to create good-paying jobs with the free and fair choice to join a union and incorporate strong labor standards but, before beginning construction of the Project, will take relevant actions described in schedule B. (Identify the relevant actions from schedule B in the supporting narrative below.) TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
14 of 17
The Recipient has not taken actions related to the Project to improving goodpaying jobs and strong labor standards and will not take those actions under this award.
2. Supporting Narrative.
The City is deeply committed to fostering local inclusive economic development and entrepreneurship. The project will actively seek out collaboration with DBEs, ensuring that they have a meaningful role in the planning process. As part of the planning process, the project will study the opportunities to establish workforce development and apprenticeship requirements that could be built into the future capital construction phase of the project, promoting robust job creation by supporting good-paying jobs directly related to the project with free and fair choice to join a union, and estimate the economic impacts those labor considerations would have on the community.
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
15 of 17
RECIPIENT SIGNATURE PAGE
The Recipient, intending to be legally bound, is signing this agreement on the date stated opposite that party’s signature.
California Department of Transportation
Date
By:
Signature of Recipient’s Authorized Representative
Dee Lam
Name
Division Chief, Division of Local Assistance
Title
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
16 of 17
DESIGNATED SUBRECIPIENT SIGNATURE PAGE
The Designated Subrecipient, intending to be legally bound, is signing this agreement on the date stated opposite that party’s signature.
City of Santa Monica
Date
By:
Signature of Designated Subrecipient’s Authorized
Representative
Oliver Chi
Name
City Manager
Title
TEMPLATE; NOT INTENDED FOR EXECUTION WITHOUT MODIFICATION Revised 2025-11-04
17 of 17
USDOT SIGNATURE PAGE
The USDOT, intending to be legally bound, is signing this agreement on the date stated opposite that party’s signature.
UNITED STATES DEPARTMENT OF
TRANSPORTATION
Date
By:
Signature of USDOT’s Authorized Representative
Doug Hecox
Name
FHWA California Division Administrator, Acting
Title