Cities Index.
Application - 1029 26th St Appeal Attachment Added. 11/14/2026

Santa Monica City Council
November 17, 2026

Document
Application - 1029 26th St Appeal Attachment Added. 11/14/2026
Meeting
November 17, 2026
Body
Santa Monica City Council
Pages
1
Original file
715 KB
Text extracted from the city's file for reading and search. Open the original on santamonicacityca.iqm2.com. That file is the official record.

26ENT- 0172
City of

CITY OF SANTA MONICA - CITY PLANNING DIVISION
Santa
Monica APPEAL FORM
Appointments to submit an Appeal Form can be scheduled at the following links for ONLINE or IN-PERSON submittal.

Appointments are encouraged, however, Appeal Forms are also accepted during REGULAR COUNTER HOURS if you have questions about completing this application, please email City Planning at [email protected].

PROJECT ADDRESS: 1029 2eth Street, Santa Monica 90403)
PROJECT CASE NUMBER: 260ENT - 008l, ORIGINAL HEARING DATE: July 15,2000 ACTION BEING APPEALED: Planning Commission vote to
approve a Childcave + Eavly Education Facility
in a single family home at 1029-26th St. 54
By applying for an appeal, 1 understand and agree that contact information, including but not limited to, email addresses and telephone numbers, will become part of a disclosable public record pursuant to the California Public Records Act and that the City may elect not to redact contact information contained in this application prior to disclosing a copy of this application to the public. I further agree that I do not object to the City's disclosure of contact information contained in this application in response to public records requests.

APPELLANT (Note: All correspondences will be sent to the contact person) Name: Tricia Crave_Organization Name: Northeast Neighbas Address: 902-33kl St City/State: Sana Monica Zip: 90403 INFORMATION Phone: 310 129.3515 Email: ITuciacrane @amal con CONTACT PERSON (If different from appellant)
Name: Organization Name:

Address: City/State: _Zip:

GENERAL
Phone: Email:

Relation to Applicant:

A hearing date on the appeal will not be scheduled until sufficient information regarding the basis for the appeal has been received to enable City Planning Division staff to prepare the required analysis for the staff report.

Tricia cranes Tricia Case 7/28/2024
Appellant's Name (PRINT) Appellant's Signature / Date

APPEAL INFORMATION
Please state the specific reason(s) for the appeal (use additional sheets if necessary) Is the appeal related to the discretionary action and findings issued for the proposed project? If yes, please explain.

Etres INo
Please see attached document
Is the appeal related to the conditions of approval? If yes, which conditions and why:

Aires No
Please see attached document
is the appeal related to design issues? If yes, please explain.

LYes L No
is the appeal related to compatibiity issues such as building height, massing. pedestrian orientation, etc.? If yes, please explain.
•Yes I]No
Is the appeal related to non-compliance with the Santa Monica Municipal Code? If yes, which Code sections) does the project not corply with and why:

DYes •No
is the appeal related to environmental impacts associated with the project if yes, please explain:

LYes •No
Is the appeal related to other issues? If yes, please explain:
•Yes •No
Appeal Form
October 5, 2023 Page 2
To: Santa Monica City Council
From: Northeast Neighbors
Re: Appeal of Planning Commission 7/15/2026 approval of a Conditional Use Permit to allow a Child Care & Early Education Facility in a single-family home in an R-1 Zone. (Case #26ENT-)86
The City of Santa Monica's Childcare Master Plan is 20 years old, and an update is long overdue according to City Planning staff. Given that housing is a current policy priority for Santa Monica, the City Council should not sanction the Planning Commission's decision to turn a house into a commercial daycare center without consideration for the loss of housing, the impact on the people who live nearby, the safety of children, and the increase to parking and traffic on an already heavily traveled 26th Street We are appealing the Planning Commission approval of the escalation of use at the single-family home at 1029 26" Street, just north of Wilshire Blvd. because the expansion proposed adversely impacts our neighborhood and is unsafe. The existing Family Daycare currently serves 12 two- and three-year-olds during a day that ends at 2:45 p.m. The proposed Childcare Center has been approved to expand to 40 children at any given time until 5 p.m. and to hold events at night.

The proposal presented to the Planning Commission was informed by a defective Parking Occupancy count that does not report the full impact of the proposed expansion. City Mobility conducted a count of available parking spaces on the 26'h street location in the morning and in the afternoon ending at 2:45 p.m. They did not count parking at 5 p.m., which is the proposed pickup time for the Childcare Center.

A Santa Monica Police Department neighborhood resource officer told us "26" Street and the traffic circle at Washington Ave. was on our radar because of complaints." No data is available on accidents at that intersection.

Neighbors who attended the July 15 Planning Commission meeting commented that the LLC operator that seeks to expand the business there has not been a good neighbor.

These residents are requesting that the City Council review the defective CUP Findings and Conditions of Approval and reject the proposed expansion.

Please see the attached list of reasons why we object to the Findings and Conditions of Approval in the Planning Commission's Statement of Official Action.

Thank you
Tricia Crane and the Board of Northeast Neighbors on behalf of the residents Attachments: Parking and Loading Operations Plan (PLOP) from Playgroup Preschool Parking Occupancy County by the Dept. of Public Works Mobility Division

APPEAL INFORMATION
These are Our Responses:

Is the appeal related to discretionary action and findings issued for the proposed project that were not addressed by the Planning Commission? Yes

1. The proposed use does NOT comply with applicable single family zoning district
While it is "conditionally allowed" for a CUP to change the use of a single-family home that operates as a Large Family Daycare to be converted to a Child Care and Early Education Facility, this change of use will result in the loss of housing for the person who lives in and runs the family daycare. We oppose this change because it results in the loss of housing. While one unit may seem insignificant it sets a precedent for Council intrusion into residential neighborhoods.

2. The proposed use is INCONSISTENT with the General Plan Converting housing to commercial use in an R1 residential zone conflicts with the City of Santa Monica's commitment to protecting our housing stock (LUCE Goal N.1:

Protect, preserve and enhance the residential neighborhoods.) The CUP should be denied so that the home at 1029 26' Street will remain a residence and continue to function as Family Daycare.

The Planning Commission allowed the conversion of a Family Daycare to a commercial level Early Education Childcare Center and was silent on the significance of this loss of housing. (LUCE Goal N.1: Protect, preserve and enhance the residential neighborhoods.)

3. The parcel is NOT suitable for the proposed land use:

The intensification of commercial activity in this R1 neighborhood located on a major arterial street poses safety issues for access and parking.

The Zoning Ordinance requires four passenger loading spaces for the proposed use, but this project has only one because street parking is needed by neighbors who find it dangerous to back out of driveways into heavy 26'h Street traffic. The home currently being used for Family Daycare does not have sufficient parking space for the increase to 40 children together with the necessary increase in staff. While it has been claimed that one third of the children enrolled in the family daycare walk to school, that means 70% are driven to school.

Safety issues were downplayed by the applicant at the Planning Commission hearing, but the street passenger loading plan referred to as the PLOP (Parking and Loading Operations Plan) proposes an impossible timed drop-off and pick-up regime that treats children like FedEx parcels.

Page 1 ends

of "dwell time" in the loading zone during which a child in a car seat is expected to be extracted by staff. (The PLOP allows for a maximum of five minutes per car for an estimated 20 - 25 vehicles dropping off or picking up children.) The PLOP calls it "valet style," but no one who transports young children who require strapping into car seats and gathering backpacks will find it credible that such timing is possible - or acceptable. How can it be a "plan" to load toddlers into and out of the car in the two minutes? This unrealistic plan should not have been approved by the City's Mobility Division. (See attached)
The PLOP also calls for "approximately 5 staff vehicles" to be parked on nearby neighborhood streets "to reduce congestion directly in front of the site." "Teachers will park east or west of 26th Street on Washington Ave. or on California Ave one block west of campus."
Then there's the plan to use the alley "for loading, unloading, drop-off, or pick up."

4. The proposed use is NOT compatible with any of the present land use 26" Street is a major north/south arterial roadway, and poses safety risks for parents driving children to school who attempt to use the loading zone. According to the Mobility report "The PLOP anticipates approximately 8 to 10 vehicles arriving during each 15- minute morning drop-off interval with approximately 8 to 10 vehicles during each 30- minute afternoon pick-up interval." (See attached). The school plan (See attached) instructs parents and caregivers who cannot access the loading space in front of the facility to not double park, but to try to access the loading zone again by driving north to the roundabout at Washington Ave. and then driving south down 26th to make a second attempt. Given that the facility is on the east side of the street the driver would be required to make a U-turn at Wilshire Blvd to try again to access the one-car loading zone in front of the school. In the meantime, a car in the loading zone must wait for passing traffic. None of this makes sense. It's a hazardous driving scenario. It is, however, the school plan (attached).

5. The proposed use is NOT compatible with permissible land used in the general area
Construction has begun on an 84 ft housing project at the corner of 26t Street and Wilshire, only a block away from the proposed Childcare Center. The housing mix is for one-bedroom and studio apartments. These units are likely to generate street parking because parking will be "unbundled" (residents must pay additional fees to park in the subterranean parking structure.) The project plan includes ground floor retail and a grocery store, which is certain to generate overflow street parking demand and competition for parents trying to park to drop off or pick up their children.

6. The use is NOT compatible with the surrounding neighborhood LUCE Goal N.1 calls for us to "Protect, preserve and enhance the residential neighborhoods." Commercial ventures such as Daycare Centers operating from 8 a.m. to 5 p.m. with cars circling to find their way into the PLOP are intrusions into a residential area. Additional burdens will result from the planned four special events per year and the "evening events directly related to its educational program" that are mentioned in the Conditions of Approval. These intensive commercial activities conflict with residential well-being.

Is the appeal related to Conditions of Approval? Yes

1. The Planning Commission permits the use of the facility until 5 p.m. but has not directed Mobility to look at street conditions at that hour when there is daily bumper to bumper traffic on 26" Street, a heavily traveled north-south corridor. The only restriction given to consideration for neighbors is to agree that after 4 p.m. there will be no "outdoor activity."

2. The plan calls for "special events" to be held "outside the authorized hours" as late as 7:30 p.m. (Conditions of Approval Item 5.) There was no study done by Mobility of the parking conditions at 5 p.m. or for the "special events" to be held "outside the authorized hours" as late as 7:30 p.m. (Conditions of Approval Item 5.) Summary
The Board of Northeast Neighbors requests that the City Council vote to overturn the decision by the Planning Commission to grant a Conditional Use Permit to increase a Family Daycare for 12 children to an Early Childhood Education Center for 40 children with extended hours of operation into the evening.

The busy commercial venue, producing increased noise and hazardous driving patterns, is incompatible with the quality of life of the surrounding residential neighborhood. The access plan for families driving to and from the site is based upon unrealistic driving and drop-off assumptions.

Childcare facilities for young children is an important service, and we ask whether the City has looked at all the existing vacant commercial space currently available, and whether conversion of those spaces for childcare is more appropriate than in residential neighborhoods.

Parking and Loading Operations Plan (PLOP)
The Playgroup Preschool
1029 26th Street
Santa Monica, CA 90403
A. Project Overview
The Playgroup Preschool is a small, play-based early childhood program serving children ages 3-5, with a maximum future enrollment of 40 students. The program is designed to grow • Current enrollment: 11 students (licensed for 12)
• Planned enrollment (Fall 2026): 24 students
• Planned enrollment (Fall 2027): up to 36-40 students
The operational plan below reflects full enrollment conditions, representing the highest anticipated traffic scenario.

This Parking and Loading Operations Plan has been developed to ensure that student drop-off and pick-up activities occur in a safe, efficient, and neighborhood-sensitive manner without queueing, double parking, or disruption to surrounding streets.

B. Transportation Assumptions
• Total enrollment: 40 students
• Estimated non-vehicle arrivals: approximately 25% (10 students) • Estimated vehicle trips: approximately 20-25 vehicles total Average dwell time: approximately 2 minutes per vehicle, with a maximum of 5 minutes The school community is highly local. Many families walk, bike, or park nearby and walk to the site.

Additionally:
3 sibling families anticipated in Fall 2026
At least 6 sibling families anticipated at full enrollment (Fall 2027) 1 of 10
Informal carpooling is common, including shared pick-up among families These factors further reduce vehicle trips.

C. Parking and Curb Availability
• I curbside passenger loading stall is available directly in front of the property during the drop-off and pick-up time windows
6-8 curb spaces are typically available directly in front of the property during morning hours
Approximately 16 total spaces are available in the immediate vicinity, including across the street
• Additional neighborhood parking is consistently available within 1-2 blocks • Parking is available in the neighborhood on California Avenue south of the facility and north of the campus on Washington Ave.
• 3 short-term bicycle parking stalls are available on the driveway Staff Parking:
• One staff vehicle will utilize the driveway
• Remaining staff vehicles (approximately 5) will park on nearby residential streets where permitted to reduce congestion directly in front of the site.

Teachers will park east or west of 26th street on Washington Ave or on California Ave., one block south and west of the campus.

Parking Contingency Plan:

In limited circumstances requiring use of the rear alley access, a vehicle may temporarily utilize the rear alley entrance for loading. unloading, drop-off, or pick-up activities. Such se shall be restricted to situations involving inclement weather, accessibilit ccommodations, or other special circumstances requiring closer access to the facility Any temporary stopping shall be brief in duration and shall not obstruct alley access or circulation. (
D. Passenger Loading Plan
Families will utilize:
available curbside loading space
legal street parking along 26th Street
• nearby residential streets where permitted (along California Ave. and Washington Ave. or 26th Street north of Washington Ave).
public parking where available
Families are encouraged to park legally and walk children to and from the site as needed.

E. Arrival (Drop-Off) Operations
8:30 AM - 9:15 AM (staggered by classroom group):

Time Window Group Students Estimated Vehicles
8:30-8:45 AM S's Program ~12 ~8-10 vehicles
8:45-9:00 AM 4's Program ~14 ~8-10 vehicles
9:00-9:15 AM 3's Program ~14 ~8-10 vehicles
Operational Procedures:

Families are assigned designated arrival windows by classroom group. Families with more than one student enrolled (i.e. one child enrolled in the 3's Program and another enrolled in the 5's Program), can drop-off both students together at the earliest time • Older students arrive earlier, supporting efficient drop-off flow Parents park legally and walk children into the school
• A staff member is positioned outside during arrival to:
assist children exiting vehicles
monitor traffic flow and ensure compliance with procedures • Drop-off is limited to approximately 5 minutes, with typical durations closer to 2 minutes • Early arrivals are discouraged to prevent overlap
Optional Staff-Assisted Drop-Off:

For 4's and 5's programs, a staff-assisted (valet-style) drop-off option is available, allowing staff to receive children at the curb and escort them into the school to further reduce dwell time and maintain traffic flow.

F. Capacity Analysis
Approximately 10 vehicles arrive within each 15-minute interval, equating to:

I vehicle every 90 seconds
With:
• an average dwell time of approximately 2 minutes, and 6-8 available curb spaces at minimum
Multiple vehicles can be accommodated simultaneously without queueing.

Additional nearby parking (approximately 16 spaces in the immediate vicinity) provides further capacity.

G. Departure (Pick-Up) Operations
Staggered dismissal by program:

Time Window Group Students Estimated Vehicles
1:00-1:30 PM 3's Program ~14 ~8-10 vehicles
1:30~2:00 PM 4's Program ~14 ~8-10 vehicles
2:00-2:30 PM 5's Program ~12 ~8-10 vehicles
Operational Procedures:

Families park legally and walk to the outdoor yard area. Families with more than one student enrolled (i.e. one child enrolled in the 3's Program and another enrolled in the 5's Program), will have to pick-up each student separately during their designated dismissal • Teachers bring children out to families
• Families do not enter the building
• Pick-up is limited to approximately 5 minutes
• Staggered scheduling eliminates overlap
4 of 10
H. Unscheduled Arrivals and Departures
If arrivals or departures occur outside designated windows:

Families utilize available legal street parking
No queueing or waiting areas are permitted
• Children are not permitted to arrive before 8:30 AM or remain after 2:30 PM I. Transportation Demand Management
The school actively promotes:

Walking and biking (Biking stall to be installed on property in driveway) • Carpooling and shared pick-up arrangements
• Reduced trips through sibling enrollment
• Use of nearby parking with short walking distances
• A no-idling policy
• Clear communication of procedures to families
J. Queue Lengths and Overflow Management
The school's operations are designed such that no on-site vehicle queue is created. Vehicles are not directed to wait on private property for loading access. Instead, families utilize available legal curbside or street parking and proceed to the site on foot.

Due to the nature of 26th Street, it is not safe or appropriate for vehicles to wait in the travel lane for an available space. Accordingly. families are explicitly instructed that queueing or holding in the roadway is not permitted under any circumstances.

Maximum Queue Length:

The anticipated maximum on-site queue length is zero vehicles, as no stacking or waiting line is permitted.

Operational Controls to Prevent Queueing:

Families are explicitly instructed not to queue or wait in the travel lane A staff member is stationed at the sidewalk during arrival and dismissal to:
monitor traffic flow
ensure compliance with procedures
assist with efficient loading and unloading
• If curb spaces directly in front of the site are temporarily occupied, families are instructed to:
circle the block and return, rather than wait
utilize additional available parking nearby
use the Washington Avenue and 26th Street roundabout to safely circulate, or continue along Washington Avenue to locate available parking before walking to the school.

Overflow Management:
• Families will utilize additional parking across the street or on nearby residential streets where permitted
• Families are accustomed to parking within 1-2 blocks and walking to the site • Staff support efficient transitions to maintain turnover of curb spaces • Early arrivals are discouraged to prevent overlap
• Staff-assisted drop-off may implemented for older students (4's and 5's programs) to further reduce dwell time if needed
With approximately 16 parking spaces available in the immediate vicinity, overflow demand can be accommodated without formation of queues in the public right-of-way or impact to adjacent intersections.

K. Staff Management and Active Curbside Operations
During peak times, three staff members are stationed outside:
• Curbside Staff (Valet Support)
• Gate Staff
• Front Entry Staff
Staff rotate positions to ensure continuous flow and no delays. • Staff use walkie-talkies for coordination
Optional valet drop-off for 4's and 5's improves efficiency Staff actively enforce rules:

No double parking
No illegal stopping
No blocking driveways
• No queueing
Staff will immediately direct vehicles to move or circle if needed and may call the Director for support.

Staff also enforce no jaywalking across 26th Street.

L. Queue Lengths and Overflow Management
No queueing is permitted.

Due to the nature of 26th Street, vehicles may not wait in the travel lane.

Maximum Queue Length: 0 vehicles
If no space is available:
• Families circle the block
• Use the Washington & 26th roundabout
• Park nearby and walk
Overflow is absorbed by ~16 nearby spaces and neighborhood parking.

M. Contingency Provisions
The school has established contingency procedures to address peak or atypical conditions, including inclement weather, special events, or other circumstances that may temporarily increase demand beyond typical daily operations. These procedures are designed to maintain safe, efficient operations and minimize impacts to surrounding streets.

Inclement Weather (Rain or Adverse Conditions):

Staff implement a staff-assisted loading protocol, in which:
children are escorted individually to waiting vehicles
staff assist with safe entry into vehicles, including helping with buckling when appropriate
• This approach minimizes the time families spend outside vehicles and reduces curbside dwell time
Special Events (e.g., Graduation or School Celebrations):
• School events that generate higher attendance are:
scheduled outside of peak drop-off and pick-up windows
typically held mid-morning (e.g., 10:30 AM or 11:00 AM) to avoid traffic conflicts
• only graduate one class of 12 students at a time
• Families are advised in advance to:
• utilize neighborhood parking
allow additional time for arrival and walking
Based on prior experience, adequate parking has been available within the surrounding neighborhood, with increased walking distances but no operational conflicts Early Dismissals:
• The school does not schedule early dismissals during the year • All pick-up continues to occur within the established 30-minute staggered windows, maintaining consistency and predictability
Operational Flexibility:
• Staff are trained to adapt procedures in real time based on conditions • Additional staff support may be deployed outdoors during higher-demand periods, we have 1 additional staff members inside ready to assist outdoors if needed.

Families receive advance communication when adjustments are needed N. Communication of PLOP Requirements
AIl PLOP procedures and expectations are clearly communicated to families through multiple channels:

Parent handbook
• Orientation meeting
• Email reminders and periodic updates
• On-site staff direction during arrival and dismissal
These communications emphasize:
no queueing or waiting in the travel lane
adherence to assigned arrival and pick-up windows
• efficient drop-off and pick-up procedures
compliance with staff direction at all times
O. Parental Compliance and Enforcement
The school utilizes a progressive enforcement approach to ensure adherence to PLOP procedures:

1. Initial Warning
Staff provide a real-time reminder and clarify expectations Second Instance - Financial Penalty
A $15 noncompliance fee is issued
Ongoing Noncompliance
Additional corrective measures may be implemented, including:
required modification of drop-off/pick-up procedures (e.g., mandatory park-and-walk)
scheduling adjustments
• direct communication with the Director
Pick-Up Time Compliance
Families are expected to arrive within their assigned pick-up window • A $15 late pick-up fee will be applied if families arrive outside their designated window • Continued late arrivals will be addressed through the progressive enforcement process described above
9 of 10
Incentives to Reduce Vehicle Trips
The school actively encourages reduced vehicle usage through the following incentives:

A 5% tuition discount is offered to families who enter into an agreement to walk, bike, or carpool to the facility at least three days per week
• Priority enrollment consideration is given to families residing within ½ mile of the facility
These measures support reduced traffic generation and align with the City's sustainability and mobility goals.

P. Conclusion
Based on staggered scheduling, low vehicle volumes, short dwell times, active staff management, and ample parking availability, the proposed drop-off and pick-up operations can be accommodated without queueing, double parking, or adverse impacts to surrounding streets.

Trip demand is further reduced through sibling families and informal carpooling practices within the school community.

The Playgroup Preschool is committed to ongoing monitoring and management of pick-up and drop-off operations to ensure continued safety and efficiency. The school will observe operations regularly and, upon request, will provide updates to the City regarding traffic flow and curbside conditions.

If operations are observed to result in queueing, unsafe conditions, or impacts to the public right- of-way, the school will work collaboratively with the City to implement appropriate adjustments.

The school acknowledges that the City may require modifications to this Parking and Loading Operations Plan to address any such conditions.

Through proactive management, clear communication, and a willingness to adapt as needed, the Playgroup Preschool is committed to maintaining operations that are safe, efficient, and compatible with the surrounding neighborhood.

I0 of 10
Department of Public Works City of
Mobility Divsion Santa
July 13, 2026 Monica
Re: 1029 26th Street Childcare & Early Education Facility Parking Occupancy Counts Methodology and Findings
The proposed project at 1029 26th Street would convert the existing Family Day Care use to a Child Care and Early Education Facility with a maximum enrollment of 40 children. The proposed change of use is subject to the passenger loading requirements of Santa Monica Municipal Code (SMMC) Section 9.28.080, which would otherwise require four passenger loading spaces for the proposed use.

Pursuant to SMMC Section 9.28.080(C), the Director may approve a Parking and Loading Operations Plan (PLOP) that results in a waiver or reduction of the number or dimensions of otherwise required loading spaces. In considering such a waiver or reduction, the Director must consider existing site conditions and whether the abutting rights-of-way can accommodate loading without disruption to traffic circulation, public health and safety services, and public infrastructure and utilities.

Because the project site cannot accommodate the required passenger loading spaces on-site, the applicant has proposed a PLOP that relies on a passenger loading zone along the project frontage, other available parking on 26th Street, and supplemental parking on nearby Washington and California Avenues. The following parking occupancy analysis was conducted to evaluate observed parking availability in relation to the applicant's projected pick-up and drop-off demand and to inform the City's review of the proposed PLOP.

Parking Occupancy Counts Methodology and Findings
The Mobility Division conducted parking occupancy counts on April 23, 2026, and May 20, 2026, during time periods encompassing the student arrival and departure periods identified in the applicant's PLOP. Prior to conducting the counts, staff evaluated the available curb space on 26th Street between Washington Avenue and California Avenue and identified approximately 40 legal on-street parking spaces after accounting for driveways, red curbs, and other areas where parking is prohibited. The counts were conducted on two typical weekdays when no known unusual conditions were present that would materially affect parking availability. 1o3
1685 Main St - Mail Stop #38, Santa Monica, CA 90401 • (310) 458-2201 santamonica.gov • ® @cityofsantamonica • O@santamonicacity During each count period, staff surveyed parking conditions at 15-minute intervals and recorded the number of available parking spaces. Counts were conducted between 8:00 a.m. and 10:00 a.m. and between 1:00 p.m. and 3:00 p.m. Parking conditions on nearby Washington and California Avenues were also observed, but formal parking occupancy counts were not conducted on those streets. These observations were used to assess the general availability of supplemental parking within walking distance of the site. The results of the 26th Street parking counts are summarized in the charts below.

Staff compared the observed parking availability with the applicant's projected pick-up and drop-off activity at full enroltment. The PLOP anticipates approximately 8 to 10 vehicles arriving during each 15-minute morning drop-off interval and approximately 8 to 10 vehicles during each 30-minute afternoon pick-up interval.

The analysis also considered the proposed passenger loading zone along the project frontage and other available parking on 26th Street, with Washington and California Avenues serving as additional parking resources.

As a conservative comparison, staff evaluated whether 26th Street alone had sufficient available parking to accommodate all 8 to 10 anticipated vehicles simultaneously, without accounting for parking turnover during each arrival or departure interval. Of the 22 observations conducted during the PLOP's proposed arrival and departure periods, at least eight parking spaces were available during 14 observations, and at least 10 spaces were available during 11 observations. These results demonstrate that 26th Street alone had sufficient immediately available parking to accommodate the applicant's full projected demand during many of the observed periods, even under the conservative assumption that all vehicles would require parking simultaneously. During periods of more limited availability, parking turnover would allow available spaces to accommodate additional vehicles over the course of each interval, while the proposed passenger loading zone and supplemental parking on nearby streets would provide additional parking resources for pick-up and drop-off activity. As additional context, the Zoning Ordinance would otherwise require four passenger loading spaces for the proposed use, whereas staff's analysis evaluates the availability of parking to accommodate the applicant's projected arrival and departure demand.
dof 3
1685 Main St - Mail Stop #38, Santa Monica, CA 90401 • (310) 458-2201 santamonica.gov • ® @cityofsantamonica • O @santamonicacity 1029 26th Street Parking Utilization Counts
AM Parking Utilization Along 26th Street
Between Washington Avenue and California Avenue
100% 38
35 35 35 35 35
50% 33
32 80% 30
26 27
70% 26
ім й
60%
50%
40%
30%
20%
10%6
0%
8am 8:15am 8:30am 8:45am 9am 9:15am 9:30am 9:45am
• AM Parking Utilization 4/23 I AM Parking Utilization 5/20 Total Parking = 40 PM Parking Utilization Along 26th Street
100% Between Washington Avenue and California Avenue
90%
80% 31
29 70% 27 F 27 27 27 27
26 26
50%
50% 19
40%
30%
20%
10%
00%
1pm 1:15pm 1:30pm 1:450m 2pm 2:15pm 2:45pm
• AM Parking Utilization 4/23 • AM Parking Utilization 5/20 Total Parking = 40 3 А 3

← All documents from this meeting