2. Fences and trellises should be made of finished wood, vinyl, or wrought iron. Wrought iron fences should
have iron posts and/or brick or stone piers.

B. Configurations

1. Garden walls cannot be less than six inches wide and capped by a top, overlapping the wall below by not
less than 1/2-inch on each side. Exceptions to this
requirement may be allowed in accordance with the
Development Plan Review process (see Section 4.9.3).

Legend
Frontage Setback Area.

Primary Street
Side Street
Alley (where present)
Corner
Lot
Interior
Lot
15 ft. min.
2 ft. min.

Figure 6-6: Fence Height and Placement
Primary
Building
Primary
Building
Figure 6-5: Storefront Configurations
A
B
C
E D E
A Entablature may consist of architrave, frieze and cornice.

B Transom windows may be equally divided and consistent across the facade.

C Shopfront windows may be equal in size and recessed a minimum of 2 inches from stucco, masonry or wood piers as adjacent materials.

D Base panels or bulkhead should not exceed 24 inches in height.

E Pier bases may align with horizontal elements on the
shopfront, such as sills.

A Header may either be 4 or 5 brick course high, and project out 1 inch from face of the building.

B Transom windows may be equally divided and consistent across the facade.

C Shopfront windows may be equal in size and recessed a minimum of 2 inches from stucco, masonry or wood piers as adjacent materials.

D Base panels or bulkhead cannot exceed 24 inches in height.

E The brick mould may be equal at the top and sides, with interior divisions of equal to or twice the size of the sides.

A
B
C
E D
Stucco or Masonry Storefront
Wood Storefront
562
East Area 1 Specific Plan
Santa Paula, California

6. Design Guidelines
6-30

6.4 Architectural Design Guidelines

2. Wood and vinyl fences and gates on Frontages may
be constructed with vertical pickets or lattice with
no more than 3-inch gaps in between. Wrought iron
fences and gates may be made of wrought iron, or
steel bar that faithfully simulates true wrought iron,
with bars with no less than a four-inch space between.

3. Fences built parallel to the frontage between houses or other structures should be set back a minimum
two feet behind the facade line, except walls that
are an integral part of the architecture of the house,
which may be flush with the facade or set back from
it as approved through the Development Plan Review
process (see Figure 6-6).

4. Wood and vinyl fences at interior side and rear
property lines should provide fronts to both sides
of the property line (“good neighbor fencing”), for
example by alternating members from one side of the
fence to the other.

5. Retaining walls within the frontage setback area
- and to the line of the side yard enclosing fence or
wall - may be made of slumpstone block or clad in
materials as specified in these Architectural Design
Guidelines. Retaining walls behind the fence line and
substantially obscured from views from the public
way may be relieved of this requirement.

6. Parking, utilities, trash receptacles and similar service functions and equipment should be screened from
public view by opaque walls or fences meeting the
requirements of this EA1SP.

8. Trash receptacles should be screened from public view by opaque walls or fences meeting the requirements
of these Guidelines and City regulations.

9. Fence and Wall Height:
a. Fences and garden walls within frontage setback
areas may be between 30 inches and 42 inches
high (see Figure 6-6). The frontage setback area is
defined as the front yard area within the Primary
Street setback. For corner lots, the frontage
setback area also includes the area between the
Primary Building, the Side Street property line,
and a distance of fifteen (15) feet behind the
Primary Street facing facade line
b. Rear yard and side yard fences and garden walls
behind the frontage setback area may be up to 6
feet high (see Figure 6-6).
c. Retaining walls along Primary Street and Side
Street frontages may be up to three feet high, as
approved through the Development Plan Review
process (see Section 4.9.3).
d. Parking lots that abut and/or are visible from
street views should be screened by a wall or fence
36” to 48” in height, enhanced with landscaping.

6.4.8 Signage
A. Sign design. The following design criteria should be used in reviewing the design of individual signs. Substantial conformance, as determined by the Director, with each
of the following design criteria is required before a sign permit or Building Permit can be approved.

1. Color. Colors on signs and structural members
may be harmonious with one another and relate
to the dominant colors of the buildings on the site.

Contrasting colors may be utilized if the overall effect of the sign is still compatible with building colors.

2. Design and construction.
a. Except for banners, flags, temporary signs, and
temporary window signs conforming with the
requirements of this section, each sign may be
constructed of permanent materials and may be
permanently attached to the ground, a building,
or another structure by direct attachment to a
rigid wall, frame, or structure.
b. Each permanent sign may be designed by a
professional (e.g., architect, building designer,
landscape architect, interior designer, or
others whose principal business is the design,
manufacture, or sale of signs), or who is capable
of producing professional results.
563
City of Santa Paula
March 2024
6-31

6. Design Guidelines

6.4 Architectural Design Guidelines
c. Each permanent sign may be constructed by
persons whose principal business is building
construction or a related trade including sign
manufacturing and installation, or others capable
of producing professional results. The intent is
to ensure public safety, achieve signs of careful
construction, with neat and readable copy, and
durability, to reduce maintenance costs and
prevent dilapidation.

3. Materials and structure.
a. Sign materials (including framing and supports)
may be representative of the type and scale
of materials used on the site where the sign is
located. Sign materials may match those used on
the building(s) on site and any other signs on the
site.
b. Signs should not include reflective material.
c. Materials for permanent signs may be durable
and capable of withstanding weathering over the
life of the sign with reasonable maintenance.
d. The size of the structural members (e.g. columns,
crossbeams, and braces) may be proportional to
the sign panel they are supporting.

4. Street address. The Fire Chief or Director may require that a sign include the street address of the site,
where it determines that public safety and emergency
vehicle response would be more effectively served
than if the street address were displayed solely on one or more buildings on the site.

5. Copy design guidelines. The Planning Department
does not regulate the message content (copy) of signs.

However, the following principles of copy design
and layout are identified to enhance the readability
and attractiveness of signs. Copy design and layout
should be reviewed by Planning for consistency with
these principles.
a. Sign copy relates only to the name and/or nature
of the business or commercial center.

Examples of projecting signs
564
East Area 1 Specific Plan
Santa Paula, California

6. Design Guidelines
6-32

6.4 Architectural Design Guidelines
b. Copy is conveyed briefly or by logo, symbol, or
other graphic manner to increase the readability
of the sign and thereby enhance the identity of
the business.
c. The area of letters or symbols does not exceed 40
percent of the background area in commercial
districts or 60 percent in residential districts.
d. Freestanding signs contain the street address of
the parcel or the range of addresses for a multitenant center.

6. Sign lighting. Sign lighting may be designed to
minimize light and glare on surrounding rights-ofway and properties. a. External light sources should be directed and
shielded so that they do not produce glare off the
site, on any object other than the sign.
b. Sign lighting should not blink, flash, flutter, or
change light intensity, brightness, or color.
c. Colored lights should not be used at a location or
in a manner so as to be confused or construed as
traffic control devices.
d. Neither the direct nor reflected light from
primary light sources should create hazards for
pedestrians or operators of motor vehicles.
e. For energy conservation, light sources may be
hard-wired fluorescent or compact fluorescent
lamps, or other lighting technology that is of
equal or greater energy efficiency. Incandescent
lamps are prohibited.

B. Sign maintenance.

1. Each sign and supporting hardware, including
temporary signs and awning signs, may be maintained
in good repair and functioning properly at all times.

Any damage to a sign or its illumination, including the failure of illumination may be repaired within 14 days
from the date of damage or failure.

2. A repair to a sign may be of materials and design of equal or better quality as the original sign.

3. When an existing sign is removed or replaced, all
brackets, poles, and other supports that are no longer
required may be removed.

C. Sign Guidelines by Zone. Signs are allowed within the Neighborhood (N), Hallock Center (HC) and Civic District (CD) zones. Each sign may comply with the guidelines
provided in Table 6-1.
565
City of Santa Paula
March 2024
6-33

6. Design Guidelines
Allowed Sign Types Maximum Sign Height Maximum Number of Signs Allowed per Parcel
Maximum Sign Area
Allowed per Parcel Notes
Wall or freestanding Wall signs: below edge of
roof; Freestanding: 48 in.
1 of either allowed type per
entrance or street frontage 12 sf each; 24 sf total all signs Allowed Sign Types Maximum Sign Height Maximum Number
of Signs Maximum Sign Area Notes
Awning
Should be entirely on awning
valence; lettering max 66%
of valence height; valence
height max 18 inches.
1 sign max per each separate
awning valence.
50% of the area of the
valence front.

Projecting or
Suspended
16 inches.

Bottom of sign should be no
closer than 8 ft above sidewalk surface below.
1 sign allowed per business
frontage with pedestrian
entrance
6 sf
No dimension greater than
3 ft
Sign may be redwood
sandblasted, hand carved,
or architecturally designed
equivalent.

Wall
2 ft below parapet or eave.

Individual letters 18 inches;
1 sign allowed per business
frontage with pedestrian
entrance.
1 sf per lf of primary business
frontage
Side street or rear entrance
wall sign max 50% of the primary sign area.

Mounting 1-story: above 1st
floor windows
Mounting multi-story:
between windows
Window - Permanent Within window area 1 sign allowed per window 15% of total window area.

Window - Temporary Within window area
1 sign allowed per window
(in addition to Permanent
Window sign, if exists)
25% of total window area.

Allowed for display a maximum of 15 days at 1 time,
up to 3 times in 12-month
period.

Non-Residential
Table 6-1: Sign Guidelines
Residential
Example of a wall mounted sign
Examples of window signs
This page intentionally left blank.

6.4 Architectural Design Guidelines
566
East Area 1 Specific Plan
Santa Paula, California

6. Design Guidelines
6-34
This page intentionally left blank.
567

APPENDIX A
Approved Administrative Modifications
568
This page intentionally left blank.
569
Modification Date Section Comments / Actions
(1) Revise bridge cross section
and extend Class I Bike Lane East
of Bridge
4/7/2016 SP - 5.6.7
Public Works Approved the extension of the Bike Lane with crossing to the park at Park Loop Rd (Now Harvest Loop) 6’ walkway on the north side, two (2) 15’ travel lanes, and a 12’ class I bike lane on the south side of the bridge, for a total ROW of 48’ to meet with existing City & County bike lanes. (2) Haun Creek Drive (Now
Autumn Path Lane) Cross Section
Revisions. Also street changed
from public street to private
street
4/7/2016 SP - 5.6.10 Tree Wells to be used in lieu of tree planters in gravel shoulders. Multi-Use Trail will now be curb adjacent. Trees within Haun Creek Linear Park will be located in back of multiuse trail with minimum spacing of 75' on center. The street was also changed to a cul-de-sac with no connection to
Foothill Collector.
(3) A portion of Palm Lane (Now
Limoneira Lane) was changed
from a public street to a private
street.
4/7/2016 SP - 5.6.11 Palm Lane, from Haun Creek Drive to Park Blocks was change to a private street.
(4) Hallock Parkway Right-ofWay Width and Cross Section Revision
6/23/2016 SP - 5.6.5 Curb adjacent parking eliminated. Right-of-Way reduced from 120' to 104'. Cross Section is now 16' median, 30 travel lanes, 8' parkways, 6' sidewalks.
(5) Neighborhood Streetlight
Spacing
8/23/2016 SP - 5.6.19 Spacing will be determined by photometric study to be reviewed and approved by Public Works Department
(6) Water reservoir locations,
size and types were modified.

SP - 3.3 The 3MG tank will now be a pre-stressed concrete structure which will be partially buried. The 2 MG reservoir was
reduced to 1.5 MG and the location was moved to northwest of the 3MG reservior due to geologic constraints.
(7) Roundabout Harvest
Loop/Santa Paula Street
2/23/2017 SP - 5.6.10 10'-12' min
parkway 5.6.15 8' min
parkway 5.6.17 Trail II
For peds/bikes to allow for a 12’ trail, expansion from 10' trail. 8’ parkway at roundabout, 10'-12' parkway down to Santa Paula Street will be amended to be 8'.
(8) Street Light Standard 2/23/2017 SP - 5.6.19 Where street lights required to be placed in areas that will be altered with future development in the near future, standard street lights will be placed on Telegraph Road in lieu of Nostalgic Street light poles as required in the Specific Plan. (9) Hallock Drive Cross Section
Change
9/7/2017 SP - 5.6.5 Amend to 4'-8" parkway, 5' sidewalk, and 1'-2" planter for vines from 4'x4' tree wells and 14' walkways
(10) Cluster Product Drive
Approach
2/1/2018 SP - 6.2.1.4 Public Works Approves a 24' Drive Approach for cluster product.

ADMINISTRATIVE MODIFICATIONS
APPROVED THROUGH FEBRUARY 2018
8/23/2016
570
65283.00302\42105360.1

EXHIBIT B
General Plan Amendments. City Council approves the following amendments to the 2040 General Plan.

A. The introductory paragraphs under subheading ”Specific Plans” and the description of the “SP-3 East Area 1 Specific Plan” on Page 2-32 of the Land Use Element of the 2040 General Plan is amended as follows (where stricken text denotes deletions, and underlined text additions):
“Specific Plans and Expansion Areas
Specific Plans
A specific plan is a regulatory tool that local governments use to guide development in a localized area and to systematically implement the General Plan.

Specific plans contain detailed development standards, distribution of land uses, infrastructure requirements, and implementation measures for the development of a specific geographic area.

The City requires specific plans for all expansion areas prior to development, except for annexations of minor acreage within areas that are already substantially developed. Details regarding siting, design, infrastructure, provision of open space, and financing are established through the specific plans. Each specific plan must address locations for land uses identified by the Land Use Element, as well as mitigation of environmental impacts and design standards for new development.

As of 2019 2024 the following specific plans have been adopted. The locations of these specific plans are shown in Figure 2-1 (page 2-20). Development regulations for these areas are established within each specific plan as summarized below.

SP-3 East Area 1 Specific Plan. East Area 1 encompasses approximately 501 acres located east of Santa Paula Creek, west of Haun/Orcutt Creeks, south of the Topatopa Mountains, and north of Telegraph Road. At buildout, the Specific Plan anticipates 1,500 2,050 residential units, 25,000 square feet of light industrial, 215,000 10,000 square feet of commercial, and 20.2 8.3 acres of institutional uses.

Public facilities to be provided include a police substation, an elementary school, a high school, and a post-secondary institution/community college. These 8.3 acres are set aside as a site for school facilities for use by the Santa Paula Unified School District. A total of 225.3 acres of open space will also be provided, including agricultural preserve, open space preserve, parks/greenways and public athletic fields.6”
571
65283.00302\42105360.1
B. Footnote 6 on Page 2-32 of the Land Use Element of the 2040 General Plan is amended as follows (where stricken text denotes deletions, and underlined text additions):
“6 East Area 1 Specific Plan, Table 2-1 (January 2015 February 2024)” C. The second to the last paragraph of Subsection 1, Overview, of Section E, Education, on page 6-13 of the Public Services and Utilities Element of the 2040 General Plan is amended as follows (where stricken text denotes deletions, and underlined text additions):
“The East Area 1 Specific Plan identifies a site for a K-8 school centrally located in the Specific Plan area. The Specific Plan also designates land in the Civic District for additional high school facilities. The high school site adjoins planned public athletic fields. The East Area 1 Specific Plan identifies a site for a future Santa Paula Unified School District facility centrally located in the Specific Plan area.

Under California law, public school districts are independent of city governments; however, cooperation between school districts and cities is required in the planning, design and construction of new schools, school facilities, major additions to existing school facilities, and recreation and park facilities in the community.” 572
11661 San Vicente Boulevard Suite 306
Los Angeles, California 90049
310.820.2680, 310.820.8341 fax
www.stanleyrhoffman.co
Memorandum
To: David Lauletta, Vice President - Regional Planned Communities Lewis Management Corporation
From: Bravish Mallavarapu, Director and Principal Economist Date: June 30, 2023
Subject: Harvest at Limoneira Projected Fiscal Impacts and Assumptions SRHA Job No.: 1391
This memorandum is an update to the analysis prepared previously in March 2022 presenting the projected fiscal impacts to the City of Santa Paula for Harvest at Limoneira and the assumptions for the projected impacts. Harvest at Limoneira includes the combined annexed areas formerly known as East Area 1 and Santa Paula Gateway Project (East Area 2). The following fiscal analysis is based on the current land use phasing for Harvest at Limoneira and a new 35-acre sports park.

Fiscal Impacts
Table 1 summarizes the projected cumulative fiscal impacts to the City for Harvest at Limoneira. Table 1 also includes estimated net new street maintenance costs; as well as the projected net City benefits when these new obligations are subtracted from the projected surplus for Harvest at Limoneira. Based on the current development agreement, it is assumed that approximately two-thirds of the sports park maintenance costs would be borne by the city with the balance by the School District. Compared to the 2016 study, the study area has undergone a major reallocation of property tax revenues, with the City General Fund share decreasing from 16.06% to 3.84% of the 1% property tax, while a newly created allocation for the Ventura County Fire District now receives 14.44% share of the 1 percent property tax.

Table 1
Summary of Phased Projected Fiscal Impacts
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
1 2 3 4 5 6 7 7-Year Total
Category 2023 2024 2025 2026 2027 2028 2029 Undiscounted A. HARVEST AT LIMONEIRA GENERAL FUND CUMULATIVE FISCAL IMPACTS Recurring Revenues $970,821 $1,184,109 $2,316,050 $3,287,003 $3,879,684 $4,317,370 $4,725,025 $20,680,062 Recurring Costs 682,513 842,046 1,197,989 1,871,065 2,347,138 2,729,422 3,019,280 $12,689,455 GENERAL FUND CUMULATIVE SURPLUS (CS) $288,307 $342,062 $1,118,061 $1,415,938 $1,532,546 $1,587,948 $1,705,745 $7,990,607 General Fund Revenue to Cost Ratio 1.42 1.41 1.93 1.76 1.65 1.58 1.56 Cumulative Housing Units 586 707 957 1,557 1,855 2,109 2,348 Cumulative Non-Residential Square Feet 0 0 130,000 461,560 461,560 461,560 461,560 MINUS
B. NET NEW CITY CUMULATIVE FISCAL OBLIGATIONS
Two-Thirds of New Sports Park Maintenance $0 $0 $608,653 $608,653 $608,653 $608,653 $608,653 $3,043,265 New Street Maintenance Obligation (net Gas Tax) 63,022 52,630 58,564 29,073 1,020 (20,794) (41,320) $142,196 LESS CFD No. I IA-A Special Tax B @ $93 per unit (54,498) (65,751) (89,001) (121,551) (144,801) (168,423) (190,650) (834,675) TOTAL NET NEW CITY CUMULATIVE OBLIGATIONS (CO) $8,524 ($13,121) $578,216 $516,175 $464,872 $419,436 $376,683 $2,350,786 EQUALS
C. NET CITY CUMULATIVE FISCAL BENEFIT (CS-CO) $279,783 $355,183 $539,845 $899,763 $1,067,674 $1,168,512 $1,329,062 $5,639,821 D. VENUTRA COUNTY FIRE DISTRICT
Property Tax (14.4 % of 1% Property Tax) $575,602 $694,455 $1,053,073 $1,592,954 $1,928,684 $2,173,015 $2,399,257 $10,417,040 Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Adopted Revenue and Expenditure Report, Fiscal Year 2022-2023 Lewis Management Companny
573
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 2 of 19 ends

Harvest at Limoneira General Fund Cumulative Fiscal Impacts. As shown in Panel A of Table 1, a recurring surplus to the City General Fund is projected for all years of development and after buildout of the Harvest at Limoneira project. The Year 1 surplus of about $288,307 increases to the projected surplus of about $1.705 million at buildout in Year 7. The total projected cumulative surpluses over the 7-Year period are about $7.99 million in undiscounted dollars. This updated analysis does not include the property tax revenues foregone by the City General Fund now accruing to the Ventura County Fire District, and therefore, also does not include fire services costs.

Net New City Cumulative City Fiscal Obligations. Panel B of Table 1 presents the City’s projected annual obligations for approximately two-thirds share of operations and maintenance costs for the new sports park in Harvest at Limoneira, the City’s net new obligation for public street maintenance offset by projected state gasoline tax from the project, and net revenues collected by the City from CFD No. I IA-A Special Tax B used for landscape maintenance, tree maintenance, streetlights, and catch basins.

Accounting for the above, City net new obligations are projected at $8,524 in Year 1 and increase to $376,683 at buildout. The total City net new obligations over the 7-Year period are projected at about $2.35 million in undiscounted dollars. This accounts for $834,675 in CFD revenues over this period.

In Year 3, with the City’s approximately two-thirds O&M cost share of the new sports park (or about

23.33 acres), the City’s sports park obligation is estimated at $608,653 for the remainder of the 7-Year period. The total City obligations over the 7-Year period for the sports park are projected at about $3.04 million in 2023 undiscounted dollars. According to the project development agreement, the sports park is the joint responsibility between the City and School District, and therefore the balance one-third of sports park O&M costs are borne by the School District.

Net annual street maintenance costs are estimated at $63,022 in Year 1 and continue to decline over the 7-year period as the State Gas tax increases constantly with population growth, and offsets increasing portions of these street maintenance costs. Gas tax offsets these costs completely after Year

5. Cumulatively, net City obligations for street maintenance over the 7-year period are projected at about $142,196 in undiscounted 2023 dollars.

Net City Cumulative Fiscal Benefit: As shown in Panel C of Table 1, when the Harvest at Limoneira revenue surplus is matched against the City obligations, net City benefits are projected throughout the development-period and at buildout. The lowered share of City General Fund property tax revenue from tax rate area (TRA) reallocations between the City and the Ventura County Fire District since 2016, has the effect of reducing overall property tax revenues relative to projected development-related costs. The net benefits increase from $279,783 in Year 1 to $1.33 million at buildout. The total net City benefit over the 7-year period is projected at $5.64 million in undiscounted dollars.

Ventura County Fire District: As shown in Panel D of Table 1, a large portion of the property tax revenues previously going to the City General Fund prior to the TRA reallocations now accrues to the Ventura County Fire District. These revenues increase from about $575,602 in Year 1 to $2.34 million by Year 7 for a cumulative 7-year total of $10.42 million in undiscounted dollars.

Detailed Fiscal Impacts. Table 2 presents the detailed projected cumulative fiscal impacts to the City General Fund, the new City cumulative fiscal obligations and the net City cumulative fiscal benefit of Harvest at Limoneira.
574
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 3 of 19 ends

Table 2
Detailed Projected Phased Fiscal Impacts
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
1 2 3 4 5 6 7 Percent of
Category 2023 2024 2025 2026 2027 2028 2029 Buildout
A. HARVEST AT LIMONEIRA GENERAL FUND CUMULATIVE FISCAL IMPACTS General Fund Annual Recurring Revenues
Property Tax $153,008 $184,602 $279,931 $423,443 $512,688 $577,637 $637,777 13.5% Residential Property Transfer Tax:

Initial Sale 404 1,358 3,362 4,526 3,835 2,791 2,584 0.1% Turnover 6,575 7,933 11,295 15,821 19,656 22,447 25,031 0.5% Property Tax in Lieu of VLF 1 453,523 559,127 849,207 1,328,905 1,627,209 1,844,303 2,045,325 43.3% Retail Sales and Use Tax (On-Site and Off-Site) 109,037 131,552 447,568 582,842 646,440 692,724 735,581 15.6% Non-Retail Sales and Use Tax 0 0 0 0 0 0 0 0.0%
Franchise Fee Tax 52,327 63,132 87,817 130,209 159,376 182,057 203,399 4.3% Transient Occupancy Tax 0 0 306,600 306,600 306,600 306,600 306,600 6.5% Business License Tax 0 0 3,413 16,959 16,959 16,959 16,959 0.4% Animal Licenses 935 1,129 1,517 2,065 2,586 2,992 3,373 0.1% Fines and Forfeitures 6,081 7,337 10,206 15,132 18,522 21,158 23,638 0.5% Rents and Concessions 12,048 14,536 19,540 26,600 33,316 38,538 43,452 0.9% Other Revenue from Other Agencies 22,244 26,837 36,076 49,111 61,510 71,151 80,223 1.7% Charges for Recurring Services 59,628 71,940 100,069 148,375 181,611 207,457 231,776 4.9% Other Revenues 1,957 2,361 3,285 4,871 5,962 6,810 7,608 0.2% Overhead Transfers In 93,052 112,266 156,163 231,546 283,414 323,748 361,699 7.7% Total Recurring Revenues $970,821 $1,184,109 $2,316,050 $3,287,003 $3,879,684 $4,317,370 $4,725,025 100.0% General Fund Annual Recurring Costs
General Government $149,716 $184,711 $262,791 $410,437 $514,868 $598,726 $662,309 21.9% Police 435,833 525,826 731,431 1,084,506 1,327,442 1,516,352 1,694,107 56.1% Fire 2 0 0 0 0 0 0 0 0.0%
Buildings and Grounds Maintenance 51,226 61,804 85,970 127,470 156,024 178,227 199,120 6.6% Street Maintenance 4,534 4,534 5,607 5,607 5,607 5,607 5,607 0.2% Other Public Works 35,073 42,316 58,861 87,275 106,825 122,028 136,332 4.5% Neighborhood Parks Maintenance 0 0 0 55,800 111,600 167,400 167,400 5.5% Building & Safety 0 0 0 0 0 0 0 0.0%
Planning 2,250 9,814 27,095 56,771 77,190 93,068 108,008 3.6% Community Services 3,880 13,042 26,233 43,199 47,582 48,013 46,396 1.5% Total Recurring Costs $682,513 $842,046 $1,197,989 $1,871,065 $2,347,138 $2,729,422 $3,019,280 100.0% 7-Year Total
HARVEST AT LIMONEIRA Undiscounted
GENERAL FUND CUMULATIVE SURPLUS (CS) $288,307 $342,062 $1,118,061 $1,415,938 $1,532,546 $1,587,948 $1,705,745 $7,990,607 GENERAL FUND REVENUE TO COST RATIO 1.42 1.41 1.93 1.76 1.65 1.58 1.56 Cumulative Housing Units 586 707 957 1,557 1,855 2,109 2,348 Cumulative Non-Residential Square Feet 0 0 130,000 461,560 461,560 461,560 461,560 MINUS 7-Year Total
B. NEW CITY CUMULATIVE FISCAL OBLIGATIONS Undiscounted
Two-Thirds of New Sports Park Maintenance 3 $0 $0 $608,653 $608,653 $608,653 $608,653 $608,653 $3,043,265 plus
New Net Street Maintenance Costs
Street Maintenance Costs 4 $113,349 $113,349 $140,186 $140,186 $140,186 $140,186 $140,186 $927,629 (LESS) State Gasoline Tax Revenue 5 ($50,327) ($60,719) ($81,622) ($111,113) ($139,166) ($160,980) ($181,506) ($785,433) Net New Street Maintenance Obligation $63,022 $52,630 $58,564 $29,073 $1,020 ($20,794) ($41,320) $142,196 equals
(LESS) CFD No. I IA-A Special Tax B Revenue @ $93 per unit 6 ($54,498) ($65,751) ($89,001) ($121,551) ($144,801) ($168,423) ($190,650) ($834,675) equals
TOTAL NEW CITY CUMULATIVE OBLIGATIONS (CO) $8,524 ($13,121) $578,216 $516,175 $464,872 $419,436 $376,683 $2,350,786 EQUALS 7-Year Total
Undiscounted
C. NET CITY CUMULATIVE FISCAL BENEFIT (CS-CO) $279,783 $355,183 $539,845 $899,763 $1,067,674 $1,168,512 $1,329,062 $5,639,821 7-Year Total
D. VENUTRA COUNTY FIRE DISTRICT Undiscounted
Property Tax (14.4 % of 1% Property Tax) $575,602 $694,455 $1,053,073 $1,592,954 $1,928,684 $2,173,015 $2,399,257 $10,417,040 Note: 1. Property tax in-lieu of the Vehicle License Fee (PTVLF) is based on cumulative increase of new valuation since project inception.

2. Based on the Tax Rate Area (TRA) allocations for the study area, Fire Services provided by the Ventura County Fire District are funded directly by a share of 14.4 percent of the 1 percent property tax, and not by the City General Fund.

3. Based on the project development agreement, the operations and maintenance (O&M) costs of the sports park is a shared responsibility between the City and the school district. It is assumed that the City is responsible for approximately two-thirds of the O&M costs, with the balance one-third borne by the school district.

4. O&M costs for streets obtained from the 2016 study adjusted for inflation for 2023.

5. State gasoline tax is earmarked for road related expenditures.

6. East Area 1 falls within the boundaries of CFD No. 1 IA-A, and will be charged "Special Tax B" at $93 per residential unit for landscape maintenance, tree maintenance, street lights, and catch basins.

Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Adopted Revenue and Expenditure Report, Fiscal Year 2022-2023 Lewis Management Companny
575
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 4 of 19 ends

Development Description
Table 3 presents the development description after buildout for Harvest at Limoneira. The phased units, population, non-residential square feet, employment, park acres and road square feet are included in Table 4.

Acres. Harvest at Limoneira includes approximately 632.7 gross acres, with about 547.9 gross acres located in East Area 1 and about 84.9 acres located in the Santa Paula Gateway Project.

Residential Development. As shown in Panel B of Table 3, Harvest at Limoneira includes a total of 2,348 residential units with an estimated population of 7,032 after buildout. East Area 1 includes a total of 2,050 units (1,750 single family units and 300 apartments), while East Area 2 includes a total of 298 units (250 apartments, including 50 active adult units, and 48 townhomes).

Non-Residential Development. Harvest at Limoneira, East Area 2, includes a total of 461,560 square feet, including supermarket and GAFO retail (Area B), 100-room hotel (Area C), and hospital, medical and general office, and an assisted living center (Area D), as shown in Panel C of Table 3. Total employment generated by these uses is estimated at 1,093 after buildout.

Publicly Maintained Infrastructure. As shown in Panel E of Table 3, a total of 674,160 square feet of publicly maintained streets are estimated for the total Harvest at Limoneira project after buildout, with about 81 percent of the new roadways located in East Area 1. About 8.37 acres of neighborhood parks are in East Area 1 after buildout. Also, a 35-acre community sports park is planned in East Area 1, with the City responsible for approximately two-thirds and the School District for the balance one-third O&M costs, according to the project development agreement.

Assessed Valuation and Property Tax After Buildout
Table 5 includes the estimated assessed valuation, General Fund property tax and General Fund property tax in lieu of VLF for Harvest at Limoneira.

Assessed Valuation. Values per unit are provided by the developer. As shown in Panel B of Table 5, residential valuation in East Area 1 is estimated at about $1.35 billion after buildout. Combined with the estimated residential and non-residential valuation in East Area 2 of $309.19 million, total Harvest at Limoneira valuation after buildout is estimated at about $1.54 billion. For East Area 1, when the estimated assessed valuation at project inception of $45.12 million is subtracted from the new overall project valuation, net new valuation (since project inception) is estimated at about $1.31 million. For East Area 2, when the current assessed valuation of $22.25 million, in constant 2023 dollars, from the County Assessor 2020-2021 tax roll is subtracted from the new valuation, net new valuation is estimated at about $286.93 million at project buildout (development projected to commence starting 2025).

Property Tax. Based on the total assessed valuation, the one percent property tax levy is projected at about $16.61 million after buildout. Based on the tax rate area in which the project is located, the City General Fund receives about 3.84 percent of the basic one percent levy for a total of $637,777 after buildout.

Property Tax in Lieu of VLF. As part of the State’s 2004-2005 budget agreement, the State began to allocate property tax revenues to cities and counties to offset the State reduction of VLF. Property tax in lieu of VLF is projected based on the net increase in assessed valuation from the proposed project since inception, which is estimated at the Citywide average of $1,283 per million of new assessed valuation.

Based on this assumption and the project’s net assessed valuation increase, projected property tax in lieu of VLF is projected at about $1.68 million for EA1 and $368,263 for EA2 after buildout for a total of $2.05 million for Harvest at Limoneira.
576
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 5 of 19 ends

Table 3
Development Summary After Buildout
Harvest at Limoneira Fiscal Analysis, City of Santa Paula Santa Paula TOTAL
East Area 1 Gateway HARVEST
Category (EA1) (EA2) AT LIMONEIRA
A. Gross Acres 547.9 84.9 632.7
B. Residential Development
Residential Units
Single Family Units 1,750 48 1,798
Apartments 300 250 550
TOTALS 2,050 298 2,348
Persons
Per
Population Household
Single Family (incl. Townhomes) 3.33 5,823 160 5,983
Apartments 1.91 572 477 1,049
6,395 637 7,032
C. Non-Residential Development
Non-Residential Square Feet
Super Market (EA2 -B) 0 30,000 30,000
GAFO Retail (EA2-B) 0 55,000 55,000
100 Room Hotel (EA2-C) 0 45,000 45,000
Hostpital Uses (EA2-D) 0 160,560 160,560
Medical Office (EA2-D) 0 71,500 71,500
Future Pad (Office Use) (EA2-D) 0 9,500 9,500
Assisted Living (EA2-D) 0 90,000 90,000
Total Square Feet 0 461,560 461,560
Square Feet
Per
Employment Employee
Super Market (EA2 -B) 500 0 60 60
GAFO Retail (EA2-B) 500 0 110 110
100 Room Hotel (EA2-C) 2 Rms/Emp 0 50 50
Hostpital Uses (EA2-D) 350 0 459 459
Medical Office (EA2-D) 250 0 286 286
Future Pad (Office Use) (EA2-D) 250 0 38 38
Assisted Living (EA2-D) 1,000 0 90 90
Total Employment 0 1,093 1,093
D. Service Population
Population 6,395 637 7,032
Employment at 50% of Total 0 547 547
Total Service Population 6,395 1,184 7,579
E. Publicly Maintained Infrastructure
Public Roads Square Feet 545,100 129,060 674,160
Public Signalized Intersections 2 0 2
Neighborhood Public Park Acres 8.37 0 8.37
Sources: Stanley R. Hoffman Associates, Inc.

Lewis Management Companny
577
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 6 of 19 ends

Table 4
Phased Residential Units and Non-Residential Square Feet Harvest at Limoneira Fiscal Analysis, City of Santa Paula 1 2 3 4 5 6 7
Category 2023 2024 2025 2026 2027 2028 2029
Cumulative Residential Units
Single Family Units 586 707 807 1,007 1,305 1,559 1,798 Apartments 0 0 250 500 550 550 550
Total Residential Units 586 707 1,057 1,507 1,855 2,109 2,348 Cumulative Population 1,950 2,352 3,162 4,305 5,391 6,237 7,032 Cumulative Non-Residential Square Feet
Super Market (EA2 -B) 0 0 30,000 30,000 30,000 30,000 30,000 GAFO Retail (EA2-B) 0 0 55,000 55,000 55,000 55,000 55,000 100 Room Hotel (EA2-C) 0 0 45,000 45,000 45,000 45,000 45,000 Hostpital Uses (EA2-D) 0 0 0 160,560 160,560 160,560 160,560 Medical Office (EA2-D) 0 0 0 71,500 71,500 71,500 71,500 Future Pad (Office Use) (EA2-D) 0 0 0 9,500 9,500 9,500 9,500 Assisted Living (EA2-D) 0 0 0 90,000 90,000 90,000 90,000 Total Square Feet 0 0 130,000 461,560 461,560 461,560 461,560 Cumulative Employment 0 0 220 1,093 1,093 1,093 1,093
Cumulative Service Population
Population 1,950 2,352 3,162 4,305 5,391 6,237 7,032
Employment at 50% of Total 0 0 110 547 547 547 547
Total Service Population 1,950 2,352 3,272 4,851 5,938 6,783 7,578 Cumulative Park Acres
Neighborhood 0.00 0.00 0.00 2.79 5.58 8.37 8.37
Cumulative Public Road Square Feet 674,160 674,160 674,160 674,160 674,160 674,160 674,160 Sources: Stanley R. Hoffman Associates, Inc.

Parkstone Companies
Lewis Operating Corporation
578
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 7 of 19 ends

Table 5
Projected Assessed Valuation, Property Tax and Property Tax VLF Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
1 2 3 4 5 6 7
Category 2023 2024 2025 2026 2027 2028 2029

PROPERTY TAX
East Area 1
Total Residential Valuation 1 $398,487,000 $480,768,445 $631,238,301 $852,228,012 $1,026,034,799 $1,195,183,824 $1,351,810,445 1 percent Property Tax $3,984,870 $4,807,684 $6,312,383 $8,522,280 $10,260,348 $11,951,838 $13,518,104 EA1 City General Fund Share 2 $153,008 $184,602 $242,378 $327,232 $393,969 $458,918 $519,058 East Area 2 3
Residential Valuation $0 $0 $53,300,000 $106,600,000 $165,218,000 $165,218,000 $165,218,000 Non-Residential Valuation $0 $0 $44,500,000 $143,968,000 $143,968,000 $143,968,000 $143,968,000 EA 2 Total Valuation $0 $0 $97,800,000 $250,568,000 $309,186,000 $309,186,000 $309,186,000 1 percent Property Tax $0 $0 $978,000 $2,505,680 $3,091,860 $3,091,860 $3,091,860 EA2 City General Fund Share 1 $0 $0 $37,553 $96,211 $118,719 $118,719 $118,719 Total Harvest at Limoneira
Total Valuation $398,487,000 $480,768,445 $729,038,301 $1,102,796,012 $1,335,220,799 $1,504,369,824 $1,660,996,445 1 percent Property Tax $3,984,870 $4,807,684 $7,290,383 $11,027,960 $13,352,208 $15,043,698 $16,609,964 Total City General Fund Share 1 $153,008 $184,602 $279,931 $423,443 $512,688 $577,637 $637,777

PROPERTY TAX IN LIEU OF VLF
East Area 1
Total Valuation $398,487,000 $480,768,445 $631,238,301 $852,228,012 $1,026,034,799 $1,195,183,824 $1,351,810,445 Minus Valuation at Project Inception 4 $45,123,015 $45,123,015 $45,123,015 $45,123,015 $45,123,015 $45,123,015 $45,123,015 Net New Valuation $353,363,985 $435,645,430 $586,115,286 $807,104,997 $980,911,784 $1,150,060,809 $1,306,687,430 PTVLF @ $1,283 per $1million net new valuation $453,523 $559,127 $752,247 $1,035,875 $1,258,946 $1,476,040 $1,677,062 East Area 2
Total Valuation $0 $0 $97,800,000 $250,568,000 $309,186,000 $309,186,000 $309,186,000 Minus Valuation at Project Inception 4 $0 $0 $22,252,895 $22,252,895 $22,252,895 $22,252,895 $22,252,895 Net New Valuation $0 $0 $75,547,105 $228,315,105 $286,933,105 $286,933,105 $286,933,105 PTVLF @ $1,283 per $1million net new valuation $0 $0 $96,961 $293,030 $368,263 $368,263 $368,263 Total Harvest at Limoneira PTVLF $453,523 $559,127 $849,207 $1,328,905 $1,627,209 $1,844,303 $2,045,325

1. Represents the projected valuation of total new development.

2. The City of Santa Paula receives a share of 3.84 percent of the 1% propoerty tax for tax rate area (TRA) 04028.

3. Fiscal impacts, including revenues and costs for East Area 2, are not assessed until after 2025 when the area is projected to develop.

4. This represents the assessed valuation of the land parcels and development in 2016 within East Area 1 prior to project inception in constant 2023 dolalrs, and assessed valuation for East Area 2 in 2021 in constant 2023 dollars.

Source: Stanley R. Hoffman Associates, Inc.
579
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 8 of 19 ends

Sales and Use Tax
As shown in Panel C of Table 6, sales and use tax is projected at $751,151 after buildout of Harvest at Limoneira. On-site Taxable sales for EA2 are projected at about $21.4 million based on the taxable sales per square foot factors shown in Table 6. Use tax is projected at 23 percent of projected sales tax based on the latest 2022 information from the California Department of Tax and Fee Administration (CDTFA).

Total off-site taxable sales associated with household and employee spending is estimated at $39.7 million. Total sales and use tax at buildout for Harvest at Limoneira is estimated at $751,151.

Table 6
Projected Sales and Use Tax
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
FACTORS 1 2 3 4 5 6 7
2023 2024 2025 2026 2027 2028 2029

ON-SITE TAXABLE SALES
EAST AREA 2
Cumulative Square Feet
Super Market 0 0 30,000 30,000 30,000 30,000 30,000
GAFO Retail 0 0 55,000 55,000 55,000 55,000 55,000
Total 0 0 85,000 85,000 85,000 85,000 85,000
Cumulative Taxable Sales Taxable Sales
per Sq.Ft.

Super Market $72 $0 $0 $2,160,000 $2,160,000 $2,160,000 $2,160,000 $2,160,000 GAFO Retail $350 0 0 19,250,000 19,250,000 19,250,000 19,250,000 19,250,000 Total On-Site Taxable Sales $0 $0 $21,410,000 $21,410,000 $21,410,000 $21,410,000 $21,410,000 Sales Tax 1% $0 $0 $214,100 $214,100 $214,100 $214,100 $214,100 Use Tax (@ 23.0% Sales Tax) 23.0% $0 $0 $49,243 $49,243 $49,243 $49,243 $49,243 On-Site Sales and Use Tax Total $0 $0 $263,343 $263,343 $263,343 $263,343 $263,343

OFF-SITE TAXABLE SALES
EAST AREA 1
Households Retail Spending Capture 1 50% $8,864,812 $10,695,259 $14,042,638 $18,958,814 $22,825,350 $26,588,269 $30,072,612 EAST AREA 2
Households Retail Spending Capture 50% $0 $0 $0 $2,371,442 $3,675,469 $3,675,469 $3,675,469 Employee Retail Spending Capture 50% $0 $0 $935,000 $4,645,250 $4,645,250 $4,645,250 $4,645,250 Total EA1 and EA2 $8,864,812 $10,695,259 $14,977,638 $25,975,506 $31,146,068 $34,908,987 $38,393,331 Sales Tax 1% $88,648 $106,953 $149,776 $259,755 $311,461 $349,090 $383,933 Use Tax (@ 23.0% Sales Tax) 23.0% $20,389 $24,599 $34,449 $59,744 $71,636 $80,291 $88,305 Total Off-SiteSales and Use Tax $109,037 $131,552 $184,225 $319,499 $383,097 $429,381 $472,238 TOTAL SALES AND USE TAX $109,037 $131,552 $447,568 $582,842 $646,440 $692,724 $735,581

1. Represents 50% of the total household spending on retail sales tax generating expenditures.

Sources: Stanley R. Hoffman Associates, Inc.
580
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 9 of 19 ends

Transient Occupancy Tax
Transient occupancy tax (TOT) is projected at $306,600 after buildout of the hotel planned for Harvest at Limoneira. Based on a web-based survey of room rates, hotel room receipts are based on an average room rate of $120 per night and an average occupancy rate of 70 percent, as shown in Table 7. The City’s TOT rate is 10 percent of gross room receipts.

Table 7
Projected Transient Occupancy Tax After Buildout
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Fiscal Assumptions
Table 8 presents the revenue assumptions and Table 9 presents the cost assumptions for Harvest at Limoneira fiscal projections. Fiscal assumptions are based on the City of Santa Paula, Revenue and Expenditure Report, Fiscal Year 2022-2023 and discussion with City staff and consultants. Supporting fiscal assumption tables are presented in Appendix A.

Annual Estimated
Number Average Nightly Room Receipts Annual TOT at 10%
of Rooms Room Rate 1 at 70% Occupancy 1 of Room Receipts 100 $120 $3,066,000 $306,600
Note: 1. The average nightly room rate and average occupancy rate are based on a online survey of room rates for Santa Paula and surrounding areas in Ventura County.

Sources: Stanley R. Hoffman Associates, Inc.
581
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 10 of 19 ends

Table 8
Summary of Recurring Revenue Factors 1
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Fiscal Year
Fund and Category 2022-23 Projection Basis Projection Factor A. GENERAL FUND
Property Taxes $1,017,000 Assessed Valuation (AV) 3.8% GF allocation of 1% levy Real Property Transfer Tax $125,000 Property Turnover Rate 3.0% annual residential turnover rate and 0.0% annual non-residential turnover rate 4
AV of Turnover Amount $0.55 per $1,000 AV of turnover
Property Tax in Lieu of Motor Vehicle $3,783,163 AV $1,283 per $1,000,000 increase License Fees (MVLF) assessed valuation
Sales and Use Tax $3,300,000 Sales Tax Based on Taxable Sales 1.0% of taxable sales Use Tax Based on Sales Tax 23.0% of sales tax
Franchise Fee Tax $925,000 Service Population = 34,466 $26.84 per service population Transient Occupancy Tax $110,000 Room Receipts 10% of room receipts Business License Fee $133,000 Employment = 8,572 $15.52 per employee Animal Licenses $15,000 Household Population = 31,267 $0.48 per capita Fines and Forfeitures $107,500 Service Population = 34,466 $3.12 per service population Rents and Concessions $194,175 Population = 31,423 $6.18 per capita Other Revenue from Other Agencies $358,496 Population = 31,423 $11.41 per capita Charges for Services (excluding one-time charges) $1,054,051 Service Population = 34,466 $30.58 per service population Other Revenues $34,600 Service Population = 34,466 $1.00 per service population Overhead Transfers In: $1,644,903 Service Population = 34,466 $47.73 per service population (@ 75 percent of projected revenues)
B. GAS TAX FUND
State Gasoline Tax $811,100 Population = 31,423 $25.81 per capita Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Adopted Revenue and Expenditure Report, Fiscal Year 2022-23 City Finance Department
582
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 11 of 19 ends

Table 9
Summary of General Fund Cost Factors
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Fiscal Year 2022-23
Budget Net
General Fund Amount Cost Projection Basis Projection Factor General Government $4,569,988 $3,427,491 Citywide Overhead Costs Adjusted by 75% 28.1% of direct General Fund costs Police $7,704,315 $7,704,315 Service Population = 34,466 $223.53 per service population Buildings and Grounds Maintenance $905,542 $905,542 Service Population = 34,466 $26.27 per service population Other Public Works:

Street Maintenance Case Study: East Area 1 $107,163 total annual cost - East Area 1 General Fund Share = 4% of total costs $4,287 General Fund annual cost - East Area 1 Case Study: Santa Paula Gateway Project $25,372 total annual cost - Santa Paula Gateway General Fund Share = 4% of total costs $1,015 General Fund annual cost - Santa Paula Gateway
$132,535 total Harvest at Limoneira annual costs
$5,301 total General Fund annual costs
Other Public Works $908,000 $620,000 Service Population = 34,466 $17.99 per service population Building & Safety 1 $751,177 ($1,302,509) Service Population = 34,466 $0.00 per service population Planning $933,548 $647,548 Service Population = 34,466 $18.79 per service population Community Services $1,017,951 $1,017,951 Population = 31,423 $32.40 per capita Parks Maintenance
Neighborhood Parks Park Acres $20,000 per park acre
New Sports Park Case Study $710,851 net annual O&M costs Total Sports Park Acres = 35 $20,310 per park acre
Acres Allocated to East Area = 11.67 33.3% Harvest at Limoneira share times of new sports park
Annual O&M per Acre = $20,310
equals
Harvest at Limoneira Share = $236,950
plus
City Annual O&M = $473,901 66.7% City share of new sports park Total Annual O&M = $710,851

1. Building and safety costs are not projected in this analysis, as there are no net costs to the City, and are assumed to be covered by processing fees.

Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Adopted Revenue and Expenditure Report, Fiscal Year 2022-23 City Finance Department
583
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 12 of 19 ends

APPENDIX A

SUPPORTING TABLES FOR FISCAL ASSUMPTIONS
Table A-1
Summary of City General Assumptions
Harvest at Limoneira Fiscal Analysis, City of Santa Paula Assumption Description
2023 Population and Housing 1
31,267 Household Population
156 Group Quarters
31,423 Total Resident Population
9,449 Occupied Housing Units (Households)
9,735 Total Housing Units

3.31 Average Household Size
2023 Estimated Employment 2
8,572 Total Employment
times
71% Estimated Share of Total Employment Commuting into the City 3 equals
6,086 Estimated Employment Commuting into the City 3
2023 Estimated Service Population
31,423 Total Population
plus
3,043 Estimated Employment at 50 Percent of Employment from Outside the City 4 equals
34,466 Estimated Total Service Population
Note: 1. Population and housing estimates are January 1, 2023 estimates provided by the California Department of Finance (DOF).

2. The total employment estimate is for 2023 based on an interpolation of the 2016 and 2045 estimates from the Southern California Association of Governments, (SCAG) RTP 2020 Growth Forecast .

3. The total estimated City employment is weighted by 71 percent based on the Census Bureau's Longitudinal Employer-Household Dynamics (LEHD) Survey estimates of the share of total employment that commutes into the City, as shown in Appendix Table A-2 and Appendix Table A-3.

4. The total estimated employment from outside the City was weighted by 50% to account for the estimated less frequent use of City public services by employment versus population.

Sources: Stanley R. Hoffman Associates, Inc.

State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties and the State--January 1, 2021-2023, Sacramento, California, May 2023 Southern California Association of Governments (SCAG), Adopted 2020 Regional Transportation Plan (RTP) Growth Forecast
U.S. Census Bureau, Longitudinal Employer-Household Dynamics (LEHD) Program, OnTheMap for Santa Paula, California , 2020.
584
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 13 of 19 ends

Table A-2
Employment Working and Living in Santa Paula
Harvest at Limoneira Fiscal Analysis, City of Santa Paula Working and Living in Santa Paula
Category Total Amount Percent 2
Employment 1 5,430 1,592 29%
Note: 1. Employment is based on the Longitudinal Employer-Household Dynamics (LEHD) program which shows where people live and where people work, as shown in Appendix Table A-3.

2. Based on the LEHD data, about 71 percent of the total employment in the City represents workers commuting into the City.

Sources: Stanley R. Hoffman Associates, Inc.

U.S. Census Bureau, OnTheMap Application and Longitudinal Employer-Household Dynamics (LEHD) Origin-Destination Employment Statistics, Santa Paula, California, 2020 585
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 14 of 19 ends

Table A-3
General Fund Revenues
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Recurring
Revenues Projected
Not Projected Net
Fiscal Year One-Time in This Recurring
Revenue Category 2022-23 Fees/Permits Fiscal Analysis Revenues A. GENERAL FUND
Property Taxes $1,017,000 $0 $0 $1,017,000
Real Property Transfer Tax $125,000 $0 $0 $125,000
Property Tax In Lieu of MVLF $3,783,163 $0 $0 $3,783,163 Property Tax In Lieu of Sales Tax $0 $0 $0 $0
Sales & Use Taxes $3,300,000 $0 $0 $3,300,000
Franchise Fee Tax $925,000 $0 $0 $925,000
Transient Occupancy Tax $110,000 $0 $0 $110,000
Business License Fee $133,000 $0 $0 $133,000
Licenses & Permits
Animal Licenses $15,000 $0 $0 $15,000
Building Permits 900,000 900,000 0 0
Miscellaneous Permits 0 0 0 0
Electrical/Plumbing/Mechanical/Development-Related 1,153,686 1,153,686 0 0 Hazmat Permits/CUPA 0 0 0 0
Fire Annual Permits 0 0 0 0
Fire New Construction 0 0 0 0
Special Events Permits 22,000 0 22,000 0
Subtotal Licenses & Permits $2,090,686 $2,053,686 $22,000 $15,000 Fines and Forfeitures $107,500 $0 $0 $107,500
Investments and Rents
Investment Earnings $140,000 $0 $140,000 $0
Community Center Endowment 8,500 0 8,500 0
Rents and Concessions 194,175 0 0 194,175
Rents from Railroad Depot 2,000 0 2,000 0
Rents from Utilities 11,865 0 11,865 0
Southdown Royalty 0 0 0 0
Subtotal Investments & Rents $356,540 $0 $162,365 $194,175 Revenue From Other Agencies
Motor Vehicle In-Lieu $0 $0 $0 $0
P.O.S.T. Reimbursement 15,000 0 0 15,000
State Mandated Costs 0 0 0 0
State Reimbursement - Mutual Aid 0 0 0 0
Miscellaneous Grant Funding 25,000 0 25,000 0
Proposition 172-1/2 Sales Tax for Public Safety 343,496 0 0 343,496 Subtotal Revenue From Other Agencies $383,496 $0 $25,000 $358,496 Charges For Current Services
Recreation Administration and User Fees $45,000 $0 $0 $45,000 Zoning, Subdivision, Environmental Review and Planning Fees 40,000 40,000 0 0 Public Works Fees and Permits 72,500 72,500 0 0
Fire Safety Inspections and Special Services 0 0 0 0
School Resource Officer 263,251 0 263,251 0
Attorney Services Fees 0 0 0 0
Sale of Reports, Maps, Publications 5,000 0 0 5,000
Fingerprints 0 0 0 0
Miscellaneous Police Services 500 0 0 500
Police False Alarm Charges 20,000 0 20,000 0
Contract Planning Fees Reimbursement 0 0 0 0
Park Reservation Fees 500 0 0 500
Parks and Field User Fees 12,000 0 0 12,000
Filming Fees 34,000 0 34,000 0
Facilities Cleanup 500 0 0 500
Miscellaneous Department Reimbursements 990,551 0 0 990,551 Subtotal Charges for Current Services $1,483,802 $112,500 $317,251 $1,054,051 Other Revenues
Reimbursements for Damages $0 $0 $0 $0
Fee Study Update and East Area Permitting 0 0 0 0
Workers Compensation Reimbursement-Miscellaneous 0 0 0 0 Cable TV Announcements 100 0 0 100
Utility Application Fee 25,000 0 0 25,000
City Donations 0 0 0 0
Miscellaneous 9,500 0 0 9,500
Subtotal Other Revenues $34,600 $0 $0 $34,600
Overhead Transfers
Overhead From-Parkland Facilities $68,888 $0 $0 $68,888 Overhead From-Traffic Impact $45,940 0 0 45,940
Overhead From Gas Tax Fund $263,759 0 0 263,759
Overhead From LTF $46,134 0 0 46,134
Overhead From Sewer Fund $622,749 0 0 622,749
Overhead From Water Fund $1,017,528 0 0 1,017,528
Overhead From Equip Maint $128,206 0 0 128,206
Subtotal Overhead Transfers $2,193,204 $0 $0 $2,193,204 TOTAL GENERAL FUND $16,042,991 $2,166,186 $526,616 $13,350,189 B. GAS TAXES
State Gasoline Tax $811,100 $0 $0 $811,100
Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Revenue and Expenditure Report, Fiscal Year 2022-23 Estimates City Finance Department
586
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 15 of 19 ends

Table A-4
Tax Rate Area (TRA) Property Tax Allocations: TRA 04018 Harvest at Limoneira Fiscal Analysis, City of Santa Paula Table A-5
Estimated Annual Turnover Rate
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
City of Santa Paula TRA
Agency1 04028
1045 EL SCH GEN ST PAULA 21.5%
2010 UNIFIED SCH-ST PAULA 15.3%
2015 VTA COM COLLEGE GEN 5.5%
2019 VTA COLLEGE CHILD CTR 0.0%
4001 COUNTY GENERAL FUND 18.0%
4002 ERAF 92-93 SHIFT 4.0%
4004 ERAF 93-94 SHIFT 9.7%
4005 VENTURA CO OFFICE EDUC 2.4%
6001 * FIRE PROTECTION DIST 14.4%
6100 * VCWPD ADMIN 0.2%
6120 * VCWPD ZONE 2.5%
7586 BLANCHARD/SANTA PAULA LIB 1.8%
7770 UNITED WTR CONS DIST 0.6%
8050 CITY SANTA PAULA 3.8%
TOTAL 100.0%
Sources: Stanley R. Hoffman Associates, Inc.

Ventura County Auditor Controller, Property Tax Division, AB 8 TRA History Report, 2022-2023 Tax Year
Owner Occupied Percent
City of Santa Paula Housing Units of Total
A. Estimated Owner Occupied Turnover Units, 2010-2019
Year Moved In, 2010-2019
Moved in 2015 or later 360
Moved in 2010 to 2014 1,085
Total Moved In, 2010-2019 1,445
B. Estimated Turnover Rate
Estimated Annual Owner Occupied Turnover Units, 2010-2019 1 161 Total City Owner Occupied Units 2 4,658 100.0%
Estimated Annual Turnover Rate, 2010-19 1 161 3.0%
Note: 1. The annual turnover rate is based on the assumption of 9 years for the 2010-2019 period.

2. Total City owner occupied units are from the American Community Survey, as referenced below.

Sources: Stanley R. Hoffman Associates, Inc.

U.S. Census Bureau, 2019 American Community Survey (ACS) 5-Year Estimate, Tenure by Year Householder Moved Into Unit, Report B25038, Santa Paula, California 587
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 16 of 19 ends

Table A-6
Calculation of Use Tax Factor
Harvest at Limoneira Fiscal Analysis, City of Santa Paula Category
2022 HalfYear Amount
A. Santa Paula Sales Tax
Point-of-Sale $1,499,500
County Pool 344,169
State Pool 637
Total Sales Tax $1,844,306
B. Calculation of Use Tax Factor
County Pool plus State Pool $344,806
divided by
Point-of-Sale $1,499,500
equals
Estimated Use Tax Factor 23.0%
Sources: Stanley R. Hoffman Associates, Inc.

California Department of Taxation and Fee Administration (CDTFA) 588
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 17 of 19 ends

Table A-8
Summary of General Fund Expenditures
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Fiscal Year 2022-23
General Departmental
General Fund Expenditures Total Government Costs
General Government
City Council $114,533 $114,533
City Clerk 130,096 130,096
City Attorney 394,000 394,000
City Manager 610,362 610,362
Administration - PERS and Employee Relations 387,492 387,492 Administration - Risk Management 1,064,018 1,064,018
Administration - IT 797,202 797,202
Finance 722,544 722,544
Non-Departmental Administration 349,743 349,743
Non-General Government
Police $7,704,315 $7,704,315
Buildings and Grounds Maintenance 905,542 905,542
Other Public Works 908,000 908,000
Building and Safety 751,177 751,177
Planning 933,548 933,548
Community Services 1,017,951 1,017,951
General Fund Total $16,790,521 $4,569,988 $12,220,534
B. CALCULATION OF GENERAL GOVERNMENT OVERHEAD COSTS
General Government Expenditures $4,569,988
divided by
Direct General Fund Costs $12,220,534
equals
Current General Government Overhead Costs Share of Direct Costs 37.4% 75% Marginal Increase in General Government Overhead Costs Share of Direct Costs 28.1% Note: 1. Fiscal Year 2021-2022 expenditures are provided by City Finance staff.

2. General government costs for the project are not assumed to increase on a one-to-one basis. Therefore, the fiscal analysis projects general government overhead costs at a marginal rate of 75 percent, or 26.7 percent of direct recurring costs.

Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Revenue and Expenditure Report, Fiscal Year 2022-23 Estimates City Finance Department
589
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 18 of 19 ends

Table A-9
Calculation of General Fund Net Building and Safety, Planning and Public Works Costs Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Fiscal Year
Category 2022-23
A. BUILDING AND SAFETY NET COSTS
Total Building and Safety Costs $751,177
minus
One-Time Permits and Fees
Building Permits $900,000
Miscellaneous Permits 0
Electrical/Plumbing/Mechanical/Development-Related 1,153,686 Total One-Time Fees $2,053,686
equals
Net Recurring Building and Safety Costs ($1,302,509)
divided by
City Service Population 1 34,466
Net Building and Safety Cost Factor per Service Population 2 ($37.79) B. PLANNING NET COSTS
Total Planning Costs $933,548
minus
One-Time Permits and Fees
Design Review 16,000
Zoning and Subdivision Fees 105,000
Environmental Review Fees 25,000
Contract Planning Fees 115,000
Plan Check Fees 25,000
Total One-Time Fees $286,000
equals
Net Recurring Planning Costs $647,548
divided by
City Service Population 1 34,466
Net Planning Cost Factor per Service Population $18.79
C. PUBLIC WORKS NET COSTS
Other Public Works Costs $908,000
minus
One-Time Permits and Fees
Permit Issuance, Inspection $193,000
Oversize/Overweight Permits 5,000
Hazardous Material Permits 57,000
Construction Plan Check 29,000
Subdivision Map Approval 3,500
Studies and Investigations 500
Total One-Time Fees $288,000
equals
Net Recurring Other Public Works Costs $620,000
divided by
City Service Population 1 34,466
Other Public Works Cost Factor per Service Population $17.99 Note: 1. Service population is based on the estimated Santa Paula resident population plus employment weighted at 50%.

2. Building and safety costs are not projected in this analysis, as there are no net costs to the City, and are assumed to be covered by processing fees.

Sources: Stanley R. Hoffman Associates, Inc.

City of Santa Paula, Revenue and Expenditure Report, Fiscal Year 2022-23 Adopted. 590
Stanley R. Hoffman Associates
June 30, 2023
Mr. David Lauletta
Harvest at Limoneira Projected Fiscal Impacts

Page 19 of 19 ends

Table A-10
Estimated Annual Street Maintenance Costs
Harvest at Limoneira Fiscal Analysis, City of Santa Paula (In Constant 2023 Dollars)
Maintenance Schedule 2
Slurry Seal Cape Seal
Grind &
Overlay Total
Slurry Seal Cape Seal
Grind &
Overlay at 7 Years at 14 Years at 21 Years
Maintenance
Cost
East Area 1
1 545,100 $0.96 $1.28 $2.12 $525,073 $700,098 $1,155,161 $2,380,332 Santa Paula Gateway Project
1 129,060 $0.96 $1.28 $2.12 $124,318 $165,758 $273,500 $563,577 TOTAL 674,160 $649,392 $865,856 $1,428,662 $2,943,909
B. ANNUALIZED STREET MAINTENANCE COST (annualized over 21 years) East Area 1 $113,349
Santa Paula Gateway $26,837
TOTAL $140,186
Note: 1. Street square feet for East Area 1 is provided by Jensen Design and Survey Inc. Square feet for the Santa Paula Gateway Project is provided by Lewis Management Company.

2. Costs per square foot and the maintenance schedule for slurry seal, cape seal and grind & overlay are provided by City public works staff.

Sources: Stanley R. Hoffman Associates, Inc.

Lewis management Corporation
Year
Square Feet of
Streets 1
Annual Cost per Square Foot 2
591
To: Honorable Mayor and Members of the City Council
From: Caesar Hernandez, Management Analyst
Subject: DISCUSSION OF SENATE BILL 567 AMENDMENTS TO THE TENANT PROTECTION ACT OF 2019
Date: March 20, 2024
Agenda Item: 11.A

CITY OF SANTA PAULA

MEMORANDUM
RECOMMENDATION:

Staff recommends City Council receive an update on recent tenant protection legislation, Senate Bill 567, and provide further direction to staff.

Presented by: Caesar Hernandez, Housing Management Analyst BACKGROUND:

At the February 13, 2024 City Council meeting, Vice Mayor Chavez requested that Staff provide an update on Senate Bill 567 ("SB 567") as it relates to additional tenant protections and the housing affordability crisis, for City Council to consider.

In recent years, State and local governments have responded to high housing costs and low housing inventory by enacting laws that aim to facilitate housing production and affordability and to strengthen tenant protections. A number of local governments across California have enacted “anti-displacement” policies and regulations in an effort to protect residents and preserve existing affordable housing. The Tenant Protection Act of 2019 (also known as Assembly Bill (“AB”) 1482 codified at Civil Code Sections 1946.2 and 1947.12, hereafter, the "Act") established statewide just-cause eviction protections and rent stabilization for residential tenants, but it also authorized cities to enact more protective local regulations that supersede state law.

AB 1482's provisions expressly permit an owner to evict a tenant to “substantially remodel” the rental unit. “Substantially remodel” is defined as:
“the replacement or substantial modification of any structural, electrical, plumbing, or mechanical system that requires a permit from a governmental agency, or the abatement of hazardous materials, including lead-based paint, mold, or asbestos, in accordance with applicable federal, state, and local laws, that cannot be reasonably accomplished in a safe manner with the tenant in place and that requires the tenant to vacate the residential real property for at least 30 days” (Civ. Code § 1946.2(b)(2)(D)(ii). Cosmetic improvements alone, including painting, decorating, and minor repairs, or other work that can be performed safely without having the residential real property vacated, do not qualify as substantial 592
rehabilitation.”
Loopholes in AB 1482 have led to abuses that leave many covered renters vulnerable to displacement or eviction in instances where an owner terminates a tenancy under the guise of substantially remodeling a unit when the owner has no intent to actually perform a substantial remodel. Without more protective local just cause eviction provisions, “substantial remodel” evictions that do not actually qualify as substantial remodel evictions will result in displacing tenants, some of whom may become homeless. SB 567 amends the Act to curb those abuses of substantial remodel evictions.

Effective April 1, 2024, SB 567 will require an owner who proposed to displace a tenant to substantially remodel or demolish a unit to first provide the tenant with written notice with specified information, including a description of the substantial remodel to be completed and the expected duration of the repairs, or the expected date by which the property will be demolished, and a copy of permits required to undertake the substantial remodel or demolition, as specified.

ANALYSIS:

Since its passage in 2019, the Act and its provisions have protected tenants from unrestrained rent increases and unexpected evictions, but tenants across the state have nevertheless been evicted from their rental units for stated reasons that were in compliance with the Act but were exaggerated or never materialized. SB 567 was passed in October 2023 to strengthen the Act with additional just-cause and noticing requirements, such as meeting minimum occupancy requirements after displacing a tenant for owner move-in and providing proof/copies of building permits obtained for substantial remodeling. The law will take effect April 1, 2024.

Santa Paula residents have been experiencing a housing affordability crisis, which is causing homelessness and displacement of residents. Since April 2020, residential tenants were generally protected from evictions by a variety of temporary COVID-19-related governmental measures, such as: (1) the California Judicial Council’s temporary emergency measures that effectively provided for a moratorium on all evictions; and (2) the State of California’s eviction moratorium (ultimately codified through Assembly Bill 3088 (2020), Senate Bill 91 (2021), and Assembly Bill 81 (2021)). These eviction protections are no longer in place. The City has determined from directly responding to residential tenant complaints, that tenants throughout the City of Santa Paula are experiencing a surge of threats of eviction. In recent months, Staff has been informed of a number of possible evictions occurring due to purported “substantial remodeling” of residential properties where permits have not been sought, or approved, for the work to be undertaken. SB 567 would protect tenants from illegitimate substantial remodel evictions statewide.

The law provides additional tenant protections by requiring landlord's notice of termination of the lease to include all of the following information:

1. A statement informing the tenant of the owner’s intent to demolish the property or substantially remodel the rental unit property.

2. The following statement: “If the substantial remodel of your unit or demolition of the property as described in this notice of termination is not commenced or completed, the owner must offer you the opportunity to re-rent your unit with a rental agreement containing the same terms as your most recent rental agreement with the owner at the 593
rental rate that was in effect at the time you vacated. You must notify the owner within thirty (30) days of receipt of the offer to re-rent of your acceptance or rejection of the offer, and, if accepted, you must reoccupy the unit within thirty (30) days of notifying the owner of your acceptance of the offer.”

3. A description of the substantial remodel to be completed, the approximate expected duration of the substantial remodel, or if the property is to be demolished, the expected date by which the property will be demolished, together with one of the following:
a. A copy of the issued permit or permits required to undertake the substantial remodel or demolition.
b. If the remodel does not require any permit, a copy of the signed contract with the contractor hired by the owner to complete the substantial remodel, that reasonably details the work that will be undertaken to abate the hazardous materials at issue.

4. A notification that if the tenant is interested in reoccupying the rental unit following the substantial remodel, the tenant shall inform the owner of the tenant’s interest in reoccupying the rental unit following the substantial remodel and provide to the owner the tenant’s address, telephone number, and email address.

Because SB 567 applies statewide as of April 1, 2024, no local legislation is required to extend these protections to Santa Paula residents.

STRATEGIC PLAN:

Though this item does not promote an express objective of the Two-Year Strategic Plan, it is consistent with Goal F (Community Vitality): Provide the residents of Santa Paula with sustainable resources and programs to make this a great place to live and grow.

FISCAL IMPACTS:

There is no fiscal impact related to this item.

OPTIONS:

City Council has the following option:

1. Provide staff further direction as desirable.

ATTACHMENTS:
594
To: Honorable Mayor and Members of the City Council
From: Clete Saunier, Public Works Director
Subject: ESTABLISHMENT OF SEWER AND WATER RATE AD HOC

COMMITTEE
Date: March 20, 2024
Agenda Item: 11.B

CITY OF SANTA PAULA

MEMORANDUM
RECOMMENDATION:

Staff recommends City Council:

1. Adopt Resolution No. 7504 establishing the Ad-hoc Sewer and Water Rate Committee to evaluate and make recommendations regarding City’s sewer and water rates.

2. Appoint two councilmembers to the Sewer and Water Rate Committee.

Presented by: Clete Saunier, Public Works Director
BACKGROUND:

The City of Santa Paula has several “standing” and “ad hoc” committees. The Brown Act (Gov. Code, § 5495) and Section 6.4(b) of the 2023 Manual of Procedural Guidelines for the Conduct of City Council and Constituent Body/Commission Meetings (“Council Manual”) authorizes the City Council to establish advisory committees. Standing committees have either some “continuing subject matter jurisdiction” or a meeting schedule fixed by the legislative body’s formal action, whereas the Brown Act open meeting requirements do not apply to “ad hoc” committees. An ad hoc committee consisting solely of less than a quorum of the legislative body, may be established if it does not have some “continuing subject matter jurisdiction,” and does not have a meeting schedule fixed by formal action of a legislative body. Thus, ad hoc committees generally serve only a limited or single purpose, they are not perpetual, and they are dissolved when their specific task is completed.

Adoption of the attached Resolution would formally establish the Sewer and Water Rate Ad Hoc Committee.

ANALYSIS:

The City’s Sewer and Water Rate Ad Hoc Committee (“Committee”) reviews and analyzes the methodology and policies used in setting sewer and water rates. The City will begin exploring setting its sewer and water rates and seeks to establish the Committee to assist in making this determination. The Mayor will be authorized to appoint two members to the Committee. 595
The Committee would have the following responsibilities and tasks:

Review and analysis the methodology and policies used in setting sewer and water rates;
An understanding of the operation and maintenance of the City's sewer and water infrastructure, including the Water Recycling Facility; The review of the Water and Sewer Enterprise Funds, including the capital needs and debt levels;
The identification of existing and future capital projects and equipment needs; The implementation of the City's sewer rebate program; and The performance of such related duties as the Council may from time-to-time assign.

The Committee would be advisory and may provide periodic reports to the City Council, upon request. The Committee would meet as necessary to work with staff and review the findings of the rate setting consultant.

STRATEGIC PLAN:

The Project supports the currently adopted Strategic Plan in achieving the following goals:

Infrastructure, Transportation & Mobility
Goal: Maintain and develop the City’s infrastructure to be safe, sustainable, innovative and cost-efficient.

FISCAL IMPACTS:

There are no direct fiscal impacts associated with the creation of the committee.

PERSONNEL IMPACTS:

Staff liaison for the committee would be Clete Saunier, Public Works Director.

OPTIONS:

As an alternative to Staff's recommendation, City Council may:

1. Decline to approve Staff's recommendation.

2. Provide staff further direction.

ATTACHMENTS:

Santa_Paula_-_Reso_No._7504_-_Establishing_Sewer_and_Water_Rate_Ad Hoc.docx 596
65283.00302\42110336.1 -1-
RESOLUTION NO. 7504

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA

PAULA, CALIFORNIA, ESTABLISHING THE SEWER AND WATER

RATE AD HOC COMMITTEE
The City Council of the City of Santa Paula does hereby resolve as follows:

SECTION 1: The City Council finds and declares as follows:

A. At its regular meeting on December 21, 2022, the City Council voted to eliminate the Sewer and Water Rate Standing Committee (“Committee”) since the City was still two years away from a new rate review study.

B. Section 6.4(b) of the 2023 Manual of Procedural Guidelines for the Conduct of City Council and Constituent Body/Commission Meetings (“Council Manual”) authorizes the City Council to establish advisory committees and delegate to those committees authority to make recommendations to the Council on the various matters presented to it.

C. Pursuant to that authority, the City Council now desires to establish the Sewer and Water Rate Ad Hoc Committee and define the Committee ‘s responsibilities.

SECTION 2: The City Council establishes the Sewer and Water Rate Standing Committee as an ad hoc committee of the City Council pursuant to the Brown Act and Section 6.4 (b) of Council Manual. The Committee will not be subject to the open meeting requirements of the Brown Act as it is composed of less than a quorum of the City Council, does not have continuing subject matter jurisdiction, and will convene only as needed.

SECTION 3: The City Council assigns to the Sewer and Water Rate Ad Hoc Committee the responsibility of assisting in the next sewer and water rate study, which will consist of the following tasks:
 Revie wand analysis of the methodology and policies used in setting sewer and water rates;
 Understanding the operation and maintenance of the City's sewer and water infrastructure, including the Water Recycling Facility;  Review of the Water and Sewer Enterprise Funds, including the capital needs and debt levels;
 Identification of existing and future capital projects and equipment needs;  Implementation of the City's sewer rebate program; and  Performance of such related duties as the Council may from time to time assign.
597
65283.00302\42110336.1 -2-
SECTION 4: The Mayor is authorized to appoint two members to the Sewer and Water Ad Hoc Committee.

SECTION 5: The Sewer and Water Ad Hoc Committee will automatically cease to exist upon the establishment of the City’s updated water and sewer rates.

SECTION 6: This Resolution becomes effective immediately upon adoption.

PASSED AND ADOPTED this 20th day of March, 2024.
__________________________
Leslie Cornejo, Mayor
ATTEST:
____________________________
Julie Latshaw, City Clerk
APPROVED AS TO FORM:
____________________________
Monica Castillo, City Attorney
APPROVED AS TO CONTENT:
____________________________
Dan Singer, City Manager
598
65283.00302\42110336.1 -3-

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF VENTURA ) ss

CITY OF SANTA PAULA )
I, Julie Latshaw, City Clerk of the City of Santa Paula, California, DO HEREBY CERTIFY that above RESOLUTION NO. 7504 was duly passed and adopted by the City Council of the City of Santa Paula at a regular meeting thereof held on the 20th day of March, 2024, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City this 20th day of March, 2024.

Julie Latshaw, City Clerk
Of the City of Santa Paula,
California
(SEAL)
599
To: Honorable Mayor and Members of the City Council
From: Dan Singer, City Manager
Subject: FUTURE AGENDA ITEMS
Date: March 20, 2024
Agenda Item: 12.A

CITY OF SANTA PAULA

MEMORANDUM
RECOMMENDATION:

Staff recommends City Council review future agenda items.

BACKGROUND:

The attached Future Agenda Items forecast identifies anticipated agenda items for upcoming Council meetings as well as Study Session topics and long-range discussion items. Placing this forecast on the agenda affords the Council and the public the opportunity to discuss such topics and to make any recommendations. It should be noted this is only a forecast and may change over the course of time or based on feedback by the Mayor and City Manager during review of future agendas.

ANALYSIS:

Should a member of the City Council wish to introduce a future agenda topic, it should be done in compliance with the Council's adopted Manual of Procedural Guidelines, Section 5.1.

Items introduced by a member of the Council during a Council meeting requires a second and should be reserved for time-sensitive matters needing attention within the proceeding 45 day period.

STRATEGIC PLAN:

FISCAL IMPACTS:

OPTIONS:

ATTACHMENTS:

3.13.24_Future_Agenda_Items.docx
600
Santa Paula City Council Tentative Agenda Schedule
Updated 2/29/2024
April 3, 2024 AGENDA ITEMS
Admin City Manager Department Report April
PR Arbor Day Proclamation April
Admin Gun Violence Restraining Orders – D.A. Presentation April CDD Bond & Tax Credit “Arrive Santa Paula” TEFRA April
CDD Red Tail Funding Agreements April
PW Rule 20A Undergrounding District April
PW 2024 Wastewater Master Plan Update Report April
April 17, 2024
PW Public Works Department Report April
PW Sports Park Partial Acceptance
PW Disaster Recovery & Emergency Funding Reimbursement Update & Payment Plan
CDD Wayfinding Design Options
PD AB481 Reporting
Fire Ventura County Fire Department Report

STUDY SESSION TOPICS
Admin No Smoking Ordinance
Finance Development Impact Fees (DIF)
CDD Cultural Arts
CDD Municipal Code Overview – Joint Meeting with Council and Planning Commission
April

FUTURE AGENDA ITEMS
Finance Additional Revenue Options May
P&R Union Oil Building Tenant Selection May
Finance Update on Utility Bills
PW Plans & Specifications for 8th Street Streetlight Repair Project CDD ADU Ordinance
Legal Fire MOU Amendment
CDD Appointment of Housing Trust Fund Oversite Committee PW Crosswalk Improvements Project Contract Award