Cities Index.
Attachment 1 - Draft Development Related Cost of Service Fee Study

Santa Rosa City Council
January 30, 2024

Document
Attachment 1 - Draft Development Related Cost of Service Fee Study
Meeting
January 30, 2024
Body
Santa Rosa City Council
Original file
5.3 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

DEVELOPMENT RELATED COST OF

SERVICE FEE STUDY

CITY OF SANTA ROSA, CALIFORNIA
Final Dr aft  Report
Januar
y 18, 2024
MGTCONSULTING.COM
At tachment 1

MGTCONSULTING.COM

City of Santa  Rosa,  California
DEVELOPMENT   RELATED   COST   OF   SERVICE   FEE   STUDY January 18, 2024

TABLE OF CONTENTS
CHAPTER 1. EXECUTIVE SUMMARY ......................................................................................................................... 1 INTRODUCTION ........................................................................................................................................ 1 STUDY SCOPE AND OBJECTIVES ............................................................................................................... 1 CHAPTER 2. SUMMARY OF FINDINGS ..................................................................................................................... 2 USER FEE FINANCIAL OVERVIEW .............................................................................................................. 2 METHODOLOGY ....................................................................................................................................... 3 LEGAL, ECONOMIC & POLICY CONSIDERATIONS ...................................................................................... 5 CHAPTER 3. ANALYSIS HIGHLIGHTS ....................................................................................................................... 7 CHAPTER 4. RECOMMENDATIONS ........................................................................................................................ 16 APPENDIX A - USER FEE RESULTS ........................................................................................................................... 16

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 1

CHAPTER 1. EXECUTIVE SUMMARY
Introduction
MGT Consulting Group (MGT) is pleased to present the City of Santa Rosa with this summary of findings for the recently completed development related cost of services fee study.

The City contracted with MGT to perform a cost of service study using fiscal year 2023 budgeted figures, staffing and operational information.

The current fees listed in this study represent the fees being charged at the beginning of this study. The last development user fee study was completed in 2013 and adopted by City Council in early 2014.   A minor, City‐generated fee update was completed in 2018, but did not include several key areas in the development process. Each year, the City of Santa Rosa adopts revisions to its comprehensive fee schedule. While this process allows for the City to account for variance in the Consumer Price Index or the value of land or public infrastructure improvements, it does not (generally) include a revision of  the  underlying formulas  used  to make the  fee  calculations. As such,  some of the development user fees have not been revisited since 2013.

This report is the culmination of an extensive study conducted by MGT in collaboration with the City’s Planning and Economic Development management and staff.

MGT would like to take this opportunity to
gratefully acknowledge all management and staff who participated in this project for their efforts and coordination.   Their  responsiveness  and  continued  interest  in  the  outcome  of  this  study  contributed greatly to its success.

Study Scope and Objectives
The study included a review of development related fee for service activities within the following areas:
 Building
 Engineering
 Fire (development related only)
 Permit Services
 Planning
 Technology Surcharge
 Advance Planning Surcharge
The goal for this study was to present a well‐documented and defensible cost of service plan that would identify rates that would be used to recover billable costs for services and to develop user fees that comply with Proposition 26, Proposition 218 and other applicable statutory requirements.

The study was performed under the general direction of the Director and Interim Director of Planning and Economic Development. The primary goals of the study were to:
 Make the fee structure easier for all parties to understand.  Define what it costs the City to provide the various fee‐related services.

CHAPTER 2: SUMMARY OF FINDINGS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 2

 Determine whether there are any services where a fee should be collected.  Identify service areas where the City might adjust fees based on the full cost of services and other economic or policy considerations.
 Develop revenue projections based on recommended increases (or decreases) to fees.

The information summarized in this report addresses each of these issues and provides the City with the tools necessary to make informed decisions about any proposed fee adjustments and the resulting impact on City revenues.

CHAPTER 2. SUMMARY OF FINDINGS
User Fee Financial Overview
The study's primary objective was to provide the City's decision‐makers with the basic data needed to make informed pricing decisions.  This report details the full cost of each service for which a fee is charged and  presents  proposed  fees  at  100%  cost  recovery  levels.   The  fee  analysis  adheres  to  Proposition  26 which is based on the "estimated reasonable cost of providing a service".

The City is looking for guidance from the City Council on any reductions they may want to see to any of the fees.  At 100% cost recovery the fees would cover all labor and indirect costs associated with providing
each service. Any reduction in the fee would not eliminate the cost of providing the service but would reduce the price to the consumer.  The difference between 100% full cost recovery and any reduction in price would need to be covered through other funding sources such as the general fund.  This cost does not  go  away  due  to  a  price  reduction  and  cannot  be  shifted  to  another  fee  to  be  covered  based  on California state law.

The exhibit below shows the annualized costs and revenues for the City’s user fees that were part of this analysis.   The analysis was based on  the average volumes from fiscal year 2020/2021, 2021/2022 and 2022/2023.  It is difficult to predict future revenues due to the fluctuation in the volumes and economic conditions.  MGT has based the annual cost off of the individual full cost for each fee analyzed and then multiplied that cost by the average volumes. The results are shown in Exhibit 1 on the next page:

CHAPTER 2: SUMMARY OF FINDINGS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 3

Exhibit 1

 Column  A,  User  Fee  Costs  –  This  column  represents  what  it  is  actually  costing  each  of  the departments to provide the annual user fee services based on the average volumes listed above.

In total, this study evaluated $14,225,755 of costs to provide development related services.  It is this amount that is the focus of this study and represents the total potential for user fee‐related revenues for the city.

 Column B, Current Revenues – This column represents what the city is currently recovering in revenue for these same services based on the average volumes listed above. Based on current fee recovery levels, the city receives fee‐related cost recovery in the amount equal to $10,901,887 and is experiencing an overall 77% cost recovery level.  The details of individual fees may be found in and in Appendix A of this report.

 Column C, Current Subsidy – This column shows the difference between what it is actually costing the city to provide services versus what is being recovered in revenue for these same services.

Current fee levels recover 77% of full cost, leaving 23% or $3,323,866. This difference is being subsidized  by  other  funding  sources  such  as  the  general  fund.  This  subsidy  represents  an opportunity  for  an  updated  and  more  focused  cost  recovery  effort  by  the  city  for  fee‐related services.

Methodology
A cost‐of‐service (user fee) study is comprised of two basic elements:
 Hourly rates of staff providing the service.
 Time spent providing the service.

The product of the hourly rate calculation multiplies by the time spent yields the cost of providing the service.

CHAPTER 2: SUMMARY OF FINDINGS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 4

HOURLY  RATES

The hourly rate methodology used in this study builds indirect costs into City staff hourly salary and benefit rates  to  arrive  at  fully  burdened  hourly  rates.  Fully  burdened  hourly  rates  are  a  mechanism  used  to calculate the total cost of providing services. Total cost is generally recognized as the sum of the direct cost together with a proportionate share of allowable indirect costs. The proper identification of all costs (including  labor,  operating  expense,  department  administration  and  citywide  support)  as  “direct”  or “indirect” is crucial to the determination of the total cost of providing services.

Direct costs are typically defined
as those that can be identified specifically to a particular function or activity, including the labor of persons working directly on the specific service for which the fee is charged, and possibly  materials or supplies those people  use for the task. Indirect  costs are those that support more than one program area and are not easily identifiable to specific activities. Examples of indirect costs are: 1) departmental administrative and support staff, 2) training and education time, 3) public counter and telephone time, 4) some service and supply costs, and 5) citywide overhead costs from outside of the department as identified in the City’s cost allocation plan.

MGT’s hourly rate calculation methodology includes the following:

Personnel Services Analysis – each staff classification within the department or division is analyzed in the study. The first burden factor is comprised of compensated absences such as vacation/holidays/sick leave days taken in a year’s time. Staff
classifications are then categorized as either direct (operational) or indirect (administrative or supervisory) labor. In some cases, a classification will have both direct and indirect duties. The total indirect portion of staff cost is incorporated into hourly overhead rates.

Indirect Cost Rate – a ratio of indirect cost to direct labor (salaries plus benefits) is established. There
are three elements of indirect cost incorporated, including:
 Indirect Labor – includes compensated absences, administrative and supervisory staff costs.  Other Operating Expenses – most services and supplies are included as a second layer of indirect cost and are prorated across all fees and services. There are some service and supply expenses classified as “allowable direct”. Some examples of these are professional services expenses, or supplies.  These  allowable  direct  expenses  would  be  directly  associated  with  specific  fees  or programs, as opposed to being allocated across all activities through the indirect overhead.  External Indirect Allocations – this represents the prorated portion of citywide overhead (from the City’s cost allocation plan) which is attributable to the service for which the fee is charged.

Fully Burdened Hourly Rates – incorporates all the elements that comprise the hourly rates used in this cost analysis.
 Each direct or operational staff classification is listed, together with the average annual salary and benefits.
 The  hourly  salary  and  benefit  rate  is  calculated  by  taking  the  annual  salary  and  benefits  of  an employee and dividing by 2,080 available hours in a year.  The overhead rate is derived by multiplying the internal and external indirect cost rates against the salary and benefit rates.

CHAPTER 2: SUMMARY OF FINDINGS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 5

The total combines the salary, benefits and overhead rates. This is the fully burdened rate for each staff classification. MGT prepared indirect overhead rates and corresponding hourly rate calculations using FY 2023 budgeted expenditures.  The building and safety division utilizes one divisional hourly rate which incorporates all of these elements but averages them together.

TIME  SPENT

Once fully burdened hourly rates were developed for city staff, the next step in the process was to identify staff time spent directly on each of the user fee activities. Each staff person involved in the user fee services identified time spent to complete each task associated with all user fee services.

FEE  CALCULATIONS  AND  REVENUE  PROJECTIONS
Given this information, MGT was able to calculate the cost of providing each service, both on a per‐unit and total annual basis (per‐unit cost multiplied by annual volume equals total annual cost). As mentioned above, costs were calculated by multiplying per‐unit time estimates by the hourly labor rates; additional operating expenses directly associated with certain services were also added in. Finally, if other departments or divisions provided support to certain user fee activities, this time was accounted for and added into the analysis as a crossover support activity. Full costs are then compared to current fees/revenues collected, and subsidies (or over‐recoveries) are identified.

User fee summaries by department may be seen in Appendix A of this report.

Legal, Economic & Policy Considerations

Calculating the true cost of providing city services is a critical step in the process of establishing user fees and corresponding cost recovery levels.  Although it is a principal factor, other factors must also be given consideration.  City decision‐makers must also consider the effects that establishing fees for services will have on the individuals purchasing those services, as well as the community as a whole.

The following legal, economic and policy issues help to illustrate these considerations:

 State Law ‐  In California, user fees are limited to the "estimated reasonable cost of providing a service" by Government Code section 66014(a) and other supplementary legislation. California voters approved Proposition 26 in November of 2010, which defined “taxes” as “any levy, charge, or exaction of any kind imposed by a local government” subject to seven exceptions. Most of the exceptions require that the city charge a fee which does not exceed the reasonable cost to the city to provide the service for which the fee is charged. Thus, if the fee exceeds the reasonable cost of service, it may be considered a “tax” which must be approved by the voters. We have calculated each fee to recover no more than the reasonable cost of each service so that none of the  fee  adjustments  recommended  herein  will  be  considered  taxes  under  Proposition  26.

Additionally, it should be noted that some fees (e.g., oversize permit fees) may be capped by state law and may not change, regardless of any cost analysis performed.

CHAPTER 2: SUMMARY OF FINDINGS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 6

 Economic  barriers ‐  It  may  be  a  desired  policy  to  establish  fees  at  a  level  that  permits  lower income groups to use services that they might not otherwise be able to afford.

 Community benefit ‐ The Council may wish to subsidize some user fees in order to reflect policy considerations  which  supersede  cost  recovery.  For  example,  some  agencies  may  choose  to subsidize or waive fees related to historic district plan review. This encourages customers to seek the necessary approvals for development so that the project adheres to the historic district needs.

The cost to perform this service does not go away and this cost would need to be funded through another funding source such as the general fund.

 Private benefit ‐ If a user fee primarily benefits the fee payer, we recommend the fee be set at, or close to 100% full cost recovery. Development related fees generally fall into this category; however,  exceptions  are  sometimes  made  for  services  such  as  appeal  fees  or  fees  charged exclusively to residential applicants.

 Service driver ‐ In conjunction with the third point above, the issue of who is the service recipient versus the service driver should also be considered.

 Managing demand ‐ For those fees which are not subject to pure cost recovery limitations, other market considerations may inform recommended fee levels. Elasticity of demand is a factor in pricing certain city services; increasing the price of some services results in a reduction of demand for those services, and vice versa.

 Incentives ‐ Fees can be set low to encourage participation in a service, such as the issuance of a water heater permit.

A sample of the decision‐making process is shown in Exhibit 2 on the next page:

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 7

Exhibit 2
CHAPTER 3. Analysis Highlights
Below is a brief discussion of the findings for each department/division’s analysis.  Please see the user fee summary sheets in Appendix A of this report for the details on each fee calculation and cost analysis.

Fees are charged in a variety of ways including:
 Flat (or fixed) fees – the fee is always the same, regardless of size or complexity of the service provided in each instance.
 Per square foot – the fee is calculated based on the size of the project under review.  Hourly  (or  time‐and‐materials)  –  City  staff  track  time  and  materials  expense,  and  fees  are calculated to recover actual costs.
 Actual  cost  –  this  fee  is  charged  to  recover  consultant  costs  as  billed  to  the  City,  or  time  and materials of staff.
 Percentage of permit – the fee is calculated as a percentage of the original permit fee.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 8

 Percentage of Engineer’s Estimate – fees are calculated as percentage of engineer’s estimate of construction value.
 Other increments – fees are calculated based on increments such as number of sheets or number of set ups/take downs.

BUILDING  & SAFETY
Building permits and plan checks benefit individuals and the development community and are therefore eligible for cost recovery.  In general, because these fees primarily benefit the fee payer, typically these fees are set at or close to 100% cost recovery.  However, there are some fees such as the trade permits within Mechanical, Electrical and Plumbing permits that in the past have been set at less than 100% cost recovery as directed by the City Council.

The  Building  and  Safety  division  has  experienced  a  boom  since  FY  2019  and  the  industry  is  just  now showing signs of slowing down.  Because of the large increase in volume, the department is showing an excess in revenues vs the budgeted cost for the division.  This is an issue of volume and timing and not of excessive fees.

Within  the  Building  and  Safety  division,  current  fees  recover  100.1%  ($6,114,461)  with  actual  costs  at $6,109,159 which is a difference of $5,303 or less than 0.1%.  An additional $39,471 has been added to the Planning fees as cross support. These costs for cross support represent the time spent by the Building staff to perform plan review services on the planning fees.  This cost would be recognized as revenue on the Planning fees.

In keeping with State law, the
target cost recovery percentage must not exceed 100%.  Assuming no loss in demand or change in volume, fee adjustments result in a 100% overall recovery rate. It should be noted that at the prior direction of City Council that the trade permits (mechanical,  electrical and plumbing) were set much lower than 100% cost recovery. In order to meet 100% cost recovery, these fees would need to increase considerably.   We are proposing some fee reductions on some permits and some fee increases in order to keep the cost aligned with the level of effort to provide the services and to keep within State cost recovery limits. In addition, it should be noted that the State of California restricts solar panel review fees to specific pricing. All proposed solar panel review fees comply with AB 1414 which is what the division is proposing.

In addition to performing an analysis of the costs, MGT worked with the department to modify their fee
structure allowing it to reflect the current process and to be a more user‐friendly fee schedule. In doing this the division was able to reduce the number of fees significantly.

The Building analysis followed the following approach:

 MGT developed a fully burdened hourly rate and applied it to the average time spent to perform services that were listed as fixed price permits.  Subtracting the cost of fixed price permits from the  total  cost  of  the  division,  we  arrive  at  the  cost  of  variable  price  (construction) permits.  Dividing this figure by the square footage of projects permitted, we arrive at a cost per square foot for plan review and a cost per square foot for inspections.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 9

 Total cost – Cost of fixed price permits = Cost of variable price permits. Construction permits have an analysis supplied by the Building  division of how each position’s effort is dedicated to plan review and inspection of construction permits.  “Plan review” covers all activities related to the approval of the building plans and incorporates the cross‐support costs from the permit division for additional time spent in the initial intake of the permit, and Engineering and Planning cross support  for  their  approval  of  the  plans.  “Inspection”  covers  all  activities  to  confirm  that construction  is  according  to  approved  plans  and  to  close  out  the  permit  when  work  is completed.  Additional contractor costs were also incorporated where appropriate.

Here are some of the changes being proposed (details can be found on the executive summary listed in Appendix A at the end of this report:

Construction Permit Categories
Construction permits were simplified into 10 categories with a price per square foot for plan review and a price per square foot for inspections.

 Residential (single family) (R‐2.1/R‐3/R‐3.1/R‐4)
 Residential Accessory Structure – U
 Residential (Additions or Alterations)
 Residential (multi‐family) (R‐1/R‐2)
 Assembly, High Hazard, Institutional, Educational (A, H, E, I, L)  Business, Mercantile (B, M)
 Factory and Industrial, Storage (F, S)
 Utility & Misc. (commercial accessory structure) (U)
 Shell
 Residential Plot Plans (R‐3)
Tenant Improvement Categories
Tenant Improvements (TI) were broken down into 3 primary groups and then into minor, standard and major categories. The result is 9 TI categories now have their own per square foot cost for plan review and for inspections.

 TI for A, H, E, I – Minor
 TI for A, H, E, I – Standard
 TI for A, H, E, I – Major
 TI for B, M ‐ Minor
 TI for B, M ‐ Standard
 TI for B, M – Major
 TI for F, S ‐ Minor
 TI for F, S – Standard
 TI for F, S ‐ Major
The Building Official will set guidelines as to what is considered a minor, standard or major TI. The Building Official will have discretion as to what category a project may fall under.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 10

Trade Permits: Mechanical, Electrical and Plumbing (MEP) The number of trade permits for Mechanical, Electrical and Plumbing (MEP) were significantly reduced since many of the fees take the same amount of time to perform the service.

Mechanical ‐ Now has only 10 fees
 Air Conditioning (residential)
 Air Conditioning (commercial)
 Air Handler
 Boiler
 Chiller
 Exhaust Hood
 Furnace – New/Replacement
 Heater / Heat Pump
 Vent Fan / Chimney Vent
 Walk‐in Box / Refrigerator Coil / Refrigeration Compressor Electrical ‐ Now has only 10 fees
 Generator Installation (residential)
 Electrical Service, New/Meter Replacement
 Electrical Circuits, New
 Energy Storage System
 Temporary Power Service
 Commercial Generator
 Water Heater – Electric
 Electric Vehicle Charging Stations (residential)
 Electric Vehicle Charging Stations (commercial/multifamily) – non accessible  Electric Vehicle Charging Stations (commercial/multifamily) – accessible Plumbing/Gas ‐ Now has only 9 fees
 Fixtures (each 5)
 Gas system/Gas Piping / Fixture
 Sewer, Building
 Water Reclamation (Grey Water)
 Solar Water System
 Water Heater
 Plumbing Repair
 Water Pump
 Commercial Plumbing Permits
Miscellaneous Fees
There are 20 new fees being recommended under the miscellaneous permit fee schedule. Some are brand new fees and others have taken the current fee and split it into multiple fees.

New Fees
CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 11

 Awning/Canopy (supported by building)
 Cell site alteration/remodel
 Manufactured home – removal
 Moved building ‐ residential
 Partition – interior
 Photovoltaic System (ground mount pedestal)
 Photovoltaic System (ground mount structure)
 Reroof ‐ Commercial/Multifamily: up to 25,000 sq. ft.  Reroof ‐ Commercial/Multifamily: 25,001 and over sq. ft  Reroof ‐ Residential (SFD/Duplex): up to 10,000 sq. ft.  Reroof ‐ Residential (SFD/Duplex): 10,001 and over sq. ft  Pool/Spa Replastering/Renovations (Commercial or Residential)  Temporary Trailer, Residential
 Water Tank
 Records Imagining Fee: Plans & Permits B& W 24x36
 Records Imagining Fee: Plans & Permits B& W 30x42
 Records Imagining Fee: Plans & Permits B& W 11x17
 Records Imagining Fee: Plans & Permits Color 24x36
 Records Imagining Fee: Plans & Permits Color 30x42
 Records Imagining Fee: Plans & Permits Color 11x17
PERMIT  SERVICES
Permit  Services  is  responsible  for  the  intake  of  planning  applications,  building  trade  permits  and construction permits.

Currently there is a $56.28 fee for the intake of the building trade permits. The time to intake the planning applications is currently built into the planning fees themselves.  By breaking out the planning application intake costs from the planning fees themselves it will allow the department to ensure that these costs are
covered should the applicant request  a refund.  The process to  perform an intake for either a building trade permit or planning applications takes the same amount of time. At 100% cost recovery, this fee would need to be increased to $75.

The additional cross support provided for building services totaled $1,521,048 and were incorporated into the construction and tenant improvement fees.

The projected revenue for the intake fees is estimated to be approximately $127,135. There is currently only one intake fee for the building permits which is recovering approximately $44,124. The time for the
planning  application  intake  is  currently  incorporated  into  the  current  planning  fee  and  has  now  been pulled out and identified as a separate fee.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 12

PLANNING

The Planning division administers and implements City land use and development policies. The division processes numerous land use applications requiring city approval before the land can be developed or action  taken.  These  services  benefit  the  development  community  and  are  therefore  eligible  for  cost recovery.

Within the Planning division, current fees recover is 65% ($1,814,029) with a 35% ($989,146) subsidy.  A combination  of  fee  increases  and  decreases  are  recommended  in  order  to  align  fees  with  100%  cost recovery.  The full cost of services is $2,803,175.  Of the $2,803,175, cross support from other departments make up $475,911 leaving $2,327,264 related directly to Planning itself.

This cross support represents the time that other departments/divisions may spend performing tasks for services provided by the Planning division.  By incorporating cross support costs into the fee, Planning can see what the full cost is to provide these services and set their fees accordingly.

The Planning
division is proposing seven new fees, some of which include the existing fee being broken down into a major or minor category. Overall, there are no significant structural changes being proposed for the Planning fee schedule.

Other highlights for the Planning division:

 Design Review: Major with reduced fee authority
 Design Review: SB9 two‐unit development
 SB 35/AB 2162 (change to Minor Ministerial) – this fee was split into a major and minor ministerial fee.
 Research Fee
 Subdivision: Parcel Map Waiver
 Subdivision: SB9 Urban Lot Split
 Over the Counter – Entitlement Fee
ENGINEERING  DEVELOPMENT  SERVICES

The  Engineering  Development  Services  division  reviews  street  and  utility  improvement  plans  for compliance with applicable design standards and regulations, as well as inspects project construction to assure conformance with approved grading, drainage and storm water management plans. These services benefit the development community as well as individuals and are therefore eligible for cost recovery. In general, because these fees primarily benefit the fee payer, typically these fees are set at or close to 100% cost recovery.

Engineering fees are currently recovering approximately 60% of their cost.  In order to better align services provided with fees charged, Engineering is proposing restructuring many of their fees. Details of these
proposed changes are as follows:

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 13

Public Improvement Plans – Review and Inspection
Current fees are based on percentage of estimated construction value with a tiered structure for both plan checks and inspections. To analyze the true cost, staff estimated time spent on 13 sample parcels of varying size and complexity. Time estimates included cross support from other departments. The resulting cost to valuation ratio was compared to the fee collected for each parcel. Results showed that the smaller parcels  were  under‐recovering  cost,  i.e.,  the  cost  to  valuation  ratio  was  higher  than  current  fees,  and larger parcels were over‐recovering, with a cost to valuation ratio lower than current fees.

Engineering  is  proposing  a  similar  tiered  structure,  with  adjustments  to  the  divisions  of  tiers  and percentages of construction value charged.

Encroachment Permits
Encroachment permits are currently charged with a processing fee and a percentage of construction value for  plan  checks  and  inspections.  Recommendations  for  new  categories of  encroachment  fees  are  as
follows:
 Major encroachment permits – fee structure will not change. Fees will be charged based on the same percentage of construction value as the Public Improvement Plan fees.  Minor encroachment permits ‐ Flat fees in 11 different categories based on type of parcel. Permits will include separate fees for processing, plan check, and inspection. The new categories are:

1. Single Family Residential Lot Improvements (driveway, sidewalk, curb & gutter)

2. Multi‐Family Residential and Commercial Single Lot Improvements (driveway, sidewalk, curb & gutter)

3. Debris Bins and Storage Containers

4. Encroachment proposing no Modifications to Public or Private Infrastructure

5. Encroachment permit with Signed Public Improvement Plans

6. Private Utility Company ‐ Small Wireless Facilities

7. Private Utility Company ‐ Short Term Service Work
o maximum of 3 parcels ‐ includes modifications to City's Infrastructure o maximum of 3 parcels ‐ no modifications to City's Infrastructure

8. Private Utility Company ‐ Linear Construction
o > 3 parcels ‐ includes modifications to City's infrastructure ‐ no construction activities adjacent to more than 72 parcels
o >  3  parcels ‐   no  modifications  to  City's  infrastructure ‐   no  construction  activities adjacent to more than 72 parcels

9. Public or Private Parklets
Subdivision Plan Check
Currently a flat fee is charged per lot for all subdivision plan checks. The recommendation is to replace this “one‐size‐fits‐all” flat fee with:
 Minor subdivision plan check: flat fee for the first three map sheets for subdivisions with four lots or fewer, charging a fee for additional map sheets as required.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 14

 Major subdivision plan check: flat fee for the first three map sheets with subdivisions with more than four lots, charging a fee for additional map sheets as required.

Other Public Improvement Plan Fees
Recommendations are as follows:
 Replace the single Improvement Plan Revision fee with Minor and Major revision fees. The minor
revision fee will be capped at two plan reviews with no added sheets. Major revision fees will follow the percentage‐based fee structure of the original plan submittal.  Replace the single Record Drawing flat fee with Minor and Major Record Drawing fees.

Drainage and Stormwater LID
Review fees
Recommendations are as follows:
 Replace the single SUSMP Review flat fee with three LID Review fees: two flat fees based on size of parcel and an additional review fee if needed based on actual cost.  Add four new Drainage Study Review fees with similar structure to the LID Review fees.

Other New Fee Proposals
 Encroachment Time Extension Request
 Modifying Scope on Approved Permit
 Complex Traffic Control Review Fee
 Two penalties for work performed without permit, plus permit reinstatement fee  After hours inspection fee
 Drainage Study Review fees
 Five new Street Light and Traffic Signal fees:
o Traffic Signal Plan Review
o Traffic Signal Inspection
o Street Light Activation
o Traffic Signal Modification
o Traffic Signal Modification ‐ after hours
 Parking Administration fee for reservation of meters associated with construction activity FIRE

The Prevention division of the  Fire department  currently  charges 50% of Building  permit fees for plan checks and inspections of new construction.

CHAPTER 2: ANALYSIS HIGHLIGHTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 15

The methodology used to calculate Fire Prevention’s cost for development fee services was similar to that used  for  Building.  Fire  staff  subtracted  their  non‐development  related  cost  from  their  budget.  The remaining cost was used for the analysis, supplied by Fire staff, on how each position’s effort is dedicated to plan review and inspection of each of the categories of new construction occupancies requiring Fire inspections. Using the same total annual square footage for each occupancy type as Building’s analysis, we were able to calculate a cost per square foot for plan reviews and inspections. This cost per square foot was then used to calculate the percentage of Building’s cost for each type of occupancy.

The cost analysis showed that Fire Prevention’s plan review and inspection cost is, on average, 22% of Building’s permit cost. Fire will need to lower their new construction plan review and inspection fees, so they  don’t  over‐recover  their  cost.  Fire’s  recommendation  is  to  charge  a  fee  per  square  foot  for  each category of building they review and inspect, rather than a percentage of Building’s permit fees.

TECHNOLOGY  SURCHARGE

This fee is currently paid with the building permit fee.   The fee is for the purpose of cost recovery for
specialized  license  fees,  maintenance  of  computer  hardware,  and  computer  software  that  are instrumental in the City’s ability to provide efficient service and maintain accurate records. Currently the City charges eight separate fees ranging from $26 to $219 depending on the type of building permit being issued.

A
new technology fee of 5.69% is being recommended as a replacement for the eight existing flat fees.

This  technology  fee  is  to  cover  the  department’s  current  technology  costs  plus  future  costs  such  as additional  handheld  devices  for  the  field  and  updates  to  the  permitting  system.   Any  excess  revenue received through this fee should be held in a special revenue fund and used only for its intended purpose.

This fee should be reviewed, at a minimum, every three (3) and no more than five (5) years to ensure that it is set at an appropriate level.  This new technology fee would be paid with the issuance of all building, planning, and engineering development fees. Fire development fees are excluded from this surcharge.

Estimated  annual  revenue  is  $416,215  assuming  revenue  for  building,  planning,  and  engineering  are similar to the averages utilized in this study.

ADVANCE  PLANNING  SURCHARGE

This fee is currently paid with the issuance of the building permit. The fee is for the purpose of recovering a  portion  of  the  Planning  division’s  cost  of  service  associated  with  Advance  Planning,  preparing  and updating the General Plan, development code updates, housing element and specific plan updates.

There  are  currently
eight  separate  flat  fees  ranging  from  $104  up  to  $833  depending  on  the  type  of building permit that is being issued.

Current Advance Planning Fees:

1. New detached dwellings       $590

2. Dwelling Additions/Remodels      $104

3. New Attached & Multi‐Family Dwellings    $417

4. Multi‐Family Additions/Remodels      $104
CHAPTER 2: RECOMMENDATIONS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 16

5. Commercial‐Business & Retail      $833

6. Commercial Additions/Remodels      $487

7. Industrial           $555

8. Industrial Additions/Remodels      $347

A  new  Advance  Planning  surcharge  of  16.15%  is  being  recommended  as  a  replacement  for  the  eight existing  flat  fees.  This  new  Advance  Planning  surcharge  would  be  paid  with  the  issuance  of  building permits  (excluding
trade  permits)  and  plan  reviews.  Fire  development  fees  are  excluded  from  this surcharge. Estimated annual revenue, which assumes no change in volume and demand, is $612,500.

CHAPTER 4. Recommendations
MGT recommends the following:
 Staff are looking for guidance from the City Council on recommendations.  MGT recommends reviewing the technology and advance planning surcharges annually to ensure that the percentages represent and are recovering the needs of the City.  These funds should be placed in a special revenue fund to ensure that they are used only for their intended purpose.  MGT recommends that the City continue to build on its investment in this cost‐of‐service analysis by continuing to analyze its fees and charges every three to five years whether this is done by staff or an outside consultant.
 MGT recommends that for the period between analysis, that the City increase fees based on a CPI factor in order to maintain cost recovery as salaries and benefits and services and supply costs increase.

Appendix A - User Fee Results
The following pages provide the individual fee study results.

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 17

Building

Note: Cross support costs are included in the Planning results and are excluded from the total above. *Miscellaneous revenues are rolled up into building permits and plan review revenues in the City’s financial system.  This revenue currently includes the trip fee of $63.31, at the time of this analysis. The current trade fees (Mechanical, Electrical and Plumbing) do not show the trip fee. This is added as a separate fee.  MGT's analysis has included the trip fee in order to do a proper comparison of the fee recovery level. MGT has added the trip fee into the current trade fees to provide this comparison.  This change required MGT to adjust the revenue down under the building permits to account for this; however, there was no good way to account for this revenue adjustment in the model.  As a way to account for this and not overestimate the existing revenues, MGT has offset the miscellaneous revenues with this trip fee revenue that shifted to the trade fees.  Since the miscellaneous fees are also rolled up into the building permit and plan review revenues, this should balance the existing revenues out at the overall level.  This does however show that there is a larger difference in the recovery level for the miscellaneous fee.  The individual fees listed on under the miscellaneous permits will show the appropriate recovery levels.

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 18

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
Final Report
DIFF ‐/+
Occupancy Types in Category Type Plan Review Inspection Total Plan  Review Inspection Total Current ‐Full R‐2.1/R‐3/R‐3.1/R‐4
(single  family) Residential  (single  family) $1.4 4 $0.98 $2.42 $1.65 $0.86 $2.50 $0.08 Residential  Accessory Structure ‐ U
Residential  Accessory Structure $2.02 $1.87 $3.89 $2.52 $1.27 $3.80 $0.09 Residential  (Additions  or Alterations) Residential  (Additions  or Alterations) $1.78 $1.05 $2.83 $1.95 $0.87 $2.82 $0.01
R‐1, R‐2
(multi ‐family) Residential  (multi ‐family) $0.28 $0.11 $0.39 $0.55 $0.24 $0.79 $0.40 A, H, E, I, L Assembly,  High Hazard,
Institutional,  Educational $0.89 $0.44 $1.33 $1.28 $0.63 $1.91 $0.58 B, M
Business,  Mercantile $1.32 $0.56 $1.88 $1.35 $0.80 $2.15 $0.27 F, S
Factory and Industrial,  Storage $0.6 4 $0.27 $0.91 $0.81 $0.50 $1.32 $0.41 U (commercial accessory structure) Utility  & Misc (commercial accessory structure) $4.04 $0.81 $4.84 $3.93 $2.02 $5.94 $1.10 TI for A, H, E, I
Minor Tenant Improvement $1.07 $0.36 $1.43 $0.66 $0.41 $1.06 $0.37 TI for A, H, E, I
Standard Tenant Improvement $1.01 $0.39 $1.40 $1.14 $0.56 $1.71 $0.31 TI for A, H, E, I
Major Tenant Improvement $0.99 $0.39 $1.37 $1.71 $0.64 $2.3 4 $0.97 TI for B, M
Minor Tenant Improvement $1.66 $0.58 $2.23 $0.74 $0.61 $1.35 $0.88 TI for B, M
Standard Tenant Improvement $1.29 $0.7 4 $2.03 $1.18 $0.91 $2.09 $0.06 TI for B, M
Major Tenant Improvement $1.36 $0.6 4 $2.00 $1.74 $1.00 $2.7 4 $0.74 Current Full  Cost
Price Per Square Foot
CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 19

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
Final Report
DIFF ‐/+
Occupancy Types in Category Type Plan Review Inspection Total Plan  Review Inspection Total Current ‐Full TI for F, S
Minor Tenant Improvement $0.91 $0.30 $1.20 $0.63 $0.30 $0.93 $0.27 TI for F, S
Standard Tenant Improvement $0.6 6 $0.26 $0.92 $1.03 $0.37 $1.41 $0.49 TI for F, S
Major Tenant Improvement $1.07 $0.33 $1.40 $1.65 $0.53 $2.18 $0.78 Shell
Shell $0.59 $0.27 $0.8 6 $0.78 $0.50 $1.29 $0.43
R‐3
Residential  Plot Plans $0.19 $0.49 $0.68 $0.77 $0.45 $1.22 $0.54 Current Full  Cost
Price Per Square Foot

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 20

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 21

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 22

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 23

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
TABLE 5 Miscellaneous building permits Fee Description
Current fee
(PC/INSP)
Annual
Volume   Full Cost
Diff. +/‐
Current‐Full
Cost
Annual
Revenue Annual  Cost
Annual Diff.
+/‐ Current‐
Full Cost
Alternate Material Request Fixed  Fee $300.24 10                $183.59 $116.65 $3,002 $1,836 $1,167 Awning/Canopy (supported by building) ‐ New
Fee
New ‐ Fixed Fee 5                  $183.59 ($183.59) $0 $918 ‐$918 Balcony Addition/Deck Fixed  Fee $199.93 55                $229.48 ($29.55) $10,996 $12,622 ‐$1,625 Cell/wireless  site (cell, radio, TV antenna) Fixed  Fee $626.37 9                  $458.96 $167.41 $5,637 $4,131 $1,507 Cell Pole / Tower / Eqpt shelter Fixed  Fee $696.72 10                $458.96 $237.76 $6,967 $4,590 $2,378 Cell site alteration/remodel (new fee) New  ‐ Fixed Fee 10                $458.96 ($458.96) $0 $4,590 ‐$4,590 Covered porch Fixed  Fee $175.31 30                $229.48 ($54.17) $5,259 $6,884 ‐$1,625 Demolition ‐ major Fixed  Fee $198.62 8                  $321.27 ($122.65) $1,589 $2,570 ‐$981 Demolition ‐ minor Fixed  Fee $163.43 31                $229.48 ($66.05) $5,066 $7,114 ‐$2,048 Fence/Gate/Free Standing Wall Fixed  Fee $251.53 8                  $183.59 $67.94 $2,012 $1,469 $544 Flag pole Fixed  Fee $139.55 3                  $183.59 ($44.04) $419 $551 ‐$132 Grading  Fixed Fee $1,064.46 10                $1,376.89 ($312.43) $10,645 $13,769 ‐$3,124 Grading permit add on for NPDES  Fixed Fee $1,795.67 10                $2,478.41 ($682.74) $17,957 $24,784 ‐$6,827 Manufactured home ‐ removal New Fee New  ‐ Fixed Fee 3                  $229.48 ($229.48) $0 $688 ‐$688 Moved building ‐ residential New Fee New  ‐ Fixed Fee 1                  $826.14 ($826.14) $0 $826 ‐$826 Partition ‐ interior New Fee New  ‐ Fixed Fee 30                $229.48 ($229.48) $0 $6,884 ‐$6,884 Patio cover (each) (Size Limit 0 sf to 500 sf) Fixed  Fee $175.31 25                $229.48 ($54.17) $4,383 $5,737 ‐$1,354 Per Customer Budget Impact

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 24

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
TABLE 5 Miscellaneous building permits * Fee Description Current fee
(PC/INSP)
Annual
Volume   Full Cost
Diff.  +/‐
Current‐Full
Cost
Annual
Revenue Annual  Cost
Annual Diff.
+/‐ Current‐
Full Cost
Photovoltaic System (residential) Fixed  Fee $200.81 1,019          $367.17 ($166.36) $204,625 $374,147 ‐$169,522 Photovoltaic System (commercial) Fixed  Fee $226.69 16                $826.14 ($599.45) $3,627 $13,218 ‐$9,591 Photovoltaic System (ground mount
pedastool)
New ‐ Fixed Fee $1,285.10 ($1,285.10) $0
Photovoltaic System (ground mount structure) New  ‐ Fixed Fee $1,835.86 ($1,835.86) $0 Reroof ‐ Commercial/Multifamily: up to
25,000 sq. ft.

New ‐ Fixed Fee
(previously charged
under another fee)
$1,671.43 124             $642.55 $661.71 $207,257 $79,676 $127,581 Reroof ‐ Commercial/Multifamily: 25,001 and
over sq. ft
New ‐ Fixed Fee
(previously charged
under another fee)
$1,733.03 100             $1,009.72 $1,457.65 $173,303 $100,972 $72,331 Reroof ‐ Residential (SFD/Duplex): up to
10,000 sq. ft.

New ‐ Fixed Fee
(previously charged
under another fee)
$705.82 100             $275.38 $63.27 $70,582 $27,538 $43,044 Reroof ‐ Residential (SFD/Duplex): 10,001 and
over sq. ft
New ‐ Fixed Fee
(previously charged
under another fee)
$769.13 100             $642.55 $558.01 $76,913 $64,255 $12,658 Residing/ stucco ‐ one story Fixed  Fee $204.45 99                $211.12 ($6.67) $20,241 $20,901 ‐$661 Residing/ stucco ‐ multistory Fixed  Fee $204.45 100             $211.12 ($6.67) $20,445 $21,112 ‐$667 Retaining wall, engineered Fixed  Fee $221.62 24                $367.17 ($145.55) $5,319 $8,812 ‐$3,493 Signs: Monument/Freestanding Non‐Electric  Fixed Fee $223.38 19                $183.59 $39.79 $4,244 $3,488 $756 Signs: Pole Non‐Electric Fixed  Fee $223.38 20                $183.59 $39.79 $4,468 $3,672 $796 Per Customer Budget  Impact

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 25

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
TABLE 5 Miscellaneous building permits * Fee Description Current fee
(PC/INSP)
Annual
Volume   Full Cost
Diff. +/‐
Current‐Full
Cost
Annual
Revenue Annual  Cost
Annual Diff.
+/‐ Current‐
Full Cost
Signs: Wall, Non‐Electric Fixed  Fee $158.88 20                $183.59 ($24.71) $3,178 $3,672 ‐$494 Signs ‐ Electric Fixed  Fee $190.76 20                $229.48 ($38.72) $3,815 $4,590 ‐$774 Skylight Fixed  Fee $154.79 25                $229.48 ($74.69) $3,870 $5,737 ‐$1,867 Spa or hot tub (prefabricated) Fixed  Fee $158.29 70                $550.76 ($392.47) $11,080 $38,553 ‐$27,473 Storage Racks / catwalks Fixed  Fee $156.34 25                $275.38 ($119.04) $3,909 $6,884 ‐$2,976 Swimming pool / spa: Residential
(SFD/Duplex) Pool and or Spa
Fixed Fee $390.86 70                $1,376.89 ($986.03) $27,360 $96,382 ‐$69,022 Swimming pool / spa: Commercial /
Multifamily
Fixed Fee $512.00 $1,376.89 ($864.89) $0 $0
Pool/Spa Replastering/Renovations
(Commercial or Res)
New ‐ Fixed Fee $1,376.89 ($1,376.89) $0 $0
Fiberglass  Pools/Spas Fixed  Fee $269.70 $275.38 ($5.68) $0 $0 Temporary trailer, residential New Fee New  ‐ Fixed Fee 25                $275.38 ($275.38) $0 $6,884 ‐$6,884 Water tank New Fee New  ‐ Fixed Fee 3                  $275.38 ($275.38) $0 $826 ‐$826 Window or sliding glass  door Fixed  Fee $175.31 42                $229.48 ($54.17) $7,363 $9,638 ‐$2,275 National Pollutant Discharge Permit Review  ‐ 5%
of plan check fee of all valuation based building
permits (new buildings  or new grading projects)
(NPDES)
Remove fee $0.00 $0.00 $0 $0
Additional  Plan Review,  Master Plan Change or
Review  for New Code
Hourly Rate $234.00 $183.59 $50.41 $0 $0 $0
Expedited  Plan Review Remove fee $0.00 $0.00 $0 $0
Plan Reviews  with no fee indicated Hourly  Rate $234.00 $183.59 $50.41 $0 $0 $0 Per Customer Budget  Impact

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 26

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
TABLE 5 Miscellaneous building permits * Fee Description Current fee
(PC/INSP)
Annual
Volume   Full Cost
Diff. +/‐
Current‐Full
Cost
Annual
Revenue Annual  Cost
Annual Diff.
+/‐ Current‐
Full Cost
Time extension  for issued  building  permit Fixed  Fee $142.33 100              $27.54 $114.79 $14,233 $2,754 $11,479 Reinspection  ‐ first 1/2 hour First  1/2 hr. $145.87 $91.79 $54.08 $0 $0 $0 Reinspection  ‐ each 1/2 hour thereof Each  1/2 hr. thereof $114.61 $91.79 $22.82 $0 $0 $0 Inspections  with no fee  indicated Hourly  Rate $205.00 $183.59 $21.41 $0 $0 $0 Temporary Certificate  of Occupancy $120,  plus $1.50 per $10,000 of valuation.

Change to Per Hour (1
hour minimum)
$120.00 $183.59 ($63.59) $0 $0 $0
Residential  Seismic  Hazard Inspection change  to Minimum 1 hr. with 1 hr.
increments
thereafter.
$60.00 $183.59 ($123.59) $0 $0 $0
Commercial Seismic  Hazard Inspection change  to Minimum 1 hr. with 1 hr.
increments
thereafter.
$181.00 $183.59 ($2.59) $0 $0 $0
Single ‐Family Dwelling  Code Disclosure
Inspection
change to Minimum 2
hr. with 1 hr.
increments
thereafter.
$181.00 $367.17 ($186.17) $0 $0 $0
Multi‐Family Dwelling  Code Disclosure (base
fee)  Inspection
change to per hour
with 2 hour minimum
$181.00 $367.17 ($186.17) $0 $0 $0
Multi‐Family Dwelling  Code Disclosure (per
additional  unit) Inspection
change to per hour
with 2 hour minimum
$57.00 $367.17 ($310.17) $0 $0 $0
Per Customer Budget  Impact

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 27

City of Santa Rosa
Development Service: Building fees
FY 22‐23 Budget
TABLE 5 Miscellaneous building permits * Fee Description Current fee
(PC/INSP)
Annual
Volume   Full Cost
Diff. +/‐
Current‐Full
Cost
Annual
Revenue Annual  Cost
Annual Diff.
+/‐ Current‐
Full Cost
Commercial Code Disclosure Inspection $60/per  hr. (3 hrs. minimum)
$180.00 $550.76 ($370.76) $0 $0 $0
Review  and Abatement of Existing Hazardous
Structures ‐  initial  review
change to per hour
with 2 hour minimum
$211.00 $367.17 ($156.17) $0 $0 $0
Review  and Abatement of Existing Hazardous
Structures ‐  review  the structural engineer
recommendations
change to per hour
with 2 hour minimum
$497.00 $367.17 $129.83 $0 $0 $0
Review  and Abatement of Existing Hazardous
Structures ‐  fail to voluntarily  follow ‐up to abate
deficiencies  in building  structural elements
within  required  365 days
twice the permit fee $0.00 $0.00 $0 $0 $0
Change of Contractor Remove fee $54.00 $0.00 $54.00 $0 $0 $0 Micrographics fee ( per $1,000 valuation) state  fee $0.45 $0.45 $0.00 $0 $0 $0 STRONG MOTION INSTRUMENT FEES ‐ residential
buildings  1‐3 story ‐ $13 per $100,000 valuation
state fee $13.00 $13.00 $0.00 $0 $0 $0
STRONG MOTION INSTRUMENT FEES ‐
Commercial and residential  buildings  over 3‐
$ $
state fee $28.00 $28.00 $0.00 $0 $0 $0
STRONG MOTION INSTRUMENT FEES ‐ Mi nimum
fee  ‐ $0.50
state fee $0.50 $0.50 $0.00 $0 $0 $0
SB 1473 CBSC Fee_ Fee transmitted to State for
the agencies involved  in Code development
with emphasis on the development,  adoption,
publication,  updating, and educational efforts
associated with green building  standards.
state fee  (per 100,000
in valuation)
$4.00 $4.00 $0.00 $0 $0 $0
Per Customer Budget Impact

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 28

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 29

Permit Services

City of Santa Rosa
PED Permit Services ‐ 080102
FY 22‐23
Ord Service  Name Fee  Description Annual
Volume Current Fee Full  Cost Current
Recovery % Annual Cost Annual
Revenue
Annual
Subsidy
1B u i l d i n g Intake Fee (MEP permits  only) new  fee 784            56.28$           74.65$           75% 58,528$         44,124$         14,405$ 2 Planning  Intake Fee new  fee 919            ‐ $               74.65$           0% 68,606$         ‐ $               68,606$ 6P R A Requests ‐ Non Billable  Ti me non  fee 1                ‐ $               58,379$         0% 58,379$         ‐ $               58,379$ 7C r o s s Support to Building  Construction  Permits non  fee 1                ‐ $               1,521,048$   0% 1,521,048$   ‐ $               1,521,048$ Total User Fees $127,135 $44,124 $83,011
% of Full  Cost 35% 65%
Per Unit Annual
Current

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 30

Planning

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 31

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 32

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 33

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 34

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 35

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 36

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 37

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 38

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 39

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 40

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 41

CHAPTER 2: APPENDIX A ‐ USER FEE RESULTS

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 42

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 43

Engineering

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 44

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 45

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 46

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 47

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 48

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 49

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 50

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 51

City of Santa Rosa, California  January 18, 2024
Development Related Cost of Service Fee Study  Final Draft Report Page  | 52

Fire

← All documents from this meeting