Attachment 1 - New and Revised Fees - Methodology

Budget Review Subcommittee
September 17, 2024

Document
Attachment 1 - New and Revised Fees - Methodology
Meeting
September 17, 2024
Body
Budget Review Subcommittee
Original file
183 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Fee Description Current  Fee Proposed  Fee Justification  / Calculation Gate opening fobs N/A $50
ECI III: $144.27 * 5 min
Dept Tech Coord: $156.62 * 5 min
SAA: $93.53 * 5 min
Supplies: $17.48
Broken Viper lock N/A $53
Meter Tech: $93.53 * 5 min
SAA: $93.53 * 10 min
Sr CSR: $105.95 * 1 min
Cost of Lock: $27.95
Broken Collar N/A $55
Meter Tech: $93.53 *4 min
CSR: $93.53 * 10 min
Sr CSR: $105.95 * 1 min
Cost of collar: $32.00
Water and sewer demand
payment plan processing fee $320 $345
Civil Engineering Technician III: $86.49 * 4 hrs
WDO application processing fee $160 $173
Civil Engineering Technician III: $86.49 * 2 hrs
WDO application processing fee ‐
applicant proposed program $970 $1,067
Sustainability Coordinator: $106.69 * 10 hrs
Water waste turn‐off fee $50 $75
Meter Technician: $93.53 * 45 min
Vehicle Costs: $5.75
MISCELLANEOUS FEES AND CHARGES UPDATE
ATTACHMENT 1
Revised Fees (Rounded down to nearest $1)
Trucked Waste Gate Opening Fobs ‐ New (Rounded down to nearest $1) Broken Viper Lock ‐ New (Rounded down to nearest $1)
\
Broken Collar ‐ New (Rounded down to nearest $1)
Manual meter reading fee (AMI
refusal) $25 $36
Meter Technician: $93.53 * 20 min
Vehicle Costs = $5.75
Charge‐back fee/customer stop‐
payment $25 $57
Bank charges $25 to the City for this reversal of payment.

SAA: $93.53 * 15 min
Sr CSR: $105.95 * 5 min
Annual wastehauler permit fee $206 $654
ECI III: $144.27 * 2 hrs
SAA: $93.53 * 2 hrs
Sr. CSR: $105.95 * 30 min
Analysis Costs = $126
Groundwater ‐ one‐time discharge
permit (uncontaminated ‐ no limit) $222 $526
ECI III: $144.27 * 3 hrs
SAA: $93.53 * 1 hrs
Groundwater ‐ one‐time discharge
permit (potentially
contaminated/contaminated
<10,000 gals)
$422 $814
ECI III: $144.27 * 5 hrs
SAA: $93.53 * 1 hrs
Groundwater ‐ one‐time discharge
permit (potentially
contaminated/contaminated
=/>10,000 gals)
$678 $959
ECI III: $144.27 * 6 hrs
SAA: $93.53 * 1 hrs
5 Year groundwater remediation/
continuous permit fee $1,542 $2,397
ECI III: $144.27 * 15 hrs
SAA: $93.53 * 2.5 hrs
Broken lock (standard) $25 $44
Meter Tech: $93.53 * 5 min
SAA: $93.53 * 10 min
Sr CSR: $105.95 * 1 min
Cost of Lock: $19.40
Replace broken lock & box meter $40 $52
Meter Tech: $93.53 * 10 min
SAA: $93.53 * 10 min
Sr CSR: $105.95 * 1 min
Cost of lock: $19.40
Unable to read meter (vehicle on
meter, meter buried, etc.) $15 $15 CPI-U
Administrative fee for processing
delinquent turn‐off $55 $56 CPI-U
Turn‐off meter and lock due to
backflow non‐compliance $70 $71 CPI-U
Charge for damaged box lock $60 $61 CPI-U
Lock‐off service ‐ pull and plug meter $125 $128 CPI-U
Emergency/after hours meter turn
on/off $130 $133 CPI-U
Replace meter box due to owner
negligence or damage
CPI-U
‐ in concrete $2,525 $2,585 CPI-U
‐ in dirt $395 $404 CPI-U
Replace meter box lid $175 $179 CPI-U
Replace MXU $165 $168 CPI-U
Flow Test ‐ First Call CPI-U
‐ Subsequent calls 5/8" ‐ 2" meter $35 $35 CPI-U
‐ Subsequent calls 3" ‐ 6" meter $575 $588 CPI-U
Leak Check ‐ First Call CPI-U
‐ Subsequent calls if no leak $100 $102 CPI-U
Construction meter ‐ 5/8", 1" CPI-U
‐ 3" Hydrant, 2" or 6" bridge CPI-U
‐ First‐time set & each subsequent
move $125 $128 CPI-U
‐ Unable to set or test meter $25 $25 CPI-U
$1,500 Deposit
Escalated Fees ‐ Based on February 2023 to February 2024 CPI‐U Increase SF Area (2.4%) ‐ Rounded down to nearest $1 No Charge
No Charge
$300 Deposit
Minimum monthly construction
charge for all construction meters $25 $25 CPI-U
Monthly fire line protection fee CPI-U
‐ 2" $32 $32 CPI-U
‐ 4" $32 $32 CPI-U
‐ 6" $41 $41 CPI-U
‐ 8" $60 $61 CPI-U
‐ 10" $69 $70 CPI-U
CPI-U
‐ 5/8" $310 $317 CPI-U
‐ 3/4" $310 $317 CPI-U
‐ 1" $360 $368 CPI-U
‐ 1 1/2" $1,570 $1,607 CPI-U
‐ 2" $1,570 $1,607 CPI-U
‐ 3" $2,810 $2,877 CPI-U
‐ 4" $4,030 $4,126 CPI-U
‐ 6" $5,570 $5,703 CPI-U
‐ 10" $8,085 $8,279 CPI-U
Meter install on existing, undamaged
surface where same size previously
existed
$110 $112 CPI-U
Meter re‐inspection fee $110 $112 CPI-U
Water service taps ‐ 3/4", 1" $85 $87 CPI-U
‐ 1.5", 2" $210 $215 CPI-U
‐ Greater than 2", less than 12" $525 $537 CPI-U
New water meter installed on existing, undamaged service where no meter previously existed (dos not include meter box or service repair work) ‐ 12" $620 $634 CPI-U
Water system shutdown $395 $404 CPI-U
CPI-U
‐ Type A ‐ On line and grade $725 $742 CPI-U
‐ Type B ‐ Cut‐in tee and valve $775 $793 CPI-U
‐ Type C ‐ Complex $1,400 $1,433 CPI-U
Fireflow test $135 $138 CPI-U
Water processing fee (per
connection) $510 $522 CPI-U
Sewer processing fee (per
connection) $510 $522 CPI-U
Sanitary sewer lateral connection
inspection fee $175 $179 CPI-U
Water supply assessment (WSA) ‐ In‐
house $5,675 $5,811 CPI-U
Water supply verification (WSV) ‐ In‐
house $400 $409 CPI-U
Water supply verification (WSV) ‐
outside consultant $750 $768 CPI-U
Backflow tester annual fee $99 $100 CPI-U
Abbreviation
WDO
AMI
ECI
SAA
Sr CSR
CPI-U
Senior Customer Service Representative
Legend
Consumer Price Index - all urban consumers
Meaning
Water Demand Offset
Advanced Metering Infrastructure
Environmental Compliance Inspector
Senior Administrative Assistant
Water main tie‐in inspection fee