S
onoma Water i Draft 2/24/2025
Water Transmission FY 20 25/2026 Draft Budget and Rates Sonoma Water
Sonoma Water is a wholesale water supplier to nine cities and water districts that serve more than 600,000 residents in portions of Sonoma and Marin counties. The Russian River provides most of Sonoma Water’s water supply with groundwater supply from the Santa Rosa Plain as a secondary source.
Under agreements with the U.S. Army Corps of Engineers, Sonoma Water manages the water supply storage in Lake Mendocino and Lake Sonoma to provide a reliable water supply and maintain minimum instream flow requirements for fish and wildlife protection and recreation in the Russian River and Dry Creek. Sonoma Water holds water-right permits issued by the State Water Resources Control Board that authorize Sonoma Water to store up to 122,500 acre-feet per year of water in Lake Mendocino and up to 245,000 acre-feet/year of water in Lake Sonoma.
The primary points of Sonoma Water’s diversion facilities near Forestville include six radial collector wells that extract Russian River underflow that has been filtered through approximately 100 feet of natural sand and gravel. This highly efficient, natural filtration process, with chlorination treatment, produces high-quality, potable water. This water is then fed directly into Sonoma Water's aqueduct system.
The Water Transmission System extends from Sonoma Water’s Russian River diversion facilities located near Forestville to the Santa Rosa, Petaluma, and Sonoma valleys. The Water Transmission System consists of over 85 miles of pipelines, seven booster-pump stations, and 18 storage tanks with a combined storage capacity of 128.8 million gallons. The major pipelines that comprise the system and range in diameter from 16 to 54 inches are:
the Santa Rosa Aqueduct (built in 1959), the Sonoma Aqueduct (built in 1963), the Petaluma Aqueduct (built in 1962), and the Cotati Intertie (built in 1977).
Sonoma Water remains dedicated to serving our communities and securing our future through responsible resource and environmental stewardship, continued technical innovation, investment in critical infrastructure and effective fiscal management. A few highlights of programs and projects that Sonoma Water accomplishes in collaboration with the water contractors and other partners that benefit the community are summarized below.
More information can be found on Sonoma Water’s website at: https://www.sonomawater.org. • Santa Rosa Plain Water Supply Resiliency: Reactivate three Santa Rosa Plain Wells, utilizing $6.9 million in Department of Water Resources grant funding for two of the wells, and implement Aquifer Storage and Recovery for additional water supply reliability and alleviate drought impacts to the water contractors and their customers.
• Regional Water Supply Resiliency: Sonoma Water has worked collaboratively with the water contractors to improve the region’s water supply reliability during periods of water supply shortage due to drought, seismic, and other hazard events. Using Sonoma Water's transmission system as the backbone, Sonoma Water will pursue development of a Regional Water Bank Implementation Strategy to integrate the most significant regional water storage facilities (Lake Sonoma, groundwater basins, Lake Stafford, and Marin Water reservoirs).
• Hazard Mitigation: Sonoma Water and its water contractors have invested substantially in efforts to protect water supply infrastructure with continued emphasis on implementing high priority seismic and flood hazard mitigation projects.
• Sonoma-Marin Saving Water Partnership (SMSWP): Sonoma Water is administering a $4 million region al
d
rought resiliency program with a $2 million United States Bureau of Reclamation grant that is being p
assed through to the water contractors to implement critical drought resiliency programs.
Attachment 1
S
onoma Water ii Draft 2/24/2025
• Water, Stormwater, and Energy Education Program: Sonoma Water collaborates with the SMSWP and Sonoma Clean Power to bring its education program annually to more than 16,000 local students. • Dry Creek Habitat Enhancement: Sonoma Water, the water contractors, and the U.S. Army Corps have completed 5 miles of restoration to date. The U.S. Army Corps agreement with Sonoma Water provides a 65 percent cost share to complete fishery habitat restoration work in Dry Creek.
S
onoma Water leverages partnerships to implement programs funded from other sources that also benefit the water contractors and the community they serve:
• Quagga Mussels: Sonoma Water collaborates with the U.S. Army Corps of Engineers, the California Department of Fish and Wildlife, and the California Department of Boating and Waterways on a boat inspection strategy to prevent invasive mussel infestations in Lake Mendocino and Lake Sonoma. • Forecast Informed Reservoir Operations (FIRO): FIRO is an ongoing collaborative program with Sonoma Water, the U.S. Army Corps of Engineers, and a multi-agency steering committee that began in 2012.
FIRO is a flexible water management approach that uses data from watershed monitoring and improved weather forecasting to help water managers selectively retain or release water from reservoirs for increased resilience to droughts and floods.
• San Francisco Bay Advanced Quantitative Precipitation Information System (AQPI): A $20 million grant from the Department of Water Resources was awarded to Sonoma Water and its partners to install four X-Band radars in the Bay Area to provide improved precipitation and hydrologic information to water agencies, flood control managers, and emergency personnel. The radar data will result in improved management of water supply reservoirs, and improved operations of wastewater systems and flood protection facilities.
I
nfrastructure Investments
The draft FY 2025/2026 Water Transmission Budget supports Sonoma Water’s five-year strategic plan by continuing investments to upgrade aging infrastructure and systems. Sonoma Water’s critical water infrastructure, including aqueducts, pipelines, pump stations, storage tanks, and wells supply essential water to all water contractors and ultimately 600,000 residents in Sonoma and Marin county. Undervaluing the actual costs to operate, maintain, and improve this system could jeopardize this essential service with drastic consequences given our role as a wholesaler. Our critical infrastructure is gradually aging after decades of reliable service. A significant portion of it is approaching the end of its useful lifespan. Sonoma Water is currently developing an Asset Management Program. Preliminary assessments of the water production/transmission systems indicate that a large portion is in less than acceptable (i.e. fair, poor, or failed) condition. The age of the infrastructure, current condition of assets, combined with substantial levels of deferred maintenance, underscores the importance of making investments to guarantee a reliable water source for more than 600,000 residents in portions of Sonoma and Marin counties. Furthermore, Sonoma Water is also currently working to prepare a 20-year Comprehensive Water Master Plan on the water production/transmission system. The assessment data collected under the Asset Management Program will be incorporated, along with recommendations of other current seismic and regional resilience planning efforts, into the 20-year Comprehensive Water Master Plan.
Sonoma Water, our water retailers, and the industry at-large are facing very similar challenges: aging infrastructure, rising operating and maintenance costs, water usage fluctuations resulting in lower revenues, etc.
These challenges drive rate increases which have a financial impact on end users but are necessary to upgrade infrastructure and ensure reliable service. Similar to the water contractors, Sonoma Water has deferred maintenance and capital projects in an effort to keep water rate increases as low as possible, while providing clean, reliable, essential water for the benefit of the water contractors and the 600,000 customers they serve every day. As presented, the draft budget does not address the full needs of maintenance and improvements for the water transmission system but allows significant progress toward that goal. There will continue to be pressure on rates in the coming years as additional infrastructure investments are required to fully meet the needs of the system. In this budget, Sonoma Water has cut and deferred more than $16.69 million in O&M, subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project
Sonoma Water iii Draft 2/24/2025
costs that would occur in the 3-year required time frame for expending revenue bonds to finance improvements resulting in rate increases of nearly 40 percent, to the proposed rates within this package (7.60% for Sonoma Aqueduct/8.86% for Santa Rosa Aqueduct/9.98% percent for Petaluma Aqueduct).
Sonoma Water works diligently to secure alternate funding and utilize cost effective financing mechanisms to moderate rate increases. Sonoma Water has been successful in securing grants from various sources and has utilized fund balances and bond proceeds in this effort. In fact, Sonoma Water’s wholesale rates (the rates that are charged to water contractors) continue to be among the lowest in the greater Bay Area. Future proposed budgets will continue to prioritize ongoing infrastructure maintenance, replacement, and improvement to ensure a sustainable source of water for the benefit of the communities served.
This draft FY 2025/2026 Water Transmission Budget has been developed based on the 36-month average water deliveries of 42,407 Acre-Feet (AF) and is shown below.
FY24-25 FY25-26
Budget
(in Millions)
Budget
(in Millions)
Change
(in Millions)
Operations and Maintenance $45.41 $45.87 $0.46
Capital Projects $15.66 $18.28 $2.62
Biological Opinion Compliance, Water
Supply Planning, Water Conservation $7.53 $8.80 $1.27
Debt Service $5.83 $9.07 $3.25
Totals $74.43 $82.02 $7.60
Grants, Use of Fund Balance, and Bond
Proceeds $18.13 $21.34 $3.21
Sonoma Water iv Draft 2/24/2025
Budget and Rate Reduction Measures: Changes made since January 17, 2025 Draft Water Transmission Budget:
• Reduced rate increase from 10.67% to 8.68% (Santa Rosa Aqueduct), 11.97% to 9.98% (Petaluma Aqueduct) and 9.37% to 7.60% (Sonoma Aqueduct).
• Reduced O&M contract services by an additional $871,000 by deferring the Collector Capacity Study, and portions of the Natural Hazard reliability study, Wohler-Mirabel Flood Resilience Alternatives Evaluation, Transmission System Condition Assessments, and the Tank Recoating Program. The consequences of reducing the tank recoat program budget are that for the subsequent two fiscal years (FY 2026/2027 and FY 2027/2028), there will be less of a buffer for cost overruns, less water sales revenue, reduced capacity to build fund balance to smooth rates, and on top of the rate increase needed to operate and maintain the water transmission system, there would be up to an additional 3% increase in rates each year just from the tank recoat program. Note that we also deferred Tank recoat costs in the prior year’s budget as a rate reduction measure. The additional funding for the tank recoat program has been included in the budget to smooth rates over the 10-year tank recoat program. • Reduced Watershed Planning/Restoration contract services by $100,000 for the Dry Creek Habitat Enhancement – Phase 4.
• Reduced Common Facilities FY25/26 budget request by $1.5 million by deferring design costs for the Water Treatment System Modernization - Phase 2 and deferring project construction of the Collector 3 and 5 Liquefaction Mitigation to FY28/29.
• Incorporated additional revenue of $860,854 tied to the Warm Springs Dam Hydropower Retrofit Project for FY24/25 in Common Facilities. This revenue reflects a new request for reimbursement from the Power and Water Resources Pooling Authority Cap-and-Trade Program. It has a dollar-for-dollar reduction on the amount of bond funding needed in Common Facilities over the 3-year bond window. • Revised bond and loan charges: a) updated debt service figures; b) Common Bond Charges are decreasing due to removal of costs tied to the Water Treatment System Modernization - Phase 2 Project, Collector 3 and 5 Liquefaction Mitigation Project, and factoring in the additional revenue to reimburse costs for the Warm Springs Dam Hydropower Retrofit Project. • Updated Exhibit A to reflect changes noted above and to fix typographical errors in the amount of reductions from the Tank Recoating Program and Ely BPS Flood Control and Electrical Upgrade Project. • Fixed sum error in calculation of rate for Water Management Planning. This resulted in an additional $20,000 in expenses, increasing the rate by $0.47 A/F.
• Various other typographical or sum errors not affecting the rate.
FY 2025/2026 Draft Budget Financial Summary compared to FY 2024/2025 Adopted Budget: Factors affecting the rate increase:
The terms of the Restructured Agreement for Water Supply require that budgeted deliveries be the lesser of the preceding twelve months of water delivered, or the average annual amount of water delivered during the preceding 36 months. This requirement is to ensure Sonoma Water can meet its obligation to set rates at an amount that covers the projected costs for the following year. Sonoma Water must also generate sufficient revenue to cover debt obligations and maintain a debt coverage ratio as stipulated in outstanding bond issuances.
Deliveries remain low by historical standards and trends show negative or flat growth both in the near and long term. Sonoma Water’s rate is fully volumetric meaning that lower deliveries drive rates higher. Year-to-year differences in budgeted deliveries averaged over the 3-, 5-, and 10-year periods have been negative, even when
Sonoma Water v Draft 2/24/2025
including the deviation proposed and approved in FY 2024/2025 to use the higher of the delivery numbers. Year- to-year differences in actual deliveries inherently have more variability but have also shown flat growth when averaged over the 3-, 5-, and 10-year periods.
Difference in Year-to-Year Budgeted
Deliveries
Difference in Year-to-Year Actual
Deliveries
3-year
average
5-year
average
10-year
average
3-year
average
5-year
average
10-year
average
-2.31% -0.37% -0.37% 1.30% 0.56% 0.44%
* Increase in actual deliveries in FY20-21 was partially due to the backfilling of Stafford Lake by NMWD. In FY21-22, MMWD took excess winter instream flows. FY22-23 was an historic low at 36,032 AF.
Multiple years of drought and mandated conservation measures resulted in low water deliveries, low water sales revenue, and significantly reduced fund balance reserves. The FY budgeted deliveries of 42,407 AF represent a 1% decrease (419 AF) from the FY 2024/2025 budget, and the combination of low reserves, increasing operations and maintenance costs to keep pace with critically needed infrastructure improvements, and capital projects to replace aging infrastructure, has contributed to needed rate increases.
Sources of revenue including water sales and charges for services, federal and state grants, existing fund balances, contributions, interest, and bond financing are detailed below:
Sonoma Water vi Draft 2/24/2025
Revenues
FY 2025/2026
Draft Budget
Increase/(Decrease)
over FY 2024/2025
Water Sales & Charges for Services $60,872,586 8.1%
Operating Grants 73,000 (93%)
Capital Grants 0 0%
Contributions 593,870 97.3%
Interest & Investment Earnings 1,100,172 (.8%)
TOTAL $62,630,890 6.6%
*Operating Grant decrease associated with $1 million Sonoma Marin Drought Resiliency USBR WEEG Grant. Grant budgeted in FY24/25. This is a multi-year project and project revenues/expenses will be rolled forward into the adjusted budget. *Capital Grant figure only reflects new awards. Most capital grants are multi-year projects and project revenues/expenses will be rolled forward into the adjusted budget. New awards not known at budget time will be added to the adjusted budget. *Contributions include TOW diverted revenue and WUE Passthroughs including the new $250,000 Spatial Analysis Project which is rate neutral. Without spatial analysis the increase would be
15.7%.
Fund Balance FY 2025/2026
Draft Budget
Increase/(Decrease)
over FY 2024/2025
Use of Fund Balance: 35% from Operating
Funds; 65% from Capital Funds $ 8,054,728 (24%)
Bond Funds FY 2025/2026
Draft Budget
Increase/(Decrease)
over FY 2024/2025
Use of Bond Funds (FY 2025/206: issuing
$32.96 million in revenue bonds) $ 13,215,000 105%
Budget Requirements:
• Maintain 3-month operating reserve.
• Maintain 1.15x debt coverage bond covenant.
• Rates collect 1.15x debt service in accordance with the provisions of the Water Transmission System Master Ordinance.
Significant efforts have been made to cut and defer more than $16.69 million in O&M, subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project costs that would occur in the 3-year required time frame for expending revenue bonds (see Exhibit A). The proposed rate increases are
7.60% to 9.98% for prime contractors served from the three aqueducts. See page xi which also includes rates for Town of Windsor, NMWD, and MMWD. Sonoma Water is not alone in facing rate pressures, as decreasing water sales are forcing other wholesalers and retailers to raise rates beyond historical averages to address maintenance and capital needs.
Operations and Maintenance (O&M)
• 8.1% increase in water sales revenue due to a decrease in deliveries and the rate needed to cover budgeted expenditures.
• 1.0% increase in budgeted expenditures. Budgeted expenditures increase is mostly attributable to cost increases for maintenance equipment, equipment rentals and leases, SCADA system contributions,
Sonoma Water vii Draft 2/24/2025
utilities, and staff labor costs tied to negotiated labor agreements, offset by decreases in other contract services.
• O&M budget has been reduced by $10.04 million by deferring maintenance costs, studies, and projects.
Included in this amount is a $3.21 million reduction to the Tank Recoat Program and a $3.05 million reduction to the SR AQ Cathodic Protection project. These deferrals could result in rate spikes in future years as the projects cannot be deferred indefinitely. See list of deferrals in Exhibit A. • Deferring maintenance projects reduced the O&M rate increase from more than 21.7% to 1.4%. • Budgeted projects have been thoroughly reviewed and edited and represent the budgeted work that can reasonably occur in FY 2025/2026. Budgeted maintenance projects are a priority, and further delays and cuts pose detrimental operational impact and risk.
• Must have sufficient net operating revenues to meet 1.15x debt coverage bond covenant requirement.
Note that this budget includes a $32.96M bond issuance to fund the capital program. • Water Sales Revenue Shortfall:
o FY 2021/2022: $1M
o FY2022/2023: $10.2M
o FY 2023/2024: $1.6M
o FY 2024/2025:Currently estimating we will meet budgeted deliveries • FY 2024/2025 expenditures are anticipated to align with the adjusted budget. Unspent budget is rolled forward to subsequent budget years to avoid being included in the rate calculation more than once.
See pages 19-26 for details on major services & supplies, maintenance – equipment, and consulting/contractual services occurring in FY25/26.
Capital Projects
Capital Projects: FY 2025/2026 draft budgeted expenditures of $18.28 million increased by $2.62 million or
16.73%. The capital program is fully funded by grants, bonds, and use of fund balance. See detailed list of capital projects on page xvii.
Capital budget has been reduced by $5.37 million by deferring design of Water Treatment System Modernization - Phase 2, construction awards for Collectors 3 and 5 Liquefaction Mitigation, and the Bennett Valley Fault Crossing Project pending availability of grant funding. Capital budget also reduced by $87.93 million in additional capital project costs that would have occurred in the 3-year required time frame for expending revenue bonds. See list of deferrals in Exhibit A.
Hazard mitigation projects ($8.31 million) and infrastructure improvement projects/drought resiliency projects ($9.97 million) are fully funded by Water Revenue Bonds, Grants, and Fund Balance.
Investing in Infrastructure:
Construction: Hazard Mitigation Projects $8,176,284
Ely BPS Flood Control & Electrical Upgrade 426,440 River Diversion Structure (RDS) Upgrade Project 4,000,000 Seismic Retrofit of Storage Tanks 1,057,177 Wilfred Booster Station 2,692,667
Design: Hazard Mitigation Projects $130,247
Santa Rosa Creek Crossing 130,247
Sonoma Water viii Draft 2/24/2025
Construction: Other Capital Projects $7,259,724
Mirabel Collector Wells Pump Hoist Upgrades 2,431,357 Occidental Road Well 920,949
Ralphine Tanks Flow Thru Conversion 280,540 Sebastopol Road Well 707,215
Todd Rd Well Discharge Connection 597,110 Warm Springs Dam Hydropower Retrofit 2,322,553
Design Other Capital Projects $2,714,165
Kawana-Ralphine SBS Pipeline 767,250
Mirabel/Wohler Storage Building 411,130 Water Treatment System Modernization - Phase 1 526,880 Water Treatment System Modernization - Phase 3 (River Road) 1,008,905
Biological Opinion
• 9.6% increase in revenue due to a decrease in deliveries and the rate needed to cover budgeted expenditures.
• Subfund budget has been reduced by $1,062,000 by deferring costs. See list of deferrals in Exhibit A. • $3.2 million in Use of Fund Balance reduces rate increase from 202.58% to 14.14%. • 14.14% rate increase compared to 11.37% increase in FY 2024/2025 when $1.7 million in Use of Fund Balance was budgeted.
• Expenditures are anticipated to range from $3 million to $4.5 million annually in this subfund. A rate of $45.71/AF at 42,407 AF generates $1.93 million in revenue. There is a need to increase revenue in this fund to cover a greater portion of annual costs as we continue to utilize fund balance to keep the rate low. If more fund balance were used, there would be a significant rate spike in subsequent years to generate sufficient revenue for the subfund. The rate increase is intended to smooth future rate increases. • See pages 34-36 for list of consulting/contractual services occurring in FY25/26.
Water Conservation
• 14.1% decrease in revenue due to a reduction in anticipated grant revenue partially offset by rate needed to cover budgeted expenditures.
• 15.11% decrease in expenditures.
• Subfund budget has been reduced by $126,000 by deferring costs. See list of reductions in Exhibit A. • $210,000 in Use of Fund Balance. Reduces rate increase from 15.51% to 7.20%. o FY 2024/2025 Adopted Budget used $250,000 in Fund Balance to reduce the Water Conservation Rate Increase to 10.11%.
o Without the Use of Fund Balance in the FY 2024/2025 Adopted budget, the Water Conservation rate increase would have been 20.90%.
• See pages 34-36 for list of consulting/contractual services occurring in FY25/26.
This year the Water Conservation Subfund budget is only inclusive of what is needed to maintain existing successful regional programs of the Partnership, including the Water Education Program, Green Business Program, Garden Sense Program, Water Loss Working Group and Validation Services, QWEL Program, Eco- Friendly Garden Tour, and WaterSmart Plant Label Program. The budget also includes funds to implement a
Sonoma Water ix Draft 2/24/2025
spatial analysis project for the Sonoma-Marin Saving Water Partnership that has offsetting revenue contributed outside the subfund rate by participating members.
Water Management Planning and Recycled Water and Local Supply For both of these subfunds, low budgeted expenditures, low rates, and use of fund balance have minimal impact (2.7% and 0.1% respectfully) on the overall rate increase.
Water Management Planning rate is increasing for budget needed for the Annual Water Supply & Demand Assessment and upcoming 2025 Urban Water Management Plan (UWMP). The increase in the rate is to fund a new consultant agreement for these tasks and associated staff time. Sonoma Water used $156,000 in Fund Balance towards this effort. See pages 34-36 for list of consulting/contractual services occurring in FY25/26.
Recycled Water and Local Supply costs have historically been for Sonoma Water’s share of the groundwater sustainability agency’s contributions. Sonoma Water’s share of mandatory fees has been included in the Agency Operating fund in FY 2024/2025. The rate is set to $0.14/AF which covers depreciation expenses incurred in the fund.
Debt Service
Debt Service Expenditures increase by $3.25M or 55.8% resulting from the planned issuance of $32.96M in 2025 Water Revenue Bonds to fund critical infrastructure projects in Petaluma AQ, and Storage and Common capital funds.
Debt service is driving the majority of the rate increase. A list of capital projects that we anticipate funding with revenue bond proceeds in the 3-year required time frame is shown in the Long-Range Financial Plan.
Summary
The draft proposed budget for FY 2025/2026 is based on accomplishing the required elements of the Biological Opinion, maintenance of facilities, continued implementation of hazard mitigation and reliability projects, and projects to maintain, replace, and improve critical infrastructure.
Significant efforts have been made to cut and defer more than $ 16.68 million in O&M , subfund, and capital projects from the FY 2025/2026 budget and $87.93 million in additional capital project costs that would occur in the 3-year required time frame for expending revenue bonds (see Exhibit A). The proposed rate increases are
7.60% to 9.98% for prime contractors served from the three aqueducts. See page xi which also includes rates for Town of Windsor, NMWD, and MMWD.
Sonoma Water recognizes the profound impact of natural hazards, the remnants of the COVID-19 pandemic, inflationary pressures, and other economic circumstances to many residents, businesses, and our retail water contractors throughout our county and beyond. In response to the far-reaching financial hardships, Sonoma Water made a conscious effort to reduce rate increases while continuing to maintain system reliability and public health and safety.
Factors affecting the Rate Increase:
• 1.0% decrease in deliveries
• Three years with actual water deliveries at 4%, 21.2%, and 1.2% less than budget. Total budget shortfall over three years is 12,105 AF.
• 1.0% increase in O&M costs.
• 16.7% increase in Capital Project costs mostly attributable to capital project construction costs. • 16.9% increase in Subfund costs.
Sonoma Water x Draft 2/24/2025
• 55.8% increase in debt service tied to 2025 Water Revenue Bond necessary to fund near-term critical capital improvement projects.
• 12.3% of the rate increase is attributable to the O&M budget, 74.9% to capital projects and debt service, and 12.8% to the subfunds (Water Management, Watershed Planning and Restoration, Recycled Water and Local Supply, and Water Conservation).
• Increases in material and equipment costs for aging infrastructure and priority maintenance projects that can no longer be deferred, supply chain disruptions, long lead times on equipment, and the current inflationary environment are putting continued upward pressure on the Water Transmission System budget.
Sonoma Water continues to have one of the lowest wholesale water rates in the San Francisco Bay Area. The chart below compares the proposed FY25/26 (if known) rate per AF to the current rates of other wholesale water agencies in the bay area.
* SFPUC and Valley Water rates for FY25/26 not available and FY24/25 rates are used as a placeholder.
Sonoma Water xi Draft 2/24/2025
Proposed rates are shown in the table below:
Charge / Aqueduct Santa Rosa Petaluma Sonoma
Deliveries (Acre-Feet) 42,407
O&M $1,029.16 $1,029.16 $1,029.16
Water Management Planning $4.57 $4.57 $4.57
Watershed Planning & Restoration $45.71 $45.71 $45.71 Recycled Water and Local Supply $0.14 $0.14 $0.14
Water Conservation $63.83 $63.83 $63.83
Total O&M $1,143.41 $1,143.41 $1,143.41
Storage & Common Bond/Loan Charges $246.45 $246.45 $246.45 Petaluma Aqueduct Bond/Loan Charge $15.66
Sonoma Aqueduct Bond/Loan Charge $144.56
Prime Contractors $1,389.86 $1,405.52 $1,534.42
Discretionary Charges
Capital Charges - to build fund balance for
future projects
$11.00 $0.00 $34.90
Total Prime Contractors $1,400.86 $1,405.52 $1,569.32 Total Overall Increase: 8.68% 9.98% 7.60%
Entity Rate per AF Rate Increase
Town of Windsor $1,400.86 8.68%
Town of Windsor (Diverted Water) $114.26 14.32%
NMWD 1,472.48 6.30%
MMWD $1,740.53 8.10%
• Deliveries: (Budget Packet Pages 9-14):
FY 2022/2023
Budget
FY 2022/2023
Actuals
FY 2023/2024
Budget
FY 2023/2024
Actuals
FY 2024/2025
Budget
FY 2025/2026
Est. Budget
3-year average
12-months
3-year average 3-year average
45,748 36,032 41,847 41,317 42,826 42,407
21.2% less
than budget
1.3% less than
budget
A/F change (9716)
(530)
FY 2024/2025 Budgeted Deliveries vs FY 2025/2026
Budgeted Deliveries
1.0% decrease
Sonoma Water xii Draft 2/24/2025
• Operations and Maintenance (O&M) – Water Transmission O&M Fund (Budget Packet Pages 15-26):
o In accordance with the Restructured Agreement for Water Supply:
The rate is calculated by dividing operations and maintenance expenditures (less specific cash and noncash revenues and expenditures) by budgeted deliveries.
O&M Fund
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $13.77 1.36% Increase is attributable to increased infrastructure maintenance needs.
Revenue $4,489,000 7.93% Increase in revenue is attributable to the rate increase.
Expenditures $4,279,000 6.74%
Increase is attributable to cost increases for maintenance equipment, equipment rentals and leases, SCADA system
contributions, utilities, staff labor costs tied to negotiated labor agreements, and other expenditures increases described below, offset by decreases in contract services.
Factors affecting the O&M rate:
O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Labor $1,022,000 5.06%
Increase is attributable to an increase in labor costs for maintenance projects, offset by projects deferred to reduce the rate increase. The majority of this increase is due to negotiated labor rates.
Power $553,000 13.00%
Power demand and costs expected to increase roughly 13%. The majority of this increase is associated with increased transmission and distribution costs.
Chemicals ($1,000) -0.06% Costs expected to remain stable after several years of large increases.
Testing/Analysis $10,000 4.17%
Increase associated with expanded sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as additional microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.
Contract Services ($2,462,000) -20.46% Decrease attributable to deferring cathodic protection and tank recoats.
Maintenance -
Equipment $169,000 6.78%
Increase attributable to increased costs of the Pump 9 replacement offset by $270,000 in projects that have been deferred to reduce the rate increase.
Rents and Leases
- Heavy Eqt $175,000 43.75% Increase to align with FY23/24 actuals.
Sonoma Water xiii Draft 2/24/2025
O&M Fund
Expenditures
Increase
(Decrease)
in Dollars
Percent
Change Description
Equipment
Usage Charges $105,000 9.55% Increase attributable to increased use of Sonoma Water equipment to implement routine maintenance projects.
SCADA $354,351 16.17% Increase attributable to water transmission system’s share of SCADA maintenance expenses and capital project costs.
Operating
Transfers $3,824,000 8.00%
Operating Transfers (OT’s) move revenue generated by rates into respective funds (debt service funds, subfunds, aqueduct capital funds and Common Facilities) and maintain an appropriate fund balance.
• Subfunds: (Budget Packet Pages 27-36):
o Subfund rates are calculated by dividing subfund expenditures minus grant revenue by budgeted water deliveries.
o Water Management Planning:
Expenditures are for Urban Water Management Planning (UWMP) which is required to be updated every five years and the Annual Water Supply & Demand Assessment.
Water
Management
Planning
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $4.22 1206.1%
Fiscal Year 2024/2025 rate is $0.35. Fund is for Urban Water Management Plan updates and the Annual Water Supply &
Demand Assessment. Using $156,000 in fund balance. Rate increase is due to use of fund balance to reduce rates in prior years and work needed to submit the 2025 Urban Water Management Plan.
Revenue $186,000 803.1%
Increase due to subfund rate increase and decreased interest earnings offset by use of fund balance. Increasing use of fund balance to smooth rate increases.
Expenditures $205,000 141.4%
Budget increase is due to contract service and staff time related to the Annual Water Supply & Demand Assessment and 2025 Urban Water Management Plan. Low budgeted expenditures, low rates, and use of fund balance have minimal impact (2.7%) on the overall rate increase.
Sonoma Water xiv Draft 2/24/2025
o Watershed Planning and Restoration:
Expenditures are for planning, design, and implementation of watershed restoration projects and projects required under the Biological Opinion.
Watershed
Planning and
Restoration
Increase
(Decrease) in
Dollars
Percent
Change Description
Rate per AF $5.66 14.1%
Fiscal Year 2024/2025 rate is $40.04. Rate increase is primarily a result of costs associated with maintenance of Dry Creek Phases 4 and 5, RRIFR Estuary Management & Monitoring, the new Biological Opinion, and fire fuel reduction offset by the increased use of fund balance. Rate of $121.17/AF based on $5.1M in expenditures and 42,407 AF is reduced to $45.71/AF by using $3.2M in fund balance. In Fiscal Year 2024/2025, $1.7M in fund balance was utilized to offset rate increases.
Revenue $190,000 9.6%
Increase due to subfund rate increase and higher interest earnings offset by use of fund balance to reduce and smooth overall rate increase.
Expenditures $1,681,000 48.6%
Increase in expenditures for maintenance of Dry Creek Habitat Enhancement Phases 4 and 5, increased efforts for RRIFR Estuary Management & Monitoring, fire fuel reduction, and required efforts for the new biological opinion.
Sonoma Water xv Draft 2/24/2025
o Recycled Water and Local Supply:
Expenditures are for planning, design, and implementation of recycled water and local supply projects. The fund previously included water contractor projects under the Local Recycled Water Tier 2 (LRT2) Program.
Recycled Water
and Local Supply
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $0.14
NA – last
FY rate was
$0.
Fiscal Year 2024/2025 rate is $0.00. Rate increase of $0.14 for depreciation.
Revenue ($2,000) -22.2% Using an estimated $0 in fund balance. Decrease in revenue is associated with decreased expenses in the subfund.
Expenditures ($25,000) -80.6%
Decrease is due to Sonoma Water's share of Groundwater
Sustainability Agency mandatory fees moving to the Agency Operating Fund.
Water Conservation:
Expenditures are for water use efficiency projects, outreach, and education.
Water
Conservation
Increase
(Decrease)
in Dollars
Percent
Change Description
Rate per AF $4.29 7.2%
Fiscal Year 2024/2025 rate is $59.55. Rate increase is primarily a result of not being able to utilize as much fund balance to offset rate as was used in prior year. Rate of $68.78/AF based on $2.9M of net expenditures and 42,407 AF is reduced to $63.83/AF by using $210,000 in fund balance. In Fiscal Year 2024/2025, net expenditures were 2.8M and $250,000 in fund balance was utilized to offset rate increases.
Revenue ($539,000) -14.1% Decrease due to subfund rate increase offset by lower anticipated grant funding than prior year budget.
Expenditures ($589,000) -15.1%
Decrease is associated with decreased planned expenditure due to lack of a new grant funded project. Expenditures are used to implement water use efficiency, outreach and education projects, and address ongoing water conservation needs.
Sonoma Water xvi Draft 2/24/2025
• Storage, Common, and Sonoma Bond/Loan Charges: (Budget Packet Pages 48-62):
o The rates are calculated by dividing the annual debt service and reserve requirements (2015A, 2019A, 2022A, and anticipated 2025A Water Revenue Bonds) by water deliveries.
Storage and
Common
Bond/Loan
Charges
Increase
(Decrease)
in Dollars
Percent
Change Description
Storage
Bond/Loan
Charge
$18.63 59.2%
Fiscal Year 2024/2025 rate is $31.47. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service higher than previous year due to issuance of 2025 Bonds for capital projects in the Storage Fund and decrease in budgeted water deliveries.
Common
Bond/Loan
Charge
$65.13 49.6%
Fiscal Year 2024/2025 rate is $131.22. Rate is based on revenue requirement for debt service divided by water deliveries. Total Debt service higher than previous year due to issuance of 2025 Bonds for capital projects in the Common Fund and decrease in budgeted water deliveries.
Petaluma
Aqueduct
Bond/Loan
Charge
$15.66
NA – last
FY rate was
$0.
Fiscal Year 2024/2025 rate is $0. Petaluma Aqueduct pays an additional revenue bond charge for the bonds associated with Ely BPS Flood Control and Electrical Upgrade and Wilfred Booster Station Projects. Reduced Aqueduct Capital Charge and use of Fund Balance in prior years results in total Debt service and rate increase that are higher in FY 2025/2026 as Petaluma AQ will be bonding for the first time with the 2025 Revenue Bond Issuance.
Sonoma
Aqueduct
Bond/Loan
Charge
($0.93) -0.6%
Fiscal Year 2024/2025 rate is $145.49. Sonoma Aqueduct pays an additional revenue bond charge for the bonds associated with Sonoma Booster Station Electrical Upgrade and Pumping Reliability Project, Bennett Valley Fault Crossing Project, and other Creek Crossing Projects on the Aqueduct. Total Debt service lower than previous year due to structure of the bond payments and the fact that Sonoma AQ will not be utilizing funds from the 2025 Revenue Bond Issue.
Aqueduct Capital Charge: (Budget Packet Page 1):
o A discretionary charge is added by the water contractors to build fund balance for future aqueduct capital projects and to provide rate stabilization capacity. o The FY 2024-2025 budget included an $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $0 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct.
o The FY 2025-2026 draft budget includes a $11 per Acre-Foot charge for the Santa Rosa Aqueduct, a $0 per Acre-Foot charge for the Petaluma Aqueduct, and a $34.90 per Acre-Foot charge for the Sonoma Aqueduct pending input from the water contractors
• Overall Draft Proposed Rate Increases: (Budget Packet Pages 1-8):
o 8.68% (Santa Rosa Aqueduct); 9.98% (Petaluma Aqueduct); 7.60% (Sonoma Aqueduct) o FY2025/2026 budgeted deliveries are based on 36-month average water deliveries (42,407 AF).
FY2025/2026 budgeted deliveries are 1.0% less than FY 2024/2025 budgeted deliveries.
Sonoma Water xvii Draft 2/24/2025
FY 2025-2026 Capital Projects (Budget Packet Pages 37-46):
Water Transmission Budget FY25-26
Capital Projects Summary
Project Category Amount Status
Santa Rosa Creek Crossing Santa Rosa AQ 130,247 Funding de-obligated; re-evaluating project design and schedule Ely BPS Flood Control & Electrical Upgrade
Petaluma AQ 426,440
Awarded Q3 FY21/22; Delayed due to Elec Supply Chain issues; Substantial Completion anticipated Oct 2025
Wilfred Booster Station Petaluma AQ 2,692,667 90% design; Prepurchase Elec Equip in fabrication; Anticipate Construction Award Q1 FY25/26 Kawana-Ralphine SBS Pipeline Storage 767,250 Consultant Selection 24/25; multi year design; construction award anticipated FY28/29 Seismic Retrofit of Storage Tanks Storage 1,057,177 Site specific geotech planned at each tank; seismic upgrades tied to Tank Recoat schedule Ralphine Tanks Flow Thru Conversion Storage 280,540 1st tank design underway; flow mixing system upgrades tied to Tank Recoat schedule Mirabel Collector Wells Pump Hoist Upgrades Common 2,431,357 Design agrmt anticipated Q3 FY24/25; construction award anticipated Q4 FY25/26 Mirabel/Wohler Storage Building Common 411,130 Design Advancing; CEQA/permitting commencing Q4 FY24/25; Anticipate award FY26/27 River Diversion Structure (RDS) Upgrade Project Common 4,000,000 Design Advancing; Anticipate award in FY25/26 Occidental Road Well
Common 920,949
Well drilling contract complete FY23/24; topside design complete FY24/25; construction award in Q4 FY24/25
Sebastopol Road Well
Common 707,215
Construction ongoing; delays in electrical equipment delivery; Substantial Completion anticipated Q4 FY24/25
Todd Rd Well Discharge Connection Common 597,110 Design and Construction award in 25/26 Warm Springs Dam Hydropower Retrofit Common 2,322,553 Switchgear pre-purchased in FY24/25. Design being finalized; Anticipate award in Q2 FY25/26 Water Treatment System Modernization - Phase 1 Common 526,880 Design agrmt anticipated Q4 FY24/25; construction award anticipated FY26/27 Water Treatment System Modernization - Phase 3 (River Road) Common 1,008,905 Land acquisition being explored in FY25/26 TOTAL 18,280,420
Santa Rosa AQ 130,247
Petaluma AQ 3,119,107
Sonoma AQ -
Storage 2,104,967
Common 12,926,099
18,280,420
Sonoma County Water Agency
Fiscal Year 2025/2026 Draft Water Transmission Budget and Rates Budget Packet Page
Rates
Prime Contractor Rates Summary 1-2
Water Charges Per Acre-Foot 3
Revenue Summary 4
Water Rates 5
O&M Rate 6
Line Item Rate Comparison 7
Russian River Projects and Conservation Charges 8
Deliveries
Deliveries (36 Mo) 9
Deliveries (12 Mo) 10
Deliveries and Revenue - All Aqueducts 11
Deliveries and Revenue - Santa Rosa Aqueduct 12
Deliveries and Revenue - Petaluma Aqueduct 13
Deliveries and Revenue - Sonoma Aqueduct 14
Agency O&M Fund
Agency Fund Cash Summary 15-18
Major Services and Supplies Expenditure Items 19
Equipment Maintenance, Contracts, Consulting Services 20-21 Contract Services & Contributions Project Information 22-26 Subfunds
Water Management Subfund 27
Watershed Planning and Restoration Subfund 28-29
Recycled Water and Local Supply Subfund 30-31
Water Conservation Subfund 32-33
Subfund Contract Services 34-36
Facilities and Other Funds
Santa Rosa Aqueduct Capital Fund 37-38
Petaluma Aqueduct Capital Fund 39-40
Sonoma Aqueduct Capital Fund 41-42
Storage Facilities Cash Summary 43-44
Common Facilities Cash Summary 45-46
North Marin Water Deposit Fund 47
Bonds and Loans
State Revolving Loan Debt Service Fund 48
State Revolving Loan Reserve Fund 49
Storage Bonds 2015 Cash Summary 50
Common Bonds 2015 Cash Summary 51
Sonoma Bonds 2015 Cash Summary 52
Common Bonds 2019 Cash Summary 53
Sonoma Bonds 2019 Cash Summary 54
Storage Bonds 2022 Cash Summary 55
Common Bonds 2022 Cash Summary 56
Sonoma Bonds 2022 Cash Summary 57
Petaluma Bonds 2025 Cash Summary 58
Storage Bonds 2025 Cash Summary 59
Common Bonds 2025 Cash Summary 60
Bond & Loan Charges 61-62
Fund Balances and Operating Transfers 63
DRAFT
Fiscal Year 2025/2026 Prime Contractor Rates Summary
Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct FY24-25
Percent
Change
SR Pet Son
O&M Charge [4.2] $1,029.16 $1,029.16 $1,029.16 $1,015.39 $1,015.39 $1,015.39 1.36% Water Management Planning Sub-charge [4.13] 4.57 4.57 4.57 $0.35 $0.35 $0.35 1206.12% Watershed Planning/Restoration Sub-charge [4.14] 45.71 45.71 45.71 $40.04 $40.04 $40.04 14.14% Recycled Water & Local Supply Sub-charge [4.15] 0.14 0.14 0.14 $0.00 $0.00 $0.00 N/A Water Conservation Sub-charge [4.16] 63.83 63.83 63.83 $59.55 $59.55 $59.55 7.20% O&M Charge $1,143.41 $1,143.41 $1,143.41 $1,115.33 $1,115.33 $1,115.33 2.52% Storage and Common Bond & Loan Charges 246.45 246.45 246.45 $162.69 $162.69 $162.69 51.49% Petaluma Aqueduct Bond Charge 15.66 $0.00 N/A Sonoma Aqueduct Bond Charge 144.56 $145.49 -0.64%
PRIME CONTRACTORS $1,389.86 $1,405.52 $1,534.42 $1,278.02 $1,278.02 $1,423.51 8.75% Capital Charges - to build fund balance
for future projects 11.00 0.00 34.90 $11.00 $0.00 $34.90 0.00% PRIME CONTRACTORS 11.00 0.00 34.90 $11.00 $0.00 $34.90 0.00% TOTAL PRIME CONTRACTORS $1,400.86 $1,405.52 $1,569.32 $1,289.02 $1,278.02 $1,458.41 8.68% Increase from Fiscal Year 2024/2025 8.68% 9.98% 7.60% 9.88% 9.98% 8.14% With No Capital Charge 7.82% 9.98% 5.21%
Deliveries:
12-month 36-month
FY16-17 40,524
FY17-18 41,446
FY18-19 41,768
FY19-20 43,870
FY20-21 43,707
FY21-22 46,095
FY22-23 45,748
FY23/24 41,847
FY24-25 42,826
FY25-26 42,407
CHARGE PER ACRE FOOT:
2/24/2025
1 DRAFT
Fiscal Year 2025/2026 Prime Contractor Rates Summary
CHARGE PER ACRE FOOT:
Petaluma AQ
NMWD NMWD
Percent
Change
FY25-26 FY24-25
O&M Charge [4.2] $1,029.16 $1,015.39 1.36%
Water Management Planning Sub-charge [4.13] 4.57 0.35 1206.12% Watershed Planning/Restoration Sub-charge [4.14] 45.71 40.04 14.14% Recycled Water & Local Supply Sub-charge [4.15] 0.14 0.00 N/A Water Conservation Sub-charge [4.16] 63.83 $59.55 7.20% O&M Charge $1,143.41 $1,115.33 2.52%
North Marin Bond & Loan Charge [4.9] 148.66 90.54 64.19% Russian River Conservation Charge [4.18 (a)] 160.41 159.28 0.71% Russian River Projects Charge [4.18 (b)] 20.00 20.00 0.00% TOTAL NMWD $1,472.47 $1,385.15 6.30%
Rates Rate Increase
Town of Windsor 1,400.86 8.68%
Town of Windsor (Diverted Water) 114.26 14.32%
NMWD 1,472.48 6.30%
MMWD 1,740.53 8.10%
2/24/2025
2 DRAFT
SANTA
ROSA
AQUEDUCT
% INCR.
(DECR.)
PETALUMA
AQUEDUCT
% INCR.
(DECR.)
SONOMA
AQUEDUCT
% INCR.
(DECR.)
2025 - 2026 1400.86 8.68% 1405.52 9.98% 1569.32 7.60%
2024 - 2025 1289.02 9.88% 1278.02 9.98% 1458.41 8.14%
2023 - 2024 1173.09 10.56% 1162.09 9.42% 1348.67 10.56% 2022 - 2023 1061.04 6.05% 1062.04 6.15% 1219.90 6.52%
2021 - 2022 1000.46 3.47% 1000.46 3.47% 1145.18 3.43%
2020 - 2021 966.95 5.30% 966.95 5.30% 1107.21 5.57%
2019 - 2020 918.30 4.60% 918.30 4.60% 1048.80 4.77%
2018 - 2019 877.88 3.67% 877.88 3.67% 1001.06 5.98%
2017 - 2018 846.78 4.98% 846.78 4.98% 944.56 5.58%
2016 - 2017 806.59 5.98% 806.59 5.98% 894.62 6.94%
2015 - 2016 761.05 4.16% 761.05 4.16% 836.55 5.46%
2014 - 2015 730.68 3.60% 730.68 3.60% 793.24 3.19%
2013 - 2014 705.30 4.95% 705.30 4.95% 768.75 3.84%
2012 - 2013 672.03 5.98% 672.03 5.98% 740.34 5.26%
2011 - 2012 634.11 5.00% 634.11 5.00% 703.33 4.28%
2010 - 2011 603.92 6.93% 603.92 6.93% 674.47 8.42%
2009 - 2010 564.78 19.88% 564.78 10.50% 622.11 27.95%
2008 - 2009 471.13 6.66% 511.13 10.71% 486.22 7.22%
2007 - 2008 441.70 2.41% 461.70 2.31% 453.49 2.46%
2006 - 2007 431.29 4.51% 451.29 4.30% 442.60 4.26%
WATER TRANSMISSION SYSTEM
FY25-26 WATER CHARGES PER ACRE-FOOT
FOR PRIME CONTRACTORS
FISCAL
YEAR
A-2 2/24/2025
3 DRAFT
FY25-26 FY24-25 FY25-26
WATER CUSTOMER Budgeted Water
Use (Acre-Feet)
Rate
$/Acre-Foot
Proposed Rate
$/Acre-Foot Dollar Change Percent
Change
Santa Rosa Aqueduct 15,733 $1,289.02 $1,400.86 $111.84 8.68% Petaluma Aqueduct 8,949 1,278.02 1,405.52 127.50 9.98%
Sonoma Aqueduct 3,565 1,458.41 1,569.32 110.91 7.60%
North Marin Water District 5,357 1,385.15 1,472.48 87.33 6.30% Marin Municipal – Fourth
Off Peak 4,300 1,610.09 1,740.53 130.44 8.10%
Marin Municipal –
Supplemental 2,568 1,610.09 1,740.53 130.44 8.10%
Forestville Aqueduct 351 1,289.02 1,400.86 111.84 8.68% Wholesale/Municipal 965 1,750.08 1,883.18 133.10 7.61%
Surplus 96 1,338.40 1,372.09 33.69 2.52%
Windsor 522 1,289.02 1,400.86 111.84 8.68%
TOTAL 42,407
WATER TRANSMISSION SYSTEM
FY25-26 REVENUE SUMMARY CHART
2/24/2025
4 DRAFT
[x] ESTIMATED [ ] OFFICIAL CHARGE PER ACRE FOOT:
Santa Rosa Petaluma Sonoma
Aqueduct Aqueduct Aqueduct
PRIME CONTRACTORS
O&M Charge [4.2] $1,029.16 $1,029.16 $1,029.16
Water Management Planning Sub-charge [4.13] $4.57 $4.57 $4.57 W
atershed Planning/Restoration Sub-charge [4.14] $45.71 $45.71 $45.71 Recycled Water & Local Supply Sub-charge [4.15] $0.14 $0.14 $0.14 Water Conservation Sub-charge [4.16] $63.83 $63.83 $63.83 O&M Charge $1,143.41 $1,143.41 $1,143.41
Bond & Loan Charges - to pay for existing debt service
Storage Facilities Capital Charge [4.7] 50.09 50.09 50.09 Common Facilities Capital Charge [4.8] 196.36 196.36 196.36 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 15.66 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 144.56 Total Bond & Loan Charges 246.45 $262.11 $391.01
Discretionary:
Aqueduct Capital Charges - to build fund balance for future projects Aqueduct Facilities Capital Charges [4.6 e] 11.000 0.00 34.90 LRT2 - included in Recycled Water & Local Supply Sub-Charge above.
TOTAL PRIME CONTRACTORS $1,400.86 $1,405.52 $1,569.32
Charge without LRT2 and voluntary AQ Capital Charge $1,389.86 $1,405.52 $1,534.42
OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES
(WATER CO’S & PUBLIC AGENCIES)
O&M Charge $1,143.41 $1,143.41 $1,143.41
Capital Charges 246.45 262.11 391.01
Aqueduct Facilities Capital Charge [4.12] $493.32 $477.66 $348.76 TOTAL OTHER AGENCY CUSTOMERS/WHOLESALE CHARGES (4.12) $1,883.18 $1,883.18 $1,883.18 (120% OF HIGHEST PRIME)
FORESTVILLE
O&M Charge [4.2] * $1,029.16
Water Management Planning Sub-charge [4.13] $4.57
Watershed Planning/Restoration Sub-charge [4.14] $45.71 Recycled Water & Local Supply Sub-charge [4.15] $0.14
Water Conservation Sub-charge [4.16] $63.83
O&M Charge $1,143.41
Bond & Loan Charges - to pay for existing debt service
Aqueduct Facilities Capital Charges [4.6] 11.00
Storage Facilities Capital Charge [4.7] 50.09
Common Facilities Capital Charge [4.8] 196.36
Total Capital Charges 257.45
TOTAL FORESTVILLE $1,400.86
* Forestville Water District was exempt from Santa Rosa Aqueduct sub-charge from FY 06/07 to FY 16/17 [4.12].
NORTH MARIN WATER DISTRICT
O&M Charge $1,143.41 Note: N. Marin pays
North Marin Bond & Loan Charge [4.9] 148.66 bond and loan charge Russian River Conservation Charge [4.18 (a)] 160.41 in lieu of Capital Charge.
Russian River Projects Charge [4.18 (b)] 20.00
TOTAL NORTH MARIN WATER DISTRICT 1,472.48
FOURTH OFF-PEAK (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,560.12
Russian River Conservation Charge 160.41
Russian River Projects Charge 20.00
TOTAL FOURTH OFF-PEAK $1,740.53
SUPPLEMENTAL (MARIN MUNICIPAL)
Highest Prime on SR and PET AQ x 1.11 $1,560.12
Russian River Conservation Charge 160.41
Russian River Projects Charge 20.00
TOTAL SUPPLEMENTAL $1,740.53
SURPLUS
Non-Municipal / Municipal [4.11 (a)] $1,372.09 $1,372.09 $1,372.09 (120% of O&M Charge)
Town of Windsor $1,400.86
$1,400.86
The applicable section of the Restructured Agreement has been indicated in brackets.
Beginning in FY22/23 all water delivered to Town of Windsor is charged at the Santa Rosa Aqueduct rate [4.17 (a)]. Town of Windsor pays all subcharges [4.13, 4.14, 4.15, and 4.16] on all water they divert from the Russian River using their equipment [4.17 (b)].
SONOMA COUNTY WATER AGENCY RATES FOR WATER DELIVERIES IN FY25-26 5 DRAFT
FY 2025-26 BUDGET
SONOMA COUNTY WATER AGENCY
Operations and Maintenance Rate Computation
O & M REVENUE REQUIREMENT
ESTIMATED FISCAL YEAR EXPENDITURES $67,783,211
LESS:
Depreciation Amortization 7,569,000
Investment Income, Interest on Pooled Cash, Charges for Services 211,651 Power Sales 100,000
PWRPA Pre-paid Expense - FY 08/09 Rate Reduction-One time only "Mandatory Prudent Reserve" charge
Use of Fund Balance
Recycled Water funds (Sub-object 7277) taken from special reserve 0 Transfers Out 14,346,472
REVENUE REQUIREMENT (Net Expenditures) $45,556,088
O & M ACRE FOOT BASE
DELIVERIES: 42,407.3
LESS:
Marin Municipal 6,868.3
Surplus (Irrigation) 96.3
TOTAL BASE DELIVERIES 35,442.7
O & M RATE COMPUTATION:
Rate = Revenue Requirement - (Marin Municipal Deliveries x 1.11 x 0.92568 x Highest Prime Rate on Petaluma or Santa Rosa Aqueduct - Subfunds)
Total Deliveries - Surplus Deliveries - Marin Muni Deliveries = 45,556,088 - (4,300.00 x 1326.78) - (2,568.26 x 1326.78) 42,407.3 - 96.3 - 6,868.3
* = 1,029.16
FY25-26
2/24/2025
6 DRAFT
FY24-25 FY25-26
(Actual) (Proposed) % Change
O&M Charge 1015.39 1029.16 1.36%
Water Management Planning Sub-Charge 0.35 4.57 1206.1%
Watershed Planning/Restoration Sub-Charge 40.04 45.71 14.14% Recycled Water Sub-Charge 0.00 0.14 N/A
Water Conservation Sub-Charge 59.55 63.83 7.20%
Total O&M Charge 1115.33 1143.42 2.52%
Santa Rosa Aqueduct Rate
O&M Charge 1115.33 1143.41 2.52%
Aqueduct Facilities Capital Charges [4.6 e] 11.00 11.00 0.0% Storage Facilities Capital Charge [4.7] 31.47 50.09 59.20% Common Facilities Capital Charge [4.8] 131.22 196.36 49.64% TOTAL 1289.02 1400.85 8.68%
Petaluma Aqueduct Rate
O&M Charge 1115.33 1143.41 2.52%
Aqueduct Facilities Capital Charges [4.6 e] 0.00 0.00 N/A Storage Facilities Capital Charge [4.7] 31.47 50.09 59.20% Common Facilities Capital Charge [4.8] 131.22 196.36 49.64% Petaluma Aqueduct Facilities Capital Charges [4.6 0.00 15.66 N/A TOTAL 1278.02 1405.51 9.98%
Sonoma Aqueduct Rate
O&M Charge 1115.33 1143.41 2.52%
Aqueduct Facilities Capital Charges [4.6 e] 34.90 34.90 0.0% Storage Facilities Capital Charge [4.7] 31.47 50.09 59.20% Common Facilities Capital Charge [4.8] 131.22 196.36 49.64% Sonoma Aqueduct Facilities Capital Charges [4.6 145.49 144.56 -0.64% TOTAL 1458.41 1569.31 7.60%
FY25-26
Proposed Water Rates
2/24/2025
7 DRAFT
SONOMA COUNTY WATER AGENCY
RUSSIAN RIVER CONSERVATION CHARGE COMPUTATION
FISCAL YEAR 2025-26
PROPERTY ASSESSMENT VALUES AS OF FY24-25:
TAX CODE ENTITY SECURED UNSECURED TOTAL VALUE
14000 Forestville Co Water District 569,038,799 3,309,543 $572,348,342 42800 City of Cotati 1,458,559,933 34,271,987 1,492,831,920 43500 City of Petaluma 13,229,983,942 518,268,914 13,748,252,856 43800 City of Rohnert Park 7,486,674,091 166,266,919 7,652,941,010 44500 City of Santa Rosa 31,834,749,820 1,075,283,013 32,910,032,833 45000 City of Sonoma 3,711,593,808 124,511,392 3,836,105,200 N/A Valley of the Moon Water District 4,666,087,332 21,195,044 4,687,282,376 TOTAL $62,956,687,725 $1,943,106,812 $64,899,794,537 Notes:
1 Total value of secured and unsecured property in service areas of Prime Water Contractors of Sonoma County (see above) $64,899,794,537 2 2016-17 Sonoma County tax rate per $100 of full cash value assessed for payment of Warm Springs Dam Project Obligations 0.007 3 Total tax levied on citizens residing in service areas of Prime Water Contractors of Sonoma County, i.e., (Line 1/100) x Line 2 $4,542,986
4 Total acre feet of water delivered to Prime Water Contractors of Sonoma County (excluding North Marin and Town of Windsor) plus deliveries to Forestville 28,320.40 during the prior 12 month period ending March 31.
5 Total Russian River Conservation Charge per Acre Foot (Line 3 / Line 4) $160.41 Russian River Projects Charge RR Conservation Charge
Historical calculations Historical calculations
For FY Calculated Actual Charge
06-07 17.02 $17.02 $48.33
07-08 21.4 $20.00 $52.70
08-09 25.08 $20.00 $58.44
09-10 24.68 $20.00 $57.70
10-11 24.4 $20.00 $74.62
11-12 23.44 $20.00 $72.27
12-13 20.38 $20.00 $72.08
13-14 14.72 $14.72 $63.30
14-15 8.72 $8.72 $63.90
15-16 12.39 $12.39 $69.38
16-17 12.96 $12.96 $78.73
17-18 13.08 $13.08 $105.78
18-19 9.13 $9.13 $109.75
19-20 8.34 $8.34 $102.09
20-21 8.68 $8.68 $106.12
21-22 10.63 $10.63 $115.94
22-23 13.92 $13.92 $115.36
23-24 15.79 $15.79 $137.33
24-25 20.37 $20.00 $159.28
25-26 26.85 $20.00 $160.41
2/24/2025
8 DRAFT
DELIVERING AQUEDUCT Monthly
Santa Rosa Petaluma Forestville Sonoma Total
36 Jan-22 1073.2 1423.2 18.6 205.2 2,720.2
35 Feb-22 1041.5 1861.2 20.0 195.4 3,118.1
34 Mar-22 1227.5 2175.2 26.0 237.7 3,666.4
33 Apr-22 1233.9 2107.2 24.0 250.7 3,615.8
32 May-22 1649.3 2923.1 33.1 378.7 4,984.0
31 Jun-22 1448.3 2456.3 33.3 380.6 4,318.5
30 Jul-22 1415.9 1538.8 34.9 358.4 3,348.0
29 Aug-22 1752.9 1762.2 44.6 382.9 3,942.7
28 Sep-22 1459.2 1453.6 35.2 277.2 3,225.2
27 Oct-22 1430.9 1549.8 30.9 274.3 3,285.8
26 Nov-22 1132.2 1427.5 23.3 231.8 2,814.8
25 Dec-22 1091.1 1487.9 18.5 210.2 2,807.7
24 Jan-23 1111.4 1374.6 24.5 240.3 2,750.7
23 Feb-23 976.6 1058.4 18.4 171.8 2,225.2
22 Mar-23 1055.7 946.1 19.2 147.2 2,168.1
21 Apr-23 872.7 665.8 20.7 166.8 1,726.0
20 May-23 1388.0 1896.0 30.3 328.2 3,642.6
19 Jun-23 1413.1 2301.5 31.4 348.8 4,094.8
18 Jul-23 1853.3 2813.1 42.0 456.0 5,164.4
17 Aug-23 1832.4 2669.5 42.4 452.9 4,997.1
16 Sep-23 1552.3 2229.6 34.3 427.0 4,243.2
15 Oct-23 1600.8 2423.0 33.1 410.8 4,467.7
14 Nov-23 1201.5 1505.0 25.3 225.0 2,956.7
13 Dec-23 1039.9 1196.3 19.2 152.3 2,407.7
12 Jan-24 1173.5 1254.9 22.6 212.5 2,663.4
11 Feb-24 1024.7 975.2 18.9 127.5 2,146.4
10 Mar-24 980.2 936.0 17.6 110.9 2,044.8
9 Apr-24 1091.5 1320.5 24.3 177.1 2,613.3
8 May-24 1395.6 1587.3 28.8 315.9 3,327.6
7 Jun-24 1613.2 2179.8 37.4 454.2 4,284.6
6 Jul-24 2216.4 3252.1 52.3 574.4 6,095.3
5 Aug-24 1855.3 2751.7 41.3 400.2 5,048.5
4 Sep-24 1964.3 2830.7 45.1 427.5 5,267.6
3 Oct-24 1685.8 2692.0 38.3 411.4 4,827.5
2 Nov-24 1033.3 1769.2 21.6 290.7 3,114.7
1 Dec-24 1168.1 1623.6 22.9 281.7 3,096.4
Total Deliveries 49,055.4 66,417.7 1,054.3 10,694.4 127,221.8 3-Year Annual Average 16,351.8 22,139.2 351.4 3,564.8 42,407.3 Past 12 Months 17,201.9 23,173.0 371.2 3,784.2 44,530.2 Total Deliveries 49,055.4 66,417.7 1,054.3 10,694.4 127,221.8 Less: North Marin 16,070.9 16,070.9
Marin Municipal 20,604.8 20,604.8
Sonoma Co. Deliveries 49,055.4 29,742.0 1,054.3 10,694.4 90,546.1 3-Year Annual Average 16,351.8 9,914.0 351.4 3,564.8 30,182.0
SCHEDULE OF WATER DELIVERIES BY AQUEDUCT
PAST 36 MONTHS / 12 MONTHS AVERAGE
2/24/2025
9 DRAFT
SONOMA COUNTY WATER AGENCY SONOMA COUNTY WATER AGENCY
SCHEDULE OF ACTUAL PRIOR 12 MONTHS WATER DELIVERIES IN ACRE FEET (BY CUSTOMER TYPE) ACTUAL WATER DELIVERY DISTRIBUTION BY AQUEDUCT (ACRE FEET) JANUARY THROUGH DECEMBER PRIOR 12 MONTHS
Aqueduct * * * * DELIVERING AQUEDUCT * * * *
No. Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 TOTAL Santa Rosa Petaluma Sonoma TOTAL PRIMES DELIVERED TO:
1 City of Santa Rosa 1,121.6 973.1 911.6 1,031.8 1,328.6 1,536.9 2,078.3 1,731.2 1,845.1 1,595.0 950.8 1,090.6 16,194.6 2 City of Petaluma 469.0 401.8 357.1 506.3 630.0 709.3 955.9 757.5 817.9 740.6 469.9 498.4 7,313.7 CITY OF SANTA ROSA (A) 2 North Marin Water Dist. 424.0 360.7 358.5 488.9 628.2 697.6 891.4 632.2 923.7 751.5 459.8 477.8 7,094.5 Jan 2024 965.5 0.0 156.1 1,121.6 2 City of Rohnert Park 165.9 156.2 172.0 226.7 241.3 279.2 383.7 304.2 303.6 275.4 169.7 206.5 2,884.3 Feb 2024 829.3 0.0 143.7 973.1 2 City of Cotati 28.1 24.9 23.9 40.7 52.8 63.7 85.8 71.5 71.2 62.2 32.9 33.3 590.9 Mar 2024 766.5 0.0 145.1 911.6 1 Town of Windsor 38.6 38.4 56.9 36.9 36.0 39.9 50.5 52.0 51.8 44.3 38.5 38.9 522.4 Apr 2024 825.0 0.0 206.8 1,031.8 4 City of Sonoma 98.3 83.1 74.7 126.2 168.2 201.2 267.7 184.0 194.9 169.4 123.3 108.1 1,799.0 May 2024 1,103.4 0.0 225.2 1,328.6 4 Valley of the Moon Dist. 97.9 32.4 26.1 38.4 126.6 231.2 277.1 193.2 209.7 221.4 154.9 163.7 1,772.5 Jun 2024 1,425.0 0.0 111.9 1,536.9 TOTAL PRIMES 2,443.4 2,070.5 1,980.8 2,495.9 3,211.6 3,758.8 4,990.4 3,925. 7 4,417.9 3,859.8 2,399.7 2,617.3 38,171.7 Jul 2024 1,689.2 0.0 389.1 2,078.3 Aug 2024 1,352.6 0.0 378.5 1,731.2
OTHER AGENCY CUSTOMERS Sep 2024 1,408.5 0.0 436.6 1,845.1 1 Cal-American Water 12.6 12.6 10.6 21.1 29.8 32.2 44.7 36.6 38.8 33.0 43.1 37.7 352.9 Oct 2024 1,258.1 0.0 336.9 1,595.0 2 Penngrove Water Co 11.3 10.2 9.1 11.8 16.7 18.9 23.9 19.6 20.7 18.2 10.8 11.8 183.0 Nov 2024 842.1 0.0 108.7 950.8 4 Lawndale Mutual 1.9 1.2 1.3 2.9 3.9 5.5 8.2 7.0 6.9 5.8 2.7 1.7 49.0 Dec 2024 984.1 0.0 106.5 1,090.6 4 Kenwood Village Water Co 2.1 0.4 0.4 0.5 0.5 0.5 0.6 0.6 0.8 0.7 0.9 1.2 9.3 TOTAL SANTA ROSA 13,449.5 0.0 2,745.1 16,194.6 3 Forestville Co Water Dist. 22.6 18.9 17.6 24.3 28.8 37.4 52.3 41.3 45.1 38.3 21.6 22.9 371.2 1 Other Gov-Santa Rosa Aq 0.7 0.7 1.1 0.7 0.7 0.8 1.0 0.9 0.9 0.9 0.7 0.8 9.9 OTHER PRIME CONTRACTORS (B) 2 Other Gov-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CITY OF PETALUMA 0.0 7,313.7 7,313.7 4 Other Gov-Sonoma Aq 9.6 8.1 6.3 6.5 4.8 7.6 10.9 9.5 11.3 10.9 6.7 4.1 96.3 NORTH MARIN WATER DISTRICT 7,094.5 7,094.5 TOTAL OTHER AGY. CUST 60.8 52.1 46.5 67.9 85.2 102.8 141.7 115.6 124.4 107.8 86.5 80.4 1,071.7 CITY OF ROHNERT PARK 48.9 2,835.4 2,884.3 CITY OF COTATI 4.2 586.7 590.9
OFF-PEAK CUSTOMERS TOWN OF WINDSOR 522.4 522.4
2 Marin Municipal 156.5 21.5 15.3 46.0 18.4 411.2 911.5 966.7 693.6 843.9 626.1 395.9 5,106.6 CITY OF SONOMA 1,799.0 1,799.0 VALLEY OF THE MOON DISTRICT 1,772.5 1,772.5
SURPLUS CUSTOMERS TOTAL OTHER PRIME CONTRACTORS 575.5 17,830.2 3,571.4 21,977.1 1 Irrigation-Santa Rosa Aq 0.0 0.0 0.0 0.9 0.6 3.4 41.9 34.6 27.7 12.6 0.2 0.0 122.0 2 Irrigation-Petaluma Aq 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL DELIVERIES TO PRIMES 14,025.0 17,830.2 6,316.5 38,171.7 4 Irrigation-Sonoma Aq 2.7 2.3 2.2 2.6 11.9 8.3 9.8 5.8 4.0 3.4 2.3 2.9 58.1 TOTAL SURPLUS CUST. 2.7 2.3 2.2 3.5 12.4 11.7 51.7 40.4 31.8 16.0 2.5 2.9 180.2 LESS: NORTH MARIN (7,094.5) (7,094.5) TOTAL DELIVERIES 2,663.4 2,146.4 2,044.8 2,613.3 3,327.6 4,284.6 6,095.3 5,048.5 5,267.6 4,827.5 3,114.7 3,096.4 44,530.2 TOTAL SONOMA COUNTY DELIVERIES 14,025.0 10,735.8 6,316.5 31,077.3 2/24/2025
10 DRAFT
FY 2025-26 BUDGET
Water Transmission System Agency Fund
ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - O&M
1 PRIMES without Subcharges 34,477.4 1,029.16 35,482,799 2 OTHER AGENCY CUSTOMERS 965.3 1,768.92 1,707,581
3 MARIN MUNICIPAL (OFF-PEAK) 4,300.0 1,326.78 5,705,138 4 MARIN MUNICIPAL (SUPPLEMENTAL) 2,568.3 1,326.78 3,407,512 5 SURPLUS CUSTOMERS 96.3 1,257.83 121,084
TOTAL WATER SALES - O&M 42,407.3 N/A $46,424,114
Note: MMWD rate adjusted per Amended MMWD Water Supply Agreements Effective 7/1/15.
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 42,407.3 4.57 194,000 1b Watershed Planning/Restoration Sub-charge [4.14] 42,407.3 45.71 1,938,370 1c Recycled Water & Local Supply Sub-charge [4.15] 42,407.3 0.14 6,000 1d Water Conservation Sub-charge [4.16] 42,407.3 63.83 2,706,900 TOTAL WATER SALES - Subcharges 42,407.3 N/A $4,845,270
2/24/2025
11 DRAFT
FY 2025-26 BUDGET
Water Transmission System Agency Fund
SANTA ROSA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - O&M
1 SANTA ROSA AQUEDUCT 16,351.8 1,029.16 16,828,628
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 16,351.8 4.57 74,804 1b Watershed Planning/Restoration Sub-charge [4.14] 16,351.8 45.71 747,415 1c Recycled Water & Local Supply Sub-charge [4.15] 16,351.8 0.14 2,314 1d Water Conservation Sub-charge [4.16] 16,351.8 63.83 1,043,752 TOTAL WATER SALES - Subcharges 16,351.8 N/A $1,868,285
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 16,351.8 11.00 179,870
BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 16,351.8 50.09 819,101 Common Facilities Capital Charge [4.8] 16,351.8 196.36 3,210,761 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 16,351.8 0.00 0 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 16,351.8 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 16,351.8 N/A $4,209,732 TOTAL ESTIMATED REVENUE $22,906,645
Sub-Object 4175, 4176, 4177, and 4178
2/24/2025
12 DRAFT
FY 2025-26 BUDGET
Water Transmission System Agency Fund
PETALUMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - O&M
1 PETALUMA AQUEDUCT 22,139.2 1,029.16 22,784,826
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 22,139.2 4.57 101,280 1b Watershed Planning/Restoration Sub-charge [4.14] 22,139.2 45.71 1,011,950 1c Recycled Water & Local Supply Sub-charge [4.15] 22,139.2 0.14 3,132 1d Water Conservation Sub-charge [4.16] 22,139.2 63.83 1,413,170 TOTAL WATER SALES - Subcharges 22,139.2 N/A $2,529,532
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 22,139.2 0.00 0
BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 22,139.2 50.09 1,109,008 Common Facilities Capital Charge [4.8] 22,139.2 196.36 4,347,154 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 22,139.2 15.66 346,697 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 22,139.2 0.00 0 TOTAL WATER SALES - Capital & Bond and Loan Charges 22,139.2 N/A $5,802,859 TOTAL ESTIMATED REVENUE $31,117,217
Sub-Object 4175, 4176, 4177, and 4178
2/24/2025
13 DRAFT
FY 2025-26 BUDGET
Water Transmission System Agency Fund
SONOMA AQUEDUCT ESTIMATED WATER DELIVERIES AND WATER SALES - O&M plus Surcharges
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - O&M
1 SONOMA AQUEDUCT 3,564.8 1,029.16 3,668,743
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
WATER SALES - Sub-charges
1a Water Management Planning Sub-charge [4.13] 3,564.8 4.57 16,308 1b Watershed Planning/Restoration Sub-charge [4.14] 3,564.8 45.71 162,941 1c Recycled Water & Local Supply Sub-charge [4.15] 3,564.8 0.14 504 1d Water Conservation Sub-charge [4.16] 3,564.8 63.83 227,544 TOTAL WATER SALES - Subcharges 3,564.8 N/A $407,297
ESTIMATED
REVENUE CATEGORY ACRE FEET ESTIMATED ESTIMATED
DELIVERED RATES REVENUE
CAPITAL CHARGES
Aqueduct Facilities Capital Charges [4.6 e] 3,564.8 34.90 124,411
BOND AND LOAN CAPITAL CHARGES
Storage Facilities Capital Charge [4.7] 3,564.8 50.09 178,569 Common Facilities Capital Charge [4.8] 3,564.8 196.36 699,965 Petaluma Aqueduct Facilities Capital Charges [4.6 b] 3,564.8 0.00 0 Sonoma Aqueduct Facilities Capital Charges [4.6 b] 3,564.8 144.56 515,315 TOTAL WATER SALES - Capital & Bond and Loan Charges 3,564.8 N/A $1,518,260 TOTAL ESTIMATED REVENUE $5,594,300
Sub-Object 4175, 4176, 4177, and 4178
2/24/2025
14 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNNG FUND BALANCE 12,327,122 14,640,955 6,610,937
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 963,245 285,142 285,142 211,651 (73,492) (25.77%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 860,744 0 0 0 0 N/A 44109 Concessions 0 0 0 0 0 N/A
44101 Rent - Real Estate 0 0 0 0 0 N/A
SUBTOTAL 1,823,989 285,142 285,142 211,651 (73,492) (25.77%)
INTERGOVERNMENTAL REVENUES
42282 State CalOES Disaster Funding 0 0 0 0 0 N/A 42284 State Cal OES Admin Allowance 0 0 0 0 0 N/A 42358 State Other Funding 0 0 0 0 0 N/A
42441 Federal FEMA Disaster Funding 0 0 0 0 0 N/A 42443 Federal FEMA Admin Allowance 0 0 0 0 0 N/A 42461 Federal Other Funding 0 0 0 0 0 N/A
42610 Other Governmental Agencies 0 0 0 0 0 N/A 42621 North Marin Water District 0 0 0 0 0 N/A
42701 Revenue Appl - PY Intergovmtl 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
CHARGES FOR SERVICES
45062 Construct/Bldg Permit Rvw Svcs 0 0 0 0 0 N/A 45065 Inspection Fees 0 0 0 0 0 N/A
45223 Sewer/Water Hook up Fees 50,004 20,000 20,000 20,000 0 0.00% 45301 Charges for Services (65,858) 0 0 0 0 N/A 45314 Sale - Power 0 100,000 100,000 100,000 0 0.00%
45315 Sale - Water, Wholesale 37,926,149 45,686,001 45,686,001 46,424,114 738,113 1.62% 45316 Water Conservation 2,270,600 2,550,140 2,550,140 2,706,900 156,760 6.15% 45323 Common Fac Rev Bond Chg 4,233,976 3,889,158 3,889,158 5,907,651 2,018,493 51.90% 45324 Storage Fac Rev Bond Chg 883,734 932,557 932,557 1,507,069 574,513 61.61% 45325 Sonoma Aqueduct Rev Bond Chg 526,308 512,337 512,337 515,315 2,979 0.58% 45326 Petaluma Aqueduct Rev Bond Chg 0 0 0 346,697 346,697 N/A 45327 Santa Rosa Aqueduct Cap Chg 321,676 299,408 299,408 309,921 10,513 3.51% 45328 Petaluma Aqueduct Cap Chg 80,658 0 0 0 0 N/A 45329 Sonoma Aqueduct Cap Chg 161,085 116,752 116,752 118,191 1,438 1.23% 45330 North Marin Rev Bond Chg 454,484 492,184 492,184 796,359 304,175 61.80% 45331 Water Mgmt Plan/Restore Chg 0 15,000 15,000 194,000 179,000 1193.33% 45332 Watershed Plan/Restore Chg 1,509,849 1,714,950 1,714,950 1,938,370 223,420 13.03% 45333 Recycled Water & Local Supply 0 0 0 6,000 6,000 N/A 45401 Revenue Appl PY Chgs for Svcs 0 0 0 0 0 N/A SUBTOTAL 48,352,664 56,328,487 56,328,487 60,890,586 4,562,099 8.10% 2/24/2025
15 DRAFT
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
MISCELLANEOUS REVENUES
46027 Insurance Claims Reimbursement 0 139,834 0 0 0 N/A 46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 4,961 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrants 2,458 0 0 0 0 N/A 46200 Revenue Appl PY Misc Revenue 6,542 0 0 0 0 N/A 46205 PY Revenue – Charges for Servi 0 0 0 0 0 N/A 46215 Other Grants 0 0 0 0 0 N/A
SUBTOTAL 13,961 139,834 0 0 0 N/A
OTHER FINANCING SOURCES
47002 Sale of Capital Assets 0 0 0 0 0 N/A
47101 Transfers In - within a Fund 0 0 0 0 0 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 0
SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 0
TOTAL REVENUES 50,190,614 56,753,463 56,613,629 61,102,237 4,488,608 7.93%
EXPENDITURES
SERVICES AND SUPPLIES
51021 Communications Expense 0 0 0 0 0 N/A
51031 Waste Disposal Services 0 0 0 0 0 N/A
51032 Janitorial Services 7,104 7,000 7,000 7,400 400 5.71% 51041 Insurance - Liability 0 0 0 0 0 N/A
51042 Insurance - Premiums 0 5,000 5,000 4,000 (1,000) (20.00%) 51061 Maintenance - Equipment 1,784,342 2,427,741 2,495,200 2,664,400 169,200 6.78% 51071 Maintenance - Bldg & Improve 60,687 0 0 0 0 N/A 51072 Landscaping Services 0 0 0 0 0 N/A
51077 Maint-Infrastructure 0 0 0 0 0 N/A
51083 VSP Premiums 0 0 0 0 0 N/A
51205 Advertising/Marketing Svc 199 5,000 5,000 5,000 0 0.00% 51209 Information Tech Svc (non ISD) 1,951 3,000 3,000 4,500 1,500 50.00% 51211 Legal Services 18,576 50,000 50,000 50,000 0 0.00% 51212 Outside Counsel - Legal Advice 286 2,500 2,500 2,500 0 0.00% 51214 Agency Extra/Temp Help 0 0 0 0 0 N/A
51221 Medical/Laboratory Services 5,546 15,000 15,000 10,000 (5,000) (33.33%) 51225 Training Services 0 0 0 0 0 N/A
51226 Consulting Services 1,749 0 0 0 0 N/A
51230 Security Services 0 2,000 2,000 2,000 0 0.00%
51231 Testing/Analysis 172,939 240,000 240,000 250,000 10,000 4.17% 51241 Outside Printing and Binding 1,164 1,500 1,500 2,000 500 33.33% 51242 Bank Charges 0 50 50 50 0 0.00%
51243 Filing Fees 150 0 0 0 0 N/A
51244 Permits/License/Fees 162,675 90,000 90,000 95,510 5,510 6.12% 2/24/2025
16 DRAFT
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 51249 Other Professional Services 0 0 0 0 0 N/A 51301 Publications and Legal Notices 0 0 0 0 0 N/A 51401 Rents and Leases - Equipment 217,479 400,000 400,000 400,000 0 0.00% 51402 Rents and Leases - Heavy Eqt 577,824 400,000 400,000 575,000 175,000 43.75% 51421 Rents and Leases - Bldg/Land 0 0 0 3,991 3,991 N/A 51509 SCADA System Contributions 877,390 2,191,349 2,191,349 2,545,700 354,351 16.17% 51601 Training Services 24,545 20,000 20,000 15,000 (5,000) (25.00%) 51602 Business Travel/Mileage (37) 6,000 6,000 6,000 0 0.00% 51605 Private Car Expense 1,557 750 750 750 0 0.00%
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 8,380,773 19,597,668 12,031,260 9,569,421 (2,461,839) (20.46%) 51902 Telecommunication Usage 58,258 75,000 75,000 75,000 0 0.00% 51911 Mail Services 0 150 150 150 0 0.00%
51917 District Operations Chgs 20,217,209 20,820,463 20,206,914 21,229,384 1,022,470 5.06% 51921 Equipment Usage Charges 1,619,248 1,100,000 1,100,000 1,205,000 105,000 9.55% 52021 Clothing, Uniforms, Personal 8,869 8,000 8,000 8,000 0 0.00% 52031 Food 0 500 500 500 0 0.00%
52041 Household Supplies Expense 0 0 0 0 0 N/A
52042 Janitorial Supplies 411 0 0 0 0 N/A
52043 Safety Supplies/Equipment 44,156 6,000 6,000 6,000 0 0.00% 52061 Fuel/Gas/Oil 887 75,000 75,000 75,000 0 0.00%
52063 Vehicle Parts 0 500 500 500 0 0.00%
52071 Materials and Supplies Expense 148,082 35,000 35,000 63,276 28,276 80.79% 52072 Chemicals 1,134,472 1,200,000 1,200,000 1,199,329 (671) (0.06%) 52081 Medical/Laboratory Supplies 16,699 50,000 50,000 15,000 (35,000) (70.00%) 52091 Memberships/Certifications 38,199 49,775 45,000 53,175 8,175 18.17% 52101 Other Supplies 0 0 0 0 0 N/A
52111 Office Supplies 6,162 7,500 7,500 7,500 0 0.00%
52112 Office Furniture/Fixtures 0 3,500 3,500 3,500 0 0.00% 52114 Freight/Postage 0 1,000 1,000 1,000 0 0.00%
52115 Books/Media/Subscriptions 1,532 500 500 500 0 0.00% 52117 Mail and Postage Supplies 6,103 5,000 5,000 5,000 0 0.00% 52141 Minor Equipment/Small Tools 141,764 200,000 200,000 200,000 0 0.00% 52142 Computer Equipment/Accessories 59 2,500 2,500 2,500 0 0.00% 52143 Computer Software/Licensing Fees 12,607 30,000 30,000 52,633 22,633 75.44% 52147 SBITA Payment Adjustments 0 0 0 0 0 N/A
52162 Special Department Expense 0 0 0 0 0 N/A
52171 Water Conservation Program 0 0 0 0 0 N/A
52191 Utilities 3,404 3,500 3,500 3,500 0 0.00%
52192 Utilities - Gas/Propane 35 0 0 0 0 N/A
52193 Utilities - Electric 4,025,593 4,250,000 4,250,000 4,802,500 552,500 13.00% 52194 Utilities - Water 0 0 0 0 0 N/A
SUBTOTAL 39,780,648 53,388,446 45,271,173 45,222,169 (49,004) (0.11%)
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other interest Expense 0 0 0 0 0 N/A
53301 Taxes and Assessments 0 0 0 0 0 N/A
53401 Amortization Expense 3,433 83,000 83,000 83,000 0 0.00% 53402 Depreciation Expense 7,206,400 7,486,000 7,486,000 7,486,000 0 0.00% 53403 Loss - Disposed Capital Asset 0 0 0 0 0 N/A 53500 Contributions Non-County Agy 0 0 0 0 0 N/A 53501 Contributions 0 125,000 0 0 0 N/A
53610 Other Charges 0 0 0 0 0 N/A
SUBTOTAL 7,209,833 7,694,000 7,569,000 7,569,000 0 0.00% 2/24/2025
17 DRAFT
Section Title: Water Transmission System Agency Fund
Fund/Department No: 44205 33040100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0 0 N/A
19822 Mobile Equipment 0 0 0 0 0 N/A
19824 Computer Equipment 0 0 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 0 0 0 0 0 N/A
19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 747,549 141,300 645,570 504,270 356.88% 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A SUBTOTAL 0 747,549 141,300 645,570 504,270 356.88%
OTHER FINANCING USES
57011 Transfers Out - within a Fund 10,169,217 10,522,486 10,522,486 14,346,472 3,823,986 36.34% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 10,169,217 10,522,486 10,522,486 14,346,472 3,823,986 36.34% APPROP. FOR CONTINGENCIES
55011 Appropriation for Contingency 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
REMIBURSEMENTS
58010 Reimb. - General 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 0 0 0 0 N/A 59005 Admin Control Acct Clearing 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 57,159,697 72,352,481 63,503,959 67,783,211 4,279,252 6.74% Adjustments to Reserves/Encumbrances:
Depreciation 7,209,833 7,569,000 7,569,000
Donated Asset (Caltrans) 0
Outstanding Encumbrances - Net Change 3,153,546 0
Capitalized Interest 0
Gain/Loss on disposal of fixed assets 0
Unrealized Gain/ Loss (GASB 31) (860,744)
Change in Prepaid Expense 1,024
Change in Prudent Reserve 0
Post audit adjustments - Payables (254,731)
Use of Fund Balance 0
Move CIP balance between funds 33,987
Rounding 1
ENDING FUND BALANCE 14,640,955 6,610,937 7,498,963
Operations and Maintenance 44205 Fund Balance Reserve Goal 11,466,935 Over/(Under) Goal (3,967,972)
2/24/2025
18 DRAFT
Water Transmission System Agency Fund
Major Services & Supplies Expenditure Items
Fund/Department No: 44205 33040100
Actual Adopted Requested Percent
FY23-24 FY24-25 FY25-26 Difference Change
51061 Maintenance - Equipment 1,784,342 2,495,200 2,664,400 169,200 6.78% 51211 Legal Services 18,576 50,000 50,000 0 0.00%
51231 Testing/Analysis 172,939 240,000 250,000 10,000 4.17% 51402 Rents and Leases - Heavy Eqt 577,824 400,000 575,000 175,000 43.75% 51509 SCADA System Contributions 877,390 2,191,349 2,545,700 354,351 16.17% 51803 Other Contract Services 8,380,773 12,031,260 9,569,421 (2,461,839) -20.46% 51917 District Operations Chgs 20,217,209 20,206,914 21,229,384 1,022,470 5.06% 51921 Equipment Usage Charges 1,619,248 1,100,000 1,205,000 105,000 9.55% 52072 Chemicals 1,134,472 1,200,000 1,199,329 (671) -0.06% 52193 Utilities - Electric 4,025,593 4,250,000 4,802,500 552,500 13.00% Power demand and costs expected to increase roughly 13%. The majority of this increase is associated with increased transmission and distribution costs.
Reflects five year average expenditures.
Reflects five year average expenditures.
Increase attributable to increased costs of the Pump 9 replacement offset by $270,000 in projects that have been deferred to reduce the rate increase.
Decrease attributable to deferring cathodic protection and tank recoats.
Increase attributable to water transmission system’s share of SCADA maintenance expenses and capital project costs.
Increase associated with expanded sampling and analysis tied to the Santa Rosa Plain Wells Projects as well as additional microplastics and Perfluoroalkyl/Polyfluoroalkyl Substances (PFAS) testing.
Increase is attributable to an increase in labor costs for maintenance projects, offset by projects deferred to reduce the rate increase. The majority of this increase is due to negotiated labor rates.
Costs expected to remain stable after several years of large increases.
Increase to align with FY23/24 actuals.
2/24/2025
19 DRAFT
AMOUNT
O&M Routine Maintenance
1 Electrical/Instumentation/SCADA Equipment and Supplies 400,000 2 Meter and Backflow Equipment and Supplies 150,000
3 Plains Wells Equipment and Supplies 50,000
4 Production and Treatment Equipment and Supplies 220,000 5 Transmission and Storage Equipment and Supplies 300,000 6 Warehouse Equipment and Supplies 10,000
7 Warm Springs Dam Equipment and Supplies 10,000
8 Water Operations Equipment and Supplies 50,000
O&M Projects
9 Electric Vehicle Charging Station for Water Ed 15,000 10 Pump 9 Replacement 1,209,400
Emergency Management Program/Security
11 Emergency Inventory Procurement 200,000
12 TAC Emergency Coordination Committee (Grand Jury) 25,000 Other
13 Santa Rosa Plain Well Monitoring Program (SW Wells) 10,000 14 Wohler Mirabel Groundwater Monitoring 15,000
2,664,400$
AMOUNT
1 SCADA System Contributions 2,545,700
2,545,700$
2025-26
Water Transmission System Agency Fund
51061 Maintenance - Equipment
51509 SCADA System Contributions
2/24/2025
20 DRAFT
AMOUNT
O&M Routine Maintenance
1 Various Routine Contracts 465,000
Implementation
2 As-Needed Dive Services 60,000
3 Asset Management Program 250,000
4 Cathodic Protection - Maintenance 50,000
5 Cathodic Protection - Site Assesment and Design Support 50,000 6 Cathodic Protection - SR/Cotati 355,000
7 Hazardous Materials Management 50,000
8 Regional Water Supply Resiliency Implementation 250,000 9 Riverfront Park Maintenance - Regional Parks 100,000
10 Lease Agreements 35,000
11 Tank Maintenance Program 1,400,548
12 Tank Recoating Program 3,754,800
13 TPW Pavement Preservation Program 25,000
Advocacy
14 Community Outreach Program 40,000
15 IRWM North Coast 70,000
16 Government Affairs - Legislative Program 155,000
Studies/Planning
17 Arc Flash Studies 116,840
18 Cathodic Protection Assessment 982,733
19 Natural Hazard Reliability Study 25,000
20 Planning Studies 30,000
21 System Monitoring Program 20,000
22 Transmission System Condition Assessments 200,000
23 Water System Comprehensive Master Plan 400,000
24 Watershed Water Quality Study - LBNL 210,000
25 Watershed Water Quality Study - USGS 187,500
26 Wohler-Mirabel Flood Resilience Alternatives Evaluation 92,000 27 Wohler/Mirabel Groundwater Model Update and Supporting Stud 20,000 9,569,421$
51803 Other Contract Services
2/24/2025
21 DRAFT
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Asset Management Program 250,000
The primary objectives of Sonoma Water’s Asset Management Program (AMP) are to improve the cost-effective management of assets throughout their life cycle, promote data sharing and interconnectivity, and demonstrate fiscal responsibility. Phase 1 included review of Sonoma Water’s current asset management practices, development of an AMP vision and charter, asset management framework. Phase 2 included condition assessment of the water production facilities (Mirabel & Wohler); assessment of the water tanks, booster stations, and other miscellaneous water facilities; and of several of the wastewater treatment facilities. In addition, the new Computerized Maintenance Management System (CMMS) software implementation is underway and is now live.
To date the AMP has delivered: Asset Management Framework Tech Memo; State of the Assets Tech Memos; Asset Management Implementation Plan (AMIP) Report; Asset Management Program Statement of Commitments; assessment of the water and wastewater facilities; and have begun the implementation of the CMMS software. In FY 24/25, Phase 3 will involve integrating the recommendations during Phase 2 into the full roll-out of the enterprise-wide AMP, implementing the selected CMMS software, furthering data management and integration and continuing with additional condition assessments of water and wastewater facilities. Future work for FY 24/25 and 25/26 will involve continued integration with the CMMS software. Additionally, there will be a focus on implementing the AMP. This may require hiring staff or engaging a consultant to launch the program.
Cathodic Protection - SR/Cotati 355,000
Provide improvements to upgrade the cathodic protection system along the existing Santa Rosa Aqueduct and Russian River-Cotati Intertie. The project includes designing and constructing a new corrosion protection system to protect the pipeline from corrosion and monitor the state of the pipelines. The corrosion protection system will have a useful life of approximately 50 years, and will allow for remote assessment and data collection to quantify the condition of the pipeline and state of the cathodic protection system. The project will be constructed in two phases with a completed project that consists of 27 corrosion protection well sites and 51 test stations.
In FY 21-22, design efforts commenced and CEQA environmental review was completed for the project. In FY23-24, Sonoma Water reengaged design consultants to develop 90% plans and specifications for the Phase 1 Project and anticipated advertisement before the end of FY 24/25. Work completed in FY 23/24 and 24/25 includes electrical design, coordination and design approvals from PG&E, and land surveys of rectifier and test station locations.
Work in FY 25/26 will focus on acquisition of necessary rights-of-way to construct phase 2, environmental permitting, and developing plans and specifications for the remaining rectifier and test station locations.
Collector 5 Structural Evaluation -
Sonoma Water has conducted preliminary structural evaluations of the Collector buildings and hoist support structures within to support a proposed hoist load capacity increase from 10 tons to 12.5 tons. Preliminary analyses suggest the Collector 5 floor slab does not appear to be adequate for the proposed 12.5 ton hoist load or the original building load.
In FY 23/24, a preliminary structural evaluation was conducted. In FY 24/25, Sonoma Water plans on conducting more sophisticated and detailed structural evaluation possibly including finite element modeling to determine what improvements may be needed to meet loading demands.
LHMP Program Planning -
The LHMP program planning provides for the maintenance and update to the Local Hazard Mitigation Plan (required for FEMA funding) and the preliminary development of mitigation project concepts for the purposes of preparing grant applications and refining projected costs of projects associated with the Natural Hazard Reliability Mitigation Program.
FY 22-23 funding was used to commence development of the 2023 LHMP Update. In FY23-24, the 2023 draft LHMP Update was finalized and was submitted to CalOES for approval. In FY24-25 Sonoma Water expects to receive CalOES and FEMA approval, and funding may be needed to address comments prior to approval as well as to begin discussions and any necessary coordination with the County’s Multijurisdictional LHMP update. 2/24/2025
22 DRAFT
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Regional Water Supply Resiliency Implementation FY25-26 Retail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through existing water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, each retail provider also has local supplies which are used to meet the demands of their customers. Although these systems are connected, they are not operated or managed in a coordinated manner, especially in times of water shortage.
Funds expended between FY 19/20 and FY24/25 for the Regional Water Supply Resiliency Study were used to build a decision support model to evaluate the region’s resiliency to drought, and natural hazards such as seismic events, wildfires and flooding. Based on modeling scenarios completed for the development and evaluation of projects and strategies to improve the regions water supply reliability during periods of water supply shortage due to drought and seismic events, development of regional water banking strategies were identified as priority initiatives to pursue to improve the regions water supply resiliency. Funds budgeted for FY 24/25 and FY 25/26 will be used to implement priority recommendations from the Regional Water Supply Resiliency Study to develop a Regional Water Bank Implementation Strategy, which would provide a mechanism to integrate the most significant regional water storage facilities (Lake Sonoma, Santa Rosa Plain groundwater basin, Sonoma Valley groundwater basin, Petaluma Valley groundwater basin, Lake Stafford, and reservoirs operated and managed by Marin Water), using Sonoma Water's transmission system as the backbone. Surplus surface water during wet periods could be stored in surface reservoirs or groundwater basins and subsequently extracted during critical drought periods or emergencies thus providing improved resilience and reliability to the region. The scope of work will include (1) develop a Regional Water Bank Strategy; (2) support participant and partner benefit statements; (3) develop and apply regional water bank model; (4) support engagement and outreach; (5) develop funding approach and implementation schedule; and (6) prepare implementation strategy report.
250,000
SCADA System Contributions 2,545,700
The SCADA System Contributions line-item funds the Water Transmission System’s portion of routine operations and maintenance of Sonoma Water’s SCADA system (including SCADA staff labor) as well as capital improvement projects.
Routine work to operate and maintain the SCADA system on an annual basis includes monitoring system performance, performing software updates and patching, maintaining and replacing hardware, troubleshooting issues, providing user training and support, assessing and revamping programming standards to accommodate new/modified processes and current technologies, and implementing new standards to streamline maintenance and operations.
In addition to annual, routine work, Sonoma Water has undertaken several capital improvement projects to improve the SCADA system over the last few years. These projects are identified in Sonoma Water’s SCADA Master Plan.
During FY21/22, we completed much of the background work necessary to replace Sonoma Water’s entire SCADA software system. This included documenting the logic embedded in the existing SCADA system interface, duplicating that logic into a new PLC, and creating new interface graphics. In FY22/23, we began live, side-by-side testing of the new system software and completed the majority of reporting requirements for the new system. In FY23/24, we cut- over the majority of our sites to the new SCADA system and implemented additional improvements including optimizing system performance and hardware replacements and upgrades.
In FY24/25, we completed migration to the new SCADA system which includes historian, dashboards, and reporting.
We also began an extensive planning effort to replace the legacy SCADA radio system. The SCADA radio system replacement design kickoff was held in December 2024. The project will include a joint-effort with Sonoma County TCOMM to improve performance and security of Sonoma Water's SCADA radio system. We also kicked-off a separate project for SCADA Network upgrades, including a focus on firewalls and related security improvements.
In FY25/26, we plan to continue making substantial investments in network equipment (firewalls, switches, routers, power supplies, and new dedicated ISP connections), and will begin replacement of legacy SCADA radio equipment. 2/24/2025
23 DRAFT
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Tank Maintenance Program 1,400,548
Sonoma County Water Agency (Sonoma Water) owns and operates 18 water storage tanks with a total combined capacity of 128.8 million gallons as a part of the water transmission system that provides clean drinking water to approximately 600,000 residents in nine major cities and water districts within Sonoma and Marin counties. Maintaining these tanks is critical. This program covers a 10-year agreement for maintenance services with a Service Provider.
In FY 24/25 Enhanced Washout Cleaning and Inspections were conducted on 2 tanks, and Visual Inspections were conducted on 12 tanks. FY25/26 funding will be used to conduct Enhanced Washout Cleaning and Inspections on 2 tanks and Visual Inspections for remaining tanks.
Tank Recoating Program 3,754,800
Water storage tanks are an integral component of Sonoma Water’s transmission and supply system and provide operational flexibility and system supply resiliency when demand exceeds production capacity. In total, Sonoma Water’s 18 welded steel water tanks provide 129 million gallons of storage, which is approximately three times the average daily system demand. Welded-steel tanks are susceptible to corrosion and have a limited functional lifespan of approximately 50 years without coatings. With regularly scheduled and targeted maintenance, monitoring, and recoating activities welded-steel tanks can attain a lifespan of over 100 years. Sonoma Water’s Tank Recoating Program specifically targets the protection and maintenance of welded-steel tanks by designing and implementing tank rehabilitation projects that include interior and exterior recoating, structural repairs, and installation of cathodic protection systems to maximize the functional life of each facility.
In FY 22/23 and 23/24 Sonoma Water finalized plans and specifications, solicited bids, and entered an agreement to complete recoating Kastania and Cotati No. 1 tank. In FY 24/25 Sonoma water completed recoating at Kastania and Cotati No. 1, developed plans and specifications for Cotati No. 3, advertised for bids, and is scheduled to award the project in January of 2025. Construction is anticipated to last between March of 2025 and February of 2026. During this time, Sonoma Water will finalize plans and specifications, advertise, and enter a construction agreement to commence recoating at Ralphine No. 1 and Sonoma No. 1 tanks in FY 26/27.
Studies/Planning
Arc Flash Studies 116,840
Arc Flash Studies and Arc Flash Labeling for electrical equipment are required to comply with NFPA 70E (National Electrical Safety Code) and OSHA requirements. Performing the study includes data collection of the electrical system, modeling, and calculations. The Code requires that Arc Flash Studies be updated on a 5-year cycle. The scope includes 28 sites in the Water System which will be completed within a 2-year period.
This update cycle began with a project kick-off in October 2024. By February 2025, data collection will be completed for 10 sites in the Water System, including the largest electrical system at Wohler and Mirabel. Draft reports for these sites will be provided in the Spring of 2025, and finalized in Summer 2025.
In the upcoming FY 25/26, studies will be completed for the 18 remaining sites.
Cathodic Protection Assessment 982,733
This is a new request starting in FY 25/26 to establish a long term program to operate and maintain cathodic protection systems for Sonoma Water’s water infrastructure. This project seeks to improve the long-term reliability of infrastructure throughout Sonoma Water’s water transmission system by evaluating the effectiveness of the existing cathodic protection systems, identifying deficiencies, and developing a strategy and program to maintain systems and implement improvements as needed.
Specific objectives of the initial assessment include:
1. Enhancing system reliability and preventing premature failure by minimizing corrosion to infrastructure.
2. Extending water transmission system infrastructure service life and avoiding the need for costly repairs.
3. Developing a cathodic protection improvement strategy which accounts for corrosion risks, mitigation feasibility, and costs.
4. Improving operational efficiency by expanding Sonoma Water’s cloud-hosted Cathodic Protection monitoring system.
5. Identify program operational and maintenance needs and associated budget and staffing required for continued operation of the system.
2/24/2025
24 DRAFT
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Natural Hazard Reliability Study 25,000
The seismic mitigation planning study will advance feasibility evaluation and refine strategic approaches to implementing measures to mitigate failure risks of the water transmission system to specific seismic vulnerabilities identified as part of prior natural hazard reliability studies. Particular focus of the study will evaluate: 1) liquefaction mitigation solutions to protect collector wells at the Wohler-Mirabel production facilities, 2) strategies that best balance risk mitigation of aqueduct failure at numerous locations of potential seismic vulnerability against a cost-effective and timely implementation approach (including conducting a broad CPT investigation at numerous sites), and 3) analyze alternative seismic retrofit solutions at select water storage tanks.
In FY 22/23, a consultant was contracted to initiate the planning study, coordinating geotechnical investigations, and securing necessary permits and permission to enter agreements. In FY23/24, CPT investigations were performed along with seismic assessment of the water storage tanks. Preliminary design of liquefaction mitigation solution of Collector 5 was also commenced to assess feasibility of implementing a secant pile wall concept. In FY24/25, funding will be utilized to finalize the preliminary design of Collector 5, assess the feasibility to expand design concepts to other collectors, and prepare a final report. In FY25/26, funding will be utilized to update the draft Seismic Assessment of Water Storage Tanks report with site specific geotechnical data that is planned to be collected.
Regional Water Supply Resiliency Study
Retail water providers to over 600,000 people in Sonoma and Marin Counties are regionally connected through existing water supply infrastructure. Along with purchasing wholesale water from the Sonoma County Water Agency, each retail provider also has local supplies which are used to meet the demands of their customers. Although these systems are connected, they are not operated or managed in a coordinated manner, especially in times of water shortage.
Funds expended between FY 19/20 and FY24/25 for the Regional Water Supply Resiliency Study were used to build a decision support model to evaluate the region’s resiliency to drought, and natural hazards such as seismic events, wildfires and flooding. Based on modeling scenarios completed for the development and evaluation of projects and strategies to improve the regions water supply reliability during periods of water supply shortage due to drought and seismic events, development of regional water banking strategies were identified as priority initiatives to pursue to improve the regions water supply resiliency. Funds budgeted for FY 24/25 and FY 25/26 will be used to implement priority recommendations from the Regional Water Supply Resiliency Study to develop a Regional Water Bank Implementation Strategy, which would provide a mechanism to integrate the most significant regional water storage facilities (Lake Sonoma, Santa Rosa Plain groundwater basin, Sonoma Valley groundwater basin, Petaluma Valley groundwater basin, Lake Stafford, and reservoirs operated and managed by Marin Water), using Sonoma Water's transmission system as the backbone. Surplus surface water during wet periods could be stored in surface reservoirs or groundwater basins and subsequently extracted during critical drought periods or emergencies thus providing improved resilience and reliability to the region. The scope of work will include (1) develop a Regional Water Bank Strategy; (2) support participant and partner benefit statements; (3) develop and apply regional water bank model; (4) support engagement and outreach; (5) develop funding approach and implementation schedule; and (6) prepare implementation strategy report.
2/24/2025
25 DRAFT
51803 Other Contract Services & 51509 SCADA System Contributions Project Information FY25-26
Transmission System Condition Assessments 200,000
During FY24/25, Sonoma Water under the Asset Management Program developed an Aqueduct Condition Assessment report hat reviewed the water system pipeline infrastructure and developed a risk-based prioritization model for inspections. The report evaluated appropriate inspection technologies and developed an inspection projects prioritization plan. The initiation of inspection projects are planned for FY25/26.
Water System Comprehensive Master Plan 400,000
Sonoma Water aims to develop a Comprehensive Water System Master Plan (Master Plan) to define the programs, policies, and projects required to meet the potable water infrastructure needs of Sonoma Water’s service area for the next 20-years. Master Plan development will consider future system demands, current system conditions, and required system improvements. This Master Plan will yield a prioritized list of projects, serving as a guide for financial commitments needed to ensure sufficient operation of the water system’s infrastructure. In FY23/24, a consultant was brought under contract and a kick off meeting was held. During FY 24/25, data was collected about the Water System and compiled into TM1 to provide a baseline. Coordination with the Water Contracts is underway and task 2 will work to provide a forecast of future water demands on the system. This FY will also begin the work of generating a basis of cost for projects and a methodology for project prioritization. During FY 25/26, the work from the previous four tasks will be used to identify deficiencies in Sonoma Water's facilities and identify various project groupings to meet long- term capital, operations, and maintenance needs for the Water System.
Watershed Water Quality Monitoring - USGS and LBNL 397,500 Sonoma Water’s riverbank filtration (RBF) facilities leverage the natural subsurface sediments to remove chemical pollutants and waterborne pathogens via filtration, adsorption, and degradation. RBF is a low cost and sustainable alternative to traditional drinking water treatment because it relies on natural filtration processes rather than a traditionally engineered water treatment system. Unlike an engineered system, the nature of RBF requires scientific study of the natural system processes to demonstrate continued efficacy amidst changing environmental pressures.
Sonoma Water has funded studies in collaboration with USGS and LBNL to develop a robust scientific research program to demonstrate the efficacy of RBF to regulators, to understand the processes that contribute to the efficacy of RBF, and to identify any potential vulnerabilities (e.g., drought, wildfire, emerging contaminants of concern).
Following the most recent drought, historically low water levels and reductions in collector efficiency were observed in Collector 6 during summer and fall, 2021. In response, USGS and LBNL developed a monitoring program to assess the role of Russian River streambed clogging (both microbial and physical) on observed reductions in collector efficiency at Wohler and Mirabel. Funds budgeted during FY23/24 and FY24/25 were used to deploy >40 sensors to measure streambed infiltration in the river adjacent to Collectors 1, 2, and 6, collect groundwater, surface water, and streambed water chemistry samples, and conduct geophysical surveying to better understand the development, persistence, and impacts of streambed clogging and its potential impacts on RBF. Funds budgeted for FY25/26 will be used to complete data collection and interpretation, ultimately resulting in publication of the study findings in the peer- reviewed scientific literature. Results from this study will help inform operational decision-making and improve system resilience for Sonoma Water’s RBF facilities amidst drought and future climate-change impacts. 2/24/2025
26 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Management Planning
Fund/Department No: 44210 33041000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 381,063 344,187 222,405
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 12,328 7,366 7,366 4,550 (2,816) (38.23%) 44050 Unrealized Gains and Losses 13,774 0 0 0 0 N/A SUBTOTAL 26,102 7,366 7,366 4,550 (2,816) (38.23%)
INTERGOVERNMENTAL REVENUE
42619 Town of Windsor 0 852 852 11,126 10,274 1206.12%
SUBTOTAL 0 852 852 11,126 10,274 1206.12%
CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 15,000 15,000 194,000 179,000 1193.33% 47102 Transfers In - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 0 15,000 15,000 194,000 179,000 1193.33%
TOTAL REVENUES 26,102 23,218 23,218 209,676 186,458 803.08%
EXPENDITURES
SERVICES AND SUPPLIES
51205 Advertising Marketing 0 0 0 0 0 N/A
51211 Legal Services 142 0 0 0 0 N/A
51212 Legal Services - External 0 0 0 0 0 N/A
51241 Outside Printing & Binding 0 0 0 0 0 N/A
51601 Training/Conference Expense 0 0 0 0 0 N/A 51602 Business Travel/Mileage 0 0 0 0 0 N/A
51605 Private Car Expense 0 0 0 0 0 N/A
51803 Other Contract Services 10,511 100,000 100,000 230,000 130,000 130.00% 51917 District Operations Chgs 19,063 45,000 45,000 120,000 75,000 166.67% 51921 Equipment Usage Charges 0 0 0 0 0 N/A
SUBTOTAL 29,716 145,000 145,000 350,000 205,000 141.38%
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53501 Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A 57012 Transfers Out - btw Govtl Fun 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 29,716 145,000 145,000 350,000 205,000 141.38% Adjustments to Reserves/Encumbrances:
Outstanding Encumbrances - Net Change (19,489) 0 0
Audit Adjustment (A/P) 0 0 0
Unrealized Gain/ Loss (GASB 31) (13,774) 0 0
Rounding 1
ENDING FUND BALANCE 344,187 222,405 82,081
2/24/2025
27 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 12,804,811 10,444,099 3,882,765
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 422,645 119,377 119,377 71,964 (47,413) (39.72%) 44050 Unrealized Gains and Losses 505,094 0 0 0 0 N/A SUBTOTAL 927,739 119,377 119,377 71,964 (47,413) (39.72%)
INTERGOVERNMENTAL REVENUE
42461 Federal Other Funding 0 0 0 0 0 N/A
42619 Town of Windsor 91,162 97,387 97,387 111,163 13,775 14.14% SUBTOTAL 91,162 97,387 97,387 111,163 13,775 14.14%
CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
45332 Watershed Plan/Restore Chg 61,024 40,000 40,000 40,000 0 0.00% Subtotal Charges for Service 61,024 40,000 40,000 40,000 0 0.00%
MISCELLANEOUS REVENUE
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warran 0 0 0 0 0 N/A 46200 Revenue Appl PY Misc Revenu 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,509,605 1,714,950 1,714,950 1,938,370 223,420 13.03% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 1,509,605 1,714,950 1,714,950 1,938,370 223,420 13.03% TOTAL REVENUES 2,589,530 1,971,714 1,971,714 2,161,497 189,782 9.63%
EXPENDITURES
SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51061 Maintenance - Equipment 30,542 0 0 0 0 N/A 51205 Advertising Marketing 555 0 0 0 0 N/A
51209 Information Tech Svc (non ISD 0 0 0 0 0 N/A 51211 Legal Services 12,675 0 0 0 0 N/A
51212 Legal Services - External 825 0 0 0 0 N/A 51221 Medical/Laboratory Services 0 0 0 0 0 N/A 51226 Consulting Services 0 0 0 0 0 N/A
51231 Testing/Analysis 82,656 0 0 0 0 N/A
51241 Outside Printing and Binding 186 0 0 0 0 N/A 51243 Filing Fees 150 0 0 0 0 N/A
51244 Permits/License/Fees 58,394 0 0 0 0 N/A
51401 Rents and Leases - Equipment 1,724 0 0 0 0 N/A 51402 Rents and Leases - Heavy Eqt 17,701 0 0 0 0 N/A 51601 Training/Conference 11 0 0 0 0 N/A
51602 Business Travel/Mileage 1,432 0 0 0 0 N/A 51605 Private Car Expense 1,259 0 0 0 0 N/A
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 1,138,718 920,101 538,000 1,993,000 1,455,000 270.45% 51902 Telecommunication Usage 0 0 0 0 0 N/A
51917 District Operations Chgs 2,600,356 5,859,709 2,423,300 2,977,370 554,070 22.86% 51921 Equipment Usage Charges 56,670 0 0 0 0 N/A 2/24/2025
28 DRAFT
Section Title: Watershed Planning/Restoration
Fund/Department No: 44215 33041100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 52021 Clothing, Uniforms, Personal 4,311 0 0 0 0 N/A 52031 Food 528 0 0 0 0 N/A
52042 Janitorial Supplies 0 0 0 0 0 N/A
52043 Safety Supplies/Equipment 0 0 0 0 0 N/A
52061 Fuel/Gas/Oil 0 0 0 0 0 N/A
52063 Vehicle Parts 0 0 0 0 0 N/A
52071 Materials and Supplies Expens 8,984 0 0 0 0 N/A 52081 Medical/Laboratory Supplies 25,488 0 0 0 0 N/A 52091 Memberships/Certifications 156 0 0 0 0 N/A 52101 Other Supplies 0 0 0 160,000 160,000 N/A
52111 Office Supplies 0 0 0 0 0 N/A
52114 Freight/Postage 0 0 0 0 0 N/A
52115 Books/Media 646 0 0 0 0 N/A
52117 Mail and Postage Supplies 88 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 1,151 0 0 0 0 N/A 52142 Computer Equipment/Accesso 0 0 0 0 0 N/A
52143 Computer Software 626 0 0 0 0 N/A
52144 Equipment Allowance 0 0 0 0 0 N/A
52181 Business Meals/Supplies 0 0 0 0 0 N/A
52191 Utilities Expense 0 0 0 0 0 N/A
52192 Utilities - Gas/Propane 56 0 0 0 0 N/A
SUBTOTAL 4,045,890 6,779,810 2,961,300 5,130,370 2,169,070 73.25%
OTHER CHARGES
53104 Other Interest Expense 0 0 0 0 0 N/A
53402 Depreciation Expense 7,665 8,000 8,000 8,000 0 0.00% 53403 Loss - Disposed Capital Asset 56,266 0 0 0 0 N/A 53501 Contributions 144,577 0 0 0 0 N/A
SUBTOTAL 208,507 8,000 8,000 8,000 0 0.00%
REIMBURSEMENTS
58010 Reimb. - General 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
FIXED ASSETS
19840 Acq-WIP-Equipment 16,861 0 0 0 0 N/A 19841 Acq-WIP-Intangibles 145,661 1,753,239 488,000 0 (488,000) (100.00%) 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A SUBTOTAL 162,522 1,753,239 488,000 0 (488,000) (100.00%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 4,416,919 8,541,049 3,457,300 5,138,370 1,681,070 48.62% Adjustments to Reserves/Encumbrances:
Outstanding Encumbrances - Net Change (39,631) 0
Capital Interest 0 0
Depreciation 7,665 8,000 8,000
Change in prepaid expense 0 0
Gain/loss on disposal of Capital Assets 57,972
Unrealized Gain/ Loss (GASB 31) (505,094) 0
Audit Adjustment (A/P) 0 0
Post Audit Adjustment (54,235)
Rounding 1 0
ENDING FUND BALANCE 10,444,099 3,882,765 913,891
2/24/2025
29 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 753,070 (13,256) (5,097)
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 24,385 8,158 8,158 0 (8,158) (100.00%) 44050 Unrealized Gains and Losses 26,727 0 0 0 0 N/A SUBTOTAL 51,112 8,158 8,158 0 (8,158) (100.00%)
INTERGOVERNMENTAL REVENUE
42358 State Other Funding 0 0 0 0 0 N/A
42619 Town of Windsor 0 0 0 344 344 N/A
SUBTOTAL 0 0 0 344 344 N/A
CHARGES FOR SERVICES
45301 Charges for Services 0 0 0 0 0 N/A
45333 Recycled Water & Local Supply 33 0 0 0 0 N/A 45401 Revenue Appl PY Chgs for Svcs 0 0 0 0 0 N/A SUBTOTAL 33 0 0 0 0 0
MISCELLANEOUS REVENUE
46022 Capital Grants-State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenue 0 0 0 0 0 N/A 46029 Donations/Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 6,000 6,000 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 0 0 0 6,000 6,000 N/A
TOTAL REVENUES 51,144 8,158 8,158 6,344 (1,814) (22.24%)
EXPENDITURES
SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51061 Maintenance - Equipment 0 0 0 0 0 N/A
51205 Advertising/Marketing Svc 0 0 0 0 0 N/A
51209 Information Tech Svc (non ISD) 0 0 0 0 0 N/A 51211 Legal Services 0 0 0 0 0 N/A
51212 Legal Services - External 0 0 0 0 0 N/A
51226 Consulting Services 0 0 0 0 0 N/A
51241 Outside Printing and Binding 0 0 0 0 0 N/A 51244 Permits/License/Fees 0 0 0 0 0 N/A
51401 Rents and Leases - Equipment 0 0 0 0 0 N/A 51601 Training Services 0 0 0 0 0 N/A
51602 Business Travel/Mileage 0 0 0 0 0 N/A
51803 Other Contract Services 240,759 0 0 0 0 N/A 51902 Telecommunication Usage 0 0 0 0 0 N/A
51915 ISD - Reprographics Services 0 0 0 0 0 N/A 51917 District Operations Chgs 472 0 0 0 0 N/A
51921 Equipment Usage Charges 0 0 0 0 0 N/A
2/24/2025
30 DRAFT
Section Title: Recycled Water and Local Supply
Fund/Department No: 44220 33041200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 52031 Food 0 0 0 0 0 N/A
52061 Fuel/Gas 0 0 0 0 0 N/A
52101 Other Supplies 0 0 0 0 0 N/A
52115 Books/Media/Subscriptions 0 0 0 0 0 N/A
52117 Mail and Postage Supplies 0 0 0 0 0 N/A
52141 Minor Equipment/Small Tools 0 0 0 0 0 N/A 52143 Computer Software/Licensing Fees 0 0 0 0 0 N/A 52171 Water Conservation Program 0 0 0 0 0 N/A
52191 Utilities Expense 0 0 0 0 0 N/A
SUBTOTAL 241,231 0 0 0 0 N/A
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53402 Depreciation Expense 5,966 6,000 6,000 6,000 0 0.00% 53501 Contributions 23,662 0 25,000 0 (25,000) (100.00%) SUBTOTAL 29,627 6,000 31,000 6,000 (25,000) (80.65%)
FIXED ASSETS
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 270,858 6,000 31,000 6,000 (25,000) (80.65%) Adjustments to Reserves/Encumbrances:
Outstanding Encumbrances - Net Change (209,241) 0
Change in Windsor Reserve (208,769) 0
Capital Interest 0 0 0
Depreciation 5,966 6,000 6,000
Audit Adjustment (A/P) (107,840) 0 0
Unrealized Gain/ Loss (GASB 31) (26,727) 0 0
Rounding (1) 0
ENDING FUND BALANCE (13,256) (5,097) 1,247
2/24/2025
31 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 398,903 48,878 65,671
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 17,139 2,563 2,563 1,806 (757) (29.54%) 44050 Unrealized Gains and Losses 19,743 0 0 0 0 N/A 44201 Royalties 3 0 0 0 0 N/A
SUBTOTAL 36,885 2,563 2,563 1,806 (757) (29.54%)
INTERGOVERNMENTAL REVENUE
42358 State Other Funding 71,817 388,330 0 38,000 38,000 N/A 42461 Federal Other Funding 26,718 1,942,860 1,036,360 35,000 (1,001,360) (96.62%) 42601 County of Sonoma 31,727 54,725 0 0 0 N/A
42610 Other Governmental Agencies 0 0 0 0 0 N/A 42611 City of Santa Rosa 0 0 0 0 0 N/A
42612 City of Petaluma 0 0 0 0 0 N/A
42613 City of Rohnert Park 0 0 0 0 0 N/A
42615 City of Cotati 0 0 0 0 0 N/A
42618 City of Sonoma 0 0 0 0 0 N/A
42619 Town of Windsor 137,098 144,816 144,816 155,237 10,421 7.20% 42621 North Marin Water District 0 0 0 0 0 N/A
SUBTOTAL 267,361 2,530,731 1,181,176 228,237 (952,939) (80.68%)
CHARGES FOR SERVICES
45301 Charges for Services 44,706 42,000 42,000 42,000 0 0.00% 45316 Water Conservation 1,555 0 0 0 0 N/A
SUBTOTAL 46,262 42,000 42,000 42,000 0 0.00%
MISCELLANEOUS REVENUE
46021 Capital Gains - Federal 0 0 0 0 0 N/A
46022 Capital Grants - State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 58,000 58,000 316,000 258,000 444.83% 46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated Warrants 0 0 0 0 0 N/A 46200 Revenue Appl PY Misc Revenue 0 0 0 0 0 N/A 46204 PY Intergovmntl Rev - Other 14,498 0 0 0 0 N/A 46215 Other Grants 0 0 0 0 0 N/A
SUBTOTAL 14,498 58,000 58,000 316,000 258,000 444.83%
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 2,270,233 2,550,140 2,550,140 2,706,900 156,760 6.15% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 2,270,233 2,550,140 2,550,140 2,706,900 156,760 6.15% TOTAL REVENUES 2,635,239 5,183,434 3,833,879 3,294,943 (538,936) (14.06%)
EXPENDITURES
SERVICES AND SUPPLIES
51021 Communication Expense 0 0 0 0 0 N/A
51032 Janitorial Services 0 0 0 0 0 N/A
51061 Maintenance - Equipment 9,105 0 0 0 0 N/A 51071 Maintenance - Bldg & Improve 0 0 0 0 0 N/A 51205 Advertising/Marketing Svc 39,143 0 0 0 0 N/A 51209 Information Tech Svc (non ISD) 775 0 0 0 0 N/A 2/24/2025
32 DRAFT
Section Title: Water Conservation
Fund/Department No: 44225 33041300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 51211 Legal Services 639 0 0 0 0 N/A
51214 Agency Extra/Temp Help 0 0 0 0 0 N/A
51225 Training Services 0 0 0 0 0 N/A
51230 Security Services 0 0 0 0 0 N/A
51241 Outside Printing and Binding 34,534 41,000 41,000 41,000 0 0.00% 51244 Permits/License 0 0 0 0 0 N/A
51249 Other Professional Services 0 0 0 0 0 N/A 51250 Planning/Mapping/Inspections 0 0 0 0 0 N/A 51301 Publications and Legal Notices 0 0 0 0 0 N/A 51401 Rents and Leases - Equipment 2,640 0 0 0 0 N/A 51601 Training Services 5,896 0 0 0 0 N/A
51602 Business Travel/Mileage 0 13,000 13,000 13,000 0 0.00% 51605 Private Car Expense 525 0 0 0 0 N/A
51801 Other Services 0 0 0 0 0 N/A
51803 Other Contract Services 187,748 650,000 236,000 498,400 262,400 111.19% 51902 Telecommunication Usage 0 0 0 0 0 N/A
51915 ISD Reprographics Services 0 0 0 0 0 N/A
51917 District Operations Chgs 2,515,538 2,214,151 2,200,000 2,500,000 300,000 13.64% 51921 Equipment Usage Charges 26,408 0 0 0 0 N/A 52021 Clothing, Uniforms 0 0 0 0 0 N/A
52031 Food 753 0 0 0 0 N/A
52042 Janitorial Supplies 0 0 0 0 0 N/A
52043 Safety Supplies/Equipment 0 0 0 0 0 N/A
52061 Fuel/Gas/Oil 0 0 0 0 0 N/A
52071 Materials and Supplies Expense 31,508 93,500 93,500 81,000 (12,500) (13.37%) 52091 Memberships/Certifications 5,974 12,000 12,000 6,000 (6,000) (50.00%) 52101 Other Supplies 0 0 0 0 0 N/A
52111 Office Supplies 1,107 0 0 0 0 N/A
52112 Office Furniture/Fixtures 0 0 0 0 0 N/A
52114 Freight/Postage 0 0 0 0 0 N/A
52115 Books/Media/Subscriptions 3,827 0 0 0 0 N/A 52117 Mail and Postage Supplies 216 0 0 0 0 N/A 52141 Minor Equipment/Small Tools 1,602 0 0 0 0 N/A 52142 Computer Equipment/Accessories 0 0 0 0 0 N/A 52162 Special Department Expense 0 0 0 0 0 N/A
52171 Water Conservation Program 30,000 243,000 273,000 166,500 (106,500) (39.01%) 52181 Business Meals/Supplies 0 0 0 0 0 N/A
SUBTOTAL 2,897,937 3,266,651 2,868,500 3,305,900 437,400 15.25%
OTHER CHARGES
53500 Contributions Non-County Agy 0 0 0 0 0 N/A 53501 Contributions 62,497 2,299,990 1,026,000 0 (1,026,000) (100.00%) 53502 Community Grants 0 0 0 0 0 N/A
SUBTOTAL 62,497 2,299,990 1,026,000 0 (1,026,000) (100.00%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 2,960,433 5,566,641 3,894,500 3,305,900 (588,600) (15.11%) Adjustments to Reserves/Encumbrances:
Outstanding Encumbrances - Net Chan (77,903) 0 0
Change in Windsor Reserve (121,784) 400,000 0
Change in Prepaid Expense 6,500 0 0
Unrealized Gain/ Loss (GASB 31) (19,743) 0 0
Post Audit Adjustment 188,098 0 0
Rounding 2 0 0
ENDING FUND BALANCE 48,878 65,671 54,714
2/24/2025
33 DRAFT
Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY25-26
Water Management Planning
Annual Water Supply and Demand Assessment: Develop scope, cost, and schedule to complete a water supply and demand analysis and preparation and submittal of the required Annual Water Shortage Assessment Report to the Department of Water Resources by July 1 each year. Results of the Annual Assessment are also required to inform the work of Sonoma Water’s contractors’ Assessment Reports to DWR.
In FY 23-24 the AWSDA report was completed as described and results shared with the water contractors to inform the completion of their reports.
Sonoma Water’s completed AWSDA was filed with DWR prior to the July 1, 2024 reporting deadline. In FY 24-25 the AWSDA will again be completed as described and results shared with the water contractors to inform the completion of their reports. Sonoma Water’s completed AWSDA will be filed with DWR prior to the July 1, 2025 reporting deadline. The same tasks will be completed in FY 25-26. 30,000$
Watershed Planning/Restoration
RRIFR Decision 1610 Change Petition: R ussian River Flows and Fish Flow Project EIR: Continued preparation of Environmental Impact Report for Fish Habitat Flows and Water Rights Project (Fish Flow Project EIR) in preparation for any additional impact analysis, flow modeling, and monitoring needed..
The EIR is being prepared by Sonoma Water staff, with assistance from consultants on some areas of analysis. In FY23/24, most of the work focused on submission of annual Temporary Urgency Change (TUC) Petitions to the State Board to approve the requested changes to minimum in-stream flows as identified in the Biological Opinion and fisheries and water quality monitoring and reporting required by any State Board TUC Order. Work being accomplished in FY24/25 includes updates to modeling and project analysis, and lab analysis for water quality monitoring under the multiple TUC Orders issued in 2024. Work anticipated for FY25/26 includes work on the draft EIR, in particular flow modeling, as well as lab analysis for water quality monitoring related to the annual TUC.
183,000$
RRIFR Estuary Management: Required Annual Biological Opinion Activities: Sonoma Water, in consultation with the National Marine Fisheries Service (NMFS), California Department of Fish & Wildlife (CDFW) and the U.S. Army Corps of Engineers (Corps), is required to annually prepare a lagoon outlet adaptive management plan by April 1; conduct and record monthly surveys of the beach topography and the outlet channel; use a time lapse video camera to record the interaction of waves, tides and the river mouth; conduct baseline monitoring of seals and other pinnipeds, conduct estuary water quality monitoring, conduct juvenile steelhead and coho salmon rearing surveys, and prepare annual reports. Other FY23/24 and FY24/25 activities include installation and monitoring of downstream migrant salmonid traps and water quality monitoring stations. Work being completed in FY24/25 includes preparation of the annual adaptive management plan, renewing regulatory permits, and continuation of monitoring and studies. Work anticipated for FY25/26 includes renewing regulatory permits and monitoring studies. 435,000$
Upper Russian River Water Quality Monitoring: This water quality monitoring was conducted for the Upper Russian River, including the East Fork Russian River above Lake Mendocino and Lake Mendocino to contribute to planning and modeling efforts for the Potter Valley Project (PVP), Lake Mendocino management, Fish Habitat Flows and Water Rights Project, the Forecast Informed Reservoir Operations (FIRO) projects, and TUC orders.
Monitoring included the deployment of datasondes and collection of grab samples, as well as laboratory analysis. Work anticipated for FY25/26 includes the efforts described above.
25,000$
2/24/2025
34 DRAFT
Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY25-26
Landscape Resiliency: Multiyear fire landscape resiliency effort at Lake Sonoma to protect source water quality in partnership with the U.S. Army Corps and CalFire. In FY24/25, met with CalFire and USACE to identify areas that require vegetation treatment, conducted vegetation management, and facilitated CalFire controlled burns. The same tasks will be undertaken in FY 25-26. 200,000$
843,000$
Recycled Water and Local Supply
Recycled Water and Local Supply costs have historically been for Sonoma Water’s share of the groundwater sustainability agency’s contributions.
Sonoma Water’s share of mandatory fees has been included in the Agency Operating fund in FY 2025/2026. -$
-$
Water Conservation
51241-Outside Printing and Binding
WUE/Water Ed Program materials, Eco-Friendly Garden Tour materials, Water Smart Plant Label materials. 41,000$ 51602-Business Travel/Mileage
Attend local and statewide meetings representing the Partnership and Sonoma Water. 13,000$ 51803-Other Contract Services
Garden Sense Contract: Funding provides onsite visits by local master gardeners to support local turf removal programs. 20,000$ Green Business Program: Funding to staff a part time position which provides water assessments for local businesses pursuing the Green Business Certification.
30,000$
Educational Content: Displays for Education Center. 10,000$ Plant Labeling Program: Funding for nursery liaison to ensure locally appropriate plants are labeled, nursery staff trainings, outreach tabling. 20,000$ QWEL: QWEL website and database maintenance contract, QWEL trainings. 64,000$ Sonoma County Fair: Sponsorship of general WUE display/materials at the Sonoma County Fair. 10,000$ SMSWP website: Website hosting, maintenance, and development. 8,400$ Spatial Analysis: CII Landscape Measurements for contractors. 250,000$ Water Ed Bus Contract: Shuttle from school to field study sites for Water Education Program. 50,000$ Water Loss Programs: Technical assistance for regional water loss meetings and audit validations. 36,000$ 498,400$
2/24/2025
35 DRAFT
Water Transmission Budget
2025-26
Itemized Detail for Subfunds Consulting/Contractual Services Budget FY25-26
51917-District Operations Chgs
Salaries, benefits and overhead costs for staff assigned to projects budgeted within the Water Conservation Fund (Includes USBR WaterSMART Grant). 2,500,000$ 52071-Materials and Supplies Expense
Water Ed Teaching Materials: pH strips, fabric for displays, youth outreach displays, pencil sharpeners, pencils, classroom testing kits, maps, workbooks, rulers, toothbrushes, stickers, etc. Garden Tour, fair demo garden sign. 81,000$ 52091-Memberships/Certifications
Irrigation Association and AWWA Certificate Renewals, Water Education Foundation, and California Water Efficiency Partnership, Alliance for Water Efficiency, etc.
6,000$
52171-Water Conservation Program
Outdoor Water Use Focused Programs: Russian River Friendly Workshops, Living Learning Landscapes Demo Gardens, etc. 1,500$ Public Information/Outreach Programs: Media campaign for the Sonoma-Marin Saving Water Partnership including media ad buy, ad development. 60,000$ Saving Water Partnership Wholesaler Support: Acting as the regional liaison attend meetings of the CalWEP, Alliance for Water Efficiency, ACWA, Urban Advisory Group, CA Science Teachers Association, environmental education conference. 20,000$
School Education Program: Such as assembly program, port-a-potties, steelhead in the classroom program, youth outreach events, teacher program, teacher trainings, educational workbooks, maps.
70,000$
Seminars, Workshops, Training: Host trainings/ workshops to benefit the Partnership, such as Statewide Framework, Water Loss, speakers bureau.
Participation in national/statewide studies such as those conducted by CalWEP and AWE. 15,000$
166,500$
Total 3,305,900$
2/24/2025
36 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230 33045000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 9,662,681 10,305,302 10,097,733
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 309,932 314,171 314,171 310,281 (3,890) (1.24%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Los 326,898 0 0 0 0 N/A SUBTOTAL 636,830 314,171 314,171 310,281 (3,890) (1.24%)
MISCELLANEOUS REVENUES
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46021 Capital Grants - Federa 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46050 Cancelled/Stale Dated W 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
ADMINISTRATIVE CONTROL ACCOUNT
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a F 321,676 299,408 299,408 309,921 10,513 3.51% 47102 Transfers In - btw Govtl 0 0 0 0 0 N/A
SUBTOTAL 321,676 299,408 299,408 309,921 10,513 3.51%
SPECIAL ITEMS
48004 Residual Equity Transfe 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 958,506 613,579 613,579 620,202 6,623 1.08%
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
FIXED ASSETS
19820 Machinery and Equipme 0 0 0 0 0 N/A
19822 Mobile Equipment 0 0 0 0 0 N/A
19824 Computer Equipment 0 0 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 0 821,148 0 130,247 130,247 N/A 19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intan 0 0 0 0 0 N/A
19851 Intangible Assets - Non- 0 0 0 0 0 N/A
SUBTOTAL 0 821,148 0 130,247 130,247 N/A
2/24/2025
37 DRAFT
Section Title: Santa Rosa Aqueduct Capital Fund
Fund/Department No: 44230 33045000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
OTHER FINANCING USES
57011 Transfers Out - within a 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 821,148 0 130,247 130,247 N/A Adjustments to Reserves/Encumbrances:
Repayment of Loan to Storage 0 0 0
Unrealized Gain/ Loss (GASB 31) 11,013 0 0
Capitalized Interest (326,898) 0 0
Post Audit Adjustment 0 0 0
Rounding 0 0 0
ENDING FUND BALANCE 10,305,302 10,097,733 10,587,688
2/24/2025
38 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 7,672,321 3,817,392 4,615,690
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 234,550 104,762 104,762 28,633 (76,130) (72.67%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 260,888 0 0 0 0 N/A SUBTOTAL 495,438 104,762 104,762 28,633 (76,130) (72.67%)
MISCELLANEOUS REVENUE
46021 Capital Gains - Federal 242,448 2,134,138 0 0 0 N/A SUBTOTAL 242,448 2,134,138 0 0 0 N/A
ADMINISTRATIVE CONTROL ACCOUNT
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 80,657 0 0 1,450,000 1,450,000 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 80,657 0 0 1,450,000 1,450,000 N/A
TOTAL REVENUES 818,544 2,238,900 104,762 1,478,633 1,373,870 1311.42%
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
53403 Loss - Disposed Capital Asset 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0 0 N/A
19822 Mobile Equipment 0 0 0 0 0 N/A
19824 Computer Equipment 0 0 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 797,227 1,440,602 2,841,016 3,119,107 278,091 9.79% 19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intang 16,805 0 0 0 0 N/A 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A SUBTOTAL 814,033 1,440,602 2,841,016 3,119,107 278,091 9.79% 2/24/2025
39 DRAFT
Section Title: Petaluma Aqueduct Capital Fund
Fund/Department No: 44235 33045100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 814,033 1,440,602 2,841,016 3,119,107 278,091 9.79% Adjustments to Reserves/Encumbrances:
Advance to Common 0 0 0
Increase/(Decrease) in Loan Payable 0 0 0
Capitalized Interest 0 0 0
Loss on Fixed Asset 0 0 0
Principal Received on Loan 0 0 0
Change in Encumbrances (3,598,553) 0 0
Donated Asset 0 0 0
Unrealized Gain/ Loss (GASB 31) (260,888) 0 0
Rounding 0
ENDING FUND BALANCE 3,817,392 4,615,690 2,975,215
2/24/2025
40 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 44240 33045200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 43,111 208,414 151,556
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 75,540 1,615 1,615 7,862 6,247 386.72% 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 681 0 0 0 0 N/A SUBTOTAL 76,221 1,615 1,615 7,862 6,247 386.72%
MISCELLANEOUS REVENUES
46200 Transfers In - within a Fund (46) 0 0 0 0 N/A SUBTOTAL (46) 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 275,741 211,752 211,752 213,191 1,438 0.68% 47102 Transfers In - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 275,741 211,752 211,752 213,191 1,438 0.68%
SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 351,916 213,368 213,368 221,053 7,685 3.60%
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
53403 Loss-Disposed Capital Asset 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
FIXED ASSETS
19820 Machinery and Equipment 0 0 0 0 0 N/A
19822 Mobile Equipment 0 0 0 0 0 N/A
19824 Computer Equipment 0 0 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 212,041 270,225 173,200 0 (173,200) (100.00%) 19840 Work in Progress - Eqt 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 0 0 0 0 N/A
19851 Intangible Assets - Non-amor 0 0 0 0 0 N/A SUBTOTAL 212,041 270,225 173,200 0 (173,200) (100.00%)
2/24/2025
41 DRAFT
Section Title: Sonoma Aqueduct Capital Fund
Fund/Department No: 44240 33045200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 212,041 270,225 173,200 0 (173,200) (100.00%) Adjustments to Reserves/Encumbrances:
Outstanding Encumbrances - Net Change 26,062 0 0
Sale or Purchase of Fixed Asset 0 0 0
Gain/loss on disposal of Capital Assets 46 0 0
Unrealized Gain/ Loss (GASB 31) (681) 0 0
Post Audit Adjustment 0
Rounding 1 (1) 0
ENDING FUND BALANCE 208,414 151,556 372,609
2/24/2025
42 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities
Fund/Department No: 44250 33043000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 2,225,427 2,390,075 663,241
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 76,546 262 262 12,054 11,792 4506.51% 44050 Unrealized Gains & Losses 46,828 0 0 0 0 N/A SUBTOTAL 123,374 262 262 12,054 11,792 4506.51%
MISCELLANEOUS REVENUE
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46022 Capital Grants - State 0 0 0 0 0 N/A
46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
SPECIAL ITEMS
48004 Residual Equity Transfers 0 0 0 0 0 N/A
48005 Contributed Capital 19,331 0 0 0 0 N/A
SUBTOTAL 19,331 0 0 0 0 N/A
ADMINISTRATIVE CONTROL
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 77,000 1,287,000 1,287,000 1,570,000 283,000 21.99% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 77,000 1,287,000 1,287,000 1,570,000 283,000 21.99% TOTAL REVENUES 219,705 1,287,262 1,287,262 1,582,054 294,792 22.90%
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53403 Loss - Disposed Capital Asset 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
2/24/2025
43 DRAFT
Section Title: Storage Facilities
Fund/Department No: 44250 33043000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change
FIXED ASSETS
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
19832 CIP - Infrastructure 153,900 3,014,096 1,245,086 2,104,967 859,881 69.06% 19841 Acq-WIP-Intangibles 73,735 0 0 0 0 N/A
19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A SUBTOTAL 227,635 3,014,096 1,245,086 2,104,967 859,881 69.06%
ADMINISTRATIVE CONTROL ACCOUNT
59002 Advances 0 0 0 0 0 N/A
59003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 227,635 3,014,096 1,245,086 2,104,967 859,881 69.06% Adjustments to Reserves/Encumbrances:
Repayment of Loan from SR Aqueduct Cap 0 0 0
Princ. Pymnt on loan from SR Aqueduct Ca 0 0 0
Advances 0 0 0
Outstanding Encumbrances - Net Change 0 0 0
PY CIP adjustment - reclass to PY Exp 0 0 0
B & I Tsfrs 0 0 0
LTD Proceeds 0 0 0
Sold Asset 0 0 0
Capitalized Interest 0 0 0
Move Project CIP Balance (19,331) 0 0
Gain/loss on disposal of Capital Assets 0 0 0
Unrealized Gain/ Loss (GASB 31) (46,828) 0 0
Change in Encumbrances 238,736 0 0
Rounding 1 0 0
ENDING FUND BALANCE 2,390,075 663,241 140,327
2/24/2025
44 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 11,595,612 11,311,998 3,204,708
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 323,616 103,245 103,245 54,913 (48,331) (46.81%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains & Losses 288,451 0 0 0 0 N/A SUBTOTAL 612,067 103,245 103,245 54,913 (48,331) (46.81%)
CHARGES FOR SERVICES
45062 Construct/Bldg Permit Rvw Svc 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
MISCELLANEOUS REVENUES
46021 Capital Grants - Federal 0 0 0 0 0 N/A
46022 Capital Grants - State 2,327,469 3,174,592 0 0 0 N/A 46027 Insurance Claims Reimburseme 0 0 0 0 0 N/A 46029 Donations/Contributions 0 0 0 0 0 N/A
46040 Miscellaneous Revenue 0 0 0 0 0 N/A
46041 Discounts Earned 0 0 0 0 0 N/A
46200 Revenue Appl PY Misc Revenu 0 0 0 0 0 N/A 46215 Other Grants 0 860,854 0 0 0 N/A
SUBTOTAL 2,327,469 4,035,446 0 0 0 N/A
ADMINISTRATIVE CONTROL
49002 Advances 0 0 0 0 0 N/A
49003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 3,619,858 5,078,000 5,078,000 10,100,000 5,022,000 98.90% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 3,619,858 5,078,000 5,078,000 10,100,000 5,022,000 98.90% TOTAL REVENUES 6,559,395 9,216,690 5,181,245 10,154,913 4,973,669 95.99%
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 0 0 N/A
53104 Other Interest Expense 0 0 0 0 0 N/A
53403 Loss - Disposed Capital Asset 39,422 0 0 0 0 N/A SUBTOTAL 39,422 0 0 0 0 N/A
FIXED ASSETS
19810 Land 0 0 0 0 0 N/A
19811 Acq-Land Improvements 75,323 0 0 0 0 N/A
19812 Acq-CIP-Land 653,683 1,124,820 0 0 0 N/A
19831 CIP - Bldg & Impr 0 0 0 0 0 N/A
2/24/2025
45 DRAFT
Section Title: Common Facilities
Fund/Department No: 44260 33043200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change 19832 CIP - Infrastructure 4,016,308 16,179,160 11,403,800 12,926,099 1,522,299 13.35% 19840 Acq-WIP-Equipment 0 0 0 0 0 N/A
19841 Work in Progress - Intang 0 20,000 0 0 0 N/A 19851 Intangible Assets - Non-amort 0 0 0 0 0 N/A SUBTOTAL 4,745,315 17,323,980 11,403,800 12,926,099 1,522,299 13.35%
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
ADMINISTRATIVE CONTROL ACCOUNT
59002 Advances 0 0 0 0 0 N/A
59003 Advances Clearing 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 4,784,737 17,323,980 11,403,800 12,926,099 1,522,299 13.35% Adjustments to Reserves/Encumbrances:
Loan from Petaluma Aqueduct Capital Fund 0 0 0
Technical Adjustments - BRO's 0 0 0
Principal payment on Loan from Petaluma A 0 0 0
Advances 0 0 0
Outstanding Encumbrances - Net Change (1,955,735) 0 0
Capitalized Interest 0 0 0
Gain/loss on disposal of Capital Assets 39,632 0 0
Proceeds from State Loan & Other LT Debt 0 0 0
PY CIP adjustment - reclass to PY Exp (los 0 0 0
B & I Tsfr to ISF (Facilities) Fund 0 0 0
Auditor Adj - Reversal of Duplicate Pymt 0 0 0
Sale or Purchase of Fixed Asset 0 0 0
Change in Deposit w/Others 0 0 0
Move Project CIP Balance (33,987) 0 0
Change in Contingent Liability 0 0 0
Post Audit Adjustment 180,269 0 0
Unrealized Gain/ Loss (GASB 31) (288,451) 0 0
Rounding 0 0 0
ENDING FUND BALANCE 11,311,998 3,204,708 433,523
2/24/2025
46 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: North Marin Water Deposit
Fund/Department No: 44300 33045300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE 28,669 29,711 30,682
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 1,042 971 971 934 (36) (3.72%) 44050 Unrealized Gains and Losses 1,121 0 0 0 0 N/A SUBTOTAL 2,163 971 971 934 (36) (3.72%)
INTERGOVERNMENTAL REVENUE
42610 Other Governmental Agencie 52,545 0 0 0 0 N/A SUBTOTAL 52,545 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 54,708 971 971 934 (36) (3.72%)
EXPENDITURES
OTHER CHARGES
53501 Contributions 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:
Unrealized Gain/ Loss (GASB 31) (1,121) 0
Post Audit Adjustment (52,545) 0
Post Audit Adjustment 0 0
Rounding 0 0
ENDING FUND BALANCE 29,711 30,682 31,616
2/24/2025
47 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Debt Service Fund
Fund/Department No: 44265 33047000
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $480,004 $550,566 $159,026
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 34,525 10,425 10,425 2,651 (7,774) (74.57%) 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 56,875 0 0 0 0 N/A SUBTOTAL 91,400 10,425 10,425 2,651 (7,774) (74.57%)
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,196,268 1,196,267 1,196,267 1,196,269 2 0.00% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 1,196,268 1,196,267 1,196,267 1,196,269 2 0.00% TOTAL REVENUES 1,287,668 1,206,692 1,206,692 1,198,920 (7,772) (0.64%)
EXPENDITURES
OTHER CHARGES
53103 Interest on LT Debt 128,407 102,759 102,759 76,390 (26,369) (25.66%) SUBTOTAL 128,407 102,759 102,759 76,390 (26,369) (25.66%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 120,000 558,000 558,000 300,000 (258,000) (46.24%) SUBTOTAL 120,000 558,000 558,000 300,000 (258,000) (46.24%) ADMIN. CONTROL ACCOUNT
59002 Advances 911,824 937,473 937,473 963,844 26,371 2.81% 59003 Advances Clearing (911,824) (937,473) (937,473) (963,844) (26,371) 2.81% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 248,407 660,759 660,759 376,390 (284,369) (43.04%) Adjustments to Reserves/Encumbrances:
Principal payments on loan (911,824) 0
(Increase) / Decrease in Principal Payable 0 (937,473) (963,844) Advances from Other Govt (56,875) 0 0
Unrealized Gain/ Loss (GASB 31) 1 0 0
Rounding 0 0 0
ENDING FUND BALANCE $550,566 $159,026 $17,712
2/24/2025
48 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: State Loan Reserve Fund
Fund/Department No: 44270 33047100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0 $0
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 0 0 N/A
44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 45,058 0 0 0 0 N/A SUBTOTAL 45,058 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 45,058 0 0 0 0 N/A
EXPENDITURES
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 0 0 N/A
Adjustments to Reserves/Encumbrances:
Increase in Reserve 0 0 0
Unrealized Gain/ Loss (GASB 31) (45,058) 0
Rounding 0 0
ENDING FUND BALANCE $0 $0 $0
2/24/2025
49 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2015
Fund/Department No: 44290 33047500
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE ($17,071) $8,666 $21,216
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (1,958) 329 329 594 265 80.54% 44003 Other Interest Earnings 30,430 0 0 0 0 N/A 44050 Unrealized Gains and Losses 6,872 0 0 0 0 N/A SUBTOTAL 35,343 329 329 594 265 80.54%
Miscellaneous Revenues
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 477,198 476,590 476,590 471,733 (4,856) (1.02%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 477,198 476,590 476,590 471,733 (4,856) (1.02%) TOTAL REVENUES 512,541 476,919 476,919 472,328 (4,591) (0.96%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 1,179 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,179 1,500 1,500 1,500 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 144,521 131,327 131,327 117,500 (13,827) (10.53%) 53104 Other Interest Expense (11,468) 5,058 5,058 5,058 0 0.00% 53105 Costs of Issuance 0 0 0 0 0 N/A
53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 133,053 136,385 136,385 122,558 (13,827) (10.14%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 47,000 55,000 55,000 70,000 15,000 27.27% 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 47,000 55,000 55,000 70,000 15,000 27.27%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 263,876 276,541 276,541 286,145 9,604 3.47% 59005 Admin Control Acct Clearing (263,876) (276,541) (276,541) (286,145) (9,604) 3.47% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 181,231 192,885 192,885 194,058 1,173 0.61% Adjustments to Reserves/Encumbrances:
Change in Principal due to Bond Reallocation 0
Change in Bond Premium due to Bond Reallo 0
Capitalized Interest 0
Loss on Refunding of Debt 5,058 5,058 5,058
Principal Payment (263,876) (276,541) (286,145)
Special Fund Stmts'!B449 0 0 0
Amortization of Bond Premium (16,526) 0 0
Change in Reserved Fund Balance (23,358)
Unrealized Gain/ Loss (GASB 31) (6,872)
Rounding 0 (0)
ENDING FUND BALANCE $8,666 $21,216 $18,399
2/24/2025
50 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2015
Fund/Department No: 44295 33047600
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $178,906 $159,769 $67,868
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 1,582 3,390 3,390 1,510 (1,881) (55.47%) 44003 Other Interest Earnings 27,191 0 0 0 0 N/A 44050 Unrealized Gains and Losses 17,848 0 0 0 0 N/A SUBTOTAL 46,621 3,390 3,390 1,510 (1,881) (55.47%)
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,228,700 1,228,157 1,228,157 1,218,046 (10,112) (0.82%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 1,228,700 1,228,157 1,228,157 1,218,046 (10,112) (0.82%) TOTAL REVENUES 1,275,321 1,231,548 1,231,548 1,219,555 (11,993) (0.97%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 2,047 2,500 2,500 2,500 0 0.00%
SUBTOTAL 2,047 2,500 2,500 2,500 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 424,043 392,175 392,175 358,736 (33,439) (8.53%) 53104 Other Interest Expense (25,008) 4,516 4,516 4,516 0 0.00% 53105 Costs of Issuance 0 0 0 0 0 N/A
53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 399,036 396,691 396,691 363,252 (33,439) (8.43%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 200,000 260,000 260,000 200,000 (60,000) (23.08%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 200,000 260,000 260,000 200,000 (60,000) (23.08%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 637,374 668,772 668,772 693,418 24,646 3.69% 59005 Admin Control Acct Clearing (637,374) (668,772) (668,772) (693,418) (24,646) 3.69% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 601,082 659,191 659,191 565,752 (93,439) (14.17%) Adjustments to Reserves/Encumbrances:
Principal Payment (637,374) (668,772) (693,418)
Change in Principal due to Bond Realloca 0 0 0
Change in Bond Premium due to Bond Re 0 0 0
Revenue Bonds Pay - Change in Current 0 0 0
Amortization of Bond Premium (29,523) 0 0
Capitalized Interest 0
Change in Reserved Fund Balance (13,146)
Loss on Refunding Debt 4,515 4,515 4,515
Unrealized Gain/ Loss (GASB 31) (17,848) 0 0
Rounding 1 (1) 0
ENDING FUND BALANCE $159,769 $67,868 $32,768
2/24/2025
51 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2015
Fund/Department No: 44305 33047700
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $24,686 $5,855 $6,001
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 648 193 193 182 (11) (5.93%) 44003 Other Interest Earnings 1 0 0 0 0 N/A
44050 Unrealized Gains and Losses 3,730 0 0 0 0 N/A SUBTOTAL 4,380 193 193 182 (11) (5.93%)
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 37,971 37,971 37,971 37,702 (269) (0.71%) 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 37,971 37,971 37,971 37,702 (269) (0.71%)
TOTAL REVENUES 42,351 38,164 38,164 37,883 (281) (0.74%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 362 500 500 500 0 0.00%
SUBTOTAL 362 500 500 500 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 13,767 12,830 12,830 11,846 (984) (7.67%) 53104 Other Interest Expense (689) 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 13,078 12,830 12,830 11,846 (984) (7.67%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 25,000 5,000 5,000 5,000 0 0.00% SUBTOTAL 25,000 5,000 5,000 5,000 0 0.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 18,750 19,688 19,688 20,438 750 3.81% 59005 Admin Control Acct Clearing (18,750) (19,688) (19,688) (20,438) (750) 3.81% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 38,440 18,330 18,330 17,346 (984) (5.37%) Adjustments to Reserves/Encumbrances:
Change in Principal due to Bond Reallocation 0 0 0
Change in Bond Premium due to Bond Reallo 0 0 0
Accrual of Principal Payment - Revenue Bond (18,750) (19,688) (20,438) Principal Payment 0 0 0
Amortization of Bond Premium (689) 0 0
Unrealized Gain/ Loss (GASB 31) (3,730) 0 0
Change in Reserved Fund Balance 427
Rounding 1 0 0
ENDING FUND BALANCE $5,855 $6,001 $6,100
2/24/2025
52 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2019
Fund/Department No: 44310 33047800
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $631,233 $737,241 $38,313
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 17,311 12,852 12,852 993 (11,859) (92.27%) 44003 Other Interest Earnings 76 0 0 0 0 N/A
44050 Unrealized Gains and Losses 24,519 0 0 0 0 N/A SUBTOTAL 41,906 12,852 12,852 993 (11,859) (92.27%)
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 676,992 676,356 676,356 679,114 2,758 0.41% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 676,992 676,356 676,356 679,114 2,758 0.41%
TOTAL REVENUES 718,898 689,208 689,208 680,107 (9,101) (1.32%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 2,683 3,000 3,000 3,000 0 0.00%
SUBTOTAL 2,683 3,000 3,000 3,000 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 279,354 264,038 264,038 247,983 (16,055) (6.08%) 53104 Other Interest Expense (54,724) 0 0 0 0 N/A 53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 224,630 264,038 264,038 247,983 (16,055) (6.08%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 800,000 800,000 100,000 (700,000) (87.50%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 0 800,000 800,000 100,000 (700,000) (87.50%)
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 306,334 321,098 321,098 339,551 18,453 5.75% 59005 Admin Control Acct Clearing (306,334) (321,098) (321,098) (339,551) (18,453) 5.75% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 227,313 1,067,038 1,067,038 350,983 (716,055) (67.11%) Adjustments to Reserves/Encumbrances:
Principal Payment (306,334) (321,098) (339,551)
Amortization of Bond Premium (54,724) 0 0
Unrealized Gain/ Loss (GASB 31) (24,519) 0 0
Changed in Reserved Fund Balance 1 (1) 0
Rounding 0 0 0
ENDING FUND BALANCE $737,241 $38,313 $27,886
2/24/2025
53 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2019
Fund/Department No: 44315 33047900
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $216,915 $164,495 $112,244
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 5,917 6,389 6,389 2,528 (3,862) (60.44%) 44003 Other Interest Earnings 27 0 0 0 0 N/A
44050 Unrealized Gains and Losses 12,529 0 0 0 0 N/A SUBTOTAL 18,473 6,389 6,389 2,528 (3,862) (60.44%)
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 0 0 0 0 0 N/A
0 0 0 0 (3,862) N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 240,651 240,426 240,426 241,406 980 0.41% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 240,651 240,426 240,426 241,406 980 0.41%
TOTAL REVENUES 259,124 246,815 246,815 243,933 (6,744) (2.73%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 1,254 1,500 1,500 1,500 0 0.00%
SUBTOTAL 1,254 1,500 1,500 1,500 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 99,096 93,663 93,663 87,968 (5,695) (6.08%) 53104 Other Interest Expense (19,412) 0 0 0 0 N/A 53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 79,683 93,663 93,663 87,968 (5,695) (6.08%)
OTHER FINANCING USES
57011 Transfers Out - within a Fund 90,000 90,000 90,000 90,000 0 0.00% SUBTOTAL 90,000 90,000 90,000 90,000 0 0.00%
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 108,666 113,903 113,903 120,450 6,547 5.75% 59005 Admin Control Acct Clearing (108,666) (113,903) (113,903) (120,450) (6,547) 5.75% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 170,937 185,163 185,163 179,468 (5,695) (3.08%) Adjustments to Reserves/Encumbrances:
Unrealized Gains and Losses 0 0 0
Proceeds Bond Issuance 0 0 0
Restricted Cash w/Fiscal Agent 0 0 0
Accrual of Principal Payment - Revenue Bo (108,666) (113,903) (120,450) Principal Payment 0 0 0
Deposit to Cost of Issuance Fund 0 0 0
Bond Premium - Issuance of Revenue Bond 0 0 0
Amortization of Bond Premium (19,412) 0 0
Unrealized Gain/ Loss (GASB 31) (12,529) 0 0
Change in Reserved Fund Balance 0 0 0
Rounding 1 (1) 0
ENDING FUND BALANCE $164,495 $112,244 $56,259
2/24/2025
54 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bonds 2022
Fund/Department No: 44325 33048100
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE ($10,443) $9,730 $62,767
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (1,326) 1,200 1,200 1,299 99 8.26% 44003 Other Interest Earnings 173 0 0 0 0 N/A
44050 Unrealized Gains and Losses 22,224 0 0 0 0 N/A SUBTOTAL 21,071 1,200 1,200 1,299 99 8.26%
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 4,749 0 0 0 0 N/A SUBTOTAL 4,749 0 0 0 0 N/A
OTHER FINANCING SOURCES 4,749
47101 Transfers In - within a Fund 355,015 451,088 455,967 458,050 2,083 0.46% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 355,015 451,088 455,967 458,050 2,083 0.46%
SPECIAL ITEMS
48004 Residual Equity Transfers 432 0 0 0 0 N/A SUBTOTAL 432 0 0 0 0 N/A
TOTAL REVENUES 381,267 452,287 457,167 459,348 2,182 0.48%
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 720 1,000 1,000 1,000 0 0.00%
SUBTOTAL 720 1,000 1,000 1,000 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 119,586 165,680 165,680 154,190 (11,490) (6.94%) 53104 Other Interest Expense (32,639) 0 0 0 0 N/A 53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 86,947 165,680 165,680 154,190 (11,490) (6.94%)
SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 30,000 1,232,000 1,232,000 100,000 (1,132,000) (91.88%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 30,000 1,232,000 1,232,000 100,000 (1,132,000) (91.88%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 188,562 225,570 229,813 243,114 13,301 5.79% 59005 Admin Control Acct Clearing (188,562) (225,570) (229,813) (243,114) (13,301) 5.79% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 117,667 1,398,680 1,398,680 255,190 (1,143,490) (81.75%) Adjustments to Reserves/Encumbrances:
Gain on Refunding (4,913) 0 0
Amortization of Bond Premium (27,727)
Proceeds from Bond Issuance 0 0 0
Accrual of Principal Payment - Revenue Bo (188,562) (225,570) (243,114) Unrealized Gain/ Loss (GASB 31) (22,224) 0 0
Rounding (2) 0 0
ENDING FUND BALANCE $9,730 $62,767 $23,811
2/24/2025
55 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds 2022
Fund/Department No: 44335 33048300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $8,405,605 $5,576,812 $1,175,561
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 260,878 116,082 116,082 36,826 (79,256) (68.28%) 44003 Other Interest Earnings 1,000 0 0 0 0 N/A 44050 Unrealized Gains and Losses 443,571 0 0 0 0 N/A SUBTOTAL 705,449 116,082 116,082 36,826 (79,256) (68.28%)
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 27,402 0 0 0 0 N/A SUBTOTAL 27,402 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 1,378,983 1,285,442 1,280,562 1,282,250 1,688 0.13% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 1,378,983 1,285,442 1,280,562 1,282,250 1,688 0.13%
SPECIAL ITEMS
48004 Residual Equity Transfers 605 0 0 0 0 N/A SUBTOTAL 605 0 0 0 0 N/A
TOTAL REVENUES 2,112,438 1,401,525 1,396,644 1,319,076 (77,568) (5.55%)
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 2,688 3,000 3,000 3,000 0 0.00%
SUBTOTAL 2,688 3,000 3,000 3,000 0 0.00%
OTHER CHARGES
53103 Interest on LT Debt 666,486 584,533 584,533 558,233 (26,300) (4.50%) 53104 Other Interest Expense (86,634) 0 0 0 0 N/A 53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 579,852 584,533 584,533 558,233 (26,300) (4.50%)
SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 3,299,858 3,460,000 3,460,000 100,000 (3,360,000) (97.11%) 57012 Transfers Out - btw Govtl Fund 0 0 0 0 0 N/A SUBTOTAL 3,299,858 3,460,000 3,460,000 100,000 (3,360,000) (97.11%) ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 528,630 530,243 525,999 553,767 27,768 5.28% 59005 Admin Control Acct Clearing (528,630) (530,243) (525,999) (553,767) (27,768) 5.28% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 3,882,398 4,047,533 4,047,533 661,233 (3,386,300) (83.66%) Adjustments to Reserves/Encumbrances:
Proceeds Bond Issuance 0 0 0
Gain on Refunding (6,879) 0 0
Accrual of Principal Payment - Revenue Bo (528,630) (530,243) (553,767) Principal Payment 0 0 0
Amortization of Bond Premium (79,755) 0 0
Unrealized Gain/ Loss (GASB 31) (443,571) 0 0
Changed in Reserved Fund Balance 0 0 0
Post Audit Adjustment 0 0 0
Change in Principal due to Refunding of De 0 (1,225,000) 0 Rounding 1 0 0
ENDING FUND BALANCE $5,576,812 $1,175,561 $1,279,637
2/24/2025
56 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Sonoma Aqueduct Revenue Bonds 2022
Fund/Department No: 44330 33048200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $3,851 $36,819 $69,011
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash (440) 1,678 1,678 2,571 893 53.18% 44003 Other Interest Earnings 93 0 0 0 0 N/A
44050 Unrealized Gains and Losses (7,059) 0 0 0 0 N/A SUBTOTAL (7,407) 1,678 1,678 2,571 893 53.18%
MISCELLANEOUS REVENUES
46200 PY Revenue - Miscellaneous 2,552 0 0 0 0 N/A SUBTOTAL 2,552 0 0 0 0 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 234,526 233,940 233,940 236,208 2,268 0.97% 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 234,526 233,940 233,940 236,208 2,268 0.97%
SPECIAL ITEMS
48004 Residual Equity Transfers 355 0 0 0 0 N/A SUBTOTAL 355 0 0 0 0 N/A
TOTAL REVENUES 230,026 235,618 235,618 238,779 3,160 1.34%
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 530 350 350 600 250 71.43%
SUBTOTAL 530 350 350 600 250 71.43%
OTHER CHARGES
53103 Interest on LT Debt 65,778 58,888 58,888 51,678 (7,210) (12.24%) 53104 Other Interest Expense (24,172) 0 0 0 0 N/A 53105 Costs of Issuance 0 0 0 0 0 N/A
SUBTOTAL 41,606 58,888 58,888 51,678 (7,210) (12.24%)
SPECIAL ITEMS
56030 Residual Equity Transfers 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 137,808 144,188 144,188 153,120 8,932 6.19% 59005 Admin Control Acct Clearing (137,808) (144,188) (144,188) (153,120) (8,932) 6.19% SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 42,136 59,238 59,238 52,278 (6,960) (11.75%) Adjustments to Reserves/Encumbrances:
Gain on Refunding (4,040) 0 0
Accrual of Principal Payment - Revenue Bo (137,808) (144,188) (153,120) Principal Payment 0 0 0
Amortization of Bond Premium (20,132) 0 0
Unrealized Gain/ Loss (GASB 31) 7,059 0 0
R
ounding (2) 0 0
ENDING FUND BALANCE $36,819 $69,011 $102,392
2/24/2025
57 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Petaluma Aqueduct Revenue Bonds 2025
Fund/Department No: 44340 TBD
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0 $0
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 33,851 33,851 N/A 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 0 0 0 0 0 N/A SUBTOTAL 0 0 0 33,851 33,851 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 346,697 346,697 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 0 0 0 346,697 346,697 N/A
SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 0 0 380,548 380,548 N/A
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 0 0 0 480 480 N/A
SUBTOTAL 0 0 0 480 480 N/A
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 149,872 149,872 N/A 53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 37,310 37,310 N/A 53109 Capitalized Interest 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 187,182 187,182 N/A
OTHER CHARGES
56030 Interest on LT Debt 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 1,450,000 1,450,000 N/A SUBTOTAL 0 0 0 1,450,000 1,450,000 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 0 0 113,814 113,814 N/A 59005 Admin Control Acct Clearing 0 0 0 (113,814) (113,814) N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 1,637,662 1,637,662 N/A Adjustments to Reserves/Encumbrances:
(Increase)/Decrease in Bonds Payable
Principal Payments on Bonds 0 0 0
Proceeds from issuance 0 0 3,513,536
Amortization of bond discount 0 0 0
Change in Reserved Fund Balance 0 0 0
Capitalized Interest 0 0 0
Amortization of deferred amount of refund 0 0 0
Change in Principal - Refund of Debt 0 0 0
Change in bond premium - Refund of Deb 0 0 0
Unrealized Gain/ Loss (GASB 31) 0 0 0
Residual Equity Transfers 0 0 0
Rounding 0 0 0
ENDING FUND BALANCE $0 $0 $2,256,422
2/24/2025
58 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Storage Facilities Revenue Bond - 2025
Fund/Department No: 44280 33047300
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEGINNING FUND BALANCE $0 $0 $0
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 71,805 71,805 N/A 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 0 0 0 0 0 N/A SUBTOTAL 0 0 0 71,805 71,805 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 577,285 577,285 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 0 0 0 577,285 577,285 N/A
SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 0 0 649,091 649,091 N/A
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 0 0 0 799 799 N/A
SUBTOTAL 0 0 0 799 799 N/A
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 249,552 249,552 N/A 53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 62,125 62,125 N/A SUBTOTAL 0 0 0 311,677 311,677 N/A
OTHER CHARGES
56030 Interest on LT Debt 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 1,400,000 1,400,000 N/A SUBTOTAL 0 0 0 1,400,000 1,400,000 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 0 0 189,512 189,512 N/A 59005 Admin Control Acct Clearing 0 0 0 (189,512) (189,512) N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 1,712,476 1,712,476 N/A Adjustments to Reserves/Encumbrances:
Principal payments on bonds 0 0 0
Proceeds from issuance 0 0 5,850,400
Restricted cash with trustee (reserve) 0
Debt Issuance Costs
(Increase) / Decrease in Bonds Payable 0
Amortization of bond discount 0 0 0
Amortization of deferred amount of refunding 0 0 0
Changed in Reserved Fund Balance 0
Unrealized Gain/ Loss (GASB 31) 0
Change in Principal - Refund of Debt
Change in bond premium - Refund of Debt
Residual Equity Transfers 0
Rounding 0 0
ENDING FUND BALANCE $0 $0 $4,787,015
2/24/2025
59 DRAFT
FY 2025-26 BUDGET
BEGINNING AND ENDING CASH SUMMARY
Section Title: Common Facilities Revenue Bonds - 2025
Fund/Department No: 44275 33047200
Actual Estimated Adopted Requested Percent
Account Title 2023-2024 2024-2025 2024-2025 2025-26 Difference Change BEG. FUND BALANCE $0 $0 $0
REVENUES
USE OF MONEY / PROPERTY
44002 Interest on Pooled Cash 0 0 0 231,977 231,977 N/A 44003 Other Interest Earnings 0 0 0 0 0 N/A
44050 Unrealized Gains and Losses 0 0 0 0 0 N/A SUBTOTAL 0 0 0 231,977 231,977 N/A
OTHER FINANCING SOURCES
47101 Transfers In - within a Fund 0 0 0 2,328,330 2,328,330 N/A 47102 Transfers In - btw Govtl Funds 0 0 0 0 0 N/A SUBTOTAL 0 0 0 2,328,330 2,328,330 N/A
SPECIAL ITEMS
48004 Transfers In - within a Fund 0 0 0 0 0 N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL REVENUES 0 0 0 2,560,307 2,560,307 N/A
EXPENDITURES
SERVICES AND SUPPLIES
51242 Bank Charges 0 0 0 3,222 3,222 N/A
SUBTOTAL 0 0 0 3,222 3,222 N/A
OTHER CHARGES
53103 Interest on LT Debt 0 0 0 1,006,501 1,006,501 N/A 53104 Other Interest Expense 0 0 0 0 0 N/A
53105 Costs of Issuance 0 0 0 250,565 250,565 N/A SUBTOTAL 0 0 0 1,257,066 1,257,066 N/A
OTHER CHARGES
56030 Interest on LT Debt 0 0 0 0 0 N/A
SUBTOTAL 0 0 0 0 0 N/A
OTHER FINANCING USES
57011 Transfers Out - within a Fund 0 0 0 9,400,000 9,400,000 N/A SUBTOTAL 0 0 0 9,400,000 9,400,000 N/A
ADMIN. CONTROL ACCOUNT
59004 Administrative Control Account 0 0 0 764,346 764,346 N/A 59005 Admin Control Acct Clearing 0 0 0 (764,346) (764,346) N/A SUBTOTAL 0 0 0 0 0 N/A
TOTAL EXPENDITURES 0 0 0 10,660,288 10,660,288 N/A Adjustments to Reserves/Encumbrances:
Principal payments on bonds 0 0 0
Proceeds from issuance 0 0 23,596,064
(Increase) / Decrease in Bonds Payable 0 0 0
Restricted cash with trustee (reserve) 0 0 0
Amortization of bond discount 0 0 0
Amortization of bond premium 0 0 0
Amortization of deferred amount of refunding 0 0 0
Unrealized Gain/ Loss (GASB 31) 0 0 0
Change in Principal - Refund of Debt 0
Change in bond premium - Refund of Debt 0
Residual Equity Transfers 0
Rounding 0 0 0
ENDING FUND BALANCE $0 $0 $15,496,082
2/24/2025
60 DRAFT
A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities 2025 A Revenue Bond 44275 44280 44285
PRINCIPAL 764,346 N.A N.A 189,512 0 113,814
INTEREST 1,006,501 N.A N.A 249,552 0 149,872
OTHER INTEREST - DEFERRED REFUNDING CHARGE 0 N.A N.A 0 0 0 FISCAL AGENT FEES 3,222 N.A N.A 799 0 480
DEBT ISSUANCE COSTS 250,565 N.A N.A 62,125 0 37,310
Total Individual Bond Payments 2,024,635 N.A N.A 501,987 0 301,475 Bond Reserve 303,695 N.A N.A 75,298 0 45,221
Total Individual Bond Debt Service 2,328,330 N.A N.A 577,285 0 346,697 2015A Revenue Bond 44295 44290 44305
PRINCIPAL 693,418 N.A N.A 286,145 20,438 N.A
INTEREST 358,736 N.A N.A 117,500 11,846 N.A
OTHER INTEREST - DEFERRED REFUNDING CHARGE 4,516 N.A N.A 5,058 0 N.A FISCAL AGENT FEES 2,500 N.A N.A 1,500 500 N.A
DEBT ISSUANCE COSTS
Total Individual Bond Payments 1,059,170 N.A N.A 410,203 32,784 N.A Bond Reserve 158,876 N.A N.A 61,531 4,918 N.A
Total Individual Bond Debt Service 1,218,046 N.A N.A 471,734 37,702 N.A 2019A Revenue Bond 44310 44320 44315
PRINCIPAL 339,551 N.A N.A N.A 120,450 N.A
INTEREST 247,983 N.A N.A N.A 87,968 N.A
FISCAL AGENT FEES 3,000 N.A N.A N.A 1,500 N.A
DEBT ISSUANCE COSTS
Total Individual Bond Payments 590,534 N.A N.A N.A 209,918 N.A Bond Reserve 88,581 N.A N.A N.A 31,488 N.A
Total Individual Bond Debt Service 679,115 N.A N.A N.A 241,406 N.A 2022A Revenue Bond 44335 44325 44330
PRINCIPAL 553,767 N.A N.A 243,114 153,120 N.A
INTEREST 558,233 N.A N.A 154,190 51,678 N.A
FISCAL AGENT FEES 3,000 N.A N.A 1,000 600 N.A
DEBT ISSUANCE COSTS
Total Individual Bond Payments 1,115,000 N.A N.A 398,304 205,398 N.A Bond Reserve 167,250 N.A N.A 59,746 30,810 N.A
Total Individual Bond Debt Service 1,282,250 N.A N.A 458,050 236,208 N.A SRF LOAN 44265
PRINCIPAL 963,844 N.A N.A N.A N.A N.A
INTEREST 76,390 N.A N.A N.A N.A N.A
Total Individual Loan Payments 1,040,234 N.A N.A N.A N.A N.A Reserve Requirement 156,035 N.A N.A N.A N.A N.A
Total SRF Debt Service 1,196,269 N.A N.A N.A N.A N.A
SRF LOAN RESERVE
RESERVE N.A N.A N.A N.A N.A
Total SRF Debt Service 1,196,269 N.A N.A N.A N.A N.A
TOTAL DEBT SERVICE $6,704,009 $0 $0 $1,507,069 $515,315 $346,697 796,359
$5,907,651 $0 $0 $1,507,069 $515,315 $346,697
LESS REV. FROM N. MARIN REV. BOND CHARGES
REMAINING REVENUE REQUIREMENT
REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY25-26 61 DRAFT
A. ANNUAL DEBT SERVICE REQUIREMENTS
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities REVENUE BOND / STATE LOAN CHARGES - WATER RATES AND ESTIMATED REVENUES FOR FY25-26 B. CALCULATIONS OF WATER RATES FOR FY25-26
Sonoma Petaluma
Common O&M Water Storage Pipeline Pipeline
Facilities Fund Conservation Facilities Facilities Facilities Debt Service Debt Service Debt Service Revenue Bonds Revenue Bonds venue Bonds Charge Charge Charge Charge Charge Charge
REVENUE REQUIREMENT $5,907,650.56 $0 $0 $1,507,069 $515,315 $346,697 APPLICABLE BASE WATER DELIVERIES IN A.F. 30,085.78 42,311.0 42,311.0 30,085.78 3,564.8 22,139.2 CHARGES PER ACRE-FEET $196.36 $0.00 $0.00 $50.09 $144.56 $15.66 C. CALCULATIONS OF NORTH MARIN REVENUE BONDS CHARGE
$1,940,813
240,455
5,357
44.89 4,084,081
555,904
5,357
103.77
Remaining Facilities: SRF Loan, 2015A Revenue Bond Refunding, 2022A Revenue Bond Refunding Additional Facilities: 2015A Revenue Bond New Money, 2022A Revenue Bond New Money, 2025A Revenue Bond Excluded: 2019A Revenue Bond - NMWD Paid Cash
Principal Interest
Reserve
Requirement
Fiscal Agent Fee
+ Other Charges Total
SRF LOAN 963,844 76,390 156, 035 1,1 96,269 2015A Revenue Bond 693,418 358,736 158, 876 7,0 16 1,2 18,045 2015A Revenue Bond New Money 478,811 277,513 114, 205 5,0 43 875, 573 2015A Revenue Bond Refunding 214,606 81,223 44,670 1,973 342,472 2019A Revenue Bond 339,551 247,983 88,58 1 3,0 00 679, 115 2022A Revenue Bond 553,767 558,233 167, 250 3,0 00 1,2 82,249 2022A Revenue Bond New Money 293,067 470,246 114, 806 2,0 59 880, 178 2022A Revenue Bond Refunding 260,700 87,986 52,444 941 402,071 2025A Revenue Bond 764,346 1,006,501 303, 695 253, 787 2,3 28,330 2025A Revenue Bond New Money 764,346 1,006,501 303, 695 253, 787 2,3 28,330 FY25/26
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Additional Facilities per RA 4.3b9 ) N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (19.9/146.2)) ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)
NORTH MARIN REVENUE BONDS CHARGE
ESTIMATED WATER DELIVERIES TO NORTH MARIN (IN A.F.)
NORTH MARIN REVENUE BONDS CHARGE
REVENUE REQUIREMENT FOR COMMON FACILITIES DEBT SERVICE (Remaining Facilities per RA 4.3a2 ) N. MARIN'S SHARE (REV. REQMT. FOR COMMON FAC. DEBT SERVICE X (11.2/90.4)) 62 DRAFT
Fund Index OT Out (57012) To OT In (47101) Fund Bal. (Stmt.) Fund Bal. (Cash) Diff.
Santa Rosa Aq. Capital Fund 44230 0 309,921 10,587,689 10,587,688 (0) Petaluma Aq. Capital Fund 44235 0 1,450,000 2,975,215 2,975,215 0 Sonoma Aq. Capital Fund 44240 0 213,191 372,609 372,609 0 Petaluma Rev Bond 2025 Fund 44340 1,450,000 Petaluma AQ 346,697 2,256,422 2,256,422 0 Sonoma Rev Bond 2025 Fund 44285 0 Sonoma AQ 0 (0) (0) 0 Sonoma Rev Bond 2015 Fund 44305 5,000 Sonoma AQ 37,702 6,100 6,100 0 Sonoma Rev Bond 2019 Fund 44315 90,000 Sonoma AQ 241,406 56,259 56,259 0 Sonoma Rev Bond 2022 Fund 44330 0 Sonoma AQ 236,208 102,392 102,392 0 Storage Rev Bond 2025 Fund 44280 1,400,000 Storage Facilities 577,285 4,787,016 4,787,015 (1) Storage Rev Bond 2015 Fund 44290 70,000 Storage Facilities 471,733 18,399 18,399 (0) Storage Rev Bond 2022 Fund 44325 100,000 Storage Facilities 458,050 23,811 23,811 0 Common Rev Bond 2025 Fund 44275 9,400,000 Common Facilities 2,328,330 15,496,082 15,496,082 0 Common Rev Bond 2015 Fund 44295 200,000 Common Facilities 1,218,046 32,768 32,768 0 Common Rev Bond 2019 Fund 44310 100,000 Common Facilities 679,114 27,886 27,886 0 Common Rev Bond 2022 Fund 44335 100,000 Common Facilities 1,282,250 1,279,637 1,279,637 0 State Loan Debt Service 44265 300,000 Common Facilities 1,196,269 17,712 17,712 0 State Loan Reserve 44270 0 0 0 0 0
Capital Lease Financing 0 0 0 0 0
Agency Fund (Discretionary) 44205 0 Common Facilities 0 7,498,963 7,498,963 0 Agency Fund (Charges) 44205 14,346,472 0
Pipeline Facilities 44255 0 0 0 0
Storage Facilities 44250 1,570,000 140,327 140,327 0
Common Facilities 44260 10,100,000 433,522 433,523 1
North Marin 44300 0 0 31,616 31,616 0
Water Management Planning 44210 194,000 82,080 82,081 0 Watershed Planning/Restoration 44215 1,938,370 913,891 913,891 0 Recycled Water & Local Supply 44220 6,000 1,247 1,247 (0) Water Conservation 44225 2,706,900 54,714 54,714 0
Total 27,561,472 27,561,470 47,196,358 47,196,359 0
Common Facilities OT - in 47101 From
Water Transmission (discretionary) -
Water Transmission (Charges) -
North Marin - O&M Rate Computation
2015 Bond Fund 200,000 Revenue Requirement - Transfers Out:
2019 Bond Fund 100,000 14,346,472
2022 Bond Fund 100,000
2025 Bond Fund 9,400,000
State Loan Debt Service 300,000
10,100,000
Agency Fund (Charges) OT - Out To: Agency Fund (Charges) OT - Out To:
AQ Capital Funds Summary
Santa Rosa Aq. Capital Fund 309,921
Petaluma Aq. Capital Fund 0 AQ Capital Funds 428,112
Sonoma Aq. Capital Fund 118,191 Debt Service Funds 9,073,089 428,112 WT Subfunds 4,845,270
Debt Service Funds 14,346,470
Petaluma Rev Bond 2025 Fund 346,697
Sonoma Rev Bond 2015 Fund 37,702
Sonoma Rev Bond 2019 Fund 241,406 Capital Funds and North Marin 0 Sonoma Rev Bond 2022 Fund 236,208
Sonoma Rev Bond 2025 Fund 0
Storage Rev Bond 2015 Fund 471,733 Total 14,346,470
Storage Rev Bond 2022 Fund 458,050
Storage Rev Bond 2025 Fund 577,285
Common Rev Bond 2015 Fund 1,218,046
Common Rev Bond 2019 Fund 679,114
Common Rev Bond 2025 Fund 2,328,330
Common Rev Bond 2022 Fund 1,282,250
State Loan Debt Service 1,196,269
State Loan Reserve 0
Capital Lease Financing 0
9,073,089
Capital Funds and North Marin
Pipeline Facilities 0
Storage Facilities 0
Common Facilities 0
North Marin 0
0 WT Subfunds
Water Management Planning 194,000
Watershed Planning/Restoration 1,938,370
Recycled Water & Local Supply 6,000
Water Conservation 2,706,900
4,845,270
Total 14,346,470
FY 2025-26 BUDGET
Water Transmission System - Fund Balances and Operating Transfers 2/24/2025