EXHIBIT B
Metropolitan Transportation Commission
Transportation Development Act Article 3 Funds
Bicycle and Pedestrian Projects
TDA Article 3 Project Application Form
Agency
City of Santa Rosa
Primary Contact
Torina Wilson, Transportation Planner
Mailing Address
69 Stony Circle, Santa Rosa, CA 95401
Email Address
[email protected]
Phone Number
707-543-3910
Secondary Contact (in the event primary is not available) Rob Sprinkle
Mailing address (if different) N/A☐
Email Address
[email protected]
Phone Number
707-543-3817
Send allocation instructions to (if different from above):
Project Title
School Safety Improvement Projects
Amount requested
$251,120
Fiscal Year of Claim
2025/2026
Miscellaneous school improvements that will increase safety and comfort for walking and bicycling students and parents, specifically for schools that will see an increase in students due to recent closures from the Santa Rosa City Schools consolidation plan. Improvements will include up to seven RRFBs/HAWKs, crosswalk improvements at up to 5 crosswalks (bulb outs, high visibility signage, etc), speed cushions to slow vehicle traffic, green bike lane striping at conflict points, and paving of an off-street alleyway that serves as a school connection.Miscellaneous school improvements that will increase safety and comfort for walking and bicycling students and parents, specifically for schools that will see an increase in students due to recent closures from the Santa Rosa City Schools consolidation plan. Improvements will include up to seven RRFBs/HAWKs, crosswalk improvements at up to 5 crosswalks (bulb outs, high visibility signage, etc), speed cushions to slow vehicle traffic, green bike lane striping at conflict points, and paving of an off-street alleyway that serves as a school connection.Description of Overall Project:
Miscellaneous school improvements that will increase safety and comfort for walking and bicycling students and parents, specifically for schools that will see an increase in students due to recent closures from the Santa Rosa City Schools consolidation plan. Improvements will include up to seven RRFBs/HAWKs, crosswalk improvements at up to 5 crosswalks (bulb outs, high visibility signage, etc), speed cushions to slow vehicle traffic, green bike lane striping at conflict points, and paving of an off-street alleyway that serves as a school connection.
Miscellaneous school improvements that will increase safety and comfort for walking and bicycling students and parents, specifically for schools that will see an increase in students due to recent closures from the Santa Rosa City Schools consolidation plan. Improvements will include up to seven RRFBs/HAWKs, crosswalk improvements at up to 5 crosswalks (bulb outs, high visibility signage, etc), speed cushions to slow vehicle traffic, green bike lane striping at conflict points, and paving of an off-street alleyway that serves as a school connection.
ConstructionConstructionProject Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW are ineligible uses of TDA funds.) Construction
Construction
Attached to ApplicationAttached to ApplicationProject Location: A map of the project location is attached or a link to a online map of the project location is provided below:
Attached to Application
Attached to Application
Project Relation to Regional Policies (for information only) Is the project in an Equity Priority Community? Yes☒ No☐ Is this project in a Priority Development Area or a Transit-Oriented Community? Yes☐ No☒ Project Budget and Schedule
Project Eligibility
Has the project been reviewed by the Bicycle and Pedestrian Advisory Committee? Yes☒ No☐ If “YES,” identify the date and provide a copy or link to the agenda.
If "NO," provide an explanation).
Has the project been approved by the claimant's governing body? Yes☐ No☒ If "NO," provide expected date:___04/15/2025_______________ Has this project previously received TDA Article 3 funding? Yes☐ No☒ (If "YES," provide an explanation on a separate page)
For "bikeways," does the project meet Caltrans minimum safety design criteria Yes☒ No☐ pursuant to Chapter 1000 of the California Highway Design Manual?
1. Is the project categorically exempt from CEQA, pursuant to CCR Section 15301(c), Yes☒ No☐ Existing Facility?
2. If “NO” above, is the project is exempt from CEQA for another reason? Yes☐ No☐ Cite the basis for the exemption. __________________________ N/A☐ If the project is not exempt, please check “NO,” and provide environmental documentation, as appropriate.
Estimated Completion Date of project (month and year): _______June 2027_ Have provisions been made by the claimant to maintain the project or facility, or has Yes☒ No☐ the claimant arranged for such maintenance by another agency? (If an agency other than the Claimant is to maintain the facility, please identify below and provide the agreement.
Is a Complete Streets Checklist required for this project ? Yes☒ No☐ If the amount requested is over $250,000 or if the total project phase or construction phase is over $250,000, a Complete Streets checklist is likely required. Please attach the Complete Streets checklist or record of review, as applicable. More information and the form may be found here: https://mtc.ca.gov/planning/transportation/complete-streets November 2022 TDA Article 3 Model Resolution Page 5
MTC, November 2022 TDA Article 3 Model Resolution Page 1 MTC Prog. & Alloc. Section April. 2005 TDA Article 3 Claim Applications Appendix A Page 4 TDA Article 3 Claim Applications Appendix A Page 1