Cities Index.
Exhibit C - Mitigation Monitoring and Reporting Program

Santa Rosa City Council
June 3, 2025

Document
Exhibit C - Mitigation Monitoring and Reporting Program
Meeting
June 3, 2025
Body
Santa Rosa City Council
Original file
268 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

EXHIBIT C

PLACEWORKS 1
Mitigation Monitoring and Reporting Program
This Mitigation Monitoring and Reporting Program (MMRP) has been prepared for the proposed Santa Rosa General Plan 2050 (also known as Santa Rosa Forward), along with the associated Specific Plan and Santa Rosa City Code (SRCC) amendments, and Community-wide Greenhouse Gas Reduction Strategy (GHG Reduction Strategy), herein referred to as the “proposed project.” The purpose of the MMRP is to ensure the implementation of mitigation measures identified as part of the environmental review for the proposed project. The MMRP includes the following information:
 The full text of the mitigation measures;
 The party responsible for implementing the mitigation measures;  The timing for implementation of the mitigation measure;  The agency responsible for monitoring the implementation; and  The monitoring action and frequency.

The mitigation measures in this MMRP shown in Table 6-1, Santa Rosa General Plan 2050 Mitigation Monitoring and Reporting Program, shall be applied to all future development anywhere in the EIR Study Area. The City of Santa Rosa must adopt this MMRP , or an equally effective program, if it approves the proposed project with the mitigation measures that were adopted or made conditions of project approval.

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
2 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 3-1.1: For all projects with the potential
to increase VMT based on the City’s VMT
screening criteria, the City shall require a
qualified transportation engineer to prepare an
analysis of projected VMT and mitigation
consistent with the City’s VMT guidelines, as
subsequently revised, supplemented, or
replaced.
(Mitigates transportation impacts)

City of Santa
Rosa; Project
applicant;
Qualified
transportation
engineer
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review VMT
analysis and
mitigation and
confirm
consistency
with City’s VMT
guidelines
Once, prior to
project
approval

Action 3-5.7: The City shall continue to consult
with the California Department of Fish and
Wildlife (CDFW) to identify significant
environments and priorities for acquisition or
maintenance of open space areas based on
biological and environmental concerns and
develop a strategy for maintaining areas that
will preserve the protected and sensitive
populations of plants and animals currently
found in the UGB. Strategies shall be based on
federal, State, and local regulations relevant to
the protection of the identified species,
including, but not limited to, Federal or
California Endangered Species Act, Santa Rosa
Plain Conservation Strategy, and United States
Fish and Wildlife Service Programmatic
Biological Opinion, as subsequently revised,
supplemented, or replaced.
(Mitigates impacts to biological resources)

City of Santa
Rosa; California
Department of
Fish and Wildlife
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 3-5.10: The City shall continue to
require the implementation of existing
regulations and procedures, including
subdivision guidelines, zoning, design review,
and environmental law, prior to, during, and
after project approval and construction for
City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 3
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
projects that may affect wetlands and rare
plants, riparian habitat and other sensitive
natural communities, and essential habitat for
special-status species to ensure their
conservation. Existing regulations and
procedures include, but are not limited to,
Federal and California Endangered Species Act;
CDFW 2018 Protocols for Surveying and
Evaluating Impacts to Special-Status Native
Plant Populations and Sensitive Natural
Communities; Santa Rosa Plain Conservation
Strategy; United States Fish and Wildlife
(USFWS) Service Programmatic Biological
Opinion; CDFW 2012 Staff Report on
Burrowing Owl Mitigation; 2012 USFWS
Protocol for Surveying Proposed Management
Activities That May Impact Northern Spotted
Owls; 2020 Estimating the Effects of Auditory
and Visual Disturbance to Northern Spotted
Owls and Marbled Murrelets in Northwestern
California; Fish and Game Code Section 1600 et
seq; Clean Water Act; and Porter Cologne
Water Quality Control Act, as subsequently
revised, supplemented, or replaced.
(Mitigates impacts to biological resources and
hydrology)

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
4 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 3-5.11: The City shall require a qualified
biologist to prepare a biological resource
assessment (BRA) for proposed development
on sites that may support or have the potential
to affect special-status species, sensitive
natural communities, important wildlife
corridors, or regulated wetlands and waters to
identify potential impacts and measures for
protecting the resource and surrounding
habitat prior to, during, and after project
construction. The BRA shall be prepared to
address conformance with all applicable
federal, State, and local regulations and
protocols, including, but not limited to, those
listed in Action 3-5.10, as subsequently revised,
supplemented, or replaced.
(Mitigates impacts to biological resources and
water quality)
City of Santa
Rosa; Project
applicant;
Qualified
biologist
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
biological
resource
assessment and
confirm
conformance
with all
applicable
federal, State,
and local
regulations and
protocols
Once, prior to
project
approval

Action 3-5.12: The City shall require that
construction or other ground-disturbing
activities that may affect bird nests or nesting
habitat avoid nests of native birds when the
nest is in active use by implementing
protection measures specified by a qualified
ornithologist or biologist to ensure compliance
with the California Fish and Game Code and
federal Migratory Bird Treaty Act. If demolition,
construction, ground-disturbing, or tree
removal/pruning activities occur during the
nesting season (February 1 and August 31),
preconstruction surveys shall be conducted by
a qualified ornithologist or biologist and
approved by the City prior to issuance of
building permits. Preconstruction surveys are
not required for construction, ground-
City of Santa
Rosa; Project
applicant;
Qualified
ornithologist or
biologist
Prior to ground
disturbing
activities
City of Santa
Rosa Planning
and Economic
Development
Confirm
implementation
of protection
measures
Once, prior to
ground
disturbing
activities

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 5
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
disturbing, or tree removal/pruning activities
outside the nesting season.
(Mitigates impacts to biological resources and
hydrology and water quality)
Action 3-5.13: The City shall develop and adopt
a bird-safe design ordinance by a qualified
biologist and require projects to demonstrate
compliance with the ordinance prior to project
approval. The ordinance shall apply to all new
development and redevelopment projects and
include the latest bird-safe design guidelines
and best management practice strategies, such
as those from the National Audubon Society, to
provide specific criteria and refined guidelines
as part of design review and/or project
approval process of new buildings and taller
structures to protect birds from injury and
mortality from collisions with buildings, towers,
and other human-made structures. Prior to
adoption of the bird-safe design ordinance,
project applicants shall show compliance with
bird-safe design requirements, consistent with
best practices.
(Mitigates impacts to biological resources)

City of Santa
Rosa; Qualified
biologist
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 3-5.19: The City shall require new
development along waterways to establish an
ecological buffer zone between the waterway
and development that also provides
opportunities for multiuse trails and
recreation, consistent with the Santa Rosa
Citywide Creek Master Plan and concept plans
that have been developed for specific reaches
of the creek network, as subsequently revised,
supplemented, or replaced.

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Confirm
establishment
of ecological
buffer zone
Once, prior to
project
approval

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
6 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
(Mitigates impacts to biological resources,
cultural resources, and hydrology and water
quality)
Action 3-5.20: The City shall require new
development to maintain an adequate setback
from waterways to recognize the 100-year
flood elevation, with setbacks in the Creekside
Development Standards in the Zoning Code as
minimums and larger setbacks encouraged in
accordance with Restoration Concept Plans, as
subsequently revised, supplemented, or
replaced, to meet restoration and
enhancement goals.
(Mitigates impacts to biological resources,
cultural resources, and hydrology and water
quality)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Confirm
establishment
of ecological
buffer zone
Once, prior to
project
approval

Action 3-6.31: The City shall require projects
that exceed the Bay Area Air District (Air
District) screening sizes to evaluate project-
specific operation and construction emissions
in conformance with the Air District
methodology and if operation or construction-
related criteria air pollutants exceed the Air
District thresholds of significance, require the
project applicant to mitigate the impacts to an
acceptable level, consistent with the Air District
Guidelines, as subsequently revised,
supplemented, or replaced.
(Mitigates air quality impacts)
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
emissions
evaluation and
mitigation
Once, prior to
project
approval

Action 3-6.32: The City shall continue to
implement the Air District Basic Control
Measures included the Air District’s California
Environmental Quality Act (CEQA) Air Quality
Guidelines, as subsequently revised,
City of Santa
Rosa; Project
applicant
Prior to ground
disturbing
activities
City of Santa
Rosa Planning
and Economic
Development
Review
emissions
evaluation and
mitigation
Once, prior to
ground
disturbing
activities

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 7
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10)
during demolition, ground-disturbing activities,
and/or construction.
(Mitigates air quality impacts)
Action 4-2.1: The City shall continue to review
proposed developments in accordance with
federal and State laws and utilize the California
Historical Resources Information System,
Northwest Information Center at Sonoma State
University as a resource to determine whether
project areas contain known subsurface
archaeological resources, both prehistoric
and/or historic-era, and tribal cultural
resources, or if they have the potential to hold
such resources.
(Mitigates impacts to cultural resources)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Determine
presence or
potential for
subsurface
archaeological
resources, both
prehistoric
and/or historic-
era, and tribal
cultural
resources and
review
mitigation as
needed
Once, prior to
project
approval

Action 4-2.2: The City shall work in good faith
with local tribes and archaeologists to evaluate
proposed development sites for the presence
of subsurface archaeological resources, both
prehistoric and/or historic era, and tribal
cultural resources. These efforts include:
 Consideration of existing reports and
studies.
 Consultation with Native American tribes
as required by State law.

City of Santa
Rosa; Local
tribes;
Archaeologists
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
8 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
 Appropriate site-specific investigative
actions.
 On-site monitoring during excavation if
appropriate.
 Work with local tribes to develop and apply
tribal protection policies related to tribal
cultural resources.
(Mitigates impacts to cultural resources)
Action 4-2.3: The City shall continue to require
that project areas found to contain significant
subsurface archaeological resources, both
prehistoric and/or historic-era, and tribal
cultural resources be examined by a qualified
consulting archaeologist with
recommendations for protection and
preservation, developed in collaboration with
local Native American tribes and appropriate
tribal monitors, as necessary.

Recommendations shall meet the standards of
the National Historic Preservation Act, Native
American Historic Resource Protection Act,
National and California Environmental Quality
Act, and applicable Santa Rosa planning
guidelines, policies, and procedures to protect
the resource.
(Mitigates impacts to cultural resources)

City of Santa
Rosa; Project
applicant;
Qualified
consulting
archaeologist;
local Native
American tribes
and appropriate
tribal monitors
Prior to project
approval; In the
instance
significant
archaeological
resources are
uncovered
City of Santa
Rosa Planning
and Economic
Development
Review
recommendatio
ns for
subsurface
archaeological
resources, both
prehistoric
and/or historic-
era, and tribal
cultural
resources
protection and
preservation
Once, prior to
project
approval; As
needed, in
the instance
significant
archaeologica
l resources
are
uncovered

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 9
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 4-2.4: During ground disturbance for
development projects, if tribal cultural
resources are encountered, work shall be
halted to avoid altering the materials and their
context until a qualified consulting
archaeologist and Native American
representative have evaluated the situation
and recorded identified tribal cultural
resources—which may include sites, features,
places, cultural and other landscapes, sacred
places, objects, animals, structures, or plants,
with cultural value to the tribe(s)—and
determined suitable mitigation measures. If
human remains are inadvertently discovered,
the County coroner shall be notified
immediately. If the coroner determines that
the remains are those of a Native American,
the coroner must contact the NAHC by phone
within 24 hours of making that determination
(Health and Safety Code § 7050[c]). The City
and the professional archaeologist shall
contact the Most Likely Descendent, as
determined by the NAHC, regarding the
remains.
(Mitigates impacts to cultural resources)
City of Santa
Rosa; Project
applicant;
Qualified
consulting
archaeologist;
Native American
representative;
County coroner;
NAHC; Most
Likely
Descendant
In the instance
tribal cultural
resources and/or
human remains
are encountered
City of Santa
Rosa Planning
and Economic
Development
Review tribal
cultural
resources
evaluation and
mitigation;
Confirm
notification of
County Clerk
and Most Likely
Descendant
As needed, in
the instance
tribal cultural
resources
and/or
human
remains are
encountered

Action 4-3.2: For projects with known or the
potential to have historic structures, the City
shall require the project to follow the Secretary
of the Interior Standards for Preservation,
Rehabilitation, Restoration, and Reconstruction
for the treatment of historic properties and the
California Historic Building Code, as
subsequently revised, supplemented, or
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Confirm
compliance
with standards
Once, prior to
project
approval

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
10 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
replaced.
(Mitigates impacts to cultural resources)
Policy 5-1.1: Prior to new development
approval, where there are known geological
hazards as shown on Figures 5-2, 5-3, and 5-4
and current maps from the United States
Geological Survey, California Geological Survey,
California Department of Water Resources,
California Office of Emergency Services, the
City shall ensure that new development,
redevelopment, and major remodels avoid or
adequately mitigate seismic and geologic
hazards through the preparation of a site-
specific geologic study prepared by a California
Certified Engineering Geologist and/or
Geotechnical Engineer and compliance with
identified measures.
(Mitigates impacts to geology and soils)

City of Santa
Rosa; Project
applicant;
California
Certified
Engineering
Geologist and/or
Geotechnical
Engineer
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review geologic
studies and
analyses
Once, prior to
project
approval

Action 5-1.1: Prior to new development
approval, the City shall ensure site-specific
geologic studies and analyses are deemed
acceptable by a California Certified Engineering
Geologist and/or Geotechnical Engineer to
appropriately mitigate hazardous conditions.
(Mitigates impacts to geology and soils)
City of Santa
Rosa; Project
applicant;
California
Certified
Engineering
Geologist and/or
Geotechnical
Engineer
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Confirm review
by a California
Certified
Engineering
Geologist
and/or
Geotechnical
Engineer
Once, prior to
project
approval

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 11
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 5-1.2: The City shall restrict
development in areas where adverse
conditions associated with known natural or
human-caused geologic hazards cannot be
effectively mitigated, as determined by a
California Certified Engineering Geologist
and/or Geotechnical Engineer.
(Mitigates impacts to geology and soils)
City of Santa
Rosa; California
Certified
Engineering
Geologist and/or
Geotechnical
Engineer
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 5-2.14: The City shall require
improvements that maintain and improve the
storm drainage system citywide and prioritize
areas needing significant investment,
consistent with the Santa Rosa Citywide Creek
Master Plan goals of preserving natural
conditions of waterways and minimizing
channelization of creeks.
(Mitigates impacts to hydrology and water
quality)

City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 5-2.15: The City shall ensure creek-side
paths and trails are consistent with the
Citywide Creek Master Plan and Bicycle and
Pedestrian Master Plan, as subsequently
revised, supplemented, or replaced, and are
incorporated into stormwater improvement
projects along creek corridors.
(Mitigates impacts to hydrology and water
quality)

City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
12 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 5-2.17: The City shall require
implementation of best management practices
for all new development to reduce discharges
of nonpoint-source pollutants to the storm
drain system.
(Mitigates impacts to hydrology and water
quality)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Confirm
implementation
of best
management
practices
Once, prior to
project
approval

Action 5-3.8: The City shall require the
preparation of fire protection plans for new
development and major remodels in the City’s
Very High Fire Hazard Severity Zone and
WUIFA. Require that fire protection plans be
consistent with requirements of the California
Fire Code and include a risk analysis, fire
response capabilities, fire safety requirements
(e.g., defensible space, infrastructure, and
building ignition resistance), mitigation
measures, design considerations for non-
conforming fuel modifications, wildfire
education maintenance and limitations, and
evacuation plans.
(Mitigates wildfire impacts)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review fire
protection plans
Once, prior to
project
approval

Action 5-5.14: The City shall require all new
development projects to provide adequate
access for fire and emergency response
personnel.
(Mitigates wildfire impacts)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review site
plans
Once, prior to
project
approval

Action 5-5.15: The City shall prohibit the
creation of new single ingress/egress roadway
conditions in the city.
(Mitigates wildfire impacts)
City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 13
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 5-5.16: The City shall retrofit existing
single-access residential neighborhoods to
include additional access routes or other
provisions to increase evacuation safety.
(Mitigates wildfire impacts)
City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 5-5.17: The City shall analyze the
capacity, viability, and safety of evacuation
routes and evacuation locations throughout
the city under a range of emergency scenarios
and incorporate the results, as necessary, into
the Safety Element of the General Plan. This
analysis will be completed as part of the City’s
Annex to the Sonoma County Multi-
Jurisdictional Hazard Mitigation Plan in 2026.
(Mitigates wildfire impacts)

City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 5-7.1: The City shall continue to require
acoustical studies prepared by qualified
acoustical consultants in accordance with
Municipal Code standards.
(Mitigates noise impacts)

City of Santa
Rosa; Project
applicant;
Qualified
acoustical
consultant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
acoustical
studies
Once, prior to
project
approval

Action 5-7.2: The City shall use the Federal
Transit Administration’s construction noise and
vibration thresholds as applicable to assess
impacts to surrounding land uses and identify
measures during the project approval process
to ensure the threshold is met prior to project
approval.
(Mitigates noise impacts)
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
acoustical
studies and
mitigation
Once, prior to
project
approval

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
14 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 5-7.3: The City shall require
development projects to reduce noise
exceeding normally acceptable levels as
identified in Figure 5-13, unless the activities
are specifically exempted by the City Council,
on the basis of community health, safety, and
welfare, such as emergency medical vehicles,
helicopters, and sirens.
(Mitigates noise impacts)
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
acoustical
studies
Once, prior to
project
approval

Action 5-7.7: The City shall work with Caltrans
to evaluate and develop traffic noise mitigation
programs along Highway 101 and State Route

12. (Mitigates noise impacts)

City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 5-7.9: The City shall require
development projects to implement measures
to reduce noise and vibration impacts primarily
through site planning, and avoid engineering
solutions for noise and vibration mitigation,
such as sound walls, if possible.
(Mitigates noise impacts)

City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review site
plans, acoustical
studies, and
mitigation
Once, prior to
project
approval

Action 5-7.10: The City shall update the Noise
Ordinance to incorporate construction best
management practices (BMP) to minimize
construction noise, and require projects to
demonstrate compliance with the BMPs prior
to project approval.
(Mitigates noise impacts)

City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
PLACEWORKS 15
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 5-9.30: The City shall evaluate
stormwater capture and reuse consistent with
goals of the Santa Rosa Citywide Creek Master
Plan and the MS4 National Pollutant Discharge
Elimination System (NPDES) permit to preserve
natural conditions of waterways, minimize
channelization of creeks, and protect water
quality, and identify, educate, and label to
promote community awareness that storm
drains flow untreated into creeks.
(Mitigates impacts to hydrology and water
quality)
City of Santa
Rosa
Ongoing City of Santa
Rosa Planning
and Economic
Development
Follow Santa
Rosa General
Plan 2050
Implementation
Plan
Ongoing
Action 6-1.5: As recommended by the
California Air Resources Board, the City shall
require projects that would result in
construction activities within 1,000 feet of
residential and other land uses that are
sensitive to toxic air contaminants (e.g.,
hospitals, nursing homes, day care centers), as
measured from the property line of the
project, to prepare a construction health risk
assessment in accordance with policies and
procedures of the Office of Environmental
Health Hazard Assessment and the Bay Area Air
District (Air District) California Environmental
Quality Act (CEQA) Guidelines that identifies
mitigation measures and appropriate
enforcement mechanisms capable of reducing
potential cancer and non-cancer risks below
the Air District threshold.
(Mitigates air quality impacts)
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
construction
health risk
assessment and
mitigation
Once, prior to
project
approval

SANTA ROSA GENERAL PLAN 2050 FINAL EIR

CITY OF SANTA ROSA

MITIGATION MONITORING AND REPORTING PROGRAM
16 APRIL 2025
TABLE 6-1 SANTA ROSA GENERAL PLAN 2050 MITIGATION MONITORING AND REPORTING PROGRAM Mitigating General Plan Policies/Actions
Implementation Monitoring Status
Party
Responsible for
Implementation
Implementation
Timing
Agency
Responsible for
Monitoring
Monitoring
Action
Monitoring
Frequency
Is the measure applicable to the
project? (Y/N) (if no, provide
brief reason why)
Date
Completed
Action 6-1.6: The City shall require an
operational health risk assessment for new
industrial or warehousing development
projects that 1) have the potential to generate
100 or more diesel truck trips per day or have
40 or more trucks with operating diesel-
powered transport refrigeration units, and 2)
are within 1,000 feet of a sensitive land use or
Overburdened Community, as defined by the
Air District. The operational HRA shall be
prepared in accordance with policies and
procedures of the State Office of
Environmental Health Hazard Assessment and
the Air District. If the operational HRA shows
that the incremental cancer risk exceeds 10 in
a million, the noncancer hazard index of 1.0, or
the thresholds as determined by the Air
District, require the project applicant to
identify and demonstrate measures that can
reduce potential cancer and noncancer risks to
acceptable levels.
(Mitigates air quality impacts)
City of Santa
Rosa; Project
applicant
Prior to project
approval
City of Santa
Rosa Planning
and Economic
Development
Review
operational
health risk
assessment and
mitigation
Once, prior to
project
approval

← All documents from this meeting