January 12, 2026
Jose Mederos Baltazar – Assistant Engineer
City of Santa Rosa
69 Stony Circle
Santa Rosa, CA 95401
e-mail: [email protected]
Re: Route 101 Bicycle and Pedestrian Overcrossing
Contract No. C00769
Bid Protest
Dear Mr. Mederos Baltazar,
On Thursday, January 8th, 2026, Ghilotti Construction Company, Inc. bid the above referenced project and at the time of bid was the apparent 2nd low bidder. This letter serves as a protest of the bid submitted by the apparent low bidder – Gordon N. Ball, Inc. (Ball).
The City must reject Ball’s bid as non-responsive because it failed to submit the required Equal Employment Opportunity Certification’s.
Addendum No. 1 for the project required the bidding contractor to submit Equal Employment Opportunity Certifications for each of its subcontractors, per the language below:
Failing to include these completed forms at the time of bid renders Ball’s bid non-responsive:
1) Ball did not comply with the requirements of the specifications and therefore has a mistake in its bid.
2) Due to its mistake in bid, Ball can now request relief of its bid, a remedy other bidder’s do not possess. Ball now enjoys the advantage of “two bites at the apple”:
a. Post bid and after having reviewed the bid results Ball can claim a mistake in bid and request relief of bid.
ATTACHMENT 3
b. Post bid and after having reviewed the bid results Ball can decide to keep its bid. No other bidder enjoys this advantage – making its mistake a material error. Regardless of whether Ball avails itself of the bid relief, it still has the option.
3) Additionally, other bidders complying with the requirement to submit the EEOC documents at the time of bid needed time to collect from its subcontractors and transmit that information to the bid runners at the bid location. This gave Ball the advantage of additional time in the bid closing process – time other bidders did not possess.
The City must reject Ball’s bid as non-responsive as a result of its failure to comply with project Addendum No.1.
Based on the requirements cited above, Ghilotti Construction Company, Inc. protests award of this contract to Ball and requests that the City reject its bid as non-responsive.
Thank you for considering this matter.
Thomas Smith
Vice President – Estimating
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
e-mail: [email protected]
(707) 484-8292
Cc: Gordon N. Ball, Inc.
[email protected]
1 Laura Hidalgo
From: Mail Delivery System <[email protected]> To: [email protected]
Sent: Monday, January 12, 2026 3:04 PM
Subject: Relayed: City of Santa Rosa - Route 101 Bicycle & Pedestrian Overcrossing - Bid Protest This is the mail system at host https://urldefense.proofpoint.com/v2/url?u=http-3A__dispatch1-2Dus1.ppe- 2Dhosted.com&d=DwICAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=1H- e3WkwuyTLm_fY4p8qBrMuil6PtUcFyX6RQlMaAu0&m=4rBDSjoN73qdmyjyH5OkJyuwLxQ9rs7ypv1mUjPy2uvDN mFMYoVUzuIX9NSzgm0I&s=lOeuu1irZVoHAPvZsEsi5TSfc6WdPn8juJyJSJRCXkU&e=.
Your message was successfully delivered to the destination(s) listed below. If the message was delivered to mailbox you will receive no further notifications. Otherwise you may still receive notifications of mail delivery errors from other systems.
The mail system
<[email protected]>: delivery via
ba8d8bae.21.ik2.com[66.228.130.220]:25: 250 Ok
1 Laura Hidalgo
From: Laura Hidalgo
Sent: Monday, January 12, 2026 3:04 PM
To: '[email protected]'
Subject: City of Santa Rosa - Route 101 Bicycle & Pedestrian Overcrossing - Bid Protest Attachments: City of Santa Rosa - Route 101 Bicycle & Ped Xing Protest Letter.pdf Please see the attached.
Laura Hidalgo
Director of Preconstruction Administration
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
[email protected]
OƯice (Direct): 707-303-2313
OƯice (Main): 707-585-1221