Bid Summary
Bid Name Total % Over/Under Estimate
ENGINEERS ESTIMATE $3,887,827.00
TEAM GHILOTTI INC $3,779,141.00 2.80% UNDER
ARGONAUT CONSTRUCTORS $3,992,094.00 2.68% OVER
Project Name: Downtown Connectivity to Support Housing Density Contract No.: C02456
Bid Opening: 8/6/2026 at 2:00 PM
Attachment 2
Bid Abstract
Line Description Unit Quantity Estimated Price Estimated Total Price Total Price Total 1 Mobilization (3%) LS 1 $100,000.00 $100,000.00 $110,000.00 $110,000.00 $119,000.00 $119,000.00 2 Traffic Control LS 1 $100,000.00 $100,000.00 $74,533.80 $74,533.80 $326,000.00 $326,000.00 3 Water Pollution Control LS 1 $10,000.00 $10,000.00 $35,000.00 $35,000.00 $9,000.00 $9,000.00 4 Lower and Adjust Sewer Manhole Frames and Covers to Grade EA 17 $1,200.00 $20,400.00 $2,850.00 $48,450.00 $1,600.00 $27,200.00 5 Lower and Adjust Sewer Mainline Cleanouts Frames and Covers to Grade EA 3 $1,200.00 $3,600.00 $1,850.00 $5,550.00 $1,600.00 $4,800.00 6 Lower and Adjust Water Valve Box Frames and Covers to Grade EA 77 $1,200.00 $92,400.00 $1,700.00 $130,900.00 $1,280.00 $98,560.00 7 Lower and Adjust Storm Drain Manhole Frames and Covers to Grade EA 13 $1,500.00 $19,500.00 $2,850.00 $37,050.00 $1,600.00 $20,800.00 8 Lower and Adjust Monument Frames and Covers to Grade EA 13 $1,500.00 $19,500.00 $1,700.00 $22,100.00 $1,280.00 $16,640.00 9 Subgrade Stabilization (0.35') SY 8,982 $20.00 $179,640.00 $12.00 $107,784.00 $15.00 $134,730.00 10 Soil Stabilization Fabric SY 8,982 $5.00 $44,910.00 $0.80 $7,185.60 $1.00 $8,982.00 11 GlasGrid SY 55,032 $5.00 $275,160.00 $11.95 $657,632.40 $11.75 $646,626.00 12 HMA Surface TON 9,596 $175.00 $1,679,300.00 $155.00 $1,487,380.00 $145.00 $1,391,420.00 13 HMA Base TON 2,193 $200.00 $438,600.00 $157.00 $344,301.00 $200.00 $438,600.00 14 Edge Grind (0.25') LF 16,926 $17.00 $287,742.00 $3.70 $62,626.20 $6.50 $110,019.00 15 End of Street Conform Grind (0.25') EA 12 $1,500.00 $18,000.00 $1,875.00 $22,500.00 $1,150.00 $13,800.00 16 Remove and Replace Signs and Posts EA 15 $300.00 $4,500.00 $650.00 $9,750.00 $650.00 $9,750.00 17 Pedestrian Barricade (6') EA 1 $800.00 $800.00 $1,250.00 $1,250.00 $1,250.00 $1,250.00 18 Curb and Gutter LF 1,119 $75.00 $83,925.00 $96.50 $107,983.50 $114.00 $127,566.00 19 Curb Ramp SF 4,325 $50.00 $216,250.00 $71.50 $309,237.50 $60.00 $259,500.00 20 Sidewalk SF 2,903 $30.00 $87,090.00 $29.00 $84,187.00 $37.00 $107,411.00 21 Valley Gutter SF 300 $50.00 $15,000.00 $53.00 $15,900.00 $55.00 $16,500.00 22 Median Island Modification SF 100 $100.00 $10,000.00 $75.00 $7,500.00 $136.00 $13,600.00 23 Reflective Pavement Marker (Fire Hydrant) EA 10 $5.00 $50.00 $25.00 $250.00 $25.00 $250.00 24 Reflective Pavement Marker (Yellow) EA 650 $5.00 $3,250.00 $8.00 $5,200.00 $8.00 $5,200.00 25 Yellow Thermoplastic Legends and Symbols SF 234 $15.00 $3,510.00 $10.00 $2,340.00 $10.00 $2,340.00 26 White Thermoplastic Legends and Symbols SF 1,425 $15.00 $21,375.00 $10.00 $14,250.00 $10.00 $14,250.00 27 4-Inch White Thermoplastic (Parking Divider) LF 2,100 $5.00 $10,500.00 $2.50 $5,250.00 $2.50 $5,250.00 28 6-Inch White Thermoplastic (Bike Lane) LF 5,050 $7.00 $35,350.00 $1.50 $7,575.00 $1.50 $7,575.00 29 8-Inch White Thermoplastic (Channelization Lane) LF 1,600 $9.00 $14,400.00 $2.00 $3,200.00 $2.00 $3,200.00 30 12-Inch Yellow Thermoplastic (Cross Walk) LF 855 $15.00 $12,825.00 $5.00 $4,275.00 $5.00 $4,275.00 31 12-Inch White Thermoplastic (Cross Walk) LF 2,300 $15.00 $34,500.00 $5.00 $11,500.00 $5.00 $11,500.00 32 Double Yellow Thermoplastic (Centerline) LF 3,550 $3.00 $10,650.00 $2.00 $7,100.00 $2.00 $7,100.00 33 Green Bike Lane Marking LF 300 $35.00 $10,500.00 $12.00 $3,600.00 $12.00 $3,600.00 34 Replace Traffic Detector EA 40 $550.00 $22,000.00 $575.00 $23,000.00 $575.00 $23,000.00 35 Install Detector Handhole EA 4 $650.00 $2,600.00 $700.00 $2,800.00 $700.00 $2,800.00 Total $3,887,827.00 $3,779,141.00 $3,992,094.00
ARGONAUT CONSTRUCTORS
Project Name: Downtown Connectivity to Support Housing Density Contract No.: C02456
Bid Opening: 8/6/2026 at 2:00 PM
ENGINEERS ESTIMATE TEAM GHILOTTI INC