Robert F. Tuttle Architect, Inc.
33533 Pebble Brook CircleTemecula, CA 92592Bob Tuttle952 [email protected] Excel Hotel Group10174 Old Grove Rd Ste 200San Diego CA 92131Neil Patel858 [email protected] landscape architect civil engineer: architect: owner:
Fish LandscapeLinda Fish209 [email protected] Landmark Consulting9555 Genesee Ave Ste 200San Diego CA 92121David Yeh858 [email protected] 1/16" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:12 PM
A-0
Cover
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
Project Plans DR2022-6/V2022-4
patio
pool
Hotel
4 Story
PROPERTY LINE PRO
PE
RTY
L
I
N
E
PROPERTY LINE
FDC
FH
FH
PROPERTY LINE
FH
TOWN CENTER PKWAY
RIVERVIEW PKWY
24 HOUR FITNESS
TILLYS
US AIR FORCE
DSW DESIGNER SHOE
PETSMART
NORTH
reference sheet A1.1 for more detail
MONUMENT SIGN
MONUMENT SIGN
1" = 30'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:16 PM
A-1
Master Site
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1 1" = 30'-0"
1 Master Site
patio
pool
Hotel
4 Story
TOWN CENTER PARKWAY
NORTH
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPOSED
TRASH
ENCLOSURE
W/ METAL
ROOF
AND
REAR ACCESS
GATE
PROJECT ADDRESS:381 Town Center ParkwaySantee CA
ASSESSOR'S PARCEL NUMBER:
381
-052
-04
-00
LEGAL DESCRIPTION:GOVERNING CODE:This project shall comply with the 2019 edition of the Californiabuilding code (title 24)ZONE:TPCUSE:Existing: parking lotProposed:
4 -story. 97 guestroom
hotel with pool, outdoor amentity areaand surface parking CONSTRUCTION TYPE:TYPE V
-A sprinklered
OCCUPANCY:R
-
1 LOT SIZE:71,344 sf (1.6 acres)BLDG. FOOTPRINT:First floor 13,821.23 sfTotal building 58,692 sfF.A.R:allowed:Proposed: 58,692/71,344= .82UNIT COUNT:FIRST FLOOR 13 roomsSECOND FLOOR 28 roomsTHIRD FLOOR 28 roomsFOUR FLOOR 28 roomsTOTAL ROOMS 97 roomsREQUIRED PARKING:1:1/room 97 stalls+ 2 spaces for owner 2 stalls+ 1 space per 50sf of banquet 0 stallsTotal 99 stalls10% reduction MTS trolley proximity 89 stallsPARKING PROVIDED:onsite -regular 66 stalls (4 ADA)
Motorcycle 1 stallEV charging 4 stallsClean Air Vanpool: 6 stallsBicycle (short term) 6 stalls(0.1 per 1,000 s.f. = 60 X 0.1 =6)Bicycle (long term) NAoffsite (shared) 23 stallsTotal 89 stallsSTRUCTURAL HEIGHT:Maximum structural height allowed:Proposed structural height 52'3" (tallest parapet) SITE STATISTICS:
BIKE RACK
3 1
4 11
15 2
8 4
9 1
26' - 0"
24' - 0"
FIRE ACCESS
26' - 0"
15' - 0"
FIRE ACCESS
26' - 0"
PORTE COCHERE
17' - 0" 2' - 0"
2' - 0" 17' - 6"
2' - 0"
17' - 0" 2' - 0"
8 FDC
EXISTING FH TO BE RELOCATED
FH
P
RO
P
E
RTY
L
I
N
E
EASEMENT
20' - 0"
19' - 0"
FIRE ACCESS
26' - 0"
FIRE ACCESS
26' - 0"
N39 51'36" E
186.18'
N
20 11' 47" E
85.62'
N88 32' 36" W
N54 21' 24" W
9' - 0"
9' - 0" 17' - 6
S
"
ETBACK
5' - 0"
SETBACK
5' - 0"
S
ETBACK
10' - 0"
ADA PATH
ADA PATH
ADA PATH
pool equip
easement
easement
easement
easement
2' - 0"
25' - 0"
MOTORCYCLE
2 6' - 0"
MONUMENT SIGN
MONUMENT SIGN
19' - 0"
9' - 0"
17' - 0"
17' - 6"
9' - 0"
EV PARKING EV PARKING EV PARKING EV PARKING
CLEAN AIR/
VANPOOL/EV
CLEAN AIR/
VANPOOL/EV
CLEAN AIR/
VANPOOL/EV
CLEAN AIR/
VANPOOL/EV
CLEAN AIR/
VANPOOL/EV
CLEAN AIR/VANPOOL/EV
A-1.2
1 A-1.3
1 PASSANGER LOADING ZONE
36' - 0"
ZERO CURB
1' - 6"
A-1.4
1 A-1.3
4 SUSTAINABLE SANTEE PLAN (SSP)LAND USE SECTOR-COMMERCIALGOAL 4. INCREASE ENERGY EFFICENCY IN NEW COMMERCIAL UNITSMEASURE 4.1. NEW COMMERCIAL UNITS MEET OR EXCEED CALIFORNIA GREEN BUILDING STANDARDS TIER 2 VOLUNTARY MEASURES SUCH AS OBTAIN GREEN BUILDING RATINGS INCLUDING: LEED, BUILD IT GREEN, OR ENGERY STAR CERTIFIED BUILDINGS CERTIFICATIONS IN SCORING DEVELOPMENT AND EXPLAIN THE MEASURES IMPLEMENTED.COMPLIANCE: BUILDING WILL INCLUDE TITLE 24 ENERGY SAVING MEASURESGOAL 5: DECREASE ENERGY DEMAND THROUGH REDUCING URBAN HEAT ISLAND EFFECTMEASURE 5.1. PROJECT UTILIZES TREE PLANTING FOR SHADE AND ENERGY EFFICIENCY SUCH AS TREE PLANTING IN PARKING LOTS AND STREETSCAPES.COMPLIANCE: PARKING LOT WILL BE LANDSCAPED WITH TREES.MEASURE 5.2. PROJECT USES LIGHT-REFLECTING SURFACES SUCH AS ENHANCED COOL ROOFS ON COMMERCIAL BUILDINGS.COMPLIANCE: ROOFING MATERIAL IS A WHITE THERMOPLASTIC MEMBRANE THAT REFECTS LIGHT.GOAL 6: DECREASE GHG EMISSIONS THROUGH A REDUCTION IN VMTMEASURE 6.1. PROPOSED PROJECT STREETS INCLUDE SIDEWALKS, CROSSWALKS, AND OTHER INFRASTRUCTURE THAT PROMOTES NON-MOTORIZED TRANSPORTATION OPTIONS.COMPLIANCE: PROJECT WILL INCLUDE SIDEWALKS, CROSSWALKS THAT PROMOTE NON-MOTORIZED TRANSPORTATION. ALSO, PROJECT IS IN CLOSE PROXIMITY TO THE TROLLEY.MEASURE 6.2. PROPOSED PROJECT INSTALLS BIKE PATHS TO IMPROVE BIKE TRANSIT.COMPLIANCE: BIKE PATHS ARE INTEGRAL WITHIN EXISTING DEVELOPMENT.GOAL 7: INCREASE USE OF ELECTRIC VEHICLESMEASURE 7.1. INSTALL ELECTRIC VEHICLE CHARGERS IN ALL NEW RESIDENTIAL AND COMMERCIAL DEVELOPMENTS.COMPLIANCE: PROJECT INCLUDES 4 EV CHARGING STATIONSGOAL 8: IMPROVE TRAFFIC FLOWMEASURE 8.1. IMPLEMENT TRAFFIC FLOW IMPROVEMENT PROGRAM.COMPLIANCEE: PROJECT IS WITHIN AN EXISTING DEVELOPMENT THAT INCLUDES TRAFFIC FLOW IMPROVEMENT PROGRAMS.GOAL 9: DECREASE GHG EMISSIONS THROUGH REDUCING SOLID WASTE GENERATIONMEASURE 9.1. REDUCE WASTE AT LANDFILLSCOMPLIANCE: SOLID WASTE REDUCTION PROGRAMS FOR OUR HOTELS ARE IN PLACE.GOAL 10: DECREASE GHG EMISSIONS THROUGH INCREASED CLEAN ENERGY USEMEASURE 10.1. INCREASE DISTRIBUTED ENERGY GENERATION WITHIN CITY OF SANTEE BY IMPLEMENTING THE FOLLOWING APPLICABLE PHOTOVOLTAIC SOLAR SYSTEMS.COMPLIANCE: BUILDING WILL BE EQUIPPED WITH ALL STUB OUTS FOR FUTURE USE OF SOLAR PANELS. 1" = 20'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:19 PM
A-1.1
Site Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1.1 1" = 20'-0"
1 Site
11' - 1"
14' - 7"
20' - 0" 9' - 1 1/2"
9' - 0" 30' - 0"
5' - 4 3/16" 8' - 11 17/32"
13' - 2" 2' - 3 29/32"
2'
-
0"
42"POOL GATE
42"POOL GATE
POOL EQUIP
MIN
.
2'
-
0"
42" GATE
MIN 2' - 0
"
1 3'
-
0"
1 '
-
0"
1' - 0"
1 '
-
0 "
LINEAR FIRE PIT: SPARK MODERN FIRES
ACCESSIBLE POOL LIFT, TYPICAL
A-1.2
3 2
A-1.2
A-1.2
9 A-1.2
9 6
A-1.2
8 A-1.2
A-1.2
7 5
A-1.2
GLASS PEBBLES, COLOR TO BE SELECTED#4 HORZ. 24" O.C.PRECAST CONCRETE CAP, STEPSTONE SQUARE MODULAR 13 1/4"STUCCO OVER CMU#4 VERT. 24" O.C. WITH ALTERNATE BENDS INTO FOOTINGPAVING PER PLANAGGREGATE BASE PER GEOTECHNICAL REPORTCONNECT DRAIN TO NEARBY DOWNSPOUT BOOTCONCRETE FOOTING WITH (1) #5 1' - 4" 0'
-
8"
1'
-
6"
1'
-
2"
0'
-
3 3/
8"
1'
-
9 3/
8"
DRAIN WITH STAINLESS STEEL GRATE
FIRE RING CONNECTED TO GAS LINE
PER PLAN
C
LR
.
0'
-
3"
4" THICK CONCRETE SLAB SLOPE 1/4"/FT. MIN. TO DRAIN
FIRE PIT NOTES:FIRE PIT SHALL HAVE U.L. APPROVED REMOTE OPERATION FROM REGISTRATION DESKS.PROVIDE AN EMERGENCY SHUT-OFF BUTTON IN THE AREA OF THE FIRE PIT. REVIEW LOCATION OF SHUT- OFF WITH ARCHITECT BEFORE INSTALLATION.CONTRACTOR TO PROVIDE GAS LINE AND ELECTRICAL CONNECTIONS INCLUDING ALL VALVES AND SWITCHES PER LOCAL CODE REQUIREMENTS 16 "
MIN
.
36 "MIN
.
12"
48" MIN.
1 9
"M
AX
.
17 "MIN
.
18 "MIN
.
POOL & SPA LIFT. USE MATCHING SLEEVE AND SEAT. INSTALL PER MFR'S INSTRUCTIONSSLEEVE WITH COVERPOOL DECK
LIFT SUPPLIER
VERIFY WITH
1. SWIMMING POOL & SPA LIFTS SHALL COMPLY WITH THE FOLLOWING CRITERIA FROM IBC SECTION 11B-1009:2. POOL LIFTS SHALL BE LOCATED WHERE THE WATER DEPTH IS BETWEEN 36" MINIMUM AND 48" MAXIMUM3. IN THE RAISED POSITION, THE CENTERLINE OF THE SEAT SHALL BE LOCATED OVER THE DECK AND 16" MINIMUM FROM THE EDGE OF THE POOL. THE DECK SURFACE BETWEEN THE CENTERLINE OF THE SEAT AND THE POOL EDGE SHALL HAVE A SLOPE NOT STEEPER THAN 1:48
4. ON THE SIDE OF THE SEAT OPPOSITE THE WATER, A CLEAR DECK SPACE SHALL BE PROVIDED PARALLEL WITH THE SEAT. THE SPACE SHALL BE 36" WIDE MINIMUM AND SHALL EXTEND FORWARD 48" MINIMUM FROM A LINE LOCATED 12" BEHIND THE REAR EDGE OF THE SEAT. THE CLEAR DECK SHALL HAVE A SLOPE NOT STEEPER THAN 1:48
5. THE SEAT SHALL BE RIGID AND SHALL HAVE A BACK SUPPORT THAT IS AT LEAST 12" TALL. THE HEIGHT OF THE LIFT SEAT SHALL BE DESIGNED TO ALLOW A STOP AT 17" MINIMUM TO 19" MAXIMUM MEASURED FROM THE DECK TO THE TOP OF THE SEAT SURFACE WHEN IN THE RAISED (LOAD) POSITION. THE SEAT SHALL HAVE A RESTRAINT FOR THE USE OF THE OCCUPANT WITH OPERABLE PARTS COMPLYING WITH IBC 11B-309
6. THE SEAT WIDTH SHALL BE 16" WIDE MINIMUM. FOOTRESTS SHALL BE PROVIDED AND SHALL MOVE WITH THE SEAT.
THE SEAT SHALL HAVE TWO ARMRESTS. THE ARMREST POSITIONED OPPOSITE THE WATER SHALL BE REMOVABLE OR SHALL FOLD CLEAR OF THE SEAT WHEN THE SEAT IS IN THE RAISED (LOAD) POSITION
7. THE LIFT SHALL BE CAPABLE OR UNASSISTED OPERATION FROM BOTH THE DECK AND WATER LEVELS. CONTROLS
AND OPERATING MECHANISMS SHALL BE UNOBSTRUCTED WHEN THE LIFT IS IN USE AND SHALL COMPLY WITH IBC 11B-309.4. THE LIFT SHALL BE STABLE AND NOT PERMIT UNINTENDED MOVEMENT WHEN A PERSION IS GETTING INTO OR OUT THE SEAT
8. THE LIFT SHALL BE DESIGNED SO THAT THE SEAT WILL SUBMERGE TO A WATER DEPTH OF 18" MINIMUM BELOW THE
STATIONARY WATER LEVEL
9. SINGLE PERSON POOL LIFTS SHALL HAVE A WEIGHT CAPACITY OF 300 POUNDS MINIMUM AND CAPABLE OF
SUSTAINING A STATIC LOAD OF AT LEAST ONE AND HALF TIMES THE RATED LOAD POOL LIFT NOTES: EDGE OF COPING
0'
-
6 "
0' - 6" 0' - 6"
1' - 0"
STAINLESS STEEL POOL LIFT SOCKETPROVIDE STAINLESS STEEL CAP FOR SLEEVE. MUST BE FLUSH WITH FINISHED DECK 1'-0" SQ. CUTOUT IN POOL
DECK - SET LIFT SOCKET IN
CONC. FOOTING
NON-SLIP DECK TOPPING
00' - 1 3/4"
'
-
0 1
/
2 "
0 '
-
3 "
0 '
-
1 "
POOL WALL BY POOL SUBCONTRACTORDECORATIVE TILE BOARDER, FULL PERIMETERCONTINUOUS BACKER ROD
AND SEALANT
1/2" GROUT BED
FINISHED CONCRETE DECK, SLOPE NOT LESS THAN 1% AND NOT MORE THAN 2% AWAY FROM POOL TO DECK DRAINAGE SYSTEM CONT. BACKER ROD AND SEALANT OVER PRE- MOLDED EXPANSION JOINT
PRE CAST CONCRETE COPING WITH NON-SLIP FINISH
DECK DRAIN, FORMVARIES WITH MANUF.
PRECAST CONCRETE CAP, STEPSTONE MODULAR SQUARE 13-1/4"STUCCO OVER BASE COAT OVER CMUAT CONCRETE SLAB, PROVIDE SEALANT OVER FIBER EXPANSION STRIPCONCRETE SLAB OVER CRUSHED ROCK BASE OR EARTH PER PLANCONCRETE FOOTING PER STRUCTURAL 8" CONCRETE BLOCK
#4 32" O.C. WITH
ALTERNATING BENDS
INTO FOOTING
(1) #4 AT TOP
13 1/4"
FINISH GRADE
5'
-
0"
M
NI .
4 2
"
POOL FENCE
PANIC HARDWARE ON
PUSH SIDE OF GATE
TEMPERED GLASS
POOL GATE
3" ALUMINUM TUBE
GATE POSTS
0'
-
2 "
SELF-CLOSING
HINGES
TEMPERED GLASS PANEL 6
0 "MIN
.
RFID LOCK ON PULL SIDE OF GATE
1/4" TEMPEREDGLASS PANEL3" SQ. ALUMINUM TUBE6'-0" O.C. MAX.SUBGRADE ANDEARTH COMPACTEDPER SOIL REPORTCONCRETE POOLDECK PER PLANCONCRETE FOOTING1 1/2" x 1 1/2" ZINC COATED 2CHANNEL 6'-0" O.C.
4 "
.
1 8
"
.
6 0
"MIN
.
0 '
-
2 "
GATE WILL BE PROVIDED WITH PANIC HARDWARE.GATE WILL BE PROVIDED WITH A CARD KEY ACCESS LATCH WITH KANT SLAM CLOSER & SELF LATCHING DEVICE. PROVIDE LOCK ON GATE WHEN POOL IS NOT IN USE.2 COATS OF PAINT ON GATES, (TYPICAL) PAINT ACCENT COLOR SELECTED FOR THE PROJECT. 2% MAX SLOPE
CROSS SLOPE
LANDINGLANDING
2% MAX SLOPE
CROSS SLOPE
SMOOTH STEEL KICK PLATE
0'
-
1 0
"
LOCKING
LATCHSET
LINE OF DECK
STEEL MESH AT GATE
2" SQUARE RAILS 2/ BRACKET AT EACH END
1" SQUARE PICKETS AT 4" O.C. .. 5' - 0" M NI . PANIC HARDWARE ON PUSH SIDE OF GATE 3' - 6" CLEAR 24" MIN. MIN. CLR. 12" SELF CLOSING HINGES 5" x 12" WELDED-IN
BUCK FOR RFID
LOCKSET
As indicated Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:22 PM
A-1.2
Enlarged Patio and Pool
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1.2 3/16" = 1'-0"
1 Enlarged Patio and Pool A-1.2 3/4" = 1'-0" 2 Fire Pit Section A-1.2 3/4" = 1'-0"
3 Accessible Pool Lift
A-1.2 1 1/2" = 1'-0"
4 Pool Lift Base
A-1.2 1 1/2" = 1'-0"
5 Pool Coping
A-1.2 3/4" = 1'-0"
6 CMU Garden Wall 5-0
A-1.2 3/4" = 1'-0"
7 Pool Gate Glass
A-1.2 3/4" = 1'-0"
8 Pool Fence Glass
A-1.2 1/2" = 1'-0"
9 Metal Pool Gate
9 '
-
0"
8'
-
0"
9'
-
0"
9'
-
0"
5'
-
0"
10'
-
0 "
9'
-
0"
9'
-
0"
ZERO CURB
DETECTABLE WARNING
PAINTED STRIPED FEDERAL BLUE NO. 15090
ZERO CURB
19' - 0" 6' - 0"
PAINTED INTERNATIONAL SYMBOL OF ACCESSIBILITY
WHITE PAINTED LETTERS 12" MIN HIGH
2' - 0"
SLOPE OF ACCESSIBLE PARKINGAREA AND ACCESS AISLESSHALL NOT EXCEED 2% IN ANYDIRECTION PER ICC A117.1-09SECTION 502.5 17' - 0" 2' - 0"
A-1.3
5 A-1.3
5 A-1.3
6 A-1.3
6 A-1.3
3 ACCESSIBLEROUTESIGNAGE
ACCESSIBLE PARKING SIGNAGE,TYPICAL
WHEEL STOP,TYPICAL
VAN ACCESSIBLE PARKING SIGNAGE
ACCESSIBLE PARKING SIGNAGE,TYPICAL
17' - 0" 2' - 0"
SYMBOL SHALL BE AS SHOWN IN EITHER BLUE ON WHITE BACKGROUND WITH BLUE BORDER OR WHITE SYMBOL ON BLUE BACKGROUND
PROPORTIONS FOR SIGNAGE
5'-
0"
.
5'-0".
SYMOBOL SHALL BE PAINTED ON PARKING SURFACE AND LOCATED SUCH THAT THE SYMBOL IS VISIBLE WHEN A VEHICLE IS PROPERLY PARKED IN THE SPACE.YELLOW FIGURE ON FEDERAL BLUE NO. 15090 BACKGROUND. 25'
-
0 "
9' - 0"
9'
-
0"
9'
-
0"
2' - 0" 17' - 6"
MOTORCYCLE PARKING
11'
-
0 "
BUILDING
ENTRANCE
0' - 9"
1'
-
2"
5/
8"MIN
.
INTERNATIONAL SYMBOL OF ACCESSIBILTYFOR DIRECTION OF ARROW SEE SITE PLAN FOR SIGN PLACEMENT AND PATH OF TRAVEL1" CORNER RADIUS, TYP.
NOTES:1. MINIMUM SIZE 70" SQ. IN.2. MOUNTING SCREWS TO MATCH BACKGROUND COLOR3. SIGN MATERIAL SHALL BE GALVANIZED STEEL WITH REFLECTIVE PAINT4. WHERE SIGN IS POLE-MOUNTED, REFER TO 60" ABOVE WALKING SURFACE
1' - 0"
2'
-
0"
FOR VEHICLES
SHOWING DISABLED
INSIGNIA OR LICENSE
PLATE ONLY
LAKE HAVASU CITY
ORDINANCE
SEC 10.12.120
WHITE SYMBOL OF ACCESSIBILTY ON DARK BLUE BACKGOUND, 6" x 6-3/4" 0.080" REFLECTIVE ALUMINUM SIGN2" x 2" x 1/4" PAINTED GALVANIZED STEEL TUBE SET INTO CONCRETE (POST NOT REQUIRED AT WALL)
RESERVED
PARKING
1-1/2" x 5/16" BLUE LETTERS
5'-0" MIN.
7'-0" MAX.
1" x 3/16" BLUE LETTERSSIGN MAY BE MOUNTED ON WALL IF WITHIN 4' OF EDGE OF SIDEWALK.NO LANDSCAPING OR OTHER OBSTRUCTION BETWEEN THE SIGN AND PARKING SPACE As indicated Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:23 PM
A-1.3
Enlarged ADA Parking
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1.3 1/4" = 1'-0"
1 Accessible Parking
A-1.3 1 1/2" = 1'-0"
2 International Symbol of Accessibility
A-1.3 1" = 1'-0"
3 Accessible Parking Space Symbol
A-1.3 1/4" = 1'-0"
4 Typical Parking
A-1.3 1 1/2" = 1'-0"
5 Accessible Route Signage
A-1.3 1 1/2" = 1'-0"
6 Accessible Parking Signage
10'
- 0"
18' - 8"
1'
- 4"
16' - 0"
1'
- 4"
6' - 9"
4' - 0"
7' - 11"
A-1.4
2 A-1.4
3 A-1.4
4 TRASH BINS PER CITY STANDARD
PEDESTRIAN ACCESS
6" CONCRETECURB TYP.
METAL TRASHENCLOSURE GATE
8" PCC CONCRETE W/ #4BARS @ 18" EACH WAY
18' - 8"
20'
- 0"
3'
-
0"
6'
-
6"
STANDING SEAMROOFING OVERMETAL DECK
PAINTEDSTEEL GATE
PAINTEDSTEEL GATE
HSS PERSTRUCTURAL OPEN
WELDABLE GATE BOX WITH INTEGRALSTOP. PROVIDE LOCKSET AND RFID LOCK(PROVIDE LOW VOLTAGE AS REQUIRED) 6'
-
6"
3'
-
6"
6'
-
6"8" CMU BLOCK
WITH SMOOTH FACE ONINTERIOR AND STUCCO ON EXTERIOR TO MATCHBUILDING
STANDING SEAM METALROOFING OVER METAL DECK
As indicated Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:26 PM
A-1.4
Enlarged Trash Enclosure
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1.4 1/4" = 1'-0"
1 Enlarged Trash Enclosure
A-1.4 3/8" = 1'-0"
2 Trash Enclosure Front Elevation
A-1.4 3/8" = 1'-0"
3 Trash Enclosure Back with Gate Elevation
A-1.4 3/8" = 1'-0"
4 Trash Enclosure Side Elevation
10 986
E
75 1'
-
0"
12'
-
9 "
12'
-
9 "
0'
-
5"
25' - 5"
1/4"/1'-0"
3 A-1.5
3 A-1.5
3 A-1.5
4 A-1.5
867
A
2'
-
3"
(
1 6
)
M
E
M
B
E
R
SE
Q
U
A
L
L
YS
P
A
C
E
D
30'
-
0 "
1'
-
6"
2' - 3" 19' - 4" 2' - 3"
HSS BEAM PER STRUCTURAL
6"X8" ALUMAWOOD TRELLIS MEMBERSWITH SQUARE CAPPED ENDS
HSS BEAM PER STRUCTURAL
0'
-
6"
3'
-
0"
STUCCO OVER METAL LATH OVER BLDG PAPER2x FRAMING 16" O.C.BEAM PER STRUCTURAL2x BLOCKING
MEMBRANE ROOFING
RIGID INSULATION
ROOF SHEATHING
PER STRUCTURAL
STUCCO OVER RIB LATH
OVER BLDG PAPER OVER
5/8" DENSGLASS SHEATHING
5/8" DENSGLASS
SHEATHING
STUCCO OVER METAL LATH OVER BLDG PAPERSTUCCO J-MOULDMEMBRANE ROOFINGRIGID INSULATIONROOF FRAMING PER STRUCTURALINSULATION OVER LIVABLE AREASROOF SHEATHING PER STRUCTURALTWO LAYERS 5/8" TYPE 'X' GYPSUM BOARD,GA FILE NO. RC2601 2x STUDS 16" O.C.
5/8" TYPE 'X'
GYPSUM BOARD
GYPCRETE
UNDERLAYMENT
FLOOR SHEATHING
PER STRUCTURAL
FLOOR BEAM PER
STRUCTURAL
INSULATION
5/8" TYPE 'X'
GYPSUM BOARD
5/8" TYPE 'X' GYPSUM
BOARD OVER 5/8"
DENSGLASS SHEATHING
STUCCO OVER METAL LATH OVER BLDG PAPER
MEMBRANE
ROOFING
RIGID INSULATION
INSULATION 2x NAILER
ROOF SHEATHING PER STRUCTURALSTUCCO OVER METAL LATH OVER BLDG PAPER OVER DENSGLASS SHEATHING 2x BLOCKING
5/8" TYPE 'X'
GYPSUM BOARD
2x STUD FRAMING
PER STRUCTURAL
TWO LAYERS 5/8" TYPE
'X' GYPSUM BOARD
ROOF FRAMING PER STRUCTURAL
As indicated Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:28 PM
A-1.5
Porte Cochere Plans
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-1.5 1/4" = 1'-0"
1 Porte Cochere Plan
A-1.5 1/4" = 1'-0"
2 Trellis Plan
A-1.5 1 1/2" = 1'-0"
3 Porte Cochere Edge
A-1.5 1 1/2" = 1'-0"
4 Porte Cochere Roof to Wall 1
A-1.5 1 1/2" = 1'-0"
5 Porte Cochere Roof to Wall 2
W W DD
A-8
1 A-9
1 18 1817 1715 1514 1413 1312 1211 1110 10
9 98 8
6 6
CC
EE
7 7
5 54 4
19 19
3 3
AA
1 1
16 16
DINING
NORTH
MAINELEC.
BOILER
LAUNDRY
EMP LOUNGE
LOBBY
RECEPTION
WORK ROOM
SERVING
PANTRY
ELEV EQUIP
ELEV
LOBBY
M W
GM
SALES
LINEN
PBX
ENGINEER
MKT
25' - 0"
CHUTE
MECH
GUEST LAUNDRY
FITNESS
POOL EQ
A-1.4
3 FIREPUMP
4' - 7"
10 '
-
3 "
A-1.5
1 A-1.5
2 1" = 10'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:32 PM
A-3
First Floor Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-3 1" = 10'-0"
1 Level 1
FD FD
A-8
2 A-8
1 A-9
1 18 1817 1715 1514 1413 1312 1211 1110 10
9 98 8
6 6
CC
EE
7 7
5 54 4
19 19
3 3
AA
1 1
16 16
NORTH
MECH
ELEVLOBBY
MAIDS
ELEC
ICE
H
A-9
2 3/32" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:36 PM
A-4
Second Floor Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-4 3/32" = 1'-0"
1 Level 2
FD FD
A-8
2 A-8
1 A-9
1 18 1817 1715 1514 1413 1312 1211 1110 10
9 98 8
6 6
CC
EE
7 7
5 54 4
19 19
3 3
AA
1 1
16 16
ELEV
LOBBY
LINEN
STORAGE
ELEC
NORTH
A-9
2 3/32" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:40 PM
A-5
Third Floor Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-5 3/32" = 1'-0"
1 Level 3
FD FD
A-8
2 A-8
1 A-9
1 18 1817 1715 1514 1413 1312 1211 1110 10
9 98 8
6 6
CC
EE
7 7
5 54 4
19 19
3 3
AA
1 1
16 16
NORTH
LINEN
STORAGE
ELEV
LOBBY
ELEC
A-9
2 3/32" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:45 PM
A-6
Fourth Floor Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-6 3/32" = 1'-0"
1 Level 4
2 A-8
1 A-9
1 1817151413121110
986
CC
EE
754
19 3
AA
1 16
ELEV
SHAFT
LINEN CHUTE
DISCHARGE
SERVICE WALKWAY
SERVICE WALKWAY
SERVICE WALKWAY
1/2"/FT SLOPE 1/2"/FT SLOPE1/2"/FT SLOPE 1/2"/FT SLOPE1/2"/FT SLOPE 1/2"/FT SLOPE
STAIR TO
ROOF
ROOF DRAIN ROOF DRAIN ROOF DRAIN
33' - 0"'
-
0"
3'
-
0"
3' - 0"
CONDENSER PAD
DOAS UNIT
MECHANICAL EQUIPMENT SCREEN
9'0" HIGH
NOTE: ROOF DRAIN DOWNSPOUTS TO SPLASHBLOCK ON GRADE
A-9
2 1" = 10'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:00:51 PM
A-7
Roof Plan
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-7 1" = 10'-0"
1 Roof
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Level 4
33' - 0"
7'
-
6"
6' - 0"
ROOF MECHANCIAL EQUIPMENT SCREEN 9'0" HIGH
Roof
43' - 0"
52'
-
3 "
13'
-
0 "
10'
-
0 "
10'
-
0 "
10'
-
0 "
9'
-
3"
0'
-
6 "
5 1
'
-
3 "
4 9
'
-
3 "
2 '
-
0 "
8'
-
8"
6' - 0"
7'
-
6"
6' - 0"
5' - 0"
01 04 06 05 01
02 03
06 01
1205
08 08
LED CONTINUOUS STRIP LIGHT IN COVE
LED CONTINUOUS STRIP LIGHT IN COVE
11 09
MECHANICAL EQUIPMENT HEIGHT
2'
-
6"
2'
-
0"
1'
-
6"
3'
-
0"
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Level 4
33' - 0"
Roof
43' - 0"
11'
-
0 "
13'
-
0 "
10'
-
0 "
10'
-
0 "
10'
-
0 "
5'
-
2"
5' - 6"
7'
-
8"
9'
-
0"
01 06 05 01 03 02
06 08
09 LED CONTINUOUS STRIP LIGHT IN COVE
LED CONTINUOUS STRIP LIGHT IN COVE
49'
-
9 "
50'
-
9 "
7'
-
9"
11 0102
07 TRELLIS
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:01:10 PM
A-8
Elevations
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-8 1/8" = 1'-0"
1 North Elevation
A-8 1/8" = 1'-0"
2 East Elevation
Keynote Legend
Key Value Keynote Text
01 WRAP: STUCCO COLOR MATCH DUNN EDWARDS DE 6225 "FOSSIL"02 CORE: STUCCO COLOR MATCH DUNN EDWARDS DET 625 "RECLAIMED WOOD"03 ACCENT BAND: STUCCO COLOR MATCH DUNN EDWARDS DET 620 "BARNWOOD GRAY"04 LINK: STUCCO COLOR MATCH DUNN EDWARDS DE 6369 "LEGENDARY GRAY"05 ACCENT: STUCCO COLOR MATCH DUNN EDWARDS DE 6370 "CHARCOAL SMUDGE"06 KEEP: STUCCO COLOR MATCH DUNN EDWARDS DEA 189 "BLACK RIVER FALLS"07 WINDOW FRAMES MED BRONZE ANODIZED ALUMINUM: MANUFACTURER'S STANDARD08 WINDOW GLAZING: LOW E DOUBLE GLAZING CLEAR09 STEEL DOORS AND FRAMES: DUNN EDWARDS DET 620 "BARNWOOD GRAY"11 CORNICE: STUCO COLOR MATCH DUNN EDWARDS DEC 774 "SHADY"12 BUILDING SIGNAGE: FRANCHISE STANDARD, SEPARATE PERMIT REQUIRED Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Level 4
33' - 0"
7'
-
6"
6' - 0"
Roof
43' - 0"
51'
-
3 "
13'
-
0 "
10'
-
0 "
10'
-
0 "
10'
-
0 "
8'
-
3"
MECHANICAL ROOF EQUIPMENT SCREEN 9'-0" HIGH
01 06 04 01
03 06
12 05
08 07
LED CONTINUOUS STRIP LIGHT IN COVE
5 2
'
-
3 "
3'
-
6"
2'
-
0"
02 5'
-
6"
MECHANICAL EQUIPMENT HEIGHT
5'
-
0"
3'
-
0"
5'
-
6 "
8 '
-
0 "
5'
-
2 "
POOL EQUIPMENT TRELLIS
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Level 4
33' - 0"
Roof
43' - 0"
50'
-
9 "
13'
-
0 "
11'
-
0 "
1'
-
6"
3'
-
0"
49'
-
9 "
6'
-
9"
10'
-
0 "
10'
-
0 "
10'
-
0 "
13'
-
0 "
8'
-
0"
5'
-
2"
TRELLIS
TRASH ENCLOSURE POOL EQUIPMENTWITH METAL ROOF
7'
-
8"
11' - 0"
01 04
12 06 05
01 01
08 07
09 05
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
10/21/2022 3:01:26 PM
A-9
Elevations
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
A-9 1/8" = 1'-0"
1 South Elevation
Keynote Legend
Key Value Keynote Text
01 WRAP: STUCCO COLOR MATCH DUNN EDWARDS DE 6225 "FOSSIL"02 CORE: STUCCO COLOR MATCH DUNN EDWARDS DET 625 "RECLAIMED WOOD"03 ACCENT BAND: STUCCO COLOR MATCH DUNN EDWARDS DET 620 "BARNWOOD GRAY"04 LINK: STUCCO COLOR MATCH DUNN EDWARDS DE 6369 "LEGENDARY GRAY"05 ACCENT: STUCCO COLOR MATCH DUNN EDWARDS DE 6370 "CHARCOAL SMUDGE"06 KEEP: STUCCO COLOR MATCH DUNN EDWARDS DEA 189 "BLACK RIVER FALLS"07 WINDOW FRAMES MED BRONZE ANODIZED ALUMINUM: MANUFACTURER'S STANDARD08 WINDOW GLAZING: LOW E DOUBLE GLAZING CLEAR09 STEEL DOORS AND FRAMES: DUNN EDWARDS DET 620 "BARNWOOD GRAY"12 BUILDING SIGNAGE: FRANCHISE STANDARD, SEPARATE PERMIT REQUIRED A-9 1/8" = 1'-0"
2 West Elevation
Robert F. Tuttle Architects, Inc.
10/21/2022 3:01:27 PM
A-10
Perspective
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
FRONT PERSPECTIVE - Day
Robert F. Tuttle Architects, Inc.
10/21/2022 3:01:28 PM
A-11
Perspective
Excel Hotel Group Santee Hotel October 18, 2022
San Diego CA 381 Town Center Parkway, Santee CA 834
FRONT PERSPECTIVE- Night
4-STORY HOTEL FF 346.06 PAD 345.2 TOWN CENTER PARKWAY 6 1 9 8 9 17 15 1 2 2 2 3 2 2 3 3 3 5 5 7 7 8 8 9 4 9 9 F DF W DS S DF DF 2 1 10 11 11 12 12 12 13 16 16 4 4 4 4 4 14 16 15 19 19 19 10 20 21 22 23 23 DS DS DS 4 6 22 11 7 18 6 11 5 5 22 17 10 1 24 24 11 25 25 CONSTRUCTION NOTES ROOF DRAIN POINT OF CONNECTION 5' OUTSIDE OF BUILDING. CONTINUATION PER PLUMBING DRAWINGS DEEPENED FOOTING PER STRUCTURAL DRAWINGS NEW DOMESTIC WATER POC NEW SEWER POC NEW FIRE WATER POC 0" CURB 0"-6" CURB TRANSITION 6" CURB PER SDRSD G-1 6" CURB AND GUTTER PER SDRSD G-2 CONCRETE STAIRS 6" RISE, 12" TREAD TRASH ENCLOSURE RAMP AC PAVEMENT CONCRETE SIDEWALK PER SDRSD G-7 BIO BASIN 1' CURB OPENING REMOVE AND REPLACE EXISTING RIBBON GUTTER PROTECT IN PLACE EXISTING CURB INLET AND CLOSE OPENING DEEPENED EDGE ALONG CURB ADJACENT TO BIOFILTRATION BASIN. POOL/PATIO PER ARCH DRAWINGS CONCRETE RIBBON GUTTER WHEEL STOPS TRUNCATED DOMES MODULAR WETLAND UNIT PROP PVT. 18" HDPE SD PROP 6" SD AND AREA DRAINS RELOCATE REDUCED PRESSURE DETECTOR ASSEMBLY (RPDA) TO RAISED ISLAND DSDFWSF12345678910111213141516171819202122 PRELIMINARY GRADING PLAN FOR SANTEE HOME2 HOTEL 23 CONNECT TO EX SD PER SDRSD D-63 FH W/ TWO 2-1/2" PORTS & ONE 4" PORT WITH ALL BRONZE CONSTRUCTION AND PAINTED FIRE HYDRANT YELLOW. 2425 2.5' OR 3' WIDE CONCRETE SPILLWAY DIRECTING GUTTER FLOW TO MWS P:\LMCO\0348-1 Santee Home2 Hotel\D Planning and Engineering\PGP\C-1 Preliminary Grading Plan.dwg, 1/26/2023 3:22:42 PM, DWG To PDF.pc3