Cities Index.
Agenda, regular meeting

Scotts Valley City Council
December 7, 2022

Document
Agenda, regular meeting
Meeting
December 7, 2022
Body
Scotts Valley City Council
Pages
6
Original file
244.8 MB
Text extracted from the city's file for reading and search. Open the original on scottsvalleyca.api.civicclerk.com. That file is the official record.

This Oak Creek Park Final Environmental Impact Report (FEIR) has been prepared in accordance with CEQA and state and local CEQA Guidelines and represents the independent judgment of the City, as CEQA Lead Agency. This Final EIR, together with the DEIR, technical appendices, and other written documentation prepared during the EIR process, as those documents may be modified by the City Council at the time of certification, will constitute the Final EIR, as defined in the State CEQA Guidelines, Section 15132, and the City of Scotts Valley’s environmental document reporting procedures.

1.1 Document Organization and Framework
This Final EIR is organized as follows: Section 1 provides a brief introduction to this report.

Section 2 provides a list of agencies and interested persons commenting on the DEIR. This section also contains individual comments followed thereafter by responses. To facilitate review of the responses, an index number (e.g., 1-1, 1-2, 2-1) has been assigned to each comment and to its corresponding responses. Section 3 contains changes to the DEIR as a result of the comments by agencies and interested persons. Section 4 contains the Mitigation Monitoring and Reporting Program.

City Staff has reviewed the comment letters, draft responses and information generated in the course of preparing the responses and determined that none of this material constitutes significant new information that requires a recirculation period for further public comment under CEQA Guideline Section 15088.5. None of this new material indicates that the project will result in a significant new environmental impact not previously disclosed in the DEIR.

Additionally, none of this material indicates that there would be a substantial increase in the severity of a previously identified environmental impact that will not be mitigated, or that there would be any of the other circumstances requiring recirculation as described in Section 15088.5.

1.2 CEQA Requirements Regarding Comments and Responses
CEQA Guidelines Section 15204 (a) outlines parameters for submitting comments and reminds persons and public agencies that the focus of review and comment of Draft EIRs should be, “on the sufficiency of the document in identifying and analyzing possible impacts on the environment and ways in which significant effects of the project might be avoided or mitigated.

Comments are most helpful when they suggest additional specific alternatives or mitigation measures that would provide better ways to avoid or mitigate the significant environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is determined 065 136
City of Scotts Valley Oak Creek Park Final EIR
Introduction | Page 1-2Introduction | Page 1-2
Introduction | Page 1-2
5/31/22
in terms of what is reasonably feasible, considering factors such as the magnitude of the project at issue, the severity of its likely environmental impacts, and geographic scope of the project.

CEQA does not require a lead agency to conduct every test or perform all research, study, and experimentation recommended or demanded by commenters. When responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR.”
066 137
City of Scotts Valley Oak Creek Park Final EIR
Response to Comments on the Draft EIR | Page 2-1
5/31/22
2 Response to Comments on the Draft EIR

2.1 Agency, Organization, and Individual Comments on the Draft EIR This section includes all written comments received on the DEIR and the City’s responses to each comment. Comment letters and specific comments are given letters and numbers for reference purposes. Where sections of the DEIR are excerpted in this document, the sections are shown indented. Changes to the DEIR text are shown in underline for additions and strikeout for deletions.

The following is a list of agencies and organizations that submitted comments on the Draft EIR during the public review period:

Table 2-1: List of Written Comments Received on the Draft EIR Comment Letter
No. Commenting Agency / Organization / Individual Date
Agencies
1 State of California, Department of Transportation, Caltrans District 5 November 30, 2021
2 State of California, Department of Fish and Wildlife November 24, 2021 Organizations
3 Pacific Gas and Electric October 20, 2021
Individuals
4 Mark Hemmert September 7, 2021
067 138
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
STATE OF CALIFORNIA-------CALIFORNIA STATE TRANSPORTATION AGENCY Gavin Newsom, Governor

DEPARTMENT OF TRANSPORTATION
CALTRANS DISTRICT 5
50 HIGUERA STREET
SAN LUIS OBISPO, CA 93401-5415
PHONE (805) 549-3101
FAX (805) 549-3329
TTY 711
www.dot.ca.gov/dist05/
Making Conservation
a California Way of Life.

November 30, 2021
SCr-17-3.475
SCH#2019110250
Taylor Bateman
Community Development Director
Community Development Department
City of Scotts Valley
1 Civic Center Drive
Scotts Valley, CA 95066
Dear Mr. Bateman:

COMMENTS FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT (DEIR) - OAK

CREEK PARK, SCOTTS VALLEY, CA
The California Department of Transportation (Caltrans), District 5, Development Review, has reviewed the Oak Creek Park project which include 24,973 square feet of commercial use, eight townhomes, and 44 apartments. Caltrans offers the following comments in response to the DEIR:

1. Caltrans appreciates the transportation demand management strategies to further reduce vehicle miles traveled (VMT). The bike lockers and storage, showering facilities, sidewalks, and paths will help enhance mobility alternatives to vehicular trips.

Thank you for the opportunity to review and comment on the proposed project. If you have any questions, or need further clarification on items discussed above, please contact me at (805) 835-6543 or [email protected].

Sincerely,
Chris Bjornstad
Associate Transportation Planner
District 5 Development Review
Sincerely,
068 139
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director Bay Delta Region
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
(707) 428-2002
www.wildlife.ca.gov
Conserving California’s Wildlife Since 1870
November 24, 2021
Mr. Taylor Bateman
City of Scotts Valley
One Civic Center Drive
Scotts Valley, CA 95066
[email protected]
Subject: Oak Creek Park, Draft Environmental Impact Report, SCH No. 2019110250, City of Scotts Valley, Santa Cruz County
Dear Mr. Bateman:

The California Department of Fish and Wildlife (CDFW) has reviewed the Draft Environmental Impact Report (DEIR) prepared by the City of Scott’s Valley (City) for the Oak Creek Park Project (Project), located in Santa Cruz County. CDFW is submitting comments on the DEIR regarding potentially significant impacts to biological resources associated with the Project.

CDFW ROLE
CDFW is a Trustee Agency with responsibility under the California Environmental Quality Act (CEQA; Pub. Resources Code, § 21000 et seq.) pursuant to CEQA Guidelines § 15386 for commenting on projects that could impact fish, plant, and wildlife resources (e.g., biological resources). CDFW is also considered a Responsible Agency if a project would require discretionary approval, such as permits issued under the California Endangered Species Act (CESA), the Native Plant Protection Act, the Lake and Streambed Alteration (LSA) Program, and other provisions of the Fish and Game Code that afford protection to the state’s fish and wildlife trust resources.

California Endangered Species Act
Please be advised that a CESA Permit must be obtained if the Project has the potential to result in “take” of plants or animals listed under CESA, either during construction or over the life of the Project. Issuance of a CESA Permit is subject to CEQA documentation; the CEQA document must specify impacts, mitigation measures, and a mitigation monitoring and reporting program. If the Project will impact CESA listed species, early consultation is encouraged, as significant modification to the Project and mitigation measures may be required in order to obtain a CESA Permit.

CEQA requires a Mandatory Finding of Significance if a project is likely to substantially impact threatened or endangered species (Pub. Resources Code, §§ 21001(c), 21083, and CEQA Guidelines §§ 15380, 15064, 15065). Impacts must be avoided or mitigated DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 069 140
Mr. Taylor Bateman
City of Scotts Valley
November 24, 2021

Page 2 of 5 ends

to less-than-significant levels unless the CEQA Lead Agency makes and supports Findings of Overriding Consideration (FOC). The CEQA Lead Agency’s FOC does not eliminate the Project proponent’s obligation to comply with Fish and Game Code, § 2080.

PROJECT DESCRIPTION
The Project consists of a mixed-use commercial and residential development on a 3.56- acre site in the City of Scotts Valley, APN 022-162-76. There will be two lots on the property. Lot 1 would consist of eight town home apartments over approximately one acre. Lot 2 would consist of two types of buildings, commercial and residential. There would be 24,841 square feet of commercial buildings including surface parking and 12- foot-wide sidewalks. There would be 74,100 square feet of residential buildings on Lot 2 including a mix of apartments. The Project would require regrading of Lots 1 and 2, requiring several hundred yards of fill to be imported. Per the Project’s Stormwater Control Plan, the Project would include flow-through planters in the residential area to retain and treat stormwater runoff. A stacked underground storage chamber system which would provide treatment of runoff by infiltration would be used in the mixed-use and commercials portions of the Project.

ENVIRONMENTAL SETTING AND LOCATION
The Project is located at the intersection of Glen Canyon and Mt. Hermon Road, in the City of Scotts Valley, Santa Cruz County.

The Project is adjacent to Mt. Hermon Road, a commercial office building on Glen Canyon Road, and single-family residences. There are no watercourses on the property, but creeks in the vicinity of the Project site include tributaries to Bean Creek and Carbonera Creek. The Project site supports annual grassland, a small patch of coastal prairie, coast live oak tree groves, a poison oak thicket, and non-native tree groves.

COMMENTS AND RECOMMENDATIONS
CDFW offers the following comments and recommendations to assist the City in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on biological resources.

Comment 1: Surveys for special status plant species
Issue: The DEIR does not provide the methodology of the special-status plant species surveys in Mitigation Measure Bio-1.1. The DEIR on page 7-13 of the Biological Resources section states that the small patch of coastal prairie habitat may provide habitat for special-status plant species such as Congdon’s tarplant (Centromadia parryi ssp. Congdonii), a California Native Plant Society (CNPS) Rare Plant Rank 1B.1, DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 070 141
Mr. Taylor Bateman
City of Scotts Valley
November 24, 2021

Page 3 of 5 ends

pending the results of a spring season plant survey. Furthermore, Table 2 of the Biotic Report states that there is marginal habitat for other CNPS rare plant species including but not limited to Scotts Valley spineflower (Chorizanthe robusta var. Hartwegii), shortleaved evax (Hesperevax sparsiflora var. brevifolia), Point Reyes horkelia (Horkelia marinensis) and State endangered species including white-rayed pentachaeta (Pentachaeta bellidiflora) and Santa Cruz tarplant (Holocarpha macradenia). Mitigation Measure Bio 1.1 states that plant surveys will be conducted; however, the methodology for the surveys is not disclosed. Without following proper survey protocol for spring or early summer blooming plant species, it is possible to miss detection of special-status plant species on the site.

Recommendation
CDFW recommends the City update MM Bio 1.1 to include methodology capable of detecting special-status plant species.

Recommended update to MM Bio 1.1
An experienced botanist (with expertise in coastal prairie plant communities of Santa Cruz) shall conduct a minimum of two focused rare plant surveys over two seasons prior to the initiation of construction and include the information in the Project environmental document. Surveys shall be conducted according to: Protocols for Surveying and Evaluating Impacts to Special-Status Native Plant Populations and Natural Communities (CDFW 2018), available at:
https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=18959&inline.

In the event rare, threatened or endangered plants are discovered, additional measures may be needed, which may include work stoppage, flagging and avoidance of occurrences, collection of propagation material, site restoration and/or obtaining an Incidental Take Permit (Fish and Game Code section 2081, subd., (b).) COMMENT 2: Tree Removal
Issue: The Project has the potential to remove all trees on the Project site including six Coast live oaks (Quercus agrifolia), one Ponderosa pine (Pinus ponderosa), six ash trees (Fraxinus sp.), four sycamore trees (Platanus acerifolia), and a large group of acacia trees (Acacia baileyana). According to the Tree Resource Evaluation, at least one coast live oak is above 15 inches diameter at breast height (dbh). Large mature trees (e.g., native oak tree that is greater than 15 inches in diameter) are of particular importance due to increased biological values (i.e., nesting bird habitat, bat roost habitat). Furthermore, the Tree Resource Evaluation states that the sycamore trees growing along the perimeter are healthy and recommends their incorporation into the Project. However, it is unclear if the sycamore trees have been incorporated into the landscape plan.

DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 071 142
Mr. Taylor Bateman
City of Scotts Valley
November 24, 2021

Page 4 of 5 ends

Evidence the impact would be significant: While the DEIR includes on-site tree planting as a minimization measure, on-site planting at higher ratios alone is not sufficient to completely off-set temporal impacts from the loss of mature trees due to an uncertain time lag from when the new resources will be available (Marón et al., 2010).

Recommendation: CDFW recommends the Project avoid large diameter tree removal to the greatest extent feasible. CDFW recommends Project mitigation include in-kind preservation of mature native trees. Where in-kind preservation of mature native trees is not feasible, CDFW recommends planting larger sized native trees, (such as 15-gallon sized trees or larger) to help address the temporal loss of mature trees on-site.

COMMENT 3: Figures and Labels
Issue 1: Figure 3-11: Stormwater Control Plan, does not include a legend or figure labels to explain the meaning of the colors in the figure. The DEIR also references a Figure 7-2: Landscape Plan; however, only Figure 7-1: Vegetation Map is included in the DEIR.

Recommendation: CDFW recommends the final EIR should include labels with Figure 3-11 and include Figure 7-2 either in the EIR or as an attachment.

FILING FEES
CDFW anticipates that the Project will have an impact on fish and/or wildlife, and assessment of filing fees is necessary (Fish and Game Code, section 711.4; Pub.

Resources Code, section 21089). Fees are payable upon filing of the Notice of Determination by the Lead Agency and serve to help defray the cost of environmental review by CDFW.

Thank you for the opportunity to comment on the Project’s DEIR. If you have any questions regarding this letter or for further coordination with CDFW, please contact Ms. Serena Stumpf, Environmental Scientist, at (707) 337-1364 or [email protected]; or Mr. Wesley Stokes, Senior Environmental Scientist (Supervisory), at [email protected].

Sincerely,
Stephanie Fong
Acting Regional Manager
Bay Delta Region
ec: State Clearinghouse # 2019110250
DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 072 143
Mr. Taylor Bateman
City of Scotts Valley
November 24, 2021

Page 5 of 5 ends

REFERENCES
CDFW, 2018. Protocols for surveying and evaluating impacts to special status native plant populations and sensitive natural communities.
https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=18959&inline.

Marón, M., Dunn, P. K., McAlpine, C. A., & Apan, A. (2010). Can offsets really compensate for habitat removal? The case of the endangered red-tailed black-cockatoo. Journal of Applied Ecology, 47(2), 348–355.

DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 073 144
Plan Review Team
Land Management
[email protected]
PG&E Gas and Electric Facilities Page 1
October 20, 2021
Susie Pineda
City of Scotts Valley Planning Dept
One Civic Center Drive
Scotts Valley, CA 95066
Ref: Gas and Electric Transmission and Distribution
Dear Susie Pineda,
Thank you for submitting the Oak Creek Park plans for our review. PG&E will review the submitted plans in relationship to any existing Gas and Electric facilities within the project area.

If the proposed project is adjacent/or within PG&E owned property and/or easements, we will be working with you to ensure compatible uses and activities near our facilities.

Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure your safety and to protect PG&E’s facilities and its existing rights.

Below is additional information for your review:

1. This plan review process does not replace the application process for PG&E gas or electric service your project may require. For these requests, please continue to work with PG&E Service Planning: https://www.pge.com/en_US/business/services/buildingand-renovation/overview/overview.page.

2. If the project being submitted is part of a larger project, please include the entire scope of your project, and not just a portion of it. PG&E’s facilities are to be incorporated within any CEQA document. PG&E needs to verify that the CEQA document will identify any required future PG&E services.

3. An engineering deposit may be required to review plans for a project depending on the size, scope, and location of the project and as it relates to any rearrangement or new installation of PG&E facilities.

Any proposed uses within the PG&E fee strip and/or easement, may include a California Public Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a conveyance of rights for specific uses on PG&E’s fee strip or easement. PG&E will advise if the necessity to incorporate a CPUC Section 851filing is required.

This letter does not constitute PG&E’s consent to use any portion of its easement for any purpose not previously conveyed. PG&E will provide a project specific response as required.

Sincerely,
Plan Review Team
Land Management
074 145
PG&E Gas and Electric Facilities Page 2
Attachment 1 – Gas Facilities
There could be gas transmission pipelines in this area which would be considered critical facilities for PG&E and a high priority subsurface installation under California law. Care must be taken to ensure safety and accessibility. So, please ensure that if PG&E approves work near gas transmission pipelines it is done in adherence with the below stipulations. Additionally, the following link provides additional information regarding legal requirements under California excavation laws: https://www.usanorth811.org/images/pdfs/CA-LAW-2018.pdf

1. Standby Inspection: A PG&E Gas Transmission Standby Inspector must be present during any demolition or construction activity that comes within 10 feet of the gas pipeline. This includes all grading, trenching, substructure depth verifications (potholes), asphalt or concrete demolition/removal, removal of trees, signs, light poles, etc. This inspection can be coordinated through the Underground Service Alert (USA) service at 811. A minimum notice of 48 hours is required. Ensure the USA markings and notifications are maintained throughout the duration of your work.

2. Access: At any time, PG&E may need to access, excavate, and perform work on the gas pipeline. Any construction equipment, materials, or spoils may need to be removed upon notice.

Any temporary construction fencing installed within PG&E’s easement would also need to be capable of being removed at any time upon notice. Any plans to cut temporary slopes exceeding a 1:4 grade within 10 feet of a gas transmission pipeline need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

3. Wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that must be enforced whenever any equipment gets within 10 feet of traversing the pipe.

Ensure a list of the axle weights of all equipment being used is available for PG&E’s Standby Inspector. To confirm the depth of cover, the pipeline may need to be potholed by hand in a few areas.

Due to the complex variability of tracked equipment, vibratory compaction equipment, and cranes, PG&E must evaluate those items on a case-by-case basis prior to use over the gas pipeline (provide a list of any proposed equipment of this type noting model numbers and specific attachments).

No equipment may be set up over the gas pipeline while operating. Ensure crane outriggers are at least 10 feet from the centerline of the gas pipeline. Transport trucks must not be parked over the gas pipeline while being loaded or unloaded.

4. Grading: PG&E requires a minimum of 36 inches of cover over gas pipelines (or existing grade if less) and a maximum of 7 feet of cover at all locations. The graded surface cannot exceed a cross slope of 1:4.

5. Excavating: Any digging within 2 feet of a gas pipeline must be dug by hand. Note that while the minimum clearance is only 12 inches, any excavation work within 24 inches of the edge of a pipeline must be done with hand tools. So to avoid having to dig a trench entirely with hand tools, the edge of the trench must be over 24 inches away. (Doing the math for a 24 inch 075 146
PG&E Gas and Electric Facilities Page 3
wide trench being dug along a 36 inch pipeline, the centerline of the trench would need to be at least 54 inches [24/2 + 24 + 36/2 = 54] away, or be entirely dug by hand.) Water jetting to assist vacuum excavating must be limited to 1000 psig and directed at a 40° angle to the pipe. All pile driving must be kept a minimum of 3 feet away.

Any plans to expose and support a PG&E gas transmission pipeline across an open excavation need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

6. Boring/Trenchless Installations: PG&E Pipeline Services must review and approve all plans to bore across or parallel to (within 10 feet) a gas transmission pipeline. There are stringent criteria to pothole the gas transmission facility at regular intervals for all parallel bore installations.

For bore paths that cross gas transmission pipelines perpendicularly, the pipeline must be potholed a minimum of 2 feet in the horizontal direction of the bore path and a minimum of 12 inches in the vertical direction from the bottom of the pipe with minimum clearances measured from the edge of the pipe in both directions. Standby personnel must watch the locator trace (and every ream pass) the path of the bore as it approaches the pipeline and visually monitor the pothole (with the exposed transmission pipe) as the bore traverses the pipeline to ensure adequate clearance with the pipeline. The pothole width must account for the inaccuracy of the locating equipment.

7. Substructures: All utility crossings of a gas pipeline should be made as close to perpendicular as feasible (90° +/- 15°). All utility lines crossing the gas pipeline must have a minimum of 12 inches of separation from the gas pipeline. Parallel utilities, pole bases, water line ‘kicker blocks’, storm drain inlets, water meters, valves, back pressure devices or other utility substructures are not allowed in the PG&E gas pipeline easement.

If previously retired PG&E facilities are in conflict with proposed substructures, PG&E must verify they are safe prior to removal. This includes verification testing of the contents of the facilities, as well as environmental testing of the coating and internal surfaces. Timelines for PG&E completion of this verification will vary depending on the type and location of facilities in conflict.

8. Structures: No structures are to be built within the PG&E gas pipeline easement. This includes buildings, retaining walls, fences, decks, patios, carports, septic tanks, storage sheds, tanks, loading ramps, or any structure that could limit PG&E’s ability to access its facilities.

9. Fencing: Permanent fencing is not allowed within PG&E easements except for perpendicular crossings which must include a 16 foot wide gate for vehicular access. Gates will be secured with PG&E corporation locks.

10. Landscaping: Landscaping must be designed to allow PG&E to access the pipeline for maintenance and not interfere with pipeline coatings or other cathodic protection systems. No trees, shrubs, brush, vines, and other vegetation may be planted within the easement area.

Only those plants, ground covers, grasses, flowers, and low-growing plants that grow unsupported to a maximum of four feet (4’) in height at maturity may be planted within the easement area.
076 147
PG&E Gas and Electric Facilities Page 4

11. Cathodic Protection: PG&E pipelines are protected from corrosion with an “Impressed Current” cathodic protection system. Any proposed facilities, such as metal conduit, pipes, service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection system must be reviewed and approved by PG&E Corrosion Engineering.

12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas transmission pipelines in order to ensure public awareness of the presence of the pipelines.

With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign that is in direct conflict with proposed developments may be temporarily relocated to accommodate construction work. The pipeline marker must be moved back once construction is complete.

13. PG&E is also the provider of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs which may endanger the safe operation of its facilities.
077 148
PG&E Gas and Electric Facilities Page 5
Attachment 2 – Electric Facilities
It is PG&E’s policy to permit certain uses on a case by case basis within its electric transmission fee strip(s) and/or easement(s) provided such uses and manner in which they are exercised, will not interfere with PG&E’s rights or endanger its facilities. Some examples/restrictions are as follows:

1. Buildings and Other Structures: No buildings or other structures including the foot print and eave of any buildings, swimming pools, wells or similar structures will be permitted within fee strip(s) and/or easement(s) areas. PG&E’s transmission easement shall be designated on subdivision/parcel maps as “RESTRICTED USE AREA – NO BUILDING.”

2. Grading: Cuts, trenches or excavations may not be made within 25 feet of our towers.

Developers must submit grading plans and site development plans (including geotechnical reports if applicable), signed and dated, for PG&E’s review. PG&E engineers must review grade changes in the vicinity of our towers. No fills will be allowed which would impair ground-toconductor clearances. Towers shall not be left on mounds without adequate road access to base of tower or structure.

3. Fences: Walls, fences, and other structures must be installed at locations that do not affect the safe operation of PG&’s facilities. Heavy equipment access to our facilities must be maintained at all times. Metal fences are to be grounded to PG&E specifications. No wall, fence or other like structure is to be installed within 10 feet of tower footings and unrestricted access must be maintained from a tower structure to the nearest street. Walls, fences and other structures proposed along or within the fee strip(s) and/or easement(s) will require PG&E review; submit plans to PG&E Centralized Review Team for review and comment.

4. Landscaping: Vegetation may be allowed; subject to review of plans. On overhead electric transmission fee strip(s) and/or easement(s), trees and shrubs are limited to those varieties that do not exceed 15 feet in height at maturity. PG&E must have access to its facilities at all times, including access by heavy equipment. No planting is to occur within the footprint of the tower legs. Greenbelts are encouraged.

5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibited within PG&E’s fee strip(s) and/or easement(s) for electric transmission lines.

6. Automobile Parking: Short term parking of movable passenger vehicles and light trucks (pickups, vans, etc.) is allowed. The lighting within these parking areas will need to be reviewed by PG&E; approval will be on a case by case basis. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet.

Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings are not allowed.

7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or combustibles and no fueling of vehicles within PG&E’s easement. No trash bins or incinerators are allowed.
078 149
PG&E Gas and Electric Facilities Page 6

8. Streets and Roads: Access to facilities must be maintained at all times. Street lights may be allowed in the fee strip(s) and/or easement(s) but in all cases must be reviewed by PG&E for proper clearance. Roads and utilities should cross the transmission easement as nearly at right angles as possible. Road intersections will not be allowed within the transmission easement.

9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are not allowed. Construction plans must be submitted to PG&E for review and approval prior to the commencement of any construction.

10. Signs: Signs are not allowed except in rare cases subject to individual review by PG&E.

11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications.

12. Construction Activity: Since construction activity will take place near PG&E’s overhead electric lines, please be advised it is the contractor’s responsibility to be aware of, and observe the minimum clearances for both workers and equipment operating near high voltage electric lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial Safety (https://www.dir.ca.gov/Title8/sb5g2.html), as well as any other safety regulations.

Contractors shall comply with California Public Utilities Commission General Order 95 (http://www.cpuc.ca.gov/gos/GO95/go_95_startup_page.html) and all other safety rules. No construction may occur within 25 feet of PG&E’s towers. All excavation activities may only commence after 811 protocols has been followed.

Contractor shall ensure the protection of PG&E’s towers and poles from vehicular damage by (installing protective barriers) Plans for protection barriers must be approved by PG&E prior to construction.

13. PG&E is also the owner of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable operation of its facilities.
079 150
Subject: FW: EXTERNAL: EIR on Traffic for Oak Creek Park - Mixed Use Development From: Mike Hemmert <[email protected]>
Sent: Tuesday, September 7, 2021 2:06 PM
To: Bradley, Paula <[email protected]>
Subject: EXTERNAL: EIR on Traffic for Oak Creek Park ‐ Mixed Use Development Paula,
I would like to make sure that the EIR on Traffic impact for this project includes the impact of residents traveling to rt 17. If there is not sufficient room for a vehicle to enter onto Mt. Hermon and get to the left lane to do a U-turn at the SV Drive intersection, then vehicles may turn right onto SV Drive and then drive to Quien Sabe/Oak Creek Blvd residential neighberhood. As you know this neighberhood has young children on bikes and many walkers. This problem was compeletely missed in the EIRs for the new developments behind the Shell station and the upcoming adjacent development (stating that vehicles would do U-turns on SV Drive is not realistic given the bend in the road).

If however an EIR states that vehicles will predominently drive through the commercial parking lot and use the light at Glen Canyon then all is well.

Thank you,
- Mike Hemmert
080 151
City of Scotts Valley Oak Creek Park Final EIR
Response to Comments on the Draft EIR | Page 2-2
5/31/22

2.2 Response to Comments

2.2.1 Response to Comment Letter #1: State of California, Department of Transportation, Caltrans District 5
1-1: Comment noted regarding Caltrans support of transportation demand management strategies to further reduce vehicle miles traveled (VMT).

2.2.2 Response to Comment Letter #2: State of California, Department of Fish and Wildlife 2-1: Comment noted. As summarized in the Biological Resources section of the Draft EIR and described more fully in Appendix C-b Biotic Report by Biological Resources Group, a plant survey was conducted in 2018 (March, April and May) and again in 2019 (May). Both of those survey years were negative for special status plant species. Also both 2018 and 2019 were average rainfall years, so these were good survey years for adequate plant expression.

Because these surveys are almost three years old, Mitigation Measure BIO 1.1 Focused Plant Surveys requires the project applicant to have a qualified biologist conduct a spring season plant survey, with a focus on the coastal prairie and the bottom of the detention basin. This survey must be completed at least one year prior to issuance to grading permits, and/or any clearing, grading, or excavation work on the project site.

These previous surveys, and the additional required survey are considered prudent and acceptable per CA Department of Fish & Wildlife protocols (email from Kathy Lyons, Biotic Resources Group, to Bill Wiseman, Kimley-Horn & Associates, 12/15/21). As such, there is no change in significance and no revisions to the Draft EIR are necessary. 2-2: Comment noted. The proposed project will avoid large diameter tree removal to the extent feasible. Additionally, it is noted that the landscape plans call for a tree replacement ratio of 3:1, for a total of 21 replacement trees. In total, the landscape plan calls for the planting of 136 trees throughout the project site.
2-3: Regarding Figure 3-11: Stormwater Control Plan, there is no legend in the plans. The different colors only represent different stormwater management areas and are not colorcoded to a particular meaning. There is a detailed table associated with the figure that identifies (for each area) total area, previous and impervious areas, and stormwater runoff coefficients and flow factors. This information is further described in the Stormwater Control Plan (C2G/Civil Consultant Group, July 2019).

Regarding the Draft EIR reference to Figure 7-2: Landscape Plan, this has been corrected to read Figure 3-8: Landscape Plan.

2.2.3 Response to Comment Letter #3: Pacific Gas and Electric 3-1: Comment noted regarding construction-related activities associated with PG&E-owned gas and electric facilities.
081 152
City of Scotts Valley Oak Creek Park Final EIR
Response to Comments on the Draft EIR | Page 2-3
5/31/22

2.2.4 Response to Comment Letter #4: Mark Hemmert
4-1: Comment noted regarding traffic to Highway 17 and potential impacts on neighborhood streets. As shown in Figure 15-1: Study Intersection & Trip Distribution, traffic existing from the project site would exit directly onto Mount Hermon Road and would not use residential streets.

Most vehicles going to Highway 17 would travel east of Mount Hermon Road. 082 153
City of Scotts Valley Oak Creek Park Final EIR
Changes to the Draft EIR | Page 3-1
5/31/22
3 Changes to the Draft EIR
Changes to the Draft EIR are shown on the following pages in the order that they appear in the EIR. New text is shown in underline, and removed text is shown in strikethrough. These text changes do not constitute substantial new information and do not result in significant new impacts or the increase in severity of impacts already disclosed. 083 154
City of Scotts Valley Oak Creek Park
Biological Resources | Page 7‐15
Draft EIR
12/16/21
The project would result in the removal of trees, including a large group of acacia trees, six Coast live oaks, and one Ponderosa pine. In addition, six immature ash trees and four sycamore trees growing behind the existing sidewalk may also require removal because these trees may be in conflict with the sidewalk and landscaping proposed for the development. All six Coast live oaks and one Ponderosa pine on the project site are proposed to be removed are protected. The group of acacia trees to be removed are not protected by Scotts Valley ordinances. Table 7 2: Tree Inventory lists the trees included in the survey area and those proposed for removal.

Table 7-2: Tree Inventory
Species
Trees Identified in Arborist
Report
Trees Proposed for
Removal
Ash 6 6
Sycamore 4 4
Coast Live Oak 6 6
Group of Acacia At least 200 At least 200
Ponderosa Pine 1 1
Source: Maureen Hamb, 2018
The loss of trees regulated by the City’s Tree Protection Regulations would require a Tree Removal Permit from the City processed concurrently with the other requested entitlements.

Pursuant to the Tree Protection Regulations, the Tree Removal Permit, inclusive of Planning Commission approval for removal of Heritage Trees, if required, would be obtained and submitted to Scotts Valley Building Department prior to approval of Improvement Plans, issuance of grading permits, and/or any clearing, grading, or excavation work on the project site.

Per the City’s Tree Protection Regulations, the applicant would be required to provide for the planting of two trees for each “protected” tree removed (2:1 ratio). Because the project would remove seven protected trees, a minimum of 14 trees would be required to be replanted. As shown in Figure 7‐23‐8: Landscape Plan, the project would replace the protected trees at a 3:1 ratio for a total of 21 trees, or seven tree more than required the City’s Tree Protection Regulations. In total, 136 trees will be planted, as shown in Figure 7‐23‐8: Landscape Plan.

Because the project would exceed the tree replacement requirements as defined in the City’s Tree Protection Regulations per Section 17.44.080 of the City of Scotts Valley Zoning Ordinance, impacts from tree removal would be less than significant.

Tree and vegetation removal may also affect nesting birds. The Biotic Report concluded that nesting birds (protected by the MBTA) may occur within the project site (Biotic Resources Group, 2017). Removal of trees or understory vegetation has the potential to harm nesting 084 155
Figure 3-13: ExisƟng and Proposed Zoning DesignaƟon
Oak Creek Park
DraŌ EIR
Project Site
Existing Zoning Classiöcation Proposed Zoning Classiöcation Legend
085 156
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-1
5/31/22
4 Mitigation Monitoring and Reporting Program

4.1 Public Resources Code
When approving projects with Environmental Impact Reports (EIRs) that identify significant impacts, the California Environmental Quality Act (CEQA) requires public agencies to adopt monitoring and reporting programs or conditions of project approval to mitigate or avoid the identified significant effects (Public Resources Code Section 21081.6(a)(1)). A public agency adopting measures to mitigate or avoid the significant impacts of a proposed project is required to ensure that the measures are fully enforceable, through permit conditions, agreements, or other means (Public Resources Code Section 21081.6(b)). The mitigation measures required by a public agency to reduce or avoid significant project impacts not incorporated into the design or program for the project, may be made conditions of project approval as set forth in a Mitigation Monitoring and Reporting Program (MMRP). The program must be designed to ensure project compliance with mitigation measures during project implementation.

The MMRP includes the mitigation measures identified in the EIR required to address only the significant impacts associated with the project being approved. The required mitigation measures are summarized in this program; the full text of the impact analysis and mitigation measures is presented in the DEIR.

The MMRP is organized in a table format (see Table 4-1: Mitigation Monitoring and Reporting Program for the Oak Creek Park Project, keyed to each significant impact and each EIR mitigation measure. Only mitigation measures adopted to address significant impacts are included in this program, based upon whether the measure applies to the hotel development, residential development, or both developments. Each mitigation measure is set out in full, followed by a tabular summary of monitoring requirements. The column headings in the tables are defined as follows:
 Mitigation Measures: This column presents the mitigation measure identified in the EIR.  Monitoring/Reporting Responsibility: This column contains an assignment of responsibility for the monitoring and reporting tasks.
 Monitoring and Reporting Requirement: This column refers the outcome from implementing the mitigation measure.
 City Staff/Notes: This column will be used by the lead agency to document the person who verified the implementation of the mitigation measure and the date on which this verification occurred.

4.2 Enforcement
If the project is approved, the MMRP for each development would be incorporated as a condition of such approval. Therefore, all mitigation measures for significant impacts must be carried out to fulfill the requirements of approval. A number of the mitigation measures would 086 157
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-2
5/31/22
be implemented during the course of the development review process. These measures would be checked on plans, in reports, and in the field prior to construction. Most of the remaining mitigation measures would be implemented during the construction, or project implementation phase.
087 158
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-3
5/31/22
Table 4-1: Mitigation Monitoring and Reporting Program for the Oak Creek Park Project Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done

AIR QUALITY
Impact AQ-2: Future
construction activities
would generate dust and
exhaust emissions of
criteria pollutants and
toxic air contaminants.

MM AQ-2.1 Reduce Fugitive Dust
The applicant for future residential development shall
implement the following measures to minimize
nuisance impacts and to significantly reduce fugitive
dust emissions, and the applicant shall require all of
the following measures to be shown on grading and
building plans:
 Limit grading to 8.1 acres per day, and
grading and excavation to 2.2 acres per day.
 Water graded/excavated areas and active
unpaved roadways, unpaved staging areas,
and unpaved parking areas at least twice
daily or apply non-toxic chemical soil
stabilization materials per manufacturer’s
recommendations. Frequency should be
based on the type of operations, soil and
wind exposure.
 Prohibit all grading activities during periods
of high wind (more than 15 mph).
 Apply chemical soil stabilizers on inactive
construction areas (disturbed lands within
construction projects that are unused for at
least four consecutive days).

Planning
Department
Contractor
Review and approve
construction
specifications prior to
issuance of building
permit.

Include in construction
specifications and
implement during
construction.

Review during site
inspections.
088 159
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-4
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
 All disturbed soil areas not subject to
revegetation shall be stabilized using
approved chemical soil binders, jute netting,
or gravel for temporary roads and any other
methods approved in advance by MBARD.
 Exposed ground areas that are planned to be
reworked for durations longer than 1 month
after initial grading shall be sown with a fast
germinating, non-invasive grass seed and
watered until vegetation is established.
 Plant vegetative ground cover in disturbed
areas as soon as possible.
 Use street sweepers, water trucks, or
sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the
project site. Reclaimed (non-potable) water
should be used whenever possible;
 Spray dirt stock pile areas daily as needed.
 Place gravel on all roadways and driveways as
soon as possible after grading. In addition,
construct building pads as soon as possible
after grading unless seeding, soil binders, or
frequent water application are used.
 Vehicle speed for all construction vehicles
shall not exceed 15 mph on any unpaved
surface at the construction site.
089 160
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-5
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
 All trucks hauling dirt, sand, soil, or other
loose materials shall be covered or shall
maintain at least 2 feet of freeboard
(minimum vertical distance between top of
load and top of trailer) in accordance with
California Vehicle Code Section 23114.
 Unpaved road travel shall be limited to the
extent possible, for example, by limiting the
travel to and from unpaved areas, by
coordinating movement between work areas
rather than to central staging areas, and by
busing workers where feasible.
 Install wheel washers where vehicles enter
and exit unpaved roads onto streets, or wash
off trucks and equipment leaving the project
site, and inspect vehicle tires to ensure they
are free of soil prior to carry-out to paved
roadways.
 Sweep streets at the end of each day, or as
needed, if visible soil material is carried onto
adjacent paved roads. Water sweepers with
reclaimed water shall be used where feasible.

BIOLOGICAL RESOURCES
Impact BIO-1: Cause a
direct or indirect adverse
effect on special-status
invertebrate species.

MM BIO-1.1 Focused Plant Surveys
At least one year prior to issuance to grading permits, and/or any clearing, grading, or excavation work on
the project site, the project applicant shall have a
Planning
Department
Review documentation
from relevant
Responsible Agency(s).
090 161
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-6
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
qualified biologist conduct a spring season plant
survey, with a focus on the coastal prairie and the
bottom of the detention basin. The survey shall
ascertain whether the site supports any special status
plant species. The survey findings shall be subject to
review by the City of Scotts Valley. If no special status species are found, no additional actions are required.

If special status species are found on site, the
applicant shall confer with regulating agencies (i.e.,
City, CDFW, and/or USFWS) on measures to avoid,
minimize, or compensate for the impact. A mitigation
plan shall be prepared and implemented that
provides preservation, salvage, or presents other
compensation for the impact, such that impacts are
reduced to a less than significant level.

CA Dept of Fish
and Wildlife
Qualified
biologist
Demonstrate mitigation
compliance.

Impact BIO-3: Cause a
direct or indirect adverse
effect on nesting bird
sites.

MM BIO-2.1 Avoid Nesting Birds
The applicant shall schedule tree removal to occur
between September 1 and March 1 of any given year,
which is outside the bird nesting season for Central
California Coast to avoid impacting nesting birds, if
present. Because this tree grove is adjacent to very
busy roadways, it would be difficult to detect nesting
birds by listening for their vocalizations; the dense
acacia vegetation also makes it difficult to ascertain
visually if any small bird nests such as hummingbirds
are present. Therefore, this measure to avoid impacts
to nesting birds, is the only practical method to avoid Planning
Department
Qualified
biologist
Construction
specifications prior to
issuance of grading
permits.

Preconstruction surveys.
091 162
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-7
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
disturbance or destruction of active bird nests, if any are present.

GEOLOGY, SOILS, AND

SEISMICITY
Impact GEO-3: Be located
on a geologic unit or soil
that is unstable, or that
would become unstable
as a Result of the project,
and potentially result in
on-or off-site landslide,
lateral spreading,
subsidence, liquefaction,
or collapse.

MM GEO-3.1 Implement Geotechnical Report
Recommendations
The project applicant shall ensure that the project
incorporates appropriate geotechnical
recommendations for the seismic ground shaking,
seismic-related ground failure and liquefaction,
landslide susceptibility, erosion and erosion control,
soil stability, expansive soils, and any other
appropriate issue. Prior to building permit issuance,
the project geotechnical engineer shall review the
plans submitted for a grading/building for compliance
with the recommendation of the geotechnical report.

Once the plans comply with the recommendations,
the project geotechnical engineer shall provide a plan
review letter stating that the project design meets all of the geotechnical report recommendations.

Planning
Department
Registered
geotechnical
engineer
Review geotechnical
report and ensure
recommendations are
included in plans prior
to issuance of building
permits.

Prepare design-level
geotechnical
investigation.

NOISE
Impact N-1: Cause a
temporary or periodic
increase in ambient noise
levels during
construction that would
MM N-1 Construction Noise Reduction
To reduce the effects of construction noise, the
project applicant shall ensure that the following is
Planning
Department
Review of and approval
of construction plan
prior to issuance of
grading and building
permits.
092 163
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-8
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
substantially disturb
sensitive receptors.
included as part of all relevant construction plans for any future proposed project:

Construction Equipment. Properly maintain
construction equipment and ensure that all internal
combustion engine driven machinery with intake and
exhaust mufflers and engine shrouds (if the
equipment had such devices installed as part of its
standard equipment package) are in good condition
and appropriate for the equipment. Equipment
engine shrouds shall be closed during equipment
operation. The project applicant shall require all
contractors, as a condition of contract, to maintain
and tune-up all construction equipment to minimize
noise emissions.

Vehicle and Equipment Idling. Construction vehicles
and equipment shall not be left idling for longer than
5 minutes when not in use.

Stationary Equipment. All noise-generating
stationary equipment, such as air compressors or
portable power generators, shall be located as far as
possible from sensitive receptors. Temporary noise
barriers shall be constructed to screen stationary
noise generating equipment when located near
adjoining sensitive land uses. Temporary noise
barriers could reduce construction noise levels by 10
dBA.

Building
Department
Contractor
Prepare construction
plan, including noise
specifications; adhere to
plan provisions during
construction.
093 164
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-9
5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
Construction Route. All construction traffic to and
from the project site shall be routed via designated
truck routes where feasible. All construction-related
heavy truck traffic in residential areas shall be
prohibited where feasible.

Workers’ Radios. All noise from workers’ radios shall
be controlled to a point that they are not audible at
sensitive receptors near the construction activity.

Construction Plan. Prior to issuance of any grading
and/or building permits, the contractor shall prepare
and submit to the City of Scotts Valley Building
Department for approval a detailed construction plan
identifying the schedule for major noise-generating
construction activity.

Disturbance Coordinator. A “noise disturbance
coordinator” shall be designated by the contractor
and be responsible for responding to any local
complaints about construction noise. The noise
disturbance coordinator shall determine the cause of
the noise complaint (e.g. starting too early, bad
muffler, etc.) and shall require that reasonable
measures warranted to correct the problem be
implemented. The coordinator shall conspicuously
post a name and telephone number for the
disturbance coordinator at the construction site and
094 165
City of Scotts Valley Oak Creek Park Final EIR
Mitigation Monitoring and Reporting Program | Page 4-10 5/31/22
Category/Impact Mitigation Measures
Monitoring/
Reporting
Responsibility
Monitoring/ Reporting
Requirement
City Staff
Notes;
Initials/Date
when Done
include it in the notice sent to neighbors regarding
the construction schedule.

Transportation
Impact TR-2:

Substantially increase
hazards due to a design
feature or incompatible
use.

MM TR-2.1 Mt. Hermon Road Project Site
Access
Prior to issuance of the grading permit, the project
applicant shall submit an analysis by a qualified traffic engineer demonstrating that ingress access from Mt.

Hermon Road is designed to adequately
accommodate bus access to the existing transit stop
(even if not currently used) and provide safe access
for vehicles entering the project site from Mt.

Hermon Road.

Planning
Department
Traffic
engineer
Letter of compliance
with associated plans.
095 166
096 167
Agenda Item No. 1
September 8, 2022
City of Scotts Valley

PLANNING COMMISSION STAFF REPORT
Date: September 8, 2022
Applicant /
Property Owner: Charlie Eadie/GranumPartners
Applications: Environmental Impact ReportEIR19-004
General Plan Amendment GPA18-001
Zone Change ZC18-001
Planned Development PD18-002
Minor Land Division MLD18-003
Design Review DR18-007
Location: Intersection of Mt. Hermon Road and Glen Canyon Road/APN 022-162-76
General Plan / Zoning: Service Commercial / C-S
Environmental Status: Environmental Impact Report (EIR) was circulated for public review October 11- November 30, 2021, in accordance with the California Environmental Quality Act (CEQA)
Request: Consideration of an Environmental Impact Report, General Plan Amendment (GPA), Zone Change, Planned
Development Zoning and Planned Development Permit,
Design Review application and a Minor Land Division to
allow for the construction of a mixed use commercial and residential development on a 3.56-acre site at the
intersection of Glen Canyon and Mt. Hermon Road. Project land uses include 24,973 square feet of commercial, eight townhomes, and 44 apartments.

Staff Planner: Susie Pineda,Consulting Planner, (408) 331-7987 [email protected]

SUMMARY
The Planning Commission held a public hearing on June 9, 2022 to discuss the proposed project. A motion was made and carried, to direct the applicant to work with staff to address specific design related issues and bring the revised project back to the Planning Commission with a resolution for consideration. The items that the Planning Commission directed the applicant to address are as follows:
001 168
Lot 1:
a. Setbacks of the townhomes
b. Parking
c. Size of the units
Lot 2:
a. Reduced Parking Stall Dimensions
b. Shared Parking
c. Enhanced Parking Lot Design
d. Private open space regarding rooftop screening from neighbors e. Architectural enhancements
f. Circulation and parking
g. Trash bin location
h. Redwoods behind the buildings
i. Parking Garage Venting
As directed, a draft approval resolution has been prepared (Attachment 1). A complete discussion of the project is included in the Planning Commission Staff Report dated June 9, 2022 (Attachment 2). Also attached to this staff report are the Planning Commission meeting minutes from the June hearing (Attachment 3), the revised project plans (Attachment 4), alternative townhome plans (Attachment 5), and the applicant’s response to comments (Attachment 6).

DISCUSSION AND ANALYSIS
The proposed project is a mixed-use commercial and residential development, located at the intersection of Glen Canyon and Mt. Hermon Roads. Project land uses include 24,973 sf. of commercial (e.g. retail and office), eight townhomes, and 44 apartments.

The project proposes to subdivide the existing 155,350 sf parcel into two lots. Proposed Lot 1 is approximately 45,250 sf and would include eight townhome style apartments housed within two separate buildings (Buildings C and D). Lot 2 is approximately 110,100 sf and also includes two buildings, Building A and Building B. Building B would consist of 9,910 sf of commercial use which fronts Glen Canyon Road, and Building A includes 14,931 sf of ground floor commercial space, for a total of 24,973 sf of commercial use on Lot 2.

The proposed project includes a zone change for Lot 1 from Service Commercial (C-S) to Medium High Residential/Planned Development (R-M-6/PD). Planned Development zoning is proposed for both Lots 1 and 2.

A detailed discussion and analysis of the design related issues for this project can be found in the staff report, dated Jun 9, 2022 (Attachment 2). The zoning compliance table provided below is intended to serve as a quick reference to illustrate how the proposed project compares to the base zoning district of each respective Lot. The exceptions requested by the applicant are highlighted in bold font. 002 169
Zoning Compliance Table – Lot 1 Townhomes
R-M-6, Multiple Residential
Standard Proposed Compliance Comment
Maximum Lot
Density
5,000 sf/unit 5,656 sf/unit Yes
Minimum Lot
Area
6,000 sf 45,250 sf Yes
Minimum Lot
Width
50’ approx. 300’ Yes
Minimum Lot
Depth
100’ approx. 180’ Yes
Minimum Lot
Frontage
60’ approx. 180’ Yes
Maximum Site
Coverage
55% 60% No Exception required through
Planned Development
process
Front Setback 20’ 20’ Yes
Side Setback
(northwest
corner)
10% of lot width
6’ max
3’ No Exception required through
Planned Development
process
Side Setback
(between Bldgs.

C and D)
14’ 10’ No Min. 10’ required, plus 1’ for
each one foot of height
above which the top plate
exceeds 15’ in height
Exception required through
Planned Development
process
Rear Setback 15’ 105’ Yes
Height 35’ 41’ No Exception required through
Planned Development
process
Parking 2 spaces/unit + 1
for every 5 units
2 spaces/unit +
1 for every 5
units
Yes
Interior Garage
Dimensions
22’ x 22’ 19.5’ x 21’ No Exception required through
Planned Development
process
Private Open
Space
100 sf/unit 97 sf/unit No Exception required through
Planned Development
process
003 170
Zoning Compliance Table – Lot 2 Commercial/Mixed Use Building C-S, Service Commercial
Standard Proposed Compliance Comment
Density Range 15-20 units/acre 17.4 units/acre Yes
Minimum Lot
Area
10,000 sf 110,100 sf Yes
Minimum Lot
Width
100’ 345’ Yes
Minimum Lot
Depth
100’ 330’ Yes
Minimum Lot
Frontage
100’ 180’ Yes
Maximum
Building
Coverage
45% 40% Yes
Minimum Setbacks for Commercial Use
Front 20’ 19.5’ No Exception required through
Planned Development
process
Side * 0’ 30’ Yes
Rear ** 0’ 20’ Yes
Minimum Setbacks for Residential Use
Front 10’ from street; 20’
from front of
garage

N/A N/A
Side 10’ 30’ Yes
Rear 15’ 20’ Yes
Corner from the
street
10’ N/A N/A
Corner from
garage
20’ N/A N/A
Height 35’ 45’-4” No Exception required through
Planned Development
process
Landscaping Not less than 10%
of total area

27.5% Yes A portion of the proposed
landscaping is located
within the public right-ofway
Landscaping
within setback
adjoining a
street
Not less than 10’ 20’ Yes
Trash Disposal adequate,
screened,
accessible
Yes Yes 3 trash facilities located on
site
Parking
Residential
Component
2 spaces/unit + 1
for every 5 units
2 spaces/unit +
1 for every 5
units
Yes
004 171
Commercial
Component
1 space/250 sf of
floor area
1 space/250 sf
of floor area (16
of the required
spaces are
situated on Lot
1)
No A shared parking
agreement would be
required as a condition of
approval
Exception required through
Planned Development
process
Reduced
Parking Stall
Dimensions
9’ x 20’, or
9’ x 17’ plus a 3’
overhang
9’ x 17’ plus a 3’
overhang
Yes The ramp impacts parking
spaces 14-22 and 23-31,
approximately eighteen
parking stalls, where there
will be limited space for the
front end of the car to
overhang and the sidewalks
would feel tight
Off Street
Parking -
Landscaping
landscaped areas
within or adjacent
to the parking area
shall provide for a
minimum of one
shade tree for
every four parking
stalls.

No Exception required through
Planned Development
process
Private Open
Space
100 sf/unit Ranging from
32sf - 80sf
No Exception required through
Planned Development
process
*Side setback for interior lot: Where the lot is adjacent to any “R” district, the side yard shall be a minimum of 10’
*Side setback for corner lot: The exterior side yard of a corner lot shall be a minimum of 15’ **Rear yard: If the development abuts an R district, then the rear yard shall be a minimum of 20’ Planning Commission Direction
The following section provides a discussion of issues and concerns raised by the Planning Commission at the June 9, 2022 public hearing and the applicant’s response to those issues.

Lot 1
Setbacks of the townhomes/Size of units
As proposed, the project would require a reduced side yard setback at the northwest corner of Building D. The zoning code requires 10’, and the project proposes 3’. The Planning Commission expressed concern that the buffer between the land uses was not adequate. The Planning Commission recommended that the applicant consider 005 172
reducing the footprint of Building D, in order to meet the setback requirement, and also potentially bring the project into compliance with the site coverage requirement.

The applicant believes that the reduced side yard setback is acceptable at this location because the adjacent lot is an unbuildable steep hillside, the gas station is over 100’ feet away and the hillside is dominated by mature trees (refer to Sheet PC-1 Neighborhood Plan). The applicant has expressed concern about reducing the size of the units because they believe the 3-bedroom townhomes satisfies a need for rental housing in the “missing middle” designed for families needing more rooms.

While the applicant believes the proposal is adequate, they have provided an alternative design in response to the Planning Commission concerns (refer to Attachment 5 Alternative Townhome Plans). As shown on Sheets Sheet PC-1A, A5.0 and A5.1, one of the 3 bedroom townhomes could be replaced with a 2 bedroom option which would allow for the required 10’ side setback at the northwest corner of Building D, adjacent to the gas station.

Shared Parking
While the Townhome development on Lot 1 meets the multifamily parking requirement set forth in the zoning code, the Planning Commission believes the units would function more like single family homes and recommended that the project include a shared parking agreement that would include a provision to ensure adequate parking for the townhomes.

The applicant believes that the project, as proposed, includes adequate parking and since Lots 1 and 2 would be under one ownership, the property management could establish rules and lease terms to manage the parking. The applicant would agree to a condition of approval which would require a shared parking agreement if either lot is sold separately. Staff has concerns about how this will be enforceable as it is possible that the sale could occur without the knowledge of the City.

Staff recommends that the terms of the shared parking agreement be agreed upon between the City and the applicant prior to City Council consideration of the project.

At that time, the parties can enter into an agreement which requires the recordation of a shared parking agreement upon sale or transfer of the parcels. A project condition of approval has been added to the project that requires that the CC&R’s include a shared parking agreement to be approved by the City and executed by the property owner prior to approval of the final map. The CC&R's shall be approved by the City Attorney and recorded prior to building permit final.
006 173
Lot 2: Commercial and Mixed Use Buildings
Reduced Parking Stall Dimensions and Enhanced Parking Lot Design The zoning code requires that reduced sized parking stalls may be 17’ in length with a 3’ overhang. While the proposed project meets that requirement, the accessible slope/ramp, situated between Buildings A and B, impacts parking spaces 14-22 and 23- 31, approximately eighteen parking stalls, where there will be limited space for the front end of the car to overhang and the sidewalks would feel tight (refer to Sheet 2.0). In these locations, the sidewalks narrow to 5' which creates a less than ideal design.

Without a major redesign of the project, the Planning Commission did not identify a solution to remedy this situation but recommended that the proposed project incorporate additional landscaping and amenities in other locations in the project, such as planter boxes and enhanced pedestrian crossings, to break up the design.

The applicant responded that the parking stalls meet the city standard of 17 feet with a 3-foot overhang and, in addition, there is additional width at each of the store front entryways. (refer to Sheet A6.0). To enhance the project design, the applicant would agree to include a condition of approval that would include storefront planting and auto irrigation as appropriate, consistent with retail needs (refer to Sheet A4.1, A6.0 and L1).

Rooftop Private Open space – Building A
Building A provides private open space in the form of patios and balconies. The proposed balconies vary in size, however, about half of them are undersized and do not comply with the zoning code requirements. In addition to the small amount of private space, the proposed project also includes common open space, located on the rooftops of the second and third stories of the proposed development. The Planning Commission expressed concern that proposed balconies may be too small to be functional. In addition, the Planning Commission, as well as, adjacent neighbors expressed concern about the rooftop common areas and potential privacy issues with the adjacent properties.

Despite the representations on the plans, the applicant clarified that the common open space shown on the floor plans (refer to Sheet A3.2) is not active or shared common open space available for recreational use by the residents, but rather passive open space, which serves as a buffer between units. While this may help to alleviate potential privacy issues with neighbors, it is important to note that this also drastically changes the overall square footage of active common open space that is available to the residents of the building. The City regulations require 100 sq. ft. of open space per unit. The project proposes 32 sf - 48 sf balconies for a majority of the units and 80 sf patios for approximately 15 units adjacent to the rooftop passive open space. In addition to the balconies and patios, the mixed use building proposes an approximately 1000 sf common area terrace.
007 174
The applicant has not proposed any changes or additions to the private open space configuration. In response to concerns about privacy, the applicant explained that the rooftop area of concern is 25 feet below the roof peak, situated on the floor of the first apartment level, above the parking. The applicant is amenable to adding additional landscaping as an additional buffer (refer to Sheet A3.5, and Sheets A3.2 and A6.1).

Architectural enhancements
The Planning Commission recommended architectural enhancement on prominent elevations, as outlined below.
• Mixed Use Building A - Lot 2: The Planning Commission recommended architectural enhancement on the east and west elevations. The applicant has proposed to install a mural on the east elevation to create visual interest (refer to Sheet A3.5)
• Commercial Building B - Lot 2: The Planning Commission recommended the design include greater architectural detail on the east and west elevations to add visual interest to the highly visible elevations (refer to Sheet A4.1).The applicant did not propose any changes to the architecture of this building because they believe the heavy landscaping screens the elevations from view and provides consistency with the City’s urban forest theme.

Circulation
The Planning Commission had concerns about traffic circulation, on and off site. As designed, the project would be accessible by two unsignalized driveways. One would utilize the existing driveway along Glen Canyon Road, just east of Mt. Hermon Road, and the second would be a new driveway along Mt. Hermon Road, just north of Glen Canyon Road. The Planning Commission expressed concern that on site congestion and potential backups that could occur on Mount Hermon Road or Glen Canyon Road as a result of the development on site.

There are several factors that could contribute to the potential circulation problems.

Vehicles would drive through the parking lots to reach their destinations, while at the same time, other vehicles would be maneuvering to enter and exit parking stalls. In addition, trucks may be pulling in and out of the designated truck loading zone which could also interrupt the traffic flow.

The truck loading area is a pull out on the western side of Building A. The drive aisle itself is 20’ and the pull-out area measures 12’ wide. As proposed, trucks would pull into the loading area heading northwest and exit by backing into the 26’ drive aisle in the lower parking lot in front of Building A (Refer to Sheet A2.0). Vehicles would then exit northbound to Mt. Hermon Road.

To exacerbate the issue, there is an existing bus pull out on Mount Hermon Road, in close proximity to the proposed Mount Hermon Road driveway. As a part of the 008 175
environmental review process, the EIR identified a potential impact with regard to circulation which explains that the project may result in a safety hazard to vehicles as they decelerate to pull into the Mount Hermon Road driveway.

The EIR identified the following mitigation for this impact:

MM TR-2.1 Mt. Hermon Road Project Site Access: Prior to issuance of the grading permit, the project applicant shall submit an analysis by a qualified traffic engineer demonstrating that ingress access from Mt. Hermon Road is designed to adequately accommodate bus access to the existing transit stop (even if not currently used) and provide safe access for vehicles entering the project site from Mt. Hermon Road.

Implementation of Mitigation Measure MM TR-2.1: Mt. Hermon Road Project Site Access, would reduce the impact to a less-than-significant level.

The applicant asked their engineer to review the plan and confirmed that truck maneuvering is workable. Cars have over 20’ road width to pass a parked truck in the loading zone in either direction (refer to Sheet C2.1). Queuing space for several cars is available out of the Mt. Hermon travel lane even with a bus in the pullout area. CEQA mitigation measure will be implemented if and when any transit district potential future use of the bus pullout. The applicant believes any delays due to truck maneuvering would be short lived and not unusual for this type of urban design.

The applicant has not made any changes to the plans.

Trash bin location
The Planning Commission, as well as adjacent neighbors, expressed concern about the location, and potential impacts related to the trash enclosure located to the east of Building A (refer to Sheet A3.5 and PC-1).

The applicant has responded that the trash enclosure is located 46’ from the property line and it is separated by a wall and landscaping and there is a substantial grade differential which would also help to alleviate potential impacts to adjacent residences.

In addition, the applicant has clarified that there would be a roof over the enclosure to limit exposure and this trash bin location is one of three trash locations on site so it does not accumulate all trash produced on site.

Redwoods behind the buildings
The Planning Commission, as well as adjacent neighbors, expressed concern about how construction on site may affect the root system of the redwoods located to the north of the project site, on the adjacent parcel (refer to Sheet A3.5). 009 176
The applicant has responded that minimal grading will occur at that location (+/- 12”). In addition, the proposed new building would be constructed outside of the root zone. The applicant has not yet completed this analysis but proposes to obtain a letter from a certified arborist prior to City Council review.

Parking Garage Venting
The Planning Commission, as well as adjacent neighbors, expressed concern about exhaust fumes related to the parking garage venting and how those fumes could potentially impact the adjacent neighbors.

The applicant has responded that no mechanical venting is anticipated. The project proposes open flow (grated) garage doors and other passive ventilation and the proposed project will comply with all California Building Code requirements.

PUBLIC NOTICE
On August 26, 2022, public hearing notices were posted at City Hall and were mailed to surrounding property owners located within 300 feet of the subject property, pursuant to State law.

CONCLUSION
The Planning Department has identified three options for Planning Commission consideration:

1. If it is determined that the issues associated with the proposed project are adequately addressed the Planning Commission could recommend approval of the proposed project by adopting the attached resolution and conditions of approval.

2. If it is determined that the issues with the proposed project are not adequately addressed, the Planning Commission could modify the project through the conditions of approval and forward a resolution of approval to the City Council.

3. If it is determined that the issues with the proposed project are not adequately addressed, the Planning Commission could direct staff to prepare a resolution of denial to forward to the City Council. 010 177

ATTACHMENTS

1. Resolution (Action Item)…................................................................... (Attached)

2. Planning Commission Staff Report (06/09/22)…………………........... (Attached) a. Location Map
b. Project Plans
c. Draft Environmental Impact Report https://www.scottsvalley.org/358/OakCreek-Park Mixed-Use-Development d. Final Environmental Impact Report
e. Comment Letter (received 6/2/2022)

3. Planning Commission Minutes (06/09/22)…........................................ (Attached)

4. Project Plans.................................................................................. (Attached)

5. Alternative Townhome Plans............................................................... (Attached) a. Sheet A5.0 Townhome Floor Plans
b. Sheet A5.1 Townhome Elevations
c. Sheet PC-1A Site Plan

6. Applicant Response to Comments from 06/09/22 PC hearing............. (Attached) 011 178
ATTACHMENT 1
RESOLUTION NO. _____

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

SCOTTS VALLEY RECOMMENDING TO THE CITY COUNCIL

CERTIFICATION OF A FINAL ENVIRONMENTAL IMPACT REPORT
(EIR19-004), APPROVAL OF A GENERAL PLAN AMENDMENT GPA 18- 001), ZONE CHANGE (ZC18-001), MINOR LAND DIVISION MLD18-003, PLANNED DEVELOPMENT PERMIT (PD18-002), DESIGN REVIEW
PERMIT (DR18-007), FOR A PROJECT LOCATED AT THE
INTERSECTION OF MT. HERMON ROAD AND GLEN CANYON
ROAD/APN 022-162-76
WHEREAS, the City of Scotts Valley has received an application from Granum Partners (referred to as the “applicant”) for “Oak Creek Park” project to: 1) subdivide the existing 155,350 sf parcel into two lots to allow a mixed-use commercial and residential development which includes 24,973 sf. of commercial, eight townhomes, and 44 apartments; 2) change the existing General Plan land use designation on Lot 1 from Service Commercial to Medium High Residential; 3) change the zoning on Lot 1 from Service Commercial (C-S) to Medium High Residential (R-M-6); 4) add a zoning overlay on Lot 1 Medium High Residential/Planned Development (R-M-6/PD) and Lot 2 Service Commercial/Planned Development (C-S/PD) to allow for exceptions to the zoning regulations and to allow tailored development standards to fit the needs of the project; and 5) approve Planned Development/ Design Review Permits to evaluate the architecture and related site improvements, on the subject site, located at the intersection of Mt. Hermon Road and Glen Canyon Road/APN 022-162-76; and WHEREAS, the Applicant has presented substantial evidence which supports the application; and
WHEREAS, the application is a “Project” pursuant to the California Environmental Quality Act (“CEQA”), which requires the preparation and certification of an Environmental Impact Report in accordance with the requirements of CEQA; and WHEREAS, the City selected Kimley-Horn and Associates, an independent environmental consultant (“Consultant”) to prepare a Draft Environmental Impact Report (“Draft EIR”), paid for by the applicant; and
WHEREAS, the Consultant prepared a DEIR (State Clearinghouse # 2019110250) in accordance with the State CEQA Guidelines and requirements. The DEIR was duly noticed, published, and distributed for a 45-day public review period from October 11, 2021 to November 30, 2021 and was made available for public review at the Planning Department at City Hall; and
WHEREAS, the City’s Consultant prepared a duly noticed and published Final Environmental Impact Report (Final EIR) on June 9, 2022, that was made available at City Hall, Planning Department, the City’s website, and upon request at the Planning Department; and
012 179
WHEREAS, the Planning Commission held duly published and noticed public hearings on June 9, 2022, and September 8, 2022, to review and consider the Final EIR and the requested General Plan and Zoning changes, hear public testimony, and provide comments and recommendations to the City Council.

NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Scotts Valley (“Commission”) that the Commission hereby recommends to the City Council:

SECTION 1: That the FEIR has been completed in compliance with the requirements of CEQA and that the Planning Commission has reviewed and considered the information within the FEIR.

SECTION 2: That the FEIR represents the independent judgement and analysis of the City.

SECTION 3: That the City Council certify the Final EIR and approve the recommended mitigation contained in the Conditions of Approval attached hereto (Exhibit A) and incorporated herein by this reference based on the following findings pursuant to CEQA and the CEQA Guidelines Section 15091.

1. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Final EIR. The Final EIR meets the requirement of this finding in that mitigation has been identified that would reduce impacts to less than significant levels.

All mitigation measures in the Final EIR shall be included in any future resolutions approving the Project, made fully enforceable as future planning permit conditions of approval, and are incorporated herein in their entirety by this reference.

2. The City has prepared a program to report on and monitor changes made to the Project in order to mitigate or avoid significant effects on the environment. The Final EIR meets the requirement of this finding in that the Conditions of Approval (Exhibit A) attached hereto and incorporated herein include all of the mitigation measures and identifies the parties responsible to monitor and report/track compliance of the mitigation measures.

3. The documents and other materials constituting the record of the proceedings upon which the City’s decision and its findings will be located at the Department of Planning of the City of Scotts Valley in the custody of the Community Development Director. The Final EIR meets the requirement of this finding in that documents and other material constituting the record of the proceedings upon which the City’s decision and findings are located at the Planning Department of the City of Scotts Valley, One Civic Center Drive, Scotts Valley, CA, 95066, in the custody of the Community Development Director as part of the public record.

013 180
SECTION 4: That the City Council approve General Plan Amendment based on the following findings:

4. The change in the General Plan land use designations are consistent with the General Plan. The Project meets the requirements of this finding in that the City’s 2015 – 2023 Housing Element identified the project site as one of six “Opportunity Sites” that have zoning and development standards, infrastructure and public facilities in place to accommodate the construction of new housing. This criterion allows highdensity residential as part of a mixed-use project.

5. That the density is compatible with adjacent uses and densities. The Project meets the requirements of this finding in that the residential density will be 7.7 units per acre, which is within the allowed range of 5 to 9 units/acre in the Medium-High Residential zone and is compatible with the housing development project to the northwest of the Project site. The property is slightly more dense that the residential uses to the northwest of the Project site, but the proposed residences are more than 100 feet from those residential uses and are screened by landscaping.

SECTION 5: Approve Zone Change ZC18-001 based on the following findings:

6. The change in the zoning districts are consistent with the General Plan and the densities are compatible with adjacent uses and densities. The Project meets the requirements of this finding, because the Project will change the existing Service Commercial (C-S) zone to Medium High Residential (R-M-6). As with the General Plan Amendment, this zoning density is compatible with the housing development project to the northwest of the Project site. The property is slightly more dense the residential uses, but the proposed residences are more than 100 feet from those residential uses and are screened by landscaping.

SECTION 6: Approve the Planned Development Overlay PD18-002 as shown on the plans as submitted to the Planning Commission, based on the following findings, subject to Conditions of Approval in Exhibit A, attached hereto and incorporated herein.

7. The proposed Planned Development and Planned Development Permit is consistent with the underlying zoning designation of the City of Scotts Valley General Plan. The proposed project is consistent with the land uses prescribed in the Commercial Service and Medium High Density Residential categories of the General Plan. The project is consistent with the purpose and intent of the Commercial Service and R-M-6 land use designation, which allow residential and mixed-use development.

The proposed zoning would be R-M-6/Planned Development (R-M-6/PD) for Lot 1 and Service Commercial/Planned Development (C-S/PD) for Lot 2.

SECTION 7: Approve the Minor Land Division MLD18-003 as shown on the plans as submitted to the Planning Commission, based on the following findings, subject to Conditions of Approval in Exhibit A, attached hereto and incorporated herein. 014 181

8. That the locations of the commercial uses are in accordance with the objectives of the zoning ordinance and the purposes of the district in which the site is located. The mixed use development on Lot 2 meets the requirements of this finding in that one of the purposes of the Commercial-Service (C-S) zoning district is to provide appropriately located areas for retail stores, offices, and service establishments to meet the needs of the community. The residential development on Lot 1 meets the requirements of this finding in that it expands and improve the City’s housing supply by developing high-quality housing on a City-designated “opportunity site.” The project will provide affordable and market-rate housing consistent with the City of Scotts Valley General Plan Housing Element goals and policies.

9. That the proposed tentative map / minor land division, together with the provisions for its design and improvement, is consistent with the General Plan.

The project meets the requirements of this finding in that the design of the minor land division and its related property improvements are consistent with many goals and objectives of the General Plan, including LP-3 The City shall promote the availability of adequate sites for a variety of housing types and densities consistent with Housing Element goals and environmental constraints; LA-5 The City shall re-designate, as appropriate, non-residential land uses for residential use to meet the identified housing demand if the report of the Planning Director so justifies it; LP-28 The City shall promote availability of commercial sites to accommodate a mix of professional office, service commercial, and shopping center developments consistent with the environmental, service, and economics goals of the City; LP-33 Commercial developments shall be designed and screened in an attractive manner and thereafter maintained so as to integrate the entire development visually with the overall natural beauty of the Planning Area; LO-37 Ensure compatibility between commercial developments and surrounding land uses; and LP-45 Commercial land uses should be concentrated along the urban core of the City.

10.That the project site is physically suitable for the density of the land division.

The project meets the requirement of this finding in that the 3.6 - acre site contains sufficient spatial area for commercial building A and mixed-use building B, located on Lot 1, 8 townhouses located on Lot 2, and associated parking, landscaping, and related site improvements for the development. Public services are available, and utilities are of adequate capacity to accommodate the project.

11.That the design of the minor land division or the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. The project meets the requirements of this finding in that the EIR includes mitigation that would reduce any impact to fish, wildlife or habitat to a less than significant level.

12.That the design of the minor land division or the type of improvements is not likely to cause serious public health problems. The project meets the requirement of this finding in that the project will not generate hazardous emissions nor store hazardous/combustible materials. The Oak Creek Park EIR concluded that the project is not expected to cause serious public health problems. 015 182

13.That the design of the minor land division will not conflict with easements acquired by the public at large (for access through or use of property within the land division). The project meets the requirement of this finding in that the project will provide reciprocal access easements to adjacent parcels to integrate access from one parcel to another. The Scotts Valley Fire Protection District has reviewed the project and recommends approval subject to conditions.

SECTION 8: Approve the Planned Development Permit PD18-002 as shown on the plans as submitted to the Planning Commission, based on the following findings, subject to Conditions of Approval in Exhibit A, attached hereto and incorporated herein.

14.The planned development permit as issued furthers the policies of the General Plan). The project meets the requirements of this finding in that the project site will accommodate a mix of commercial and residential uses consistent with the housing and economic goals of the City, as called for in General Plan Land Use Element Policy LA-5 which allows the City to re-designate nonresidential land uses for residential use to meet the identified housing demand; and LA-11 which allows residential mixed-use as long as the projects that are compatible with the residential use.

15.The planned development permit, as issued, conforms in all respects to the planned development zoning of the property. The project meets the requirements of this finding in that approval of the PD Permit will allow development consistent with the planned development zoning.

16. The interrelationship between orientation, location, mass and scale of building volumes, and elevations of proposed buildings, structures and other uses onsite are appropriate, compatible, and aesthetically harmonious. The project meets the requirements of this finding in that the siting and size of the residential, mixed use and commercial buildings will be compatible within the project. Lot 1 includes eight townhome style, 3-bedroom apartments housed within two separate buildings (Buildings C and D). Lot 2 includes two buildings, Building A and Building B. Building B would consist of 9,910 sf of commercial use which fronts Glen Canyon Road, and Building A includes 14,931 sf of ground floor commercial space, for a total of 24,973 sf of commercial use on Lot 2. Surface parking and 12’ wide sidewalks would separate Buildings A and B, creating a “main street” commercial core. The residential units are located to the rear of the project site, on the third and fourth floors of Building A, above the commercial space.

17.The environmental impacts of the project have been reviewed and considered.

The project meets the requirements of this finding in that the City has prepared an EIR in accordance with CEQA. The project will not result in new or substantially more severe project or cumulative impacts in any of the environmental topics addressed in the EIR;
016 183
SECTION 9: Approve the Design Review Permit DR18-007 as shown on the plans as submitted to the Planning Commission, based on the following findings, subject to Conditions of Approval in Exhibit A, attached hereto and incorporated herein.

18.The siting of any structure on the property as compared to the siting of other structures in the immediate neighborhood is appropriate. The project meets the requirement of this finding in that the proposed townhomes on Lot 1 and commercial building (Building B) on Lot 2 are proposed to be set back a minimum of 20 feet from Mt. Hermon Road and Glen Canyon Road and includes landscaping to help soften their appearance. Building B fronts Mt. Hermon Road and is consistent in scale and height with the one-story office building to the east. The parking lot (located between Buildings A and B) will have landscaping and most of the parking spaces will be screened by buildings or will be set back from Mt. Hermon Road to minimize street views of parked cars. Building A, situated behind Building B on the project site, is proposed to be a mixed-use building with two residential levels over two levels of parking/commercial uses. To help reduce mass and height, the existing hillside would be graded so that a portion of the parking structure would be below grade.

19.The materials, colors, proportion, mass and detail of all structures shall be in good proportion, have simplicity of mass and detail and be compatible in appearance with surrounding structures. There shall be an appropriate use of materials. Colors shall be appropriate within the context of use and should blend with surrounding structures. The project meets the requirements of this finding in that the building architecture includes sloped rooflines, articulated with varied forms, patterns, and massing. Building materials would consist of painted wood, stucco, exposed concrete, stone veneer, standing seam metal roofs, and aluminum and fiberglass windows, all of which are compatible in appearance with surrounding structures.

20.Landscaping and irrigation plans shall be required on the site. Landscaping shall be in keeping with the character or design of the building. Existing trees shall be preserved wherever possible. The project meets the requirements of this finding in that the project proposes irrigated landscaping interspersed throughout the site including a variety of ground covers, vines, and medium height bushes. Planting areas surround the residential buildings and the perimeter of the site, and two bioretention swales would be located on both sides of the driveway from Mount Hermon Road. In addition, three sycamore trees growing at the perimeter of the site, near the intersection of Mount Hermon and Glen Canyon Roads would be preserved and incorporated into the landscape plan for the project. A condition of approval has been included requiring the uniform maintenance of landscaping along Mt. Hermon Road to create a pleasing entrance to the City of Scotts Valley.

21.The size, location and arrangement of on-site parking and paved areas shall be appropriate. The project meets the requirements of this finding in that the proposed project complies with the zoning code requirements and has been designed to accommodate 208 parking spaces. The townhomes on Lot 1 have in-unit garages on the first floor that provide two parking spaces per unit, for a total of 16 spaces. Building 017 184
A includes 21 commercial and 101 residential parking spaces, three of which will be handicap accessible, 58 spaces are provided in the surface lot between Buildings A and B and the 18 spaces on Lot 1 are proposed to be shared, which would necessitate a shared parking arrangement.

22.For ingress, egress and internal traffic circulation, all the above factors shall be related to the setting or established character of the neighborhood or surrounding area. The project meets the requirements of this finding in that the Oak Creek Park EIR studied ingress, egress, and internal traffic circulation. The plan reflects the City’s and Scotts Valley Fire Protection District requirements. The project will provide reciprocal access easements to adjacent properties to ensure adequate pedestrian and emergency vehicle access The existing reciprocal easement located on APN 22-162-72 and a portion of APN 22-162-68 shall remain in place. If it needs to be modified, it shall be reviewed and approved by the City prior to recordation of the final map.

NOW THEREFORE, BE IT FURTHER RESOLVED that, after careful consideration of the application and related materials, plans, maps, facts, exhibits, staff report, testimony and other evidence submitted in this matter, and incorporated herein by this reference, the Planning Commission of the City of Scotts Valley recommends City Council approve the Oak Creek Park Environmental Impact Report EIR19-004, General Plan Amendment GPA18-001, Zone Change ZC18-001, Planned Development Permit PD18-002, Minor Land Division MLD18-003, and Design Review Permit DR18-007, for the “Oak Creek Park” project subject to the conditions of approval, for a 3.6 acre site to: 1) subdivide the existing 155,350 sf parcel into two lots to allow a mixed-use commercial and residential development which includes 24,973 sf. of commercial, eight townhomes, and 44 apartments; 2) change the existing General Plan land use designation on Lot 1 from Service Commercial to Medium High Residential; 3) change the zoning on Lot 1 from Service Commercial (C-S) to Medium High Residential (R-M-6); 4) add a zoning overlay on Lot 1 Medium High Residential/Planned Development (R-M-6/PD) and Lot 2 Service Commercial/Planned Development (C-S/PD) to allow for exceptions to the zoning regulations and to allow tailored development standards to fit the needs of the project; and 5) approve Planned Development/ Design Review Permits to evaluate the architecture and related site improvements, on the subject site, located at the intersection of Mt. Hermon Road and Glen Canyon Road/APN 022-162-76 subject to the Conditions of Approval (Exhibit A) which are attached hereto and incorporated herein by this reference.
018 185
THE ABOVE AND FOREGOING RESOLUTION was duly and regularly passed by the Planning Commission of the City of Scotts Valley at a meeting held on the 8th day of September 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

Approved: _______________________________
Lori Gentile
Planning Commission Chair
Attest: ________________________________
Taylor Bateman
Community Development Director
019 186

EXHIBIT A

STANDARD

1. Developer has agreed to and shall defend, indemnify and hold harmless the City of Scotts Valley, its officers, agents and employees from any claim, action or proceeding against the City or its officers, agents or employees to attach, set aside, void or annul any action of the City in connection with approvals under the California Environmental Quality Act or with respect to approval of the project. The City shall promptly notify the developer of any such claim, action or proceeding and shall fully cooperate in defense.

2. After City Council approval, the property owner shall sign the Conditions of Approval (Exhibit A) agreeing to the Conditions of Approval prior to the issuance of any building permits, transfer of title, or within 30 days of approval of this application, whichever occurs first.

3. After City Council approval, the property owner shall have a signed and notarized copy of the Notice of Conditions of Approval recognizing this application (provided by the City), recorded at the County Recorder’s Office prior to issuance of any building permits or operation of the use.

4. All required building permits shall be obtained and the applicant shall pay all appropriate fees prior to commencement of any construction on the property.

PLANNING DEPARTMENT
Design

5. The color, materials, size, location, and design of the improvements shall match the approved plans. Modifications to the approved project may require approval by the Planning Commission at the discretion of the Community Development Director.

6. All mechanical equipment shall be screened from public view.

7. The outdoor storage of material is prohibited.

Landscaping

8. Landscape irrigation shall connect to the recycled water distribution system as prescribed by the Scotts Valley Water District.

9. The landscaping improvements shall be permanently maintained and irrigated. The landscaping along Mt. Hermon Road on Lots 1 and 2 shall be uniformly landscaped and maintained. Such requirement shall be included in the project CC&Rs. 020 187

10. Landscaping Requirement. Applicant shall provide irrigated planters on the sidewalk in front of the tenant spaces on the south side of Mixed Use Building A and the north side of Commercial Building B.

11. Applicant shall provide a revised landscape plan to the Community Development Director for review and approval showing the exact location of the joint trench prior to obtaining building permits. If the location of the joint trench results in loss of landscaping, the applicant shall be required to take measures to improve the landscaping subject to the approval of the Community Development Director.

12. Applicant shall enter into a landscaping maintenance agreement with the City of Scotts Valley for the landscaping in the public right of way adjacent to Mount Hermon Road and Glen Canyon Road, prior to the issuance of building permits.

Signs

13. Signage shall be consistent with the sign program included in the plan set titled “Oak Creek Park,” dated October 2016, revised June 1, 2020.

14. Sign lighting shall be positioned to minimize light leakage beyond the sign perimeter and to minimize ambient light pollution. The light source shall not be directly visible.

Lighting

15. The lighting plan shall be reviewed and approved by the Community Development Director prior to issuance of building permit.

16. All exterior lighting shall be the minimum necessary for security and all lighting shall be down shining with the light source not directly visible from adjacent properties.

Where deemed necessary by the Community Development Director light cutoffs/shields shall be installed.

17. Parking lot lighting shall utilize technology to minimize light spill when the parking lot is not in use.

Trees

18. Prior to obtaining building permits, applicant shall submit a report to the Planning Director, written by a certified arborist, addressing potential construction impacts to the redwoods located to the north of the project site and implement all recommendations included in the report.

19. All recommendations in the Tree Resource Evaluation prepared by Maureen Hamb Consulting Services dated July 2018, are incorporated as conditions of project approval.
021 188

20. The three sycamore trees growing at the perimeter of the site, near the intersection of Mount Hermon and Glen Canyon Roads shall be preserved and incorporated into the landscape plan for the project.

21. Tree removal shall not occur until a grading or building permit has been issued for the project.

22. The final grading plans and improvement plans shall be reviewed and approved by the project Arborist prior to any grading and if deemed necessary additional tree preservation measures shall be applied to the project.

23. The project arborist shall place a monetary value on trees preserved on development sites and a surety bond in an amount equal to the value of the preserved trees shall be deposited with the city prior to issuance of a grading/building permit for the project. If damage occurs to the preserved trees during development and/or construction, funds will be drawn from the deposited amount. Funds remaining in the account will be returned to the applicant upon final inspection of the project.

24. During the pre-construction phase of development the project arborist shall inspect tree protection fencing and the completion of pre-construction treatments. This inspection shall be completed prior to the issuance of any grading or building permits.

25. The project arborist shall routinely inspect the development site through the term of the project.

26. Upon completion of construction activities, the project arborist shall submit written documentation stating that all recommended tree preservation measures have been completed prior to Building Permit final for the project.

27. The cost of the project arborist review and implementation of conditions, site inspection and related work shall be borne by the applicant.

CC&R’s

28. CC&R's for the on-going management and maintenance of the site shall be approved by the City and executed by the property owner prior to approval of the final map. The CC&R's shall be approved by the City Attorney and recorded prior to building permit final. The property owner shall pay for all recording costs. The CC&Rs shall include provisions for the following:
a. Uniform standards for maintenance and upkeep of exterior buildings and grounds.
b. Utility maintenance provisions addressing commonly owned infrastructure 022 189
including, but not limited to, landscaping water lines and bioretention facilities.
c. An enforcement mechanism for the City in case of failure to maintain the ongoing maintenance and management of the parcels. d. Maintenance of the drainage improvements, landscaping, including the landscaping located in the public right-of-way along Mt. Hermon Road. e. Shared parking for Lots 1 and 2.
f. The emergency vehicle access gate shall be reviewed and approved by the City and other emergency responders, as necessary, prior to issuance of building permits. If required, the gate shall be modified to meet emergency services requirements.

Grading

29. All recommendations in the “Updated Geotechnical Investigation for the Oak Creek Par Project,” prepared by Haro, Kasunich and Associates, Inc., dated January 2018, are incorporated as conditions of project approval. The limits of grading shall be clearly marked on the site prior to the issuance of a grading or building permit.

Archaeology

30. If potential historical or unique archaeological resources are discovered during construction, suspend all work in the immediate vicinity (within approximately 50 feet) and avoid altering the materials and their context pending site investigation by a qualified archaeological or cultural resources consultant retained by the project applicant. Construction work shall not commence again until the archaeological or cultural resources consultant has been given an opportunity to examine the findings, assess their significance, and offer proposals for any additional exploratory measures deemed necessary for the further evaluation of, and/or mitigation of adverse impacts to, any potential historical resources or unique archaeological resources that have been encountered.

31. If the find is determined to be an historical or unique archaeological resource, and if avoidance of the resource would not be feasible, the archaeological or cultural resources consultant shall prepare a plan for the methodical excavation of those portions of the site that would be adversely affected. The plan shall be designed to result in the extraction of sufficient volumes of non-redundant archaeological data to address important regional research considerations. The work shall be performed by the archaeological or cultural resources consultant, and shall result in detailed technical reports. Such reports shall be deposited with the California Historical Resources Regional Information Center. Construction in the vicinity of the find shall be accomplished in accordance with current professional standards and shall not recommence until this work is completed.
023 190

32. The project applicant shall assure that project personnel are informed that collecting significant historical or unique archaeological resources discovered during development of the project is prohibited by law. Prehistoric or Native American resources can include chert or obsidian flakes, projectile points, mortars, and pestles; and dark friable soil containing shell and bone dietary debris, heat-affected rock, or human burials. Historic resources can include nails, bottles, or other items often found in refuse deposits.

33. If human remains are discovered, there shall be no further excavation or disturbance of the discovery site or any nearby area reasonably suspected to overlie adjacent human remains until the project applicant has complied with the provisions of State CEQA Guidelines Section 15064.5(e). In general, these provisions require that the County Coroner shall be notified immediately. If the remains are found to be Native American, the County Coroner shall notify the Native American Heritage Commission within 24 hours. The most likely descendant of the deceased Native American shall be notified by the Commission and given the chance to make recommendations for the remains. If the Commission is unable to identify the most likely descendent, or if no recommendations are made within 24 hours, remains may be reinterred with appropriate dignity elsewhere on the property in a location not subject to further subsurface disturbance. If recommendations are made and not accepted, the Native American Heritage Commission will mediate the problem.

Air Quality

34. Reduce Fugitive Dust
To reduce fugitive dust emissions, and the applicant shall require the following measures to be included as part of construction grading and building plans:
a. Limit grading to 8.1 acres per day, and grading and excavation to 2.2 acres per day. b. Water graded/excavated areas and active unpaved roadways, unpaved staging areas, and unpaved parking areas at least twice daily or apply non‐toxic chemical soil stabilization materials per manufacturer’s recommendations. Frequency should be based on the type of operations, soil and wind exposure. c. Prohibit all grading activities during periods of high wind (more than 15 mph). d. Apply chemical soil stabilizers on inactive construction areas (disturbed lands within construction projects that are unused for at least four consecutive days). e. All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or gravel for temporary roads and any other methods approved in advance by MBARD.
024 191
f. Exposed ground areas that are planned to be reworked for durations longer than 1 month after initial grading shall be sown with a fast germinating, non‐invasive grass seed and watered until vegetation is established.
g. Plant vegetative ground cover in disturbed areas as soon as possible. h. Use street sweepers, water trucks, or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the project site. Reclaimed (non‐potable) water should be used whenever possible;
i. Spray dirt stock pile areas daily as needed.
j. Place gravel on all roadways and driveways as soon as possible after grading. In addition, construct building pads as soon as possible after grading unless seeding, soil binders, or frequent water application are used.
k. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site.
l. All trucks hauling dirt, sand, soil, or other loose materials shall be covered or shall maintain at least 2 feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with California Vehicle Code Section 23114. m. Unpaved road travel shall be limited to the extent possible, for example, by limiting the travel to and from unpaved areas, by coordinating movement between work areas rather than to central staging areas, and by busing workers where feasible. n. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the project site, and inspect vehicle tires to ensure they are free of soil prior to carry‐out to paved roadways. o. Sweep streets at the end of each day, or as needed, if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible.

Biological Resources

35.Focused Plant Surveys
Within one year prior to issuance of grading permits, and/or any clearing, grading, or excavation work on the project site, the project applicant shall have a qualified biologist conduct a spring season plant survey, with a focus on the coastal prairie and the bottom of the detention basin. The survey shall ascertain whether the site supports any special status plant species. The survey findings shall be subject to review by the City of Scotts Valley. If no special status species are found, no additional actions are required. If special status species are found on site, the applicant shall confer with regulating agencies (i.e., City, CDFW, and/or USFWS) on measures to avoid, minimize, or compensate for the impact. A mitigation plan shall be prepared and implemented that outlines provides preservation, salvage, or 025 192
presents other compensation for the impact, such that impacts are reduced to a less than significant level.

36. Avoid Nesting Birds
The applicant shall schedule tree removal to occur between September 1 and March 1 of any given year, which is outside the bird nesting season for Central California Coast to avoid impacting nesting birds, if present. Because this tree grove is adjacent to very busy roadways, it would be difficult to detect nesting birds by listening for their vocalizations; the dense acacia vegetation also makes it difficult to ascertain visually if any small bird nests such as hummingbirds are present. Therefore, this measure to avoid impacts to nesting birds, is the only practical method to avoid disturbance or destruction of active bird nests, if any are present.

Geology and Soils

37. Implement geotechnical report recommendations.

The project applicant shall ensure that the project incorporates appropriate geotechnical recommendations for the seismic ground shaking, seismic-related ground failure and liquefaction, landslide susceptibility, erosion and erosion control, soil stability, expansive soils, and any other appropriate issue. Prior to building permit issuance, the project geotechnical engineer shall review the plans submitted for a grading/building for compliance with the recommendation of the geotechnical report. Once the plans comply with the recommendations, the project geotechnical engineer shall provide a plan review letter stating that the project design meets all of the geotechnical report recommendations.

Noise and Vibration

38. Construction Noise Reduction
To reduce the effects of construction noise, the project applicant shall ensure that the following notes are included as part of all relevant grading and building construction plans:

Construction Equipment. Properly maintain construction equipment and ensure that all internal combustion engine driven machinery with intake and exhaust mufflers and engine shrouds (if the equipment had such devices installed as part of its standard equipment package) that are in good condition and appropriate for the equipment. Equipment engine shrouds shall be closed during equipment operation.

The project applicant shall require all contractors, as a condition of contract, to maintain and tune-up all construction equipment to minimize noise emissions.

Vehicle and Equipment Idling. Construction vehicles and equipment shall not be left idling for longer than 5 minutes when not in use.
026 193
Stationary Equipment. All noise-generating stationary equipment, such as air compressors or portable power generators, shall be located as far as possible from sensitive receptors. Temporary noise barriers shall be constructed to screen stationary noise generating equipment when located near adjoining sensitive land uses. Temporary noise barriers could reduce construction noise levels by 10 dBA.

Construction Route. All construction traffic to and from the project site shall be routed via designated truck routes where feasible. All construction-related heavy truck traffic in residential areas shall be prohibited where feasible.

Workers’ Radios. All noise from workers’ radios shall be controlled to a point that they are not audible at sensitive receptors near the construction activity.

Construction Plan. Prior to issuance of any grading and/or building permits, the contractor shall prepare and submit to the City of Scotts Valley Building Department for approval a detailed construction plan identifying the schedule for major noisegenerating construction activity.

Disturbance Coordinator. A “noise disturbance coordinator” shall be designated by the contractor and be responsible for responding to any local complaints about construction noise. The noise disturbance coordinator shall determine the cause of the noise complaint (e.g. starting too early, bad muffler, etc.) and shall require that reasonable measures warranted to correct the problem be implemented. The coordinator shall conspicuously post a name and telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule.

Transportation

39. Mt. Hermon Road Project Site Access
Prior to issuance of the grading permit, the project applicant shall submit an analysis by a qualified traffic engineer demonstrating that ingress access from Mt.

Hermon Road is designed to adequately accommodate bus access to the existing transit stop (even if not currently used) and provide safe access for vehicles entering the project site from Mt. Hermon Road.

40. Applicant shall comply with all VMT requirements as discussed in EIR.

Affordable Housing

41. The developer shall comply with Title 14 of the City’s Municipal Code and all applicable City of Scotts Valley Affordable Housing Policies and Procedures for the implementation of Affordable Housing.

42. The developer shall enter into an Affordable Housing Agreement with the City of Scotts Valley prior to Final Map recordation.
027 194
Construction Phasing

43. Prior to the issuance of a Certificate of Occupancy for any of the units on Lot 1, the following improvements to Building A and the commercial component of Building B shall be permitted, completed and approved by the City’s Building Official and all applicable fees shall be paid : full standard interior wall finishes, heating & air ventilation systems, water service meter connections, and sewer connections. In addition, all applicable fees shall be paid. Before any grading or building permit issuance for either Lot 1 or Lot 2, the developer shall prepare a draft phasing plan agreement of the proposed construction phasing of the commercial component of the project, for review and approval by the City which memorializes this requirement. The purpose of the agreement is to provide “turn-key” commercial buildings.

Building Department

44. The developer shall obtain any required grading and/or building permit(s) and pay applicable fees.

45. Winter grading shall require prior review and approval by the City.

46. The developer shall pay all applicable City development impact fees before grading and/or building permit issuance.

47. The developer shall pay school impact fees to the Scotts Valley Unified School District before building permit issuance.

48. All trades of electrical, plumbing and mechanical will be issued under one building permit for said project (General Contractor permittee). All subcontractors shall provide their contractor’s license number and their workers compensation insurance information to the Building Department.

49. Applicant shall remove all references to “apartments” on the electrical sheets in the plan set and revise to read “townhomes” prior to City Council consideration.

50. All buildings shall be designed to comply with the current California Building Code, California Mechanical Code, California Electrical Code, California Plumbing Code, California Energy Code and California Green Building Code, in effect at the time of building permit application.

51. The building permit plans must comply with the current California Plumbing and Green Building Code for water-conserving fixtures and fittings and with the CA Energy Commission Building Energy Efficiency Standards, which includes energysaving fixtures and appliances to be used throughout the building. 028 195

52. All structures shall comply with the most current California Energy Commission Standards (California Energy Code).

53. All new construction shall comply with the California Green Building Code and the City’s current Green Building Guidelines, which require various low-impactdevelopment and resource efficient techniques, to the satisfaction of the CDD.

54. Structural calculations shall be submitted and wet-signed by the Engineer of record.

55. A Special Inspection form shall be submitted and the names of Special Inspectors with certifications as required shall be provided.

56. A soils report by a qualified geologic engineer shall be submitted with the application for any building permits. The developer shall submit a plan review letter from the project Geotechnical Engineer confirming that the construction documents comply with the project geotechnical engineer’s recommendations.

57. The developer shall comply with the City’s standard erosion control measures. The plans submitted for a building permit must include best management practices (e.g. erosion control practices and procedures) during construction, which include complying with Regional Air Quality Control Board emissions for construction equipment.

58. Site drainage erosion control and foundation plans must be reviewed and approved by the soils engineer of record.

59. To ensure that City requirements are met, the developer shall specify to the Building Official the off-site disposal location of any exported soil material at a preconstruction meeting or before grading permit issuance. If the disposal site is located outside the City, the site shall be a legal facility such as a licensed landfill or permitted fill site.

60. Developer shall submit a plan showing temporary (during construction) and permanent erosion control measures will need to be submitted to the Regional Water Quality Control Board (RWQCB), the agency that administers NPDES, and the City Building Department for review and approval.

61. A completed City of Scotts Valley Construction and Waste Management Plan form shall be submitted with the Building permit application.

62. The project shall comply with all California Building Code Accessibility requirements and show the required features as they apply to this project.

63. If grading in the rainy season (October 15th to April 15th) is necessary, approvals from the Building Department shall be obtained.
029 196

64. The location of all soil to be exported shall be reviewed and approved by the Building Official prior to issuance of a grading or building permit.

City Public Works Department

65. A final subdivision or parcel map in conformance with the California Government Code, Section 66410 et seq, and with the City Subdivision Ordinance, and including the conditions of the tentative subdivision map, shall be filed to the satisfaction of the Public Works Director/City Engineer.

66. All required documents, final or parcel map sheets, covenants, developer and city improvement agreements and bonds, shall be provided to the satisfaction of the Public Works Director/City Engineer prior to the recordation of any final map or application for any building permit. (Applicant should be advised that officials of Santa Cruz County, such as the Auditor-Controller, Recorder and Clerk of the Board have requirements, such as payment of taxes and present title guarantee, which precede recordation of the map.)

67. Engineered Improvement Plans shall be submitted for all on-site and off-site work and will be approved by the Public Works Director/City Engineer. On-site and offsite (encroachment) civil engineering permits must be issued by the City prior to commencing any work. Improvement Plans shall include any necessary grading, drainage, masonry retaining walls, driveway, utilities, utility pole relocation, frontage improvement and/or repair of sidewalk, curb and gutter or similar facilities required satisfying tentative map conditions to the satisfaction of the Public Works Director/City Engineer. All improvements shall conform to the design standards contained in text and illustration in the "City of Scotts Valley Standard Details", latest revision adopted by the City Council.

68. Applicant shall construct street improvements for the full parcel frontage in accordance with the City of Scotts Valley Standard Details, latest revision, adopted by the City Council.

69. Engineered improvement plans for all work, signed and prepared under the direction of a registered civil engineer, shall be approved by the Public Works Director/City Engineer prior to commencing work.

70. All work in the public right-of-way will require an encroachment permit application made to the satisfaction of the Public Works Director/City Engineer. The civil onsite work, as plan reviewed by the Public Works Department, will require an onsite civil engineering permit and inspection.

71. All public improvements shall be guaranteed by written Agreement with the city, Faithful Performance Bond, and Labor and Material men's Bond, to the satisfaction of the Public Works Director/City Engineer.

72. All signing and striping shall be approved and completed as required by the Public 030 197
Works Department, and shall be in conformance with current editions of Transportation and Traffic Engineering Handbook, by the Institute of Transportation Engineers, and the State Department of Transportation "Standard Specifications".

73. The project shall connect to the sanitary sewer system and existing septic systems, if any, shall be properly abandoned. Grease interceptors to be added to the system pursuant to the requirements of City of Scotts Valley Municipal Code 13.04.055.

74. Applicant shall comply with SVMC Chapter 16.35 – Dedication of land for Park and Recreation Purposes.

75. Applicant shall pay the cost to accomplish the utility design and construction to underground the telephone, electric power, and television cables in each project contained easement, private or public road frontage. This under grounding of utilities to remove utility poles comes in addition to the state required under grounding of transmission for the project and any new service connections.

76. The final map shall be submitted to the City's Public Works Department on an AutoCAD drawing version 2018 LT or earlier electronic version and .pdf prior to recording.

77. Applicant shall submit electric files for all civil plans (.dwg and .pdf) for review and As-Builts (.dwg and .pdf) when project is completed.

78. Applicant shall submit a completed "segregation of assessment" form for each assessment district in which the subdivision participates.

79. Prior to the filing of the final/parcel map, applicant shall contact the Santa Cruz County Assessor's Office or the Local Agency Formation Commission (LAFCO) to ensure that the subdivided property is within a single tax code.

80. Pursuant to City Council action on March 3, 2010, the Applicant shall conduct a Traffic Impact Study to address the Mount Hermon Road/Scotts Valley Drive and Mount Hermon Road /La Madrona Drive intersections to determine the additional peak hour trips through the intersections.  Specifically AM and PM peak hour trips for Mount Hermon Road /Scotts Valley Drive and PM only peak hour trips for Mount Hermon Road /La Madrona Drive.  The study will also determine if the additional trips will degrade the Level of Service (LOS) of the intersections. The findings of the study will determine the amount owed for the Mount Hermon Road traffic mitigations fair share contribution. The Applicant shall conclude this study and pay any associated fees prior to tentative map approval

81. The applicant shall repair any damage caused to the City streets [or the private roadway] by applicant or its contractors, consultants, and/or employees prior to issuance of a certificate of occupancy. A videotape log, DVD format, clearly showing the existing condition of the applicable street to the project site shall be 031 198
presented to the Department of Public Works prior to the start of construction.

Applicant is advised that, absent clear video evidence to the contrary, road damage must be repaired to the satisfaction of the City prior to issuance of a certificate of occupancy. Damage assessment will be at the sole discretion of the City.

82. Full frontage of Glen Canyon Road and NW lanes of Mount Hermon Road that front the project need full slurry and striping prior to permit sign off, including all bike lanes fronting project need to be updated to latest bike lane and symbols will be thermal plastic treatments approved by DPW.

83. Prior to issuance of building permit, provide letter from City’s hauler, Greenwaste, approving site design and serviceability. 831.768-9505. Project shall be design in compliance with SB1383 requiring collection of 3 waste streams for all customer types. Garbage, Recycle and Compost/Food Waste. Ensure adequate space for cart service (residential) and trash enclosure space (commercial/multi-family.) Stormwater Management Plan:

84. Applicant shall construct storm drain facilities in conformance with data and analysis in the adopted City of Scotts Valley Storm Drain Master Plan, December 1989 and in accordance with the city’s SWMP Ordinance No. 184.1.

85. A registered civil engineer shall provide storm (hydrologic and hydraulic) calculations for appropriate storm drain facilities to control on-site drainage and mitigate off-site impacts. The design shall follow the criteria contained in the City of Scotts Valley Standard Details and the data and analysis contained in the latest adopted City of Scotts Valley Storm Drainage Master Plan.

86. Development shall not increase the rate of flow (cubic feet per second) or velocity (feet per second) of site run-off water to any off-site drainage areas beyond the measured or calculated pre-project rate and velocity. Impervious area must be shown on coversheet.

See the Stormwater Technical Guide on the Scotts Valley City website for requirements and formatting under Public Works
Dedication of land for Park and Recreational Purposes:

87. Applicant shall comply with SVMC Chapter 16.35 – Dedication of land for Park and Recreation Purposes.

88. Applicant shall pay the cost to accomplish the utility design and construction to underground the telephone, electric power, and television cables in each project contained easement, private or public road frontage. This under grounding of utilities to remove utility poles comes in addition to the state required under grounding of transmission for the project and any new service connections. 032 199

89. The final map shall be submitted to the City's Public Works Department on an AutoCAD drawing version 2018 LT or earlier electronic version prior to recording.

90. Applicant shall submit electric files for all civil plans for review and As-Builts when project is completed.

91. Applicant shall submit a completed "segregation of assessment" form for each assessment district in which the subdivision participates.

92. Prior to the filing of the final/parcel map, applicant shall contact the Santa Cruz County Assessor's Office or the Local Agency Formation Commission (LAFCO) to ensure that the subdivided property is within a single tax code.

93. Pursuant to City Council action on March 3, 2010, the Applicant shall modify the Traffic Impact Study to address the Mount Hermon Road/Scotts Valley Drive and Mount Hermon Road /La Madrona Drive intersections to determine the additional peak hour trips through the intersections. Specifically AM and PM peak hour trips for Mount Hermon Road /Scotts Valley Drive and PM only peak hour trips for Mount Hermon Road /La Madrona Drive. The study will also determine if the additional trips will degrade the Level of Service (LOS) of the intersections. The findings of the study will determine the amount owed for the Mount Hermon Road traffic mitigations fair share contribution. The Applicant shall conclude this study and pay any associated fees at the time of tentative map submittal.

94. The applicant shall repair any damage caused to the City streets [or the private roadway] by applicant or its contractors, consultants, and/or employees prior to issuance of a certificate of occupancy. A videotape log, DVD format, clearly showing the existing condition of [the applicable street] to the project site shall be presented to the Department of Public Works prior to the start of construction.

Applicant is advised that, absent clear video evidence to the contrary, road damage must be repaired to the satisfaction of the City prior to issuance of a certificate of occupancy. Damage assessment will be at the sole discretion of the City.

95. Full frontage of Glen Canyon Road and NW lanes of Mount Hermon Road that front the project need full slurry and striping prior to permit sign off, including all bike lanes fronting project need to be updated to latest bike lane and symbols will be thermal plastic treatments approved by DPW.

96. Prior to issuance of building permit, provide letter from City’s hauler, Greenwaste, approving site design and serviceability. 831.768-9505. Project shall be design in compliance with SB1383 requiring collection of 3 waste streams for all customer types. Garbage, Recycle and Compost/Food Waste. Ensure adequate space for cart service (residential) and trash enclosure space (commercial/multi-family). 033 200
Scotts Valley Fire Protection District

97. All structures shall be protected by a fire sprinkler system. Systems shall be appropriately designed in accordance with Chapter 9 of the California Fire Code and the National Fire Protection Association (NFPA) Standards. The standard will be dependent upon which building is to be protected.

98. All structures shall be protected by an automatic manual fire alarm system designed and installed in accordance with Chapter 9 of the California Fire Code and NFPA

72. 99. All residential units shall also have low frequency audible devices installed for annunciation of any general alarm.
100. Each commercial suite shall have at minimum 1 (one) manual pull station installed. 101. All residential units designated as ADA Compliant shall also have audio/visual notification for occupants upon annunciation of an y general alarm. 102. Buildings obtaining commercial suites may also be subject to the installation of an Emergency Responder Radio Coverage system in accordance with section 510 of the California Fire Code This requirement will be dependent on type(s) of construction.

Scotts Valley Water District (SVWD)
103. The Scotts Valley Water District shall review a detailed landscape irrigation plan prior to the issuance of a building permit from the City of Scotts Valley. 034 201
Agenda Item No. 2
June 9, 2022
City of Scotts Valley

PLANNING COMMISSION

STAFF REPORT
Date: June 9, 2022
Applicant /
Property Owner: Charlie Eadie/Granum Partners
Applications: Environmental Impact Report EIR19-004
General Plan Amendment GPA18-001
Zone Change ZC18-001
Planned Development PD18-002
Minor Land Division MLD18-003
Design Review DR18-007
Location: Intersection of Mt. Hermon Road and Glen Canyon Road/APN 022-162-76
General Plan / Zoning: Service Commercial / C-S
Environmental Status: Environmental Impact Report (EIR) was circulated for public review October 11- November 30, 2021, in accordance with the California Environmental Quality Act (CEQA)
Request: Consideration of an Environmental Impact Report, General Plan Amendment (GPA), Zone Change, Planned
Development Zoning and Planned Development Permit,
Design Review application and a Minor Land Division to
allow for the construction of a mixed use commercial and residential development on a 3.56-acre site at the
intersection of Glen Canyon and Mt. Hermon Road.

Project land uses include 24,973 square feet of
commercial, eight townhomes, and 44 apartments.

Staff Planner: Susie Pineda, Consulting Planner, (408) 331-7987 [email protected]

STAFF RECOMMENDATION
Staff recommends that the Planning Commission hold a public hearing and provide comment and direction on the proposed project.
035 001 202

BACKGROUND
The project site (APN: 022-162-76) is located at the northeast intersection of Glen Canyon Road and Mt. Hermon Road (Attachment 1 - Location Map).

The project site was previously approved for a three-lot subdivision to build three commercial buildings in 1991, however, the project was never constructed. In 1997, the City approved the Oak Creek Park Business Center to create three lots and build three commercial buildings (two 2-story buildings and one 1-story building). The one-story building was built at 3600 Glen Canyon Road. The approved two 2-story buildings (approx. 48,000 square feet) were not built.

In 2008, the Planning Commission recommended to the City Council for approval the Oak Creek Mixed-Use Planned Development project for two one-story commercial buildings (24,500 sf.) and a three-story, 10-unit townhouse building. However, due to a potential legal challenge, the public hearing was continued to a date uncertain and the City Council did not consider the proposed development.

PROJECT DESCRIPTION
The subject site is an approximately 3.6-acre, vacant lot, located at the intersection of Mt. Hermon and Glen Canyon Roads (see Location Map, attached). The site slopes upward to the northeast to the rear yards of single-family homes on Lucia Lane. The site is currently vacant and supports annual grassland, a small patch of coastal prairie, coast live oak tree groves, a poison oak thicket, and non-native tree groves. An overhead electrical transmission line extends generally east to west over the southern portion of the site and includes a steel monopole adjacent to Mt. Hermon Road.

The project fronts on Mt. Hermon Road which is one of the busiest commercial corridors in Santa Cruz County. Across Mt. Hermon Road are commercial uses comprised of small businesses, such as a coffee shop, restaurant, yoga studio, salon, gas station and laboratory equipment suppliers. North of the project site are 19 residential residences known as The Terrace Planned Development. Northeast of the site are single-family residences. Southeast of the project site is a one-story commercial building.

The project is a mixed-use commercial and residential development. Project land uses include 24,973 sf. of commercial (e.g. retail and office), eight townhomes, and 44 apartments.

The project proposes to subdivide the existing 155,350 sf parcel into two lots. Proposed Lot 1 is approximately 45,250 sf and would include eight townhome style, 3-bedroom apartments housed within two separate buildings (Buildings C and D). The proposed density is 7.7 units per acre, which conforms to the City’s density standard of 6-9 units per acre for the R-M-6 Medium High Density residential zoning district. Façade treatments for both buildings include a sloped standing seam metal roof, painted 036 002 203
gutters, wood balcony railings, painted shingle siding, painted fiberglass windows and doors and painted stucco chimneys.

Lot 2 is approximately 110,100 sf and also includes two buildings, Building A and Building B. Building B would consist of 9,910 sf of commercial use which fronts Glen Canyon Road, and Building A includes 14,931 sf of ground floor commercial space, for a total of 24,973 sf of commercial use on Lot 2. Surface parking and 12’ wide sidewalks would separate Buildings A and B, creating a “main street” commercial core. The residential units are located to the rear of the project site, on the third and fourth floors of Building A, above the commercial space. The proposed residential uses include a mix of apartments (4 studios, 18 one bedroom, and 22 two bedrooms) for a total of 44 units located on two levels. The studio and one bedroom apartments range in size from 712 sf- 906 sf, and the two- and three- bedroom units range in size from 1,184 sf to 2,172 sf.

Façade treatments for both Buildings A and B include painted wood and sheet metal parapet, painted stucco siding, aluminum storefront windows and doors and a sloped standing seam metal roof.

Pursuant to the Scotts Valley Municipal Code the project is required to designate 15% of the housing units as affordable. Of the proposed 52 units, the project is required to provide seven affordable units and pay in-lieu fees of 0.80 of a unit. The income-levels of the units requires review and recommendation by the City Council affordable Housing Subcommittee. Before City Council review, the applicant will submit proposed incomelevels for review by the City Council Affordable Housing Subcommittee for recommendation to the City Council.

The following objectives have been identified by the project applicant for the project:

1. Provide a balanced mix of residential and commercial uses that integrate into the existing urban setting and provide a safe and attractive environment for living and working.

2. Create a high-quality mixed-use development that is visually and aesthetically compatible with adjacent land uses.

3. Expand and improve the City’s housing supply by developing high-quality housing on a City-designated “opportunity site.”

4. Provide affordable and market-rate housing consistent with the City of Scotts Valley General Plan Housing Element goals and policies.

5. Provide a mix of residential and commercial uses that achieves a financially feasible project.

6. Provide commercial uses that provide net financial benefits to the City of Scotts Valley.

7. Provide a project that balances housing with job-creating uses.

8. Develop a project that supports the success of the commercial uses through careful site planning and infrastructure design.

9. Develop vacant and underutilized land in an urban area.

10. Locate commercial and residential uses where such uses can take advantage of existing infrastructure and utilities.
037 003 204

11. Provide and improve pedestrian connections within the project and across adjacent arterial streets to facilitate pedestrian activity between neighborhoods and within the development.

PROPOSED ENTITLEMENTS
The project requires the following planning permits:

1. Environmental Impact Report Certification – to address environmental impacts per the California Environmental Quality Act (CEQA)

2. General Plan Amendment – to change the existing land use designation on Lot 1 from Service Commercial to Medium High Residential

3. Zone Change – to change the zoning on Lot 1 from Service Commercial (C-S) to Medium High Residential (R-M-6)

4. Planned Development Zoning – to add a zoning overlay on Lot 1 Medium High Residential/Planned Development (R-M-6/PD) and Lot 2 Service Commercial /Planned Development (C-S/PD) to allow for exceptions to the zoning regulations and to allow tailored development standards to fit the needs of the project

5. Minor Land Division – to create two lots

6. Planned Development permit / Design Review – to evaluate the architecture and related site improvements
The following sections provides a discussion of the relevant planning, entitlement and environmental issues associated with the proposed project.

General Plan
General Plan Amendment
The project site is designated as Service Commercial under the City of Scotts Valley General Plan. As defined in the City’s General Plan, the Service Commercial designation is intended for commercial and service-related land uses. Land uses permitted under the Service Commercial designation allow retail stores and shops, food and motel/hotel establishments, services such as printing shops and electrical repair shops, heating and ventilating shops. Very high density mixed use residential uses at a density range of 15.1 to 20 units/acre are also permitted, providing adjacent uses are compatible and the residential is secondary to the retail use.

The proposed project includes a General Plan Amendment to re-designate Lot 1 from Service Commercial to Medium High Residential which allows for a density range of 5 to 9 units per acre. Lot 1 is approximately 45,250 sf, resulting in a maximum allowable 038 004 205
density of nine dwelling units per acre. Eight townhomes are proposed for Lot 1 and the resulting density would be 7.7 DU/acre.

Lot 2 would remain Service Commercial and be 110,100 sf. in area and be comprised of 24,973 net sf. of commercial and 55,055 sf. of residential. The residential density would be 17.4 DU/acre. The total average density on the entire project site would be 15.1 dwelling units per acre.

When considering a General Plan Amendment, the City must find that the project is in the public interest.

General Plan Consistency
Per the General Plan, Service Commercial land use requirements allow mixed use residential provided that adjacent uses are compatible and the residential use is secondary to the retail use. As proposed the development plan for Lot 1 is not consistent with this requirement as shown on the following table.

As illustrated in the table above, the residential land use comprises nearly 70% of the land use, which is not consistent with the General Plan. The purpose of the secondary requirement is to ensure that the commercial function of the property is retained.

In the City of Scotts Valley, floor area ratio is calculated as the total horizontal area, in square feet, on each floor within the exterior walls of a structure, but not including the area of inner courts, shaft enclosures or exterior walls. This was confirmed by the Planning Commission at an appeal hearing in December 2017. At that time, the Commission affirmed that commercial uses should be the primary use and that this method is an important way for the City to implement, promote, and protect the availability of its commercial zones, as called for in General Plan Land Use Element Policy LP-28. This is even more important due to the location of the project on one of the busiest commercial corridors in Santa Cruz County.

On Sheet A1.1 of the plan set, the applicant shows several calculations for mixeduse ratios based not only on this method, but also a variety of alternate calculations that create substantial confusion about the actual percentages. For clarity purposes, the Planning Department requested that the alternate calculations be removed from the plans and be in included as a separate attachment, but the applicant did not comply. Projects proposed in Scotts Valley are required to comply Mixed Use Ratio Consistent with Zoning Code
Total Square Footage Lot 2 = 80,028 sf
Use Square Footage Ratio
Commercial 24,973 sf 24,973 sf/80,028 sf = 31.2%
Residential 55,055 sf 55,055 sf/80,028 sf = 68.8%
039 005 206
with City requirements and the only Mixed-Use Ratio calculation that is consistent with these requirements is Alternative 2, labelled ‘Mixed Use Ratio (Based on Area By Function)’ as summarized in the table above.

In response to conversations with the Planning Department about the secondary requirement, the applicant felt that the project as proposed was preferred based on the following reasoning:

If the site did not include housing, or included fewer units, all parking would be located in surface lots because commercial development alone would not support the cost of a parking structure. In that case, the amount of commercial space would be nearly identical (25,000 square feet) but the housing opportunity would be almost entirely lost. The housing does not compromise the commercial opportunity, in fact, it provides a base of residents to support the commercial uses on the site.

Despite the applicant’s preferences, the City’s General Plan and Zoning Code are clear about the parameters under which residential uses can be located within the Service Commercial areas in order to preserve the commercial base of the City.

General Plan Housing Element
While reviewing the project the Planning Department identified an additional way to process the application that would not require adherence to the secondary requirement. This method would be at the discretion of the Planning Commission and City Council.

In the City’s 2015 – 2023 Housing Element, the subject site is identified as one of six Opportunity Sites that have zoning and development standards, infrastructure, and public facilities in place to accommodate the construction of new housing. These criteria allow high-density residential as part of a mixed-use project and this site was estimated to accommodate 10 units, two low income affordable units and eight market units.

The Planning Commission and City Council could interpret the Opportunity Site designation as an indicator that additional residential area would be an acceptable method of implementing the goals and objectives of the General Plan provided development standards, infrastructure and public facilities can accommodate the development. The Opportunity Site designation would allow for greater flexibility regarding the commercial/residential area ratio and could also be an opportunity to require additional affordable units. A decision to interpret the General Plan in this way would be unique to this property, as other properties with this designation in the Housing Element have already been developed.

By interpreting the “Opportunity Site” designation in this way the Planning Commission and City Council could allow the residential area of the site to exceed the secondary requirement and still be in compliance with the General Plan. 040 006 207
General Plan Circulation Element
The Scotts Valley General Plan Transportation Element Action CA-149 has established a threshold of LOS D for Mt. Hermon Road / Scotts Valley Drive and Granite Greek Road / Scotts Valley Drive. All other signalized intersections are required to maintain a LOS of C or better, per CA-150.

As stated in the City of Scotts Valley Guide for the Preparation of Traffic Impact Studies (2003), the City of Scotts Valley considers intersections with LOS C or better under “Existing Conditions” to be operating at an acceptable level. For intersections operating at LOS C or better under “Cumulative Conditions,” a project would cause a deficiency if it would result in intersection operations of LOS D. This criteria is applied to signalized intersections within the City’s jurisdiction, as well as Caltrans intersections.

The proposed project is expected to generate 1,678 net new daily trips, with 206 net new trips (130 in and 76 out) occurring during the AM peak hour and 126 net new trips (60 in and 66 out) occurring during the PM peak hour. Please see the “Transportation” section of the Draft Environmental Impact Report for a complete discussion of traffic related elements of the project (https://www.scottsvalley.org/358/Oak-Creek-Park---Mixed-UseDevelopment).

The Traffic Impact Study for the project identified several impacts associated with the project. Below is a summary of the issues and how they could be addressed. The Planning Commission and City Council will need to make a determination that the project is in the public interest and that the benefits outweigh the identified traffic impacts.

Mt. Hermon Road / Scotts Valley Drive (Existing + Project Conditions) The Traffic Impact Study concluded that all intersections operate at acceptable levels of service under the “Existing + Project Conditions” during the weekday AM and PM peak hours with the exception of the Mt. Hermon Road / Scotts Valley Drive intersection. It Would degrade from acceptable LOS D to and unacceptable LOS E during the AM Peak. The addition of project traffic to the intersection to Scotts Valley Drive / Mt.

Hermon Road would result in an average delay from 54.7 to 56.7 seconds (a two second increase).

Given the fact that the existing right-of-way is fully utilized, future constructed improvements at this intersection are limited without acquiring additional land and making major modifications to the infrastructure, which would be prohibitively expensive. Payment by the applicant of their fair-share traffic impact mitigation fee and other City improvements would help fund other improvements such as traffic signal controllers, which would improve the LOS. Implementation of the recommended signal timing devices from Mt. Hermon Road/Lockewood Lane west to the Mt. Hermon Road / La Madrona Drive / SR 17 Southbound off-ramp intersection would improve operations 041 007 208
to LOS D or better in AM and PM peak hours at the intersection of Mt. Hermon Road / Scotts Valley Drive.

Mt. Hermon Road / La Madrona Road / SR 17 Southbound Off-Ramp - Cumulative + Project Conditions:

The Traffic Impact Study concluded that all study intersections operate at acceptable levels of service under the Cumulative + Project Conditions during the weekday AM and PM peak hours except for:

Mt. Hermon Road / Scotts Valley Drive (Intersection #2) • Would continue to operate at LOS E during AM Peak
Mt. Hermon Road/ La Madrona Drive-Hwy 17 SB Ramps (Intersection #4) • Would continue to operate at LOS D during AM Peak
• Would continue to operate at LOS D during PM Peak
Mt. Hermon Road / Project Driveway (Intersection #7)
• Would operate at LOS D during AM Peak
The addition of project traffic to the intersection to Mt. Hermon Road / La Madrona Road / SR 17 Southbound Off-Ramp would cause slight increases in delay (less than 5 seconds) during the AM and PM peak hours. Improvements to signal timing would improve the condition from LOS D to C during the AM peak hour. However, the LOS would remain at LOS D during the PM peak hour due to ramp delays, which is not consistent with Caltrans which endeavors to maintain a target LOS at signalized intersections at the transition between C and D.

The Scotts Valley Town Center Specific Plan EIR identified a second westbound rightturn lane on the SR 17 off-ramp as mitigation for deficient operations at Mt. Hermon Road / La Madrona Road / Hwy 17 Ramps (Mitigation Measure T-1). However, as noted in the Draft EIR, even with this improvement, the intersection would continue to operate at LOS D, which is not sufficient to meet Caltrans LOS C/D standard.

Because no further feasible mitigation could be identified to avoid the future cumulative delays, the Scotts Valley Town Center Specific Plan EIR determined that this impact would remain significant and unavoidable.

The intersection of Mt. Hermon Road / Project Driveway is expected to operate at LOS D during the PM peak hour; however, this intersection does not satisfy signal warrant and is located to close to the Mt. Hermon Road / Glen Canyon Road intersection, and therefore no improvement is recommended.

The Planning Commission and City Council would need to determine that the proposed improvements are feasible, that the project is in the public interest and that the benefits outweigh the identified traffic impacts.

Zone Change and Planned Development Zoning
042 008 209
The proposed project includes a zone change for Lot 1 from Service Commercial (C-S) to Medium High Residential/Planned Development (R-M-6/PD). The R-M-6 classification is intended to provide areas for single-family subdivisions and multi-family developments.

Planned Development zoning is proposed for both Lots 1 and 2. According to the General Plan, the purpose of Planned Development Zoning is to provide the means to tailor zoning regulations and to apply specific standards for the development of a particular site. This process enables the City Council to consider the unique characteristics of a site and its surroundings to better implement the citywide objectives, goals and policies of the General Plan and to provide site-specific development standards. Anytime Planned Development zoning is utilized, the standards established for the zoning district, which reflects the General Plan designation are tailored as part of a planned development. Tailored zoning regulations include, but are not limited to, lot size and shape, intensity, coverage and appearance of structures.

As proposed the project requires various exceptions from the R-M-6 and C-S Zoning district regulations. The requested exceptions and analysis are discussed in various sections below.

Minor Land Division
The project includes the subdivision of the existing 155,350 square foot parcel into two lots. Proposed Lot 1 is approximately 45,250 sf and would include eight townhome style (Buildings C and D).

Proposed Lot 2 is approximately 110,100 sf and also includes two buildings, Building A and Building B. Building B would consist of 9,910 sf of commercial use which fronts Glen Canyon Road, and 14,931 sf of ground floor commercial space within Building A, for a total of 24,841 sf of commercial use on Lot 2.

As designed the project requires shared amenities like access roads and parking between the commercial and residential portions of the project. Since the project spans two lots, it is possible that they could be sold separately. The only way to ensure that the shared amenities are managed and maintained in perpetuity is through a legal agreement. Such an arrangement would need to be reviewed and approved by the City, ideally in conjunction with these project entitlements. The applicant has not provided a proposal for this aspect of the project.

Planned Development Permit/Design Review
The project is required to obtain both Planned Development Permit and Design Review approvals. The development regulations in the zoning code provide the framework for evaluating the proposed project. The following development standards, as defined in the zoning code, apply to the project:
043 009 210
Lot 1 - Multiple Residential Zoning District Regulations (R-M-6) Land Use Designation R-M-6
Primary Uses Multi- and single- family dwellings
Front setback 20’
Side setback 10% lot width, max of 6’
Rear setback 15’
Building Height Max = 35’
Building coverage Max = 55%
Parking 2 spaces per unit, plus one additional space for every five units
Lot 2 – Service Commercial Zoning District Regulations (C-S) Land Use Designation C-S
Primary Uses Retail, business, personal service establishments, medical, professional and general business offices
Front setback 20’
Side setback 0’
Rear setback 20’ when abutting a Residential district
Building Height Max = 35’
Building coverage Max = 45%
Parking 1 space per 250 sf of floor area
The existing C-S zoning district designation allows very high-density mixed use residential uses at a density range of 15.1 to 20 units/acre, provided adjacent uses are compatible, the multiple family dwellings are located either above the ground level commercial use or at ground level at the rear of a commercial space.

Additionally, the Mount Hermon Road Design Guidelines and Commercial and Industrial Design Guidelines are applied by the City through the design review process. The design review process includes project review by City Staff, Planning Commission, and City Council. This review serves as a basis for evaluating proposals for quality of design. The City’s review process is designed to encourage the highest level of design quality, while at the same time provide the flexibility necessary to encourage creativity on the part of the project designers. The overall objective is to ensure that the intent and spirit of the guidelines are followed.

The project site is located in an existing urban setting along Mount Hermon Road and serves as a gateway that breaks up a long commercial corridor. With thoughtful and intentional design, development on this parcel can serve as an important gateway to the City’s commercial core area, which invites shoppers, protects the natural and manmade features which distinguish Scotts Valley and accentuates the urban forest theme.

With this goal in mind, the following sections of the staff report include a discussion of 044 010 211
the proposed exceptions, as well as several design issues that the Planning Department identified during the design review process and the applicant chose not to incorporate for a variety of reasons.

The applicant’s rationale is included as a part of the discussion. The Planning Department is requesting Planning Commission input and direction on the following exceptions and design issues.

Site Design
Existing development along Mt. Hermon Road is generally set back from the street frontage and includes a variety of one- and two-story commercial buildings, surface parking lots, vacant lots and landscaping. Further north on Mt. Hermon Road (past Scotts Valley Drive), the built form is more developed with paved parking lots and onestory commercial buildings, typical of a suburban streetscape.

The proposed townhomes on Lot 1 and commercial building (Building B) on Lot 2 are proposed to be set back a minimum of 20 feet from Mt. Hermon Road and Glen Canyon Road and includes landscaping to help soften their appearance. Building B fronts Mt.

Hermon Road and is consistent in scale and height with the one-story office building to the east. The parking lot (located between Buildings A and B) will have landscaping and most of the parking spaces will be screened by buildings or will be set back from Mt.

Hermon Road to minimize street views of parked cars.

Building A, situated behind Building B on the project site, is proposed to be a mixed-use building with two residential levels over two levels of parking/commercial uses. To help reduce mass and height, the existing hillside would be graded so that a portion of the parking structure would be below grade. The building architecture includes sloped rooflines, articulated with varied forms, patterns, and massing. Building materials would consist of painted wood, stucco, exposed concrete, stone veneer, standing seam metal roofs, and aluminum and fiberglass windows.

The proposed project would require a number of exceptions which will be discussed in further detail below. As a general rule, if an exception is proposed, the result should be a superior project. The Planning Department requests Planning Commission input and direction on the following site design issues:

Location of Townhomes –Lot 1: The proposed multi-family dwellings may not be appropriate fronting a busy commercial corridor, and, in addition, if the multi-family dwellings are moved away from Mt. Hermon Road, it may negatively impact the residents on Lucia.

The applicant believes that the placement of the townhouses on Lot 1 is a superior design because it works with the site topography. In contrast, the previous proposal required several retaining walls and extensive grading which consequently reduced landscaping opportunities.
045 011 212
While the current design does work with the site topography, the Planning Department believes the larger issue is whether or not residential use is appropriate at this site at all.

Planning Staff has concerns about the residential interface with the existing gas station, the high traffic volumes on Mount Hermon Road, the busy intersection at Mount Hermon Road and Scotts Valley Drive, and the additional traffic that would be generated by the proposed mixed-use portion of the project. Mount Hermon Road is one of the busiest commercial corridors in Santa Cruz County. Residential use situated this close to these land uses will create a loud and busy living experience for the residents.

If the residential uses are setback on the project site, the project could impact residents on Lucia Lane. During the design review process, Planning Staff requested that the applicant provide photo simulations to help assess the impacts (Refer to Sheet A1.3).

While they are helpful, it is important to note that they do not accurately represent the impacts to 107 Lucia Lane, which is situated much closer to the rear property line of the proposed development (please refer to the building footprints shown on Sheet C0.1, specifically APN 022-162-64,
The Planning Department believes that the site is better suited for commercial use because the residential use is incompatible with the adjacent gas station, the high traffic volumes on Mount Hermon Road, the busy intersection at Mount Hermon Road and Scotts Valley Drive., and the additional traffic that would be generated by the proposed mixed-use portion of the project. Since this parcel is located along a busy, highly visible commercial corridor, it has potential to create a number of successful business opportunities.

Setback Exception – Townhomes Lot 1: The hillside development standards are required to be met for the residential use on Lot 1, with a slope greater than 10%.

Pursuant to SVMC Section 17.40.060(6)), one foot shall be added to each side yard for each one foot of height above which the top plate line exceeds fifteen feet in height.

As proposed, the west elevation, shown on Sheet A5.1 of the plan set shows the top plate measures 19-feet, therefore an additional four feet would be required, resulting in a 14-foot side setback in between Buildings C and D.

The Planning Department believes the setback exception could be acceptable, as proposed, at 10’ as long as it is not further reduced.

Side setback exception – Townhomes Lot 1: The hillside development standards are required to be met for the residential use on Lot 1, with a slope greater than 10%. Pursuant to SVMC Section 17.40.060(6)), one foot shall be added to each side yard for each one foot of height above which the top plate line exceeds fifteen feet in height.

As proposed, the project would require a reduced side yard setback at the northwest corner of Building D. The zoning code requires 10’, and the project proposes 3’.
046 012 213
The applicant believes that the reduced side yard setback is acceptable at this location because the adjacent lot is an unbuildable steep hillside. The gas station is 100' away and the hillside is dominated by mature trees.

The Planning Department does not support an exception to the setback requirement at this location because the setback creates an important buffer between the residential use and the gas station.

Height Exception – Townhomes Lot 1: The R-M-6 zoning district allows a maximum height of 35’ and the proposed height for the townhouses (Buildings C and D) is shown as 41 feet on the west elevation, and 35.5 feet on the east elevation. (Refer to Sheet A5.1). The zoning code defines height as the vertical distance from the highest point of a structure to either the natural grade or the finished grade of the structure pad, whichever distance is greater, excluding basements or crawl spaces around the structure which are below grade and not created by a fill, provided, however that for the purposes of measuring height, chimneys, flagpoles and radio and television aerials shall not be considered part of the structure.

The applicant has shown height on the plans, not only based on the zoning code definition, but also based on an alternate height calculation, set forth in the Uniform Building Code. For clarity purposes, the Planning Department requested that the alternate method for calculating height be removed from the plans, but the applicant did not comply. Proposing a building code standard is not interchangeable with a zoning code development standard for a planning project. In order to approve this project, as proposed, a height exception would be required.

The Planning Department could support the exception provided the townhomes are located in the right context. As previously discussed, the Planning Staff has concerns about the residential interface with the existing gas station, the high traffic volumes on Mount Hermon Road, the busy intersection at Mount Hermon Road and Scotts Valley Drive, and the additional traffic that would be generated by the proposed mixed-use portion of the project.

Site Coverage Exception -Townhome Development – Lot 1
Pursuant to SVMC Section 17.12.040(C), the maximum allowable site coverage in the R-M-6 zoning district is 55%. The zoning code defines site coverage as the percentage of site area covered by impervious surfaces, including all structures, open or enclosed or projections of structures.

The total site coverage for Lot 1 is calculated by adding all impervious areas and dividing by the overall square footage of the lot. Using the information provided in the project data table on Sheet A1.1, the total site coverage is approximately 60%. As proposed, the project would require an exception.
047 013 214
The Planning Department recommends incorporating more permeable surfaces to meet the requirement.

Height Exception- Mixed Use Development Lot 2: Development standards in the C-S zoning district allow for a maximum building height of 35’ and the height of Building A is approximately 45’-4”. In order to approve this project, as proposed, a height exception would be required. As a part of the design review process, the Planning Department requested site sections to study the relationship between the proposed new development and the existing adjacent residences (Refer to Sheet A6.1). While the sections are helpful, it is important to note that using 115 Lucia Lane as a point of reference is misleading because it is situated above the townhouses, not Building B/the apartments, which are taller.

The applicant believes that the increased height only affects the internal commercial street and creates a town center feel allowing for additional floor to ceiling heights in the ground floor commercial space.

The Planning Department is not opposed to a height exception at this location, provided the proposed project includes high quality architectural finishes, the massing is broken appropriately and it works in the overall context of the project.

Front Yard Setback Exception - Mixed Use Development Lot 2: Pursuant to SVMC Section 17.20.040(F)(1), the mixed-use development on Lot 2 requires a 20’ front yard setback. As proposed, the southwest corner of Commercial Building B, encroaches approximately 1’ into the required setback area.

The applicant believes that the encroachment is trivial and should not require an exception.

Planning Department acknowledges that the encroachment is minimal however, in order to be built, an exception must be granted.

Restaurant Seating Area - Mixed Use Development - Lot 2: The proposed project includes an on-grade terrace situated in front of Building B, at the corner of Mount Hermon Road and Glen Canyon Road. The Planning Department has recommended relocating this terrace to the interior of the project site, between Buildings A and B to protect customers from the traffic noise generated by the busy streets and contribute to the vitality of the streetscape within the project.

The applicant believes that the most public place within the development is the corner of Glen Canyon and Mount Hermon Roads and situating the gathering space on this corner helps to create an active, welcoming environment.

The Planning Department agrees gathering spaces enliven a project and for this reason, Staff believes it would be better located on the south side of Building B, between the two commercial buildings. The life and vibrance that the gathering space 048 014 215
would bring to the project would have more of an impact on the shoppers than it would on the vehicles travelling down the busy corridors. In addition, this location would provide shelter from the traffic at the intersection of Mount Hermon and Glen Canyon Roads, creating a more pleasant experience.

Pedestrian Amenities - Mixed Use Development Lot - 2: The Mount Hermon Design Guidelines encourage site design, access and circulation that are pedestrian friendly and incorporate gathering and resting area throughout the project site. This should include amenities such as water features to reduce noise, wood trellises to provide shade and enhanced paving materials on paths and driveways.

The applicant believes they have satisfied the requirements of the design guidelines by providing an on-grade terrace fronting Glen Canyon Road and Mount Hermon Road and that if the tenants within the commercial buildings wanted additional seating, they could arrange seating areas on the sidewalks in front of their business, The applicant believes that permanent fixed seating throughout the project would attract behavior problems and is only beneficial in an enclosed location. The applicant has also explained that they do not want to include textured paving materials because they believe they are uncomfortable for people with disabilities and they prefer not to use colored paving materials because they are difficult to repair and match over time.

While the proposed project includes an on-grade terrace, the Planning Department recommends adding additional seating throughout the project. Relying on individual businesses to provide seating on the sidewalks is not good practice because there is no way to ensure it would be provided, and the sidewalks are not wide enough to accommodate these amenities in many places. The Planning Department also recommends incorporating enhanced paving materials, or decorative pavers to connect Buildings A and B, at the entry driveways, and to differentiate crosswalks within the parking lot. Enhanced paving materials are commonly used in projects without issue.

This attention to detail helps create a stronger sense of place and an enhanced pedestrian experience.

Architecture
Building, site design, landscaping and signage are required to be consistent with the Mt. Hermon Road Design Guidelines, the Commercial and Industrial Design Guidelines and the Residential Design Guidelines. The Guidelines recommend that new projects include architectural/design elements consistent with the urban forest theme, utilizing large post and beam design with open beam overhangs and interiors to give structures the appearance of stability and break up monotony.

The Façade treatments for both commercial Buildings A and B do not utilize large post and beam design encouraged in the Design Guidelines, rather the proposed architecture includes painted wood and sheet metal parapets, painted stucco siding, aluminum storefront windows and doors and a sloped standing seam metal roof. The Planning Department has the following concerns/recommendations as described in the 049 015 216
following sections.

Architectural Enhancement - Mixed Use Building A - Lot 2 : The Design Guidelines recommend building materials with an urban forest theme, preferably with large post and beam design. The proposed project includes horizontal siding on the north, east and west elevations. The design guidelines recommend a consistent architectural treatment with character, variety and interest on all elevations. Walls longer than thirty feet should have 3-dimensional architectural relief giving the appearance of depth through the use of trellis, dormers, bay windows, awnings, etc., in addition to changes in materials.

The applicant believes that the architecture for the proposed project is adequate because, in addition to the horizontal siding, the design incorporates wood trim around the doors and windows, wood balconies with steel railings, metal gutters and roofs and cement plaster walls at the base of the walls on the east, west and north elevations.

The Planning Department recommends the applicant incorporate additional design features and further architectural enhancement for added visual interest.

Architectural Enhancement - Commercial Building B - Lot 2: The Design Guidelines encourage a prominent main building within a commercial development. Since the project site is an important gateway to the City’s commercial core area, the Planning Department recommends that the center of Commercial Building “B” be an area of visual interest for this prominent corner.

The applicant believes that the proposed design includes an important focal point because the center of Building B is the tallest element which features a stone wall and umbrellas, and the landscaping frames the dominant building shapes.

The Planning Department recognizes that the proposed project includes a focal point however staff recommends that the applicant incorporate additional design features and architectural enhancement to create more visual interest.

Architectural Enhancement - Commercial Building B - Lot 2: The Planning Department recommends the design include greater architectural detail on the east and west elevations to add visual interest to the highly visible elevations (refer to Sheet A4.1).

The design guidelines recommend a consistent architectural treatment with character, variety and interest on all elevations. Walls longer than thirty feet should have 3- dimensional architectural relief giving the appearance of depth through the use of trellis, dormers, bay windows, awnings, etc., in addition to changes in materials.

The applicant believes that the elevations are richly varied, as designed, and do not warrant further detail.

The Planning Department recommends the applicant incorporate additional design features and further architectural enhancement for added visual interest. 050 016 217
Circulation
Vehicular access to the project site would be from a new driveway on Mt. Hermon Road (right in/right out only) and existing driveway on Glen Canyon Road. Pedestrian access to the project site is available along Glen Canyon Road and Mt. Hermon Road.

Sidewalks are proposed to be constructed on the project site and would connect with the existing sidewalks along Glen Canyon Road and Mt. Hermon Rd.

On-Site Circulation – Mixed Use Development - Lot 2: The Planning Department is concerned about traffic circulation on site. As designed, vehicles would be driving through the parking lots to reach their destinations. Staff is concerned about overall congestion on the site as vehicles maneuver to enter and exit parking stalls and the ensuing congestion that it will create, potentially creating backups on Mount Hermon Road or Glen Canyon Road.

The applicant responded with a letter from their project traffic engineer which concluded that with five vehicles of storage capacity and a low entering vehicle volume, it is unlikely that drivers leaving the existing parking area would spill back onto Glen Canyon Road.

While the Planning Department appreciates the additional information provided by the applicant, staff is concerned about overall congestion that would result from the project, not only on the major streets but within the project site. The Planning Department has not identified a solution to this problem. Addressing it would require a redesign of the project, which may suggest that the proposed development is too intensive for this site.

Truck Loading Area – Mixed Use Development - Lot 2: The truck loading area is a pull out on the western side of Building A. The drive aisle itself is 20’ and the pull-out area measures 12’ wide. While it is accommodated on site, the Planning Department is concerned about how it would function and how the trucks would maneuver on site. As proposed, the trucks would pull into the loading area heading northwest and exit by backing into the 26’ drive aisle in the lower parking lot in front of Buidling A (Refer to Sheet A2.0). Vehicles would then exit northbound to Mt. Hermon Road.

Good planning practices would prefer that the loading area be a dedicated, separate area, or at least an area with lower traffic volumes. The Planning Department has not identified a solution to this problem. Addressing it would require a redesign of the project, which may suggest that the proposed development is too intensive for this site.

Parking
The proposed project has been designed to accommodate 208 parking spaces.

Buildings C and D (townhomes) have in-unit garages on the first floor that provide two parking spaces per unit, for a total of 16 spaces. Building A includes 21 commercial and 101 residential parking spaces, three of which will be handicap accessible, 58 spaces are provided in the surface lot between Buildings A and B and the 18 spaces in the 051 017 218
upper lot are proposed to be shared, which would necessitate a shared parking agreement, and will be discussed in greater detail below.

Townhome Development – Lot 1:

The total parking demand for the townhouses is calculated as 8 units x 2 spaces per unit for a total of 16 spaces, plus 1 space for every five units to accommodate guest parking. Buildings C and D have in unit garages on the first floor that accommodate 2 spaces per unit, and an additional 18 spaces are provided in the parking lot, two of which are required for guest parking. (Please note that there is an error in the parking data table on Sheet A1.1. The table indicates that each townhouse garage would provide only 1 space per unit, but as designed, each townhouse garage will provide two parking spaces per unit.)
While the multifamily parking requirement has been applied to Lot 1, it is important to note that the proposed townhomes will function more like single family dwellings, despite the current ownership proposal where they cannot be individually sold.

While it is not required, the Planning Department believes it would make sense to consider additional parking on Lot 1 for the townhomes, or have a plan for shared parking with Lot 2 to accommodate future parking needs. A future shared parking arrangement would need to be reviewed and approved by the City, ideally in conjunction with these project entitlements.

Exception to Interior Garage Dimensions: Pursuant to SVMC Section 17.44.030(B), a standard interior garage is required to provide 22’ x 22’ of unobstructed space. As proposed, the townhouse garage unobstructed interior dimensions are 19.5’ wide by 21” deep.

The applicant has responded that each garage parking space will have net dimensions of 9’9”x 21’-0” which is slightly smaller than the City’s standard but significantly larger than the published professional standards of 8’-9” x 17’-6” for a large parking space.

The Planning Department recommends that the garage interiors meet the standard set forth in the zoning code because these dimensions have been devised to accommodate larger vehicles with larger maneuvering requirements, which are typical within the City.

Shared Parking: Since a portion of the required commercial parking would be situated on Lot 1, a shared parking agreement is required.

The applicant does not agree that a shared parking agreement would be necessary as the owner would continue to own and manage both properties.

Since the project spans two lots, it is possible that each lot could be sold separately and the only way to ensure that the shared parking would continue into the future is to 052 018 219
require an agreement. A shared parking arrangement would need to be reviewed and approved by the City, ideally in conjunction with these project entitlements.

Reduced Parking Stall Dimensions - Mixed Use development- Lot 2: Pursuant to SVMC Section 17.44.030(G)(1), each full-sized parking space shall not be less than twenty feet in length and nine feet in width, exclusive of aisles and access drives. When an overhang is provided, the parking stall shall be seventeen feet, plus a three-foot overhang area, which shall be paved, rock lined, concrete or landscaped with low growing plants or ground covers. The overhang area shall be edged with continuous cubing of six inches in height. No light standards or fixed objects are allowed in this overhang area. A three-foot overhang and a four-foot-wide sidewalk is required if the parking space is adjacent to a building.

The proposed project does not meet this standard on either side of the parking lot situated between Buildings A and B where the accessible slope/ramp is located, (refer to Sheet A2.0). The ramp impacts parking spaces 14-22 and 23-31, approximately eighteen parking stalls, where there will be limited space for the front end of the car to overhang and the sidewalks would feel tight.

The applicant responded that the sidewalks along the storefronts at Buildings A & B have an average width of 11' beyond the 3' parked car overhang. This width is reduced to accommodate the accessible ramps at the east end. In these locations, the sidewalks narrow to 5' for some short portions. However, the average sidewalk width for building A is over 6' and for Building B it is over 7'.

The sidewalks within the project will be heavily used and the Planning Department recommends they be as functional as possible. Since the site is so constrained, staff has not identified a viable solution to maintain sidewalk width while including the accessible ramps. This may suggest that the proposed development is too intensive for the site. While a solution has not been identified, to offset the narrow sidewalks and create a better pedestrian experience in the parking lot, the Planning Department recommends additional landscaping and pedestrian amenities, such as planter boxes and enhanced pedestrian crossings.

Commercial Off-Street Parking requirement exception – Mixed Use development– Lot 2:

Pursuant to SVMC Section 17.44.030(G)(7), landscaped areas within or adjacent to the parking area shall provide for a minimum of one shade tree for every four parking stalls.

Depending on the parking dimensions, layout type and size of shade tree, this requirement may be modified by the Planning Director.

The applicant does not believe an exception is necessary because while the parking lot does not include one shade tree for every four parking stalls, they believe the project incorporates ample landscaping in the overall project, which compensates for the deficiency.
053 019 220
The Planning Department does not support this exception and believes that trees are an important part of parking lot design. They create shade and provide relief from the glare and harshness that result from large expanses of concrete.

Landscaping
Mixed – Use Development (Lot 2):

Pursuant to SVMC Section 17.20.040(I), not less than 10% of the total site area in the C-S zoning district shall be landscaped and permanently maintained.

The project proposes irrigated landscaping interspersed throughout the site including a variety of ground covers, vines, and medium height bushes. Planting areas surround the residential buildings and along the perimeter of the site. Many of these landscape areas are narrow, in the range of three to five feet. Planter edges along parking stalls are also used as vehicle overhangs, which reduce the possibility of these areas for shrubs or screening. Two bioretention swales would be located on both sides of the driveway from Scotts Valley Drive. The project proposes approximately 27.5% of the site to be covered with landscaping. While the proposed project meets the minimum landscaping requirement, the Planning Department has additional concerns, which are described in the following sections.

Parking Lot located between Buildings A and B (Lot 2): While the proposed development meets the overall landscaping requirement for the site, the Planning Department is concerned that the parking lot located between commercial Buildings A and B is not adequately landscaped, as evidenced by the Off-Street Parking requirement and Reduced Parking Stall dimension exceptions that were both requested and have been discussed in the Parking section above. The Planning Department recommends that the project include additional landscaping and pedestrian amenities within the parking lot, such as planter boxes, enhanced pedestrian crossings and additional landscaping to soften the hardscape.

Irrigation – Mixed Use Development (Lot 2): The Landscape Plan includes a Retail Pedestrian Street note that states the lightweight portable planters will be hand watered by the building tenants. The Planning Department does not recommend hand watering, as it is not reliable. The planters should be tied into the overall irrigation system on the project site.

Joint Trench – Mixed Use Development (Lot 2). A joint trench is a trench that is shared by a number of utility providers and runs underground through a project site. It should be designed during the project planning phase because trenching requires adequate space and separation and, if it is not considered early in the process, it could result in the loss of trees and/or landscaping.

The Planning Department recommends the applicant submit a detailed plan that shows the joint trench in relation to the landscape plan so we can determine how the utility 054 020 221
trench may impact the landscaping. Any loss of landscaping would be a negative impact for the project.

Open Space
Private open space would be comprised of townhouse decks on Lot 1 (776 sf total; 97 sf/unit) and apartment patios and balconies on Lot 2 (2,976 sf total; 72 sf/unit). Lot 2 would also include common open space in the form of terraces and roof top common areas (5,478 sf total; 105 sf/unit).

Private Open Space Exception for Townhomes (Lot 1): Pursuant to Section

17.09.040(F), each dwelling shall have private, usable outdoor space, i.e. decks, balconies, yards, or patios of one hundred square feet per residential unit. If the design is not suitable for private open space, useable common open space may be provided at two hundred square feet per residential unit, if approved by the Planning Commission.

The proposed project includes a 97sf deck for each unit, which does not meet the minimum requirement.

The Planning Department believes that applying the minimum outdoor private open space requirement to the townhomes is not adequate. These units will function more like single family homes and the outdoor space should be functional. The proposed deck area faces Mount Hermon Road and the units front on a parking lot. Planning Staff has not identified a viable solution to this problem, rather it would require a redesign of the project and, as discussed previously, raises the question of whether or not residential use is appropriate on this site.

Private Open Space Exception for Mixed Use Development (Lot 2, Building A):

Pursuant to SVMC Section 17.20.045(C), each dwelling shall have private, usable outdoor space i.e. decks, balconies, yards or patios of 100-square feet per residential unit. The Planning Commission may determine that the required private outdoor space is not appropriate in a particular building design and allow the required outdoor space to be common open space for all residential units.

The proposed balconies vary in size, however, about half of them are undersized. As shown on Sheet A3.2, the balcony interior dimensions for some of the units only measure 4-feet deep by 8-feet wide (32 sf) and staff is concerned that they may be too small to be functional.

The applicant has responded that a 4' x 8' balcony can accommodate active use with a table and chairs and plants, and that the common areas and landscaping provide additional open space for the residents. The applicant believes their design is superior because the mixed-use apartment building is based on an integration of shared and private open spaces.
055 021 222
The Planning Department strongly encourages that the applicant increases the size of all balconies where feasible. The Planning Department also requests additional clarity in regard to how the roof top common open space would function, and how amenities in these areas could be maximized.

Public Art
Per the Scotts Valley General Plan commercial and residential projects should include public art. Commercial development should incorporate artistic elements and/or treatments into the architecture, landscape design, and infrastructure where appropriate and residential development should incorporate artistic elements and/or treatments into structures, landscaping, common space areas, or open space that are consistent with the City’s urban forest concept.

In response to this requirement, the applicant has identified the stone walls as the public art contribution for the project. The applicant feels that the stone walls uniquely incorporate artistic elements of handcrafted stonework into locations that enhance the architecture, the landscape and place-making intended by the Guidelines. The stone walls form the setting for the urban forest theme. Details of the proposed rock wall are shown on Sheet A3.6.

Typically, site improvement like retaining walls are not considered public art. Given the scale and density of the project the Planning Commission should consider additional opportunities to meet the public art requirements.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
An Environmental Impact Report was prepared for the proposed development consistent with the requirements of the California Environment Quality Act. No significant project related environmental impacts were found to be present that were not reduced to less than significant levels. The Draft EIR was circulated from October 11, 2021 through November 30, 2021. Based on those comments, a Final EIR was prepared and attached is for consideration. The following written comments were received and addressed as a part of the Final EIR:

1. State of California, Department of Transportation, CalTrans District 5

2. State of California, Department of Fish and Wildlife

3. Pacific Gas and Electric

4. Email from Scotts Valley resident

PUBLIC NOTICE
On May 27, 2022, public hearing notices were posted at City Hall and were mailed to surrounding property owners located within 300 feet of the subject property, pursuant to State law. The Planning Department has received one letter in support of the project. 056 022 223

CONCLUSION
In summary, the Planning Department is requesting Planning Commission input and direction on the requested entitlements. This report does not include a resolution or request for action.

The Planning Department has identified three options for Planning Commission consideration:

1. Direct the project applicant to address Planning Commission identified issues associated with the project and return with an amended project.

2. If it is determined that the issues associated with the proposed project are adequately addressed the Planning Commission could direct staff to prepare a resolution recommending approval for consideration at a future Planning Commission meeting. The final recommendation would then be forwarded to the City Council for consideration.

3. If it is determined that the issues associated with the proposed project are not adequately addressed or that it is not consistent with the General Plan the Planning Commission could direct staff to prepare a recommendation of denial for consideration at a future Planning Commission meeting. The final recommendation would then be forwarded to the City Council for consideration.

ATTACHMENTS

1. Location Map..........................................................................................(Attached)

2. Project Plans ..........................................................................................(Attached)

3. Draft Environmental Impact Report ........................................................................ https://www.scottsvalley.org/358/Oak-Creek-Park---Mixed-Use-Development

4. Final Environmental Impact Report ........................................................(Attached)

5. Comment Letter (received 6/2/2022) ......................................................(Attached) 057 023 224

GLEN CANYON RD

SUN RIDGE CT

MT HERMON RD

LUNDY LN

APPALOOSA CT

RABIAN WY
WY
ILVER
BIRCH
LN

OAK CREEK BLVD

LUCIA LN

KIR KORIO
N
C
T

KENT WOOD CT

GREENTREE WY

ANGELA CT

SUZANNE L
O
N

AK CREEK
BLVD

QUIEN SABE RD

KELSEY CT

OAK CREEK B

SCOTTS VALLEY DR
CAMP

EVERS LN

A ESCUELA
WY

SPRING LAKES DR
4115
4121
95 105
320
8 108
201
2 370
381
242
103
101
204-206
10 4203
253
4113
34 35
26 30
33 7
32 24
28 A&B
31 29
55 37
4110
99 203
2 6
223
210
90 17
13 111
15 45
59 34
75 700
11 221
107
227
3 153
25 19
39 152 157
6 2
444
244
47 3
35 156
104
23 21
37 154
13 3
2 1
7 5 9
3 15
3 1
11 216
106
1 15
0 219
41 8
200
180
140
18 29
2 155
7 57
320
290
270
280
340
411
280
144
130
53 134
4 190
160
14 6
0 261
150
280
201
159
191
331
301
10 221
250
271
31 230
240
251
210
125
3410
161
341
311
140 142
69 132 1
136
31 138
23 127
146
26 28
440
390
24 129
400
431
31 290
300
241
246
401
451
441 300
11 63
26 33
11 19 18
14 51 50
10 4
5 13
69 32 31
34 12
20 26
22 66 72
25 2
7 62
24 21
3 6
29 17
16 36 1
8 41
39 38
142
58 3
40 41
43 70
71 55
65 144
60 59
52 47
45 67
9 37
42 56
49 22
27 48
46 64
68 30
140
44 61
23 28
35 9
15 101.5
103
330
194
328
12A
12B
4200
29-35
300
188
310
316
10 183
37-43
21-27
182
180
8 6
4 2
60 50
4 6
8 40
30 20
3 1
176
5 9
168
170
172
174
109
111
113
115
107
103
105
7 11
10 5
3 9
177
175
169
171
112
108
110
104
106
173
165
167
163
102
161
3600
SUITE
1,2,3,4
106
104
102
100 156
154
152
10 9
8 4 105
107
160
7 5
162
164
111 3412
166
11 7
25 27
20 22 23
21 29
2 4
3475
104
307
105
118
116
120
48 58
68 78
78 #1
107
101
195
24 22
501
21 524
523
3 502
8 3115
3105
3103
3101
116
114
#3
#2
3535
110
112
150
108
3111
311
31 3
09 3107
114
109
¯ 00 0.125 .25
Miles
Project Site
Oak Creek Park / 3640 Glen Canyon Road / APN 022‐162‐76 Project Site
058 024 225

VICINITY MAP
A1.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2019 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19

O A K C R E E K P A R K OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA

G L E N C A N Y O N
M T. H E R M O N R O A D

PROJECT DESCRIPTION
PROJECT ADDRESS: MOUNT HERMON ROAD AT

GLEN CANYON ROAD

SCOTTS VALLEY, CA
PROJECT APN: 022-162-76
ZONING: CS- COMMERCIAL SERVICE
GENERAL PLAN: SERVICE COMMERCIAL

PROJECT DATA
AREA TOTAL LOT 1 LOT 2
LOT AREA: 155,350 SF 45,250 SF 110,100 SF

LAND USE
DRIVEWAY/SURFACE PARK: 40,470 SF 13,426 SF 27,044 SF
% LOT AREA: 26.0% 29.7% 24.6%
BUILDING COVERAGE: 54,685 SF 11,430 SF 43,255 SF
% LOT AREA:* 35.2% 25.2% 39.3%
LANDSCAPE: 48,436 SF 18,095 SF 30,341 SF
%LOT AREA: 31.2% 40.0% 27.5%
SIDEWALK & PATIO/TERRACE: 11,759 SF 2,299 SF 9,460 SF
%LOT AREA: 7.6% 5.1% 8.6%
*C-S ZONE DISTRICT MAXIMUM COVERAGE: 45%

BUILDING
COVERAGE:

35.2%

LANDSCAPE

31.2%

DRIVEWAY

SURFACE PARK

26.0% SIDEWALK

PATIO/TERRACE

7.6%

SHEET INDEX
A1.0 PROJECT INTRODUCTION
A1.1 PROJECT DATA
A1.2 ILLUSTRATIONS
A1.3 COLOR PHOTO SIMULATIONS
A2.0 SITE PLAN
A3.0 BUILDING A FIRST LEVEL
A3.1 BUILDING A SECOND LEVEL
A3.2 BUILDING A THIRD AND FOURTH LEVELS
A3.3 BUILDING A ROOF PLAN
A3.4 BUILDING A ELEVATIONS
A3.5 BUILDING A ELEVATIONS / SECTIONS
A3.6 BUILDING A SECTIONS
A4.0 BUILDING 'B' PLANS
A4.1 BUILDING 'B' ELEVATIONS / SECTION
A5.0 TOWNHOUSE PLANS
A5.1 TOWNHOUSE ELEVATIONS
A6.0 SITE CONTEXT ILLUSTRATIONS
A6.1 SITE SECTIONS
A7.0 SIGN PROGRAM
C0.1 COVER SHEET
C0.2 EXISTING SITE
C0.3 TENTATIVE MAP
C1.1 TOPO AND DEMOLITION PLAN
C2.1 HORIZONTAL CONTROL & PAVING PLAN
C3.1 GRADING PLAN
C3.2 CUT-FILL PLAN
C4.1 UTILITY PLAN
C4.2 STORMWATER CONTROL PLAN
C5.1 EROSION CONTROL PLAN
C6.1 SECTIONS

L LANDSCAPE PLAN

TC TREE CANOPY
E1.0 SITE PHOTOMETRIC PLAN
E1.1 PARTIAL SITE PHOTOMETRIC PLAN
E1.2 PARTIAL SITE PHOTOMETRIC PLAN
E1.3 PARTIAL SITE PHOTOMETRIC PLAN
E3.1 LIGHT FIXTURE CUT SHEETS & FIXTURE SCHEDULE

AERIAL VIEW PROJECT TEAM
ARCHITECT: THACHER & THOMPSON ARCHITECTS
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 246-2109
CONTACT:
[email protected]
[email protected]

EADIE CONSULTANTS
P.O. BOX 1647
SANTA CRUZ, CA 95061
(831) 431-3396
CONTACT: CHARLIE EADIE
[email protected]

LAND USE
PLANNER:

LANDSCAPE
C2G CIVIL CONSULTANTS GROUP, INC
4444 SCOTTS VALLEY DRIVE
SCOTTS VALLEY, CA 95066
(831) 426-5313
CONTACT: DAVID DAUPHIN
[email protected]

CIVIL ENGINEER/
OWNER: GRANUM PARTNERS
340 UNIVERSITY AVE. #1
LOS GATOS, CA 95030
(408) 395-0101
CONTACT: GREG
[email protected]
ARCHITECT:

SURVEYOR:

ELLEN COOPER
612 WINDSOR STREET
SANTA CRUZ, CA 95062
(831) 426-6845
[email protected]

ELECTRICAL
ENGINEER:

MIRACLES UNLIMITED, INC.

P.O. BOX 1808
APTOS, CA 95001
(831) 688-8013
ARBORIST: MAUREEN HAMB
849 ALMAR AVENUE, SUITE C 319
SANTA CRUZ, CA. 95060
(831) 234-7739
[email protected]
BIOLOGIST: KATHLEEN LYONS

BIOTIC RESOURCES GROUP
P.O. BOX 14
SANTA CRUZ, CA 95063
(831) 476-4803
[email protected]
PLANNING & BUILDING: CITY OF SCOTTS VALLEY
FIRE: SCOTTS VALLEY FIRE DEPT.

WATER: SCOTTS VALLEY WATER DEPT.

SANITATION: SCOTTS VALLEY SANITATION

APPROVAL AGENCIES
No. PLAN CK 6/01/20
059 025 226

PARKING DEMAND
TOTAL COMMERCIAL: 23,629 SF @ 1:250 = 94.5 SPACES
RESIDENTIAL: 52 @ 2.2 / D.U. = 114 SPACES
TOTAL PARKING DEMAND: 208.5 SPACES

PARKING SUPPLY
LOWER LOT:

UPPER LOT:

TOWNHOUSE GARAGE:

COMMERCIAL GARAGE:

LOWER RESIDENTIAL GARAGE:

UPPER RESIDENTIAL GARAGE:

TOTAL PARKING SUPPLY:
58 SPACES
18 SPACES
8 SPACES
21 SPACES
41 SPACES
60 SPACES
206 SPACES
A1.1
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2019 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA

NET AREAS BY LEVEL
AREA TOTAL LOT 1 LOT 2
FIRST LEVEL GROSS: 54,685 SF 11,456 SF 43,229 SF
NET RESIDENTIAL: 7,616 SF 7,616 SF 0
% 13.9% 66.5% 0
NET COMMERCIAL: 19,691 SF 0 19,691 SF
% 36.0% 0 45.5%
NET PARKING GARAGE: 25,222 SF 3,840 SF 21,382 SF
% 46.1% 33.5% 49.5%
COMMON AREA: 2,156 SF 0 2,156 SF
% 4.0% 0 5.0%
NET ASSIGNED COMMON OPEN SPACE: 0 0 0
NET PRIVATE OPEN SPACE: 388 SF 388 SF 0
SECOND LEVEL GROSS: 39,644 SF 9,992 SF 29,652 SF
NET RESIDENTIAL: 9,992 SF 9,992 SF 0
% 25.2% 100% 0
NET COMMERCIAL: 3,938 SF 0 3,938 SF
% 9.9% 0 13.3%
NET PARKING GARAGE: 24,123 SF 0 24,123 SF
% 60.9% 0 81.4%
COMMON AREA: 1,591 SF 0 1,591
% 4.0% 0 5.3%
NET ASSIGNED OPEN SPACE: 1,164 SF 0 1,164 SF
NET PRIVATE OPEN SPACE: 388 SF 388 SF 0
THIRD LEVEL GROSS: 26,326 SF 0 26,326 SF
NET RESIDENTIAL: 22,600 SF 0 22,600 SF
% 85.8% 85.2%
NET COMMERCIAL: 0 0 0
NET PARKING GARAGE: 0 0 0
COMMON AREA: 3,726 SF 0 3,726 SF
% 14.2% 14.2%
NET ASSIGNED OPEN SPACE: 4,314 SF 0 4,314 SF
NET PRIVATE OPEN SPACE: 2,088 SF 0 2,088 SF
FOURTH LEVEL GROSS: 26,326 SF 0 26,326 SF
NET RESIDENTIAL: 22,600 SF 0 22,600 SF
% 85.8% 85.2%
NET COMMERCIAL: 0 0 0
NET PARKING GARAGE: 0 0 0
COMMON AREA: 3,726 SF 0 3,726 SF
% 14.2% 14.2%
NET ASSIGNED COMMON OPEN SPACE: 0 0 0
NET PRIVATE OPEN SPACE: 564 SF 0 564 SF

PARKING DATA

RESIDENTIAL HOUSING MIX

AVERAGE SIZE
STUDIO: 4 712 SF
1 BEDROOM: 18 906 SF
2 BEDROOM: 22 1,184 SF
TOWNHOUSE: 8 2,172 SF
TOTAL 52
#

DENSITY
LOT 1: 45,250 / 8 = 5,656 SF PER D.U. = 7.7 D.U.s PER ACRE LOT 2: 110,100 / 44 = 2,502 SF PER D.U. = 17.4 D.U.s PER ACRE TOTAL: 155,350 / 52 = 2,987.5 SF PER D.U. = 15.1 D.U.s PER ACRE

BUILDING AREAS BY FUNCTION
AREA TOTAL LOT 1 LOT 2
GROSS BUILDING AREA: 146,981 SF 21,448 SF 125,533 SF
COMMERCIAL: 24,973 SF 0 24,973 SF
NET: 23,629 SF 0 23,629 SF
COMMON AREA: 1,344 SF 0 1,344 SF
RESIDENTIAL: 72,633 SF 17,608 SF 55,055 SF
NET: 62,808 SF 17,608 SF 45,200 SF
COMMON AREA: 9.855 SF 0 9,855 SF
PARKING GARAGE: 49,345 SF 3,840 SF 45,505 SF
PARKING GARAGE RESIDENTIAL: 42,650 SF 3,840 SF 38,810 SF PARKING GARAGE COMM: 6,695 SF 0 6,695 SF
GROSS BUILDING AREA: 146,154 SF 21,448 SF 125,533 SF
BASEMENT BUILDING AREA: 45,505 SF 0 45,505 SF
% 31.1% 0 36.5%
NON BASEMENT AREA: 100,649 SF 21,448 SF 79,201 SF
% 68.9% 100% 63.5%

OPEN SPACE USES
OPEN SPACE TOTAL: 9,230 SF 776 SF 8,454 SF
PER DWELLING: 177.5 SF 97.0 SF 192.1 SF
APARTMENT BALCONY: 1,436 SF 0 1,436 SF
APARTMENT PATIO: 1,540 SF 0 1,540 SF
TOWNHOUSE DECK: 776 SF 776 SF 0
NET PRIVATE OPEN SPACE: 3,752 SF 776 SF 2,976 SF
PER DWELLING: 72.2 SF 97.0 SF 67.6 SF
COMMON APT. TERRACE: 1,164 SF 0 1,164 SF
COMMON APT. ROOF-TOP: 4,314 SF 0 4,314 SF
NET COMMON OPEN SPACE: 5,478 SF 0 5,478 SF
PER DWELLING: 105.3 SF 0 105.3 SF

COMMERCIAL DATA

BUILDING A
TYPE 1: 6,786 SF
TYPE 2: 3,975 SF
SUBTOTAL FIRST FLOOR: 10,761 SF
TYPE 3: 2,958 SF
COMMON AREA: 1,344 SF
TOTAL BUILDING A: 15,063 SF

BUILDING B
TYPE 1: 8,930 SF
TYPE 3: 980 SF
TOTAL BUILDING B: 9,910 SF
TOTAL COMMERCIAL LOT 2: 24,973 SF

PARKING SPACES BY TYPE
STANDARD SURFACE PARKING: 73 SPACES
STANDARD COVERED PARKING: 127 SPACES
ADA SURFACE PARKING: 3
ADA COVERED PARKING: 3
BICYCLE TENANT STOREROOM BLDG. A: 46
BICYCLE PARKING IN TOWNHOUSE GARAGE: 16
BICYCLE PUBLIC LOCKERS: 8
BICYCLE RACKS: 40
EV CHARGING STATIONS PER CALIF. CODE TBD
TRUCK LOADING: 1
AUTO PASSENGER LOADING: 1
PLAN CK 6/01/20

3. MIXED USE RATIO
(CALIFORNIA BUILDING CODE)

NON-RESIDENTIAL
A, B, M, S-2 OCCUPANCIES
70,478 SF = 56.1%
CALIFORNIA BUILDING CODE:

A OCCUPANCY: RESTAURANTS, ASSEMBLY AREAS
B OCCUPANCY: BANKS BUSINESS OFFICES, ETC.

M OCCUPANCY: STORES, RETAILERS
S-2 OCCUPANCY: GARAGES
R-2 OCCUPANCY: MULTI-FAMILY RESIDENTIAL

RESIDENTIAL
R-2 OCCUPANCY
55,055 SF = 43.9%

4. MIXED USE RATIO
(BASED ON AREA BY FUNCTION)

NON-RESIDENTIAL
24,973 SF = 31.2%

RESIDENTIAL
55,055 SF = 68.8%

5. MIXED USE RATIO
(BASED ON BUILDING COVERAGE)

NON-RESIDENTIAL
COMMERCIAL: 19,691 SF
COMMRCIAL PARKING: 6,695 SF
TOTAL: 26,386 SF = 64.2%

RESIDENTIAL
RESIDENTIAL PARKING: 14,687 SF = 35.8%

6. MIXED USE RATIO
(ALLOCATION OF BLDG. AREA BY BLDG.

COVERAGE RATIO)
NET COMMERCIAL: 23,629 SF x 64.2% COVERAGE = 15,170 SF 48.4% NET RESIDENTIAL: 45,200 SF x 35.8% COVERAGE = 16,182 SF 51.6% 31,352 SF 100%

2. MIXED USE RATIO
(BASED ON ZONING CONSISTENCY - 17.20.020 (H))
GROUND FLOOR COMMERCIAL, NET 19,691 SF 100%
GROUND FLOOR RESIDENTIAL, NET 0 SF 0%
ABOVE OR BEHIND COMMERCIAL, NET 3,938 SF 8%
ABOVE OR BEHIND RESIDENTIAL, NET 45,200 SF 92%

1. MIXED USE RATIO
(BASED ON NET BUILDING AREAS ON LOT 2)
COMMERCIAL 23,629 SF 34.3%
RESIDENTIAL 45,200 SF 65.7%
060 026 227
M T .

H E R M O N R D .

GLEN
M T .

H E R M O N R D .

CANYON RD
GLEN

CANYON RD
A1.2
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2019 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19 OAK CREEK PARK MOUNT HERMON ROAD AT SCOTTS VALLEY DRIVE SCOTTS VALLEY, CA VIEW LOOKING UP MT. HERMON ROAD

VIEW LOOKING TOWARD PROPOSED COMMERCIAL BUILDING
PLAN CK 6/01/20
061 027 228
A1.3
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2019 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA GLEN M T .

H E R M O N R D .

CANYON
RD
GLEN
M T .

H E R M O N R D .

CANYON
RD
GLEN
M T .

H E R M O N R D .

CANYON
RD
GLEN
M T .

H E R M O N R D .

CANYON
RD
VIEW 2
VIEW 1 VIEW 3
VIEW 4
109 LUCIA LANE
113
111
109
107
PLAN CK 6/01/20
062 028 229

SITE PLAN
1 SCALE: 1" = 20'-0"

GLEN CANYON ROAD
APN
022-162-61
APN
022-162-62
APN
022-162-63
APN
022-162-64
APN
022-162-65
M T .

H E R M O N R D .

EXISTING OFFICE

BUILDING

PROPOSED MIXED USE

BUILDING 'A'

PROPOSED

TOWNHOUSE

BUILDING 'D'

PROPOSED

TOWNHOUSE

BUILDING 'C'

PROPOSED COMMERCIAL BUILDING 'B'
A2.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 7/15/19
PLAN CHECK 6/01/20 5'
5% SLOPE
5% SLOPE
FIRE
ENGINE
17' 8'

FIRE ENGINE
30'-6"
20'-0"
20'-0"
28'-0"
8'
10'-0"
3'-0"
1 2
3 4
5 6
7 9
10 11
12 13
14 15
16 17
18 1
3 4
5 6
7 8
9 2
10 11
47 46 45 44 43 42 41 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17 18 19 20 21 22
TRASH/

RECY OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA B
B
A
A
5' CLEAR S.W.

EXIT WIDTH

UNDERGROUND
PG&E VAULT, TYP.

APARTMENT

ENTRANCE
5' CLEAR S.W.

EXIT WIDTH
POTENTIAL ONGRADE TERRACE
8' WIDE CONC.

SIDEWALK
8' WIDE CONC.

SIDEWALK
12' WIDE SIDEWALK
12' WIDE SIDEWALK
6' WIDE CONC.

SIDEWALK
PT. 'B' EL. 506.7'
PT. 'C' EL. 515.5'
PT. 'A' EL. 512.0'
PT. 'D' EL. 523.0'
PT. 'A' EL. 519.0'
PT. 'B' EL. 516.5'
PT. 'C' EL. 520.0'
PT. 'D' EL. 529.0'
PT. 'E' EL. 529.5'
PT. 'H' EL. 538.0'
PT. 'G' EL. 525.5'
PT. 'F' EL. 519.0'
3' DRAINAGE
SWALE
16 BIKES
26'
17' 17'-0" 26'-0" 17'-0" 84'
9'-0"
TYP
12' BIKES
12' BIKES
8 BIKE LOCKERS
32' 7' 5' 7'-0"
20'
12'
23'
17'
26'
TRASH
15'
15'-0"
20'-0"
12'-0"
45'-0"
TRUCK

LOADING
AREA

POTENTIAL
FUTURE BUS STOP 10'-4"
PG&E
PYLON
20' SETBACK

ROOF TOP
COMMON
AREA

ROOF TOP
COMMON
AREA

ROOF TOP
COMMON
AREA
COMMON

AREA TERRACE
5' HIGH STONE WALL

PASSENGER

LOADING

EMERGENCY VEHICLE

ACCESS POINT WITH

REMOVEABLE BOLLARDS

TYPICAL BICYCLE RACK
18"
2"Ø STEEL TUBING 36"
GRID PATTERN = TYPICAL

ROOFTOP OPEN SPACE
40 39 23

TYPICAL STAGING

AREA FOR WASTE
CARTS 26'-0"
20' WIDE x 7' HIGH DOOR
063 029 230
UP

COMMERCIAL PARKING
TYPE 2 COMMERCIAL SPACE
TYPE 1 COMMERCIAL SPACE

RESIDENTIAL PARKING

RESIDENTIAL PARKING

UTILITY
LOBBY
OFF
ELEV
A3.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19
PLAN CK 6/01/20
FIRST LEVEL (BASEMENT) 1 SCALE: 1/8"=1'-0"
280'-0"
81'-0" 83'-0" 53'-0" 63'-0" 103'-0"
65'-0"
36'-6" 181'-0"
10'-0" 16'-11 1/2" 9'-6 1/2"
ELEV

TRASH/RECY

TRASH CHUTE INTO
4 YD. DUMPSTER
1 2
3 4
5 6
7 8
9 10
11 20
19 18
17 16
15 14
13 12
21 1 2 3 4 5 6
18'-5" 10'-8"7 8 9 10
11 12 13 14 15 16 17 18
25 24 23 22 21 20 19
31 30 29 28 27 26
41 40 39 38 37 36 35 34 33 32
RECYL

UP EXIT CORRIDOR OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA 24'-0"
UP

WALL ABOVE
9'-0" TYP. 18'-6" TYP. 26'-0"
8'-0" 9'-0" 9'-0" 5'-0"
18'-6"
A B
A B
C D
C D

SEE SITE PLAN FOR

TRASH ENCLOSURE

REMOVABLE

BOLLARDS
THE COMMERCIAL AREAS DESIGNATED AS TYPE 1, TYPE 2 AND TYPE 3 REFER TO THE LIKELY COMMERCIAL USES. THESE USES ARE USED TO DIFFERENTIATE THE POTENTIAL PARKING DEMANDS AND MARKET VALUE OF TENANT LEASES. THEY CAN BE CHARACTERIZED AS FOLLOWS:

TYPE 1

THESE USES BENEFIT FROM VISUAL CONNECTIONS TO THEIR CUSTOMERS WITH DISPLAY WINDOWS AND .DOORS ON THE STREET' WITH TENANTS SUCH AS RETAILERS, FOOD AND BEVERAGE.

TYPE 2
THESE USES ARE THE 'BACK OF HOUSE' PORTIONS OF TYPE 1 USES SUCH AS STOCK ROOMS, RESTROOMS, KITCHENS, OFFICES, MEETING ROOMS, ETC.

TYPE 3
THESE USES ARE THE SUPPORT AREAS INCLUDING STORAGE OR REPAIR FACILITIES.

OPTIONAL STAIR

TO UPPER LEVEL
064 030 231
UP

RESIDENTIAL PARKING RESIDENTIAL PARKING
TYPE 3 COMMERCIAL SPACE

OPEN TO COMMERCIAL SPACE OPEN TO COMMERCIAL SPACE

STORAGE/UTILITY

COMMON AREA

COMMON AREA TERRACE

RESIDENTIAL PARKING
ELEV
STOR
ELEV
A3.1OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19
PLAN CK 6/01/20
SECOND LEVEL (1ST STORY) 1 SCALE: 1/8"=1'-0"
UP
DN
STAIR
LOBBY
DN
5 4
3 2
1 7
8 9
10 6
11 12 13 14 15 16
23 24 25 26 27 28 29 30
37 36 35 34 33 32 31
43 42 41 40 39 38
53 52 51 50 49 48 47 46 45 44
17 18 19 20 21 22
60 59 58 57 56 55 54
UP
DN

BICYCLE STORAGE
OPEN
A B
A B
C D
C D

TRASH CHUTE
46 BICYCLE STORAGE UNITS 6'-0" 4'-0" 6'-0"
3'-6"

OPTIONAL OPEN WALL OPTIONAL OPEN WALL

OPTIONAL STAIR

TO LOWER LEVEL
065 031 232
UP DN
3RD & 4TH LEVELS (2ND AND 3RD STORIES) 1 SCALE: 1/8"=1'-0" 101 / 201

TERRACE BELOW
LOBBY
BALCONY ON 4TH

FLOOR ONLY
ELEV
ELEV
A3.2
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19
PLAN CK 6/01/20
WINDOW @
4TH FLOOR
BALCONY @
4TH FLOOR
A B
A B
C D
C D
LIV. RM
KITCH
BEDRM
BATH
W
D
ENTRY
LIV. RM
DINING
BEDRM 1
BATH
BEDRM 2
BEDRM

DRESS BATH
KITCH
W D
W
D
BATH
ENTRY
KITCH
KITCH
KITCH
DINING
DINING
DINING
DINING
BATH
BATH
BATH
BATH
DRESS
LIV. RM
LIV. RM
LIV. RM
BEDRM 1
BEDRM 2

ENTRY ENTRY

W ENTRY
D
BEDRM
LIV. RM
DINING
ENTRY

KITCH KITCH
KITCH
KITCH

KITCH KITCH

KITCH KITCH
LIV. RM
LIV. RM
LIV. RM LIV. RM
LIV. RM
LIV. RM
LIV. RM LIV. RM

DINING DINING

DINING DINING

DINING DINING
DINING
DINING
BEDRM
BEDRM 2
BEDRM 1 BEDRM 1
BEDRM 2
BEDRM 2 BEDRM 2
BEDRM 1 BEDRM 1

BEDRM BEDRM

ENTRY ENTRY

ENTRY ENTRY

ENTRY ENTRY

ENTRY ENTRY

DRESS DRESS
BEDRM

BATH BATH

BATH BATH

BATH BATH
BATH

BATH BATH

BATH BATH
W
D
W D
W
D
W
D
REF

REF REF
REF

REF REF
REF
REF
REF
REF
REF
REF
W
D

KITCH KITCH
KITCH
KITCH

KITCH KITCH

REF REF
REF
REF
REF

REF REF
BEDRM 1
BEDRM 2
BEDRM 1
BEDRM 2
BEDRM 1 BEDRM 1
BEDRM 2 BEDRM 2
BEDRM
BEDRM 2
BEDRM 1
OFF

DINING DINING
DINING
DINING
DINING
DINING
DINING
BATH
TRASH

RECYL OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA 102 / 202
103 / 203
104 / 204
105 / 205
106 / 206
107 / 207
108 / 208
109 / 209
110 / 210
111 / 211 112 / 212
113 / 213 114 / 214
115 / 215
116 / 216
117 / 217
118 / 218
119 / 219
120 / 220
121 / 221
122 / 222

ROOF TOP COMMON AREA

ROOF TOP COMMON AREA

ROOF TOP COMMON AREA
5' HIGH PRIVACY

WALLS, TYP
CONC.

PAVERS

BALCONY
ABOVE
TRASH
CHUTE
JAN/
STOR
ROOF
ACCESS
JAN.

REF D W
REF
ROOF
ACCESS
UP
DN

CORRIDOR

EXIT STAIR
ROOF
ACCESS
PATIO
PATIO
PATIO
PATIO
PATIO
PATIO

PATIO PATIO

PATIO PATIO
PATIO

SHADED AREAS INDICATE THIRD
LEVEL ROOFTOP COMMON AREA 5'-0"
VARIES
2x4 HORIZONTALCEDAR BOARDS
SPACED 1"APART, ATTACHED
TO 2x3 ALUMINUM FRAME
ANCHORED TO CONC. SUBFLOOR.

PATIO ENCLOSURE WALL 2 SCALE: 1/8"=1'-0"
066 032 233
ROOF PLAN 1 SCALE: 1/8"=1'-0"
A3.3
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
FEBRUARY 2017
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CK 7/15/19
PLAN CK 6/01/20 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA ROOF
HATCH
ROOF
HATCH
ROOF
HATCH 5'-4"

SOLAR PANELS HVAC UNITS
12 ROOF SECTION 2 SCALE: 1/8"=1'-0"
067 033 234
A3.4
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CHECK 7/15/19
PLAN CHECK 6/01/20 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA NORTH ELEVATION 2 SCALE: 1/8"=1'-0"
SOUTH ELEVATION 1 SCALE: 1/8"=1'-0"
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
GRADE PLANE = 514.2'
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
ELEV. 515.5'

STONE VENEER BETWEEN THE SIDEWALK

AND THE BOTTOM EDGE OF STOREFRONT
WINDOW FRAMES. TYPICAL 37' 26'
24" DIA. CAFE
TABLE SHOWN 4'-0"
8'-0"
TYP. BALCONY PLAN 3 SCALE: 1/8"=1'-0" 45'-4" 45'-4"
068 034 235

WEST ELEVATION
1 SCALE: 1/8"=1'-0"
A3.5
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CHECK 7/15/19
PLAN CHECK 6/01/20
LOBBY
ELEVATION/SECTION 'A' 2 SCALE: 1/8"=1'-0"
ELEV
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
GARAGE
GARAGE
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'

TERRACE
STOR
STOR

CORRIDOR

CORRIDOR

PRIVATE PATIO

SCREEN WALL
24" PAINTED BELTLINE TRIM OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA BUILDING 'A' HEIGHT CALCULATIONS:

AVERAGE GRADE OF 4 CORNERS = GRADE PLANE PER CBC. SEC. 502.1 REFER TO BLDG. A SITE PLAN
CORNER A ELEVATION = 512.0'
CORNER B ELEVATION = 506.7'
CORNER C ELEVATION = 515.5'
CORNER D ELEVATION = 523.0'
AVERAGE ELEVATION = 514.3' = GRADE PLANE
AVERAGE ELEVATION = 514.3' = GRADE PLANE 35'-5"
HIGHEST ROOF: 552.1'
AVG. ROOF HEIGHT

EAST ELEVATION
3 SCALE: 1/8"=1'-0"
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
FLOOR ELEV: 506.8'
MATERIALS:

SLOPED ROOF:

EAVES:

BALCONY RAILINGS:

SIDING:

WINDOWS/DOORS:

STANDING SEAM METAL

PAINTED GUTTER ON PAINTED WOOD FASCIA

WITH PAINTED WOOD SOFFIT BOARDS

WOOD RAILING WITH PAINTED METAL PICKETS

PAINTED STUCCO BELOW BELTLINE TRIM

PAINTED HORIZONTAL BEVELED SIDING
FIBERGLASS DOUBLE HUNG @ RESIDENTIAL
ALUM. STOREFRONT @ COMMERCIAL 45'-4" 13'

CEMENT PLASTER

TRASH ENCLOSURE
069 035 236

COMMERCIAL OFFICE

STOR STOR COMMOM TERRACE
A3.6
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
No. PLAN CHECK 7/15/19
PLAN CHECK 6/01/20
ELEVATION/SECTION 'B' 1 SCALE: 1/8"=1'-0"

COMMERCIAL
TYPE 1 COMMERCIAL
GARAGE
GARAGE
ELEVATION/SECTION 'C' 2 SCALE: 1/8"=1'-0"
ELEVATION/SECTION 'D' 3 SCALE: 1/8"=1'-0"
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'

PRIVATE PATIO

SCREEN WALL

COMMERCIAL

GLASS LINK

GLASS LINK

GLASS LINK

GLASS LINK

PRIVATE PATIO

SCREEN WALL

PRIVATE PATIO

SCREEN WALL
GARAGE
GARAGE
GARAGE
GARAGE
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
TYPE 3 COMMERCIAL

GLASS LINK

GLASS LINK OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA TYPE 2 COMMERCIAL

EXTERIOR BUILDING MATERIALS

PRIVATE PATIO

SCREEN WALL
SEE DETAIL 2/A3.2
CARMEL STONE SAMPLE 4 SCALE: 1/8"=1'-0"
070 036 237
A4.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 6/01/20
FLOOR PLAN 1 SCALE: 1/8"=1'-0"

STAIR TO

MEZZANINE
UP

RAILING ABOVE
ROOF PLAN 2 SCALE: 1/8"=1'-0"
200'-0"
25'-0" 25'-0" 35'-0" 25'-0" 25'-0" 25'-0" 40'-0" 70'-0" 30'-0" 8'-0" 8'-0" 8'-0" 14'-0" HC HC

COMMERCIAL BUILDING

FLAT ROOF

FLAT ROOF

FLAT ROOF

FLAT ROOF
5% SLOPE UP
DN 2'-0" 2'-0" 11'-7" 26'-0" 24'-0" 18'-0" 68'-0" A A A A 4:12 4:12

MEZZANINE ABOVE

PARAPET WALL

PARAPET WALL

PARAPET WALL OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA

TRASH/RECYL
20'-0"
CANOPY
CANOPY
CANOPY
CANOPY 11'-4"
071 037 238
WEST ELEVATION 3 SCALE: 1/8"=1'-0"

EAST ELEVATION
4 SCALE: 1/8"=1'-0"
A4.1
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 6/01/20
SECTION 'A' 5 SCALE: 1/8"=1'-0" 14'-0" 5'-0" OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA

MEZZANINE

PARAPET WALL

INTERIOR

COLUMNS

MEZZANINE

RAILING AND STAIR
PARAPET WALL 3'-0" 34'
NORTH ELEVATION 1 SCALE: 1/8"=1'-0"
SOUTH ELEVATION 2 SCALE: 1/8"=1'-0"
MATERIALS:

SLOPED ROOF:

EAVES: CLOSED SOFFIT:

PARAPET CORNICE:

SIDING:

WINDOWS/DOORS:

STANDING SEAM METAL

PAINTED WOOD

PAINTED WOOD AND SHEET METAL

PAINTED STUCCO
ALUM. STOREFRONT

STONE VENEER BELOW THE SILL LINE OF

STOREFRONT WINDOWS, TYPICAL NORTH
ELEVATION ONLY. 6.8'

LOW POINT AT
EXISTING GRADE 40.8' 6'

EXTERIOR BUILDING MATERIALS
4:12

COMPOSITION ROOF

OGEE GUTTER ON

PAINTED FASCIA

STUCCO SIDING
12' W x 7'H PAINTED METAL
ROLL UP DOOR 10'-5"
11'-4" 20'-0"
TRASH ENCLOSURE 6 SCALE: 1/8"=1'-0"

TYPICAL CONTROL JOINT

IN CEMENT PLASTER WALL

TYPICAL CONTROL JOINT

IN CEMENT PLASTER WALL
072 038 239
A5.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 7/15/19
PLAN CHECK 6/01/20
TOWNHOUSE FIRST FLOOR 3 SCALE: 1/8"=1'-0"
BEDRM 1 BEDRM 2
LNDRY
BATH
GARAGE
CLO
UP
PORCH
ENTRY
HALL
DUMB
WAITER
TOWNHOUSE SECOND FLOOR 4 SCALE: 1/8"=1'-0"
28'-0"
14'-0" 14'-0" 16'-8" 35'-4" 24'-0" 8'-0"
HALL
7'-8 1/2" 20'-3 1/2"

UNIT A UNIT B
DINING

DUMB KITCHEN
WAITER
M. BATH
M. BEDRM
M. CLO
GAS F.P.

PANTRY

OPEN TO
BELOW
REF
OVENS 52'-0" 17'-9" 18'-6" 15'-9" 3'-0"
STOR
DN
28'-0"
7'-8 1/2" 12'-11" 7'-4 1/2"
DECK
LIV. RM
DINING
LIV. RM
DN
BEDRM 1 BEDRM 2

OPEN TO
BELOW
M. BEDRM
M. CLO
M. BATH
SHWR
LNDRY
BATH
ALCOVE
S.L.

STOR
DECK
M. CLO
STOR
PANTRY

KITCHEN
REF
UP
STOR
DECK
ENTRY
UP
PORCH
DUMB
WAITER

UNIT C UNIT D
UP
DECK
ENTRY
ROOF
TOWNHOUSE ROOF PLAN 1 SCALE: 1/8"=1'-0" OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA A
A
A
A
A
A
12' TYPICAL TRASH/RECYLE
CARTS

TRASH/RECYLE
CARTS

TRASH/RECYLE
CARTS
S.L. S.L.

SHWR

EXTERIOR BUILDING MATERIALS

LINE OF SILL BELOW

WINDOW ASSEMBLY
2 x 6" TRIM OVER WRB
TYP. FRAMING BETWEEN

WINDOWS

SHINGLE SIDING

CASEMENT WINDOW
3/4" WINDOW SILL RETURN

INTO WINDOW ASSEMBLY
SILL FROM 2x3
1 1/4" x 3 1/2" SKIRT

SHINGLE SIDING

JAMB SILL
WINDOW DETAILS 5 SCALE: 1/8"=1'-0"
2x6 EXTERIOR DOOR HEAD TRIM
2x TRIM
1x3 TRIM OVERHEAD DOOR HARDWARE

SHINGLE SIDING
GARAGE DOOR HEAD 6 SCALE: 1/8"=1'-0" 23'-6 1/2" 21'-0"
19'-6 1/2" TYPICAL GARAGE

DIMENSIONS
073 039 240

EAST ELEVATION
3 SCALE: 1/8"=1'-0"

NORTH ELEVATION
1 SCALE: 1/8"=1'-0"

WEST ELEVATION
4 SCALE: 1/8"=1'-0"
A5.1
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 7/15/19
PLAN CHECK 6/01/20
1ST FLOOR: 523.6'
2ND FLOOR: 534.1'
1ST FL: 538.0'
2ND FL: 548.0'
1ST FLOOR: 523.6'
2ND FLOOR: 534.1'

UNIT A UNIT B UNIT C UNIT D OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA HALL
SECTION A @ TOWNHOUSE 'C' 2 SCALE: 1/8"=1'-0"

LIVING RM

BEDROOM HALL
ROOF
TOWNHOUSE BUILDING 'C' HEIGHT CALCULATIONS:

AVERAGE GRADE OF 4 CORNERS = GRADE PLANE PER CBC.

REFER TO BLDG. 'C' SITE PLAN
CORNER A ELEVATION = 519.0'
CORNER B ELEVATION = 516.5'
CORNER C ELEVATION = 520.0'
CORNER D ELEVATION = 529.0'
AVERAGE ELEVATION = 521.1' = GRADE PLANE

SEE NORTH ELEVATION

UNIT A UNIT B UNIT C UNIT D
1ST FLOOR: 538.0
2ND FLOOR: 548.0
TOWNHOUSE BUILDING 'D' HEIGHT CALCULATIONS:

AVERAGE GRADE OF 4 CORNERS = GRADE PLANE PER CBC.

REFER TO BLDG. 'D' SITE PLAN
CORNER E ELEVATION = 529.5'
CORNER F ELEVATION = 519.0'
CORNER G ELEVATION = 525.5'
CORNER H ELEVATION = 538.0'
AVERAGE ELEVATION = 528.0' = GRADE PLANE

SEE SOUTH ELEVATION
GRADE PLANE: 521.1'
AVERAGE HIGHEST ROOF: 26.8' AVERAGE BLDG. HT.

SOUTH ELEVATION
2 SCALE: 1/8"=1'-0"

TOWNHOUSE BUILDING 'D' TOWNHOUSE BUILDING 'C'
1ST FLOOR: 538.0
2ND FLOOR: 548.0
AVERAGE HIGHEST ROOF:

GRADE PLANE 33'-10" BLDG. HT. 13'-0" 28' 41' 23'-0"
TOP PLATE 32' 25'-6"
TOP PLATE 34.5' 28' 19'
TOP PLATE 32'-0"TOP PLATE

LOWEST GRADE
074 040 241
5’ 12’ 26’ 17’ 12’ 3.5’
awning
sign area
17’
building b building a entrance
canopy
container
planting
recessed
entry
commercial streetscape
12’
travel lane
5’
bike lane
varies
landscape blvd.
8’
sidewalk stormwater
treatment
planter
. .
property line
setback to townhouses
varies 20’ to 40’
Mt hermon
road
lot one
townhouses
townhouses at mt hermon rd
17’ 3.5’
sidewalk parking parking sidewalk
lot one uncovered parking
drainage swale
parking
3 1
. .
28’ to 53’
property line
12’
travel lane
5’
bike lane
8’
sidewalk
13’
landscape blvd
10’
landscape
buffer
20’
active terrace
building b corner terrace
building b
5’ tall carmel stone wall
terrace enclosure
A6.0
075 041 242

ACCESS ROAD &

PERPENDICULAR

PARKING
EXIST. SFR @
115 LUCIA LANE
528.0' FLOOR ELEV
554.85' FLOOR ELEV APARTMENT 'C'
P.L.
8' SIDEWALK
FENCE
P.L.

SECTION A
1 SCALE: 1" = 16'-0"
FLOOR ELEV: 506.8'
FLOOR ELEV: 517.8'
FLOOR ELEV: 527.8'
FLOOR ELEV: 537.8'
P.L.

COMMERCIAL BLDG. 'B'
MIXED USE BLDG. 'A'
P.L.

A6.1
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 7/15/19
PLAN CHECK 6/01/20 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA SECTION B 2 SCALE: 1" = 16'-0"
13' LANDSCAPE
8' SIDEWALK
076 042 243
BUILDING A SOUTH ELEVATION 1 SCALE: 1/8"=1'-0"
A7.0
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 6/01/20 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA 34 SF 28 SF
SOUTH ELEVATION 3 SCALE: 1/8"=1'-0"
20 SF

SIGN PROGRAM
20 SF
32 SF

THE SIGN PROGRAM REFLECTS THE BEST PRACTICES FOR A
WALKABLE COMMERCIAL STREET. THE SCALE AND

CHARACTER OF THE SIGNS ARE APPROPRIATE FOR THE SIGHT
DISTANCES OF AROUND 80' AND THE TRAVEL SPEEDS OF
AROUND 5-10 MPH IN CONTRAST TO THE DISTANCES AND
SPEEDS FOUND WITH STRIP SHOPPING CENTERS.

PER THE CITY'S SIGN ORDINANCE 17.56.180, THE ALLOWABLE
SIGN AREA IS ONE SQ. FT. PER WIDTH OF THE FRONT OF THE
BUILDING. ALL PROPOSED SIGNS ARE A MAXIMUM OF 30" TALL.

THE APPROXIMATE DISTANCE FROM THE WALKWAY TO THE
SIGN IS SHOWN ON THESE ELEVATIONS.

PROPOSED SIGNS ARE THREE DIMENSIONAL LETTERS AND
NUMBERS APPLIED DIRECTLY ON THE WALL SURFACE.

SIGNS WILL BE ILLUMINATED BY WALL SCONCES. NO BACK-LIT
SIGNS OR CAN SIGNS ARE ALLOWED. MIRROR REFLECTIVE OR

IRRIDESCANT SIGNS ARE PROHIBITED EXCEPT AS MAY BE
APPROVED BY THE PLANNING COMMISSION.

BUILDING 'A'
TOTAL WIDTH OF BUILDING = 235 FT.

TOTAL ALLOWABLE SIGN AREA = 235 SF
TOTAL PROPOSED SIGN AREA = 192 SF
235'
34 SF 34 SF 34 SF 28 SF
200'-0"

BUILDING 'B' NORTH ELEVATION
TOTAL WIDTH OF BUILDING = 200 FT.

TOTAL ALLOWABLE SIGN AREA = 200 SF
TOTAL PROPOSED SIGN AREA = 195 SF
BUILDING B NORTH ELEVATION 2 SCALE: 1/8"=1'-0"
31 SF 31 SF 31 SF 31 SF 31 SF

BUILDING 'B' SOUTH ELEVATION
TOTAL WIDTH OF BUILDING = 200 FT.

TOTAL ALLOWABLE SIGN AREA = 200 SF
TOTAL PROPOSED SIGN AREA = 160 SF
32 SF 32 SF 32 SF 32 SF +/- 16' +/- 16' +/- 15'-4" +/- 19'-8" 077 043 244

PROPOSED

APARTMENT

BUILDING

PROPOSED

APARTMENT

BUILDING

PROPOSED MIXED

USE BUILDING

PROPOSED

COMMERCIAL
BUILDING #1
#2
#3
#4
#5
#6
#10
#18
SD
SS
SS SS
SD
SD

CLEAN AIR/

VAN POOL / EV

EV CHARGING ONLY
SD
SS
SS

COVER SHEET
1" = 40'
C0.1
WATER: SCOTTS VALLEY WATER DISTRICT GAS AND ELECTRIC: PACIFIC GAS AND ELECTRIC SANITARY SEWER: CITY OF SCOTTS VALLEY STORM DRAIN SYSTEM: CITY OF SCOTTS VALLEY THE WITHIN PLANS ARE COPYRIGHTED AS AN UNPUBLISHED WORK BY C2G/CIVIL CONSULTANTS GROUP, INC. ALL IDEAS DESIGNS,ARRANGEMENTS AND PLANS INDICATED OR REPRESENTED BY THESE DRAWINGS ARE OWNED BY, AND THE PROPERTY OF C2G/CIVIL CONSULTANTS GROUP, INC. AND WERE CREATED, EVOLVED AND DEVELOPED FOR USE ON, AND IN CONNECTION WITH, THE SPECIFIED PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS OR PLANS SHALL BE USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF C2G/CIVIL CONSULTANTS GROUP, INC.

LN
LUNDY
CANYON
GLEN

DR PINES

WHISPERING

DR VALLEY
SCOTTS
LUCIA
LN

WY GREENTREE
BLVD
CREEK
OAK
RD
HERMON
MOUNT C0.1 - COVER SHEET C0.2 - EXISTING SITE
C0.3 - TENTATIVE MAPC1.1 - TOPO AND DEMOLITION PLANC2.1 - HORIZONTAL CONTROL & PAVING PLANC3.1 - GRADING PLANC3.2 - CUT-FILL PLANC4.1 - UTILITY PLANC4.2 - STORMWATER CONTROL PLANC5.1 - EROSION CONTROL PLANC6.1 - SECTIONS

PROJECT

LOCATION

CONTRACTOR RESPONSIBILITY

CONTRACTOR AGREES THAT HE SHOULD ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS,

INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, AND THAT REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED DURING WORKING HOURS. THE CONTRACTOR

SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE DESIGN PROFESSIONALS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FORLIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR DESIGN PROFESSIONAL.

DISCREPANCIES

IF THERE ARE ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND EXISTING CONDITIONS WHICH WILL AFFECT THE WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES TO THE DESIGN PROFESSIONAL FORADJUSTMENT BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING

OF ALL WORK AND FOR THE COORDINATION OF ALL TRADES, SUBCONTRACTORS, AND PERSONS ENGAGED UPON THIS CONTRACT.

EROSION CONTROL NOTE

1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN EROSION CONTROL MEASURES AS REQUIRED

THROUGHOUT THE LIFE OF THE PROJECT IN CONFORMANCE WITH THE CITY OF SCOTTS VALLEY AND THEASSOCIATION OF BAY AREA GOVERNMENTS

2. CONTRACTOR TO PROVIDE BACK-UP EROSION PREVENTION MEASURES (SOIL STABILIZATION) WITH SEDIMENT

CONTROL MEASURES SUCH AS STRAW WATTLES, SILT FENCE, GRAVEL INLET FILTERS, AND/OR SEDIMENT TRAPS OR BASINS. ENSURE CONTROL MEASURES ARE ADEQUATE, IN PLACE, AND IN OPERABLE CONDITIONS. SEDIMENT

CONTROLS, INCLUDING INLET PROTECTION, ARE NECESSARY BUT SHOULD BE A SECONDARY DEFENSE BEHIND GOOD EROSION CONTROL MEASURES.

3. ALL EROSION PREVENTION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED AND REPAIRED THROUGHOUT THE SEASON. REPLACEMENT SUPPLIES SHOULD BE KEPT ON SITE.

4. SITE INSPECTIONS SHALL BE CONDUCTED BEFORE AND AFTER EACH STORM EVENT, AND EVERY 24 HOURS FOR

EXTENDED STORM EVENTS, TO IDENTIFY AREAS THAT CONTRIBUTE TO EROSION AND SEDIMENT PROBLEMS OR ANY OTHER POLLUTANT DISCHARGES. IF ADDITIONAL MEASURES ARE NEEDED, REVISE THE EROSION CONTROL PLAN AND IMPLEMENT THE MEASURES IMMEDIATELY. DOCUMENT ALL INSPECTION FINDINGS AND ACTIONS TAKEN.

5. CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES DURING CONSTRUCTION FOR CONTROL OF STORM WATER RUNOFF (E.G. GRAVEL BAGS AT CATCH BASIN INLETS).

GENERAL NOTES

1. NO CHANGE TO THE PLANS SHALL BE PERMITTED WITHOUT PRIOR WRITTEN APPROVAL BY THE OWNER OR OWNERS REPRESENTATIVES AND THE CITY OF SCOTTS VALLEY.

2. CONTRACTOR SHALL VERIFY LOCATIONS, ELEVATIONS AND INVERTS OF EXISTING UTILITY PRIOR TO COMMENCEMENT OF WORK AND SHALL NOTIFY OWNER OR OWNERS REPRESENTATIVES OF VARIANCE FROM THOSE SHOWN ON THE PLANS.

3. UNDERGROUND FACILITIES AND UTILITIES HAVE BEEN SHOWN BASED ON RECORD DRAWINGS AND VISIBLE EVIDENCE FOUND IN FIELD. NO WARRANTY IS MADE REGARDING THE COMPLETENESS OR ACCURACY OF SUCH INFORMATION. PRIOR

TO CONSTRUCTION, DETERMINE THE EXACT LOCATION OF UNDERGROUND FACILITIES AND UTILITIES, AND PRESERVE SAME FROM DAMAGE. PRIOR TO CONSTRUCTION, VERIFY LOCATION AND ELEVATION OF EXISTING UNDERGROUND UTILITIES AT THE CROSSING POINTS WITH PROPOSED UTILITIES. THE CONTRACTOR SHALL NOTIFY THE OWNER OR OWNERS REPRESENTATIVES IF CONDITIONS DIFFER FROM THOSE SHOWN ON THE DRAWINGS AND SHALL NOT BEGINCONSTRUCTION UNTIL THE CHANGED CONDITION HAS BEEN EVALUATED. CONTACT UNDERGROUND SERVICES ALERT (USA) (1-800-227-2600) TWO (2) WEEKS PRIOR TO DIGGING. REPAIR UNDERGROUND UTILITIES DAMAGED BY CONSTRUCTION OPERATIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES ASSOCIATED WITH CONTRACTOR'S FAILURE TO EXACTLY LOCATED AND PRESERVE UNDERGROUND FACILITIES AND UTILITIES.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH THE APPROPRIATE UTILITY COMPANIES AND/OR AGENCIES TO VERIFY THE EXISTENCE AND/OR LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OFWORK. AND SHALL NOTIFY U.S.A. @ (800) 227-2600 AT LEAST 48-HOURS IN ADVANCE OF EXCAVATION.

5. IF ANY INDICATIONS OF ARCHEOLOGICAL REMAINS ARE ENCOUNTERED DURING GRADING ACTIVITIES FOR ANY DEVELOPMENT WITHIN THE PROJECT SITE, ALL WORK SHALL BE HALTED WITHIN 200 FOOT RADIUS OF THE FIND. OWNER

SHALL RETAIN A QUALIFIED ARCHEOLOGIST RETAINED TO DETERMINE THE NATURE OF THE DISCOVERY AND RECOMMEND APPROPRIATE EVALUATION PROCEDURES.

6. CONTRACTOR SHALL BE FAMILIAR WITH, KEEP AND MAINTAIN A COPY OF THE MITIGATION MONITORING AND REPORTING PROGRAM (MMRP) ONSITE, IN THE JOB TRAILER AT ALL TIMES.

VICINITY MAP
SCALE: NTS

CIVIL SHEET INDEX
ARCHITECT:

CIVIL ENGINEER:

SURVEYOR:

C2G/CIVIL CONSULTANTS GROUP, INC
4444 SCOTTS VALLEY DRIVE STE. 6
SCOTTS VALLEY, CA 95066OFFICE: (831) 438-4420

1. STORMDRAIN PIPE SHALL BE SDR-26 P.V.C., A.D.S. N-12 SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE OR APPROVED SUBSTITUTE, OR AS NOTED ON PLAN. ALL DRAINAGE PIPE SHALL BE SHIPPED, STORED, AND INSTALLED PER THE PIPE MANUFACTURER'S RECOMMENDATIONS.

2. ALL CONCRETE DRAINAGE INLETS CALLED OUT ON THE PLANS SHALL BE CHRISTY BRAND PRECAST CONCRETE OR EQUIVALENT. ALL STRUCTURES SHALL BE STORED, HANDLED, AND INSTALLED PER THE MANUFACTURER'SRECOMMENDATIONS. ALL GRATES IN PAVEMENT AREAS SHALL BE ADA COMPLIANT.

3. ALL CONCRETE DRAINAGE INLETS CALLED OUT ON THE PLANS SHALL HAVE A HEAVY RATED FRAME WITH A ADA COMPLIANT GRATE. CATCH BASINS THAT HAVE SILT AND GREASE TRAPS SHALL BE INCLUDED IN THE PROJECT MONITORING AND MAINTENANCE PLAN.

4. STORM DRAIN TRENCH BACKFILL SHALL CONFORM TO CITY OF SCOTTS VALLEY FIG SD-9.

5. JETTING OF BACKFILL MATERIALS TO ACHIEVE COMPACTION IS NOT ALLOWED.

6. ALL THE WATER PIPING SHALL BE AWWA CLASS 150 OR APPROVED EQUAL, ALL VALVES , ANGLES, AND THRUST BLOCKS SHALL BE INSTALLED PER CURRENT CPC SPECIFICATIONS.

7. ALL FIRE SERVICE PIPING AND APPURTENANCES SHALL CONFORM TO NFPA STANDARDS AND SPECIFICATIONS

8. ANY EXISTING UTILITIES THAT ARE REQUIRED TO BE RELOCATED AS A PART OF THIS CONSTRUCTION SHALL BE RELOCATED AT THE DEVELOPER'S EXPENSE.

UNDERGROUND NOTES ABBREVIATIONS LEGEND UNAUTHORIZED CHANGES AND USES CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGESTO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OFTHE PLANS

AB AGGREGATE BASEAC ASPHALT CONCRETE

B/SS BOTTOM OF SANITARY SEWERBFC BOTTOM FACE OF CURBBFS BOTTOM FACE OF STEPB/STEP BOTTOM OF STEPBFW BOTTOM FACE OF WALLBW BACK OF WALLBFP BACKFLOW PREVENTERE ELECTRICAL (PG&E) (E) EXISTING

EP EDGE OF PAVEMENT

C AT&T CABLECB CATCH BASIN

FH FIRE HYDRANTFL FLOW LINEFG FINISHED GROUNDFS FINISHED SURFACE

G GASGV GATE VALVE

HYD HYDRANTME MATCH EXISTING
(N) NEW

OH OVERHEAD LINES

P PAVEMENTPOC POINT OF CONNECTIONREC RECLAIMED WATERPE POLY ETHYLENE TUBING

SAN SANITARYSSCO SANITARY SEWER CLEAN OUTSD STORM DRAINSTA STATION

T TELEPHONET/REC TOP OF REC WATER LINETC TOP OF CURBTOW TOP OF WALLT/STEP TOP OF STEP

SW TOP OF SIDEWALK

W WATERWM WATER METERWV WATER VALVE

VALLEY GUTTER

RETAINING WALL

STORM MANHOLE

DRAIN/DROP INLET

SEWER MANHOLE

GATE VALVE

UTILITY POLE

SEWER LATERAL

WATER SERVICE &WATER METER

FIRE HYDRANT

CLEAN OUT

STORM DRAINSANITARY SEWERCENTER LINE

PROPERTY LINE

JOINT TRENCH

ELECTRICAL

WATER MAIN

PROPOSED EXISTING DESCRIPTION

AREA DRAIN

CONTOURSOVERLAND RELEASE

FS FS FIRE SUPPRESSION
C 2016 TODD R. CREAMER, D.B.A. AS C2G/CIVIL CONSULTANTS GROUP, INC.

UTILITIES/NOTIFICATIONS
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420 2

OAK CREEK PARK

SCOTT'S VALLEY, CA
AB
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
A
B
CD
E
F
G
1 2 3 4 5 6 7 8 9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

THACHER & THOMPSON ARCHITECTS
877 CEDAR STREET, SUITE 248SANTA CRUZ, CA 95060831.457.3939 THE TOPOGRAPHIC SURVEY IS BASED UPON NAVD88.

BENCHMARK : SANITARY SEWER MANHOLE RIM FOUND IN

THE CENTER OF LUNDY LANE
ELEV=505.89

PROJECT DATUM

ALPHA SURVEY
4444 SCOTTS VALLEY DRIVE
SCOTTS VALLEY, CA 95066
OFFICE: (831) 438-4420

CONSTRUCTION SURVEYING / STAKING

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SURVEYING AND OR STAKING BY A LICENSED SURVEYOR FOR ALL CONSTRUCTION PURPOSES.

IMPROVEMENT PLANS FOR OAK CREEK PARK
3640 GLEN CANYON ROAD
SCOTT'S VALLEY, CALIFORNIA 95066
APN: 022-162-76

THRUST BLOCK
078 044 245
20'
#1
#2
#3
#4
#5
#6
#10
#18

EXISTING PARCEL 'A' EXISTING PARCEL 'B'
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420
2 OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

EXISTING SITE
1" = 30'
C0.2
LEGEND
NOTES

VICINITY MAP
SCALE: NTS
I.D. ACTION
079 045 246
080 046 247
081 047 248
082 048 249
083 049 250
SD
SS
SS
SS
SD
SD

CLEAN AIR/

VAN POOL / EV

EV CHARGING ONLY
SD
SS
SS
#1
#2
#3
#4
#5
#6
#10
#18
520
525
535
530
520
525
520
515
515
520
525
540
535
530
525
525
520
515
510
505
505
510
505
505
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420
2 OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

GRADING PLAN
1" = 40'
C3.1

EXISTING SHELL STATION
EL = 518'(+/-)
NOTE: THE EARTHWORK QUANTITIES SHOWN HEREON ARE

EXCLUSIVE OF WALL FOOTINGS, EXISTING PAVEMENT REMOVAL

AND OVER EXCAVATION AND RECOMPACTION, UTILITY TRENCH SPOILS & SOIL EXPANSION AND CONTRACTION FACTORS.

ITEM DESCRIPTION CUT (cu.yds) FILL (cu.yds)
1 EG VS. FG 5687 7686
NET VOLUME =
1999 CU.YDS. OF FILL
THE ABOVE QUANTITIES ARE FOR INFORMATION PURPOSES ONLY.

THE CONTRACTOR IS RESPONSIBLE TO PROVIDE THE NECESSARY CUT AND FILL TO ACCOMPLISH FINISH GRADE SHOWN ON THESE PLANS.

EARTHWORK QUANTITIES
084 050 251

CLEAN AIR/

VAN POOL / EV

EV CHARGING ONLY
#1
#2
#3
#4
#5
#6
#10
#18
520
525
535
530
520
525
520
515
515
520
525
540
535
530
525
525
520
515
510
505
505
510
505
505
Elevations Table
Number 1
23456789
10 Minimum Elevation
-16.00-13.00-10.00
-7.00-4.00-1.00

2.00 4.00

6.00 8.00
Maximum Elevation
-13.00-10.00
-7.00-4.00-1.00

2.00 4.006.008.00

10.00 Area
1479.85
4928.17
9006.52
15414.11
47398.11
54630.07
13516.74
6588.66
2849.17
431.25
Color
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420
2 OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

GRADING CUT - FILL PLAN
1" = 20'
C3.2
M T. H E R M O N R O A D
G
L
E
N
C
A
N
Y
O
N
R
D
085 051 252
086 052 253
SD
SD
SD

CLEAN AIR/

VAN POOL / EV

EV CHARGING ONLY
SD
520
525
535
530
520
525
520
515
515
520
525
540
535
530
525
525
520
515
510
505
505
510
505
505
M-2
M-4
M-1
M-3
S-1
S-18
R-4
S-22
R-3
R-2
R-1
S-24
S-25
S-23
S-26
S-21
S-19
S-20
S-17
S-14
S-10
S-12
S-11
C-1
S-9
C-3
S-8
S-7
C-2
S-5
S-4
S-27
S-3
S-2
S-16
S-13
S-15
S-6
SCM 2
SCM 1
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420
2 OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

TENTATIVE

STORMWATER CONTROL PLAN
1" = 20'
C4.2

DRAINAGE AREA TABLE
TOTAL AREA IMPERVIOUS AREA (SQ. FT.) PERVIOUS AREA STORMWATER ID SQ FT ACRES (A) BUILDING CONCRETE ASPHALT TOTAL SQ. FT.

RUNOFF

COEFFICIENT
(C)

RAINFALLINTENSITY
(I) FLOW (Q)
C-1 3125 0.0717 3125 0
0 3125
0 0.95 2.0 0.14
C-2 3076 0.0706 3076 0
0 3076
0 0.95 2.0 0.13
C-3 2823 0.0648 2823 0
0 2823
0 0.95 2.0 0.12
M-1 11535 0.2648 11535 0 0 11535
0 0.95 2.0 0.50
M-2 5400 0.1240 5400 0
0 5400
0 0.95 2.0 0.24
M-3 8206 0.1884 8206 0
0 8206
0 0.95 2.0 0.36
M-4 8965 0.2058 8965 0
0 8965
0 0.95 2.0 0.39
R-1 3875 0.0890 3100 645
0 3745 130 0.93 2.0 0.16
R-2 3388 0.0778 2736 587
0 3323 65 0.94 2.0 0.15
R-3 3794 0.0871 2977 692
0 3669 125 0.93 2.0 0.16
R-4 4067 0.0934 2904 925
0 3829 238 0.91 2.0 0.17
S-1 18134 0.4163 0 802
0 802 17332 0.28 2.0 0.23
S-2 4567 0.1048 0
0 0
0 4567 0.25 2.0 0.05
S-3 3313 0.0761 315 813 2186 3313
0 0.95 2.0 0.14
S-4 2627 0.0603 0 638 1989 2627
0 0.95 2.0 0.11
S-5 9154 0.2101 234 2294 6507 9035 119 0.94 2.0 0.40
S-6 545 0.0125 0 359
0 359 186 0.71 2.0 0.02
S-7 4448 0.1021 0
0 0
0 4448 0.25 2.0 0.05
S-8 1233 0.0283 0 1233 0 1233
0 0.95 2.0 0.05
S-9 2677 0.0615 0
0 0
0 2677 0.25 2.0 0.03
S-10 2225 0.0511 0 1083 0 1083 1143 0.59 2.0 0.06S-11 9774 0.2244 0 2808 6285 9093 681 0.90 2.0 0.40S-12 2273 0.0522 0 310 1563 1873 400 0.83 2.0 0.09 S-13 3040 0.0698 0 417 2277 2694 346 0.87 2.0 0.12
S-14 3949 0.0907 0 762 2746 3508 442 0.87 2.0 0.16
S-15 503 0.0115 0 40
0 40 464 0.30 2.0 0.01
S-16 789 0.0181 0 50
0 50 739 0.29 2.0 0.01
S-17 3645 0.0837 0 321 3097 3418 227 0.91 2.0 0.15S-18 8931 0.2050 0 717 7041 7758 1173 0.86 2.0 0.35S-19 1620 0.0372 0 0 0
0 1620 0.25 2.0 0.02
S-20 185 0.0042 0
0 0
0 185 0.25 2.0 0.00
S-21 1875 0.0430 0
0 0
0 1875 0.25 2.0 0.02
S-22 1374 0.0315 0
0 0
0 1374 0.25 2.0 0.02
S-23 2591 0.0595 0
0 0
0 2591 0.25 2.0 0.03
S-24 4495 0.1032 0 18 4477 4495
0 0.95 2.0 0.20
S-25 1252 0.0287 0
0 0
0 1252 0.25 2.0 0.01
S-26 1530 0.0351 0 1530 0 1530
0 0.95 2.0 0.07
S-27 498 0.0114 0 498
0 498
0 0.95 2.0 0.02
087 053 254
SD
SD
SD
SD
#1
#2
#3
#4
#5
#6
#10
#18
520
525
535
530
520
525
520
515
515
520
525
540
535
530
525
525
520
515
510
505
505
510
505
505
C

PROPOSED

APARTMENT

BUILDING

PROPOSED

APARTMENT

BUILDING

PROPOSED MIXED

USE BUILDING

PROPOSED

COMMERCIAL
BUILDING MT. HERMON ROAD

GLEN CANYON ROAD
7'-0"
Notes:

ERTEC® ProWattle
Installation Details
File Name:Layout Name:

8.5" x 11"
Default Print Size: Page:
©
Flow
Flow
Notes:

Notes:

ERTEC® S-Fence
Installation Details
Important
8", 10" or 14", SF08, SF10 or SF14
File Name:Layout Name:

8.5" x 11"
Default Print Size: Page:
©
S-Fence "A" "B"

SANDBAG
A A
PLAN
3'

SECTION A-A
BERM
VARIES
10 MIL PLASTIC
LINING
B B
STAKE
(TYP.)

WOOD FRAME SECURELY

FASTENED AROUNDENTIRE PERIMETER WITH

TWO STAKES
10 MIL PLASTIC
LINING
VARIES
10 MIL

PLASTIC LINING
PLAN

SECTION B-B
STAKE
(TYP.)

STRAW BALE
(TYP.)
B B 10 MIL PLASTIC LINING
STRAW BALE(TYP.)

BINDING WIRE

WOOD OR

METAL STAKES
(2 PER BALE)
STAPLES(2 PER BALE)
4"

STAPLE DETAIL
2"

VARIES SANDBAG
NOTES

1. ACTUAL LAYOUT DETERMINED IN
FIELD.

2. THE CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN 30 FT.OF THE TEMPORARY CONCRETE WASHOUT FACILITY.
10 MIL

PLASTICLINING
10 MIL PLASTIC
LINING

TWO-STACKED
2 X 12 ROUGH

WOOD FRAME
10' MIN
10' MIN
10' MIN
18 IN DIA.

STEEL WIRE
PLAN

NOT TO SCALE
TYPE "ABOVE GRADE"

LATH & FLAGGING ON

ALL SIDES
BERM

NOT TO SCALE

NATIVE MATERIAL
(OPTIONAL)

NOT TO SCALE

NOT TO SCALE
TYPE "BELOW GRADE"

NOT TO SCALE
TYPE "BELOW GRADE"
NOTES

1. ACTUAL LAYOUT DETERMINED IN
FIELD.

2. THE CONCRETE WASHOUT SIGN SHALL
BE INSTALLED WITHIN 30 FT. OF THE

TEMPORARY CONCRETE WASHOUT
FACILITY.

PLYWOOD
48" X 24"

PAINTED WHITEBLACK LETTERS
6" HEIGHT0.5" LAGSCREWS

WOOD POST
3" X 3" X 8"

CONCRETE

WASHOUT

CONCRETE WASHOUT

SIGN DETAIL
(OR EQUIVALENT)
3'3'

SECTION B-B

NOT TO SCALE
ImportantMaintenance: Installation Notes 1.Placement: Select correct size (Table 1). DO NOT remove grate. Lay GR8 Guard on top of grate. GR8 Guard shall extend at least 3 inches beyond grate in each direction. 2. Anchor methods: A) Attach with 16 gauge tie-wire. Cut wire to 18” length. At each corner of GR8 Guard, feed one end of wire down through GR8 Guard, around grate bar, and back up thru GR8 Guard . Above ground, twist wires several times, cut-off excess (Fig 1). or B) Place small snake bags or equivalent (gravel bags) containing clean, pea-sized graded gravel around perimeter of GR8 Guardä ( ä ( 3.Clean: Accumulation of leaves, debris and sediment can cause backups! Clean after every storm or as necessary. 4.Protect: In stop and go traffic areas where exposed to constant tire abuse, it is useful to place traffic cones or delineators on or near GR8 Guard to discourage run-overs. GR8 Guard Installation Guide
Unprotected
drainage inlet
Protected drainage inlet
ERTEC® GR8 ” ” Grates less than
Table 1
GG size ” ” ERTEC® GR8 Guard For drainage inlets with grates in paved areas File Name:Layout Name:

NONE
Page:

Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420 2

OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4 5 6 7 8 9 10
A
B
CD
E
F
G
1 2 3 4 5 6 7 8 9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I

EROSION CONTROL PLAN
1" = 20'
C5.1

EROSION CONTROL NOTE

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN EROSION CONTROL

MEASURES AS REQUIRED THROUGHOUT THE LIFE OF THE PROJECT IN CONFORMANCE WITH

THE CITY OF SCOTTS VALLEY AND THE ASSOCIATION OF BAY AREA GOVERNMENTS

CONTRACTOR TO PROVIDE BACK-UP EROSION PREVENTION MEASURES (SOILSTABILIZATION) WITH SEDIMENT CONTROL MEASURES SUCH AS STRAW WATTLES, SILT FENCE, GRAVEL INLET FILTERS, AND/OR SEDIMENT TRAPS OR BASINS. ENSURE CONTROLMEASURES ARE ADEQUATE, IN PLACE, AND IN OPERABLE CONDITIONS. SEDIMENT

CONTROLS, INCLUDING INLET PROTECTION, ARE NECESSARY BUT SHOULD BE A SECONDARY DEFENSE BEHIND GOOD EROSION CONTROL MEASURES.

ALL EROSION PREVENTION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED AND REPAIRED THROUGHOUT THE SEASON. REPLACEMENT SUPPLIES SHOULD BE KEPT ON SITE.

SITE INSPECTIONS SHALL BE CONDUCTED BEFORE AND AFTER EACH STORM EVENT, AND EVERY 24 HOURS FOR EXTENDED STORM EVENTS, TO IDENTIFY AREAS THAT CONTRIBUTE TO EROSION AND SEDIMENT PROBLEMS OR ANY OTHER POLLUTANT DISCHARGES. IFADDITIONAL MEASURES ARE NEEDED, REVISE THE EROSION CONTROL PLAN AND IMPLEMENTTHE MEASURES IMMEDIATELY. DOCUMENT ALL INSPECTION FINDINGS AND ACTIONS TAKEN.

CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES DURING CONSTRUCTION FOR CONTROL OF STORM WATER RUNOFF (E.G. GRAVEL BAGS AT CATCH BASIN INLETS).

EROSION CONTROL BMP'S

EROSION CONTROL LEGEND
DIRECTION OF DRAINAGEPRO WATTLE (SEE DETAIL 3)
S-FENCE (SEE DETAIL 4)

ROCKED CONSTRUCTION ENTRANCE
(SEE DETAILS 1)INLET PROTECTION (SEE DETAIL 2)

PROPOSED STORM WATER SAMPLING LOCATION
CONCRETE WASHOUT AREA (SEE DETAIL 5)SANITARY FACILITY

MATERIALS & EQUIPMENT STORAGE AREA

VEHICLE MAINTENANCE/FUELING AREA

ALL CONSTRUCTION SITES

1. DELINEATE CLEARING LIMITS, SENSITIVE OR CRITICAL AREAS, TREES, DRAINAGE COURSES, AND BUFFER ZONES TO PREVENT EXCESSIVE OR UNNECESSARY DISTURBANCE AND EXPOSURE OF SOIL.

2. IDENTIFY ALL STORM DRAINS, DRAINAGE SWALES AND CREEKS LOCATED NEAR THE CONSTRUCTION SITE

AND MAKE SURE ALL SUBCONTRACTORS ARE AWARE OF THEIR LOCATIONS TO PREVENT POLLUTANTS FROM ENTERING THEM.

3. PRESERVE EXISTING VEGETATION, WHERE REQUIRED AND WHEN FEASIBLE, TO THE MAXIMUM EXTENT PRACTICABLE.

4. PHASE GRADING OPERATIONS, TO THE EXTENT POSSIBLE, TO LIMIT AREAS OF DISTURBANCE AND TIME OF

EXPOSURE

5. AVOID AND/OR MINIMIZE IMPACTS OF EXCAVATION AND GRADING DURING WET WEATHER AND IMMEDIATELY PRECEDING EXPECTED WET WEATHER.

6. MINIMIZE CUTS AND FILLS.

7. IMPLEMENT MEASURES TO MINIMIZE EROSION, MANAGE STORM WATER RUNOFF, AND PREVENT POLLUTANTS FROM CONSTRUCTION ACTIVITIES FROM ENTERING STORM DRAINS.

8. ALIGN TEMPORARY AND PERMANENT ROADS AND DRIVEWAYS ALONG SLOPE CONTOURS.9. WASH VEHICLES AT AN APPROPRIATE OFF-SITE FACILITY. IF EQUIPMENT MUST BE WASHED ON-SITE, USE

WASH DOWN AREAS DEVELOPED FOR SPECIFIC SITE REQUIREMENTS AND APPROVED BY THE CITY REPRESENTATIVE. DO NOT USE SOAPS, SOLVENTS, DEGREASERS, OR STEAM CLEANING EQUIPMENT, ANDPREVENT WASH WATER FROM ENTERING STORM DRAINS.

MINIMIZE SOIL MOVEMENT1. STOCKPILED SOIL AND MATERIALS SHOULD BE COVERED AND STABILIZED WITH TARPS, GEOTEXTILE FABRIC, HYDROSEEDING AND/OR EROSION CONTROL BLANKETS.

2. CREATE A BERM AND/OR INSTALL SILT FENCING AROUND STOCKPILED MATERIALS TO PREVENT STORM WATER RUNOFF FROM TRANSPORTING SEDIMENT OFFSITE.

3. USE STANDARD EROSION CONTROL SEEDING, PLANTING, MULCHING, GEOTEXTILE FABRIC AND/OR EROSION CONTROL BLANKETS TO STABILIZE DISTURBED SOIL AND REDUCE THE POTENTIAL FOR EROSION.

4. USE OTHER SOIL STABILIZERS AS APPROVED BY THE CITY OF SCOTTS VALLEY.

STRUCTURES TO CONTROL AND CONVEY RUNOFF

1. CONVEY RUNOFF BY USE OF EARTH DIKES, DRAINAGE SWALES AND/OR DITCHES WHEN FEASIBLE.

2. USE SLOPE DRAINS TO COLLECT AND CONVEY WATER FOR DISCHARGE BELOW SLOPES WHEN FEASIBLE.3. USE VELOCITY DISSIPATION DEVICES, FLARED CULVERT END SECTIONS AND/OR CHECK DAMS TO REDUCE RUNOFF VELOCITY AND MITIGATE EROSION WHEN FEASIBLE.

CAPTURE SEDIMENT

1. USE TERRACING, RIPRAP, SAND BAGS, ROCKS, APPROVED TEMPORARY VEGETATION AND/OR OTHER APPROVED BMP’S ON SLOPES TO REDUCE RUNOFF VELOCITY AND TRAP SEDIMENTS. DO NOT USE ASPHALT RUBBLE OR OTHER DEMOLITION DEBRIS FOR THIS PURPOSE.

2. PROTECT STORM DRAIN INLETS FROM SEDIMENT-LADEN RUNOFF. STORM DRAIN INLET PROTECTION DEVICES INCLUDE GRAVEL BAGS, FILTER FABRIC FENCES AND BLOCK AND GRAVEL FILTERS.

OTHER RUNOFF CONTROLS

1. TEMPORARY SEDIMENT BASIN

2. SEDIMENT TRAP3. BRUSH OR ROCK FILTER

4. SILT FENCE

5. SAND OR GRAVEL BAG BARRIER

TRACKING CONTROL

1. IMPLEMENT MEASURES AS NECESSARY TO MINIMIZE TRACKING OF SOIL OFF SITE

2. USE DRY SWEEPING METHODS WHEN CLEANING SEDIMENTS FROM STREETS, DRIVEWAYS AND PAVED AREAS BY HAND. WHEN USING MECHANICAL STREET SWEEPERS, USE FINE WATER SPRAY TO REDUCE DUST AND IMPROVE SEDIMENT REMOVAL WHILE MINIMIZING RUNOFF.

PAINT WORK1. DO NOT CLEAN PAINT BRUSHES OR RINSE PAINT CONTAINERS INTO A STREET, GUTTER, STORM DRAIN, OR CREEK.

2. FOR WATER-BASED PAINTS, PAINT OUT BRUSHES TO THE EXTENT POSSIBLE AND RINSE TO A DRAIN LEADING TO THE SANITARY SEWER (I.E., INDOOR PLUMBING).

3. FOR OIL-BASED PAINTS, PAINT OUT BRUSHES TO THE EXTENT POSSIBLE, AND FILTER AND REUSE THINNERS AND SOLVENTS. DISPOSE OF UNUSABLE THINNERS, OIL-BASED PAINT, SLUDGES AND RESIDUE AS HAZARDOUS WASTE.

4. NON-HAZARDOUS PAINT CHIPS AND DUST FROM DRY STRIPPING AND SAND BLASTING MAY BE SWEPT UP OR COLLECTED IN PLASTIC DROP CLOTHS AND DISPOSED OF AS TRASH. CHEMICAL PAINT STRIPPING RESIDUE

AND CHIPS AND DUST FROM MARINE PAINTS OR PAINTS CONTAINING LEAD OR TRIBUTYL TIN MUST BE DISPOSED OF AS A HAZARDOUS WASTE.

5. WHEN STRIPPING OR CLEANING BUILDING EXTERIORS WITH HIGH-PRESSURE WATER, COVER OR BERM STORM DRAIN INLETS. COLLECT (MOP OR VACUUM) BUILDING CLEANING WATER FOR DISPOSAL IN A PRE-AUTHORIZED MANNER.

6. RECYCLE, RETURN TO SUPPLIER OR DONATE UNWANTED WATER-BASED (LATEX) PAINT.

7. DRIED LATEX PAINT MAY BE DISPOSED OF IN THE TRASH.

CEMENT AND CONCRETE WORK

1. AVOID MIXING EXCESS AMOUNTS OF FRESH CONCRETE OR CEMENT MORTAR ON-SITE.

2. STORE DRY AND WET CONCRETE AND CEMENT UNDER COVER, PROTECTED FORM RAINFALL AND RUNOFF.3. WASH OUT CONCRETE TRANSIT MIXERS ONLY IN DESIGNATED WASH-OUT AREAS. WHENEVER POSSIBLE, RECYCLE WASHOUT BY PUMPING BACK INTO MIXERS FOR REUSE. DO NOT DISPOSE OF WASHOUT INTO THE STREET, STORM DRAINS, DRAINAGE DITCHES, OR CREEKS. DESIGNATED WASH-OUT AREAS MUST BE MAINTAINED TO PREVENT OVER FLOW.

4. WHENEVER POSSIBLE, RETURN CONTENTS OF MIXER BARREL TO THE OFF-SITE YARD FOR RECYCLING.

DISPOSE OF SMALL AMOUNTS OF EXCESS CONCRETE, GROUT, AND MORTAR IN THE TRASH.

ROADWORK/PAVEMENT

5. APPLY CONCRETE, ASPHALT, AND SEAL COAT DURING DRY WEATHER TO PREVENT CONTAMINANTS FROM CONTACTING STORMWATER RUNOFF.

6. COVER STORM DRAIN INLETS AND MANHOLES WHEN PAVING OR APPLYING SEAL COAT, SLURRY SEAL, FOG SEAL, AND SIMILAR MATERIALS.

7. ALWAYS PARK PAVING MACHINES OVER DRIP PANS OR ABSORBENT MATERIALS, SINCE THEY TEND TO DRIP CONTINUOUSLY.

8. WHEN MAKING SAW-CUTS IN PAVEMENT, USE AS LITTLE WATER AS POSSIBLE. COVER POTENTIALLY

AFFECTED STORM DRAIN INLETS COMPLETELY WITH FILTER FABRIC DURING THE SAWING OPERATION AND

CONTAIN THE SLURRY BY WET-VACUUMING, OR BY PLACING STRAW BALES, SANDBAGS, OR GRAVEL DAMS AROUND THE CATCH BASINS. AFTER THE LIQUID DRAINS OR EVAPORATES, SHOVEL OR VACUUM THE SLURRY RESIDUE FROM THE PAVEMENT OR GUTTER AND REMOVE FROM SITE.

9. WASH DOWN EXPOSED AGGREGATE CONCRETE ONLY WHEN THE WASH WATER CAN: (1) FLOW ONTO A DIRT AREA; (2) DRAIN ONTO A BERMED SURFACE FROM WHICH IT CAN BE PUMPED AND DISPOSED OF PROPERLY; OR (3) BE VACUUMED FROM THE AREA ALONG THE CURB WHERE SEDIMENT HAS ACCUMULATED BY BLOCKING A STORM DRAIN INLET.

10. ALLOW AGGREGATE RINSE TO SETTLE, AND PUMP THE WATER TO THE SANITARY SEWER IF ALLOWED BY YOUR LOCAL WASTEWATER AUTHORITY.

11. DO NOT WASH SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE INTO A STREET OR STORM DRAIN.

COLLECT AND RETURN TO AGGREGATE BASE STOCKPILE, OR DISPOSE WITH TRASH.

12. RECYCLE BROKEN CONCRETE AND ASPHALT.HAZARDOUS MATERIAL SPILL PREVENTION, SPILL REPORTING AND RESPONSE1. ALL HAZARDOUS MATERIALS SHALL BE STORED SO THAT THEY ARE PROTECTED FROM INCLEMENT WEATHER AND VANDALISM.

2. MOTOR VEHICLES SHALL NOT BE FUELED ON THE PROJECT SITE.3. SPILL CONTAINMENT MEASURES MUST BE MADE PRIOR TO FUELING WHEN FUELING EQUIPMENT OTHER THAN MOTOR VEHICLES.

4. VEHICLE MAINTENANCE, OTHER THAN EMERGENCY REPAIRS, SHALL NOT BE PERFORMED ON THE PROJECT SITE.

5. APPROPRIATE EMERGENCY SPILL CONTAINMENT SUPPLIES SHALL BE MAINTAINED ON SITE BY THE CONTRACTOR.

6. SPILLS GREATER THAN ONE QUART SHALL BE IMMEDIATELY REPORTED TO THE CITY'S REPRESENTATIVE AND COUNTY INSPECTOR.

7. SPILLS SHALL BE DIKED OR CONTAINED BY TRAINED PERSONNEL TO PREVENT THE SPILLED HAZARDOUS MATERIAL FROM ENTERING THE STORM WATER SYSTEM OR LEAVING THE PROJECT SITE.

8. SPILLS OF LESS THAN FIVE (5) GALLONS SHALL BE ABSORBED USING AN APPROPRIATE MATERIAL. ALL

CONTAMINATED MATERIALS SHALL BE CONTAINERIZED, REMOVED FROM THE JOBSITE AND DISPOSED IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.

9. SPILLS IN EXCESS OF FIVE (5) GALLONS SHALL BE ABSORBED USING AN APPROPRIATE MATERIAL AND

PLACED IN CONTAINERS UNDER THE DIRECTION OF THE COUNTY OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY.

10. ANY CONTAMINATED SOIL SHALL BE REMOVED BY THE CONTRACTOR AND REPLACED WITH ACCEPTABLE FRESH SOIL.

11. RESPONSE SHALL BE CARRIED OUT BY APPROPRIATELY TRAINED PERSONNEL UTILIZING SAFE PRACTICES.

GOOD HOUSEKEEPING PRACTICES

1. DO NOT WASH DOWN PAVEMENT OR SURFACES WHERE SILT HAS BEEN DEPOSITED OR MATERIALS HAVE SPILLED. USE DRY CLEANUP METHODS.

2. AVOID CONTAMINATING CLEAN RUNOFF FROM AREAS ADJACENT TO YOUR SITE BY USING BERMS AND/OR TEMPORARY OR PERMANENT DRAINAGE DITCHES TO DIVERT WATER FLOW AROUND THE SITE.

3. COVER EXPOSED PILES OF SOIL, CONSTRUCTION MATERIALS AND WASTES WITH PLASTIC SHEETING OR TEMPORARY ROOFS. BEFORE IT RAINS, SWEEP AND REMOVE MATERIALS FROM SURFACES THAT DRAIN TO STORM DRAINS, CREEKS, OR CHANNELS.

4. PLACE TRASH CANS AROUND THE SITE TO REDUCE POTENTIAL LITTER. DISPOSE OF NON-HAZARDOUS CONSTRUCTION WASTES IN COVERED DUMPSTERS OR RECYCLING RECEPTACLES. RECYCLE LEFTOVER MATERIALS WHENEVER POSSIBLE.

5. DISPOSE OF ALL WASTES PROPERLY. MATERIALS THAT CAN NOT BE REUSED OR RECYCLED MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE, AS APPROPRIATE.

6. COVER OPEN DUMPSTERS WITH PLASTIC SHEETING OR A TARP DURING RAINY WEATHER. SECURE THE SHEETING OR TARP AROUND THE OUTSIDE OF THE DUMPSTER. IF THE DUMPSTER HAS A COVER, CLOSE IT.

7. TRAIN YOUR EMPLOYEES AND INFORM CONTRACTORS AND SUBCONTRACTORS ABOUT STORM WATER MANAGEMENT REQUIREMENTS AND THEIR RESPONSIBILITIES FOR COMPLIANCE.

Scale: NTS
ROCKED CONSTRIUCTION ENTRANCE 1
Scale: NTS
GR8 GUARD DETAIL 2
Scale: NTS
PRO WATTLE DETAIL 3 Scale: NTS S FENCE DETAIL 4
Scale: NTS
CONCRETE WASH DETAIL 5
C
088 054 255
PL
109 Lucida Lane
550.64 Deck Elevation
Existing Single Family Residence
559.68 Deck Elevation
PL
(N) BLDG
FF = 528.0
PL
EC EC
115 Lucida Lane
554.85 Floor Elevation 554.71 Deck Elevation
Existing Single Family Residence
Existing Fence
STA:1+16.58
ELEV:526.70
STA:1+60.00
ELEV:527.10
STA:1+65.50
ELEV:527.60
STA:1+74.00
ELEV:527.18RESIDENTIAL ACCESS ROAD & PERPENDICULAR PARKING TC TC EC BLDG FF=505.79
PL
LIP
FL
LIP

SECTIONS
1" = 20'
C6.1
Date:Scale:Drawn:

Job:

Of Sheets
Sheet:

REVISIONS BY

12.02.19 DD/JB
318-00
C G /CIVIL CONSULTANTS GROUP, INC.

Engineers/Planners
4444 Scotts Valley Drive / Suite 6
Scotts Valley, CA 95066
T (831) 438-4420 F (831) 438-4420
2 OAK CREEK PARK

SCOTT'S VALLEY, CA
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
A
B
CD
E
F
G
1 2 3 4
5 6 7 8
9 10
11 MIXED USE DEVELOPMENT
11 12
11 12
H
I
H
I
Scale: 1"=10'

SECTION A
1 Scale: 1"=10'

SECTION B
1 MT. HERMON ROAD EG
FG
3 1
089 055 256

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.2

0.1 0.1

0.1 0.2

0.2 0.2

0.1 0.3

0.3 0.3

0.2 0.2

0.4 0.4

0.4 0.4

0.3 0.3

0.3 0.2

0.4 0.5

0.5 0.5

0.5 0.5

0.4 0.4

0.3 0.3

0.5 0.6

0.6 0.7

0.6 0.6

0.6 0.5

0.4 0.3

0.2 0.6

0.7 0.8

0.8 0.8

0.8 0.8

0.7 0.7

0.6 0.4

0.3 0.6

0.7 0.8

1.0 1.0

1.0 1.0

1.0 0.9

0.9 0.7

0.5 0.4

0.2 0.7

0.7 0.8

0.9 1.1

1.2 1.3

1.3 1.2

1.2 1.2

1.1 0.8

0.6 0.4

0.3 0.8

0.9 1.0

1.1 1.2

1.3 1.5

1.6 1.6

1.5 1.4

1.4 1.2

1.0 0.7

0.5 0.3

0.8 0.9

1.1 1.2

1.3 1.4

1.5 1.7

1.9 2.0

2.0 1.9

1.7 1.6

1.3 1.0

0.7 0.6

0.5 0.3

1.0 1.2

1.4 1.5

1.6 1.8

1.9 2.1

2.3 2.5

2.4 2.2

1.9 1.6

1.3 1.0

0.9 0.7

0.6 0.3

0.7 1.0

1.2 1.4

1.6 1.8

2.0 2.3

2.5 2.6

2.7 2.7

2.6 2.3

1.9 1.7

1.3 1.1

1.0 0.8

0.5 0.3

0.5 0.7

0.9 1.1

1.4 1.6

1.9 2.1

2.4 2.8

3.1 3.1

2.9 2.7

2.5 2.3

2.1 1.7

1.4 1.2

1.0 0.6

0.3 0.3

0.4 0.5

0.6 0.8

1.0 1.3

1.6 1.9

2.2 2.4

2.7 3.1

3.4 3.3

3.0 3.0

2.9 2.8

2.3 1.9

1.5 1.3

0.7 0.4

0.5 0.6

0.8 0.9

1.2 1.4

1.8 2.1

2.5 2.7

3.0 3.3

3.4 3.3

3.2 3.3

3.4 3.2

2.9 2.3

1.5 0.7

0.7 0.8

0.9 1.1

1.4 1.7

2.0 2.4

2.9 3.1

3.3 3.4

3.3 3.3

3.3 3.5

3.8 3.8

3.3 2.1

1.0 0.8

1.0 1.2

1.4 1.6

1.9 2.3

2.8 3.2

3.4 3.5

3.4 3.2

3.1 3.1

3.6 3.9

2.4 2.5

1.3 0.0

0.0 0.9

1.0 1.2

1.4 1.6

1.9 2.2

2.5 3.0

3.4 3.5

3.4 3.2

3.1 2.9

3.0 3.4

3.2 2.1

1.2 0.0

0.0 0.0

0.0 0.9

1.0 1.2

1.4 1.7

1.9 2.3

2.6 2.9

3.2 3.3

3.3 3.2

3.1 2.9

2.8 2.9

2.5 1.7

1.3 0.0

0.0 0.0

0.0 0.0

0.0 1.0

1.2 1.4

1.7 2.0

2.3 2.7

3.1 3.3

3.2 3.1

3.3 3.5

3.3 3.0

2.7 2.1

1.4 1.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.8 1.1

1.3 1.6

1.8 2.1

2.5 3.0

3.3 3.4

3.2 3.3

3.7 3.9

3.6 3.0

2.3 1.3

0.9 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.0 0.9

1.2 1.5

1.8 2.0

2.3 2.7

3.1 3.4

3.4 3.2

3.6 4.0

4.0 3.6

2.9 1.7

1.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.0 0.0

0.0 0.0

0.7 0.9

1.2 1.6

2.0 2.3

2.6 2.9

3.2 3.3

3.2 3.2

3.6 3.9

3.9 3.4

2.2 1.4

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.6

0.7 1.0

1.3 1.7

2.1 2.6

2.9 3.1

3.3 3.3

3.1 3.0

3.3 3.6

3.4 1.6

0.8 0.2

0.2 0.2

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.6

0.8 1.0

1.4 1.7

2.2 2.7

3.1 3.3

3.2 3.1

2.9 2.8

3.0 3.0

2.0 1.4

1.2 0.2

0.2 0.2

0.2 0.2

0.1 0.1

0.1 0.1

0.1 0.1

0.2 0.2

0.6 0.7

0.9 1.1

1.4 1.8

2.3 2.8

3.2 3.2

3.1 2.9

2.8 2.8

2.7 1.7

1.2 1.2

0.2 0.3

0.3 0.3

0.2 0.2

0.2 0.2

0.1 0.2

0.2 0.3

0.3 0.3

0.7 0.9

1.0 1.2

1.5 1.9

2.3 2.9

3.0 3.0

3.0 3.1

3.0 2.7

1.8 1.1

1.0 0.9

0.2 0.3

0.4 0.4

0.4 0.3

0.3 0.3

0.2 0.3

0.4 0.5

0.5 0.4

0.3 0.8

0.9 1.1

1.2 1.4

1.7 2.1

2.5 2.8

2.8 3.0

3.4 3.4

3.1 2.6

1.4 1.0

0.8 0.2

0.3 0.5

0.5 0.5

0.5 0.4

0.3 0.3

0.3 0.6

0.7 0.7

0.6 0.5

0.4 0.8

1.0 1.1

1.3 1.5

1.7 2.0

2.4 2.8

2.8 2.8

3.1 3.5

3.5 3.3

2.4 1.3

0.9 0.3

0.4 0.5

0.5 0.6

0.7 0.6

0.5 0.5

0.5 0.8

1.0 0.9

0.8 0.7

0.6 0.6

1.0 1.2

1.4 1.5

1.7 1.9

2.2 2.5

2.8 2.9

2.7 3.1

3.2 3.7

3.3 1.9

1.3 1.0

0.5 0.5

0.6 0.6

0.9 0.9

0.9 0.8

0.9 1.1

1.3 1.2

1.0 1.0

0.9 0.9

0.8 0.7

1.0 1.1

1.3 1.5

1.7 1.9

2.1 2.2

2.5 2.8

2.7 2.5

2.7 3.1

3.4 2.9

1.2 1.2

0.5 0.6

0.6 0.6

0.8 1.0

1.3 0.8

1.3 1.8

2.0 1.6

1.4 1.3

1.2 1.2

1.1 1.0

0.8 0.7

0.7 1.1

1.2 1.4

1.6 1.9

2.1 2.2

2.3 2.5

2.7 2.5

2.2 2.3

2.6 2.7

1.7 1.3

0.5 0.6

0.6 0.6

0.6 0.8

0.9 1.1

1.6 2.6

2.4 2.4

1.9 1.7

1.6 1.6

1.5 1.3

1.2 1.0

0.8 0.7

0.8 0.8

1.1 1.2

1.3 1.5

1.8 2.0

2.3 2.4

2.4 2.5

2.6 2.3

1.9 1.8

2.1 1.8

1.2 1.1

0.5 0.6

0.6 0.6

0.6 0.6

0.7 1.0

1.6 2.8

3.4 3.1

2.6 2.3

2.0 1.9

1.9 1.8

1.6 1.5

1.4 1.3

1.1 1.0

1.1 1.2

1.2 1.0

1.1 1.3

1.5 1.7

1.9 2.2

2.4 2.6

2.5 2.4

2.5 2.1

1.6 1.6

1.6 1.0

0.9 0.5

0.5 0.7

0.8 0.7

0.7 0.8

0.9 1.5

2.4 3.2

3.3 3.1

2.9 2.5

2.3 2.2

2.1 1.9

1.8 1.7

1.6 1.6

1.6 1.7

2.0 2.2

2.4 1.2

1.6 1.1

1.1 1.2

1.4 1.6

1.8 2.1

2.4 2.6

2.6 2.5

2.4 2.4

1.9 1.5

1.5 1.0

0.7 0.6

0.5 0.5

0.6 0.9

1.0 1.0

1.0 1.1

1.5 2.1

2.7 2.9

3.1 3.1

2.9 2.6

2.6 2.5

2.3 2.0

1.8 1.7

1.6 1.6

1.6 1.8

2.1 2.5

2.9 3.0

2.5 2.0

1.6 1.3

1.3 1.5

1.7 2.0

2.4 2.6

2.6 2.5

2.4 2.4

2.3 1.8

1.5 1.1

0.6 0.6

0.4 0.5

0.6 0.8

1.1 1.3

1.1 1.3

2.0 2.4

2.5 2.6

2.8 3.0

3.1 2.9

2.8 2.7

2.6 2.3

2.1 1.9

1.9 1.8

1.8 1.8

1.9 2.2

2.5 2.7

2.8 2.5

2.1 1.8

1.8 1.8

1.8 1.9

2.2 2.6

2.7 2.7

2.6 2.5

2.5 2.6

1.8 1.3

0.9 0.6

0.4 0.4

0.5 0.6

0.7 1.1

0.8 0.8

2.5 2.9

2.9 2.7

2.7 2.9

3.1 3.1

3.1 3.0

2.8 2.4

2.2 2.0

2.0 1.9

1.9 1.9

1.9 2.0

2.1 2.4

2.6 2.5

2.3 2.0

1.8 1.7

1.8 1.9

2.2 2.4

2.8 2.8

2.6 2.7

2.8 3.0

2.9 1.8

1.1 0.8

0.4 0.4

0.4 0.5

0.6 0.9

1.3 2.6

3.2 3.3

3.1 2.9

2.9 3.1

3.2 3.2

3.2 3.0

2.6 2.3

2.1 2.0

1.9 1.9

1.9 2.0

2.0 2.1

2.1 2.2

2.3 2.2

2.1 2.0

1.8 1.8

1.8 1.9

2.1 2.4

2.8 2.7

2.7 2.9

3.1 3.4

3.1 1.7

1.2 0.4

0.4 0.4

0.4 0.5

0.7 1.0

2.0 2.9

3.4 3.3

3.2 3.0

3.1 3.3

3.3 3.2

3.1 2.8

2.5 2.2

2.0 1.9

1.9 1.9

1.8 1.9

2.0 2.2

2.2 2.2

2.1 2.2

2.1 2.0

1.9 1.9

1.9 2.0

2.1 2.4

2.7 2.7

2.7 3.0

3.2 3.6

3.2 0.8

0.4 0.4

0.4 0.4

0.5 0.6

0.7 1.4

2.3 2.9

3.1 3.2

3.0 3.0

3.3 3.4

3.3 3.1

2.9 2.7

2.4 2.1

1.9 1.8

1.8 1.8

1.7 1.7

1.9 2.1

2.2 2.1

2.2 2.2

2.2 2.1

2.1 2.0

2.0 2.1

2.2 2.5

2.7 2.6

2.5 2.8

3.0 3.3

2.8 0.5

0.5 0.5

0.5 0.5

0.5 0.6

1.1 1.8

2.3 2.6

2.8 2.8

2.9 3.1

3.3 3.3

3.0 2.8

2.7 2.6

2.4 2.1

1.9 1.8

1.7 1.7

1.6 1.6

1.6 1.7

1.8 1.8

1.9 2.1

2.1 2.0

2.0 2.0

2.1 2.1

2.2 2.4

2.5 2.4

2.3 2.4

2.6 2.7

0.5 0.5

0.6 0.7

0.5 0.5

0.7 1.0

1.8 2.0

2.2 2.4

2.6 2.7

3.0 3.1

3.2 3.0

2.8 2.6

2.5 2.5

2.4 2.2

2.0 1.8

1.7 1.8

1.5 1.4

1.4 1.4

1.4 1.5

1.6 1.8

1.9 1.8

1.8 1.8

1.9 2.0

2.1 2.2

2.3 2.2

2.0 1.9

2.0 2.1

0.5 0.5

0.6 0.9

0.8 0.7

0.9 1.1

1.7 2.0

2.0 2.2

2.4 2.7

2.9 3.1

3.1 2.9

2.7 2.5

2.4 2.4

2.4 2.3

2.2 2.0

1.9 1.8

1.8 1.5

1.3 1.2

1.2 1.2

1.3 1.4

1.5 1.6

1.6 1.6

1.6 1.7

1.8 1.8

1.9 2.0

1.9 1.8

1.6 1.6

0.4 0.5

0.6 0.8

1.1 1.0

1.0 1.3

2.0 2.2

2.1 2.1

2.4 2.6

2.8 2.9

3.0 2.9

2.7 2.5

2.4 2.3

2.3 2.3

2.3 2.2

2.1 1.9

1.8 1.8

1.6 1.1

1.1 1.1

1.0 1.1

1.2 1.3

1.3 1.4

1.4 1.4

1.5 1.5

1.6 1.7

1.7 1.7

1.5 1.3

1.4 0.4

0.4 0.6

0.7 1.1

1.1 1.3

2.5 2.6

2.4 2.2

2.4 2.6

2.8 2.8

2.8 2.8

2.7 2.6

2.4 2.3

2.2 2.2

2.2 2.3

2.3 2.2

2.1 1.9

1.9 1.6

1.1 1.0

0.9 0.9

1.0 1.1

1.1 1.1

1.2 1.2

1.2 1.3

1.3 1.4

1.5 1.5

1.4 1.2

1.1 1.2

0.3 0.3

0.4 0.5

0.7 0.9

1.4 1.4

3.1 2.9

2.5 2.4

2.5 2.7

2.8 2.7

2.6 2.6

2.5 2.4

2.3 2.3

2.2 2.3

2.3 2.4

2.5 2.3

2.2 2.0

2.0 0.2

0.3 0.3

0.4 0.5

0.7 1.1

2.2 2.9

3.0 2.8

2.7 2.5

2.7 2.8

2.8 2.6

2.4 2.4

2.4 2.3

2.3 2.3

2.3 2.3

2.5 2.6

2.6 2.5

2.4 2.3

2.3 0.2

0.3 0.3

0.3 0.4

0.5 0.8

1.5 2.2

2.6 2.7

2.8 2.6

2.6 2.8

2.9 2.8

2.5 2.4

2.3 2.3

2.3 2.3

2.3 2.3

2.4 2.6

2.8 2.9

2.7 2.7

2.8 2.8

0.3 0.3

0.3 0.4

0.4 0.4

0.6 1.1

1.6 1.9

2.2 2.5

2.5 2.5

2.6 2.8

2.8 2.6

2.5 2.3

2.3 2.3

2.3 2.3

2.4 2.5

2.5 2.7

3.0 3.0

2.9 3.1

3.2 3.3

0.3 0.4

0.4 0.4

0.4 0.4

0.6 0.9

1.4 1.5

1.8 2.0

2.3 2.4

2.6 2.6

2.7 2.5

2.4 2.4

2.3 2.3

2.3 2.3

2.4 2.6

2.7 2.7

2.9 3.2

3.1 3.2

3.4 3.5

3.7 0.4

0.4 0.5

0.5 0.5

0.5 0.6

0.8 1.2

1.4 1.5

1.8 2.1

2.3 2.5

2.6 2.6

2.4 2.3

2.2 2.3

2.3 2.4

2.4 2.4

2.6 2.8

2.9 3.0

3.1 3.4

3.4 3.4

3.6 3.6

3.6 0.4

0.5 0.6

0.6 0.7

0.7 0.8

1.1 1.3

1.4 1.6

1.9 2.2

2.4 2.5

2.5 2.4

2.2 2.1

2.1 2.2

2.3 2.5

2.6 2.6

2.8 3.1

3.3 3.4

3.5 3.8

3.8 3.7

3.6 3.5

3.3 0.4

0.5 0.6

0.7 0.8

0.8 0.9

1.1 1.3

1.4 1.5

1.8 2.1

2.2 2.3

2.3 2.4

2.2 2.1

2.0 2.0

2.1 2.3

2.5 2.7

2.8 2.9

3.3 3.5

3.5 3.7

3.9 3.9

3.7 3.5

3.2 3.0

0.4 0.5

0.6 0.7

0.8 0.9

1.1 1.2

1.3 1.4

1.5 1.7

1.9 2.1

2.2 2.2

2.2 2.2

2.1 2.0

1.9 1.9

2.1 2.3

2.5 2.8

2.9 3.1

3.4 3.6

3.4 3.5

3.6 3.7

3.6 3.3

3.0 2.7

0.6 0.7

0.8 0.9

1.1 1.3

1.4 1.5

1.6 1.7

1.9 2.1

2.2 2.2

2.1 2.1

2.1 2.0

2.0 1.9

2.0 2.1

2.3 2.6

2.9 3.0

3.1 3.3

3.6 3.2

3.4 3.6

3.6 3.4

3.1 2.7

2.5 0.8

0.9 1.1

1.3 1.5

1.8 1.9

1.9 2.0

2.2 2.3

2.3 2.2

2.1 2.0

2.0 2.0

1.9 1.9

2.0 2.2

2.4 2.7

2.9 2.9

3.1 3.3

3.6 3.4

3.6 3.8

3.7 3.4

2.9 2.4

2.1 0.9

1.1 1.2

1.5 1.7

2.0 2.1

2.1 2.2

2.4 2.4

2.3 2.2

2.1 2.0

2.0 1.9

1.9 1.9

2.1 2.3

2.7 3.0

3.0 3.1

3.2 3.5

3.9 3.7

3.8 3.9

3.9 3.5

2.8 2.3

2.0 1.1

1.3 1.5

1.7 1.9

2.0 2.1

2.2 2.3

2.3 2.3

2.2 2.1

2.0 1.9

1.8 1.8

1.9 2.1

2.3 2.8

3.0 3.1

3.3 3.6

4.0 4.0

4.1 4.0

2.2 1.8

1.3 1.4

1.6 1.8

2.0 2.2

2.2 2.2

2.2 2.1

2.0 2.0

1.9 1.8

1.8 1.8

1.8 2.0

2.3 2.6

2.8 2.8

3.1 3.4

3.7 1.1

1.3 1.6

1.9 2.2

2.4 2.5

2.5 2.2

2.0 2.0

1.9 1.8

1.8 1.8

1.8 1.9

2.1 2.3

2.7 2.7

2.7 3.0

3.3 3.6

3.6 1.2

1.5 2.0

2.4 2.7

2.8 2.7

2.3 2.0

1.9 1.9

1.9 2.0

2.0 2.0

2.1 2.3

2.5 2.9

2.9 2.8

3.0 3.2

3.1 3.2

2.5 2.9

3.0 2.9

2.5 2.1

2.1 2.1

2.1 2.1

2.1 2.1

2.2 2.4

2.7 3.0

3.1 2.8

2.8 2.9

2.9 2.7

2.5 2.5

2.1 1.8

1.9 2.0

2.0 2.0

2.0 2.1

2.2 2.5

2.8 3.0

3.1 2.9

2.7 2.7

2.5 2.1

1.3 1.8

1.7 1.6

1.7 1.8

1.9 1.9

2.0 2.2

2.3 2.5

2.8 3.0

3.1 2.9

2.6 2.6

2.3 1.8

1.6 1.7

1.9 2.0

2.0 2.0

2.1 2.3

2.4 2.6

2.8 3.0

3.0 2.9

2.7 2.5

1.8 1.7

1.8 2.0

2.1 2.1

2.2 2.2

2.3 2.5

2.8 3.0

3.1 3.0

2.9 2.7

2.5 1.9

2.0 2.0

2.1 2.3

2.3 2.3

2.3 2.4

2.5 2.8

3.0 3.1

3.0 2.9

2.9 2.8

2.3 2.2

2.2 2.3

2.4 2.5

2.4 2.3

2.3 2.4

2.7 3.0

3.0 2.8

3.0 3.0

3.1 2.9

2.6 2.5

2.5 2.4

2.5 2.6

2.4 2.3

2.2 2.4

2.6 2.9

2.8 2.8

2.9 3.0

3.3 2.8

2.6 2.5

2.4 2.5

2.6 2.4

2.2 2.2

2.3 2.6

2.8 2.8

2.6 2.8

2.8 3.1

2.9 2.6

2.5 2.4

2.5 2.6

2.4 2.3

2.3 2.4

2.6 2.8

2.8 2.5

2.6 2.6

2.7 2.5

2.4 2.4

2.3 2.5

2.6 2.5

2.4 2.3

2.4 2.6

2.8 2.7

2.5 2.3

2.3 2.3

2.1 2.1

2.1 2.3

2.5 2.6

2.5 2.4

2.4 2.5

2.6 2.7

2.7 2.5

2.3 2.1

2.0 1.7

1.8 2.0

2.1 2.4

2.5 2.5

2.5 2.4

2.5 2.5

2.7 2.7

2.6 2.3

2.0 1.9

1.2 1.5

1.6 1.8

2.1 2.3

2.4 2.4

2.4 2.4

2.4 2.5

2.6 2.7

2.6 2.3

2.0 1.9

1.6 1.1

1.5 1.5

1.8 2.0

2.2 2.3

2.3 2.3

2.4 2.4

2.5 2.6

2.7 2.6

2.3 2.0

1.9 1.5

1.5 1.7

2.0 2.2

2.3 2.3

2.3 2.3

2.4 2.5

2.7 2.7

2.6 2.3

2.1 2.0

1.5 1.5

1.7 2.0

2.2 2.3

2.2 2.2

2.3 2.4

2.5 2.7

2.7 2.6

2.3 2.2

2.1 1.5

1.5 1.6

1.9 2.1

2.2 2.1

2.1 2.2

2.3 2.5

2.7 2.8

2.6 2.3

2.4 2.4

2.2 1.5

1.5 1.7

1.9 2.0

2.1 2.1

2.0 2.1

2.2 2.3

2.6 2.7

2.5 2.4

2.6 2.7

2.7 1.5

1.6 1.7

1.9 2.1

2.1 2.1

2.0 2.0

2.1 2.2

2.4 2.5

2.4 2.4

2.6 2.8

2.9 1.6

1.7 1.9

2.0 2.2

2.2 2.1

2.1 2.0

2.0 2.1

2.4 2.5

2.4 2.3

2.5 2.6

2.7 2.0

2.0 2.0

2.1 2.3

2.4 2.2

2.1 2.0

2.0 2.1

2.4 2.5

2.3 2.1

2.3 2.3

2.3 2.4

2.3 2.3

2.2 2.4

2.5 2.2

2.1 2.0

2.0 2.1

2.3 2.3

2.2 2.0

1.9 1.9

2.8 2.5

2.4 2.3

2.4 2.5

2.2 2.1

2.0 2.0

2.1 2.2

2.2 2.1

1.9 1.8

1.7 2.8

2.5 2.4

2.3 2.4

2.5 2.3

2.1 2.0

2.0 2.1

2.1 2.1

2.1 1.9

1.8 1.6

1.4 2.4

2.3 2.3

2.2 2.5

2.6 2.4

2.2 2.1

2.1 2.1

2.2 2.2

2.1 1.9

1.7 1.6

2.0 2.0

2.0 2.2

2.4 2.5

2.4 2.2

2.2 2.2

2.2 2.3

2.3 2.1

1.9 1.7

1.6 1.6

1.7 1.9

2.1 2.3

2.4 2.3

2.3 2.2

2.2 2.2

2.3 2.3

2.2 1.9

1.6 1.6

1.5 1.6

1.8 2.0

2.2 2.3

2.3 2.2

2.2 2.3

2.3 2.4

2.4 2.2

1.9 1.6

1.7 1.5

1.5 1.7

1.9 2.1

2.2 2.2

2.2 2.2

2.3 2.4

2.5 2.4

2.2 1.9

1.7 1.7

1.5 1.5

1.6 1.9

2.1 2.2

2.2 2.2

2.2 2.3

2.5 2.6

2.5 2.2

2.0 1.9

1.9 1.5

1.5 1.5

1.6 1.9

2.1 2.2

2.1 2.1

2.2 2.3

2.5 2.6

2.6 2.3

2.3 2.3

2.3 1.9

1.4 1.4

1.5 1.8

2.0 2.1

2.1 2.1

2.1 2.2

2.4 2.6

2.5 2.3

2.5 2.6

2.7 1.4

1.4 1.6

1.8 2.0

2.0 2.0

2.0 2.0

2.2 2.4

2.5 2.4

2.4 2.5

2.6 2.9

1.4 1.5

1.7 1.8

2.0 2.1

2.0 2.0

2.1 2.2

2.3 2.5

2.4 2.2

2.4 2.5

2.6 1.6

1.7 1.8

1.9 2.1

2.2 2.2

2.1 2.1

2.1 2.3

2.4 2.3

2.1 2.1

2.1 2.1

2.0 2.0

2.0 2.0

2.3 2.4

2.2 2.1

2.0 2.0

2.2 2.2

2.1 1.9

1.8 1.7

1.7 2.5

2.4 2.3

2.1 2.3

2.4 2.2

2.0 1.9

1.9 1.9

1.9 1.9

1.7 1.5

1.4 1.3

1.0 2.1

2.8 2.5

2.4 2.2

2.2 2.3

2.1 1.9

1.7 1.7

1.6 1.7

1.7 1.5

1.4 1.2

1.2 2.2

2.7 2.5

2.4 2.2

2.2 2.3

2.1 1.8

1.6 1.5

1.5 1.5

1.5 1.4

1.2 1.1

1.2 0.6

0.8 0.9

1.9 2.3

2.2 2.1

2.0 2.2

2.3 2.0

1.7 1.6

1.4 1.4

1.4 1.3

1.2 1.1

1.2 1.4

1.4 1.5

1.8 1.9

1.6 1.3

1.2 1.2

1.5 1.8

1.9 1.6

1.3 1.0

1.0 1.2

1.5 1.7

1.7 1.3

0.9 0.6

0.4 0.5

0.8 1.4

1.8 1.8

1.8 1.9

2.0 2.1

1.9 1.6

1.5 1.4

1.3 1.2

1.1 1.1

1.0 1.2

1.4 1.6

1.9 2.3

2.4 2.1

1.7 1.5

1.6 1.9

2.3 2.4

2.1 1.7

1.4 1.3

1.5 1.9

2.3 2.2

1.8 1.2

0.8 0.3

0.4 0.5

1.0 1.4

1.4 1.5

1.6 1.8

1.8 1.6

1.5 1.3

1.2 1.1

1.0 0.9

0.9 0.9

1.0 1.3

1.4 1.7

2.0 2.0

1.8 1.6

1.4 1.5

1.7 1.9

2.0 1.8

1.5 1.3

1.3 1.4

1.7 1.9

1.9 1.5

1.1 0.8

0.2 0.3

0.4 0.8

1.1 1.2

1.3 1.5

1.6 1.5

1.4 1.3

1.2 1.1

1.0 0.9

0.8 0.7

0.7 0.8

0.9 1.0

1.2 1.3

1.4 1.3

1.1 1.1

1.1 1.2

1.4 1.4

1.3 1.1

1.0 1.0

1.1 1.2

1.3 1.3

1.1 0.8

0.6 0.2

0.2 0.2

0.7 1.0

1.0 1.1

1.3 1.3

1.3 1.2

1.1 1.0

0.9 0.8

0.7 0.6

0.5 0.5

0.6 0.6

0.6 0.7

0.8 0.8

0.8 0.7

0.7 0.7

0.7 0.8

0.8 0.8

0.7 0.6

0.6 0.6

0.7 0.7

0.7 0.6

0.5 0.4

0.2 0.2

0.2 0.5

0.8 0.8

0.9 1.0

1.1 1.1

1.0 0.9

0.8 0.7

0.6 0.5

0.5 0.4

0.4 0.4

0.4 0.3

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.3 0.3

0.3 0.3

0.3 0.3

0.3 0.2

0.2 0.1

0.1 0.2

0.4 0.7

0.7 0.7

0.8 0.9

0.9 0.8

0.7 0.6

0.6 0.5

0.4 0.4

0.3 0.3

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.1

0.1 0.1

0.1 0.1

0.1 0.3

0.5 0.5

0.5 0.6

0.6 0.7

0.6 0.6

0.5 0.4

0.4 0.3

0.3 0.2

0.2 0.2

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.2 0.4

0.4 0.4

0.4 0.4

0.5 0.5

0.4 0.4

0.3 0.3

0.3 0.2

0.2 0.2

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.2 0.3

0.2 0.3

0.3 0.3

0.3 0.3

0.3 0.3

0.2 0.2
090 056 257

0.8 0.9

1.1 1.3

1.4 1.5

1.8 2.1

2.2 2.3

2.3 2.4

2.2 2.1

2.0 2.0

2.1 2.3

2.5 2.7

2.8 2.9

3.3 3.5

3.5 3.7

3.9 3.9

3.7 3.5

3.2 3.0

1.1 1.2

1.3 1.4

1.5 1.7

1.9 2.1

2.2 2.2

2.2 2.2

2.1 2.0

1.9 1.9

2.1 2.3

2.5 2.8

2.9 3.1

3.4 3.6

3.4 3.5

3.6 3.7

3.6 3.3

3.0 2.7

1.3 1.4

1.5 1.6

1.7 1.9

2.1 2.2

2.2 2.1

2.1 2.1

2.0 2.0

1.9 2.0

2.1 2.3

2.6 2.9

3.0 3.1

3.3 3.6

3.2 3.4

3.6 3.6

3.4 3.1

2.7 2.5

1.5 1.8

1.9 1.9

2.0 2.2

2.3 2.3

2.2 2.1

2.0 2.0

2.0 1.9

1.9 2.0

2.2 2.4

2.7 2.9

2.9 3.1

3.3 3.6

3.4 3.6

3.8 3.7

3.4 2.9

2.4 2.1

1.7 2.0

2.1 2.1

2.2 2.4

2.4 2.3

2.2 2.1

2.0 2.0

1.9 1.9

1.9 2.1

2.3 2.7

3.0 3.0

3.1 3.2

3.5 3.9

3.7 3.8

3.9 3.9

3.5 2.8

2.3 2.0

1.7 1.9

2.0 2.1

2.2 2.3

2.3 2.3

2.2 2.1

2.0 1.9

1.8 1.8

1.9 2.1

2.3 2.8

3.0 3.1

3.3 3.6

4.0 4.0

4.1 4.0

2.2 1.8

1.6 1.8

2.0 2.2

2.2 2.2

2.2 2.1

2.0 2.0

1.9 1.8

1.8 1.8

1.8 2.0

2.3 2.6

2.8 2.8

3.1 3.4

3.7 1.6

1.9 2.2

2.4 2.5

2.5 2.2

2.0 2.0

1.9 1.8

1.8 1.8

1.8 1.9

2.1 2.3

2.7 2.7

2.7 3.0

3.3 3.6

3.6 1.5

2.0 2.4

2.7 2.8

2.7 2.3

2.0 1.9

1.9 1.9

2.0 2.0

2.0 2.1

2.3 2.5

2.9 2.9

2.8 3.0

3.2 3.1

3.2 2.5

2.9 3.0

2.9 2.5

2.1 2.1

2.1 2.1

2.1 2.1

2.1 2.2

2.4 2.7

3.0 3.1

2.8 2.8

2.9 2.9

2.7 2.5

2.5 2.1

1.8 1.9

2.0 2.0

2.0 2.0

2.1 2.2

2.5 2.8

3.0 3.1

2.9 2.7

2.7 2.5

2.1 1.3

1.8 1.7

1.6 1.7

1.8 1.9

1.9 2.0

2.2 2.3

2.5 2.8

3.0 3.1

2.9 2.6

2.6 2.3

1.8 1.6

1.7 1.9

2.0 2.0

2.0 2.1

2.3 2.4

2.6 2.8

3.0 3.0

2.9 2.7

2.5 1.8

1.7 1.8

2.0 2.1

2.1 2.2

2.2 2.3

2.5 2.8

3.0 3.1

3.0 2.9

2.7 2.5

1.9 2.0

2.0 2.1

2.3 2.3

2.3 2.3

2.4 2.5

2.8 3.0

3.1 3.0

2.9 2.9

2.8 2.3

2.2 2.2

2.3 2.4

2.5 2.4

2.3 2.3

2.4 2.7

3.0 3.0

2.8 3.0

3.0 3.1

2.9 2.6

2.5 2.5

2.4 2.5

2.6 2.4

2.3 2.2

2.4 2.6

2.9 2.8

2.8 2.9

3.0 3.3

2.8 2.6

2.5 2.4

2.5 2.6

2.4 2.2

2.2 2.3

2.6 2.8

2.8 2.6

2.8 2.8

3.1 2.9

2.6 2.5

2.4 2.5

2.6 2.4

2.3 2.3

2.4 2.6

2.8 2.8

2.5 2.6

2.6 2.7

2.5 2.4

2.4 2.3

2.5 2.6

2.5 2.4

2.3 2.4

2.6 2.8

2.7 2.5

2.3 2.3

2.3 2.1

2.1 2.1

2.3 2.5

2.6 2.5

2.4 2.4

2.5 2.6

2.7 2.7

2.5 2.3

2.1 2.0

1.7 1.8

2.0 2.1

2.4 2.5

2.5 2.5

2.4 2.5

2.5 2.7

2.7 2.6

2.3 2.0

1.9 1.2

1.5 1.6

1.8 2.1

2.3 2.4

2.4 2.4

2.4 2.4

2.5 2.6

2.7 2.6

2.3 2.0

1.9 1.6

1.1 1.5

1.5 1.8

2.0 2.2

2.3 2.3

2.3 2.4

2.4 2.5

2.6 2.7

2.6 2.3

2.0 1.9

1.5 1.5

1.7 2.0

2.2 2.3

2.3 2.3

2.3 2.4

2.5 2.7

2.7 2.6

2.3 2.1

2.0 1.5

1.5 1.7

2.0 2.2

2.3 2.2

2.2 2.3

2.4 2.5

2.7 2.7

2.6 2.3

2.2 2.1

1.5 1.5

1.6 1.9

2.1 2.2

2.1 2.1

2.2 2.3

2.5 2.7

2.8 2.6

2.3 2.4

2.4 2.2

1.5 1.5

1.7 1.9

2.0 2.1

2.1 2.0

2.1 2.2

2.3 2.6

2.7 2.5

2.4 2.6

2.7 2.7

1.5 1.6

1.7 1.9

2.1 2.1

2.1 2.0

2.0 2.1

2.2 2.4

2.5 2.4

2.4 2.6

2.8 2.9

1.6 1.7

1.9 2.0

2.2 2.2

2.1 2.1

2.0 2.0

2.1 2.4

2.5 2.4

2.3 2.5

2.6 2.7

2.0 2.0

2.0 2.1

2.3 2.4

2.2 2.1

2.0 2.0

2.1 2.4

2.5 2.3

2.1 2.3

2.3 2.3

2.4 2.3

2.3 2.2

2.4 2.5

2.2 2.1

2.0 2.0

2.1 2.3

2.3 2.2

2.0 1.9

1.9 2.8

2.5 2.4

2.3 2.4

2.5 2.2

2.1 2.0

2.0 2.1

2.2 2.2

2.1 1.9

1.8 1.7

2.8 2.5

2.4 2.3

2.4 2.5

2.3 2.1

2.0 2.0

2.1 2.1

2.1 2.1

1.9 1.8

1.6 1.4

2.4 2.3

2.3 2.2

2.5 2.6

2.4 2.2

2.1 2.1

2.1 2.2

2.2 2.1

1.9 1.7

1.6 2.0

2.0 2.0

2.2 2.4

2.5 2.4

2.2 2.2

2.2 2.2

2.3 2.3

2.1 1.9

1.7 1.6

1.6 1.7

1.9 2.1

2.3 2.4

2.3 2.3

2.2 2.2

2.2 2.3

2.3 2.2

1.9 1.6

1.6 1.5

1.6 1.8

2.0 2.2

2.3 2.3

2.2 2.2

2.3 2.3

2.4 2.4

2.2 1.9

1.6 1.7

1.5 1.5

1.7 1.9

2.1 2.2

2.2 2.2

2.2 2.3

2.4 2.5

2.4 2.2

1.9 1.7

1.7 1.5

1.5 1.6

1.9 2.1

2.2 2.2

2.2 2.2

2.3 2.5

2.6 2.5

2.2 2.0

1.9 1.9

1.5 1.5

1.5 1.6

1.9 2.1

2.2 2.1

2.1 2.2

2.3 2.5

2.6 2.6

2.3 2.3

2.3 2.3

1.9 1.4

1.4 1.5

1.8 2.0

2.1 2.1

2.1 2.1

2.2 2.4

2.6 2.5

2.3 2.5

2.6 2.7

1.4 1.4

1.6 1.8

2.0 2.0

2.0 2.0

2.0 2.2

2.4 2.5

2.4 2.4

2.5 2.6

2.9 1.4

1.5 1.7

1.8 2.0

2.1 2.0

2.0 2.1

2.2 2.3

2.5 2.4

2.2 2.4

2.5 2.6

1.6 1.7

1.8 1.9

2.1 2.2

2.2 2.1

2.1 2.1

2.3 2.4

2.3 2.1

2.1 2.1

2.1 2.0

2.0 2.0

2.0 2.3

2.4 2.2

2.1 2.0

2.0 2.2

2.2 2.1

1.9 1.8

1.7 1.7

2.5 2.4

2.3 2.1

2.3 2.4

2.2 2.0

1.9 1.9

1.9 1.9

1.9 1.7

1.5 1.4

1.3 1.0

2.1 2.8

2.5 2.4

2.2 2.2

2.3 2.1

1.9 1.7

1.7 1.6

1.7 1.7

1.5 1.4

1.2 1.2

2.2 2.7

2.5 2.4

2.2 2.2

2.3 2.1

1.8 1.6

1.5 1.5

1.5 1.5

1.4 1.2

1.1 1.2

0.6 0.8

0.9 1.9

2.3 2.2

2.1 2.0

2.2 2.3

2.0 1.7

1.6 1.4

1.4 1.4

1.3 1.2

1.1 1.2

1.4 1.4

1.5 1.8

1.9 1.6

1.3 1.2

1.2 1.5

1.8 1.9

1.6 1.3

1.0 1.0

1.2 1.5

1.7 1.7

1.3 0.9

0.6 0.4

0.5 0.8

1.4 1.8

1.8 1.8

1.9 2.0

2.1 1.9

1.6 1.5

1.4 1.3

1.2 1.1

1.1 1.0

1.2 1.4

1.6 1.9

2.3 2.4

2.1 1.7

1.5 1.6

1.9 2.3

2.4 2.1

1.7 1.4

1.3 1.5

1.9 2.3

2.2 1.8

1.2 0.8

0.3 0.4

0.5 1.0

1.4 1.4

1.5 1.6

1.8 1.8

1.6 1.5

1.3 1.2

1.1 1.0

0.9 0.9

0.9 1.0

1.3 1.4

1.7 2.0

2.0 1.8

1.6 1.4

1.5 1.7

1.9 2.0

1.8 1.5

1.3 1.3

1.4 1.7

1.9 1.9

1.5 1.1

0.8 0.2

0.3 0.4

0.8 1.1

1.2 1.3

1.5 1.6

1.5 1.4

1.3 1.2

1.1 1.0

0.9 0.8

0.7 0.7

0.8 0.9

1.0 1.2

1.3 1.4

1.3 1.1

1.1 1.1

1.2 1.4

1.4 1.3

1.1 1.0

1.0 1.1

1.2 1.3

1.3 1.1

0.8 0.6

0.2 0.2

0.2 0.7

1.0 1.0

1.1 1.3

1.3 1.3

1.2 1.1

1.0 0.9

0.8 0.7

0.6 0.5

0.5 0.6

0.6 0.6

0.7 0.8

0.8 0.8

0.7 0.7

0.7 0.7

0.8 0.8

0.8 0.7

0.6 0.6

0.6 0.7

0.7 0.7

0.6 0.5

0.4 0.2

0.2 0.2

0.5 0.8

0.8 0.9

1.0 1.1

1.1 1.0

0.9 0.8

0.7 0.6

0.5 0.5

0.4 0.4

0.4 0.4

0.3 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.3

0.3 0.3

0.3 0.3

0.3 0.3

0.2 0.2

0.1 0.1

0.2 0.4

0.7 0.7

0.7 0.8

0.9 0.9

0.8 0.7

0.6 0.6

0.5 0.4

0.4 0.3

0.3 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.1 0.1

0.1 0.1

0.1 0.1

0.3 0.5

0.5 0.5

0.6 0.6

0.7 0.6

0.6 0.5

0.4 0.4

0.3 0.3

0.2 0.2

0.2 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.2

0.4 0.4

0.4 0.4

0.4 0.5

0.5 0.4

0.4 0.3

0.3 0.3

0.2 0.2

0.2 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.2

0.3 0.2

0.3 0.3

0.3 0.3

0.3 0.3

0.3 0.2

0.2 091 057 258

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.2 0.2

0.2 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.2 0.2

0.2 0.2

0.2 0.1

0.1 0.1

0.1 0.1

0.1 0.2

0.2 0.2

0.3 0.3

0.3 0.2

0.2 0.2

0.2 0.1

0.2 0.2

0.3 0.3

0.3 0.2

0.3 0.4

0.4 0.4

0.3 0.3

0.3 0.2

0.3 0.4

0.5 0.5

0.4 0.3

0.2 0.3

0.5 0.5

0.5 0.5

0.4 0.3

0.3 0.3

0.6 0.7

0.7 0.6

0.5 0.4

0.3 0.4

0.5 0.5

0.6 0.7

0.6 0.5

0.5 0.5

0.8 1.0

0.9 0.8

0.7 0.6

0.6 0.5

0.5 0.6

0.6 0.9

0.9 0.9

0.8 0.9

1.1 1.3

1.2 1.0

1.0 0.9

0.9 0.8

0.7 0.5

0.6 0.6

0.6 0.8

1.0 1.3

0.8 1.3

1.8 2.0

1.6 1.4

1.3 1.2

1.2 1.1

1.0 0.8

0.7 0.7

0.5 0.6

0.6 0.6

0.6 0.8

0.9 1.1

1.6 2.6

2.4 2.4

1.9 1.7

1.6 1.6

1.5 1.3

1.2 1.0

0.8 0.7

0.8 0.8

0.5 0.6

0.6 0.6

0.6 0.6

0.7 1.0

1.6 2.8

3.4 3.1

2.6 2.3

2.0 1.9

1.9 1.8

1.6 1.5

1.4 1.3

1.1 1.0

1.1 1.2

1.2 0.5

0.5 0.7

0.8 0.7

0.7 0.8

0.9 1.5

2.4 3.2

3.3 3.1

2.9 2.5

2.3 2.2

2.1 1.9

1.8 1.7

1.6 1.6

1.6 1.7

2.0 2.2

2.4 1.2

0.5 0.5

0.6 0.9

1.0 1.0

1.0 1.1

1.5 2.1

2.7 2.9

3.1 3.1

2.9 2.6

2.6 2.5

2.3 2.0

1.8 1.7

1.6 1.6

1.6 1.8

2.1 2.5

2.9 3.0

0.4 0.5

0.6 0.8

1.1 1.3

1.1 1.3

2.0 2.4

2.5 2.6

2.8 3.0

3.1 2.9

2.8 2.7

2.6 2.3

2.1 1.9

1.9 1.8

1.8 1.8

1.9 2.2

2.5 2.7

2.8 0.4

0.4 0.5

0.6 0.7

1.1 0.8

0.8 2.5

2.9 2.9

2.7 2.7

2.9 3.1

3.1 3.1

3.0 2.8

2.4 2.2

2.0 2.0

1.9 1.9

1.9 1.9

2.0 2.1

2.4 2.6

2.5 0.4

0.4 0.4

0.5 0.6

0.9 1.3

2.6 3.2

3.3 3.1

2.9 2.9

3.1 3.2

3.2 3.2

3.0 2.6

2.3 2.1

2.0 1.9

1.9 1.9

2.0 2.0

2.1 2.1

2.2 2.3

2.2 0.4

0.4 0.4

0.4 0.5

0.7 1.0

2.0 2.9

3.4 3.3

3.2 3.0

3.1 3.3

3.3 3.2

3.1 2.8

2.5 2.2

2.0 1.9

1.9 1.9

1.8 1.9

2.0 2.2

2.2 2.2

2.1 2.2

0.4 0.4

0.4 0.4

0.5 0.6

0.7 1.4

2.3 2.9

3.1 3.2

3.0 3.0

3.3 3.4

3.3 3.1

2.9 2.7

2.4 2.1

1.9 1.8

1.8 1.8

1.7 1.7

1.9 2.1

2.2 2.1

2.2 2.2

0.5 0.5

0.5 0.5

0.5 0.5

0.6 1.1

1.8 2.3

2.6 2.8

2.8 2.9

3.1 3.3

3.3 3.0

2.8 2.7

2.6 2.4

2.1 1.9

1.8 1.7

1.7 1.6

1.6 1.6

1.7 1.8

1.8 1.9

2.1 0.5

0.5 0.6

0.7 0.5

0.5 0.7

1.0 1.8

2.0 2.2

2.4 2.6

2.7 3.0

3.1 3.2

3.0 2.8

2.6 2.5

2.5 2.4

2.2 2.0

1.8 1.7

1.8 1.5

1.4 1.4

1.4 1.4

1.5 1.6

1.8 0.5

0.5 0.6

0.9 0.8

0.7 0.9

1.1 1.7

2.0 2.0

2.2 2.4

2.7 2.9

3.1 3.1

2.9 2.7

2.5 2.4

2.4 2.4

2.3 2.2

2.0 1.9

1.8 1.8

1.5 1.3

1.2 1.2

1.2 1.3

1.4 1.5

0.4 0.5

0.6 0.8

1.1 1.0

1.0 1.3

2.0 2.2

2.1 2.1

2.4 2.6

2.8 2.9

3.0 2.9

2.7 2.5

2.4 2.3

2.3 2.3

2.3 2.2

2.1 1.9

1.8 1.8

1.6 1.1

1.1 1.1

1.0 1.1

1.2 1.3

0.4 0.4

0.6 0.7

1.1 1.1

1.3 2.5

2.6 2.4

2.2 2.4

2.6 2.8

2.8 2.8

2.8 2.7

2.6 2.4

2.3 2.2

2.2 2.2

2.3 2.3

2.2 2.1

1.9 1.9

1.6 1.1

1.0 0.9

0.9 1.0

1.1 1.1

0.3 0.3

0.4 0.5

0.7 0.9

1.4 1.4

3.1 2.9

2.5 2.4

2.5 2.7

2.8 2.7

2.6 2.6

2.5 2.4

2.3 2.3

2.2 2.3

2.3 2.4

2.5 2.3

2.2 2.0

2.0 0.2

0.3 0.3

0.4 0.5

0.7 1.1

2.2 2.9

3.0 2.8

2.7 2.5

2.7 2.8

2.8 2.6

2.4 2.4

2.4 2.3

2.3 2.3

2.3 2.3

2.5 2.6

2.6 2.5

2.4 2.3

2.3 0.2

0.3 0.3

0.3 0.4

0.5 0.8

1.5 2.2

2.6 2.7

2.8 2.6

2.6 2.8

2.9 2.8

2.5 2.4

2.3 2.3

2.3 2.3

2.3 2.3

2.4 2.6

2.8 2.9

2.7 2.7

2.8 2.8

0.3 0.3

0.3 0.4

0.4 0.4

0.6 1.1

1.6 1.9

2.2 2.5

2.5 2.5

2.6 2.8

2.8 2.6

2.5 2.3

2.3 2.3

2.3 2.3

2.4 2.5

2.5 2.7

3.0 3.0

2.9 3.1

3.2 3.3

0.3 0.4

0.4 0.4

0.4 0.4

0.6 0.9

1.4 1.5

1.8 2.0

2.3 2.4

2.6 2.6

2.7 2.5

2.4 2.4

2.3 2.3

2.3 2.3

2.4 2.6

2.7 2.7

2.9 3.2

3.1 3.2

3.4 3.5

3.7 0.4

0.4 0.5

0.5 0.5

0.5 0.6

0.8 1.2

1.4 1.5

1.8 2.1

2.3 2.5

2.6 2.6

2.4 2.3

2.2 2.3

2.3 2.4

2.4 2.4

2.6 2.8

2.9 3.0

3.1 3.4

3.4 3.4

3.6 3.6

3.6 0.4

0.5 0.6

0.6 0.7

0.7 0.8

1.1 1.3

1.4 1.6

1.9 2.2

2.4 2.5

2.5 2.4

2.2 2.1

2.1 2.2

2.3 2.5

2.6 2.6

2.8 3.1

3.3 3.4

3.5 3.8

3.8 3.7

3.6 3.5

3.3 0.4

0.5 0.6

0.7 0.8

0.8 0.9

1.1 1.3

1.4 1.5

1.8 2.1

2.2 2.3

2.3 2.4

2.2 2.1

2.0 2.0

2.1 2.3

2.5 2.7

2.8 2.9

3.3 3.5

3.5 3.7

3.9 3.9

3.7 3.5

3.2 3.0

0.5 0.6

0.7 0.8

0.9 1.1

1.2 1.3

1.4 1.5

1.7 1.9

2.1 2.2

2.2 2.2

2.2 2.1

2.0 1.9

1.9 2.1

2.3 2.5

2.8 2.9

3.1 3.4

3.6 3.4

3.5 3.6

3.7 3.6

3.3 3.0

2.7 0.6

0.7 0.8

0.9 1.1

1.3 1.4

1.5 1.6

1.7 1.9

2.1 2.2

2.2 2.1

2.1 2.1

2.0 2.0

1.9 2.0

2.1 2.3

2.6 2.9

3.0 3.1

3.3 3.6

3.2 3.4

3.6 3.6

3.4 3.1

2.7 2.5

0.8 0.9

1.1 1.3

1.5 1.8

1.9 1.9

2.0 2.2

2.3 2.3

2.2 2.1

2.0 2.0

2.0 1.9

1.9 2.0

2.2 2.4

2.7 2.9

2.9 3.1

3.3 3.6

3.4 3.6

3.8 3.7

3.4 2.9

2.4 2.1

0.9 1.1

1.2 1.5

1.7 2.0

2.1 2.1

2.2 2.4

2.4 2.3

2.2 2.1

2.0 2.0

1.9 1.9

1.9 2.1

2.3 2.7

3.0 3.0

3.1 3.2

3.5 3.9

3.7 3.8

3.9 3.9

3.5 2.8

2.3 2.0

1.1 1.3

1.5 1.7

1.9 2.0

2.1 2.2

2.3 2.3

2.3 2.2

2.1 2.0

1.9 1.8

1.8 1.9

2.1 2.3

2.8 3.0

3.1 3.3

3.6 4.0

4.0 4.1

4.0 2.2

1.8 1.3

1.4 1.6

1.8 2.0

2.2 2.2

2.2 2.2

2.1 2.0

2.0 1.9

1.8 1.8

1.8 1.8

2.0 2.3

2.6 2.8

2.8 3.1

3.4 3.7

1.1 1.3

1.6 1.9

2.2 2.4

2.5 2.5

2.2 2.0

2.0 1.9

1.8 1.8

1.8 1.8

1.9 2.1

2.3 2.7

2.7 2.7

3.0 3.3

3.6 3.6

1.2 1.5

2.0 2.4

2.7 2.8

2.7 2.3

2.0 1.9

1.9 1.9

2.0 2.0

2.0 2.1

2.3 2.5

2.9 2.9

2.8 3.0

3.2 3.1

3.2 2.5

2.9 3.0

2.9 2.5

2.1 2.1

2.1 2.1

2.1 2.1

2.1 2.2

2.4 2.7

3.0 3.1

2.8 2.8

2.9 2.9

2.7 2.5

2.5 2.1

1.8 1.9

2.0 2.0

2.0 2.0

2.1 2.2

2.5 2.8

3.0 3.1

2.9 2.7

2.7 2.5

2.1 1.3

1.8 1.7

1.6 1.7

1.8 1.9

1.9 2.0

2.2 2.3

2.5 2.8

3.0 3.1

2.9 2.6

2.6 2.3

1.8 1.6

1.7 1.9

2.0 2.0

2.0 2.1

2.3 2.4

2.6 2.8

3.0 3.0

2.9 2.7

2.5 1.8

1.7 1.8

2.0 2.1

2.1 2.2

2.2 2.3

2.5 2.8

3.0 3.1

3.0 2.9

2.7 2.5

1.9 2.0

2.0 2.1

2.3 2.3

2.3 2.3

2.4 2.5

2.8 3.0

3.1 3.0

2.9 2.9

2.8 2.3

2.2 2.2

2.3 2.4

2.5 2.4

2.3 2.3

2.4 2.7

3.0 3.0

2.8 3.0

3.0 3.1

2.9 2.6

2.5 2.5

2.4 2.5

2.6 2.4

2.3 2.2

2.4 2.6

2.9 2.8

2.8 2.9

3.0 3.3

2.8 2.6

2.5 2.4

2.5 2.6

2.4 2.2

2.2 2.3

2.6 2.8

2.8 2.6

2.8 2.8

3.1 2.9

2.6 2.5

2.4 2.5

2.6 2.4

2.3 2.3

2.4 2.6

2.8 2.8

2.5 2.6

2.6 2.7

2.5 2.4

2.4 2.3

2.5 2.6

2.5 2.4

2.3 2.4

2.6 2.8

2.7 2.5

2.3 2.3

2.3 092 058 259

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.2

0.1 0.1

0.1 0.2

0.2 0.2

0.1 0.3

0.3 0.3

0.2 0.2

0.4 0.4

0.4 0.4

0.3 0.3

0.3 0.2

0.4 0.5

0.5 0.5

0.5 0.5

0.4 0.4

0.3 0.3

0.5 0.6

0.6 0.7

0.6 0.6

0.6 0.5

0.4 0.3

0.2 0.6

0.7 0.8

0.8 0.8

0.8 0.8

0.7 0.7

0.6 0.4

0.3 0.6

0.7 0.8

1.0 1.0

1.0 1.0

1.0 0.9

0.9 0.7

0.5 0.4

0.2 0.7

0.7 0.8

0.9 1.1

1.2 1.3

1.3 1.2

1.2 1.2

1.1 0.8

0.6 0.4

0.3 0.8

0.9 1.0

1.1 1.2

1.3 1.5

1.6 1.6

1.5 1.4

1.4 1.2

1.0 0.7

0.5 0.3

0.8 0.9

1.1 1.2

1.3 1.4

1.5 1.7

1.9 2.0

2.0 1.9

1.7 1.6

1.3 1.0

0.7 0.6

0.5 0.3

1.0 1.2

1.4 1.5

1.6 1.8

1.9 2.1

2.3 2.5

2.4 2.2

1.9 1.6

1.3 1.0

0.9 0.7

0.6 0.3

0.7 1.0

1.2 1.4

1.6 1.8

2.0 2.3

2.5 2.6

2.7 2.7

2.6 2.3

1.9 1.7

1.3 1.1

1.0 0.8

0.5 0.3

0.5 0.7

0.9 1.1

1.4 1.6

1.9 2.1

2.4 2.8

3.1 3.1

2.9 2.7

2.5 2.3

2.1 1.7

1.4 1.2

1.0 0.6

0.3 0.3

0.4 0.5

0.6 0.8

1.0 1.3

1.6 1.9

2.2 2.4

2.7 3.1

3.4 3.3

3.0 3.0

2.9 2.8

2.3 1.9

1.5 1.3

0.7 0.4

0.5 0.6

0.8 0.9

1.2 1.4

1.8 2.1

2.5 2.7

3.0 3.3

3.4 3.3

3.2 3.3

3.4 3.2

2.9 2.3

1.5 0.7

0.7 0.8

0.9 1.1

1.4 1.7

2.0 2.4

2.9 3.1

3.3 3.4

3.3 3.3

3.3 3.5

3.8 3.8

3.3 2.1

1.0 0.8

1.0 1.2

1.4 1.6

1.9 2.3

2.8 3.2

3.4 3.5

3.4 3.2

3.1 3.1

3.6 3.9

2.4 2.5

1.3 0.9

1.0 1.2

1.4 1.6

1.9 2.2

2.5 3.0

3.4 3.5

3.4 3.2

3.1 2.9

3.0 3.4

3.2 2.1

1.2 0.9

1.0 1.2

1.4 1.7

1.9 2.3

2.6 2.9

3.2 3.3

3.3 3.2

3.1 2.9

2.8 2.9

2.5 1.7

1.3 1.0

1.2 1.4

1.7 2.0

2.3 2.7

3.1 3.3

3.2 3.1

3.3 3.5

3.3 3.0

2.7 2.1

1.4 1.0

0.8 1.1

1.3 1.6

1.8 2.1

2.5 3.0

3.3 3.4

3.2 3.3

3.7 3.9

3.6 3.0

2.3 1.3

0.9 0.9

1.2 1.5

1.8 2.0

2.3 2.7

3.1 3.4

3.4 3.2

3.6 4.0

4.0 3.6

2.9 1.7

1.1 0.7

0.9 1.2

1.6 2.0

2.3 2.6

2.9 3.2

3.3 3.2

3.2 3.6

3.9 3.9

3.4 2.2

1.4 0.6

0.7 1.0

1.3 1.7

2.1 2.6

2.9 3.1

3.3 3.3

3.1 3.0

3.3 3.6

3.4 1.6

0.8 0.6

0.8 1.0

1.4 1.7

2.2 2.7

3.1 3.3

3.2 3.1

2.9 2.8

3.0 3.0

2.0 1.4

1.2 0.6

0.7 0.9

1.1 1.4

1.8 2.3

2.8 3.2

3.2 3.1

2.9 2.8

2.8 2.7

1.7 1.2

1.2 0.7

0.9 1.0

1.2 1.5

1.9 2.3

2.9 3.0

3.0 3.0

3.1 3.0

2.7 1.8

1.1 1.0

0.9 0.8

0.9 1.1

1.2 1.4

1.7 2.1

2.5 2.8

2.8 3.0

3.4 3.4

3.1 2.6

1.4 1.0

0.8 0.8

1.0 1.1

1.3 1.5

1.7 2.0

2.4 2.8

2.8 2.8

3.1 3.5

3.5 3.3

2.4 1.3

0.9 1.0

1.2 1.4

1.5 1.7

1.9 2.2

2.5 2.8

2.9 2.7

3.1 3.2

3.7 3.3

1.9 1.3

1.0 1.0

1.1 1.3

1.5 1.7

1.9 2.1

2.2 2.5

2.8 2.7

2.5 2.7

3.1 3.4

2.9 1.2

1.2 1.1

1.2 1.4

1.6 1.9

2.1 2.2

2.3 2.5

2.7 2.5

2.2 2.3

2.6 2.7

1.7 1.3

0.8 1.1

1.2 1.3

1.5 1.8

2.0 2.3

2.4 2.4

2.5 2.6

2.3 1.9

1.8 2.1

1.8 1.2

1.1 1.1

1.2 1.2

1.0 1.1

1.3 1.5

1.7 1.9

2.2 2.4

2.6 2.5

2.4 2.5

2.1 1.6

1.6 1.6

1.0 0.9

2.0 2.2

2.4 1.2

1.6 1.1

1.1 1.2

1.4 1.6

1.8 2.1

2.4 2.6

2.6 2.5

2.4 2.4

1.9 1.5

1.5 1.0

0.7 0.6

2.1 2.5

2.9 3.0

2.5 2.0

1.6 1.3

1.3 1.5

1.7 2.0

2.4 2.6

2.6 2.5

2.4 2.4

2.3 1.8

1.5 1.1

0.6 0.6

2.2 2.5

2.7 2.8

2.5 2.1

1.8 1.8

1.8 1.8

1.9 2.2

2.6 2.7

2.7 2.6

2.5 2.5

2.6 1.8

1.3 0.9

0.6 2.1

2.4 2.6

2.5 2.3

2.0 1.8

1.7 1.8

1.9 2.2

2.4 2.8

2.8 2.6

2.7 2.8

3.0 2.9

1.8 1.1

0.8 2.1

2.2 2.3

2.2 2.1

2.0 1.8

1.8 1.8

1.9 2.1

2.4 2.8

2.7 2.7

2.9 3.1

3.4 3.1

1.7 1.2

2.2 2.2

2.1 2.2

2.1 2.0

1.9 1.9

1.9 2.0

2.1 2.4

2.7 2.7

2.7 3.0

3.2 3.6

3.2 0.8

2.2 2.1

2.2 2.2

2.2 2.1

2.1 2.0

2.0 2.1

2.2 2.5

2.7 2.6

2.5 2.8

3.0 3.3

2.8 1.8

1.8 1.9

2.1 2.1

2.0 2.0

2.0 2.1

2.1 2.2

2.4 2.5

2.4 2.3

2.4 2.6

2.7 1.4

1.5 1.6

1.8 1.9

1.8 1.8

1.8 1.9

2.0 2.1

2.2 2.3

2.2 2.0

1.9 2.0

2.1 1.2

1.3 1.4

1.5 1.6

1.6 1.6

1.6 1.7

1.8 1.8

1.9 2.0

1.9 1.8

1.6 1.6

1.0 1.1

1.2 1.3

1.3 1.4

1.4 1.4

1.5 1.5

1.6 1.7

1.7 1.7

1.5 1.3

1.4 0.9

1.0 1.1

1.1 1.1

1.2 1.2

1.2 1.3

1.3 1.4

1.5 1.5

1.4 1.2

1.1 1.2
093 059 260
094 060 261
095 061 262

GLEN CANYON ROAD
APN
022-162-61
APN
022-162-62
APN
022-162-63
APN
022-162-64
APN
022-162-65
M T .

H E R M O N R D .

EXISTING OFFICE

BUILDING

PROPOSED MIXED USE

BUILDING 'A'

PROPOSED

TOWNHOUSE

BUILDING 'D'

PROPOSED

TOWNHOUSE

BUILDING 'C'

PROPOSED COMMERCIAL BUILDING 'B'
TC
C 12725

THOMAS THACHER
DECEMBER 31, 2023

EXPIRATION
UNAUTHORIZED USE IS PROHIBITED. LIABILITY TO THE ARCHITECT. BE THE USER'S RESPONSIBILITY WITHOUT ELECTRONIC TRANSFER OF DATA SHALL CONSENT OF THE ARCHITECT. THE PROPER

REPRODUCED, OR USED WITHOUT THE
SERVICE AND MAY NOT BE ALTERED, ARCHITECTS. IT IS AN INSTRUMENT OF THE PROPERTY OF THACHER & THOMPSON

THE DATA CONTAINED ON THIS SHEET IS

THACHER &

THOMPSON

ARCHITECTS

DESCRIPTION

REVISIONS
No. DATE
215 OREGON STREET
SANTA CRUZ, CA 95060
(831) 566-3079 V
www.tntarch.com
c 2016 THACHER & THOMPSON ARCHITECTS

DRAWING DATE
OCTOBER, 2016
PROJECT FILE NAME:

GRANUM 16.SD
PLAN CHECK 7/15/19
PLAN CHECK 6/01/20 OAK CREEK PARK MOUNT HERMON ROAD AT GLEN CANYON ROAD SCOTTS VALLEY, CA 8' WIDE CONC.

SIDEWALK

PARTIAL TREE CANOPY DIAGRAM
1 SCALE: 1" = 20'-0"
THE APPROXIMATE TREE CANOPY AT YEAR 15 IS SHOWN
IN THE SHADE CIRCLES ON THIS DRAWING. THE TREE CANOPIES SHOWN ONLY REFLECT TREES ADJACENT TO PARKING AREAS.

FOR A COMPLETE PICTURE OF THE PROPOSED TREE CANOPY
SEE THE LANDSCAPE PLAN (SHEET L). THE MATURE TREE CANOPY WILL COVER OVER 30% OF THE SITE.
096 062 263
Oak Creek Park
Final EIR
SCH # 2019110250
097 063 264
City of Scotts Valley Oak Creek Park Final EIR
Table of Contents | Page i
5/31/22
Table of Contents
1 Introduction 1-1
2 Response to Comments on the Draft EIR 2-1
3 Changes to the Draft EIR 3-1
4 Mitigation Monitoring and Reporting Program 4-1
098 064 265
City of Scotts Valley Oak Creek Park Final EIR
Introduction | Page 1-1Introduction | Page 1-1
Introduction | Page 1-1
5/31/22
1 Introduction
The Oak Creek Park Draft Environmental Impact Report (DEIR) was circulated for a 45-day public review period from October 12, 2021 to November 30, 2021, as assigned by the State of California Governor’s Office of Planning and Research State Clearinghouse and consistent with CEQA regulations. Copies of the document were distributed to state, regional, and local agencies, as well as organizations and individuals, for their review and comment.

This Oak Creek Park Final Environmental Impact Report (FEIR) has been prepared in accordance with CEQA and state and local CEQA Guidelines and represents the independent judgment of the City, as CEQA Lead Agency. This Final EIR, together with the DEIR, technical appendices, and other written documentation prepared during the EIR process, as those documents may be modified by the City Council at the time of certification, will constitute the Final EIR, as defined in the State CEQA Guidelines, Section 15132, and the City of Scotts Valley’s environmental document reporting procedures.

1.1 Document Organization and Framework
This Final EIR is organized as follows: Section 1 provides a brief introduction to this report.

Section 2 provides a list of agencies and interested persons commenting on the DEIR. This section also contains individual comments followed thereafter by responses. To facilitate review of the responses, an index number (e.g., 1-1, 1-2, 2-1) has been assigned to each comment and to its corresponding responses. Section 3 contains changes to the DEIR as a result of the comments by agencies and interested persons. Section 4 contains the Mitigation Monitoring and Reporting Program.

City Staff has reviewed the comment letters, draft responses and information generated in the course of preparing the responses and determined that none of this material constitutes significant new information that requires a recirculation period for further public comment under CEQA Guideline Section 15088.5. None of this new material indicates that the project will result in a significant new environmental impact not previously disclosed in the DEIR.

Additionally, none of this material indicates that there would be a substantial increase in the severity of a previously identified environmental impact that will not be mitigated, or that there would be any of the other circumstances requiring recirculation as described in Section 15088.5.

1.2 CEQA Requirements Regarding Comments and Responses
CEQA Guidelines Section 15204 (a) outlines parameters for submitting comments and reminds persons and public agencies that the focus of review and comment of Draft EIRs should be, “on the sufficiency of the document in identifying and analyzing possible impacts on the environment and ways in which significant effects of the project might be avoided or mitigated.

Comments are most helpful when they suggest additional specific alternatives or mitigation measures that would provide better ways to avoid or mitigate the significant environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is determined 099 065 266
City of Scotts Valley Oak Creek Park Final EIR
Introduction | Page 1-2Introduction | Page 1-2
Introduction | Page 1-2
5/31/22
in terms of what is reasonably feasible, considering factors such as the magnitude of the project at issue, the severity of its likely environmental impacts, and geographic scope of the project.

CEQA does not require a lead agency to conduct every test or perform all research, study, and experimentation recommended or demanded by commenters. When responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR.”
100 066 267
City of Scotts Valley Oak Creek Park Final EIR
Response to Comments on the Draft EIR | Page 2-1
5/31/22
2 Response to Comments on the Draft EIR

2.1 Agency, Organization, and Individual Comments on the Draft EIR This section includes all written comments received on the DEIR and the City’s responses to each comment. Comment letters and specific comments are given letters and numbers for reference purposes. Where sections of the DEIR are excerpted in this document, the sections are shown indented. Changes to the DEIR text are shown in underline for additions and strikeout for deletions.

The following is a list of agencies and organizations that submitted comments on the Draft EIR during the public review period:

Table 2-1: List of Written Comments Received on the Draft EIR Comment Letter
No. Commenting Agency / Organization / Individual Date
Agencies
1 State of California, Department of Transportation, Caltrans District 5 November 30, 2021
2 State of California, Department of Fish and Wildlife November 24, 2021 Organizations
3 Pacific Gas and Electric October 20, 2021
Individuals
4 Mark Hemmert September 7, 2021
101 067 268
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
STATE OF CALIFORNIA-------CALIFORNIA STATE TRANSPORTATION AGENCY Gavin Newsom, Governor

DEPARTMENT OF TRANSPORTATION
CALTRANS DISTRICT 5
50 HIGUERA STREET
SAN LUIS OBISPO, CA 93401-5415
PHONE (805) 549-3101
FAX (805) 549-3329
TTY 711
www.dot.ca.gov/dist05/
Making Conservation
a California Way of Life.

November 30, 2021
SCr-17-3.475
SCH#2019110250
Taylor Bateman
Community Development Director
Community Development Department
City of Scotts Valley
1 Civic Center Drive
Scotts Valley, CA 95066
Dear Mr. Bateman:

COMMENTS FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT (DEIR) - OAK

CREEK PARK, SCOTTS VALLEY, CA
The California Department of Transportation (Caltrans), District 5, Development Review, has reviewed the Oak Creek Park project which include 24,973 square feet of commercial use, eight townhomes, and 44 apartments. Caltrans offers the following comments in response to the DEIR:

1. Caltrans appreciates the transportation demand management strategies to further reduce vehicle miles traveled (VMT). The bike lockers and storage, showering facilities, sidewalks, and paths will help enhance mobility alternatives to vehicular trips.

Thank you for the opportunity to review and comment on the proposed project. If you have any questions, or need further clarification on items discussed above, please contact me at (805) 835-6543 or [email protected].

Sincerely,
Chris Bjornstad
Associate Transportation Planner
District 5 Development Review
Sincerely,
068 102 269
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director Bay Delta Region
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
(707) 428-2002
www.wildlife.ca.gov
Conserving California’s Wildlife Since 1870
November 24, 2021
Mr. Taylor Bateman
City of Scotts Valley
One Civic Center Drive
Scotts Valley, CA 95066
[email protected]
Subject: Oak Creek Park, Draft Environmental Impact Report, SCH No. 2019110250, City of Scotts Valley, Santa Cruz County
Dear Mr. Bateman:

The California Department of Fish and Wildlife (CDFW) has reviewed the Draft Environmental Impact Report (DEIR) prepared by the City of Scott’s Valley (City) for the Oak Creek Park Project (Project), located in Santa Cruz County. CDFW is submitting comments on the DEIR regarding potentially significant impacts to biological resources associated with the Project.

CDFW ROLE
CDFW is a Trustee Agency with responsibility under the California Environmental Quality Act (CEQA; Pub. Resources Code, § 21000 et seq.) pursuant to CEQA Guidelines § 15386 for commenting on projects that could impact fish, plant, and wildlife resources (e.g., biological resources). CDFW is also considered a Responsible Agency if a project would require discretionary approval, such as permits issued under the California Endangered Species Act (CESA), the Native Plant Protection Act, the Lake and Streambed Alteration (LSA) Program, and other provisions of the Fish and Game Code that afford protection to the state’s fish and wildlife trust resources.

California Endangered Species Act
Please be advised that a CESA Permit must be obtained if the Project has the potential to result in “take” of plants or animals listed under CESA, either during construction or over the life of the Project. Issuance of a CESA Permit is subject to CEQA documentation; the CEQA document must specify impacts, mitigation measures, and a mitigation monitoring and reporting program. If the Project will impact CESA listed species, early consultation is encouraged, as significant modification to the Project and mitigation measures may be required in order to obtain a CESA Permit.

CEQA requires a Mandatory Finding of Significance if a project is likely to substantially impact threatened or endangered species (Pub. Resources Code, §§ 21001(c), 21083, and CEQA Guidelines §§ 15380, 15064, 15065). Impacts must be avoided or mitigated DocuSign Envelope ID: 76D64D7A-8D29-44F5-905B-EA276502697C 069 103 270
Mr. Taylor Bateman
City of Scotts Valley
November 24, 2021

Page 2 of 5 ends
← All documents from this meeting