Cities Index.
Agenda-Item-Number-5-Award-of-Contract-City-Web-Site-ReDesign-Planeteria

Sebastopol City Council
March 15, 2022

Document
Agenda-Item-Number-5-Award-of-Contract-City-Web-Site-ReDesign-Planeteria
Meeting
March 15, 2022
Body
Sebastopol City Council
Pages
65
Original file
13.9 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofsebastopol.gov. That file is the official record.

CITY OF SEBASTOPOL

CITY COUNCIL

AGENDA ITEM
Meeting Date: March 15, 2022
To: Honorable Mayor and City Councilmembers
From: City Administration
Subject: Approval of Award of Contract for City Web Site Redesign- Awardee: Planeteria Recommendation: That the Mayor and City Council Consider Approval of Award of Contract to Planeteria for the City of Sebastopol Web Site Redesign
Funding: Currently Budgeted: __X_____ Yes ________ No _____ N/A Net General Fund:

Contract Services
Amount: $35,000
Net General Fund Cost:

Account Code Number: 100-13-01-4210 $35,000 - Authorized in City Approved Budget (if applicable) _AK___ (verified by Administrative Services Department)
INTRODUCTION:

This item is to request City Council Consider Award of Contract for City Web Site Redesign to Planeteria.

BACKGROUND:

On November 16, 2021, City staff released the Request for Proposals for the redesign of the City Web site. The City of Sebastopol was seeking the best proposal that would be equipped to integrate additional features that may be needed or new technologies that may be developed in the future for the site. The City is seeking a redesigned site that centralizes content management, is easier for the public to navigate, and allows for any City Staff member to manage the daily, weekly, monthly and beyond inputs.

DISCUSSION:

The City of Sebastopol received three proposals as listed below:

Jesse James $35,000.00/ Maintenance would be billed at a rate of $125/hr./ $6,000.00 Yearly Hosting (Not part of Contract)
Mobikasa $35,000.00/Yearly Managed Maintenance $8,000.00/ $2,000.00 Yearly Hosting (Not part of Contract)
Planeteria $34,650.00 /Yearly Managed Maintenance $2,400.00/ $600.00 Yearly Hosting (Not part of Contract)
An interview panel was created containing a staff member from each City department, as well as the City’s community outreach coordinator staff. Interviews were conducted with each proposal and a follow up interview was conducted with the two highest nominated proposals based upon the input from each panel member.

Second interviews were conducted with Mobikasa and Planeteria.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 1 of 65 ends

Based upon the interviews conducted, and follow up clarifications with each proposal, discussion and understanding of development of a more attractive contemporary look and improved site security; as well as compliance with the City’s local purchasing policy “Whenever possible, the City wishes to support, promote the use of local businesses, suppliers an services providers to help create a sustainable economy, preserve local businesses, and make a commitment to circulate tax dollars within city limits”, Planeteria, a local company (located in Santa Rosa, CA) (the other two proposals are located on the East Coast), and who provided the best submittal to the City, it is recommended that the City Council consider award of contract for the City Web Site Redesign to Planeteria. The City Council could also reject all proposals and direct staff to re-issue the Request for Proposal.

CITY COUNCIL AND/OR GENERAL PLAN GOALS:

5.3.3 Encourage and increase public awareness of City Policies, decisions, programs and all public processes and meetings, by investigating effective methods of communication and obtaining feedback from the community.

PUBLIC COMMENT:

As of the writing of this staff report, the City has not received any public comment. However, if staff receives public comment from interested parties following the publication and distribution of this staff report such comments will be provided to the City Council as supplemental materials before or at the meeting. In addition, public comments may be offered during the public comment portion of this item.

PUBLIC NOTICE:

This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to schedule meeting date.

FISCAL IMPACT:

There is no fiscal impact with this action tonight as this item was approved in the FY 21-22 budget in the amount of $35,000 for City Web site redesign.

RECOMMENDATION:

That the City Council Approve Award of Contract for City Web Site Redesign to Planeteria, in an amount not to exceed $35,000.

Attachment(s):

Contract Template
Proposal – Planeteria
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 2 of 65 ends

AGREEMENT FOR PROFESSIONAL SERVICES
THIS AGREEMENT, made and entered into on ________________ by and between the City of Sebastopol, located in the County of Sonoma, State of California (City), and Planeteria. (Consultant).

RECITALS:

A. City desires to employ Consultant to furnish professional services in connection with the project described as Professional Audit Services.

B. Consultant has represented that Consultant has the necessary expertise, experience, and qualifications to perform the required duties.

NOW, THEREFORE, in consideration of the mutual premises, covenants, and conditions herein contained, the parties agree as follows:

SECTION 1 – BASIC SERVICES
Consultant agrees to perform the services set forth in Exhibit A, “Scope of Services” and made part of this Agreement.

SECTION 2 – ADDITIONAL SERVICES
Consultant shall not be compensated for any services rendered in connection with its performance of this Agreement which are in addition to or outside of those set forth in this Agreement or Exhibit A, “Scope of Services”, unless such additional services and compensation are authorized in advance and in writing by the City Council or City Manager of the City.

SECTION 3 – TIME FOR COMPLETION
The time for completion of services shall be as identified in Exhibit A, “Scope of Services”.

SECTION 4 – COMPENSATION AND METHOD OF PAYMENT
A. Subject to any limitations set forth in this Agreement, City agrees to pay consultant the amount specified in Exhibit A, page 30, “Proposed Pricing”, attached hereto and made a part hereof.

Total compensation shall not exceed a total of $35,000 and shall be completed per attached proposed scheduled unless additional compensation is approved in accordance with Section 2.

B. Consultant shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month. The invoice shall detail charges by the following categories if applicable: labor (by sub-category), travel, materials, equipment, supplies, subconsultant contracts, and miscellaneous expenses. City shall independently review each invoice submitted to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. If no charges or expenses are disputed, the invoice shall be approved and City will use its best efforts to cause Consultant to be paid within 30 days of receipt of invoice. If any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. If the City reasonably determines, in its sole judgment, that the invoiced Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 3 of 65 ends

charges and expenses exceed the value of the services performed to date and that it is probable that the Agreement will not be completed satisfactorily within the contract price, City may retain all or a portion of the invoiced charges and expenses. Within thirty (30) days of satisfactory completion of the project, City shall pay the retained amount, if any, to Consultant.

C. Payment to the Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant.

SECTION 5 – STANDARD OF PERFORMANCE
Consultant represents and warrants that it has the qualifications, experience and facilities necessary to properly perform the services required under this Agreement in a thorough, competent and professional manner. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. In meeting its obligations under this Agreement, Consultant shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to those required of Consultant under this Agreement.

SECTION 6 – INSPECTION AND FINAL ACCEPTANCE
City may inspect and accept or reject any of Consultant’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Consultant’s work within sixty (60) days after submitted to City, unless the parties mutually agree to extend such deadline. City shall reject work by a timely written explanation, otherwise Consultant’s work shall be deemed to have been accepted. City’s acceptance shall be conclusive as to such work except with respect to latent defects and fraud. Acceptance of any of Consultant’s work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, the sections pertaining to indemnification and insurance.

SECTION 7 – INSURANCE REQUIRED
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees.

Refer to Exhibit B, Insurance Requirements for IT Vendor Services.

SECTION 8 – INDEMNIFICATION
A. Consultant shall indemnify and hold harmless City, its agents, officers, officials, employees, and volunteers from any and all claims, demands, suits, loss, damages, injury, and/or liability (including any and all costs and expenses in connection therewith), incurred by reason of any negligent or otherwise wrongful act or omission of Consultant, its officers, agents, employees and subcontractors, or any of them, under or in connection with this Agreement; and Consultant agrees at its own cost, expense and risk to defend any and all claims, actions, suits, or other legal proceedings brought or instituted against City, its agents, officers, officials, employees and volunteers, or any of them, arising out of such negligent or otherwise wrongful act or omission, and to pay and satisfy any resulting judgments.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 4 of 65 ends

B. When Consultant under this Agreement is duly licensed under California Business and Professions Code as an architect, landscape architect, professional engineer, or land surveyor (“design professional”), the provisions of this section regarding Consultant’s duty to defend and indemnify apply only to claims that arise out of or relate to the negligence, recklessness, or willful misconduct of the design professional.

C. If any action or proceeding is brought against Indemnitees by reason of any of the matters against which Consultant has agreed to indemnify Indemnitees as provided above, Consultant, upon notice from City, shall defend Indemnitees at Consultant’s expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees are entitled to Indemnification in order to be so indemnified. The insurance required to be maintained by Consultant shall ensure Consultant’s obligations under this section, but the limits of such insurance shall not limit the liability of Consultant hereunder. The provisions of this section shall survive the expiration or earlier termination of this Agreement.

D. The provisions of this section do not apply to claims to the extent occurring as a result of the City’s sole negligence or willful acts or misconduct.

SECTION 9 – INDEPENDENT CONTRACTOR STATUS
A. Consultant is and shall at all times remain a wholly independent contractor and not an officer, employee, or agent of City. Consultant shall have no authority to bind City in any manner, nor to incur an obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City.

B. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant’s exclusive direction and control. Neither City, nor any elected or appointed boards, officers, officials, employees or agents of City, shall have control over the conduct of Consultant or any of Consultant’s officers, employees or agents, except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant’s officers, employees or agents are in any manner officials, officers, employees or agents of City.

C. Neither Consultant, nor any of Consultant’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees.

Consultant expressly waives any claim Consultant may have to any such rights.

SECTION 10 – CONFLICTS OF INTEREST
A. Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of services under this Agreement.

Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the City Manager. Consultant agrees to at all times avoid conflicts with the interests of City in the performance of this Agreement.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 5 of 65 ends

B. City understands and acknowledges that Consultant is, as of the date of execution of this Agreement, independently involved in the performance of non-related services for other governmental agencies and private parties. Consultant is aware of any stated position of City relative to such projects.

Any future position of City on such projects shall not be considered a conflict of interest for purposes of this section.

SECTION 11 – OWNERSHIP OF DOCUMENTS
A. All original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents prepared, developed or discovered by Consultant in the course of providing any services pursuant to this Agreement shall become the sole property of City and may be used, reused or otherwise disposed of by City without the permission of the Consultant.

When requested by City, but no later than three years after project completion, Consultant shall deliver to City all such original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents.

B. All copyrights, patents, trade secrets, or other intellectual property rights associated with any ideas, concepts, techniques, inventions, processes, improvements, developments, works of authorship, or other products developed or created by Consultant during the course of providing services (collectively the “Work Product”) shall belong exclusively to City. The Work Product shall be considered a “work made for hire” within the meaning of Title 17 of the United States Code.

Without reservation, limitation, or condition, Consultant hereby assigns, at the time of creation of the Work Products, without any requirement of further consideration, exclusively and perpetually, any and all right, title, and interest Consultant may have in the Work Product throughout the world, including without limitation any copyrights, patents, trade secrets, or other intellectual property rights, all rights of reproduction, all rights to create derivative works, and the right to secure registrations, renewals, reissues, and extensions thereof.

SECTION 12 – CONFIDENTIAL INFORMATION; RELEASE OF INFORMATION A. All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the City Manager, except as may be required by law.

B. Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the City Manager or unless requested by the City Attorney of City, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided consultant gives City notice of such court order or subpoena.

C. If Consultant, or any officer, employee, agent, or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorney’s fees, caused by or incurred as a result of Consultant’s conduct.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 6 of 65 ends

D. Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed thereunder. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite such response.

SECTION 13 – SUSPENSION OF WORK
City may, at any time, by ten (10) days written notice suspend further performance by Consultant. All suspensions shall extend the time schedule for performance in a mutually satisfactory manner and Consultant shall be paid for services performed and reimbursable expenses incurred prior to the suspension date.

SECTION 14 – COMPLIANCE WITH LAW
Consultant shall keep itself informed of and comply with all applicable federal, state and local laws, statutes, codes, ordinances, regulations and rules in effect during the term of this Agreement.

Consultant shall obtain any and all licenses, permits and authorizations necessary to perform the services set forth in this Agreement. Neither City, nor any elected or appointed boards, officers, officials, employees or agents of City, shall be liable, at law or in equity, as a result of any failure of Consultant to comply with this section.

SECTION 15 – COMPLIANCE WITH CIVIL RIGHTS
During the performance of this contract, Consultant agrees as follows:

A. Equal Employment Opportunity. In connection with the execution of this Agreement, Consultant shall not discriminate against any employee or applicant for employment because of race, religion, color, ancestry, age, sexual orientation, physical handicap, medical condition, marital status, sex, or national origin. Such actions shall include, but not be limited to, the following: employment, promotion, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rate of pay or other forms of compensation; and selection for training including apprenticeship.

B. Nondiscrimination Civil Rights Act of l964. Consultant will comply with all federal regulations relative to nondiscrimination to federally-assisted programs.

C. Solicitations for Subcontractors including Procurement of Materials and Equipment. In all solicitations, either by competitive bidding or negotiations, made by Consultant for work to be performed under a subcontract, including procurement of materials or leases of equipment, each Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 7 of 65 ends

potential subcontractor, supplier, or lessor shall be notified by Consultant of Consultant’s obligations under this Agreement and the regulations relative to nondiscrimination.

SECTION 16 – RECORDS
A. Records of Consultant’s direct labor costs, payroll costs, and reimbursable expenses pertaining to this project covered by this Agreement will be kept on a generally recognized accounting basis and made available to City if and when required for a period of up to 3 years from the date of Consultant’s final invoice.

B. Consultant’s records and design calculations will be available for examination and audit if and as required. The cost of any reproductions shall be paid by City.

C. Records/Documents. All records produced by CONSULTANT during the course of your work under this agreement are and at all times shall remain the property of the CITY.

CONSULTANT shall assemble these records in an orderly fashion and store same, for at least three years, in a mutually agreed upon location so that they may be reasonably available to the public or to the officials of CITY as required. Copies of records shall be provided to the City from time to time, as requested.

SECTION 17 – COOPERATION BY CITY
All public information, data, reports, records, and maps as are existing and available to City as public records, and which are necessary for carrying out the work as outlined in the Exhibit A, “Scope of Services”, shall be furnished to Consultant in every reasonable way to facilitate, without undue delay, the work to be performed under this Agreement.

SECTION 18 – NOTICES
All notices required or permitted to be given under this Agreement shall be in writing and shall be personally delivered, or sent by facsimile or first class mail, addressed as follows:

To City: City Manager
7120 Bodega Ave
Sebastopol, California 95472
To Consultant: Consultant Name
Address
City, State, Zip Code

Notice shall be deemed effective on the date personally delivered or transmitted by facsimile, or, if mailed, three (3) days after deposit in the custody of the U.S. Postal Service.

SECTION 19 – TERMINATION
A. City may terminate this Agreement, with or without cause, at any time by giving ten (10) days written notice of termination to Consultant. If such notice is given, Consultant shall cease immediately all work in progress.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 8 of 65 ends

B. If either Consultant or City fail to perform any material obligation under this Agreement, then, in addition to any other remedies, either Consultant, or City may terminate this Agreement immediately upon written notice.

C. Upon termination of this Agreement by either Consultant or City, all property belonging to City which is in Consultant’s possession shall be delivered to City. Consultant shall furnish to City a final invoice for work performed and expenses incurred by Consultant, prepared as set forth in this Agreement.

SECTION 20 – ATTORNEY FEES
If litigation or other proceeding is required to enforce or interpret any provision of this Agreement, the prevailing party in such litigation or other proceeding shall be entitled to an award of reasonable attorneys’ fees, costs and expenses, in addition to any other relief to which it may be entitled. In addition, any legal fees, costs and expenses incurred to enforce the provisions of this Agreement shall be reimbursed to the prevailing party.

SECTION 21 – ENTIRE AGREEMENT
This Agreement, including the attached Exhibits, is the entire, complete, final and exclusive expression of the parties with respect to the matters addressed therein and supersedes all other agreements or understandings, whether oral or written, or entered into between Consultant and City prior to the execution of this Agreement. No statements, representations or other agreements, whether oral or written, made by any party which are not embodied herein shall be valid and binding unless in writing duly executed by the parties or their authorized representatives.

SECTION 22 – SUCCESSORS AND ASSIGNS
This Agreement shall be binding on the heirs, executors, administrators, successors and assigns of the parties. However, this Agreement shall not be assigned by Consultant without written consent of the City.

SECTION 23 – CONTINUITY OF PERSONNEL
Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant’s staff assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant’s staff assigned to perform the services required under this Agreement, prior to any such performance.

SECTION 24 – DEFAULT
In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default and may terminate this Agreement immediately by written notice to Consultant.

SECTION 25 – WAIVER
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 9 of 65 ends

Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision, nor a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement.

SECTION 26 – LAW TO GOVERN; VENUE
This Agreement shall be interpreted, construed and governed according to the laws of the State of California. In the event of litigation between the parties, venue in state trial courts shall lie exclusively in the County of Sonoma. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Northern District of California, in San Francisco.

SECTION 27 – SEVERABILITY
If any term, condition or covenant of this Agreement is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall not be affected thereby and the Agreement shall be read and construed without the invalid, void or unenforceable provision(s).

SECTION 28 – SPECIAL PROVISIONS
This Agreement is subject to the following special provisions: none.

IN WITNESS WHEREOF, the parties hereto have accepted, made, and executed this Agreement upon the terms, conditions, and provisions above stated, the day and year first above written.

Consultant: City:

By: ________________________________ By: ________________________ Name: Name: Larry McLaughlin
Title: Title: City Manager

Approved as to Form:

By: _________________________________
Name: Larry McLaughlin
Title: City Attorney
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 10 of 65 ends

Exhibit B
City of Sebastopol
Insurance Requirements for IT Vendor Services
IT Vendor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Vendor, its agents, representatives, or employees. Vendor shall procure and maintain for the duration of the contract insurance claims arising out of their services and including, but not limited to loss, damage, theft or other misuse of data, infringement of intellectual property, invasion of privacy and breach of data.

MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (nonowned), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (Not required if consultant provides written verification it has no employees)

4. Cyber Liability Insurance, with limits not less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. Coverage shall be sufficiently broad to respond to the duties and obligations as is undertaken by Vendor in this agreement and shall include, but not be limited to, claims involving infringement of intellectual property, including but not limited to infringement of copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations.

If the Vendor maintains broader coverage and/or higher limits than the minimums shown above, the City of Sebastopol requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City of Sebastopol.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The City of Sebastopol, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Vendor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to this contract, the Vendor’s insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City of Sebastopol, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City of Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 11 of 65 ends

Sebastopol, its officers, officials, employees, or volunteers shall be excess of the Vendor’s insurance and shall not contribute with it.

Notice of Cancellation
Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City of Sebastopol.

Waiver of Subrogation
Vendor hereby grants to the City of Sebastopol a waiver of any right to subrogation which any insurer of said Vendor may acquire against the City of Sebastopol by virtue of the payment of any loss under such insurance. Vendor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Sebastopol has received a waiver of subrogation endorsement from the insurer.

Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City of Sebastopol. The City of Sebastopol may require the Vendor to provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or the City of Sebastopol.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M.

Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Sebastopol.

Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:

1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Vendor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.

Verification of Coverage
Vendor shall furnish the City of Sebastopol with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Vendor’s obligation to provide them. The City of Sebastopol reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Subcontractors Vendor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Vendor shall ensure the City of Sebastopol is an additional insured on insurance required from subcontractors.

Special Risks or Circumstances The City of Sebastopol reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

All certificates and endorsements shall reference the appropriate policy number, names of insured, and shall be signed by an authorized representative of the insurer.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 12 of 65 ends

PREPARED FOR:

PREPARED BY:

CONTACT:

Tyler Coffin - Sales & Business Development Director
Brian Lee - Strategy Director
Victoria Kovatch - Sales & Marketing Analyst
Planeteria Media
110 Stony Point Road, Ste 225, Santa Rosa, California 95401 P: 707.843.3773 E: [email protected]
Office of the City Manager
City of Sebastopol
7120 Bodega Avenue, Sebastopol, CA 95472
P: 707.823.1153 E: [email protected]
PROPOSAL ISSUED: DECEMBER 29, 2021

THE CITY OF SEBASTOPOL

WEBSITE REDESIGN
FEDERAL EIN: 45-4957640 | CA MICRO SMALL BUSINESS CERTIFICATION: 1759443 | DUNS & BRADSTREET NUMBER: 079196688 WWW.PLANETERIA.COM
@planeteria_media @planeteria @planeteria
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 13 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 2

HELLO CITY OF SEBASTOPOL PROJECT TEAM,
Planeteria is excited for the opportunity to extend our website services for the City of Sebastopol’s by redesigning the City’s public facing website. We have had the pleasure of designing the previous version of the City’s website in 2016 and have provided continued tech support and maintenance since the launch. We are uniquely positioned to understand your functional/technical needs, in addition to your content requirements. At Planeteria we believe in flexible and modular websites. That means that as the City grows and changes, the website can evolve easily with you. This is why we recommend utilizing an open-source, license free solution like WordPress that not only allows control of all content by non-technical staff, but also allows for global design and functionality changes without re-building the entire site. A flexible website keeps your brand fresh and your audience engaged without great expense or difficulty.

We also read in your RFP that this project is part of a broad effort to strengthen and support the City of Sebastopol and modernize the it’s communication tools, while also highlighting your diverse and dynamic community. That caught our interest because it tells us the City thinks about how to best serve its audience. Planeteria’s mission statement is to design digital experiences that support communities in having positive and productive interactions with their local government.

Our approach to your City website is to create a virtual city hall, so your community can easily interact and engage using online resources. We understand the City would like the website to be a tools residents, businesses, tourists and City staff can rely on to provide vital & easily navigable resources such as an events calendar, alerts, department pages, forms, news, directories, Covid-19 updates and much more. The City of Sebastopol is choosing to redesign your websites at a very interesting and unique point in time, and it is extremely important to provide a service centric website with online tools for your audience to rely on.

We recommend a revitalized digital presence that leverages enhanced functionality to allow for added online services, improved navigation/work flow, and a defined website style guide to dictate your visual style. We take extra time with art direction to select photos and imagery that represent the unique features of The City of Sebastopol. This is the type of project Planeteria excels at delivering. We will become your technology partner, just like we have done for the City of Lacey, Clackamas County, City of Pleasanton, Township of North Brunswick, and San Diego County Water Authority.

We are excellent at our craft and have an experienced team ready to deliver an exceptional web presence for The City of Sebastopol. Your website will become a pivotal resource for City staff and the community to lean on. We pride ourselves on long term relationships and would be proud to help you launch a second website with the City of Sebastopol.

WARM REGARDS,
Tyler Coffin - Sales & Business Development Director
P: 707.843.3773 E: [email protected]
110 Stony Point Rd Suite 225, Santa Rosa, CA 95401
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 14 of 65 ends

SECTION ONE:

Company Profile
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 15 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 4

ABOUT PLANETERIA
Since 1999, Planeteria has been designing, developing and supporting community-focused websites for cities, counties, municipalities and other public agencies around the country. We’ve built over 500 sites serving millions of customers. We pride ourselves in offering modular solutions for local government organizations who want the ability to make adjustments to their website without needing technical support. Additionally, we build our sites with the ability to be comprehensively re-designed without requiring a full re-development effort. This helps save our clients money while keeping your website flexible as the needs of your community and organization change.

We’re also highly focused on providing content support. Our content specialists personally work with you to understand, organize, edit, refine and migrate your content and its structure.

We find that WordPress meets the needs of 90% of our projects. WordPress is one of the most widely used solutions in the world. Through 22 years of developing government websites, our team has created and refined proprietary tools specific to the needs of the public sector.

For Planeteria to create positive and productive digital experiences, we uphold three core values: service, diversity, and equity. We consider those values when proposing solutions for our clients, and we have considered those values as we’ve built our team. We have 25 employees distributed around the country with our main office in Santa Rosa, California. Using a distributed work force allows us a broader access to talent with diverse life experience. It also provides our team with experience working in a wider variety of communities.

We leverage our staff size to provide excellent service. Our clients can speak directly with our technical director, our lead designer, and our content specialist without navigating a phone tree.

We are proud to say our team has won multiple design and development awards for work around the country.

WE DESIGN WITH YOUR COMMUNITY AS THE PRIORITY. IN FACT, IT’S OUR MISSION STATEMENT:

To design digital experiences that support communities in having positive and productive interactions with their local government.

RECENT AWARDS
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 16 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 5

MUNICIPAL EXPERIENCE
We have worked with cities, counties and other municipalities all over the country and below is a sampling. Each client below has their own unique technology stack and functionality requirements for their website. Often times Planeteria integrates third party functionality using best practices. In other times, we incorporate our own functionality stack such as calendar events, board meetings and more.

For a full list of our projects, visit WWW.PLANETERIA.COM/GOVERNMENT • City of Nixa, MO
• City of Pleasanton, CA
• City of Sebastopol, CA
• Township of North Brunswick, NJ
• Clackamas County, OR
• City of Tacoma, WA
• City of Lacy, WA
• City of Tucker, GA
• City of Midway, UT
• Town of Ithaca, NY
• Aleutians East Borough, AK
• Sonoma Water, CA
• Boston Housing Authority, MA
• Butler County Regional Transportation Authority, OH
• San Diego County Water Authority, CA
• Lextran, KY
• AC Transit, CA
• Solano Superior Court, CA
• Solano Transportation Authority, CA
• OC Local Area Formation Commission, CA
• Bend Parks & Rec, OR
• Basin Recreation District, UT

ADDITIONAL RELATED PROJECTS
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 17 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 6

PLANETERIA VALUES

SERVICE
• We actively seek out opportunities to help.
• We are good listeners and are attentive to client needs. • We actively research new technologies to support our clients’ goals. We don’t always have the answer but we work hard to uncover a path for project success. • We respond thoughtfully and punctually in our communications.

DIVERSITY
• We embrace and celebrate people different from ourselves and ideas unlike our own. We feel this is a key element to bringing fresh and effective ideas to any successful project. • We work to understand other perspectives. Through active listening we work to understand what others are trying to communicate.
• We believe great solutions are born from gathering a wide variety of ideas. • We understand our own experience is not the only experience. • We seek feedback and input from all stakeholders in our projects.

EQUITY
• We keep in mind that not all people have the same opportunities and resources. • We actively remove barriers to using our products.
• We strive to understand the cultural components of inequity and fight against those components.

There are a lot of digital agencies on the planet for you to choose from. You should work with Planeteria because of our unique combination of Our Team, Our Designs, and Our Process. Our project managers run our projects with our three company values in mind.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 18 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 7

FINANCIAL STABILITY & HISTORY
Planeteria was established in 1999 and has survived 2 recessions and has grown steadily. We started in Santa Rosa, Northern California, and now have a distributed work force all over the county. We also have clients all over the country and have a strong client base in California. Planeteria is privately owned, financially stable and has no outstanding business loans or mortgages.

DUNS & BRADSTREET NUMBER: 079196688

BALANCE SHEET
Ending 12/17 Ending 12/18 Ending 12/19 Ending 12/20 Forecast 12/21 ASSETS
Current Assets $81,360 $91,655 $150,000 $200,000 $300,000 Fixed Assets $181,456 $402,645 $525,000 $750,000 $1,200,000 Total Assets $262,816 $494,300 $675,000 $950,000 $1,500,000

LIABILITIES
Current Liabilities $16,700 $23,655 $25,000 $35,000 $50,000 Equity $246,116 $470,645 $650,000 $915,000 $1,450,000
Total Liabilities & Equity $262,816 $494,300 $675,000 $950,000 $1,500,000

PROFIT & LOSS
FY 2017 FY 2018 FY 2019 FY 2020 FY 2021
Total Income $951,000 $1,100,525 $1,600,000 $3,200,000 $5,000,000 Total Expenses $818,500 $945,245 $1,300,000 $2,500,000 $3,900,000 Net profit $132,500 $155,280 $300,000 $700,000 $1,100,000 • There are no past of pending litigations against Planeteria alleging failure to perform in accordance with contractual obligations.
• There have been no projects which have resulted in time extensions and/or the assessment of liquidated damages against any member of the project team during the last ten (10) years.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 19 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 8 SECTION TWO:

Project Team
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 20 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 9 Planeteria is made up of a dedicated team of 25 experts who will be handling all aspects of your project. Our robust creative, technical, content, and management teams collaborate closely to ensure that projects are executed seamlessly, while our team leads remain committed to delivering quality work and facilitating communication. We have subject matter experts in project management, user experience, design, ADA, technology, customer service, SEO etc. Our team’s versatility and concise project management process sets us apart from the competition. We will not require any subcontractors for this project.

Wyatt has been Planeteria’s lead project manager since 2015. Because of her abilities managing diverse stakeholder interests, she specializes in working with our Municipal clients. Wyatt is excellent at handling multiple projects, ensuring all timelines and goals are met. She is a very effective communicator, and makes sure that information is constantly flowing to the right person. Wyatt is organized, flexible, and strategizes to make sure all projects are executed on time. She has a degree in Arts and Communication Design from Pacific Northwest College of Arts, and has also completed a Cornell University Project Management Certificate.

CITY OF SEBASTOPOL PROJECT TEAM
WYATT BENOIT | PROJECT MANAGER
Sandeep has over 20 years of international experience managing creative technology projects. Before Planeteria he served as director for process Redesign at Citigroup and also as the managing director of a technology solutions company. Sandeep has built over 150 websites for organizations across the country. Sandeep manages a team of engineers on all technical elements of our projects.

SANDEEP MEHTA | TECHNOLOGY DIRECTOR
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 21 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 10 For over a decade, Chloe has been committed to communicating clearly through compelling, user-focused design that is carefully crafted to enrich each clients’ branding and aesthetic. As Planeteria’s lead visual designer, Chloe has been instrumental in developing comprehensive design systems and experiences that are not only intuitive and effective for users, but flexible and easy for our clients to implement and maintain. She has a Bachelor of Fine Arts in Communication Design from Pacific Northwest College of Art.

CHLOE STEINHOFF-SMITH | LEAD VISUAL DESIGNER
Heidi has been advising non-profits and government agencies about website development, digital communications and internal processes since 2001. Heidi serves as the bridge between content, design and programming by evaluating what clients already have vs. what they need. Heidi also plays a key role in evaluating the breadth of existing content and streamlining it to make it clear, consistent, and usable for audiences across generational divides. Heidi is a Sonoma State graduate, has a bachelors in Business and Psychology and a master’s in Psychology with a focus on research.

HEIDI PEYSER | INFORMATION ARCHITECT
Tyler has over 15 years of technical website sales experience helping organizations turn project ideas into a reality.

Communicating website design needs can prove to be difficult, but Tyler prides himself on educating clients so they are co-creators with input and buy-in on the final product. He will initiate the scope of work, project contract/agreement and payment terms and will be the point of contact for post-launch account management. Tyler is a graduate from University of California, Davis with a bachelors in Communication and Sociology.

TYLER COFFIN | SALES & BUSINESS DEVELOPMENT DIRECTOR
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 22 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 11 Keegan’s philosophy in life is “talk a little, listen a lot, and then over-deliver on client expectations”. Keegan is our lead ADA specialist. He has been programming websites for thirteen years, leading our development team since 2009, and brings a contagious enthusiasm to our projects. He has expertise in multiple programming frameworks and has also been involved in the development of CMS systems. Keegan graduated from University of California, Davis with a degree in Computer Science.

KEEGAN ORTIZ-DEKRAMER | SENIOR DEVELOPER
Victoria got her start working for a large consumer products distribution company in branding and marketing. At Planeteria, Victoria assists in identifying new leads, preparing proposals, and making sure all parts of the sales process are up to date. She also works on marketing initiatives, press releases, newsletters, social media, and SEO. Victoria primary roles bridge the gap between sales and marketing. She has a degree in sociology from Azusa Pacific University and recently completed a digital marketing certificate from Columbia University’s Emeritus Business School.

VICTORIA KOVATCH | SALES & MARKETING ANALYST
Bill has over 12 years of web development experience, and is our main customer support lead. His primary role is making sure new project designs and functionality meet expectations upon launch and beyond. He also serves as a main point of contact for existing web site maintenance and technical support, and assists in content migration. Bill has an Associate degree in Interactive Media Design from the Santa Rosa Junior College and training as an Adobe Application Specialist.

BILL OLSON | WEB PRODUCER
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 23 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 12 Brian has been building Planeteria’s client list since 2009. He holds an MA in Journalism, a BS in Cell and Molecular Biology and has worked around the world as a professional photojournalist. Between his communication skills and his understanding of design strategy, he helps Planeteria understand what digital business tools will be of greatest value to our clients. He has been integral in establishing Planeteria’s focus on serving the needs of our municipal clients by soliciting input from the community they serve. Brian enjoys bringing diverse thinkers together and seeing what unexpected ideas and unique solutions arise.

BRIAN LEE | STRATEGY DIRECTOR
With a background in both audio engineering and photographic artistry, Katrina has spent the better part of the past two decades cultivating her technical expertise and creative vision. Earning her C.P.P. designation from the Professional Photographers Association in 2014 was a turning point in her career. Recognized for her technical skill as well as her artistic vision, Katrina began to shift her focus from general portrait photography to dynamic environmental portraits, and commercial imagery. Creating an image with a compelling photographic story is exciting and made possible only through mutual collaboration.

KATRINA THOMAS | LEAD PHOTOGRAPHER & ART DIRECTOR
Jessica has over 8 years of creative experience in a variety of roles. She has a strong passion for streamlining processes and bringing people together. Jessica provides excellent communication and planning support for both our internal team as well as our clients. She graduated in Arts and Communication Design from California State University, Channel Islands. She has studied writing, design, and user strategy.

JESSICA KANE | PROJECT MANAGER
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 24 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 13 SECTION THREE:

Municipal Design
Experience
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 25 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 14

MUNICIPAL EXPERIENCE

CLACKAMAS COUNTY
WWW.CLACKAMAS.US
PROJECT DURATION: 9 months
YEAR LAUNCHED: May 2019
PROJECT CONTACT:

JESSIE KIRK | Web Content Editor
[email protected] | 503.742.5916

BACKGROUND
Clackamas County is Oregon’s third-most
populous county. Since the county’s creation,
agriculture, timber, manufacturing, and
commerce have been the principal economic
activities.

THE PROJECT
Planeteria was hired for website design and development services for the county’s 2,000+ page website that receives more than 2 million visits per year. With a site over 2,000 pages, the content reorganization was essential. A unique challenge to this project was the County has over 40 different departments and divisions all of which needed unique department pages with an overall look and feel that created uniformity throughout the site but also provides levels of flexibility in what they could post and where.

THE SOLUTION
The solution for Clackamas county required an in depth audit of their immense content.

We conducted an audience needs assessment with relevant stakeholders to determine the most essential components for the new website. From there, we created a new site map, wireframes, web style guide (colors/typography), mood-boarding, design mock ups, developed using Drupal CMS, and mobile responsiveness.

SERVICES PROVIDED
News & events, social media integration, custom calendar integration, procurement, emergency alerts, in-site search functionality, video embedding/streaming, document archive, online forms, department directory, unique department home pages, ADA compliant, Google Analytics, mobile responsive, language translation, ongoing maintenance and hosting.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 26 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 15

EASY ACCESS TO KEY TOOLS

AND SERVICES
On the home page we wanted to give citizens
easy access to the most important information
and resources and we wanted to display this
information in a stackable format that is both
aesthetically pleasing and scales easily for different
screen sizes.

FEATURED GUIDES
Clackamas County has several resource guides to help citizens identify which department they should be connecting with. There is easy access to these guides on the home page of the County website.

SYNDICATION OF LATEST NEWS

AND UPCOMING EVENTS
We believe municipal websites should be a tool that
make staff more effective and efficient. One way to
achieve this is through content syndication of News
& Events. County staff updates News and Events in
the CMS and the News articles and calendar Events
are syndicated throughout the website with one
administrative effort.

CASE STUDY: CLACKAMAS COUNTY
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 27 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 16

COUNTY EMPLOYEE INTRANET
Following the completion of the public facing County
website, Planeteria was retained to design and develop
the staff facing County intranet.

THE SOLUTION
The intranet allows county staff to collaborate internally using the same intuitive CMS as the main site and share content between instances to maximize efficiency. This
password protected portal will gives county staff access to restricted documents, internal staff newsletters,
articles, county internal calendars employee resources, HR documents and more information.

SERVICES PROVIDED
Planeteria provided a discovery sessions with the different departments to understand the Intranet requirements
and expectations. Then we completed wireframing,
sitemaping, and mockups for the home page, and several
internal pages. The Intranet was then developed in Drupal and was tested on various devices and browsers. The
solution includes and API integration with DocHub for
synchronized documents and synced with the employee
database. The Intranet was be personalized, i.e it can show content on home page (example news/events) based on
the department of user and the personal preferences set of the user. Users can also have personalized welcome
messages and save personal bookmarks.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 28 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 17

MUNICIPAL EXPERIENCE

THE PROJECT
In 2016 municipal officials reviewed their website and found several enhancements were required for transparency, civic engagement, and to meet the growing need for digital communications with the community. Planeteria was selected for the full Redesign of the website for the Township of North Brunswick with a service centric design. The scope of the project included interactive forms, expanded online payments, links to the cable studio for live stream, citizen resource center, new procurement portal and resident notifications. Because of a new communications initiative that was accelerated by COVID-19, the project had a quick turn around time.

THE SOLUTION
Site map, wireframes, web style guide (colors/typography), mood-boarding, mock ups, WordPress CMS, mobile responsive, hosting and managed maintenance.

SERVICES PROVIDED
News & events, social media integration, custom calendar integration, procurement, emergency alerts, site search functionality, video embedding/streaming, document archive, online forms, ADA compliant, Google Analytics, mobile responsive, language translation, ongoing maintenance and hosting.

TOWNSHIP OF NORTH

BRUNSWICK
WWW.NORTHBRUNSWICKNJ.GOV
PROJECT DURATION: 4 months
YEAR LAUNCHED: November 2020
PROJECT CONTACT:

JUSTINE PROGEBIN
[email protected] |
732.247.0922 x 268

BACKGROUND
North Brunswick is a township in Middlesex County,
New Jersey with a population of approximately
40,000, 38 different departments and nearly 100
services and programs run by the City.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 29 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 18

SERVICES AND PROGRAMS SEARCH
It is very important for residents to have easy access to Township services.

Because the Township provides so many services and programs it is critical to provide search options and filter options for residents.

MEETINGS & EVENTS
The goal of the Meeting & Events page is to keep residents and other stakeholders informed on upcoming public meetings and community events. These can be filtered by meeting category and month/year. This tool allows the Township to look up future meeting dates and search for past meetings.

CONTACT DIRECTORY
Residents have easy access to different departments, mayor, council members and other representatives.

PUBLIC NOTICES
Providing current news to citizens is very important to municipal organizations. News articles are written like a blog post and are syndicated to the home page and the news page of the website. This allows the website administrator to create and publish content in the websites CMS and the content can be updated throughout the website. We refer to this as data base driven architecture.

CASE STUDY: TOWNSHIP OF NORTH BRUNSWICK
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 30 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 19

MUNICIPAL EXPERIENCE

THE PROJECT
The challenge faced during this project was reorganizing content, removing content that was duplicate and eliminating old/outdated content. To do this, Planeteria interviewed different City department representatives in order to have a better understanding of their specific needs. A survey was put out to the public for assessment of public priorities and needs, nearly 2,000 citizens of all ages responded. Findings were delivered in a live forum. A comprehensive site audit was also conducted.

All of these stakeholder data prints and anecdotes were factored into the site architecture and design with a goal of being a site for not just local government but for the greater community built upon it. During the Discovery Phase of the project, certain applications and functionality were identified as essential: local business directory, online bill pay, live stream City meetings, multi-department calendar creation, smart searching, social media integration and live local weather.

THE SOLUTION
Audience needs assessment, site map, wireframes, web style guide (colors/typography), mood-boarding, mock ups, Kentico CMS, mobile responsive, hosting and managed maintenance.

SERVICES PROVIDED
News & events, social media integration, custom calendar integration, procurement, emergency alerts, site search functionality, video embedding/streaming, document archive, online forms, ADA compliant, Google Analytics, mobile responsive, language translation, ongoing maintenance and hosting.

CITY OF SEBASTOPOL
WWW.CI.SEBASTOPOL.CA.US
PROJECT DURATION: 7 months
YEAR LAUNCHED: Feb 2016
PROJECT CONTACT:

MARY GOURLEY
[email protected] |
707.823.1153

BACKGROUND
The City of Sebastopol is a small semi-urban
community located in Sonoma County,
CA with just over 7,000 residents. In this
dynamic community, a small-town vibe
blends with an international feel, creating a
sophisticated rural atmosphere.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 31 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 20

MUNICIPAL EXPERIENCE

THE PROJECT
The site’s focus is to better communicate with internal and external customers, including the public, member agencies, investors, media, contractors, water industry leaders and elected officials. The site serves as the primary source of information about the agency and regional water issues. Planeteria Media integrated interactive data and charts about water storage and usage from the present back to mid last century, Google-like predictive search with visual results, customized Google Maps to display current projects, member agency zip code search, and member agency clickable county map. The result is a visually appealing, mobile responsive ADA compliant solution.

THE SOLUTION
Site map, wireframes, web style guide (colors/typography), mood-boarding, mock ups, WordPress CMS, mobile responsive, hosting and managed maintenance.

SERVICES PROVIDED
News & events, social media integration, custom calendar integration, procurement, emergency alerts, site search functionality, video embedding/streaming, document archive, -online forms, ADA compliant, Google Analytics, mobile responsive, language translation, ongoing maintenance and hosting.

SAN DIEGO COUNTY

WATER AUTHORITY
WWW.SDCWA.ORG
PROJECT DURATION: 8 months
YEAR LAUNCHED: March 2021
PROJECT CONTACT:

ANDREA MORA
[email protected] | 858.522.6600

BACKGROUND
The San Diego County Water Authority sustains a $245
billion regional economy and the quality of life for 3.3 million residents through a multi-decade water supply
diversification plan, major infrastructure investments
and forward-thinking policies that promote fiscal and
environmental responsibility.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 32 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 21

MUNICIPAL EXPERIENCE

THE PROJECT
AC Transit was seeking a turnkey solution for a new external website (www.actransit.org) including hosting, deployment of a Content Management System, design, implementation, training and on-going support of the website.

THE SOLUTION
AC Transit required Planeteria to design and develop the new website utilizing Drupal 8 and provide ongoing support post launch to upgrade to new versions of Drupal as they are released.

The project included questionnaires, stakeholder focus groups, interviews, in-person kickoff, site map, wireframes, web style guide (colors/typography), mood-boarding, mock ups, Drupal CMS, mobile responsive, hosting and managed maintenance. Multi-modal Trip Planner with quick access to essential information, such as ACT RealTime, system map and service notices.

Seamless integration of engagement opportunities, including AC Transit Board Meetings, community events calendar and other engagement opportunities.

SERVICES PROVIDED
News & events, live bus tracking with Clever Devices, GTFS schedules, trip planning, maps, social media integration, custom calendar integration, emergency alerts, site search functionality, video embedding/streaming, document archive, online forms, ADA compliant, Google Analytics, mobile responsive, language translation, ongoing maintenance and hosting.

AC TRANSIT
WWW.ACTRANSIT.COM
PROJECT DURATION: 11 months
YEAR LAUNCHED: February 2021
PROJECT CONTACT:

DARRELL TAKARA
[email protected] | 510.891.7108

BACKGROUND
AC Transit is an Oakland-based public transit
agency serving the western portions of
Alameda and Contra Costa counties in the
East Bay of the San Francisco Bay Area. AC
Transit operates 147 routes and over 5,500
stops.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 33 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 22

MUNICIPAL EXPERIENCE

THE PROJECT
Gold Coast Transit District intended for the new website to be user-friendly on a variety of desktop browsers and mobile platforms. In addition, the website will need to be accessible for persons with disabilities, comply with all Web Content Accessibility Guidelines (WCAG) 2.0, and offer an easy-to-use translation system. The website needed to be able to support a large variety of content for people to view, search, and link to, including but not limited to, bus schedule information, google transit trip planner, NextBus real-time arrival information, social media integration (including Facebook, Twitter, etc.), and online video platforms (including YouTube, Vimeo, etc.).

THE SOLUTION
Project questionnaire, audience needs assessment, site map, wireframes, web style guide (colors/typography), mood-boarding, mock ups, WordPress CMS, mobile responsive, hosting and managed maintenance. This project was delivered on time and did not exceed the “not-to-exceed” original quote.

SERVICES PROVIDED
Site search functionality, real time information, NextBus live bus tracking, GTFS+ schedules/maps, video embedding/streaming, site admin roles/permissions, document archive, procurement, online forms, news/ announcements, social media integration, rotating banners of photos/video, ADA compliant, multilingual and Google Analytics.

GOLD COAST TRANSIT

DISTRICT
WWW.GOLDCOASTTRANSIT.ORG
PROJECT DURATION: 12 months
YEAR LAUNCHED: August 2021
PROJECT CONTACT:

CYNTHIA TORRES DUQUE
[email protected] | 805.483.3959 x 110

BACKGROUND
GCTD serves nearly 4 million riders in western Ventura
County in southern California annually. GCTD has
20 routes, 57 clean natural gas-fueled buses and 24
paratransit vans.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 34 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 23

SAMPLE RESPONSIVE/MOBILE DESIGN
Below is a sample of responsive design completed for San Bernardino County Transportation Authority. Our mobile websites are built to respond the device the website is being viewed on by using different design break points. The website is designed for laptops, desktops, horizontal tablets, vertical tablets, horizontal phones and vertical phones. The designs are tested in all formats in the most popular browsers (Chrome, FireFox, Safari, etc).

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 35 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 24

REFERENCES

TOWNSHIP OF NORTH BRUNSWICK
Craig Yetsko | Program Manager
[email protected] | 732.247.0922
PROJECT URL: www.northbrunswicknj.gov (Launched Nov 2020) SERVICES: Website design, development, hosting & maintenance “
You have done a phenomenal job with all the twists
and turns of this project! I know it was tough with
the timeline.”

CLACKAMAS COUNTY, OR
Justine Kadziel | Content Editor
[email protected] | 503.742.5916
PROJECT URL: www.clackamas.us (Launched May 2019)
SERVICES: Website design & development
“
There are about 3,000 moving pieces that have to come
together in the right order to complete a comprehensive web design project for a large-scale website. Thanks
to the wonderful team at Planeteria, all those moving
pieces came together on time and on budget and we
couldn’t be happier with the end result.

SOLANO TRANSPORTATION AUTHORITY
Lloyd Nadal | Programs Manager
[email protected] | 707.399.3319
PROJECT URL: www. sta.ca.gov (Launched March 2019)
SERVICES: Website design, development, hosting & maintenance

SAN DIEGO COUNTY WATER AUTHORITY
Mike Lee | Public Affairs Manager
[email protected] | 858.522.6600
PROJECT URL: www.sdcwa.org (Launched March 2021)
SERVICES: Website design, development & maintenance
“
“
The experience working with Planeteria has been
amazing. The team was easy-going, super flexible, and
immediately responsive to all our needs.

The upgraded site is a huge improvement both for
internal and external users. We really appreciated not
only the result but the fact that you and your team
were so flexible and responsive along the way. Your
team provided significant functionality improvements
to simplify navigation, integrate Google maps, offer
interactive charts, improve the search function and
create a mobile-friendly platform.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 36 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 25 SECTION FOUR:

Project Development
Approach
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 37 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 26 We begin by creating a clear project plan, identifying key players on both the client and Planeteria side. We clearly define roles, methods and systems for communication as well as clear timeline to keep the project on track and everyone in the loop. We understand that timelines can shift and plans can change; any adjustments to the project will be reflected in a modified Road Map. This ensures we all keep the project on time and on budget.

DEFINE
From what we learn in discovery, we
formulate measurable goals by which
to evaluate deliverables. We also review
and finalize the project plan.

DEVELOP
In this phase we implement proprietary
technologies within our CMS solutions,
and oversee the integration of any
existing online tools. We provide a beta
environment for our client’s to review
and offer feedback.

TRAIN
When the site is ready for launch, we
host a training bootcamp for your
website managers. To support ongoing
learning we provide an online resource
with searchable tutorial videos and
written guidance.

DISCOVER
Through a kickoff meeting, we learn
about your organizational goals and
key elements of your project’s success.

We also identify the diverse set of
stakeholders who will guide the project
through interviews, surveys, and review.

ORGANIZE
We have a staff member whose sole job
is to establish an organizational strategy
for your content. Editing, creating, and
restructuring content can often be a
project’s heaviest lift and we support this
effort.

REVIEW
Near the end of the project our QA team
tests your new website on all major
browsers and platforms. Once we have
QA-ed the site, we turn the site over and
provide tools for internal review.

DESIGN
Our design process allows multiple
opportunities for discussion, review, and
revision. We mock up key functionality
so you can test usability before we enter
the programming phase.

MIGRATE
Through manual labor as well as
automation, we migrate your content
to the new environment. Once it’s there,
our content editor reviews each page to
make final adjustments and recommend
refinements.

LAUNCH
During launch you have direct
communication with key team
members. Our team is on call 24 hours
a day during the critical launch window.

We establish fail safe protocols if any
unforeseen issues arise.

PROJECT APPROACH
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 38 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 27

PROJECT MANAGEMENT & RESOURCES
As a company that serves customers all over the country, we have a streamlined project management process that allows for plenty of meeting time throughout the life cycle of the project. When it comes to weekly check-ins, bench mark reviews, and other checkpoints, we utilize video conferencing, where we can share wireframes, graphics, presentations, and mockups in real time.

We believe client engagement is critical to any projects success. All primary meetings and decision-making processes are overseen by the dedicated project manager assigned to your project. You’ll also be able to communicate directly with design and technical leads, as well as any other key team members wherever appropriate. Throughout the project, we schedule weekly check-ins and communicate regularly between meetings. We establish a clear decision-making path early on. We are careful to define goals for each meeting, clearly record decisions, and frequently remind the team of feedback opportunities and deadlines.

We have budgeted for in-person meetings when possible. Below are a couple of tools we use to effectively manage our project communication with you:

MONDAY
All the projects are managed through an online project tool called Monday. With Monday, both our teams can share documents and media, track to-dos, stay up-to-date with schedules, and easily manage discussion topics. This tool will be used for the duration of the project and you will receive a quick training during the kickoff.

BUGHERD
For the Quality Assurance phase of the project, we use BughHerd. This online tool allows you to report issues by making annotations right from the site being worked on. It allows us to effectively turn your annotations into full reports with all the info we need to fix the problem and make sure your site is executed perfectly.

FRESHDESK
Our commitment is to ensure your team is fully supported post-launch. We use a client portal called Freshdesk that enables your to easily submit support tickets, or you can send a simple email to [email protected] to reach our dedicated team. Either way, we are quickly and easily available to help. Before we reach the projects end, we provide a runthrough for you to learn the submission process.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 39 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 28

WEBSITE DESIGN PROCESS
Here is an overview of the project in its seven-phase project plan. We understand timelines overlap, we value flexibility and we are experts at balancing and prioritizing all of your needs. Throughout the lifetime of the project, we will provide deliverables and collect feedback with regular communication and documentation. Weekly meetings will help us stay on track.

VERSION:

Each deliverable (sitemap, wireframe, designs) will have 1 - 3 versions, depending on the contract agreement. Each version of the deliverable will differ from the other. Alterations for each version are made based on client feedback and best practices.

ROUND OF FEEDBACK:

Each round of review starts with a different versioned deliverable. The client is provided a time period to review the deliverable. Once feedback for the deliverable is posted and provided to the Planeteria team that round of review is closed.

BELOW IS A SAMPLE SCHEDULE ESTIMATE:

PHASE ONE: DISCOVERY – 5 WEEKS
The Discovery Phase lays the foundation of the project by helping further identify the needs of your stakeholders, better define your audience and furthers clarify project goals.

I. ONBOARDING, QUESTIONNAIRE & DOCUMENTS
The City will fill out and complete the provided digital questionnaire. Supplemental documents may be requested such as branded material or existing brand books. The City project manager will take part in an onboarding call to discuss internal/ external stakeholder involvement, decision making process and goals for the site walk-through.

CITY DELIVERABLE: Completed Questionnaire & Requested Documents II. SURVEYS
Planeteria will create digital surveys for identified stakeholders and report on findings. Surveys need to be deployed for a minimum of two weeks in order to collect adequate data.

PLANETERIA DELIVERABLE: Surveys & Survey Report
VERSIONS: 2
ROUNDS OF FEEDBACK: 1
III. SITE AUDIT
Planeteria internally analyzes and audits the existing sites content, analytics, heat maps, mobile responsiveness, ADA accessibility and architecture for each section of the websites. With a site mapping platform Planeteria creates an interactive sitemap of existing sites.

PLANETERIA DELIVERABLE: Existing Sitemap
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 40 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 29 IV. SITE WALK-THROUGH
Planeteria will conduct a walk-through of the City’s live website pages requiring redesign to solicit feedback from your primary stakeholders to further investigate the needs and opportunities for your existing site. Other agenda items may be discussed.

PLANETERIA DELIVERABLE: Site Walk-Through
IV. MOODBOARD
The moodboard meeting will serve as the kickoff of weekly standing meetings to review deliverables and provide feedback.

Planeteria will provide a digital collage that consists of examples from pre-existing websites that visually and functionally align with the goals of the City’s site.

PLANETERIA DELIVERABLE: Interactive Moodboard Link
VERSIONS: 1
ROUNDS OF FEEDBACK: 1
CITY DELIVERABLE: Feedback
PHASE TWO: INFORMATION ARCHITECTURE – 5-6 WEEKS
The Information Architecture Phase’s primary function is to streamline your navigation and content for the new sites.

I. SITEMAP
Based on the findings from the Discovery Phase, we will create a sitemap outlining the high-level architecture of the City ’s website.

PLANETERIA DELIVERABLE: Interactive Sitemap Link
VERSIONS: 2
ROUNDS OF FEEDBACK: 1
CITY DELIVERABLE: Feedback & Approval
II. PAGE TYPES
Based on the websites and content audit we will identify the primary page types for the websites. We will apply these page types to the pages on the sitemap to clarify which page types are assigned to which page content. This item serves as an internal process. Can be shared upon request.

PAGE TYPES: Up to 8
III. WIREFRAMES
We will create a wireframe per identified page type + homepage that establishes the layout, user interactions, and navigation structure of the websites. This identifies what kind of content will be included and the most important call to action on each page type.

PLANETERIA DELIVERABLE: Interactive Wireframe Link
VERSIONS: 2
ROUNDS OF FEEDBACK: 1
CITY DELIVERABLE: Feedback & Approval
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 41 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 30 PHASE THREE: VISUAL DESIGN 4-5 WEEKS
The Visual Design phase establishes the overall design for the sites I. COLORS, TYPOGRAPHY & HOMEPAGE MOCKUPS
Based on the approved homepage wireframes, moodboard as well as a review of any existing branding or design precedents, we will provide three homepage design options with different type and color choices.

PLANETERIA DELIVERABLE: Interactive Homepage Design Link VERSIONS: 3
ROUNDS OF FEEDBACK: 2
CITY DELIVERABLE: Feedback & Approval
II. PAGE TYPE DESIGNS
We will apply the approved design principles from the approved homepage design to the remaining approved page type wireframes.

PLANETERIA DELIVERABLE: Interactive Page Type Design Link VERSIONS: 2
ROUNDS OF FEEDBACK: 1
CITY DELIVERABLE: Feedback & Approval
PHASE FOUR: CONTENT STRATEGY & MIGRATION – 6 WEEKS
The Content Strategy & Migration Phase establishes the strategy for migrating and establishing content for the new sites.

I. MAPPING CONTENT
Through various exercises we will help the City map content from the existing sites and where it goes on the new sites based on the approved sitemap and designs. This process helps identify what content is and isn’t being migrated to the new site, missing and needs to be edited.

PLANETERIA DELIVERABLE: Creation of Mapping Strategy Exercises CITY DELIVERABLE: Complete Assigned Exercises
II. CONTENT SANCTUARY CREATION
The content sanctuary is a folder system that enables you to upload new, edited, missing or remaining content, identified in the content mapping, to Monday. This process allows for easy migration of the content to the development site.

PLANETERIA DELIVERABLE: Content Sanctuary
III. CONTENT EDITING, COMPILING AND UPLOAD TO CONTENT SANCTUARY The City will be responsible for editing, creating all new and existing content then appropriately uploading it to the content sanctuary per instructions provided by Planeteria.

CITY DELIVERABLE: Complete Content Sanctuary
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 42 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 31 IV. CONTENT MIGRATION
Planeteria will migrate all identified content from the existing site as well as content from the completed Content Sanctuary.

PLANETERIA DELIVERABLE: Content Migration
PHASE FIVE: BETA DEVELOPMENT- 6 WEEKS
The Beta Development Phase is dedicated to the development of the site based on the previously approved and completed phases.

I. SERVER, CMS SETUP, FUNCTIONALITY & VIRTUAL CITY HALL We create necessary accounts, set up GIT (version control), install plugins, create database and modify CMS based on security best practices. All site functionality is integrated and customized in this phase.

PLANETERIA DELIVERABLE: Server & CMS Setup
II. TEMPLATE DEVELOPMENT
We will develop the page type templates based on the approved designs.

PLANETERIA DELIVERABLE: Developed Templates
III. PLANETERIA QUALITY ASSURANCE
We will review the sites in different browsers and devices to ensure that the pages with the content scale appropriately based on the approved desktop designs.

PLANETERIA DELIVERABLE: Internal Quality Assurance
IV. BETA SITE & INITIAL TRAINING
You will be presented and provided access to a beta (draft) developed/interactive version of the websites that are as complete as possible based on the content provided by the City. An initial training on how to use the backend of the sites is provided.

PLANETERIA DELIVERABLE: Beta Sites & Initial Training
PHASE SIX: QUALITY ASSURANCE & LAUNCH- 6 WEEKS
Planeteria will conduct internal quality assurance checks in addition to soliciting feedback from the City. The City will have 4 weeks to provide all QA feedback.

I. CITY USER FEEDBACK
Once you have been provided access to the beta site, you will log all defects and bugs as a support tickets or a document that prioritizes the items as high, medium or low priority (Priority level assigned by the City).

CITY DELIVERABLE: Internal Quality Assurance
II. IMPLEMENT USER FEEDBACK
Prior to launch, all high and medium tickets will be resolved by Planeteria. Low priority tickets will be resolved post-launch.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 43 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 32 III. CONTENT EDITS
The City will need to provide Planeteria with any content edits that need to be made and Planeteria will execute the changes.

CITY DELIVERABLE: Edit Content or Provide Content Edits IV. LAUNCH
The sites are live and ready for public use and viewing! PLANETERIA DELIVERABLES: Launch Sites
PHASE SEVEN: MONITORING & TRAINING
Post launch we provide proactive monitoring and in depth training.

I. MONITORING
For one week after launch, we carefully monitor the sites and provide 24 hour support for any issues.

PLANETERIA DELIVERABLES: Monitoring
II. TRAINING
Planeteria hosts a hands-on training where departments and administrators interact and practice modifying content in a testing environment. Post training we record and host screen cast tutorials explaining CMS functionality for your reference.

ESTIMATED IMPLEMENTATION PLAN
We estimate this project will take approximately 6-8 months to complete.

BELOW IS A SAMPLE SCHEDULE ESTIMATE:

Timely client feedback is required to keep the project on track.

PHASE I: Discovery
MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5
PHASE II: Information Arch.

PHASE III: Visual Design
PHASE V: Beta Development
PHASE IV: Content Strategy
PHASE VI: QA + Launch
MONTH 6
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 44 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 33 SECTION FIVE:

Support & Maintenance
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 45 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 34

MAINTENANCE & TECH SUPPORT

POST LAUNCH MAINTENANCE & TECHNICAL SUPPORT

WEBSITE MAINTENANCE
• Security updates, upgrades and patches for CMS, plugins, modules and third party tools • Automated monitoring tools running 24/7 preventing intrusions and other incidents on a CMS level • We will deploy updates across the platform, including 3rd party apps and modules

SUPPORT
• We provide phone support (M-F 7 AM to 6 PM PST), online ticketing, and email support. Our ticketing portal can be used for non-emergency issues which allows your staff to open a ticket and track tickets • Client-requested site modifications requiring less than 30 minutes of time (limit: 3 per month as part of the SLA. Limit can be increased upon request.)
• Trainings as requested up to three per year

SUPPORT TICKET RESPONSE TIMES
• All urgent requests are responded to within 2 hours.
• High priority requests - one business day
• Medium priority requests - two to three business days • Low priority requests - five to seven business days

WARRANTY
Repair, at no additional charge, of all bugs in code for the lifetime of the site as long as:
• The code was not modified by a third-party (client included) • The bug is not due to a change in technology including browser, plugin, and CMS updates • The bug was not caused by the addition of content.

SOFTWARE
• No licensing fees required
• Software Version upgrades during the life cycle of the website • All source code, graphics and any other web content will be the property of the client.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 46 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 35

ADA COMPLIANCE
The Americans with Disabilities Act (ADA) was introduced in 1990 to help the millions of Americans who live with disability.

In everyday life, it ensures accessibility in public places and protects against discrimination. These requirements apply not only to public places, but cyber spaces as well.

BENEFITS OF ADA COMPLIANCE
• IT’S THE LAW. It’s better to be safe than sorry!
• TOTAL ACCESSIBILITY. Accessibility means everyone can visit your site and that content can be interpreted and consumed in various ways. It creates more visitors and an improved image for your firm or company. • ENHANCED USABILITY. ADA compliance also requires that website content flows in a logical manner and meets the latest coding standards. It can even improve Search Engine Optimization (SEO).

RISKS OF NON-COMPLIANCE
The City could face a lawsuit if a person with a disability claims they cannot access your website. The result of this can range from legal fees including possible settlements, PR problems, and the cost of rebuilding your website.

HOW WE ACCOMPLISH COMPLIANCE
Accessibility often naturally flows from good design. This means that the City ’s website should be designed to deliver a great experience for all its visitors, whether or not they have a disability. We approach ADA compliance from a visual standpoint and a technical standpoint broken down below:
• COLOR CONTRASTING. Design for sufficient contrast between the color of the text and the color of the background; Avoid putting a light font color on a light background. • FONTS. Use fonts that are easy to read; and make fonts larger • USE ALT IMAGE TEXT. Make sure the images on your website have descriptive alt tags. Alt tags are used by screen readers, players, and voiceovers to describe elements on a website to users. • ANALYZE SITE LOGIC FLOW. Make sure that forms on your site are labeled properly and make sure that form fields are in a logical tab order to make your site accessible to those who can’t use a mouse. • HEADINGS. Use headings correctly to organize the structure of your content. • LINKS. Give your links unique and descriptive names.
• ADD CAPTIONS FOR VIDEO & AUDIO CONTENT. Videos or Audios on your site should be close captioned so that those with hearing disabilities can follow along
• CONTENT MANAGEMENT SYSTEM. If you are about to build a new website, choose a content management system that supports accessibility. Common examples include Wordpress, but there are many other options available.

POST LAUNCH COMPLIANCE
ADA compliance does not end when your new website goes live. When new pages are added and content is edited, this new content needs to remain in compliance. This is accomplished with set guidelines for fonts and colors within the page templates. We also use automated tools to scan new content regularly to ensure compliance.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 47 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 36

TRAINING
Planeteria offers training sessions and materials in a variety of format options for both your initial and ongoing training needs. While our overall solutions are generally consistent from project to project, the administrative details often are specific to the individual project and client needs.

TRAINING FORMATS INCLUDE:

LIVE & IN-PERSON:

BOOT CAMP IN WINE COUNTRY: Planeteria hosts a hands-on training where administrators interact and practice modifying content in a testing environment. For this training session, we invite City staff to our Santa Rosa offices in beautiful wine country for four hours per day, two-day long boot camp.

ONSITE: We are also happy to take the training to your offices for hassle-free, in-person learning.

LIVE & VIRTUAL:

PRIVATE ZOOM: We also offer virtual (online) training using Zoom screencasting and participant management. These training sessions can be requested up to three times per year for new employees or as refreshers. These are recorded and shared on a private YouTube channel.

PUBLIC ZOOM: As client interest permits we offer cross-client technical user groups to provide a user community to our clients.

SELF-SERVE TRAINING LIBRARIES:

INSTRUCTIONAL VIDEOS ON YOUR OWN PRIVATE YOUTUBE CHANNEL: Post training we record and host screen cast tutorials explaining CMS functionality for your reference and training new employees. These are hosted on a private, client-specific YouTube channel. They are generally topic/task specific and much shorter than a whole, initial training. We are happy to add additional videos on specific topics as unique client need arises.

Video Sample: “All About Online Forms” https://youtu.be/-jweXxwGFkc WRITTEN MANUALS: For clients who prefer written documentation, we are glad to take the same steps broken out in videos and make them into written instructions.
• For WordPress clients, we have a solution where these instructions can be accessed, and updated, upon login.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 48 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 37

QUALITY CONTROL
Website quality control is generally referred to as a list of tasks that assist in the launch of a functional and compliant website. These tasks include browser testing, mobile review, ADA confirmation, performance testing, broken link check and more. However, quality control does not stop once the website is launched. Quality control should continue post launch to ensure that your website is always functioning properly. We perform quality control practices using automated tools, manual and visual tests.

BROWSER TESTING
• Your website will be viewable & responsive on different browsers including Firefox, Safari, Chrome, Opera, & Internet Explorer.
• We test to make sure your design layout works in every browser. We also check for consistency in the different elements of the layout.
• Planeteria tests all elements of the website like trip planners, calendars, news, links, and search to make sure all they function properly and consistently.
• Finally, we will open your website from all operating systems including Windows, Mac OS, Android, Linux, & iOS.

MOBILE REVIEW
• Cross-test the website on mobile devices using a variety of browsers (Firefox, Safari, Chrome, Opera, Internet Explorer), and operating systems (Windows, Mac OS, Android, Linux, iOS).

ADA CONFIRMATION
• ADA compliance is embedded in our design and development process, so during quality control, we are confirming compliance of: color contrast, fonts, technical code and image captions.

PERFORMANCE TESTING
• It is important that page load times are within industry standards. • Meta data, H1 tags, title tags and image alt text will be checked to ensure best exposure on search engines. • All forms will be tested to confirm they are working properly and information is being delivered to the right the City staff member and also a record stored in the CMS database.
• All third party tools will be fully activated and confirmed to be working properly. • Planeteria checks for broken links on your website. Broken links can lead to a poor user experience A sound quality control plan ensures a successful launch of the new the City website. We complete this comprehensive inspection prior to the launch of all our websites. After website launch our managed maintenance plan ensures on going quality control.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 49 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 38 SECTION SIX:

Branding Aesthetics
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 50 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 39

SAMPLE INTERACTIVE DESIGN
While working with the San Bernardino County Transportation Authority, Planeteria worked with a predefined brand style guide. The result is a website that reflects a consistent brand across all mediums and channels. The same concepts will apply to the City’s website redesign project.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 51 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 40

IMPLEMENTING YOUR BRAND & VISION

BRAND STATEMENT
By establishing a clear statement we will have a tool against which to measure all future communication efforts.

RESEARCH
Conduct research to discover previous success stories and short comings from other municipal organizations similar to the City.

YOUR TARGET
Who are you talking to? The community, residents, potential residents, local government stakeholders, community groups and City staff. Further breakdown of audience segments.

YOUR DIFFERENCE
How will the City stand out from other municipal organizations?

BRAND ESSENCE
What is the value to people when interacting with your brand? Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 52 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 41 SECTION SEVEN:

Content Management
System & Functionality
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 53 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 42 We have developed websites for municipal organizations using open-source technologies and they have proven to be powerful, flexible and scalable. WordPress (version 5.4) is a web based, open-source content management platform that is the best solution for the City’s new website. The functionality we incorporate will ensure that audiences and stake holders have easy access to information that is important to them and have the ability to interact with City staff in numerous ways on the website. As your technology partner, we are CMS agnostic. The main misconception is that WordPress is a template website. While some website design companies use templates, ALL websites designed by Planeteria are 100% custom while using a CMS as the software. WordPress does not have any licensing fees.

WEBSITE CONTENT MANAGEMENT SYSTEM
Initially developed in 2003, WordPress is now the world’s most popular content management system with over 62 million installs. Over 40% of the Internet is now powered by WordPress. WordPress has made significant gains with municipal organizations and political leaders; Whitehouse.gov is built on WordPress for both of the past two presidents.

WHY WORDPRESS: WordPress is great for organizations with non-technical editors. WordPress has the best user ratings when it comes administering content.

Your website is the primary information source for your audience providing access to services and information 24 hours a day, 7 days a week. The Virtual City Hall likely sees more traffic than your physical City Hall and should have some of the same priorities; look fresh, welcoming, inviting, up-to date, ADA accessible and easy to find information. As part of our open source government CMS solution, we integrate calendars, agenda management, news, procurement and more. We can also integrate legacy third party softwares when relevant.

VIRTUAL CITY HALL
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 54 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 43

FUNCTIONALITY FOR THE CITY OF

SEBASTOPOL
We understand you need a visually attractive, interesting, and dynamic website that represents your unique organization.

From our experience the City’s website will also need to be mobile, accessible, reliable, highly functional and provide useful, relevant and current information. Below is a list of functionality options we have integrated for other clients. We will provide best practices for the implementation for each option below.

Admin Roles & Permissions
Content Approval Workflows
Feeds & RSS
Page Builder & Templates
Browser Based Administration
Content Scheduling
User-Friendly URLs
WYSIWYG Editor
Document Archive
Media Upload & Asset Management
Fillable Forms
Multi Browser Support
Google Analytics
Change Log
SEO Tool
Broken Link Finder
Mobile Responsive
User Roles & Permissions
Alerts, Emergency Notifications,
Archive Center
RFP & Procurements
Board Meetings and Agendas
Online Agenda Management System
Calendar & Events
News Syndication
Press Releases
Third Party Widgets & APIs
Email Subscriptions & E-Newsletter
Staff Directory & Contacts
City Service Directory
Department Directory
Department Homepages
Social Media Integration
GIS Mapping
In-site Predictive Search
FAQ Tool
Interactive Maps
Feeds & RSS
Job Posting
Employee Intranet
Printable Pages
One Click Language Translation
Text Message/Email Alerts
Audience Engagement Tool
Activities
Content Workflow
E-communication Platform
Online Payments
Website Visitor Profile
Document Management Center
Rotating Photos & Banners
City Laws and Building Codes
E commerce
Intranet
Rotating Photos/Banners
Bread Crumbs
Single Sign-On for Employees

CORE CMS FUNCTIONALITY

ADMINISTRATIVE FUNCTIONALITY

VIRTUAL CITY HALL FUNCTIONALITY
Historically City Hall has been a place for City officials and the public to meet and discuss the community. Our Virtual City Hall allows for an open and transparent government.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 55 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 44

E-ALERTS - MASS NOTIFICATION SYSTEM
Our E-Alerts solution keeps your community informed using the communications medium of their choice. You can schedule message delivery, allow your community to subscribe to notifications for any number of topics, and automate distribution to reduce your administrative burden. This feature is included in the total cost of the website build.

MULTI-CHANNEL SYNDICATION
Specific content types (news, calendar events, board meetings and others) can be configured to automatically syndicate new content to several channels (City website, Facebook, Twitter, text and email). You save time using one interface to manage several channels instead of managing each channel individually

ADMINISTRATION
The most common problem we hear about content administration is that content needs to be administered in multiple places on the website and shared to several social platforms creating major inefficiencies. With E-Alerts, content can be scheduled to publish at specific date in the future through the CMS. These pieces of content will then be syndicated to the appropriate channels when published live. City staff can use mapping abilities to send notifications to different notification zones based on user location.

USER PREFERENCES
Empower your community to customize the alerts they receive. They select the alerts that are important to them and can even receive notifications based on keywords. When new content containing the keyword is added to the website, the user receives a notification.

REAL TIME DELIVERY
Alert your community promptly during emergencies. The E-Alerts system is robust and scalable to handle large user databases so that you can distribute your emergency message widely and efficiently. Have peace of mind knowing your audience is receiving current and time sensitive information.

SECURITY
E-Alerts is administered through the City website CMS and utilizes the same security protocols as the CMS itself. The Planeteria managed maintenance plan and our 24/7 security protocols ensure all user data and communication remains secure.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 56 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 45

PROCUREMENT - OPTIONAL FEATURES
A robust RFP management function will be included. Post RFPs, addenda, and other documents as well as track and organize proposers and bidders. Your active and archived RFPs will be searchable and sortable.

REGISTERED VENDORS
Vendors can register to receive notifications for new procurement opportunities that meet their preferences. Vendors can also fill out intake forms and submit proposals for procurement opportunities.

NOTIFICATIONS
When vendors express interest in particular opportunities, the City can send automated notifications when addenda are released.

JOB POSTING - OPTIONAL FEATURES
Our job postings tool allows you to add listing information into your custom template, set an expiration date, feature the job post and receive applicant information and documents automatically into your email account.

JOB BOARD
The human resource department will have control of the management of job postings to the website, including job description, salary range, experience required and other required details. Individual job postings can be syndicated to the appropriate department page on the City website for added exposure.

APPLICATIONS
Registered users can fill out intake forms and upload resumes for submission. Users can also set settings to receive alerts for new or upcoming job postings from the City.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 57 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 46

AGENDA MANAGEMENT- OPTIONAL FEATURES
Planeteria provides a single platform for the complete management of the agenda, minutes, video, audio and records related to a meeting all administered with the City CMS website solution. The solution manages the critical functions of the clerk’s office and secures it all within a central repository that also supports your public records responsibilities. The features make City staff more efficient and provide convenient access for constituents and elected officials.

AGENDA PACKET AUTOMATION
Automatic packet creation for constituents and council members: Take all approved items and supporting documents for each meeting and create public and executive session packets. With a few clicks, staff can publish and distribute these packets for constituents and City stakeholders to reference online.

APPROVAL WORK FLOW
Agendas and packets are put together automatically based on approved items. This includes the necessary supporting documents. Next, the staff publishes and electronically distributes the meeting information to the proper people.

ACCESS TO DOCUMENTS
Meeting attendees can access agendas on the go with mobile devices or through your website.

Finding information for meeting isn’t hard, either. The solution offers a fast, comprehensive search feature – no more shuffling through endless paper notes!

VIDEO & AUDIO
Simplify the video and audio posting process through utilizing Zoom. Using Zoom’s API after the meeting, the video can be posted to the agenda/meeting page on the website automatically saving the City staff time. (Zoom or similar video solution is required)

AFTER THE MEETING
With the agenda management system, you can securely store all documents in one central electronic location. One central location and advanced search features make it easier to find what you need when you need it.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 58 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 47 SECTION EIGHT:

Hosting & Security
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 59 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 48

HOSTING & SECURITY

HOSTING
We have a partnership with Codero (www.codero.com) and offer fully managed hosting solution. The website will be hosted on a Linux server on the Codero platform. We will determine the appropriate hosting configuration (shared or dedicated server) to fit your needs (GB Storage, visitors per month, peak traffic availability, bandwidth). This includes Unlimited incoming bandwidth and 99.9% uptime guarantee. SSL Certificate is included.

SECURITY & MONITORING
• The website will be backed up automatically every night • Website and server are constantly monitored for Malware, intrusions and other incidents on a server level • Firewalls will be deployed to block ports to virtual platforms and web resources • Should a DDoS attack be detected and confirmed, we will provide a mitigation service • This includes Antivirus protection from malware
• Staging environment, production environment and live environment

CONTENT MANAGEMENT SYSTEM
• Roles, permissions and user groups will be created to allow different access levels for different editors • Editors with the same access-level can edit, approve or make changes concurrently • Two-factor authentication system (if requested)
• Change the pre-fix of the databases
• Restrict database user privileges
• Lock down directories when possible
• Remove default admin user and regular review of registered users • Use well-known and trusted plugins and modules
• Install security related and monitoring plugins and modules Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 60 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 49 SECTION NINE:

Project Costs & Insurance
Documents
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 61 of 65 ends

Date: December 29, 2021
Customer ID: SEBASTOPOL
To:

Design Phase Hours Rate Line Total
20 $ 110.00 $ 2,200.00
5 110 550.00
5 110 550.00
10 110 1,100.00
45 $ 110.00 4,950.00
20 110 2,200.00
25 110 2,750.00
70 $ 110.00 7,700.00
15 110 1,650.00
55 110 6,050.00
45 $ 110.00 4,950.00
15 110 1,650.00
15 110 1,650.00
15 110 1,650.00
95 $ 110.00 10,450.00
45 110 4,950.00
30 110 3,300.00
20 110 2,200.00
25 $ 110.00 2,750.00
15 110 1,650.00
10 110 1,100.00
15 $ 110.00 1,650.00
5 110 550.00
10 110 1,100.00
Design & Development Total $ 34,650.00
$ 2,400.00
$ 600.00
Additional Services $110/ Hour
15 $ 110 1,650.00
600.00
10 $ 110 1,100.00
10 $ 110 1,100.00
Optional AddOn
Procurement Solution
Job Posting Solution
1 2
Agenda
Management
Agenda Management System (Set-Up)
Yearly Hosting, Maintenance & Support
Kickoff
Content Strategy & Migration
Wireframes (All Page Types)
Sitemap & Page Types
Moodboard
Proposal
Planeteria Media
Description
City of Sebastopol
7120 Bodega Avenue, Sebastopol, CA 95472
P: 707.823.1153 E: [email protected]
110 Stony Point Rd #225, Santa Rosa, CA 95401, Phone/Fax 707-843-3773 [email protected] Thank you for your business!
Quality Assurance & Launch
Yearly Hosting
6 7
Post Launch Monitoring & Training
Hands on Training & Video Training Library
Post Launch "Hyper-Care" Monitoring
Yearly Managed Maintenance
User Feedback & Feedback Implementation
Content Edits & Launch
3 Beta Site & Initial Training
Discovery
All Page Design Mockups
Questionnaire & Documents
Visual Design
Website Style Guide: Colors & Typography
5 Server, CMS Setup & Template Development
Quality Assurance
4 Content Editing & Compiling
Mapping Content & Content Sanctuary
Content Migration
Development
Information Architecture
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 62 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 50 SECTION TEN:

Guarantee
707.843.3773 [email protected] WWW.PLANETERIA.COM
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 63 of 65 ends

707.843.3773 [email protected] WWW.PLANETERIA.COM @PLANETERIA_MEDIA PLANETERIA 51

GUARANTEE

WARRANTY
Repair, at no additional charge, of all bugs in code for the lifetime of the site as long as:
• The code was not modified by a third-party (client included) • The bug is not due to a change in technology including browser, plugin, and CMS updates • The bug was not caused by the addition of content.

Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 64 of 65 ends

WE BELIEVE our team, our process and our proven outcomes at Planeteria are uniquely aligned with the needs of The City of Sebastopol to address your website redesign in meaningful ways that add enduring value for you and the audience you serve. Our team is on standby to get started immediately upon award if we are selected.

TYLER COFFIN | Sales & Business Development Director
110 Stony Point Road, Suite 225, Santa Rosa, California 95401 P: 707.843.3773 E: [email protected]

THANK YOU

THE CITY OF SEBASTOPOL

WEBSITE REDESIGN
Agenda Item Number: 5
Agenda Item Number: 5
City Council Meeting Packet of: March 15, 2022

Page 65 of 65 ends
← All documents from this meeting