23.8 Centerline Miles of Paved Streets
Arterial 1.4 miles
Collector 7.8 miles
Residential/Local 14.6 miles
Condition Category PCI Range Percent of Network
Good 70 to 100 39.6%
Fair 50 to 70 20.1%
Poor 25 to 50 23.1%
Very Poor 0 to 25 17.2%
Pavement Deterioration Curve
Costs $50/sq yd
(~$450k per lane mile)
Costs $5.50/sq yd
(~$50k per lane mile)
Further delays result in failed
street requiring reconstruction
Costs $145/sq yd
($1.3M/lane mile)
Sebastopol-Council-Presentation-2023_shortened_ml