FIGURE 1-3 PRIMARY COMPETITORS
Competitive
Hotels Included in Sample Class Status Notes
MacArthur Place Sonoma Luxury Class Primary 64 Mar 2021 Jan 1900 S/O (Apr '20); R/O (May '20); S/O (Jan '21); R/O (Mar '21) Gaige House Luxury Class Primary 23 Jun 2020 Jun 1986 S/O (Apr '20); R/O (Jun '20) Kenwood Inn & Spa Luxury Class Primary 28 Jun 2020 Jun 1989 S/O (Apr '20); R/O (Jun '20) Hotel Healdsburg Luxury Class Primary 56 Jun 2020 Nov 2001 S/O (Apr '20); R/O (Jun '20) Farmhouse Inn Luxury Class Primary 25 Jun 2020 Jun 2009 S/O (Apr '20); R/O (May '20) H2 Hotel Luxury Class Primary 36 Jun 2020 Jul 2010 S/O (Apr '20); R/O (May '20) Montage Healdsburg Luxury Class Primary 130 Dec 2020 Dec 2020 Total 362
Year Year
Affiliated Opened
Source: STR
Number
of Rooms
The following tables reflect our estimates of operating data for the primary competitors on an individual basis. These trends are presented in detail in the Supply and Demand Analysis chapter of this report.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
197 of 277
Executive Summary
Proposed Hotel Barlow – Sebastopol, California 9
FIGURE 1-4 PRIMARY COMPETITORS – OPERATING PERFORMANCE
Est. Segmentation Estimated 2022 Estimated 2023
Property Occ. RevPAR RevPAR
Occupancy
Penetration
Yield
Penetration
Montage Healdsburg 130 70 % 30 % 130 50 - 55 % $1,100 - $1,125 $575 - $600 130 50 - 55 % $1,050 - $1,075 $550 - $575 90 - 95 % 130 - 140 % Farmhouse Inn 25 70 30 25 60 - 65 875 - 900 550 - 575 25 55 - 60 850 - 875 500 - 525 100 - 110 120 - 130 MacArthur Place Hotel & Spa Sonoma 64 70 30 64 55 - 60 700 - 725 400 - 425 64 70 - 75 600 - 625 425 - 450 120 - 130 100 - 110 Gaige House 23 90 10 23 65 - 70 575 - 600 400 - 425 23 35 - 40 375 - 400 140 - 150 65 - 70 35 - 40 Kenwood Inn & Spa 28 90 10 28 65 - 70 450 - 475 300 - 325 28 35 - 40 270 - 280 105 - 110 65 - 70 25 - 30 Hotel Healdsburg 56 90 10 56 60 - 65 600 - 625 375 - 400 56 50 - 55 575 - 600 300 - 325 90 - 95 75 - 80 h2hotel Healdsburg 36 95 5 36 65 - 70 425 - 450 300 - 325 36 60 - 65 400 - 425 260 - 270 110 - 120 60 - 65 Sub-Totals/Averages 362 78 % 22 % 362 60.2 % $773.94 $466.11 362 55.8 % $726.84 $405.50 100.0 % 100.0 % * Specific occupancy and average rate data were utilized in our analysis, but are presented in ranges in the above table for the purposes of confidentiality.

TransientMeeting and Group
Average Rate
Weighted
Annual
Room
Count
Number of
Rooms Average Rate Occ.

Weighted
Annual
Room
Count
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
198 of 277
Executive Summary
Proposed Hotel Barlow – Sebastopol, California 10
Based on our analysis presented in the Projection of Occupancy and Average Rate chapter, we have chosen to use a stabilized occupancy level of 74% and a base-year rate position of $530.00 for the proposed subject hotel, with the occupancy and average daily rate (ADR) projections summarized below.

FIGURE 1-5 FORECAST OF OCCUPANCY AND AVERAGE RATE
Year
2027 64 % $573.30 3.0 % $556.10
2028 70 596.23 1.0 590.27
2029 72 614.12 0.0 614.12
2030 74 632.54 0.0 632.54
Occupancy
Average Rate
Before Discount Discount
Average Rate
After Discount
Our positioning of each revenue and expense level is supported by comparable operations or trends specific to this market. Our forecast of income and expense is presented in the following table (figures in the forecast year columns have been divided by 1,000 and reflect thousands of dollars).

Summary of Forecast
Occupancy and
Average Rate
Summary of Forecast
Income and Expense
Statement
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
199 of 277

ORDINANCE NUMBER

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SEBASTOPOL APPROVING A DEVELOPMENT AGREEMENT FOR THE BARLOW HOTEL DEVELOPMENT AND OFF-SITE PARKING AT 6782 SEBASTOPOL AVENUE AND 386 MORRIS STREET
WHEREAS, Highway Partners LLC and Sebastopol Industrial Park LLC (collectively “Applicant”) have proposed to develop a hotel at 6782 Sebastopol Avenue, with related overflow and valet parking facilities at 385 Morris Street (the “Project”); and
WHEREAS, the Project will include a single, 69,934 square foot structure consisting of up to 83 guest rooms, a meeting room and a conference room, retail space, spa, lobby restaurant, rooftop pool and deck, and rooftop cafe; and
WHEREAS, the structure will be up to 55 feet in height, except that a rooftop shade structure and certain mechanical facilities will be up to 65 feet in height; and WHEREAS, the Project will include 305 total parking spaces, including 73 spaces at 6782 Sebastopol Avenue (the “Hotel Site”) and 242 new spaces at 385 Morris Street (the “Parking Lot Site”); and WHEREAS, the Project will involve the removal of one 27” dbh Valley Oak on the Hotel Site pursuant to Sebastopol Municipal Code Section 8.12.060(D)2 &4; and
WHEREAS, the Project will include the addition of 133 new native trees to the Parking Lot Site; and WHEREAS, the Applicant will be providing a publicly accessible promenade across the Parking Lot Site, connecting to a scenic overlook of the Laguna de Santa Rosa, which will include bicycle parking, benches, trash receptacles, and interpretive signage, and will dedicate a public access easement 10’ wide to accommodate the existing AmeriCorps trail where it crosses the northeast corner of the Parking Lot Site; and
WHEREAS, the entire easterly portion of the Parking Lot site, from the 50’ ESOS setback line to the easterly parcel boundary, will be dedicated as permanent open space through the recordation of an open space easement; and
WHEREAS, the Project will replace the existing 36,402 square foot Guayaki Yerba Mate building at 6782 Sebastopol Avenue; and
WHEREAS, the Project is situated within the Barlow Market District, which is a destination for Sebastopol-area residents as well as visitors to the area; and WHEREAS, the entire Project site has a land use designation of Limited Industrial, which allows for a hotel development as well as parking facilities; and
WHEREAS, the Hotel Site is zoned Commercial Industrial, which allows hotels, and accessory uses as a conditionally permitted use; and
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
200 of 277
WHEREAS, the Parking Lot Site is zoned Industrial/Environmental & Scenic Open Space (“ESOS”) Combining Zone, which allows offsite parking facilities as a conditionally permitted use; and WHEREAS, the Government Code sections 65864 et seq., authorizes cities to enter into agreements for the development of real property with any person having a legal or equitable interest in such property in order to establish certain development rights, and the City of Sebastopol adopted Municipal Code Chapter 17.440 to implement procedures for the processing and approval of development agreements; and
WHEREAS, the Applicant has requested the City enter into a development agreement to govern the project; and
WHEREAS, the proposed Development Agreement establishes the terms and conditions for the development of the Project, strengthens the planning process, encourages comprehensive planning, and reduces uncertainty and costs in the development review process; and WHEREAS, the proposed Development Agreement authorizes the Project, and incorporates each of the land use entitlements that would otherwise be required in the absence of the Development Agreement, which consist of:
• A use permit for the hotel;
• A use permit for the sale of alcohol at the hotel;
• A tree removal permit for the removal of a tree on the Hotel Site; • A use permit for offsite parking and valet parking at the Parking Lot Site; • A use permit for the construction of a parking lot in the ESOS Zoning District and approval of ESOS setback reduction from 100’ to 50’; and • Design review for the Project;
WHEREAS, the proposed Development Agreement authorizes certain future elements of and changes to, the Project to be approved administratively, notwithstanding anything to the contrary in the Municipal Code; and
WHEREAS, the Project is expected to generate substantial tax revenue for the City, through increased sales tax, transient occupancy taxes (“TOT”), and property tax receipts; and WHEREAS, guests at the hotel will shop locally, which will create an economic benefit for local businesses; and
WHEREAS, the proposed Development Agreement establishes impact fees for the Project that reflect that the Project is providing certain improvements and property in-lieu of paying the Parkland and Development Fee and a portion of the Traffic Impact fee, and authorizes the fees to be paid over a fiveyear period, commencing upon opening of the Project; and WHEREAS, in 2016, the Sebastopol City Council certified an Environmental Impact Report for the 2016 Sebastopol General Update (SCH#2016032001) (the “General Plan EIR”), which is incorporated herein by reference; and
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
201 of 277
WHEREAS, a hotel of up to 90 rooms within the Limited Industrial land use designation was anticipated and studied by the General Plan EIR; and
WHEREAS, pursuant to California Environmental Quality Act (“CEQA”) Regulation section 15183, when a project is consistent with a general plan for which an EIR was certified, no additional environmental review is necessary, except to examine whether there are project-specific significant effects which are peculiar to the project or its site; and
WHEREAS, the Applicant retained Environmental Science Associates to review whether the Project included project-specific significant effects, which are peculiar to the Project or its site and prepare a Section 15183 Checklist, and such documentation was reviewed by Rincon Consultants on behalf of the City; and
WHEREAS, the CEQA 15183 Checklist confirmed that there are: 1) no project-specific environmental effects which are peculiar to the project or its site, 2) all potential environmental effects were previously analyzed by the General Plan EIR, 3) no potential significant off-site impacts or cumulative impacts not previously discussed in the General Plan EIR, and 4) no potential environmental effects discussed in the General Plan EIR which are, as a result of substantial new information which was not known at the time the General Plan EIR was certified, determined to have a more severe adverse impact than discussed in the General Plan EIR; and
WHEREAS, a May 2024 Biological Assessment by WRA Consultants, provided as an attachment to the CEQA 15183 Checklist, provides substantial evidence that resources of potential concern do not occur on the Parking Lot Site in the area to be developed; and WHEREAS, the addition of 133 native trees and dedication of a permanent open space easement over the Laguna portion of the Parking Lot Site from the 50’ setback line east clearly results in an environmentally and visually superior condition than currently exists on the site, which is a former concrete batch facility, and thus no additional visual and scenic analysis is necessary; and WHEREAS, the full scope of studies called for by Sebastopol Municipal Code section 17.46.050(D) are not required for the parking facilities to be constructed on the Parking Lot Site because specific resources of potential concern do not occur on the property or will not be affected by the Project, as specified herein; and
WHEREAS, a Staff Report dated April 15, 2025, and incorporated herein by reference, described and analyzed the proposed Development Agreement and related Section 15183 Checklist for the City Council; and
WHEREAS, on March 25, 2025, the Planning Commission held a duly noticed public hearing at which all interested parties had the opportunity to be heard, and thereafter adopted a resolution recommending approval of the Development Agreement; and
WHEREAS, a Staff Report dated April 15, 2025, and incorporated herein by reference, described and analyzed the proposed Development Agreement and related Section 15183 Checklist for the City Council; and
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
202 of 277
WHEREAS, on April 15, 2025, the City Council reviewed the Staff Report, all attachments thereto, and the Section 15183 Checklist at a duly noticed public hearing on the Project, at which time all interested parties had the opportunity to be heard; and
WHEREAS, the City Council has determined that the Development Agreement will (1) ensure the productive use of the property and foster orderly growth and quality development in the City, (2) allow the development of the Project to proceed in accordance with the goals and policies set forth in the Sebastopol General Plan and will implement the City’s stated General Plan policies, (3) facilitate the City receiving increased tax revenues that can be used for a variety of purposes, and (4) benefit local business by bringing more visitors to the City.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEBASTOPOL DOES ORDAIN AS FOLLOWS:

1. The above Recitals are true and correct and are made a part of this Ordinance.

2. The Project is consistent with the General Plan EIR previously certified by the City, there are: a) no project-specific environmental effects which are peculiar to the project or its site, b) all potential environmental effects were previously analyzed by the General Plan EIR, c) no potential significant off-site impacts or cumulative impacts not previously discussed in the General Plan EIR, and d) no potential environmental effects discussed in the General Plan EIR which are, as a result of substantial new information which was not known at the time the General Plan EIR was certified, determined to have a more severe adverse impact than discussed in the General Plan EIR. Accordingly, no additional environmental review is required for the Project pursuant to Pursuant to CEQA Guidelines section 15183.

3. The Development Agreement, as shown in attached Exhibit A, is hereby approved based on the following findings and considering the Staff Report and the whole of the record related to the Project:

A. The Development Agreement is consistent with the objectives, policies, general land uses, and programs specified in the General Plan and any applicable specific plan.

B. The Development Agreement is compatible with the uses authorized in, and the regulations prescribed for, the district in which the real property is located.

C. The Development Agreement is in conformity with public convenience, general welfare, and good land use practice.

D. The Development Agreement will not be detrimental to the public health, safety, and general welfare.

E. The Development Agreement will not adversely affect the orderly development of property.

F. The Development Agreement will provide sufficient benefit to the City to justify entering into the agreement.

4. The City Council’s decision is based on the following findings for the issuance of entitlements that otherwise would be required for the Project in the absence of the Development Agreement, and considering the Staff Report and the whole of the record related to the Project:

Use Permit for the Project
A. The proposed use is consistent with the General Plan and all applicable provisions of this title.

B. The establishment, maintenance, and operation of the use applied for will not, under the circumstances of the particular case (location, size, design, and operating characteristics), be Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
203 of 277
detrimental to the health, safety, peace, morals, comfort, or general welfare of persons residing or working in the area of such use or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City.

Alcohol Use Permit
A. The sale of alcohol as part of the Project will not adversely affect the health, safety, or welfare, result in an undue concentration of alcoholic beverage outlets, or detrimentally affect nearby communities.

Use Permit for Parking Facilities
A. The number of parking spaces conveniently available for use will be sufficient for the Project’s safe, convenient, and efficient operation.

B. A greater number of parking spaces than required by the Development Agreement will not be necessary to mitigate adverse parking or traffic impacts of the use on surrounding properties.

C. The use of valet parking is appropriate due to the type of use, scale of use, or other factors.

D. The configuration of parking spaces and operation of the parking facility will ensure that the use has adequate parking availability.

E. The proposed parking facilities will not create an impairment to public safety, impede safe and efficient pedestrian or vehicle traffic flow, or otherwise interfere with the operation of area uses or functions.

Use Permit for Parking Facilities in ESOS Zone and Fifty Foot (50’) Setback from the Laguna de Santa Rosa wetland/riparian boundary:

A. The required resource analysis is consistent with the requirements of Sebastopol Municipal Code Chapter 17.40.

B. The proposed Project complies with all applicable standards required by Sebastopol Municipal Code Chapter 17.40.

C. No wetlands or vernal pools will be eliminated.

D. There are no Project-specific impacts on identified resources, so no mitigation measures are proposed.

E. There is no mitigation measure inconsistent with the Conservation and Open Space Element of the General Plan.

F. Due to the existing character of the property or the size, nature, or scope of the proposed Project or previous development of the property, the full scope of studies called for by Sebastopol Municipal Code section 17.46.050(D) is not necessary, on the basis of substantial evidence provided by a qualified professional, that specific resources of potential concern do not occur on the Parking Lot Site or will not be affected by the Project.

G. The addition of 133 native trees and dedication of a permanent open space easement over the Laguna portion of the Parking Lot Site from the 50’ setback line east results in an environmentally and visually superior condition than currently exists on the site.

5. The City Manager is authorized to execute the Development Agreement, in a form approved by the City Manager.

6. If any provision of this Ordinance or the application thereof to any person or circumstance is held invalid, the remainder of the Ordinance, including the application of such part or provision to other persons or circumstances shall not be affected thereby and shall continue in full force and effect. To this end, provisions of this Ordinance are severable. The City Council hereby declares that it would Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
204 of 277
have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase hereof, irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held unconstitutional, invalid, or unenforceable.

7. Within fifteen (15) days from and after adoption, this Ordinance shall be published once in a newspaper of general circulation printed and published in Sonoma County and circulated in the City of Sebastopol, in accordance with California Government Code section 36933. This Ordinance shall take effect and be enforced thirty (30) days after its adoption.

APPROVED FOR FIRST READING AND INTRODUCTION OF ORDINANCE at the Regular City Council Meeting of April 15, 2025.

VOTE:

Ayes:

Noes:

Absent:

Abstain:

APPROVED:
__________________________________
Mayor Stephen Zollman
ATTEST: ________________________________________________ Mary Gourley, Assistant City Manager/City Clerk, MMC
APPROVED AS TO FORM: ______________________________________ Alex Mog, City Attorney
Exhibit A – Development Agreement
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
205 of 277
2498947.2 15107.003

OFFICIAL BUSINESS
Document entitled to free recording
Government Code Section 6103

RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:

City of Sebastopol
7120 Bodega Ave.

Sebastopol, CA 95473
Attn: City Clerk
__________________________________________________________________________ (SPACE ABOVE THIS LINE RESERVED FOR RECORDER’S USE)

DEVELOPMENT AGREEMENT

FOR THE

BARLOW HOTEL

BY AND BETWEEN

THE CITY OF SEBASTOPOL,
HIGHWAY PARTNERS LLC and

SEBASTOPOL INDUSTRIAL PARK, LLC,
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
206 of 277
2498947.2 15107.003

DEVELOPMENT AGREEMENT
This Development Agreement (“Agreement”) is made and entered into between the CITY OF SEBASTOPOL, a municipal corporation (“City”), and HIGHWAY PARTNERS LLC, a California Limited Liability Company, and SEBASTOPOL INDUSTRIAL PARK, LLC, a California Limited Liability Company (collectively “Developer”). City and Developer are hereinafter collectively referred to as the “Parties” and singularly as “Party.”

RECITALS
A. Authorization. To strengthen the public planning process, encourage private participation in comprehensive planning and reduce the economic risk of development, the Legislature of the State of California adopted Government Code section 65864 et seq. (the “Development Agreement Law”), which authorizes the City and any person having a legal or equitable interest in the real property to enter into a development agreement, establishing certain development rights in the Property, which is the subject of the development project application.

B. General Plan Consistency. Under State law, a Development Agreement must be consistent with applicable General Plan policies. Since a Development Agreement is adopted through an ordinance, a Development Agreement and the project it authorizes are not required to follow a local jurisdiction’s Zoning Ordinance as long as the uses allowed by the Development Agreement are allowed under the Zoning Ordinance.

A. The Project. Developer applied to the City for approvals necessary for a boutique hotel with up to 83 rooms. The Hotel Project (the "Project") is proposed to operate 24 hours a day, 7 days a week, year-round and include a lobby and reception area, retail space, on-site restaurant/café/bar, lounge, spa, public courtyard, private gardens, an outdoor rooftop deck with pool, outdoor rooftop café/bar with non-amplified outdoor sound, meeting rooms, and other hotel amenities.

C. Environmental Review. On _______, the City Council previously adopted [Resolution/Ordinance] _______certifying an environmental impact report for the Sebastopol General Plan (SCH # 2005072125) (the “General Plan EIR”) and adopting a corresponding Mitigation Monitoring and Report Program. The City has undertaken, pursuant to the California Environmental Quality Act (Public Resources Code Section 21000 et seq., hereinafter “CEQA”), the required analysis of the environmental effects that would be caused by the Project.

On___________, the City Council adopted Resolution _____________determining that the Project is consistent with the Sebastopol General Plan and General Plan EIR, and is therefore subject to limited environmental review pursuant to Public Resources Code section 20183.3 and CEQA Guidelines section 15183.

D. Public Benefits. Development of the Project will result in significant public benefits, as more fully described hereinafter, including, without limitation:

1. The provision of opportunities for employment;

2. The furtherance of the economic development goals and objectives of the City, and will implement the City’s standard General Plan policies; Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
207 of 277
2 3. The City will receive increased sales tax, transient occupancy tax, and property tax revenues, which may be used to support the general welfare of the City;

1. Developer will grant an irrevocable offer of dedication for an easement for public use to a portion of the existing AmeriCorps Trail, thus ensuring permanent access to part of the Laguna de Santa Rose. This is an irrevocable offer of dedication for an easement and does not include trail construction. A true and correct copy of the legal description for this irrevocable offer of dedication is attached hereto as Exhibit 1. City acknowledges that this irrevocable offer of dedication includes part of a wetland.

4. The development authorized herein, will expand overnight accommodations for visitors and event venues.

5. The development will enhance the east entrance to the city by providing an architecturally unique and compatible hotel.

6. According to the Developer’s 2024 economic report, prepared by RRC Associates, the fully developed, operating, and occupied project is estimated to generate $31.4 million in hotel guest spending (excluding taxes), of which $23.4 million would occur within the City of Sebastopol. An estimated $8 million would occur in nearby unincorporated areas. The development will result in $9.8 million in labor and approximately 210 jobs. The hotel rooms are estimated to generate $1.4 million in annual Transient Occupancy Tax revenue.

E. In addition to these direct financial benefits, the visitor spending would help support Sebastopol businesses and the local tax income would substantially enhance the City's ability to provide important public services, maintenance, and improvements, maintaining and improving economic vitality and the quality of life in Sebastopol.

F. These benefits are consistent with the goals of the Sebastopol General Plan, including but not limited to:

1. Land Use Element Goal LU 7 and related policies, in that the project will enhance and advance Sebastopol’s role as a market and service center by providing for a vibrant downtown through the provision of a hotel near the downtown, bringing visitors, and meeting attendees to the downtown, adding to and enhancing its vitality;

2. Economic Vitality Goal EV 1 and related policies, in that the project will broaden the City’s employment base, providing a range of hotel- and jobs as well as supporting the West County agricultural sector, substantially benefit the local economy by direct and indirect revenue generation, and diversify the local economic base;

3. Economic Vitality Goal EV 4 and related policies, in that these policies directly call for hotels, restaurants, and other visitor-serving development and the project will provide a new hotel as well as a restaurant;

4. Economic Vitality Goal EV 5 and related policies, in that the project will add to the ongoing revitalization of a business area (the Barlow, a former warehousing district);

5. Economic Vitality Goal EV 6 and related policies, in that the project will strengthen the City’s unique character with an architecturally distinctive building; and Economic Vitality Goal EV 7 and related policies, in that the project, by adding substantial direct and Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
208 of 277
3 indirect tax revenue as documented by project studies (described above) will help maintain a stable and self-sustaining fiscal base.

6. Community Design Policy 1-11 and related policies that encourage and support the inclusion of public and quasi-public spaces by offering incentives additional height where feasible and compatible with the surrounding neighborhoods, which this project does by providing the irrevocable offer of dedication for the AmeriCorps Trail and the additional height is compatible because it is adjacent to the Central Core Zoning District.

G. Developer Assurances. In exchange for the benefits to the City in the preceding Recitals, together with the other public benefits that will result from the development of the Property, Developer will receive by this Agreement assurance that it may proceed with the Project in accordance with the items set forth herein.

H. Consistency with General Plan. Having duly examined and considered this Agreement, and having held properly noticed public hearings hereon, the City found that this Agreement satisfies the Government Code Section 65867.5 requirement of General Plan consistency.

I. Consistency with the Zoning Ordinance. Having duly examined and considered this Agreement and having held properly noticed public hearings hereon, the City found that this Agreement satisfies the requirement that the authorized uses are allowed under the Zoning Ordinance and made all findings required by the Zoning Ordinance.

J. Required Notice. City has given the required notice of its intention to adopt this Development Agreement and has conducted public hearings thereon pursuant to Government Code Sections 65854 and 65867. As required by Government Code Section 65867.5, City has found that the provisions of this Development Agreement and its purposes are consistent with the goals, policies, standards and land use designations specified in City’s General Plan and Specific Plan.

K. Adopting Ordinance. On ______, the City of Sebastopol City Council (the “City Council”) adopted Ordinance No. ____ (the “Approving Ordinance”) approving this Development Agreement and authorizing its execution. The Approving Ordinance will take effect on ____________________.

AGREEMENT
NOW, THEREFORE, in consideration of the above Recitals and mutual promises, conditions and covenants of the Parties contained in this Agreement and its Exhibits, and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows:

1. Definitions. In this Agreement, unless the context otherwise requires, terms have the following meaning. Capitalized terms within the Exhibits not defined below have the meaning set out in the Exhibits.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
209 of 277
4 1.1 “Adopting Ordinance” means Ordinance No __________, adopted by the City Council on _____, 2025, which approves this Development Agreement as required by the Development Agreement Law.

1.2 “Agreement” means this Development Agreement, inclusive of all Exhibits attached hereto.

1.3 "Alcohol Use Permit" means the Alcohol Use Permit approved by this Agreement.

1.4 “CEQA” means the California Environmental Quality Act, as set forth at California Public Resources Code, Division 13, commencing at Section 21000 and the CEQA Guidelines as set forth in Title 14 of the California Code of Regulations commencing at Section 15000.

1.5 "City" means the City of Sebastopol, including its agents, officers, employees, representatives and elected and appointed officials.

1.6 "City Manager" means the City Manager of the City of Sebastopol, or the City Manager’s designee.

1.7 “Collective Standards” means: (i) the provisions of this Agreement; (ii) the Project Approvals; (iii) land use entitlement and approvals to the Project and the Property that may be granted following the Effective Date (Subsequent Approvals); and (iv) the Land Use Regulations, which shall be superseded by this Agreement to the extent inconsistent with this Agreement, Project Approvals or Subsequent Approvals.

1.8 “Conditions” means the Conditions of Approval attached hereto as Exhibit 2.

1.9 “Control” means the possession, directly or indirectly, of the power to direct or cause the direction of an entity’s management or policies, whether through the ownership of voting securities, by contract, or otherwise.

1.10 “Development Agreement Law” means Government Code section 65864 et seq.

1.11 “Developer” collectively means the owners of the following parcels and their successors in interest:

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
210 of 277
5 Name/Description APN
Project Development
Acreagea Owner
Hotel Parcel 004-750-
030

1.23 Highway Partners, LLC
Former Batch
Plant
004-011-
017

1.4 Sebastopol Industrial Park,
LLC
Former Batch
Plant
004-011-
020

1.5 Sebastopol Industrial Park,
LLC
McKinley Street 004-750-
019

0.46 Sebastopol Industrial Park,
LLC
Co-op Parcel 004-750-
034

0.90 Barlow Star, LLC
Gravenstein Court 004-750-
020

0.21 Sebastopol Industrial Park,
LLC

1.12 Intentionally omitted.

1.13 Effective Date” means that day on which the Adopting Ordinance shall be effective which is __________, 2025.

1.14 "Facility" means physical improvements to the Property used by Developer for the conduct of its operations.

1.15 “Fees” means all charges, expenses, costs, monetary exactions and any other monetary obligations imposed on Developer by the City, other than assessments or regular or special taxes and shall not be limited to fees paid pursuant to this Agreement.

1.16 “General Plan” means the General Plan of the City including the text and maps, plus any other General Plan amendments approved by the City on or before the Effective Date.

1.17 “Land Use Regulations” means the Sebastopol General Plan, ordinances, resolutions and regulations applicable to the Project, to the extent they govern the permitted uses of land, and the density and intensity of land use, as set forth in the following plans and ordinances as they exist on the Effective Date of this Agreement.

1.18 “Law” means the case law, applicable ordinances, statutes, rules, regulations, or any order, decree or directive of any court or any local, regional, state or federal government agency, unless the context suggests a different meaning.

1.19 "Municipal Code" means the Municipal Code of the City of Sebastopol.

1.20 “Planning Commission” means the City of Sebastopol Planning Commission.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
211 of 277
6 1.1 "Project" means the physical improvement of the Property with a boutique hotel with up to 83 rooms, as well as a lobby and reception area, retail space, café/bar, lounge, spa, public courtyard, private gardens, an outdoor rooftop deck with pool, outdoor rooftop café/bar with non-amplified outdoor sound; meeting rooms, and other hotel amenities and additional uses of the Property, as further shown and described in the Project plans and description dated _______________ and on file with the City Clerk, as approved by the City through the Project Approvals.

1.21 “Project Approvals” means the entitlements that are the subject of this Agreement and incorporated herein by reference:

1.21.1 CEQA Compliance under Public Resources Code section 20183.3 and CEQA Guidelines Section 15183, approved by the City Council on ________, 2025 by Resolution No. _____________.

1.21.2 Ordinance No. _____________ authorizing this Agreement.

1.21.3 This Development Agreement, as adopted on _____, 2025, by City Ordinance No. ____________ (the “Adopting Ordinance”) and all exhibits hereto.

1.21.4 All Subsequent Permits and Approvals, as defined in Section 1.24.

1.22 “Property” collectively means that certain real property within the City as more particularly described in Exhibit 5 and includes of the following parcels or portions of parcels:

Name/Description APN
Project Development
Acreagea Owner
Hotel Parcel 004-750-
030

1.23 Highway Partners, LLC
Former Batch
Plant
004-011-
017

1.4 Sebastopol Industrial Park,
LLC
Former Batch
Plant
004-011-
020

1.5 Sebastopol Industrial Park,
LLC
McKinley Street 004-750-
019

0.46 Sebastopol Industrial Park,
LLC
Co-op Parcel 004-750-
034

0.90 Barlow Star, LLC
Gravenstein Court 004-750-
020

0.21 Sebastopol Industrial Park,
LLC

1.23 "Safe Condition" means free from any natural or man-made hazards to persons or property and free from any conditions giving rise to a public or private nuisance. Conditions Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
212 of 277
7 considered unsafe include, but are not limited to: exposed trenches or excavation pits, exposed electrical wiring or pipes, unfinished buildings, unsecure buildings, attractive nuisances, etc.

1.24 “Subsequent Permits and Approvals” are those additional land use approvals, permits, and use and/or construction approvals other than those listed in Section 1.21 that are necessary to develop and operate every aspect of the Project. At such time as any Subsequent Permits and Approvals applicable to the Property is approved by the City, then such Subsequent Permits and Approvals shall become subject to all the terms and conditions of this Agreement applicable to Project Approvals and shall be treated as a “Project Approval” under this Agreement. The Subsequent Permits and Approvals may include an acoustical study to confirm that amplified music or sound remains below City noise thresholds; ABC approvals as may be required for the café/bar and restaurant uses; a demolition permit, encroachment permit, building permit, improvement plans. The term “ministerial Subsequent Approvals” means ministerial permits, such as building permits.

1.25 “Successor” means any subsequent entity or individual that acquires all or any portion of Developer's interest in the Property; provided, however, that no Successor shall acquire any rights pursuant to this Agreement unless and until that Successor is approved by the City and complies with all applicable requirements of Section 15.1 of this Agreement.

2. Incorporation of Recitals & Exhibits. The recitals and exhibits attached hereto are hereby incorporated into this Agreement as if set fully set forth herein.

3. Relationship of City and Developer. This Agreement is a contract that has been negotiated and voluntarily entered into by City and Developer. It is agreed among the parties that the Project is a private development and that the relationship of the City and Developer is and at all times shall remain solely that of the City as a regulatory body and the Developer as the owner of the Property. The City and Developer hereby renounce the existence of any form of joint venture or partnership between them and agree that nothing contained herein or in any document executed in connection herewith shall be construed as making the City and Developer joint venturers or partners.

4. Representations, Warranties and Acknowledgments.

1.2 Interest in Property. Developer represents and warrants that as of the Effective Date, ______, the entities identified in Paragraph 1.26 herein, are the owners of the Property and as such holds fee title interest in and to the parcels that comprise the Property, as specified in Section 1.23.

4.1 Authority. The Parties represent and warrant that the persons signing this Agreement are duly authorized to enter into and execute this Agreement on behalf of their respective principals.

4.2 Brokers. The Parties agree that the City has had no dealings with any real estate broker or agent in connection with the negotiation of this Agreement, and that they know of no other real estate broker or agent who is entitled to a commission in connection with this Agreement.

In the event any real estate broker or agent shall come forward and claim the right to a commission Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
213 of 277
8 or other form of compensation in connection with this Agreement, Developer shall indemnify, defend and hold harmless the City in accordance with Section 13.1.

4.3 Procedures and Requirements. The Parties acknowledge that this Agreement is subject to the procedures for approval, amendment and administration set forth in the Development Agreement Law.

5. Effective Date and Term.

5.1 Term. The term of this Agreement shall commence on the Effective Date and shall continue in force until the first to occur of the following events: 1) this Agreement is terminated in accordance with terms set forth herein, or 2) ten (10) years from the Effective Date of this Agreement. The term of this Agreement shall be automatically extended in the event of a declared disaster by the City of Sebastopol or Sonoma County within the City of Sebastopol or litigation challenging this Agreement. The automatic extension shall be for the same amount of time as the disaster, as declared by a government agency, or until there is compliance with a final judgment in any litigation.

5.2 Termination by Mutual Consent. This Agreement may be terminated in whole or in part by the mutual written consent of all the Parties.

5.3 Effect of Termination. This Agreement was entered into by the Parties for the limited purpose of setting forth certain terms and conditions concerning the proposed development and operation of the Project in a manner that is consistent with the Project Approvals and the Collective Standards. Accordingly, nothing contained herein is intended or shall be construed to grant to Developer any rights in connection with the future development or operations of the Property, except for those rights set forth in the Collective Standards and in this Agreement.

6. Development of the Project.

6.1 Vested Rights. This Agreement was entered into by the Parties for the limited purpose of setting forth certain terms concerning the development and use of the Property by Developer. Accordingly, this Agreement creates a vested right to develop every aspect of the Project, subject to the laws, regulations, and policies in effect as of the Effective Date of this Agreement, as is set forth in Government Code section 65866.

6.1.1 Approved Uses. This Agreement expressly authorizes the following uses:

An 82,275 square-feet (69,934 net square-feet) building for use as a hotel with up to 83 rooms.

The hotel is proposed to operate 24 hours a day, 7 days a week, year-round and include a lobby and reception area, meeting rooms, retail space, on-site restaurant, interior/lobby café/bar, rooftop café/bar with acoustical and other non-amplified sound, lounge, spa, public courtyard, private gardens, an outdoor rooftop deck with pool that is open to the public with outdoor acoustical, nonamplified sound, meeting rooms, room service, and other hotel amenities.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
214 of 277
9 (a) The hotel may be up to fifty-five (55) feet high, measured from the site's average grade height of +/- 1'-4 5/8" (75.89') with limited elements up to sixty-five (65) feet high, measured from the site's average grade height of +/- 1'-4 5/8" (75.89'). Elements that may exceed the maximum building height of 55'-0" are limited to two (2) roof deck pergola structures for the pool lounging area and two (2) covered seating structures, with a combined size of no larger than approximately 5,000 square feet of covered roof area and five (5) penthouses (one (1) for a kitchen for a public restaurant, two (2) for the elevators and another two (2) for stairwells), and the front courtyard chimney structure. This Agreement acknowledges that this height exceeds the Zoning Ordinance but is consistent with General Plan Policy CD1-11. (b) The ability to serve alcohol at the hotel’s proposed cafes, meeting rooms, and restaurant (subject to obtaining any required licenses from the Department of Alcoholic Beverage Control).
(c) A 2.9-acre parking lot on the site of the former batch plant site on Sonoma County APNs 004-011-017 and 004-011-017. The Developer may install electric car chargers at the locations of the Developer’s choice within the 2.9-acre parking lot. All development of any kind, including electric car charges, is prohibited within the fifty (50) foot setback from the Laguna de Santa Rose as is shown on the Developer’s plans dated August 2, 2024. This Agreement acknowledges that this use would require a conditional use permit under the Zoning Ordinance but instead this Agreement hereby grants this authority. All parking spaces shall comply with the City’s adopted standards, except that the City Manager may waive compliance with such standards for parking spaces reserved for hotel staff and valet spaces. (d) The relocation of utilities as shown on the Developer’s drawings dated August 2, 2024.
(e) Signage that is consistent with the Barlow Sign Plan and conditions of approval, as this plan was approved on January 2, 2012. (f) The removal of a Quercus lobata (Valley Oak) identified as #1 in the Arborist report, located to directly adjacent to the proposed Project site to the west, and as shown in project plans. This Agreement acknowledges that this removal would require a tree removal permit under the Municipal Code, but instead this Agreement hereby grants this authority.

6.1.2 Subsequent Permits and Approvals. The City Manager, or the City Subsequent Permits and Approvals. The City Manager, or the City Manager’s designee shall approval all Subsequent Approvals for the Project as described herein, except building permits or other permits that require the City’s Building Official or City Engineer to approve the permit. A permit for amplified sound on the rooftop café/bar is a “Subsequent Approval” subject to this administrative approval requirement. So long as the Developer submits a complete application, the City shall approve all ministerial Subsequent Approvals within thirty (30) days and sixty (60) days for discretionary Subsequent Approvals. Any Subsequent Permits and Approvals for changes to the Project shall be approved in the manner required by the Municipal Code, except for Minor Changes, which may be approved by the City Manager, or the City Manager’s designee. Subsequent Approvals for minor changes do not require but may be acted on through an Operating Memoranda per Section 10.3 below Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
215 of 277
10 6.1.3 Minor Change. “Minor Changes” to this Project, include but are not limited to: up to a ten percent (10%) reduction in the number of hotel rooms, up to a ten percent (10%) increase or decrease in the total square footage of the hotel structure, hours of operation for any proposed use within the hotel structure (as long as such hours do not extend later than midnight), signage consistent with the approved Barlow Sign Program, lighting, utility routing/points of connection changes, changes that effect less than one third of the exterior building materiality or landscaping, or other similar changes that substantially conform with the material terms of this Agreement as determined by the City Manager, shall be approved through an administrative process by the City Manager without an Operating Memoranda.

6.1.4 Public Art. Instead of the provisions of Chapter 17.310, prior to the issuance of a certificate of occupancy for the Project, Developer shall install on-site public art that complies with the criteria listed in Sebastopol Municipal Code Section 17.310.030(F)(a)- (g) and is valued at not less than Fifty-Thousand Dollars ($50,000), and the public art proposed by the Developer shall be considered by the Public Art Committee at a single public meeting, at which meeting the Public Art Committee shall make a recommendation to the City Council, which shall thereafter approve or reject the proposed public art.

6.1.5 Except as is set forth herein, nothing contained herein is intended or shall be construed to grant to Developer any rights in connection with the future development or use of the Property except as set forth herein, and the Parties agree that future development and use of the Property shall be governed by the land use and other regulations in effect at the time of development and operation. Development that is not authorized by this Agreement and use shall be subject to the terms set forth in any different approvals needed for development.

6.1.6 The permitted uses of the Property, the density and intensity of use, the maximum height and size of buildings, or the irrevocable offer of dedication of land for public purposes and other terms and conditions of development applicable to the Property shall be governed by the Project Approvals, this Agreement, the Collective Standards and all other entitlements and applicable ordinances as provided in Section 7.

6.2 Timing of Development. Because the California Supreme Court held in Pardee Construction Co. v. City of Camarillo, 37 Cal.3d 465 (1984), that the failure of the parties therein to provide for the timing of development resulted in a later-adopted initiative restricting the timing of development to prevail over the parties’ agreement, it is the Parties’ intent to cure that deficiency by acknowledging and providing that, subject to any infrastructure phasing requirements that may be required by the Project Approvals, Developer shall have the right (without obligation) to develop the Property in such order and at such rate and at such times as Developer deems appropriate within the exercise of its subjective business judgment. The Developer will submit a construction and parking lot phasing plan for review and approval by the City Manager, which shall not be unreasonably withheld, with the Construction Management Plan during the building permit submission process or with the submission of a grading permit application, whichever occurs first.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
216 of 277
11 6.3 Mitigation of Impacts. Developer shall timely satisfy and comply with all Conditions of Project Approvals. Any material failure to comply with the Conditions of the project approval required herein shall be a violation of this Agreement, entitling the City to terminate this Agreement, after notice and due process to Developer pursuant to Section 12 below.

7. Applicable Rules, Regulations, Fees and Official Policies.

7.1 Rules Regarding Design and Construction. Unless otherwise expressly provided in this Agreement, all other applicable ordinances, resolutions, rules, regulations and official policies governing design, improvement and construction standards and specifications, applicable to the Project and to public improvements to be constructed by the Developer shall be those in force and effect at the time this Agreement is approved except for newly enacted laws and regulations that pertain to the protection of public health and safety or life safety.

7.2 Design Review and Building Standards. Developer shall comply with the design, development and construction standards in effect at the time this Agreement is approved. (e.g., City standard specifications, building and fire codes, regulations related to provision of water and sewer service. etc.). The Project Approvals granted by this Agreement and all Subsequent Approvals that do not involve a change that is greater than a Minor Change shall not be subject to any Design Review Board approvals, and shall be approved by the City Manager, or the City’s Manager’s designee. Any change that is greater than a Minor Change as defined in 6.1.3, shall be subject to the review and approval process established by the Municipal Code.

7.3 Uniform Codes Applicable. Unless otherwise expressly provided in this Agreement, any improvements authorized by this Agreement or any Subsequent Approval, undertaken by Developer shall comply with the California Building Standards Codes, Title 24 of the California Code of Regulations, as adopted and amended by the City, as the same shall be in effect at the time this Agreement was approved except for newly enacted laws and regulations that pertain to the protection of public health and safety or life safety. Such improvements shall also comply with the provisions of the California Mechanical, Plumbing, Electrical and Fire Codes, and City standard construction specifications, in effect at the time this Agreement was approved.

This provision shall not apply to any changes in the State Building Code that are imposed on the City. If no permit is required for a given improvement, such improvement will be constructed in accordance with said Codes in effect in the City as of the commencement of this Agreement.

7.4 Conditions of Subsequent Approvals. In connection with any discretionary Subsequent Permits and Approvals, City shall have the right to impose reasonable conditions including, without limitation, normal and customary dedications for rights of way or easements for public access, utilities, water, sewers, and drainage necessary for the Project; provided, however, such conditions and dedications shall not be inconsistent with the Applicable Rules or Project Approvals, nor inconsistent with the development of the Project as contemplated by this Agreement.

7.5 Fees, Dedications, Assessments and Taxes.

7.5.1 Payment of City Permit & Engineering Fees. The Developer shall be responsible of paying all City permit processing and engineering fees in the amounts shown Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
217 of 277
12 in Exhibit 3, attached hereto and incorporated herein, at the time such fees are otherwise due.

Beginning on July 1, 2026, and annually thereafter, the permit processing and engineering fees shall increase by the same percentage as the City’s adopted fee schedule.

7.5.2 Payment of Development Impact Fees. The Developer shall pay the Development Impact Fees identified in Exhibit 3, attached hereto and incorporated herein.

Beginning July 1, 2026, and annually thereafter, the development impact fees as set forth in Exhibit 3 shall increase by the same percentage as the City’s adopted impact fee schedule.

The percent fee increase will be applied annually on July 1. Developer shall pay the development impact fees to the City in sixty (60) equal payments, without interest or penalty, commencing on the first day of each month following the earlier of: 1) the issuance of a final certificate of occupancy for the hotel structure portion of the Project, or 2) six (6) months after the issuance of a temporary certificate of occupancy for the hotel structure portion of the Project. If Developer fails to timely make any required payment, and such payment remains outstanding after City has provided Developer with notice and an opportunity to cure, the City may record a lien against the Property for such outstanding amount. Such lien shall bare interest at the maximum rate permitted by law.

7.5.3 Timing of Fee Payment. Except as otherwise provided herein, Developer agrees to pay when due any required fees, taxes, or assessments required by applicable law.

7.5.4 Irrevocable Offer of Dedication of an Easement for Public Use of Existing Americorps Trail. Developer shall grant an irrevocable offer of dedication for an easement for a public trail on a portion of the exiting AmeriCorps Trail, thus ensuring permanent access to part of the Laguna de Santa Rose. Developer shall make this irrevocable offer of dedication to the City no more than forty-five (45) days after the longest possible statute of limitations to challenge this Agreement or any accompanying approval lapses and there is no court challenge. If there is a court challenge, Developer shall make this irrevocable offer of dedication no more than forty-five (45) days after a final court order, compliance therewith, and discharged writ of mandate (if applicable) is filed and served on Developer. A true and correct copy of the legal description for this easement is attached hereto as Exhibit

1. City acknowledges that this easement includes part of wetland.

8. Public and Private Improvements.

8.1 Public Works and Community Development. Any public improvements and work performed by Developer in connection with the Project shall be to the satisfaction of the City Engineer.

9. Public Safety and Security. In the event that this Agreement is terminated prior to the completion of construction of the Project, Developer, at its sole costs and expense, shall be required to render the Property and any improvements required to develop the Property to a Safe Condition.

Determination of whether the Property and other improvements have been rendered to a Safe Condition shall be to the satisfaction of the Building Official and the City Engineer. This provision shall survive the termination of this Agreement as provided for in Section 13 of this Agreement.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
218 of 277
13 10. Amendment.

10.1 Material Changes. Material amendments to this Agreement may be amended in writing from time to time by mutual consent of the Parties hereto and in accordance with the procedures required by the Development Agreement Law. All material amendments to this Agreement shall be recommended for approval by the Planning Commission and approved by the City Council and, upon such approval, will become part of the Project Approvals.

10.2 Changes in Law. In accordance with California Government Code Section 65869.5, in the event that state or federal laws or regulations enacted after the Effective Date prevent or preclude compliance with one or more provisions of this Agreement, the Parties shall meet in good faith to determine the feasibility of any modification or suspension of this Development Agreement that may be necessary to comply with such State or Federal Law and to determine the effect such modification or suspension would have on the purposes and intent of this Agreement. Following the meeting between the Parties, the provisions of this Agreement may, to the extent feasible, and upon mutual agreement of the Parties, be modified or suspended, but only to the minimum extent necessary to comply with such State or Federal Law. In such an event, this Agreement, together with any required modifications, shall continue in full force and effect. In the event that the State or Federal Law operates to frustrate irremediably and materially the vesting of development rights to the Project as set forth in this Agreement, Developer may terminate this Agreement.

10.3 Operating Memorandum. The provisions of this Agreement require a close degree of cooperation between City and Developer and development of the Property hereunder may demonstrate that refinements and clarifications are appropriate with respect to the details of performance of City and Developer. If and when, from time to time, during the Term of this Agreement, City and Developer agree that such clarifications are necessary or appropriate, City and Developer shall effectuate such clarifications through operating memoranda approved by City and Developer. No such operating memoranda shall constitute an amendment to this Agreement requiring public notice or hearing. The City Manager, in consultation with the City Attorney, shall make the determination on behalf of City whether a requested clarification may be effectuated pursuant to this Section or whether the requested clarification is of such a character to constitute an amendment to this Agreement. The City Manager shall be authorized to execute any operating memoranda hereunder on behalf of City.

11. Annual Review of Agreement.

11.1 Review Date. The annual review date of this Agreement (the “Review Date”) as required by Development Agreement Law shall be approximately twelve (12) months from the Effective Date and every twelve (12) months thereafter.

11.2 Procedures. The procedures for annual review shall be as set forth in the Development Agreement Law.

11.3 Fee for Annual Review. The reasonable cost for the City’s annual review of this Agreement shall be paid by Developer, shall be actual costs incurred by the City in connection Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
219 of 277
14 with the review, plus 10 percent (10%) of the actual cost to cover administrative overhead.

However, under no circumstances shall the annual review fee exceed $10,000.

12. Default.

12.1 Default. The failure of either party to perform any material obligation or duty under this Agreement within the time required by this Agreement shall constitute an event of default. (For purposes of this Agreement, a Party asserting that the other Party is in default shall be referred to as the "Complaining Party" and the other Party shall be referred to as the "Defaulting Party.") Any delays caused by a government-declared emergency, act of God, disaster or other event beyond the Developer’s control shall not constitute a breach of this Agreement.

12.2 Notice. The Complaining Party may not place the Defaulting Party in default unless it has first given written notice to the Defaulting Party, specifying the nature of the default and the manner in which the default may be cured, if known to the Complaining Party. Any failure or delay by the Complaining Party in giving such notice shall not waive such defaults or waive any of the Complaining Party's remedies.

12.3 Cure. The Defaulting Party shall have thirty (30) days from the receipt of notice to cure the default. In the case of monetary defaults, any default must be cured completely within the thirty (30) day period. In the case of non-monetary defaults, if the default cannot be reasonably cured within such time, the default shall be deemed cured if: (1) the cure is commenced at the earliest practicable date following receipt of notice; (2) the cure is diligently prosecuted to completion at all times thereafter; (3) at the earliest practicable date (but in no event later than thirty (30) days after receiving the notice of default), the Defaulting Party provides written notice to the Complaining Party that the cure cannot be reasonably completed within such thirty (30) day period; and (4) the default is cured at the earliest practicable date, but in no event later than one hundred twenty (120) days after receipt of the first notice of default. Notwithstanding the foregoing, time to cure shall be automatically extended in the event of a declared disaster by the City of Sebastopol or Sonoma County within Sebastopol or litigation challenging this Agreement or any act necessary to comply with a court order. The automatic extension shall be for the same amount of time as the disaster, as declared by a government agency, or until there is compliance with a final judgment in any litigation.

12.4 Remedies. If the Defaulting Party fails to cure a default in accordance with the foregoing, the Complaining Party shall have the right to terminate this Agreement upon notice to the Defaulting Party and the Complaining Party may pursue all remedies available by law or in equity, including specific performance and injunctive relief, or termination of this Agreement.

12.5 Waiver of Monetary Damages. Except for compensable takings and inverse condemnation claims, and notwithstanding anything in this Agreement to the contrary, the Parties acknowledge that the City would not have entered into this Agreement had it been exposed to liability for damages from Developer, and that therefore, Developer hereby waives all claims for damages against the City for breach of this Agreement. The Developer expressly understands and agrees that the sole legal remedy available for a breach or violation of this Agreement by the City shall be an action in mandamus, specific performance or other injunctive or declaratory relief to enforce the provisions of this Agreement. Developer further acknowledges that under the Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
220 of 277
15 Development Agreement Law, land use approvals (including development agreements) must be approved by the City Council and that under law, the City Council's discretion to vote in any particular way may not be constrained by contract. Developer therefore waives all claims for damages against the City in the event that this Agreement or any Project Approval is: (1) not approved by the City Council; or (2) is approved by the City Council, but with new changes, amendments, conditions or deletions to which Developer is opposed. Developer further acknowledges that as an instrument which must be approved by ordinance, a development agreement is subject to referendum; and that under law, the City Council's discretion to avoid a referendum by rescinding its approval of the underlying ordinance may not be constrained by contract, and Developer waives all claims for damages against the City in this regard.

12.6 Effect of Termination of Agreement on Other Project Approvals. Developer agrees that termination of this Agreement in accordance with this Section 12 shall also result in the automatic termination of the Project Approvals if the Project has not yet been completed. If the Project is completed, the Project Approvals and all related conditions of approval shall survive the termination or expiration of this Agreement, and shall remain in effect and binding on the Developer.

13. Insurance and Indemnity.

13.1 Indemnification, Defense and Hold Harmless. Developer shall indemnify, defend (with counsel acceptable to City), and hold harmless to the fullest extent permitted by law, the City and its officers, officials, agents and employees from and against any and all claims, liability, loss, damage, expense, costs (including without limitation costs and fees of litigation) of every nature arising out of or in connection with the Project, the Project Approvals or the Property (including any challenge to the validity of any provision of this Agreement or any part of the Project Approvals, or Developer's failure to comply with any of its obligations in this Agreement, or Developer's failure to comply with any current or prospective Law); provided, however, that Developer shall have no obligations under this Section for such loss or damage which was caused by the sole negligence or willful misconduct of the City. This indemnification obligation shall survive the termination or expiration of this Agreement and shall not be limited by any insurance policy, whether required by this Agreement or otherwise.

13.2 Cooperation in the Event of Legal Challenge. In the event of any administrative, legal or equitable action instituted by a third party challenging the validity of any provision of this Development Agreement, the procedures leading to its adoption, the Project Approvals for the Project (“Initial Litigation Challenge”), Developer and City each shall have the right, in its sole discretion, to elect whether or not to defend such action, to select its own counsel, and to control its participation and conduct in the litigation in all respects permitted by law. If an Initial Litigation Challenge is filed, upon receipt of the petition, the Parties will have twenty (20) days to meet and confer regarding the merits of such Initial Litigation Challenge and to determine whether to defend against the Initial Litigation Challenge, which period may be extended by the Parties’ mutual agreement so long as it does not impact any litigation deadlines.

Without limiting the application of Section 13.1, if, after meeting and conferring, the Parties mutually agree to defend against the Initial Litigation Challenge, then the following shall apply: (i) the Parties hereby agree to affirmatively cooperate in defending said action and to Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
221 of 277
16 execute a joint defense and confidentiality agreement in order to share and protect information, under the joint defense privilege recognized under applicable law; (ii) for the purposes of costefficiency and coordination, the Parties shall first consider defending the Initial Litigation Challenge jointly, with counsel and under terms of joint representation mutually acceptable to the City and Developer (each in its sole discretion), at the Developer’s sole cost and expense; and (iii) if the Parties cannot reach timely and mutual agreement on a joint counsel, and Developer continues to elect (in its sole discretion) to defend against the Initial Litigation Challenge, then Developer shall take the lead role defending such Initial Litigation Challenge and may, in its sole discretion, elect to be represented by the legal counsel of its choice, in which case, City, at its expense, may elect to be separately represented by the outside legal counsel of its choice in any such action or proceeding. The City Manager is authorized to negotiate and enter into a joint defense agreement in a form acceptable to the City Attorney. Such joint defense agreement shall also provide that any proposed settlement of an Initial Litigation Challenge shall be subject to City’s and Developer’s approval, each in its reasonable discretion.

13.3 Insurance.

13.3.1 Public Liability and Property Damage Insurance. At all times that Developer is constructing any public improvements to the Property, Developer shall maintain in effect a policy of comprehensive general liability insurance with a per-occurrence combined single limit of five million dollars ($5,000,000) and a deductible of not more than fifty thousand dollars ($50,000) per claim. The policy so maintained by Developer shall name the City, its officers, officials, agents and employees as additional insureds and shall include either a severability of interest clause or cross-liability endorsement.

13.3.2 Workers’ Compensation Insurance. At all times that Developer is constructing any improvements, Developer shall maintain workers’ compensation insurance for all persons employed by Developer for work at the Project site. Developer shall require each contractor and subcontractor similarly to provide workers’ compensation insurance for its respective employees. Developer agrees to indemnify the City for any damage resulting from Developer’s failure to maintain any such insurance.

13.3.3 Evidence of Insurance. Within sixty (60) days of the Effective Date of this Agreement, Developer shall furnish City satisfactory evidence of the insurance required by this Section 13.3 and evidence that the carrier is required to give the City at least fifteen (15) days prior written notice of the cancellation or reduction in coverage of a policy. The insurance shall extend to the City, its elective and appointive boards, commissions, officers, agents, employees and representatives and to Developer performing work on the Project.

14. Assignment and Transfers of Rights and Interest.

14.1 Assignment of Rights Under Agreement. Except as set forth in herein, Developer may not transfer or assign its interests under this Agreement, in whole or in part, for any reason without the express written consent of the City. Any assignment or transfer of interests under this Agreement or the Project Approvals without the City's express written consent shall constitute an event of default, including any transfer as a matter of law due to foreclosure or some other event.

City’s consent to any assignment shall not be unreasonably withheld and may be conditioned upon Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
222 of 277
17 the Developer and transferee executing a written assignment and assumption agreement in a form approved by the City. However, Developer may lease part or all of the hotel structure to operate the uses allowed by this Agreement or any Subsequent Approval without the City’s consent and may transfer any interest in the Property to an affiliated entity without the City’s advance written consent.

14.2 Non-transferability of Project Approvals to Other Location. The Project Approvals issued for the Property shall not be transferable to any other location.

14.3 Runs with the Land. Except as otherwise provided in this Agreement, and for so long as this Agreement remains in effect, all of the provisions, rights, terms, covenants, and obligations contained in this Agreement shall be binding upon the Parties and their respective heirs, successors and assignees, representatives, sub-lessees, and all other persons acquiring the Developer's interest in the Property, whether by operation of law or in any manner whatsoever; provided that no successor or assignee of Developer may obtain the benefits hereunder unless the City has consented to assignment of those rights as set forth in Section 14.1. All of the provisions of this Agreement shall be enforceable as equitable servitudes and shall constitute covenants running with the land pursuant to applicable laws, including, but not limited to, Section 1466 of the Civil Code of the State of California. Each covenant to do, or refrain from doing, some act on the Property hereunder, or with respect to any leasehold interest in the Property: (a) is for the benefit of such properties and is a burden upon such properties; (b) runs with such properties; and (c) is binding upon each Party and each successive owner during its ownership of such leasehold interest in the Property or any portion thereof, and shall be a benefit to and a burden upon each Party and its property hereunder and each other person succeeding to an interest in such properties.

15. Mortgagee Protection. This Agreement shall be superior and senior to any lien placed upon the Property or any portion thereof after the date of recording the Agreement, including the lien of any deed of trust or mortgage (the “Mortgage”). Notwithstanding the foregoing, no breach hereof shall defeat, render invalid, diminish or impair the lien of any Mortgage made in good faith and for value.

16. Miscellaneous.

16.1 Estoppel Certificate. Either Party may at any time request the other Party to certify in writing that: (1) this Agreement is in full force and effect; (2) this Agreement has not been amended except as identified by the other Party; and (3) to the best knowledge of the other Party, the requesting Party is not in default, or, if in default, the other Party shall describe the nature and any amount of any such default. The other Party shall use its best efforts to execute and return the estoppel certificate to the requesting Party within thirty (30) days of the request. The City Manager shall have the authority to execute such certificates on behalf of the City.

16.2 Recordation. This Agreement shall not be operative until recorded with the Sonoma County Recorder's office. Developer shall record this Agreement against the Property at its expense with the County Recorder's office within ten (10) days of the Effective Date and shall cause any amendment to this Agreement or any instrument affecting the term of this Agreement to be recorded within ten (10) days from date on which the same become effective. Any amendment to this Agreement or any instrument affecting the term of this Agreement which affect Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
223 of 277
18 less than all of the Property shall contain a legal description of the portion thereof that is the subject of such amendment or instrument.

16.3 Notices. All notices required by this Agreement or by the Development Agreement Law shall be in writing and personally delivered, sent by certified mail, postage prepaid, return receipt requested, or delivered by nationally recognized overnight courier service.

Notice required to be given to the City shall be addressed as follows:

City of Sebastopol
7120 Bodega Ave.

Sebastopol, CA 95473
ATTN: City Manager
with copies to:

City of Sebastopol
7120 Bodega Ave.

Sebastopol, CA 95473
ATTN: City Attorney
Notice required to be given to the Developer shall be addressed as follows:

The Barlow, Inc
6780 Depot Street #110
Sebastopol, CA 95472
Email: [email protected]
Either Party may change the address stated herein by giving notice in writing to the other Party, and thereafter notices shall be addressed and transmitted to the new address. All notices shall be deemed received on the earlier of the date that personal delivery is affected or the date shown on the return receipt.

Notices personally delivered shall be deemed to have been received upon delivery. Notices delivered by certified mail shall be deemed to have been given and received on the first to occur of (i) actual receipt by any of the addresses designated above as the Party to whom notices are to be sent, or (ii) within five (5) days after a certified letter containing such notice, properly addressed, with postage prepaid, is deposited in the United States mail. Notices delivered by overnight courier service as provided above shall be deemed to have been received twentyfour (24) hours after the date of deposit.

16.4 References to Municipal Code. This Agreement may contain references to articles and sections of the City’s Municipal Code.

16.5 Construction of Agreement. The provisions of this Agreement and the Exhibits hereto shall be construed as a whole according to their common meaning and not strictly for or against any party and consistent with the provisions hereof, in order to achieve the objectives and Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
224 of 277
19 purpose of the parties hereunder. The captions preceding the text of each Article, Section, and subsection hereof are included only for convenience of reference and shall be disregarded in the construction and interpretation of this Agreement. Wherever required by the context, the singular shall include the plural and vice versa, and the masculine gender shall include the feminine or neuter genders and vice versa.

16.6 Third Party Beneficiaries. This Agreement is entered into for the sole benefit of the Parties and any Successors. No other party shall have any cause of action or the standing to assert any rights under this Agreement.

16.7 Attorneys’ Fees and Costs in Legal Actions by Parties to the Agreement.

Should any legal action be brought by either Party for breach of this Agreement or to enforce any provisions herein, each Party shall bear its own costs (including attorneys’ fees) and neither Party shall be entitled to recover such costs from the other Party.

16.8 Liability of City Officials. No City official or employee shall be personally liable under this Agreement.

16.9 Delegation. Any reference to any City body, official or employee in this Agreement shall include the designee of that body, official or employee, except where delegation is prohibited by law.

16.10 Severability. Should any provision of this Agreement be found invalid or unenforceable by a court of law, the decision shall affect only the provision interpreted, and all remaining provisions shall remain enforceable.

16.11 Integration. This Agreement constitutes the entire understanding and agreement of the Parties with respect to the subject matter hereof and supersedes any previous oral or written agreement. This Agreement may be modified or amended only by a subsequent written instrument executed by all of the Parties.

16.12 Counterparts. This Agreement may be signed in one (1) or more counterparts, and will be effective when the Parties have affixed their signatures to counterparts, at which time the counterparts together shall be deemed one (1) original document; provided, however, that all executed counterparts are provided to the City Clerk.

16.13 Interpretation. The Parties acknowledge that this Agreement has been negotiated by both Parties and their legal counsel and agree that this Agreement shall be interpreted as if drafted by both Parties.

16.14 Inconsistency. In the event of any conflict or inconsistency between the provisions of this Agreement and the Project Approvals or Exhibits, this Agreement shall prevail.

16.15 Entire Agreement. This Agreement, including the Recitals, and all Exhibits attached hereto and incorporated by reference herein, together with the Project Approvals, constitutes the entire understanding and agreement of the Parties and supersedes all negotiations Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
225 of 277
20 or previous agreements between the Parties with respect to all or any part of the subject matter hereof.

16.16 Applicable Law and Venue. This Agreement shall be construed and enforced in accordance with the laws of the State of California without regard to principles of conflicts of law.

In the event of litigation arising under this Agreement, the litigation shall be brought and tried exclusively in the Superior Court of the County of Sonoma or, in the event of federal litigation, the Northern District of California.

16.17 Waiver. No delay or omission by either Party in exercising any right or power accruing upon noncompliance or failure to perform by the other Party under any of the provisions of this Agreement shall impair any such right or power or be construed to be a waiver thereof. A waiver by either Party of any of the covenants or conditions to be performed by the other Party shall be in writing and signed by a duly authorized representative of the Party against whom enforcement of a waiver is sought, and any such waiver shall not be construed as a waiver of any succeeding breach or non-performance of the same or other covenants and conditions hereof.

16.18 Time of the Essence. Time is of the essence of this Agreement. (Signatures on Next Page)
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
226 of 277
21 IN WITNESS WHEREOF, the Parties hereto are executing this Agreement on the dates set forth below, to be effective as of the Effective Date. “CITY”

CITY OF SEBASTOPOL,
A municipal corporation
By:_________________________________
Name:______________________________
Title: City Manager
Dated:____________, 2025
“DEVELOPER”

HIGHWAY PARTNERS, LLC
a California Limited Liability Company
By:_________________________________
Name:______________________________
Title: ____________________________
Dated:____________, 2025
“DEVELOPER”

SEBASTOPOL INDUSTRIAL PARK, LLC
a California Limited Liability Company
By:_________________________________
Name:______________________________
Title: ____________________________
Dated:____________, 2025
ATTEST:
____________________________
City Clerk
APPROVED AS TO FORM:
_____________________________
City Attorney
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
227 of 277
2498947.2 15107.003
List of Exhibits:

1. Irrevocable Offer of Dedication and Legal Description

2. Conditions of Approval

3. Fees

4. Hotel Use Description

5. Legal Descriptions of parcels comprising the Property Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
228 of 277
2498947.2 15107.003
EXHIBIT 1
Irrevocable Offer of Dedication for Public Access
to Existing AmeriCorps Trail &
Legal Description
[to be inserted]
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
229 of 277
2498947.2 15107.003
EXHIBIT 2

CONDITIONS OF APPROVAL
[to be inserted]
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
230 of 277
EXHIBIT 3

FEE SCHEDULE
[Chart of processing fees & impact fees to be inserted] Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
231 of 277
2498947.2 15107.003
EXHIBIT 4
Project Description of each Hotel Space:
[to be inserted]
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
232 of 277
2498947.2 15107.003
EXHIBIT 5
Legal Descriptions of parcels comprising the Property
[to be inserted]
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
233 of 277

RECORDATION OF THIS CERTIFICATE IS THE RESPONSIBILITY OF THE REQUESTING PARTY.

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

Acknowledgment
State of California }
County of Sonoma }
On , before me,
_____________________________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Witness my hand and official seal.
_________
______________________________, Notary Public
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
234 of 277
Design Review Board’s Comments and Recommendations:

Overall, the Design Review Board had high praise for the project design team and agreed that they had done a great job with this difficult site. They felt that the project is consistent with the City’s established Design Guidelines and generally agreed that the architecture, materials, and details were successful in providing good design on this important site. One member expressed concern about the building’s materials, rooflines, windows, color, and overall character; however these concerns were not expressed by the other members.

Recommendations: Members agreed that it was appropriate to treat the building’s facades differently and generally recommended that the applicants pay more attention to the Sebastopol Avenue facade to make it appear more welcoming. Members also agreed that the use of real wood over a large expanse of facade may not offer the best durability over time and recommended that the design team consider a high-quality wood alternative that provides the same look. The Board’s landscape architect also offered some recommendations related to size and species of trees.

Individual member comments:

Board member Marchall Balfe - likes the project, it provides an interesting site layout and does a great job of drawing people in. The McKinley treatment is a nice touch. Balfe likes the materials used, and the structural elements at each end of the building. The building looks like it evolved over time in a historical sense. Great job by the design team.

Board member Christian Macke – overall a beautiful design, will be an asset to the community. Applicants juggled some complicated issues. The Barlow itself is adaptive reuse in action. The edible landscape used throughout The Barlow reinforces the agricultural heritage of the area and could be carried through to this project. The use of stone is nice, recommend looking at the type and color of the stone carefully to ensure that it reads local rather than like it came from Texas. Wonders if the applicants looked at doing underground retention of stormwater on the hotel site rather than using above-ground bioretention planting areas? Consider informational signage for bioretention facilities on the hotel site to explain what they are and lead people over to see the larger facilities and Laguna featured at the Batch Plant site. In terms of plant species for the hotel site, large trees would be great but let’s keep to natives; sycamores, not magnolias. Pay attention to the character of the trees; edibles would be great when compatible with the uses.

Board member Chrisine Level – in favor of this project and would like to offer comments and suggestions. Tree #1, which is proposed to be removed – it is clear that tree has to go.

Some concern that the real wood material to be used over a large expanse of the building facade may not perform well over time; suggest exploring a quality wood-like product that Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
235 of 277
may offer the same look but perform better. Board member Level likes the juxtaposition of the different materials. She feels that the project follows the City’s established Design Guidelines and meets the CM Zone design standards.

Board member Lynn Deedler – in favor of the project but has a number of concerns about the design. He feels like the project does not meet the design guidelines because it does reflect or respect the character and content of Sebastopol’s existing neighborhoods, and that it should be made to feel more Sebastopol. He opined that as proposed there are too many surfaces; it looks like a hodge-podge of 3 different surfaces that do not feel compatible. He opined that the dark color used for the hotel building is too trendy for Sebastopol and does not fit in. He noted that the Sebastopol Avenue side is just blah, and recommends that more attention should be paid to this elevation. He reminded the Board that 22 thousand vehicles drive by here each day. The Sebastopol Avenue side feels like it’s just the back of the building, especially with the handicapped railings. He suggests that it be made to feel more welcoming. As to the rooflines, Board member Deedler opined that nothing else in Sebastopol has such high pitched roofs and that they do not work here; they should reflect the most common roofline in Sebastopol, which is flat. As to the windows, they are nice to have but nothing else in Sebastopol has windows that look like these. It is another trendy thing which is not appropriate in Sebastopol, it looks like Santa Rosa Avenue somewhere. He recommends raising the window bottoms up. He also feels that the sidewalks, especially on the Sebastopol Avenue side, feel too close to the building. Six foot sidewalks are too narrow and they should be made wider.

Board Chair Lars Langberg – overall a great project. He appreciates that the design team took the design of The Barlow and transformed it, making a unique statement. The massing, the gables, the courtyards are all good and very welcoming. He feels that an archway may not be appropriate for the McKinley side, but where the archway is used around the corner as a welcome into the courtyards it definitely belongs. He agrees that the Sebastopol Avenue side of the building is challenging but feels that a nice simple facade works. The Batch Plant site looks great and the connection to the Laguna is a great move.

Board member Langberg agrees that the durability of the real wood materials over such a large expanse would be worth looking into and recommends that the applicant does so. He also opined that it is not Barlow’s responsibility to invigorate Main Street, and that there does not need to be a divide between them – Barlow is setting an example.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
236 of 277
Planning Commission’s Comments and Recommendations:

The Commission was unanimously supportive of the project. They recognized the difficulty of designing this site and complemented the applicant team on the design of both the hotel site and of the batch plant parking lot and Laguna viewing areas.

Recommendations: Commissioners agreed with the Board that the Sebastopol Avenue side of the building should be upgraded to provide a better facade treatment and pedestrian experience. They also recommended that the project approvals be structured to ensure public access to the Laguna, and that the City, applicant, and provide property owners work together to improve accessibility between the hotel and Main Street.

Individual Commissioner comments:

Commissioner Oettinger – likes the project. Notes that walkability is very important, and if walking on the Sebastopol Avenue side of the building will provide a negative experience, then she recommends that the applicant do something to make it feel more friendly. She appreciated the provision of a new crosswalk across Morris Street, but notes the many dangerous crossings taking place now are further south than Laguna Park Way where the crosswalk is proposed. Recommends that it be placed at McKinley Avenue rather than at Laguna Park Way, but that if it remains at Laguna Park Way there will need to be more signs directing people to the crosswalk location. Commissioner Oettinger also appreciated the batch plant treatment and notes that it will be an important improvement over past errors that have been make here before we came to appreciate the value of the Laguna de Santa Rosa. She is glad that there will be gates to the parking lot, but hopes that the public not shopping at the Barlow will not be excluded from use of the parking lot to enjoy the amenities provided along the Laguna. She recommends some time-limited parking near the overlook that could be used by residents. The Commissioner indicated that all of the required findings for approval of this project can be made, as reflected in the draft resolutions.

Commissioner Hadley – this project will be a great amenity for Sebastopol and is the best use for this site. The batch plant site treatment will be a great addition. Supports the project. The Sebastopol Avenue frontage sets the tone and should be considered as an important gateway into Sebastopol. Commissioner Hadley recommends that the project do more to engage Sebastopol Avenue.

Commissioner Koelemeijer – this is a good project and what we need to see here. The City should focus on making downtown Main Street accessible from the hotel. Right now, there is no easy way to walk from the hotel to Main Street because of incomplete sidewalks and poor lighting at night. Commissioner Koelemeijer recommends that the City Council Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
237 of 277
consider using some of the expected revenue from this project to make those improvements. She also wants to ensure that the Laguna promenade and overlook remain accessible to the public.

Acting Chair Fernandez – we are fortunate to have Barney Aldridge in our community. He listens to comments and he does something with them. This is a needed project, and he has heard the concerns and has addressed them. This project sets the tone. The parking lot is a great idea and provides public access to the Laguna.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
238 of 277
From: lynndeed <[email protected]>
Sent: Sunday, April 6, 2025 8:38 PM
To: Mary Gourley <[email protected]>
Subject: Comments on the Barlow Hotel exterior design
Design comments from Lynn Deedler, Design Review Board member

1. The building needs more compatible exterior surfaces. The exterior sides for the building are of distinctly different surfaces and approximately equal in area. One could not find surfaces more difference than these. It has dark metal siding, light colored stone veneer, and stained wood siding. They compete, lack harmony. Do you call this a wood, stone or steel building? It is likely that one can not find any building like this in the County or beyond. Why?
2 The most viewed face of the building is a blah design. Many thousands of eyes go past this Sebastopol Road face daily. It should look interesting and attractive. The long raised concrete handicapped ramp goes a third way across the building face and uses a third of the narrow sidewalk. It looks awkwardly out of place. The ramp ends at a relatively small door with no steps, no set back, and no trim. The pictorials in the presentation are not accurate in this elevation.

The McKinley side of the building, the second most viewed face, also needs work. If the opening portal at the sidewalk is a main entry, It should look like one befitting to this huge building. Not just a flat opening.
3 The sidewalks are too narrow for this big of a structure and the pedestrian traffic. They are out of scale. The McKinley sidewalk measures 6 feet. The perspective view of the building shows trees planted in this sidewalk. That would leave about three feet or less of clear sidewalk in front of a huge building. By contrast the one story building across the street has Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
239 of 277
a 12 foot sidewalk. The planned Sebastopol Hotel has a 17 foot sidewalk along Petaluma Ave. This area needs enhancement.

The Sebastopol Avenue sidewalk squeezes to 9 feet, but the concrete ramp will take up nearly 4 feet of that. The ramp is visually unattractive. This sidewalk should be 15 feet wide at least to fit with the building mass and use, and to get farther back from the heavy traffic going by a few feet off the curb.
4 The corrugated metal surrounding the top third of the building is a trendy grey/black “color.” No other buildings in the Barlow, nearby buildings, or our town has a similar color .

In the criteria that the Design Review Board is to follow in the DRB guidelines, and in our City Master Plan guidelines, the first criteria is "1. Infill development should be sensitively designed to respect existing patterns, and reinforce the character and context of existing neighborhoods….”
This project does not met that criteria - and it could. The above concerns are changeable without significant alteration to the design. It is possible to make this building much more Sebastopol, and be attractive. The project has many good points about the design and project. But the above issues should be addressed.
.

Two lesser concerns:

Pitched roofs:The bold high pitch roofs are out of character with the rest of the building and the Barlow. There are other ways to make these end features to the building fitting and interesting.

Windows: In an apparent effort to make the windows look like the rollup doors in the Barlow large windows go to floor level. Floor level windows are out of place with a stone facade. They may work in a lighter airier structure, but do not feel right in a stone building.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
240 of 277
From: Jessica Green <[email protected]>
Sent: Monday, March 31, 2025 5:23 PM
To: Planning Technician
Cc: Jennifer Adametz
Subject: Barlow Hotel - yes, please!
Follow Up Flag: Flag for follow up
Flag Status: Completed
Dear Planning Commission & To Whom It May Concern at Sebastopol City Council, I am thrilled to hear of the approval of the initial plans for the Barlow Hotel will move forward to be presented to the City Council and I hope to be there in April to express my support for a hotel here at The Barlow. I am sorry due to a personal conflicts I was unable to make the Tuesday, March 25th Planning Commision Meeting.

I just wanted to urge the Commission and the City —and other residents of Sebastopol to support the plans for the hotel here at The Barlow for these reasons:

1. We local businesses really really need more business. It is very hard to run a local retail business and only sales can make it thrive. We need the visitors who spend money at our businesses. My retail business is really in need of more foot traffic and a hotel will provide our town with a study flow of new visitors- The Barlow is enjoyed by tourists and locals alike, and this is one of the wonderful thing about the The Barlow is our ability to provide food and fun for both locals and tourists.

2. The Barlow is the perfect spot to host the hotel since visitors can walk to Barlow business and downtown. With so many services and great food and drink and retail walkable, and downtown as well, the location inside /next door to the Barlow reduces car traffic by centralizing everything closer to town!

3. The Barlow management team is extremely well run and executes very well. After seven years at The Barlow, I can’t sing their praises enough! They run a tight ship, and no doubt would do so in constructing a hotel. As a longer term tenant, all my needs are met on an hourly basis. The property manager, Jennifer Adametz is responsive and professional when things are going well and even when they aren’t - like floods and fires. She and her team communicate regularly. I have her mobile number she is super responsive by TEXT which is so impressive as I am one of two dozen tenants! She and her team always come through.

It is a good feeling knowing the maintenance, marketing and crew by first names! The management group has done an excellent job hiring and retaining great talent at every level, from Jennifer to the janitor (Joe!). They have my back and were here for me when it flooded and have the sandbags and flood locks ready when the rains come! They work very hard - even on weekends to help in any way needed and I really appreciate the staff here at the Balrow. I have no doubt the group would execute well and do what they say they will deliver.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
241 of 277

4. We need to keep it local - and that means offering more choices of places to stay. Sebastopol needs an anchor hotels located closer to town- this will give people choices so they don’t have to AirBnB or stay in other towns. Thoughtful growth is good, and our town needs it. Locals make a point of “shopping local” but some months are very thin and we shop owners do without paying ourselves or working weekends and we need more foot traffic!
I hope the City Council remains open the Planning Commissions recommendations and moves forward with the hotel plans in April!

5. Ownership that considers and supports community. The owner, Barney Aldridge has encouraged Peacetown and given the people of Sebastopol a place to gather. When I was desperately looking for a space to park my 7.5 TON felting machine, he offered me a place to run my business. Mixed -use warehouse space with 3-phase power is very hard to find in smaller footprints! I feel Barney and his team are sensitive to the local spirit here, and do so much to build community, through offering tours of the Barlow, advertising at the airport and billboards to help bring business to the town, and numerous other events and initiatives.

Your Fellow Sebastopol resident,
Jessica Switzer Green,
Owner and Artist

JG SWITZER
Barlow tenant for 7 years.

Jessica Switzer Green
Artist & Owner

JG SWITZER
www.jgswitzer.com
707 244 3330
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
242 of 277

ALDRIDGE
Docusign Envelope lD: B2M5Fl F-DOBB*41 89-8020-7ECOCD8D9394 Aprit 10,2025
Honorab[e City CounciI Members
City of SebastopoI
7120 Bodega Avenue
Sebastopol,, C495472
Re: Bartow Hotel Devetopment Agreement
Dear Honorabte City Councitmembers,
We have enjoyed working with City staff on this exciting project and we are confident that the Barl.ow Hotet witl, bring many benefits to the City of Sebastopol and the community.

There is onty one outstanding issue that we did not reach agreement on with staff. We woutd tike a fee credit for the cost of instatting benches and interpretative signage at the Laguna de Rosa Overtook and Hotet site. The cost of these improvements is $69,000 and a bid for the improvements is attached to this letter. city staff fel,t they coutd onty reduce the Park Land and Devetopment fee, since these are park improvements, but exptained that the City Councit coutd approve a fee credit against the other impact fees the project witl need to pay. We think these improvements witl enhance the overtook and provide a wonderful ptace for the community to enjoy the Laguna de Rosa.

We propose to add the foltowing provision to the Development A$reement.

Fee Credit for lmprovements to Laguna Overlook. ln exchange for a fee credit of Sixty-Nine Thousand Dottars ($69,000) against the fees otherwise detaited in Exhibit 3, Developer shal.t provide benches and interpretive signs at the hotel and proposed overlook within the parking lot site adjacent to the Laguna de Rosa.

We ask that you add this provision to the Development Agreement.

We are happy to discuss our proposal at any time.

Thank you,
by:

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
243 of 277
Docusign Envelope lD: B2A25Fl F-D0BB-4189-8020-7EC0CD8D9394 March 31, 2025 EBROWN qoNsTRucTtof,
Bid Card #
Labor Rate $ 43.00
Brown Construction, lnc.

Siie Furnishinos Budoet

BROWN BUDGET
TOTAL

DOLLARS
5af

29.U4
,lo nnn
1r
LABOR
HOUR
TOTALS
4 .S
s
cosT
'I 5t)0
17 5()010.500
b.uuO
17 50n
7 000
1n nnn
LABOR

PRODUCT
s2 000$2,500$1.800
UNIT
Cost
s500
$2,500$3.500
$500
$2.500$3 500
s'to 000
UNITS
EA
EA
bAEA

OUANITY
373
10 7
H6tel
Sira Fttrnichinds
BIKE RACKS Kevstone Ridoe-Metal4 Bikes eachBENCHES Kevstone Ridqe-6' TRASH-RECYCLE BINS Kevstone Ridoe-Metal
Batch PlanaPatuina Lot
BIKF RACKS Kevsfone Ridde-Metal4 Bikes eachBENCHES Kevstone Ridoe-6' TRASH-RF(]Y(]I F RINS KFvstnne Flidda-Matrl
INTFRPRFTIVF SIGNAGF CUstdm
rOTAfotal Hotel and Batch Plant Parkinq Lot
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
244 of 277
Barlow Hotel Project
Sebastopol City Council
April 15, 2025
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
245 of 277
Staff
Recommendation
• We are recommending approval of
the Barlow Hotel. Key factors:
• Consistent with Sebastopol
General Plan & General Plan EIR
• Consistent with Uses Allowed by
Zoning
• Benefits to Downtown Vitality &
Businesses
• Significant Anticipated Increases
in Tax Revenues to City
• Estimated $1m - $2m annually
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
246 of 277
Project Features: Hotel
• Up to 83 rooms, with ground floor
restaurant, bar, spa, retail & meeting rooms
• 2-3 stories, with rooftop pool deck and
covered café bar
• Up to 55’ tall, plus elevator shaft (max 65’)
• Redeveloped Parking Lot adds spaces
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
247 of 277
• 232 new parking spaces
• Valet spaces “flex”
• EV charging stations
• Bioswales
• Storage building
• Laguna Overlook and
Promenade
• Trail connections, benches
and interpretive signage
(Laguna Foundation)
• Bike parking
• Picnic Area
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
248 of 277
Development Agreements
 Contract Between Property Owner & City
 Consistent w/GP & Uses Allowed by Zoning
 Establishes Terms for Development of Property
• Building sizes, heights, densities, setbacks, vehicular access and parking, site design, landscaping, and other physical development features
• Permitted uses and operating standards
• Mitigation measures and conditions of approval
• Amount and payment schedule of any impact fees
• Term of the Agreement
• Procedures for subsequent reviews
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
249 of 277
Project Component Allowed by
Zoning Code?
Typical Processing & Approval
Procedure
Procedure for Barlow Hotel Project
Hotel Hotel, with accessory uses including
spa, restaurant, cafe & retail
Yes Use Permit Development Agreement
Bar spaces/alcohol sales Yes Admin Review or Use Permit, depending on seats and food
service
Development Agreement
Hotel structure, height, massing,
architectural features, colors &
materials, landscaping, lighting
Yes Design Review Board; Planning
Commission (height)
Development Agreement;
Subsequent Administrative Review if
consistent with Development
Agreement
Signs Yes Admin Review if consistent with
Sign Program
Admin Review if consistent with Sign
Program & Development Agreement
Tree Removal (Tree #1) Yes Tree Board Development Agreement Parking
Lot
Offsite Parking (batch plant parking lot) Yes Use Permit Development Agreement Valet Parking (batch plant parking lot) Yes Use Permit Development Agreement ESOS Setback reduction from 100’ to
50’
Yes Use Permit Development Agreement
Landscaping & Lighting; Shed structure Yes Design Review Board Development Agreement; Subsequent Administrative Review if
consistent with Development
Agreement
Typical Approval Process & Procedure with Barlow Hotel DA Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
250 of 277
General Plan Consistency
GOAL EV 1: Encourage Economic Development that
Broadens the City’s Employment Base, Attracts High-Quality Jobs, Provides Services and Goods that Reflect the City’s Values, and Increases the City’s Tax Base
GOAL EV 4: Emphasize Sebastopol's Role as a Market,
Service, and Tourism Hub for the West County and as a
Gateway to the Coast
• Policy EV 4-3: Encourage amenities needed to support
tourism, including hotels, bed-and-breakfasts, eco-lodging, and a variety of restaurants, shopping, and services.
• Policy EV 4-4: Encourage the development of civic
amenities, entertainment venues, retail and restaurants, and services that increase visitation, spending, and tourism. • Policy EV 4-5: Promote both the City, and the City’s open space and natural resources, with emphasis on the Laguna Wetlands Preserve, as a tourist destination.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
251 of 277
California Environmental
Quality Act (CEQA)
CEQA Section 15183 mandates for
Project Consistent with General Plan &
Previously Certified EIR
• Limits Additional CEQA Review
• Extensive Checklist (similar to Initial
Study) & Site-Specific Studies
• LOS and VMT Studies, Crosswalk Study
• Historical Resources Evaluation
• Biological Assessment for Batch Plant
Parking Lot
• Arborist’s Report
• Greenhouse Gas (GHG)
• Air Quality Assessment
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
252 of 277
Zoning
Consistency
• Uses are Allowed by Zoning Code
• Height up to 4 stories/50’ allowed with Use
Permit, but DA can allow more
• Use Permit Findings for Conditional Uses
(Hotel, Bar, Off-site Parking, ESOS) and
allowed by DA
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
253 of 277
Design Review/Tree
Board Discussion &
Recommendations
• Consistent with City’s established Design Guidelines
• Architecture, materials, and details successful in
providing good design on this important site
• Tree #1 should be removed
Recommendations:
• Appropriate to treat the building’s facades differently • Pay more attention to the Sebastopol Avenue facade
• Consider a high-quality wood alternative that provides same look to replace the real wood over large expanses
• Recommendations made re: tree sizes & species
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
254 of 277
Planning Commission
Discussion & Actions
• Planning Commission made findings & recommended
approval 4-0-1
• Complemented the applicant team on design of hotel
site & parking lot w/Laguna viewing areas
• Recognized difficulty of designing this site & agreed w/DRB re: Sebastopol Avenue side
Recommendations:
• Upgrade Sebastopol Ave side to provide a better facade treatment and pedestrian experience.
• Ensure public access to the Laguna
• City, applicant & provide property owners should work together on accessibility between hotel & Main Street
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
255 of 277
SMC 17.440.070 Development Agreements – Findings
A. Consistent with
Goals, Objectives &
Policies of General
Plan
B. Compatible with
the uses authorized in,
and the regulations
prescribed for,
the zone district
C. Is in conformity
with public
convenience, general
welfare and good land
use practice
D. Will not be
detrimental to the
public health, safety
and general welfare
E. Will not adversely
affect the orderly
development of
property
F. Will provide
sufficient benefit to
the City to justify
entering into the
Agreement
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
256 of 277
Processing &
Impact Fees
Barlow Hotel Fees Value of
Improvements
Applicable
Impact Fees
Traffic Impact $229,112.00 $51,727.00 $177,385.00
Park Land and
Development
$309,258.00 $309,258.00 $0.00
General Government $6,358.00 $6,358.00
Fire Facilities $10,528.00 $10,447.00
General Plan Update $15,106.66 $15,106.66
Storm Water $28,800.00 $28,800.00
Water Connection Fee $172,434.00 $172,434.00
Sewer Connection Fee $106,167.00 $106,167.00
TOTAL IMPACT FEES $877,763.66 $360,985.00 $516,697.66

TOTAL PROCESSING
FEES
$417,042.88 $417,042.88
TOTAL FEES DUE $1,294,806.54 $933.740.54
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
257 of 277
Fiscal Analysis Summary
Estimated Annual Revenues after 5 Years of Operation
Hotel Tax (TOT) Property
Tax
Sales Tax Total
RRC
Associates
$1,548,000 $180,000 $350,000 $2,078,000
EPS $891,000 $54,000 $34,200 $979,200
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
258 of 277
Next Steps:
• Introduce Ordinance & Waive 1st Reading • 2nd Reading & Possible Adoption • Ordinance Effective 30 Days after Adoption • Enter into Development Agreement • Annual Reporting Required • Applicant Prepares & Submits Construction Documents
• Subsequent Administrative (Staff) Reviews • Permits Issued • Processing Fees Paid • Impact Fees Deferred • Commencement of Construction • Inspections • Hotel Opens Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
259 of 277
End of Staff
Presentation
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
260 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

PERSPECTIVE VIEW-SEBASTPOL AVE

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
261 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

KEY BENEFITS

THE BARLOW HOTEL SEBASTOPOL, CA

PROJECT'S KEY BENEFITS

1. 2022-2024: DISCUSSIONS WITH THE CITY ON HOTEL ZONING, DESIGN, AND FLOOD MITIGATION.

2.MARCH 2023: COMMUNITY MEETING TO DISCUSS THE ECONOMIC BENEFITS OF A HOTEL.

3. MAY 2024: PLANNING APPLICATION SUBMITTAL.

4. JULY 2024: COMMUNITY MEETING AT THE YERBA MATTE BUILDING.

5. AUGUST 2024: RESUBMITTED OUR REVISED DESIGN BASED ON INPUT FROM THE CITY AND THE PUBLIC COMMENTS AT THE COMMUNITY MEETING.

6. MARCH 2025: PLANNING COMMISSION HEARING – TODAY!
FUTURE PROPOSED SCHEDULE:

1. APRIL 2025: CITY COUNCIL MEETINGS.

2. ESTIMATED: MAY 2025 – DESIGN DRAWINGS AND CONSTRUCTION DRAWINGS WOULD PROCEED.

3. ESTIMATED: Q3/4 2025 – BUILDING PERMIT SUBMITTAL

4. ESTIMATED: Q4 2025 – Q1 2026 – BUILDING PERMIT APPROVAL.

5. ESTIMATED: Q1 2026 – CONSTRUCTION START.

6. ESTIMATED Q3/Q4 2027: CONSTRUCTION COMPLETE.

PROJECT TIMELINE
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
262 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

KEY BENEFITS

THE BARLOW HOTEL SEBASTOPOL, CA

PROJECT'S KEY BENEFITS

1. $31.4 MILLION IN GUEST SPENDING (NET OF TAXES).

A. $23.4 MILLION OF THIS IS EXPECTED TO OCCUR IN SEBASTOPOL, AND $8 MILLION ELSEWHERE IN SONOMA COUNTY.

2. WOULD GENERATE APPROXIMATELY $9.8 MILLION IN LABOR INCOME AND SUPPORT APPROXIMATELY 210 JOBS.

3. FOR THE CITY OF SEBASTOPOL, THIS PROJECT WOULD GENERATE APPROXIMATELY $1.5 MILLION IN ANNUAL TRANSIENT OCCUPANCY TAXES, ABOUT $350,000 IN SALES TAXES, AS WELL AS ADDED PROPERTY TAXES.

4. IN ADDITION TO THESE DIRECT FINANCIAL BENEFITS, THE VISITOR SPENDING WOULD HELP SUPPORT

SEBASTOPOL BUSINESSES, WHICH SERVE BOTH RESIDENTS AND VISITORS, AND THE LOCAL TAX INCOME

WOULD SUBSTANTIALLY ENHANCE THE CITY'S ABILITY TO PROVIDE IMPORTANT PUBLIC SERVICES,

MAINTENANCE, AND IMPROVEMENTS, MAINTAINING AND IMPROVING ECONOMIC VITALITY AND THE QUALITY OF LIFE IN SEBASTOPOL.

ECONOMIC BENEFITS
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
263 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

PERSPECTIVE VIEW-SEBASTPOL AVE

THE BARLOW HOTEL SEBASTOPOL, CA

PLANNING COMMISSION FINDINGS PLANNING COMMISSION RECOMMENDATIONS

1. UPDATE THE SEBASTOPOL AVE. ELEVATION TO ADDRESS THE FOLLOWING CONDITIONS:

A. FEEL MORE WELCOMING; SERVE AS AN ENTRY TO THE REST OF THE CITY.

B. SIMPLE FACADE ACCEPTABLE, BUT SHOULD NOT FEEL LIKE THE BACK OF THE BUILDING.

C. BETTER INTEGRATION OF THE RAILINGS INTO THE OVERALL DESIGN, AS ALLOWED BY ADA.

D. INCOPORATE DESIGN ASPECTS OR PHYSICAL ADDITIONS TO BETTER ENGAGE THE STREET AND TO IMPROVE THE PEDESTRIAN EXPERIENCE.

2. APPLICANT AND RELEVANT PROPERTY OWNERS TO WORK WITH THE CITY IN EXPLORING HOW TO IMPROVE ACCESSIBILITY BETWEEN THE HOTEL AND MAIN STREET.

3. EXPLORE THE USE OF A WOOD-LIKE PRODUCT IN LIEU OF A TRUE, WOOD MATERIAL FOR THE FACADE DUE TO MAINTENANCE CONCERNS.

4. EXPLORE USING A STONE MATERIAL SIMILAR TO LOCAL BUILDINGS. APPLICANT TEAM TO REFERENCE THE P&SR ELECTRIC RAILWAY DEPOT.

5. APPLICANT TO EXPLORE REMOVING THE MCKINLEY ARCHWAY. EXPLORE A SQUARE PROFILE TO FIT BETTER WITHIN THE SURRONDING CONTEXT.

6. EXPLORE RAISING THE MCKINLEY STOREFRONT WINDOWS TO SIT FURTHER ABOVE THE SIDEWALK TO BETTER RELATE WITH WHAT I SEEN ELSWHERE IN SEBASTOPOL.

7. EXPLORE PUBLIC ACCESSIBILITY OPTIONS TO THE LAGUNA OVERLOOK AT THE BATCH PLANT SITE.

Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
264 of 277

PROPOSED

BATCH PLANT PARKING LOT

THE BARLOW HOTEL

BARLOW MARKET DISTRICT BOUNDARY

MORRIS ST
S
E
B
AS
T
O
P
O
L
AV
E
.

D
E
P
O
T
S
T

LAGUNA PARK WAY

MCKINLEY ST
RIALTO

BUILDING

THEATER BUILDING

CONCRETE

BUILDING

RAILROAD

BUILDING

BUILDING B

BUILDING D BUILDING F

BUILDING G

BUILDING H BUILDING I

VETERINARY

HOSPITAL

SEBASTOPOL

COMMUNITY MARKET

GRAVENSTEIN COURT
CO-OP

BUILDING
OLD
CENTER

FOR THE
ARTS

FOUNDRY

BUILDING

BOHEMIAN

STONEWORKS
RIPON
MOTORS

SEBASTOPOL

LIQUOR AND
DELI

GOODWILL
NAPA

AUTOPARTS

SEBASTOPOL

BIKE CENTER

CRYSTAL

CLEAR HOME

ELDERBERRY

COMMONS

A BOUTIQUE

MARKET PLACE
ATTICO

CONSIGNMENT

FURNITURE

BENDETTI TIRE

SERVICE

BENDETTI TIRE PRO
0' 160' 320' TRUE
NORTH
PROJ
NORTH
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect. 1"=160'-0" AP0.06
JANUARY 24, 2025

AREA DEVELOPMENT PLAN

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
265 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

B
A
R
L
O
W
H
O
T
E

L AT-GRADE
SIT
E
P
L
A
N

THE BARLOW HOTEL SEBASTOPOL, CA
MCKINLEY ST.

SEBASTOPOL AVE.

Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
266 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BARLOW HOTEL ROOF SITE PLAN

THE BARLOW HOTEL SEBASTOPOL, CA
SEBASTOPOL AVE.

MCKINLEY ST.

Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
267 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

PERSPECTIVE VIEW-GRAVESTEIN COURT

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10 Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
268 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

MATERIAL BOARD

THE BARLOW HOTEL SEBASTOPOL, CA
3 STONE VENEER

GLAZING SYSTEM
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
269 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect

THE BARLOW HOTEL SEBASTOPOL, CA
SS SS SS SS SS SS SS SS SS M o r r i s S t r e e t
Lands of Sebastopol Ready Mix, Inc. APN 004-011-017 & 020 APN 004-011-080
APN 004-011-041 & 039
APN 004-011-080
APN 004-011-080
767 Maps 17
2 4
6 8
3 5
7 9
1 1
2 3
4 5
6 7
8 9 KEY MAP-NTS NORTH BATCH PLANT-BEFORE SITE PHOTOS
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
270 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT SITE PLAN

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
271 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT STREETSCAPE
THE BARLOW HOTEL SEBASTOPOL, CA 68.5 TWO-WAY DRIVE ISLE WALK TO LAGUNA PROMENADE PL PL STREET TREES + NATIVE STREET PLANTING LIGHTING LOW FENCE BEYOND SHADE TREES at PARKING BEYOND STREET TREES + NATIVE STREET PLANTING LIGHTING LOW FENCE BEYOND SHADE TREES at PARKING BEYOND TWO-WAY DRIVE ISLE LOW FENCE BIORETENTION PLANTING BEYOND STREET TREES + NATIVE STREET PLANTING SHADE TREES at PARKING BEYOND BIORETENTION PLANTING BEYOND SHADE TREES at PARKING BEYOND PL MORRIS STREET SIDEWALK BIORETENTION STREET TREES + NATIVE STREET PLANTING SHADE TREES + PARKING LOW FENCE 0' 5' 10' 20' SECTION at MORRIS STREET MORRIS STREET ELEVATION 0' 5' 10' EXISTING CONDITIONS at MORRIS STREET Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
272 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT SITE SECTION
THE BARLOW HOTEL SEBASTOPOL, CA 76747270686678 74.66 7472706866 VALET ONE-WAY VALET VALET SELF PARK SELF PARK VALET VALET SELF PARK DRIVE ISLE TWO-WAY DRIVE ISLE TWO-WAY DRIVE ISLE SELF PARK VALET WALK TO LAGUNA PROMENADE L0W RETAINING WALL PL PLSWALE/ BIORETENTION SWALE/ BIORETENTION LOW RETAINING WALL/ DRAINAGE VEHICLE CHARGING STATION LIGHTING LIGHTING LIGHTING 0' 5' 10' 20' LANDSCAPE SECTION A-A Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
273 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

THE BARLOW HOTEL SEBASTOPOL, CA STORAGE SHED ROLL-UP DOOR PLANTING 20' 34'
15'
19'-2"
NORTH 0' 2' 4' 8' EAST ELEVATION NOTE: ARCHITECTURAL STYLE AND MATERIALS TO MATCH THE BARLOW 0' 2' 4' 8' CONCEPTUAL PLAN BATCH PLANT SHED Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
274 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT - OVERLOOK VIEW

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
275 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT - AERIAL VIEW

THE BARLOW HOTEL SEBASTOPOL, CA
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
276 of 277
All drawings and written material appearing herein constitute original, and unpublished work of the architect and may not be duplicated, used or disclosed without the written consent of the architect.

BATCH PLANT - AERIAL VIEW

THE BARLOW HOTEL SEBASTOPOL, CA
THANK YOU!
Agenda Item Number 10
Agenda Item Number: 10
City Council Meeting Packet of: April 15, 2025
277 of 277