Cities Index.
Agenda packet

Shafter City Council
September 20, 2022

Document
Agenda packet
Meeting
September 20, 2022
Body
Shafter City Council
Pages
53
Original file
281.1 MB
Text extracted from the city's file for reading and search. Open the original on www.shafterca.gov. That file is the official record.

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
35075 1430578397-0 AUG 22 08/31/2022 091522 2,873.13
34002
Invoice: 1430578397-0 AUG 22 ELECTRICAL CHARGES
2,873.13 50020020 510707 Power
35077 1098600677-2 AUG 22 08/31/2022 091522 150.56
34004
Invoice: 1098600677-2 AUG 22 ELECTRICAL CHARGES
150.56 08080010 510707 Power
35078 8758714175-2 AUG 22 08/31/2022 091522 1,664.46
34005
Invoice: 8758714175-2 AUG 22 ELECTRICAL CHARGES
832.23 50040020 510707 Power
832.23 51030020 510707 Power
35080 1110247266-6 AUG 22 08/31/2022 091522 59.50
34006
Invoice: 1110247266-6 AUG 22 ELECTRICAL CHARGES

59.50 01000440 510707 Power
35081 2644018719-8 AUG 22 08/31/2022 091522 47.43
34008
Invoice: 2644018719-8 AUG 22 ELECTRICAL CHARGES

47.43 01000440 510707 Power
35082 6962924118-8 AUG 22 08/31/2022 091522 10.10
34009
Invoice: 6962924118-8 AUG 22 ELECTRICAL CHARGES

10.10 01000110 510707 Power
35083 9898158900-9 AUG 22 08/31/2022 091522 7,329.61
34010
Invoice: 9898158900-9 AUG 22 ELECTRICAL CHARGES
7,329.61 01000220 510707 Power
35084 3962617783-4 AUG 22 08/31/2022 091522 268.78
34011
Invoice: 3962617783-4 AUG 22 ELECTRICAL CHARGES
268.78 50020020 510707 Power
35085 5376849141-6 AUG 22 08/31/2022 091522 2,639.06
34012
Invoice: 5376849141-6 AUG 22 ELECTRICAL CHARGES
2,639.06 01000250 510707 Power
35086 7952472969-0 AUG 22 08/31/2022 091522 678.23
34013
Invoice: 7952472969-0 AUG 22 ELECTRICAL CHARGES
678.23 01000270 510707 Power
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 20 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
35087 2770705903-9 AUG 22 08/31/2022 091522 919.51
34014
Invoice: 2770705903-9 AUG 22 ELECTRICAL CHARGES
919.51 51000010 510707 Power
35088 2690526140-5 AUG 22 08/31/2022 091522 10.03
34015
Invoice: 2690526140-5 AUG 22 ELECTRICAL CHARGES

10.03 08020010 510707 Power
CHECK 1009548 TOTAL: 143,046.12
1009549 09/15/2022 PRTD 11867 PACIFIC TIRE 34975 31380 09/07/2022 091522 22.14 33902
Invoice: 31380 WATER - REPAIR FLAT TIRE

22.14 50020020 510300 Vehicle Operations
35037 32028 09/08/2022 091522 278.77
33964
Invoice: 32028 WATER - NEW TIRES
278.77 50020020 510300 Vehicle Operations
35175 32017 09/07/2022 091522 15.00
34099
Invoice: 32017 POLICE #162 bw - TIRE ROTATION

15.00 01000220 510300 Vehicle Operations
35176 31284 09/08/2022 091522 37.14
34100
Invoice: 31284 POLICE #180 BW - REPAIR FLAT TIRE

37.14 01000220 510300 Vehicle Operations
CHECK 1009549 TOTAL: 353.05
1009550 09/15/2022 PRTD 6562 PEOPLEFACTS LLC 34958 2022080288 09/01/2022 091522 92.67 33884
Invoice: 2022080288 PD Recruitment Livescans: PO Trainees

92.67 01000220 510115 Recruitment
CHECK 1009550 TOTAL: 92.67
1009551 09/15/2022 PRTD 217 PUBLIC WORKS - COUNT 35120 NOINV09/08/2022 09/08/2022 091522 1,798.92 34045
Invoice: NOINV09/08/2022 LANDFILLS CHARGES - SEPTEMBER 2022 1,798.92 50010020 510114 Outsource Activity
CHECK 1009551 TOTAL: 1,798.92
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 21 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
1009552 09/15/2022 PRTD 12208 QUEST IRRIGATION INC 35192 22-4209 08/24/2022 091522 87.82 34117
Invoice: 22-4209 WATER - FIG-8/HOLE PUNCH TOOL/DRIP EMITTER

87.82 50020020 510200 Repairs & Maintenance
CHECK 1009552 TOTAL: 87.82
1009553 09/15/2022 PRTD 1622 QUILL CORPORATION 34971 27286155 08/24/2022 111 091522 189.51 33898
Invoice: 27286155 Office Supplies
132.66 01000170 510001 Departmental Supplies

56.85 50030020 510000 Office Supplies
34972 27290465 08/24/2022 111 091522 11.74
33899
Invoice: 27290465 Office Supplies

8.22 01000170 510001 Departmental Supplies

3.52 50030020 510000 Office Supplies
34973 27283966 08/24/2022 111 091522 19.87
33900
Invoice: 27283966 Office Supplies

13.91 01000170 510001 Departmental Supplies

5.96 50030020 510000 Office Supplies
CHECK 1009553 TOTAL: 221.12
1009554 09/15/2022 PRTD 844 RAYMOND'S TROPHY & A 34920 85531 08/18/2022 091522 18.40 33847
Invoice: 85531 Name Plate - M. Cuxum

18.40 01000180 510001 Departmental Supplies
34921 85028 07/18/2022 091522 40.59
33848
Invoice: 85028 Key of the City - Captain Bell

40.59 01000090 510802 Community Promotion
CHECK 1009554 TOTAL: 58.99
1009555 09/15/2022 PRTD 8241 RLH FIRE PROTECTION 34925 0976597 07/01/2022 091522 40.00 33852
Invoice: 0976597 SLLC Fire Alarm FY 22/23

40.00 01000250 510100 Service Agreements
CHECK 1009555 TOTAL: 40.00
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 22 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
1009556 09/15/2022 PRTD 292 RODNEY BECKER 35040 SEPTEMBER 2022 09/01/2022 091522 200.00 33967
Invoice: SEPTEMBER 2022 PARKING LOT LEASE PAYMENT
200.00 01000080 510600 Rents & Leases
CHECK 1009556 TOTAL: 200.00
1009557 09/15/2022 PRTD 285 RUSSELL (FRANK) MFG 35141 767322 08/29/2022 76 091522 115.40 34065
Invoice: 767322 WATER - FLAT MILD STEEL/BLACK PIPE
115.40 50020020 510200 Repairs & Maintenance
CHECK 1009557 TOTAL: 115.40
1009558 09/15/2022 PRTD 14472 SAMSARA 35202 3105195102563 07/08/2022 23000253 091522 11,570.02 34125
Invoice: 3105195102563 Samsara Subscription Renewal yr 2 & 3-Net Video Re 11,570.02 51030020 510105 Software Licensing
35203 3105195250918 08/26/2022 23000253 091522 11,570.37 34126
Invoice: 3105195250918 Samsara Subscription Renewal yr 2 & 3-Net Video Re 11,570.37 51030020 510105 Software Licensing
CHECK 1009558 TOTAL: 23,140.39
1009559 09/15/2022 PRTD 15015 SHAFTER TRUE VALUE I 34985 2209-034305 09/08/2022 81 091522 8.34 33912
Invoice: 2209-034305 SHOP - 1/2x1/4GALV HEX BUSHING/GT3/4x1/2 BRS CONNE

8.34 51010020 510001 Departmental Supplies
34987 2208-032537 08/29/2022 81 091522 57.89
33914
Invoice: 2208-032537 PARKS - 11Ooz 50:1 FUEL/OIL

57.89 01304020 510001 Departmental Supplies
35024 2209-034451 09/09/2022 81 091522 206.30
33951
Invoice: 2209-034451 PARKS - PRESS VAC BREAKER/MALE ADAPTER/COUPLING 206.30 01304020 510001 Departmental Supplies
35025 2209-034458 09/09/2022 81 091522 54.20
33952
Invoice: 2209-034458 WATER - HOLE SAW/CHINA MARKER/LUMBER CRAYON

54.20 50020020 510001 Departmental Supplies
35026 2209-034432 09/09/2022 97 091522 39.06
33953
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 23 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
Invoice: 2209-034432 WATER - GALV TEE/BALL VALVE

39.06 50020020 510200 Repairs & Maintenance
35027 2209-034452 09/09/2022 091522 78.20
33954
Invoice: 2209-034452 WATER - SCREWDRIVER/ROACH KILLER/HEX BUSHING

52.54 50020020 510001 Departmental Supplies

25.66 50020020 510200 Repairs & Maintenance
35036 2209-034498 09/09/2022 81 091522 35.33
33963
Invoice: 2209-034498 WATER - EAR MUFFS/EAR PLUGS

35.33 50020020 510001 Departmental Supplies
35079 2209-035077 09/12/2022 091522 24.51
34007
Invoice: 2209-035077 WATER - ADAPTER/PLAS LENS/KEY RING/SHADE LENS

4.28 50020020 510001 Departmental Supplies

20.23 50020020 510200 Repairs & Maintenance
35105 2209-034448 09/09/2022 091522 7.82
34031
Invoice: 2209-034448 SLLC small tools & materials

7.82 01000250 510001 Departmental Supplies
35190 2209-035192 09/13/2022 091522 31.92
34114
Invoice: 2209-035192 WATER - STORAGE STRAP/MARKER/PVC PIPE

19.98 50020020 510001 Departmental Supplies

11.94 50020020 510200 Repairs & Maintenance
CHECK 1009559 TOTAL: 543.57
1009560 09/15/2022 PRTD 13737 SITEONE LANDSCAPE SU 35226 122959573-001 09/02/2022 091522 1,788.54 34149
Invoice: 122959573-001 STREETS - LERDO MEDIAN - PRESSURE VACUUM BREAKER 1,788.54 01000440 510110 Landscaping Services
CHECK 1009560 TOTAL: 1,788.54
1009561 09/15/2022 PRTD 14779 STANDARD PLUMBING SU 34978 QVXB14 09/08/2022 78 091522 12.31 33911
Invoice: QVXB14 STREETS - HAND SANITIZER GEL/TBCLNR TANK TABS 5PK

12.31 01000430 510001 Departmental Supplies
35005 QVYQ57 09/08/2022 78 091522 37.53
33932
Invoice: QVYQ57 STREETS - FELT PAPER 72FT 30LB

37.53 01000430 510001 Departmental Supplies
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 24 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
35038 QWFJ17 09/12/2022 78 091522 26.79
33965
Invoice: QWFJ17 STREETS - GRAFITTI REMOVER

26.79 01000430 510001 Departmental Supplies
35048 QWGL85 09/12/2022 78 091522 46.48
33975
Invoice: QWGL85 STREETS - ACE EXT POLE/ROLLER FRAM/ACE BETTER RLR

46.48 01000430 510001 Departmental Supplies
CHECK 1009561 TOTAL: 123.11
1009562 09/15/2022 PRTD 6132 SUN COUNTRY FLOWERS 34991 89741 08/30/2022 091522 75.06 33918
Invoice: 89741 Plant for V. Rodriguez

75.06 01000090 510802 Community Promotion
CHECK 1009562 TOTAL: 75.06
1009563 09/15/2022 PRTD 5364 TEL-TEC SECURITY SYS 34993 788665 09/01/2022 091522 618.71 33921
Invoice: 788665 Monthly Security Services

65.00 01000130 510100 Service Agreements

4.79 01000200 510100 Service Agreements

4.79 01000210 510100 Service Agreements
115.30 01000250 510100 Service Agreements

17.50 01000420 510100 Service Agreements

17.50 01000430 510100 Service Agreements

39.17 01304020 510100 Service Agreements

17.50 50000020 510100 Service Agreements

17.50 50010020 510100 Service Agreements

17.50 50020020 510100 Service Agreements
132.92 50040020 510100 Service Agreements

22.29 51000010 510100 Service Agreements
146.95 51030020 510100 Service Agreements
CHECK 1009563 TOTAL: 618.71
1009564 09/15/2022 PRTD 533 UNITED RENTALS (NORT 34840 196532385-013 08/27/2022 091522 864.00 33768
Invoice: 196532385-013 100 Carver rental 8/26/22-9/26/22 864.00
E ED00001 -50 -555 -
01000500 580300 Capital Prj.- Other Imp.

CHECK 1009564 TOTAL: 864.00
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 25 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
1009565 09/15/2022 PRTD 45 WAGEWORKS, INC 34864 INV4137326 08/24/2022 091522 170.75 33792
Invoice: INV4137326 Monthly Compliance and Admin. Fee: Aug. 2022 170.75 01000160 510400 Professional Services
CHECK 1009565 TOTAL: 170.75
1009566 09/15/2022 PRTD 15101 WEX BANK - ACCOUNT 0 34999 E/3629450 09/06/2022 091522 35.00 33926
Invoice: E/3629450 Fuel for CS Equinox

17.50 01000400 510302 Vehicle Operations - Fuel

17.50 01000200 510200 Repairs & Maintenance
CHECK 1009566 TOTAL: 35.00
1009567 09/15/2022 PRTD 1495 WITCHER ELECTRIC INC 35002 38703AA 08/15/2022 091522 284.32 33929
Invoice: 38703AA WATER - CVH LIFT STATION - CHEMICAL PLUG 284.32
E WW00004 -50 -525 -
50000030 580100 Capital Prj.- Infrastructure
35006 38694AA 08/17/2022 23000247 091522 207.52
33933
Invoice: 38694AA WATER - WELL #17 REPAIRS TO RADIO SIGNAL 207.52 50020020 510200 Repairs & Maintenance
35008 38693AA 08/17/2022 23000247 091522 1,056.97
33934
Invoice: 38693AA WATER - WELL #17 REPAIR TO ANTENNA
1,056.97 50020020 510200 Repairs & Maintenance
35010 38706AA 08/18/2022 23000247 091522 207.52
33936
Invoice: 38706AA WATER - WELL #11 REPAIRS TO ALARM
207.52 50020020 510200 Repairs & Maintenance
35011 38734AA 08/25/2022 23000247 091522 362.92
33937
Invoice: 38734AA WATER - WELL #11 REPAIR TO ETHERNET SWITCH 362.92 50020020 510200 Repairs & Maintenance
35012 38752AA 08/30/2022 23000247 091522 823.50
33939
Invoice: 38752AA WATER - WELL #11 REPAIR TO FANS AND VENT 823.50 50020020 510200 Repairs & Maintenance
35013 28767AA 09/02/2022 23000247 091522 255.24
33940
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 26 ends

CASH ACCOUNT: 0000-00-000-00-00-100001- Cash7135

CHECK NO CHK DATE TYPE VENDOR NAME VOUCHER INVOICE INV DATE PO WARRANT NET

DOCUMENT INVOICE DTL DESC
Invoice: 28767AA WATER - WELL #11 REPAIRS ETHERNET CABLES 255.24 50020020 510200 Repairs & Maintenance
35014 38668AA 08/15/2022 23000247 091522 93.74
33941
Invoice: 38668AA WATER - WELL #20 - REMOVED VOLTAGE RECORDING & SCO

93.74 50020020 510200 Repairs & Maintenance
CHECK 1009567 TOTAL: 3,291.73
NUMBER OF CHECKS 65 *** CASH ACCOUNT TOTAL *** 464,055.06

COUNT AMOUNT
TOTAL PRINTED CHECKS 61 351,903.26
TOTAL WIRE TRANSFERS 4 112,151.80
*** GRAND TOTAL *** 464,055.06
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 27 ends

JOURNAL ENTRIES TO BE CREATED
CLERK: 5292blopez

YEAR PER JNL

SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT
EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC
2023 3 284
APP 0100-00-000-00-00-205000- Accts Payable 192,698.62
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0000-00-000-00-00-100001- Cash: Mission Bank Acct#7135 464,055.06 09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5101-00-000-00-00-205000- Accts Payable 1,376.72
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5103-00-000-00-00-205000- Accts Payable 33,161.85
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5002-00-000-00-00-205000- Accts Payable 154,931.75
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5100-00-000-00-00-205000- Accts Payable 21,434.35
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5001-00-000-00-00-205000- Accts Payable 9,597.51
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5000-00-000-00-00-205000- Accts Payable 3,415.73
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5006-00-000-00-00-205000- Accts Payable 173.35
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0204-00-000-00-00-205000- Accts Payable 38,484.20
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5003-00-000-00-00-205000- Accts Payable 108.88
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0207-00-000-00-00-205000- Accts Payable 1,535.00
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0808-00-000-00-00-205000- Accts Payable 5,485.91
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0800-00-000-00-00-205000- Accts Payable 10.51
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0802-00-000-00-00-205000- Accts Payable 20.54
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0803-00-000-00-00-205000- Accts Payable 262.62
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0811-00-000-00-00-205000- Accts Payable 63.19
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0810-00-000-00-00-205000- Accts Payable 21.26
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 5004-00-000-00-00-205000- Accts Payable 1,204.51
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0807-00-000-00-00-205000- Accts Payable 58.70
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
APP 0801-00-000-00-00-205000- Accts Payable 9.86
09/15/2022 091522 091522 AP CASH DISBURSEMENTS JOURNAL
GENERAL LEDGER TOTAL 464,055.06 464,055.06
APP 0000-00-000-00-00-209001- Due To Funds - Gen Fund 192,698.62 City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 28 ends

JOURNAL ENTRIES TO BE CREATED

YEAR PER JNL

SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT
EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC
09/15/2022 091522 091522
APP 0100-00-000-00-00-109000- Due From Funds - Cash Pool 192,698.62 09/15/2022 091522 091522
APP 0000-00-000-00-00-209047- Due To Funds - Vehicle Maint 1,376.72 09/15/2022 091522 091522
APP 5101-00-000-00-00-109000- Due From Funds - Cash Pool 1,376.72 09/15/2022 091522 091522
APP 0000-00-000-00-00-209049- Due To Funds - Info Tech 33,161.85 09/15/2022 091522 091522
APP 5103-00-000-00-00-109000- Due From Funds - Cash Pool 33,161.85 09/15/2022 091522 091522
APP 0000-00-000-00-00-209038- Due To Funds - Water Operat 154,931.75 09/15/2022 091522 091522
APP 5002-00-000-00-00-109000- Due From Funds - Cash Pool 154,931.75 09/15/2022 091522 091522
APP 0000-00-000-00-00-209046- Due To Funds - Facility Maint 21,434.35 09/15/2022 091522 091522
APP 5100-00-000-00-00-109000- Due From Funds - Cash Pool 21,434.35 09/15/2022 091522 091522
APP 0000-00-000-00-00-209037- Due To Funds - Refuse Operat 9,597.51 09/15/2022 091522 091522
APP 5001-00-000-00-00-109000- Due From Funds - Cash Pool 9,597.51 09/15/2022 091522 091522
APP 0000-00-000-00-00-209036- Due To Funds - Wastewtr Operat 3,415.73 09/15/2022 091522 091522
APP 5000-00-000-00-00-109000- Due From Funds - Cash Pool 3,415.73 09/15/2022 091522 091522
APP 0000-00-000-00-00-209042- Due To Funds - Rail Operat 173.35 09/15/2022 091522 091522
APP 5006-00-000-00-00-109000- Due From Funds - Cash Pool 173.35 09/15/2022 091522 091522
APP 0000-00-000-00-00-209006- Due To Funds - TDA - Streets 38,484.20 09/15/2022 091522 091522
APP 0204-00-000-00-00-109000- Due From Funds - Cash Pool 38,484.20 09/15/2022 091522 091522
APP 0000-00-000-00-00-209039- Due To Funds - Transit Operat 108.88 09/15/2022 091522 091522
APP 5003-00-000-00-00-109000- Due From Funds - Cash Pool 108.88 09/15/2022 091522 091522
APP 0000-00-000-00-00-209009- Due To Funds - RMRA 1,535.00 09/15/2022 091522 091522
APP 0207-00-000-00-00-109000- Due From Funds - Cash Pool 1,535.00 09/15/2022 091522 091522
APP 0000-00-000-00-00-209032- Due To Funds - LLMD - 001-2015 5,485.91 09/15/2022 091522 091522
APP 0808-00-000-00-00-109000- Due From Funds - Cash Pool 5,485.91 09/15/2022 091522 091522
APP 0000-00-000-00-00-209024- Due To Funds - LLMD - 001-2002 10.51 09/15/2022 091522 091522
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 29 ends

JOURNAL ENTRIES TO BE CREATED

YEAR PER JNL

SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT
EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC
APP 0800-00-000-00-00-109000- Due From Funds - Cash Pool 10.51 09/15/2022 091522 091522
APP 0000-00-000-00-00-209026- Due To Funds - LLMD - 002-2005 20.54 09/15/2022 091522 091522
APP 0802-00-000-00-00-109000- Due From Funds - Cash Pool 20.54 09/15/2022 091522 091522
APP 0000-00-000-00-00-209027- Due To Funds - LLMD - 003-2005 262.62 09/15/2022 091522 091522
APP 0803-00-000-00-00-109000- Due From Funds - Cash Pool 262.62 09/15/2022 091522 091522
APP 0000-00-000-00-00-209035- Due To Funds - LLMD - 001-2009 63.19 09/15/2022 091522 091522
APP 0811-00-000-00-00-109000- Due From Funds - Cash Pool 63.19 09/15/2022 091522 091522
APP 0000-00-000-00-00-209034- Due To Funds - LLMD - 001-1998 21.26 09/15/2022 091522 091522
APP 0810-00-000-00-00-109000- Due From Funds - Cash Pool 21.26 09/15/2022 091522 091522
APP 0000-00-000-00-00-209040- Due To Funds - Telecom Operat 1,204.51 09/15/2022 091522 091522
APP 5004-00-000-00-00-109000- Due From Funds - Cash Pool 1,204.51 09/15/2022 091522 091522
APP 0000-00-000-00-00-209031- Due To Funds - LLMD - 002-2007 58.70 09/15/2022 091522 091522
APP 0807-00-000-00-00-109000- Due From Funds - Cash Pool 58.70 09/15/2022 091522 091522
APP 0000-00-000-00-00-209025- Due To Funds - LLMD - 001-2005 9.86 09/15/2022 091522 091522
APP 0801-00-000-00-00-109000- Due From Funds - Cash Pool 9.86 09/15/2022 091522 091522
SYSTEM GENERATED ENTRIES TOTAL 464,055.06 464,055.06
JOURNAL 2023/03/284 TOTAL 928,110.12 928,110.12
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 30 ends

JOURNAL ENTRIES TO BE CREATED

FUND YEAR PER JNL EFF DATE DEBIT CREDIT

ACCOUNT ACCOUNT DESCRIPTION
0000 Pooled Cash Fund 2023 3 284 09/15/2022
0000-00-000-00-00-100001- Cash: Mission Bank Acct#7135 464,055.06 0000-00-000-00-00-209001- Due To Funds - Gen Fund 192,698.62 0000-00-000-00-00-209006- Due To Funds - TDA - Streets 38,484.20 0000-00-000-00-00-209009- Due To Funds - RMRA 1,535.00
0000-00-000-00-00-209024- Due To Funds - LLMD - 001-2002 10.51 0000-00-000-00-00-209025- Due To Funds - LLMD - 001-2005 9.86 0000-00-000-00-00-209026- Due To Funds - LLMD - 002-2005 20.54 0000-00-000-00-00-209027- Due To Funds - LLMD - 003-2005 262.62 0000-00-000-00-00-209031- Due To Funds - LLMD - 002-2007 58.70 0000-00-000-00-00-209032- Due To Funds - LLMD - 001-2015 5,485.91 0000-00-000-00-00-209034- Due To Funds - LLMD - 001-1998 21.26 0000-00-000-00-00-209035- Due To Funds - LLMD - 001-2009 63.19 0000-00-000-00-00-209036- Due To Funds - Wastewtr Operat 3,415.73 0000-00-000-00-00-209037- Due To Funds - Refuse Operat 9,597.51 0000-00-000-00-00-209038- Due To Funds - Water Operat 154,931.75 0000-00-000-00-00-209039- Due To Funds - Transit Operat 108.88 0000-00-000-00-00-209040- Due To Funds - Telecom Operat 1,204.51 0000-00-000-00-00-209042- Due To Funds - Rail Operat 173.35 0000-00-000-00-00-209046- Due To Funds - Facility Maint 21,434.35 0000-00-000-00-00-209047- Due To Funds - Vehicle Maint 1,376.72 0000-00-000-00-00-209049- Due To Funds - Info Tech 33,161.85 FUND TOTAL 464,055.06 464,055.06
0100 General Fund 2023 3 284 09/15/2022
0100-00-000-00-00-109000- Due From Funds - Cash Pool 192,698.62 0100-00-000-00-00-205000- Accts Payable 192,698.62
FUND TOTAL 192,698.62 192,698.62
0204 Tran. Dev. Act - Streets 2023 3 284 09/15/2022
0204-00-000-00-00-109000- Due From Funds - Cash Pool 38,484.20 0204-00-000-00-00-205000- Accts Payable 38,484.20
FUND TOTAL 38,484.20 38,484.20
0207 Road Maint & Rehab. Acct 2023 3 284 09/15/2022
0207-00-000-00-00-109000- Due From Funds - Cash Pool 1,535.00 0207-00-000-00-00-205000- Accts Payable 1,535.00
FUND TOTAL 1,535.00 1,535.00
0800 LLMD - 001-2002 2023 3 284 09/15/2022
0800-00-000-00-00-109000- Due From Funds - Cash Pool 10.51 0800-00-000-00-00-205000- Accts Payable 10.51
FUND TOTAL 10.51 10.51
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 31 ends

JOURNAL ENTRIES TO BE CREATED

FUND YEAR PER JNL EFF DATE DEBIT CREDIT

ACCOUNT ACCOUNT DESCRIPTION
0801 LLMD - 001-2005 2023 3 284 09/15/2022
0801-00-000-00-00-109000- Due From Funds - Cash Pool 9.86 0801-00-000-00-00-205000- Accts Payable 9.86
FUND TOTAL 9.86 9.86
0802 LLMD - 002-2005 2023 3 284 09/15/2022
0802-00-000-00-00-109000- Due From Funds - Cash Pool 20.54 0802-00-000-00-00-205000- Accts Payable 20.54
FUND TOTAL 20.54 20.54
0803 LLMD - 003-2005 2023 3 284 09/15/2022
0803-00-000-00-00-109000- Due From Funds - Cash Pool 262.62 0803-00-000-00-00-205000- Accts Payable 262.62
FUND TOTAL 262.62 262.62
0807 LLMD - 002-2007 2023 3 284 09/15/2022
0807-00-000-00-00-109000- Due From Funds - Cash Pool 58.70 0807-00-000-00-00-205000- Accts Payable 58.70
FUND TOTAL 58.70 58.70
0808 LLMD - 001-2015 2023 3 284 09/15/2022
0808-00-000-00-00-109000- Due From Funds - Cash Pool 5,485.91 0808-00-000-00-00-205000- Accts Payable 5,485.91
FUND TOTAL 5,485.91 5,485.91
0810 LLMD - 001-1998 2023 3 284 09/15/2022
0810-00-000-00-00-109000- Due From Funds - Cash Pool 21.26 0810-00-000-00-00-205000- Accts Payable 21.26
FUND TOTAL 21.26 21.26
0811 LLMD - 001-2009 2023 3 284 09/15/2022
0811-00-000-00-00-109000- Due From Funds - Cash Pool 63.19 0811-00-000-00-00-205000- Accts Payable 63.19
FUND TOTAL 63.19 63.19
5000 Wastewater Operations 2023 3 284 09/15/2022
5000-00-000-00-00-109000- Due From Funds - Cash Pool 3,415.73 5000-00-000-00-00-205000- Accts Payable 3,415.73
FUND TOTAL 3,415.73 3,415.73
5001 Refuse Operations 2023 3 284 09/15/2022
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 32 ends

JOURNAL ENTRIES TO BE CREATED

FUND YEAR PER JNL EFF DATE DEBIT CREDIT

ACCOUNT ACCOUNT DESCRIPTION
5001-00-000-00-00-109000- Due From Funds - Cash Pool 9,597.51 5001-00-000-00-00-205000- Accts Payable 9,597.51
FUND TOTAL 9,597.51 9,597.51
5002 Water Operations 2023 3 284 09/15/2022
5002-00-000-00-00-109000- Due From Funds - Cash Pool 154,931.75 5002-00-000-00-00-205000- Accts Payable 154,931.75
FUND TOTAL 154,931.75 154,931.75
5003 Transit Operations 2023 3 284 09/15/2022
5003-00-000-00-00-109000- Due From Funds - Cash Pool 108.88 5003-00-000-00-00-205000- Accts Payable 108.88
FUND TOTAL 108.88 108.88
5004 Telecommunications Operations 2023 3 284 09/15/2022 5004-00-000-00-00-109000- Due From Funds - Cash Pool 1,204.51 5004-00-000-00-00-205000- Accts Payable 1,204.51
FUND TOTAL 1,204.51 1,204.51
5006 Rail Operations 2023 3 284 09/15/2022
5006-00-000-00-00-109000- Due From Funds - Cash Pool 173.35 5006-00-000-00-00-205000- Accts Payable 173.35
FUND TOTAL 173.35 173.35
5100 Facility Maintenance 2023 3 284 09/15/2022
5100-00-000-00-00-109000- Due From Funds - Cash Pool 21,434.35 5100-00-000-00-00-205000- Accts Payable 21,434.35
FUND TOTAL 21,434.35 21,434.35
5101 Vehicle Maintenance 2023 3 284 09/15/2022
5101-00-000-00-00-109000- Due From Funds - Cash Pool 1,376.72 5101-00-000-00-00-205000- Accts Payable 1,376.72
FUND TOTAL 1,376.72 1,376.72
5103 Information Technology 2023 3 284 09/15/2022
5103-00-000-00-00-109000- Due From Funds - Cash Pool 33,161.85 5103-00-000-00-00-205000- Accts Payable 33,161.85
FUND TOTAL 33,161.85 33,161.85
City of Shafter

A/P CASH DISBURSEMENTS JOURNAL
Report generated: 09/15/2022 11:36
User: 5292blopez
Program ID: apcshdsb

Page 33 ends

JOURNAL ENTRIES TO BE CREATED

FUND DUE TO DUE FR
0000 Pooled Cash Fund 464,055.06
0100 General Fund 192,698.62
0204 Tran. Dev. Act - Streets 38,484.20
0207 Road Maint & Rehab. Acct 1,535.00
0800 LLMD - 001-2002 10.51
0801 LLMD - 001-2005 9.86
0802 LLMD - 002-2005 20.54
0803 LLMD - 003-2005 262.62
0807 LLMD - 002-2007 58.70
0808 LLMD - 001-2015 5,485.91
0810 LLMD - 001-1998 21.26
0811 LLMD - 001-2009 63.19
5000 Wastewater Operations 3,415.73
5001 Refuse Operations 9,597.51
5002 Water Operations 154,931.75
5003 Transit Operations 108.88
5004 Telecommunications Operations 1,204.51
5006 Rail Operations 173.35
5100 Facility Maintenance 21,434.35
5101 Vehicle Maintenance 1,376.72
5103 Information Technology 33,161.85
TOTAL 464,055.06 464,055.06
** END OF REPORT - Generated by Brenda Lopez **
munts' Gity of Shafter ":h
DETAIL PROOF . FINAL REPORT
Pay Period 07123122 To 08/05/22
hIARMNT: 08L222 PAYROLL TYPE: BIWEEKLY
@
Totalt-otal .rotal
rota'l -rotal
-rotal
Report generated:
employee checks: emblovee AcH Transactions :
vehdoi checks this payroli: vendor checks other oavrolls:
vendor electronic rrhnSfers this payro'll: vendor Electronic Transfers other payrolls:
cHEcK DArE: 08/L2/2022
transfers this payro'll : Transfers other payrolls:

0.00 789. 90

0.00 0.000.000.000.00

0. o0
253
.rotal vendor .rel .rotal vendor Tel
@
rota'l relephone Transfers
.rotal rmp'loyee,/employer (Check type = no check) total Pay Escrow: Total Escrow Balance: .rotal tnvoices this payroll: Total rnvoices other payrolls: rotal checks,/rnvoi ces,/err/te'l ephone transfers this payro'll (deferred) : rotal chetks/rnvo'ices/:rr,/relephone transfers other payrolls (deferred) : 20,402.44 0.00 0.00 L75,297 .43

0.00 0.00
80,0l_7.95
t,oo4.a2
** END oF REpoRT - Generated by t-ety Lara **
APPROVED BY:

O8/LU2O22 08:40
52921.1ara prpyddpf
i€: r.i I ::: :':-i :i! ;- I '.,1-t ' ,-: ,,.,:

User i
Program ID

Page 44 ends

City of Shafter
DETAIL PROOF . FINAL REPORTPay Period 081061227o 08119122 WARRANT: 082622 PAYROLL TYPE: BIWEEKLY
@ -rotal
tota'l -rotal-rotalTotal -rotal
-rotal-rotal
cHEcK DATE: 08/26/2022
VEVe
ndor telephone Transfers this payrol ndor Tel one Transfers other payrot:11s Employee checks: rmployee AcH Transactions: vendor checks this payroll: vendor checks other payrolls:

Vendor Electronic Transfers th'is payroll: vendor rlectronic Transfers other payrolls:
@ .rotal telephone Transfers:

0.00 2s1,801.71 0.00

0.000.000.00

0.000.00

0.00 251,983 .98
8]-,022.07

0.000.00
Total Employee/emp'loyer (check type = ruo check): 20, 309. 50 0.00

0.00 S: 'lephone transfers1 ephone transfers
-*!Y END OF REPORT - Generated by:acqueline De La Torre ** ED BY:

Report generated: [Jser: 08/2s/2022 5292i del ato prpyddpf Rerrj.il nl it.l 'ul I l-;-,lri I it,.::

Program ID:
tLt4L
rre Page 43
munts'
a City of Shafter ":h \, L ?::l- ..: a
DETAIL PROOF . FINAL REPORT
Pay Period 09101122To 0913O122
WARMNT: O9OT22 PAYROLL TYPET COUNCIL cHEcK DATE: O9/OL/2O22

DEDUCTION SUMMARY
;iD l'/Pi ENJ TCTAL A\-.iT a,t:?l El c.r,!c
1000
1_1003000
4000
8300
83109999
FICA

MEDICARE
FTT

SITCA SDICA UI

DIRECT DEP
150.3s 1_50.35

35.17 0. o00.00

0.00 50.95

0.00 35.17

16.25 0.00

26.70 0.00

71.53 70
33 300
70 2,425.OO
2,425.OO2,425.0O2,425.002,425.0O
2,425.00 2,425.00
300.70

70.3416.25

0.00 26.70

50.95 x L2.40% =
x 2.9O% =
1,0 1",071.53
Total .rotal
rotal total .rotal
"rotal
tota'l -rotal
Emolovee checks: pmbloyee AcH Transactions :
vendor checks this payroll: vendor checks other payrol'ls: vendor Electronic Transfers th'is payroll: vendor Electronic Transfers other payroils vendor -relephone Transfers this payroll: vendor relephone Transfers other payrolls:

0.00 1,071_.53 0.00

0.00 0.000.000.00

0.00 0.00
@
rotal relephone Transfers
total employee/employer (check type = tto check) -fotal Pav Escrow: rotal pstrow Balance: Total rnvoi ces thi s payrol 1 : 'rotal tnvoices other payrolls: total chec ks,/rnvoi ces,/rrtlrel ephone t ran s fe rs this payroll (deferred): rotal chetk-s,/rnvoi ces,/E FTlTel ephone tran sf e rs APPROVED BY: 0.00 0.00 0 .00 464.94 0.00 0,00 Report generated:

User:

Program ID:

A8/30/2022 08;38
52921 l ara
prpyddpf

Page 4 ends

ioi-i 3{a .17
J Ci',J:s
0a0;1
tre ,.', .CS5
IJ , rrj ;av rcl i lr .r:rr I i':i es
Gity of Shafter
DETAIL PROOF . FINAL REPORTPay Period 08120122To 09102122 WARMNT: 090922 PAYROLL TYPE: BIWEEKLY
t.otal total -rotal
.rotal
rotal total total total
Report generated: User:Program ID:
09/08/2022 LltL4
5292'1 1 ara prpyddpf
cHEcK DATE: 09/09/2022
Emolovee checks:embloyee AcH Transactions : vendor checks this payroll:
vendor checks other payro'l1s:
vendor electronic Transfers this payroll:vendor Electronic .rransfers other payrolls vendor telephone Transfers this payro'l'l: vendor relebhone Transfers other payrolls:

0.00 26L,870.76 0.00

0.000.00

0.000.000.00

0.00 0 .00
@
total telephone Transfers
rotal emp'loyee/employer (check type = Ho check) total eay Escrow: Total Escrow Balance: total tnvoi ces thi s payrol 1 : Total rnvoices other payrolls: rotal checks,/rnvoi ces/errlrelephone transfers this payroll (deferred): rotal chetki,/rnvoi ces,/Err,/relephone transfers other payro'lls (deferred) :
** END oF REpoRT - cenerated by t-ety Lara **
2L
a7L
89 0000
11 00
572
0 0
577
0 79,01L.68
APPROVED BY:

Ava l 82L.25

70.76 i'olI r-iabi'l itie

Page 42 ends

OVERTIME REPORT FOR PERIOD ENDING: 08/26/22
Police Department OVERTIME HOLIDAY HOL STRT CTOT Total Hrs Amount ALEGRIA, E 12.00 0.00 0.00 0.00 12.00 s 519.96
CAMACHO, R 6.00 0.00 0.00 0.00 5.00 s 2s0.s7
CAMACHO, RENE 0.00 0.00 0.00 0.00 0.00 s
CARDWELL, K 15.00 0.00 0.00 0.00 15.00 S s99.20
CARRASCO, RACHEL 283.29 0.00 0.00 0.00 283.29 s 283.29
CAUDILLO, S 12.00 0.00 0.00 0.00 12.00 s 588.s4
DAVALOS, EDGAR 72.50 0.00 0.00 0.00 72.50 5 4,L07.67
DIAZ L0.50 0.00 0.00 0.00 1_0.50 s 520.1L
DRAUCKER 26.50 0.00 0.00 0.00 26.50 s 1,61s.94
FERNANDEZ 3.00 0.00 0.00 0.00 3.00 s 203.52
FRYE, DALE 0.00 0.00 0.00 0.00 0.00 s
GARCIA, J 42.00 0.00 0.00 0.00 42.00 s 2,158.09
GOMEZ, K 2.00 0.00 0.00 0.00 2.00 s 60.68
GOMEZ, M 25.00 0.00 0.00 0.00 25.00 S t,tstst
GRAVES 22.00 0.00 0.00 0.00 22.00 S 1,161.75
GREEN 0.00 0.00 0.00 0.00 0.00 s
GREER 0.00 0.00 0.00 0.00 0.00 s
HOPKINS 0.00 0.00 0.00 0.00 0.00 s
KING, T 15.00 0.00 0.00 0.00 15.00 s 813.8s
KINKADE, S 19.00 0.00 0.00 0.00 19.00 s 1,032.82
LOPEZ s.00 0.00 0.00 0.00 s.00 S 366.82
MARTINEZ, G 0.00 0.00 0.00 0.00 0.00 s
MARTINEZ, MOISES 13.00 0.00 0.00 0.00 13.00 S goz.tt
MARTINEZ-GERVACIO L.00 0.00 0.00 0.00 1.00 s 29.32
MCCALEB 11.00 0.00 0.00 0.00 11.00 S 399.47
MILLIGAN 0.00 0.00 0.00 0.00 0.00 s
MORA 1.00 0.00 0.00 0.00 1.00 s 76.55
MORRIS 0.00 0.00 0.00 0.00 0.00 s
NOUSCH 12.00 0.00 0.00 0.00 12.00 s 5s1.09
NUNEZ 23.50 0.00 0.00 0.00 23.50 S L,277.43
PAILING 17.00 0.00 0.00 0.00 17.00 S eg+.rs
PUENTE s5.00 0.00 0.00 0.00 55.00 s 3.248.2L
RIDDICK 4.00 0.00 0.00 0.00 4.00 s 209.63
ROMERO, C 8.00 0.00 0.00 0.00 8.00 s 434.06
SANCHEZ, M 0.00 0.00 0.00 0.00 0.00 s
SERJEANT, M 4.50 0.00 0.00 0.00 4.50 5 2L6.07
STEPHENS 0.00 0.00 0.00 0.00 0.00 s
YORK, J 1.1.00 0.00 0.00 0.00 11.00 s 627.96
YOSHIKAWA, P 7.50 0.00 0.00 0.00 7.50 S sor.rs
Total 727.29 0.00 0.00 0.00 727.29 s 25,648.78
OVERTIME REPORT FOR PERIOD ENDING: 08/26/22
Public Works OVERTIME HOLIDAY HOL STRT CTOT Total Hrs Amount ACOSTA 0.00 0.00 0.00 0.00 0.00 s
ALDACO 0.00 0.00 0.00 0.00 0.00 s
ALVAREZ 0.00 0.00 0.00 0.00 0.00 s
ALVIDREZ 1.00 0.00 0.00 0.00 1.00 5 33.84
ARELLANO 0.00 0.00 0.00 0.00 0.00 s
ARMSTRONG 0.00 0.00 0.00 0.00 0.00 $
BAREL.A 0.00 0.00 0.00 0.00 0.00 s
BROWN 8.75 0.00 0.00 0.00 8.75 s 413.96
CASTRO 0.00 0.00 0.00 0.00 0.00 s
CRUZ 0.00 0.00 0.00 0.00 0.00 s
FLORES 0.00 0.00 0.00 0.00 0.00 s
IBARRA 0.00 0.00 0.00 0.00 0.00 s
MARTINEZ. J 0.00 0.00 0.00 0.00 0.00 s
MEADORS 0.00 0.00 0.00 0.00 0.00 s
OBRIEN 6.00 0.00 0.00 0.00 6.00 s 332.91
PALLARES 0.00 0.00 0.00 0.00 0.00 s
PENA 4.00 0.00 0.00 0.00 4.00 s 153.96
RUBIO, BRIDGETT 0.00 0.00 0.00 0.00 0.00 s
VASQUEZ 0.00 0.00 0.00 0.00 0.00 s
VERDUGO 0.00 0.00 0.00 0.00 0.00 s
ZAVALA 0.00 0.00 0.00 0.00 0.00 s
Total L9.75 0.00 0.00 0.00 L9.75 s 944.67
ENG OVERTIME HOL HOL STRT CTOT Total Hrs Amount
GARCIA, C 0.00 0.00 0.00 0.00 0.00 s
DELGADILLO, J 0.25 0.00 0.00 0.00 0.2s s 9.80

0.00 0.00 0.00 0.00 0.00 s
Total: 0.25 0.00 0.00 0.00 0.25 s 9.80
IT OVERTIME HOL HOL STRT CTOT Total Hrs Amount
HERRERA, A 6.2s 0.00 0.00 0.00 6.25 s 324.36
Total: 6.25 0.00 0.00 0.00 6.25 S 324.36
BUILDING / INSP OVERTIME HOL HOL STRT CTOT Total Hrs Amount coMsTocK 4.00 0.00 0.00 0.00 4.00 5 244.s3
HITCHCOCK 5.s0 0.00 0.00 0.00 6.50 s 4s6.s7
MATHIS, C 0.00 0.00 0.00 0.00 0.00 s
MARQUEZ, M 0.00 0.00 0.00 0.00 0.00 s
NOLAN,A 0.00 0.00 0.00 0.00 0.00 s
VARGAS, R 0.00 0.00 0.00 0.00 0.00 s
Total: 10.50 0.00 0.00 0.00 10.50 5 741.L0

MINUTES OF THE SPECIAL MEETING OF THE

SHAFTER CITY COUNCIL
COUNCIL CHAMBER, 336 PACIFIC AVENUE
MEETING HELD IN.PERSON AND VIA ZOOM AND LIVESTREAM TO YOUTUBE TUESDAY, AUGUST 16, 2022
Pursuant to AB 361 Issued by Governor Gavin Newsom on September 20, 2021and, to the extent applicable, Government Code Section 54953(e), this meeting was held as a Virtual Meeting viaZoom and livestreaming on YouTube Live.

CALL TO ORDER: 6:00 P.m'
ROLL CALL:
pRESENT (In-Person): Mayor Prout, Mayor Pro Tem Givens, and Council Members Alvarado, Espinoza, and Lopez. Also present: City Manager Gonzalez, Assistant to Chief of Police Bumett, Ciiy Rttorney Martinez, City Clerk Pallares, IT Systems Manager Rubio, and Interim Public Works Director Torres. (Via Zoom): Planning Director Esselman, Building Official Fidler, Education partnership Director Franz,Economic Development Director Meadows, Administrative Services Director Sanchez, and Community Engagement Manager Zermeno' APPROVAL OF AGENDA:

MovED (cntnNs) AND )EC)NDED (LopEZ) C)UNCIL APPR)VED THE AGENDA AS PRESENTED. MoTIoN CARNED BY THE FOLLOWING VOTE:

AYES: ALVAMDO, ESPINOZA, GIVENS, LOPEZ, AND PROUT.

NAYS: NONE.

ABSENT: NONE.

ABSTENTIONS: NONE.

MANAGEMENT REPORTS:

LEAGUE OF CALIFORNIA CITIES ANNUAL CONFERENCE PROPOSED
BYLAWS AMENDMENTS: City Clerk Pallares made introductory comments.

MovED (cruaNs) AND SEC)NDED (rornz) C)UNCIL DISCUSSED AND DETERMINED A POSITION To SUPP7RT THE PRESENTED BYLAWS AMENDMENTS TO BE CONSIDERED AT THE UPCOMING 2022 TN'ACUN OF CALIFOKN]A CITIES ANNUAL CONFERENCE. MOTION CARRIED BY THE FOLLOITING VOTE:

AYES: ALVARADO, ESPINOZA, GIVENS, LOPEZ' AND PROUT.

NAYS: NONE.

ABSENT: NONE,
ABSTENTIONS: NONE.

ADJOURNMENT:

MovED (cvaws) AND ;ECzNDED (Lornz) couNCIL ADJIuRNED THE MEETING 'qr 6:59 P.M. MorIoN CARNED WITH NO OPPOSITION.

Cathy L. Prout, Mayor
ATTEST:
4 Y azmina Pallares, City Clerk

MINUTES OF THE REGULAR MEETING OF THE

SHAFTER CITY COUNCIL
couNCIL CHAMBER, 336 PACTFIC AVENUE
MEETING HELD IN.PERSON AND VTAZOOM AND LIVESTREAM TO YOUTUBE TUESDAY, AUGUST 16, 2022
Pursuant to AB 361 Issued by Governor Gavin Newsom on September 20r2021and, to the extent applicable, Government Code Section 54953(e)' this meeting was held as a Virtual Meeting viaZoom and livestreaming on YouTube Live.

CALL TO ORDER: 6:00 p.m.

ROLL CALL:

PRESENT (In-Person): Mayor Prout, Mayor Pro Tem Givens, and Council Members Alvarado, Espinoza, andLopez. Also present: City Manager Gonzalez, Assistant to Chief of Police Burnett, City Attorney Martinez, City Clerk Pallares, IT Systems Manager Rubio, and Interim Public Works Director Torres. (Via Zoom): Planning Director Esselman, Building Official Fidler, Education Partnership Director Franz,Economic Development Director Meadows, Administrative Services Director Sanchez, and Community Engagement Manager Zetmeno.

PLEDGE OF ALLEGIANCE:

INVOCATION:

Council Member Espinoza
Mayor Pro Tem Givens
APPROVAL OF AGENDA:

MovED (cvnNs) AND ;EC)NDED (rcroz) couNCIL APPR)YED THE AGENDA AS PRESENTED. MorIoN CARRIED BY THE FOLLOWING VOTE:

AYES: ALVAMDO, ESPINOZA, GIVENS, LOPEZ, AND PROUT.

NAYS: NONE.

ABSENT: NONE.

ABSTENTIONS: NONE.

PRESENTATION:

Paola llescas, Patricia Perez, Lorena Castrejon, and VeronicaPerez, with Latino Coalition for a Healthy California, gave a presentation on the Mannel Park Clean-up Event; and requested to meet with the City Council and Staff on September 2,2022 from 4:00 p.m. to 6:00 p.m.

PUBLIC COMMENT:

Jeff Martin, with American Refuse, provided an update on the rollout of the 3-cart trash can system throughout the City.
1 COUNCIL ANNOUNCEMENTS AND REPORTS:

Minutes of the Shafter CitY Council
August 16,2022
Page2
On August 8,2022,Mayor Prout, Council Members Alvarado, Espinoza, andLopezattended the Stuff the Bus event at the Dollar General parking lot'
on August 8,2022,Mayor Prout attended an AB617 meeting viazoom.

On August 10, 2022, Council Member Espinoza attended the Oath of Office ceremony for Building Intern Natalie Sanchez at the City Hall courtyard.

On August 13-14,2022, Council Member Lopezattended a softball tournament with the Brawlers in Santa Maria.

On August 15,2022,Mayor Prout and Mayor Pro Tem Givens, along with staff, attended the City Hall Selfie Day that was open to the community.

CONSENT CALENDAR:

1. 2.

J.

4. 5.

6. Approve General Checks: August 4,2022, August 11,2022.

Approve Payroll: August 1,2022.

Approve Overtime Report: Iuly 2022.

Approve Minutes: August 2,2022.
approve Special Event Permit: Harvest Festival, Shafter Missionary Baptist Church, Veterans Park, October 22,2022.

Authorize the addition of one (l) Senior Police Officer position for the purpose of reintroducing a school resource officer to the Richland School District; and approve a FY 2022-2023 budget amendment one-time appropriation inthe amount of $77,000 to provide patrol vehicle and personal officer equipment for the proposed position.

Approve the agreement and allow the City Manager to sign for a School Resource Officer position at the Richland School District.
pind th" requested action is exempt from the California Environmental Quality Act; approve the Well No. 22 Well Drilling Project Engineering Proposal submitted by Dee faipar and Associates; and authorize the Public Works Director to award a professional services contract for work covered under said proposal.

Find the requested action is exempt from the California Environmental Quality Act; and authorize the installation of stop signs for all directions of vehicular travel at the intersection of Soaring Heights Way and Cotton Creek Drive.

Find the requested action is exempt from the California Environmental Quality Act; approve sole source cost proposal for 350 water meters with radio transmitters from Badger Meter valued at$104,542; approve a cost proposal for 350 water meter boxes and lids from Ferguson valued at $32,390; and authorize the Public Works Director to award the prr..hur. of water meter assemblies as covered in said proposals for a total value of $136,932.

Ratifu a professional services agreement with Government Technology Group in the amount of $34,365 for the citywide Broadband Expansion Project.

Adopt Resolution 2884,a Resolution ofthe City Council of the City of Shafter authorizing the continued need for a teleconferencing option for City Council, Commission and Committee meetings pursuant to Assembly Bill 361.

Cancel the regularly scheduled City Council meeting of Septembet 6,2022. 7 8
9 l0

11. t2
l3
I
Minutes of the Shafter City Council
August 16,2022

Page 3 ends

14. Find the requested action is exempt from the California Environmental Quality Act; and, provide direction to staff regarding the proposed project for funding allocation from the State of Good Repair funding source for Fiscal Year2022-2023.

MovED (ctrnws) AND SECzNDED (Lorzz) couNCIL AppRovED THE IoNSENT cALENDAR AS PRESENTED.

MOTION CARRIED BY THE FOLLOWING VOTE:

AYES: ALVAMDO, ESPINOZA, GIVENS, LOPEZ, AND PROUT.

NAYS: NONE.

ABSENT: NONE.

ABSTENTIONS: NONE.

MANAGEMENT REPORTS:
2022 POSO STREET AND STORM DRAIN IMPROVEMENT PROJECT AWARI) OF CONTRACT: Interim Public Works Director Torres made introductory comments.

MovED (ctvnws) AND SECzNDED (rorzz) couNCrL FrND THE RE7UESTED ACTIoN IS EXEMPT FRoM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT; ACCEPTED THE BIDS RECE]VED FORTHE 2022 POSO STREET AND STORM DRAIN IMPROVEMENT PROJECT; AUTHORIZED THE C]TY ENGINEER TO ISSUE A NOTICE OF AWARD AND NOTICE TO PROCEED TO GRIFFITH COMPANY; AND AUTHONZED A FY 2022-2023 AUPCET AppRopRrArroN oF $300,000 tu UNALLq:ATED srATE GAS TAX oR TRANSPqRTATIzN DEVELoPMENT ACT FT]NDS TO CAPITAL IMPROVEMENT PROGMM PROJECT#STOOO3O. MOTION CARNED BY THE FOLLOWING VOTE:

AYES: ALVARADO, ESPINOZA, GIVENS, LOPEZ, ANDPROUT.

NAYS: NONE.

ABSENT: NONE.

ABSTENTIONS: NONE.

DISCUSSION AND DIRECTION FOR PLANNING COMMISSION
APPOINTMENT PROCESS: City Clerk Pallares made introductory comments.

COUNCIL DISCUSSED AND PROV]DED DIRECT]ON TO STAFF TO DRAFT A LIST OF QUESTIONS FOR THE PLANNING COMMISSION APPOINTMENT INTERV]EW PROCESS TO REVIEW BOTH LETTER OF INTEREST AND ADDITIONAL QUESTIONS FOR EACH CANDIDATE.

APPROVAL OF FIRST AMENDMENT OF CITY MANAGER EMPLOYMENT
AGREEMENT EXTENSION: City Attorney Martine z made introductory comments.

MovED (ctreus) AND SECzNDED (maz) couNCIL FIND THE ACTIoN IS Nor SUBJECT To rHE

CALIFORNIA ENVIRONMENTAL QUALITY ACT,' AND APPROVED THE FIRST AMENDMENT TO THE CITY MANAGER EMPLOYMENT AGREEMENT WITH GABNEL A, GONZALEZ. MOTION CARRIED BY THE FOLLOIT]NG VOTE:

AYES: ALVARADO, ESPINOZA, GIVENS, LOPEZ, ANDPROUT.

NAYS: NONE.

ABSENT: NONE.

ABSTENTIONS: NONE.
2 J
Minutes of the Shafter City Council
August 16,2022

Page 4 ends

CITY MANAGER COMMENTS AND REPORTS: City Manager Gonzalezreported City Hall will be closed on September 5, 2022 in observance of Labor Day; reminded Council the League of California Cities Annual Conference and Expo is scheduled to take place September 7-9; and the next regular City Council meeting is scheduled for September 20,2022.

DEPARTMENT DIRECTOR COMMENTS AND REPORTS: InteriM PUbIiC WOrKS DiTECtOT Torres reported the annual road resurfacing project began on September 16 and will continue for the next five weeks.

ADJOURNMENT
MovED (cvr,Ns) AND IECzNDED (Lornz) couNCIL ADJIURNED THE MEETING AT 6:59 P.M. MorIoN

CARNED WITH NO OPPOSITTON,
Cathy L. Prout, Mayor
ATTEST:

Y azmina Pallares, City Clerk
336 Pacific Avenue, Shafter CA93263
Tel: (661) 746-5002 'Fax (661) 746'9125
Emarl: facilitvrentals@ shafter,com

APPLICATION FOR SPECIAL EVENT PERMIT
Shafter Municipal Code 17.02.100 permits short-term placement of activities on privately or publicly owned property with appropriate regulations so that such activities are compatible with the surrounding areas' The City's project Assistance Team is authorized to approve a special event permit if the event is expected to accommodate less than 50 persons. City Council approval is required if more than 50 persons will attend.

Complete applications must be received a minimum of 30 days prior to the event. If errors or omissions are discovered, ihe application wifl be deemed incomplete and will be retumed to the applicant for revision. Acceptance of your application is not a guarantee of approval. After the initial intake of your completed application, other City permits may be required. Application Fees are due at the time of submittal and are non-refundable.

APPLICANT: Name (Contact Persoh): Mark Scialabba or Kobie Carrasco Name of Business or Organization (if applicable):
lf Organizatron, what type: Iservice Club
Congregational Bible Church of Shafter
Mailing Address: 430 E Tulare Ave Shafter StateCA 93263 p6on"661-746-2187 Fax s6a1 secreta ry@cbcs h afte r. org TYPE OF'EVENT (concert, reception, paradeoparty, promotion, rally, wedding, parade, etc.) Worship Service followed by lunch
f,l Other:

DATE(S) OF EVf,NT:

TIME OF EVENT:

TIME SET-UP STARTS:

NUMBER OF ATTENDEES:
rrom:
(OCl q. )>>
pro-. 8:00 am
8:00 am
100
1o. 3:00 pm
TrME SLEAN-Up ENDS: 3:00 Pm
ADMISSION FEE? Yes t/ No
LOCATION OF EVENT: Mannel Park Gazebo and surrounding area Name of
Name of Property Owner: City of Shafter
FULL DESCRIPTION OF ACTIVITY: (check all that applD
flAmplified speech or music r' Food Beverages served/sold** nBunn"rs/Flags to be used flruUtt Dance !street closure (attach map) !narricaOes (attach map) t/ Equipment to be brought in (specify below) Ifooa Vendors *xa coov of the Communitv Event Permit issued bv Kern Coantv Public Health must be attached f Alcoholic Beverage *x the event orsanizer must obtain an ABC licensed issued bv Alcoholic Beverase Control EVENT ORGANIZERS ARE RESPONSIBLE FOR ENSARING ALL VENDORS ARE PROPERLY LICENSED.

AdditionalPertinentInformation(attachadditionalsheetifneceSsary):

Worship Service: Tables, chairs, food, amplified speech and music GENERAL REQUIREMENTS:

1. Execute a Hold Harmless Agreement.

2. Provide a Certificate of Insurance with an Endorsement for the Citv of Shafter, if required. See o'Insurance Requirement" below.

3. There shall be no disruption in normal vehicular traffic flow.

4. All City noise regulations must be observed.

5. Parking must be in authorized parking spaces only.

6. There shall be no alcoholic beverages at event without prior City Council approval.

7. Carefully observe Hours of Event, as stated on permit.

7. All set-up and clean-up is the responsibility of the permit-holder. Following the event, all facilities must be left in a clean and orderly condition.

8. If indicated, comply with any additional conditions that may have been imposed as Conditions of Approval following review of your application for a Special Event Permit.

9. Do not advertise your event until the application is approved.

10. Application fees are non-refundable.

INSURANCE REQAIREMENTS ONLY IF THE EVENT WILL BE HELD ON A CITY OWNED FACILITY OR ON CITY RIGHT-OF-WAY:

1. Open to the Public

2. Fundraising

3. More than 100 persons

4. Amplification

5. Alcohol to be served/sold
es
Yes
Yes
Yes
o
o
o
es
If any one or more of the boxes above are marked YES, a Certificate of Insurance must be filed two weeks prior to the event. The Certificate of Insurance alone is not an acceptable proof of coverage and must be accompanied by an Endorsement page naming: "The City of Shafter, it's Officers, Employees, City Council members, Agents, Boards and Commissions" as additional insured. The insurance coverage accepted is $1,000,000 per occurrence and $2,000,000 general aggregate.In addition, if Alcohol is present or sold, a host liquor liability in the amount of $2,000,000 per occurrence and S4,000,000 general aggregate must be produced.

The following Hold Harmless Agreement is also required:

This is to certify that
Congregational Bible Church of Shafter
agrees to indemnifz
and hold harmless the City of Shafter, its Employees, City Council members, Agents, Boards and Commisstons from and against any and all claims, liability loss, costs, damages, fees of attorneys, and other expenses which the City may sustain or incur by reason of, or in consequence of, the use of City streets and land, including but not limited to, sums paid on liability judgments in relation to use of land and streets.

Furthermore, I certifr that I am the applicant or authorized agent and that the information filed is true and correct to the best of my knowledge. I understand that additional Conditions of Approval may be imposed on my event by the Project Assistance Team or the City Council, and I agree to comply with any conditions that may be required.

Applicant's S Date:
08t26t2022
CHIEF OF POLICE: tr APProved with Conditions Listed Below tr Denied Date:
fu1nn o,"u
Signature:

PROJECT ANCE TEAM: with Conditions ListedBelow D Denied Signature: Date t ^?)-e
CITY COUNCIL: tr Approved tr Approved with Conditions Listed Below D Denied Signature Date:

CONDITIONS OF APPROVAL
As part of the approval process for a Special Event Permi! application, conditions may be imposed that are deemed rrecessary to ensure that the permit will be applied in accordance with the criteria outlined in the City Zoning Ordinance. These conditions mpy involve any factors affecting the operation of the temporary use or event. conditions of Approval include the following items circled:
l. provision of temporary parking facilities, including vehicular ingress and egress.

2. Regulation of nuisattce factors such as, but not limited to, prevention of glare or direct illumination of adjicent properties, noise, vibration, smoke, dirt, odors, gases, and heat.

3. Regulation of t.-potury buildings, structures, and facilities, including placement, height and size,location or equipment and open spaces including buffer areas and other yards.

4. Provision of sanitary and medical facilities.

5. Provision of solid waste collection and disposal.

6. Police and fire concerns.
7 . Provision of security and safety measures.
g. Regulation of operating hours and days, including limitation of the duration of the special event to a shorter time period than requested.
g. Submission of a performance bond or other surety device to assure that any temporary facilities or structures used for the proposed special event will be'removed from the site within a reasonable time following the event and that the property will be restored to its former conditions.

10. Submission of a site plan indicating any information required by the Zoning Ordinance.

11. A requirement that tile approval of the requested special event permit is contingent upon compliance with the Z}ningOrdinance and with other applicable provision of other ordinances, resolutions, or regulations.

12. Other rondition, that will ensure the operation of the proposed special event in an orderly and efficient intent and purpose of
ftpp'ou'a
manner and in accordance with the

13. Additional Conditions of Approval:
a
Ordinance.

C aot ^ t',
a a,_ c,t
-t tfY*
Received by
Fee Waived: tr es o Fee: $ CD cash
&", tr NA Park Use Permit Issued
E Yes gdIA Encroachment Permit Issued

FOR OFFICE USE ONLY
Date $-ZLl zz Zoningof
Credit Card
wAt D NA
Check No23?-sl,4
Insurance Certifi cate Filed
tr Yes ffi ABC License

APPLICATION FOR PARK USAGE
336 Pacific Avenue, Shafter, California 93263
(661) 746-5002 . Fax (661) 746-9125
Email: [email protected]
AppLICANI, Mark Scialabba or Kobie Carrasco Organization Congregational Bibile Church of Shafter If applicable, what type of Organization:

Local non-profit Organization? il Yes
D Service Club il Church il Other:

D No If yes, please provide Tax rD po95-214-1789
Mailing Address: 430 E Tulare Ave City Shafter State CA Zip 93263 7s1661-746-2187 Fax Email secretary@cbcshaft er.org
Alternate Contact Sams' Kobi Carrasco 7s1661-204-0047
il Open to the Public I AmpfneO Music/Speech tr Alcoholic Beverage l] Amusement/Mechanical fudes I Bounce House/IVater Slide fl Food Sales il Fundraiser D Admission Charge ilBirthday Party DCarnival E Circus tr Reunion I Other, please describe
CHECK AI,I, THAT APPI,Y:

NOTICE: Please visit cdph.org and
kernpublichealth.com for updates and information on
how to protect yourself and others from COVID-19.
tr Sporls Field Lighting D Yes il No If yes, please indicate requested I Electricity * [ Water * (*Avaitabte at Mannel Park ontv. Areas 1 and 5l Area of park. Gazebo and surrounding tables
Number of Attendees: Adults Juveniles
End Time
Provisions for Security and Medical Aid
PurposeA.,lature of Event : Worship Servive
Equipment to be brought into the psrp Sound System, Tables, Chbirs Start Time
Sunday
Name of park: Mannel Park
Date 10-09-20022
Totat lOb
Start Time 8:00 am End Time 3:00 pm
Date
Date
Start Time
Start Time
End Time
End Time
C;ROUI' PARK FACILII'Y USE PERN{IT:

Time of Use 9:30 am - 1:00 pm Wanage Maximum Distance Music will be Heard 5oo AM PLI FI liD NI USIC/SPIiECH PERM I'I': Nlunici I Code 12.32.150 -l Type s941s6h611 N/A
ALCOFIOLI C I]IiVTi RAG E POSS ESSION O R. CONSUNI PTION PEITNI IT: N,lunici lCode 12.32.070) Tax Exempt No.
dBQ figslssN/A
Purpose 6pga1g N/A
Type eg41"oLo1 N/A
AI,COHOI,IC BEVEIIAGE SALE PERN{IT ttach Co of ABC l,iccnse M al Code 12.32.070) A facility use agreement authorizes rental of the facility under the following conditions:
a. The requested park facility, date and time are available b. The rental will not interfere with official City business or programs c. A complete reservation form has been submitted to the City and all applicable fees paid d. A hold harmless and indemnification agreement has been signed and submitted e. If Liability insurance is required, the renter must submit proof of insurance coverage and endorsements to the City ten days prior to the event
Applicant must be 18 years or older
Park hours are from 5am to 10pm and facilities are available for Rental between 5am to 9pm Applicant is responsible for the conduct and control ofthe attendees and must be present at the rental at all times
City events will take precedence over non-city events
Payment of park permit fees is non-refundable. In the event of a rain-outo the renter may opt to reserye a future rental date up to 120 days in advance and is subject to availability Applicant is responsible for vacating the facility in a timely manner All parks are to left clean and litter free after use, all trash must be placed in the trash bin receptacles Placement of signs or posters for advertising purposes is prohibited Recurring reservations that are religious or political in nature are prohibited Changes to the reservation date, time and nature of activity must be requested in person Consumption of Alcohol is prohibited
a.
b.
d.
e.
f.
s.
h.
i.
j
k.
l. Additional Conditions of
Standard Park Conditions:
kc INITIAL
The Director may revoke an issued permit or deny a reservation, when it is determined by the Director that the proposed use of the facility is not consistent with the intended use. Use of the facility will be granted upon the conditions that all rules and regulations will be followed. A reptal permit may be revoked for violations of any rule or regulation contained in the City of Shafter Municipal Code or state and local laws by the renter, guests, attendees,. employees or vendors. Applicant is responsible for any damage to the facility, contents or fixtures and is responsible.for the cost of repairs and or replacements of such at the City's discretion. All damages must be reported to the City at the conclusion ofthe event or the next business day.
kc
The Director may establish additional rules, regulations and conditions concerning the use of the park that are consistent with Chapter 12.32 of the Municipal Code
kc INITIAL
The Park Permit is nonexclusive and nontransferable. Under no condition shall the Renter assign or transfer use ofthis permit or any obligation, right, title or interest assumed by the renter without the prior written consent of the City. City reseryes the right to terminate the park permit.
kc INITIAI,
Applicant is responsible for the conduct and control of all the attendees AND further agrees to ensure that the number of attendees does not exceed the number declared on the Permit Application. Non-compliance with this requirement can be subject to rental cancellation and fees revoked. kc
The Director may grant local charitable or non-profit organizations to conduct sales, collect fees or have fundraising events at city parks under the following conditions;
a. A use permit is granted
b. A city business license is obtained
c. Food sales must be approved by Kem County Public Health and a copy of the permit filed with the City PARK IT.ENl'AI, AGRT'EM ENT
CITY'S RIGHT T0 REVOKE, CANCIiL OII, DI'NY T{ENI'AL PERN,IIT IUGHl' 1'O ES'I'AI}I,ISH ADDI'I'IONAI, RUI,ES AND CONDIL'IONS NON-ASSIGN,\II'N'I'
A'I''I'IiND,,\NCtJ AN D CAPACI'I'Y
SALES AND C]OLI,IiCI'ION OF FEIiS

INITIAL
Inflatable attractions including bounce houseso water slides, obstacle course$, laser tags and non-mechanical rides may it, be permitted as follows:
a. Facility must be adequate in size and have electricity or water connection available b. Vendor must have an active business license with the City c. Liability insurance and additional endorsements must be filed with the City 10 days prior to the event

INITIAL

1. No Amusement Ride shall be operated in the City of Shafter unless such ride has a valid TAR Permit and a Certificate of Inspection issued by the State of Califomia.2, Certificate shall be posted on or near the amusement ride in a location where it can be easily seen and accessible at the request of authorized Citv Staff. 3. Other City Permits may be required.

City Council Resolution 888 requires that a Certificate of Insurance shall be submitted if the event is open to the public; is a fund-raising activity; is expected to have: more than 100 persons attending; amplified music; amusement rides; or alcohol consumption. MINIMUM REQUIRMENS: Commercial insurance with limits not less than $2,000,000 in aggregate and $1,000,000 each occutrence. Proof of inswance coverage including the required additional endorsements naming the City of Shafter, its Officers, Employees, City Council members, Agents, Boards and Commissions as Additional Insured must be filed with the city l0 days prior to the event. The insurance carrier must t/
have a Best's A- and be size VII or larger and licensed to do business in the State of Califomia.

Is certificate of Insurance es o
l. Play golfor archery or fly motor-driven model aircrafts (except in designated areas)

2. Yandalize or damage any park trees or other vegetation, buildings, benches, equipment or facilities

3. Light any fire (except in grills and pits)

4. Litter in any manner I

5. Drive or park motor vehicles or bicycles (except when authorized on park permit)

6. Ride horses or other animals

7. Allow dogs to run loose

8. Interfere with other persons or groups who have reserved park areas

9. Obstruct paths and passage ways

10. Possess or use any weapon

11. Camp or lodge ovemight, except by permission of the City

12. Operate a radio or other audible device loud enough to be heard 50 feet from the radio or device

13. Amplified music, speech or sound, except by permit

14. Possess, consume or sell alcoholic beverages, except by permit issued by the City Council a. Application to consume or sell alcoholic beverages must be submitted 2l days prior to the event b. Denial of the application may be appealed to the City Council by filing a written appeal with the City Clerk within 5 days of mailing or delivery of such decision c. The City Council shall hold a hearing within 14 days of filing the appeal d. The decislon of the Council shall be final

15. Power driven mechanical rides also referred to as Amusement Rides require City Council approval

16. Hazardous materials are prohibited in any City facility and defined as asbestos or asbestos containing materials, petroleum, including but not limited to crude oil, nafural gas, or natural liquids, pollutants or contaminants 17 . Any violations of law
IN FI,ATABI,ES AN D BOUNCII I IOUSI.]S
A N{ U SIiN'I ENT/N{ I'CHANICAL RIDES
INST]RANCE II T]IREMEN'T
O'I'I I IIR IIEGUI,A'I'ION S AND PROH I BITED,\C]-S
By initialing and signing this application, the applicant agrees to the rental policies set forth. I certifu that I am the applicant or authorized agent and that the informationfiled is true and correct to the best of my knowledge.

Applicant's Date &15aqpov>
PARI( PERMIT APPROVAL: il Approved
Received
Fee $
Date Time
Approved,orithCopditions tr.De4ied
Check No. Credit Card Receipt No
7T Wr tllt1hltLt ,bmt[
PERMIT REVIEW; City Manager
PERMIT REVIEW: Chief of Police
GROUP PARK FACILITY USE: Public Works Director:

FOR OFFICE USE ONLY
This Releaseo Hold Harmless And Indemnification Agreement ("Agreement") is made and entered into by and between the City of Shaftero
the State of California ("City"), and
a organized under the laws of
("User/Renter").

In consideration ofthe covenants, set forth herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged by the parties, intending to be legally bound hereby, the parties agree as follows:

User/Renter has reserved and rented the venue, or space owned or operated by City and commonly referred to as
tOeO Col lrn'r.s *
which is located at
, Shafter, CA. City hereby grants permission to User/Renter to reserve, rent, enier, ana rise-ttre ab6velreferenced property for lawful and authorized purposes or events as further detailed in the records related to User/Renter's reservation, use and rental of the referenced City property.

User/Renter hereby agrees to indemnify and hold harmless the City, and its officials, officers, employees, and agents from any and all suits, demands, claims, lawsuits, judgments, losses, penalties, actions, fines, costs, liabilities, debts, damages, and expenses, including but not limited to all reasonable legal fees and costs, from loss, damage, or injury to persons or property in any manner arising out of, allegedly arising out of, incident to, or connected to any acts, omissions, or misconduct in connection with the reservation, use, and rental described above whereby User/Renter enters, occupies, or uses the above-referenced City property. User/Renter further agrees to defend at User/Renteros own expense, including but not limited to all reasonable legal fees and costs, the City, and its officials, officers, employees, and agents in any legal action based upon such acts, omissions, or misconduct.

User/Renter fully recognizes tlre dangers of entering, occupying, or using the above-referenced City property for lawful and authorized purpbses or events and voluntarily assumes all risks of loss, damage, or injury to persons or property associated with his'or her reservation, use, and rental.

User/Renter hereby releases City from any and all liability in any manner arising out of, allegedly arising out of, incident to, or connected to User/Renter's reservation, use, and rental of the above-referenced City property. User/Renter understands and,acknowledges that City is not liable for any loss, damage, or injury to persons or property associated with User/Renter's reservation, use, and rental.

If any provision of this Agreement is held to be void or unenforceable, the remaining provisions shall continue in full force and effect. This Agreement shall be governed by and construed in accordance with the laws of the State of California without giving effect to any choice of law or conflict of law provision or rule in any other jurisdiction. This Agreement constitutes the entire Agreement between the parties with respect to the subject matters described herein, and supersedes any and all agreements or understandings, whether written or oral, between the parties with respect to such subject matters. All waivers of any provision hereunder shall be in writing and signed by both parties. The failure of either party to enforce at any time for any period any provision hereof shall not be construed to be a waiver of such provision.

This Agreement Shall be effective on the date of execution by the parties, as indicated by the later date of the parties' signatures below, and expires on the completion of the above-referenced -User/Renier from City, which in no case should extend beyond th q day of reservation, use, and rental by Och ,20!>_
USER/RENTER:

Kobie Carrasco 08-26-2022
User/Renter [Print Name] ISignafure] Date

RELEASE, HOLD HARMLESS AND INDEMNIFICATION AGREEMENT

AND WAIVER OF LIABILITY FOR THE CITY OF S CALIFORNIA
336 Pacific Avsnue, Shafter CA93263
Tel: (661) 746-5002 'Fax (661) 746-9125
Email: facilitvrentals @ shafter.com

APPLICATION FOR SPECIAL EVENT PERMIT
Shafter Municipal Code 17.02.100 permits short-term placement of activities on privately or publicly owned property with appropriate regulations so that such activities are compatible with the surrounding areas.

The City's Project Assistance Team is authorized to approve a special event permit if the event is expected to accommodate less than 50 persons. City Council approval is required if more than 50 persons will attend.

Complete applications must be received a minimum of 30 days prior to the event. If errors or omissions are discovered, the application will be deemed incomplete and will be returned to the applicant for revision. Acceptance of your application is not a guarantee of approval. After the initial intake of your completed application, other City permits may be required. Application Fees are due at the time of submittal and are non-refundable.

APPLICANT: Name (Contact Person): tb\
Name of Business or Organization (if applicable): I rurn U*lll*- F;lno <s If Organization, what type: Service Club
Mailing Address: 155 ELe,tn fl.-"
vnone 66( gt{ ofra() Yax
I
Church
1t*u.lE Other:
state3j4- zip_?3C6 3
Email Al"oinla irarn tcrlle'- Fi lnrs5 .f,elTYPE OF EVENT (concert, reception, parade, p,arty, promotion, rally, wedding, parade, etc.) DATE(S) OF EVENT:

TIME OF'EVENT:

TIME SET.UP STARTS:

NUMBER OF ATTENDEES:

LOCATION OF'EVENT:

From: i0 -t - 1'L To: I0'l ' LL
From: rA To: l/1/\

TIME CLEAN-UP ENDS
t0 ADMISSION FEE? Yes
T rr,.- Vpttta- fl+,.rrs /15 E l-erSa
-T0 7 EI'N"
v*t4,-o SL, Ftcr
- Nanre of Facility/Address
Name of Property Owner: A)chonl Hn',r St
FULL DESCRIPTION OF ACTIVITY: (check all that apply)
lAmplified speech or music ErooO Beverages served/sold* * ffi^ners/Flags to be used Public Dance I Street closure (attach map) ! nanicades (attach map) [nquipment to be brought in (specify below) !fooA Vendors **a copv of the Communitv Event Permit issued bv Kern Countv Public Health mast be attached [-lAtcohotic Beverage ** the event orsanizer must obtain an ABC licensed issued bv Alcoholic Beverase Control EVENT ORGANIZERS ARE RESPONSIBLE FOR ENSAKING ALL VENDORS ARE PROPERLY LICENSED.

Additional Peftinent Information (attach additional sheet if necessary) GENERAL REQUTREMENTS:

1. Execute a Hold Harmless Agreement.

2. Provide a Certificate of Insurance with an Endorsement for the Citv of Shafter, if required. See "Insurance Requirement" below.

3. There shall be no disruption in normal vehicular traffic flow.

4. A11 City noise regulations must be observed.

5. Parking must be in authorized parking spaces only.

6. There shall be no alcohoiic beverages at event without prior City Council approval.

1. Carefully observe Hours of Event, as stated on permit. 7 " A11 set-up and clean-up is the responsibility of the permit-holder. Following the event, all facilities must be left in a clean and orderly condition.

8. If indicated, comply with any additional conditions that may have been imposed as Conditions of Approval following review of your application for a Special Event Permit. 9" Do not advertise your event until the application is approved.

10. Application fees are non-refundable.

INSARANCE REQAIREMENTS ONLY IF THE EVENT WILL BE HELD ON A CITY OWNED FACILITY OR ON CITY RIGHT.OF-WAY:

I
2 J
4 5
Open to the Public
Fundraising
More than 100 persons
Amplification
Alcohol to be served/sold
ES ,No
Yes o
ES o
Yes
Yes o
I
If any one or more of the boxes above are marked YES, a Certificate of Insurance must be filed two weeks prior to the event. The Certificate of Insurance alone is not an acceptable proof of coverage and must be accompanied by an Endorsement page naming: "The City of Shafter, it's Officers, Employees, City Council members, Agents, Boards and Commissions" as additional insured. The insurance coverage accepted is $1,000,000 per occuffence and $2,000,000 general aggregate. In addition, if Alcohol is present or sold, a host liquor liability in the amount of $2,000,000 per occuffence and $4,000,000 general aggregate must be produced.

The following Hold Harmless Agreement is also required:

This is to certifz that Tr"'- Ur,.llo^o Fi[',. s* agrees to indemni$r and hold harmless the City of Shafter, its Elnployees, Clty Council members, Agents, Boards and Commissions f,rom and against any and all claims, liability loss, costs, damages, fees of attorneys, and other expenses which the City may sustain or incur by reason of, or in consequence of, the use of City streets and land, including but not limited to, sums paid on liability judgments in relation to use of land and streets.

Furthermore, I certiff that I am the applicant or authorized agent and that the information filed is true and correct to the best of my knowledge. I understand that additional Conditions of Approval may be imposed on my event by the Project Assistance Team or the City Council, and I agree to comply with any conditions that may be required.

Applicant's Signature Date X- t1 -LL
CHIEF OF POLICE: tr Approved D Approved with Conditions Listed Below Date:
tr Denied
Signature:

PROJECT ANCE TEAM: tr Approved with Conditions Listed Below tr Denied Signature: Date: < ( 11 n
/- zCITY COUNCIL: tr Approved tr Approved with Conditions Listed Below Signature: Date:

CONDITIONS OF APPROVAL
As part of the approval process for a Special Event Permit application, conditions may be imposed that are deemed necessary to ensure that the permit will be applied in accordance with the criteria outlined in the City Zoning Ordinance. These conditions may involve any factors affecting the operation of the temporary use or event. Conditions of Approval include the following items circled:

1. Provision of temporary parking facilities, including vehicular ingress and egress.

2. Regulation of nuisance factors such as, but not limited to, prevention of glare or direct illumination of adjacent properties, noise, vibration, smoke, dirt, odors, gases, and heat. 3" Regulation of temporary buildings, structures, and facilities, including placement, height and size,location or equipment and open spaces including buffer areas and other yards.

4. Provision of sanitary and medical facilities.

5. Provision of solid waste collection and disposal.

6. Police and fire concerns.
7 . Provision of security and safety measures.

8. Regulation of operating hours and days, including limitation of the duration of the special event to a shorter time period than requested.

9. Submission of a performance bond or other surety device to assure that any temporary facilities or structures used for the proposed special event will be removed from the site within a reasonable time following the event and that the property will be restored to its former conditions.

10. Submission of a site plan indicating any information required by the Zoning Ordinance.

11. A requirement that the approval of the requested special event permit is contingent upon compliance with the Zoning Ordinance and with other applicable provision of other ordinances, resolutions, or regulations.

12. Other conditions that will ensure the operation of the proposed special event in an orderly and efficient of the Zoning
\app.u.a
tr Denied
manner and in accordance with the

13. Additional Conditions of Approval:
.--A
intent and
€>L O
s*z .J- I
<-
/)-
.ft\.{.- c
C. r-/-' a.d

FOR OFFICE USE ONLY
Received by Dxe 2l .?.'A Zoning of
Fee Waived: E Yes o Fee: $ OCash
Park Use Permit Issued
Encroachment Permit Issued
Credit Card
trYes trNA,/
fl Yes ffNn
_Check No
Insurance Certifi cate Filed
ABC License
tr Yes
D Yes
K"
r(re
336 Pacific Avenue, Shafter CA93263
Tel: (661) 746-5002. Fax (661) 146-9125
Email: iacilityr:entals@ shafter.com

APPLICATION FOR SPECIAL EVENT PERMIT
Shafter Municipal Code 17 .02.100 permits short-term placement of activities on privately or publicly owned properly with appropriate regulations so that such activities are compatible with the surrounding areas.

The City's Project Assistance Team is authorized to approve a special event permit if the event is expected to accommodate less than 50 persons. City Council approval is required if more than 50 persons will attend.

Complete applications must be received a minimum of 30 days prior to the event. If errors or omissions are discovered, the application will be deemed incomplete and will be returned to the applicant for revision. Acceptance of your application is not a guarantee of approval. After the initial intake of your completed application, other City permits may be required. Application Fees are due at the time of submittal and are non-refundable.

APPLICANT: Name (Contact Person): Christine Hadwar
Name of Business or Organization (if applicable) . Target Distribution Center If Organization, what type: Service Club E other: Warehouse-Distribution Mailing Address: 3880 Zachary Ave City Shafter state9e_ zip932ffiphone 661 -396-601 5 Fax661-396-6016 B,oui1 Ch risti ne. Hadwa r@Target, com TYPE OF EVENT (concert, reception, parade, party, promotion, rally, wedding, parade, etc.) Annual Team Member Picnic
DATE(S) OX',EVENT:

TIME OF EVENT:

TIME SET-UP STARTS:

NUMBER OX'ATTENDEES:

From: 10fi52022 ro.10/15t2022
-1o. 9:00 pm
TrME CLEAN-Up ENDS: 10:00 pm
ADMISSION FEE? Iv., Z*o
pro-. 3:00 pm
11:00 am
1500
L6CATI9N oF EVENT. Mannel Park
Name of Facility/Address
Name of Property Owner:

FULL DESCRIPTION OF : (check all that apply)
f,emplified speech or music Mpooa Beverages served/sold** l-lBanners/Flags to be used lruUti. Dance flStr..t closure (attach map) !narricaAes (attach map) f,nquipment to be brought in (specify below) Food Vendorc xxa copv of the Communitv Event Permit issued bv Kern Countv Public Health must be attached Alcoholic Beverage xx the event orsanizer must obtain an ABC licensed issued bv Alcoholic Beverage Control EVENT ORGANIZERS ARE RESPONSIBLE FOR ENSURING ALL VENDORS ARE PROPERLY LICENSED.

Additional Pertinent Information (attach additional sheet if necessary) Carnival Games, Bounce Houses, BBQ. Team members will not be attending at the same time. lt will be in between work shifts so attendance will be sporattc.

GENERAL REQUIREMENTS:

1. Execute a Hold Harmless Agreement.

2. Provide a Certificate of lnsurance with an Endorsement for the City of Shafter, if required' See o'Insurance Requirement" below.

3. There shall be no disruption in normal vehicular traffic flow'

4. All City noise regulations must be observed.

5. Parking must be in authorized parking spaces only.

6. There shall be no alcoholic beverages at event without prior City Council approval. 7 . Carefully observe Hours of Event, as stated on permit.

7. All set-up and clean-up is the responsibility of the permit-holder. Following the event, all facilities must be left in a clean and orderly condition.

8. If indicated, comply with any additional conditions that may have been imposed as Conditions of Approval following review of your application for a Special Event Permit.

9. Do not advertise your event until the application is approved.

10. Application fees are non-refundable.

INSARANCE REQAIREMENTS ONLY IF THE EVENT WILL BE HELD ON A CITY OWNED FACILITY OR ON CITY MGHT.OF-WAY:

1. 2.
a

4. 5.

Open to the Public
Fundraising
More than 100 persons
Amplification
Alcohol to be served/sold
ES
Yes
Yes
Yes
Yes ZNo
o
If any one or more of the boxes above are marked YES, a Certificate of Insurance must be filed two weeks prior to the event. The Certificate of Insurance alone is not an acceptable proof of coverage and must be accompanied by an Endorsement page naming: "The City of Shafter, it's Officerso Employeeso City Council members, Agents, Boards unO Co**issions" as additional insured. The insurance coverage accepted is $1,000,000 per o.iu.r"n", and $2,000,000 general aggregate. In addition, if Alcohol is present or sold, a host liquor liability in the amount of $2,000,000 per occurrence and $4,000,000 general aggregate must be produced.

The following Hold Harmless Agreement is also required:

This is to certify,nu, Target Distribution
agrees to indemnify
and hold harmless tt e City of Sftafter; its Employees, City Council members, Agents, Boards and Commissions from and against any andall claims, liabilityloss, costs, damages, fees of attorneys, and other expenses which the City may sustain or incur by reason of, or in consequence of, the use of City streets and land, including but not limited to, sums paid on liability judgments in relation to use of land and streets.

Furthermore, I certify that I am the applicant or authorized agent and that the information filed is true and correct to the best of my knowledge. I understand that additional Conditions of Approval may be imposed on my event by the Projeci Assistance Team or the City Council, and I agree to comply with any conditions that may be required.

Applicant's S Date 3
CHIEF OF POLICE: tr Approved tr Approved with Conditions Listed Below Signature: Date:

PROJECT AI{CE TEAM: Approved {Approved with Conditions Listed Below D Denied Signature Date: alte lzz
CITY COUNCIL: tr Approved
lf
tr Approved with Conditions Listed Below
Signature: Date:

CONDITIONS OF APPROVAL
As part of the approval process for a Special Event Permit application, conditions may be imposed that are deemed necessary to ensure that the permit will be applied in accordance with the criteria outlined in the City Zoning Ordinance. These conditions may involve any factors affecting the operation of the temporary use or event. Conditions of Approval include the following items circled:

1. Provision of temporary parking facilities, including vehicular ingress and egress.

2. Regulation of nuisance factors such as, but not limited to, prevention of glare or direct illumination of adjacent properties, noise, vibration, smoke, dirt, odors, gases, and heat.

3. Regulation of temporary buildings, structures, and facilities, including placement, height and size, location or equipment and open spaces including buffer areas and other yards.

4. Provision of sanitary and medical facilities.

5. Provision of solid waste collection and disposal.

6. Police and fire concerns.
7 . Provision of security and safety measures.

8. Regulation of operating hours and days, including limitation of the duration of the special eventto a shorter time period than requested.

9. Submission of a performance bond or other surety device to assure that any temporary facilities or structures used for the proposed special event will be removed from the site within a reasonable time following the event and that the property will be restored to its former conditions.

10. Submission of a site plan indicating any information required by the Zoning Ordinance.

I L A requirement that the approval of the requested special event permit is contingent upon compliance with the Zoning Ordinance and with other applicable provision of other ordinances, resolutions, or regulations.

12. Other conditions that will ensure the operation of the proposed special event in an orderly and efficient manner and in accordance with the

13. Additional Conditions of Approval
and purpose of the Zoning
c)
c "'f C.=*.r".r.', I
tr Denied
tr Denied
rl-.'-L
Received by

FOR OFFICE USE ONLY
Date Zoninp of Prooertv
Fee waived: E Yes u No p""j 150 . /lD cash ,/&R P&l,D 1.tr apzo El Yes I NA Park Use Permit Issued ,/
f,l Yes EfNA Encroachment Permit Issued
Credit Card -7"* try
tr Yes dNa
Insurance Certifi cate Filed
ABC License
?a??-07-19 09:53 Tarset 6613966016 >> 6617469125 P 1t4

APPLICATION FOR PARK USAGE
336 PaclflcAvenue, Shafrer, Califomla 93260
APPLICAITIT: Cnrisline Hadwar
If applicable, what type of Organizationl O Scrvico Club Local oon.profit Organization? O Ycs I No If yes, plcaseprovidc Tax DNo Mailing n646ss; 3880 Ave City Shefler
(661) 746.5002. Fax, (661) 746-9125
Em ai h frcllltyrontaht@shefter-com
Statc Ca Zip 93263
ret 661-396-6015 Fax 6g Emnil
Altcmatc ContactName: Mary Flnn L16614*!.6076
O Opco to the hrblic O enptilicd MuridSpeech O Alcobolic Bcvcragc El Amuscmcnt&{cchanicol Ridcs I Bouncc HouscAilatcr Slide O Food Sales O Frmdroiscr O Admission Chorge OBirthilay Party O Circqs O Rcuniou I OOcr, Food-BBQ
CIIECK ALL THATA}PLY:

Dste SunTinc EndTimc
TVOIICET FIoDgo Yfslttl4hpll snd
l(tmbubllpheilrh.co,n for ugdoie6 and lnforneilon on
how to protcEt youE€ll rnd olhlr! fnr'n COV|D.19.
tr Sports Field Lighting I ycs tr No If ycs, pleasc indicatc rcqucssr6 51s11;6c 730pm , Eud Tinc-].![
I Elccticity ' ; Warcr' fAvatlabta allilannalPa*only. Anas:Lad#l Provisions for Security and Medical Aid
P urpoeeNanrrc of Evcnt; AnnualTeam Picnic
Equipmcnt to bc brought into rhepark Generators, Large BBQ Grill Nurnbcr of Attcndccs: Aduhs 1
ofpark Mannel Park
Satu
Area ofPark All
esg10115122
StartTimc_EndTimc_
SartTimc gndlhc 10pm
yuygpilgs 500 fotot 1500
GROUP PARK FACILTTY USE PIRNII'I':

Time of Usc 3pm.9pm Wnttoge _Murimum Distanco Mrsic willbc Hcard z0ne AMPLIFIED MUSIC/SPEDCH PERItIT: (Muricipal Codr 12.32.150 -l60) ofAlcohol: NA
ALCOHOLIC B EVERACE POSSESSION OR CON S U ill PI'I O.\-. PER}I I1' nlcl al Codc 1232.0'7{t) Typc of Alcohol Tax Excmpt No. _
ftuposc of Salc NA
ABC
AI,COHOLIC BE1IERAGE SAI,E PER,\{IT Attrch Co of ,\BC I,iccnrc) fi\lunic ;rl Codc 11.32 2022-07-19 09:54 Tarset 6613966016 >> 6617469125 P 2t4
b. The rennl will uor i.orcrfcc wirh officid City busincss orgrognnt c, A cornplcle rescwatioa fonn hos bccn mbnittcd to tho Ctty urd all applicablc fccs pdd d. A hold hqrmlcsc ond indcmriScltiou ogrccmcat ho bccn rigncd qnd submfurd e' Ifliabiliry incrrrance is rcquired, lhc rcntcr rnrst submit proofofilsurrloc covcregc rnd cndorsemeng A
to thc City tcn Frior tq 1|1s stc'j
usc 0grccmcnt undcr cooditiols:
a. The requcstcd puk lhcility, dile and timc lrc awiloblo s. Applicut mrst bc 18 years or oldcr
b. Pqrk hou$ src from 5rnr !o l0pn aad faciliricr src avgilablc for Rrqtll 5o6".cl 5o.n to 9pn c' Applicant is rcsponsiblc for thc conduc{ snd coauol ofthe g$€ndc€g ud nust bc prcrcnt at 0rs renlsl at all dmcs
d. City cvents will nkc pcccdcncc ovcr uon+iqr cvcntr
c, Payncnt of park pcrmit fccs ls non.rpfurrd$lc. In thc cvent of o rrin-out, thc rcntcr rnay opt b rcscn G I fuilrc rsnbl drtc up io 120 dsys in odvunce qnd is subjcct to ovrilabiliry f. Applioaru is rcsponriblc for vacating thc focility in a timclymmncr S' All parks orc to lcft clcm qnd litisr frec ofter use, sll trlsh must bc plrccd in thc urrh bin rcccpractcs h, Placoncnt ofsigns or postcru for advcnisilrg purposes ir prohibilcd i. Recurring rcc€Nstioos thot arE religiou or politicrl in mtuo arc prohibilcd :, Changcr to thc rcscrvttion dute, tinc qnd ncture of ac$vity must bc rcqucstcd in pcaon k Couurtrprioa of Alcohol is prohibitcd
l. Additiond Conditions of Anrolal
usc of $s facility is not consistcnt with drc inrcnded usa Uec of &c ficility will tr gnntcd upon ttc conditionr that all rulcr and rcgulations will bc follortd. A rsntrl pcrmit moy bc rcvoked for violrtinnr of rny rulc or regulation coulaincd io thc City of Shaftcr Mrmicipll Codc or ststs ond locut lours by the renter, gucrts, arcudcer, eoptoyccs or vsndore, Applicrnt is responsible for my drmrgc to tic focility, contcnlr ot fixhrcf urrl ie lcsponriblc for tbc cogt of rcplim and or rcplaccmcnte of such rt tbs Cily's discrcion, Atl &mrgcr nwt bs rcportcd lo thc City lt thc conclusior ofthe cvcnt or thc acxt busincss doy,
Thc Dirc*tor may rcvokc an gcrnit or &ty o, nscrvotioq whcn it ts proposed Thc Dircctor may cstablish rulct, rcgulations ond conditionr conceming tbc usc of thc irt coogistcnt with 12.32 oftho Codc
pennit or my obligadon, right, tidc or inrcrcst qsrumsd by thc rcntcr without thc pdor t*rinct conscnt of thc City. City rcscrves thc to tcrmi.nstc ihc
Thc is noncxclu6ivc snd notbrarfcrsblc. oo Rsnlcr or [uefcrusc ofthis of qttcndces docs not cxcscd thc numbcr dcclarcd on dre PemitApplisation Nou.compliancc with thig rcquircncmt can bc subjcct to rcntal cnncellltion and fccg revokcd.

Applicrnt 1'or thc ond control of sll thc dlcndcss AlilD Egrccs ro €mu! that thc nwtbcr cvents ut city puks undcr the following oondidonsl
a. A usc pcruit ie grurtcd
b. A city burincns licsnrq ir obtrincd
c, Food sn,les mst bc approvcd by Kcm County Public Halth and a copy of thc pcrnit liled with tbo Ciry may gfirnt local choritobls or nsn profit orgonizatiorr to conducr sdcs, or P,\RK RE}ITAL AGREET\,'ENT
CITY'S RTCHT TO ROVOhT, CANCDL OR DENY RINTAL PER!\IIT
RIGHT TO EST^BLISX ADDITION^L RULES AND CONDITIONS
NO}I.ASSICNMENT

ATTENDANCE AND CAPACITY
SALES.},ND COLLECTION OF FEES
20?2-07-19 09:54 Tarset 661396016 >> 6617469125 P 3/4
lltlT'AL
-a, Fqciliry nust bc adcquatc in sizc and hrve elecciciry b. Vendor murt bove ln rcdvc bruin$s liccnro sl& tho couBqg. tosud my
or wtlcr connsction tvaitrblo
watcrdidca,
be pemrincd as follows:
c. insurancg $rd ldditiond
No Anugc,rnsnt sbnll
ofInrDcction issucd by tho Sntc ofCdifbrnio. 2. Ccrtilicotc ehall bc bc rnd acccssiblc at thc
on Or ncrr thc 0muscment rids in a locrtion
a urdo
of Insulncc
2- Vardalizq or damage nny pork trccs or othcr vcgetation, buildiags, bcnchcs, cquipmcnt or facilirics 3. Light cny firc (cxccpt in grills rnd pis)

4. Littcr in ony manner

5. Drivc or park motor vchicles or bicyclcs (cxccpr whcrr authorizcd on pnrk parmit)

6. Ridc horscs or othcr animuls
?, Allow dogs to mu loosc

8. Intcrfcrc with othcr pcrsonr or groups urho hsve rcrErved put< ucts 9. Obrruct paths and paroage ways 10, Posscss or ullc any wcrpol
I l. Camp or lodge ovemight, cxccpt by pcmission of tbc City

12. Operote a rudio or other qudible devicc loud caough to bc beed 50 fcct ioro tf,c rrdio or dcvicc 13, Amplificd mwic, rpccch or loundr F(ccpt by permit

14. Posscss, consumc or ssll dsoholic bcvcrsgcq cxcopt by permit irsucd by thc City Gouncit s. Applicatiou to consruuc or scll alcoholic beveruges murt be submitad 2l deyn prior ro 1[c cr,cnt b, Dcnial of tlrs ryplicltion mly bc rypcded o the Ciry Council by filing a nnincn upped wi16 thc City Clcrk vrithin 5 dcys of mailing or dclivcry of such dccision c. Thc City Council gball hold a hooring within 14 dox of tiling thc oppcrl d, The deci;ion ofthe Council sholl bc final

15. Powcr drivcn mcchonicql ridu rlrc rcfcmd to us AmuscmcotRidcs rcquiro City Councit opprovol 16' Hnzardous o.ltcrials arc prohibitcd in my City facility uud dcfircd m rubesos orssbcsros gontaining rnltcriuls, pcholeum, including but not lirnitrd to crudc oil, nltunl g!^s, or na$uBl tiquids, pollunnur of conlaminlnts l?. Aay violations of low
Ploy golfor orcbery or fly orcss)
INFLAT^BLES AND BOUNCE HOUSts
rr MIiSEM El'lT/!tDCI!^NIC^ L RIDES
TNSI.IRANCE IR[MIiNT
OTHER REGUL^TIONS AND PROIIIBITED ,\CTS
By initialing and s-lgntng
aulhorhed ogent and lhql
Applicurt's
thls appllcatiorr, the
lnlornatlonglcd
opplicant agreer to lhe renlal policiet rct f,orth. I cetify that I zm the opplicanl or is tav and codccl lo the besl olny lotowledgc.
7t19t22
No. Ctcdit
o
No.

PN'K PERMIT APPR,OVAI,: O Dcnisd
Fcc
CROUP PARKFACILITY USE: Public Works
PERMTREVIEW: ChicfofPolicc
PERMITREVIEW: CityMooagcr

FOR OFFICE USE OHLY
This Release, Hold Harmless And Indemnification Agreement ("Agreement") is made and entered into by and between the City of Shafter, California, a Califomia municipal corporation organized under the laws of the State of Califomia ("City"), and Distribution Center ("User/Renter"). ln consideration of the covenants, promises, representations, and warranties set forth herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged by the parties, intending to be legally bound hereby, the parties agree as follows:

User/Renter has reserved and rented the following property, venue, or space owned or operated by City and commonly referred to as Mannel Park , which is located at 600 Calloway Street , Shafter, CA. City hereby grants permission to User/Renter to reserve, rent, entero and use the above-referenced property for lawful and authorized purposes or events as further detailed in the records related to User/Renter's reservation, use and rental of the referenced City property.

User/Renter hereby agrees to indemnify and hold harmless the City, and its officials, officers, employees, and agents from any and all suits, demands, claims, lawsuits, judgments, losses, penalties, actions, fines, costs, liabilities, debts, damages, and expenses, including but not limited to all reasonable legal fees and costs, from loss, damage, or injury to persons or property in any manner arising out of, allegedly arising out of, incident to, or connected to any acts, omissions, or misconduct in connection with the reservation, use, and rental described above whereby User/Renter enters, occupies, or uses the above-referenced City property.

UserlRenter further agrees to defend at User/Renter's own expense, including but not limited to all reasonable legal fees and costs, the City, and its officials, officers, employees, and agents in any legal action based upon such acts, omissions, or misconduct.

User/Renter fully recognizes the dangers of entering, occupying, or using the above-referenced City property for lawful and authorized purposes or events and voluntarily assumes all risks of loss, damage, or injury to persons or property associated with his or her reservation, use, and rental.

User/Renter hereby releases City from any and all liability in any manner arising out of, allegedly arising out of, incident to, or connected to User/Renter's reservation, use, and rental of the above-referenced City property. User/Renter understands and acknowledges that City is not liable for any loss, damage, or injury to persons or property associated with User/Renter's reservation, use, and rental.

If any provision of this Agreement is held to be void or unenforceable, the remaining provisions shall continue in full force and effect. This Agreement shall be governed by and construed in accordance with the laws of the State of Califomia without giving effect to any choice of law or conflict of law provision or rule in any other jurisdiction. This Agreement constitutes the entire Agreement between the parties with respect to the subject matters described herein, and supersedes any and all agreements or understandings, whether written or oral, between the parties with respect to such subject matters. All waivers of any provision hereunder shall be in writing and signed by both parties. The failure of either party to enforce at any time for any period any provision hereof shall not be construed to be a waiver of such provision.

This Agreement shall be effective on the date of execution by the parties, as indicated by the later date of the parties' signatures below, and expires on the completion of the above-referenced reservation, use, and rental by User/Renter from City, which in no case should extend beyond the 15 day of October 2023 USER/RENTER:

Christine Hadwar 9t2t22
User/Renter Name U ls l Date

RELEASE, HOLD HARMLESS AND INDEMNIFICATION AGREEMENT

AND WAIVER OF LIABILITY FOR THE CITY OF SHAFTER, CALIFORNIA # City of Shafter

SFIAFTER COUNCIL AGENDA REPORT
Meeting Date:

FROM:

SUBJECT:

September 20,2022
Gabriel A. Gonzalez, City Manager
Prepared By: Michael James, Public Works Director
TEMPORARY USE AGREEMENT WELL 17 SOLAR PROPERTY

RECOMMENDATION
Council find the requested action is not a "project" per Section 15378(b)(a) of the California Environmental Quality Act Guidelines; approve License Agreement for temporary use of Assessor Parcel Number 026-160-46 with Piuser Construction subject to review and approval by the City Attorney; and authorizethe Public Works Director to execute said agreement.

BACKGROUND
Earlier this year, solar panels at multiple City water well and tank sites were installed. Among the sites is Weli 17, located at the southwest corner of Veterans Park. The energy production for this site was supposed to have been fully generated from solar-covered shade structures at a paved lot at the so.rth end of the park. However, the location of an underground storm drain pipeline prevented the installation of approximately one-half of the structures that the solar contractor had already ordered. These structures were eventually installed at a vacant City-owned lot immediately west of Well 17.

Staff does not have any immediate plan or use for the site of the relocated solar parking structures.

In the future, it could be developed as a secondary parking lot for activities at Veterans Park. Still, until the City is ready to consider and fund any improvements, the ground between the parking structure will not be used or needed.

The property owner to the west of the solar parking structures, represented by David Piuser of Piuser Construction, has expressed an interest inusing the areaunderneaththemto store equipment for professional use. Mr. Piuser and Staff have discussed a Temporary Use Agreement to permit this use. The terms discussed include the City not charging Mr. Piuser provided he maintains the site and allows the City to access and maintain the panels' The estimated annual cost for the City to maintain the site is broken downs as follows:

Desuiption Unit Otv Rate Ext. Cost
Service Crewmember (5hr/wk) HR 260 $50 $13,000
Public Facilities Manager HR 24 $60 $1,440
Public Works Director HR t2 $120 $1,440
Chemicals for Weed Control LS I $1,000 $1,000
Total $16,880
v

CONSENT CALENDAR
Temporary Use Agreement for Well 17 Solar Property
The estimated annual gross revenue from a potential lease of an unimproved lot is $15,000.

Therefore, with the estimated savings in reduced maintenance costs exceeding the estimated income from lease payments, the proposed temporary use agreement would not constitute aa gift of public funds or resources. The public benefit in terms of monetary value is the cost savings to the City for not having to maintain the vacant parcel.

As drafted, the temporary use agreement would expire June 30, 2023 or sooner if the City issues a 30-day termination notice. A new agreement can be developed and brought before the Council for approval if the use is mutually beneficial to both the City and Mr. Piuser.

FISCAL IMPACT
No budget action is necessary

CEQA ANALYSIS
The action is not a "projecf'per CEQA Guidelines Section 15378(b)(4) because the action is the creation of govemment funding mechanisms or other government fiscal activities which do not involve any commitment to any specific project that may result in a potentially significant physical impact on the environment. Therefore, the action is not subject to CEQA.

ALTERNATIVES
The City can reject the recommended action in favor of not committing the use of the solar site.

However, the recommended temporary use agreement does not extend past June 30,2023, which allows the City to assess future uses. During this period, Piuser Construction will be responsible for site maintenance, reducing a burden that would have otherwise been the City's responsibility.

Therefore, staff is not recommending an alternative.

ATTACHMENTS

1. Draft Temporary Use Agreement - Well 17 Solar Property -2-

LICENSE AGREEMENT
This License Agreement ("Agreement") is entered into on ,2022 ("Effective Date") by and between the City of Shafter, a public body, corporate and politic ("Shafter"), and Piuser Construction ("Licensee") with its principal place of business located at 680 West Los Angeles Avenue, Shafter, CA93263. Shafter and Licensee are sometimes referred to herein individually as "Palty" and collectively as "Parties." Recitals
A. Shafter owns that certain real property generally located at 640 West Los Angeles Avenue, Shafter, California, as further described by the Kern County Assessor as Parcel Number 026-160-47 and shown in Exhibit "A" (the "Property"); and B. Licensee desires to obtain a temporary license for the limited purposes of entering and using the Property for equipment and vehicle storage; and NOW, THEREFORE, in consideration for the promises set forth in this Agreement, the Parties agree as follows:

Terms

1. Recitals. The Recitals are incorporated into and are made a part of this Agreement.

2. License. Shafter hereby grants to Licensee, and Licensee's employees, agent, representatives, and contractors a revocable, exclusive, nontransferable License to access the Property for the limited purpose of allowing Licensee to stage, store, and distribute refuse collection carts for the implementation of automated refuse collection within the Shafter boundaries (the "License"). Licensee shall not use the Property for any other purposes whatsoever, except as authorized by subsequent written agreement signed by Shafter. The Parties hereby acknowledge and agree that use of the Property by Licensee, as set forth in this Agreement, is with the consent of Shafter and shall be considered permissive. Nothing in this Agreement shall be interpreted as, or otherwise deemed to be, a transfer or conveyance of any inierest in the Property whatsoever between Shafter and Licensee. The Parties hereby acknowledge and agree that nothing in the Agreement shall be interpreted as an agreement for the lease or other use of the Property by Licensee.

3. Solar Panel Operations and Maintenance. Through its use of the Property, Licensee shall not prevent or inhibit the ability for Shafter or its authorized agents access to existing solar panels for operation and maintenance purposes.

4. General Site Maintenance and Appearance. Licensee shall be fully-responsible for ensuring that Property is routinely cleared of weeds and debris and does not pose ahazardto the general public.

5. Security. Licensee shall be fully-responsible for the security of any material or equipment stored.
l 7236.00000\3s03s661 1

6. Improvements. No improvements or alterations to the Property shall be performed unless they are separately agreed to in writing by both parties and properly permitted.

7. Term. The term of this License shall commence on the Effective Date and shall, unless otherwise modified, continue until the earlier of June, 30, 2023 or the date on which Shafter revokes and terminates this Agreement upon 3O-day advanced written notice to Licensee with or without cause.

8. Removal of Propertv upon Termination. Licensee agrees to remove all of Licensee's equipment and property and any and all debris from the Property within twenty-four (24) hours of termination of this Agreement. In the event any equipment or property are not timely removed, Shafter will have the right to remove such equipment or property and Licensee agrees to be responsible for all associated costs of such removal and storage, if any.

9. Compliance with Law.
(a) Federal. State. and Local Laws. Licensee shall conduct its activities related to the License in compliance with all Federal, State and local laws. (b) Prevailins Wases.
(i) Licensee acknowledges that Shafter has made no representation, express or implied, to licensee or any person associated with licensee regarding whether or not laborers employed relative to the license must be paid the prevailing per diem wage rate for their labor classification, as determined by the State of California, pursuant to labor code sections 1720, et seq. Licensee agrees with Shafter that licensee shall assume the responsibility and be solely responsible for determining whether or not laborers employed relative to the license must be paid the prevailing per diem wage rate for their labor classification, as determined by the State of California, pursuant to labor code sections 1720, et seq. (ii) Licensee, on behalf of itself, its successors, and assigns, waives and releases Shafter from any right of action that may be available to any of them pursuant to labor code section 1781. Licensee acknowledges the protections of civil code section 1542 relative to the waiver and release contained in this section, which reads as follows:

A general release does not extend to claims that the creditor or releasing party does not know or suspect to exist in his or her favor at the time of executing the release and that, if known by him or her, would have materially affected his or her settlement with the debtor or released party. By initialing below, licensee knowingly and voluntarily waives the provisions of section 1542 solely in connection with the waivers and releases of this section:

Licensee's initials:
(iii) Additionally, licensee shall indemnify, defend and hold harmless Shafter, pursuantto section g,against any claims pursuantto labor code section l78l arising from this agreement or the license.
17236 00000\3s03566Ll

10. Indemnity by Licensee.
(a) To the fullest extent permitted by law, Licensee shall indemnifu, defend, and hold harmless the City, its elected officials, officers, volunteers, agents, afforneys and employees ("City Indemnitees") from and against any and all claims, damages, losses, and expenses, including, but not limited to attorneyso fees, arising out of or resulting from Licenseeos use of property pursuant to this License, including, but not limited to, storing vehicles and equipment by Licensee, provided that such claim, damage, loss, or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), but only to the extent caused by the willful or negligent acts or omissions of Licensee, its subcontractor(s), or anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss, or expense is caused in part by a pafi indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist as to a party or person described in this section.
(b) In claims against any person or entity indemnified under this section by an employee of Licensee, its subcontractor(s), or anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, the indemnification obligation under this section shall not be limited by a limitation on amount or type of damageso compensation, or benefits payable by or for Licensee or its subcontractor(s) under workers' compensation acts, disability benefit acts, or other employee benefit acts.

I l. Hazardous Materials. Licensee shall not under any circumstances store or bring onto the Property any Hazardous Materials and shall be solely responsible for the removal of any Hazardous Material, including asbestos, pursuant to this Agreemento stored or brought onto the Property by Licensee. As used in this Agreement, the term "Hazardous Material" means any substanceo material or waste which is (l) defined as a "hazardous waste," "hazardous material," hazardous substance," "extremely hazardous waste," or "restricted hazardous waste" under any provision of California law; (2) petroleum or petroleum products; (3) asbestos; (4) polychlorinated biphenyls; (5) radioactive materials; (6) designated as a "hazardous substance" pursuantto Section 311 ofthe Clean WaterAct,33 U.S.C. section 1251 et seq. (33 U.S.C. $1321) or listed pursuant to Section 307 of the Clean Water Act, (33 U.S.C. $1317); (7) defined as a"hazardous substance: pursuant to the Resource Conversation and Recover Act, 42 U.S.C. section 6901 et seq. (42 U.S.C. $6903) or its implementing regulations; (8) defined as a "hazardous substance" pursuant to Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act,42 U.S.C. section 9601 et seq. (42 U.S.C. $9601); or (9) determined by California, federal or local governmental authority to be capable of posing a risk of injury to health, safety, or property.

12. Insurance. Licensee, at its sole cost and expense, shall obtain and maintain in full force and effect, throughout the term of this Agreement, insurance in amounts and coverages shown below, including, without limitation, a provision that Shafter, and its officers, directors, and employees, be included as additional insureds. Failure by Licensee to maintain all insurance in effect at all times shall constitute a default under this Agreement. 1 7236.00000\3s03566 I . 1
l. Worker's Compensation - Statutory; Employers' liability - $100,000 each occurrence;

2. Comprehensive General liability (including Contractual Liability) $5.000,000 each occurrence combined single limit; and

3. Comprehensive Automobile liability - $5,000,000 each occurrence combined single limit.

13. Sole Cost and Expense. Licensee expressly acknowledges that it is entering into this Agreement and performing the work authorized hereunder at its own risk. Licensee acknowledges that any work Licensee chooses to perform in connection with this Agreement shall be at its sole cost and expense. Licensee further acknowledges that any activity or work or act by Licensee, made in connection with this Agreement will not impose any obligation upon Shafter to compensate Licensee, to convey any sort of property interest to Licensee, or enter into or retain any agreement with Licensee.

14. Payment of Costs. Licensee shall be solely responsible for all costs and expenses of all activities contemplated by this Agreement. Licensee shall assure that its activities do not result in the filing or attempted enforcement of any claims or liens against the Property, and Licensee shall indemnifu, defend, and hold Shafter, its officials, officers, employees, agents, and volunteers free and harmless from any claims based upon any work performed pursuant to this License.

15. No Third Party Riehts. This Agreement is entered into between and solely for the benefit of Shafter and Licensee. No other person shall have any right to enforce the terms of this Agreement.

16. Notices. Any notice to be given or other document to be delivered by either party to the other hereunder shall be in writing and shall be deemed to have been duly given and received as of the third business day after mailing by United States registered or certified mail, return receipt requested, postage prepaid, addressed as set forth below:

Shafter: City of Shafter
336 Pacific Avenue
Shafter, CA93263
Attention: City Manager
With a copy to: Best Best & Krieger, LLP
18101 Von Karman Ave, Suite 1000
Irvine, CA92612
Attention: Marco Martinez, Esq.

Licensee: Piuser Construction
Any Party hereto may from time to time, by written notice to the other, designate a different address which shall be substituted for the one above specified. 17236.00000\3503s661. I

17. Assignment. This License is personal to Licensee and may not be assigned without the prior written consent of the Shafter, which may grant or withhold consent in its sole discretion.

18. Attorneys' Fees. If a Party commences an action against the other Party arising out of or in connection with this Agreement, the prevailing Party in such action shall be entitled to have and recover from the losing Party reasonable attorneys' fees and costs. t9 Law. The interpretation and enforcement of this Agreement shall be governed by the laws of the State of California.

20. Entire Agreement: Severabilitv. This Agreement contains the sole and complete agreement between the parties relating to the License. This Agreement may not be changed orally and may be amended only by an agreement in writing signed by both parties. In the event that any provision of this Agreement shall be held to be or become invalid or unenforceable in certain circumstances, the validity and enforceability of the remaining provisions, or such provision in other circumstances, shall not in any way be affected or impaired. l 7236.00000\3503s661. l
IN WITMSS WHEREOF, the Parties have executed this Agroement on the date first set forth above.

LICENSEE: SHAFTER:

Piuser Construction CITY OF SHAFTER, a public body,
corporate and politic
By:

Manager
Title:

City Clerk
as
Best & Krieger LLP City Attorney
17236.00000\35035661. I

EXHIBIT '(A)'

PROPERTY ASSESSOR PARCEL MAP
ffi License Agooment Property

0.t!1
0,03
1:2257
033 0.06 nl
0,1 kn
FI' U!F4
r 7236.00000\35035661. 1
A
l-a,r" ofl
City of Shafter
S}IAFTER COUNCIL AGENDA REPORT
Meeting Date: September 20,2022
FROM: Gabriel A. Gonzalez,City Manager
Prepared By: Michael James, Public Works Director
SUBJECT: AWARD A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE

CITY OF SHAFTER AND KSI ENGINEERING IN AMOUNT NOT TO
EXCEED $65,000 FOR THE STRINGHAM PARK SITE AMENITIES
DESIGN

RECOMMENDATION
Council find the requested action is not a "project" per Section 15378(b)(5) of the Califomia Environmental Quality Act Guidelines; accept three (3) proposals submitted in response to a Request for Proposals for the Stringham Park Site Amenities Design project; and authorize the Public Works Director to award and execute a professional services contract to KSI Engineering, Inc. in an amount not to exceed $65,000 for said project subject to said contract being reviewed and approved by the City Attorney.

BACKGROUND
Nearly $5 million in grant funding through the Clean California program was awarded for recreational improvements within the Historic Core of the City. Approximately $1 million of the grant funds new amenities at Stringham Park, including a visitor parking lot, shade structure, playground, lighting, and landscaping.

Staff recently completed an informal Request for Proposals for qualified firms to assist staff with the design of the grant-funded improvements. Three proposals were received, which are summarized as follows:

KSI Engineering (KSI) submitted the lowest responsive proposal for a proposed fee of $58,400.

While this firm has not previously provided contracted design services for the City, newly acquired staff committed to the project have provided past engineering and surveying work. An appropriate budget to cover their proposed fees plus contingency (approx. l0%) is $65,000. Upon being awarded a professional services contract to proceed, KSI expects to complete its design work within six months, putting construction in a position to start next summer and finish by Spring 2024.

KSI Ensineering.Inc $58,400
Meyer Civil Eneineering, Inc. $70,526
San Joaquin Engineering, Inc. $92,100
CONSENT CALENDAR q
Stringham Park Site Amenities Design Award

FISCAL IMPACT
An unspent balance of State of Good Repair (SGR) funds, committed to establishing a new transit station at Stringham Park, is a funding option for the proposed design services because the design entails a parking lot that supports transit ridership. Further, using SGR funds preserves Clean California grant funds for construction. The estimated unspent SGR balance progralnmed in the Fiscal Year 2022-2023 Capital Improvement Program (CIP) budget is summarized as follows:

SGR Total $191,260
Bus Shelter Purchase $13,800
Bus Bay Construction $85,000
Unspent Balance $92,460
Because the SGR funds are programmed into the current CIP, no additional budget action is required.

CEQA ANALYSIS
The action is not a "project" per CEQA Guidelines Section 15378(bX5) because the action is the organizational or administrative activities of governments that will not result in direct or indirect physical changes in the environment. Therefore, the action is not subject to CEQA.

ALTERNATIVES
By completing the necessary project design work with City staff rather than a consultant, the SGR funds can be preserved and used for other transit-related improvements within the City. However, there is currently no alternative project site identified for SGR funds. Most importantly, the design work should commence soon to complete the construction of the improvements funded by the Clean California grant before the completion deadline of June 2024. Due to limited City staffing, contracted design services are considered the best option for meeting the construction deadline.

ATTACHMENT
l. Proposals Received for Stringham Park Site Amenities Design (3) -2-
6205 District Boulevard
Bakersfield, California 93313
66t-6t7 -t7 OO I 66L'6L7 -1800 (fax)
H0til::Rlt0,ltc.

Re:

August tL,2022
Mr. MichaelJames, PE
Public Works Director
City of Shafter
720 Commerce Way
Shafter, California 93263
Proposal - Surveying and Engineering Services
Stringham Park Site Amenities
Dear Mr. James
KSI Engineering, Inc. is pleased to present this proposal for surveying and engineering services associated with the Stringham Park Site Amenities project. Our understanding of this project is based upon our review of the Request for Proposals document provided by the CiW of Shafter and subsequent Addendum 1 dated August 8,2022.

KSI Engineering is a multi-disciplinary engineering service provider located in southwest Bakersfleld, California. As you may know, in May of this year, Palmetto Engineering and Land Surveying, Inc. became a part of the KSI Engineering team. I am now the Principal Civil Engineer and Director of Land Development for KSL I'm excited to combine my many (30+) years of engineering and design experience with the resources available at KSI Engineering' While at Palmetto, I directed and oversaw the engineering and design of many publicly funded projects, including park and recreation faciliUes. We are now looking forward to continuing my history with the City of Shafter and utilizing the resources of KSI Engineering to successfully deliver a project of which the City can be proud.

For the geotechnical and irrigation/landscape portion of this project, KSI Engineering is pleased to join with two well respected local firms - Soils Engineering, Inc. and Rios Design Studios. Both firms have worked with the City of Shafter on previous projects and are excited to be included as part of the team for this project.

The remaining portions of this document will present the information in response to the Request For Proposal. Should you require any additional information or would like to discuss any portion of this document, please call (661-330-236I) or email ([email protected]) me at your convenience.

Sincerely,
a Fa"c-'
Gregory O. Black, RCE, PLS
Principal Civil Engineer/Director of Land Development
u$mnilo,tto, SCOPE OF WORK AND ASSOCIATED WORK PLAN
Our scope of work on this project will entail the following activities:
o Preliminary Site Plan Development
. Site Suruey
. Base Map Development
. Geotechnical Investigation
. Final Site Plan Development
. Design
o Grading/Drainage/Hardscape
o Foundations (Shade, Transit, Playground)
o Landscape/Irrigation
o Lighting
o Vendor Coordination
Our initial task will entail the development of a preliminary site plan. Using an approximate outline of the existing park area, we will incorporate the expected layout of the new parking area and other planned features of the park (shade structure, playground, transit shelter, etc.) to produce a draft site plan of the updated park. We will review this draft plan with City staff and revise as necessary to produce an efficient and pleasing park layout.

Upon approval of the preliminary park plan, we will gather the survey data necessary design the revitalized park. Our site suryey work will entail capturing horizontal location and elevation for all existing significant points within the project area. Significant points would include all curb and gutters (lip, flowline and top of curb), sidewalks (sufficient surface points to identify non-ADA compliant areas), adjacent asphalt surfaces, adjacent building perimeters and doors, utilities (power poles, catch basins, manholes, vaults, valve boxes, etc.), landscaping and irrigation systems, and other planimetric items (street signs, traffic control signs, fire hydrants, benches, trash receptacles, etc.). In addition to conventional suruey methods, a drone will be utilized to provide point cloud data and video documentation of the project area.

Upon completion of the field surveying activities, all point data will be downloaded and processed to create a base map reflecting all existing are topography, structures, hardscape and landscape. The resulting plan will be reviewed by the survey coordinator to ensure that the developed map accurately reflects the existing condition of the project area. The produced AutoCAD and PDF files will be made available to the City for review and reference.

Once the base map is completed, the preliminary site plan will be insefted into the surveyed park site and adjusted to conform to the actual limits of the existing park. Additionally, if any physical constraints are identified during the survey which will impact the preliminary layout the site plan will be revised accordingly.
llPage
Once the preliminary site plan is issued, we will begin interacting with product vendors for the ilsltlfll0.lr0' shade structure, transit shelter and playground equipment. We will engage multiple vendors for each item and work with City staff to select the vendors which provide suitable deliverables at competitive prices. Note that we have assumed that the City (or City-selected contractor) will purchase the actual items. This scope of work does not include procurement of any items to be installed.

The geotechnical investigation will begin shortly after completion of the site suruey. The geotechnical investigation will consist of drilling hollow-stem borings at key site locations and collecting samples for laboratory analysis. Based upon the site observations during drilling and the results of the laboratory analyses, the geotechnical engineer will provide soil properties and recommendations for the design and construction of foundations for the planned park amenities.

Should the geotechnical investigation identify any conditions that require the adjustment of the planned improvements, the park site plan will be modified. Of course, all plan revisions will be revised and approved by City staff. At this point the final site plan will be issued and site design work will commence.

Using the resulting information from all the above activities, construction plans will be developed for the planned park improvements. We anticipate issuing the following drawings a part of this package:
o Title Sheet
. Geotechnical Notes/Project Notes Sheet
o Demolition Plan (if necessary)
o Horizontal Control Plan
. Site Improvement Plan
. Grading Plan
o Foundation Location Plan
. Foundation Construction Plan and Details
. Landscape/PlantingPlan
. Irrigation Plan
o Vendor Plan - Shade Structure
o Vendor Plan - Transit Shelter
. Vendor Plan - Playground Equipment
. Supporting Detail Sheets
In addition to the plans, structural calculations for the structure foundations will be provided.

Note that all plans, calculations and documents will be stamped by the appropriate licensed professional (surveyor, geotechnical engineer, civil engineer, landscape architect).

An anticipated project schedule has been prepared and is included with the bid documents in Appendix A.
2lPage
Itotffffito,n8,

FIRM & SUBCONSULTANT QUALIFICATIONS
All surueying and engineering design work for this project will be performed by KSI Engineering, Inc. Articles of Incorporation for KSI Engineering, Inc. (KSIE) were filed with the Secretary of State of the State of California on April 25, t99L. Since its beginning in Bakersfield, California, KSIE has provided multi-disciplinary engineering seruices to many clients in Kern County and California and serving clients through branch corporate offices in North Dakota, New Mexico, Wyoming, Colorado and Texas.

While KSIE was historically a mechanical and electrical engineering firm, they have recently expanded their services to include civil engineering and land surueying capabilities. This expansion was brought about by the acquisition of Palmetto Engineering and Land Surueying, Inc (Palmetto). With this procurement, KSIE obtained the seruices of Palmetto founder and owner Gregory Black and long-time Palmetto project manager Theresa Wren. Additionally, KSIE obtained the seruices of land suryeyor Matthew Lanzer.

Mr. Black is a California-licensed civil engineer (C53952) and land surveyor (18195) with over thirlry years of engineering experience in the Kern County area. Mr. Black has work with several cities in the south San Joaquin Valley area. Specifically, Mr. Black has directed and design several projects for the City of Shafter and will provide all project management and technical direction during the entire course of this project, A copy of Mr. Black's resume is included in Appendix B of this document,
Project Manager Theresa Wren has worked with Mr. Black since July 2010. In additional to her twelve years with Palmetto, Ms. Wren previously was a project manager with Helt Engineering. In total, Ms. Wren has prepared staff repofts and studies, peformed plan checks, and managed grant funded projects for several Kern County cities for over 20 years.

Ms. Wren will provide all project controls and cost tracking for this project. A copy of Ms.

Wren's resume is included in Appendix B of this document.

Mr. Lanzer is a California-licensed land surveyor (19335) with over eighteen years of land surueying experience. With a balanced background in cadastral surueying, municipal review, topographic mapping, construction staking and three-dimensional modeling, Mr. Lanzer has a strong foundation in managing successful land surveying projects across multiple industries, A copy of Mr. Lanzer's resume is included in Appendix B of this document.

Mr. Joshua Jordan is a California-licensed civil engineer (C65605) with over twenty years of structural design experience. Mr. Jordan will be providing foundation design for the planned structures in the park. A copy of Mr. Jordan's resume in included in Appendix B of this document.

Blair Kingwell will be providing all AutoCAD design for this project. A Senior Designer with over twenty years of experience in civil drafting and design, Mr. Kingwell has provided design 3lPage
services for multiple municipal and private projects. A copy of Mr. Kingwell's resume is il$ftrilrlilc' included in Appendix B of this document.

Geotechnical services for this project will be provided by Soils Engineering, Inc. (SEI) of Bakersfield, California. Since their inception in 1966, SEI has provided quality, customized geotechnical engineering, field investigations and testing to the thriving local construction industry. Specifically, SEI has previously provided geotechnical engineering seruices for the City of Shafter.

Oversite of the geotechnical services will be provided by On Man Lau, Engineering Manager for SEI. Mr. Lau has over 30 years of experience in performing and managing geotechnical engineering and construction materials testing projects in Kern, Tulare, Kings and Fresno counties, and Owens Valley, Antelope Valley, and the Mojave Desert regions of California. A copy of Mr. Lau's resume is included in Appendix B of this document, Landscape and irrigation design services for this project will be provided by Rios Design Studio, LLC, of Bakersfield, California. With over fifty years of combined landscape design experience, the professional staff at Rios Design Studio is well-known in Kern County. Rios Design Studio has previously provided landscape and irrigation design for the City of Shafter.

Oversite of the landscape and irrigation design will be provided by Megan Rios, President of Rios Design Studio. Ms. Rios is a California-licensed landscape architect and has over thirty years of experience. A copy of Ms. Rios resume is provided in Appendix B of this document. 4lPage
rura

FIRM ORGANIZATIONAL CHART & PROPOSED STAFFING PLAN
Tasks/Detuenbbs ' Structural Cahubtbns ' Foundatbn Desbn DrawiEs Task/Detuenbhs ' Fbh Survey ' Base Map Preparatjrn Tasks/Defuerabbs ' Geotecfintal Investigatbn Repod Task/Defuenbbs ' landscape, Ir4lafDn Pbns Tasks/Defuerables
' Ttie Sheet' Geotechnbal Not6/Project Notes Sheet ' Demofon Pbn (f necessary) ' Horizontal Control Plan' Ste Impmvement Plan ' Grddhg Plan

SURVEY CCORDINATOR

MATT LANZER, PLS
GEOTECI-iNiCAL CONSUTTANT

ON MAN LAU/ RCE, GE (SEI)
iK\.bA ! lJi\ cJ:!5!- | A \ i

MEGAN RIOS, LA (RIOS)

GREG BLACK, RCE, PLS

PRINCIPAL CIVIL ENGINEER
PROJECT MANAGER,,TECHNICAL LEAD,;CONTRACTS

BLAIR KINGWELL
SENIOR DES]GNER,
PRO]ECT AUTOCAD DESiGNER

THERESA WREN, EIT
PROJECT SPECIAL]ST
PRO]ECi CONTROi5,, PRCGRFSS TRACKING
]OSHUA JORDAN, RCE
S,fRUCTURAL DES]GN
SlPage
Itltruffim,ilc,

RELEVANT PROJECT EXPERIENCE
Veterans Memorial Plan
Prepared construction drawings for a new Veterans Memorial to be installed in Veterans Park in Shafter, California.

Client: City of Shafter
Year Completed: 2019
Sites and Sounds Preliminarv Park Desisn
Prepared preliminary plans and project cost estimate for proposed park in Wasco, California for Urban Greening Program grant funding purposes. Project was advanced to final round review, but ultimately was not funded.

Client: City of Wasco
Year Completed: 2019
Barker Park Walkinq Path Proiect
Oversaw development of plans to construct walking path in Barker Par( improve adjacent street sidewalK and install ADA compliant curb ramps at park corners. Project was funded through HSIPL.

Client: City of Wasco
Year Completed: 2018
Hiqhwav 166 Park lmprovelnents
Designed the park expansion including parking area, sidewalks, picnic tables, barbeque grills and trash receptacles, and landscaping and irrigation for local park. Project recently received funding and construction is expected in 2023.

Client: City of Maricopa
Year Completed: 2015
Memorial Park lmprovements
Prepared construction plans for park improvements including new sidewalk, landscaping, gazebo installation and irrigation system installation. Provide ADA access to existing park building.

Client: City of Maricopa
Year Completed: 2013
Annin Soccer Pa Liohtino Desiqn
Prepared electrical plans for new light standards and irrigation pump for an existing soccer park in Wasco, California.

Client: Wasco Recreation and Parks District
Year Completed: 2020
6lPage
It$rflilr0.m,

APPENDIX A

PROPOSAL FORM

BID DOCUMENTS

PROPOSAL FORM

DESIGN OF STRINGHAM PARK SITE AMENITIES
To: City of Shafter
Public Works Department
ATTN: PUBLIC WORKS DIRECTOR
720 Commerce Way
Shafter, CA 93263
ln compliance with your Request for Proposal, the undersigned, hereinafter termed the Offeror, proposes to enter into a Contract with the City of Shafter to provide the necessary design, engineering, drawings, and calculations for:

RFP. DESIGN OF STRINGHAM PARK SITE AMENITIES
The Offeror has carefully examined and fully understands the Contract, General Conditions, Special Conditions, General Requirements, Scope of Work, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his Offer is accepted, he will contract with the City of Shafter in full conformance with the Contract Documents.

Unless othenuise directed, all work performed shall be in accordance with the terms and conditions of this solicitation, scope of work, and sample Contract.
ln accordance with the foregoing, the undersigned proposes to design, engineer, provide plans for, obtain approval the items listed in the attached Offer schedule for the unit prices stated, The Offeror agrees that the cost of services provided or expenses incurred, which are not specifically delineated in the Contract Documents but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled. lf this Offer shall be accepted by the City of Shafter and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Shafter may, at its option, determine that the undersigned abandoned the Contract and thereupon this offer shall be null and void and the City of Shafter may proceed to award to another Offeror, Offeror acknowledges receipt of the following addenda: Addendum 1, dated 8/08/22 I certify that this offer is made without prior understanding, Contract, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards.

I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer.
7 Offeror further declares that the full name and resident address of the Offero/s Principal is as follows OFFEROR:

Company Name
Mailing Address
KSI Engineering, Inc.
6205 District Boulevard, Bakersfield, California 93313
Phone: 66t-6I7-I7OO Fax: 661-617-1800
Authorized
Signature:

Print/Type Name:
a
O. Black
Title: Principal Civil Enqineer
Date: August tZ, ZOZ1
Deliverable Cost Schedule
Preli minary Site Layout $3,000
Topography Study $6,000
Preli minary Soils Study $5,600
FinalSite Layout $3,000
Draft Construction Plans (50o/o) $20,400
Final Construction Plans for Bidding $20,400
Project Total $58,400
8 PROPOSED CONTRACT SCHEDULE
Offeror shall include a proposed schedule with their proposal illustrating all tasks including preliminary plans and layouts of key equipment and spaces, structural analysis, design, tasks up to an including project completion.

The following is a sample form only that the offeror may illustrate the proposed schedule will also be acceptable to the City. SEE ATTACHED

PROJECT SCHEDULE

WEEK TASK
1 2
3 4
5 6
7 I
o
10 11
12 '13
9 DESIGNATION OF SUBCONTRACTORS
Portions of Work Subcontractor Location of Business
Geotechnical
Investioation
Soils Engineering,
Inc.
4400 Yeager Way
Bakersfield, California 93313
Irrigation System
f)esinn
Rios Design
Studio
3805 Ora Vista Avenue
Bakersfield. California 93309
Copy & aftach additional forms lfnecessary
By
Gregory O. Black Principal Civil Engineer
Date
Name (Print or Type)
Company Name: KSI Engineering, Inc.

Title
Date: Auoust L2.2022
10 CITV OF SHAFTER DESIGN OF STRINGHAM PARK STTE AMENTTIES

PROJECTED PROJECT SCHEDULE

FEBRUARY

WFFK OF
216 2lL3 2120

JANUARY

WFFK OF
Llz u9 LIL6 Ll23 1/30

DECEMBER

WFFK OF
Lzls L2IL2 L2n9 L2t26

NOVEMBER

WEEK OF
LLIT ILIL4 LLI2T LLI28

OCTOBER

WEEK OF
10/3 10/10 LOIIT rol24 10/31

SEPTEMBER

WEEK OF
916 9lL2 9lL9 9126

TASK / DELITIERABLE
Preliminary Site Plan Development

REVIEW PREUM SITE PIAN WITH CITY
Revise/Complete Preliminary Site Plan
Vendor CoordinationSite Suruey
Base Map Development
Geotechnical Investigation
Final Site Plan Development

CITY APPROVAL OF FINAL SITE PLAN
Design (50o/o Complete)
CITY REVIEW OF 50o/o COMPLETE PLANS
Design (100o/o Complete)
CITY REVIEW OF 100o/o COMPLETE PLANS

ISSUE PLANS FOR CONSTRUCTION
Itoil$Nrr0,ila

APPENDIX B

PROJECT PERSONNEL RESUMES
u3tmilnila
Gregory O. Black, RCE, PLS
Principal Civil Engineer
Director of Land Development
Gregory is licensed in the State of California as
both a Licensed Civil Engineering and as
Professional Land Surveyor. During his 30+
year career in civil engineering and land
surveying, Mr. Black has accumulated vast and
varied experience. His experience includes
serving as a City Engineer, designing federally,
state and locally grant funded projects for
various municipalities. Projects included
pedestrian improvements, transportation
improvements and streetscaping
improvements.

Project Experience
City of Wasco - Wasco, California
Contracted City Engineer/City Surveyor for the City of Wasco (2010 - 2019) Design and oversight of multiple pedestrian improvement projects, traffic enhancement projects, Safe Routes to School projects. Many of these projects included landscaping and ha rdscape im provements.

City of Shafter - Shafter, California
Prepared city park plans, landscape easement designs as well as subdivision maps on City properties (parcel maps, tract maps, lot line adjustments), prepared legal descriptions and illustrative maps for various right-of-way and easement documents, including annexations, designed projects which required initial boundary and topographic survey work.

Grant Funded Municipal Improvement Proiects
Conducted and directed numerous state- and federal-funded projects for the following local jurisdictions: City of Wasco, City of Shafter, City of Tehachapi, City of Maricopa, City of McFarland. The projects included pedestrian improvements, landscape and hardscape i m provements and traffic en hancement projects.

Residential and Commercial Development Clients
Prepared numerous street improvement plans and landscaping plans within the City of Bakersfield, County of Kern and many other jurisdictions within California.

Emplovment Historv
KSI Engineering, lnc | 2022-Present
Principal Civil Engineer/Director of Land
Development
Palmetto Engineering and Land Surveying,
lnc. | 2oo8-2022
President/Principal Civil Engineer and Land
S u rveyo r
DeWalt Corporation | 2004-2008
Director of Engineering
T.J. Cross Engineers, Inc. | 1995-2OOO4
Chief Civil Engineer
Environmental Technology Engineering,
lnc | L988-1995
Staff Engineer
REV 08-05-2022
:t$ttlilxltt8.

Theresa A. Wren, EIT
Project Specialist
Theresa is an Engineer-in-Training and a
Qualified SWPPP Practitioner-in-Training.

During 20+ yeat career in civil engineering
and land surveying, Theresa has
conducted and supervised varied projects
including municipal road projects,
streetscapes, land division mapping and
annexations, preparation of legal
descriptions, funding management, and
report preparation as required for
municipal needs.

Project Experience
City of Wasco - Wasco, California
Contracted City Engineer/City Surueyor for the City of Wasco (2010 - 2019) Managed funding applications, estimates, specifications, bidder qualifications, project monitoring, certified payroll audits. Maintained DBE Program. Prepared Engineer Reports for the Lighting and Landscape Maintenance Districts. Prepared reports including Urban Water Management Plan, Small MS4 report, FEMA updates, and Water and Refuse Fee Studies.

Wrote legal descriptions for City easements, dedications, and reviewed land division map submittals.

City of Shafter - Shafter, California
Prepared land division maps on City properties (parcel maps, tract maps, lot line adjustments), prepared legal descriptions and illustrative maps for various right-of-way and easement documents, including annexations. Research grant opportunities for water meter installation.

Storm Water Pollution Prevention Plan Support
Prepared and amended SWPPPS and WPCPs for Risk Level 1 projects throughout Kern County. Reported weekly and annually on SWPPP compliance on 22-mile project. Provided oversight on weekly and annual reports for Risk Level 2 project for LA Metro. Completed CISEC Training as a QSP-in-Training and Caltrans required WPCM 8-hour training.

Residential and Commercial Development Clients
Processed reports and studies for numerous tentative parcel/tract maps and final maps within the City of Bakersfield, County of Kern and many other jurisdictions within California.

KSI Engineering, lnc | 2022-Present
Project Specialist
Palmetto Engineering and Land Surveying,
tnc. | 2OLO-2O22
Project Manager
Helt Engineering, lnc. | 1998-2010
Project Manager
CSU Bakersfield | 1996-1998
Teacher's Assistant, Dept. of Mathematics
Emolovment Historv
REV 07-25-2022
n0lffmnilG.

Matthew J. Lanzer, PLS
Chief lnnovation Officer - Geomatics and Geospatial Services Matthew is licensed in the State of California as a Professional Land Surveyor and oversees all surveying operations at KSl, Engineering, lnc. (KSIE). His leadership, construction experience, and use of technology provide the KSIE client base land surveying and consulting services with a solid foundation of innovation, integrity, and reliability. Matthew's ability to successfully complete work assignments outside the land surveying profession in Kenya, Nicaragua, and the Philippines has proven his resourcefulness and dependability.

Project Experience
Water Storage and Distribution
Kern-Tulare Water District- Guzman Reservoir
Conducted boundary, right-of-way, and aerial/terrestrialtopographic mappingforthe design of the Guzman Reservoir off Highway 65. Managed construction staking services and aerial quantification services in conjunction with Granite Construction. Reservoir completion in summer, 2021.

East Niles Community Service District
Conducted boundary, right-of-way and aerial/terrestrial topographic mapping for the design of numerous distribution systems within the east Bakersfield area. Managed construction staking services for system layout.

Semitropic Water Storage District
Conducted boundary, right-of-way and aerial/terrestrial topographic mapping for the design of numerous distribution systems within the Shafter service area.

Municipal
Project management and consulting for the layout and construction of the Bakersfield College ABC building and related site improvements, Del Oro High School (lncrements 1 and 2), Highgate Elementary School, Crescent Elementary School. Field layout of the White Lane/Highway 99 southbound onramp and Allan Road bridge (Kern River crossing).

Municipal review of tentativefinal maps and certificates of compliance for land division applications for the Cities of Malibu, Pasadena, Buellton, Goleta, Salinas, Greenfield, Arroyo Grande and Carpinteria.

Oil and Gas
Project management of aerial and scanning services and online geospatial representation of point cloud data.

Project management and oversight of aerial surveying via UAS of 2,000+ acres and mapping of over 40,000 pipelines in Poso Creek, Belridge, Lost Hills, Midway Sunset and Maricopa fields in Kern County, CA for ABL42O and 481960 compliance.

Project management of platting and construction of numerous wells and well pads throughout the Kern County area.

Commercial and Residential
Project management and oversight of construction layout of numerous tracts within Bakersfield, Tehachapi, Rosamond and Ridgecrest.

Project management and consulting for construction of numerous commercial developments within the Kern County area, including the Maya Cinemas in Delano and the Gas Company's Bakersfield base.

Emplovment History
KSI Engineering, lnc | 2021-Present
Chief lnrrovation Officer
Ceornati<:s anrJ Geospatial Servir.es
Cornerstone Engineering, lnc. | 2OL7 -2}zt
Marraging Project Su rveyor
MNS Engineers, lnc. | 2OL6-2OI7
Project Surveyur
Well Analysis Corporation | 2010-2016
ProrJuction Specialist
MNS Engineers, lnc | 2OO7-2OLO
Assisl ant Projer:t Surveyor
Cornerstone Engineering, lnc. | 2OO4-2OO7
Proier;l. Coordinator
REV 03-10-2022
lmmnillila
Joshua M. Jordan, PE
Structural Design
Matthew is licensed in the State of California as a Professional Engineer and holds a Bachelor of Science degree in Civil Engineering from California Polytechnic State University, San Luis Obispo.

Matthew leads the Structural Design at KSIE. He has extensive experience in structural design for petroleum, commercial and shoring projects throughout the Central Valley and the Central Coast.

Matthew's experience with management of a diverse team and successful project delivery are an asset he brings to KSIE clients.

Project Experience
lndustrial
Design for anchorage for thirty-six storage tanks and new access catwalk structures Design of 160-kip steel condenser stand design & wind screen (Grimmway Farms) Concrete tilt up buildings: design with reinforced concrete roof deck (Lusich Farms); seismic retrofit 47,500 sf storage
Design for LO-ton crane, 4-ton monorail crane, S-ton bridge crane, job crane addition, silo tank foundation, interior offices, frame retrofit, dock retrofit, weighmaster office building condenser stand for clients on the Central Coast and CentralValley
Design of steel building addition with interior offices (Paramount Citrus), 15,000 SF steel bldg with 2-story wood frame (Patterson Crane), 6,000 SF steel canopy , I4,O0O SF steel canopy w/ 10-ton crane (Cleo Mfct.) Retrofit foundation anchorage for huller process equipment, 72,OO0 SF steel building addition (Sunny Gem Almond)
Commercial
Design of Best Western hotel, pool equipment building and retaining wall Remodels including 88,000 SF concrete tilt up building for new truck dock, 2-story CMU building with new elevator shaft enclosure, CMU bldg for new car FIAT dealership with suspended light gauge steel ceiling Design office buildings: 15,000 SF steel 2-story office bldg / 45,000 SF warehouse / I2,OOO SF canopy; 6,000 SF (4 total) steelwith cantilevered entry canopy
Design of Kern River Brew pub 6,000 SF with 2-story wood office inside, tank anchorage Design at Kiler Grove Winery: steel pile shoring design for basement and site retaining walls Pacific Tire: 5,400 SF CMU bldg. with interior wood frame mezzanine tire storage Residential
Project management and design of 4-story residence with elevator shafts, drilled pier foundations.

Design helical piles to stabilize and lift foundation after 50 years of settlement.

Design of seismic retrofits in residences along the Central Coast Emplovment Historv
KSI Engineering, lnc | 2021-Present
Structural Design
Cornerstone Engineering, lnc. | 2OL9-202t
Struct urol Derign
Joshua M. Jordan, P.E. | 2018-2019
Prinr:lpa I
ATS Engineers, lnspectors & Surveyors I
2015-2018
Structural Departnrent Manager
Jordan Engineering, lnc. | 2003-2015
Pri nci pa I
Jordan Design | 1998-2003
Owner
REV 08-09-2022
Ir]tEtrt0,llt
Blair Kingwell
Senior Designer
Blair is a Senior Designer with over 20+
year career in civil engineering as well as
oil and gas drafting and design. Blair has
designed varied projects for municipal
improvement plans, subdivision
developments, precise development
plans, wells, and pipeline rights-of-way. ln
relocating from Alberta, Canada, to the
United States, Blair demonstrated
flexibility and resilience that he brings to
KSIE clients.

Project Experience
Residential and Commercial Development Clients
Designed Site Grading and Drainage Plans for commercial development and agency prolects.

Drafted and designed subdivision improvement plans including street, water, sewer.

Created Precise Grading Plans.

Oil and Gas
Supported field crews for well pad and access road design, tracked material lists, volumes, cuUfill reports
Mentored and provided technical training for new and existing employees Managed the GIS database
Completed borrow pit and water pit design
Planned well site and pipelines utilizing LiDAR, aerial photography, and satellite imagery Created plans and profiles, cross sections, volume, and 3D modeling Prepared Real Property Reports for the City of Calgary
Customized CAD experience using AutoLlSP and SCRIPT
KSI Engineering, Inc | 2022-Present
Senior Designer
Cornerstone Engineering, lnc. | 2O2O-2O22
Senior Designer (Contractor)
All-Can Engineering & Surveys (L976) Ltd.,
Calgary, Alberta I I997-20L9
CAD Technical Lead (2010-2019)
CAD Draftsman (1997-2010)
SIAST Palliser lnstitute, Moose Jaw,
Saskatchewan | 1996
Diploma, CAD and Engineering Technology
Emol nt Histor V
REV 08-04-2022
On Mnn Leu, P.E., c.E.

EttcrneERrNG Menacen
EDUCATION:

California Polytechnic State University, San Luis Obispo:

B.S., Civil and Environmental Engineering, 1992
California Polytechnic State University, San Luis Obispo:

M.S., Civil and Environmental Engineering, 1994
REGISTRATION:

Registered Civil Engineer, C057398 - Californi4 September 1997 Registered Geotechnical Engineer, GE2644 - California, Jantary 2004 PROFESSIONAL HISTORY:

Soils Engineering, Inc., Bakersfield, CA
BSK Associates, Bakersfield, CA
Feb. 2022-Present
1994-2022
PROFESSIONAL BACKGROUND:

Mr. Lau has more than 30 years of experience in geotechnical engineering, soils/earthwork observation and testing, and construction materials testing and inspection. His areas of expertise include investigations for foundations, seismic hazards, slope stability, liquefaction analyses, drainage studies, footing foundation designs, settlement evaluations, pavement designs, slab-on-grade design, drilled pier design and construction, pile driving design and construction, expansive soils, corrosive soils, excavation stability, shoring, compaction requirements and volumetric calculations.

His projects have included water and wastewater facilities, pipelines, canals, bridges, roadways and highways, schools, hospitals, parks, multi-story buildings, commercial office complexes, airports, energy sites, dams, retaining walls, manufacturing plants, and police/fire/prison sites. Mr. Lau has performed and managed geotechnical engineering and construction materials testing projects in Kern, Tulare, Kings and Fresno counties, and Owens Valley, Antelope Valley, and the Mojave Desert regions of California.

RELEVANT PROJECTS
. Bakersfield Sport Village, Bakersfield, California
. Kern Counly Buena Vista Lake Improvements, Kern County, California . Kern CounQ Lake Ming Improtements, Kern County, CaliJbrnia . City of Bakersfield Bike Path, Bakersfield, Califurnia . City of Delano, Skate Park, Delano, California
' City of Porterville, Henderson Road Project, Porlerville, California . City of Corcoran Park Improyements, Corcoran, California . City of tilasco, Park Improvements, Wasco, California . City of McFarland, Park Improttements, McFarland, California . City of Taft, Bike Path, Taft, California
ffitrEil
StJtl:i Ir:r.;:'r;:1tt 1'r1 l:tl
Rior Derign Jtudio Lcndrcope Architecture & Derign
3805 Orcl Virto Aue. Boherrfield CA 93309 (CCt) 935-C259 riorderighoGoln PLA #3250 RIos DESIGN STUDIO LLC
38o5 Ora Vista Avenue
Bakersfield, CA 93log
www.riosdesiEn.com
EIN 26-4269026
Phone: 66t-835-9259
Fax:66t367-5284
Email : meEanr(OriosdesiEn.com
Founded in zoo9, Rios Design Studio is a California Limited Liability Company, woman owned business, City of Bakersfield Tax Certificate # to ootry849, and City of Bakersfield, and City of McFarland Business License. Employees... (l) three total. Landscape Architects are licensed by the State of California.

RIOS DESIGN STUDIO provides a variety of Landscape Architectural Design services with specialties in Site Planning, Design Detail, Preliminary, Site Plan and Design Review, Urban Design and Redevelopment Master Planning, Presentation Graphics, Planting and lrrigation Design.

RDS can provide hand and AutoCAD format generated drawings. We are proficient in Microsoft Word and Excel, as well. RDS can provide issue calculations and technical memorandums, cost estimates, phone and onsite meetings, and observations with City architectural and engineering staff and any other required material to aid in the completed installation of proposed projects with the County of Kern, and other cities within Kern County and beyond. We are familiar with grant funded projects and will work within the specified constraints to achieve positive results. We are currently involved with public works and redevelopment projects in Bakersfield CA.

RDS can provide plan which are compliant with MWELO, California Water Conservation Bill. We have all the certificates and licenses necessary for landscape and irrigation design. We are drought tolerant landscape design as well as water efficient inigation design and review of installed irrigation systems.

Client References:

1. Derek Holdsworth, Principal, KSA Group Architects,4660 American Avenue, Bakersfield CA 93309, 66t-834-t33t, [email protected]

2. Don Evans, PrincipalArchitect, Klassen Corporation,2ozt Westwind, Bakersfield CA 93301, 66'r-324-3ooo, [email protected]
Matt VoVilla, Principal, LAV/Pinnacle Engineering, tz4tS Rosedale Hwy, Suite A, Bakersfield CA 933t2 Ph. 66t-869-ot 8, [email protected]
Mark W. Steele, President, M.W. Steele 6roup, lnc. t8o5 Newton Avenue, Suite A, San Diego, CA 92113, (6t9) 4o-o325, [email protected]
Danny Ordiz, Principal, Ordiz MelbyArchitects,55oo MingAve Suite z8o, Bakersfield CA 93309, 66t-832-5258, [email protected]
Greg Lince, President and CEO, McMurtrey Lince lnc., 424% z4th Street, Bakersfield CA 93301
66t-32l-9l3o greg@m cm utrevl i nce.com
3 4
5 6
L
Rios Derign $tudio Lqndrcqpe Architecture & Derign
il8o5 Orcr Ui*q Aue. &rherrfleld CA 93309 (661) s35-9259 riordedgn.com PLA #3250

FIRM EXPERIENCE
Mecnn E Rros PLA#326o
PnEsroenr
With twenty-nine years of experience in the field of Landscape Architecture, she has practiced in the design and construction of commercial developments in California, Nevada and Arizona, including office complexes, hotels and casinos, and daycare facilities. Having worked at several notable Landscape Architectural firms, she is well versed in a wide diversity of projects.

Understanding the soil make up is imperative to choosing the right plant material for its survival. RDS is unique, because they provide soil analysis and recommendations prior to design and work the soil requirements into the design. Mrs. Rios also has specialized in salvaging protected native plant material such as cacti, well as, relocating them, as required. She considers each site, and can necessitated the use of existing plant material and its low water needs while introducing additional plant material to create a special space.

Rios Design Studio (RDS) takes pride in developing landscapes which use water responsibly while branding a marketable look and manageable design. Whether it is model homes, custom residences or even commercial sites, she can bring a distinctive look while working with maintenance personnel to establishing a readable design to the public and customer. Crossroads Business Park is an example of an industrial site that has been planted and irrigated as per the California State Water Conservation Law (MWELO) to welcome the public and be easily maintained. RDS also works with hotels like Holiday lnn Express & Suites in Ventura, CA. Artisan Square Shopping Complex is a high end successful retail complexes that we designed for bold color and low water use planting to entice shoppers.

Creating a sense of community is essential for Rios Design Studio. RDS has worked with key architects and local state housing authority agencies on two farmworkers housing projects; one in Almond Village Multi-family and Single Family in Lost Hills CA and the other in Wasco, CA. Each housing project includes a park & club house with a variety of housing types like apartments, duplexes, and single family units. RDS is currently involved with the ARC committee for K. Hovanian's Four Seasons HOA. Mrs. Rios works with the committee to provide professional direction to the review of new landscapes within the community. RDS has also worked with local Engineer, LAV/Pinnacle Engineering, in the design of the City of Arvin's Garden in the Sun Spray Park and Par Course Park. With both projects RDS had introduced low water using, easy to maintain, hardy native plant material in conjunction with the use of new innovative irrigation techniques to promote water conservation and ease of maintenance. RDS works with the local maintenance directors to ensure long lasting beautiful City landscapes.

EDUCATION
Bachelor of Science, California Polytechnic State University, Pomona CA, 1985

LICENSURE
California Licensed Landscape Architect #3260, obtained in 199o Arizona Licensed Landscape Architect #434o9, obtained in 2005 2 Rior Derign Jtudio Lqndrcqpe Architecture & Derign
i!8o5 Ora Virta Aue. Bcherrfield CA 93309 (661) 835-9259 riordetign.com PLA #3260 Jnrnne Rros PLA #zglg
Vrce PResroerur
With thirty years of experience in the field of Landscape Architecture, he has practiced in the design and construction of a wide diversity of projects located in California and Nevada. These projects primarily consisted of master planned residential, educational and public institutions, park and recreation and commercial type of projects.

From the beginning Rios Design Studio, has made a commitment to designing landscapes which make effective use of water. This is the company Mission Statement. By adopting a strategy that is proven to work, our slogan is /Conservation by Designt'.

Listed below are projects that focused on water conservation that Mr. Rios has worked on.

The Wonderful Company's (Paramont) Headquarters in Kern County had goals to change the landscape look of grass, eucalyptus and junipers to a new brand of beautiful, flowering, drought tolerant frontage that could also be used by the employees with a walking path and covered dining patio. Mr. Rios designed the exterior to reflect the blossoming nature of the Wonderful Company with many flowering plant materials that attract hummingbirds and butterflies.

While working on the West Kern Pedestrian Bridge Approach in McFarland, RDS prepared the plans to be drought tolerant and the irrigation to be as efficient as possible. No sprays were used on the project at all. The trees were watered using deep root bubblers, the shrub beds were irrigated using dripper lines that were covered with wood mulch and the turf was irrigated using a subsurface irrigation system, thereby eliminating overspray and run-off issues.

While working with Klassen Corporation, Rios Design Studio landscaped the Oxy Emergency and Fire Station, west of Taft, CA which utilized local desert plant material to blend in with the existing oil facility and incorporated point to point drip irrigation as a water conservation measure. The area is very arid and has weather patterns that change the wind direction and strength often. The local faunas, such as rabbits and ground squirrels, tend to eat away at the plant material. The Caterpillar Plant within the Teion lndustrial Complex, the planting and drip irrigation design minimized maintenance while still providing some softscape around the entrances.

Mill Creek Community redevelopment project, Bakersfield, CA (zoto). The project consists of streetscapes, Townhouses, Apartments, a small pocket park. The entire project was designed to meet the requirements of AB 1881. The irrigation system uses a smart controller to automatically adjust systems runtimes as the seasons change throughout the year. Drip irrigation delivers water to the shrubs that fill the landscape beds and the trees are irrigated with deep watering bubbler systems. Calculations were done to determine a Maximum Applied Water Allowance (MAWA), based on the project size and evapotranspiration rate of the city. Once the systems were designed an Estimated Total Water Use (ETWU) calculation was done to determine how much water would actually be used and to show that it was less than the MAWA.

Grimmway Academy Charter School located in Arvin, Ca. The project was designed to have a Mediterranean 3 flavor in the architecture and the landscape. With that, the plant material is drought tolerant in nature and the majority of the campus is to be watered by drip irrigation. There is a soccer field on the site that will be irrigated with a rotor system for efficiency. The campus also includes an edible garden that is watered by hose bibs, per the request of the private consultant designing the edible garden as an educational part of the campus.

A 45 acre campus, Dr. Douglas K Fletcher Elementary & Paul L Cato Middle Schools, for BCSD was completed in 2014. The project is a combined Middle School and Elementary School on one site. The two campuses include large sport field areas, the inner campus between the classroom and the front of the school designed for staff parking and student drop-off and pick-up. The front of the school has drought tolerant landscaping, using drip irrigation installed. The sport fields will be watered using rotor systems and the inner campus will be utilizing spray irrigation. He was also involved in revitalizing his alma mater, Delano High School football field and practice field , redesigning a new irrigation system and drainage system with Ordiz Melby Architects. He has been involved with many other modernizations of local campuses as well as new elementary campuses.

Mr. Rios has specified several projects using artificial turf. One such project is Almond Village Multi-family Complex in Lost Hills, Ca with KSA Group Architects office and the Wasco Farmworkers Housing Complex, as well as, new and modernized schools. Both Multi-Family Complexes called for only large center plaza for play a4d outdoor dining. ln the Almond Village, the single family housing included real turf only in the backyards.

Both projects met all the LEED and Green Codes. All other areas larger projects using the artificial turf may require irrigation and specialty drainage in order to be compliant with sports fields requirements.

Mr. Rios has concentrated a focus on efficiently designed irrigation systems for maximizing water conservation. He has twenty-nine years of experience in designing irrigation systems as a landscape architect.

As a further commitment to this cause, Mr. Rios has passed requirements to obtain certifications issued through the lrrigation Association. He is a Certified Landscape lnigation Auditor (CLIA) and a Certified Irrigation Designer (Cl D).

EDUCATION
Graduated from California Polytechnic State University, San Luis Obispo, CA Bachelor of Science Degree in Landscape Architecture, t984 LICENSURE.

Registered as a Landscape Architect in the State of California (License #2979),t989 CURRENT CERTI FICATIONS.

Certified lrrigation Designer obtained through the lrrigation Association in zoog Certified Landscape Irrigation Auditor obtained through the lrrigation Association in 2oo9 AWARDSHunter lndustries Trailblazer Award (zot5)- The Trailblazer Award showcases professionals who have demonstrated innovation, leadership, and forward thinking in the irrigation industry. 4 u$$nlrl.ns.

APPENDIX C

DBE GOOD FAITH EFFORT DOCUMENTATION
H0ilffRile,il0.

DBE SOLICITATION
DUE DATE: Thursday, August Lt, 2022 @ 9:00 a.m.

PROJECT NAME: City of Shafter - Stringham Park Amenities PROJECT LOCATION: City of Shafter, Kern County, California DESCRIPTION: Geotechnical Services
KSIE is seeking participation from qualified subconsultants for the above project.

Subcontracted work includes preparing a geotechnical investigation for a new transit shelter, recreational shade structure, and playground equipment.

The City of Shafter project for the design of new amenities for Stringham Park is located on the northwest corner of the intersection of James Street and Lerdo Highway. The park propefi includes two lots: APN 027-27t-0t and -02. See attached samples of the types of structures that will be paft of the design package.

CONTACT:

Greg Black, Principal Civil Engineer & Director of Land Development KSI Engineering, Inc.
6205 District Blvd
Bakersfield CA 93313
[email protected]
Mobile: (661) 330-2361
x,r s # u F'p fti 5? q o !sc"arov'*'i{} i{'
Oa:tc nrpona *r"ito : Ortt i,lon Tlg' , Uif'^g . lmlwm Tnntd. Zmm 8lu€b..n ; Vrr pttitttllorr ' I I rurnr iqla rli i I : t bngursci loon i i vtarpornt i loo'in ;PttrhAttn ia file Mcllge Hslp SLUESEAM
DBE Solicitation City of Shafter
Wren Theresa
t6 n$hotr0cvtrr.$m; dwlngopltihhnd.(onx pwloorgcaco.tom; O Blatl( Grug I B ?$*;;;;;;";';i'edr ;l.l Srmplc Pbygroundjpg Shrdc Structu.sP0f IMB ill 18
Profil.of lnt!.in Tr.ffin ShchG.idt v .
?9t K8
Hellol
KSI ElUlneerlng, lnc. ls seeklng podldpaffon from quallffed zubconnrltanb for the aborre poJect. Subconbacted wo* lndudes preparlng a geotedrnkal ln€sfigatlon for a rplv banstt strelter, recr€ttlonal shade sbucture, atd playground equlpment. See detalls ln the attacM documenb,
Thank yon,
a Tue f.i9ll$?l l2:4! PM
Sl'rch

DBE SEARCH AND FOLLOWUP
Certified Directory
As of 8/9/2022 11:28:06 AM
Results filtered by search parameters Geotech (C8780) Work in Kern The information provided in this file is not to be used for unsolicited advertising, spam, or any other unauthorized use. 559-891-8815
405-452-9004
l* 7L4-630-O326
559-891-8811
408-452-9000
71,4-630-0321
Selma

MILPITAS
Anaheim
2511 Logan Street
1497 N MILPITASBLVD
685 N Shepard
Street
SAHOTA
WangChrysovergis
NICKDavidPanajotis
CENTRAL VALLEY ENGINEERING ANDSURVEYING, lnc.

Parikh Consultants, lnc.

SPC Geotechnical, lnc
Generated from the B2Gnow System.

NOTES FROM KSIE:

There are no certified DBE firms performing Geotechnical work in Kern County We sent solicitations to the 3 DBE firms in the Caltrans search results above.Solicitation Emailed to all parties (attached): 8/912022 Central Valley Engineering, followup call S/LO|22. Message left.

Parikh Consultants, lnc., followup call S/70/22. Message left.

SPC Geotechnical, lnc. submitted a proposal (attached)
The proposal for SPC Geotechnical lnc. was not selected. lt was 45% higher than the estimates provided by local firms. The firm is located in Anaheim NOTES FROM I(SIE:

There are no certified Female DBE firms performing Geotechnicalwork in Kern County.

Ehry*qbrv ffirmdisl **l i$adi*
CERIIFI€ATIOFScs{tltoDtTfcoDE
uroH( DtsrilcTsrEGfolrs
GFilNFR
m r*qr*:fnnrcA*:pir:PSflcRffiECefieEr€fiEEm .FGtrrEEltrcflftcnr Fcarle
Yorlr eearcir Fsrarn€Fere. did rltrt retrrrn aq{ rn#tes" (hcft Edf hrsr{ilf,rlr. m${ffi/t*re lnr$erwration iir the ffelds e&BFE srd dicl* Seamlr"aepin.

ITGIM:Ril0.ilC,

DBE SOLIGITATION
DUE DATE: Thursday, August tt, 2022 @ 9:00 a.m.

PROJECT NAME: City of Shafter - Stringham Park Amenities PROJECT LOCATION: City of Shafter, in Kern County, California DESCRIPTION: Landscape Design
KSIE is seeking participation from qualified subconsultants for the above project.

Subcontracted work includes designing and preparing construction drawings for a new irrigation system to replace the existing irrigation system and support the plantings around the parking area and approximately 10 new trees in the remaining park area.

The City of Shafter project is for the design of new amenities for Stringham Park which is located on the northwest corner of the intersection of James Street and Lerdo Highway. The park propefi includes two lots: APN 027-271-01 and -02. The majority of 027-27t-01 will be replaced with a parking lot with some surrounding landscaping ornamental landscaping comprised of shrubs, groundcover, or other drought-tolerant alternatives approved by the City. See attached preliminary parking lot plan.

CONTACT:

Greg Black, Principal Civil Engineer & Director of Land Development KSI Engineering, Inc.
6205 District Blvd
Bakersfield CA 93313
[email protected]
Mobile: (661) 330-2361
rib
X
Msls{ge Help
sht!? 6lo

STUESEAM
e) 1' rg F p is 5t
Trrsartr
trf,9sga
o,
::

I I sild lo Virlr s
Yilr
h$ghti
Add.in
f'.{
0datc Rrlpond Quick Mryc Ilgt Idrting lmmwivr Slucbcam PhirhAcn b* Sropo. Brport
larnr 6ric", Vlspotnl Phiih tt.rt
DBE Solicitation for Landscape Design
a
Wren, The.esa
Tc bdt''alrn*(!p€Ot..don.ncf tas,muat(6{ity*o*l.brr lcffoff:ludio:.ton: lhttg$dohlygoodleeoc.(om; r6yolclkrnit.hlli.(om; ?le@nnconi..(omi i SbcL6tca
"fst 9'91,10J? ll:J1 pM
0 thrr rr thc nort r.(tnt raBton, Dul yfl sada (htng!t lo !noth!. (opy. lli(t ltrt to Jaa lh? olhlt ftttloar.

St.inghrm P.rt P.*rng Arcr.gdl
4M8
Hellol
l€I Englneerlng, Inc. ls seeklng parUclpaUon from gudM zukonsultants for the abore prore€t, Subcontracted no* lncludes deslgnlng and preparlng constuctlon drawlngs for a neu, lnbatlon system to reploce the eld*lr€ lnlgaton system atd support the plangngs around the parklng area and appro<lmately 10 n€$r tre€s ln tfre remalnlng park area. See d$lls ln the attached documenE.

Thank you,

DBE SEARCH AND FOLLOWUP
Certified Directory
As of 8/9/2022 11:28:06 AM
Results filtered by search parameters Landscape Architect (C8744) Work in Kern The information provided in this file is not to be used for unsolicited advertising, spam, or any other unauthorized use Email
beckvs. la ndscape@verizon. netI isa. m u rzic@ cityworks. [email protected] havgood @ havgoodassoc.com amv@ kellermitchell.com
rleo@ rinconla.com
Phone
805-331-3483
519-238-9091

71.4-973-0368s10-597-7855510-451-9987
805-275-9755
City
LOMPOC
SAN DIEGOSanta Ana
Berkeley

OAKLAND
Ventura
Mailing Address
313 SOMERSET PLACE

1.526 INDIA STREET, UNIT E
951 E Santa Ana Blvd647 Santa Barbara Road302 FOURTH ST5225 Elmhurst St Owner Last

BARRITT
Warner
KimHAYGOOD
KELLERLeo
Owner First
BECKYLaura
Jeff
LEAH
JACQUE
Roberto
Company Name

BECKY'S CREATIVE LANDSCAPE & DESIGN INC
CITYWORKS PEOPLE PLACES, INC.Cornerstone Studios, I nc.

HAYGOOD & ASSOCIATES LANDSCAPE

ARCHITECTS
KELLER MITCHELL & COMPANYRincon Landscape Architecture
Generated from the B2Gnow System.

NOTES FROM KSIE:

There are no certified DBE firms performing Geotechnical work in Kern County We sent solicitations to the DBE firms in the Caltrans search results above.

Solicitation Emailed to all parties (attached):

HAYGOOD & ASSOCIATES LANDSCAPE ARCHITECTS
Cornerstone Studios, I nc.

BECKY'S CREATIVE LANDSCAPE & DESIGN INCKELLER MITCHELL & COMPANYRincon Landscape Architecture 8le/2022
Response email stated (8/9/2022) it is too far but keep them in mind for other projects.Responded (8/10/20221with their DBE company profile to keep in mind for other projects.Followup up phone call. MessageS/IO/22. No response.Followup up phone call. MessageS/IO/22. No response.Followup up phone call. MessageS/tO/22. No response.

Offeror further declares that the full name and resident address of the Offeror's Principal is as follows:

OFFEROR:

Company Name
Mailing Address
Meyer Civil Engineering, Inc.
8224 Espresso Drive, Suite 100, Bakersfield CA, 93312
Phone: (661) 836-6934 Fax: (661) 836-9761
Authorized
Signature:

Print/Type Name:

Title:

Date:

Q;^t
Richard Meyer
President
August 12,2022 We acknowledge the receipt of Addendum #1 Deliverable Cost Schedule
Preliminary Site Layout $6,442.00
Topography Study $10,210.00
Prel iminary Soils Study $11,532.00
Final Site Layout $7,620..00
Draft Construction Plans $28,726.00
Final Construction Plans for Bidding $5,996.00
Projed Totql $70,526.00
8 PROPOSED CONTRACT SCHEDU LE
Offeror shall include a proposed schedule with their proposal illustrating all tasks including preliminary plans and layouts of key equipment and spaces, structural analysis, design, tasks up to an including project completion.

The following is a sample form only that the offeror may use. Other schedule formats that clearly illustrate the proposed schedule will also be acceptable to the City,

WEEK TASK
1 Please refer to the attached detailed schedule
2 3
4 5
6 7
8 9
10 11
12 13
9 PROPOSED DESIGN OF STRINGHAM PARKSITE AMENITIES
4 Team Meeting wilh City's Project Manager/StaffAdjusl Projecl Schedule and ldenlify Crilical Tasks Schedule Eariy Stan TasksStart Pcliminary Plen Studies
Research Prcperty Lines & suNey Benchmarks & Datum
1 day1 day
3 days
37 days
2 days
Compih Conhol lnformalion into CAD & Develop BaseMap
lwk
I 2 wks
5 wks

1.4 wks
0 days
'1.4 wls
0 days
2 days2 days2 days2 ddys
i1
oder Geotechni€l lnwsligationTopographic MappirE & CompilationBegin Preliminary Design & Cosl Estimal6 Defne conceptual Site PlanPresenl con@ptual Site Plan to Clientln@rporale Clienl Review CommeilsFinalia Concept PlanPrepare Preliminary Conslruction EstifrateQuantify ltems of Wo* Research Prices frcm History and conthctor sources
1U2A
13 18
Preliminary Plan Submittal to Client
Team Meeting with city's Project Managerto review Prelim Begin Final Design Process afrer Nolilication byclient
0 days
lwk
87 days
3 days2 days
1wk
3 days
3 wks3 wks4 wks
2 dsys
2 wks
11t23 11t29
Assist City in applications to Utilily companies for seNice Needsln@rporate Commenls fbm City's Pmject Manager andStafiAdd New Ljlility lnformalion lncorpomte soils lnformationField Veriry Cba€nces with Exisling ltems, adjust asnecessaryNolify Utililies if Relocalion is NeededPrepare Final calculationsPrepare Technical Specifr @tionsPrepare Final Drafl PlansUpdate Project EstimateFinal D€fi Plans and Specification Submittal & Review 11 t3011/30
12t21
28 Team Meeting with Cily's Prcjecl Managerto review Final Drafl Plsns & Specifrcationslncoeomle comments frcm city's Project Manager and Staff for Phns,
Final2e Plans, specifi@tions and EstimteSubmit to Client forAppro€lProject Reviewl by owner/client 2 vdc
2 wks
0 days
2 wks
Plan 0 days
a
SummaryProjeclsummary ?-lt
Task
Split
ProgressMilestone
E)demalTasks i::L-:il:l*-! Deadline
Eiernal Milestone a
Meyer cMl Engineering, lnc.thu ah1122
Page I
PTJECI: PROPOSED DESIGN OF STRINGHAM PARK SITE AMENITIESDele:Ihu 8i11n2

DESIGNATION OF SUBCONTRACTORS
Portions of Work Subcontractor Location of Business
Geotechnical
lnvestigation 15.60/o
Soils
Engineering, Inc.
4400 Yeager Way
Bakersfield, CA 93313
Electrical
Engineering 6.6%
MichaelLouden, PE 2720 Stolle Court
Bakersfield, California 93309
copy & attach addifionalforms if necessa/y
Signature
Richard Meyer
August 12,2022 By
Date
President
Name (Print or Type)
Company Name: Meyer Civil Engineering, lnc. Date: August 12,2022 Title
10 Sfofemenf of Quo/ificoflons for Desrgn of Stnnghom Pork Sife Ameniiles ( FliltPl fiVFF P en ltraT DtrCll[i{tr( ANn ('l}ll lltrll^aTll'\Nl( O. RICHARD MEYER:

PRINCIPAL IN CHARGE AND PROJECT MANAGER
President, Meyer Civil Engineering, lnc.

EXPERIENCE: Since entry into the job morkel in 1975, Richord Meyer hos goined over forty-seven yeors of experience in procticol engineering, design, surveying, construction monogement ond project ond personnel monogement.

Richord Meyer's experience includes o wide orroy of woter resources, public ogency ond development reloted work. Projects include design ond construction of lorge infrostructure focilities for the City of Bokersfield, City of Shofter, the County of Kern, other public ogencies qnd district owned focilities for Kern County irrigotion ond woterstoroge districts. Exomples of these focilities ore os follows:

Projeci Dulies Doles Proiecl Stotus
Brundoge Lone Street
lmprovements for City of Bokersfield
Monogement
Design
Specificotions
Sep 202'l to July
2022
Under
Construction
Stockdole Ronch Multiuse Poth for
City of Bokersfield
Monogement
Design
Specificotions
Jon2021to July
2022
Under
Construction
Friont-Kern Conol Multiuse Poth for
City of Bokersfield
Monogement
Design
Specificotions
Nov 202'l to Apr
2022
Awoiting USBR
opprovol
City in the Hills Pork for City of
Bokersfield
Prelim. Design
Monogement
Design
Specificotions
Feb 2010 to Sep
2011
Complete ond in
service
Mill Creek Lineor Pork Prelim. Design
Monogement
Design
Specificotions
2003 to 2013 Complete ond in
service
Beole Pork Restroom for City of
Bokersfield
Monogement
Design
Specificotions
Dec2O2O to Mor
2021
Complete ond in
service
Buttonwillow Pork Reconstruction
Project for Buttonwillow Recreotion
ond Pork District
Monogement
Design
Specificotions
Construction
Monooement
2013 to 2O1 4 Complete ond in
service

EMPLOYEE PROJECT RESUMES AND

QUALIFICATIONS
Meyen Civil Engineering, lnc. t0
Stofernent of Quolificotions for Design of Sfringhom Pork Sile ,Arnenifies RrcHnRo MEYER, PRtNctPAL tN cHARGE AND PROJECT MANAGER (continued) Mr. Meyer is olso experienced os o design professionol in Design of Sewoge Lift Stotions ond Reloted Force Moins, Lorge ond Smoll Sewer ond Storm Droin Plons, Storm Woter Lift Stotions, Detention Bosins, Municipol Woter Wells, Lorge ond Smoll Woter Moin Plons, Domestic Wqter Pump Stotions, Woter Treotment Plonts, Woter Storoge Focilities, both Domestic ond lrrigotion, Troffic ond Roilrood Signols, Street Design High Pressure lrrigotion Pump Stotions, Conol Crossings of Arteriql Streets, Pedestrion Bridges over Conols, Colifornio Aqueduct Turnouts, Lorge Low-pressure ond Highpressure Pipelines, Conol Focilities, On-Coll Plon ond Mop Checking, Agency permitting. Complex engineering studies hove olso been occomplished by Richord Meyer which include: Sewer Studies, Detoiled Hydroulic Anolysis for Grovity ond Pressure Pipeline Conveyonces, Wqter Distribution Anolysis, Hydrology ond Droinoge Studies were performed using vorious types of Rotionol ond Hydrogroph Methodology such os FLO-2D, HECI, HEC-RAS, HEC-HMS, SCS TR55, SWMM ond Son Bernordino Hydrology Monuol ond the Kern County Hydrology Monuol, Floodploin onolysis, FEMA PAL Certificotions, FEMA LOMR's ond CLOMR's
Richord Meyer hos deep experience in construction odvisory ond inspection. Such projects include mojor pipeline ond conol focilities, Colifornio Aqueduct Turnouts, reinforced concrefe structures, woter ond sewer projects, storm droin, troffic signols, pork improvements, curb, gutter ond poving projects. Richord Meyer hos ployed o key role in the ongoing development of the Kern River. He hos been involved in o mojority of the lorge river weirs ond rechorge bosins on the river reoch through the greoter Bokersfield oreo.

REGISTRATION: Registered Civil Engineer, Stote of Coliforniq, CE 28104 since April1977.

Mr. Meyer is quolified to do legol surveying, ond quolified ond licensed (QSP) to prepore Storm Woter Pollution Prevention Plons.

EDUCATION: Fresno Stote University, Bochelor of Science in Civil Engineering, Summo cum Loude, Life Member Tou Beto Pi.

EMPLOYEE PROJECT RESUMES AND

QUALIFICATIONS
Meyen Civil Engineering, lnc. 11
Sfofemenl of Quolificqtions for Design of Sfringhom Pqrk Sife Amenifies b. AARCIN MEYER:

PROJECT ENGINEER
Executive Vice President, Meyer Civil Engineering, lnc.

EXPERIENCE: Since entry into the job morket in 200.|, Aoron Meyer hos goined over twenty-one yeors of experience in procticol design engineering. Recent exomples of this experience include:

Proiecl Dulies Doles Proiecl Slolus
Slockdole Ronch Multiuse Poth for
City of Bokersfield
Survey
Design
Detoilinq
Jon 2021 to
July 2022
Under
Construction
Well R-02 Pipeline for Kern County
Woter Agency
Survey
Design
Detoilinq
Moy 2022 to
Jun 2022
Out to Bid
Bosin I I Turnout Focilities for the
Kern Woter Bonk Authority
Survey ond oeriol
drone
Design
Detoilinq
Feb 2021 to
Jvn2022
Out to Bid
Torino Homes Sport Complex for
City of Bokersfield
Survey
Design
Detoilinq
Moy 2019 to
Mor 2020
Complete ond
in service
Topogrophic Survey for
Groundwoter Bo nk Authority
Survey on ground
ond with oeriol
drone
Moy 2O22to
Jun 2022
Project is now
being
desiqned
Record of Survey for Kern County
Woter Agency
Survey,
Monumentotion
ond Record Mop
Morch 2021
to
June 2022
Underwoy
Buttonwillow Pork Reconstruction
Project for Buttonwillow Recreotion
ond Pork District
Focility Design
Building Design
lnigotion Design
Specificotions
2013 lo 2014 Complete ond
in service
Mr. Meyer is olso experienced os o design professionol in Sewer studies ond design of Sewoge Lift Stqtions ond Collection Systems, lnigotion district focility hydroulic onolysis, Droinoge studies, Bockwoter curye onolysis, Woter system design ond grid system onolysis, Floodploin studies ond processing of FEMA LOMR's, Preporotion of improvement plons, groding plons, woll design, utility composites, Preporotion of specificotions, Preporotion of cost estimotes, Extensive experience os suryey crew chief, Legol ond topogrophic survey ond mopping.

REGISTRATION: Registered Civil Engineer, Stote of Coliforniq, RCE 66960 since June 2004. Licensed Lond Surveyor, Stote of Colifornio, LS 9066 since December 20,l3. Port ,|07 Remote Pilot Certificotion for UAS, FAA, Cert. No. 4285847 Since July 2019 EDUCATION: Fresno Stote University, 2O0l Bochelor of Science in Civil Engineering.

EMPLOYEE PROJECT RESUMES AND

QUALIFICATIONS
Meyen Civil Engineering, lnc. 12
Slofemenf of Quolificqlions for Design of Stringharn Pqrk Site ,Arneniiles c. Chqd Alyeo

ASSOCIATE ENGINEER
EXPERIENCE:

Preliminory design loyouts, hydroulic colculotions, project estimotes ond reports.

Reports ond colculotions for pumping systems, woter trqnsfer, heoting ond cooling opplicotions, etc. On-site ond over the phone ossistonce wiih instollqtion, repoir, ond trouble-shooting systems ond equipment, such os pumps, volves, motors, compressors, VFDs, piping, PLCs, tonks, etc. Completed Engineering pockoges contoining engineering recommendotion with design, plons, specificotions, colculotions, instrumentotion recommendotion ond AutoCAD drowings.

EDUCATION: Colifornio Stote University of Socromento Moy 24,2014 Bochelor of Science in Mechonicol Engineering (BSME)
REGISTRATION : Certified Engineer-in-Troining (certificotion no. I 5328 I ) d. Chorlene Brinson

DRAFTER, DESIGNER & ADMINISTRATIVE ASSISTANT
EXPERIENCE:
o Over 19 yeors of experience in boih monuolond CAD drofting. o Extensive knowledge in the use of AutoCAD.
o Experienced in both civil ond orchitecturoldisciplines. o Knowledgeoble in the Colifornio Building Code.
o Key designer on mony City porks
o Key designer on the Mill Creek Project
o Knowledgeoble in prevoiling woge rote low

EMPLOYEE PROJECT RESUMES AND

QUALIFICATIONS
Meyen Civil Engineering, lnc. l3
Sfofemenl of Quqlificqlions for Destgn of Sfringhorn Pqr'k Sile .Arnenift'es

6. MEYER CIVIL ENGINEERING, INC. RELEVANT EXPERIENCE.
q. REFERENCE PROJECTS: Following is o list of reference projects for which Meyer Civil Engineering, lnc. hos provided professionolservices. These projects opply to the disciplines listed in the RFQ-P os noted in "How this Project Relotes":

City of tsokersfield Recreotion qnd Pqrks Dept. - Linnell & Bt'ohmo Pqrk How this Froject Pork Preliminory Plon
Relqtes:

Locotion: Locoted of the cross streets of Linnell Woy ond Brohmo Street in the City of Bokersfield
Description: Meet with the community to discuss neighborhood pork needs ond develop o conceptuol pork plon occordingly
Budget estimote wos formuloted to the purpose of
opplying for o stote gront.

Size of Project: $3M
Nqture of Responsibility: Prepore concept plon ond ossist with gront Applicotion, ADA design qnd Estimote.

Stort Dote: April2019
End Dote: Plon Complete July 2019
Project Stotus: Concept Plqn completed.

Firm & Key Personnel: Meyer Civil Engineering, Richord Meyer Totol Controct Amount: $8,300
Project Owner: City of Bokersfield, Recreotion ond Porks Deportment 1600 Truxtun Avenue
Bokersfield, CA 9330.|
Contoct Person: Fidel Gonzolez, Focil Plonner 661 326-3866 Linnell Brohmo Pork Concept Plon
l! r:
$iii l;i
#i
#
I
b
fi
Meyen Civil Engineering, lnc. 14 RELEVANT EXPERIENCE
Sfolernenl of Quolifications for Desrgn of Stringham Pork Siie Amenilies How this Project Relotes:

Locqtion:

Description:

Size of Project:

Noture of Responsibility:

Stort Dote:

End Dote:

Project Stotus:

Firm & Key Personnel:

Totol Controct Amount:

Project Owner:

Contoct Person:

City in the Hills Pork
Pork Conslruction Plons ond SpecrTrcofions
City in the Hills, Bokersfield
Prepore plons, specificotions, estimote, ond ossisted
in the inspection, monitoring, odvisory, ond
monogement of o City constructed project.

Excqvotion, recompoction, bockfill, rock slope
protection, ond miscelloneous metol were
inspected. Assisted in ihe decisions of construction
procedures, moteriqls ond schedule regording the
instollotion of pork omenities such os benches, picnic
oreos, shode structures, ployground ond exercise
equipment, sidewolks, londsco pin g o nd irrigotion,
lighting, volleyboll pits, tennis courts with fencing,
bosketboll courts, disc golf course, wolking poths,
pump stotion ond electric control screened oreo.
$r.5M
Topogrophic Survey, Utility Locotion, Permit
Applicotion, Preliminory ond Finol Plon Preporotion,
ADA design, Specificotions ond Estimote.

Februory 2010
Plons Complete Moy 2010
Complete September 201 1
Meyer Civil Engineering, Richord Meyer, Aoron
Meyer
$52,040
City of Bokersfield, Recreotion ond Porks Deportment .l600 Truxtun Avenue Bokersfield, CA 9330,|
Fidel Gonzelez, Focility Plonner (661) 326-3866
City in the Hills Pork
Meyen Civil Engineering, lnc I5 RELEVANT EXPERIENCE
sfotemenf of Qvalifieetians fon Desrryl qf Strngi'wrn Ferk $ife Amenities How ihis Proieci Relotes:

Locotion:

Description:

Size of Project:

Noture of Responsibility:

Stort Dote:

End Dote:

Construction:

Key Personnel:

TotolControct Amount:

Project Owner:

Contoct Person:
tsuttonrw:lllow 12 A,ere Pork ProJeet
Pork Construction Plons ond Specifrcqlions
Community of Buttonwillow, Colifornio
Preliminory Design, Plons, Specificotions & Estimote ond Construction Monogement of o I 2 ocre pork renovotion in Buitonwillow, Co lifornio.
$1,500,000
Topogrophic Survey, Utility Locotion, Permit Applicotion, Preliminory ond Finol Plon Preporotion, Specificotions ond Estimote.

Jonuory 2013
Plons Complete October 2013
Complete July 2014
Richord Meyer, Aoron Meyer, Som Blue & Chorlene Brinson $r 41,850
Buttonwillow Recreotion ond Pork District
Morie Porsons, Generol Monoger (661) 301 -2140
8{llol!!!pi{ llocror,{iol' & P!-{l-( Q-S.!t!q :? &!o qS4-f'.gild ! ls*rj'd(@$
d Cdb AdB ef(P* b$Mro^ttu.
b & rd.{ld ilto ks(
. lM\Aqilq *
d Srdd [81Mr
! k h,!S ssls
i kl*
o {6 R6( T& A og)i
h tufrlcus
. hrftrytonb! ETrd to$*
2 &oM'Ehtu
[gU.1,hawdp&iMc
Fnre 2 Wdrw UghtiE
Fdr[ ] vdb kl Cil(
td!€r 6tu Grm
fdretr hkFE
OUTD@8GYM otlEgEt!9
RX{Nl'TR&S
$srrc rF[$ 10f,ruN
ttrElR:STM]MLGIIS
FEr-:ti ffisrnlNr4trffratrA
c ffif06rtr
*;:;;:n*1*,N,ilY4!
$
u
{
1 Buttonwillow Pork Concept Plon
Meyer Civil Engineering, lnc. 16 RELEVANT EXPERIENCE
Sfqtcrnenf af Qualifieatians for Desr'gn of $fringhqrn Fqlk Site Arnenifies eenfuqlPqrk & Lowell Fork Floygraund Speeifieqtions & Plons How this Proiect Relotes: Ployground Design
Locotion: Centrol Pork & Lowell Pork, Bokersfield Description: Prepore plons ond specificotions for hondicop occessible ployground equipment ond ploying surfoce.

Size of Project: $325,000
Noture of Responsibility: Topogrophy Mopping, Site Plon Design, CDBG specificotions, Construction Documents ond Construction Support
Stort Dote: August 20'10
End Dote: December 2O1O Construction: Complete November 201l Key Personnel: Richord Meyer, Aoron Meyer
TotolControct Amounl: $8,400
Project Owner: City of Bokersfield Recreotion ond Porks Deportment Contoct Person: Fidel Gonzelez, Focility Plonner (661) 326-3866 Centrol Pork ADA Ployground
Meyen Civil Engineering, lnc, 17 RELEVANT EXPERIENCE
Slofemenl of Quolificofions for Desrgn of Stringhom Pork Sife Amenilies City of Bokersfield Mill Creek Lineor Pork Sister Cities Pork How this Project Relqtes: Pork Conslruction Plons ond Specificofions Locotion: Downtown Bokersfield, Mill Creek Lineor Pork
Description: Prepore Plons, Specificotions & Estimote for construction of o two-phose Pork designed to emphosize the cultures of
Bokersfield's Sister Cities.

Size of Projecl: $1.25 million
Noture of Responsibility: Topogrophic Survey, Utility Locotion, Permit Applicotion, Preliminory ond Finol Plon Preporotion, Specificotions ond Estimote.

Stort Dote: Phoses A & B: JulY 2010
End Dote: Plons Complete August 2012
Construction: Construction Complete Phose A: June 2012
Key Personnel: Richord Meyer, Aoron Meyer, Chorlene Brinson Totol Controct Amount: $56,013
Project Owner: City of Bokersfield Public Works Dept., l50l Truxtun Avenue, Bokersfield, CA 9330.l
Contoct Person: Novdip Grewol, (661) 326-3724
Mill Creek Sister City Pork
Meyer Civil Engineering, lnc I B RELEVANT EXPERIENCE
Sfqfemenf of Quql'ficqfions for Design of Sfringhom Pork Site ,Amenifies How lhis Prolect Relotes:

Locotion:

Description:

Size of Project:

Noture of Responsibility:

Stort Dote:

End Dote:

Construction:

Key Personnel:

Totol Controct Amount:

Project Owner:

Contoct Person:

Mill ereek Lineqr Pqrk
Pork Construction Plons ond Specificqfions
Downtown, City of Bokersfield
Project converting the historicol Kern lslond Conol to o lineor oquotic porkwoy with commerciol ond residentiol interfoce.

Project wos completed in six phoses including oll conol focility construction. The conol improvements were constructed in o 3- week time frome in which opproximotely $4 million dollors of improvements were constructed.
$14.e M
Topogrophic Survey, Utility Locotion, Permit Applicotion, Preliminory ond Finol Plon Preporotion, Specificotions ond Estimote.

June 2002
Plons Complete August 2009
Complete Morch 2010
Richord Meyer, Aoron Meyer, Chorlene Brinson
$836,36',|
City of Bokersfield Public Works Depi., l50l Truxtun Avenue, Bokersfield, CA, 93301, (66'l) 326-3724
Novdip Grewol, (661) 326-3724
{
\
Mill Creek Covered Bridge
t
I E l*i,
.1,
L l.
:!l t E
-U-; t l,; 5-a'r
F
.ili I ;i "
t.
'!:
-a?
-r.
,le
;
t
t
flF'lt l, , I
a
a
)
t
i
, ,*r a
,:
'
'..' -.€t F .t" t
';:-2.
-' t,
l.

Meyen Civil Engineering, lnc. 19 RELEVANT EXPERIENCE
Slofemenl of Quolifications for Desrgn of Sfringhom Pqrk Site .,Amenifies Sur,veying for Povement Rehob - Holey Street from Columbus Street to University How this Project
Relotes:

Locotion:

Avenue
Pork Conslruction Plons ond Speclfrcolions
Description
Size of Project:

Noture of Responsibility:

Stort Dqte:

End Dote:

Project Stotus:

Firm & Key Personnel:

Totol Controct Amount:

Project Owner:

Contoct Person:

City of Shofter - Jomes Street Phoses 1 & 2 from Lerdo
Avenue to Shofter Avenue
Survey, Topogrophy Mopping, Construction Plons &
Construction Stoking for the City Street Reconstruction Project
$600,000
Topogrophic Survey, Utility Locotion, Permit Applicotion, Preliminory ond Finol Plon Preporotion, Specificotions ond Estimote.

Moy 2Ol7
August 2020
Complete.

Meyer Civil Engineering, Aoron Meyer
$65,220
City of Shofter Public Works Dept.

Michoel Jomes (661) 746-5004
Record of Survey for Kern County Woter Agency for Berrendo Meso Woter Rechorge Focility Londs
How this Project Surveying / Mapping Services
Relqtes:

Locotion:

Description:

Size of Project:

Noture of Responsibility:

Stort Dote:

End Dote:

Project Stotus:

Firm & Key Personnel:

Totol Controct Amount:

Project Owner:

Contoct Person:

Kern County Woter Agency - Rechorge Lqnds west of
Allen Rood ond south of the Kern River
Survey, reestoblish monumentotion, retroce property ond section lines ond provide detoiled mopping for
recordotion.

N/A
Legol Lond Survey
Morch 2O2l
Jvly 2022
Submitted for recordotion.

Meyer Civil Engineering, Aoron Meyer
$52,900
Kern County Woter Agency, 3200 Rio Mirodo Drive,
Bokersfield, CA 93308
Kris Budok - (661) 634-140O
Meyen Civil Engineering, lnc, 20 RELEVANT EXPERIENCE
Slolemenl of Quqlificqtions for Desri2n of Str,rhghom Pork Sife ,Amenifies b. MANAGEMENT OF SUBCONSULTANTS:

Meyer Civil Engineering often utilizes speciolized consultonts for ossistonce the preporotion of construction plons. Typicolly, pork projects speok to the need of utilizing these consultonts for electricol design ond geotechnicol investigotions.

Historicolly we hove hod much success with the two subconsultonts thot we hove listed in Section 3 of this stotement.

SEI ond Michoel Louden hqve consistently provided timely deliverobles in our post projects ond thus we ore confident to recommend them for this project. This success speoks to both theirs ond MCE professionolism in monogement of complex projects.

Our proposed subconsultont resumes follow:

Meyen Civil Engineering, lnc. 21 RELEVANT EXPERIENCE
Slofemenf of Qua.lifications for Des(2n of Sfnnghom Pqrk Site Amenilies . SOILS ENGINEERING, INC. COMPANY PROFILE:

Soils Engineering, lnc. (SEl) hos over 40 yeors of experience in providing geotechnicol engineering, geologicol, environmentol, moteriols testing ond surveying services to privote, government ond industriol clients throughout Colifornio, in the oreos of Kern County, Tulore County, Venturq County, Monterey County, Son Jooquin County qnd Son Luis Obispo County. We hope you will consider us during the bidding process to provide engineering services on your current or future projects.

Following ore some of the key elements which our compony will provide for your project:
l. Continuity: Our firm con perform Geotechnicol lnvestigotion, Geologicol Hozords Reports, Surveying, ond Phose I Environmentol Assessments of the initiqtion of the project. We will olso perform the moteriols testing progrom during the construction of the project. lt is in the best interest of our clients to use our firm for performing the previously mentioned engineering services throughout the whole project from design through construction to minimize risk ond mointqin continuity of services for the project.

2. A high stqndqrd of lechnicol experlise: Our Compony is heoded by two registered engineers with more thon twenty yeors' experience. Both engineers hove Moster's Degrees in Geotechnicol Engineering from highly reputoble universities (USC & Berkeley). Our compony is olso stoffed with two registered Environmentol Assessors, Level ll, one Certified Engineering Geologist, q field supervisor ond engineering technicions with extensive experience in loborotory ond field testing. All our stoff resides in the Bokersfield oreo ond is quickly occessible.

3. We qre very efficienl qnd cosl conscious: Our forty yeors of experience hos provided us o degree of efficiency in deoling with school projects, oil field projects, power plonts, commerciol ond residentiol developments. We olwoys moke on extro effort to help in solving problems ond meeting the schedule deodlines. Our post ond current clients ore our best odvertisement.

4. All of our work is performed in-house, from drilling lo loborolory lesting issuing of engineering reporls. We operote our own drill rig thot is dispotched on o doily bosis out of our Bokersfield office. We perform oll loborotory testing (soils, concrete, steel, ospholt, ond mqsonry) in our loborqtory locoted on Yeoger Woy in Bokersfield. This gives us on odvontoge over other componies in being oble to reoct quickly to the needs of our clients ond to deliver on time to meet their requirements.

5. We qre conlinuously upgroding our skills qs siluolions qnd necessity demqnd.

Due to recent events in the Kern County oil fields we hove odded Ground Penetroting Rodor (GPR) to our list of services provided. This procedure is utilized to determine ihe locotion of mojor underground utilities (pipes, etc.), subsurfoce feotures such os voids, depth to chonges in soil conditions, qnd obondoned oil Meyen Civil Engineering, lnc. 22 RELEVANT EXPERIENCE
Slofemenf of Quolificqtions for Design of Slnhghorn Pork Site Amenities wells. The GPR doto is initiolly onolyzed in the field ond then processed in the office utilizing stote of the ort computer progroms. The results of the GPR survey ore then presented in grophic qnd written form to the client.

List of Services Performed by Soils Engineering lnc.:

Geolechnicql Services
. Geotechnicol (Soils) lnvestigotions
. Sewoge Feosibility Studies
. Povement Design
. Slope Stobility Anolysis
. Settlement Anolysis
. Liquefoction PotentiolStudies
. Sump Droinoge Studies
Geologicql Services (Hozords)
. Geologic Hozord Studies
. Fqult lnvestigotions
. Geophysicol lnvestigotions
. Seismic Evoluotions
. Londslide lnvestigotions
. Pipeline Risk Evoluotions
. HydrologicolStudies
. Ground Penetroting Rodor (GPR)
Mqleriqls Testing Services (Alltests ore performed in-house) . Soils Field & Loborotory Testing
. Concrete Sompling & Testing
. Concrete Mix Design
. Post-Tension lnspection
. Mosonry lnspection & Quolificotions Tests
. Aspholt QA/QC Field & Loborotory Testing
. Aspholt Mix Design
. Structurol Steel & Reinforcing Steel (lnstollotion & Moteriol Quolificotion) . High Strength Bolting (lnstollotion & Moteriol Quolificotion) . Welding Shop & Field lnspection
Environmeniql Services
Phose I Environmentol Site Assessments, Phose ll EnvironmentolSite Assessments & Preliminory Environmentol Assessments (PEAs):
. SoilSompling
. Woter Sompling
. Chemicol Anolysis of Somples
. Soil Vopor Sompling ond Anolysis
Meyen Civil Engineering, lnc. 23 RELEVANT EXPERIENCE
Sfqfer.nent of Quof'fr'cqfions fot'DesrEn of Sfringhom Pqrk Sife ,Arnonities Asbestos ond Leod-Bosed Point Sompling ond Anolysis
Monitoring Well lnstollotions ond Sompling (Quorterly, etc.) Woste Depth Assessments ond Cop Assessments of Londfills Conlqminqnl Risk qnd Hozord Assessmenls, Spill Prevenlion Conlrol & Countermeosure Plqns (SPCC), Slorm Wqler Pollulion Prevenlion Plqns (SWPPP) qnd SWPPP lnspeclions, qnd Remediol Aclivilies:

Preporotion of Reports ond Work Plons (RAW) ond Reports Soil Removol ond Disposol (hozordous ond non-hozordous) Groundwoter Treotment
Soil Vopor Extroction, Design, lnstollotion ond Operotion Vopor lntrusion Mitigotion
Bioventing ond Bioremediotion
Air Sporging
Other Remediol Activities
Drilling Services
. Geotechnicol & Environmentql Borings for Somple Collection . lnstollotion of Monitoring Wells
. lnstollotion of Vopor Extroction Wells
. Abondonment of Monitoring Wells ond Woter Wells
. lnstollotion of lnclinometer Wells
a
a
a
a
a
a
a
Meyen Civil Engineering, lnc. 24 RELEVANT EXPERIENCE
Sfolernenf of Quofificofions for Desgn of Slringhom Pork Sile ,Amenifies . E. MICHAEL LOUDEN ELECTRICAL ENGINEERING, RESUME OF PRINCIPAL:

E. Michoel Louden, P.E.
2720 Slolle Court
Bokersfield, Coliforniq 93309
Phone (661) 304-3324
Emoil: [email protected]

PROFESSIONAL RESUME
Professionol
Expedence
Unique skills
Work Hislory
Pdvole elecldcol
engineer consullonl,
cenlrol Colifornio
Bdnderson LLC. Coslo
Meso, CA
Slole licensed electricol engineer with experience in project monogemenl, power ond control designs; ond technicolleom supervision; Work os on employee, conlroctor, ond engineering consullonl to smoll ond lorge construction ond engineering firms;
Project experience wilh induslriol, ogricullurol processing, commerciol, ond governmentol orgo nizolions,
Electricol engineering monoger for Stotewide generol construction ond engineering firm; monoge worklood for (6) member technicol stoff locoled in (3) Stoie wide regionol offices. Monoger of industriol projecls for lorge oil producers.

Engineering monoger for locol industricl electricol conlroctor.

Electdcol teom monoger for multi-disciplined engineering firms.

Plonl eleclricol engineer for lorge ogriculturol processing orgonizotion; Project engineer for notionol household product monufoclurer.

Consultont to electricol controctors. orchitects, civil engineers, ond independent oil producers.

Eleclricol utility service representolive.

Distribution ond substotion design engineer for electricol utility.

Project rnonogernenl, scope definition, schedu/ing, ond cosl conlrol Power Distribution System Design
Code complionce - NEC, UL,IEEE Sfondord
Colifornio Title 24 Lighting design comp/ionce
Construclion field supporl ond quolity control
Serving Utility lnterfoce / Coordinotion
Soflwore progroms - EXCEL, WORD, MS PROJECT, ETAP, ond. AUTOCAD (1997-presenl). Provide eleciricol design suppori to orchilects. civil engineers, generol ond eleciricol conlroclors; developed single line diogroms, lighting, power, ond signol plons for construction of office buildings, fire stotions, ouio recycling plonts, medicol offices, county ond city mointenonce focilities, solor generoting plcnis, oircrofl fueling slolions. commerciol oircroft hongors, woter pumping plonls, bonk odditions, militory computer complex, recreotionol porks, City redevelopmenl projects, conol pumping stotions, ond moiel syslem upgrodes. (2011-2016). Electricol group leod engineer with mulli-disciplined internotionol industriol engineering construction teom; responsible for eleclricol group project monogement; technicol support, conslruciion documentotion, specificolions. drowings, ond reports; fBokersfie/d, C A. offices/
Meyen Civil Engineering, lnc. 25 RELEVANT EXPERIENCE
Sfqlemenf of Quqlificotions for Design of Sfringhqm Pqrk Site ,Amenities Projects size vories from $50K to $lM construction cosl. Mojority of project work in the petrochemicol up-streom producing focilities locoted within the South Son Jooquin Volley.
(2008 - 20l l). Engineering monoger wilh electricol controcling firm; responsible for electricol project monogemeni; technicol support, conslruciion documentotion, specificotions, drowings, ond reports; project work for locol commerciol, induslriol, ond peirochemicol ind ustries. (Bokersfie/d, CAJ
(2006 to 2008). Project Monoger/Supervisor with generol engineering firm; responsible for eleciricol project leom of engineers ond designers Provided projecl monogemenl; lechnicol support, conslruciion documentotion, specificotions, drowings, ond reports; project work for Slote wide commerciol, induslriol, petrochemicol, ond utiliiy industries. /Bokersfie/d, cA)
(2001 to 2005). Project//licensed electricol engineer wilh generol conlrociing firm; responsible for electricol projecl monogement; technicol support, construciion documenlolion, specificotions, drowings, ond reports; projecl work for locol commerciol, industriol, ond peirochemicol in duslries. 1,, Bokersfie/d C o lif ornio.)
Project leod for $1.5M substolion upgrode for Socromento Utility District (sMUD).

McKee Elecltic,lnc.

Bokersfield, CA
Processes Unlimiled
lnlernolionol, lnc.

Bqkersfield, CA
Fluor Doniel, Inc.
lrvine, CA
Bollhouse Forms, Inc.

Bokersfield,
Colifomio
Additionol
experience
Regislrolion
Educolion
(1998 to 2001). Senior electricol engineer conlroct position with inlernotionol design/construclion firm; responsible for eleclricol project monogemenl; developed construction documentotion, specificolions, drowings. ond reports; projecls ol locol cement plonl, oreo winery, oil pipeline pumping stotion, nolurol gos compression focility, ond gosoline refinery. @okersfield office,lrvine, CA)
Projecl leod for $10M Cleon fuel exponsion ot Shell Refinery. (1997 to 1998). Plonl electricol engineer responsible for design ond new construction of plont electricol focililies, member of complele plont engineering teom; ; supervised ond direcled CAD designer ond droftsmon; directed ond supervised work of controct electricol conslruction ftrm. (Bolthouse Forms, lnc., Corrot processing focilities, Bokersfield, CA) Customer service representolive for PG&E
Eleclricol distribution ond substotion engineer for PG&E.

Licensed eleclricol engineer, Stote of Colifornio, No. E8339 BSEE, Power option - Col Poly, S.L.O., Colifornio
College course work in MBA progrom, ColStote, Bokersfield AuloCAD insiruclion oi locol Junior college.
070'e
Meyen Civil Engineering, lnc 26 RELEVANT EXPERIENCE
Slofemenl of Quolificofions for Design of Sfr,rngham P-ork Sife A,meniiies C. FEDERAL AND STATE PROJECTS:

Meyer Civil Engineering hos prepored mony project construction plons ond specificotions for locol ogencies thot hove been funded with non-locql funds. These hove included both federol ond stote funded projects. When non-locol funds ore procured, they neorly olwoys hove speciol requirements os to selection of subcontroctors, meeting DBE gools ond the like. Usuolly, the ogency thot hqs received the funding is knowledgeoble os to those speciol provisions thqt need to be included in the controct documents. Since the scope of this work does not include the preporotion of the front-end specificotion boiler plote, the City will incorporote the speciol forms ond requirements for the porticulor funding obtoined. However, there con be speciol requirements thot offect the technicol specificotions such os "mode in the USA". MCE willwork with the City in this regord to qssure thot funding complionce is met.

Presently Meyer Civil Engineering is working on the following non-locol funded projects:
. Brundoge Lone Street lmprovements for City of Bokersfield - Federol (CDBG) . Stockdole River Ronch Multiuse Poth for City of Bokersfield - Stote Gront . Friqnt-Kern Conol Multiuse Poth for City of Bokersfield - Stote Gront . Kern River Bockup Weir Reconstruction Project for the City of Bokersfield - Stote Gront (DWR)
. Sounders Pork Sump Woll & Sports Povilion Fence Renovotions Project for the City of Bokersfield - Federol (CDBG)
Meyer Civil Engineering, lnc. 27 RELEVANT EXPERIENCE
.gletement of Quqlifleeflons for Dcsign ef $triaghorn Ferk $Xte ArnenifbE

7. REFERENCES
Reference letters ore provided in this Section. The persons providing these references for Meyer Civil Engineering qre:

Mr. Dorin Budok, Assistont Director
City of Bokersfield Recreotion ond Porks Deportment
1600 Truxtun Avenue
Bokersfield, CA 93301
(661) 326-3866
Mr. Novdip Grewol, P.E. Civil Engineer lV
Public Works Deportment, Design Engineering
l50l Truxtun Avenue
Bokersfield, CA 93301
(661) 326-3724
Mr. Nick Fidler, Director
City of Menifee Public Works Dept.
29844 Houn Rood
Menifee, CA 92586
(9s1) 672-6777
Meyer Civil Engineering, lnc 28 REFERENCES
Jvly 7,2022
Regording: Reference Lelter
To Whom it moy Concern,
Meyer Civil Engineering hos
Bokersfield Recreotion ond
hove provided plons, spec
They ore cunently involved
look forword to working with
Sinc
I

D KERSFIELD
souND or $aUdl'ytttr1 6rqa
of Recreoilon ond Porks

RICK ANTHONY, DIRECTOR
Meyer Civil Engineering, lnc.
consultont engineering services to the City of
Deportment for opproximotely the lost l9 yeors, They
ond construction ossistonce for o myriod of
projects, These projects includ
Tennis Court Rehqbilitoti
Ployground Focilities
lnigotion Systems
Pork Concept Plons
Full Pork lmprovements ty in the Hills ond Mill Creek)
Restroom Rehobilitotion
us in four new fencing ond woll projects. We hove been
pleosed with Meyer Civil Engi ring's work ond ossistonce on oll these projects ond we m in the future
Dorin Budok, Assisiqnt Director
City of Bokersfield Recreqtion Porks Dept
n & Porks Deportment
I 600 Avenue, Bokersfield, CA ?3301
66 -326-3866 FAX: 66 1 -852-21 40

BAKERSFIELD
1r# souND orSudlauyeftw
July 29,2022
SubJect Reference Letler for Meyer Clvll Englneerlng. lnc.

To Whom it moy concern,
Meyer Civil Engineering hos provided consultont engineering services io the City of Bokersfield Public Works Deportment for opproximolely the lost lg yeors. They hove provided plons, specificotions, ond construction ossislonce for o myriod of projects. These projects included:
o Plon ond Mop Checking Services
o Roilrood-Street Surfoce Crossings
o Moster Droinoge Studies
r Moster Sewer Studies
. Storm Droin Focililies
r Lorge Trunk Sewer Projects
r New Sewoge Lift Stotions
r Sewoge Lift Stotion Rehobiliiotion
r Trsffic Signol Projecls
o Applicotions for FEMA Funding of Droinoge Projects
o Surveying Supporl Services such os lopogrophy mopping. Legol descriptions ond mopping lhereof
r Streel lmprovements
r Sewer Cleoning Projects
They ore currenlly involved with us in lhree sewoge lift stotion projects ond Bockup Generotor sizing. Richord Meyer is providing services os the lnterim Cily Surveyor.

We hove been pleosed wilh Meyer Civil Engineering's work ond ossistonce on ollof these projects ond we look forword lo working with them in the fulure.

Sincerely,
By
I I rdirfr/i l)c\lto,rl{rli.[.nr(l{tt.r llr\( ( rrrl llpr rlrr ovdip Grewol, P.E. I Civil Engineer lV
Public Works Deportment, Design Engineering
Public Works Deportment
l50l Truxtun Avenue, Bokersfield, CA 93301
661 -326-3724 FAX: 66 I -852-2120 ry4r'!\F
MENIFEE 29844 Haun Road : Menifee, CA 92586
951-672-6777 : Fax 951-679-3843
New. Better. Best. cityotmenifee. us
July I1,2022
RE: Reference Letter for Meyer Civil Engineering, Inc,
To Whom it may Concern,
I am the former Public Works Director for the City of Bakersfield and during my tenure at the City, Meyer Civil Engineering provided consultant engineering services to the Public Works Department for approximately the last 19 years, They have provided plans, specifications, bidding support and construction support for a myriad of projects. These proiects included:
r Railroad-StreetSurfaceCrossings
r Master Drainage Studies
o Master Sewer Studies
r Storm Drain Facilities
r Large Trunk Sewer Projects
r New Sewage Lift Stations
o Sewage Lift Station Rehabilitation
r Traffic Signal Projects
o Street Improvements
o Sewer Cleaning Projects
In addition, Meyer Civil Engineering acted as an extension of City staff by providing professional services which included:

I City Surveyor
r Surveying Support Services such as topography mapping. Legal descriptions and mapping thereof
r On-Call Inspection Services for Capital Improvement Program Projects r On-Call Plan and Map Checking Services for Land Development projects . Applications for FEMA Funding of Drainage Projects
I was very pleased with Meyer Civil Engineering's work and assistance on all of these projects, and I strongly recommend them for further work with the City of Bakersfield. Please feel free to contact me at (951) 723-3703 or nfidlsradcityofincnifee.us if you have any questions regarding this reference.

Sincerely,
Nick Fidler,
Public Works Director
Bill Zimmerman
Mayor
Dean Deines
Mayor Pro Terrr
District 4
Bob Karwin
Cotrncilnrerllrrlr
Distr ict 1
Matt Liesemeyer
Cou rrciInterrnber r
Dislrict 2
Lesa A, Sobek
Cottttcilntcmt:or
District 3
Armando G. Villa
City Manaqer

PROPOSAL TO PROVIDE

DESIGN SERVICES FOR STRINGHAM

PARK AMENITIES
f"
t
I
,
,t
ti
ll';r t'
-
l, I
I i;il;;) l|'.-----
l1r
I
rii
r. 1
l]d
ilm
f,r
Sg rli :
il.l: r
: ..:ll 'i *-*. 't!t:rf*T
F
t
August 12,2022
Mr. Michael James
City of Shafter
336 Pacific Avenue
Shaftero CA93263
Re: Request fbr Proposals (pJP) Design Services for Design of Strtngham ParkAmenities Dear Mr. James,
San Joaquin Engineering is pleased to submit our proposal to provide engineering design services for Stringham Park. This correspondence constifites our formal submittal and request for consideration. The opportunity to serve the City is of great importance to San Joaquin Engineering. We have provided civil engineering services for two (2) pwk projeots, with the latest being the Villa del Caribe Park for the City of McFarland.

San Joaquin Engineering is a full service engineering company fully equipped to accommodate the needs of virtually any project. We have a now office in Bakersfield, with an office stafflevel of seven (7). My personal experience spans 40 years of extensive experience in Public Works and land development projects in both the private and public sectors. I believe this experience on both sides of the counter has given me a unique perspective that will translate to the best possible service to my clients.
q*U?aBrett Dawson, P.E,
200 NEV STTNE ROAD SUITE 175 r BATCEnSF|ELD, CA 93309 I 6t-336-Wr7

DESIGN SERVICES PROPOSAL
rOR STRINGHAM PARK AMENITIES ctrY of SffiR

APPROACH
San Joaquin Engineeringos approach foouses first on developing a comprehensive understanding of our client's needs and goals, then diligently pursuing those goals th,rough responsiveness and communication.

PROJECT UNDNRSTAI\DING
The project is comprised of three (3) major components; a Prelimi\Ny & Final Site Layouts, a Topographical Survey, and Draft & Final Construction Documents.

San Joaquin Engineering (SJE) will provide a comprehensive topographioal survey of the project area which will serve to delineate the project limits and constraints. The sutrey will include, but not be limited to existing walls, fencing, curbs, gutters, existing sidewalks, rrstroom, sheet lights, utility polesn trees, planters, and other above ground features. The survey will also provide elevations to generate a site contour map, In addition, a CAD file of the field survey will be provided to the City, To aid the City in meeting its funding budget, San Joaquin Engineering will provide a preliminary site plan and cost estimate for review. Utilizing City comments, SJE will then prepare a final site plan, that would guide design and the final construction documents. The construction improvement plans and technical specifications will provide for the parking lot with lighting, general park lighting, new landscape and irrigation, replacement of the existing inigation system, playground structure, shade stucture, hansit shelter, and all miscellaneous park amenities and signage, All design work will conform to City standards.

Finally, it is our understanding the City will be responsible to provide bidding documents and forms, records pertaining to "as-built'o plans, dry utility coordination, and final construction as built plans.

Zn NEW STINE ROAD SUITE 1?5 o BAIGRSFIELD, CA 93309 | PHONE/FAX:661-336-0fi7

DDSIGN SERVICES PROPOSAL
F'OR STRINGHAM PARK AMENITIES CITY OF SffiR
PRO.IECT TEAM
San Joaquin Engineering will provide the following stafffor the dwation of the project. r Brett Dawson, PE:
o 40 Years of Public and Private Experience in all facets of civil engineering o Comprehensive experience with the design, construotion, topographic and construction surveys of public inftastnroture
o Served as the lead consultant for the Villa del Caribe Park in the City of MsFarland. (See below ofproject details)
o William Kinnett, P.E.
o 15 Years of Public and Private Experience in all facets of oivil engineering StaffResumes Provided

EXPERIENCE AND QUALIFICATIONS
San Joaquin Engineering was originally fornred in 2003. The company has provided a complete array of civil engineering services for public aod private companies. We take pride ia pmviding ow clients with our best professional care and service. We believe in timeliness, communication and a rpsolve to drive projects to their completion.

We have extensive experienoe in preliminary analysis, preparation of plans, specifications, and estimates, project management, construction inspectiono construction management for various types of public works related and private development projects.

Villa del Caribe Park
San Joaquin Engineering prepared preliminary and final design and construction drawings for a 5 acre park in the City of MoFarland, In addition to the technical specifications, we provided full bid documents as well. Park improvements included a soccer field with lighting, a baseball field with lighting, play struoture with lighting, exercise circuit, a shade structure, volleyball cour! a new restroom, and a parking lot with lighting. Construction bids for the project ranged from $2.5 million to $3.4 million.

The 35 sheet set of improvement plans consisted of the full array of construction sheets, inoluding gtrading, sewer, water, electrical, landscape and inigatiorL as well as sheets detailing the aforementioned park amenities.
zfi) NEW STrNE ROAD SUITE 175 o BAreRSFIELD, CA 933{'9 r PHONE/F X*, 66t-tX-On7

DESIGN SERVICES PROPOSAL
r.OR STRINGHAM PARK AIVIENITIES ctrY oj SffiR

COST PROPOSAI,
San Joaquin Engineering acknowledges receipt of Addendum #1 and will provide the requested services as outlined below.
o Preliminary Site Layout
r Topographic Survey
o Preliminary Soils Report
o Final Site Layout
r DraftCcinsbuctionPlans
o Final Construction Plans for Bidding
$17,500
$7,500
$5,500
$8,600
$36,000
$17,000
Total Agreementfor Design Sen'ices 892,100
PROJECT SCIIEDULE (Assumes a Lrte September NTP)
Task
Topographic Survey
Submittal of Preliminary Site Plan:

Submittal of Final Site Plan:

Submittal of 70Vo Consfiuction Plans for review:

Submittal of Final Construction Document for Bidding:

BrettDawson, P.E.

President, San Joaquin Engineering, Inc.

Completion Date
October t4,2022
November L8,2022
December 16,2022
January 20,2023
March 17,2023
200 NEV STINE ROAD SUrTE 1?5 o BAKERSFIELD, CA 93309 O PHONE / FA)( : 661-356 -097 7

PROPOSAL FORM

DESIGN OF STRINGHAM PARK SITE AMENITIES
To: City of Shafter
Public Works Department
ATTN: PUBLIC WORKS DIRECTOR
720 Commerce Way
Shafier, CA 93263
In compliance with your Request for Proposal, the undersigned, hereinafter termed he Offeror, proposes to enter into a Contract with the City of Shafter to provide the necessary design, engineering, drawings, and calculations for:

RFP. DESIGN OF STRINGHAM PARK SITE AMENITIES
The Offeror has carefully examined and fully understands the Contract, General Conditions, Special Conditions, General Requirements, Scope of Work, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to lhe actual condilions and requirements of the Wo*, and hereby proposes and agrces hat if his Offer is accepted, he will contract wilh the Ci$ of Shafter in full conformance witr tre Conhact Documents.

Unless olhenuise directed, all work performed shall be in accordance with the terms and conditions of this solicitation, smpe of work, and sample Contract.
ln accordance with the foregoing, the undersigned proposes to design, engineet, provide plans for, obtain approval the items listed in fie attached Offer schedule for the unit prices stated.

The Offeror agrees that he cost of seMces provided or expenses incuned, wtrich are not specifically delineated in the Conhact Documents but which are incidental to lhe scope, intent, and completion of the Contract shall be deemed to have been included in the prices bid for the various items scheduled. lf this Offsr shall be accepted by he City of Shafter and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Gontract, and give satisfactory proof of carriage of the insurance required witrin ten days from fre date of Notice of Award of the Contract, then the City of Shafier may, at ib option, determine that he undensigned abandoned the Contract this ofier shall be null and void and the City of Shafter may proceed to award to another Offeror acknowledges receipt of the following
I certify that this offer is made without prior underctanding, Gontract, 01 connection with any corporation, fim, or peson submltting a proposalfor the same mateilala, supplies, equlpment, or services and is in all respecb fair and without collusion orfraud. I underutand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. lagree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal forthe proposer.
7 Offeror further declares that the full name and resident address of the Offeror's Principal is as follows:

OFFEROR:

Company Name:

Mailing Address:

Print/Type Name:

Title:

Date:
?,*:
c\
tt'o
'bo.k'CsQ a ar-\
Phone: e1or-ja6-sh--1
Authorized
Do.^,
' S[--
\5b\."-
Fax \oG\- a,5k- eq-l-l
\- \?-. z-?-
Deliverable Cost Schedule
Deliverable Proposed Cost
Preliminary Site Layout
L
? \1 . -)o<>
Topography Study $' 1, s.or
Preliminary Soils Study \ s,5l.,o
FinalSite Layout \ t,\oqo
Draft Construction Plans \ :*. as:>
Final Construction Plans for Bidding \
\-1, eos
ProjedTotdl
IYqz-r\se
8 PROPOSED CONTRACT SCHEDULE
Offeror shall include a proposed schedule with their proposal illustrating all tasks including preliminary plans and layouts of key equipment and spaces, strucfural analysis, design, tasks up to an including project completion.

The following is a sample form only that the offeror may use. Other schedule formats hat clearly illustrate tre proposed schedule will also be acceptable to the City,

WEEK TASK
1 1u-- ?-o^o.-\
2 3
4 5
6 7
I
I
10 11
12 13
9 Copv&
By:

DESIGNATION OF SUBCONTRACTORS
ifnecgssary
6- t"-- -?--zSlgnature Date ,
B"-+ ?r.q-s', e,,$
Portions of Work Subcontractor Location of Business
F-\"-cl6li-o11 ?.\-lsF +rJ. S.,n\* N Li.oV&VAn\rqC
Q^o..^.o'-a\*
-,
'g qL-res{V-\N, \lrst -,
F,<r: bgr'1.,,s1 r*-rLs {
.5l3c>$ <}e= Y':r\o 'F're--'
B.eL*-l s $,-\<\ A>r5sj^
L-..{s*-q.- |
\c i,*--{\d
Name (Pdnt or Type)
Company
Ti0e
n Dah' Rr iL-((-
10 Appendix
San Joaquin Engineering
Organtzational Ghaft
Proiect Staff Organizational
Ghail
Staff Resumes
San Joaquin Engineering 0rganizational Chart
Brett Dowson, R.C.E.

Principol Engineer
Hunter Troxel, E.l.T.

Stoff Engineer
Megon Wholey
Admin. Assistont
Billy Kinnett, R.C.E.

Senior Civil Engineer
Victor Pinedo
Civil 3D Cqd Designer
Jock Hug
Stqff Engi
hes
neer
Note Beomer
Civil 3D Cod Designe
Stringham Park Design-Produetion Teaur
Sub* sultonts
Megon
AdminVlholey Assistont R.C.E.

Brett Dowson, R.C.E.

Principol Engineer
Jock Hughes Stoff Engineer
Preliminory Site Plon
Topogrophic Survey
Finol Site Loyout
Droft Construction Plons
Technicol Specificotions
Finql Construction Plons
Koren Mortinez, P.E.

Antrox Engineering Electricol & Ughting
Joime Rios, PLA
Rios Design Studio
Londscope & lrrigotion
Hunter Troxel, E.l.T.

Stoff Engineer
Note Beomer
3D Cod Desig
Victor Pinedo
3D Cod
William Kinnett, P.E.

Senlor Civil Englneer
Experience: Mr. Kinnett has oyer 10 years of experience in civil planning design, and drafting of multi-million dollar land development projects and 5 years ofexperience in state freeway corridor right-of-way acquisition projects. Recent assignments for San Joaquin Engineering, Inc. include:
a Tract 6490, 3O-acre residential subdivision in the City ofShafter I Tract 7141,33-acre residential subdivision in the City ofBakersfreld t Tract 6191, 84-acre residential subdivision in the City of Bakersfield i Tract 7364,4.2-aue residential subdivision in the City of Bakersfield a Tract 6674,78-acre residential subdivision in the City ofShafter Previous experience includes the Centennial Corridor Demolition Project, Westside Parkway Route Adoption, California High-Speed Rail Project, and numerous commercial, indushial, and residential projects throughout Kem County.

Educution: General Engineering Program, Bakersfield College, Bakersfield, CA Bachelor of Science in Civil Engineering, California Polytechnic State University, San Luis Obispo, CA
P r ofes s ional Reg istralio ns :

Civil Engineer, CA, No. 81841
Job Duties: Plnnninq
t Tentative Tract design
a Preliminary grading desigt
a Constraints mapping
o hoject Base Mapping
I Feasibility studies
o Right-of-Way Acquisition Impact Studies
O Preliminary cost estimating
Civil Ensineednq
r Subdivision Final Maps
I Design and drafting of sanitary sewer systems
o Design and drafting of storm drain systems
o Mass grading plans
o Design and drafting of water systems
t Design and drafting of public streets and pavement structural sections r Design and drafting of commercial parking lots
I CAD data for special engineering studies
o heliminary grading earthwork quantlty take-offs
Construction Management $unnort
o "As-builf' construction documents and improvement plans o Coordinate with confiactors for staking, resolving project consfuction issues r Field coordination ofproject design
o Demolition/Construction oversightand inspection
Survev
e Coordinate field survey crews
o Establish cogo poinls and point map exhibits for field survey crews r Topographic Surveys, Level Circuits, and Construction Staking I State Freeway Conidor Right-of-Way Mapping

HUNTER TROXELO EIT

STAFF CIWL ENGINEER
Experience:

Education: Bachelor of Science in Civil Engineering, California State University, Fullerton.

General Education Transfer at Bakersfield College.

Prcfess io nal Re g lslrat ion s :

Engineering-In-Training (EIT) : Certificate No' EIT 176256 P r ofes s io n a I Affi liat io ns :

I American Society of Civil Engineers (ASCE)
fob Duties: Plannlns
i Preliminary grading design
O Consfaints maPPing
I Project Base MaPPing
o Foasibility studies
o Preliminary cost estimating and quantity takeoffs
Civil Enqineerins
o Design and drafting of sanitary sewer systems
r Design and drafting of storm drain systems
t Mass grading Plans
t Modeling for storm and earthwork calculations
a CAD data for special engineering studies
I heliminary grading earthwork quantrty take-offs
Construction Mrnasement Sunport
t "As-builf' construction documents and improvement plans I Coordinate with field foremen and labors
o Coordinate with multiple government agencies
o Field coordination ofproject design
t Project and Consffuction Scheduling
t Manage RFIs, RFQs, COs, Submittals, Material Inventory I Perfonn cost estimate and bid submittal for multiple public works projects Sltrvev
I Coordinate field surveY crews
r Establish cogo points and point map exhibits for field survey crews r Topographic SwveYs
o Level Circuits
Mr. Troxel is a recent graduate and newly employed with San Joaquin Engineering lnc. His focus has been on developing construction grading plans, designing sewer and storm drain systems, and perforrring drainage studies for residential developments.

I Tract 6191, 84 acre residential subdivision in the City of Bakenfield t Tract 6614,'78 acre residential subdivision in the City of Shafter previous work experience includes projecVconstruction management of the California High-Speed Rail in the city of Wur.o, CA, the behway/Express road development project in the City of Shafter, CA, and the RTE 223lTejon Hwy storm drain and street improvements in the city of Arvin, CA. Along with bid estimating forpublic works projects in Arvin and Wasco' Jack Hughes
Snlf Clvil Englneer
Experience:

Education: WorcesterPolytechnic Institute, Worcester, MA Bachelor of Science, Civil Engineering
Job Daties: Plsnnins
Mr. Hughes is a recent graduate and newly employed with SJE and is participating in civil planning design, and drafting of multimillion-dollar land development projects. Rscent assignments for San Joaquin Engineering, Inc. include:
o Tract 6191, 84-acre residential subdivision in the City of Bakersfield o Tract 6614,78-arr.e residential subdivision in the City of Shafter I Tract 6490, 30-aqe residential subdivision in the City of Shafter t Tract 7141,33-acre residential subdivision in the City of Bakersfield I Tract 7364,4-asre residential subdivision in the City of Bakersfield Previous work experience includes site inspections and photo documentation of existilg sewer, storm drain, water, and electrical utilities. Assessed existing conditions and remaining life spans of manhole and catch basin structures and compiled frndings in a detailed report. Worked on public high school bus/parking loop design and presented to groups ofengineers. o Preliminary street, sewet, and storm drain design
o Project Base Mapping
r Preliminary oost estimating
Civil Bnsineering
I Design aide and drafting of sanitary sewer systems
t Design aide and drafting of storm drain systems
0 CAD dala for special engineering studies
o Plan revisions for city engineers
o Creation ofstreet centerline exhibits
Nathaniel Beamer
CAD Deslgn Technlcian
Experience: Mr. Beamer has I months of experience in civil planning, design, and drafting of multi-million dollar land development projects. Recent assignments for San Joaquin Engineering, Inc. include:
o Tract 7141,33-aors residential subdivision in the City of Bakersfield o Tract 6191, 84-acre residential subdivision in the City of Bakersfield t Tract 6614,78-acreresidential subdivision in the City ofShafter t Tract 7364,4.2-acre residential subdivision in the City of Bakersfield o Tract 6490, 30-acre residential subdivision in the City ofShafter o PM 10606,22-acreresidential subdivision in the City of Bakersfield Education: Civil Engineering Program, Califomia Polytechnic University, San Luis Obispo, CA Bachelor of Science Degree in Civil Engineering
Job Duties: Plannins
I Preliminary grading design
o Project Base Mapping
r Preliminary cost estimating
Civil Ensineerins
r Design aide and drafting of sanitary sewer systems
i Design aide and drafting of storm drain systems
I Design aide and drafting of grading plans
t Design aide and drafting of water systems
l Design aide and drafting of public sffeets
I CAD data for special engineering studies
r Preliminary grading earthwork quantity take-offs
o Subdivision final maps
Survev
r Establish cogo points and point map exhibits for freld survey crews i Topographic Surveys
o Level Circuits
t Construction Staking

VICTOR PINEDA

CAD DESIGN TECHNICIAN
Experience
Education: BakersfieldCollege,Bakersfield,CA
Associates of Science Degree, Industrial Drawing
Job Duties: Planuins I Preliminary grading design
I Project Base Mapping
r Preliminary cost estimating
Mr. Pineda has I year of experience in civil planning, desigr, and drafting of multi-million dollar land development projects. Recent assignments for San Joaquin Engineering, Inc. include:
o Tnct 6490, 3O-acre residential subdivision in the City of Shafter I Tract 732l,2l-asreresidential subdivision in the City of Bakersfield t Tract 7141, 33-acre residential subdivision in the City of Bakersfield t Tract7364,A-acre residential subdivision in the City of Bakersfield I Tract 6191, 84-acre residential subdivision in fhe City of Bakersfield Clvil Snsineerlns
o Design aide and drafting of sanitary sewer systems
o Design aide and drafting of storm drain systems
o Design aide and drafting of gmding plans
o Design aide and drafting of water systems
o Design aide and drafting of public sheets
a CAD data for special engineering studies
t Preliminary grading earthwork quantity take-offs
t Subdivision final maps
Survey
r Establish cogo points and point map exhibits for field slwey crews I Topographic Surveys
t Level Circuits
i Construction Staking
Suh'Gonsultant
Resumea & Portfollos
Electrical
&
Lighting
Antrox Engineering, lnc.
2130 FStreet, Ste. A, Bakersfield, CA 93301 (561) 374-87L5

ORGANIZATIONAL INFORJVIATION
Antrox Engineering, Inc. is a woman owned engineering firm based in Bakersfield, CA. It was established in 1996 to provide electrical engineering seruices in Kern County and neighboring areas.

The President and Principal Electrical Engineer of Antrox Engineerlng, Karen Maftinez, is a professional electical engineer with over thirty-four years of experience.

Corporah Profile:

Antrcx Engineering, Inc.
2130 F Street, Suite A
Bakercfield, CA 93301
(661) 374-871s
Mailing Address:

Antrox Engineering, Inc.

P.O. Box 2694
Bakersfield, CA 93303
Antrox Engineering, Inc. is a Private California S-C.orporation' Business ltcality:

Antrox Engineering, Inc. is a local Kern County Electrical Engineering Consulting firm.

Percon Authorized to Execute Proposed Contract:

Karen Martinez, P.E.

PrincipaUPresident
(661) 374-87rs
(661) 203-2182
Primary Contact fur Managing Work:

Karen Martinez, P.E.

Principal/President
Antrox Engineering, Inc.
2130 F Street, Suite A
Bakersfield, CA 93301
(661) 374-871s
(661) 203-2182

QUALIFICATIONS AND EXPERIENCE
Antrox Engineering, Inc. is a woman owned engineering firm based in Bakersfield, CA established in 1996 to provide electrical engineering services In Kern County and neighboring areas. The President and Principal Electrical Engineer of Antrox Engineering, Karen Martinez, is a professional electrical engineer with over thifi-four yearc of experience including commercial electrical design, fire alarm system design, lighUng design, electrical facilities design, project management and control system design.

Antrox Engineering employs local seasoned professionals with comprehensive electrical engineering and communications experience. Our staff members have worked for both public sector and private sector clients on a diverse range of engineering projects. Types of public sector projects include school hcilities, OSHPD hospital and medical facilities, parks and recreational facilities, and government buildings. Types of private sector projects include office buildings, restaurants, houses of worship, sports facilities, warehouses, retail, as well as agriculture and petroleum facilities.

Project responsibilities includes all bceb of electrical design including power distribution, main power switchboards, backup power systems, oneline diagrams, power and signal plans, lighting plans, photometrics, panel schedules, equipment layouts, fire alarm systems, ommunications systems and PV solar systems deign.

A set of engineering drawings and documents will be prepared using up-todate industry standards and pertinent codes so that persons reviewing them get a thorough understanding of the elecfrical system and auxiliary systems necessary such as fire alarm system or communications equipment.

Peftinent codes include but are not limited to the current:
. California Building Code
. NationalElectricalCode
. Uniform Fire Code
. California Administrative Code Titles 15, 79, and 24
. All State laws, County ordinances, Rules of the State Proiect Summary:

1. Review Scope of Work

2. Reviews As-Built or Existing Drawings

3. Field Visit as required

4. Meet with Appropriate people for RFI (request for information)

5. Prepare Drawings and Documents for Construction:
a. Schematic Design L0o/o
b. Design Development 30o/o
c. Construction Documents 35o/o
d. Bid or Negotiation Phase 10o/o
e. C.onstruction AdministraUon l0o/o f. Post Construction Phase 5o/o

SAMPLE OF CURRENT PRO'ECTS
Height Street Nurcing Home LED Lighting Upgrade - Lighting design to upgrade light fixtures in nursing home to LED fixtr.rres and update lighting wiring and controls. All design work to conform to OSHPD standards.

Radian Design
Glenn Hartel
5301 Truxtun Ave., Ste. 300
Bakersfield, CA 93309
(66t) 8ffi-7676
Benchmark Pluperties Site & Building Development - Electrical plans for new three building property development. Site electrical design includes site power plan, photometrics, single line diagram, panel schedules, and details. Building llghting design, power plans, panel schedules, single line digrams, and details.

Radian Design
Laszlo Petrik
5301 Truxtun Ave., Ste. 300
Bakersfield, CA 93309
(66t) 8U-7676
Jastro Park Stage Remodel - Electrical plans for park stage remodel. Design includes site power plan, stage lighting plan, and pedestrian light additions. Electrical package includes lighting plans, site plan, photometrics, single line diagram, panel schedules and details.

Radian Deign
Glenn HarEel
530l Truxtun Ave., Ste, 300
Bakersfield, CA 93309
(661) 864-7676
Prlvab Club Remodel - Electrical plans for private club remodel. Electrical package includes lighting plans fur dining rooms, bans, lounges, patios, kitchen & gamerooms, phobmetrics, single line diagram, panel schedules and details.

Elevate Architects
Chris Ennis
2131 l9r' Street
Bakersfield, CA 93301
(66r) 44/.4346

PAST PARK PRO'ECTS
McFarland Via Del Garibe Park - Electrical plans for new city park. Site electrical & utiliUes design, pedestrian & parking lot lighting, power plans, panel schedules, single line diagrams & details.

San Joaquin Engineering
Brctt Dawson
200 New Stine Road, Ste. 175
Bakersfield, CA 93309
(661)336-0977
County of Kem Pioneer Park Lighting Remodel - Electrical plans for city pafl< to renovate the soccer field and baseball field sports lighting and upgrade their PG&E service. Site elecfical lighting design, photomebics, single line diagrams, panelschedules, and details.

County of Kern Construction Seruices
Ken Svendsen
1115 Truxtun Ave., 3'd Floor
Bakersfield, CA 93301
Hart Park Entnnce Sign and Monument Sign Lighting - Electrical plans for county park to add lighUng to west enFance sign and east monurnent sign. Provided site electrical lighUng plans, single line diagrams, panel schedules, and details.

County of Kern General Seruices
Don Woodard
1115 Truxtun Ave., 3d Floor
Bakersfield, CA 93301
(661)868-7020

KEY PROJECT PERSONNEL
Name and Title Karen Martinez, P.E, Principal Electrical Engineer Function : Professional Electrical Engineer
Prior Public Building Projects: Yes
Name and Title: DanielCantelml, Electrical Engineer
Function: Electrical Engineer
Prior Public Building Projects: Yes
Name and Tids Anna Chtchegoleva, Junior Designer
Function : Junior Electical Designer
Prior Public Building Projects: Yes
Name and Tide: lose Maldonado, Senior Designer
Function: Senior Electrical Designer
Prior Public Building Projects: Yes
Karen Martinez, P.E.
(PrinoipaUOwner)
S u mma ry of Qua I ifi cati on s :

Professional Electrical Enginoer oonsultant witlr over thirty-four years of exporisnco foousing on electrical design for schools, commercial facilities, renewable energy projects and industrial facilities. Project responsibilities includes all facets of faoility electrical design and project manBgement.

Areas of Expertise:

Elestrical Design Engineering
r Electrical power distrlbution design and load analysls r Slte plans, utillty plans, photometrlcs
r Single-line diagrams, panelschedules, po\ rer, llghtlng, and signalplans I Maln power swltchboards, motor controlcenters, equipment layouts r Backup power systems
r Fire Alarm Systems
r Renewable energy facllitles
r Economic evaluatlons, submittal reviews, cost estimates, electrlcal speclflcatlons I Project management, profect scoplng, and project analysls Commercial Project Experience
r Office bulldlngg retallfacllitles, houses of worship, and restaurants r Schools - elementary, hlgh school, and colleges
r Healthcare - Hospitals (OSHPD), medical and dental offices, memory care facilltles r Clvlc facllities - sports, recreational, libraries, parks, theaters, and flre statlons Renewable Energy Project Experience
r Photovoltaic Systems - Commercial and residential roof-mount and ground-mount I Solar Thermal- Large scale solar hot water and steam systems Industrial Proj ect Experience
. Petroleum facilities
: Agriculturefacilities
r Cogeneration plants
r Motor control centers
Education:

Bachelor of Science Electrical Engineering, Santa CIam University, 1988.

Profess ion al C erlificatio ns :

Califomia Professional Engineering Lioense (Electrioal) No. E18218 Nevada Professional Engineering License @lectrical) No. 20126 Hawaii Professional Engineering Lioence (Electrical) No. 16927E Idaho Professional Enginearing License @leotical) No. 18967 l*rznnProfessional Engineering License (Elechical)No . 72694 Experience:

Consulting Electrioal Engineer-Antrox Engineeringo Inp., Bakersfield, CA (1995-present) Adjunct Instru$tor. Electronics-Bakersfield College (Jan. - May 2009) Electricat Enginser - T.J. Cross Engineersn Bakersfield, CA (1990-1992, Part-time consultant 20rL-2A14)
Electrical Engineer - Kanis Engineering, Bakersfield, CA (1988-1990) Computer Skills:

AutoCAD
Microsoft Office Suite
Sketoh-Up
Visual Photomefiic Softrvare
Rockwell Software
Intellution Softrvare
Daniel Cantelmi
Electrioal Engineor
S u mmu ry of Qua I ificatio ns :

Eleotrical Engineerwith over eleven yea$ of experience in the preparation ofelechical and energy compliance pians for commercial construction. Experience in sommercial electricel design as well as plumbing and air conditioning design.

Areas of Expertise:

Elesfiical Design Engineering
r Electrlcal power distrlbutlon design and load analysls r Slte plans, utllity plans, photometrics
r Slngle-line diagrams, panelschedules, power, llghtlng, and signal plans r Main power switchboards, motor control centers, equlpment layouts r Fire Alarm & Communicatlon systems
r Backup power systems
r Economic evaluations, submittal reviews, cost estlmates, electrlcal specifications Commercial Proj ect Experience
r Office buildings, retail facilltles, houses of worship, and restaurants r Schools - elementary, high school, and colleges
r Healthcare - Hospitals (OSHPD), medlcaland dental offices, memory care facilities r Civic facilitles - sports, recreational, libraries, parks, theatert and fire stations Educulion:

Bachelor of Science Electrical Engineering, California State University Long Beaoh, 2011.

P r ofe ss io n a I Affi I i ati o n s :

IEEEMember
ASHRAE Member
Computer,S*i/Is.'
AutoCAD
Revit
Microsoft Office Suite
Energy Pro 5
Visual Photometric Softruare
Jose Maldonado
Electrical DesigneriDrafter
S ummary of Qualifications :

Commerpial and indusfiial designer with sixteen yea$ experience in eleofiioal, civil, meohanical, stnrctural, piping, and solar projeots. Project responsibilities inoludes preparing design drawings to client and industry standards using AutoCAD.

Areas of Expertise:

Electrical Design
r Electrical system layouts & load calculations
r Slte plans
r Single-line dlagrams
r Equipmentspecificatlons
Commersial Project Experience
r Offlce buildlngs, retall facllitles, houses of worshlp r Clvlc Facllltles - sports and recreational
r Gas stations and mlni marts
r Dentaloffices
Renewable Energy Project Experience
r Photovoltaic Systems - Commercial and residential roof-mount and ground-mount Industrial Project Experience
r Petroleum facilities - ASME Pressure vessels, steam generators, manlfolds, metering and measurement equ ipment.

Educalion:

Bakersfield College, Certificate of achievement in AutoCAD.

Computer Skills:

AutoCAD (2Dand 3D)
Miorosoft Office Suite
Sketch-Up
Olher S/rills;
Bilingual - Fluent in English and Spanish languages
Anna Chtchegoleva
Electrical Desi gner/Drafter
S u mmary of Qual ifi c atio ns :

Eleotrical designor/drofter with fifteen years €xperience in commeroial electrical and mechanical projects. Project responsibilities includes preparing design drawings to slient and induefiy standards using AutoCAD.

Areas of Expertise:

Elecilical Design/Drafting
r Electrical power distrlbutlon
r Site plans, utility plans
r Slngle-line diagrams, panelschedules, power, lightinS, and siSnalplans Commeroial Proj eot Experience
r Offlce buildings, retail facilities, houses of worshlp, and restaurants r Schools - elementary hlgh school, and colleges
r Healthcare - Hospitals (OSHPDI, medical and dental offlbes, memory care facllities r Civic facilities - sports, recreational, libraries, parks, theaters, and fire stations Educalion:

Bakersfield College, Certificate of Achievement in AutoCAD.

Compuler Skills:

AutoCAD
Microsoft Office Suite
Other Skills:

Bilingual - Fluent in English and Russian languages
Landscape
&
lrrigation
Rlor Derlgn ltudlo londrcqpc Anhltncturo & Drdsn
tiol On Ul$l Arr. DchrrfirH Gl euoe (ei) lrprale rbCobn com Pld#t2tf, South Mlll Creek Streetscape
RDS worked wlth the Bedevelopment
Department of the Clty of Bakersfleld to provlde
a compllmentary streetscape for'R' Street north
of Callfornla Avenue. Thls lncluded a landscape
medlan. Publlc streets, t4s and'5'Street
lmprovements lncluded llghtlng, trces, lnlgatlon,
and tree grates. RDS deslgned enhanced pavlng
at all maforvehicularcrosslngs, RDS also
deslgned a small pocket park adfacent to the
CanalWalk. Constructlon Cost f4.5 million
Darnell Haynes, Principal Planner
Clty of Bakersfield
1600 TruxtunAvc, $ultc 300
Bakerefidd CA 93t101
681.852-7509
dhaynes@hakersfi eldcitv. us
West Kern Pedestrlan Brldge Western
Approach lmprovements
RDS worked wlth the Clty of McFarland, Plannlng
Department to provlde a green space to begln future
streetscape lmprovements forWest Kem Street,
lmprovements lncluded a gazebo plantlng, inigation,
and llghtlng, as well a$ establlshlng slte furniture,
Construction Cost: $16r,ooo
Dennls McNamara, Planner
Plannlng Dlrector
Clty of McFarland
4orW. KemAve
McFarland CA93z5o
(66r) 792-3o9t d@
Rlol Derlgn ltudlo Lsndrcspt Archl!.cturr & Drrlsn
tSOr Oru Ulrtc Aur. lchrrfirld Ql errOc (a0l) 3lt-OAte rbcdolgnoon Pll#''''p-- Artlsan 9quare thopplng Complex
RDS worked wlth the Froehllch Signature homes, Klassen Corpontlon and MLLS Landscaplng to create a slgnature landscaped area uslng colorfulflowerlng drought tolennt plant material. Thls profect has a natlonal box store wlth surroundlng retall, rcstaurants, and fltness center. There ls a comer plaza with fountaln forthe restaunnt. Constructlon Cos* $3'4 mllllon, Ron Froehlich
Froehlich Slgnature Homes
E5or Brlmhall Road,Sulte 4o4
Bakersfleld CA933tz
66r46q-7t'o
ro n@f roehl lcbho{nes.com
Oxy Emergency/Flre Statlon
The primary work for this proiect was to introduce very low water using plantlng material within this wlndy' dry settlng. The planting palette was simple, trees where
used to provlde shade and rock mulch provlded dust
and erosion control. RDS asslsted wlth Klassen
Corporatlon Archltects wlth Constructlon Drawings and
Construction Admlnlstration. RDS worked closely with
the Landscape Contractorthe tlmeline needed forthe
facility. Construction Cos*$z5o,ooo.

Ed Childres, Principal Archltect
Klassen Corporation
2o2r westwlnd
Bakersfield C.A 93301
66r'324-3ooo
[email protected]
It Il
:-4?-
--l**.**1
-a(l*&+Er..
i",&
':'.;T
.&nF-:-.. ^;i,:'
Rlor Dglgn Itudlo lnndrccne Archlhchrro & Dcrlgn
tlot Ol! UlilcAur. lchmfrdd Gt gttot (6, w,5,, rlodrdrnom PLA #tam Dr. Douglas K Fletcher Elcmentary
& Paul L Cato Mlddle School
RDS worked wlth the BCSD and Ordiz Melby
Architects comblning a Mlddle and Elementary
School entrles and a shared multl-purpose
cafetorlum, Each campus lncluded separate large
sport flelds. The front of the school was deslgned
wlth shrubs beds watered with drip lnlgatlon to
meet Oty and State Water Conservation
standards.

Constructlon Cost $50 mllllon
Danny Ordlz, Prlncipal Archltect
Ordlz MelbyArchltects
55oo MlngAvenue, Sulte 28o
Bakersfleld CA933o9
66r-El:-525E
dordlr@ordlzmel by.com
Paramount Farmlng
A $25orooo lmprovement profect is a
renovation of an existing site, whlle retalning
some existi,ng trees, all of the turf grass was
removed and with much of the otherexlsting
shrubs, Existing spray irrigation was replaced
wlth water efftcient drip lnigation. Wood and
rock mulches were used in planting areas to
reduce weed growth and retaln moisture in
the soll. An automatlc fertlgatlon system was
installed to reduce maintenance. The
lmprovements added vlsual interest and
hlghlighted the proiect entry.

Mlke Bray, Profect Manager
Paramount Farming
5Eot East Lerdo Highway
Rlor Derlgn ltudlo Lsndrcsne Archltectrrrc & Dsrlgn
mos Orc Vlrk Aw. Echrrrflrtd CA ttlot (cd) srt.gue rbdeibncom PIA #llco Grlmmway Academy
RDS worked wlth the Ordlz Melby Archltects
and Western Propertles to create a unlque
campus ln Arvln. Thls theme wlthln the
campus ls Medltenanean. The camPus
provides under-prlvlleged chlldren wlth an
introduction lnto livlng well through an edlble
educational garden much like the Buena Vlsta
Edible Schoolyard. RDS provlded design for
drought tolerant plantlng and water
conserving irrlgation throughout the campus
and adfacent sports field. Constructlon Cost:
$ 6 mlllion
Danny Ordlz, Princlpal Archltect
Ordiz Melby Architects
55oo Ming Avenue, Sulte 280
Bakersfleld CA 93309
66r-8325258
[email protected]
Hollday lnn Express & Suites,
Ventura CA
This renovated 4r room hospitality building
between Navigator Drlve and the Ventura
Marina was designed by Frank Lloyd Wright and
the landscape design reflected the lines of the
architecture. Under strict review from the
Ventura Architectural Review to maintain view
shed and include exlsting trees for relocation, as
wellas, keep within a small list of low water use
natlve plant materlals. Water detentlon ponds
were included in the deslgn. Committee
Construction has not been started.

Heidlde Guzman, Dlrector of Design
Prime Group Construction, lnc.
3045 Walson Road, Bakersfhld CA 9:loq
(66t) 3q-52o5 [email protected]
,1
rrrl .lF

6.b
I F
)
It
lii,l
,iilrl
:; {t
;_
"ill
tftg*lrt:q.t' It1tlllf,fil&r
r{rJiltt:$drr*
$*Fsti ffiffigg
Rlor Dorlgn ltudlo londrcqpc Ar.chltcctrns & Dsrlsn
Itol OrcUlrtcArr. Edtrfidd Cl gtlOt (cd) tlt'9ille dcdrrlgmccm PIA #!a6o Crossroads Buslness Park
RDS worked wlth Roll Real Estate
Development, a divlslon of the
Wonderful Company and McMurtrey
Llnce to create a contemporary
landscape design that hlghllghts the
buslness bulldlngs and strong
streetscape along Hanis Road and
Young Str€et ln Bakersfleld CA,
Landscape constructlon cost $2601000.

Greg Llnce, Presldent
McMurtrey Unce
42+%24 Street, Ste.A
Bakersfleld CAgwog
(66r) 3zt-3r3o
gltncle@mcm urtreyllnqsLqgm
Wasco Farmworkers Houslng Relocation Profect
Located ln Wasco CA, RDS worked wlth MW Steele Group for the rz6 multi-famlly complex wlth a chlld development center and communlty center, as well as a medlcal cllnlc. RDS designed the lnterlor areas such as BBQ statlons, and play area, as well as, streetscape around the complex, The only area were there was turf was the chlld development center and adfacent lawn. The Profect is under constructlon.

Cost Estlmate: $4o M.

Mark W. Steele, President
M.W. Steele Group lnc,
1805 Newton Avenue, Sulte A
San Diego, CA 92rr3
(619) z3o-o325
email: [email protected]
Rlor Derlgn ltudlo kndrcopc Archt'trcturc & Dorlgn
ItOt Onr Ulrtc Arn lchrnfidd Cl t$Oe (ll!if, W.rzr, dcdlrltn,com P[t #!C60 Almond Vlllage Multl-Famlly and Slngle Famlly Houslng
Lost Hllls, CA
RDS worked wlth the l$A Group Archltects and Wasco Affordable Houslng, lnc. to create a unique farmworker Houslng ln Lost Hills, CA. This 5o unit multl-family has a community center and communhy plaza wlth outdoor dlnlng areas wlth synthetlc turf, llmltlng the profect to be inlgated by bubblers and drlp lrrlgatlon. The zr Single Family units were landscaped to provlde turf areas in the backyards wlth frult trees, the front of the homes were of trees and shrubs. RDS provided deslgn for drought tolerant plantlng and water consewlng inigation throughout the proiect to meet both LEED and Green Code Certlflcatlon. Construction Cost $ t3.25 mllllon Derek Holdsworth, Prlnclpal Archltect
KSA Group Archltec8, lnc.
4650 Amerlcan Avenuer Sulte 2oo
Bakersfleld cA 9t3og
661-E3+1331
[email protected]
6a-rl I
.

Rlor Derlgn Itudlo Londrcspc Archltectutt & Derlgn
rror Orc Ublo Arn l*rffdd CA tltOg (aCl) Cl$tllt rlordrrlrn.com FIA *WO ROSDESIGNSTD|OLLC
3805 Ora Vlsta Avenue
Bakersfield, CA g)rog
www.rlgsdesign.com
EIN 26-4269026
Phone: 66r-835-9z59
Faxt661367-5284
Emall: ms [email protected]
Founded ln 2oo9, Rios Design Studio is a California Limited Llability Company, woman owned business, City of Bakersfield Tax Certificate # 10 oott3849, and City of Bakersfleld, and Clty of McFarland Buslness Llcense, Employees... (3) three total. Landscape Archltects are licensed by the State of California.

RIOS DESIGN STUDIO provldes a variety of landscape Archltectural Deslgn services with specialties in Site Planning, Design Detail, Prellmlnary, Site Plan and Deslgn Review, Urban Deslgn and Redevelopment Master Plannlng, Presentation Graphlcs, Planting and lnigation Design.

RDS can provide hand and AutoCAD format generated drawings. We are proflclent in Microsoft Word and Excel, as well. RDS can provide issue calculations and technlcal memorandums, cost estimates, phone and onsite meetings, and observatlons with Clty architectural and englneering staff and any other required material to aid in the completed installation of proposed proiects with the Countyof Kern, and othercities within Kem County and beyond. We are familiarwith gr:antfunded proiects and will work within the specified constraints to achieve positive results. We are currently involved with public works and redevelopment proiects in Bakersfield CA.

RDS can provide plan whlch are compliant with MWELO, California Water Conservation Blll. We have atl the certificates and licenses necessary for landscape and irrlgation design. We are drought tolerant landscape design as wellas water efficient inigation design and review of installed irrigation systems.

Client References:
1, Derek Holdsworth, Principal, KSA Group Architects,4S5o American Avenue, Bakersfield CA 97)09, 66r-81ql3r, dholds*[email protected] z. Don Evans, PrincipalArchitect, Klassen Corporation,2o2l Westwind, Bakersfield CA 93301, 66t324-3ooo,@ j. Matt VoVllla, Principal, LAV/Pinnacle Engineering tz4t8 Rosedale Hwy, Suite An Bakersfleld CA g33tz Ph. 66t-869o18, [email protected]$le.
4, Mark W. Steele, Presldent, M.W. Steele Group, lnc. t8o5 Newton Avenue, Suite A, san Diego, CA 921i3, (6t9) z3o-0325, [email protected]'!

5. Danny Ord,4 Principal, Ordiz Melby Architects, 55oo Ming Ave Suite z8o, Bakersfield CA 933og, 66t-832-5258, dordiz@ord izmelby.cgm
6, GregLince, Presidentand CEO, McMurtrey Lince lnc., 4241%24'h Street, Bakersfield CA g)rot
66t5zt-9r3o greg@mcmutreilince,com
1 Rlor Derlgn ftudlo Londrcope Architecture & Derign
ggol Orcr Ulrto Arn Bshcrrfield GA cgoo (661) sll-9:159 rlorderltm.com ptA #!a6o

FIRM EXPERIENCE
MrcRn E Ros PLA#326o
Pnssrorur
With twenty-nine years of experience in the field of Landscape Archltecture, she has practiced in the design and construction of commercial developments in C:lifomia, Nevada and Arizona, including office complexes, hotels and casinos, and daycare facilities. Having worked at several notable Landscape Architectural firms, she is well versed in a wide diversity of proiects,
Understanding the soil make up ls imperative to choosing the right plant material for its survival, RDS is unique, because they provide soil analysis and recommendations prior to design and work the soil requirements into the design. Mrs. Rios also has specialized in salvaging protected native plant material such as cacti, well as, relocating them, as required. She considers each site, and can necessitated the use of existing plant material and its low water needs while introducing additional plant material to create a special space.

Rios Design Studio (RDS) takes pride in developing landscapes which use water responslbly while branding a marketable look and manageable design, Whether it is model homes, custom residences or even commercial sites, she can bring a distinctive look while working with maintenance personnel to establishing a readable design to the publlc and customer. Crossroads Buslness Park is an example of an industrial site that has been planted and irrigated as per the California State Water Conservation Law (MWELO) to welcome the publlc and be easily maintained. RDS also works with hotels like Hollday lnn Express & Sultes ln Ventura, CA. Artlsan Square Shopplng Complex is a high end successful retail complexes that we designed for bold color and low water use planting to entice shoppers.

Creating a sense of community is essential for Rios Design Studio. RDS has worked wlth key architects and local state houslng authority agencies on two farmworkers housing projects; one in Almond Vlllage Multl-famlly and Slngle Family in Lost Hills CA and the other in Wasco, CA. Each housing project includes a park & club house with a variety of housing types like apartments, duplexes, and single family units. RDS is currently involved with the ARC committee for K. Hovaniants Four Seasons HOA, Mrs. Rios works with the committee to provide professional direction to the review of new landscapes within the community. RDS has also worked with local Englneer, l-AV/Pinnacle Engineering, in the design of the City of Arvin's C,arden in the Sun Spray Park and Par Course Park. With both projects RDS had introduced low water using, easy to maintain, hardy native plant material in conjunction with the use of new innovative irrigation techniques to promote water conservation and ease of maintenance. RDS works with the local maintenance directors to ensure long lasting beautlful City landscapes,

EDUCATION
Bachelor of Science, California Polytechnic State University, Pomona CA, 1985

TICENSURE
Califomla Licensed Landscape Architect #1260, obtained in r99o Arizona Llcensed Landscape Architect #434o9, obtained in zoo5 2 Rior Derign ltudlo LondrcoFe Architecture & Derign
l8o5 Ors Ulrta Arrc. Bchcrrfield CA 93tog (CCt) 0ll.c259 rlorderlgncom PIA #rco Jrunne Rrcs PLA#2979
Vrcr PnesroeNr
With thirty years of experience in the field of Landscape Architecture, he has practiced in the design and construction of a wide diversity of projects located in Glifomia and Nevada. These proiects primarily consisted of master planned residential, educational and public institutions, park and recreation and commercial type of projects,
From the beginning Rios Design Studio, has made a commitment to designing landscapes which make effective use of water. This is the company Mission Statement. By adopting a str:ttegy that is proven to work, our slogan is'rConselvation by Deslgn".

Listed below are projects that focused on water conservaUon that Mr. Rios has worked on.

The Wonderful Company's (eanmont) Headquarters in Kem County had goals to change the landscape look of grass, eucalyptus and junipers to a new brand of beautiful, flowering drought tolerant frontage that could also be used by the employees with a walking path and covered dining patio, Mr. Rios designed the exterior to reflect the blossoming nature of the Wonderful Company with many flowering plant materials that attract hummingbirds and butterflies.

While working on the West K€rn Pedestrlan Bridge Approach in McFarland, RDS prepared the plans to be drought tolerant and the irrigation to be as efficient as possible. No sprays were used on the project at all. The trees were watered using deep root bubblers, the shrub beds were irrigated using dripper lines that were covered with wood mulch and the turf was irrigated using a subsurface irrigation system, thereby eliminating overspray and run-off issues.

While working with Klassen Corporation, Rios Design Studio landscaped the Oxy Emergency and Flre Statlon, west of Taft, CA which utilized local desert plant material to blend in with the existing oil facility and incorporated point to point drip irrigation as a water conservation measure, The area is very arid and has weather patterns that change the wind direction and strength often. The local faunas, such as rabbits and ground squirrels, tend to eat away at the plant material. The Caterpillar Plant within the Tejon lndustrial Complex, the planting and drip irrigation design minimized maintenance while still providing some sofGcape around the entrances.

Mlll Creek Community redevelopment proiect, Bakenfield CA (roro). The project consists of streetscapes, Townhouses, Apartments, a small pocket park. The entire proiect was designed to meet the requirements of AB 1881. The irrigation system uses a smart controller to automatically adiust systems runtimes as the seasons change throughout the year. Drip irrigation delivers water to the shrubs that fill the landscape beds and the trees are irrigated with deep watering bubbler systems. Calculations were done to determine a Maximum Applied WaterAllowance (MAWA), based on the project size and evapotranspiration rate of the city. Once the systems were designed an Estimated Total Water Use (ENVU) calculation was done to determine how much water would actually be used and to show that it was less than the MAWA.

Grlmmway Academy Charter School located in Arvin, Ca. The project was designed to have a Medlteranean 3 flavor in the architecture and the landscape. With that, the plant material is drought tolerant in nature and the majority of the campus is to be watered by drip irrigation. There is a soccer field on the site that will be irrigated with a rotor system for efflciency. The campus also includes an edible garden that is watered by hose bibs, per the request of the private consultant designing the edible garden as an educational part of the campus.

A 45 acre campus, Dr. Douglas K Fletcher Elementary & hul L Cato Middle Schools, for BCSD was completed in 2or4. The project is a combined Middle School and Elementary School on one site. The two campuses include large sport field areas, the inner campus between the classroom and the front of the school designed for staff parking and student dropoff and pick-up. The front of the school has drought tolerant landscaping, using drip irrigation installed. The sport fields will be watered using rotor systems and the inner campus will be utilizing spray irrigation. He was also involved in revitalizing his alma mater, Delano High School football fleld and practice field , redesigning a new irrigation system and drainage system with Ordiz Melby Architects. He has been involved with many other modemizations of local campuses as well as new elementary campuses.

Mr- Rios has specified several projects using artificial turf. One such proiect ls Almond Village Multi-famlly Complex in Lost Hills, Ca with KSA Group Architects office and the Wasco Farmworkers Houslng Complex, as well as, new and modernized schools. Both Multi-Family Complexes called for only large center plaza for play and outdoor dining. ln the Almond Village, the single family housinf included real turf only in the backyards.

Both profects met all the LEED and Green Codes. All other areas larger prolects using the artificial turf may require irrigation and specialty drainage in order to be compliant with sports fields requirements.

Mr. Rios has concentrated a focus on efficiently designed inlgation systems for maximizing water conservation. He has twenty-nine years of experience in designing irrigation systems as a landscape architecl As a further commitment to this cause, Mr. Rios has passed requirements to obtain certifications issued through the lrrigation Association. He is a Certified Landscape lnigation Auditor (CLIA) and a Certified lrrigation Designer (ClD).

EDUCATION
Graduated from California Polytechnic State University, San Luis Obispq CA Bachelor of Science Degee in Landscape Architecture, 1984 LICENSURERegistered as a Landscape Architect in the State of Califomia (License #2979), t989 CURRENT CERTIFICATIONSCertified lrrigation Designer obtained through the lrrigation Association in zoog Certified Landscape lnigation Auditor obtained through the lrrigation Association in 2oo9 AWARDSHunter Industries Trailblazer Award (zor5) fhe TrailblazerAward showcases professionals who have demonstrated innovation, leadership, and forward thinking in the irrigation industry. 4 Rlor Derign Jtudlo Londrcopc Archltecturc & Derlsn
9805 Oro Ul'ta Auc. Bllherrfield C/A 9t!og (661) 813-9259 rlordedgn.conr PIA #3460 Flrm Background
Founded in zoo9, Rios Design Studio is a California Limited Liability Company, The two founders have more than 5o years of experience in the field of Landscape Architecture. Rios Design Studio has licenses in Califomia and Arizona. Jaime Rios is certified lA lrrigation Designer and Water Auditor. "Conservation by design" is their motto.

Rios Design Studio (RDS) provides a variety of Landscape Architectural Design service with specialties in Prellminary Plans, Construction Documents that meet state, county, and local standards, such as the State MWELO ordinance like Hydrozone, Hardscape, lrrigation, Planting and Lighting plans with all needed details and specifications, Presentation drawings can be provided as requested. Their focus is on drought tolerant planting that add interest to each landscape with supporting state of the art inigation for longevity and water conservation. Their specialty is working with Commercial properties, School Districts, and Specialty Pro,ects.

Commercla l Fopertles Experlence:

Artlsan Square Shopping Complex: ln Bakersfield CA, RDS worked with the Froehlich Signature homes, Klassen Corporation and MLLS Landscaping to create a signature landscaped area using colorful flowering drought tolerant plant material. This project has a national box store with surrounding retail, restaurants, and fitness center. There is a comer plaza with fountain for the restaurant with large shading palms. Completed in zor6.

Crossroads Business Parlc RDS worked with Roll Real Estate Development, a division of the Wonderful Company and McMurtrey Lince to create a contemporary landscape design that highllghts the business buildings and strong streetscape along Harris Road and Young Street in Bakersfield CA. Completedin2oll.

Hollday lnn Express Ventura: This renovated 41 room hospitality buildlng between Navigator Drive and the Ventura Marina was designed by Frank Lloyd Wright and the landscape design reflected the lines of the architecture. Under strict review from the Ventura Architectural Review to maintain view shed and include existlng trees for relocation, as well as, keep within a small list of low water use native plant materials. Water detention ponds were included in the design. Completed in zot9.

The Wonderful Company (Paramount) Headquarters: A g25o,ooo improvement project is a renovation of an existlng site, while retaining some existing trees, all of the turf grass was removed and with much of the other existing shrubs. Existing spray inigation was replaced with water efficient drlp irrigatlon. Wood and rock mulches were used in planting areas to reduce weed growth and retain moisture in the soil. An automatic fertigation system was installed to reduce maintenance. The improvements added visual interest and highlighted the project entry in Shafter CA. Completed in zor5.

School Dlstrlcts & Schools Experlence:

Dr. Douglas K Fletcher Elementary Schoof Paul L Cato Mlddle School combined: Located in Bakersfield CA, RDS worked with the Bakersfield City School District (BCSD) and Ordiz Melby Architects combining a new Middle and Elementary School entries and a shared multi-purpose cafetorium. Each campus included separate 1 large sport fields. The front of the school was designed with shrubs beds watered with drip irrigation to meet City and State Water Conservation standards. Completed in zot4.

Grimmway Academy: Set in Arvin CA, RDS worked with the Ordiz Melby Architects and Western Properties to create a new & unique campus in Arvin. This theme within the campus is Mediterranean. The camPus provides under-privileged children with an introduction into living well through an edible educational garden much like the Buena Vista Edible Schoolyard. RDS provided design for drought tolerant planting and water conserving irrigation throughout the campus and adjacent sports field. Completed in 2012.

Haclenda Elementary Sporb fleld: Located in California City, RDS worked with Steve Corbin Architects and the Mojave Unified School District (MUSD) with a sports field that was being irrigated by the EPIC system which uses a plastic pan system below the turf root system. The premise is that soils are essentially sand and can hold no water. The pan system holds water applied by water cannons overhead, until the water dries or evaporates.

The school system were having problems with the turf due to high pH soil and water. RDS recommended a fertlgation system to bring down the pH. Completed in zol5.

Delores Whitley Ehrrentary Sdrooft RDS worked with Ordiz Melby Architects and Panama Buna Vista Union School District (PBVUSD) to create a new elementary school in Southwest Bakersfield. Meeting the MWELO standards for water conservation and low water using plant material, RDS worked closely with the School District to ensure ease of maintenance. Completed in zot7.

North Hlgh SchoolModemlzation: RDS worked with Ordiz Melby Architects and Kern High School District (KHSD) to modemize on an exlsting campus. lmprovements were made on existing soccer and practice fields, around a new gymnasium, and along the front parking and entry area of the campus. This site located in Bakersfield CA, had really unhealthy soils due to oil dumping that were resolved with specialty soil amendments and replacing the existing irrigation systems without adding a pump. Completed zot8.

Delano High School FootballField and Track RDS worked with Ordiz Melby Architects and Delano Joint Union School District (DJUSD) to make improve the existing football field by reducing drainage issues by adding a French drain, new irr'rgation and re-crowning the football field. A new pump, and water meter was added to decrease the water burden of the school. The football field also had its own irrigation controller with a two wire irrigation system. The track was upgraded from a dirt track to a new synthetic surface and new stands.

The track and adjoining practice fields were given their own water meter and pump along with two wire irrigation system to allow more control in athletic areas. Football field was completed inzor5 and track was completed in zot8.

Panama Ehmentary Modernization: RDS worked with Klassen Corporation and PBVUSD to make improvements on this older school in southwest Bakersfiield. Under the direction of the School District, RDS designed a landscape that successfully meets the MWELO standards for water conservation and the need for reduced maintenance with the use of synthetic turf within the campus and eliminating all turf on the exterior of the campus. The installation is ongoing.

ThompsonJunlor High School Plaza: RDS worked with PBVUSD to amend existing tree wells and turf areas that were not meeting the student needs for lunch areas and to reduce the planting and irrigation to be more maintainable forthe Junlor High in Bakersfield CA" Completed in zot8.

Palm Avenue Junlor Hlgh Schook RDS worked with Klassen Corporation and Wasco Union Elementary School Distrlct in Wasco CA. This school was originally an elementary school renovated to be a much needed Junior High School by renovating the sports fields and adding a new gymnasium. Completed in zo19 2 James Forrest Elementary Schook RDS worked wlth Ordiz Melby Architects and the School District to landscape this new school. The schools irrigation system uses two different water sources: one potable from that local water district and the other non-potaHe fiom Shafter Wasco lrrlgation District (SWID) agricultural inigation water district for the sports ffeld only. The SW D water required a filter to clean the non-potable source. Each source had its own pump and controller.

KHSD Del Oro Hlgh Sclrooh RDS worked with HMC outof Ontario CA and the School District to landscape a new high school on the corner of Cottonwood Ave and Panama Lane. The high school has a large quad with seat walls abound within the quad and other more intimate seating areas, There are specialty areas that focus on gardens that relate to historlc or scientiflc lessons. The landscape outside the campus provide area that allow for shallow water basins to gather water before it runs off into the street drainage.

New Crescent Elementary School wfth Greenfteld Union School Dlstrlct RDW worked with Ordiz Melby Architect to design the landscape at this new elementary school along Panama Lane. This school focuses on an interior courtyard with loG of canopy trees. Water retention is located along the outer campus.

Specialty Proiects:

Bear Valley Springs Associatlon Park lrrlgation System: ln a small hamlet near Tehachapi CA, working with Bear Valley Springs Association (BVSA) and the local golf course, RDS redesigned the existing inigation system into a dual system to allow for lake water use for the local park and golf course irrigation and another water source form the local potable water system, for times when the lake was too low to pump from. A new pump and with a new inigation system with a fertigation system was added to solve the watering issue. Completed in zor4.

Almond Village Single Family and Apartments: RDS worked with the KSA Group Architects and Wasco Affordable Housing, lnc. to create a unique farmworker Housing in Lost Hills, CA. This 6o unit multi-family has a community center and communlty plaza with outdoor dining areas with synthetic turf, limiting the project to be irrigated by bubblers and drip irrigation. The zr Single Family units were landscaped to provide turf areas in the backyards with fruit trees, the front of the homes were of trees and shrubs. RDS provided design for drought tolerant planting and water conserving inigation throughout the proiect to meet both LEED and Green Code Certifi cation. Construction Completed in zol7.

Wasco Farmworkers Houslng: Located in Wasco CA, RDS worked with MW Steele Group for the zz6 multifamily complex with a child development center and community center, as well as a medical clinic. RDS designed the interior areas such as BBQ stations, and play area, as well as, streetscape around the complex.

The only area were there was turf was the child development center and adjacent lawn. The Project is under construction. Completed in zor9.

Ronald McD,onald House Bakersfleld: Next to the Memorial Hospital in Bakersfield CA, RDS worked with Dave Packer Custom Homes and Klassen Corporation to add rooms to this much needed house for family of those chlldren who are in the adiacent hospital. RDS designed the drought tolerant planting and irrigation next to this existing hospital. Completed in 2o19.
3 Rlol Derlgn ftudlo Lcndrcope Archltecturc & Derign
!8oi O?c Ulrto Ase. Bqh€rtfrdd CA gttog (661) 885-vr59 rlodedgn.conr PIA #lt6o tb7*2 Design Program for Stringham Park lmprovements
The Stringham Park is an existing park in Shafter CA located on the corner of James Street and Lerdo Highway. These improvements witl add a z8-stall parking lot along Lerdo Highway, add trees and make improvements on the existing inigation system.

Our objective is to provide a water saving irrigation and planting design to compliment the housing and activity areas within the Green Communities & Net Zero Energy, and/or State Communities codes. As per the state water conservation mandate, irrigation improvements will help reduce overwatering and excessive runoff. The parking will have no turf and be designed with drought tolerant plant material and mulch to reduce water consumPtion and mainlenance. This design will have beautifut, excitlng sustainable landscape sPaces within the community that promote a healthy lifestyle and benefit the City's residents. RDS will work in coordination with the Engineer and other sub-contractors. This design will be in accordance with the City of Shafter ordinances.

Consultant, Rios Design Studio (RDS) agrees to Perform the following services:

Phase t: Slte Analysis
RDS willgo to the site for a site analysis, review the existing irrigation system and its performance, as well as, existing trees and their health, along with to conduct collect site soil samples. RDS witl submit soil samples to an independent Soils Laboratory for analysis. Soil preparations recommendations and specifications from the lab will be incorporated in the construction drawing landscape specifications (Phase 3). RDS will prepare a plan and report about allthe findings at the existing site. This phase willtake two weeks to complete.

Phase x Draft Construction Documents
With the prepared site plan, RDS will prepare and provide a Preliminary planting Ptan. This plan will determine tree shading calculations needed to meet City standards and the water budget for the site. This plan will be submitted to the City of Shafter and staff to review and comment. This phase includes two (z) meetings with the City of Shafter and Engineer, and any subconsultants and site visit. Three $) weeks are needed to complete this phase.

Once the Preliminary Plan is approved. RDS will Prepare and a 5o% completlon or Draft Construction Plans will be submitted to the Engineer and City of Shafter of the construction drawings for review. lrrlgation Plan will include locations of major equipment and mainline locations as well as specific irrigation brands preferred for Oient review. A Hydrozone plan will be provided that will include an Estimated water Use calculations and water !."-dg:a with PlantingPlan with plant photos. AII plans include specifications.

Thisphase includes (z) meetings. This phase will be completed in seven (7) weeks.

Phase 3: Final Constructlon Documents
once the Design Deveropment prans are approved, RDs wiil prepare arco?t constructlon Plans for submittal to the city of Shafter & Engineer. RDS will include Hardscape Plans, lrrigation Plans, and Planting ptans with details and specifications. one (l) meeting are included for this c6ordination. This phase willtake seven (7) weeks to complete.

Phase 4: Plan Check
RDS will work with the Engineer and city planner to make the appropriate revisions to get an approval of the plans by the city along with the go:t submittal to Engineer & City of Shafter. RDS will wlrt wiih the Architect to determine what revisions needs to be changed to the design to meet the costs. one (l) meeting are included for this loordination, fhis phase will take two (z) weeks to complete. ,# City of Shafter

SI-IAFTER COUNCIL AGENDA REPORT
Meeting Date: September 20,2022
FROM: Gabriel A. Gonzalez, City Manager
Prepared By: Kevin Hatmon, City Engineer
SUBJECT: NOTICE OF COMPLETION AND ACCEPTANCE OF WORK FOP. 2022

ZERKER ROAD RECONSTRUCTION PROJECT

RECOMMENDATION
Council find the requested action is not a 'oproject" per Section 15378(bX5) of the California Environmental Quality Act Guidelines; accept public improvements completed with the 2022 Zerker Road Reconstruction Project; authorize the City Engineer to file a Notice of Completion and Acceptance of work for said project.

BACKGROUND
The2022 Zerker Road Reconstruction Project is now complete. Staff has reviewed and approved the improvements effective July 29, 2022. This project demolished and reconstructed approximately 3,500 feet of Zerker Road north of the Calloway Canal. The existing pavement ruifu". and underlying materials were removed and replaced with a standard section of asphalt and aggregate base. The paved shoulders with rumble strips were replaced and the road restriped.

The primary project contractor was Griffith Company. Construction costs arc $774,539.96.

Grifdth's oiiginat bid was $767,735.00. The difference is due to asphalt price fluctuations and 3l additional tons of asphalt used. Third party materials testing performed by lkazan & Associates is an additional $7,178.00.

With the project work completed and field-approved by Public Works, Staff should now file and record a Notice of Completion and Acceptance of Work, which requires Council authorization.

FISCAL IMPACT
Not applicable for a notice of completion. Public Works already requested a budget adjustment on June 7,2022 council meeting.

ALTERNATIVES
There are no alternatives to the recommended action. The City must accept ownership of the constructed improvements.

CONSENT CALENDAR
IO
I
2 Notice of Completion and Acceptance of Work for2022Zerker Road Reconstruction Project

CEQA ANALYSIS
The (action is not a "project" per CEQA Guidelines Section 1537S(bX5)) because the action is the orgarizational or administrative activities of govemments that will not result in direct or indirect physical changes in the environment. Therefore, the action is not subject to CEQA.

ATTACHMENTS
Final Tally of Construction Costs For 2022 Zerker Road Reconstruction Project Vicinity Map of Improvements
a

CITY OF SHAFTER
336 PACIFIC AVENUE
SHAFTER, CA 93263
JOB NO" 30024 PROJECT
Corporate Ofiice
3050 E. Birch $t.
8rea Ca 9282'1
(71 4)9845500
Central Region
11 28 Catrie. Paftway I\ve.

Bakersfeld. CA 9330S
{66li 392-6640
2O22 Zerker Road Reconstruction Project
$outhern Region
12200 EloomfieldAw.

Santa Fe Spings, CA 9067M150
1562't S2*1128
Eastern Region
4756 [4ission glvd.

Montclair. CA 917A2-4413
i909) 27C5040
contractors Lic. # 88
INVOICE DATE 07131122
rNVOlCr NO. 30024001
PROGRESS EST. 1

CONTRACT NO,

GRIFFITH
(ENG2022- COMPANY
SrNCE riO2
774,539.95

0.00 38,727.00

0.00 735,812.96
384,875.40
180,400.00
105,8,10.00
23,520.00
4,480.00
8,750,00
2,650.00
19,500,00
9,925.00
500.00
30,570.00
3,529.56
774,539.96
TOTAL
PLUS $LES TAX

LESS RETENTIONLESS PREV PAYMENT

AMOUNT DUE
3,630.904,400.00
117,600.00
117,600.00112,000.00
7,000.00

1.00 1.001.00

1.00 1.00

0.00 774,539.96

0.00 38,727.O0
735,812.96
384,875.40
180,400,00105,8210.00
23,520.00
4,480.00
8,750.00
2,650.00
19,500.00
9,925.00
500.00
30,570.00
3,529.56
3,630.904,400.00
117,500.00
117,600.00112,000,00
7,000.00

1.00 1.001.00

1.00 1.00
0,00
381,500,00
180,400.00105,840.00
23,520.00
4,480.00
8,750.00
2,650.00
19,500.00
9,925.00
500.00
30,570.00

0.00 0.2000.040
1,250
2,650.000
19,500.000
9,925.000
s00.000
30,570.000
0,000
106.000

41.000
0,900
3,500.004,400.00
117,500.00
117,500.00112,000.00
7,000.00

1.00 1.001.00

1.00 1.001.00
roN
CY
SF
SFSF
LF
EA
LSLS
LS
LSLS
HMA

CII AGGREGATE BASE

FULL DEPTH GRIND AND REMOVESECTIONSUBGMDE COMPACTION

FOG SEAL

RUMBLE STRIP

ADJUST MONUMENTTO GMDETMFFICCONTROLTRAFFIC STRIPING
PERMIT AND INSPECilON FEE

ALLOWANCE

MOBILIZATION
Oillndex
TOTAL

PLUS SALES TAXLESS RETENTION

CURRENTAPPTOTAL

CONTRACT TOTAL

APPROVAL
Date Prepared 07131122
Customer # 23805
1 234
567
89 10
11 70r
Page'l of 1
n
\
\
I
lrBENCHMARK GOSSAMER
GROVE
tgl{.) va<KJN

SITE OF
WORK
7th STANDARD ROAD
s
xq
5 s
/L
'l
\
\\

WONDERFUL

INDUSTRIAL
PARK

VICINITY MAP - NO SCALE
NTS
"fi# City of Shafter

SFIAFTER COUNCIL AGENDA REPORT
MEETING DATE: September 20,2022
FROM Gabriel A. Gonzalez,City Manager
Prepared by: Carol Chavolla, Human Resources Manager
SUBJECT: ADOPT CITY OF SHAFTER EMPLOYEE BI.WEEKLY PAY
SCHEDULE EFFECTIVE ruLY I, 2022, REVISED SEPTEMBER 20,
2022

RECOMMENDATION
Council adopt the City of Shafter Employee Bi-Weekly Pay Schedule effective July 1, 2022, revised September 20, 2022.

BACKGROUND
Personnel System Rule 3.3 grants the City Manager the authority to continually review the City's classification plan for decision-making on compensation, selection, employee development, career advancement, and other personnel activities. With the authority granted in the aforementioned Personnel System Rule, the following revisions have been made to the City of Shafter Employee Bi-Weekly Pay Schedule:

Position Range Bi-Weeklv Pav Action
Animal Control Officer SPOA - NS 124 $1,601 - $1,947 Revised bi-weekly pay from $1,358 - $1,651 to
$1,601 - $1,947
Facilities Manager NR - 212 $2,509 - $3,050 Added
Facilities Construction
Specialist I
NR - 152 $1,860 -$2,261 Removed
Facilities Construction
Specialist II
NR - 174 $2,076 - $2,523 Removed
Finance Director (Previously
Administrative Services
Director)
NR - 384 $5,917 -$7,r93 Changed title from
Administrative Services
Director to Finance
Director; no salary change
Education Partnership -
Program Coordinator
NR - 157 $1,907 - $2,317 Added
Police Officer Cadet
(Previously Police Officer
Trainee)
Hourly $23.00 Changed title from PO
Trainee to PO Cadet;
Revised Hourly Rate from
$16.65 to $23.00

CONSENT CALENDAR II
City of Shafter EmPloYee Bi-Weekly Pay Schedule Effective July 1,2022, Revised September 20,2022 pursuant to California Code of Regulations (CCR) Section 570.5, CaIPERS requires that a pay schedule be adopted by City Council to formally authorize the employee pay rates and eamable reportable compensations. For City Council adoption, enclosed is the revised City of Shafter Employee Bi-Weekly Pay Schedule revised on September 20,2022,with an effective date of July 1,2022.

FISCAL IMPACT
The revisions are within the approved Fiscal Year 2022-2023 Arrual Operating Budget. A budget amendment is not required.

NEXT STEPS
The adopted Employee Bi-Weekly Pay Schedule shall be submitted to CaIPERS and made publicly available.

ATTACHMENTS
l. City of Shafter Employee Bi-Weekly Pay Schedule Effective July 1, 2022, Revised September 20,2022.
-2-
ctTy oF sHAFTER EMPLOYEE BIWEEKLY PAY SCHEDULE (Effective 07/0112022 . Revised 9/20/22) '110 $ $ 1,583 $ 1,663 $ 1,746 $ 1,833 NR 1,508 Cle* I
$ $ 1,838 $ 1,929 $ 2,025 NR 130 1,666 $ 1,750 nt Clerk ll $50.00 - $85.00 DoE Senior (PT/Extrc
$ $ 3,479 $ 3,653 $ 3,836 NR 258 3,156 $ 3,313 Manager
$ 1,905 $ 2,000 $ 2,100 $ 2,205 NR 147 $ 1,814 Assistant I $ 2,053 $ 2,156 $ 2,263 $ 2,376 NR 162 $ 1,955 Assistant ll $ $ 2,358 $ 2,476 $ 2,600 SPOA-NS 182 2,139 $ 2,246 Contol Manager $ $ 1,766 $ 1,854 $ 1,947 SPOA-NS 124 1,601 $ 1,682 Control Officer $ 1,298 $ 1,363 $ 1,431 $ 1,503 NR 70 $ 1,236 Control Services Worker $ 3,397 $ 3,567 $ 3,745 $ 3,933 NR 263 $ 3,235
$ $ 2,632 $ 2,763 $ 2,902 NR 202 2,387 $ 2,506
NR $ 2,572 $ 2,701 $ 2,836 $ 2,978 $ 3,127 217 lnspector ll $ 3,297 $ 3,462 $ 3,635 $ 3,817 NR 257 $ 3,140 lnspec{or $ 6,213 $ 6,524 $ 6,850 $ 7,193 NR 384 $ 5,917 Building Official $ $ 5,904 $ 6,199 $ 6,509 N 364 5,355 $ 5,623 Director
$ $ 2,981 $ 3,130 $ 3,286 NR 227 2,704 $ 2,839 Clerk
$ 5,651 $ 5,933 $ 6,230 $ 6,541 NR 365 $ 5,382 Engineer Contract $ 8,269 Manager
Contract $ 7,757 Acting
$ $ 1,431 $ 1,503 $ 1,578 NR 80 1,298 $ 1,363
Hourly $ 16.23 Typist (PT/Ex[a
$ 2,279 $ 2,394 $ 2,514 $ 2,63e NR 183 $ 2,171 Enforcement Officer I $ $ 2,632 $ 2,763 $ 2,902 R 202 2,387 $ 2,506 Enforcement Offcer ll $ $ 2,922 $ 3,068 $ 3,222 NR 223 2,650 $ 2,783 ity Engagement $ 4,606 $ 4,836 $ 5,078 $ 5,332 NR 324 $ 4,387 Director $ 2,002 $ 2,102 $ 2,207 $ 2,317 NR 157 $ 1,907 - Program Coordinator $ 36.91 Parfirership - Teader /Exba Help)*
Hourly $ 15.00 Partnership - Tutor I Help).

Hourly $ 17.77 Tutorll (PT/Exha
$ $ 3,145 $ 3,302 NR 228 2,717 $ 2,853 $ 2,995
$ $ 3,228 $ 3,389 $ 3,559 NR 243 2,928 $ 3,074 il
$ 1,821 $ 1,912 $ 2,008 $ 2,108 SEIU 137 $ 1,734 0perator $ 2,634 $ 2,766 $ 2,904 $ 3,050 NR 212 $ 2,509
$ $ 1,431 $ 1,503 $ 1,578 NR 80 1,298 $ 1,363 Finance Clerk $ $ 6,213 $ 6,524 $ 6,850 $ 7,193 NR 384 5,917 Director $ 3,553 $ 3,731 $ 3,917 $ 4,113 NR 272 $ 3,384 Coordinator $ $ 1,864 $ 1,957 $ 2,055 NR 133 1,691 $ 1,776 Technician $ $ 2,156 $ 2,263 $ 2,376 NR 162 1,955 $ 2,053 Resources Analyst I $ 2,583 $ 2,712 $ 2,847 $ 2,990 NR 208 $ 2,460 Resources il $ 4,211 $ 4,421 $ 4,642 $ 4,874 NR 306 $ 4,010 man Resources Manager $ $ 3,826 $ 4,017 $ 4,2'18 NR 277 3,470 $ 3,643 Tec{rnology Manager - Network $ $ 3,826 $ 4,017 $ 4,218 NR 277 3,470 $ 3,643 lnformation Technology $ 2,469 $ 2,593 $ 2,722 $ 2,859 NR 199 $ 2,352
$ $ 3,149 $ 3,306 $ 3,472 NR 238 2,856 $ 2,999 Technology Specialist ll $ 15.00
Hourly $ 15.00 ll (PT/Extra
$ $ 2,112 $ 2,218 $ 2,328 SEIU 157 1,916 $ 2,012
$ $ 1,663 $ 1,746 $ 1,833 NR 110 1,508 $ 1,583 Technician $ 2,325 $ 2,441 $ 2,563 $ 2,691 SEIU 186 $ 2,214 Foreman $ $ 2,020 $ 2,121 $ 2,227 NR 149 1,832 $ 1,924 Technician BIWEEKLY PAY SCHEDULE (Effective 07t01 t2022 Revisod 91201221 CITY OF SHAFTER EMPLOYEE $ $ 4,098 $ 4,302 NR 281 $ 3,539 3,716 $ 3,902
Senior $ $ 4,421 $ 4,642 $ 4,874 NR 306 4,010 $ 4,211
Planning Director $ 4,18s $ 4,395 $ 4,614 295 $ 3,796 $ 3,986 Captain $ $ 6,850 $ 7,193 NR $ 5,917 6,213 $ 6,524 384 Chief $ $ 5,840 $ 6,132 5,297 $ 5,562 NR 352 $ 5,044 Chiel Assistant $ $ 1,757 $ 1,844 $ 1,937 SPOA-NS 123 1,593 $ 1,673
Dispatcher
$ $ 3,902 $ 4,098 $ 4,302 NR 281 3,539 $ 3,716
Lieutenant $ $ 2,322 $ 2,439 $ 2,561 SPOA-S 175 2,106 $ 2,212 Oflicer Hourly $ 23.00 Officer Cadet
$ 2,444 $ 2,566 $ 2,694 $ 2,828 SPOA-S 195 $ 2,327 Offcer, Senior $ $ 2,221 $ 2,332 $ 2,449 NR 168 2,014 $ 2,115
Records Supervisor
$ $ 3,086 $ 3,240 $ 3,402 SPOA-S 232 2,799 $ 2,939 Sergeant $ $ 2,039 $ 2,141 NR 141 $ 1,761 1,849 $ 1,941 Services Tedtnician $ $ 2,904 $ 3,050 2,634 $ 2,766 NR 212 $ 2,509 Facilities Manager $ $ 6,524 $ 6,850 $ 7,193 NR 384 5,917 $ 6,213
Works Dhec'tor
$ $ 2,712 $ 2,847 $ 2,990 NR 208 2,460 $ 2,583
Works
$ $ 4,989 $ 5,238 $ 5,500 $ 5,775 NR 340 4,751 Works
$ $ 1,719 $ 1,805 SEIU '106 $ 1,485 1,559 $ 1,638
Crew Member I
$ 1,941 $ 2,038 $ 2,140 SEIU 't40 $ 1,761 $ 1,849 Crew Member ll $ 1,453 $ 1,526 $ 1,602 NR 83 $ 1,318 $ 1,384 Driver
$ 15.97 Driver
$ $ 4,550 $ 4,778 4,127 $ 4,334 NR 302 $ 3,931 Manager
$ $ 1,941 $ 2,038 $ 2,140 SEIU 140 1,761 $ 1,849
Operator I
$ $ 2,289 $ 2,403 $ 2,523 SEIU 173 2,076 $ 2,179
Operator ll
$ $ 2,819 $ 2,960 $ 2,435 2,557 $ 2,684 SEIU 205 Tedtnician olhemise contract
from actual payroll calculations due to rounding
are not toa range. 0n schedule are nearest may vary slightly BIWEEKLY PAY SCHEDULE 0f 10'112022 Revised 9t20t221 EMPLOYEE (Elfective CITY OF SHAFTER

NONREPRESENTED EM
FULL.TIME PART.TIME

SHAFTER

CORRECTIONAL

OFFICERS

ASSOCIATION

SEIU PUBLIC

WORKS UNIT

SHAFTER POLICE

OFFICER

INCENTIVE ASSOCIATION
$36.92 $960 Annual
per
SYo $36.92 $36.92
lncentive

2.50 2.5o/o Student +60

2.SYo 2.50/o* Associate 2.5T0
5To 5%* Bachelor 5To
5Yo POST lntermediate SYo
5o/o POST Advanced lYo

2.5o/o - 3.5o/o 2.5o/o - 3.5T0
lYo -2Vo 1To'2To AS

2.5o/o - 4.5o/o 2.5o/o - 4.5Y0 Water 0r
Y FLAT AMOUNT ANDiOR PERCENTAGE OF BASE BIWEEKLY AMOUNT PREMIUM PA -Applies to designated positions that do not require a degree as minimum qualification and by approval of the City Manager .# City of Shafter
S}IAFTER COUNCIL AGENDA REPORT
Meeting Date: SePtember 20,2022
FROM:

SUBJECT
Gabriel A. Gonzalez,City Manager
Prepared by: Carol Chavolla, Human Resources Manager

RATIFICATION OF SIDE LETTER AGREEMENT WITH SHAFTER
polrcE OFFICERS ASSOCIATION (SPOA) - ANIMAL CONTROL

OFFICER EQUITY PAY ADJUSTMENT

RECOMMENDATION
Council ratifi and adopt the Side Letter Agreement with the Shafter Police Officers Association agreeing to modifu certain provisions of the Memorandum of Understanding approved by the City Councif on December 7,2021, amending Section 5.1 Salary to indicate that the Animal Control Officer classification shall receive an equity pay adjustment to Range 124 of the SPOA Non-Sworn pay schedule, representing biweekly compensation of $1,60I - $I,947 '

BACKGROUND
The Animal Control Officer position became vacant on December 11, 2021. Recruiting efforts have been made to fill the vacancy with no success due to a lack of interest from candidates as the current pay is established below the job market. A citywide compensation study is currently underway io address arry pay deficiencies citywide. However, it is not scheduled to conclude until the end of 2022 or the beginning of 2023. There is an urgent need to address the pay deficiency with this position as we n""a to fill the vacancy to relieve the workload of current Animal Control and Police Department staff.

Staff recommends increasing the base pay for this position to $1,601 - 5I,947 biweekly from $1,358 - $1,651, which is competitive with the base pay from sunounding agencies' The total compensation for this position will be further studied during the citywide compensation study and any further pay discrepancies will be addressed then.

The City,s negotiation team met and conferred in good faith with SPOA in accordance with the Meyers-Milias-Brown Act and reached a tentative agreement with SPOA. On August 26' 2022, the SpOA membership ratified a tentative agreement for a Side Letter Agreement agreeing to the proposed equity pay adjustment for the Animal Control Officer classification as recommended by City staff.
coNSENr cALENDAR lZ
Shafter police Officers Association (SPOA) Side Letter Agreement Animal Control Officer Equity Pay Adjustment

FISCAL IMPACT
There is no fiscal impact on the 2022-2023 budget due to the vacancy cost savings. Upon the hiring of a qualified candidate, the increase in the salary can be absorbed within the current budget.

Therefore, no budget amendment is necessary.

NEXT STEPS
Upon Council ratification and adoption of the Side Letter Agreement with SPOA, the following shall occur:
l. The Biweekly Pay Schedule shall be revised to reflect the equity pay adjustment to Range 134 of the SPOANon-Sworn pay schedule, representing biweekly compensation of $1,601 - $1,947.

ATTACHMENT
I Side Letter Agreement to the Memorandum of Understanding The Shafter Police Officers Association
2 SIDE LETTER AGREEMENT TO MEMORANDUM OF UNDERSTANDING

BETWEEN THE CITY OF SHAFTER AND

THE SHAFTER POLICE OFFICERS ASSOCIATION
The authorized representatives of the City of Shafter and the Shafter Police Officers Association (collectively, "Parties") have met and conferred pursuant to the Memorandum of Understanding (the ooMdu"), approved by the City Council on December 7,2021, and the Parties have determined that it is reasonable and appropriate to modiff certain provisions of this MOU by means of this Side Letter Agreement ("Agreement").

Section l. The following Sections of the MOU are amended to incorporate the changes and additions as follows:

SECTION 5.1 SALARY
The Animal Control Officer classification shall receive an equity pay adjustment to Range lZ4 of the SPOA Non-Sworn Pay Schedule, representing biweekly compensation of $1,601 - $1,947.

Section 2. This amendment is effective August 1,2022. Except as expressly modified by this Side Letter, the provisions of the existing MOU remain in fulI force and effect' Ratification
This Side Letter Agreement has been ratihed on September 20, 2022, pursuant to the recommendation of the following parties:
sPoA cITY
SPOA President Date Gabriel A. Gonzalez, City Manager Date SPOA Vice President Date Cathy L. Prout, Mayor Date
SPOA Board Member Date
SPOA Board Member Date
1# City of Shafter
S}IAFTER COUNCIL AGENDA REPORT
Meeting Date:

FROM:

SUBJECT:

September 20,2022
Gabriel A. Gonzalez,CitY Manager
Prepared By: Yazmina Pallares, City Clerk

APPROVE DESTRUCTION OF CERTAIN CITY RECORDS

RECOMMENDATION
Council adopt Resolution 2888, a Resolution of the City Council of the City of Shafter Approving and Directing Destruction of Certain City Records'

BACKGROUND
Records management is the practice of maintaining the records of an organization from the time they are createi up to their eventual disposal. This may include classifring, storing, securing, and destruction (or iniome cases, archival preservation) of records throughout the records lifecycle.

Each year, staff generates a list, which consists of records that have reached their maximum retention period pursuant to State guidelines. The List is provided to each Department Head for review and apprwal, the List is presented to the Council for final approval.

Attached for Council consideration is a Resolution approving and directing destruction of certain records, pursuant to Section 34090 of the Government Code.

FISCAL IMPACT
The cost for destruction of these records is not expected to exceed $200. These costs are allocated to the City departments for which records are being destroyed and can be accommodated in the operating budgets for those departments. No budget action is needed with the approval ofthis item.

ALTERNATIVES
Reject adoption of Resolution 2888. STAFF DOES NOT RECOMMEND THIS OPTION.

ATTACHMENT
1 1. Resolution 2888
CONSENT CALENDAR 13
RESOLUTION NO. 2888

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER

APPROVING AND DIRECTING DESTRUCTION OF CERTAIN CITY RECORDS Pursuant to Section 34090 of the Government Code of California, the City Council of the City of Shafter does hereby resolve as follows:

SECTION 1: The City Clerk of the City of Shafter having made written request therefore, and the City Attorney of the City of Shafter having given his written consent thereto, approval and direction are hereby given to the City Clerk for destruction of the records, papers, documents instruments and books ofthe City of Shafter, in charge of the City Clerk, as set forth and described in the list hereto attached, marked "Exhibit A" and made aparthereof by this reference.

PASSED AND ADOPTED this 20th day of September,2U22.

Cathy L. Prout, Mayor
ATTEST:

Y azmina Pallares, City Clerk
APPROVED AS TO FORM:

Marco A. Martinez, City Attorney
I. Modified Communitv Conectional Facilitv
Shafter City Council Resolution 2888
September 20,2022
Page2
l.

2. J.

4. 5.

6. 7.

8. 9.

10. 11.

Exhibit A
Request for Destruction of Records
September 20,2022
Inmate Payroll Records
Inmate Participation Records
Inmate Time Cards
Quarterly Cost RePorts
STC Training Files
Facility Log Books
R & R Files
Warden's Checkout Orders
Inmate Statement RePorts
Housing and Employment Changes Daily Records
Dorm Sheets & Totals
Prior to December 31,2021
Prior to December 31,202I
Prior to December 3I,2021
Prior to December 31,2021
Prior to December 31,2021
Prior to December 3I,2021
Prior to December 31,202I
Prior to December 3I,2021
Prior to December 31,2021
Prior to December 31,2021
Prior to December 31,202t

12. Inactive Inmate Files Prior to December 31,2021

13. Inmate Count Sheets Prior to December 31,2021

14. visitor Logs Prior to December 31,2021

15. Inmate Rules & Violation reports Prior to December 3I,2021

16. Canteen Sales Sheets Prior to December 3I,2021

17. Inmate Rosters Prior to December 31,2021

18. Restitution Reports Prior to December 31,2021

19. Inmate Appeals Prior to December 31,2021

20. Inmate Canteen Forms Prior to December 31,2021

21. Canteen Kitchens Files Prior to December 31,2021

22. Inmate Training Logs Prior to December 31,2021

23. Transmittal Logs Prior to December 31,2021

24. Inmate Participation Invoices Prior to December 31,2021

25. Inmate Duty Rosters Prior to December 31,2021

26. Inmate Property Files Prior to December 31,2021

27. Incident Reports Prior to December 3I,2021

28. Inmate Medical Reports Prior to December 31,202I

29. Inmate Control Count Sheets Prior to December 31,2021

30. Volunteer Training Logs Prior to December 3l'202I
3 1 . 1 1 5 Tracking Forms Prior to December 31, 2021

32. Inmate Rules Violation Report Prior to December 3I,2021

33. Disciplinary Hearing Reports Results Prior to December 31,2021

34. RAC Attendance Rosters Prior to December 31,2021

35. Inmate Time Log Prior to December 31,2021

36. CDC Contract checks copies Prior to December 31,2021

37. Inmate Trust Deposits Prior to December 31,2021

38. Invoice Log ^ Prior to December 31,2021

39. Inmate Weifare Reports Prior to December 31,202I

40. Correspondence thaf is general in nature, including letters, and files, not related to specific cases and not otherwise specifically covered a legal authority governing retention of records prior to December 31,2021'
1# City of Shafter
S}IAFTER COUNCIL AGENDA REPORT
MEETING: September 20,2022
FROM: Gabriel A. Gonzalez, City Manager
Prepared By: Yazmina Pallares, City Clerk
SUBJECT: CONSIDERATION OF A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF SHAFTER AUTHORIZING THE CONTINUED NEED
FOR A TELECONFERENCING OPTION FOR CITY COI.]NCIL,

COMMISSION AND COMMITTEE MEETING PURSUANT TO
ASSEMBLY BILL 36I

RECOMMENDATION
Council adopt Resolution 2889,a Resolution of the City Council of the City of Shafter authorizing the continued need for a teleconferencing option for City Council, Commission and Committee meetings pursuant to Assembly Bill 361.

BACKGROUND
Assembly Bill (AB) 361 was signed by Governor Newsom in September 202l.It amends the Brown Act to allow local legislative bodies to continue having meetings using teleconferencing and virtual meeting technology as long as there is a gubernatorial "proclaimed state of emergency", and either (1) state or local-officials imposing or recommending measures that promote social distancing or'(2) the legislative body finding that meeting in person would present an imminent safety risk to attendees.

The key differences between existing Executive Order N-08-21, which expired September 30, 202l,utta Rg 361 is that AB 361 imposes particular requirements with respect to public commenl; however, the City of Shafter's praclices with respect to live public comment viaZoom already satisfu ali of the new requir"-.nts. Additionally, the City must make findings to adopt a resolution by majority vote that the state of emergency still exist and continued to directly impact the ability of the members to meet safely in person every 30 days.

FISCAL IMPACT
None

ATTACHMENT

1. Resolution 2889
CONSENT CALENDAR \+
RESOLUTION NO.2889

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER
AUTHORIZINGTHECONTINUEDNEEDFoRA

TELECONFERENCING OPTION FOR CITY COUNCIL, COMMISSION
AND COMMITTEE MEETINGS PURSUANT TO ASSEMBLY BILL 361
WHEREAS, the City of Shafter is committed to preserving and nurturing public access and participation in meetings of the City Council; and
WHEREAS, all meetings of the City of Shafter legislative bodies are open and public, as required by the Ralp'h M. Browi Act (Cal. Gov. Code 54950 - 54963), so that any member of the prrfti" may attend, participate, and watch the City's legislative bodies conduct their business; and WHEREAS, on September 16, 202l,the Governor of California signed into lawAssembly Bill 361 amending Gove^rnment Code $ 54953 and providing alternative teleconferencing requirements to conduct public meetings as a result of a proclaimed state of emergency; and WHEREAS, on March 4,2020, Governor Newsom declared a State of Emergency as a result of the COVID-19 pandemic which currently remains in effect; and WHEREAS, on March 16,2020, the City of Shafter declared a local State of Emergency as a result of the COVID-19 pandemic which currently remains in effect; and WHEREAS, COVID- I 9 continues to threaten the health and lives of Shafter residents and state and local health officials continue to recommend or require precautions be taken including, but not limited to, masking, limiting prolonged interior exposure to other individuals, limiting the size of gatherings indoorsl and, foi ihose with compromised health conditions or those without vaccinei, limiting attendance at functions indoors; and WHEREAS, state and local officials continue to recommend social distancing to protect the community's health against the spread of COVID-19; and WHEREAS, the Omicron variant and other variants continue to emerge and are highly transmissible in indoor settings and COVID-I9 cases in Kern County are still high; WHEREAS, hospitalizations continue to be high throughout Kern County;

NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED BY THE CITY COUNCIL OF THE CITY OF SHAFTER, CALIFORNIA AS FOLLOWS:

SECTION l. The above recitals are correct and are material to this Resolution and are incorporated into this Resolution as findings of the City Council'
SECTION 2. The City continues to follow safety measures in response to COVID-I9 as ordered or recommended uy itre Centers for Disease Control and Prevention, California Department of public Health, unilo, county of Kern, as applicable. Based upon that guidance, in person attendance indoors at public meetings continues to present an imminent health risk for certain segments of the Cityh population, necessitating teleconferencing when needed to allow for mJaningful participaiion opiionr for all city constituents and its elected and appointed officials.

Shafter City Council Resolution No. 2889
September 20,2022
Page2
SECTION 3. State and local officials continue to recommend social distancing to protect the community's health against the spread of COVID-I9.

SECTION 4. pursuant to the findings listed in this Resolution, the City Council and the City's Legislative Bodies are authorized to utilize teleconferencing accessibility to conduct public meetings pursuant to AB 361.

SECTION 5. The City,s Legislative Bodies are hereby authorized to conduct meetings in a format whereby members of th. Legislative Body and members of the public may elect to be present in person, utilizing appropriate safety procedures, or participate by teleconferencing technology. 'Such
meetitrgr of ttr" Legislative Bodies that occur using teleconferencing technology will provide an opportunity fo. utry *d all members of the public who wish to address Legislative Bodies to Oo so, and wiil otherwise occur in a manner that protects the statutory and constitutional rights of members of the public attending the meeting via teleconferencing. The City's Legislative Bodies have safety *"ur.rr", and technology in place to allow in-person and teleconferenced appearances at meetings, which reduces the risks to health and safety because the number of attendees is reduced.

SECTION 6. This Resolution shall take effect immediately upon its adoption and shall be effective until the earlier of (i) 30 days from the date of adoption of this Resolution, or (ii) such time the City Council adopts a subsequent resolution in accordance with Government Code section 54953(eX3) to extend the time during which the legislative bodies of the City of Shafter may continue to teleconference without Jompliance with paragraph (3) of subdivision (b) of section 54953 for another 30 day period.

PASSED, APPROVED AND ADOPTED this 20th day of September,z022.

Cathy L. Prout, Mayor
ATTEST:

Y azmina Pallares, City Clerk
APPROVED AS TO FORM:

Marco A. Martinez, City AttorneY
.fi# City of Shafter

SHAFTER COUNCIL AGENDA REPORT
Meeting Date
FROM:

SUBJECT
September 20,2022
Gabriel A. Gonzalez,CitY Manager
Prepared by: Rachel Zermeno, Community Engagement Manager

AUTHORIZING DECLARATION OF SURPLUS EQUIPMENT

RECOMMENDATION
Council declare the list of equipment below as surplus property; and authorize the sale of said items through a public sale process and or auction'

BACKGROUND
with the closing of the shafter Modified community correctional Facility (MCCF) in2020 and the final audit completed, we need to clear out the MCCF building to be able to either utilize or advertise the space.
l. Dining Room Metal Tables and Stools

2. 64 Tables in Dorms

3. 40 Benches in Dorms

4. 128 Stools in Dorms

5. Miscellaneous Scrap Metal throughout the Medical, Intake, and Facility.

FISCAL IMPACT
No budget action is necessary for this item. Any revenues generated from sale of surplus property will be issigned to the appropriate general fund or enterprise operations budgets.

CONSENT CALENDAR 15
,# City of Shafter

SHAFTER COUNCIL AGENDA REPORT
Meeting Date: SePtember 20,2022
FROM: Gabriel A. Gonzalez, CiIy Manager
Prepared By: Rachel Zetmeno, Assistant to the City Manager

SUBJECT APPROVE A PROFESSIONAL SERVICES AGREEMENT WITH

REVENUE & COST SPECIALISTS (RCS) TO CALCULATE

INFRASTRUCTURE DEVELOPMENT IMPACT FEE NEXUS STUDY IN
AN AMOUNT OF $32,500

RECOMMENDATION
Council authorize and accept the Professional Service Agreement and Proposal to secure the services of Revenue & Cost Specialists (RCS) for Phase II Infrastructure Development Impact Fees and Nexus for a total of $32,500 that would consist of the following projects:
o Local Storm Drainage Collection Facilities;
o Water Storage and Distribution;
o WastewaterCollectionFacilities;
o General Facilities (city hall, corporate yard, and municipal fleet); o Aquatics Facilities;
o Public Use Facilities (community, senior, teen centers, et. al.); o Library Building and Collection,
. Park Land and Open Space Acquisition and Recreation Facilities; and o Development and any other infrastructure provided by the City allowed by Government Code $OOO00, et. seq. (often referred to as ,{81600). (hereinafter referred to as "the Project").

BACKGROUND
On Octobe r 5,202l,Staff met with Revenue & Cost Specialists (RCS) regarding a new calculation of the City's existing schedule of development impact fees that recognizes the unique set of circumstances that define Shafter, its citizens, and the business community. The infrastructure proposed to be included in the long term over two phases.

For the City to ensure it can continue to provide basic municipal services by increasing its inventory oi service-providing capital capacity and with the continued increase in housing at Gossamer Grove, timi is of the essence for us to continue with Phase II of the Infrastructure Development. Scott Thorpe, with the firm Revenue & Cost Specialists, has worked with the City and most recently with the Public Safety Services Development Impact Fee Calculation and Nexus Report (Phase I).

The firm has worked with many cities throughout California over the last 40 years, from Cost Allocation plans, Cost of Service Fee Studies, Development Impact Fees, Software Solutions. The strength of their capital planning system is identiffing long-range capital facility and infrastructure CONSENT CALENDAR l\0
Proposal to Calculate Phase II Infrastructure Development ImPact Fee Schedule needs consistent with the City's General Plan. Providing the City Council with the capability to utilize the proposed projects and their costs to make informed policy decisions.

FISCAL IMPACT
No fiscal impact, funds are available in current operating Budget.

ATTACHMENTS
l. professional Services Agreement and Proposal to Calculate Phase II Infrastructure Development ImPact Fee Schedule.
-2-

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF SHAFTER

AND REVENUE & COST SPECIALISTO LLC'
This Agreement is made and entered into as of 2022by and between the City of Shafter, a charter city and municipal corporation organized and operating under the laws of the State of California with its principal place of business at336 Pacific Avenue, Shafter, CA 93263 ("City"), and Revenue & Cost Specialist, LLC, a Califomia Limited Liability Company with its principal place of business at 1519 Chapman Avenue, Suite C, Fullerton, cA 92831 (hereinafter referred to as "Consultant"). City and Consultant are hereinafter sometimes referred to individually as "Pafi" and collectively as the "Partie

RECITALS
s."
A. City is a public agency of the State of California and is in need of professional services for the following project:

Calculating impact fees for the City's:
i. Local Storm Drainage Collection Facilities;
ii. Water Storage and Distribution;
iii. WastewaterCollectionFacilities;
iv. General Facilities (city hall, corporate yard, and municipal fleet); v. Aquatics Facilities;
vi. Public Use Facilities (community, senior, teen centers, et. a1.); vii. Library Building and Collection,
viii. Park Land and Open Space Acquisition and Reueation Facilities; and ix. Development and any other infrastructure provided by the City allowed by Government code $66000, et. seq. (often referred to as AB1600). (hereinafter referred to as "the Project").

B. Consultant has the necessary experience and qualifications to provide such services.

C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.

AGREEMENT
NOW, THEREFORE,IT IS AGREED AS FOLLOWS:

1. Incorporation of Recitals. The recitals above are true and correct and are hereby incorporated herein by this reference.

2. Services. Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit '0A."

3. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel identified in their proposal. Consultant 1 I 7236.00000\40637 7 05.t
waffants that Consultant is familiar with all laws that may affect its performance ofthis Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. Consuitant further represents that no City employee will provide any services under this Agreement.

4. Compensation. The City shall pay for such services in accordance with the Fee for Services set forth in-Exhibit "A." In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of Thirty Two Thousand and Five Hundred Dollars ($32,500.00). This amount is to cover all related costs, and the City will not pay any additional fees for printing expenses. Consultant may submit invoices to City for approval. Said invoice shall be based on tf,e total of all Consultant's seryices which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoic.. ttt" invoice shall describe in detail the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as,,Additional Services" and shall identiff the number of the authorized change order, where applicable, on all invoices.

5. Additional Work. If changes in the work seem merited by Consultant or the City, and informul .onrrrltution-*ith the other party indicate that a change is warranted, it shall be processed in the following manner: a lettei outlining the changes shall be forwarded to the City ty Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance o_f such s!rvices, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.

6. Term. This Agreement shall commence on the Effective Date and continue through the completion-of services as set forth in Exhibit "B," unless the Agreement is previously terminated as provided for in Section 21.

7. Maintenance of Records; Audits'
a. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City for inspection and/or audit at mutually convenient times for a period of four (4) years from the Effective Date.
b. Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable ii-", during the contract period and for four (4) years from the date of final payment under the contract for inspection bY CitY.
g. Time of Performance. Consultant shall perform its services in a prompt and timely manner and shall "o*" p.trofinance upon receipt of written notice from the City to proceed.

Consultant shall complete the services required hereunder within Term'

9. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement 2 1 7236.00000\40 63"t 7 05.r
for delays in performance caused by circumstances beyond the reasonable control of the nonperforming puttv. For purposes of this Agreement, such circumstances include but are not limited io, abnonial weather "ottditiotrr;
floodsfearthquakes; fire; epidemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint.
b. Should such circumstances occur, the non-performing Party shall, within a reasonable time of being prevented from performing, give written notice to the other Party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.

10. with Law
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including CallOSHA requirements. b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies. c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and^toxic substances spilled as a result of his or her services or operations performed under this Agreement.

11. Standard of Care. Consultant's services will be performed in accordance with generally u"..pt.d p.of.sio*l practices and principles and in a manner consistent with the level of care and skill ordinarily exeicised by members of the profession currently practicing under similar conditions.

12. Conflicts of Interest. During the term of this Agreement, Consultant shall at all times maintain u a"ty of foyufty u"a a fiduciary duty to the City and shall not accept payment from or employment with-any pl.ro.t or entity which will constitute a conflict of interest with the City.

13. Citv Business Certificate. Consultant shall, prior to execution of this Agreement, obtain and maintai" O"ting tfr" t"rr" of this Agreement a valid business registration certificate from the City pursuant to TitleJ of the City's Municipal Code and any and all other licenses, permits, qualificaiions, insurance, and upproroulr of whatever nature that are legally required of Consultant to practice his/her profession, skill, or business'

14. Assignment and Subconsultant. Consultant shall not assign, sublet, or transfer this Agreement or any;ght. ""d.r "r t"terest in this Agreement without the written consent of the Ci'ty, which -uy 6. *ittttt"ta for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination.

Subcontracts, if any, shall contaitr u proroirion making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associites and subconsultants as Consultant may deem appropriate to assist in the performance of services hereunder.

J
l 7236.00000\40637705.1

15. Independent Consultant. Consultant is retained as an independent contractor and is not an "-ploy"" of City. No employee or agent of Consultant shall become an employee of City.

The worhto-be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided.

16. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under this section. In addition, Consultantshall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required under this section. a. Additional Insured
The City of Shafter, its officials, officers, employees, agents, and volunteers shall be named as additionai insureds on Consultant's and its subconsultants' policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents.
b. Commercial General Liabilitv
(i) The consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (ii) Coverage for Commercial General Liability insurance shall be at least as broad as the following:

Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent'
(iiD Commercial General Liability Insurance must include coverage for the following:

Bodily Injury and Property Damage
Personal Injury/Advertising Injury
Premises/Operations Liability
Products/Completed Operations Liability
Aggregate Limits that Apply per Project
Explosion, Collapse and Underground (UCX) exclusion
deleted
Contractual Liability with respect to this Contract
Broad Form Property Damage
Independent Consultants Coverage
(iv) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against"anothei; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(1)
(2)
(3)
(4)
(s)
(6)
(7)
(8)
(e)
4 l 7236.00000\40637'105.r
(v) The policy shall give City, its elected and appointed officials, officers, employees, ug*tr, and City-designated volunteers additional insured status using ISO endorsemerri forms cc zo l0 10 0l and 20 37 l0 01, or endorsements providing the exact same coverage.
(vi) The general liability program may :utilize either deductibles or provide coverage ""r"r, of a self-insured retention, subject to written approval by the City, and provided that sich deductibles shall not apply to the City as an additional insured. c. Automobile Liability
(i) At all times during the performance of the work under this Agreement, the Consuiiant shall maintain Automobile Liability Insurance for bodily injury and pr:operty damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(ii) Coverage for automobile liability insurance shall be at least as broad as Insurance Services office Fo* Number CA 00 01 covering automobile liability (Coverage Symbol l, any auto).
(iii) The policy shall give City, its elected and appointed offrcials, officers, employees, agents and City designated volunteers additional insured status. (iv) subject to written approval by the city, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an adaitionat insured, but not a self-insured retention'
d. Workers'Compensation/Employer'sLiabilitv
(i) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California iabor Code which requires every employer to be insured against liability for workers, compensation or to undertake self-insurance in accordance with the provisions of that code, and he/shl wil comply with such provisions before commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during the term of this Agreement, x'ali times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the ..Workers, Compensation and Insuranie Act," Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer's Liability Coverage in amounts indicated herein. ionsultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers' compensation coverage of the same type and limits as specified in this section.
e. Professional Liabilitv (Errors and Omissions)
At all times during the performance of the work under this Agreement the Consultant shall 5 1 7236.00000\40 637 7 0s.t
maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein.

This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Consultant. "Covered Professional Services" as designated in the policy must specifically include work performed under this Agreement. The policy must o'pay on behalf of' the insured and must include a provision establishing the insurer's duty to defend. f. Minimum Policy Limits Required
(D The following insurance limits are required for the Agreement:

Combined Single Limit
Commercial General Liability $1,000,000 per occurence/ $2,000,000 aggtegate for bodily injury, personal injury, and property
damage
Automobile Liability $1,000,000 per occurrence for bodily injury and property damage
Employer's Liability $1,000,000 per occrurence
professional Liability $1,000,000 per claim and aggregate (errors and omissions)
(ii) Defense costs shall be payable in addition to the limits. (iiD Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement. g. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifring to the coverage of all insurance required herein.

Such evidence shall include original copies of the ISO CG 00 01 (or insurer's equivalent) signed by the insurer's representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with requiled endorsements. All evidence of insurance shall be signed by a properly arithorized officei, agent, or qualified representative of the insurer and shall certifu the names of the insured, any addiiional iniureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance. h. Policv Provisions Required
(i) consultant shall provide the city at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to 6 1 7236.00000\40637 70s.1
non-payment of the premium. If any of the required coverage is cancelled or expires during the terrrrof this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Addiiional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(ii) The Commercial General Liability Policy and Automobile Policy shall each contain a piovision stating that Consultant's policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss.
(iiD The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three y-ears after the completion of the work under this Agreement. Consultant shall purchase a one (l j year extended reporting period A) if the retroactive date is advanced past the effective date ofiftir Agreement; gi if the policy is cancelled or not renewed; or C) if the policy is replaced by anotf,er claims-made policy with a retroactive date subsequent to the effective date of this Agreement.
(iv) All required insurance coverages, except for the professional liability coverage, shail contain or be endorsed to provide waiver of subrogation in favor of the City, its offic[ls, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery piior to a loss. Consultant hereby waives its own right of recovery against City, ;d shall require similar written express waivers and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each insured against whom claims aie made or suits are brought, except with respect to the limits of liability.

Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant's indemnification obligations to the City and shall not precludJthe City from taking such other actions available to the City under other provisions of the Agreement or law.
i. Qualiffing Insurers
(i) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisff the following minimum requirements:
(l) Each such policy shall be from a company or companies with a current A.M. Best's iating of no less than A:VII and admitted to transact in the business of insurance in the State o1Califomia, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the Califomia Insurance Code or any federal law.
j. AdditionallnsuranceProvisions
(i) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not 7 I 7236.00000\40637705.1
intended to and shall not in any manner limit or qualiff the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including, but not limited to, the provisions concerning indemnifi cation.
(iD If at any time during the life of the Agreement, any policy of insurance required nna.i this Agreement does not comply with these specifications or is canceled and not replaced, city has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the altemative, City may cancel this Agreement.
(iii) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (iv) Neither the City nor the City Council, nor any member of the City Council, nor any of the'officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement. k. Subconsultant Insurance Requirements. Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this section. policies of commlrcial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 3g 04 13 or an endorsement providing the exact same coverage. If requested by Consultant, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

17. Indemnification
a. To the fullest extent permitted by law, Consultant shall defend (with counsel reasonably approved by the City), indemnify and hold the City, its elected and appointed offrcials, officers, "-ptty."t, agents, and authorized volunteers free and harmless from any and all claims, demands, cu.rs", of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind' in law or equity, to property or p.rronr, including wrongful death, (collectively, "Claims") in any manner arising out of, pertaining to, or lncident to any alleged acts, errors or omissions, or willful misconduct of -Consultant,
its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the ConsJtant's services, the Project, or this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys' fees and other related costs and expenses. Notwithstanding the foregoing, to the extent Consultant,s seryices are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section2782.8,to Claims that arise out of, pertain to, or relate to the negligence, ,."kl.sness, or willful misconduct of the Consultant. Consultant's obligation to inderinf;y shall not be restricted to insurance proceeds, if any, received by the City, the 6ity Council, -"tttberr of the City Council, its employees, or authorized volunteers' b. Additional Indemnity Obligations. Consultant shall defend, with counsel of City,s choosing and at Consultant's own cost, expense and risk, any and all Claims covered by 8 1 7236.00000\40637 7 05.1
this section that may be brought or instituted against the City, its elected and appointed officials, employees, agents, or authorized volunteers. Consultant shall pay and satisff any judgment, award o, d."i.. that may be rendered against the City, its elected and appointed officials, employees, agents, or authorized volunteers as part of any such claim, suit, action or other proceeding' C-onsultant shall also reimburse City for the cost of any settlement paid by the City, its elected and appointed officials, employees, agents, or authorized volunteers as part of any such claim, suit, u"iio' or other proceeding. Such reimbursement shall include payment for the City's attorney's fees and costs, including Jxpert witness fees. Consultant shall reimburse the City, its elected and appointed offrcials, employees, agents, or authorized volunteers, for any and all legal expenses and "'ort,
irr".rrred by "urh
oi them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemniff shall not be restricted to insurance proceeds, if any, received by the City, iis elected and appointed officials, employees, agents, or authorized volunteers.
lg. California Labor Code Requirements. Consultant is aware of the requirements of California Labor Code Sections 1720 ,I-srq and 1770 et seq., as well as California Code of Regulations, Title g, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of frevailing wage rates and the performance of other requirements on certain "public works" and ,,m^aintenanJe,, frojects. If the Services are being performed as part of an applicable "public works,' or..maintenance" project, as defined by the Prevailing Wage Laws, Consultant agrees to fully comply with such prevailing Wage Laws, if applicable. Consultant shall defend, indemnify urrd hold it. city, its elected offiiials, bfficers, employees and agents free and harmless from any claims, liabitities, costs, penalties or interest arising out of any failure or alleged failure to comply with the prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages, employment of apprentices, hours of labor and debarment of contractors and subcontractors.

19. Verification of Emplovment Eligibilitv. By executing this Agreement, Consultant verifiestt'utit@al1requirementsandrestrictionsofstateandfederallaw respecting the empllyment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.

20. Laws and Venue. This Agreement shall be interpreted in accordance with the laws of the State of cairorniu- lr any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of Fresno, State of California.

21. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giuittg ten (10) calendar days' written notice to Consultant. In such event, City shall be immediui"t"ty giu"" tiile and possession to all original field notes, drawings and specifications, written r"plJr and other documents produced or developed for that portion of the wo.k completed andlor
^being abandoned. City shall pay Consultant the reasonable value of services rendered for any portlion of the work completed prior to termination. If said termination occurs prior to completi,on of any task for the Project for which a payment request has not been 9 r 7236.00000\40637 7 05.r
received, the charge for services performed during such task shall be the reasonable value of such services, based o1 un amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the "h-g.. or portions ihereof which are specified herein. Consultant shall not be entitled to payment for-unperiormed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days' written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant.

22. Attornevs' Fees. In the event that litigation is brought by any Party in connection with this Agr".rn"rt,th. p.evailing Party shall be entitled to recover from the opposing Party all costs and .rp.rrr"r, including reasonable attorneys' fees, incurred by the prevailing Party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or irovisions hereof. The costs, salary, and expenses of the City Attorney's Office in enforcing this Agreement on behalf of the City shall be considered as o'attorneys' fees" for the purposes of this Agreement.

23. Responsibilit)' for Enors. Consultant shall be responsible for its work and results under this Agreem.ttt. Cotrtnltant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no addiiional cost to City. In the event that an eror or omission attributable to CJnsultant,s professional services occurs, Consultant shall, at no cost to City, provide all other services ,r.""i.*y to rectiff and correct the matter to the sole satisfaction of the City and to participate in any meeting required with regard to the correction.

24. prohibited Emplovment. Consultant shall not employ any current employee of City to perform the work under this Agreement while this Agreement is in effect.

25. Costs. Each Party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein.

26. Documents. Except as otherwise provided in ooTermination or Abandonment," above, all original field notes, written reports, Drawings and Specifications and other documents, produced or dleveloped for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City'

27. Organization. Consultant shall assign Scott Thorpe, as Project Manager. The project Munugo rhull *t be removed from the Project or reassigned without the prior written consent of the City.

28. Limitation of Asreement. This Agreement is limited to and includes only the work included in the Project described above.
1 7236.00000\4063770s.r
10 29. Notice. Any notice or instrument required to be given or delivered by this Agreement rnuy U. gi.t,,.r, o. d.li'toered by depositing the same in any United States Post Office, ".Irtifi.a
mail, retum"receipt requested, postage prepaid, addressed to the following addresses and shall be effective upon receipt thereof:

City of Shafter
336 Pacific Avenue
Shafter, CA93263
Attn: City Manager
CITY: CONSULTANT:

Revenue & Cost SPecialist, LLC
1519 E. Chapman
Suite C
Fullerton, CA 92831
Attn: Scott ThorPe
With Copy To:

Best, Best & Krieger
2855 E. Guasti Rd.

Ontario, CA9176l
Attn: Marco Martinez

30. Third party Rights. Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.

31. Equal Opportunit), Emplo)'ment. Consultant represents that it is an equal opportunity "-p[y"iffi thut li shall-not discriminate against any employee or applicant for emptoyment because of race, religion, color, national origin, ancestry, Sex' age or other interests proteci"d by the State or Federal Constitutions. Such non-discrimination shall include, but not be ii-it"a to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

32. Entire Agreement. This Agreement, including Exhibit "A," represents the entire understandi''gofCity-"dCo"*ltantastothosematterscontainedherein,andsupersedesand cancels urry prio, or contemporaneous oral or written understanding, promises or representations with respect to those mattersiovered hereunder. Each Party acknowledges that no representations, inducements, promises, or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This is an integrated Agreement.

33. Severabilitv. If any provision of this Agreement is determined by a court of competent3urird[ti* toTe invalii, illegal, or unenforceable for any reason, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance, and the remaining provisions of this Agreement shall remain in fuIl force and effect.

34. Successors and Assigns. This Agreement shall be binding upon and shall inure to the benefit of the ,.r"* in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any 11 I 7236.00000\406377 05.1
or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

35. Non-Waiver. The delay or failure of either Party atany time to require performance or complian". Uy tn ottr"t farty of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representatlve of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occulrence or event shall not be deemed a waiver of any right or- remedy with respe"f to *y other occurrence or event, nor shall any waiver constitute a continuing waiver.

36. Time of Essence. Time is of the essence for each and every provision of this Agreement.

37. Headines. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modifr, explain, or to be a full or accurate description of th" content thereof and shall not in any way affect the meaning or interpretation of this Agreement.

38. Amendments. Only a writing executed by all of the Parties hereto or their respective successors and assigns may amend this Agreement.

39. Citv's Right to Employ Other Consultants. City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.

40. prohibited Interests. Consultant maintains and warrants that it has neither employed no. ,-"tuin.d any company or person, other than a bona fide employee working solely for Consultant, to solicit o. r.".rr" this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, anyfee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of thisiananty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no official, officei or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

41. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be d".-.d an original. All counterparts shall be construed together and shall constitute one single Agreement.

42. Authoritv. The persons executing this Agreement on behalf of the Parties hereto warrant that they ur. d,tty authoiized to execute this Agreement on behalf of said Parties and that by doing so, the Parties hereto are formally bound to the provisions of this Agreement.

ISIGNATURES ON FOLLOWING PAGEI
I 7236.00000\4063'1 7 05.1
12 SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OT'SHAFTER
AND REVENUE & COST SPECIALIST' LLC.

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.

CITY OF SHAFTER
Approved By

CONSULTANT
Gabriel Gorra;alez
City Manager
Approved as to Form:

Signature
Name
Title Marco Martinez
City Attorney
Attested By:

Yazmina Pallares
City Clerk
I 7236.00000\40637705.r
13 EXHIBIT A
Scope of Services
l 7236.00000\40637'l0s.l
l4

PROPOSAL
Services To Be provided - To ensure that the City can continue to provide basic municipal services by increasing its inventory of service-providing capital capacity, RCS proposes to compleie a Development tmpact Fee Catculation and Nexus that would consist of the following infrastructure:

1. Local Storm Drainage System Facilities

2. Water Sources, Storage and Delivery

3. Wastewater Collections SYstem

4. General Facilities, Vehicles and Equipment (city hall, yard, and fleet)

5. Aquatics Facilities

6. Public Use Facilities (community, senior, teen centers, et. al.)

7. Library Facilities and ltem Collection
B. parkland and Open Space Acquisition and Recreation Facilities Development, and any other Americans with Disabilities Act compliance needed for any of the above infrastructure areas and any infrastructure allowed by Government Code 566000, et. seq.

Scope of Work. To provide the legal basis for the City's Devel_opment lmpact Fee schedule the following steps would be taken by the Revenue & Cost Specialist staff, working with City staff where necessary and appropriate:

1. Review all maps, land-use documents and master plans, especially the Comprehensive General Plan.

2. Do a field "windshield" survey to become acquainted with the physical characteristics and general improvement needs and standards of the City.

3. Continue using the land use database created in the previous RCS impact fee study. While .r"iting the public safety impact lees RCS worked with the Directors of Finance, planninj and Building Safety and Public Works (and their designates) to determine the laid-use based development impact fee categories' This same land use database will be used for the impact fees included in this proposal. 1 7236.00000\40637 7 05.1
15 Land-uses for which an impact fee would be provided include the following NOTE: additional land-use particular to the City of Shafter could be added'

4. ldentify the existing Levels of Service (LOS) provided by the infrastructure and appropriations currently afforded by the City.

S. Meet with City staff responsible for each infrastructure to assist in the identification of aliprojects needed through theoretical build-out via use of master plans, specific plans, and other service requirement studies.

6. ldentify and analyze the demand driver specific to each infrastructure or servlce area. The "drivers" are the factors of nexus demand related to each land use and would be based upon the project plans or City productivity records. ldentify the amount of new demand for services that can be anticipated from the City's remaining development opportunities of privately-owned parcels.

7. Foster development of a specific list of projects and project costs of needed capital improvements and acquisitions for each of the previously recommended Development lmpact Fee infrastructures based on the anticipated new demands identified in SteP #6 above.
g.Apply the RCS computerized formulas for the distribution of the benefits of, nexus for,'ani impact of each group of projects on each of the above categories of land use. Undertake the proportional analysis necessary to identify the appropriate burden to be placed upon both the existing and future infrastructure' Gategory
of Land Use
Developed
Units/Acres
Potential
Units/Acres
Total
Unib/Acres
Detached Dwellin Units 1,521.63 16,491 21,329
Attached Dwell Units 350 2,319 2,669
Mobile Home Dwelling Units 175 32 207
Commercial Lod I Units 80 70 150
Retail/Services/Office Uses SF 1,675,000 4,081,271 5,756,271 Business Park Uses SF 2,090,880 58,715,395 60,806,275
lnd./Manufacturi Uses SF 7,130,772 5,860,998 12,991,770 Private lnstitutional Uses SF 1,075,932 141,570 1,217,502 1 7236.00000\40637'l 0s.t
t6
g.ldentify any "excess capacity" provided by the existing infrastructure, the cost for which may be recovered from future residents and businesses.

10. Develop a specific fee structure for each of the previously listed potential development imPact fees.

Textual Nexus SuPPort Document -

11. prepare a comprehensive report consisting of the fee-structures and the necessary relevant nexus text and Report with recommended fees and also present the C1y with twenty sets of printing stock (covers and letterhead paper). One draft report icycle) is included in the proposal and then the final Report. Any additional Oran reb6rts or final reports beyond those included in this proposal will be invoiced separaiely at RCS hourly rates at an amount reflecting the magnitude of the requested changes.

12.Included in the report will be a written defense addressing AB 602 and a detailed explanation of why RCS has chosen to use a per dwelling unit versus the square footage measurement suggested by AB 602. The d_etailed explanation included in the report will satisfy all legal requirements of AB 602.

13. Meet with the City Attorney to review the relevant California State Statutes, specifically Government Code $OOOOO, et. seq., relating to land use an_d definition of fees in light of current State of California and United States Supreme Court rulings.

14.Attend a City Council study session and a public hearing of the resultant fees, and the process through which they were determined.

Staff Time Required - RCS will require some time of each of the Director of Planning and Building Safety, Director of Public Works, Director of Finance and any infrastructure manager to- develop the basic cost distribution structure, once the capital needs are identified by the various planning documents and approved by Council' During the DIF process, it is difficult for RCS decide what facilities the City needs or wantsl nor set development standards for the City. Due to 30 years of capital project and impact fee experience, RCS can assist in the project identification process. However, city staff retains the primary responsibility for determining the projects needed for the delired service levels necessary to support the General Plan and its many elements.

RCS will first rely upon various ieports, master plans, specific plans, and other related reports identifying needed infrastructure'
Time requirements will vary depending upon the current availability of needed information. An updated master plan will reduce the time necessary for project identification and costing. Lack of one will require an engineer's time in creating the costing information. RC-S will use the best information possible to complete legally supportable development impact fees.
17236.00000\40637 7 05.r
t7
Fee for Services - The City has indicated the need for updated development impact fees for the previously identifieb infrastructure. Based upon these needs and the proposed scope of work, the flat fee for services for the various components is as follows:

Tnfal
Develo ment lm Fee Calculation $ 29,500
Textual Nexus Su rt Document DIF lncluded
Storm Drainage AnalYsis/DlF $3,000
Total $ 32,500
First invoice ..................

Second Invoice.....

Third lnvoice.....

Fourth and Final lnvoice
The above flat rate fee covers all RCS costs except any required business license which will also be invoiced upon the conclusion of the project. The fee for services is based upon a Zoom-b"rlo r""ting basis. RcS would travel onsite to Shafter for an initial presentation to City Councit a-nd a public hearing, assuming that is what the City desires.

Invoicinq Schedule. RCS will submit four equal invoices totaling the Fee for Services. 30 days after the contract is signed by the City
...... Upon Presentation of draft DIF Schedules
.........Upon submission of the draft DIF Report
Upon submission of final DIF Report
project Staff - Scott Thorpe. Senior Vice Pregident, will manage and undertake Deietopmentt@andNexusReporteffortandwillbeassistedby
Associate Gregory Brown. professional qualifications for Mr. Thorpe and Mr' Brown are attached hereto as APPendix A'
The RCS Staff have also contributed to the body of text of general publiclinancial management information through publication of articles and other writings' They are available for downloading from our website www.revenuecost.com Described, they are:
"lmpact Fees: Practical Guide for Calculation and lmplementation" is considered by some to be the most concise primer on the calculation of impact fees. This paper was presented to the American Society of Civil Engineers at the Society's annual land management conference and was then selected for public-ation in their September, 1992 Journal of Urban Planning and Development, (Vol' 18, No' 3), pages 196.J18' This document suitably demonstrates RCS's understanding of the nexus req u i rement for leg a I ly-su ppo rtable im pact fees' 1 7236.00000\40637 70s.1
18 "Financing Capital lmprovements" was published in the Journal (of the) Americai WaterWorks Assocrafion, August, 1991, pages 50-52' This article, written atthe A\AAA/A's request, illustrates the continuing importance of the capital improvement planning process and simplifies its veneer of complexiiy. lt also demonstrates RCS's understanding of the relationship of the DlFs to the City's Comprehensive General Plan and overall capital planning process.
"The Missing lngredient in State-Mandated General Plans", Public Managemenf, lnternational City Management Association", March 2014' pageJ Zi-22. The article addresses the lack of a requirement for a Finlncial Component in the General Plan documents as to how the General Plan infrastructure and operational service costs would be supported.

Conflict of lnterest - No principal of RCS has any financial interests in the City of Shafter thatwould preclude the completion of impartialwork. RCS will complete such declarations and file them with the City Clerk. Our only interest is in leaving the City in better financial condition then before we started.

Legal Advice - RCS is not authorized to practice law, however we will offer management advice on issues related to impact fee setting. The City is advised to veriff the legality of such issues prior to attempting to adopt ordinances, resolutions and code modifications' The Report scope includes allowances for a zoom meeting with the City's legal team. lnsurance Gertificates - RCS maintains adequate insurance and will provide proof.

Reservation of Rights - Some of the concepts discussed in this proposal are considered to be proprietary an-d are the property of Revenue & Cost Specialist. All rights are reserved and no part oi this work may be reproduced or copied in any form without written permission of RCS. Expresseld permission rs hereby granted to the-City of Shafterto 'make sufficient copies of this proposal to permit evaluation thereof. No other use or distribution of this document is permitted.

The Revenue & Cost Specialist staff looks forward to being of assistance in bringing the management advantages and the revenue fairness and equity benefits of our System to the City, the Mayor, its City Council, and their constituents, and to City staff.

END OF TEXT
1 7236.00000\4063770s.r
t9
I 7236.00000\40637 7 0s.1
20 EXHIBIT B
Deliverable Schedule
I 7236.00000\4063770s.1
2I
I
r 7236.00000\40 637 7 05.t
22 # City of Shafter
S}IAFTER COUNCIL AGENDA REPORT
Meeting Date: September 20,2022
FROM Gabriel A. Gonzalez, City Manager
Prepared By: Steve Esselman, Planning Director
SUBJECT: GENERAL PLAN AMENDMENT NO. 2I-37 AND ZONE CHANGE NO. 2t-70 (SHAFTER COMMLTNITY PARK PROJECT)

RECOMMENDATION
Council conduct a public hearing; adopt Resolution 2885, a Resolution of the City Council of the City of Shafter adopting Mitigated Negative Declaration (Environmental Assessment No. 2l-242), with Mitigation as described in Exhibit'0A", for an Amendment to the Land Use Map andaZone Change; adopt Resolution 2886, a Resolution of the City Council of the City of Shafter approving General Plan Amendment No. 21-37 as depicted in Exhibit ".L"; and introduce for first reading by title only and waive reading of OrdinanceT4l, an Ordinance of the City Council of the City of Shafter, Califomia approving Zone Change No. 2l-70 as depicted in Exhibit "A"'

PROJECT DATA

1. On-site: The project site is vacant. See Exhibit 1.

2. Off-site: The site is surrounded by residential to the north, industrial to the west and south, and oil production and cultivated farmland to the east.

3. General Plan Designation: The site's current land use designation is Industrial (I) and Business Park (BP). See Exhibit 2.

4. Zoning The site is currently zoned Industrial (I) and Business Park (BP). See Exhibit 3.

5. Acrease: 42.4 acres

PROJECT ANALYSIS
The Shafter Recreation and Park District (applicant and owner) is requesting a General Plan Amendment and,Zone Change to allow for the construction of a two-phase recreation and sports park on a 42.4-acre site located at the northwest corner of East Ash Avenue and Golds Avenue in itte City of Shafter (project). The proposed General Plan Amendment would change the land use from the existing Industrial (I) and Business Park (BP) land use designations to PS (Parks and Schools) designation, or a more restrictive designation. The proposed Zone Change would change the Industrial Q and Business Park (BP) zone districts to CF (Community Facilities) zone district, or a more restrictive district.

The project consists of a requested General Plan Amendment and Zone Change to allow for the construction of a two-phase recreation and sports park on a 42.4-acre site located at the northwest corner of East Ash Avenue and Golds Avenue in the City of Shafter (project). The proposed General Plan Amendment would change the land use from the existing Industrial (I) and Business

PUBLIC HEARING I
Environmental Assessment No. 2l-242' General Plan Amendment No. 2l-37,andZone Change No. 2l-70 park (Bp) land use designations to PS (Parks and Schools) designation. The proposed ZoneChange would change the Industrial (I) and Business Park (BP) zone districts to CF (Community Facilities) zone district.

The project would be developed in two phases. Phase I would include the construction of various recreational fields and courts for baseball, softball, soccer, basketball, and handball, as well as children's playground and barbecue areas totaling approximately 20 acres. Phase 1 would also include a 340-square-foot restroom, a 1,30O-square-foot concession stand with restroom, a 1,000- square-foot storage building, one 72O-square-foot offrce, and three parking a.reas composed of 336 parking spaces.
phase 2 would include the construction of various recreational features and courts such as an outdoor gym, tennis/pickle ball courts, kids fit course, dog-park, barbecue area, and track field. phase 2 would also include the construction of a26,725-square-foot gym/multi-pu{pose room, a 1,500-square-foot shop, a 1,000-square-foot restroom, maintenance yard, and two parking areas ,o,,'por.d of 388 purtitrg rpu".r. Street construction included in Phase 2 would include the ,"*uinirrg portion of tn u"."rr road along the north and west boundaries of the park. An on-site retention basin, sized per a drainage study reviewed and approved by the City Engineer, would also be developed at ihe site. Additionally, an on-site drywell and filtration unit would also be developed to filter raw irrigation water provided by the Shafter-Wasco Irrigation District and supplemented by an offsite water well (see below).

The anticipated closing time of the park would be 10:00 p.m. in compliance with Shafter Municipal Code Section 12.32.040j. The conceptual development plan for both phases of the proposed improvements is attached to this document' See Exhibit 4' The lighting at the site would utilize mechanics and directional design that would prevent light from bleedirg ou", onto adjacent residences during recreational events occurring during evening hours.

Both phase 1 and phase 2 of the project would include the installation of lighting on poles up to g0 feet tall, which, if the subject General Plan Amendment and Zone Change is approved, will require a subsequent Conditional Use Permit (CUP) approval for the installation of up to 8O-foot poles.

Offsite improvements are not shown on the conceptual site plan attached to this document. Offsite improvements include:
o Connection to existing potable water system at East Ash Avenue or a future waterline to be constructed within-G-olds Avenue. This connection would be for potable water only and the supplied potable water is not to be used for irrigation' o Connection to existing sewer service located along East Ash Avenue. o Connection to the SWID system via an existing outlet located on adjacent City property (ApN 089-140-73) to supply irrigation water to the site February through November. o Connection to existing water well from three possible nearby wells. Two of these wells are private and one is on City-owned properfy.
.|
Environmental Assessment No. 2l-2420 Generaf Plan Amendment No. 2l-37,andZone Change No. 21-70 Construction of a gravity sewer within the access road on the west and north sides of the park with a point of connection to the existing sewer system within East Ash Avenue. This r.*". is meant to serve the commercial lots between the proposed park and Lerdo Highway. Construction of this public facility would be completed before or concurrently with Phase 1. Note: Since the park does not benefit from a new sewer, the sewer's construction would be on the City of Shafter to design and install.

LAND USE ELEMENT COMPATIBILITY
Staff has reviewed the proposal for compatibility with the applicable objectives and policies contained within the Shafter General Plan Land Use Element and finds the following:

2.10 Public and Ouasi-Public Uses
Objective: provide ample area for the conduct of public business and the operation of individual i*tit"tio* within the iommunity, reinforcing Shafter's vision of a community that values civic involvement.

The project is consistent with this objective because the 42.4-acre park provides additional arcato cond.rcip.tblic business to allow for the operation of individual institutions within the community, such as a possible site for future community events put on by either the City or other individual institutions.

Policv 3: Work with area service agencies to define their needs and ensure adequate inventory of tuoOr f* schools, parks and recreational facilities, police and fire facilities, libraries, cultural facilities, and other public and quasi-public services.

This project is consistent with this policy because the City has been working with the Shafter Recreation and park District and this collaboration resulted in the need to entitle the subject property for use as a park and recreational facility. The City will continue to work with the Shafter Recreation and Park District on the development of the park. policy 4: Support the development and operation of shared school/park facilities. Work with area ro-',,ir" ug.tt"i.r to identiff and implement programs to share resources and undertake joint programs where such programs could result in mutually beneficial cost savings and improved services and facilities to Shafter residents and businesses.

This project is consistent with this policy because both the City and the Shafter Recreation and park bistrict are working together to develop a park facility that will be shared by the City, the District, and any other individual institutions that wish to use the park and in compliance with the Municipal Code.
policy 6: Require new development to pay its fair share of the infrastructure and facilities improvements that are required to support the development.

This project is consistent with this policy because the City is requiring the Shafter Recreation and Park District to pay its fair share of improvements, including, but not necessarily limited to, improvements to poiable, non-potable, sewer, and storm drainage facilities as well as nearby roads. -3-
a
Environmental Assessment No. 2l-242, General Plan Amendment No. 2l-37 , and Zone Change No. 21-70 Policv 7: Ensure that the location, intensity, and timing of new rural and urban development are coordinated with the provision of infrastructure.

This project is not consistent with this policy because the City has determined that necessary infrastructure is not available to serve the project site without needing to increase service capacity.

NOTICING
As required by Senate Bill 18, all general plan amendments require consultation with California Native American tribes. Staff requested a tribal consultation list from the Native American Heritage Commission, and Staff received a list with 25 tribal contacts. Staff provided a letter dated September 14,2021to each contact on the list.

Public notice for the proposed project and environmental determination were also advertised in The Shafter Press. All property owners within 300 feet of the project site were notified by United States Postal Service mail regarding this public hearing.

Comments Received: The City received a comment from the San Manuel Band of Mission Indians stating that they did not wish to participate in the processing of this project because the project area is outside their ancestral territory. Comment noted for the record.

CEQA
Based upon an initial study, Staff has determined that the project, with mitigation measures, would not have a significant effect on the environment. Therefore, a Mitigated Negative Declaration (IvIND) (Shafter Environmental Assessment No. 2l-242 and State Clearinghouse No. 2022060577) was prepared for this project in accordance with the California Environmental Quality Act (CEQA). The MND was circulated for a 30-day public and agency review period from June24,2022to July 24,2022. The MND is provided as Exhibit 5.

Comments Received: The following comments were received by staff during the public review period for the MND.

Department of Toxic Substanse Control - Commenter provides recommendations and requirements regarding potential historic soil contamination and backfill. Comment noted for the record and provided to the applicant.
o
The State CEQA Guidelines have been followed in the evaluation of the environmental effects of this project. Significant environmental impacts were not identified with the project proposal.

Therefore, a MND was prepared for the project. Compliance with the mitigation measures in the MND, local ordinances, state laws, and construction to the standards of the California Building Codes would reduce impacts to a less-than-significant level.

FISCAL IMPACT
There is no fiscal impact because of the proposed action. -4-
Environmental Assessment No. 2l'242, General Plan Amendment No. 2l-37, and Zone Change No. 21-70

ALTERNATIVES
The City Council could deny the proposed action, and the MND (EA No. 2l-242) would not be adopted, and General Plan Amendment No. 2l-37 and Zone Change No. 21-70 would not be appioved. The site would remain designated by the General Plan and zoned per Shafter Municipal Code as I (Industrial) and BP (Business Park).

ATTACHMENTS EXHIBIT
Vicinity Map
Existing General Plan Land Use MaP
Existing Zone District Map
Conceptual Development Plan
Mitigated Negative Declaration
EA Resolution No. 2885
GPA Resolution No. 2886
ZC Ordinance No. 741
I
2 J
4 5
6 7
8 -5-
General Plan Amendment No. 21-37 and Zone Change No. 21-70 1:4,514

0.03 0.06
Exhibit 1

0.12mi 211112021,2:08:56 PM
Roads and Alleys Local-Residential
Hrgnway
00 0.05 0.1 0.2 km
Copyright nearmap 2015, Esri Community Maps Contributoc, City of Shatter, Section Boundary City of Shafter, Planning Department Official
.a
:

L
a
{
Er'
a,
tr
,t,. n-*
-tLr
!1tl li' lIr
,,
iqt.

I t
i;$
t
&,
:rr
,.
t
*Yr 4
,i
-rIIrf"
Parcel Boundary
Exhibit 2
General Plan Amendment No. 21-37
Parcel Boundary
-
Local-Residential
1:4,514

0.03 0.06 0.12 mi 211112021, 2:15:18 PM
General Plan
I eusiness Park
lndustrialLow Density Residential Roads and Alleys
Very Low Density Residential
-
Highway
0 0.05 0.1 0.2 km
SgCtiOn BOUndary copyright neamap 201s, Esri community Maps contributoE, city of shafier, City of Shafter, Planning Department Offcial
rv--lfi:;ral.t{:.:1':1
211112021,2:17:30 PM
Roads and Alleys l-'l Section Boundary
ParcelBoundary
-
Highway Zoning (2020 update)
Zone Change No. 21-70
n
EIn
ccffiep
I
0 0.05 0.1 0.2 km
Copyright neamap 20'15, Esri Community Maps ContributoE, City of Shafter, City of Shafter, Planning Department Offcial
1:4,514
0 0.03 0.06
Exhibit 3

0.12 mi
-
Local-Residential R-1
1 SITE PLAN
PHASE t&2FULL BUILD
OUT
ffi w
$IIAFTER
COIITIIUN]TY PARK
::&wu

CORTER G
WTSAWNEI ruS
AWNUF
FOR:

CONCEPTIONAL DEVELOPMENT PLAN
=Uz
x&w, @@f,1 r':L !,;..';r,{ jr ! lrirt 1,i\ I Fl, l
N
O
o o
o

UM UNI UNI
PHASE 1 " PARKING LOT'C.1' nt ilililililillilthiln
ur l|l1ililr il ilittlu nEre€

GYIIMSIUM
o
m
PARK
trD
trCI
GARDEN t]trtr
C@RSE
ffiFff
PMKNG I ffiIW
YARD GW o!m@R
E
+
J
f
a:

PHASE 2
lru SPACES
::+: s
:-
I
=$A
PARNre
Exhibit 4
Exhibit 5
SR
t

CITY OF

CIW OF SHAFTER, CALIFORNIA
Mitigated Negative Declaration
GPA 2I-37 and ZC 2I-7O
(Shafter Community Park Proiect)
City of Shafter
336 Pacific Avenue
Shafter, CA 93263
Exhibit 5

CONTENTS
M ITIGATE D N EGATIVE DECLARATION ....................

Mitigation Measures
Biological Resources lmpact Mitigation Measures
Cultural Resources lmpact Mitigation Measures
tNtTtAL STUDY CHECKLIST (CEaA APPENDIX G: ENVIRONMENTAL CHECKLIST FORM).........'

E NVI RON M ENTAL FACTORS POTENTIALLY AFFECTED
Determination

EVALUATION OF ENVIRONMENTAL IMPACTS
ENVIRONMENTAL ISSUE .........

Aesthetics
Evaluation of Environmenta I Effects
Agriculture and Forestry Resources....

Eval uation of Environ mental Effects .........'..

Air Quality
Evaluation of Environmental Effects ..."'.'
Biological Resources..

Evaluation of Environmental Effects
Cultural Resources..

Evaluation of Environmental Effects ...'...

Energy
Evaluation of Environmental Effects ....

Geology and Soils
Evaluation of Environ menta I Effects ..'..........."
Greenhouse Gas Emissions
Evaluation of Environmental Effects ......

Hazards and Hazardous Materia|s..............

Evaluation of Environmental Effects ."...

Hydrology and Water Quality
Evaluation of Environ mental Effects
4 4
4 7
10 13
13 L4
L6
16 16
18 18
20 20
29 29
33 36
36 40
40 45
45 48
48 52
..33
.....52
Land Use and Planning........

Evaluation of Environmental Effects."....

Mineral Resources..

Evaluation of Environmental Effects '.'....

Noise
Evaluation of Environmenta I Effects .......'..

Population and Housing...........

Evaluation of Environmenta I Effects
Public Services.....

Evaluation of Environ mental Effects'..............'
Recreation....

Evaluation of Environ mental Effects .........

Tra nsportation/Traff ic..

Evaluation of Environmental Effects
Tribal Cultural Resources
Evaluation of Environmental Effects....

Utilities and Service Systems
Eval uation of Environmental Effects
Wildfires
Evaluation of Environ mental Effects'.........'....

Mandatory Findings of Significance .....

Evaluation of Environmental Effects

BIBLIOGRAPHY
57 .............. 57
.....61
.....61
.....62
58 58
59 59
62 ..64
..64
65 65
70 70
7L
7L
74 ...'.',,......,.'.,'. 7 4
....'.,..,.....''.,.. 7 6
..................... 76
..................... 78

CITY OF SHAFTER

M ITIGATED N EGATIVE DECLARATION
The City of Shafter (City) has completed an initial study (attached) of the possible environmental effects of the following-described project and has determined that a Mitigated Negative Declaration is appropriate. lt has been found that the proposed project, as described ,nJ proposed to be mitigated (if required), would not have a significant effect on the environment. This determination has been made according to the California Environmental Quality Act (CEQA) and the State CEQA Guidelines'
Proiect Title: General Plan Amendment 21-37 and Zone Change 2L-7O (Shafter Community Park)
Com nt Period June24,2022
Comment Period Ends: JulY 24,2022
Mitigation Measures
Mitigation Measures (included in the proposed project to avoid potentially significant effects) are as follows
Biological Resources lmpact Mitigation Measures

1. Within 14 days of the start of project activities, a pre-activity survey shall be conducted by a qualified biologist knowledgeable in the identification of these species. The pre-activity survey shall include walking transects to identify presence of burrowing owls and their burrows, American badgers and their dens, and San Joaquin kit foxes and their dens' The pre-activity survey shall be walked by no greater than 3O-foot transects for 100 percent coverage of the project site and the 250-foot buffer, where feasible. lf no evidence of these special-status species is detected, no further action is required. lf dens or burrows that could support any of these species are discovered during the preactivity survey conducted under MM 810-L, the avoidance buffers outlined below shall be established. No work would occur within these buffers unless the biologist approves and monitors the activitY.

Burrowing Owl (active burrows)
Nonbreeding season: September 1-January 31- 160 feet
Breeding season: February L - August 31 - 250 feet
2 American Badger and San Joaquin Kit Fox
Potential or Atypical den - 50 feet
Known den - 100 feet
Natal or pupping den - Contact agencies for further guidance

3. The following avoidance and mitigation measures shall be implemented during all phases of the project to reduce the potential for impact from the project. They are modified from the U.S. Fish and Wildlife Service Standardized Recommendations for Protection of the Endangered San Joaquin Kit Fox Prior to or During Ground Disturbance:
o project-related vehicles shall observe a daytime speed limit of 20-mph throughout the site in all project areas, except on County roads and State and federal highways. o All project activities shall occur during daylight hours, but if work must be conducted at night then a night-time construction speed limit of 10-mph should be established. o Off-road traffic outside of designated project areas should be prohibited' o To prevent inadvertent entrapment of kit foxes or other animals during construction of the project, all excavated, steep-walled holes or trenches more than two feet deep shall be covered at the close of each working day by plywood or similar materials. lf the trenches cannot be closed, one or more escape ramps constructed of earthen-fill or wooden planks should be installed.
o Before holes or trenches are filled, they should be thoroughly inspected for trapped animals. lf at any time a trapped or injured kit fox is discovered, the USFWS and the CDFW shall be contacted before proceeding with the work' r ln the case of trapped animals, escape ramps or structures should be installed immediately to allow the animal(s) to escape, or the USFWS and CDFW should be contacted for guida nce.
o All construction pipes, culverts, or similar structures with a diameter of four inches or greater that are stored at a construction site for one or more overnight periods shall be thoroughly inspected for kit foxes and burrowing owls before the pipe is subsequently buried, capped, or otherwise used or moved in any way. lf a kit fox is discovered inside a pipe, that section of pipe shall not be moved until the USFWS has been consulted. lf necessary, and under the direct supervision of the biologist, the pipe may be moved only once to remove it from the path of construction activity, until the fox has escaped. r All food-related trash items such as wrappers, cans, bottles, and food scraps should be disposed of in securely closed containers and removed at least once a week from a construction or Project site.
o No pets, such as dogs or cats, should be permitted on the project site. o project-related use of rodenticides and herbicides should be restricted. o A representative shall be appointed by the project proponent who will be the contact source for any employee or contractor who might inadvertently kill or injure a kit fox or who finds a dead, injured or entrapped kit fox. The representative should be identified a
a
o
o
during the employee education program and their name and telephone number should be provided to the USFWS and CDFW.

Upon completion of the project, all areas subject to temporary ground disturbances (including storage and staging areas, temporary roads, pipeline corridors, etc.) shall be recontoured if necessary, and revegetated to promote restoration of the area to preproject conditions. An area subject to "temporary" disturbance means any area that is disturbed during the project, but after project completion will not be subject to further disturbance and has the potential to be revegetated.

Any project personnel who are responsible for inadvertently killing or injuring one of these species should immediately report the incident to their representative. This representative shall contact the CDFW (and USFWS in the case of San Joaquin kit fox) immediately in the case of a dead, injured or entrapped San Joaquin kit fox, American badger, or western burrowing owl.

The Sacramento Fish and Wildlife office and CDFW Region 4 office shall be notified in writing within three working days of the accidental death or injury to a San Joaquin kit fox during project related activities. The CDFW shall be notified in the case of accidental death to an American badger or western burrowing owl. Notification must include the date, time, and location of the incident or of the finding of a dead or injured animal and any other pertinent information.

New sightings of San Joaquin kit fox, American badger, or western burrowing owl shall be reported to the CNDDB. A copy of the reporting form and a topographic map clearly marked with the location of where a San Joaquin kit fox was observed should also be provided to the USFWS.

4. lf project activities must occur during the nesting season (February 1 to September L5), preactivity nesting bird surveys shall be conducted within seven days prior to the start of construction at the construction site plus a 250-foot buffer for songbirds and a 500-foot buffer for raptors (other than Swainson's hawk). The surveys shall be phased with construction of the project. lf no active nests are found, no further action is required.

However, existing nests may become active and new nests may be built at any time prior to and throughout the nesting season, including when construction activities are in progress. lf active nests are found during the survey or at any time during construction of the project, an avoidance buffer ranging from 50 feet to 500 feet will be required, with the avoidance buffer from any specific nest being determined by a qualified biologist. The avoidance buffer will remain in place until the biologist has determined that the young are no longer reliant on the adults or the nest. Work may occur within the avoidance buffer under the approval and guidance of the biologist, but full-time monitoring will be required. The biologist shall have the ability to stop construction if nesting adults show any sign of distress.

5. lf project activities must occur during the nesting season (February 15 to August 31), preactivity surveys shall be conducted for Swainson's hawk nests in accordance with the Recommended Timing and Methodology for Swainson's Hawk Nesting Surveys in California's CentralValley, Swainson's Hawk Technical Advisory Committee. The surveys will 6 be conducted on the project site plus a o.S-mile buffer. To meet the minimum level of protection for the species, surveys shall be conducted during at least two survey periods' The survey will be conducted in accordance with the methodology outlined in existing protocols and should phased with construction of the project. lf no Swainson's hawk nests are found, no further action is required.
lf an active swainson's hawk nest is discovered at any time within o'S-mile of active construction, a qualified biologist should complete an assessment of the potential for current construction activities to impact the nest. The assessment will consider the type of construction activities, the location of construction relative to the nest, the visibility of construction activities from the nest location, and other existing disturbances in the area that are not related to construction activities of this project. Based on this assessment, the biologist will determine if construction activities can proceed, and the level of nest moniioring required. Construction activities shall not occur within 500 feet of an active nest but depending upon conditions at the site this distance may be reduced. Full-time monitoring to evaluate the effects of construction activities on nesting Swainson's hawks will be required. The qualified biologist shall have the authority to stop work if it is determined that project construction is disturbing the nest. These buffers may need to increase depending on the sensitivity of the nesting Swainson's hawk to disturbances and at the discretion of the qualified biologist.
prior to the initiation of construction activities, all personnel shall attend a Worker Environmental Awareness Training program developed by a qualified biologist. The program shall include information on the life histories of special-status species with potential to occur on the project, their legal status, course of action should these species be encountered on-site, and avoidance and mitigation measures to protect these species.

Cultural Resources lmpact Mitigation Measures
g. lf prehistoric or historic-era cultural materials are encountered during construction activities, all work in the immediate vicinity of the find shall halt until a qualified archaeologist can evaluate the find and make recommendations. Cultural resource materials may include prehistoric resources such as flaked and ground stone tools and debris, shell, bone, ceramics, and fire-affected rock as well as historic resources such as glass, metal, wood, brick, or structural remnants. lf the qualified archaeologist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required to mitigate adverse impacts from project implementation' These additional studies may include avoidance, testing, and evaluation or data recovery excavation.
lf human remains are discovered during construction or operational activities, further excavation or disturbance shall be prohibited pursuant to section 7050.5 of the california Health and Safety Code. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Section 7050'5 of 7 9
the Health and Safety Code, Section 5097.98 of the Public Resources Code (Chapter L492, Statutes of L982, Senate Bill 2971, and Senate Btl 447 (Chapter 44, Statutes of 1987), shall be followed. Section 7050.5(c) shall guide the potential Native American involvement, in the event of discovery of human remains, at the direction of the county coroner.

Geologv and Soils lmpact Mitigation Measures

10. During site plan review, the applicant shall provide a revised site plan that includes an onsite surface drainage retention basin and/or other capture method (such as vegetated swales) of sufficient capacity to capture all onsite flows and potentially some offsite flows from public streets as required and approved by the City Engineer. The surface drainage collection and retention collection system shall be supported by a drainage study and analysis prepared per City development standards'
1-1. lf any paleontological resources are encountered during ground disturbance activities, all work within 25 feet of the find shall halt until a qualified paleontologist as defined by the Society of Vertebrate Paleontology Standard Procedures for the Assessment and Mitigation of Adverse lmpacts to Paleontological Resources, can evaluate the find and make recommendations regarding treatment. Paleontological resource materials may include resources such as fossils, plant impressions, or animal tracks preserved in rock. The qualified paleontologist shall contact the Natural History Museum of Los Angeles County or other appropriate facility regarding any discoveries of paleontological resources. lf the qualified paleontologist determines that the discovery represents a potentially significant paleontological resource, additional investigations and fossil recovery may be required to mitigate adverse impacts from project implementation. lf avoidance is not feasible, the paleontological resources shall be evaluated for their significance. lf the resources are not significant, avoidance is not necessary. lf the resources are significant, they shall be avoided to ensure no adverse effects, or such effects must be mitigated.

Construction in that area shall not resume until the resource appropriate measures are recommended or the materials are determined to be less than significant. lf the resource is significant and fossil recovery is the identified form of treatment, then the fossil shall be deposited in an accredited and permanent scientific institution. Copies of all correspondence and reports shall be submitted to the Lead Agency.

Hvdrolosv and Water Qualitv lmpact Mitigation Measures

12.Prior to grading permit issuance, the applicant shall receive a water will-serve letter from the City Public Works Director for potable water only (not irrigation water). Said will serve letter will specify the potable water capacity allowed for the project. The fee for said capacity will be per the adopted fee scheduled and due to the City prior to connecting to the City water system.

13. prior to grading permit issuance, the applicant shall receive a sewer will-serve letter from the city public works Director. said will serve letter will specify the sewer collection capacity allowed for the project. The fee for said capacity will be per the adopted fee scheduled and due to the City prior to connecting to the City sewer system'

14. Prior to grading permit issuance, the applicant shall provide the city with a conclusive irrigation water will-serve letter from Shafter-wasco lrrigation District stating that they will provide irrigation water between February and November'

15. During site plan review, the applicant shall provide a revised site plan that includes the location of the existing offsite raw Shafter-Wasco lrrigation District water connection to the existing connection point on city-owned property (APN 089-140-73]'and future conveyance systern to get the raw Shafter-Wasco lrrigation District water to the drywell and filtration unit.

16. During site plan review, the applicant shall provide a revised site plan that includes the location of the existing offsite well and future conveyance system to get the supplemental well water to the drywell and filtration unit'

17. During site plan review, the applicant shall provide a revised site plan that includes a drywell and filtration unit to filter the raw Shafter-Wasco lrrigation District water and supplemental well water prior to being sent through the irrigation system' l-8. Prior to grading permit issuance, the applicant shall provide a comprehensive year-round irrigation plan to be approved by the City Public Works Director. The irrigation plan shall include calculations on conveyance of irrigation water during normal, dry, and multiple dry years as well as provide contingency steps if raw Shafter-Wasco lrrigation District water is reduced or not made available to the site'

I N ITIAL STUDY CH ECKLIST
(cEqA APPENDIX G: ENVIRONMENTAL CHECKLIST
FORM)
General Plan Amendment 2l'-37 and Zone Change
2L-7O (Shafter CommunitY Park)
L. Proiect title:

2. Lead Aeencv name and address:

3. Contact Person and Phone number:

4. Proiect location:

5. Proiect sponsor's name and address:

6. General Plan Designation:

7. Zoning:

City of Shafter
336 Pacific Avenue
Shafter, CA 93263
Steve Esselman
Planning Director
66L-746-5002
Northwest corner of East Ash Avenue and Golds
Avenue
Shafter Recreation and Park District
700 East Tulare Avenue
Shafter, CA 93263
BP (Business Park) and I (lndustrial)
BP (Business Park) and I (lndustrial)
of oroiect (descri be the whole action involved, includins but not lim to later 8 Descri nd n
implementation):

The project consists of a requested General Plan Amendment and Zone Change to allow for the construction of a two-phase recreation and sports park on a 42.4-acJe site located at the northwest corner of East Ash Avenue and Golds Avenue in the City of Shafter (project). The proposed General plan Amendment would change the land use from the existing lndustrial (l) and Business park (BP) land use designations to PS (Parks and Schools) designation' The proposed Zone Change would change the lndustrial (l) and Business Park (BP) zone districts to CF (Community Facilities) zone district.

The project would be developed in two phases. Phase L would include the construction of various recreational fields and courts for baseball, softball, soccer, basketball, and handball, as well as children's playground and barbecue areas totaling approximately 20 acres. Phase 1 would also include a 340-square-foot restroom, a 1,300-square-foot concession stand with restroom, a 1",000-square-foot storage building, one 720-square-foot office, and three parking areas composed of 336 parking spaces.
phase 2 would include the construction of various recreational features and courts such as an outdoor gym, tennis/pickle ball courts, kids fit course, dog-park, barbecue area, and track field. phase 2 would also include the construction of a26,725-square-foot gym/multi-purpose room, a 1,500-square-foot shop, a 1,000-square-foot restroom, maintenance yard, and 2-parking areas composed of 388 parking spaces. Street construction included in Phase 2 would include the remaining portion of the access road along the north and west boundaries of the park. An on-site retention basin, sized per a drainage study reviewed and approved by the City Engineer, would also be developed at the site. Additionally, an on-site drywell and filtration unit would also be developed to filter raw irrigation water provided by the Shafter-Wasco lrrigation District and supplemented by an offsite water well (see below)'
Both phase 1 and Phase 2 of the project would include the installation of lighting on poles up to 80 feet tall. The lighting at the sports amenities would utilize mechanics and directional design that would prevent light from bleeding over onto adjacent residences during recreational events occurring during evening hours. The anticipated closing time of the park would be 10:00 p.m. in compliance with Shafter Municipal Code Section L2.32.O4O.j. The conceptual site plan for both phases of the proposed improvements is attached to this document.

Offsite improvements are not shown on the conceptual site plan attached to this document.

Offsite improvements incl ude :
o Connection to existing potable water system at East Ash Avenue or a future waterline to be constructed within Golds Avenue. This connection would be for potable water only and the supplied potable water is not to be used for irrigation. o Connection to existing sewer service located along East Ash Avenue. r Connection to the SWID system via an existing outlet located on adjacent City property (ApN 089-i.40-73) to supply irrigation water to the site February through November. o Connection to existing water well from three possible nearby wells. Two of these wells are private and one is on City-owned property.
o Construction of a gravity sewer within the access road on the west and north sides of the park with a point of connection to the existing sewer system within East Ash Avenue. This sewer is meant to serve the commercial lots between the proposed park and Lerdo Highway. Construction of this public facility would be completed before or concurrently with Phase 1. Note: Since the park does not benefit from a new sewer, the sewer's construction would be on the City of Shafter to design and install.

9. Surrounding land uses and setting:

The site is surrounded by residential to the north, industrial to the west and south, and oil production and cultivated farmland to the east.
blic asencies aooroval is a ated to be reoui red {e-s-. oermits. financrn s

10. Other ou
apOroval. or participation agreement):
o City of Shafter-Mitigated Negative Declaration consideration and adoption . City of Shafter-Grading Permit
. City of Shafter-Building Permit
o City of Shafter-Site Plan Review
. city of shafter - Potable water and sewer will-serve letters o Shafter-Wasco lrrigation District - lrrigation water will-serve letter o San Joaquin Valley Air Pollution Control District-Air Quality Plan compliance o CentralValley RegionalWater Quality Control Board - National Pollutant Discharge Elimination System General Permit for Construction Activities compliance

11. Have California Native American tribes traditionallv and culturallv affiliated with the Oroiect area requested consultation pursuant to Public Resources Code section 2L080.3.1? lf so. is there a plan for consultation that includes. for example. the determination of significance of imoacts tribal cultural rces. orocedures rdins confide itv. etc.? No, California Native American tribes traditionally and culturally affiliated with the project area have not requested consultation'

ENVI RONM ENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant lmpact" as indicated by the checklist in the following Pages:
n Aesthetics
a Biological Resources
n Geology/Soils
r Hydrology/W.Q.
n Noise
r Recreation
n Utilities/Service SYstems
I Agricultural & Forestry Resources I Air Quality
n Cultural Resources n EnergY
n G.H.G. Emissions I Hazards/Haz. Mat.
n Land Use/Planning tr Mineral Resources
r Population/Housing n Public Services
n Transportation I Tribal Cultural Res.
r Wildfire n MandatorY Findings
Determination
On the basis of this initial evaluation:
tr I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION would be prepared' I I find that aithough the proposed project could have a significant effect on the environment, there would not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent' A MITIGATED NEGATIVE DECLARATION would be prepared'
! lfind thatthe proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required'
tr I find that the proposed project MAY have a "potentially significant impact" or ,,potentially significant unless mitigated" impact on the environment, but at least one effect has been 1) adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) addressed by mitigation measures based on the earlier analysis as described on the attached sheets. An ENVIRONMENTAL IMPACT REpORT is required, but it must analyze only the effects that remain to be addressed.
! I find that although the proposed project could have a significant effect on the environment, beciuse all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable legal standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. lrrne 24.

Steve Esselman, Planning Director Date
o) 2

EVALUATION OF ENVI RON M ENTAL I M PACTS
L. A brief explanation is required for all answers except "No lmpact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No lmpact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No lmpact" answer should be explained where it is based on project-specific factors as well as general standards (e'g', the pioject would not expose sensitive receptors to pollutants, based on a project-specific screening analYsis).

2. All answers must take account of the whole action involved, including off-site as well as onsite, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. once the lead agency has determined that a particular physical impact may occur, then the checklist .nr*"i, must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant lmpact" is appropriate if there is substantial evidence that an effect may be significant' lf there are one or more ,'potentially Significant lmpact" entries when the determination is made, an EIR is required.

4. ,,Negative Declaration: Less Than Significant With Mitigation lncorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially significant lmpact,,to a "Less Than Significant lmpact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from "Earlier Analyses," as described in (5) below, may be crossreferenced).

5. Earlier analyses may be used where, pursuant to the tiering, program ElR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration' Section 15063(cX3)(D). ln this case, a brief discussion should identify the following:
a) Earlier Analysis Used. ldentify and state where they are available for review. b) lmpacts Adequately Addressed. ldentify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis'
c) Mitigation Measures. For effects that are "Less than significant with Mitigation Measures lncorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address sitespecific conditions for the project' G. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated'

7. Suppoiting lnformation Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. g. This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected.

9. The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance.

ENVIRONMENTAL ISSUE
Aesthetics
Evaluation of Environm I Effects
a) Less than sisnificant impact. The project proposes a future public park on 42.4 acres. The project site is located on undeveloped land with business park and industrial land use designations and zoning. There are several residences located north of the project site.

There is industrial development west and south of the project site, including the Shafter public Works Department office and yard and the now-closed Shafter Modified Community Correctional Facility. The areas southeast and northeast of the project site include irrigated fields, either fallow or vegetated with alfalfa. East of the project site, the land has been cleared and there are five active oil pumping units.

According to the City of Shafter General Plan, the site is not within or in the vicinity of an identified scenic vista, and no known aesthetic resources exist on or near the site. The project does not lie near or within a State Designated or Eligible State Scenic Highway (Caltrans 2O2Ol. Furthermore, development of the project would not block or preclude views to any area containing important or what would be considered visually appealing landforms. The project does not include the removal of trees determined to be scenic or of scenic value, the destruction of rock outcroppings or degradation of any historic building(s)' Therefore, the project would not have a substantial adverse effect on a scenic vista.

Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
T
lmpact
No
tr
I
Would the project:
a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcrops, and historic buildings within a state scenic highwaY?
c) ln non-urbanized areas, substantially degrade the existing visual character or quality of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point.) lf the project is in an urbanized area, would the project conflict with the applicable zoning or other regulations governing scenic q ualitY?
d) Create a new source of substantial light or glare which would adversely affect d orn ime views in the area?
tr
tr
I
I
b) No impact. Please see response to a. above. Therefore, the project would not substantially damage scenic resources, including, but not limited to, trees, rock outcrops, and historic buildings within a state scenic highway.
c) Less than sisnificant oact. The project is in an area with residential to the north, industrial to the west and south, and oil production to the east. The project would be visible from passing motorists and the surrounding residential communities. Changes to the visual quality and character of the project site would be compatible with the nearby residential development and include landscaping improvements that would enhance the visual character of the area. The park will be relatively open, with park amenities for use by City residents. Therefore, the project would not substantially degrade the existing visual character or quality of the site and its surroundings in a non-urban area or conflict with the applicable zoning or other regulations governing scenic quality in an urban area. d) Less than sienificant impact. The project will be developed in two phases' Construction of the proposed project would generally occur during daytime hours, typically from 7:00 a.m. to 7:00 p.m. All lighting would be directed downward and shielded to focus illumination on the desired work areas only and prevent light spillage onto adjacent properties. Because lighting used to illuminate work areas would be shielded, focused downward, and turned off by 7:00 p.m., the potential for lighting to affect any residents adversely is minimal. lncreased truck traffic and the transport of construction materials to the project site would temporarily increase glare conditions during construction. However, this increase in glare would be minimal. Construction activity would focus on specific areas on the sites, and any sources of glare would not be stationary for a prolonged period.

The proposed baseball, softball, and soccer practice and game schedules indicates that sports field will be utilized by sports teams every day during the months of February through September. The schedule also indicates that practice and game times will end by 10:00 p.m. throughout the year. Therefore, it is anticipated that park nighttime-lighting will be used for a few hours during the evenings, especially in the winter months.

Lighting at the sports amenities will be located on poles up to 80 feet tall. All lighting would be directed downward and shielded to focus illumination on the sports fields only and prevent light spillage onto off-site properties. Because lighting used to illuminate the sports fields, will be focused downward, and turned off by 10:00 p.m., the potential for lighting to affect any residents adversely is minimal. Furthermore, the project would be designed and improved with all applicable policies and regulations, including those that require development within proximity to residential areas to provide buffers, along with appropriate setbacks, landscaping, and screening to minimize light and glare impacts.

Therefore, the project would not create a new source of substantial light or glare which would adversely affect day or nighttime views in the area.

Agriculture and Forestry Resources
Eva tion of E nvironmental
a) No impact. The 42.4-acre vacant project site has business park and industrial land use O"rig*tions and zoning, and is surrounded by residential uses to the north, industrial uses to the west and south, and oil production and cultivated farmland to the east.

Potentially
significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
No
ln determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (Lgg7) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. ln determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state's inventory of forest land, including the Forest and Range Assessment project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
a) convert Prime Farmland, Unique Farmland, or Farmland of Statewide lmportance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring Program of the california Resources Agency, to nonagricultural use? tr
b) conflict with existing zoning for agricultural use, or a williamson Act contract? n
c) conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(gD, timberland (as defined by Public Resources code section 45261, or timberland zoned Timberland Production (as defined by Government Code section 51104(e))? tr
d) Result in the loss of forestland or conversion of forest land to non-forest use? tr
e) lnvolve other changes in the existing environment which, due to their location or nature, could result in conversion of farmland to non-agricultural use or conversion of forest land to nonforest use? lmpact
I
D D
CEeA uses the California Department of Conservation Division of Land Resource Protection's Farmland Mapping project (FMMP) categories of "Prime Farmland," "Farmland of Statewide lmportance," and "Unique Farmland" to define "agricultural land" for the purposes of assessing environmental impacts (PRC Section 21060.1[a]). The project site is designated as "Grazing Land" and "Vacant or Disturbed Land" (DOC 2020)' The project site is not designated as Prime Farmland, Farmland of Statewide lmportance, Unique Farmland, or Farmland of Local lmportance. Additionally, the project and surrounding area is currently zoned for nonagricultural uses. Therefore, the project would not significantly convert Prime Farmland, Unique Farmland, or Farmland of Statewide I m portance (Farm land) to non-agricultural use.
b) No impact. The 42.4-acre vacant project site has business park and industrial land use and zoning designations, and is surrounded by residential uses to the north, industrial uses to the west and south, and oil production and cultivated farmland to the east. The proposed project includes a General Plan Amendment from lndustrial and Business Park to Parks & Schools, and a Zone Change from lndustrial and Business Park to Community Facilities' Neither the project site nor the parcels adjacent to its boundary are subject to williamson Act contracts. Therefore, the project would not conflict with existing zoning for agricultural use or a Williamson Act contract.
c) No impact. The Public Resources Code Section I222O (g) and Section 4526 defines "forest land" as land that can supportLO% native tree cover of any species, including hardwoods, under natural conditions, and that allows for management of one or more forest resources, including timber, aesthetics, fish and wildlife, biodiversity, water quality, recreation, and other public benefits. There are no forest lands identified on the project site or within its vicinity. Therefore, the project would not conflict with existing zoning for, or cause rezoning of forest land or timberland, or timberland zoned Timberland Production. d) No impact. Please see response to c. above. Therefore, the project would not result in the loss of forestland or conversion of forest land to non-forest. e) No impact. Please see responses to a. through d. above. Therefore, the project would not involve other changes in the existing environment, which, due to their location or nature, could result in conversion of farmland to non-agricultural use or conversion of forest land to non-forest use.

Air Quality
Evaluation of Environmental Effects
a) Less than sisnificant impact. State CEQA Guidelines and the Federal Clean Air Act (Sections L76 and 316) contain specific references on the need to evaluate consistencies between the proposed project and the applicable Air Quality Attainment Plan (AQAP)for the project site.

To accomplish this, the California Air Resources Board (CARB) has developed a three-step approach to determine project conformity with the applicable AQAP:
1,. Determination that an AQAP is being implemented in the area where the project is being proposed. The San Joaquin Valley Air Pollution Control District (SJVAPCD) has implemented the current, modified AQAP as approved by CARB.

2. The proposed project must be consistent with the growth assumptions of the applicable AQAP. The proposed project land use type was not anticipated in the current growth assumptions. Therefore, growth assumptions in the adopted 2005 City of Shafter General Plan Update will be modified with the approval of the proposed project.

3. The project must contain in its design all reasonably available and feasible air quality control measures. The proposed project incorporates various policy and rulerequired implementation measures that will reduce related emissions.

The California Clean Air Act (CCAA) and AQAP identify transportation control measures as methods to further reduce emissions from mobile sources. Strategies identified to reduce vehicular emissions such as reductions in vehicle trips, vehicle use, vehicle miles traveled, Potentially
Significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact lmpact
No
Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan?
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? c) Expose sensitive receptors to substantial pollutant
concentrations?
d) Result in other emissions (such as those leading to odors) adverse affecti a substantial amount of e?
!
T
I
T
tr
tr
vehicle idling, and traffic congestion, to reduce vehicular emissions, can be implemented as control measures under the CCAA as well. Additional measures may also be implemented through the building process such as providing electrical outlets on exterior walls of structures to encourage use of electrical landscape maintenance equipment or measures such as electrical outlets for electrical systems on diesel trucks to reduce or eliminate idling time.

As the growth represented by the proposed project will be updated in the adopted 2005 City of Shafter General Plan Update and incorporated into the AQAP, conclusions may be drawn from the following criteria:
o That, by definition, the proposed emissions from the project are below the SJVAPCD's established emissions impact thresholds and
That the primary source of emissions from the project will be motor vehicles that are licensed through the State of California and whose emissions are already incorporated into CARB's San Joaquin Valley Emissions lnventory.

Based on these factors, the project is consistent with the AQAP The Kern Council of Governments (Kern COG) Regional Conformity Analysis determination demonstrates that the regional transportation expenditure plans (Destination 2042 Regional Transportation Plan and Federal Transportation lmprovement Program) in the Kern County portion of the San Joaquin Valley air quality attainment areas would not hinder the efforts set out in CARB's SIP for each area's nonattainment pollutants [carbon monoxide (CO), ozone (O3), and particulate matter less than 10 microns (PM10)1. The analysis uses an adopted regional growth forecast, governed by both the adopted Kern COG Policy and procedure Manual and a Memorandum of Understanding between the County of Kern and Kern COG (representing itself and outlying municipal member agencies).

The Kern COG Regional Conformity Analysis considers General Plan Amendments (GPA) and Zone Changes that were enacted at the time of the analysis as projected growth within the area based on land use designations incorporated within the adopted 2005 City of Shafter General Plan. Land use designations that are altered based on subsequent GPAs that were not included in the Regional Conformity Analysis were not incorporated into the Kern COG analysis. Consequently, if a proposed project is not included in the regional growth forecast using the latest planning assumptions, it may not be said to conform to the regional growth forecast. Under the current City of Shafter Zoning, the project site is designated as "lndustrial" and "Business Park."
Item 2 under Section 3 - Model Maintenance Procedure, of the Kern COG Regional Transportation Modeling Policy and Procedure Manual states "Land Use Data - General plan land capacity data" or "Build-out capacity" is used to distribute the forecasted County a
totals, and may be updated as new information becomes available, and is revised in regular consultation with local planning departments'"
Under current policies, only after a GPA is approved, can housing and employment assumptions be updated to reflect the capacity changes. Since the proposed development does require a GPA and Zone Change, the existing growth forecast will be modified to reflect these changes. To determine whether the forecasted growth for the project area is sufficient to account for the projected increases in employment, an analysis based on Kern COG regional forecast was conducted.

The adopted growth forecast for the project site is distributed to Traffic Analysis Zones (TAZ). To evaluate the impacts to the proposed project area, a one-mile radius analysis was conducted that included TAZs 48O, 485, 486, 487 , 488, 490,653, 655, 794,gLL, 1651', 1652' 1653, and 1657. This places the project site at the center of the analysis area and provides a conservative evaluation of the TAZ data. Kern COG has predicted an increase in growth in population (3%l,an increase in growth in housing (a%land an increase in employment (5%) between 2OL7 and 2020. Employment forecast for the TAZ analysis area appears to be sufficient to account for LOOo/o of the planned employment growth attributed to the proposed project. To be considered "consistent" and, therefore, in conformance with the AeAp, these increases would need to occur over the same time as the adopted growth forecast. From 2OL7 through 2020, L27 new jobs are forecast to be added to the analysis area.

The following table provides the projected growth rates for the TAZ analysis area. lnsight 2019.

The following table provides the percent increase/decrease for the analysis area population, households, and emPloyment.
lnsight 2019.

As the estimated construction and operational emissions from the project would be less than significant, no specific mitigation measures would be required. However, to ensure TAZ Area Growth
Metric 20L7 2020 2030
78 7 77 lation
Households 977
2,5r4 3,084 Em ent
TAZ Ana Area Growth Ana
% lncrease/Decrease
ulation Households
Years
0 0 0 2017*
3 4 5
2020
T2 t4 23 2030
that the project follows all applicable SJVAPCD rules and regulations, and emissions are further reduced, the applicant should implement and comply with several measures that are either recommended as a "good operating practice" for environmental stewardship or they are required by regulation. Some of the listed measures are regulatory requirements or construction requirements that would result in further emission reductions through their inclusion in project construction and long-term design. The following measures either have been applied to the project through the CalEEMod model and would be incorporated into the project by design or would be implemented in conjunction with SJVAPCD rules as conditions of approval.

As the project would be completed in compliance with SJVAPCD Regulation Vlll, dust control measures would be taken to ensure compliance specifically during grading and construction phases. Therefore, the project would not conflict with or obstruct implementation of the applicable air quality plan.
b) Less than sisnificant impact. Under SJVAPCD's Guidance for Assessing and Mitigating Air euality lmpacts (GAMAQI), any project that would have individually significant air quality impacts would also be considered to have significant cumulative air quality impacts.

The most recent, certified San Joaquin Valley Air Basin (SJVAB) Emission lnventory data available from the SJVAPCD is based on data gathered for the 2015 annual inventory. This data will be used to assist the SJVAPCD in demonstrating attainment of federal L-hour 03 standards (SJVAPCD 2015). The following table provides a comparative look at the impacts proposed by the proposed project to the SJVAB Emissions lnventory. lnsight 2019.

The following three tables provide CARB Emissions lnventory projections for the year 2020 for both the SJVAB and the Kern County portion of the air basin. Looking at the SJVAB Emissions predicted by the CARB year 2020 emissions inventory, the Kern County portion of the air basin is a moderate source of the emissions. The proposed project produces a small portion of the total emissions in both Kern County and the entire SJVAB. rative Based on SJV Air Basin 2015 lnvento - Tons Year
ROG NOX co sox PMlO PM2.5
22,484 20,842 33,872 511 13,688 3,833 Kern County -2OI5 Ltz,93L 96,10s 199,509 2,738 95,667 2t,681 SJVAB - 2015

0.2939 0.8s89 0.4679 0.00245 o.L027 0.0289 P ed

0.001% 0.o04% 0.001% 0.000% o.oor% 0.007o/o Proposed project's % of Kern SJVAB 2O2O n Year Emission - Tons
ROG NOX co sox PMlO PM2.5
108,113 74,205 162,425 2,847 96,652 21,535 Total Emissions Percent Stationary Sources 30.820/o 74.07% 6.22% 83.33% 5.63% 14.75% Percent Areawide Sources s7.59% 3.89% 1r36% 3.8s% 89.43o/o 70.85% Percent Mobile Sources 17.56% 82.05% 81.82o/o 72.82% 4s5% t4.4r% 33,32s L0,439 10,111 2,373 5,439 3,r76 Total Stationary Source Emissions Emission lnventory SJVAB 2020 Proiection - Tons per Year ROG NOX co sox PMlO PM2.5
Total Areawide Source Emissions 55,772 2,884 79,418 110 86,432 15,257 Total Mobile Source Emissions 18,980 60,882 132,897 365 4,782 3,103 Emission SJVAB - Kern Cou Portion 2020 - Tons Year
ROG NOX co sox PMlO PM2.5
Total Emissions 21,535 15,878 27,339 511 13,6s1 3,723
Percent Stationary Sou rces 52.O3% 1839% 14.82% 78.57% 7r.76% 3235% Percent Areawide Sources 33.73o/o 2.76% 6.94% o.oo% 82.620/o s5.88% Percent Mobile Sources t4.24% 78.62% 78.24o/o t4.29o/o 5.88% tr.76% 1r,206 2,920 4,052 402 1,606 1,20s Total Stationary Source Emissions 7,264 438 1898 0 77,279 2,08L Total Areawide Source Emissions 3,066 12,483 27,389 73 803 438 Total Mobile Source Emissions lnsight 2019.
lnsight 2019.
lnsight 2019.

As shown above, the project would pose an inconsequential impact on regional 03 and pMlO formation. Because the regional contribution to these cumulative impacts would be negligible, the project would not be considered cumulatively considerable in its contribution to regional 03 and PM10 imPacts.

A review of the City of Shafter tentative projects indicates that there are 32 other planned developments found within a 6-mile radius of the project. The listings provided below in following tables is only a geographical reference to demonstrate the construction activity in the project vicinity. The number or size of these projects is of no particular significance since no "cumulative" emissions thresholds have been established by the SJVAPCD or the City. 2020 Emissions Proiections - Proposed proiect, Kern Counw, and SJVAB ROG NOX PMlO
Proposed proiect 0.2939 0.8589 0.L027
Kern County 21,53s 15,878 13,651
SJVAB 108,113 74,2Q5 96,652
Proposed proiect Percent of Kern County 0.00r% 0.005% 0.00r% Proposed project Percent ofSJVAB o.ooo% 0.007% 0.000o/o Kern County Percent of SJVAB L9.92% 21.40% 14.t2%
Cumulative Construction
Pollutant (tons/year)l
ROG NOX co sox PMlO PM2.5
Six-Mile Radius Proiects

77.36 65.69 69.80 0,34 45.46 9.87 Tota I Cumulative Six-Mile Projects

2.\7 15.09 13.95 0.05 2.85 t.t4 This Proiect

79.53 80.79 83.76 0.38 48.31 11.01 Total Cumulative Projects lThese emissions are overestimated and include a ll years of construction, not just a single year, as they are discretionary projects that are subject to various mitigation measures that have not yet been determined nor their impacts reduced herein
lnsight 2019,
Cumulative onal
Pollutant
ROG NOX co sox PMlO PM2.5
Six-Mile Radius Proiects

78.78 267.48 420.21 1.81 95.77 s0.06 Total Cumulative Six-Mile P o.29 0.86 o.46 0.002 0.10 0.03 This P

79.08 262.34 420.67 1.81 95.88 s0.08 Total Cumulative
1 These emissions are overestimated and include all years of construction, not discretionary projects that are subject to various mitigation measures that have not yet been determined nor just a single year, as they are
their im reduced herein.
lnsight 2019,
No mitigation measures were applied to any of the projects as it is not known which, if any, would be required or which may be voluntarily proposed by each developer or required by code or regulation. Additionally, no cumulative significance thresholds are shown since no cumulative thresholds have been established by the SJVAPCD, CARB, or other regulatory authority. These projects represent all known and reasonably foreseeable projects in the area. As these projects either are currently under construction or, at a minimum, approved by the City of Shafter Planning Department for consistency with applicable regulation, for the purposes of this analysis, it is assumed that they are in conformance with the regional AeAp. Because the proposed project would generate less than significant project related operational impacts to criteria air pollutants, the project's contribution to cumulative air quality impacts would not be cumulatively significant.

The GAMAQI also states that when evaluating potential impacts related to Hazardous Air pollutants (HAPs), "impacts of local pollutants (CO, HAPs) are cumulatively significant when modeling shows that the combined emissions from the project and other existing and planned projects will exceed air quality standards." Because the project would not be a significant source of HAPs, the project would also not be expected to pose a significant cumulative CO or HAPs imPact.

The SJVApCD,s GAMAeI has identified CO impacts from impacted traffic intersections and roadway segments as being potentially cumulatively considerable. Traffic increases and added congestion caused by a project can combine to cause a violation of the SJVAPCD's CO standard also known as a "Hotspot." There are two criteria established by the GAMAQI by which CO "Hotspot" modeling is required:

A traffic study for the project indicates that the Level of Service (LOS) on one or more streets or at one or more intersections in the project vicinity will be reduced to LOS E or F; or
a
a A traffic study indicates that the project will substantially worsen an already existing LOS F on one or more streets or at one or more intersections in the project vicinity.

According to the project proponent, at the time of this analysis no traffic generation assessment impact study was prepared for this project. However, due to the location and traffic increase anticipated from this project, impacted intersections and roadway segments are anticipated to operate at a LOS of C or better. Therefore, CO "Hotspot" modeling was not conducted for this project and no concentrated excessive CO emissions are expected to be caused once the proposed project is completed'
Therefore, the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard.
c) Less than significant impact. Sensitive receptors are defined as locations where young children, chronically ill individuals, the elderly, or people who are more sensitive than the general population reside, such as schools, hospitals, nursing homes, and daycare centers.

The nearest residential sensitive receptor to the proposed project site is 0.03 miles north of the project. The nine known nonresidential sensitive receptors within 2 miles of the project site are listed below in the following table.

Sensitive Receptors Located < 2 Miles from proiect
Receptor Type of Facility Distance from project in
Miles
Direction from project
Shafter Community
Health Center
Medical Center 0.38 SW
Shafter Hieh School Hieh School 0.84 NW
Shafter Kiddie Kollege PK-6 Public 0.95 NW
Carrinston of Shafter Nursing Home 1.09 NW
Golden Living Center -
Shafter
Nursing Home 7.20 NW
Redwood
School
Elementary PK-6 Public 1.22 NW
Sequoia
School
Elementary PK-6 Public 1.25 NW
Golden Oak Elementary
School
PK-6 Public r.28 W
Community
Partnership
Action Daycare 1.61 SW
Grimmway Academy K-8 Public Charter r.64 SW
lnsight 2019.

Visibility impact analyses are intended for stationary sources of emissions which are subject to the Prevention of Significant Deterioration (PSD) requirements in 40 CFR Part 60; they are not usually conducted for area sources. Because the project's PML0 emissions increase is predicted to be less than the PSD threshold levels, an impact at any Class l area or military/airspace operation within 100 kilometers of the project (including San Rafael Wilderness, Domeland Wilderness, and Sequoia National Park) is extremely unlikely' Therefore, based on the project's predicted less-than-significant PM10 emissions, the project would be expected to have a less-than-significant impact to visibility at any Class 1 area or military/airspace operation.

Ambient CO concentrations normally correspond closely to the spatial and temporal distributions of vehicular traffic. Relatively high concentrations of CO would be expected along heavily traveled roads and near busy intersections. CO concentrations are also influenced by wind speed and atmospheric mixing. CO concentrations may be more uniformly distributed when inversion conditions are prevalent in the valley. Under certain meteorological conditions, CO concentrations along a congested roadway or intersection may reach unhealthful levels for sensitive receptors, e.g. children, the elderly, hospital patients, etc. This localized impact can result in elevated levels of CO, or "hotspots" even though concentrations at the closest air quality monitoring station may be below National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (cAAQS).

The localized project impacts depend on whether ambient CO levels in the project vicinity would be above or below NAAQS. lf ambient levels are below the standards, a project is considered to have significant impacts if a project's emissions would exceed of one or more of these standards. lf ambient levels already exceed a State standard, a project's emissions are considered significant if they would increase one-hour CO concentrations by 10 ppm or more or eight-hour CO concentrations by 0.45 ppm or more. There are two criteria established by the SJVAPCD's GAMAQI by which CO "Hotspot" modeling is required:

L. A traffic study for the project indicates that the Level of Service (LOS) on one or more streets or at one or more intersections in the project vicinity would be reduced to LOS E or F; or
Z. A traffic study indicates that the project would substantially worsen an already existing LOS F on one or more streets or at one or more intersections in the project vicinity.

According to the project proponent, at the time of the Air Quality analysis was prepared no traffic generation assessment impact study was prepared for this project' However, due to the location and traffic increase anticipated from this project, impacted intersections and roadway segments are anticipated to operate at a LOS of C or better. Therefore, CO "Hotspot" modeling was not conducted for this project and no concentrated excessive CO emissions are expected to be caused once the proposed project is completed.

GAMAeI recommends that Lead Agencies consider situations wherein a new or modified source of HAPs is proposed for a location near an existing residential area or other sensitive receptor when evaluating potential impacts related to HAPs.

The proposed project would not result in a significant increase in operational emissions of Hazardous Air Pollutants (HAPs) because there will be little to no increase in heavy duty truck travel associated with the project; therefore, an assessment of the potential risk to the population attributable to emissions of hazardous air pollutants from the proposed project is not required.
potential risk to the population attributable to emissions of HAPs from the proposed project would be less than significant and therefore, the project would not expose sensitive receptors to substantial pollutant concentrations'
d) Less than sienificant impact. The SJVAPCD's GAMAQI states "An analysis of potential odor impacts should be conducted for both of the following two situations:

L. Generators - projects that would potentially generate odorous emissions proposed to locate near existing sensitive receptors or other land uses where people may congregate and

2. Receivers - residential or other sensitive receptor projects or other projects built for the intent of attracting people locating near existing odor sources.

The GAMAQI also states, "The District has identified some common types of facilities that have been known to produce odors in the San Joaquin Valley Air Basin. These are presented in Table 6 (Screening Levels for Potential Odor Sources), along with a reasonable distance from the source within which, the degree of odors could possibly be significant. lTable 6] can be used as a screening tool to qualitatively assess a project's potential to adversely affect area receptors" (sJVAPCD 2015). The project is a city park and the anticipated activities for the project site are not listed in Table 6 of the GAMAQI as a source that would create objectionable odors. Therefore, the project would not create objectionable odors affecting a substantial number of people'
Biological Resources
Evaluation of Environmental Effects
a) Less than sisnificant with mitigation incorporated. The following analysis in this section are based on a Biological Analysis Report (QK 2019). Reviews of agency-maintained databases were conducted to determine the potential presence of sensitive biological resources and special-status species. The results indicated that seven special-status plant species and 2L special-status wildlife species have the potential to occur in the vicinity of the project. The reconnaissance-level field survey was conducted to identify sensitive biological resources on-site and to document the suitability of the habitat on the project to support specialstatus species.

No special-status plant species have potential to occur within the biological study area (BSA) because of existing habitat and soil conditions'
Potentially
Significant
lmpact
tr
Less Than
Significant
with
Mitigation
lncorporated
n
Less Than
significant
lmpact
No
Would the project;
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the california Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or US Fish and Wildlife Service?
c) Have a substantial adverse effect on federally protected wetlands as defined by section 404 of the clean water Act (including, but not limited to, marsh, vernal pool, coastal, etc') through direct removal, filling, hydrological interruption, or other means?
d) lnterfere substantially with the movement of any native resident or migratory fish or wildlife species or with an established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
e) conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
f) conflict with the provisions of an adopted Habitat conservation Plan, Natural Community Conservation Plan, or other approved local, regiona or state habitat conservation plan?
I
lmpact
n T
I
I
tr
tr
Most of the BSA is highly disturbed, but it does contain suitable burrowing and foraging habitat. No burrowing owl individuals, burrows, or other sign of the species were observed during the reconnaissance survey, but the species is present in the region year-round and individuals may travel from burrow to burrow periodically. lt is possible for a transient burrowing owl to inhabit the project site at any time. Direct and/or indirect impacts to burrowing owl could occur if there is an active burrow within the BSA during the period of construction activities. Construction activities could result in crushing or destroying a burrow with a burrowing owl inside. Noise and vibration from the project construction activities could alter the daily behaviors of individual owls and effect foraging activities or rearing of young.

There is no positive evidence that Swainson's hawk is present within the BSA. The project supports marginal foraging habitat with a meager prey base, although hawks may forage in alfalfa fields east of the project. Any loss of the low-quality foraging habitat present on the project would be an indirect impact to the species. There do not appear to be any suitable nesting trees within a half mile of the project so direct impacts to the species are unlikely.

Horned larks were observed on the project during the reconnaissance survey, although they could not be identified to subspecies. The project and portions of the survey buffer provide suitable nesting and foraging habitat for this ground-nesting species. Ground-disturbing project activities would destroy nesting habitat and could lead to the destruction of California horned lark nests. Construction-related vibration, noise, and dust production, and human presence could alter the normal behaviors of nesting California horned larks in the vicinity of the project and lead to nest failure. Loss of foraging habitat would be an indirect impact for the sPecies.

There is no positive evidence that the American badger is present within the BSA, but lowquality denning and foraging habitat exists. Because this species is highly mobile, this species may be present on the site as a transient forager. Direct impacts could include injury or death of individuals, or entrapment in trenches or pipes. Noise, vibration, and the presence of construction workers could alter normal behaviors if badgers are present, which could affect reproductive success. lncreased human presence at the community park following project completion could indirectly impact American badger by deterring them from denning or foraging in the vicinity of the project. Loss of foraging habitat would also indirectly impact the sPecies.

There is no positive evidence that the San Joaquin kit fox is present within the BSA, but suitable denning and foraging habitat exists within the BSA, and the species is known to inhabit the region and is highly adaptable to urban environments. Because this species is hiehly mobile, it may be present from time to time on the project site as a transient forager or part-time resident. Direct impacts resulting in injury, death, or entrapment in trenches or pipes could occur if a fox travels into the construction area. Noise, vibration, and the presence of construction workers may alter normal behaviors, which could affect reproductive success. Loss of foraging habitat could indirectly affect the species. After the project is completed, accumulated food-related trash may attract foxes to the park, which could lead to an increase in human interactions'
The BSA contains suitable habitat for a wide variety of nesting native bird species' The project itself would support only ground-nesting species such as horned lark' killdeer (charadrius vociferous),and northern harrier (circus hudsonius), and this habitat is relatively low quality. Ground-disturbing project activities could lead to the destruction of nests of ground-nesting birds. Construction-related vibration, noise, and dust production' and human presence could alter the normal behaviors of nesting birds in the vicinity of the project and lead to nest failure. The project would also result in the loss of marginal ground nesting and forage habitat. lncreased human presence at the completed community park could indirectly impact nesting native birds by deterring them from nesting or foraging in the vicinitY of the Project.

The limited disturbance footprint for this project and the short duration of activities at any given location, coupled with implementation of the mitigation measures listed below would reduce impacts of the project to special-status wildlife species to level that would be less than significant. Mitigation measures are recommended to avoid and minimize impacts to the western burrowing owl, swainson's hawk, california horned lark, San Joaquin kit fox, and nesting birds. With implementation of mitigation, the project would not have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans' policies, or regulations, or by CDFW or USFWS'
b) No impact. The database and literature review identified one sensitive plant communities within 10 miles of the project site, Valley saltbush scrub. The nearest cNDDB occurrence (EONDX 28906) is appioximately 3.7 miles southwest of the project. No sensitive plant community occurs within the BSA because all lands in the vicinity have been developed for urban and agricultural uses. The project does not overlap with any federally designated critical habitats. Critical habitatfor Buena Vista Lake Ornate Shrew (sorexornatus relictus)is located approximately 14 miles southwest of the project site. The project does not support any riparian or other sensitive natural communities, nor does it overlap with any designated critical habitat. Therefore, the project would have no impact on any riparian habitat or other sensitive natural community'
c) No impact. A formal delineation of waters of the U.s. and waters of the state was not conducted for this project and a delineation was not warranted. A search of the National Hydrography Dataset (NHD) and National Wetlands lnventory (NWl) databases showed that there are no jurisdictional waterways or wetlands within the BSA, and no temporary or permanent bodies of water or waterways occur within the BSA.

There are no wetlands or water features on or in the vicinity of the project' The project would have no impacts to jurisdictional aquatic resources and no mitigation measures are warranted. Therefore, the project would have no impact on federally protected wetlands' d) Less than sienificant impact. Wildlife movement corridors, also referred to as dispersal corridors or landscape linkages, are generally defined as linear features along which animals can travel from one habitat or resource area to another. Wildlife movement corridors can be large tracts of land that connect regionally important habitats that support wildlife in general, such as stop-over habitat that supports migrating birds or large contiguous natural habitats that support animals with very large home ranges [e.g., coyotes (Conis latrans), mule deer (Odocoileus hemionus colifornicus)]. They can also be small scale movement corridors, such as riparian zones, that provide connectivity and cover to support movement at a local scale.

The project is not located within any identified wildlife linkages or corridors identified by the California Essential Habitat Connectivity project. No potential wildlife corridors occur within the BSA.

The project is not located within a mapped wildlife movement corridor or linkage and none were observed during the survey. The project would not have any impacts to wildlife movement corridors. Therefore, the project would not interfere substantially with the movement of any native resident or migratory fish or wildlife species or with an established native resident or migratory wildlife corridors or impede the use of native wildlife nursery sites.
e) No impact. The project does not conflict with the adopted 2005 City of Shafter General Plan Update and is not subject to any local ordinances. Therefore, the project would not conflict with any local policies or ordinances protecting biological resources. f) No impact. The project is within the range of the PG&E San Joaquin Valley Operations and Maintenance Habitat Conservation Plan, but this Plan applies only to PG&E operations and maintenance projects and does not apply to this project. Therefore, the project would not conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan.

Cultural Resources
Evaluation of Environmental Effects
a) Less than significant with mitigation incorporated. An archival records search was conducted at the California State University, Bakersfield, Southern San Joaquin Valley Archaeological lnformation Center (AlC), by AIC staff members to determine: (1) if prehistoric or historical archaeological sites had previously been recorded within the study area; (2) if the project area had been systematically surveyed by archaeologists prior to the initiation of this field study; and/or (3) whether the region of the field project was known to contain archaeological sites and to thereby be archaeologically sensitive (ASM 2019). The results of this archival records search are summarized here.

According to the AIC records search, no previous studies have occurred in the study area and no cultural resources are known to exist within it. Four previous surveys, however, have been completed within 0.5 miles of the study area.

Potentially
significant
lmpact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
significant
lmpact
No
lmpact
Would the project:
a) cause a substantial adverse change in the significance of a historical resource as defined in 515064.5?
b) cause a substantial adverse change in the significance of an archaeological resource pursuant to 515064'5?
c) Disturb any human remains, including those interred outside of dedicated cemeteries?
T
I
T
D
tr
tr
tr
tr
tr
Su within 0.5 Miles of the Area
Report No. Year Author(s)/Affiliation Title
Negative Archaeological Survey Report for
Overlay & Widening of Route 43 from Route
58 to .3 Mile S. of Lerdo Highway PM 8.1-16'3
KE-07497 1996 TJ Schuster/ lndividual consultant
Cultural Resources Assessment Pacific Bell
Mobile Services Facility CV-007-01, Shafter,
Kern County, CA
KE-02343 1998 B Price/ Applied Earthworks
Cultural Resource Survey for the Level (3)
Communications Long Haul Fiber Optics
project: Segment WS04: Sacramento to
Bakersfield
WJ Nelson / Far Western
Anthropological Research GrouP,
lnc.

KE-02396 2000
Historical Resources Compliance Report:

Burlington Northern Santa Fe Railway Double
Track project (Segment 1) Jastro (MP 892.13)
to Shafter (MP 905.07) in and near the Cities
of Bakersfield and Shafter, Kern County,
California
KE-03025 2005 B Tang et al. / CRM Tech
ASM 2019.

As a result of these studies, one historical resource - a segment of the Atchison Topeka and Santa Fe Railway (P-L5-000560) - was recorded within 0.5 miles of the study area' According to a records search of the Native American Heritage Commission (NAHC) Sacred Lands Files, no tribal cultural resources are known within or in the vicinity of the proposed project. Outreach letters were sent to tribal organizations on the NAHC contact list' No information on tribal cultural resources or sacred places were received as responses. ln addition to the records search, historic maps were examined to determine whether historical development had occurred within the APE. These included Google Earth, historic aerial photography, and the earliest available Rio Bravo USGS topographical quadrangles dating back to L931. According to these maps, only an unnamed linear dirt road, which no longer exists, was known to bisect the project area. Multiple reservoirs and small structures appear near the study area by 1931 and 1954; however, these no longer exist. No structures or development within the project are shown on any of these information sources.

An intensive Phase I survey of the 42.4-acres project study area was conducted. The field methods employed included intensive pedestrian examination of the ground surface for evidence of archaeological sites in the form of artifacts, surface features (such as bedrock mortars, historical mining equipment), and archaeological indicators (e'g., organically enriched midden soil, burnt animal bone, refuse dumps); the identification and location of any discovered sites, should they be presen| tabulation and recording of surface diagnostic artifacts; site sketch mapping using a Trimble GEOEXPLORER 6000 Series GPS with submeter accuracy; preliminary evaluation of site integrity; and site recording, following the California Office of Historic Preservation lnstructions for Recording Historic Resources and the BLM 8100 Manual, using DPR 523 forms.

The survey was conducted by walking parallel transects across the 42.4-acres project area, spaced at 15-meter intervals. Visibility was excellent throughout the entire project' The project site consisted of undeveloped former agricultural land bordered by paved roads and private property. One dirt road, East Ash Avenue, bisects the project area along its approximate center. A low-density cover of grass was present in some portions; however, visibility was excellent throughout the entire project and adequate for Phase I survey coverage. No cultural resources of any kind were identified within the Shafter community or project area.

However, there is still the potential to unearth previously unknown historical resources at the site and grading and other ground-disturbing activities have the potential to damage or destroy such resources. Mitigation requires prehistoric or historic-era cultural materials are encountered during construction activities, all work in the immediate vicinity of the find shall halt until a qualified archaeologist can evaluate the find and make recommendations. lf the qualified archaeologist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required, and these additional studies may include avoidance, testing, and evaluation or data recovery excavation. With mitigation, the project would not cause a substantial adverse change in the significance of a historical resource.
b) Less than significant with mitigation incorporated. Please refer to response a. above. On September ZL,2O2L pursuant to Public Resources Code Section 21080.3.1 and Government Code Section 65300 et seq, letters were sent to each of the 25 Native American tribes within the geographic area as identified by the NAHC. The letters included a project description and location maps. Outreach letters were sent to tribal organizations on the NAHC contact list. No information on tribal cultural resources or sacred places were received as responses. Additionally, the project would only require minimal ground disturbance related to the construction of walls and fences on already graded ground.

However, there is still the potential to unearth previously unknown archeological resources at the site and grading and other ground-disturbing activities have the potential to damage or destroy such resources. Mitigation requires prehistoric or historic-era cultural materials are encountered during construction activities, all work in the immediate vicinity of the find shall halt until a qualified archaeologist can evaluate the find and make recommendations' lf the qualified archaeologist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required, and these additional studies may include avoidance, testing, and evaluation or data recovery excavation' c) Less than significant with mitigation incorporated. The Phase I Survey of Cultural Resources confirmed that no cultural resources of any kind were identified within the project area.

There are no known cemeteries or burials on or near the project. Although unlikely, subsurface construction activities, such as trenching and grading, associated with the proposed project could potentially disturb previously undiscovered human burial sites.

Accordingly, this is a potentially significant impact. Although considered unlikely, subsurface construction activities could cause a potentially significant impact to previously undiscovered human burial sites. The cultural resources and Sacred Lands File records searches did not indicate the presence of human remains, burials, or cemeteries within or in the vicinity of the Project site.

No human remains have been discovered at the project site, and no burials or cemeteries are known to occur within the area of the site. However, construction would involve earthdisturbing activities, and it is still possible that human remains may be discovered, possibly in association with archaeological sites. lmplementation of mitigation that included immediately ceasing work and contacting the County coroner and Native American tribal representatives, if needed, would ensure that the proposed project would not directly or indirectly destroy previously unknown human remains. With mitigation, the project would not disturb any human remains, including those interred outside of dedicated cemeteries.

Energy
Evaluation of Environmental Effects
a) Less than significant impact. Energy usage for construction and operations were developed using the California Emissions Estimator Model (CalEEMod) output files. Project energy consumption levels were estimated for both construction and operations scenarios. These estimates include: (L) fuel use for construction off-road equipment and construction onroad vehicles; (2) fuel use from vehicle trips generated by the project operations; (3) operational natural gas estimates; and (4) operational electricity estimates. Typically, there would be a significant energy impact if the increase in demand for electricity or gas would impact the current capacities of the electric and natural gas utilities. The following table gives estimate of square footage of the park and associated parking lot' lnsight 2019.

Estimates of average daily traffic (ADT) volumes generated by the park are presented in the tables below. Estimates of additional heavy trucks and employees attributable to the expansion were provided by the applicant. Both the heavy truck and employee ADT estimates account for incoming and outgoing trips'
The estimates supplied were the anticipated trucks per month and year for each category' lt was assumed from the information that the trips would be evenly spread through the month and therefore, would be a maximum of one additional truck per day for each category. This would equate to two trips (inbound and outbound) for each category of delivery.

Potentially
significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
No
lmpact
Would the project:
a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
b) conflict with or obstruct a state or local plan for renewable tr
energy or ene efficie
Land Use
Phase 2 ft Total ft Land Uses Phase 1 ft
200 Lot
496 Park
Total
Truck ADT
Additional Trucks ADT
Monthly
Load Type
Truck ADT
Additional Trucks ADT
Monthly Yearly
Load Type
t7 2 3500-eallon water trucks
207 2 Off-highway trucks
15 2 Concrete trucks
Total 6
lnsight 2019,
Based on the ADT estimates above, the following tables present the anticipated fuel usage during Phase 1 and 2 construction'
lnsight 2019
lnsight 2019.

The total fuel usage for the construction of the Phase 1 project L57,640 gallons, and the Phase 2 project LOs,LzO gallons, which is a total fuel usage of 262,760 gallons.

New buildings and infrastructure constructed under the proposed ordinance would be required to meet the California Code of Regulations Title 20, Energy Building Regulations and Title 24, Energy Conservation Standards, for energy efficiency that are in effect at the time of construction. This would continue to improve energy efficiencies' Furthermore, the California Green Building Standards Code (CALGreen), sets a minimum and mandatory Construction Fuel Estimates
Off-road Daily ADT2 Total Fuel Usage
Hoursr
Construction # of Days
Phase 1
160 t2 7 Site 20
45 360 14 t G
440 3,520 74 730,2409 Building
Construction
Total Fuel L57
1 Off road equipment are conservatively estimated to use 2 ga duty diesel trucks are conservatively estimated to use 8 gallons per mile (rounded). 2 Heavy duty trucks are conservatively estimated to use 20 gallons per day, and employee vehicles use 2 llons per hour operating in place and medium
lons d
Construction Fuel Usaee Estimates (Phase 2)
Construction
Phase 2
f of Days Off-road
Equipment Hoursr
Daily ADT2 Total Fuel Usage
Site Preparation 10 80 t2 2,560e
Grading 30 240 14 8,8809
Building
Construction
300 2,4O0 14 2,40ox2g=4,gggga
14x300dx20g=84,000 =
88,880g
Total Fuel 105,120 sallons
1 Off road equipment are conservatively estimated to use 2 gallons per hour operating in place and medium duty diesel trucks are conservatively estimated to use 8 gallons per mile (rounded). 2 Heavy duty trucks are conservatively estimated to use 20 gallons per day, and employee vehicles use 2 sallons per day
energy efficiency and materials requirements, to reduce environmental impact through better planning, design, and construction practices which are enforced at the City level.

Based on the project gas and electricity consumption estimates summarized above in tables above, the table below summarizes relative project energy impacts compared to Kern County 2019 usage. The proposed project would generate substantially less than L% of the County's usage.
lnsight 2019.

The project's relative consumption would be minimal, and less than L/1000th of 1% of the County,s usage, which is considered insignificant. The project would not require any increase in annualconsumption rates of fuel, electricity, and gas. Therefore, naturalgas and electricity providers would not need to extend distribution networks and support facilities to serve the proposed project. Therefore, the project would not result in impacts due to wasteful, inefficient, or unnecessary consumption of energy resources' b) Less than sienificant impact. The project must comply with Title 24, chapter 4 of the California Creen guilding Standards Code for residential development and Part 6, of the california Energy code (cEC) the california code of Regulations (ccR), Title 20 with adoptions of the California Energy Commission'
The proposed project would result in the construction of a two-phase recreation and sports park on a vacant 42.4-acre site. Energy saving strategies will be implemented where feasible to reduce the project's energy consumption during the construction and post-construction phases. Strategies being implemented include those recommended by CARB that may reduce both the project's construction energy consumption, including diesel anti-idling measures, light-duty vehicle technology, usage of alternative fuels such as biodiesel blends and ethanol, and heavy-duty vehicle design measures to reduce energy consumption.

Additionally, as outlined in the SJVAPCD's GAMAQI, the project includes recommendations to reduce energy consumption by shutting down equipment when not in use for extended periods, limiting the usage of construction equipment to eight cumulative hours per day, usage of electric equipment for construction whenever possible in lieu of diesel or gasoline powered equipment, and encouragement of employees to carpool to retail establishments or to remain on-site during lunch breaks'
The project will also incorporate energy saving design features as outlined in the 201-9 California Green Building Standards Code to offset energy consumption and costs' ln Summa of Consum
Operational
Electricity
(
Operational Natural
Gas (kBTU/year)
(unmitigated
Project Total
Total 0
34,200,000 15,942,000,000 Cou Total

0.00 0.0006 Project % of CountY Total
addition, the project will comply with all applicable General Plan policies and Municipal Code requirements specific to energy and water efficiency standards. Therefore, the project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency.
a
Geology and Soils
Evaluation of Environmental Effects
a) The following discusses the potential for the project to expose people or structures to substantial adverse effects because of various geologic hazards. Potential seismic hazards in the planning area involve strong ground shaking, fault rupture, liquefaction, and landslides' i. No impact. The
because of the a
city of shafter is subject to moderate to severe ground shaking lluvial soils that underlie the area and its proximity to active faults' Additionally, the thick sedimentary deposits in the City create the likelihood that a strong earthquake or other disturbance in the area could cause ground subsidence (typicilly a gradual settling or sinking of the ground surface with little or no horizontal movement). The General Plan policy 7.1.1' requires that all new developments comply with the most recent Uniform Building Code's seismic design sta nd a rd s.

Potentially
significant
lmpact
Less Than
Signiticant
with
Mitigation
lncorporated
Less Than
significant
lmpact lmpact
No
Would the project:
a) Directly or indirectly cause potential substantial effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the mostrecentAlquist-PrioloEarthquakeFaultZoningMap
issued by the state Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines & Geology Special Publication No' 42'
ii. Strong seismic ground shaking?
iii. seismic-related ground failure, including liquefaction? iv. Landslides?
b) Result in substantial soil erosion or the loss of topsoil? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18-1-8 of the Uniform Building code (1994), creating substantial risks to life or property?
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
f) Directly or indirectly destroy a unique paleontological resource or site or uni feature?
tr
tr
tr
tr
!
tr
!
D
tr
tr
tr
T
I
tr
I
I
!
tr
I
n
tr
tr n I tr
tr
T
tr
n
I
tr
The project site is not located within an Alquist-Priolo Earthquake Fault Zone. Per the Department of Conservation, California Geologic Survey Regulatory Maps (DOC 2O2O), the nearest fault line is the North of Oildale premier fault, which lies approximately 1L miles east of the project site. The greatest potential for substantial geologic adverse effects in the City is posed by the San Andres Fault, which is located approximately 4 miles west of the Kings County boundary line within Monterey County. The distance from the nearest active faults precludes the possibility of fault rupture on the project site. Although the project area could potentially experience ground shaking, the magnitude of the hazard would not be severe as indicated by the General plan and project construction will comply with the applicable local and State requirements. Therefore, the project would not directly or indirectly cause potential substantial effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault'
ll Less than sisn ificant imoact. See response to a. above. The City is surrounded on three sides by active fault systems, several of which are less than l-0 miles from the City boundaries. ln addition, there are faults outside the San Joaquin Valley, but close enough that a major earthquake could affect Shafter. The General Plan policy

7.1.1. requires that all new developments comply with the most recent Uniform Building Code's seismic design standards.

The project site lies within the vicinity of five earthquake fault lines - North of Oildale, Oildale, Pond, Oil Center, and Rio Bravo Ranch. Given the high seismicity of the southern San Joaquin Valley region, moderate to severe ground shaking associated with earthquakes on the nearby faults can be expected within the project area and throughout Kern County. ln the event of an earthquake on one of the nearby faults, it is likely that the project would experience ground shaking.

While such seismic shaking would be less severe from an earthquake that originates at a greater distance from the project site, the side effects could potentially be damaging to the recreation park's structures and supporting infrastructure' The project is required to design structures and infrastructure to withstand substantial ground shaking in accordance with all applicable State law and applicable codes included in the California Building Code (CBC) Title 24 for earthquake construction standards and building standards code including those relating to soil characteristics.

The project shall adhere to all applicable local and State regulations to reduce any potentially significant impacts to structures resulting from strong seismic ground shaking at the project site. Therefore, the project would not directly or indirectly cause potential substantial effects, including the risk of ,loss, injury, or death involving strong seismic ground shaking.
iii. Less than significant impact. Liquefaction is defined as a phenomenon where earthquake-induced ground vibrations increase the pore pressure in saturated, granular soils until it is equal to the confining, overburden pressure. When this occurs, the soil can completely lose its shear strength and enter a liquefied state' The possibility of liquefaction is dependent upon grain size, relative density, confining pressure, saturation of the soils, and intensity and duration of ground shaking. For liquefaction to occur, three criteria must be met: "low density," coarsegrained (sandy) soils, a groundwater depth of less than about 50 feet, and a potential for seismic shaking from nearby large magnitude earthquake.

The project subsurface area soils generally consist of Lewkalb and Wasco sandy loam, with permeability and low permeability layers continuous beneath the site.

The depth-to-groundwater at the site is greater than 250 feet below ground surface (bgs), and the site is in an area of minimal rainfall (AEC 20L8). Because the depth of the groundwater at the project site is much greater than 50 feet, there is a negligible risk of liquefaction occurring at the project site during a seismic event.

Structures constructed as part of the project would be required by State law to be constructed in accordance with all applicable IBC CBC, Title 24 construction standards. Therefore, the project would not expose people or structures to potential substantial adverse effects involving seismic-related ground failure, including liquefaction.
iv. No impact. The project site is located on the floor of the San Joaquin Valley, west of the Sierra Nevada foothills. The topography is flat, with an elevation of approximately 355 feet above mean sea level, and no significant topological features. As such, there is no potential for rock fall and landslides to impact the project in the event of a major earthquake, as the area has no significant elevation changes. Based on the predicted maximum horizontal accelerations at the project site and the soil types, minor subsurface settlement may occur onsite during a major earthquake, and this is considered less than significant. The property is flat and there is a low potential for landslides. Therefore, the project would not expose people or structures to potential substantial adverse effects involving landslides. b) Less than significant impact. The Shafter area generally contains sandy loams. Due to the characteristics of the on-site soil types and the relatively flat terrain, implementation of the project would not result in significant erosion, displacement of soils or soil expansion problems. The project would be subject to City ordinances and standards relative to soils and geology. Standard compliance requirements include detailed site-specific soil analysis prior to issuance of building permits and adherence to applicable building codes in accordance with the Uniform Building Code'
Construction of the site would temporarily disturb soils, which could loosen soil, and the removal of vegetation could contribute to future soil loss and erosion by wind and storm water runoff. The project would have to request coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction Activities (No. 2012-0006-DWQ) (General Permit) because the project would result in one or more acres of ground disturbance. To conform to the iequirements of the General Permit, a Storm Water Pollution Prevention Plan (SWPPP) would need to be prepared that specifies best management practices (BMPs) to prevent construction pollutants, including eroded soils (such as topsoil), from moving offsite' lmplementation of the General Permit and BMPs requirements would mitigate erosion of soil during construction activities.

During operation, the soils would be sufficiently compacted to required engineered specifications, revegetated in compliance with City requirements, or paved over with impervious surfaces such that the soils at the site would not be particularly susceptible to soil erosion. Therefore, the project would not result in substantial soil erosion or the loss of topsoil.
c) Less than significant impact. See Geology and Soils responses above. As indicated in previous responses, the site is flat and does not have slopes. Additionally, the site is not located near any areas with sufficient slope that could result in off-site landslides.

Moreover, the project will be designed by an engineer as to resist potential side-effects of spreading, subsidence, liquefaction, or collapse. Therefore, the project would not be located on a geologic unit or soil that is unstable, or that would become unstable because of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liq uefaction, or collaPse'
d) Less than sienificant impact. see Geology and soils responses above. Expansive clay soils are -ublect to shrinking and swelling due to changes in moisture content over the seasons.

These changes can cause damage or failure of foundations, utilities, and pavements. During periods of high moisture content, expansive soils under foundations can heave and result in structures lifting. ln dry periods, the same soils can collapse and result in settlement of structures. According to Physical and Chemical Properties of the Soils in the USDA Kern County Soil Survey, the upper five feet of the onsite soil (sandy loam) is considered to have low shrink-swell or expansion potential. ln addition, the site is not located in an area of expansive soils. Compliance with applicable City of Shafter General Plan policies, Municipal Code, and the California Building Code, would reduce potential site-specific impacts to lessthan-significant levels. Therefore, the project would not be located on expansive soil creating substantial risks to life or property.
e) No impact. See Utility and Service Systems responses below. The project would not use r"pti. systems but would connect to the existing City sewer system located along East Ash Avenue. There the project would not result in soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater.
f) Less than sisnificant with mitisation incorporated. A paleontological study prepared for the p.j".t notes that geological reports covering the project area indicate that the project is underlain by late Holocene-age alluvial fan deposits and middle to late Pleistocene-age older alluvial fan deposits (SDMNH 2OL9). These deposits generally consist of unconsolidated silt, sand, gravel, cobbles, and boulders eroded from the surrounding highlands and deposited by the action of streams or rivers. There are no known recorded fossil collection localities from these deposits in the vicinity of the project site. ln general, late Holocene-age alluvial deposits are considered unlikely to contain preserved remains of organisms that are not conspecific with modern species living in the southern San Joaquin Valley region. As a result, any such remains encountered in these geologically very young deposits generally would not be considered scientifically significant (SDMNH 2OL9l.

The General Plan confirms that the City of Shafter has received sediments from the Coast Ranges to the west, the Sierra Nevada to the east, and to a lesser degree from activity on the San Andreas Fault system. These sediments contain different species of fossils, reflecting the different periods of deposition. General Plan policy 6.6.3. includes a standard condition of approval for new development projects. The policy requires that if cultural or paleontological resources are encountered during grading, alteration of earth materials in ihe vicinity of the find be halted until a qualified expert has evaluated the find and recorded identified cultural resources. With implementation of mitigation, the project would not directly or indirectly destroy a unique paleontological resource or site or unique geologic feature.

Greenhouse Gas Emissions
Evaluation of Environmental Effects
a) Less than significant impact. On December !7,2009, SJVAPCD adopted Guidance for Valley Land-use Agencies in Addressing GHG Emission lmpacts for New Projects under CEQA, which outlined the SJVApCD's methodology for assessing a project's significance for GHGs under CEqA. The following criteria was outlined in the document to determine whether a project could have a significant impact:
r projects determined to be exempt from the requirements of CEQA would be determined to have a less-than-significant individual and cumulative impact for GHG emissions and would not require further environmental review, including analysis of project specific GHG emissions. Projects exempt under CEQA would be evaluated consistent with established rules and regulations governing project approval and would not be required to implement Best Performance standards (BPs). o projects complying with an approved GHG emission reduction plan or GHG mitigation program which avoids or substantially reduces GHG emissions within the geographic area in which the project is located would be determined to have a less-than-significant individual and cumulative impact for GHG emissions. Such plans or programs must be specified in law or approved by the Lead Agency with jurisdiction over the affected resource and supported by a CEQA compliant environmental review document adopted by the Lead Agency. Projects complying with an approved GHG emission reduction plan or GHG mitigation program would not be required to implement BPS' o projects implementing BPS would not require quantification of project specific GHG emissions. consistent with CEQA Guidelines, such projects would be determined to have a less-than-significant individual and cumulative impact for GHG emissions. projects not implementing BPS would require quantification of project specific GHG emissions and demonstration that project specific GHG emissions would be reduced or Potentially
significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
No
lmpact
Would the project:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the
environment?
b) conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of !
enhouse ?
a
mitigated by at least 29o/o, compared to Business-as-Usual (BAU), including GHG emission reductions achieved since the 2002-2004 baseline period. Projects achieving at least a 29o/oGHG emission reduction compared to BAU would be determined to have a less-than-significant individual and cumulative impact for GHG. projects implementing BPS or achieving at least a 29% GHG emission reduction compared to BAU would be determined to have a less-than-significant individual and cumulative impact for GHG.

The project's construction and operational GHG emissions were estimated using the CalEEMod program (version 2016.3.2). For the project to conform with the goals of AB 32, at least a 29% reduction of GHG emissions from BAU must be achieved by 2020' lncluding improved walkability design, improved destination accessibility, improved pedestrian network, and 3% electric lawnmower, leaf blower, and chainsaw, as well as reducing the operational vehicle trip length for park visitors and workers from a 6'6 mile and 14.7 mile radius (respectively) to an assumption of a 4-mile radius that encompasses all of the urban and rural portions of Shafter as mitigation in the model, the mitigated emissions were calculated using updated emission factors from CalEEMod. The unmitigated and mitigated GHG emissions are summarized in the following table.
lnsight 2019.

The project would not result in the emissions of hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), or sulfur hexafluoride (SF6), the other gases identified as GHG in AB 32. The proposed project will be subject to any regulations developed under AB 32 as determined by CARB. As noted in following table, implementing the noted mitigation as part of the project design and development, the project will reduce GHG emissions by

44.5%.

Estimated Annual GHG Emissions
co2 cH4 N20 CO2e Source
M Construction Emissions
1280 0.1536 0.000 t284 2020 Emissions
1372 0.1283 0.000 L375 2021 Emissions
870.3 0.111 0.000 873.r 2022 Emissions
590.3 0,058 0.000 59r.7 2023 Emissions
rational Emissionsl

0.013 0.000 0.000 0.014 Area Emissions

29.49 0.001 0.000 29.60 En Emissions
228.9 0.027 0.000 229.6 Mobile Emissions
Waste 0.58s 0.035 0.000 7.448 Emissions
Water 40.65 0.002 0.000 40.81 Emissions
299.6 0.065 0.001 301.4 Total o I Emissions
137.t 0.015 0.000 t37.5 Annualized Construction Emissions2 436.7 0.080 0.001 438.9 Emissions
Note: 0.000 could rePresent <0.000
1 Maximum operational emissions were calculated by adding Phase 1 2O2tand Phase 2 2022firstyear emissions 2 Per South Coast D's Method
of and GHG Emissions MT
proiect Mitigated (2020) BAU (Unmitigated)
543.3 301.4 CO2e Emissions

44.5% Percent Reduction
lnsight 2019.

As shown in the above table, the project will meet the required2go/o reduction to meet the AB 32 goals. Therefore, the project would not generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment' b) Less than sienificant impact. see response to a. above. The project will reduce GHG emissions bV 4+.{o/o;thus, it will meet the required 29% reduction to meet the AB 32 goals' Therefore, the project would not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHG.

Hazards and Hazardous Materials
Fvaluation of Envi ronmental Effects
a) Less than significant impact. The project would not involve the routine transport, use, or disposal of hazardous materials as defined by the Hazardous Materials Transportation Uniform Safety Act. However, construction activities would require the transport, storage, use, and/or disposal of hazardous materials such as f uels and greases for the fueling/servicing of construction equipment, and there is the potential for upset and accident conditions that could release such material into the environment. Such substances would be stored in temporary storage tanks/sheds that would be located at the site.

Although these types of materials are not acutely hazardous, they are classified as hazardous materials and create the potential for accidental spillage, which could expose construction workers. All transport, storage, use, and disposal of hazardous materials used in the construction of the project would be in strict accordance with federal and state laws and regulations. During construction of the project, Material Safety Data Sheets (MSDS) for Potentially
Significant
lmpact
tr
Less Than
Significant
with
Mitigation
lncorporat€d
!
tr
Less Than
Signiflcant
lmpact
T
lmpact
No
Would the project:
a) create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
b) create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous material into the
environment?
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) lmpair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
g) Expose people or structures to a significant risk of loss, injury or death involvi wildland fires?
tr
tr
all applicable materials present at the site would be made readily available to onsite personnel. During construction, non-hazardous construction debris would be generated and disposed of at approved facilities for handling such waste. Also, during construction, waste disposal would be managed using portable toilets located at reasonably accessible onsite locations.

Once the project is operational, there may be maintenance activities that utilize gasoline and other vehicle-related chemicals that, if handled improperly, may result in spills. Day-today activities in parks do not involve the routine transport, use, or disposal of hazardous materials as defined by the Hazardous Materials Transportation Uniform Safety Act.

Maintenance of a park would require the transport, storage, use, and/or disposal of hazardous materials such as paints, cleaners, oils, batteries, and pesticides. Users should follow any instructions for use and storage provided on product labels carefully to prevent any accidents at home. Users should also read product labels for disposal directions to reduce the risk of products exploding, igniting, leaking, mixing with other chemicals, or posing other hazards on the way to a disposal facility. Additionally, residential hazardous waste can be dropped off at Metro Kern County Special Waste Facility located at 4951 Standard Street or at one-day hazardous waste collection events that take place throughout the year. Therefore, the project would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials. b) Less than significant impact. Please refer to response a. above. Therefore, the project would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous material into the environment.
c) No impact. The Sequoia Elementary School is located 1.25 miles to the northwest, and the Golden Oak Elementary School is located 1.28 miles west of the project site. Given the distance and the intervening uses there is a very limited potential for the project to affect the schools in the vicinity. Therefore, the project would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 miles of an existing or ProPosed school'
d) No impact. There are no underground storage tanks (USTs) containing regulated substances and no evidence of past or present USTs, such as fill caps or vent pipes, were observed on this property. Also, no unusual ground conditions which might indicate the presence of USTs, waste oil tanks, hydraulic lifts, or other obvious environmental concerns, were observed on the subject property (AEC 2O1S)' Therefore, the project would not The project is not located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and would not create a significant hazard to the public or the environment. The project site is not within the immediate vicinity of a hazardous materials site and would not impact a listed site. There is no data identifying any facilities in the vicinity that might reasonably be anticipated to emit hazardous air emissions or handle hazardous materials, substances, or wastes that might affect the proposed park. Therefore, the project would not be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment.
e) No impact. The project is not located within the boundaries of the adopted Airport Land Use plan area. The closest public airport to the project is the Shafter Airport/Minter Field located approximately 3.5 miles east of the project, west of State Route 99. The airport provides services such as flight training; supporting area agricultural and business operations; and aircraft fueling, storage, and maintenance. As is typical of most general aviation airports, the dominant type of aircraft based at Shafter Airport/Minter Field is the single-engine, propeller-driven, airplane, comprising 87% of the total (Shafter 2005).

Therefore, the project would not result in a safety hazard for people residing or working in the project area because of a public airport or public use airport. f) Less than sienificant impact. The city of shafter maintains an emergency plan for response to disasters, including but not limited to earthquakes, floods, fires, hazardous spills or leaks, major industrial accidents, major transportation accidents, major storms, airplane crashes, civil unrest, and national security emergencies. ln a disaster, Shafter could experience significant casualties, property damage, and utility service interruptions, potentially exceeding the response capabilities of both the City and the County. The plan outlines the general authority, organization, and response actions for City staff to undertake, in iompliance with existing law, when disasters happen. The objectives of the plan are to reduce loss of life, injury, and property losses through effective management of emergency forces (Shafter 2oo5). The emergency plan includes objectives and policies that would prevent new development from interfering with emergency response of evacuation plans.

The project will comply with all local regulations related to the construction of new development that is consistent with the emergency plan. The project would also comply with the appropriate local and state requirements regarding emergency response plans and access. The proposed project would not inhibit the ability of local roadways to continue to accommodate emergency response and evacuation activities. Therefore, the project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.
g) Less than significant impact. According to data from the Cal Fire, there are no fire hazard severity zones on the project site or within the City boundaries (Cal Fire 20071' The City of Shafter maintains an emergency plan for response to disasters, including fires' The objectives of the plan are to reduce loss of life, injury, and property losses through effective management of emergency forces (Shafter 2OO5). The emergency plan includes objectives and policies that would prevent new development from interfering with emergency response of evacuation plans. The project will comply with all local regulations related to the construction of new development that is consistent with the emergency plan. The project would also comply with the appropriate local and State requirements regarding emergency response plans and access. The proposed project would not inhibit the ability of local roadways to continue to accommodate emergency response and evacuation activities.

Therefore, the project would not expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires' Hydrology and Water QualitY
Evaluation of Environmental Effects
a) Less than significant impact. As discussed in Geology and soils above, the project site's soil iypes have a low-to-medium susceptibility to sheet and rill erosion by rainfall and a low susceptibility to wind erosion at the ground surface. Disturbance of onsite soils during construction could result in soil erosion and siltation, and subsequent water quality degradation through increased turbidity and sediment deposition during storm events to offsite locations. Additionally, disturbed soils have an increased potential for fugitive dust to be released into the air and carried offsite. As described in Geology and Soils, the project would be required to comply with the General Permit. To conform to the requirements of the General permit, a SWPPP would need to be prepared that specifies BMPs to prevent construction pollutants from moving offsite. The project is required to comply with the General permit because project-related construction activities would disturb at least 1 acre of soil. Therefore, the project would violate any water quality standards or waste discharge requirements.

Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
tr
Less Than
significant
lmpact
No
Would the project:
a) Violate any water quality standards or waste discharge requirements?
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the
basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or rive or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or off-site; ii. substantially increase the rate of runoff in a manner which would result in flooding on- or off-site;
iii. create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage system or provide substantial additional sources of polluted runoff; or
iv. lmpede or redirect flood flows?
d) ln flood hazard, tsunami, or seiche zones, risk of release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water quality control lan or sustainable undwater ma nt lan?
lmpact
tr
I
T
tr
tr
I
tr
I
tr
tr
tr
b) Less than sisnificant with mitigation incorporated. A large groundwater basin covering over

1.5 million acres underlies most of the southern San Joaquin Valley, including the City, and has been providing water for the area since the early 1900s. This basin is replenished by the natural runoff from the Sierra Nevada, as well as through percolation from the many irrigation canals that import water into the area from other regions of the State. Shafter's drinking water is derived from the aquifers within the basin and is pumped to the surface by a system of groundwater wells operated by the City. The City owns and operates its own public water system, including groundwater wells, above-ground water storage tanks with booster stations, an above-ground tank and booster plant, and water distribution lines (City of Shafter 2005).

There are two types of water sources proposed for the project: (1) potable and (2) irrigation. Potable water would be only used to provide drinking quality water for bathrooms, drinking fountains, and sinks throughout the park site. lrrigation water would be used to irrigate the Park.

Full development of the park would require a peak potable water flow (under fire flow conditions) of L,374 gpm (QK 2O2La). The water assessment concluded that the existing potable water system has adequate capacity and the increase in potable water demand can be accommodated by the existing water system and remain within the City's water design criteria without any improvements or upgrades (QK 202La). The assessment also concluded that the park would result in less potable water demand than the now defunct Shafter Community Correctional Facility, or less than the baseline condition (QK 2021a). The project would tie into the existing potable water system at East Ash Avenue or a future waterline to be constructed within Golds Avenue. Mitigation also requires that the applicant receive a water will-serve letter from the City for potable water only (not irrigation water).

Non-potable water would be used to irrigate the full buildout of the park. The irrigation demand for Phase 1 of the park would be 49,7O7 gallons of water per day (gpd) with an annual estimated total water use (ETWU) of 55.67 acre-feet/year (AFY). Phase 2 would require 36,905 gpd with an ETWU of 4L.33 AFY. The total water usage for irrigation at full build-out is 86,612 gpd or 97 AFY (QK 2021a). The Shafter-Wasco lrrigation District (SWID) has provided the applicant with a letter stating that SWID "typically has water available February through November" and that the water is raw and therefore, requires filtration prior to irrigation use by sprinkler or drip irrigation' The project would connect to the SWID system via an existing outlet located on adjacent City property (ApN 089-140-73) to supply irrigation water to the site February through November. Mitigation requires, prior to grading permit issuance, that the applicant provide the City with a conclusive irrigation water will-serve letter from SWID stating that they will provide irrigation water between February and November. Additional mitigation requires, during site plan review, that the applicant provide a revised site plan that includes the c)
location of the existing offsite SWID connection and future conveyance system to get the SWID water to the drywell and filtration unit (see below)' Generally, December and January (the months were SWID water is not available) occur during the cold, wet winter months where evapotranspiration and water demand is at its lowest and therefore, demand is at its lowest. Additionally, the applicant intends to supplement SWID water with well water from three possible nearby wells. Two of these wells are private and one is on city-owned property. Mitigation requires, during site plan review, that the applicant provide a revised site plan that includes the location of the existing offsite well and future conveyance system to get the well water to the drywell and filtration unit (see below).

Raw SWID water and supplemental well water would need to be filtered prior to being used in sprinkler and/or irrigation drip systems. The applicant intends to have an onsite filtration system using a drywell system with filtration unit (Jimenez pers. comm.). Mitigation requires, during site plan review, that the applicant provide a revised site plan that includes a drywell and filtration unit to filter the raw SWID water and supplemental well water prior to being sent through the irrigation system.

The largest water need at the site is irrigation water, which would percolate (minus evapotranspiration) to ground and help with replenishment of the basin. Mitigation would also require, prior to grading permit issuance, that the applicant provide a comprehensive year-round irrigation plan to be approved by the City Public works Director. The irrigation plan would include calculations on conveyance of irrigation water during normal, dry, and multiple dry years as well as provide contingency steps if raw Shafter-Wasco lrrigation District water is reduced or not made available to the site' With mitigation, the project would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin'
The following discusses whether the project would substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces'
i. Less than sisnificant impact. The project site is flat and grading would be minimal.

The topography of the site would not appreciably change because of grading activities. The site does not contain any water features, streams, or rivers' The project would develop significant areas of impervious surfaces that could significantly reduce the rate of percolation at the site or concentrate and accelerate surface runoff in comparison to the baseline condition. However, onsite storm drainage infrastructure is required as a condition of approval for the project.

The project is not within the Federal Emergency Management Agency (FEMA) Flood lnsurance Rate Map, the project outside of a 100-year flood zone. The project site is located within the FEMA Flood Hazard Zone X: Area of Minimal Flood Hazard, and therefore the potential for flooding at the site appears to be very low' The project would comply with all city codes and regulations related to flooding.

The project requires development of a SWPPP and the use of BMPs and limit the amount of grading where feasible to reduce impacts to water quality during construction.

Therefore, the project would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner that would result in substantial erosion or siltation on- or offsite' ii. Less n sisnificant imoact. Refer to response c.i above. Therefore, the project ilt.
would not substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner that would result in flooding on- or offsite.

Less than significant with mitisation incorporated, The project would comply with all applicable State and local codes and regulations and be required to provide an onsite stormwater retention basin of sufficient capacity to capture and store all surface flow from the park without any of the flow leaving the site. The current site plan attached to this MND is conceptual. Mitigation requires that, during site plan review, the applicant provide a revised site plan that includes an onsite retention basin and/or other capture method (such as vegetated swale) of sufficient capacity to contain all onsite surface stormwater flows. Mitigation also requires providing an engineering analysis by a qualified individual that calculates the projected stormwater flows onsite and provides the dimensions of the basin to capture such flows. With mitigation, the project would not create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff.

Less than sisnificant impact. Construction activities could potentially degrade water quality through the occurrence of erosion or siltation at the project site' Construction of the project would include soil-disturbing activities that could result in erosion and siltation, as well as the use of harmful and potentially hazardous materials required to operate vehicles and equipment. The transport of disturbed soils or the accidental release of potentially hazardous materials could result in water quality degradation. The project would be required comply with the NPDES Construction General Permit. A SWPPP would be prepared to specify BMPs to IV
prevent construction pollutants. The project would not otherwise substantially degrade water quality.

The project site is located outside the 500-year floodplain and is not located within a 100.year flood hazard area (FEMA 202L). Therefore, the project would not impede or redirect flood flows.
d) No impact. As noted above, the project site is not within a FEMA flood hazard zone, nor is it located near the ocean or a steep topographic feature (i.e., mountain, hill, bluff, etc.).

Tsunamis are waves generated in oceans from seismic activity. Due to the inland location of the site, tsunamis are not considered a hazard for the site. Therefore, there is no potential for the site to be inundated by tsunami or mudflow.

A seiche is a wave generated by the periodic oscillation of a body of water whose period is a function of the resonant characteristics of the containing basin as controlled by its physical dimensions. There is no body of water within the vicinity of the project site. There is no potential for inundation of the project site by seiche' There are no nearby levees that would be susceptible to failure or flooding of the site. The project site is not located within the Lake lsabella flood inundation area (Kern County2OtTl, which is the area that would experience flooding if there was a catastrophic failure of the Lake lsabella Dam. ln the event of flooding, the City would utilize the Evacuation Plan to support its Emergency Operations Plans (EOPs). With implementation of the Evacuation Plan, the project would not expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam. e) Less than significant impact. Refer to a. through d. responses above. There is currently no adopted groundwater management plan for the project site or its vicinity. Therefore, the project would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan.

Land Use and Planning
Evaluation of Envi ronmental Effects
a) Noi The project does not include the construction of roads or any other physical barrier. Therefore, the project would not physically divide an established community. b) No impact. The proposed project consists of a General Plan Amendment and Zone Change to construct a two-phase recreation and sports park on a vacant, 42.4-acre site. The proposed General Plan Amendment would change the land use designations from the existing lndustrial and Business Park to Parks & Schools. The proposed Zone Change would change the zoning from lndustrial and Business Park to Community Facilities.

The public Services and Facilities Element of the General Plan indicates that parks and recreational facilities are a high community priority and is an indicator of residents' quality of life. The goal is to provide 2.5 acres of parkland per 1,000 residents in locations to serve the needs of the community (Shafter 2005).

The proposed project will fulfill the City's General Plan objective for parks and recreational facilities, and with approval of the General Plan Amendment and Zone Change, the proposed 42.4-acre recreation and sports-park will assist the City in meeting its requirements for the provision of parks and recreation facilities. As such, the proposed project would not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project. Therefore, the project would have a less-thansignificant impact. Therefore, the project would not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect.

Potentially
significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
significant
lm pact
No
lmpact
Would the project:
a) Physically divide an established community?
b) cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose tr I
of avoidi or mit and environmental effect? tr
Mineral Resources
Evaluation of Environmental Effects
a) No impact. The California Department of Conservation, Geological Survey classifies lands into Aggregate and Mineral Resource Zones (MRZs) based on guidelines adopted by the California State Mining and Geology Board, as mandated by the Surface Mining and Reclamation Act of L974. These MRZs identify whether known or inferred significant mineral resources are present in areas. Lead agencies are required to incorporate identified MRZs resource areas delineated by the State into their General Plans. The principal mineral resources within the City are oil and natural gas. The southern portion of Kern County is a major oil producing region, with oil fields extending into the southern portion of Shafter's Planning Area (Shafter 2005).

No oil or gas resources have been identified in or extracted from the project site. According to the California Geologic Energy Management [formerly called Division of Oil, Gas and Geothermal Resources (DOGGR)], the project site is not located in an identified oilfield and there are no known wells located on the site. There are five active oil wells located on the eastern adjoining property which were drilled in 2OL2 (AEC 2018). The proposed project would not result in the loss of availability of mineral resources as the project does not propose the extraction of mineral resources. Additionally, the proposed project would not restrict the ability of mineral rights' holders in the area to exercise their legal rights to access surrounding sites for the exploration and/or extraction of underlying oil research or other natural resources. Therefore, the project would not result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state.
b) No impact. As noted above, the project is not designated as a mineral recovery area. The project would not alter any existing plans that protect mineral resources. As a result, the proposed project would not interfere with known mining operations and would not result in the loss of land designated for mineral and petroleum. Therefore, the project would not result in the loss of availability of a locally important mineral resource recovery site that is delineated in a local general plan, specific plan or other land use plan.

Potentially
significant
lmpact
tr
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
No
Would the project:
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site that is delineated in a local general plan, plan or other land use Plan?
lmpact
I
Noise
Evaluation of Environmental Effects
a) Less than significant impact. project construction would generate temporary increases in noise levels. The General plan Section 7.7 requires exterior noise levels in residential zones to be maintained at 60 to 65 decibels utilizing site and architectural design features to mitigate noise impacts when feasible (Shafter 2005).

Chapter 8.24 (Noise Control Regulations) of the City of Shafter Municipal Code establishes regulations and enforcement procedures for construction noise generated in the City' Section g.z4.O3O limits construction activities within a residential zone or within a radius of five hundred feet that creates noise exceeding the ambient noise level between the hours of 7:00 p.m. and 7:00 a.m. (Shafter 2OO5). The regulations do not limit the days of operating construction equipment or vehicles, or the performance of construction work. Construction operations are prohibited from exceeding the ambient noise level between the hours of 7:00 p.m. and 7:00 a.m. The project would comply with all applicable policies, regulations, and standards and policies within the City's General Plan and Municipal Code. Therefore, the project would not generate substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies' b) Less than significant impact. The project is expected to create temporary groundborne vibration because of the construction activities (during site preparation and grading).

According to the U.S. Department of Transportation, Federal Railroad Administration, vibration is sound radiated through the ground. The rumbling sound caused by the vibration is called groundborne noise. The ground motion caused by vibration is measured as particle velocity in inches per second and is referenced as vibration decibels (VdB). The background Potentially
Significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
!
Less Than
Significant
lm pact
tr
lmpact
No
Would the project result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards from other agencies? b) Generation of excessive groundborne vibration or groundborne noise levels?
c) For a project within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
I
I
tr
Different Levels of Groundborne Vibration
Vibration Level
104 VdB Pile Driver
94 VdB roller
93 VdB Pile Driver
87 VdB bulldozer
87 VdB Caisson drill
86 VdB Loaded trucks
79 VdB Jackhammer
58 VdB Small bulldozer
Note: 25 feet from the ndi ment
vibration velocity level in residential areas is usually around 50 VdB. A list of typical vibration-generating equipment is shown in following table, although construction of the project may not use allthese equipment types.

The vibration velocity level threshold of perception for humans is approximately 65 VdB' A vibration velocity level of 75 VdB is the approximately dividing line between barely perceptible and distinctly perceptible levels for many people. Typical outdoor sources of perceptible groundborne vibration are construction equipment and traffic on rough roads.

For example, if a roadway is smooth, the groundborne vibration from traffic is rarely perceptible. Typically, groundborne vibration generated by construction activity attenuates rapidly with distance from the source of the vibration. Therefore, vibration issues are generally confined to distances of less than 500 feet (FTA 2006). There are residences located within the surrounding area of the proposed project site. Potential sources of temporary vibration during construction of the proposed project would be minimal and would include transportation and use of equipment on the site. Construction activity would include various site preparation, grading, in fabrication, and site cleanup work. Construction would not involve the use of equipment that would cause high groundborne vibration levels such as pile-driving or blasting. Once constructed, the proposed project would not have any components that would generate high vibration levels. Therefore, the project would not expose persons to or generation of excessive ground-borne vibration or ground-borne noise levels.
c) No impact. As noted in the Hazards and Hazardous materials section, the closest public airport is Shafter Airport/Minter Field located 3.5 miles east of the project site and provides general aviation facilities and services (Shafter 2005). The project is not located within the airport land use compatibility plan boundaries for Shafter Airport/Minter Field' Therefore, the project would not expose people residing or working in the project area to excessive noise levels for a project located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport.

Population and Housing
Evaluation of Environmental Effects
a) No impact. The total City population was estimated to be t9,746 in 2019. Growth projections indicate that population in the Shafter Planning Area will be approximately 24,72L in 2030 (shafter 2005). The project proposes to construct a two-phase recreation and sports park on a vacant 42.4-ate site. The project does not include any new homes or businesses and only roads required to provide access to and around the facility will be constructed as part of the project. The project will not induce unplanned population growth in the area, either directly or indirectly. Therefore, the project would not induce substantial population growth in an area, either directly or indirectly' b) No impact. See response to a. above. The project proposes to construct a two-phase recreation and sports park on a vacant 42.4-acre site. Construction of the project would likely be done by construction workers residing in the City or the surrounding area who would not require new housing. The project site is undeveloped and will not involve demolition of existing housing, or construction of new housing, and will not require the construction of replacement housing elsewhere. Therefore, the project would not displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere.

Potentially
significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact lmpact
No
Would the project;
a) lnduce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
b) Displace substantial numbers of existing housing, necessitating the construction of re acement h elsewhere?
!
tr
tr
tr
Public Services
Evaluation of Environ menta I Effects
a) The following discusses whether the project would result in substantial adverse physical impacts to public services. The need for additional public service is generally directly correlated to population growth and the resultant additional population's need for services beyond what is currently available'
i. Less than sisnificant imoact. Construction and operation of the project would result in an increase in demand of fire protection services leading to the construction of new or physically altered facilities. Under contract with the City of Shafter, fire suppression support is provided by the Kern County Fire Department located at 325 sunset Avenue, approximately 1.4 miles northeast of the project site' The proposed project would result in the construction of a recreation and sports park on a 42.4-acre site. The City of Shafter will ensure that construction activities are conducted in accordance with local and State fire codes. Services are adequately planned for within the City's General Plan through policies to ensure the City maintains fire department performance and response standards by allocating the appropriate resources. As stated, the project applicant is responsible for constructing any infrastructure needed to serve the project. Therefore, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for fire protection.

Potentially
significant
lmpact
Less Than
signiflcant
with
Mitigation
lncorporated
Less Than
significant
lm pact lmpact
No
Public Services:
a) would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
i. Fire protection?
ii. Police Protection?
iii. Schools?
iv. Parks?
v. Other ublic facilities?
tr
tr
fl
tr
tr
tr
tr
tr
tr
tr
tr
!
tr
tr
tr
T
t
I
T
T
ll Less than sisnificant impact. Law enforcement and public protection are provided by the City of Shafter Police Department. The City's police station is located at 2OL Central Valley Hwy, approximately 1.4 miles northwest of the project site. The project would not increase demands for public safety protection. The project applicant is responsible for constructing any infrastructure needed to serve the project. Therefore, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for police protection.

No impact. The proposed project would not have any impacts on school facilities.

Therefore, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for schools.
nact. with approval of the proposed General Plan Amendment and Zone il
IV Noi
V
Change the project will fulfill the General Plan's objective and assist the City in meeting its requirements for the provision of parks and recreation facilities.

Therefore, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for parks.

No impact. The proposed project does not include any impacts to other public facilities such as libraries, hospitals, or emergency medical facilities. The proposed project would comply with the objectives and policies of the General Plan' Therefore, the project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for other public facilities.

Recreation
Eval uation of Environmental Effects
a) No impact. As stated in the Public Services section, the project would fulfill the City's General plan objective for parks and recreational facilities, and with approval of the General plan Amendment and Zone Change, the proposed sports park would assist the City in meeting its requirements for the provision of parks and recreation facilities' Therefore, the project would not increase of the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would not occur or be accelerated'
b) No impact. As discussed in this MND, with mitigation, the development of this park would not have an adverse physical effect on the environment. Therefore, the project would not include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment' Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
tr
lmpact
No
Would the project:
a) lncrease the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse hysical effect on the environment?
tr n
I
Tra nsportation/Traffic
Evaluation of Environmenta I Effects
a) Less than significant impact. The trip generation and design hour volumes shown in the table below were calculated using anticipated vehicle information from Shafter Recreation and parks District. lt was estimated that six baseball fields and three soccer fields on the project site will have two teams at each field, with 12 children on each baseball team and 15 children on each soccer team. lt is anticipated that each child would arrive in a separate vehicle, with a limited number of additional vehicles for spectators. These trips would arrive between the hours of 4:30 p.m. and 6:00 p.m. Therefore, the total number of vehicles entering the facility during this time was assumed to be 270, with 180 trips arriving in the peak hour from 4:30 P.m. to 5:30 P.m.

Daily traffic assumes additional games that are outside of the peak hour' A conservative estimate of trips leaving during this same peak hour was made to consider players that are dropped off. The following table summarized the project traffic from the assumptions above.

R&S 2022
A capacity analysis of the study intersections was conducted using Synchro 9 software from Trafficware. This software utilizes the capacity analysis methodology in the Transportation Research Board's 2010 Highway Capacity Manual'
Potentially
Significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
Significant
I m pact lmpact
No
Would the project:
a) Conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities?
b) Conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
c) substantially increase hazards due to a design feature (for example, sharp curves or dangerous intersections) or
incompatible uses (for example, farm equipment)?
d Result in ina uate eme n access?
tr
n
I
!
!
I
tr
tr
Generation
General PM Peak Hour Trips lnformation DailY
ADT ln (% Split/Trip %) Out Trip Type
Plaver Arrival 618 67%/154% 33%/77%
Additional Spectators 104 67%/26% 33%/t3%
Total 722 180 90
Criteria for intersection level of service (LOS) are shown in the tables below' R&S 2019
R&S 2022
As stated in the City of Shafter General Plan, the peak hour level of service shall be no lower than LOS "C." Levels of service for the study intersections are presented in the following table. The intersection peak hour level of service goal for the study intersections is LoS C or better.

R&S 2022.
peak hour signal warrants were evaluated for each of the unsignalized intersections within the study area based on the California Manual on Uniform Traffic Control Devices (MUTCD). peak hour signal warrants assess delay to traffic on the minor street approaches when entering or crossing a major street. Signal warrant analysis results for the PM peak hour are shown in following table.

Level of Service Criteria - lntersections
Expected Delay to Minor Street
Traffic
Average Control DelaY level ofService
A Little or no delay <10
B Short traffic delays >10and<15
c Average traffic delays >15and<25
D Long traffic delays >25and<35
F Extreme delays >50
Level of Service Criteria -
Intersections
Control Delay (sec/veh) level of Service Vol
<10 A < 0.60
>10and<20 B

0.61 - 0.70
>20and335 c 0.71 - 0.80
>35and<55 D 0.81- 0.90
>55andS80 E

0.91 - 1.00
>80 F > 1.0
PM lntersection Level ofService
2040 2O4O+ 204O+
project w/
Control 20L9 2019+
Type
* lntersection
B B c c
t Shafter Ave & Lerdo
nal B B c c
2 Central Vall H SR 43 & Lerdo
SB c c F F c
3 Mannel Ave & Lerdo
al B B c c
4 Beech Ave & Lerdo

AWSC A A A A
5 Beech Ave & Ash Ave
ASWC 2 2 A A
6 Golds Ave & Ash Ave
PM Traffic Waarant Ana
2040 2040+Project 20L9 2019+Proiect # lntersection
Major
Street
Total
High
vol
Minor
Street
Total
High
Vol
Warrant
Met?
Major
Street
Total
High
Vol
Minor
Street
Total
High
vol
Warrant
Met?
Major
Street
Total
High
vol
Minor
Street
Total
High
Vol
Warrant
Met?
Major
Street
Total
High
Vol
Minor
Street
Total
High
vol
Warrant
Met?
3 Mannel Ave
at Lerdo
Hwy
1131 119 7248 742 7783 222 1900 245
5 Beech Ave
at Ash Ave
257 17 N 407 93 N 350 23 N 500 99 N
6 Golds Ave
at Ash Ave
2 2 N 35 77 N 3 2 N 35 77 N
R&S 2019.

It is important to note that a signal warrant defines the minimum condition under which signalization of an intersection might be warranted. Meeting this threshold does not suggest traffic signals are required, but rather, that other traffic factors and conditions be considered to determine whether signals are truly justified. lt is also noted that signal warrants do not necessarily correlate with level of service. An intersection may satisfy a signal warrant condition and operate at or above an acceptable level of service or operate below an acceptable level of service and not meet signal warrant criteria.

Volume-to-capacity (v/c) ratios for roadway segments in the study area are shown in the following table. A volume-to-capacity ratio of greater than 0.80 corresponds to a LOS of less than C, as defined in 2010 Highway Capacity Manual. The City of Shafter's operational goal for roadway capacity is LOS C or better.

Mitigation is required where project traffic reduces the LOS to below LOS C or, where the pre-existing condition of the roadway (pre-project) is below LOS C, mitigation is required where the addition of project traffic increases the v/c.

R&S 2019
lntersection and roadway improvements needed by the Yeat 2040 to maintain or improve the operational level of service of the street system in the vicinity of the project are presented in in the following table.

ADT &
vlc
2040
vlc
2040+
Proiect
Existing
Capacity
vlc
20L9
vlc
2019+
Proiect
2040
ADT
2040+
Project
20L9 Project
ADT
2019+
Project
Street

0.51 o.62 o.76 0.77 163 9369 11345 11508 1s000 Lerdo Hwy; Shafter Ave to James St
9206
22500 0.41 0.42 0.67 0.68 9206 280 9486 15111 15391 Lerdo Hwy:

James St to Central
Vallev Hwv (SR 43)

0.31 o.32 0.51 0.52 435 729s3 20548 20983 40000 Lerdo Hwy:

Central Valley Hwy
(SR 43) to Beech
Ave
12518
Future lntersection I ents and local
lmprovements Required bY 2040 Proiect % Share for Local Mitigation f lntersection Future lntersection lm nts and Local Mitigation
# lntersection Improvements Required by 20a0 Proiect % Share for Local Mitigation 3 Mannel Ave & Lerdo
HwV
Add Signal
R&S 2022
Based on the analysis, getting the intersection of Mannel Avenue and Lerdo Highway to an acceptable LOS includes the construction of a traffic signal. The analysis concluded that with or without the project, the intersection would operate at a LOS F and therefore, the project would not cause an impact and would not conflict with an applicable plan, ordinance, or policy establishing measures of effectiveness for the performance of the circulation system. b) No impact. An evaluation of vehicle miles traveled (VMT) for project traffic was conducted based on applicable CEQA guidance. The analysis involved comparing an estimate of VMT attributable to the project to a baseline VMT for the Shafter area and assessing whether project VMT would result in a significant transportation impact. Several factors were taken into consideration when estimating project VMT, including proposed land use and project trip type and distribution. The park will mainly serve residents of the City of Shafter and therefore it was assumed that 90% of trips would be local. The remaining L0% of trips would be regionalfrom nearby population centers.

Based on the table below, it is anticipated that the project will result in a weighted average VMT of 6.55 miles per vehicle per day. An average daily VMT of 44.44 miles was obtained from the Kern County Association of Governments (Kern COG) for use in this study. This baseline average VMT was developed based on household populations in the Shafter area as well as local and regional travel patterns.

R&S 2022
The average project VMT of 6.55 miles per vehicle per day is 85.3% less than the baseline average VMT of 44.44 miles. Therefore, the project would not be in conflict or be inconsistent with CCR Section L5064.3(b).
c) No imoact. The project will be designed to current standards and safety regulations. All site access/egress will be constructed as to comply with the MUTCD regulations and design and safety standards of Chapter 33 of the California Building Codes (CBC) and the guidelines of Title 24 to create safe and accessible roadways. Vehicles exiting the site will be provided with a clear view of the roadway without obstructions. Landscaping associated with the entry driveways could, impede such views, if improperly installed. Specific circulation patterns and driveway designs will incorporate all applicable safety measures to ensure that VMT
Trip Type Proiect ADT Trip lenglh Mile Traveled Average VMT Resional 77 7r.20 865 7r.20
Local 695 1.90 1320 1.90
Total 6.5s
hazardous design features or inadequate emergency access to the site or other areas surrounding the project area would not occur. Therefore, the project would not substantially increase hazards due to a design feature or incompatible uses. d) Less than sienificant impact. See response to c. above. The project would be required to comply with all emergency access requirements adopted and set forth in the City of Shafter Municipal Code. These requirements and all others required to be included in the project design will be verified by the City prior to project approval. Therefore, the project would not result in inadequate emergency access.

Tribal Cultural Resources
Evaluation of Environmental Effects
a) No impact. On September 2L, 202L pursuant to Public Resources Code Section 21-080.3.1 and Government Code Section 65300 et. seq., letters were sent to each of the 25 Native American tribes within the geographic area as identified by the NAHC. The letters included a project description and location maps. No information on tribal cultural resources or sacred places were received as responses. Therefore, the project would not cause a substantial adverse change in the significance of a tribal cultural resource that is listed in the California Register of Historical Resources or in a local register of historical resources. b) No impact. See response to a. above and in the Cultural Resources section. Therefore, the project would not cause a substantial adverse change in the significance of a tribal cultural resource that is determined by the lead agency to be significant.

Potentially
Significant
lmpact
Less Than
significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact lmpact
No
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 2L074 as either a site, feature, place, cultural landscape that is geographically defined in the terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1-(k)?
b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 502L.L. ln applying the criteria set forth in subdivision (c) of Public Resources Code 5024.1", the lead agency shall consider the significance of the resource to a California Native American tribe.

Utilities and Service Systems
Evaluation of Environmental Effects
a) Less than significant impact. Refer to Geology and Soils and Hydrology and Water Quality responses above regarding potable and irrigation water, wastewater, and stormwater. The above analysis concluded that the project would not require the relocation or construction of new or expanded facilities for water potable and irrigation water, wastewater, and stormwater facilities.

The Pacific Gas and Electric Company (PG&E) provides electricity to the City. The existing trunk and transmission facilities are adequate to meet present and projected demand to the project site. The project will connect to the existing PG&E transmission lines for electrical power. Although some evening sports events may require the use of lighting, most of the park's activities will be held during the day, when lighting would be minimal. The park will have security lighting, but electrical demand is anticipated to be minimal.

No natural gas or telecommunication facilities are proposed for the project.

Therefore, the project would not require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural Would the project:
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater
drainage, electrical power, natural gas, or telecommunication facilities, the construction of which could cause significant environmenta I effects?
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years?
c) Result in the determination by the wastewater treatment provider which serves or may serve the project that is has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments?
d) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
e) Comply with federal, state, and local management and reduction statutes and lation related to solid waste?
Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
No
lmpact
T tr
! !
n
gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects.
b) Less than significant impact. Refer to the Hydrology and Water Quality responses above.

Therefore, the project has sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years. c) No impact. The proposed land use changes associated with the Shafter Community Park project will result in an increase of sewer flows of 61 gpm at peak flow (QK 202Lb).

Compared to existing conditions that currently include the Shafter Community Correctional Facility, the increased flow from the park is expected to be smaller than the flow from the Correctional Facility. The increase in flow was analyzed to determine if the existing system has sufficient capacity to accommodate the increase in sewer flows. The analysis indicate that the existing system has adequate capacity and the increase in flows can be accommodated by the existing system and remain within the City's sewer design criteria without any improvements or upgrades.

The project also proposes the construction of a gravity sewer within the access road on the west and north sides of the park with a point of connection to the existing sewer system within East Ash Avenue. This sewer is meant to serve the commercial lots between the proposed park and Lerdo Highway. Construction of this public facility would be completed before or concurrently with Phase 1. Note: Since the park does not benefit from a new sewer, the sewer's construction would be on the City of Shafter to design and install' Therefore, the project would not result in the need for a determination by the wastewater treatment provider which serves or may serve the project has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments. d) Less than sienificant impact. Two franchise haulers, American Refuse and Varner Brothers, serve properties in the City. American Refuse is the franchise hauler within the city core area and will provide service to the proposed project. Solid waste that is collected is disposed of at the Shafter/Wasco Landfill and the Bakersfield Metropolitan (Bena) Landfill.

These landfills are owned and operated by the Kern County Waste Management Department. The Shafter/Wasco Landfill is the City's primary landfill, while the Bena Landfill accepts some refuse from industrial uses within the City. Both facilities are designated as a Class lll landfills and have the capacity to serve projected solid waste disposal needs through December 2053 and April 2046, respectively. lmplementation of the project would result in the generation of solid waste on the project site, which would increase the demand for solid waste disposal. During construction these materials, which are not anticipated to contain hazardous materials, would be collected and transported away from the site. The project, in compliance with federal, State, and local statutes and regulations related to solid waste, would dispose of all waste generated onsite at an approved solid waste facility.

Therefore, the project would be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs.
e) No impact. See response to d. above. The 1989 California lntegrated Waste Management Act (AB 939) requires Kern County to attain specific waste diversion goals. ln addition, the California Solid Waste Reuse and Recycling Access Act of 1991, as amended, requires expanded or new development projects to incorporate storage areas for recycling bins into the project design. Reuse and recycling of construction debris would reduce operating expenses and save valuable landfill space. As stated above, the Shafter/Wasco Landfill is the City's primary landfill, while the Bena Landfill accepts some refuse from industrial uses within the City. Both facilities have the capacity to serve projected solid waste disposal needs through 2056 and 2046, respectively. Therefore, the project would comply with federal, state, and local management and reduction statutes and regulation related to solid waste.

Wildfires
Evaluation of Env mental Effects
a) Less than sisn ificant imoact. See Hazards and Hazardous Materials section regarding emergency response. According to data from the Cal Fire, there are no fire hazard severity zones on the project site or within the City boundaries. As noted previously, the City of Shafter maintains an emergency plan for response to disasters, including fires. The objectives of the plan are to reduce loss of life, injury, and property losses through effective management of emergency forces (Shafter 2005). The emergency plan includes objectives and policies that would prevent new development from interfering with emergency response of evacuation plans. The project will comply with all local regulations related to the construction of new development that is consistent with the emergency plan. The project would also comply with the appropriate local and State requirements regarding emergency response plans and access. The proposed project would not inhibit the ability of local roadways to continue to accommodate emergency response and evacuation activities.

Therefore, the project would not substantially impair an adopted emergency response plan or emergency evacuation plan.
b) Less than significant impact. The project site is in a region dominated by agricultural and urban development. The topography of the area is flat, with an elevation of approximately 355 feet above mean sea level. The project would installthe required infrastructure to meet water supply demands for fire protection services. Development of the project will not increase the need for fire protection services or expand the service area of the local Fire Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Significant
lmpact
T
lmpact
No
lf located in or near state responsibility areas or areas classified as very high hazard severity zones, would the project:
a) Substantially impair: an adopted emergency response plan or emergency evacuation Plan ?
b) Due to slope, prevailing winds, or other factors, exacerbate wildfire risk, and thereby expose project occupants to, pollutant concentrations from a wildfire or uncontrolled spread of wildfire?
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of ru noff -fire slo instability, or draina cha ?
I
Department, and the project will comply with all applicable fire codes and regulations.

Therefore, the project would not exacerbate wildfires and expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire due to slope, prevailing winds, and other factors.
c) No impact. The Pacific Gas and Electric Company (PG&E) provides electricity to the City. The existing trunk and transmission facilities are adequate to meet present and projected demand to the project site. The project will connect to the existing PG&E transmission lines for electrical power. Therefore, the project would not require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment.
d) No impact. The site is topographically flat land, as is the surrounding area. There are no slopes on or near the property and the project would not expose the people or structures to significant risks from downslope or downstream flooding or landslides due to a result of runoff, post fire instability or drainage changes. According to FEMA Flood lnsurance Rate Maps the project is within an area of minimal flood hazards (FEMA 202Ll.. Therefore, the project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

Ma ndatory Findings of Significance
Evaluation of Environ mental Effects
a) Less than sienificant with mitieation incorporated. As evaluated in this document, the project would not substantially degrade the quality of the environment; substantially reduce the habitat of a fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining levels; threaten to eliminate a plant or animal community; reduce the number or restrict the range of an endangered, rare, or threatened species; or eliminate important examples of the major periods of California history or prehistory' With implementation of the mitigation measures recommended in this document, the project would not have the potential to degrade the quality of the environment, significantly impact biological resources, or eliminate important examples of the major periods of California history or prehistory. Therefore, with the following mitigation measures the project would have a less-than-significant impact. Therefore, the project, with the implementation of the identified conditions of approval, best management practices, and mitigation measures, would not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory.

Potentially
Significant
lmpact
Less Than
Significant
with
Mitigation
lncorporated
Less Than
Slgnificant
lmpact lmpact
No
Mandatory Findings of Significance:
a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually limited, but cumulatively considerable? ("cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?
c) Does the project have environmental effects which would cause substantial adverse effects on human beings, either directly or indirect
T
?
b) Less than sisnificant impact with mitisation incorporated. As described in the impact analyses in this document, any potentially significant impacts of the project would be reduced to a less-than-significant level through implementation of the project as described and by mitigation measures. The project would not otherwise combine with impacts of related development to add considerably to any cumulative impacts in the region. With mitigation, the proposed project would not have impacts that are individually limited, but cumulatively considerable. Therefore, the project would have a less than cumulatively considerable impact with mitigation incorporated. There is no substantial evidence that with the implementation of the identified conditions of approval, best management practices, and mitigation measures, there are any cumulative effects associated with this project.
c) Less than significant with mitigation incorporated. All the project's impacts, both direct and indirect, that are attributable to the project were identified and mitigated. The project mitigation measures will substantially reduce or eliminate impacts of the project. Therefore, the project, with mitigation, would not have environmental effects that would cause substantial adverse effects on human beings, either directly or indirectly.

BIBLIOGRAPHY
L AEC (Advance Environmental Concepts). 2018. Phase 1 Environmental Site Assessment

2. ASM (ASM Affiliates). 2019. Final Phase I Survey, Shafter Community Park Project, Shafter, Kern County, California. December.

3. Cal Fire. 2007. California Wildland Hazard Severity Zone Map Update. Retrieved from Local Responsibility Area (LRA) Map. Available:
< http ://www.fi re.ca.gov/fi re_preventionfi re_p revention_wi ld la nd_statewid e >

4. Caltrans (California Department of Transportation). 2020. California State Scenic Highway Mapping System. Available: <https://dot.ca.gov/progra ms/design/la p-la ndscapea rchitectu re-and-com mun ity-livability/la p-liv-i-scenic-highways>.

5. DOC. 2O2O. CGS lnformation Warehouse: Regulatory
Available:<http://maps.conservation.ca.gov/cgs/informationwa rehouse/>.

Maps.

6. FEMA (Federal Emergency Management Agency). 2021. FEMA Flood Map Service Center:

Search By Address. Available:<https://msc.fema.gov/portal/search#searchresultsanchor>.

7. FTA (Federal Transit Administration). 2006. Transit Noise and Vibration lmpact Assessment.

8. lnsight (lnsight Environmental Consultants). 20L9. Air Quality lmpact Analysis, Shafter Commu nity Pa rk, Shafter Ca lifornia. December.

9. Jimenez. pers. comm. Email dated December L,ZOZL to Steve Esselman.

10. Kern County. 2OL7. Lake lsabella Flood Area
Available:<http://esps.kerndsa.com/flood pla in-ma nagement/la ke-isa bella-flood- areaf >.

11. QK. 20t9. Biological Analysis Report, Shafter Recreation and Park District, Shafter Community Park Project. December.

L2. QK. 2o2ta. Water lmpact Assessment. August.

13. QK. 202Lb.Municipal Sewer lmpact Assessment. August.

14. R&S (Ruettgers & Schuler). 2022.fraffic Study for Shafter Community Park at the Northwest Corner of east Ashe Avenue & Golds Avenue, City of Shafter, CA. May.

15. SDMNH (San Diego Museum of Natural History). 2019. Paleontological Records Search - Shafter Community Park. December.

16. Shafter (City of Shafter). 2005. General Plan

17. SJVAPCD (San Joaquin Valley Air Pollution Control District). 2015. Guide for Assessing and Mitigating Air Quality lmpacts. March.

ATTACHMENT A
Maps
General Plan Amendment No. 21-37 and Zone Change No. 21-70 .a
*
j
t.
a,
l-,
L
-3br.. .,+ $' tii
***._:ry__'
,, 1 'i' !liF
,:
..€. h: 1[ j.)
tI
ltI
211112021,2:08:56 PM
Roads and Alleys Local-Residential
Htgnway
1:4,514
0 0.03 0.06 0.12 mi
0 0.05 0.1 0.2 km
Copyright nearmap 2015, Esri Community Maps ContributoE, City ofShafter, Section Boundary City of Shafter, Planning Department Offcial
Parcel Boundary

ATTACHMENT B
Site Plan
{s$r" I Iarehitectsl
' D.ohi!lonr' rql,ol!Ll''hI
r@x I /L.*.S I
**.'W***iffiffi:; ;ffffi]
Il

SHAFTER
COiIMUNtrY PARK
FOR:
,::.8W,mEh
coireR ff STSAWEIruS
AWNUE

SITE PLAN
PHASE ,1&2

FULL BUILD
ouT
1 CONCEPTIONAL DEVELOPMENT PLAN
r
FUUEFEuz
;F,yr.,{rqf*
:#t4. 8/W,
@ME,r;l,; rrrl;.!),, .1{r rr, r,p1.,r
N
@
o
soccER
o
o
UM uN uNl
.|Il,l
PHASE I -PAR(INGLOT'C,1'
0+it+t++ltlt+lilffi nffilff€
nir! lllillilililt [LLl'llJ, rt i r/JJirlUlJJ| I rr I lJ o
PMSE 1
m
ffiDEN
onB

COMMUNIW
gtru

KIDS FIT CORE
COURSE
PffiKING/MIffi

YARD OUDMR
...tif: :.4:-.'ts
lre SPAC€S :F:
.*_
:f
r
-l=
+
RESOLUTION NO. 2885

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER ADOPTING MITIGATED NEGATIVE DECLARATION (ENVIRONMENTAL ASSESSMENT NO. 2L-242),WITH MITIGATION AS DESCRIBED IN EXHIBIT "A", FOR AN AMENDMENT TO THE LAND USE MAP AND A ZONE CHANGE.

WHEREAS, the City Council has, at its regularly scheduled meeting on Septembet 20, 2022 studied and considered General Plan Amendment No. 21-37, a request to change the land use designation from Business Park (BP) and Industrial (I) to Parks and Schools (PS), and Zone Change No. 21-70, a request to change the zoning from Business Park (BP) and Industrial (I) to Community Facilities (CP), on 42.4 aqes (the "Project"); and WHEREAS, it was determined that the Project, with mitigation, would not have a significant effect on the environmsnt and therefore, a Mitigated Negative Declaration was prepared in accordance with the California Environmental Quality Act (CEQA); and WHEREAS, the Mitigated Negative Declaration includes enforceable mitigation described in the Mitigation, Monitoring, and Reporting Program ("MMIU"';, which is attached as Exhibit "A"; and
WHEREAS, the City Council has determined that the provisions of the California Environmental Quatity Act ("CEQA") and the State CEQA Guidelines have been followed; and WHEREAS, the City of Shafter Planning Department (336 Pacific Avenue, Shafter, California) is the custodian of all documents and other materials upon which the environmental determination is based; and
WHEREAS, a timely and properly noticed public hearing for consideration of the proposed Mitigated Negative Declaration and Project as required by Govemment Code Section ASf : was held by the City Council of the City of Shafter at a regular meeting on Septembet 20, 2022,at which hearing evidence, oral and documentary, was admitted on behalf of said Mitigated Negative Declaration.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Shafter, in a regular session assembled on the 20th day of September,2022, resolved to adopt Mitigated Negative Declaration.

BE IT RESOLVED that the Project is subject to mitigation measures found in Exhibit "A" for the Project located on the map as shown in Exhibit "B", both of which are incorporated herein.

EXHIBIT 6
Shafter City Council Resolution No. 2885
September 20,2022
Page2
PASSED AND ADOPTED THIS 20th DAY OF SEPTEMBER, 2022.

Cathy L. Prout, Mayor
ATTEST:

Y azmina Pallares, City Clerk
APPROVED AS TO FORM:

Marco A. Martinez, City Attorney
EXHIBIT "A" - Mitigation Monitoring and Reporting Program -EA2l-242 (Shafter Community Park Project) Date Initials Responsible Monitoring Agency Time Frame for Implementation No. Mitigation Measure Steps to Compliance:

1. This mitigation measure shall be incorporated as a condition of approval for any site plan review.

2. Contract a qualified biologist to perform a pre-construction survey within 14 days prior to ground disturbance activities.

3. Provide results of survey to the Planning Department for the record.

Qualified Biologist; City of
Shafter Planning Department
Prior to grading plan
approval
Within 14 days of the start of project activities, a pre-activity surveyshall be conducted by a qualified biologist knowledgeable in the identification ofthese species. The pre-activity survey shall include walking transects to identiff presence of burrowing owls and their burrows, American badgers and their dens, and San Joaquin kit foxes and their dens. The pre-activity survey shall be walked by no greater than 30-foot transects for 100 percent coverage ofthe project site andthe 250-foot buffer, where feasible. If no evidence of these specialstatus species is detected, no further action is required. #t
Steps to Compliance:

L This mitigation measure shall be incorporated as a condition of approval for any site plan review.

2. Qualified biologist implements necessary avoidance buffers and monitoring, if needed.

3. Provide summary of the avoidance buffer activities to the Planning Department for the record.

Qualified Biologist; City of
Shafter Planning Department
Prior to grading plan
approval
If dens or burrows that could support any of these species arediscovered during the pre-activity survey conducted under MM BIOl, the avoidance buffers outlined below shall be established. No workwould occur within these buffers unless the biologist approves and monitors the activity.Burrowing Owl (active burrows)Nonbreeding seu$on: September 1 - January 31 - 160 feet Breeding season: February I - August 3l -250 feet
American Badeer and San Joaquin Kit FoxPotential or Atypical den - 50 feet Known den - 100 feet
Natal or pupping den - Contact agencies for further guidance #2
Steps to Compliance:

Qualified Biologist; City of
Shafter Planning
Department; CaliforniaDepartment of Fish andWildlife;U.S. Fish & Wildlife Service
Prior to ground
disturbance
The following avoidance and mitigation measures shall be implemented during all phases of the project to reduce the potentialfor impact from the project. They are modified from the U.S. Fish andWildlife Service Standardized Recommendations for Protection of theEndangered San Joaquin Kit Fox Prior to or During GroundDisturbance:
#3
EA 2l-242 (Shafter Community Park Project)
Page I of l0
Mitigation Monitoring and Reporting Program
EXHIBIT "A" - Mitigation Monitoring and Reporting Program -EA2l-242 (Shafter Community Park Project) Date Initials Responsible Monitoring Agency Time Frame for Implementation No. Mitigation Measure L This mitigation measure shall be incorporated as a condition of approval for any site plan review.

2. Qualified biologist and applicant implements avoidance and mitigation measures.

3. Contact CDFW and/or USFW, as needed, in the event of accident death or new sightings as stipulated in the mitigation measure.

4. Provide summary of the avoidance and mitigation measures activities to the Planning Department for the record. . Project-related vehicles shall observe a daytime speed limit of 20-mph throughout the site in all project areas, except on County roads and State and federal highways. . All project activities shall occur during daylight hours, but if work must be conducted at night then a night-time construction speed limit of 10-mph should be established. . Off-road traffic outside ofdesignated project areas should be prohibited. . To prevent inadvertent entrapment of kit foxes or other animals during construction of the project, all excavated, steep-walledholes or trenches more than two feet deep shall be covered at the close of each working day by plywood or similar materials. If the trenchescannot be closed, one or more escape ramps constructed of earthenfill or wooden planks should be installed. . Before holes or trenches are filled, they should be thoroughly inspected for trapped animals. If at any time a trapped or injured kitfox is discovered, the USFWS and the CDFW shall be contactedbefore proceeding with the work. . In the case of trapped animals, escape ramps or structures should be installed immediately to allow the animal(s) to escape, or the USFWS and CDFW should be contacted for guidance. . All construction pipes, culverts, or similar structures with a diameter offour inches or greater that are stored at a construction site for one or more overnight periods shall be thoroughly inspected for kit foxes and burrowing owls before the pipe is subsequently buried, capped, or otherwise used or moved in any way. If a kit fox isdiscovered inside a pipe, that section of pipe shall not be moved until the USFWS has been consulted. If necessary, and under the direct supervision of the biologist, the pipe may be moved only once to remove it from the path of construction activity, until the fox hasescaped. . All food-related trash items such as wrappers, cans, bottles, and food scraps should be disposed of in securely closed containersand removed at least once a week from a construction or project site. . No pets, such as dogs or cats, should be permitted on theproiect site.

EA2l-242 (Shafter Community Park Project)

Page 2 ends
← All documents from this meeting