F :
30'-0"

OUTLINE OF REPLACEMENT

CANOPY ABOVE
2'-6"Ø

CIDH, TYP

BOLLARD,
TYP

OUTLINE OF EXISTING

CANOPY ABOVE, TO BE

REMOVED

EXISTING COLUMN,

TO BE REMOVED

EXISTING

CONC ISLAND
EXTEND

CONC ISLAND

L CANOPY
L BOLLARD 3
S-6 1'-3"
1'-9" 1'-9" 30'-0" A
S-5 B
S-5
COLUMN 1
S-3
NOTES:

1. FOR FUEL CANOPY FRAMING SEE AND . 2. FOR DEMOLITION DETAILS, SEE DEMOLITION PLAN SHEET.

3. CONTRACTOR TO VERIFY LOCATION
OF ALL UTILITIES.

FUEL CANOPY FOUNDATION PLAN
3/8"=1'-0" 1
S-2

BOLLARD,
TYP 3
S-6
LEGEND:

LIMITS OF REMOVE AND REPLACE PCC

PAVEMENT AND PCC MEDIAN ISLAND

COLUMN S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S G G G G G G G W W W W W W W W W W W W W W W W W W G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E EXIST 6" Ø CITY OF SIGNAL HILL
FORCE MAIN SEWER LINE 8' ±

BELOW GROUND SURFACE

EXIST SEWER LINE

EXIST ELECTRIC LINE

EXIST GAS LINE

TO FUEL TANK

EXIST WATER LINE C
2'-0"
TYP TYP 8'-9" 15'-6" 11'-6" 1
S-4
4'-0"± C 2'-0"

CONTRACTOR SHALL POTHOLE

AND LOCATE SEWER FORCE

MAIN AND REPORT FIELD

CLEARANCES FROM PROPOSED

PILE FOUNDATION TO CITY
ENGINEER.
4" Ø OUTLET

DOWNSPOUT TO
EAST
8'-0"
8'-0" 100% SUBMITTAL 05/05/23 E P T T A * S DERETSI GER NO.

N FO I A L OF C R L ONA FESSI RO
CIVIL IA REE NI GNE * CE 83293
JASON D. FIX
EXP. 3-31-2025
555 ANTON BLVD. SUITE 400
COSTA MESA, CA 92626
FUEL CANOPY FOUNDATION PLAN S-2
F :

F :

F :

F :

F :

F :

S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S

SD SD SD SD SD SD S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W

W G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W S S S S S S S S W WW W W S S W S S S W

EXISTING

FORCE MAIN
EXISTING 6"

WATER LINE
EXISTING 2"

WATER LINE
EXISTING 4"

SEWER LINE

EXISTING

BUILDING B

EXISTING

WATER LINE

EXISTING

GAS LINE

EXISTING

WATER LINE

EXISTING

MATERIAL BINS

EXISTING

OFFICE BUILDING
EXISTING 2"

WATER LINE
EXISTING 4"

SEWER LINE EXISTING

BUILDING C

EXISTING

BUILDING A

EXISTING GRAVITY

SEWER LINE

EXISTING

STORM DRAIN
EXISTING 10"

FORCE MAIN

SEWER LINE
EXISTING 6"

WATER LINE
EXISTING 2"

SEWER LINE
DUMPSTER PIT 28TH STREET E E E E E

EXISTING

ELECT LINE E E E E E E E

E E E E E E

EXISTING

ELECT LINE

EXISTING

ELECT LINE
E
E
E
E
E
E
E
E
E
E
E

EXISTING

ELECT LINE

UNDERGROUND

FUEL TANKS
EXISTING 4"

SEWER LINE
NOTES:

1. SEE SHEET S-2 FOR DEMOLITION NOTES.

2. CONTRACTOR TO VERIFY LOCATION OF ALL
UTILITIES WITHIN THE LIMITS OF WORK. SEE
GRADING NOTE NO. 5 ON SHEET G-1. W W W W W W W W E E

DEMOLITION SITE PLAN
1" = 20'-0" 1
D-1

SAWCUT LINE - REMOVE

AND REPLACE PCC

PAVEMENT AND MEDIAN
ISLAND.

EXISTING

STORAGE

CONTAINER

DEMOLISH AND

REMOVE BOLLARDS

DEMOLISH AND REMOVE
COLUMN

DEMOLISH AND

REMOVE FUEL

PUMP CANOPY

DEMOLISH AND

REMOVE BOLLARDS
LEGEND:

LIMITS OF REMOVAL OF PCC PAVEMENT AND
PCC MEDIAN ISLAND (SEE SHEET S-3 FOR

PAVEMENT REPLACEMENT)

REMOVE TOPS OF

EXISTING COLUMN

ANCHOR BOLTS AND
PATCH CONCRETE 100% SUBMITTAL 05/05/23 E P T T A * S DERETSI GER NO.

N FO I A L OF C R L ONA FESSI RO
CIVIL IA REE NI GNE * CE 83293
JASON D. FIX
EXP. 3-31-2025
555 ANTON BLVD. SUITE 400
COSTA MESA, CA 92626
DEMOLITION SITE PLAN S-8
F :

E1.0 GENERAL NOTES, LEGEND, KEYPLAN
E1.1 NOTES
E2.0 ELECTRICAL PLAN, DETAILS
E3.0 LIGHTING TITLE 24