Strategic Plan
Update
FY 2023-24
OUR VALUES
ACCOUNTABLE
ETHICAL
INCLUSIVE INNOVATIVE
STRATEGIC FRAMEWORK
OUR VALUES
OUR VISION
Our vision is that the City of Signal Hill is a desirable place to live and work because of its safe neighborhoods, abundant business opportunities, inclusive culture, and beautiful green spaces.
Our vision is that the City of Signal Hill is a desirable place to live and work because of its safe neighborhoods, abundant business opportunities, inclusive culture, and beautiful green spaces.
OUR MISSION
Accountable
We take ownership of our actions and are open, honest, and clear in our communications with each other and the community.
Ethical
We do what’s right, even when it’s difficult.
Inclusive
Our diversity is our strength. All members of our staff and community are valued and respected for their unique perspective and backgrounds.
Innovative
We continuously learn, adapt, and innovate to support our community.
GOAL 1: FINANCIAL STABILITY
Ensure the City’s long-term financial stability and
resilience.
STRATEGIC GOALS
GOAL 2: COMMUNITY SAFETY
Maintain community safety by supporting public
safety services and increasing emergency
preparedness.
GOAL 3: ECONOMIC & DOWN TOWN DEVELOPMENT
Improve the local economy, support local businesses, and create a vibrant downtown core
GOAL 4: INFRASTRUCTURE
Maintain and improve the City’s physical infrastructure, water system, and recreational spaces
GOAL 5: HIGH-FUNCTIONING GOVERNMENT
Strengthen internal communication, recruitment,
retention, systems, and processes to increase the
effectiveness and efficiency of City services.
support of a voter-approved
bond measure to fund a specific
improvement.
Survey Summary
Strategic Goal Highlight:
Civic Center Master Plan
73%
Fall 2023-Award of
Contract
In May 2022, the City received an award of $5 million from Senator Gonzalez’s office through the California Arts Council for design and construction of a new amphitheater. The grant’s timeline calls for completion of the project by June 2026; staff’s proposed implementation plan accounts for the use of this grant funding during the first phase of the project.
On July 25, 2023, the City hired John Kaliski Architects, Incorporated (JKA) to prepare the Civic Center Master Plan. Work began in August 2023, and a series of community engagement efforts have taken place to date; including regular social media and website postings and updates; two online surveys.
Following the community and stakeholder input efforts, JKA prepared three preliminary design options for City Council review and input with the goal of selecting one preferred design alternative.
Staff will make a final presentation on the selected design and updated costs and schedule during the second quarter of 2024.
100%
Review of Civic Center Master Plan
80%
respondents expressed a
preference to keep City Hall
functions in the existing
building.
53% 72%
72% responded as Signal Hill
residents
50%
Outreach Progress
60 people experiencing
unsheltered homelessness are
indoors and on a pathway to
permanent housing
IMPACT SUMMARY
ACHIEVING FUNCTIONAL ZERO
Strategic Goal Highlight:
A Pathway Home
60 Pathway Home
In March, 2024, the City of Signal Hill became the first City in Los Angeles County to achieve Functional Zero.
Functional Zero is that point when a community’s
homeless services system is able to prevent
homelessness whenever possible and ensure that when
homelessness does occur, it is rare, brief and one-time. the Los Angeles Homeless Services Authority (LAHSA)
and nonprofit service provider PATH led outreach efforts to bring the unsheltered individuals indoors, leveraging the trusting relationships they had established with the encampment residents and providing ongoing
engagement and support leading up to the day of the
operation.
Pathway Home is an LA County Homeless Initiative-led encampment resolution program that is a critical component of the County’s comprehensive response to the local emergency on homelessness adopted by the Board of Supervisors in 2023. By leveraging emergency powers and partnerships with local jurisdictions, Pathway Home is a full-circle solution that brings people off the streets into immediately available interim housing accompanied by a comprehensive suite of supportive services and, ultimately, into safe, permanent homes The LA County Department of Mental Health’s
Homeless Outreach and Mobile Engagement
(HOME) Team provided field-based support
and treatment to Pathway Home clients
during outreach, including crisis management
when necessary
people participated in the
City’s Centennial Celebration
on April 27, 2024 (throughout
the day
IMPACT SUMMARY
2024
Strategic Goal Highlight:
Centennial Celebration
5000+
Centennial Celebration Committee:
Lori Y. Woods, Mayor
Tina L. Hansen, Council Member
Tim Anhorn, Parks and Recreation Commissioner
Christopher Wilson, Planning Commissioner
Victor Parker, Planning Commissioner
Celebrating a centennial is a rare and
noteworthy achievement for any city. The City’s
historic anniversary symbolizes a century of
collective efforts, challenges overcome,
and shared successes. This is a celebration of
our City’s identity, the diversity of its
people, and our commitment to growth and
prosperity. Signal Hill stands today not
only as a beacon of progress but also as a
community that values its history and looks
forward to its future with optimism.
Events completed:
Open House City Hall
Launched Sponsorship Program
Launched Street Pole Banner Program
Launched Bus Ad Sponsorship Program
Hosted History Makers Dinner
Launched a Tree Sponsorship Program
Created enhanced marketing efforts
Launched Signal Hill Color Fun Run and Registration
21 residents graduated from
the 2023 Leadership Academy
IMPACT SUMMARY
Inaugural Class of 2023
Strategic Goal Highlight:
Signal Hill Leadership Academy
21 2024 Tentative Schedule
The SHLA provided an in-depth look at local government as well as opportunities for participants to interact with City staff and elected officials. The interactive sessions were led by representatives from all City departments. The program is designed to foster collaboration and partnership between the City and its community.
The Signal Hill Leadership Academy 2024 is getting ready for launch and will be a great opportunity to meet other active Signal Hill residents, organizations, City staff and elected officials.
Thursday, August 22: City Administration, City Attorney’s Office Thursday, August 29: Community Development and Finance
Thursday, September 5: Parks, Recreation, and Library Services and Public Works
Thursday, September 12: Police Department and Los Angeles County Fire
Tuesday, September 24 (Council Meeting): Graduation –
Presentation of Certificates
Thursday, August 22: City Administration, City Attorney’s Office Thursday, August 29: Community Development and Finance
Thursday, September 5: Parks, Recreation, and Library Services and Public Works Thursday, September 12: Police Department and Los Angeles County Fire Tuesday, September 24 (Council Meeting): Graduation – Presentation of Certificates City of Signal Hill
2023-28 STRATEGIC PLAN
1 | P a g e
Annual Work Plan 2023-2024
Goal 1: Financial Stability Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 1.1: Increase the diversity of the City’s revenue sources.
A. Explore options to diversify sales tax revenue sources to account for potential changes and fluctuations in the local economy.
Work
Underway
B. Increase Transient Occupancy Tax (TOT) revenue through the development of hotels or conference centers to diversify revenue streams C. Explore the use of Tax Increment Financing tools where feasible such as Enhanced Infrastructure Financing Districts and Community Revitalization and Investment Authorities to support the City’s infrastructure maintenance and growth.
D. Increase grant funding across all departments.
o Create and implement a collaborative Citywide grant seeking strategy. o Identify a list of needs for City infrastructure that could be fully or partially funded with State or Federal grant opportunities.
o Explore the use of Infrastructure Infill Grants to develop public infrastructure.
Work
Underway
2024- RFP Issued for
Citywide Grant
Management.
Departments are
proactively identifying and
applying for available
grants.
Police Department secured an OTS Grant for Federal FY 23/24 in the amount of $90,0000. An application was submitted for OTS grant for FY 24/25 for $117,000.
In Progress
City of Signal Hill
2023-28 STRATEGIC PLAN
2 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
The Police Department was awarded the SHSP and the EMPG grant. Staff began the process to submit for Cal OES funding for the Panorama Trail.
Objective 1.2: Increase the diversity of the City’s revenue sources.
A. Conduct a fee study to evaluate costs, revenues, and opportunities to ensure City fees are both appropriate and sustainable.
Completed New Master Schedule of
Fees and Charges Effective
July 1, 2024
B. Conduct a water rate study to evaluate the need for a rate increase to continue to provide safe and clean water in a financial sustainable manner.
Underway January 2025-Water
Master Plan and Rate
Study Ongoing.
C. Explore options for legislative action to preserve the City’s property tax income. Underway Research Ongoing Objective 1.3: Continue to enhance financial reporting to better support City efforts and decision-making.
A. Continue assessing the City’s financial health by monitoring budgets, strategically managing investments, mitigating risks, and prioritizing spending as part of the budget process.
Work
Underway
Continuous
Complete FY 22-23 audit, prepare ACFR, and apply for GFOA Certificate of Achievement for Excellence in Financial reporting with new audit firm.
Annually,
January
2024
City of Signal Hill
2023-28 STRATEGIC PLAN
3 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Compete American Rescue Plan Act reporting and single audit for Federal funding.
Annually as
required
Complete all annual governmental compliance and financial reporting. Annually as required
Continue to manage risk management activities. Ongoing
Manage and develop Biennial Budget for FY 2024-2026. Annually, completed
by June 2024
B. Prepare and present quarterly financial reports for City Council review. Underway Continuous City of Signal Hill
2023-28 STRATEGIC PLAN
4 | P a g e
Annual Work Plan 2023-2024
Goal 2: Community Safety Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 2.1: Increase efforts to recruit and retain high-quality Police Department employees.
A. Prioritize recruitment and hiring for open sworn police positions to ensure adequate staffing and deployment. This work may involve exploring new recruitment strategies and continuing efforts to ensure competitive compensation and benefits.
Underway Continuous
Recruitment for police department jobs has been multi-faceted in the last year. Efforts include social media campaigns, recruitment booths at CSULB volleyball and basketball Games as well as future baseball game recruitment opportunities. New recruitment brochures and flyers have been created and the use of the freeway billboard has been used as a marketing tool. The recruitment team’s efforts have increased the numbers of applicants we are seeing during the PELLETB testing.
Underway Continuous
B. Update Police Memorandum of Understanding (MOU) to better align with current practices and needs.
Underway Continuous
C. Take steps to increase leadership stability within the Police Department. Underway Continuous D. Increase retention and sustain employee morale within the Police Department. Underway Continuous City of Signal Hill
2023-28 STRATEGIC PLAN
5 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
• The Police Department launched a new Wellness Program. A Peer Support Team officially launched November 2023.
• The Wellness program kicked off with the Peer Support Team in 2023. The team has shown support to our staff during different life events such as injury or loss in families. To increase physical wellness, the Police Department requested funding for the upgrading of gym equipment.
Objective 2.2: Continue efforts to maintain and build strong community partnerships to support public safety.
A. Continue efforts to maintain strong communication with neighboring public safety agencies—including holding regular coordination meetings with Long Beach.
Completed Ongoing
Long Beach experienced a data breach and requested use of the jail and dispatch center to manage their inmates and urgent dispatch matters. SHPD agreed and provided Long Beach with the workspace they needed and assist as much as possible. The dispatch center also assisted Fountain Valley PD during the Orange County data breach. Our dispatchers worked with the FVPD dispatchers to make sure that their operation and their patrol officers were safe while handling car stops and other dangerous situations.
B. Explore options to increase communication with the residential and business communities. Options may include enhancing or establishing programs like Neighborhood Watch, Business Watch, and/or Coffee with a Cop.
Underway Continuous
City of Signal Hill
2023-28 STRATEGIC PLAN
6 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
• Expand the Neighborhood Watch program. Continued communication with existing Neighborhood Watch programs.
C. Explore options to implement a park ranger program to enhance public safety within City parks.
Not started
D. Explore options to leverage private security contracts to supplement staffing resources for special event coverage or other needs.
Not started
Objective 2.3: Increase the diversity of the City’s revenue sources.
A. Leverage the Emergency Response Coordinator position to expand emergency preparedness and emergency operations center training for staff.
In Progress
The CERT program is being re-envisioned with the new Emergency Management Coordinator as the lead. The Emergency Management Coordinator has reached out to other agencies to gather information on best practices and what would work best for our City.
B. Develop an Emergency Communications Plan. In Progress Emergency Communications Plan –This process is not finalized, however, during the storm, it was effective and provided a good example of what communication will be like in the future.
In Progress
City of Signal Hill
2023-28 STRATEGIC PLAN
7 | P a g e
Annual Work Plan 2023-2024
Goal 3: Economic and Downtown Development Progress Update FY 2023-2024 Project & Milestones Status 2024 Update
Objective 3.1: Develop a central business district to support a sense of community and expand local amenities
A. Develop a central business district to support a sense of community and expand local amenities
In Progress Opportunity Study Areas
RFP Released in 2024
B. Perform a comprehensive economic development study to explore the option of creating an Overlay Zone, Specific Plan, or other land use planning tools to incentivize future economic development in the City’s industrial core.
Work
Underway
Opportunity Study Areas
RFP Released in 2024
Objective 3.2: Encourage economic development and revenue diversification.
A. Work with the business community to develop a comprehensive Economic Development Plan
Work
Underway
B. Explore options to attract the development of hotels or conference centers. In Progress Opportunity Study Areas RFP Released in 2024
C. Continue efforts to redevelop industrial zones for mixed-use projects. Work Underway
Opportunity Study Areas
RFP Released in 2024
Work with Administration and City Attorney to process entitlements and negotiate Development Agreements for proposed sites on Orange and Walnut Avenue.
In Progress Site control negotiations
between SHP and
NationalCORE are
underway.
City of Signal Hill
2023-28 STRATEGIC PLAN
1 | P a g e
Annual Work Plan 2023-2024
Goal 1: Financial Stability Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 1.1: Increase the diversity of the City’s revenue sources.
A. Explore options to diversify sales tax revenue sources to account for potential changes and fluctuations in the local economy.
Work
Underway
B. Increase Transient Occupancy Tax (TOT) revenue through the development of hotels or conference centers to diversify revenue streams C. Explore the use of Tax Increment Financing tools where feasible such as Enhanced Infrastructure Financing Districts and Community Revitalization and Investment Authorities to support the City’s infrastructure maintenance and growth.
D. Increase grant funding across all departments.
o Create and implement a collaborative Citywide grant seeking strategy. o Identify a list of needs for City infrastructure that could be fully or partially funded with State or Federal grant opportunities.
o Explore the use of Infrastructure Infill Grants to develop public infrastructure.
Work
Underway
2024- RFP Issued for
Citywide Grant
Management.
Departments are
proactively identifying and
applying for available
grants.
Police Department secured an OTS Grant for Federal FY 23/24 in the amount of $90,0000. An application was submitted for OTS grant for FY 24/25 for $117,000.
In Progress
City of Signal Hill
2023-28 STRATEGIC PLAN
2 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
The Police Department was awarded the SHSP and the EMPG grant. Staff began the process to submit for Cal OES funding for the Panorama Trail.
Objective 1.2: Increase the diversity of the City’s revenue sources.
A. Conduct a fee study to evaluate costs, revenues, and opportunities to ensure City fees are both appropriate and sustainable.
Completed New Master Schedule of
Fees and Charges Effective
July 1, 2024
B. Conduct a water rate study to evaluate the need for a rate increase to continue to provide safe and clean water in a financial sustainable manner.
Underway January 2025-Water
Master Plan and Rate
Study Ongoing.
C. Explore options for legislative action to preserve the City’s property tax income. Underway Research Ongoing Objective 1.3: Continue to enhance financial reporting to better support City efforts and decision-making.
A. Continue assessing the City’s financial health by monitoring budgets, strategically managing investments, mitigating risks, and prioritizing spending as part of the budget process.
Work
Underway
Continuous
Complete FY 22-23 audit, prepare ACFR, and apply for GFOA Certificate of Achievement for Excellence in Financial reporting with new audit firm.
Annually,
January
2024
City of Signal Hill
2023-28 STRATEGIC PLAN
3 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Compete American Rescue Plan Act reporting and single audit for Federal funding.
Annually as
required
Complete all annual governmental compliance and financial reporting. Annually as required
Continue to manage risk management activities. Ongoing
Manage and develop Biennial Budget for FY 2024-2026. Annually, completed
by June 2024
B. Prepare and present quarterly financial reports for City Council review. Underway Continuous City of Signal Hill
2023-28 STRATEGIC PLAN
4 | P a g e
Annual Work Plan 2023-2024
Goal 2: Community Safety Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 2.1: Increase efforts to recruit and retain high-quality Police Department employees.
A. Prioritize recruitment and hiring for open sworn police positions to ensure adequate staffing and deployment. This work may involve exploring new recruitment strategies and continuing efforts to ensure competitive compensation and benefits.
Underway Continuous
Recruitment for police department jobs has been multi-faceted in the last year. Efforts include social media campaigns, recruitment booths at CSULB volleyball and basketball Games as well as future baseball game recruitment opportunities. New recruitment brochures and flyers have been created and the use of the freeway billboard has been used as a marketing tool. The recruitment team’s efforts have increased the numbers of applicants we are seeing during the PELLETB testing.
Underway Continuous
B. Update Police Memorandum of Understanding (MOU) to better align with current practices and needs.
Underway Continuous
C. Take steps to increase leadership stability within the Police Department. Underway Continuous D. Increase retention and sustain employee morale within the Police Department. Underway Continuous City of Signal Hill
2023-28 STRATEGIC PLAN
5 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
• The Police Department launched a new Wellness Program. A Peer Support Team officially launched November 2023.
• The Wellness program kicked off with the Peer Support Team in 2023. The team has shown support to our staff during different life events such as injury or loss in families. To increase physical wellness, the Police Department requested funding for the upgrading of gym equipment.
Objective 2.2: Continue efforts to maintain and build strong community partnerships to support public safety.
A. Continue efforts to maintain strong communication with neighboring public safety agencies—including holding regular coordination meetings with Long Beach.
Completed Ongoing
Long Beach experienced a data breach and requested use of the jail and dispatch center to manage their inmates and urgent dispatch matters. SHPD agreed and provided Long Beach with the workspace they needed and assist as much as possible. The dispatch center also assisted Fountain Valley PD during the Orange County data breach. Our dispatchers worked with the FVPD dispatchers to make sure that their operation and their patrol officers were safe while handling car stops and other dangerous situations.
B. Explore options to increase communication with the residential and business communities. Options may include enhancing or establishing programs like Neighborhood Watch, Business Watch, and/or Coffee with a Cop.
Underway Continuous
City of Signal Hill
2023-28 STRATEGIC PLAN
7 | P a g e
Annual Work Plan 2023-2024
Goal 3: Economic and Downtown Development Progress Update FY 2023-2024 Project & Milestones Status 2024 Update
Objective 3.1: Develop a central business district to support a sense of community and expand local amenities
A. Develop a central business district to support a sense of community and expand local amenities
In Progress Opportunity Study Areas
RFP Released in 2024
B. Perform a comprehensive economic development study to explore the option of creating an Overlay Zone, Specific Plan, or other land use planning tools to incentivize future economic development in the City’s industrial core.
Work
Underway
Opportunity Study Areas
RFP Released in 2024
Objective 3.2: Encourage economic development and revenue diversification.
A. Work with the business community to develop a comprehensive Economic Development Plan
Work
Underway
B. Explore options to attract the development of hotels or conference centers. In Progress Opportunity Study Areas RFP Released in 2024
C. Continue efforts to redevelop industrial zones for mixed-use projects. Work Underway
Opportunity Study Areas
RFP Released in 2024
Work with Administration and City Attorney to process entitlements and negotiate Development Agreements for proposed sites on Orange and Walnut Avenue.
In Progress Site control negotiations
between SHP and
NationalCORE are
underway.
City of Signal Hill
2023-28 STRATEGIC PLAN
8 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Update Land Use Element - expected to begin update following completion of preparation of the Environmental Justice Element and the Update to the Environmental Resources Element
In progress Consultant under contract
D. Review and update the Signal Hill Municipal code related to outdoor spaces to help support local businesses.
Not Started
E. Designate a dedicated or primary point of contact within the City who can help new or potential business owners navigate working with the City.
Completed
F. Take steps to attract more businesses, with a focus on grocery stores, restaurants, and retailers
Work
Underway
G. Continue expanding business retention efforts. This work may include initiatives to update current processes and incorporate additional permit streamlining.
In Progress
Continue implementation of the City’s work/permit management software for Building Planning, Oil Services, and Neighborhood Enhancement Divisions.
Ongoing. Planning module
(Iworqs) implementation
commenced in 2023.
Circulate Request for Proposals and select/renew and manage on-call contract Building Official and plan check services
Complete 2.27.24 City Council
approval.
Objective 3.3: Maintain and strengthen economic development partnerships.
City of Signal Hill
2023-28 STRATEGIC PLAN
9 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
A. Continue efforts to strengthen relationships with key partners, such as the Chamber of Commerce, to provide local entrepreneurship programs to encourage the development of local businesses.
In Progress Working with the Chamber
to line up additional
Business Spotlight
features.
B. Explore the option of forming a Business Council with a mix of city officials, chamber members, and business owners with a focus on sustaining and growing businesses.
Not Started
C. Develop close working relationships with State and Federal elected officials to solicit strong support for funding of City projects and initiatives.
Ongoing
D. Develop comprehensive strategy for Signal Hill Petroleum’s legacy oil field activity.
In Progress
• Complete Long-Term Extension of Drill Sites CUP to CC (Goal: By end of FY 2023-2024)
• Complete Long-Term Extension of Drill Sites CUP to CC (Goal: By end of FY 2023-2024)
Objective 3.4: Support the redevelopment of underutilized land within the City.
A. Develop a strategy for the use of vacant City-owned properties. In Progress Cont. to facilitate development of TCNW and
Heritage Square mixeduse projects.
City of Signal Hill
2023-28 STRATEGIC PLAN
10 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Finalize two long-time pending residential projects (PCH/Molino, 1933-39 Temple) on infill sites.
CEQA analyses are
underway on both
residential projects and
public hearings for 19339
Temple are estimated to
start in June 2024.
Facilitate demolition of vacant structures at PCH/Molino Completed Demolition was completed in 4th qtr. 2023.
B. Continue efforts to maintain strong relationships and work with property owners to advance the development of properties within its portfolio, focusing on those that create new revenue streams and/or increase retail sales tax opportunities In Progress Audi has secured a lease
and tenant improvements
to the interior of the
structures is underway.
Audi reports a June/July
occupancy estimate.
Support the Vacant Parcel Ordinance: Prepare annual letters prior to the rainy season, notifying property owners of their obligation to replace or refresh worn out stormwater control devices. Conduct initial and follow-up inspections annually for compliance.
Completed Ongoing
Objective 3.5: Increase the local housing supply to support current and potential residents.
A. Continue current efforts to encourage construction of workforce and marketrate affordable housing and meet the State’s Regional Housing Needs Assessment goals.
City of Signal Hill
2023-28 STRATEGIC PLAN
8 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Update Land Use Element - expected to begin update following completion of preparation of the Environmental Justice Element and the Update to the Environmental Resources Element
In progress Consultant under contract
D. Review and update the Signal Hill Municipal code related to outdoor spaces to help support local businesses.
Not Started
E. Designate a dedicated or primary point of contact within the City who can help new or potential business owners navigate working with the City.
Completed
F. Take steps to attract more businesses, with a focus on grocery stores, restaurants, and retailers
Work
Underway
G. Continue expanding business retention efforts. This work may include initiatives to update current processes and incorporate additional permit streamlining.
In Progress
Continue implementation of the City’s work/permit management software for Building Planning, Oil Services, and Neighborhood Enhancement Divisions.
Ongoing. Planning module
(Iworqs) implementation
commenced in 2023.
Circulate Request for Proposals and select/renew and manage on-call contract Building Official and plan check services
Complete 2.27.24 City Council
approval.
Objective 3.3: Maintain and strengthen economic development partnerships.
City of Signal Hill
2023-28 STRATEGIC PLAN
9 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
A. Continue efforts to strengthen relationships with key partners, such as the Chamber of Commerce, to provide local entrepreneurship programs to encourage the development of local businesses.
In Progress Working with the Chamber
to line up additional
Business Spotlight
features.
B. Explore the option of forming a Business Council with a mix of city officials, chamber members, and business owners with a focus on sustaining and growing businesses.
Not Started
C. Develop close working relationships with State and Federal elected officials to solicit strong support for funding of City projects and initiatives.
Ongoing
D. Develop comprehensive strategy for Signal Hill Petroleum’s legacy oil field activity.
In Progress
• Complete Long-Term Extension of Drill Sites CUP to CC (Goal: By end of FY 2023-2024)
• Complete Long-Term Extension of Drill Sites CUP to CC (Goal: By end of FY 2023-2024)
Objective 3.4: Support the redevelopment of underutilized land within the City.
A. Develop a strategy for the use of vacant City-owned properties. In Progress Cont. to facilitate development of TCNW and
Heritage Square mixeduse projects.
City of Signal Hill
2023-28 STRATEGIC PLAN
10 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Finalize two long-time pending residential projects (PCH/Molino, 1933-39 Temple) on infill sites.
CEQA analyses are
underway on both
residential projects and
public hearings for 19339
Temple are estimated to
start in June 2024.
Facilitate demolition of vacant structures at PCH/Molino Completed Demolition was completed in 4th qtr. 2023.
B. Continue efforts to maintain strong relationships and work with property owners to advance the development of properties within its portfolio, focusing on those that create new revenue streams and/or increase retail sales tax opportunities In Progress Audi has secured a lease
and tenant improvements
to the interior of the
structures is underway.
Audi reports a June/July
occupancy estimate.
Support the Vacant Parcel Ordinance: Prepare annual letters prior to the rainy season, notifying property owners of their obligation to replace or refresh worn out stormwater control devices. Conduct initial and follow-up inspections annually for compliance.
Completed Ongoing
Objective 3.5: Increase the local housing supply to support current and potential residents.
A. Continue current efforts to encourage construction of workforce and marketrate affordable housing and meet the State’s Regional Housing Needs Assessment goals.
City of Signal Hill
2023-28 STRATEGIC PLAN
11 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Implement 6th Cycle Housing Element Update programs. In Progress Program implementation is on schedule
Assist Administration in conducting Fair Housing Workshops and other housing programs identified in the 6th Cycle Housing Element.
Complete Two first-time homebuyer
workshops were held in
2023. Fair housing
workshops may be
scheduled with
NationalCORE as part of
public outreach for
Orange Bluff and Walnut
Bluff in 2024.
Adopt an Accessory Dwelling Unit Ordinance. Expected
Completion
June 2024
Draft Ordinance is
underway and expected to
be adopted in 2024.
B. Continue to prioritize the use of available Housing Authority funding by issuing Notices of Funding Availability to incentivize the development of affordable housing.
NOFA circulated in 2023
Developer/Manager
NationalCORE selected in
2023.
C. Continue efforts to support housing development projects through rezoning. Ongoing D. Continue to encourage market-rate developers to incorporate affordable housing into proposed projects.
Ongoing
City of Signal Hill
2023-28 STRATEGIC PLAN
12 | P a g e
Annual Work Plan 2023-2024
Goal 4: Infrastructure Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 4.1: Expand the City’s infrastructure to support community services and engagement A. Formalize the City’s 5-year Capital Improvement Plan (CIP) to identify and prioritize infrastructure projects and allocate resources.
B. Continue efforts to develop a Civic Center Master Plan, including the development of a Community Center and community amphitheater.
In Progress Review of the Final Civic
Center Master Plan, public
outreach Ongoing.
C. Continue efforts to implement the Street Tree Master Plan. In Progress July, 2024
Planting of 255 trees
(April-May).
D. Continue efforts to implement the City’s Parks Master Plan In Progress Completion
expected
Nov-Dec
2024
Design and Construction
of Hillbrook Park, currently
in demolition and grading.
Fencing around picnic shelter at Reservoir Park was installed October 2023. The planned outreach efforts will continue pending grant requirements for stormwater quality and enhancement
In Progress
E. Promote multi-modal transportation by constructing bicycle lanes and walking trails, as outlined in the City’s General Plan and Circulation Element In Progress Obtain funding for a
project that enables the
City of Signal Hill
2023-28 STRATEGIC PLAN
13 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
construction of bicycle
lanes and improve
walkability.
Begin update of the Land Use, Safety, and Circulation Elements. Fall 2024 Phase II Element updates are expected to begin in
3 rd qtr. 2024.
F. Establish an alley maintenance program. Complete
March 2024
Established an Alley
Maintenance program.
Ongoing implementation
G. Integrate sustainability, conservation, and an environmental consensus approach when constructing infrastructure.
Ongoing Collaboration with the SCC
and Community
Development
Adopt a new Environmental Justice Element. In Progress Draft Element is nearly complete with staff
reviews expected to begin
in 2nd qtr. 2024.
Adopt a comprehensive update to the Environmental Resources Element. June 2024 Near
completion
Draft Element is nearly
complete with staff
reviews expected to begin
in 2nd qtr. 2024.
City of Signal Hill
2023-28 STRATEGIC PLAN
14 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 4.2: Maintain current City assets to ensure they are safe and wellsuited to support City services
A. Develop a Capital Facilities Plan to capture current, deferred, and upcoming maintenance needs to guide long-term maintenance investments.
July 2024 Design process for
citywide street sign
replacement project.
Prepare a Facilities Maintenance Master Plan. June 2024 Facility Assessment reports complete and
development of
maintenance schedules is
Ongoing.
Initiate the design process for citywide facilities access control project with initial target focused on the Police Department.
Completed
November
2023
Procurement complete.
Access Control System
Update is Ongoing.
Continuously survey sidewalks and implement improvements to enhance ADA accessibility, ensuring compliance with accessibility standards and creating a more inclusive environment for all residents and visitors. Complete the first phase of ADA improvement project to specifically tackle non-compliant ramps and sidewalks.
Completed
Phase I
Complete
Annual sidewalk
inspections and repairs
complete.
Sidewalk Repairs
B. Continue current efforts to refurbish City Hall to enhance the City's image and functionality for the public and staff.
Construction start date
early NovemberDecember 2025
City of Signal Hill
2023-28 STRATEGIC PLAN
15 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
C. Continue advancing the citywide median project to enhance the aesthetics of the City’s major arterial roadways.
Expected
Design
Phase
completion
date:
June 2024
Design of plans and
specifications are 90%
complete.
D. Update the Signal Hill Municipal Code to promote health and safety and create better accountability for private property owners.
Completed
February
2024
Health and Safety MC
updates/Omnibus
Ordinance
Adopt a Turf Replacement Ordinance for methane safety and stormwater. Completion date: June,
2024
Draft Ordinance is pending
completion
Prepare a General Plan amendment to the Safety Element to include the approved Hazard Mitigation Plan.
Fall 2024 The Safety Element is part
of the Phase II updates
anticipated to begin in 3rd
qtr. 2024.
Objective 4.3: Continue current efforts to maintain and support the City’s water infrastructure A. Identify and implement strategies to meet current and upcoming water quality mandates.
December
2024
Ongoing
Successfully complete the
construction of the 33rd
Water Main Replacement
Project.
City of Signal Hill
2023-28 STRATEGIC PLAN
16 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Successfully complete the construction of the Temple Reservoir Disinfection Station.
Complete:
May, 2024
Ongoing
Successfully close-out the permitting phase of Well 10 Project. Well permits with DDW are under review of approval.
Well 10
B. Address staff retention and expansion to meet water-related emergency needs, improve response time, and comply with state mandates.
Prioritize staff retention
and expansion efforts.
City of Signal Hill
2023-28 STRATEGIC PLAN
17 | P a g e
Annual Work Plan 2023-2024
Goal 5: High Functioning Government Progress Update
FY 2023-2024 Project & Milestones Status 2024 Update
Objective 5.1: Improve Communications
A. Develop an internal communication plan from city leadership to staff to improve transparency and collaboration across departments In Progress
B. Implement the adopted 2023-2025 Communications Plan to coordinate the City’s Ongoing communications efforts and leverage all available communications channels to provide relevant and timely information to our residents.
Completed Ongoing Implementation
Objective 5.2: Enhance recruitment efforts to attract high-quality candidates.
A. Improve and streamline the recruitment process. Continuous Conducted 62 recruitments resulting in 26 new FT hires; 13 new PT hires; 13 promotions.
Completed
B. Develop a modern and creative recruitment strategy for key areas of high need (such as the Police Department, Public Works, and Water).
In Progress
Objective 5.3: Retain and develop City staff.
City of Signal Hill
2023-28 STRATEGIC PLAN
18 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
A. Provide educational incentives to attract and retain high-quality staff. Ongoing Provided a Leadership Series trainings, and
various Ongoing training
through CJPIA and LCW.
B. Explore telecommuting as a long-term work program to improve work-life balance, attract new candidates, and improve employee retention.
Ongoing
C. Conduct annual employee engagement surveys to better understand and meet employee needs.
Ongoing
D. Invest in professional development and educational opportunities for staff, with a particular focus on developing standardized management and leadership training for supervisors.
Provided a Leadership
Series trainings, and
various Ongoing training
through CJPIA and LCW.
E. Perform comprehensive compensation and benefits study on a regular basis to ensure equitable and competitive compensation.
Completed Completed a citywide
compensation study to
assess market
competitiveness.
F. Update the performance evaluation process so that evaluations can be performed and tracked digitally.
In Progress
City of Signal Hill
2023-28 STRATEGIC PLAN
19 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
G. Take steps to increase staffing levels to address high-priority staffing limitations or gaps including those in Human Resources, Water, Emergency Management, Fleet, Public Works, Community Development.
In Progress Support New positions
within Departments with
training and retention
efforts.
H. Annually assess City staffing levels in relation to expansion of City services or shifts in priorities.
Continuous
Implemented November 2023 as part of the City’s recruitment and retention plan. The program included a restructure of the POA Longevity Pay, which enhanced benefits for existing employees.
Completed
I. Develop succession plans for key management positions and explore options to include succession planning within the employee evaluation process.
In Progress
J. Establish an employee Engagement and Wellness Program to cultivate a positive working environment.
Ongoing
Successfully conducted a benefits fair that included the City’s providers and other vendors. Processed a successful open enrollment for 90 employees.
Completed
Established Employee Engagement Committee and hosted several employee appreciation events such as the Halloween Escape Room, Costume Contest and Social, Holiday Luncheon, Co-Worker Appreciation Completed
City of Signal Hill
2023-28 STRATEGIC PLAN
20 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Month, St. Patrick’s Day Social, Spring Taco Truck, March Madness and MLB Opening Day Spirit Weeks, etc.
K. Negotiate labor agreements that are fair and financially sustainable. Ongoing Objective 5.4: Enhance the use of technology to streamline processes and improve services.
A. Continue efforts to digitize existing paper-based records to improve accessibility and efficiency.
Ongoing Citywide efforts
Prepare IT Strategic master plan. June 2024
Assist with completion of purchase and implementation of new Council Audio/Visual System.
Completed
Complete implementation of Advanced Scheduling for the Police Department.
Estimated
completion
of major
phase June
2024
Implement new GovInvest software for annual compensation negotiation activities.
Completed
City of Signal Hill
2023-28 STRATEGIC PLAN
21 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
B. Explore options to integrate systems into/around Tyler Enterprise Resource Planning program to increase efficiencies in Finance and improve reporting and analysis.
In Progress
C. Explore usability of HDL software for building plan checks and permitting to streamline processes and increase customer service efficiency.
In Progress
D. Upgrade the City’s Computer Aided Dispatch (CAD) system to ensure reliable public safety and emergency response.
In Progress
• LEFTA FTO software program purchased and implemented. • Continue Moving toward a new radio system Radio System upgrade – anticipated completion March 2024
(CAD) – A CAD/RMS team has been created and an introductory meeting was completed. A list of viable RMS/CAD systems has been created and will be vetted out through agency visits. The discussion at the meeting was to first see what is out there and then come back and discuss what features we want and make sense for our agency. The completion date for this will most likely be 2026.
In Progress
E. Upgrade the City’s phone systems. Completed
F. Implement new technology to streamline Public Works operations, including encroachment permitting process, service requests, public record requests, project accounting, and estimation.
In Progress
City of Signal Hill
2023-28 STRATEGIC PLAN
22 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
G. Upgrade the Police Department’s body-worn cameras, in-car cameras, and evidence management services.
In Progress
Objective 5.5: Support Diversity, Equity, and Inclusion across City services.
A. Continue efforts to continue to build on the City’s reputation as being a welcoming, friendly, and inclusive employer
Ongoing
Supported Parks and Recreation Commission, Diversity Coalition Committee recruitments
B. Take steps to refine the purpose and focus of the Diversity Coalition Committee to ensure clear roles, responsibilities, and goals for this critical group.
Ongoing
Support
C. Perform an equity assessment of core City services to identify any gaps and ensure that services are provided equitably
Objective 5.6: Improve the City’s homelessness prevention, response, and reduction services.
A. Continue efforts related to the cross-functional Neighborhood Enhancement Team to improve upon existing efforts.
In Progress
B. Develop a homelessness response strategic plan that identifies goals and resources needed for departments across the City.
Ongoing
City of Signal Hill
2023-28 STRATEGIC PLAN
23 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
C. Continue to partner with the Gateway Cities Council of Governments and nonprofit organizations to better organize the City’s response to homelessness, including outreach and options for housing.
Ongoing
D. Provide education to the public about resources and existing partnerships to serve the unhoused population.
Ongoing
Develop social outreach partnerships and opportunities to provide education about services available for older adult, low-income, and unhoused populations.
Completed
March 2024
Ongoing
Introduced health and
wellness educational
programs for older adults.
In Progress to add and
enhance programs for
low-income and
unhoused populations.
Objective 5.7: Advocate on behalf of the City’s interests.
A Continue efforts to build stronger relationships with our Federal and State representatives.
Ongoing
B. Continue participating in organizations such as the League of California Cities and the California Contract Cities Association to advocate for local interests.
Ongoing
Objective 5.8: Foster a strong sense of community.
A. Celebrate the City’s Centennial to help promote the City as a regional destination.
City of Signal Hill
2023-28 STRATEGIC PLAN
24 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Execute the City’s plans for the centennial celebration, which includes (1) Major Special Event; several library programs/services; collaboration with the Signal Hill Historical Society for tours and trips; obtaining sponsorship and engaging with local businesses for community engagement in 2024; implementing the “Sponsor a Tree Program”; continuous website development and engagement, and marketing efforts.
Partially
Complete
and
Ongoing
Launched Various Key
Sponsorship Programs
Hosted SH History Makers
Dinner
SH Color Fun Run
Centennial Celebration
The department is utilizing Prop A funding to provide additional transportation for events related to the Cit’s Centennial anniversary including the City’s Centennial Celebration Event and upcoming programs that were created to visit former Mayor Jessie Nelson’s gravesite.
July, 2024 The department is
utilizing Prop A funding to
provide additional
transportation for events
related to the City’s
Centennial anniversary.
B. Coordinate with the City of Long Beach to promote Signal Hill as a participant for events related to the 2028 Summer Olympics
No Started.
C. Continue and expand efforts to support community events by leveraging the Library and other City assets and partnerships.
In Progress
D. Maintain existing and identify new partnership opportunities with organizations such as the Signal Hill Community Foundation, to provide a path for volunteerism and engagement for residents
Work with the Signal Hill Community Foundation and the Signal Hill Police Foundation to implement a new program and process for the Holiday Complete The SHCF and SHPF
collaborated in
City of Signal Hill
2023-28 STRATEGIC PLAN
25 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Outreach efforts which help to provide necessary items for Signal Hill residents
December 2023 to
streamline the efforts for
Holiday Outreach, and
created a new event,
Santa’s Workshop.
Continue to serve as the liaison for the Signal Hill Community Foundation, providing ideas for efficient operations and increase marketing and fundraising efforts.
Ongoing
E. Continue efforts to effectively support and engage City commissions and committees, including the Civil Service Commission, Parks and Recreation Commission, Planning Commission, Sustainable City Committee, and Diversity Coalition Committee.
Ongoing All Departments
F. Establish and launch the Signal Hill Leadership Academy. Complete Planning for 2024 Leadership Academy
G. Continue efforts to expand city programs and services that support community engagement.
Continuous
Provide educational offerings about animal adoption opportunities and responsible pet care with the City of Long Beach.
In Progress Provided “pet friendly”
tips to promote
responsible pet
ownership. More
educational opportunities
and pet vaccination
City of Signal Hill
2023-28 STRATEGIC PLAN
26 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
clinics will be scheduled
on an Ongoing basis.
Develop social outreach partnerships and opportunities to provide wraparound services for aging seniors.
In Progress Planning for the offering
of wraparound services
for the seniors, including
social services to help
seniors prevent
homelessness.
Explore and potentially introduce contract classes to fill the gap in programs for adults ages 18-55.
In Progress Continue to offer no-fee
based programs as
budget allows until other
opportunities are
explored.
Reintroduce camps and the Afterschool Recreation Club (ARC) program for tweens, ages 12-14.
September
2023
Initiated program at the
beginning of the
2023/2024 academic
school year September
2023. Program will
continue an Ongoing
basis.
Introduce new programs for the Community Garden, creating awareness of the gardens for local residents.
Pending
City of Signal Hill
2023-28 STRATEGIC PLAN
27 | P a g e
FY 2023-2024 Project & Milestones Status 2024 Update
Increase ridership in existing transportation programs. 2024 Ongoing Efforts Execute facility use agreement with the Long Beach Unified School District to increase access to facility spaces for the community.
December
2024
Pending review by LBUSD.
Contact Us:
@cityofsignalhill @cityofsignalhill https://www.cityofsignalhill.org Let’s get social!
City Hall
2175 Cherry Avenue
Signal Hill, CA 90755
Phone: 562-989-7300
Parks, Recreation & Library Services
1800 E. Hill Street
Signal Hill, CA 90755
Phone: 562-989-7330
Police Station
2745 Walnut Ave.
Signal Hill, CA 90755
Police Administration
Phone: (562) 989-7200
Fax: (562) 492-5908
City Yard
2175 E. 28th Street
Signal Hill, CA 90755
Tel: 562-989-7250
Fax: 562-989-7291